Questioner
1. What are the inputs required for scheduling a new project. List it all.
2. Explain the sequence of opening a new project and the preliminary items to be set
prior to listing/scheduling the project.
5. What is milestone
7. What is a constraint
11. How to create & assign a baseline and explain different methods of assigning a
baseline.
12. What is secondary/third/fourth baseline and when it will be used. How to create all
baselines after primary and on what situation it will be created.
13. What is lead & lag in P6. Explain its usage in scheduling.
14. What is Planned value, Earned value, Scheduled variance and Schedule Performance
Index. Explain its usage in project control.
15. What is Budgeted cost, Actual cost, Cost variance & Cost Performance Index. Explain
its usage in project control.
18. How to calculate the Earned Value Analysis and cost analysis
23. What are the key attributes used for effective project control.
24. Explain float/slack & its types and explain how it is used in project control. Provide
formula for float calculation.
26. What are the different types of activity percentage completion measurement available
in P6
31. Explain the interlock on assigning the different calendars for each activity in a schedule