Questioner
1. What are the inputs required for scheduling a new project. List it all.

2. Explain the sequence of opening a new project and the preliminary items to be set
prior to listing/scheduling the project.

3. What is relationship. Explain the types.

4. How to schedule a new project

5. What is milestone

6. What is different types of dates used in planning

7. What is a constraint

8. What is critical path & key performance parameters

9. How many critical path will be there on a schedule.

10. What is IPN

11. How to create & assign a baseline and explain different methods of assigning a
baseline.

12. What is secondary/third/fourth baseline and when it will be used. How to create all
baselines after primary and on what situation it will be created.

13. What is lead & lag in P6. Explain its usage in scheduling.

14. What is Planned value, Earned value, Scheduled variance and Schedule Performance
Index. Explain its usage in project control.

15. What is Budgeted cost, Actual cost, Cost variance & Cost Performance Index. Explain
its usage in project control.

16. Explain the different types of estimation methods

17. What is the difference between EAC & ETC

18. How to calculate the Earned Value Analysis and cost analysis

19. What is Agile approach of planning. Explain

20. How to load resource in schedule

21. What is resource levelling. Explain when it is required and how to do it in P6

22. What is resource management in a project

23. What are the key attributes used for effective project control.

24. Explain float/slack & its types and explain how it is used in project control. Provide
formula for float calculation.

25. What is critical path method

26. What are the different types of activity percentage completion measurement available
in P6

27. How to create user defined fields

28. How to export any project

29. Explain the method of exporting resource & roles

30. Explain on layout setting & exporting

31. Explain the interlock on assigning the different calendars for each activity in a schedule

32. Changing time scale on gant chart

33. How to include or delete any new parameters in gant chart

34. Setting print layout

35. Explain how many projects can be opened at a time. Reason it

36. Schedule the following sample projects


a. Create schedule for laying of cable for 2km in trench and 1km in tray; duration
30days; 6days, 8 hours working per day; total manpower allocated is 20
members
b. Create schedule for installation of new communication panel in LER; duration
20days; 6days, 8 hours working per day; total manpower allocated is 10
members
c. Create schedule for installation a new analyser in existing process line with new
tie-in; duration 60days; 6days, 8 hours working per day; total manpower
allocated is 20 members
d. Create schedule for new foundation for standalone cabinet (sized 500 x 500 x
1000 mm) to be installed in open area; duration 45days; 6days, 8 hours working
per day; total manpower allocated is 20 members