Shuttering for column & Slabs

Unit: Sqm
Taking Output = 10 Sqm
1)
Material
Ply wood including wastage
Battens
Ballies/ Structs
Materials for 10 Repeatations
Cost for one time
Nails
2)

Labour
Mate
Carpenter
Mazdoor

Machinery
T & P etc
Sub Total of a+b+c
4)
Contractors Profit & Overhead
charges @ 15 % on (a+b+c)
cost of 10 sqm = a+b+c+d
Rate per cum (a+b+c+d+e )/10

Sqm
Cum
Mtr

13.70
0.06
38.00

600.00
3000.00
60.00
Total

Kg
5.00
60.00
Total material cost for one time, a
day
0.50
300.00
day
2.00
280.00
day
1.50
150.00
Total manpower cost for one time, b

3)

Ls

c
d

say

8220.00
180.00
2280.00
10680.00
1068.00
300.00
1368.00
150.00
560.00
225.00
935.00
50.00
2353.00
352.95
2705.95
270.60
271.00

18 Dec
31 Jan
28 Feb
31 Mar
30 Apr
31 May
30 June
31 july
31