Sie sind auf Seite 1von 5

CRONOGRAMA VALORIZADO POR PARTIDA

Municipalidad
Distrital de Torata
ITEM

SUB-GERENCIA DE
ESTUDIOS

CREACION DE UNA VIA DE ACCESO ENTRE EL SECTOR CARRIZAL Y CENTRO LA TROJA EN EL ANEXO DE MOLLESAJA, DISTRITO DE TORATA - MARISCAL NIETO - MOQUEGUA
DESCRIPCION

UND

METRADO

COSTO

PARCIAL

MES 0
S/.

01
CONSTRUCCION DE VIA DE ACCESO CARRIZAL - CENTRO LA TROJA
01.01
TRABAJOS PROVISIONALES
01.01.01
CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 m
01.01.02
CONSTRUCCION PROVICIONAL DE CAMPAMENTO DE OBRA
01.02
SEGURIDAD Y SALUD
01.02.01
IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TR
01.02.02
EQUIPOS DE PROTECCION INDIVIDUAL
01.02.03
EQUIPOS DE PROTECCION COLECTIVA
01.02.04
EXAMENES MEDICOS PRE-OCUPACIONALES(Antes, Durante y Despus)
01.02.05
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DUR
01.02.06
SEALIZACION TEMPORAL DE SEGURIDAD
01.02.07
CAPACITACION EN SEGURIDAD Y SALUD
01.02.08
CONTINGENCIAS PARA EMERGENCIAS
01.03
TRABAJOS PRELIMINARES
01.03.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.03.02
FLETE Y TRANSPORTE DE MATERIALES
01.03.03
TOPOGRAFIA Y GEOREFERENCIACION
01.03.04
CONTROL TOPOGRAFICO
01.03.05
DERECHO DE CANTERAS
01.03.06
MANTENIMIENTO DE TRNSITO Y SEGURIDAD VIAL
01.03.07
LIMPIEZA Y DEFORESTACION
01.04
MOVIMIENTO DE TIERRAS
01.04.01
EXCAVACION EN CONGLOMERACION (BAJO AGUA)
01.04.02
ENROCADO DE PROTECCION
01.04.03
CORTE DE MATERIAL SUELTO
01.04.04
CORTE DE ROCA SUELTA
01.04.05
CORTE ROCA FIJA
01.04.06
CONFORMACION DE TERRAPLEN C/MATERIAL PROPIO
01.04.07
CONFORMACION DE TERRAPLEN C/MATERIAL DE PRESTAMO
01.04.08
CONFORMACION DE TERRAPLEN C/EQUIPO LIVIANO
01.04.09
PERFILADO Y COMPACTADO DE SUB-RASANTE EN ZONAS DE CORTE
01.04.10
REMOCION DE DERRUMBES
01.05
OBRAS DE ARTE Y DRENAJE
01.05.01
ALCANTARILLAS
01.05.01.01
TRABAJOS PRELIMINARES
01.05.01.01.01
TRAZO Y REPLANTEO DE ESTRUCTURA
01.05.01.01.02
TRAZO Y REPLANTEO DURANTE LA OBRA
01.05.01.02
MOVIMIENTO DE TIERRAS
01.05.01.02.01
EXCAVACION C/MAQUINARIA PARA ESTRUCTURAS
01.05.01.02.02
DEMOLICION DE CANAL DE CONCRETO
01.05.01.02.03
NIVELACION Y COMPACTACION DE SUB RASANTE
01.05.01.02.04
RELLENO COMPACTADO PARA ESTRUCTURAS C/MAT. PROPIO
01.05.01.03
CONCRETO SIMPLE
01.05.01.03.01
SOLADOS CONCRETO f'c=100 kg/cm2 E=2"
01.05.01.04
CONCRETO ARMADO
01.05.01.04.01
ACERO DE REFUERZO f'c=4200 kg/cm2 GRADO 60
01.05.01.04.02
ENCOFRADO Y DESENCOFRADO
01.05.01.04.03
CONCRETO f 'c=210 kg/cm2
01.05.01.05
OBRAS COMPLEMENTARIAS
01.05.01.05.01
JUNTAS DE CONSTRUCCION C/TEKNOPORT E=1"
01.05.01.05.02
JUNTA ASFALTICA E=1"
01.05.01.05.03
CURADO DE CONCRETO
01.05.02
MUROS DE SOSTENIMIENTO
01.05.02.01
TRABAJOS PRELIMINARES
01.05.02.01.01
TRAZO Y REPLANTEO DE ESTRUCTURA
01.05.02.01.02
TRAZO Y REPLANTEO DURANTE LA OBRA
01.05.02.02
MOVIMIENTO DE TIERRAS
01.05.02.02.01
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
01.05.02.02.02
EXCAVACION C/MAQUINARIA PARA ESTRUCTURAS
01.05.02.02.03
EXCAVACION EN ROCA FIJA PARA ESTRUCTURAS
01.05.02.02.04
PERFORACION EN ROCA FIJA PARA ANCLAJES DE MURO
01.05.02.02.05
NIVELACION Y COMPACTACION DE SUB RASANTE
01.05.02.03
MURO DE SECO DE PIEDRA
01.05.02.03.01
MURO SECO
01.05.02.04
MURO DE MAMPOSTERIA DE PIEDRA
01.05.02.04.01
ANCLAJE CON BARRAS DE REFUERZO EN TALUDES ROCOSOS
01.05.02.04.02
ENCOFRADO Y DESENCOFRADO EN MUROS
01.05.02.04.03
ALBAILERIA DE PIEDRA
01.05.02.04.04
SOLAQUEADO DE SUPERFICIES DE MUROS
01.05.02.05
CONCRETO SIMPLE
01.05.02.05.01
ENCOFRADO Y DESENCOFRADO
01.05.02.05.02
CONCRETO f'c=140 kg/cm2 + 50% P.M.
01.05.02.06
CONCRETO ARMADO
01.05.02.06.01
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
01.05.02.06.02
ENCOFRADO Y DESENCOFRADO
01.05.02.06.03
CONCRETO f'c= 210 kg/cm2
01.05.02.07
TRABAJOS DE DRENAJE
01.05.02.07.01
FILTRO DRENANTE
01.05.02.07.02
TUBERIA DE DRENAJE = 2"

UND
GBL

1.00
1.00

1,100.19
36,653.84

GBL
UND
GBL
UND
GBL
GBL
GBL
GBL

1.00
30.00
1.00
30.00
1.00
1.00
1.00
1.00

19,600.00
690.50
11,244.40
1,164.00
4,155.00
2,150.00
3,000.00
7,500.00

GBL
t
KM
KM
M3
GBL
HA

1.00
217.16
1.05
1.05
705.52
1.00
0.65

6,227.50
48.44
2,256.09
10,304.17
5.00
932.82
3,404.81

M3
M3
M3
M3
M3
M3
M3
M3
M2
M3

465.11
175.15
9,215.27
6,068.10
3,265.27
1,289.16
3,206.38
705.52
4,095.00
395.00

15.42
38.32
6.14
18.59
32.22
10.61
17.00
56.31
2.06
8.26

M2
M2

54.00
54.00

1.32
5.43

M3
M3
M2
M3

148.92
13.06
43.20
130.59

11.00
162.00
7.36
37.64

M2

54.00

18.88

KG
M2
M3

1,824.41
211.11
29.86

5.37
60.72
429.34

M2
M
M2

4.32
21.60
183.60

17.17
5.57
1.55

M2
M2

461.32
461.32

1.32
5.43

M3
M3
M3
UND
M2

408.30
427.83
71.30
40.00
227.18

41.38
11.00
23.00
8.06
7.36

M3

437.00

73.98

UND
M2
M3
M2

40.00
114.99
585.23
284.25

16.10
60.72
278.65
13.91

M2
M3

7.50
6.34

60.72
252.92

KG
M2
M3

1,129.03
48.49
14.24

5.37
60.72
429.34

M3
M

44.77
63.00

36.05
5.99

1,104,224.67
37,754.03
1,100.19
36,653.84
103,284.40
19,600.00
20,715.00
11,244.40
34,920.00
4,155.00
2,150.00
3,000.00
7,500.00
36,608.55
6,227.50
10,519.23
2,368.89
10,819.38
3,527.60
932.82
2,213.13
408,091.17
7,172.00
6,711.75
56,581.76
112,805.98
105,207.00
13,677.99
54,508.46
39,727.83
8,435.70
3,262.70
348,163.25
46,286.05
364.50
71.28
293.22
8,987.20
1,638.12
2,115.72
317.95
4,915.41
1,019.52
1,019.52
35,435.77
9,797.08
12,818.60
12,820.09
479.06
74.17
120.31
284.58
257,661.92
3,113.91
608.94
2,504.97
25,235.92
16,895.45
4,706.13
1,639.90
322.40
1,672.04
32,329.26
32,329.26
174,654.45
644.00
6,982.19
163,074.34
3,953.92
2,058.91
455.40
1,603.51
15,121.00
6,062.89
2,944.31
6,113.80
1,991.33
1,613.96
377.37

MES 1
%

S/.

MES 2
%

1,100.19
36,653.84
19,600.00
20,715.00
11,244.40
34,920.00
4,155.00
2,150.00
3,000.00
7,500.00
6,227.50
10,519.23
3,527.60
932.82
2,213.13
7,172.00
6,711.75
-

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
-

S/.

MES 3
%

S/.

MES 4
%

S/.

MES 5
%

365.69
386.43
14,544.45
-

608.94
2,504.97
3,285.23
4,706.13
1,639.90
322.40
1,672.04
644.00
6,531.86
87,358.11
455.40
1,603.51
6,062.89
2,944.31
6,113.80
377.37

15.44%
3.57%
25.71%
100.00%
100.00%
19.44%
100.00%
100.00%
100.00%
100.00%
100.00%
93.55%
53.57%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

S/.

MES 6
%

2,003.20
4,148.04
42,037.31
11,132.89
-

71.28
293.22
1,638.12
2,115.72
317.95
4,915.41
1,019.52
9,797.08
12,818.60
12,820.09
74.17
120.31
284.58

13,610.22
22,005.89
450.33
60,316.32
-

84.56%
38.34%
74.29%
28.02%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
80.56%
68.07%
6.45%
36.99%
-

S/.

MES 7
%

5,153.63
112,805.98
71,382.99
28,594.94
-

4,129.35
15,399.91
3,953.92
1,613.96
-

47.63%
100.00%
67.85%
71.98%
12.77%
9.44%
100.00%
100.00%
-

S/.

TOTAL
%

1,131.28
33,824.01
13,677.99
54,508.46
8,435.70
3,262.70

6,194.02
-

10.46%
32.15%
100.00%
100.00%
100.00%
100.00%
19.16%
-

S/.

1,100.19
36,653.84
19,600.00
20,715.00
11,244.40
34,920.00
4,155.00
2,150.00
3,000.00
7,500.00
6,227.50
10,519.23
2,368.89
10,819.38
3,527.60
932.82
2,213.13
7,172.00
6,711.75
56,581.76
112,805.98
105,207.00
13,677.99
54,508.46
39,727.83
8,435.70
3,262.70

71.28
293.22
1,638.12
2,115.72
317.95
4,915.41
1,019.52
9,797.08
12,818.60
12,820.09
74.17
120.31
284.58

608.94
2,504.97
16,895.45
4,706.13
1,639.90
322.40
1,672.04
32,329.26
644.00
6,982.19
163,074.34
3,953.92
455.40
1,603.51
6,062.89
2,944.31
6,113.80
1,613.96
377.37

01.05.02.08
OBRAS COMPLEMENTARIAS
01.05.02.08.01
JUNTAS DE CONSTRUCCION C/TEKNOPORT E=1"
01.05.02.08.02
JUNTA ASFALTICA E=1"
01.05.02.08.03
CURADO DE CONCRETO
01.05.03
BADENES
01.05.03.01
TRABAJOS PRELIMINARES
01.05.03.01.01
TRAZO Y REPLANTEO DE ESTRUCTURA
01.05.03.01.02
TRAZO Y REPLANTEO DURANTE LA OBRA
01.05.03.02
MOVIMIENTO DE TIERRAS
01.05.03.02.01
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS
01.05.03.02.02
ENROCADO
01.05.03.02.03
NIVELACION Y COMPACTACION DE SUB RASANTE
01.05.03.02.04
RELLENO COMPACTADO PARA ESTRUCTURAS C/MAT. PROPIO
01.05.03.03
CONCRETO SIMPLE
01.05.03.03.01
ENCOFRADO Y DESENCOFRADO
01.05.03.03.02
CONCRETO CICLOPEO f'c=140 kg/cm2 + 50 % PM.
01.05.03.03.03
CONCRETO CICLOPEO f'c=175 kg/cm2 + 30 % PM.
01.05.03.04
OBRAS COMPLEMENTARIAS
01.05.03.04.01
JUNTAS DE CONSTRUCCION C/TEKNOPORT E=1"
01.05.03.04.02
JUNTA ASFALTICA E=1"
01.05.03.04.03
CURADO DE CONCRETO
01.05.04
CUNETAS
01.05.04.01
TRABAJOS PRELIMINARES
01.05.04.01.01
TRAZO Y REPLANTEO DE ESTRUCTURA
01.05.04.01.02
TRAZO Y REPLANTEO DURANTE LA OBRA
01.05.04.02
MOVIMIENTO DE TIERRAS
01.05.04.02.01
EXCAVACION Y CONFORMACION DE ZANJAS DE CORONACION
01.05.04.02.02
CONFORMACION DE CUNETAS EN TERRENO NATURAL
01.06
SEALIZACION Y SEGURIDAD VIAL
01.06.01
SEALES INFORMATIVAS
01.06.02
SEALES PREVENTIVAS
01.06.03
SEALES REGLAMENTARIAS
01.07
REUBICACION Y REPOSICION DE RED DE AGUA POTABLE
01.07.01
OBRAS PRELIMINARES
01.07.01.01
TRAZO Y REPLANTEO
01.07.01.02
REMOCION DE TUBERIA EXISTENTE
01.07.02
MOVIMIENTO DE TIERRAS
01.07.02.01
EXCAVACION DE ZANJAS MANUAL
01.07.02.02
REFINE Y NIVELACION ZANJA EN TERRENO NORMAL
01.07.02.03
RELLENO COMPACTADO DE ZANJA P/ TUBERIA CON MATERIAL PROPIO
01.07.03
REPOSICION E INTALACION DE TUBERIAS
01.07.03.01
REPOSICION E INSTALACION DE TUBERIA HDPE D=32mm PN-10
01.07.03.02
REUBICACION E INSTALACION DE TUBERIA HDPE D=32mm PN-10
01.07.03.03
ANCLAJE PARA TUBERIA HDPE D=32MM
01.07.03.04
PRUEBA HIDRAULICA + DESINFECCION TUBERIA HDPE 20 A 32 mm
01.07.04
CONEXIONES DOMICILIARIAS DE AGUA
01.07.04.01
OBRAS PRELIMINARES
01.07.04.01.01
TRAZO Y REPLANTEO
01.07.04.02
MOVIMIENTO DE TIERRAS
01.07.04.02.01
EXCAVACION DE ZANJAS MANUAL
01.07.04.02.02
REFINE Y NIVELACION ZANJA EN TERRENO NORMAL
01.07.04.02.03
RELLENO COMPACTADO DE ZANJA P/ TUBERIA CON MATERIAL PROPIO
01.07.04.03
CONEXIONES DOMICILIARIAS DE AGUA
01.07.04.03.01
CONEXION DOMICILIARIA DE AGUA 1" A TUB PVC DE 1/2"
01.08
TRANSPORTE
01.08.01
TRANSPORTE DE MATERIALES EXCEDENTES HASTA 1 KM
01.08.02
TRANSPORTE DE MATERIALES EXCEDENTES DESPUES 1 KM
01.08.03
TRANSPORTE DE MATERIALES GRANULARES HASTA 1 KM
01.08.04
TRANSPORTE DE MATERIALES GRANULARES DESPUES 1 KM
01.09
OBRAS COMPLEMENTARIAS
01.09.01
LIMPIEZA FINAL DE LA OBRA
01.09.02
SUMINISTRO E INSTALACIN PROVICIONAL DE TUBERA PARA TRASVASE DE AGUA
01.09.03
DESMONTAJE Y MONTAJE DE SUB ESTACION BIFASICA
01.09.04
PRUEBAS DE CONTROL DE CALIDAD
01.10
ACARREOS
01.10.01
ACARREO DE AGREGADOS<150M
01.10.02
ACARREO DE CEMENTO<150M
02
CONSTRUCCION DE PUENTE SECTOR CARRIZAL
02.01
TRABAJOS PRELIMINARES
02.01.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
02.01.02
FLETE Y TRANSPORTE DE MATERIALES
02.01.03
TRAZO Y REPLANTEO DE ESTRUCTURA
02.01.04
TRAZO Y REPLANTEO DURANTE LA OBRA
02.01.05
DEFORESTACION, DESBROCE Y LIMPIEZA
02.01.06
DERECHO DE CANTERAS
02.01.07
MANTENIMIENTO DE TRNSITO Y SEGURIDAD VIAL
02.02
DEMOLICIONES
02.02.01
PUENTE DE CONCRETO EXISTENTE
02.02.01.01
DEMOLICION DE PARAPETO DE CONCRETO
02.02.01.02
DEMOLICION DE LOSA DE CONCRETO
02.02.01.03
DEMOLICION DE MURO DE CONCRETO
02.02.01.04
DEMOLICION DE ZAPATAS DE CONCRETO
02.02.01.05
ELIMINACION DE DEMOLICIONES
02.02.02
PAVIMENTO DE CONCRETO EXISTENTE
02.02.02.01
DEMOLICION DE PAVIMENTO DE CONCRETO
02.02.02.02
ELIMINACION DE DEMOLICIONES
02.03
MOVIMIENTO DE TIERRAS

M2
M
M2

88.17
58.55
849.77

17.17
5.57
1.55

M2
M2

179.27
179.27

1.32
5.43

M3
M3
M2
M3

110.84
18.60
179.27
12.63

41.38
61.31
7.36
37.64

M2
M3
M3

54.84
39.72
43.07

60.72
252.92
304.14

M2
M
M2

12.00
33.00
137.45

17.17
5.57
1.55

M2
M2

1,010.00
1,010.00

1.32
5.43

M
M

19.00
1,010.00

8.62
1.41

1.00
1.00
2.00

2,664.01
457.77
507.77

KM
M

1.08
1,087.86

801.24
8.32

M3
M
M3

215.84
1,079.20
269.80

34.87
3.33
25.73

M
M
UND
M

100.00
979.20
6.00
1,079.20

18.31
8.11
15.00
2.00

KM

0.03

801.24

M3
M
M3

5.80
29.00
5.80

34.87
3.33
25.73

UND

3.00

232.88

M3K
M3K
M3K
M3K

13,887.66
13,887.66
705.52
705.52

5.27
1.53
5.56
1.53

HA
M
UND
GBL

3.00
45.00
1.00
1.00

1,308.34
36.45
2,855.76
1,845.00

M3
BLS

432.46
3,773.00

21.36
1.61

GBL
t
M2
M2
M2
M3
GBL

1.00
144.14
508.91
508.91
508.91
668.39
1.00

6,227.50
48.44
1.32
5.43
1.36
5.00
932.82

M3
M3
M3
M3
M3

4.56
10.01
27.64
23.00
65.21

164.39
164.39
164.39
164.39
5.27

M3
M3

22.13
22.13

162.00
5.27

UND
UND
UND

3,157.14
1,513.88
326.12
1,317.14
35,809.90
1,210.08
236.64
973.44
7,521.75
4,586.56
1,140.37
1,319.43
475.39
26,475.17
3,329.88
10,045.98
13,099.31
602.90
206.04
183.81
213.05
8,405.38
6,817.50
1,333.20
5,484.30
1,587.88
163.78
1,424.10
4,137.32
2,664.01
457.77
1,015.54
41,169.81
9,916.34
865.34
9,051.00
18,062.03
7,526.34
3,593.74
6,941.95
12,020.71
1,831.00
7,941.31
90.00
2,158.40
1,170.73
24.04
24.04
448.05
202.25
96.57
149.23
698.64
698.64
99,438.23
73,187.97
21,248.12
3,922.69
1,079.45
10,266.03
3,925.02
1,640.25
2,855.76
1,845.00
15,311.88
9,237.35
6,074.53
420,658.42
21,611.67
6,227.50
6,982.14
671.76
2,763.38
692.12
3,341.95
932.82
14,765.22
11,063.53
749.62
1,645.54
4,543.74
3,780.97
343.66
3,701.69
3,585.06
116.63
74,656.53

2,664.01
457.77
1,015.54

1,640.25
9,237.35
6,074.53

6,227.50
6,982.14
671.76
2,763.38
692.12
3,341.95
932.82

749.62
1,645.54
4,543.74
3,780.97
343.66
3,585.06
116.63

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
-

1,513.88
-

865.34
9,051.00
7,526.34
3,593.74
6,941.95
1,831.00
7,941.31
90.00
2,158.40

24.04
202.25
96.57
149.23
698.64
21,417.32
-

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
29.26%
-

236.64
973.44
4,586.56
1,319.43
3,115.11
-

51,770.65
21,248.12
3,203.95
-

100.00%
100.00%
100.00%
100.00%
93.55%
70.74%
100.00%
81.68%
-

326.12
1,317.14

1,140.37
475.39
214.77
10,045.98
13,099.31
206.04
183.81
213.05

718.74
1,079.45
2,855.76
1,845.00
-

100.00%
100.00%
100.00%
100.00%
6.45%
100.00%
100.00%
100.00%
100.00%
100.00%
18.32%
100.00%
100.00%
100.00%
-

1,333.20
5,484.30
163.78
1,424.10
-

3,925.02
-

100.00%
100.00%
100.00%
100.00%
100.00%
-

1,513.88
326.12
1,317.14

236.64
973.44
4,586.56
1,140.37
1,319.43
475.39
3,329.88
10,045.98
13,099.31
206.04
183.81
213.05

1,333.20
5,484.30
163.78
1,424.10
2,664.01
457.77
1,015.54

865.34
9,051.00
7,526.34
3,593.74
6,941.95
1,831.00
7,941.31
90.00
2,158.40

24.04
202.25
96.57
149.23
698.64
73,187.97
21,248.12
3,922.69
1,079.45
3,925.02
1,640.25
2,855.76
1,845.00
9,237.35
6,074.53

6,227.50
6,982.14
671.76
2,763.38
692.12
3,341.95
932.82

749.62
1,645.54
4,543.74
3,780.97
343.66
3,585.06
116.63

02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.02
02.03.02.01
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.02

SUBESTRUCTURA
EXCAVACION EN CONGLOMERACION (BAJO AGUA)
RELLENO COMPACTADO EN ESTRIBOS C/MAT. PROPIO
RELLENO COMPACTADO EN ESTRIBOS C/MAT. PRESTAMO
ELIMINACION DE MATERIAL EXCEDENTE DE CORTE
FALSO PUENTE
RELLENO DE ESTRUCTURAS BAJO AGUA
CONCRETO SIMPLE
SUB ESTRUCTURA
ENCOFRADO Y DESENCOFRADO
CONCRETO f'c=140 kg/cm2 + 50% P.M. EN SUB ZAPATAS
CURADO DE CONCRETO
FALSO PUENTE

M3
M3
M3
M3

989.76
88.51
668.39
901.24

15.42
47.88
69.55
5.27

M3

74.14

52.88

M2
M3
M2

31.80
56.69
134.88

60.72
243.33
1.55

70,736.01
15,262.10
4,237.86
46,486.52
4,749.53
3,920.52
3,920.52
24,748.90
15,934.34
1,930.90
13,794.38
209.06
8,814.56

15,262.10
-

1,930.90
13,794.38
209.06

100.00%
100.00%
100.00%
100.00%
-

4,237.86
46,486.52
4,749.53
3,920.52

100.00%
100.00%
100.00%
100.00%
-

15,262.10
4,237.86
46,486.52
4,749.53
3,920.52

1,930.90
13,794.38
209.06

02.04.02.01
ENCOFRADO Y DESENCOFRADO
02.04.02.02
CONCRETO f'c=140 kg/cm2 + 30% PM PARA PASE DE AGUA
02.04.02.03
SOLADO E=3" MEZCLA 1:10
02.04.02.04
CURADO DE CONCRETO
02.05
CONCRETO ARMADO
02.05.01
SUB ESTRUCTURA
02.05.01.01
ZAPATAS
02.05.01.01.01
ENCOFRADO Y DESENCOFRADO
02.05.01.01.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.01.01.03
CONCRETO f'c= 210 kg/cm2 EN ZAPATAS
02.05.01.01.04
CURADO DE CONCRETO
02.05.01.02
PANTALLA
02.05.01.02.01
ENCOFRADO Y DESENCOFRADO
02.05.01.02.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.01.02.03
CONCRETO f'c= 210 kg/cm2 EN PANTALLA
02.05.01.02.04
CURADO DE CONCRETO
02.05.01.03
ALEROS
02.05.01.03.01
ENCOFRADO Y DESENCOFRADO
02.05.01.03.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.01.03.03
CONCRETO f'c= 210 kg/cm2 EN ALEROS
02.05.01.03.04
CURADO DE CONCRETO
02.05.02
SUPER ESTRUCTURA
02.05.02.01
VIGA PRINCIPAL
02.05.02.01.01
ENCOFRADO Y DESENCOFRADO
02.05.02.01.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.02.01.03
CONCRETO f'c= 280 kg/cm2
02.05.02.01.04
CURADO DE CONCRETO
02.05.02.02
VIGA DIAFRAGMA
02.05.02.02.01
ENCOFRADO Y DESENCOFRADO
02.05.02.02.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.02.02.03
CONCRETO f'c= 280 kg/cm2
02.05.02.02.04
CURADO DE CONCRETO
02.05.02.03
LOSA MACIZA
02.05.02.03.01
ENCOFRADO Y DESENCOFRADO DE FALSO PUENTE
02.05.02.03.02
ENCOFRADO Y DESENCOFRADO
02.05.02.03.03
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.02.03.04
CONCRETO f'c= 280 kg/cm2
02.05.02.03.05
CURADO DE CONCRETO
02.05.02.04
VEREDAS DE CONCRETO
02.05.02.04.01
ENCOFRADO Y DESENCOFRADO
02.05.02.04.02
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60
02.05.02.04.03
CONCRETO f'c= 280 kg/cm2
02.05.02.04.04
CURADO DE CONCRETO
02.06
OBRAS COMPLEMENTARIAS
02.06.01
CARPINTERIA METALICA
02.06.01.01
BARANDA METALICA SEGUN DISEO
02.06.02
LOSA DE APROXIMACION
02.06.02.01
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACION
02.06.02.02
CONCRETO f'c=175 kg/cm2 + 50% P.M.
02.06.02.03
CURADO DE CONCRETO
02.06.03
TRABAJOS DE DRENAJE
02.06.03.01
FILTRO DRENANTE
02.06.03.02
TUBERIA DE DRENAJE = 2"
02.06.03.03
TUBERIA DE DRENAJE = 3"
02.06.04
JUNTAS DE CONSTRUCCION
02.06.04.01
JUNTAS DE CONSTRUCCION C/TEKNOPORT E=1"
02.06.04.02
JUNTA ASFALTICA E=1"
02.06.04.03
JUNTAS DE DILATACION METALICAS
02.06.05
VARIOS
02.06.05.01
APOYO DE NEOPRENE DE 0.40 X 0.40 X 0.05 m
02.06.05.02
SEALES INFORMATIVAS
02.06.05.03
PRUEBAS DE CONTROL DE CALIDAD PARA PUENTE
02.07
OBRAS DE ENCAUSAMIENTO Y PROTECCION
02.07.01
MOVIMIENTO DE TIERRAS
02.07.01.01
DESVIO DE RIO
02.07.01.02
EXCAVACION EN CONGLOMERACION (BAJO AGUA)
02.07.01.03
RELLENO DE ESTRUCTURAS EN SECO
02.07.01.04
ELIMINACION DE MATERIAL EXCEDENTE DE CORTE
02.07.02
ENCAUSAMIENTO DE CURSO DE AGUA
02.07.02.01
ENROCADO DE PROTECCION
03
MITIGACION DE IMPACTO AMBIENTAL
03.01
REMEDIACIN AMBIENTAL
03.01.01
CONSTRUCCION DE LETRINAS
03.01.02
LIMPIEZA Y ELIMINACION DE DESECHOS
03.01.03
REACONDICIONAMIENTO EN CAMINOS DE ACCESO Y AREAS DE TRABAJO
03.01.04
REVEGETACION DE AREAS DESHABILITADAS CON ESPECIES DE LA ZONA
03.01.05
MANEJO DE RECURSO HIDRICO PARA CONTROL DE PARTICULAS EN SUSPENSION
03.02
PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS
03.02.01
CONTENEDORES DE RESIDUOS SOLIDOS
03.02.02
ELIMINACION DE RESIDUOS PELIGROSOS
03.02.03
DISPOSICION FINAL DE RESIDUOS SOLIDOS
03.03
MANEJO AMBIENTAL (Capacitacin y Educacin Ambiental)
03.03.01
CAPACITACION EN CONSERVACION DE RR.NN. Y MEDIO AMBIENTE

0.11
0.01

M2
M3
M2
M2

52.80
16.59
68.02
93.03

60.72
237.78
22.34
1.55

M2
KG
M3
M2

43.37
2,688.90
77.31
146.45

60.72
5.37
499.23
1.55

M2
KG
M3
M2

176.89
4,494.29
61.94
188.68

60.72
5.37
529.04
1.55

M2
KG
M3
M2

157.95
2,642.46
43.14
164.69

60.72
5.37
529.05
1.55

M2
KG
M3
M2

45.93
2,449.74
7.65
45.93

60.72
5.37
510.12
1.55

M2
KG
M3
M2

7.92
229.97
1.01
7.92

60.72
5.37
510.12
1.55

M2
M2
KG
M3
M2

11.13
40.92
1,493.23
11.84
74.14

1,139.74
60.72
5.37
510.12
1.55

M2
KG
M3
M2

21.98
369.90
3.53
39.50

60.72
5.37
510.12
1.55

25.40

322.93

M2
M3
M2

75.00
57.89
210.00

60.72
255.62
1.55

M3
M
M

98.03
26.40
3.00

53.98
5.99
5.93

M2
M
M

5.74
13.00
8.30

17.17
5.57
255.59

UND
UND
GBL

4.00
1.00
1.00

2,363.72
2,664.01
1,085.00

M3
M3
M3
M3

54.80
219.74
9.59
210.15

13.74
15.42
42.89
5.27

M3

78.14

38.32

UND
M2
M2
M2
M3

3.00
5,025.00
800.00
500.00
180.00

1,534.13
1.22
3.63
3.62
22.53

UND
M3
M3

2.00
30.00
30.00

600.00
8.41
9.81

GBL

1.00

2,900.32

COSTO DIRECTO
DIRECCION TECNICA DE OBRA 11.00%
DIRECCION TECNICA DE EJECUCION DE PROYECTOS DE INVERSION 1.00%

3,206.02
3,944.77
1,519.57
144.20
227,378.02
170,690.80
55,895.29
2,633.43
14,439.39
38,595.47
227.00
67,936.29
10,740.76
24,134.34
32,768.74
292.45
46,859.22
9,590.72
14,190.01
22,823.22
255.27
56,687.22
19,917.58
2,788.87
13,155.10
3,902.42
71.19
2,243.34
480.90
1,234.94
515.22
12.28
29,343.36
12,685.31
2,484.66
8,018.65
6,039.82
114.92
5,182.94
1,334.63
1,986.36
1,800.72
61.23
48,843.61
8,202.42
8,202.42
19,677.34
4,554.00
14,797.84
325.50
5,467.59
5,291.66
158.14
17.79
2,292.37
98.56
72.41
2,121.40
13,203.89
9,454.88
2,664.01
1,085.00
8,654.47
5,660.15
752.95
3,388.39
411.32
1,107.49
2,994.32
2,994.32
24,149.21
19,502.29
4,602.39
6,130.50
2,904.00
1,810.00
4,055.40
1,746.60
1,200.00
252.30
294.30
2,900.32
2,900.32

10,900.27
-

2,664.01
-

752.95
3,388.39
411.32
1,107.49
2,994.32

4,602.39
1,200.00
2,900.32

1,549,032.30
170,393.55
15,490.32

5,000.00

297,926.70
32,057.65
2,979.27

75.49%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2,633.43
3,539.12
38,595.47
227.00
10,740.76
24,134.34
32,582.04
9,590.72
14,190.01
19,507.05
-

158.14
-

155,898.08
16,434.50
1,558.98

100.00%
24.51%
100.00%
100.00%
100.00%
100.00%
99.43%
100.00%
100.00%
85.47%
100.00%
-

3,206.02
3,944.77
1,519.57
144.20

186.70
292.45
3,316.17
255.27

2,788.87
13,155.10
480.90
1,234.94
12,685.31
2,484.66
6,211.40
1,334.63
-

4,554.00
14,797.84
102.23
5,291.66
17.79
98.56
29.78
9,454.88
-

146,982.13
15,453.75
1,469.82

100.00%
100.00%
100.00%
100.00%
0.57%
100.00%
14.53%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
77.46%
100.00%
100.00%
100.00%
31.41%
100.00%
100.00%
100.00%
41.13%
100.00%
-

3,902.42
71.19
515.22
12.28
1,807.25
6,039.82
114.92
1,986.36
1,800.72
61.23

8,202.42
223.27
42.63
2,121.40
1,085.00

234,214.57
25,049.32
2,342.15

100.00%
100.00%
100.00%
100.00%
22.54%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
68.59%
58.87%
100.00%
100.00%
-

4,055.40
292,499.56
31,460.67
2,925.00

100.00%
-

276,755.59
29,728.83
2,767.56

6,130.50
2,904.00
1,810.00
252.30
294.30
144,755.67
15,208.84
1,447.56

100.00%
100.00%
100.00%
100.00%
100.00%
-

3,206.02
3,944.77
1,519.57
144.20

2,633.43
14,439.39
38,595.47
227.00
10,740.76
24,134.34
32,768.74
292.45
9,590.72
14,190.01
22,823.22
255.27

2,788.87
13,155.10
3,902.42
71.19
480.90
1,234.94
515.22
12.28
12,685.31
2,484.66
8,018.65
6,039.82
114.92
1,334.63
1,986.36
1,800.72
61.23

8,202.42
4,554.00
14,797.84
325.50
5,291.66
158.14
17.79
98.56
72.41
2,121.40
9,454.88
2,664.01
1,085.00

752.95
3,388.39
411.32
1,107.49
2,994.32

4,602.39
6,130.50
2,904.00
1,810.00
4,055.40
1,200.00
252.30
294.30
2,900.32
1,549,032.30

0.03
0.005
0.01
0.015
0.07

INSPECCION DE OBRAS 3.00%


GASTOS EN EVALUCION 0.50%
GASTOS EN LIQUIDACION 1.00%
GASTOS DEL DEPARTAMENTO DE SEGURIDAD Y SALUD EN EL TRABAJO 1.50%
GASTOS GERENCIALES DE ADMINISTRACION DE OBRA, PROYECTO 7.00%
EXPEDIENTE TECNICO
COSTO VALORIZADO
PORCENTAJE DE AVACE DE OBRA (%)

46,470.97
7,745.16
15,490.32
23,235.48
108,432.26
42,123.00
1,978,413.36
100.00%

8,937.80
1,489.63
2,979.27
4,468.90
20,854.87
42,123.00
47,123.00
2.38%

371,694.09
18.79%

4,676.94
779.49
1,558.98
2,338.47
10,912.87
194,158.31
9.81%

4,409.46
734.91
1,469.82
2,204.73
10,288.75
183,013.38
9.25%

7,026.44
1,171.07
2,342.15
3,513.22
16,395.02
292,053.93
14.76%

8,774.99
1,462.50
2,925.00
4,387.49
20,474.97
364,910.16
18.44%

8,302.67
1,383.78
2,767.56
4,151.33
19,372.89
345,230.20
17.45%

4,342.67
723.78
1,447.56
2,171.34
10,132.90
180,230.30
9.11%