UPS RATING
INVERTER EFFICIENCY
LOAD POWER FACTOR
NO. OF BATTERY
End Cell Voltage
Back Up Time
K Factor
Make
10KVA /8 KW.
0.91
0.8
31
10.50
120 Minutes
2.8
AMARARAJA
IDC(Max)
K Factor
KVAX1000X P.F
.
E.C.V X No. OF CellsX Inverter Effi.
10 X 1000 X 0.8
10.50 X 31 X0.91
27.01A
27.01 X 2.8
75.62AH or 75AH
Hence Nearest Battery Selected 12V SMF LEAD ACID 75 AH, 31 Nos BATT.
FOR 120 Minutes Back Up FOR 10KVA/ 08 KW Load, each bank.
Total Two Banks (Separate Battery bank for each set of UPS).
Make : AMARARAJA
REVISION : 0
PAGE :- 1 of 1
CLIENT
RATING
SUPPLIER
SYSTEM DATA
Make
Rating
Configuration
UPS Overall Efficiency
Dynamic Response under following
5
conditions
5.1 For 50% step load
HITACHI HI-REL
10KVA / 8KW
Parallel Redundant With Separate Battery Bank
86.45%
5%
5%
1%
10%
8
9
Finish Colour
Cable Entry
10 Type of cooling
11 Testing Standards
B
1
2
3
ENVIRONMENTAL
Design Ambient Temperature
Relative Humidity
Altitude
50 deg. C
95% RH Non-Condensing
1000 meter from MSL
C
1
2
3
4
5
6
7
3 PH, 3 WIRE
415V
+10%, - 15%
50HZ
6%
0.92
2 times rated KVA with HRC fuse links
D
1
2
3
4
5
6
7
8
9
10
RECTIFIER / CHARGER
Rectifier Unit
DC Voltage (Nominal Voltage)
Voltage Range
Float Voltage
Boost Voltage
Charging Type
Voltage Regulation
Ripple With Batteries
Ripple Without Batteries
Power Walk in time
6 Pulse
372V DC
325.5V DC 418.5V DC
418.5V DC
NA For SMFB
Automatic Float / Boost mode selection with current limit
1%
1% RMS
2% RMS
10 - 30 Sec.
Rev.: 1
Page 1 of 3
INVERTER
Type Designation
Rating (at specified ambient)
Output Voltage / No. of Phase
Voltage Regulation
Range of adjustment of output voltage
Frequency
Frequency Regulation
Synchronizing Range
Slew Rate
10 Inverter Efficiency
11 Voltage Waveform
91.00%
Sinusoidal
F
1
STATIC SWITCH
No. of Static switch
Transfer Time
G
1
2
KAYCEE
Make before break
F
1
BATTERY
Make / Model
AMARARAJA
2
3
SMFB
75 AH
4
5
31 NOS.
12V / Batt.
6
7
8
9
10.5V / Batt.
120 Min.
Two
Please Refer BATTERY GAD drg.
Rev.: 1
HITACHI HI-REL POWER ELECTRONICS PVT. LTD.
Doc. No.: 135DS08250
Page 2 of 3
Rev.: 1
HITACHI HI-REL POWER ELECTRONICS PVT. LTD.
Doc. No.: 135DS08250
Page 3 of 3
Po/LOI
CUSTOMER / CONSULTANT
O/P
Voltage
BATTERIES
TYPE
250
45410
11129
SMFB
230V
1 PH
Limited
MODEL
AH
QTY.
I4
B4
75
31
UPS
AUXILIARY
ACDB
DCDB
BATTERIES
SCOPE OF SUPPLY
BATTERY
J.B.
-
RESPONSIBILITY TABLE (while approving Customer can also put his choice in the blank box )
AREA
RESPONSIBILITY
REMARKS BY CUSTOMER
SUPPLIER
HIREL
CUSTOMER / TPIA
Incoming Inspection
P
V&P
NA
Process Inspection
N/A
P
NA
System Testing
N/A
P
V/W
Heat Run requirement
N/A
P
V
Batteries
P
V
V
Distribution panels
Site Acceptance Test
N/A
NOT APPLICABLE
P
FF-QAG-20(4)
RATING
OFFICER
OTHER
CONFIGRATIO
N
SA DR
PR
10 KVA
BATTERY
Rack
SPARES
-
P
V
W
N/A
SOFTWA
RE
RS232 C
-
ABBRIVIATION
PERFORM
VERIFY OF TR/TC
WITNESS
NOT APPLICABLE
DOCUMENTS REQUIRED
DRAWINGS FOR APPROVAL
PAGE # 1 OF 4
APPROVAL COMMENTS
Engineering By
HIREL
APPROVED BY
Sunil kambli
Himanshu Mehta
Other Abbreviations
used in this QAP
W.O. = Work Order, P.O. = Purchase Order, AH = Ampere Hour, SA = Stand Alone, DR = Dual Redundant, PR = Parallel Redundant, ACDB =
AC Distribution Board, DCDB = DC Distribution Board, J.B. = Junction Box, HV = High Voltage, HVHF = High Voltage High Frequency,
GRN = Goods Receipt Note, WI = Work Instruction, TR = Test Report, FF = Forms / Formats, BOM = Bill of Material, FRS = Fault Report Sheet,
MOM = Minutes of Meeting (of inspection), WS = Workmanship Standards, PH File = Product History File, SAT = Site Acceptance Test
#
1
Incoming Goods
Item / Component
Power Transformers
Control Transformers
Enclosures
Characteristics
Dimension, HV, NL
Voltages, Finishing,
Marking / Labeling
Dimension, Coating
Thickness
Dimension, Punching
Dimension, Surface
Finishing, Mounting
holes
Dimension, Finish
Rubber items
(Gaskets, Grommets)
Bus-bars & Hardware
Acrylic Material
Dimension, Finish,
Threads
Dimension, Finish
Current Transformers
O/P Accuracy
Switch gears
10
11
Capacitors
12
14
Semiconductor
Device
Wires, Cables
& Cable Glands
Batteries Only
Physical, NO/NC,
Auxiliary Contacts
Physical, Continuity,
Type
Physical,
Capacitance, Type
Physical
15
Fans
16
Indicating Devices
(Lamps, LED etc.)
Meters
13
Quantum
100%
01 / Batch
Applicable
Documents
GRN, WI Drawings,
Mfr. TR
Acceptance
Norms
Responsibility
FF-QAG-20(4)
Record
Register &
FF
01 / Batch
Visual
Measurement
100%
Register &
FF
Register &
FF
Go No Go
Visual
Measurement
Visual
Measurement
Visual
Measurement
Visual
Measurement
Visual
Measurement
Visual
5%
Go No Go
100%
Go No Go
100%
100%
01 / Batch
100%
Visual
Measurement
Visual
100%
10%
100%
Visual
Measurement
Visual
100%
100%
Visual &
Running
Visual,
Measurement
As Above
100%
100%
100%
100%
Go No Go
Compliance
to
the
Applicable
Documents
QA
Register
FF
Register
FF
Register
FF
Register
FF
Register
FF
Register
FF
Register
FF
&
&
&
&
&
&
&
18
Packing Material
( Wood, Thermocol )
Physical, Type of
material
Visual
100%
Register &
FF
Register &
FF
Register &
FF
Go No Go
19
PCBs
Material, Tracks,
Leveling
Visual
100%
Go No Go
17
Smooth running,
Physical
Physical & Test
Type of
Check
Visual
Physical
Electrical
Visual
Measurement
Visual
PAGE # 2 OF 4
Physical, Accuracy
Remarks
PAGE # 3 OF 4
FF-QAG-20(4)
Item / Component
2
3
PC Assembly Room
(and storage facility )
Stuffing
Soldering (Wave/Manual)
Inspection
Testing
6
7
Ana-bond
Conformal Coating
(CRC)
Characteristics
Physical,
ESD Measures
Mounting
Dry Solder
Solder Joints
Cleaning, material
as per BOM,
Short Links
Functional,
Burn-in
Physical
Physical
Check
Quantum
Applicable Documents
Visual
Testing
Visual
Visual
Every 6
months
100%
100%
IS-10087, WI
Visual
100%
WI & WS
Electrical
100%
WI, Specification
Visual
Visual
100%
100%
WI, WS
WI
BOM, Drawing, WI
WI & WS
Acceptance
Norms
Responsibility
Record
Remarks
Fault
Compliance
to all the
applicable
documents
Production
Supervisor
Report
Sheet
Process Inspection
#
1
2
3
Item / Component
Companys Logo
Rating Plate
BOM, Drawings :
Product consistency
Fitting
8
9
10
11
Functional Test
Characteristics
Position
System Details
Matching,
Availability, Layout
Mounting,
Tightening
Appropriate size,
firm joint
Routing, Tying,
Finishing, ColorCode, Ferruling
Uniform Coating,
Color
Smooth Working
Dimension
Resistance Value
Breakdown Value
Type of Check
Quantum
Applicable Documents
Visual
Visual
Visual
100%
100%
100%
Drawing
Drawing
Drawing & BOM
Visual
100%
Drawing
Visual
100%
WS
Visual
Continuity
100%
Visual
100%
WS, IS-5
Visual
Visual
Measurement
Measurement
100%
100%
100%
100%
WI
Drawing
WI
WI
Characteristics
Check
Dimensions, Setting of
parameters, Load Test, Transferretransfer, Regulation, Efficiency,
Noise Level, Auxiliary Modules,
Annunciation, Alarms, over load,
THD(at Linear Load)
Electrical
Visual
Physical
Quantum
100%
Applicable
Documents
IEC-62040-3
Hi-Rel Specs
Test Report
Acceptance
Norms
Compliance
to all the
applicable
documents
Acceptance
Norms
Compliance
to Applicable
Documents &
Approved
Data Sheet
Responsibility
Production
Supervisor
Record
Check-List
/ FRS
Responsibility
Testing
Engineer
Remarks
Record
Remarks
Test
Reports
Shall be
witnessed by
client
Inspection
Parallel Redundant
System
Auxiliary Units
Characteristics
Completion of
-Scope of Supply,
MOM & FRS Points
Check
Visual
Quantum
100%
Applicable
Documents
FRS, MOM, PH
File, WI
Characteristics
Check
Quantum
Visual
Physical
Electrical
Visual
Physical
Electrical
Visual
Physical
Electrical
Acceptance Norms
Compliance to
Applicable
Documents
PAGE # 4 OF 4
Responsibility
QA
FF-QAG-20(4)
Record
FRS,
Check-List
Acceptance
Norms
Compliance
to WI
Responsibility
Record
100%
Applicable
Documents
Work-Instruction
Site /
Commissioning
Engineer
SAT
Format
100%
Work-Instruction
Compliance
to WI
Site /
Commissioning
Engineer
SAT
Format
(at No-load,
Light-load &
actual-load
conditions)
(at No-load,
Light-load &
actual-load
conditions)
Visual
Physical
Electrical
(at No-load,
Light-load &
actual-load
conditions)
Remarks
Remarks
The Customer
shall provide
load. In case
Actual Load is
not available,
SAT will be
carried out on
NL & Partial
Load (also to be
provided by
customer)
conditions.
100%
Work-Instruction
Compliance
to WI
Site /
Commissioning
Engineer
SAT
Format
Customer
Signature in
SAT Format is
mandatory.
Test with
Generator to
be done only if
recommended
and
contractually
agreed.
A typical, basic, redundant UPS system is shown in figure 1 and comprises the following
Apart from the above the system may also include other items such as input isolation transformers, Output AC
distribution boards, Remote monitoring units, etc depending upon specific requirements.
Parallel Redundant UPS system
UPS A and UPS B, as shown in fig 1 operate in parallel and share the load.
Should any of the UPS fail, it isolates itself from the output bus and the remaining UPS supports the entire load.
Should the redundant UPS also fail, the load is transferred to the Bypass line. However in this case there is no
battery back up available.
i4 series Parallel redundant systems operate on the MASTER/ SLAVE principle.
A MASTER UPS establishes the output bus by synchronizing with the
The MASTER/SLAVE method of parallel operation has distinct advantages over any other method.
Parallel operating inverters are susceptible to cross currents. Incase both UPS systems try to
synchronize with the output bus individually, large cross currents between inverters can flow due to unequal
rates of synchronization, resulting into simultaneous failure of both UPS systems.
In the MASTER/slave operation only one UPS (MASTER) establishes synchronization, thereby
eliminating the possibility of cross currents.
In the i4 series, any UPS system (UPS A or B) that is started first, automatically designates itself as MASTER
while the remaining UPS is automatically designated as SLAVE.
The MASTER establishes synchronization first and the slave instantaneously follows.
Should the slave UPS fail, the MASTER UPS support the entire load.
Should the MASTER UPS fail, the slave UPS is automatically designated as the new MASTER and
instantaneously supports the entire load.
In the unlikely event of failure of both UPS systems the load is transferred to the Bypass line.
All i4 series UPS systems are digitally controlled by microcontrollers. The 1+1 control circuitry of each UPS
communicates the necessary signals with the redundant UPS for parallel operation.
In i4 series UPS systems the designation of an UPS as a MASTER or SLAVE is done automatically and under
software control.
Both UPS systems are identical and there are no common parts.
Redundancy in Rectifiers
As shown in fig 1, rectifiers of both UPS systems operate in parallel.
Should any rectifier fail, the redundant rectifier can supply both inverters as well as charge the battery banks.
Redundancy in input feeders
It is recommended that separate feeders for both UPS systems and the Bypass line regulator be provided which
is useful in the maintenance of input feeders and up stream switchgear .
Bypass Auxillary system
The bypass panel comprises of Bypass isolation transformer and Voltage stabilizer.The output of the stabilizer is
fed to the bypass input supply terminal of UPS system 1 & 2.