Major Developments

KLJ Organic Qatar floated Tender, on 21/Nov/15, have asked us to meet for pre bid meeting on
20/dec/15, Pre bid meeting happened as per the quiestionaire and add ons by the KLJ PM there are
amendments for which highlights of the pre bid meeting were shared with Raghu sir, he asked for
clarifications on some points, clarifications were done , final copy is being made to be submited to
Estimation team.

NIL

NIL

6
7
8
9

Qatar Aluminium

Qatar Chem Co.

Qatar Petrochem.
Co.
Qatar Steel

Qatar Foundation

Qatar Power

10

Ras Gas

11

Kahrama (Qatar
Gen Electricity &
Water)

12

Habtoor Leighton
Group

Not yet Started

Qatar Chambers of
Coommerce

Not yet Started

Contractors
Classification Cert.
(CIVIL)

Done

Not yet Started

Not yet Started

Done

Not yet Started

Medical insurance
Card

In Process

Not yet Started

Not yet Started

Not yet Started


Under
Process(Docuemnt
s Sent/ Fixed
meeting with
Procuremnt)

NIL

KLJ Organic Qatar floated Tender for Installation work, has been sent to the Estimation team, they
are working on it, No last date of submision proposed by KLJ, asked us to make a questionaire.
Habtoor Leighton Group has sent us a PQ format, for which we have sent them the complete pq
documents requested by them, and have fixed a meeting with their procurement taeam, I met they
have given a supply enquiry of Electrical equipments which we regreted, i will go meet Mr. Jesus
and Mr. Thelma at their masaied site., mails sent to them and requesed for presentation meeting,
which they will review our profile and revert.

NIL

NIL

Workmans
Compensation
policy

Not yet Started

NIL

Emraan Ali Khan

Mc Dermot Int. has been awarded a project for a new Jacket, temporary deck and replacement
umbilical by QP for the North Field Alpha gas development, offshore project, for which iam finding
an opportunity to meet them and share our cabilities as a fabricator.

Week Span:

Kentz Qatar has 3 projects in hand, of which Zero Lekage Project (ZLD) RFQ will be given to us by
January. 2016, folowing up.
Mr. Manish has been requested with his GM to visit our Head Office, for a formal discussion
regarding possible project wis JV for our opertions in KSA. He has also requested for our support in
their bids to projects like SADARA (SAUDI ARAMCO+QOU CHEM), GULF RIYADAH(MANISH'S CO.) has
bid for Hydrogen Pipeline of 16inch dia whic is a 18km pipeline 3 months back to Linde who is doing
the EPC of the whole plant, its a 80 Milllion project. Following up.

Plan for Coming Week/Meetings Scheduled

Meeting with Habtoor Leighton Group at their Massaed site office, following up.

Contact Mr. Kasi Murugan again of Alghanim International for his invitation which he said he will
send by 4th Jan 2016, he asked for our local support team to meet him , the issue was escalated
but no response. Following up

Contact Mr. Naseer Abdul Baky of Alghanim Int. on 4th Jan 2016 as requestedand understand how
we may proceed further, he asked for our quotes which we had sent him earlier, which was sent to
him again, following up.

Contact Mr. Hossam Eldin Helal for intallation of Sstructures, Equipments(Static & Rotary), Erection
of prefabricated spools Project: Lower FARS Heavy Oil Development programme.(Phase1)/,
escallated the matter no response.

Contact MEP contractors for HVAC job at KLJ, Namely ARABIAN Mep, GDC Qatar, Roller Engineering
for their quotes., got one quote from a different vendor, floated to Estimation team, expecting
another one by tommorow morning.

13

14

Meeting with Mc macdormat for their newly ofshore project awarded by Qatar.
Contact Mr. Manish for his willingness for JV with us for their Saudi based co. for their jobs in Saudi
and later Petrofac job in KSA, Also how they can help us in HVAC for KLJ job in Qatar.

Market Intel of Upcoming Projects


QATAR
Sr. No.

Name of the
Co.

Mc Dermott

1
2

Kentz Qatar WLL.

Kentz Qatar WLL.

3
Kentz Qatar WLL.

4
KLJ ORGANIC Qatar
WLL

Name of
Project

KUWAIT
Name of the
Co.

Name of
Project

Synopsis/Sow

ALGHANIM INT.

200 Tpd caustic


soda plant
expandable to 250
tpd.

Pre-fab & Sandblasting and Painting (other than ss pipes),Erection of pipe &
pipe supports and equipment erection works.

UNDISCLOSED

ALGHANIM INT.

Sabiya OCGT-024
Project

Electrical,Telecom & Instrumentation works

AWARDED TO VALETH ER. CONTS. CO., THOUGH THERE CAN BE SCOPE FOR
E&I WORKS.

ALGHANIM INT.

Lower Fars Heavy


Oil Development
Program(Phase-1)

Structural, Piping & Equipment Installation works

RFQ WILL BE FLOATED BY JAN,16 , MAINLY MECH AND ELECTRICAL AND


MAPNPOWER SUPPLY, VALVES, SUPPLY OF MATERIAL

Gulf Energy Co.

Fire Water System


for North Pier
Pumping and
Metering Station

EPC Work

Synopsis/Sow

New Jacket,
temporary deck
The brownfield contract includes front-end engineering design verification,
and replacement
detailed engineering, procurement, construction, installation (EPCI) and
umbilical by QP for commissioning of a new six-legged, 15-slot wellhead jacket and temporary
the North Field
drill deck, with a total weight of approximately 5,000 tons. The work also
Alpha gas
includes the decommissioning, removal, replacement and pre-commissioning
Development
of 2.6 miles of composite umbilical and a fiber optic cable, in the Maydan
offshore Qatar.
Mahzam field.
Shell GTL

Waste Water
Recycle &
Reloading at
Raslafan

Zero Leakage
Discharge (ZLD)
project

200 TPD Caustic


Soda Plant
Expandable to 250
TPD.

Supply, Prefab & Installation of Metallic Tanks (37 no.s),HVAC, Tower

KLJ ORGANIC Qatar


WLL

7
8
9
10
11
12

200 TPD Caustic Tender for Electrical And Instrumentation Installation Work - KLJ Organic Qatar
Soda Plant
W.L.L
Expandable to 250
TPD.
IDD ELL SHARGI
NORTH DOME
FIELD- PHASE 5

Following up with mails and ph calls to get inside, their rsponse is dull as per
to market possition.

OXY Petroleum
Kentz Qatar WLL.

QP ROJECT

Site fabrication tanks, rebuilding 8000cm square., rfq qill be sent to us 2-3
days.

3
16/01/16-21/01/16

Emraan Ali Khan

temporary deck and replacement


shore project, for which iam finding
ilities as a fabricator.

us to meet for pre bid meeting on


and add ons by the KLJ PM there are
shared with Raghu sir, he asked for
py is being made to be submited to

n sent to the Estimation team, they


asked us to make a questionaire.

e have sent them the complete pq


their procurement taeam, I met they
e regreted, i will go meet Mr. Jesus
requesed for presentation meeting,
d revert.

ect (ZLD) RFQ will be given to us by

ad Office, for a formal discussion


as also requested for our support in
), GULF RIYADAH(MANISH'S CO.) has
3 months back to Linde who is doing
oject. Following up.

duled

ed site office, following up.

his invitation which he said he will


meet him , the issue was escalated
p

6 as requestedand understand how


sent him earlier, which was sent to

quipments(Static & Rotary), Erection


elopment programme.(Phase1)/,
nse.

Mep, GDC Qatar, Roller Engineering


ed to Estimation team, expecting
ning.

project awarded by Qatar.

audi based co. for their jobs in Saudi


in HVAC for KLJ job in Qatar.

/Sow

er than ss pipes),Erection of pipe &


ment erection works.

rumentation works

ent Installation works

rk

Das könnte Ihnen auch gefallen