Beruflich Dokumente
Kultur Dokumente
CODE
JOB ORG.
ORDER/EWO
NO.
PLANT NO.
A
A
AA-036537
DRAWING NUMBER
INDEX
PdIC
XA
SET @
PSI
NOTES:
1. THE FLOW ALARM SETTING SHOULD BE BASED ON THE
RECOMMENDED MAXIMUM ALLOWABLE LEAKAGE RATE BY THE
MANUFACTURER, OR 4 SCFM WHICHEVER IS HIGHER. THE HH
SETTING SHOULD BE AT LEAST 150% OF THE ALARM SETTING
SETTING BUT LESS THAN 200%.
2. THREE MICRON GAS FILTRATION OR BETTER IS REQUIRED. IF
SUPER HEATED GAS IS NOT AVAILABLE THEN COALESCING
FILTERS ARE REQUIRED.
3. ALL INTERCONNECTING PIPING SHALL BE STAINLESS STEEL
(304, 316, 316L).
4. ALL PIPING DOWNSTREAM OF THE FILTERS SHALL BE INSTALLED
AND HEAT TRACED TO PREVENT CONDENSATION.
5. A LIQUID KNOCKOUT DRUM IS NOT REQUIRED IF SEAL GAS IS
ALWAYS SUPERHEATED.
6. AUTOMATIC CLOSURE OF ZV IS TO BE SPECIFIED BY PLANT
OPERATIONS ENGINEERING PERSONNEL.
H
PdIS
SET @
PSI
PdCV SET @
1"
1"
PSI
SEE NOTE-8
1"
1"
1"
ZV
1"
1/2 " RO
VENT TO ATMOSPHERE
AT SAFE LOCATION
SEE NOTE-6
1"
SEAL GAS
PIPING MATERIAL
SPECIFICATION AES-L-005
1"
1"
1"
1"
TT
AC/AFO -AIR TO CLOSE/
AIR FAILURE OPEN TTd
AC/AFS -AIR TO CLOSE/AIR TW
FAILURE STEADY
VZV
AO/AFC -AIR TO OPEN/
XA
AIR FAILURE CLOSE
REDUCER
XL
AO/AFS -AIR TO OPEN/AIR
XLS
FAILURE
STEADY
SPECTACLE
XVE
PLATE-OPEN
AOV -AIR OPERATED VALVE
XVS
AT -ANALYZER TRANSMITTER
SPECTACLE
PLATE-CLOSED
ESD -EMERGENCY SHUTDOWN ZV
SYSTEM
GATE VALVE
FS
FC -FLOW CONTROLLER
GLOBE VALVE
FCV -FLOW CONTROL VALVE FA
CHECK VALVE
FE -FLOW ELEMENT
FI
PLUG VALVE
FG -FLOW SIGHT GLASS
FHCV -FLOW MANUAL CONTROL
BALL VALVE
VALVE
DOUBLE DISC
FHTd -FLOW MANUAL
GATE VALVE
TRANSDUCER
ANGLE VALVE
FIC -FLOW INDICATOR
CONTROLLER
RELIEF VALVE
FM -FLOW METER
MOTOR OPERATED
FQI -FLOW TOTALIZER
VALVE
INDICATOR
PISTON OPERATED FR -FLOW RECORDER
VALVE
FT -FLOW TRANSMITTER
FY -FLOW RELAY
CONTROL VALVE
HIC -HAND INDICATOR
BALL TYPE
CONTROLLER
CONTROL VALVE
HS
-HAND
SWITCH
WITH POSITIONER
LA -LEVEL ALARM
XL
SOLENOID VALVE
LCV -LEVEL CONTROL VALVE
-LEVEL GAUGE GLASS
LG
VALVE NORMALLY
LIC -LEVEL INDICATOR
CLOSED
CONTROLLER
-LEVEL INDICATOR
LI
LR -LEVEL RECORDER
-LEVEL SWITCH
LS
LT -LEVEL TRANSMITTER
LTd -LEVEL TRANSDUCER
MOV -MOTOR OPERATED VALVE
PB -PUSHBUTTON
PC -PRESSURE CONTROLLER
PCV -PRESS. CONTROL VALVE
PdC -PRESS. DIFF. CONTROLLER
PdI -PRESS. DIFF. INDICATOR
PdIC -PRESSURE DIFFERENTIAL
INDICATOR CONTROLLER
PdIS -PRESSURE DIFFERENTIAL
INDICATOR SWITCH
-PRESS.
DIFF. TRANSMITTER
PdT
PdTd -PRESS. DIFF. TRANSDUCER
PG -PRESSURE GAGE
-PRESSURE INDICATOR
PI
PIC -PRESSURE INDICATOR
CONTROLLER
PR -PRESSURE RECORDER
PS -PRESSURE SWITCH
PT
-PRESSURE TRANSMITTER
-PRESS. COMPUTATION MOD.
PV
PX -PRESSURE POINT
PZV -PRESSURE RELIEF VALVE
RO -RESTRICTION ORIFICE
-TIGHT SHUT OFF
RTD -RESIST. TEMP. DETECTOR
- SAMPLE CONN.
-SPEED INDICATOR
SI
-DRAIN TO PRESSURE SS -SPEED SWITCH
SEWER
TC -TEMP. CONTROLLER
-OILY WATER SEWER TCV -TEMP. CONTROL VALVE
-DRAIN
TE -TEMP. ELEMENT
-VENT
TG -THERMOMETER
THS -TEMP. HAND SWITCH
TI
-TEMP. INDICATOR
TR -TEMP. RECORDER
TS -TEMP. SWITCH
NC
SEE NOTE 2
Pdt
LA
PI
H
LIQUID
KNOCK OUT
DRUM
(SEE NOTE-5)
LS
PSIG
LG
BY PURCHASER
BY SUPPLIER
1/2 "
SCFM
FAH @
FI
FT
FI
FT
SCFM
FAH @
SEE NOTE 9
M
SEE NOTE 9
1"
TO GRAVITY SEWER
FT
FI
SCFM
FAH @
SCFM
FAH @
SEE NOTE 9
FI
FT
SEE NOTE 9
PS
SET @
PSIG
L
PA
PCV
SET @
PSIG
1"
300# RF
PRIMARY
SEAL
PRIMARY
SEAL
BY SUPPLIER
TSO
S.C.
BY PURCHASER
SECONDARY
SEAL
SECONDARY
SEAL
TERTIARY
SEAL
S
OWS
D
V
TERTIARY
SEAL
COMPRESSOR
PROCESS LINE
INSTRUMENT
AIR LINE
INSTRUMENT
ELECTRICAL LINE
1/2 "
INSTRUMENT LEGEND
PIPING LEGEND
-TEMP. TRANSMITTER
-TEMP. TRANSDUCER
-THERMOWELL
-VACUUM RELIEF VALVE
-ANNUNCIATOR
-PILOT LIGHT
-LIMIT SWITCH
-VIBRATION ELEMENT
-VIBRATION SWITCH
-SAFETY SHUTDOWN VALVE
-FLOW SWITCH
-FLOW ALARM
-FLOW INDICATOR
INPUTS
PdTd
LOCAL PANEL
MOUNTED INSTR.
BOARD MOUNTED
INSTRUMENT
R/G
STATUS LIGHTS
R=RED, G=GREEN
LOCAL MOUNTED
INSTRUMENT
MOUNTED BEHIND
LOCAL PANEL
RACK MOUNTED
(OR BACK OF PANEL)
ELECTRICAL
SUPPLY
REQUIRED
INSTRUMENT
AIR SUPPLY
REQUIRED
H
HIGH
LOW
L
TWO PEN
RECORDER
DCS
TMR
SOFTWARE
LINE
REFERENCE DRAWINGS
PI
PI
AE-036204
PIPING SYMBOLS
AB-036227
EQUIPMENT SYMBOLS
AB-036305
INSTRUMENT SYMBOLS
AC-036950
SEE NOTE-7
SEE
NOTE-7
FI
FT
SCFM
FAH @
SCFM
FAH @
SEE NOTE 9
FI
FT
SEE NOTE 9
DRAWING RESPONSIBILITY:
SEE
NOTE-1
OIL DRAIN AUTO
(SECONDARY/
TERTIARY
SEAL CAVITY)
FT
FS
SET @
SCFM
HH
FA
HH
COMP S/D
HH
FA
HH
FS
COMP S/D
FT
SEE
NOTE-1
REV.
NO.
DATE
ENGG.
DESCRIPTION
JO/EWO
CERT.
PMT
OPRNS.
DESIGN
REVIEW FOR
CERTIFICATION KEY DRAWINGS
DESIGN CERTIFICATION
DRAWN BY
MHJ
CHECKED BY
12-04-96
DATE STARTED
DISCIPLINE ENGINEER
MNL
07-26-99
DATE COMPLETED
B. CARNEY
PROJECT ENGINEER
BY SUPPLIER
CERTIFIED BY:
BY PURCHASER
(NAME)
SAUDI
PRIMARY SEAL LEAKAGE TO FLARE HEADER
R. N. SEALY
SIGNATURE
DATE
REQUIRED
NOT REQUIRED
CONSTRUCTION AGENCY
OPERATIONS
OTHER
DRAWING TYPE
PID
GS
STD. DWG
PLANT NO.
INDEX
990
SAUDI ARABIA
DRAWING NUMBER
SHT. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
990
NOTES CONTD.
REV. NO.
AA-036537 001 00
Saudi Aramco 5994 ENG. (07/93)
VECTOR
CADD-04
001
SHT. NO.
00
REV. NO.