INSPECTION CHECKLIST FOR INTERNAL WATERPROOFING WORKS

PROJECT: Woodlands N6C26

DATE: _________________

BLOCK NO.: __________

UNIT NO. : _____________

NOTE: *Delete where necessary

Checklist No: WN6C26-AR07-2015

Item
1. Records and
Documentation
by Consultant

2. Material

3. Substrate
Preparation

4. Waterproofing
Membrane
Application

a. Proper supervision records by Contractor


Site Supervisor
b. Testing of material according to
specification (e.g. pre-packed
waterproofing screed)
c. Approval of method statement by
Consultant
d. Approval of work demonstration by
Consultant
a. Use of correct type of waterproofing
system under HDBs materials list and
building specification
b. Use of mechanical mixer (two-part
system for cementitious waterproofing
membrane)
a. Substrate in sound & dry condition
(surface flat & even / adequate fall to
outlets)
b. Pipe / floor openings fitted with
temporary caps so that debris cannot
enter and cause chokage
c. Wall rendered flat and even
d. 45o mortar fillet to edge between floor
and wall or pipes
e. No surface ponding or running water
f. Cleanliness (free of dust, & laitance)
a. Application of 1st coat with a roller or
brush (allow first coat to
dry to
touch)
b. Application of 2nd coat in perpendicular
direction to the 1st coat
c. Corners and pipe properly coated with
the aid of a brush
d. Upturn of at least 200 mm onto walls
e. Upturn of at least 50 mm onto pipes
f. Upturn onto the kerb as shown in the
drawing
g. No air entrapped in the membrane
h.Kitchen/service yard outlets coverage of
400mm radius from the centre of outlet
i. Thickness according to manufacturers
recommendation
(use wet film thickness gauge for checking
film thickness of membrane when it is still
wet)
j. Proper protection (after completion
cordoned off the areas till protective
covering or screed has been laid)

Verification
Complied
Remarks
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA

Yes/No/NA

5. Curing &
Protective
Screed

6. Water Test

7. Warranty for
Complete
System of
Waterproofing
System

a. Adequate curing between 1st & 2nd coat


application
(subject to weather condition)
b. Application of approved pre-packed
waterproof screed to protect the
waterproof membrane (to be done on the
following day after the curing of 2nd coat)
c. Use of mechanical mixer & water
measuring gauge
d. Adequate fall towards outlets
e. Minimum screed thickness = 15mm
f. Provision of screed with rough surface
a. A minimum depth of 10mm water
flooding test for 24 hours within 1 month
after application of waterproofing
membrane and protective screed
b. A minimum depth of 10mm water
flooding test for 24 hours within 1 month
before handing over inspection
The Contractor and the Specialist jointly
provide warrant for a period of five (5) years

Yes/No/NA
Yes/No/NA

Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA
Yes/No/NA

Yes/No/NA
Yes/No/NA

Checked By :- Contractors Supervisor

Audited By:- RESIDENT TECHNICAL OFFICER