Beruflich Dokumente
Kultur Dokumente
Student Name:
Student Number:
Date of Submission:
Name (Print)
Signature
_________________________________
Date
For completion by a course provider representative (e.g. internal practical assessor):
I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.
Name (Print)
_________________________________
Signature
_________________________________
Date
_________________________________
Name (Print)
_________________________________
Signature
_________________________________
Date
_________________________________
NB: This declaration must be completed in full submitted and retained with the
candidates script. If this declaration is not submitted the candidates result may be
declared void.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
733
Student number
Name of assessor
Course provider
name
Student name
Criteria
Maximum
marks
available
1.
1
15
1.
2
15
2.
1
2.
2
Executive summary
3.
1
15
3.
2
3.
3
10
Assessors
marks awarded
NEBOSH
moderated
marks
(if different)
4.
1
15
4.
2
15
TOTAL MARKS
Outcome: PASS
(60% or more)
100
REFER
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
Student number
Place inspected: Prestige Group, Flyover construction, Surat, India Date of inspection 30 March 2014
Observations
Hazards and consequences
Control measures
Immediate and longer term actions
Timescale
1.
1 day.
1 Month.
2 weeks
2 weeks.
2 days
1 Month.
1 Month.
3 hrs.
1 Month
3 hrs.
2 hrs
1 Month.
3 hrs.
2 weeks
1 Month
2 hrs.
4 weeks.
5Hrs.
3 Weeks.
1 Week.
2hrs.
3 Weeks
1 Month.
2 days.
3 Weeks.
2 days.
1 Month.
3 days.
Short Term Action: Insulate the kink
areas to prevent from electric leakage.
hazard).
14.Oil spillage in the warehouse area
where it has the potential for slip
hazard and could lead to head injury,
bruises etc(Physical Hazard)
1 Month.
Long Term Action: Replace the cord
and carry out portable appliance testing
to ensure the standard has been
followed.
2 hrs.
Short Term Action: Clean up the oil
spillage .
Long Term Action: Inspection regime
and continuous supervision in the
warehouse area to maintain proper
housekeeping at all times.
1 week.
2 hrs.
1 Week
Short Term Action: Frequent breaks
and job rotation by having tailor made
good working schedule.
1 Month.
1 Month.
Continue.
Continue.
1 day.
3 Weeks.
1 day
3 weeks.
1 day.
2 Weeks.
3 hrs.
1 Month.
2 hrs.
2 Weeks.
1hr.
1 Week.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Executive Summary
At the completion of this inspection, I have concluded with recommendation which includes the time,
effort, money and control measures to mitigate/eliminate the health and safety issues observed
through are pointed out .Implementing on these control measures not only benefit the company
business image also boost employees morale and avoid any legal implication from the external
authorities, Direct and indirect cost associated for the company following an accident.
Key issues were found in the construction area activities are highlighted below.
A quick analysis of the cost shown in the recommendation can help to identify the cost implication to
overcome the key areas which can in turn help to protect our workers, property and more importantly
our ISO certification renewal and public image on our business.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
*Observation#2:
Construction materials such as iron rods ,bricks, cement bags were stacked too high where workers
and publics are walking nearby and it has the potential to fall off from height , workers/public may get
crushed and result in serious personal injury not limited to bone fracture,cuts,bruises etc... Which is
against ILO-C155 Occupational Health and safety convention 1981 and Work at height regulation2005(WAHR).
Recommendation:
High-Impact aversion therapy training for all workers on safe stacking to completely eliminate this
issue and also barricading the area helps to prevent the pedestrians movement safe which both could
cost approximately USD250.
Observation#3:
Tipping operations being carried without the help of spotter where lot of workers were found to be
moving around and also no announcement being made to clear off the area that could alert the
workers to move away before the tipping operation started has the potential for workers even get
crushed when the load fall on them resulting in serious personal injury,fatality,head injury etc. which
breaches the legislation of ILO -C177- Home work convention ,1966(No.177)
Recommendation:
Interim provision of banks man allocated before tipping operation could start minimize the issue, to
completely eliminate this issue would be announcing before tipping operation starts and recruit a
spotter and train to master on signalling to the operator and ensure no one is around during tipping
operation which would cost approximately USD400.
Observation#4:
Tower crane operator where found to be no paper work of his license and certification that supposed
to be carried in the crane machine. Also no inspection/maintenance record where in place for crane
and its slings where it all could lead to serious property damage and fatality which breaches ILOR164-Occupation health and safety recommendation,1981(No.164)
Recommendation:
Enforcing strict rules all necessary paperwork should be in place in the crane such as operators
license and certification for crane and also inspection/maintenance records carried on weight lifting
equipments during operation .
Observation#5:
Excavator were reversed without the help of banks man and there are plenty of other workers working
around the excavation area and also no signage in place can lead to excavator may fall into the
excavation can cause property damage and also when it collide with pedestrians can leads to fatality
by getting crushed which breaches ILO-R175- Safety and health in Construction Recommendation,
1988(No.175)
Recommendation: Appoint interim spotter to minimize the consequence and to completely eliminate
recruit and train spotter which would cost approximately USD450.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Conclusions
At the outset, I would like to thank the management for giving me an opportunity to inspect on the
place where there is heavy mounted traffic and it found to be challenging with one of the biggest
construction of flyover project at Surat, India. Also would like to extend my thanks to each and every
workforce who helped me throughout this inspection, by understanding the importance of why I am
being here as it pertains to their safety instead that the inspector came to point out the issues out
there and hence misbehaving like not providing sufficient information when asked/look at me like a
police.
Workforce seems to be happy with the sufficient welfare facilities and adequate workload on them
with the shift basis, however there found to be still grey areas where management should focus on to
rectify them, such as
Excavation without protection could lead to falling of material/worker has the consequence of
serious personal injury and fatality, constructing a trench with adequate warning signage
would eliminate this hazard.
Construction materials were stacked too high has the potential to fall from height on to
workers can have significant head injury ,bone fracture etc. Reducing the height and training
would help to mitigate this issue.
Tipper and Excavators were reversed/operated without the help the banks man can lead to
striking of pedestrians around that area, to rectify this issue an interim spotter should be
identified to mitigate and to completely eliminate recruit and train the spotter.
Crane operation being carried out without any inspection record and also no paper work on
board such as crane operators licence and certification which could lead to cancelling the
license for that vehicle to operate and any accident may found to be breaching the statutory
law,to rectify ensure inspection carried out on schedule and necessary paper work on board
all the times.
Above issues were spotted as major which highlights the concern of serious moral, legal and
economical problems which in turn could damage the public image and reputation on us. Suitable
recommendation suggested on the spotted issue which Im bringing to your attention through this
report for implementation to rectify it without further delay.
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Recommendations:
Recommendation
Observation#1:
Trenching the excavation
area and provision of
warning signage to
minimize the
people/material falling
from height.
Observation#2
Training on safe stacking
and reducing the height
of the stacked material.
Priority
Target date
2 manpower required to
implement ,trench would cost
around USD 250 and 2 warning
signages would cost $50 , total
cost of approximately USD 300
High
30 April 2014(1
Month)
Arrangement of workplace
training on safe stacking like
purchasing training material
would cost approximately
USD50
High
1 Month
(30- April-2014)
Observation#3:
Recruit, Appoint and Train
the banks man for
reverse operation of
tipper.
High
(30- April-2014)
Enforcement of rules by
supervisor to instruct the
crane operator to carry all
necessary paperwork and
training videos for crane
operator.
Medium
2 Weeks.
(14-April-2014)
Observation#5:
Recruit, Appoint and Train
the banks man for
reverse operation of
excavator.
High
1 Month
(30- April-2014)
(1 Month)
Observation#4: