OBRA
ENTIDAD
CONTRATISTA
: CONSORCIO ILUCAN
SUPERVISIN
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
1.
MONTO DE VALORIZACIN
VALORIZACIN SIN REJUSTE
POR ADICIONALES
2.
REAJUSTE DE LA VALORIZACIN
POR OBRA PRINCIPAL
POR ADICIONALES
RETENCIN POR RETRASO DE OBRA
- En Obra Principal
- En Adicionales
REINTEGROS (Otros)
3.
4.
5.
6.
AMORTIZACIN DE ADELANTOS
ADELANTO EN EFECTIVO
ADELANTO PARA MATERIALES
7.
OTROS
MAYORES GASTOS GENERALES AMPL. DE PLAZO
INTERES POR MORA EN PAGOS
OTROS CONCEPTOS
8.
9.
MONTO RETENIDO
11.
12.
13.
14.
15.
OLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
GION CAJAMARCA"
MONTOS PAGADOS
(S/.)
(S/.)
(S/.)
6,079,377.68
5,434,782.79
644,594.89
6,079,377.72
5,434,782.83
644,594.89
-0.04
- 0.04
0.00
248,668.75
238,116.78
10,551.97
0.00
0.00
0.00
248,668.75
238 116.78
10 551.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,328,046.43
6,079,377.72
248,668.71
45,054.69
0.00
45,054.69
0.00
0.00
0.00
45,054.69
0.00
45 054.69
6,282,991.74
6,079,377.72
203,614.02
2,103,905.72
0.00
2,103,905.72
2,103,905.72
0.00
2 103 905.72
0.00
0.00
0.00
137,826.95
137,642.73
184.22
0.00
137,642.73
137 642.73
0.00
0.00
184.22
0.00
184.22
0.00
4,316,912.97
4,113,114.73
203,798.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,316,912.97
4,113,114.73
203,798.24
1,155,747.36
777,044.34
378,703.03
1,119,063.68
740 360.65
378 703.03
36,683.68
36 683.68
0.00
5,472,660.34
5,232,178.41
240,481.92
5,472,660.34
5,232,178.41
240,481.92
7,576,566.05
7,336,084.13
240,481.92
LIQUIDACIN DE CONTRATO DE O
CONTRATO DE OBRA N
228-2014-GR.CAJ.-GSRC.
NOMBRE DE OBRA
ENTIDAD
VALOR REFERENCIAL
S/.
6,413,043.74
S/.
6,413,043.74
FECHA BASE
SISTEMA DE CONTRATACIN
MAYO - 2014
:
A SUMA ALZADA
:
03 de Setiembre de 2014
04 de Setiembre de 2014
AMPLIACIN DE PLAZO N 01
17 de Setiembre de 2015
:
:
09 de Noviembre de 2015
03 de Diciembre de 2015
03 de Diciembre de 2015
I.
PRESUPUESTO CONTRATADO
1.1.0
MONTO DE CONTRATO
Pgina 5
LIQUIDACIN DE CONTRATO DE O
1.2.0
DEDUCTIVOS DE OBRA
Pgina 6
LIQUIDACIN DE CONTRATO DE O
1.2.0
-
II.
AUTORIZADO Y PAGADO
2.1.0 AUTORIZADO
2.1.1
2.1.2
POR ADICIONALES
MONTO VALORIZADO RECALCULADO
REAJUSTES RECALCULADOS
DEDUCCIN DE REAJUSTES POR ADELANTO DIRECTO
DEDUCCIN DE REAJUSTES POR ADELANTO DE MATERIALES
2.1.4
2.2.0
PAGADO
2.2.1
Pgina 7
LIQUIDACIN DE CONTRATO DE O
2.2.2
2.2.3
Pgina 8
LIQUIDACIN DE CONTRATO DE O
III.
ADELANTOS
3.1.0
3.2.0
INTERES
4.1.0
AUTORIZADO
INTERES POR DEMORA DE PAGO DE VALORIZACIONES
4.2.0
PAGADO
INTERES POR DEMORA DE PAGO DE VALORIZACIONES
AUTORIZADO
5.1.1
5.1.2
Pgina 9
LIQUIDACIN DE CONTRATO DE O
REAJUSTES RECALCULADOS
DEDUCCIN DE REAJUSTES POR ADELANTO DIRECTO
DEDUCCIN DE REAJUSTES POR ADELANTO PARA MATERIALES
5.1.3
POR ADELANTOS
AMORTIZACION DE ADELANTO DE MATERIALES
5.1.5
5.1.6
INTERES
INTERES POR DEMORA DE PAGO DE VALORIZACIONES
Pgina 10
LIQUIDACIN DE CONTRATO DE O
5.2.0
PAGADO
5.2.1
5.2.2
5.2.3
POR ADELANTOS
ADELANTO DIRECTO PAGADO POR LA ENTIDAD
ADELANTO DE MATERIALES PAGADO POR LA ENTIDAD
5.2.4
5.2.5
INTERES
INTERES POR DEMORA DE PAGO DE VALORIZACIONES
MULTAS
POR DEMORA EN TERMINO DE OBRA
6.1.0
DESCUENTO
Pgina 11
LIQUIDACIN DE CONTRATO DE O
6.2.0
DESCONTADO
DEVUELTO
7.2.0
Pgina 12
LIQUIDACIN DE CONTRATO DE O
II.
AUTORIZADO Y PAGADO
III.
ADELANTOS
IV.
INTERESES
PARCIALES
V.
VI.
MULTA
VII.
SUB TOTALES
Pgina 13
IN DE CONTRATO DE OBRA
S/. 5,434,782.83
S/. 5,434,782.83
===========
Pgina 14
IN DE CONTRATO DE OBRA
S/. 0.00
Pgina 15
IN DE CONTRATO DE OBRA
S/. 644,594.89
093-2015-GR.CAJ-GSRC.C)
S/. 644,594.89
===========
S/. 6,079,377.72
S/. 5,627,844.88
S/. 5,434,782.79
S/. 238,116.78
DELANTO DIRECTO
DELANTO DE MATERIALES
S/. 0.00
S/. 45,054.69
==============
S/. 655,146.86
S/. 644,594.89
S/. 10,551.97
DELANTO DIRECTO
DELANTO DE MATERIALES
S/. 0.00
S/. 0.00
==============
S/. 137,642.73
AMPLIACIN DE PLAZO N 01
S/. 137,643
AMPLIACIN DE PLAZO N 03
7438.88, renunciado
===============
S/. 6,420,634.47
S/. 5,434,782.83
S/. 5,434,782.83
S/. 0.00
DELANTO DIRECTO
S/. 0.00
S/. 0.00
Pgina 16
IN DE CONTRATO DE OBRA
===============
S/. 644,594.89
S/. 644,594.89
S/. 0.00
DELANTO DIRECTO
S/. 0.00
S/. 0.00
===============
S/. 137,642.73
AMPLIACIN DE PLAZO N 01
S/. 137,642.73
AMPLIACIN DE PLAZO N 03
S/. 0.00
===============
S/. 6,217,020.45
S/. 203,614.02
Pgina 17
IN DE CONTRATO DE OBRA
S/. 2,103,905.72
S/. 0.00
S/. 2,103,905.72
===============
S/. 2,103,905.72
S/. 0.00
S/. 2,103,905.72
===============
S/. 0.00
S/. 184.22
S/. 184.22
===============
S/. 0.00
S/. 0.00
===============
S/. 184.22
S/. 1,013,012.11
S/. 978,260.91
S/. 42,861.04
S/. 0.00
S/. 8,109.84
===============
S/. 117,926.44
O ADICIONALES DE OBRA
S/. 116,027.08
Pgina 18
IN DE CONTRATO DE OBRA
S/. 1,899.36
DELANTO DIRECTO
S/. 0.00
S/. 0.00
===============
S/. 378,703.03
S/. 378,703.03
===============
S/. 24,775.69
AMPLIACIN DE PLAZO N 01
S/. 24,775.69
AMPLIACIN DE PLAZO N 03
1339.00, renunciado
===============
E VALORIZACIONES
S/. 33.16
S/. 33.16
===============
S/. 1,534,450.42
Pgina 19
IN DE CONTRATO DE OBRA
S/. 978,260.90
S/. 978,260.90
S/. 0.00
DELANTO DIRECTO
S/. 0.00
S/. 0.00
===============
S/. 116,027.09
S/. 116,027.09
S/. 0.00
DELANTO DIRECTO
S/. 0.00
S/. 0.00
===============
S/. 378,703.03
S/. 0.00
O POR LA ENTIDAD
S/. 378,703.03
===============
S/. 24,775.69
AMPLIACIN DE PLAZO N 01
S/. 24,775.69
AMPLIACIN DE PLAZO N 03
S/. 0.00
E VALORIZACIONES
S/. 0.00
S/. 0.00
===============
S/. 1,497,766.71
S/. 36,683.72
S/. 0.00
S/. 0.00
Pgina 20
IN DE CONTRATO DE OBRA
S/. 0.00
===============
S/. 0.00
0.00
0.00
===============
S/. 0.00
Pgina 21
IN DE CONTRATO DE OBRA
A FAVOR DEL
CONTRATISTA
CONTRATISTA
S/. 0.00
S/. 203,614.02
S/. 0.00
S/. 0.00
S/. 0.00
S/. 184.22
S/. 0.00
S/. 203,798.24
S/. 0.00
S/. 36,683.72
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 240,481.96
S/. 240,481.96
Pgina 22
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
:CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Paralizacin de obra N 01
Resolucin de Aprobacin
: Por inaccesiblidad debido a derrumbes en los accesos a los lugares de las obras ocasionados por intesas lluvias.
Base Legal
DESCRIPCION
I. MANO DE OBRA INDIRECTA
A. AREA DE PRODUCCION
1.0 Gerente de Obra
2.0 Residente de Obra
6.0 Ingeniero asistente de Obra
B. AREA ADMINISTRATIVA
1.0 Secretaria
2.0 Almacenero
3.0 Guardan
II. MOVILIZACION DE PERSONAL
1.0 Personal Profesional
III. ALIMENTACION
1.0 Equipo Tcnico
IV. VEHICULOS
1.0 Camioneta 4x4/Produccion
VI. MARIALES DE LIMPIEZA
1.0 Materiales de Limpieza
VIII. COMUNICACIONES
1.0 Telfono
2.0 Servicio de Internet
IX. MATERIALES, SERVICIOS Y EQUIPOS OFICINA
1.0 Computadoras e Impresoras
2.0 Materiales de Oficina
3.0 Copias en General
X. GASTOS FINANCIEROS
1.0 Garanta de Fiel Cumplimiento(Carta Fianza) 4.5% anual
2.0 Garanta de1 adelanto de Materiales (4.5% anual)
XI. SEGUROS
1.0 Seguro Complementario de Trabajo de Riesgo
2.0 Seguro de Vida Ley
3.0 Seguro Contra Todo Riesgo(CAR)
unidad
Cantidad
Coef. Partic.
COSTO
(SOLES x MES)
COSTO
(SOLES x DIA)
DIAS
PARALIZADOS
MONTO
(S/.)
mes
mes
mes
1
1
8
0.25
1
0.25
S/.
S/.
S/.
mes
mes
mes
8
8
0.5
1
1
MONTO TOTAL
(S/.)
100,375.00
5,500.00
5,000.00
3,000.00
183.33
166.67
100.00
110
110
110
5,041.67
18,333.33
22,000.00
S/.
S/.
S/.
1,200.00
900.00
900.00
40.00
30.00
30.00
110
110
110
2,200.00
26,400.00
26,400.00
1,625.56
glb
S/.
15,960.00
0.25
S/.
1,773.33
59.11
110
1,625.56
glb
S/.
43,920.00
0.25
S/.
4,880.00
162.67
110
4,473.33
100.00
110
5,500.00
4,473.33
5,500.00
mes
0.25
S/.
3,000.00
mes
0.25
S/.
200.00
6.67
110
183.33
mes
mes
1
1
0.5
0.5
S/.
S/.
120.00
150.00
4.00
5.00
110
110
220.00
275.00
mes
mes
mes
8
1
8
0.2
0.2
0.2
S/.
S/.
S/.
1,200.00
400.00
87.99
40.00
13.33
2.93
110
110
110
7,040.00
293.33
516.21
mes
mes
S/. 543,478.28
S/. 643,823.71
1
1
S/.
S/.
2,038.04
2,414.34
67.93
80.48
110
110
7,472.83
8,852.58
0.1
0.1
0.1
S/.
S/.
S/.
211.35
1,006.44
1,006.44
7.05
33.55
33.55
110
110
110
77.50
369.03
369.03
183.33
495.00
7,849.54
16,325.41
815.56
S/.
1,902.17
glb
S/.
9,057.97
glb
S/.
9,057.97
glb
TOTAL GASTOS GENERALES
S/.
SUB TOTAL
IGV (18%):
TOTAL
Pgina 23
137,642.73
S/. 137,642.73
S/. 24,775.69
============
S/. 162,418.42
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
:CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
: 24 Das Cal.
Resolucin de Aprobacin
Base Legal
: S/. 79896.0756180824
0.1245013362
: 419.35
: 400.35
FORMULA GENERAL
1) Calculo del Gasto General diario (GGD):
(GGV/Plazo Contractual)
GGD
79,896.08
270 Das
S/. 295.91
S/. 7,438.88
S/. 7,438.88
S/. 1,339.00
============
S/. 8,777.88
DESCRIPCIN
GASTOS GENERALES
VARIABLES
S/.
PLAZO
CONTRACTUAL
(Das)
Ip
Nov-15
IU 39
Mes
Causal
Io
May-14
79,896.08
270
419.35
Nov-15
400.35
S/. 8,777.88
Pgina 24
(das)
24
MAYORES
GASTOS
GENERALES
S/. 7,438.92
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
:CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
CONCEPTO
VALORIZACION NETA
(VN)
I.G.V
MONTO A PAGAR
FECHA DE VENCIMIENTO
DE PLAZO DE PAGO
FECHA DE PAGO DE
VALORIZACION
DIAS DE
MORA
FACTOR ACUMULADO
FACTOR ACUMULADO
TIL
TIL
A la fecha del
A la fecha de
vencimiento
de
pago
plazo de pago
INTERES
S/. 112,638.77
S/. 20,274.98
S/. 132,913.75
31-Oct-14
27-Oct-14
S/. 0.00
S/. 329,276.74
S/. 59,269.81
S/. 388,546.55
30-Nov-14
22-Nov-14
S/. 0.00
S/. 573,689.42
S/. 103,264.10
S/. 676,953.52
31-Dec-14
17-Dec-14
S/. 0.00
S/. 532,350.45
S/. 95,823.08
S/. 628,173.53
31-Jan-15
27-Jan-15
S/. 0.00
S/. 541,505.68
S/. 97,471.02
S/. 638,976.70
31-May-15
19-May-15
S/. 0.00
S/. 483,562.69
S/. 87,041.28
S/. 570,603.97
30-Jun-15
17-Jun-15
S/. 0.00
25-Jul-15
3-Aug-15
S/. 72,276.05
S/. 13,009.69
S/. 119,130.11
S/. 21,443.42
S/. 225,859.27
31-Jul-15
6.86488
6.86616
0.00019
S/. 22.21
S/. 231,832.43
S/. 41,729.84
S/. 273,562.27
31-Aug-15
17-Aug-15
S/. 0.00
S/. 68,567.54
S/. 12,342.16
S/. 80,909.70
30-Sep-15
16-Sep-15
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
31-Oct-15
31-Oct-15
S/. 0.00
S/. 73,238.74
S/. 13,182.97
S/. 86,421.71
30-Nov-15
11-Nov-15
S/. 0.00
S/. 192,808.48
S/. 34,705.53
S/. 227,514.01
31-Dec-15
22-Dec-15
S/. 0.00
S/. 318,700.61
30-Sep-15
16-Oct-15
16
6.89149
6.89865
0.00104
S/. 29.71
5-Oct-15
6.89149
6.89371
0.00032
S/. 77.79
6.90547
6.90727
S/. 28,592.51
S/. 33,739.16
S/. 241,492.76
S/. 284,961.46
S/. 209,110.26
S/. 37,639.85
S/. 246,750.11
31-Oct-15
4-Nov-15
S/. 126,154.60
S/. 22,707.83
S/. 148,862.43
30-Nov-15
12-Nov-14
S/. 0.00
S/. 39,244.76
S/. 7,064.06
S/. 46,308.82
31-Dec-15
17-Dec-14
S/. 0.00
TOTAL INTERESES
0.00026
S/. 54.51
S/. 184.22
NOMBRE DE OBRA
PROCESO
ENTIDAD
CONTRATISTA
: CONSORCIO ILUCAN
CUADRO R
MES
SETIEMBRE 2014
VALORIZACION 02
OCTUBRE 2014
VALORIZACION 03
NOVIEMBRE 2014
VALORIZACION 04
DICIEMBRE 2014
VALORIZACION 05
ABRIL 2015
VALORIZACION 06
MAYO 2015
VALORIZACION 07
JUNIO 2015
VALORIZACION 08
JULIO 2015
VALORIZACION 09
AGOSTO 2015
VALORIZACION 10
SETIEMBRE 2015
VALORIZACION 11
OCTUBRE 2015
VALORIZACION 12
NOVIEMBRE 2015
AGOSTO 2015
VALORIZACION 02
SETIEMBRE 2015
VALORIZACION 03
OCTUBRE 2015
VALORIZACION 04
NOVIEMBRE 2015
TOTAL
ION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN
JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
SUPERVISIN
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
CUADRO RESUMEN
I.G.V (18%)
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 22.21
S/. 4.00
S/. 26.21
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 107.50
S/. 19.35
S/. 126.85
S/. 54.51
S/. 9.81
S/. 64.32
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 184.22
S/. 33.16
S/. 217.38
RIZACIONES
TOTAL VALORIZACION DE INTERESES
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 26.21
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 126.85
S/. 64.32
S/. 0.00
S/. 0.00
S/. 217.38
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
COMPROBANTE
CONCEPTO
DE PAGO
N
MONTO
REINTEGRO
SUB-TOTAL
FECHA
ADELANTO DIRECTO
AMORT.
ADELANTO MATERIALES
DEDUCCION
AMORT.
NETO
SUB-TOTAL
DEDUCCION
I.G.V
CORRECCION DE
VALORIZACION
TOTAL
RETENCION
FONDO DE
GARANTIA
TOTAL FACTURA
A2003847
27-Oct-14
VALORIZACION N 01
330,030.08
0.00
330,030.08
0.00
0.00
217,391.31
0.00
217,391.31
112,638.77
20,274.98
132,913.75
132,913.75
A2003847
22-Nov-14
VALORIZACION N 02
411,595.92
0.00
411,595.92
0.00
0.00
82,319.18
0.00
82,319.18
329,276.74
59,269.81
388,546.56
388,546.56
A2003847
17-Dec-14
VALORIZACION N 03
717,111.78
0.00
717,111.78
0.00
0.00
143,422.36
0.00
143,422.36
573,689.42
103,264.10
676,953.53
676,953.53
A2003847
27-Jan-15
VALORIZACION N 04
665,438.06
0.00
665,438.06
0.00
0.00
133,087.61
0.00
133,087.61
532,350.45
95,823.08
628,173.53
628,173.53
A2003847
19-May-15
VALORIZACION N 05
883,540.77
0.00
883,540.77
0.00
0.00
342,035.09
0.00
342,035.09
541,505.68
97,471.02
638,976.70
638,976.70
A2003847
17-Jun-15
VALORIZACION N 06
788,998.85
0.00
788,998.85
0.00
0.00
305,436.16
0.00
305,436.16
483,562.69
87,041.28
570,603.97
570,603.97
A2003847
25-Jul-15
VALORIZACION N 07
509,380.37
0.00
509,380.37
0.00
0.00
317,974.21
0.00
317,974.21
191,406.16
34,453.11
225,859.27
225,859.27
A2003847
17-Aug-15
VALORIZACION N 08
448,597.41
0.00
448,597.41
0.00
0.00
216,764.98
0.00
216,764.98
231,832.43
41,729.84
273,562.27
273,562.27
A2003847
16-Sep-15
VALORIZACION N 09
156,317.06
0.00
156,317.06
0.00
0.00
87,749.52
0.00
87,749.52
68,567.54
12,342.16
80,909.70
80,909.70
A2003847
31-Oct-15
VALORIZACION N 10
132,967.30
0.00
132,967.30
0.00
0.00
132,967.30
0.00
132,967.30
0.00
0.00
0.00
0.00
A2003847
11-Nov-15
VALORIZACION N 11
197,996.74
0.00
197,996.74
0.00
0.00
124,758.00
0.00
124,758.00
73,238.74
13,182.97
86,421.71
86,421.71
22-Dec-15
VALORIZACION N 12
A2003847
192,808.48
0.00
192,808.48
0.00
0.00
0.00
0.00
0.00
192,808.48
34,705.53
227,514.01
5,434,782.82
0.00
5,434,782.82
0.00
0.00
2,103,905.72
0.00
2,103,905.72
3,330,877.10
599,557.88
3,930,435.00
227,514.01
0.00
3,930,435.00
16-Oct-15
VAL. N 01 - ADIC. 01
270,085.26
0.00
270,085.26
0.00
0.00
0.00
0.00
0.00
270,085.26
48,615.35
318,700.61
318,700.61
A2003847
4-Nov-15
VAL. N 02 - ADIC. 01
209,110.26
0.00
209,110.26
0.00
0.00
0.00
0.00
0.00
209,110.26
37,639.85
246,750.11
246,750.11
A2003847
12-Nov-14
VAL. N 03 - ADIC. 01
126,154.60
0.00
126,154.60
0.00
0.00
0.00
0.00
0.00
126,154.60
22,707.83
148,862.43
148,862.43
A2003847
17-Dec-14
VAL. N 04 - ADIC. 01
39,244.76
0.00
39,244.76
0.00
0.00
0.00
0.00
0.00
39,244.76
7,064.06
46,308.82
46,308.82
644,594.89
0.00
644,594.89
0.00
0.00
0.00
0.00
0.00
644,594.89
116,027.09
760,621.97
760,621.97
644,594.89
0.00
644,594.89
0.00
0.00
0.00
0.00
0.00
644,594.89
116,027.09
760,621.97
760,621.97
S/. 6,079,377.71
S/. 0.00
S/. 6,079,377.71
S/. 0.00
S/. 0.00
S/. 2,103,905.72
S/. 0.00
S/. 2,103,905.72
S/. 3,975,471.99
S/. 715,584.97
S/. 4,691,056.97
S/. 4,691,056.97
ADICIONAL N 01
SUB TOTAL 2 - ADICIONALES
TOTAL PAGADO
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 0.00
S/. 23,290.71
S/. 0.00
S/. 23,290.71
Sep-2014
1.026
S/. 0.00
S/. 605.56
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
02
Oct-2014
S/. 0.00
S/. 60,468.18
S/. 0.00
S/. 83,758.89
Oct-2014
1.029
S/. 0.00
S/. 1,753.58
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
03
Nov-2014
S/. 0.00
S/. 56,266.94
S/. 0.00
S/. 140,025.83
Nov-2014
1.031
S/. 0.00
S/. 1,744.28
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
04
Dec-2014
S/. 0.00
S/. 78,463.19
S/. 0.00
S/. 218,489.02
Dec-2014
1.034
S/. 0.00
S/. 2,667.75
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
05
Apr-2015
S/. 256,940.08
S/. 30,725.37
S/. 256,940.08
S/. 249,214.39
Apr-2015
1.047
S/. 12,076.18
S/. 1,444.09
S/. 12,076.18
S/. 0.00
S/. 0.00
S/. 12,076.18
06
May-2015
S/. 299,005.30
S/. 77,993.37
S/. 555,945.38
S/. 327,207.76
May-2015
1.049
S/. 14,651.26
S/. 3,821.68
S/. 14,651.26
S/. 0.00
S/. 0.00
S/. 14,651.26
07
Jun-2015
S/. 142,567.82
S/. 128,182.68
S/. 698,513.20
S/. 455,390.44
Jun-2015
1.062
S/. 8,839.20
S/. 7,947.33
S/. 8,839.20
S/. 0.00
S/. 0.00
S/. 8,839.20
08
Jul-2015
S/. 31,098.70
S/. 119,046.47
S/. 729,611.90
S/. 574,436.91
Jul-2015
1.059
S/. 1,834.82
S/. 7,023.74
S/. 1,834.82
S/. 0.00
S/. 0.00
S/. 1,834.82
09
Aug-2015
S/. 0.00
S/. 113,708.76
S/. 729,611.90
S/. 688,145.67
Aug-2015
1.065
S/. 0.00
S/. 7,391.07
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
10
Sep-2015
S/. 0.00
S/. 61,439.06
S/. 729,611.90
S/. 749,584.77
Sep-2015
1.063
S/. 0.00
S/. 3,870.66
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
11
Oct-2015
S/. 18,607.28
S/. 0.00
S/. 748,219.18
S/. 749,584.77
Oct-2015
1.066
S/. 1,228.08
S/. 0.00
S/. 1,228.08
S/. 0.00
S/. 0.00
S/. 1,228.08
12
Nov-2015
S/. 1,365.59
S/. 0.00
S/. 749,584.77
S/. 749,584.77
Nov-2015
1.072
S/. 98.32
S/. 0.00
S/. 98.32
S/. 0.00
S/. 0.00
S/. 98.32
S/. 749,584.76
S/. 749,584.76
S/. 38,727.86
S/. 38,269.74
S/. 38,727.86
S/. 0.00
S/. 0.00
S/. 38,727.86
Dec-2015
TOTAL
01
MES
Sep-2014
REAL
PROGRAMADO
(VR)
(VP)
S/. 21,008.49
S/. 24,241.09
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
S/. 21,008.49
S/. 24,241.09
Sep-2014
1.027
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
S/. 567.23
S/. 654.51
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
S/. 567.23
S/. 0.00
S/. 0.00
REAJUSTE TOTAL
S/. 567.23
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Oct-2014
S/. 48,885.33
S/. 30,721.54
S/. 69,893.82
S/. 54,962.63
Oct-2014
1.031
S/. 1,515.45
S/. 952.37
S/. 1,515.45
S/. 0.00
S/. 0.00
S/. 1,515.45
03
Nov-2014
S/. 130,432.77
S/. 56,883.05
S/. 200,326.59
S/. 111,845.68
Nov-2014
1.032
S/. 4,173.85
S/. 1,820.26
S/. 4,173.85
S/. 0.00
S/. 0.00
S/. 4,173.85
04
Dec-2014
S/. 144,801.96
S/. 40,890.59
S/. 345,128.55
S/. 152,736.27
Dec-2014
1.035
S/. 5,068.07
S/. 1,431.17
S/. 5,068.07
S/. 0.00
S/. 0.00
S/. 5,068.07
05
Apr-2015
S/. 69,184.53
S/. 20,949.90
S/. 414,313.08
S/. 173,686.17
Apr-2015
1.045
S/. 3,113.30
S/. 942.75
S/. 3,113.30
S/. 0.00
S/. 0.00
S/. 3,113.30
06
May-2015
S/. 68,498.09
S/. 95,627.67
S/. 482,811.17
S/. 269,313.84
May-2015
1.046
S/. 3,150.91
S/. 4,398.87
S/. 3,150.91
S/. 0.00
S/. 0.00
S/. 3,150.91
07
Jun-2015
S/. 73,461.46
S/. 112,549.81
S/. 556,272.63
S/. 381,863.65
Jun-2015
1.061
S/. 4,481.15
S/. 6,865.54
S/. 4,481.15
S/. 0.00
S/. 0.00
S/. 4,481.15
08
Jul-2015
S/. 0.00
S/. 82,720.46
S/. 556,272.63
S/. 464,584.11
Jul-2015
1.057
S/. 0.00
S/. 4,715.07
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
09
Aug-2015
S/. 0.00
S/. 122,852.43
S/. 556,272.63
S/. 587,436.54
Aug-2015
1.061
S/. 0.00
S/. 7,494.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
10
Sep-2015
S/. 16,697.11
S/. 32,730.33
S/. 572,969.74
S/. 620,166.88
Sep-2015
1.060
S/. 1,001.83
S/. 1,963.82
S/. 1,001.83
S/. 0.00
S/. 0.00
S/. 1,001.83
11
Oct-2015
S/. 35,541.16
S/. 0.00
S/. 608,510.90
S/. 620,166.88
Oct-2015
1.063
S/. 2,239.09
S/. 0.00
S/. 2,239.09
S/. 0.00
S/. 0.00
S/. 2,239.09
12
Nov-2015
S/. 11,655.98
S/. 0.00
S/. 620,166.88
S/. 620,166.88
Nov-2015
1.067
S/. 780.95
S/. 0.00
S/. 780.95
S/. 0.00
S/. 0.00
S/. 780.95
S/. 620,166.88
S/. 620,166.87
S/. 26,091.83
S/. 31,238.36
S/. 26,091.83
S/. 0.00
S/. 0.00
S/. 26,091.83
TOTAL
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 48,392.06
S/. 28,561.78
S/. 48,392.06
S/. 28,561.78
Sep-2014
1.026
S/. 1,258.19
S/. 742.61
S/. 1,258.19
S/. 0.00
S/. 0.00
S/. 1,258.19
02
Oct-2014
S/. 79,355.76
S/. 30,352.45
S/. 127,747.82
S/. 58,914.23
Oct-2014
1.030
S/. 2,380.67
S/. 910.57
S/. 2,380.67
S/. 0.00
S/. 0.00
S/. 2,380.67
03
Nov-2014
S/. 103,912.97
S/. 55,037.40
S/. 231,660.79
S/. 113,951.63
Nov-2014
1.030
S/. 3,117.39
S/. 1,651.12
S/. 3,117.39
S/. 0.00
S/. 0.00
S/. 3,117.39
04
Dec-2014
S/. 64,876.45
S/. 44,021.05
S/. 296,537.24
S/. 157,972.68
Dec-2014
1.033
S/. 2,140.92
S/. 1,452.69
S/. 2,140.92
S/. 0.00
S/. 0.00
S/. 2,140.92
05
Apr-2015
S/. 116,179.10
S/. 20,964.80
S/. 412,716.34
S/. 178,937.48
Apr-2015
1.045
S/. 5,228.06
S/. 943.42
S/. 5,228.06
S/. 0.00
S/. 0.00
S/. 5,228.06
06
May-2015
S/. 76,349.91
S/. 93,705.12
S/. 489,066.25
S/. 272,642.60
May-2015
1.061
S/. 4,657.34
S/. 5,716.01
S/. 4,657.34
S/. 0.00
S/. 0.00
S/. 4,657.34
07
Jun-2015
S/. 49,473.15
S/. 111,350.44
S/. 538,539.40
S/. 383,993.04
Jun-2015
1.061
S/. 3,017.86
S/. 6,792.38
S/. 3,017.86
S/. 0.00
S/. 0.00
S/. 3,017.86
08
Jul-2015
S/. 16,455.02
S/. 76,773.51
S/. 554,994.42
S/. 460,766.55
Jul-2015
1.057
S/. 937.94
S/. 4,376.09
S/. 937.94
S/. 0.00
S/. 0.00
S/. 937.94
09
Aug-2015
S/. 20,655.96
S/. 99,524.93
S/. 575,650.38
S/. 560,291.48
Aug-2015
1.061
S/. 1,260.01
S/. 6,071.02
S/. 1,260.01
S/. 0.00
S/. 0.00
S/. 1,260.01
10
Sep-2015
S/. 0.00
S/. 32,868.94
S/. 575,650.38
S/. 593,160.42
Sep-2015
1.060
S/. 0.00
S/. 1,972.14
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
11
Oct-2015
S/. 0.00
S/. 0.00
S/. 575,650.38
S/. 593,160.42
Oct-2015
1.063
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
12
Nov-2015
S/. 17,510.04
S/. 0.00
S/. 593,160.42
S/. 593,160.42
Nov-2015
1.068
S/. 1,190.68
S/. 0.00
S/. 1,190.68
S/. 0.00
S/. 0.00
S/. 1,190.68
S/. 593,160.42
S/. 593,160.42
S/. 25,189.06
S/. 30,628.05
S/. 25,189.06
S/. 0.00
S/. 0.00
S/. 25,189.06
Dec-2015
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 48,438.19
S/. 42,710.94
S/. 48,438.19
S/. 42,710.94
Sep-2014
1.025
S/. 1,210.95
S/. 1,067.77
S/. 1,210.95
S/. 0.00
S/. 0.00
S/. 1,210.95
02
Oct-2014
S/. 31,373.79
S/. 49,883.78
S/. 79,811.98
S/. 92,594.72
Oct-2014
1.028
S/. 878.47
S/. 1,396.75
S/. 878.47
S/. 0.00
S/. 0.00
S/. 878.47
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Nov-2014
S/. 127,834.46
S/. 84,398.12
S/. 207,646.44
S/. 176,992.84
Nov-2014
1.029
S/. 3,707.20
S/. 2,447.55
S/. 3,707.20
S/. 0.00
S/. 0.00
S/. 3,707.20
04
Dec-2014
S/. 108,283.95
S/. 116,456.77
S/. 315,930.39
S/. 293,449.61
Dec-2014
1.032
S/. 3,465.09
S/. 3,726.62
S/. 3,465.09
S/. 0.00
S/. 0.00
S/. 3,465.09
05
Apr-2015
S/. 60,158.46
S/. 21,060.50
S/. 376,088.85
S/. 314,510.11
Apr-2015
1.041
S/. 2,466.50
S/. 863.48
S/. 2,466.50
S/. 0.00
S/. 0.00
S/. 2,466.50
06
May-2015
S/. 74,994.21
S/. 88,739.52
S/. 451,083.06
S/. 403,249.63
May-2015
1.042
S/. 3,149.76
S/. 3,727.06
S/. 3,149.76
S/. 0.00
S/. 0.00
S/. 3,149.76
07
Jun-2015
S/. 138,577.14
S/. 105,240.38
S/. 589,660.20
S/. 508,490.01
Jun-2015
1.056
S/. 7,760.32
S/. 5,893.46
S/. 7,760.32
S/. 0.00
S/. 0.00
S/. 7,760.32
08
Jul-2015
S/. 11,865.62
S/. 69,436.29
S/. 601,525.82
S/. 577,926.30
Jul-2015
1.051
S/. 605.15
S/. 3,541.25
S/. 605.15
S/. 0.00
S/. 0.00
S/. 605.15
09
Aug-2015
S/. 24,428.97
S/. 73,939.51
S/. 625,954.79
S/. 651,865.81
Aug-2015
1.054
S/. 1,319.16
S/. 3,992.73
S/. 1,319.16
S/. 0.00
S/. 0.00
S/. 1,319.16
10
Sep-2015
S/. 13,288.20
S/. 33,072.32
S/. 639,242.99
S/. 684,938.13
Sep-2015
1.054
S/. 717.56
S/. 1,785.91
S/. 717.56
S/. 0.00
S/. 0.00
S/. 717.56
11
Oct-2015
S/. 33,101.35
S/. 0.00
S/. 672,344.34
S/. 684,938.13
Oct-2015
1.055
S/. 1,820.57
S/. 0.00
S/. 1,820.57
S/. 0.00
S/. 0.00
S/. 1,820.57
12
Nov-2015
S/. 12,593.77
S/. 0.00
S/. 684,938.11
S/. 684,938.13
Nov-2015
1.061
S/. 768.22
S/. 0.00
S/. 768.22
S/. 0.00
S/. 0.00
S/. 768.22
S/. 684,938.12
S/. 684,938.12
S/. 27,868.95
S/. 28,442.58
S/. 27,868.95
S/. 0.00
S/. 0.00
S/. 27,868.95
TOTAL
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 74,534.84
S/. 27,149.08
S/. 74,534.84
S/. 27,149.08
Sep-2014
1.027
S/. 2,012.44
S/. 733.03
S/. 2,012.44
S/. 0.00
S/. 0.00
S/. 2,012.44
02
Oct-2014
S/. 92,794.70
S/. 43,523.13
S/. 167,329.54
S/. 70,672.21
Oct-2014
1.030
S/. 2,783.84
S/. 1,305.69
S/. 2,783.84
S/. 0.00
S/. 0.00
S/. 2,783.84
03
Nov-2014
S/. 97,470.44
S/. 62,886.33
S/. 264,799.98
S/. 133,558.54
Nov-2014
1.031
S/. 3,021.58
S/. 1,949.48
S/. 3,021.58
S/. 0.00
S/. 0.00
S/. 3,021.58
04
Dec-2014
S/. 87,426.17
S/. 54,643.86
S/. 352,226.15
S/. 188,202.40
Dec-2014
1.034
S/. 2,972.49
S/. 1,857.89
S/. 2,972.49
S/. 0.00
S/. 0.00
S/. 2,972.49
05
Apr-2015
S/. 108,286.16
S/. 23,513.22
S/. 460,512.31
S/. 211,715.62
Apr-2015
1.045
S/. 4,872.88
S/. 1,058.09
S/. 4,872.88
S/. 0.00
S/. 0.00
S/. 4,872.88
06
May-2015
S/. 84,488.05
S/. 102,982.86
S/. 545,000.36
S/. 314,698.48
May-2015
1.046
S/. 3,886.45
S/. 4,737.21
S/. 3,886.45
S/. 0.00
S/. 0.00
S/. 3,886.45
07
Jun-2015
S/. 33,070.97
S/. 69,779.29
S/. 578,071.33
S/. 384,477.77
Jun-2015
1.060
S/. 1,984.26
S/. 4,186.76
S/. 1,984.26
S/. 0.00
S/. 0.00
S/. 1,984.26
08
Jul-2015
S/. 0.00
S/. 0.00
S/. 578,071.33
S/. 384,477.77
Jul-2015
1.055
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
09
Aug-2015
S/. 0.00
S/. 0.00
S/. 578,071.33
S/. 384,477.77
Aug-2015
1.059
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
10
Sep-2015
S/. 0.00
S/. 53,360.64
S/. 578,071.33
S/. 437,838.41
Sep-2015
1.058
S/. 0.00
S/. 3,094.92
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
11
Oct-2015
S/. 15,338.28
S/. 89,431.40
S/. 593,409.61
S/. 527,269.81
Oct-2015
1.061
S/. 935.64
S/. 5,455.32
S/. 935.64
S/. 0.00
S/. 0.00
S/. 935.64
12
Nov-2015
S/. 83,228.10
S/. 131,966.70
S/. 676,637.73
S/. 659,236.51
Nov-2015
1.066
S/. 5,493.05
S/. 8,709.80
S/. 5,493.05
S/. 0.00
S/. 0.00
S/. 5,493.05
Dec-2015
S/. 0.00
S/. 17,401.20
S/. 676,637.73
S/. 676,637.71
Dec-2015
1.066
S/. 0.00
S/. 1,148.48
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 676,637.73
S/. 676,637.73
S/. 27,962.63
S/. 34,236.67
S/. 27,962.63
S/. 0.00
S/. 0.00
S/. 27,962.63
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 69,565.80
S/. 54,980.40
S/. 69,565.80
S/. 54,980.40
Sep-2014
1.023
S/. 1,600.01
S/. 1,264.55
S/. 1,600.01
S/. 0.00
S/. 0.00
S/. 1,600.01
02
Oct-2014
S/. 87,526.74
S/. 70,219.38
S/. 157,092.54
S/. 125,199.78
Oct-2014
1.026
S/. 2,275.70
S/. 1,825.70
S/. 2,275.70
S/. 0.00
S/. 0.00
S/. 2,275.70
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Nov-2014
S/. 146,960.73
S/. 86,316.10
S/. 304,053.27
S/. 211,515.88
Nov-2014
1.028
S/. 4,114.90
S/. 2,416.85
S/. 4,114.90
S/. 0.00
S/. 0.00
S/. 4,114.90
04
Dec-2014
S/. 162,191.16
S/. 77,358.90
S/. 466,244.43
S/. 288,874.78
Dec-2014
1.029
S/. 4,703.54
S/. 2,243.41
S/. 4,703.54
S/. 0.00
S/. 0.00
S/. 4,703.54
05
Apr-2015
S/. 137,866.09
S/. 25,872.71
S/. 604,110.52
S/. 314,747.49
Apr-2015
1.037
S/. 5,101.05
S/. 957.29
S/. 5,101.05
S/. 0.00
S/. 0.00
S/. 5,101.05
06
May-2015
S/. 82,671.57
S/. 103,565.09
S/. 686,782.09
S/. 418,312.58
May-2015
1.040
S/. 3,306.86
S/. 4,142.60
S/. 3,306.86
S/. 0.00
S/. 0.00
S/. 3,306.86
07
Jun-2015
S/. 33,407.46
S/. 126,386.50
S/. 720,189.55
S/. 544,699.08
Jun-2015
1.050
S/. 1,670.37
S/. 6,319.33
S/. 1,670.37
S/. 0.00
S/. 0.00
S/. 1,670.37
08
Jul-2015
S/. 37,312.47
S/. 103,701.42
S/. 757,502.02
S/. 648,400.50
Jul-2015
1.047
S/. 1,753.69
S/. 4,873.97
S/. 1,753.69
S/. 0.00
S/. 0.00
S/. 1,753.69
09
Aug-2015
S/. 0.00
S/. 90,696.00
S/. 757,502.02
S/. 739,096.50
Aug-2015
1.050
S/. 0.00
S/. 4,534.80
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
10
Sep-2015
S/. 0.00
S/. 33,418.12
S/. 757,502.02
S/. 772,514.61
Sep-2015
1.050
S/. 0.00
S/. 1,670.91
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
11
Oct-2015
S/. 0.00
S/. 0.00
S/. 757,502.02
S/. 772,514.61
Oct-2015
1.051
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
12
Nov-2015
S/. 15,012.59
S/. 0.00
S/. 772,514.61
S/. 772,514.61
Nov-2015
1.056
S/. 840.71
S/. 0.00
S/. 840.71
S/. 0.00
S/. 0.00
S/. 840.71
S/. 772,514.61
S/. 772,514.61
S/. 25,366.83
S/. 30,249.41
S/. 25,366.83
S/. 0.00
S/. 0.00
S/. 25,366.83
TOTAL
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 68,090.70
S/. 25,011.74
S/. 68,090.70
S/. 25,011.74
Sep-2014
1.025
S/. 1,702.27
S/. 625.29
S/. 1,702.27
S/. 0.00
S/. 0.00
S/. 1,702.27
02
Oct-2014
S/. 71,659.60
S/. 42,911.73
S/. 139,750.30
S/. 67,923.47
Oct-2014
1.030
S/. 2,149.79
S/. 1,287.35
S/. 2,149.79
S/. 0.00
S/. 0.00
S/. 2,149.79
03
Nov-2014
S/. 110,500.41
S/. 60,300.07
S/. 250,250.71
S/. 128,223.54
Nov-2014
1.031
S/. 3,425.51
S/. 1,869.30
S/. 3,425.51
S/. 0.00
S/. 0.00
S/. 3,425.51
04
Dec-2014
S/. 97,858.37
S/. 46,303.88
S/. 348,109.08
S/. 174,527.42
Dec-2014
1.034
S/. 3,327.18
S/. 1,574.33
S/. 3,327.18
S/. 0.00
S/. 0.00
S/. 3,327.18
05
Apr-2015
S/. 134,926.35
S/. 25,826.84
S/. 483,035.43
S/. 200,354.26
Apr-2015
1.045
S/. 6,071.69
S/. 1,162.21
S/. 6,071.69
S/. 0.00
S/. 0.00
S/. 6,071.69
06
May-2015
S/. 102,991.72
S/. 104,481.00
S/. 586,027.15
S/. 304,835.26
May-2015
1.046
S/. 4,737.62
S/. 4,806.13
S/. 4,737.62
S/. 0.00
S/. 0.00
S/. 4,737.62
07
Jun-2015
S/. 38,822.37
S/. 142,903.89
S/. 624,849.52
S/. 447,739.15
Jun-2015
1.061
S/. 2,368.16
S/. 8,717.14
S/. 2,368.16
S/. 0.00
S/. 0.00
S/. 2,368.16
08
Jul-2015
S/. 29,825.44
S/. 164,760.83
S/. 654,674.96
S/. 612,499.98
Jul-2015
1.057
S/. 1,700.05
S/. 9,391.37
S/. 1,700.05
S/. 0.00
S/. 0.00
S/. 1,700.05
09
Aug-2015
S/. 0.00
S/. 32,948.68
S/. 654,674.96
S/. 645,448.66
Aug-2015
1.060
S/. 0.00
S/. 1,976.92
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
10
Sep-2015
S/. 3,575.67
S/. 32,868.94
S/. 658,250.63
S/. 678,317.60
Sep-2015
1.060
S/. 214.54
S/. 1,972.14
S/. 214.54
S/. 0.00
S/. 0.00
S/. 214.54
11
Oct-2015
S/. 9,878.97
S/. 0.00
S/. 668,129.60
S/. 678,317.60
Oct-2015
1.062
S/. 612.50
S/. 0.00
S/. 612.50
S/. 0.00
S/. 0.00
S/. 612.50
12
Nov-2015
S/. 10,188.00
S/. 0.00
S/. 678,317.60
S/. 678,317.60
Nov-2015
1.067
S/. 682.60
S/. 0.00
S/. 682.60
S/. 0.00
S/. 0.00
S/. 682.60
S/. 678,317.60
S/. 678,317.60
S/. 26,991.91
S/. 33,382.18
S/. 26,991.91
S/. 0.00
S/. 0.00
S/. 26,991.91
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
REAJUSTE
MONTO ACUMULADO
REAL
PROGRAMADO
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
REAJUSTE TOTAL
01
Sep-2014
S/. 0.00
S/. 39,748.87
S/. 0.00
S/. 39,748.87
Sep-2014
1.027
S/. 0.00
S/. 1,073.22
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
02
Oct-2014
S/. 0.00
S/. 38,885.29
S/. 0.00
S/. 78,634.16
Oct-2014
1.031
S/. 0.00
S/. 1,205.44
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL,
LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Nov-2014
S/. 0.00
S/. 56,918.24
S/. 0.00
S/. 135,552.40
Nov-2014
1.031
S/. 0.00
S/. 1,764.47
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
04
Dec-2014
S/. 0.00
S/. 43,373.54
S/. 0.00
S/. 178,925.94
Dec-2014
1.034
S/. 0.00
S/. 1,474.70
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
05
Apr-2015
S/. 0.00
S/. 25,893.99
S/. 0.00
S/. 204,819.93
Apr-2015
1.045
S/. 0.00
S/. 1,165.23
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
06
May-2015
S/. 0.00
S/. 105,215.78
S/. 0.00
S/. 310,035.71
May-2015
1.047
S/. 0.00
S/. 4,945.14
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
07
Jun-2015
S/. 0.00
S/. 125,476.06
S/. 0.00
S/. 435,511.77
Jun-2015
1.061
S/. 0.00
S/. 7,654.04
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
08
Jul-2015
S/. 322,040.16
S/. 142,800.55
S/. 322,040.16
S/. 578,312.32
Jul-2015
1.058
S/. 18,678.33
S/. 8,282.43
S/. 18,678.33
S/. 0.00
S/. 0.00
S/. 18,678.33
09
Aug-2015
S/. 111,232.13
S/. 48,281.46
S/. 433,272.29
S/. 626,593.78
Aug-2015
1.062
S/. 6,896.39
S/. 2,993.45
S/. 6,896.39
S/. 0.00
S/. 0.00
S/. 6,896.39
10
Sep-2015
S/. 99,406.32
S/. 32,868.94
S/. 532,678.61
S/. 659,462.73
Sep-2015
1.061
S/. 6,063.79
S/. 2,005.01
S/. 6,063.79
S/. 0.00
S/. 0.00
S/. 6,063.79
11
Oct-2015
S/. 85,529.70
S/. 0.00
S/. 618,208.31
S/. 659,462.73
Oct-2015
1.064
S/. 5,473.90
S/. 0.00
S/. 5,473.90
S/. 0.00
S/. 0.00
S/. 5,473.90
12
Nov-2015
S/. 41,254.41
S/. 0.00
S/. 659,462.73
S/. 659,462.73
Nov-2015
1.068
S/. 2,805.30
S/. 0.00
S/. 2,805.30
S/. 0.00
S/. 0.00
S/. 2,805.30
S/. 659,462.73
S/. 659,462.73
S/. 39,917.71
S/. 32,563.13
S/. 39,917.71
S/. 0.00
S/. 0.00
S/. 39,917.71
TOTAL
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
SIMB
COD
DESCRIPCIN
47
0.311
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.327
523.70
0.327
523.70
0.327
0.115
100.000%
385.05
396.99
0.119
403.12
0.120
404.73
0.121
0.109
100.000%
651.14
659.07
0.110
662.20
0.111
663.74
0.111
ACERO DE CONSTRUCCION
CORRUGADO
0.086
100.000%
473.03
481.01
0.087
491.87
0.089
495.36
0.090
21
0.079
100.000%
449.97
458.79
0.081
450.85
0.079
450.61
0.079
17
BLOQUE Y LADRILLO
0.051
100.000%
575.59
572.18
0.051
573.76
0.051
578.72
0.051
AF
AGREGADO FINO
0.051
100.000%
517.47
523.47
0.052
525.43
0.052
529.10
0.052
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
39
0.198
100.000%
400.34
COEFICIENTE DE REAJUSTE
3
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.026
K2 =
1.029
K3 =
1.031
SIMB
COD
DESCRIPCIN
47
0.343
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.361
523.70
0.361
523.70
0.361
0.081
100.000%
385.05
396.99
0.084
403.12
0.085
404.73
0.085
0.099
100.000%
651.14
659.07
0.100
662.20
0.101
663.74
0.101
ACERO DE CONSTRUCCION
CORRUGADO
0.101
100.000%
473.03
481.01
0.103
491.87
0.105
495.36
0.106
21
0.072
100.000%
449.97
458.79
0.073
450.85
0.072
450.61
0.072
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
17
BLOQUE Y LADRILLO
0.053
100.000%
575.59
572.18
0.053
573.76
0.053
578.72
0.053
AF
AGREGADO FINO
0.052
100.000%
517.47
523.47
0.053
525.43
0.053
529.10
0.053
GGU
39
0.199
100.000%
400.34
403.02
0.200
404.55
0.201
403.94
0.201
K1 =
1.027
K2 =
1.031
K3 =
1.032
COEFICIENTE DE REAJUSTE
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
SIMB
COD
DESCRIPCIN
47
0.335
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.352
523.70
0.352
523.70
0.352
0.088
100.000%
385.05
396.99
0.091
403.12
0.092
404.73
0.092
0.103
100.000%
651.14
659.07
0.104
662.20
0.105
663.74
0.105
ACERO DE CONSTRUCCION
CORRUGADO
0.089
100.000%
473.03
481.01
0.091
491.87
0.093
495.36
0.093
21
0.075
100.000%
449.97
458.79
0.076
450.85
0.075
450.61
0.075
17
BLOQUE Y LADRILLO
0.061
100.000%
575.59
572.18
0.061
573.76
0.061
578.72
0.061
AF
AGREGADO FINO
0.051
100.000%
517.47
523.47
0.052
525.43
0.052
529.10
0.052
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
39
0.198
100.000%
400.34
COEFICIENTE DE REAJUSTE
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.026
K2 =
1.030
K3 =
1.030
SIMB
COD
DESCRIPCIN
47
0.335
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.352
523.70
0.352
523.70
0.352
0.053
100.000%
385.05
396.99
0.055
403.12
0.055
404.73
0.056
0.099
100.000%
651.14
659.07
0.100
662.20
0.101
663.74
0.101
ACERO DE CONSTRUCCION
CORRUGADO
0.092
100.000%
473.03
481.01
0.094
491.87
0.096
495.36
0.096
21
0.086
100.000%
449.97
458.79
0.088
450.85
0.086
450.61
0.086
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
4
17
AGREGADO FINO
BLOQUE Y LADRILLO
0.075
49.333%
50.667%
517.47
575.59
523.47
572.18
0.037
0.038
525.43
573.76
0.038
0.038
529.10
578.72
0.038
0.038
32
FLETE TERRESTRE
0.062
100.000%
465.69
468.49
0.062
468.49
0.062
468.49
0.062
GGU
39
0.198
100.000%
400.34
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.025
K2 =
1.028
K3 =
1.029
COEFICIENTE DE REAJUSTE
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
SIMB
COD
DESCRIPCIN
47
0.323
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.340
523.70
0.340
523.70
0.340
0.083
100.000%
385.05
396.99
0.086
403.12
0.087
404.73
0.087
0.103
100.000%
651.14
659.07
0.104
662.20
0.105
663.74
0.105
ACERO DE CONSTRUCCION
CORRUGADO
0.097
100.000%
473.03
481.01
0.099
491.87
0.101
495.36
0.102
21
0.078
100.000%
449.97
458.79
0.08
450.85
0.078
450.61
0.078
17
BLOQUE Y LADRILLO
0.063
100.000%
575.59
572.18
0.063
573.76
0.063
578.72
0.063
AF
AGREGADO FINO
0.055
100.000%
517.47
523.47
0.056
525.43
0.056
529.10
0.056
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
39
0.198
100.000%
400.34
COEFICIENTE DE REAJUSTE
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.027
K2 =
1.030
K3 =
1.031
SIMB
COD
DESCRIPCIN
47
0.285
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.3
523.70
0.300
523.70
0.300
0.053
100.000%
385.05
396.99
0.055
403.12
0.055
404.73
0.056
0.089
100.000%
651.14
659.07
0.090
662.20
0.091
663.74
0.091
ACERO DE CONSTRUCCION
CORRUGADO
0.076
100.000%
473.03
481.01
0.077
491.87
0.079
495.36
0.080
21
0.061
100.000%
449.97
458.79
0.062
450.85
0.061
450.61
0.061
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
4
17
AGREGADO FINO
BLOQUE Y LADRILLO
0.097
46.392%
53.608%
517.47
575.59
523.47
572.18
0.046
0.052
525.43
573.76
0.046
0.052
529.10
578.72
0.046
0.052
32
FLETE TERRESTRE
0.141
100.000%
465.69
468.49
0.142
468.49
0.142
468.49
0.142
GGU
39
0.198
100.000%
400.34
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.023
K2 =
1.026
K3 =
1.028
COEFICIENTE DE REAJUSTE
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
SIMB
COD
DESCRIPCIN
47
0.338
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.355
523.70
0.355
523.70
0.355
0.079
100.000%
385.05
396.99
0.081
403.12
0.083
404.73
0.083
0.103
100.000%
651.14
659.07
0.104
662.20
0.105
663.74
0.105
ACERO DE CONSTRUCCION
CORRUGADO
0.096
100.000%
473.03
481.01
0.098
491.87
0.100
495.36
0.101
21
0.075
100.000%
449.97
458.79
0.076
450.85
0.075
450.61
0.075
17
BLOQUE Y LADRILLO
0.058
100.000%
575.59
572.18
0.058
573.76
0.058
578.72
0.058
AF
AGREGADO FINO
0.053
100.000%
517.47
523.47
0.054
525.43
0.054
529.10
0.054
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
39
0.198
100.000%
400.34
COEFICIENTE DE REAJUSTE
403.02
0.199
404.55
0.200
403.94
0.200
K1 =
1.025
K2 =
1.030
K3 =
1.031
SIMB
COD
DESCRIPCIN
47
0.341
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
mayo-14
Coeficiente
Coeficiente
Coeficiente
100.000%
498.10
523.70
0.359
523.70
0.359
523.70
0.359
0.086
100.000%
385.05
396.99
0.089
403.12
0.090
404.73
0.090
0.099
100.000%
651.14
659.07
0.100
662.20
0.101
663.74
0.101
ACERO DE CONSTRUCCION
CORRUGADO
0.090
100.000%
473.03
481.01
0.092
491.87
0.094
495.36
0.094
21
0.076
100.000%
449.97
458.79
0.077
450.85
0.076
450.61
0.076
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
17
BLOQUE Y LADRILLO
0.055
100.000%
575.59
572.18
0.055
573.76
0.055
578.72
0.055
AF
AGREGADO FINO
0.054
100.000%
517.47
523.47
0.055
525.43
0.055
529.10
0.055
GGU
39
0.199
100.000%
400.34
403.02
0.20
404.55
0.201
403.94
0.201
K1 =
1.027
K2 =
1.031
K3 =
1.031
COEFICIENTE DE REAJUSTE
PUESTO CONTRACTUAL
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.327
523.15
0.327
523.15
0.327
544.59
0.340
544.59
0.340
544.59
0.340
544.59
407.64
0.122
429.32
0.128
434.47
0.130
438.07
0.131
442.52
0.132
450.46
0.135
447.20
668.55
0.112
675.16
0.113
679.52
0.114
677.84
0.113
680.84
0.114
684.62
0.115
688.08
501.62
0.091
505.20
0.092
497.61
0.09
496.56
0.090
458.09
0.083
462.12
0.084
457.96
450.61
0.079
454.07
0.08
461.43
0.081
460.35
0.081
459.40
0.081
459.40
0.081
459.40
575.56
0.051
583.17
0.052
581.18
0.051
580.34
0.051
579.38
0.051
579.47
0.051
580.12
530.09
0.052
520.55
0.051
520.47
0.051
521.08
0.051
524.14
0.052
523.77
0.052
523.82
PUESTO CONTRACTUAL
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.034
K5 =
1.047
K6 =
1.049
K7 =
1.062
K8 =
1.059
K9 =
1.065
K10 =
10
12
12
12
12
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.361
523.15
0.360
523.15
0.360
544.59
0.375
544.59
0.375
544.59
0.375
544.59
407.64
0.086
429.32
0.090
434.47
0.091
438.07
0.092
442.52
0.093
450.46
0.095
447.20
668.55
0.102
675.16
0.103
679.52
0.103
677.84
0.103
680.84
0.104
684.62
0.104
688.08
501.62
0.107
505.20
0.108
497.61
0.106
496.56
0.106
458.09
0.098
462.12
0.099
457.96
450.61
0.072
454.07
0.073
461.43
0.074
460.35
0.074
459.40
0.074
459.40
0.074
459.40
PUESTO CONTRACTUAL
575.56
0.053
583.17
0.054
581.18
0.054
580.34
0.053
579.38
0.053
579.47
0.053
580.12
530.09
0.053
520.55
0.052
520.47
0.052
521.08
0.052
524.14
0.053
523.77
0.053
523.82
404.87
0.201
411.50
0.205
413.82
0.206
415.20
0.206
417.07
0.207
418.64
0.208
418.76
K4 =
1.035
K5 =
1.045
K6 =
1.046
K7 =
1.061
K8 =
1.057
K9 =
1.061
K10 =
PUESTO CONTRACTUAL
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.352
523.15
0.352
523.15
0.352
544.59
0.366
544.59
0.366
544.59
0.366
544.59
407.64
0.093
429.32
0.098
434.47
0.099
438.07
0.100
442.52
0.101
450.46
0.103
447.20
668.55
0.106
675.16
0.107
679.52
0.107
677.84
0.107
680.84
0.108
684.62
0.108
688.08
501.62
0.094
505.20
0.095
497.61
0.094
496.56
0.093
458.09
0.086
462.12
0.087
457.96
450.61
0.075
454.07
0.076
461.43
0.077
460.35
0.077
459.40
0.077
459.40
0.077
459.40
575.56
0.061
583.17
0.062
581.18
0.062
580.34
0.062
579.38
0.061
579.47
0.061
580.12
530.09
0.052
520.55
0.051
520.47
0.051
521.08
0.051
524.14
0.052
523.77
0.052
523.82
PUESTO CONTRACTUAL
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.033
K5 =
1.045
K6 =
1.047
K7 =
1.061
K8 =
1.057
K9 =
1.061
K10 =
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.352
523.15
0.352
523.15
0.352
544.59
0.366
544.59
0.366
544.59
0.366
544.59
407.64
0.056
429.32
0.059
434.47
0.060
438.07
0.060
442.52
0.061
450.46
0.062
447.20
668.55
0.102
675.16
0.103
679.52
0.103
677.84
0.103
680.84
0.104
684.62
0.104
688.08
501.62
0.098
505.20
0.098
497.61
0.097
496.56
0.097
458.09
0.089
462.12
0.09
457.96
450.61
0.086
454.07
0.087
461.43
0.088
460.35
0.088
459.40
0.088
459.40
0.088
459.40
PUESTO CONTRACTUAL
530.09
575.56
0.038
0.038
520.55
583.17
0.037
0.039
520.47
581.18
0.037
0.038
521.08
580.34
0.037
0.038
524.14
579.38
0.037
0.038
523.77
579.47
0.037
0.038
523.82
580.12
468.56
0.062
469.08
0.062
469.08
0.062
466.15
0.062
466.15
0.062
466.15
0.062
467.08
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.032
K5 =
1.041
K6 =
1.042
K7 =
1.056
K8 =
1.051
K9 =
1.054
K10 =
PUESTO CONTRACTUAL
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.340
523.15
0.339
523.15
0.339
544.59
0.353
544.59
0.353
544.59
0.353
544.59
407.64
0.088
429.32
0.093
434.47
0.094
438.07
0.094
442.52
0.095
450.46
0.097
447.20
668.55
0.106
675.16
0.107
679.52
0.107
677.84
0.107
680.84
0.108
684.62
0.108
688.08
501.62
0.103
505.20
0.104
497.61
0.102
496.56
0.102
458.09
0.094
462.12
0.095
457.96
450.61
0.078
454.07
0.079
461.43
0.08
460.35
0.08
459.40
0.08
459.40
0.08
459.40
575.56
0.063
583.17
0.064
581.18
0.064
580.34
0.064
579.38
0.063
579.47
0.063
580.12
530.09
0.056
520.55
0.055
520.47
0.055
521.08
0.055
524.14
0.056
523.77
0.056
523.82
PUESTO CONTRACTUAL
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.034
K5 =
1.045
K6 =
1.046
K7 =
1.060
K8 =
1.055
K9 =
1.059
K10 =
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.300
523.15
0.299
523.15
0.299
544.59
0.312
544.59
0.312
544.59
0.312
544.59
407.64
0.056
429.32
0.059
434.47
0.060
438.07
0.060
442.52
0.061
450.46
0.062
447.20
668.55
0.091
675.16
0.092
679.52
0.093
677.84
0.093
680.84
0.093
684.62
0.094
688.08
501.62
0.081
505.20
0.081
497.61
0.08
496.56
0.08
458.09
0.074
462.12
0.074
457.96
450.61
0.061
454.07
0.062
461.43
0.063
460.35
0.062
459.40
0.062
459.40
0.062
459.40
PUESTO CONTRACTUAL
530.09
575.56
0.046
0.052
520.55
583.17
0.045
0.053
520.47
581.18
0.045
0.053
521.08
580.34
0.045
0.052
524.14
579.38
0.046
0.052
523.77
579.47
0.046
0.052
523.82
580.12
468.56
0.142
469.08
0.142
469.08
0.142
466.15
0.141
466.15
0.141
466.15
0.141
467.08
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.029
K5 =
1.037
K6 =
1.040
K7 =
1.050
K8 =
1.047
K9 =
1.050
K10 =
PUESTO CONTRACTUAL
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.355
523.15
0.355
523.15
0.355
544.59
0.37
544.59
0.37
544.59
0.37
544.59
407.64
0.084
429.32
0.088
434.47
0.089
438.07
0.090
442.52
0.091
450.46
0.092
447.20
668.55
0.106
675.16
0.107
679.52
0.107
677.84
0.107
680.84
0.108
684.62
0.108
688.08
501.62
0.102
505.20
0.103
497.61
0.101
496.56
0.101
458.09
0.093
462.12
0.094
457.96
450.61
0.075
454.07
0.076
461.43
0.077
460.35
0.077
459.40
0.077
459.40
0.077
459.40
575.56
0.058
583.17
0.059
581.18
0.059
580.34
0.058
579.38
0.058
579.47
0.058
580.12
530.09
0.054
520.55
0.053
520.47
0.053
521.08
0.053
524.14
0.054
523.77
0.054
523.82
PUESTO CONTRACTUAL
404.87
0.200
411.50
0.204
413.82
0.205
415.20
0.205
417.07
0.206
418.64
0.207
418.76
K4 =
1.034
K5 =
1.045
K6 =
1.046
K7 =
1.061
K8 =
1.057
K9 =
1.060
K10 =
Coeficiente
Coeficiente
I.U -MAY 15
Coeficiente
I.U - JUN 15
Coeficiente
I.U - JUL 15
Coeficiente
I.U - AGO 15
Coeficiente
I.U - SET 15
523.70
0.359
523.15
0.358
523.15
0.358
544.59
0.373
544.59
0.373
544.59
0.373
544.59
407.64
0.091
429.32
0.096
434.47
0.097
438.07
0.098
442.52
0.099
450.46
0.101
447.20
668.55
0.102
675.16
0.103
679.52
0.103
677.84
0.103
680.84
0.104
684.62
0.104
688.08
501.62
0.095
505.20
0.096
497.61
0.095
496.56
0.094
458.09
0.087
462.12
0.088
457.96
450.61
0.076
454.07
0.077
461.43
0.078
460.35
0.078
459.40
0.078
459.40
0.078
459.40
PUESTO CONTRACTUAL
575.56
0.055
583.17
0.056
581.18
0.056
580.34
0.055
579.38
0.055
579.47
0.055
580.12
530.09
0.055
520.55
0.054
520.47
0.054
521.08
0.054
524.14
0.055
523.77
0.055
523.82
404.87
0.201
411.50
0.205
413.82
0.206
415.20
0.206
417.07
0.207
418.64
0.208
418.76
K4 =
1.034
K5 =
1.045
K6 =
1.047
K7 =
1.061
K8 =
1.058
K9 =
1.062
K10 =
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.340
544.59
0.340
544.59
0.340
0.134
450.53
0.135
462.65
0.138
0.115
688.23
0.115
692.02
0.116
0.083
461.49
0.084
469.48
0.085
0.081
459.40
0.081
459.40
0.081
0.051
583.12
0.052
586.80
0.052
0.052
524.24
0.052
527.63
0.052
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.207
419.35
0.207
420.80
0.208
1.063
K11 =
1.066
K12 =
1.072
12
12
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.375
544.59
0.375
544.59
0.375
0.094
450.53
0.095
462.65
0.097
0.105
688.23
0.105
692.02
0.105
0.098
461.49
0.099
469.48
0.1
0.074
459.40
0.074
459.40
0.074
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.053
583.12
0.054
586.80
0.054
0.053
524.24
0.053
527.63
0.053
0.208
419.35
0.208
420.80
0.209
1.060
K11 =
1.063
K12 =
1.067
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.366
544.59
0.366
544.59
0.366
0.102
450.53
0.103
462.65
0.106
0.109
688.23
0.109
692.02
0.109
0.086
461.49
0.087
469.48
0.088
0.077
459.40
0.077
459.40
0.077
0.061
583.12
0.062
586.80
0.062
0.052
524.24
0.052
527.63
0.052
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.207
419.35
0.207
420.80
0.208
1.060
K11 =
1.063
K12 =
1.068
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.366
544.59
0.366
544.59
0.366
0.062
450.53
0.062
462.65
0.064
0.105
688.23
0.105
692.02
0.105
0.089
461.49
0.09
469.48
0.091
0.088
459.40
0.088
459.40
0.088
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.037
0.038
524.24
583.12
0.037
0.038
527.63
586.80
0.038
0.039
0.062
467.08
0.062
467.08
0.062
0.207
419.35
0.207
420.80
0.208
1.054
K11 =
1.055
K12 =
1.061
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.353
544.59
0.353
544.59
0.353
0.096
450.53
0.097
462.65
0.100
0.109
688.23
0.109
692.02
0.109
0.094
461.49
0.095
469.48
0.096
0.08
459.40
0.08
459.40
0.08
0.063
583.12
0.064
586.80
0.064
0.056
524.24
0.056
527.63
0.056
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.207
419.35
0.207
420.80
0.208
1.058
K11 =
1.061
K12 =
1.066
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.312
544.59
0.312
544.59
0.312
0.062
450.53
0.062
462.65
0.064
0.094
688.23
0.094
692.02
0.095
0.074
461.49
0.074
469.48
0.075
0.062
459.40
0.062
459.40
0.062
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.046
0.052
524.24
583.12
0.046
0.053
527.63
586.80
0.046
0.053
0.141
467.08
0.141
467.08
0.141
0.207
419.35
0.207
420.80
0.208
1.050
K11 =
1.051
K12 =
1.056
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.37
544.59
0.37
544.59
0.37
0.092
450.53
0.092
462.65
0.095
0.109
688.23
0.109
692.02
0.109
0.093
461.49
0.094
469.48
0.095
0.077
459.40
0.077
459.40
0.077
0.058
583.12
0.059
586.80
0.059
0.054
524.24
0.054
527.63
0.054
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.207
419.35
0.207
420.80
0.208
1.060
K11 =
1.062
K12 =
1.067
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
0.373
544.59
0.373
544.59
0.373
0.100
450.53
0.101
462.65
0.103
0.105
688.23
0.105
692.02
0.105
0.087
461.49
0.088
469.48
0.089
0.078
459.40
0.078
459.40
0.078
1. CASA HOGAR.rar\1. CASA HOGAR - RAR archive, unpacked size 20,699,772 bytes
0.055
583.12
0.056
586.80
0.056
0.055
524.24
0.055
527.63
0.055
0.208
419.35
0.208
420.80
0.209
1.061
K11 =
1.064
K12 =
1.068
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
SUB TOTAL
CONTRAC.
VAL-1
VAL-2
VAL-3
VAL-4
VAL-5
VAL-6
VAL-7
VAL-8
VAL-9
VAL-10
VAL-11
VAL-12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
S/. 749,584.76
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 620,166.87
S/. 21,008.49
S/. 48,885.33
S/. 130,432.77
S/. 593,160.42
S/. 48,392.06
S/. 79,355.76
S/. 103,912.97
S/. 684,938.12
S/. 48,438.19
S/. 31,373.79
S/. 676,637.73
S/. 74,534.84
S/. 772,514.61
S/. 256,940.08
S/. 299,005.30
S/. 142,567.82
S/. 144,801.96
S/. 69,184.53
S/. 68,498.09
S/. 73,461.46
S/. 64,876.45
S/. 116,179.10
S/. 76,349.91
S/. 49,473.15
S/. 127,834.46
S/. 108,283.95
S/. 60,158.46
S/. 74,994.21
S/. 138,577.14
S/. 92,794.70
S/. 97,470.44
S/. 87,426.17
S/. 108,286.16
S/. 84,488.05
S/. 69,565.80
S/. 87,526.74
S/. 146,960.73
S/. 162,191.16
S/. 137,866.09
S/. 678,317.60
S/. 68,090.70
S/. 71,659.60
S/. 110,500.41
S/. 97,858.37
S/. 659,462.73
S/. 0.00
S/. 0.00
S/. 0.00
S/. 5,434,782.83
S/. 330,030.08
S/. 411,595.92
S/. 717,111.78
S/. 31,098.70
TOTAL
ACUMULADO
(S/.)
S/. 0.00
S/. 0.00
S/. 18,607.28
S/. 1,365.59
S/. 749,584.76
S/. 0.00
S/. 0.00
S/. 16,697.11
S/. 35,541.16
S/. 11,655.98
S/. 620,166.87
S/. 16,455.02
S/. 20,655.96
S/. 0.00
S/. 0.00
S/. 17,510.04
S/. 593,160.42
S/. 11,865.62
S/. 24,428.97
S/. 13,288.20
S/. 33,101.35
S/. 12,593.77
S/. 684,938.12
S/. 33,070.97
S/. 0.00
S/. 0.00
S/. 0.00
S/. 15,338.28
S/. 83,228.10
S/. 676,637.73
S/. 82,671.57
S/. 33,407.46
S/. 37,312.47
S/. 0.00
S/. 0.00
S/. 0.00
S/. 15,012.59
S/. 772,514.61
S/. 134,926.35
S/. 102,991.72
S/. 38,822.37
S/. 29,825.44
S/. 0.00
S/. 3,575.67
S/. 9,878.97
S/. 10,188.00
S/. 678,317.60
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 322,040.16
S/. 111,232.13
S/. 99,406.32
S/. 85,529.70
S/. 41,254.41
S/. 659,462.73
S/. 665,438.06
S/. 883,540.77
S/. 788,998.85
S/. 509,380.37
S/. 448,597.41
S/. 156,317.06
S/. 132,967.30
S/. 197,996.74
S/. 192,808.48
S/. 5,434,782.83
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYU
CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
I.E.I.
I.E.I.
I.E.I.
I.E.I.
I.E.I.
I.E.I.
I.E.I.
I.E.I.
VAL. N 01
SETIEMBRE 14
VAL. N 02
OCTUBRE 14
VAL. N 03
NOVIEMBRE 14
VAL. N 04
DICIEMBRE 14
VAL. N 05
ABRIL
15
VAL. N 06
MAYO 15
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 256,940.08
S/. 299,005.30
S/. 21,008.49
S/. 48,885.33
S/. 130,432.77
S/. 144,801.96
S/. 69,184.53
S/. 68,498.09
S/. 48,392.06
S/. 79,355.76
S/. 103,912.97
S/. 64,876.45
S/. 116,179.10
S/. 76,349.91
S/. 48,438.19
S/. 31,373.79
S/. 127,834.46
S/. 108,283.95
S/. 60,158.46
S/. 74,994.21
S/. 74,534.84
S/. 92,794.70
S/. 97,470.44
S/. 87,426.17
S/. 108,286.16
S/. 84,488.05
S/. 69,565.80
S/. 87,526.74
S/. 146,960.73
S/. 162,191.16
S/. 137,866.09
S/. 82,671.57
S/. 68,090.70
S/. 71,659.60
S/. 110,500.41
S/. 97,858.37
S/. 134,926.35
S/. 102,991.72
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 330,030.08
S/. 411,595.92
S/. 717,111.78
S/. 665,438.06
S/. 883,540.77
S/. 788,998.85
S/. 59,405.41
S/. 74,087.27
S/. 129,080.12
S/. 119,778.85
S/. 159,037.34
S/. 142,019.79
REAJUSTES
I.E.I. N567 CASA HOGAR DE MARIA
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 12,076.18
S/. 14,651.26
S/. 567.23
S/. 1,515.45
S/. 4,173.85
S/. 5,068.07
S/. 3,113.30
S/. 3,150.91
S/. 1,258.19
S/. 2,380.67
S/. 3,117.39
S/. 2,140.92
S/. 5,228.06
S/. 4,657.34
S/. 1,210.95
S/. 878.47
S/. 3,707.20
S/. 3,465.09
S/. 2,466.50
S/. 3,149.76
S/. 2,012.44
S/. 2,783.84
S/. 3,021.58
S/. 2,972.49
S/. 4,872.88
S/. 3,886.45
S/. 1,600.01
S/. 2,275.70
S/. 4,114.90
S/. 4,703.54
S/. 5,101.05
S/. 3,306.86
S/. 1,702.27
S/. 2,149.79
S/. 3,425.51
S/. 3,327.18
S/. 6,071.69
S/. 4,737.62
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
TOTAL DE REAJUSTES ( R )
S/. 8,351.09
S/. 11,983.92
S/. 21,560.43
S/. 21,677.29
S/. 38,929.66
S/. 37,540.20
I.G.V
S/. 1,503.20
S/. 2,157.11
S/. 3,880.88
S/. 3,901.91
S/. 7,007.34
S/. 6,757.24
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 2,521.43
S/. 4,529.77
S/. 6,545.90
S/. 11,482.76
S/. 8,156.37
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,822.05
S/. 138.59
S/. 0.00
S/. 398.26
S/. 723.14
S/. 987.32
S/. 1,559.10
S/. 1,514.63
S/. 0.00
S/. 258.68
S/. 616.68
S/. 731.57
S/. 1,455.53
S/. 980.33
S/. 0.00
S/. 158.41
S/. 609.39
S/. 1,123.74
S/. 1,152.40
S/. 1,429.32
S/. 0.00
S/. 736.65
S/. 901.84
S/. 1,427.27
S/. 1,958.29
S/. 1,698.28
S/. 0.00
S/. 408.53
S/. 1,002.20
S/. 1,520.57
S/. 1,810.36
S/. 1,060.19
S/. 0.00
S/. 560.90
S/. 676.52
S/. 755.43
S/. 1,725.03
S/. 1,335.03
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
TOTAL DE DEDUCCIONES ( D )
S/. 0.00
S/. 2,521.43
S/. 4,529.77
S/. 6,545.90
S/. 11,482.76
S/. 8,156.37
I.G.V
S/. 0.00
S/. 453.86
S/. 815.36
S/. 1,178.26
S/. 2,066.90
S/. 1,468.15
S/. 338,381.17
S/. 421,058.41
S/. 734,142.44
S/. 680,569.45
S/. 910,987.67
S/. 818,382.68
S/. 60,908.61
S/. 75,790.51
S/. 132,145.64
S/. 122,502.50
S/. 163,977.78
S/. 147,308.88
S/. 399,289.78
S/. 496,848.92
S/. 866,288.08
S/. 803,071.95
S/. 1,074,965.45
S/. 965,691.56
S/. 399,289.78
S/. 496,848.92
S/. 866,288.08
S/. 803,071.95
S/. 1,074,965.45
S/. 965,691.56
VAL. N 08
JULIO 15
VAL. N 09
AGOSTO 15
VAL. N 10
SETIEMBRE 15
VAL. N 11
OCTUBRE 15
VAL. N 12
NOVIEMBRE 15
TOTAL (S/.)
S/. 142,567.82
S/. 31,098.70
S/. 0.00
S/. 0.00
S/. 18,607.28
S/. 1,365.59
S/. 749,584.77
S/. 73,461.46
S/. 0.00
S/. 0.00
S/. 16,697.11
S/. 35,541.16
S/. 11,655.98
S/. 620,166.88
S/. 49,473.15
S/. 16,455.02
S/. 20,655.96
S/. 0.00
S/. 0.00
S/. 17,510.04
S/. 593,160.42
S/. 138,577.14
S/. 11,865.62
S/. 24,428.97
S/. 13,288.20
S/. 33,101.35
S/. 12,593.77
S/. 684,938.11
S/. 33,070.97
S/. 0.00
S/. 0.00
S/. 0.00
S/. 15,338.28
S/. 83,228.10
S/. 676,637.71
S/. 33,407.46
S/. 37,312.47
S/. 0.00
S/. 0.00
S/. 0.00
S/. 15,012.59
S/. 772,514.61
S/. 38,822.37
S/. 29,825.44
S/. 0.00
S/. 3,575.67
S/. 9,878.97
S/. 10,188.00
S/. 678,317.60
S/. 0.00
S/. 322,040.16
S/. 111,232.13
S/. 99,406.32
S/. 85,529.70
S/. 41,254.41
S/. 659,462.72
S/. 509,380.37
S/. 448,597.41
S/. 156,317.06
S/. 132,967.30
S/. 197,996.74
S/. 192,808.48
S/. 5,434,782.79
S/. 91,688.47
S/. 80,747.53
S/. 28,137.07
S/. 23,934.11
S/. 35,639.41
S/. 34,705.53
S/. 978,260.91
S/. 8,839.20
S/. 1,834.82
S/. 0.00
S/. 0.00
S/. 1,228.08
S/. 98.32
S/. 38,727.86
S/. 4,481.15
S/. 0.00
S/. 0.00
S/. 1,001.83
S/. 2,239.09
S/. 780.95
S/. 26,091.83
S/. 3,017.86
S/. 937.94
S/. 1,260.01
S/. 0.00
S/. 0.00
S/. 1,190.68
S/. 25,189.06
S/. 7,760.32
S/. 605.15
S/. 1,319.16
S/. 717.56
S/. 1,820.57
S/. 768.22
S/. 27,868.95
S/. 1,984.26
S/. 0.00
S/. 0.00
S/. 0.00
S/. 935.64
S/. 5,493.05
S/. 27,962.63
S/. 1,670.37
S/. 1,753.69
S/. 0.00
S/. 0.00
S/. 0.00
S/. 840.71
S/. 25,366.83
S/. 2,368.16
S/. 1,700.05
S/. 0.00
S/. 214.54
S/. 612.50
S/. 682.60
S/. 26,991.91
S/. 0.00
S/. 18,678.33
S/. 6,896.39
S/. 6,063.79
S/. 5,473.90
S/. 2,805.30
S/. 39,917.71
S/. 30,121.32
S/. 25,509.98
S/. 9,475.56
S/. 7,997.72
S/. 12,309.78
S/. 12,659.83
S/. 238,116.78
S/. 5,421.84
S/. 4,591.80
S/. 1,705.60
S/. 1,439.59
S/. 2,215.76
S/. 2,278.77
S/. 42,861.04
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 7,125.91
S/. 1,724.38
S/. 745.77
S/. 821.54
S/. 1,400.86
S/. 0.00
S/. 45,054.69
S/. 890.06
S/. 813.94
S/. 131.65
S/. 0.00
S/. 0.00
S/. 0.00
S/. 3,796.29
S/. 1,564.12
S/. 0.00
S/. 0.00
S/. 222.72
S/. 514.81
S/. 0.00
S/. 7,484.10
S/. 857.61
S/. 148.40
S/. 91.33
S/. 0.00
S/. 0.00
S/. 0.00
S/. 5,140.13
S/. 2,083.05
S/. 154.56
S/. 251.02
S/. 138.14
S/. 366.59
S/. 0.00
S/. 7,466.62
S/. 604.30
S/. 0.00
S/. 0.00
S/. 0.00
S/. 83.81
S/. 0.00
S/. 7,410.44
S/. 431.23
S/. 308.02
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 6,541.10
S/. 695.54
S/. 266.28
S/. 0.00
S/. 17.93
S/. 52.75
S/. 0.00
S/. 6,085.41
S/. 0.00
S/. 33.18
S/. 271.77
S/. 442.75
S/. 382.90
S/. 0.00
S/. 1,130.60
S/. 7,125.91
S/. 1,724.38
S/. 745.77
S/. 821.54
S/. 1,400.86
S/. 0.00
S/. 45,054.69
S/. 1,282.66
S/. 310.39
S/. 134.24
S/. 147.88
S/. 252.15
S/. 0.00
S/. 8,109.85
S/. 532,375.78
S/. 472,383.01
S/. 165,046.85
S/. 140,143.48
S/. 208,905.66
S/. 205,468.31
S/. 5,627,844.91
S/. 95,827.64
S/. 85,028.94
S/. 29,708.43
S/. 25,225.83
S/. 37,603.02
S/. 36,984.30
S/. 1,013,012.08
S/. 628,203.42
S/. 557,411.95
S/. 194,755.28
S/. 165,369.31
S/. 246,508.68
S/. 242,452.61
S/. 6,640,856.99
S/. 628,203.42
S/. 557,411.95
S/. 194,755.28
S/. 165,369.31
S/. 246,508.68
S/. 242,452.61
S/. 6,640,856.99
NOMBRE DE
PROCESO
ENTIDAD
CONTRATISTA
TEM
DESCRIPCIN DE PARTIDAS
TEM
01.01.05.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06.
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO CON MATERIAL DE FILTRO PARA MURO DE CONTENCION
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
GRADAS EN PISO, CONCRETO F'C=175 Kg/cm2
GRADAS , ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
TEM
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
02.06.02
02.06.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
DESCRIPCIN DE PARTIDAS
TEM
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.04.02
03.07.05
DESCRIPCIN DE PARTIDAS
TEM
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.09.03.02
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.02.01.01
04.02.01.02
DESCRIPCIN DE PARTIDAS
TEM
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.02
05.02.01
05.02.02
DESCRIPCIN DE PARTIDAS
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIESGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
EMPALME A RED EXISTENTE, DE DESAGUE
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TEM
05.02.03
05.02.04
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
DESCRIPCIN DE PARTIDAS
TEM
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
TEM
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO AFIRMADO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
TEM
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
DESCRIPCIN DE PARTIDAS
TEM
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.01
03.04.03
03.04.03.01
03.05
03.05.01
DESCRIPCIN DE PARTIDAS
TEM
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.09.03.02
03.10
DESCRIPCIN DE PARTIDAS
TEM
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
DESCRIPCIN DE PARTIDAS
TEM
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.03.17
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
DESCRIPCIN DE PARTIDAS
TEM
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
TEM
DESCRIPCIN DE PARTIDAS
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
TEM
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO AFIRMADO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
TEM
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.02.11
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
DESCRIPCIN DE PARTIDAS
TEM
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.01
03.04.03
03.04.03.01
03.05
03.05.01
DESCRIPCIN DE PARTIDAS
TEM
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.09.03.02
03.10
DESCRIPCIN DE PARTIDAS
TEM
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
DESCRIPCIN DE PARTIDAS
TEM
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
DESCRIPCIN DE PARTIDAS
TEM
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
TEM
DESCRIPCIN DE PARTIDAS
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
TEM
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
DESCRIPCIN DE PARTIDAS
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
GRADAS EN PISO, CONCRETO F'C=175 Kg/cm2
GRADAS, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
MUROS REFORZADOS
MUROS DE CONTENCION - CONCRETO F'C=175 Kg/cm2
MUROS DE CONTENCION - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
MUROS DE CONTENCION - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
TEM
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
02.06.02
02.06.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
DESCRIPCIN DE PARTIDAS
TEM
03.04.01.02
03.04.02
03.04.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
DESCRIPCIN DE PARTIDAS
TEM
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.09.03.02
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.03
04.03.01
04.03.02
04.03.03
04.03.04
DESCRIPCIN DE PARTIDAS
TEM
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.01.09
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.06
05.06.01
DESCRIPCIN DE PARTIDAS
TEM
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
COSTO DIRECTO
TEM
DESCRIPCIN DE PARTIDAS
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
TEM
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.03
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.02.07
02.02.08
02.02.09
02.02.10
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
DESCRIPCIN DE PARTIDAS
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO COMPACTADO C/EQUIPO MAT/PRESTAMO AFIRMADO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
GRADAS EN PISO, CONCRETO F'C=175 Kg/cm2
GRADAS, ENCOFRADO Y DESENCOFRADO
SARDINEL, CONCRETO1:8+25% P.M.
SARDINEL, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
MUROS REFORZADOS
MUROS DE CONTENCION - CONCRETO F'C=175 Kg/cm2
MUROS DE CONTENCION - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
TEM
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
02.06.02
02.06.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.03
03.03.01
DESCRIPCIN DE PARTIDAS
TEM
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
DESCRIPCIN DE PARTIDAS
TEM
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.09.03.02
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
DESCRIPCIN DE PARTIDAS
TEM
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
DESCRIPCIN DE PARTIDAS
TEM
05.04
05.04.01
05.04.02
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
DESCRIPCIN DE PARTIDAS
TEM
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
TEM
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.05
01.01.05.01
01.01.06
01.01.06.01
01.01.07
01.01.07.01
01.01.07.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
DESCRIPCIN DE PARTIDAS
DEMOLICIONES
DEMOLICION DE PISOS DE CONCRETO INC. F.P.
DEMOLICION MUROS DE ADOBE C/MAQUINA
ELIMINACION DE DEMOLICIONES
MOVILIZACION DE CAMPAMENTO, MAQUINARIAS Y HERRAMIENTAS
MOVILIZACION DE CAMPAMENTO, MAQUINARIAS Y HERRAMIENTAS
FLETE
FLETE RURAL
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
SEGURIDAD Y SALUD
ELABORACION, IMPLEM. Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
TEM
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
DESCRIPCIN DE PARTIDAS
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
TEM
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.01
03.04.03
03.04.03
03.04.04
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
DESCRIPCIN DE PARTIDAS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO PULIDO DE SARDINELES DE CONCRETO (1:5)
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
SARDINEL EN DUCHA REVESTIMIENTO CON MAYOLICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. M
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
ESCALERA
TEM
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
DESCRIPCIN DE PARTIDAS
TEM
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
DESCRIPCIN DE PARTIDAS
TEM
05.01.09
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.04
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.02
05.04.03
05.05
05.05.01
05.05.02
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
DESCRIPCIN DE PARTIDAS
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 20 mm
TUBERIA PVC - P 35 mm
TUBERIA PVC - P 20 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A, 1-IDF 25AMP
TG 1-3x40A; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
TEM
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
TEM
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.01.04.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
DESCRIPCIN DE PARTIDAS
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
TEM
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
DESCRIPCIN DE PARTIDAS
TEM
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
DESCRIPCIN DE PARTIDAS
TEM
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
DESCRIPCIN DE PARTIDAS
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZXA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIO
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TEM
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
DESCRIPCIN DE PARTIDAS
TEM
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
DESCRIPCIN DE PARTIDAS
TEM
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
TEM
DESCRIPCIN DE PARTIDAS
TEM
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.06
01.01.05
01.01.05.01
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
DESCRIPCIN DE PARTIDAS
TEM
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
DESCRIPCIN DE PARTIDAS
TEM
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
DESCRIPCIN DE PARTIDAS
TEM
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
DESCRIPCIN DE PARTIDAS
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIO
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
TEM
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
DESCRIPCIN DE PARTIDAS
TEM
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
DESCRIPCIN DE PARTIDAS
TEM
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN DE PARTIDAS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
% AVANCE DE OBRA PARCIAL
% AVANCE DE OBRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
PUERTAS
VENTANAS
PORTON (3.00 x 2.40)
ECHO DE ETERNIT/CALAMINA
FALSO CIELO RASO
APARATOS SANITARIOS
M2
M2
UND
M2
M2
UND
6.69
9.12
1.00
29.21
4.95
3.00
M2
M3
M3
M2
M3
M3
114.08
10.31
8.01
192.60
29.72
29.72
M2
607.57
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
NTE EL PROCESO
UD
PLEMENTACION Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
ECCION INDIVIDUAL
ECCION COLECTIVA
MPORAL DE SEGURIDAD
SEGURIDAD Y SALUD
Unidad
M2
GLB
UND
GLB
GLB
GLB
GLB
Metrado
607.57
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
266.26
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
269.35
82.34
M3
M3
M2
98.02
38.88
100.00
M2
M2
M2
516.42
209.43
516.42
M3
M3
305.17
574.54
M3
M2
M3
M3
M3
M2
M2
M2
32.22
159.62
0.48
8.49
71.12
1.46
5.85
209.43
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
M3
KG
29.74
806.29
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M3
M2
KG
16.30
129.67
1,952.62
M3
M2
KG
10.00
109.29
344.32
M3
M2
KG
70.31
187.92
3,658.98
M3
M2
KG
17.72
189.75
2,996.41
M3
M2
KG
29.49
264.78
3,200.00
M3
M2
KG
M3
M2
KG
UND
0.45
2.25
114.05
24.76
282.98
1,220.81
2,357.23
M2
M
374.48
33.92
M2
374.48
M
M
M
277.10
16.20
32.40
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
101.50
170.39
272.48
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
M2
M2
M2
M
M
M
70.63
403.64
152.38
276.94
160.50
242.41
37.50
M2
285.23
M2
54.85
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
254.19
4.74
M2
254.19
M2
399.03
M2
70.63
M
M
148.10
199.10
M2
M2
M2
M2
2.88
5.54
13.20
23.76
M2
11.70
M2
90.99
38.40
BO F N DE 2"
BO F N DE 1 1/2" EN SS.HH.
M
M
6.00
10.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
M2
Metrado
180.00
PZA.
PZA.
52.00
6.00
UND
13.00
UND
UND
5.00
13.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
AMICA
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
7.00
M2
M2
580.53
518.12
M2
M2
11.70
26.37
M
M
38.40
89.10
GLB
GLB
M
M
1.00
1.00
124.22
29.70
PTO
M2
1.00
5.64
PZA
PTO
PTO
PTO
UND
UND
UND
2.00
3.00
6.00
3.00
11.00
3.00
5.00
UND
PTO
1.00
13.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
"
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
Unidad
Metrado
M
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
27.00
38.53
11.00
67.10
35.00
8.00
10.00
6.00
4.00
2.00
1.00
1.00
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
PTO
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
1.00
13.00
6.00
6.00
17.34
17.34
23.80
29.46
57.80
1.00
6.00
2.00
2.00
7.00
M
M
M
22.40
95.44
87.20
PTO
PTO
PTO
PTO
UND
UND
UND
39.00
11.00
3.00
10.00
13.00
3.00
4.00
M3
M3
18.15
18.15
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
XISTENTE, DE DESAGUE
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
ONCE 2"
ONCE 4"
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
mm
0 mm
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
-2x16A 1-IDF 25AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
M
M
Metrado
50.50
10.00
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
90.30
13.60
18.00
UND
UND
UND
UND
3.00
15.00
18.00
4.00
UND
UND
UND
UND
UND
UND
UND
15.00
60.00
3.00
3.00
3.00
3.00
21.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
GLB
1.00
AMBIENTES DE CLASE
PRIMEROS AUXILIOS
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
O
ALES FIJOS (14.80% CD)
% CD)
BRA ACUMULADO
Unidad
Metrado
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
0.1480
0.0520
0.1800
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
GLB
1.00
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
505.09
505.09
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
107.08
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
308.15
112.40
M3
M3
M2
41.24
7.46
75.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
M2
M2
365.00
159.71
365.53
M3
M3
205.82
376.23
M3
M3
M2
M3
M3
M2
M3
M2
M3
M2
M2
57.26
1.19
67.39
0.42
15.23
63.52
2.44
8.14
4.79
25.53
159.71
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
25.12
663.37
M3
M2
KG
13.91
110.56
1,470.59
M3
M2
KG
12.66
132.35
403.70
M3
M2
KG
15.24
170.45
2,397.84
M3
M2
KG
24.73
213.82
2,956.58
M3
5.07
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
ENCOFRADO Y DESENCOFRADO
ACERO F'Y=4200 kg/cm2
CONCRETO F'C=210 Kg/cm2 - 01 PISO
ENCOFRADO Y DESENCOFRADO
ACERO F'Y=4200 kg/cm2
LADRILLO HUECO 15X30X30 cm
M2
KG
M3
M2
KG
UND
M2
M
327.77
31.57
M2
327.77
186.38
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
104.53
143.92
247.12
M2
M2
M2
M2
M2
M
M
M
75.93
411.49
142.33
222.50
25.52
131.11
314.96
46.50
M2
339.98
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
155.37
7.46
M2
155.37
M
M2
37.90
306.69
26.43
302.08
841.95
2,516.31
1.10
190.75
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
75.93
M
M
115.50
95.80
M2
M2
M2
M2
2.88
6.39
19.77
5.94
M2
11.70
M2
51.89
54.95
5.00
BO F N DE 1 1/2" EN SS.HH.
M2
360.00
PZA.
PZA.
48.00
6.00
UND
12.00
UND
UND
3.00
12.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
7.00
M2
M2
648.43
553.82
M2
M2
11.70
35.10
M
M
54.95
94.80
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
Unidad
Metrado
GLB
GLB
M
M
1.00
1.00
90.86
39.00
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
UND
PTO
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
1.00
17.00
46.48
7.50
44.06
50.25
10.00
8.00
8.00
3.00
1.00
1.00
2.00
PTO
PTO
UND
M3
M3
M
M
M
14.00
7.00
7.00
15.59
15.59
21.30
31.06
52.30
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
DE D-1.20m H=1.40m
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
1-2 x 16A, 1 - IDF 25 AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
-1*6+1*4(T))mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
Unidad
UND
UND
UND
UND
UND
UND
UND
PTO
PTO
Metrado
1.00
4.00
4.00
1.00
2.00
9.00
2.00
1.00
1.00
M
M
M
33.60
79.94
69.05
PTO
PTO
PTO
PTO
UND
UND
UND
UND
33.00
12.00
3.00
8.00
16.00
3.00
1.00
4.00
M3
M3
M
M
M
13.29
13.29
16.85
25.80
14.15
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
M
34.80
14.15
16.85
18.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
AMBIENTES DE CLASE
S
S
AS
PRIMEROS AUXILIOS
IVOS
DE KITS Y MODULOS EDUCATIVOS ADECUADOS
DE KITS BASICO PARA ESTUDIANTES
DE KITS BASICO PARA ESTUDIANTES
DIDACTICO PARA AULAS
DIDACTICO PARA AULAS
DE MODULO DE COMUNICACIN
MODULO DE COMUNICACIN
DE MODULO DE MATEMATICA
MODULO DE MATEMATICA
DE MODULO DE CIENCIA Y AMBIENTE
MODULO DE CIENCIA Y AMBIENTE
DE MODULO PSICOMOTRICIDAD
MODULO DE PSICOMOTRICIDAD
DE MODULO DE BIBLIOTECA DE AULA
MODULO DE BIBLIOTECA DE AULA
O
ALES FIJOS (14.80% CD)
Unidad
Metrado
UND
UND
UND
UND
5.00
7.00
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
0.1480
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
% CD)
BRA ACUMULADO
Unidad
0.0520
0.1800
Metrado
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
GLB
1.00
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
439.65
439.65
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
107.08
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
143.93
96.54
M3
M3
M2
41.46
68.82
73.24
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
M2
M2
337.84
159.71
337.84
M3
M3
170.30
285.14
M3
M3
M2
M3
M3
M2
M3
M2
M3
M2
M2
45.82
6.15
67.39
0.42
11.65
63.52
1.40
2.80
0.80
4.24
159.71
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
25.12
663.37
M3
M2
KG
13.91
110.56
1,470.59
M3
M2
KG
14.98
163.29
520.77
M3
M2
KG
15.24
170.45
2,397.84
M3
M2
KG
24.73
213.82
2,956.58
M3
5.07
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
ENCOFRADO Y DESENCOFRADO
ACERO F'Y=4200 kg/cm2
CONCRETO F'C=210 Kg/cm2 - 01 PISO
ENCOFRADO Y DESENCOFRADO
ACERO F'Y=4200 kg/cm2
LADRILLO HUECO 15X30X30 cm
M2
KG
M3
M2
KG
UND
M2
M
327.77
31.57
M2
327.77
187.28
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
104.53
143.92
247.12
M2
M2
M2
M2
M2
M
M
M
75.93
411.49
142.33
222.50
4.24
131.11
314.96
31.50
M2
339.98
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
155.37
7.46
M2
155.37
M
M2
37.90
306.69
26.43
302.08
841.95
2,516.31
1.10
153.92
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
75.93
M
M
115.50
95.80
M2
M2
M2
M2
2.88
6.39
19.77
5.94
M2
11.70
M2
51.89
10.60
BO F N DE 1 1/2" EN SS.HH.
5.00
7.00
M2
PZA.
PZA.
48.00
6.00
UND
12.00
UND
UND
3.00
12.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
274.20
M2
M2
648.43
553.82
M2
M2
11.70
35.10
M
M
10.60
94.80
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
Unidad
Metrado
GLB
GLB
M
M
1.00
1.00
90.86
39.00
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
UND
PTO
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
1.00
17.00
46.48
7.50
61.85
11.40
10.00
6.00
8.00
2.00
1.00
1.00
2.00
PTO
PTO
UND
M3
M3
M
M
M
14.00
7.00
7.00
9.14
9.14
21.30
31.06
30.45
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
UND
UND
UND
UND
UND
UND
PTO
PTO
1.00
4.00
4.00
1.00
2.00
10.00
1.00
1.00
M
M
M
33.60
79.94
51.80
PTO
PTO
PTO
PTO
PTO
UND
UND
1.00
33.00
12.00
3.00
8.00
16.00
3.00
M3
M3
M
M
M
10.79
10.79
11.45
20.60
14.70
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
(CENTRO DE LUZ)
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
1-2 x 16A, 1 - IDF 25 AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
-1*6+1*4(T))mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
M
29.60
14.15
11.45
18.00
UND
UND
5.00
7.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
AMBIENTES DE CLASE
S
S
AS
PRIMEROS AUXILIOS
IVOS
DE KITS Y MODULOS EDUCATIVOS ADECUADOS
DE KITS BASICO PARA ESTUDIANTES
DE KITS BASICO PARA ESTUDIANTES
DIDACTICO PARA AULAS
DIDACTICO PARA AULAS
DE MODULO DE COMUNICACIN
MODULO DE COMUNICACIN
DE MODULO DE MATEMATICA
MODULO DE MATEMATICA
DE MODULO DE CIENCIA Y AMBIENTE
MODULO DE CIENCIA Y AMBIENTE
DE MODULO PSICOMOTRICIDAD
MODULO DE PSICOMOTRICIDAD
DE MODULO DE BIBLIOTECA DE AULA
MODULO DE BIBLIOTECA DE AULA
O
ALES FIJOS (14.80% CD)
% CD)
Unidad
Metrado
UND
UND
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
0.1480
0.0520
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
0.1800
BRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
REPLANTEO
EO PRELIMINAR
NTE EL PROCESO
UD
PLEM. Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
ECCION INDIVIDUAL
ECCION COLECTIVA
MPORAL DE SEGURIDAD
SEGURIDAD Y SALUD
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
GLB
1.00
GLB
1.00
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
405.12
405.12
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
301.18
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
603.51
54.27
M3
M2
58.16
4.15
M2
M2
M2
340.15
197.56
340.15
M3
M3
154.87
879.08
M3
M2
M3
M3
M2
M3
M2
M2
23.86
139.69
0.69
4.80
40.07
2.10
9.45
197.56
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
28.07
757.82
M3
M2
KG
16.07
127.86
1,785.01
M3
M2
KG
11.74
126.71
396.51
M3
M2
KG
112.89
290.75
5,820.96
M3
16.28
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
OFRADO Y DESENCOFRADO
O F'Y=4200 kg/cm2
M2
KG
178.86
2,623.97
M3
M2
KG
28.37
252.58
3,257.88
M3
M2
KG
M3
M2
KG
UND
0.45
2.25
114.05
28.34
323.84
1,176.94
2,697.58
M2
M
381.32
34.54
M2
381.32
M
UND
M
175.83
16.68
33.35
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
124.33
106.25
200.24
M2
M2
M2
M2
M
M
M
65.64
390.61
121.88
263.92
147.31
308.35
58.80
M2
199.03
0mm
M2
193.22
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
6.74
M2
193.22
M2
134.03
M2
65.64
M
M
120.80
87.20
M2
M2
M2
M2
2.88
5.55
13.29
14.85
M2
11.70
M2
68.05
41.50
BO F N DE 1 1/2" EN SS.HH.
10.00
7.00
M2
PZA.
PZA.
40.00
6.00
UND
10.00
UND
UND
3.00
10.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
M2
M2
109.65
546.76
521.49
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
TAS Y VENTANAS
ROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
N CARP. DE MADERA
RAZOCALOS Y BARANDAS
ROSIVA Y ESMALTE EN BARANDAS
DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
AMICA
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
Unidad
Metrado
M2
M2
11.70
31.02
M
M
41.50
87.20
GLB
GLB
M
M
1.00
1.00
121.62
36.30
PTO
M2
1.00
5.99
PZA
PTO
PTO
PTO
UND
UND
UND
2.00
3.00
6.00
3.00
5.00
2.00
5.00
UND
PTO
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
1.00
13.00
36.53
7.50
42.30
27.42
6.00
4.00
6.00
1.00
1.00
1.00
1.00
PTO
PTO
UND
M3
13.00
6.00
6.00
13.50
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
Unidad
Metrado
M3
M
M
M
UND
UND
UND
UND
UND
UND
PTO
PTO
16.64
21.30
23.46
45.00
1.00
2.00
2.00
1.00
2.00
8.00
1.00
1.00
M
M
M
22.40
69.14
7.75
UND
PTO
PTO
PTO
PTO
UND
UND
UND
UND
1.00
33.00
10.00
3.00
8.00
13.00
2.00
1.00
1.00
M3
M3
M
M
7.58
7.58
25.25
7.20
(CENTRO DE LUZ)
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
UND
1.00
UND
UND
UND
1.00
1.00
1.00
M
M
34.25
7.20
12.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
UND
UND
UND
UND
3.00
11.00
14.00
4.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
AMBIENTES DE CLASE
PRIMEROS AUXILIOS
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
0.1480
0.0520
0.1800
BRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
GLB
1.00
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
564.05
564.05
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
146.23
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
445.09
121.64
M3
M3
M2
58.96
7.62
78.57
M2
M2
M2
408.30
217.44
408.30
M3
M3
229.49
512.50
M3
M2
M3
M3
M2
M3
M2
M2
M2
M2
57.26
83.88
0.81
15.23
63.52
1.46
5.85
0.97
5.18
217.44
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
30.77
820.19
M3
M2
KG
17.74
141.18
1,960.32
M3
M2
KG
14.61
153.54
474.30
M3
M2
12.40
36.30
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
KG
632.65
M3
M2
KG
18.24
204.06
2,946.22
M3
M2
KG
30.75
267.58
3,558.10
M3
M2
KG
M3
M2
KG
UND
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
M2
M
419.63
39.89
M2
419.63
M
UND
M
206.83
3.03
6.05
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
124.33
150.55
267.28
M2
M2
M2
M2
M2
M
M
M
75.93
464.36
147.08
276.67
5.18
166.21
335.25
37.50
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
234.68
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
213.09
7.46
M2
213.09
M
M2
186.07
M2
75.93
M
M
142.70
105.80
M2
M2
M2
M2
2.88
6.39
19.77
14.85
M2
11.70
M2
72.91
7.80
BO F N DE 1 1/2" EN SS.HH.
5.00
7.00
1.10
M2
PZA.
PZA.
52.00
6.00
UND
13.00
GOLPES EN PUERTA
CIERRE
360.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
Unidad
UND
UND
Metrado
3.00
13.00
M2
M2
595.15
611.44
M2
M2
11.70
38.34
M
M
7.80
105.80
GLB
GLB
M
M
1.00
1.00
124.62
44.40
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
UND
PTO
M
M
M
M
UND
UND
UND
1.00
17.00
46.48
7.50
44.06
41.25
10.00
6.00
8.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
Unidad
Metrado
UND
UND
UND
UND
2.00
1.00
1.00
2.00
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
PTO
PTO
14.00
7.00
7.00
15.92
15.92
21.30
31.06
53.05
1.00
4.00
4.00
1.00
2.00
7.00
1.00
1.00
M
M
M
33.60
79.94
69.07
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
4.00
M3
M3
M
M
M
13.29
13.29
16.85
25.80
14.15
UND
1.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
1-2 x 16A, 1 - IDF 25 AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
-1*6+1*4(T))mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
AMBIENTES DE CLASE
S
S
AS
PRIMEROS AUXILIOS
IVOS
DE KITS Y MODULOS EDUCATIVOS ADECUADOS
DE KITS BASICO PARA ESTUDIANTES
DE KITS BASICO PARA ESTUDIANTES
DIDACTICO PARA AULAS
DIDACTICO PARA AULAS
DE MODULO DE COMUNICACIN
Unidad
UND
UND
UND
UND
Metrado
1.00
1.00
1.00
1.00
M
M
M
34.80
14.15
16.85
18.00
UND
UND
UND
UND
5.00
11.00
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
GLB
1.00
GLB
1.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
MODULO DE COMUNICACIN
DE MODULO DE MATEMATICA
MODULO DE MATEMATICA
DE MODULO DE CIENCIA Y AMBIENTE
MODULO DE CIENCIA Y AMBIENTE
DE MODULO PSICOMOTRICIDAD
MODULO DE PSICOMOTRICIDAD
DE MODULO DE BIBLIOTECA DE AULA
MODULO DE BIBLIOTECA DE AULA
Metrado
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
O
ALES FIJOS (14.80% CD)
% CD)
0.1480
0.0520
0.1800
BRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
GLB
GLB
1.00
1.00
PUERTAS
VENTANAS
HO DE ETERNIT/CALAMINA
M2
M2
M2
4.02
0.96
57.09
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
REPLANTEO
EO PRELIMINAR
NTE EL PROCESO
UD
PLEM. Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
ECCION INDIVIDUAL
ECCION COLECTIVA
MPORAL DE SEGURIDAD
SEGURIDAD Y SALUD
Unidad
M2
M3
M3
Metrado
36.65
50.40
64.88
GLB
1.00
GLB
1.00
M2
M2
GLB
GLB
GLB
GLB
GLB
GLB
574.72
574.72
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
125.36
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
267.86
144.67
M3
M2
37.97
114.10
M2
M2
M2
441.48
217.44
409.94
M3
M3
251.96
418.77
M3
M2
M3
M3
M2
M2
46.71
83.88
0.81
11.82
49.87
217.44
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
RZADOS
RZADOS, CONCRETO F'C=175 Kg/cm2
RZADOS, ACEROS FY=4200 Kg/cm2
Unidad
Metrado
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
24.38
586.40
M3
M2
KG
17.20
137.58
1,888.68
M3
M2
KG
14.61
153.57
474.30
M3
M2
KG
18.24
204.06
2,946.22
M3
M2
KG
30.75
267.58
3,558.10
M3
M2
KG
M3
M2
KG
UND
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
M2
M
419.63
39.89
M2
419.63
264.08
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
124.33
150.55
267.28
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
29.68
166.21
335.25
M2
234.68
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
213.09
7.46
M2
213.09
M
M2
194.36
M2
75.93
M
M
142.70
105.80
M2
M2
M2
M2
2.88
6.39
19.77
14.85
M2
11.70
M2
72.91
5.00
BO F N DE 1 1/2" EN SS.HH.
M2
1.10
278.10
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
PZA.
PZA.
52.00
6.00
UND
13.00
UND
UND
3.00
13.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
FRIA
XISTENTE, AGUA
7.00
M2
M2
595.15
611.44
M2
M2
11.70
38.34
89.20
GLB
GLB
M
M
1.00
1.00
124.62
44.40
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
PTO
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
UND
PTO
1.00
17.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
O GALVANIZADO DE 1"
SE 10 - 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
Unidad
Metrado
M
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
27.00
46.48
7.50
33.95
24.65
10.00
6.00
8.00
2.00
1.00
1.00
2.00
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
ONCE 2"
ONCE 4"
ONCE 2"
ONCE 4"
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
5 m3
OR
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
PTO
PTO
14.00
7.00
7.00
14.49
14.49
21.30
31.06
50.00
1.00
4.00
4.00
1.00
2.00
8.00
1.00
1.00
M
M
M
33.60
79.94
75.55
UND
PTO
PTO
PTO
PTO
UND
UND
UND
1.00
37.00
12.00
4.00
8.00
18.00
3.00
1.00
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
(CENTRO DE LUZ)
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
-2x16A, 1-IDF 25AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
2-1*4+1*4(T)]mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
AMBIENTES DE CLASE
S
S
AS
Unidad
UND
M3
M3
M
M
M
Metrado
4.00
14.16
14.16
33.30
24.85
10.55
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
M
33.85
14.15
33.30
18.00
UND
UND
UND
UND
5.00
11.00
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
1.00
3.00
2.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
PRIMEROS AUXILIOS
IVOS
DE KITS Y MODULOS EDUCATIVOS ADECUADOS
DE KITS BASICO PARA ESTUDIANTES
DE KITS BASICO PARA ESTUDIANTES
DIDACTICO PARA AULAS
DIDACTICO PARA AULAS
DE MODULO DE COMUNICACIN
MODULO DE COMUNICACIN
DE MODULO DE MATEMATICA
MODULO DE MATEMATICA
DE MODULO DE CIENCIA Y AMBIENTE
MODULO DE CIENCIA Y AMBIENTE
DE MODULO PSICOMOTRICIDAD
MODULO DE PSICOMOTRICIDAD
DE MODULO DE BIBLIOTECA DE AULA
MODULO DE BIBLIOTECA DE AULA
Metrado
UND
1.00
GLB
1.00
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
O
ALES FIJOS (14.80% CD)
% CD)
0.1480
0.0520
0.1800
BRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
1.00
1.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
NAL DE ESTERAS
ICOS
ROVISIONALES
NSTRUCCION
CA PARA LA CONSTRUCCION
CAMPAMENTO, MAQUINARIAS Y HERRAMIENTAS
CAMPAMENTO, MAQUINARIAS Y HERRAMIENTAS
REPLANTEO
EO PRELIMINAR
NTE EL PROCESO
UD
PLEMENTACION Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
ECCION INDIVIDUAL
ECCION COLECTIVA
MPORAL DE SEGURIDAD
SEGURIDAD Y SALUD
Unidad
Metrado
ML
GLB
200.00
1.00
GLB
GLB
1.00
1.00
GLB
1.00
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
620.67
620.67
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
125.36
E TERRENO A MAQUINA
NO EN FORMA MANUAL
M3
M3
167.53
150.90
M3
M2
48.32
59.25
M2
M2
M2
433.08
217.44
520.32
M3
M3
267.21
346.87
M3
M2
M3
M3
M2
M2
60.70
83.88
0.81
16.30
67.82
217.44
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
30.77
820.19
M3
M2
KG
17.74
141.18
1,960.32
M3
M2
KG
14.16
153.54
474.30
M3
M2
KG
18.24
204.06
2,946.22
M3
M2
KG
30.99
267.58
3,558.10
M3
M2
KG
M3
M2
KG
UND
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
M2
M
419.63
39.89
M2
419.63
239.83
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
M2
M2
KG
124.33
150.55
267.28
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
166.21
335.25
M2
234.68
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
213.09
7.46
M2
213.09
M
M2
235.46
M2
75.93
M
M
142.70
105.80
M2
M2
M2
M2
2.88
6.39
19.77
14.85
M2
11.70
M2
72.91
BO F N DE 1 1/2" EN SS.HH.
5.00
7.00
M2
1.10
385.80
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
XISTENTE, AGUA
"
SE 10 - 1 1/2" ROSCADA
Unidad
Metrado
PZA.
PZA.
52.00
6.00
UND
13.00
UND
UND
3.00
13.00
M2
M2
595.15
611.44
M2
M2
11.70
38.34
105.80
GLB
GLB
M
M
1.00
1.00
124.62
44.40
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
UND
PTO
M
M
1.00
17.00
27.00
46.48
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
Unidad
Metrado
M
M
M
UND
UND
UND
UND
UND
UND
UND
7.50
52.40
38.00
10.00
8.00
8.00
3.00
1.00
1.00
2.00
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
PTO
PTO
14.00
7.00
7.00
12.90
12.90
21.30
31.06
53.05
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1.00
M
M
M
33.60
79.94
85.30
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
4.00
M3
11.19
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
-2x16A 1-IDF 25AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
2-1*4+1*4(T)]mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
M3
M
M
M
Metrado
11.19
18.35
16.70
13.05
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
M
25.70
13.05
18.35
18.00
UND
UND
UND
UND
5.00
11.00
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
GLB
1.00
AMBIENTES DE CLASE
PRIMEROS AUXILIOS
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
O
ALES FIJOS (14.80% CD)
% CD)
0.1480
0.0520
0.1800
BRA ACUMULADO
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
NSTRUCCION
CA PARA LA CONSTRUCCION
GLB
GLB
PUERTAS
VENTANAS
ECHO DE ETERNIT/CALAMINA
M2
M2
M2
17.55
19.28
328.19
M2
M3
M3
M3
66.30
182.42
234.82
234.82
GLB
M2
M2
GLB
UND
GLB
GLB
GLB
GLB
1.00
1.00
1.00
546.00
546.00
1.00
25.00
1.00
1.00
1.00
1.00
ERRAS
M3
125.36
NO EN FORMA MANUAL
M3
105.23
M3
M2
49.46
112.85
M2
M2
M2
422.74
217.44
422.74
M3
M3
211.05
164.45
M3
M2
M3
44.86
83.88
0.81
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
M3
M3
M2
11.35
48.08
217.44
M3
KG
0.70
17.47
TO F'C=210 KG/CM2
DE REFUERZO FY=4200 Kg/m2
ACION
ACION - CONCRETO F'C=201 Kg/cm2
ACION - ENCOFRADO Y DESENCOFRADO
ACION - ACERO F'Y=4200 kg/cm2
M3
KG
30.77
820.19
M3
M2
KG
17.74
141.18
1,960.32
M3
M2
KG
14.61
153.57
474.30
M3
M2
KG
18.24
204.06
2,946.22
M3
M2
KG
30.75
267.58
3,558.10
M3
M2
KG
M3
M2
KG
UND
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
M2
M
419.63
39.89
M2
419.63
205.53
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
S DE ALBAILERIA
LO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
LO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REFUERZO HORIZONTAL EN MUROS
Unidad
Metrado
M2
M2
KG
124.33
150.55
267.28
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
166.21
335.25
M2
234.68
0mm
" ACABADO PULIDO, ZONA MUEBLES BAJOS
M2
M2
213.09
7.46
M2
213.09
ML
1.10
M2
199.02
M2
75.93
M
M
142.70
105.80
M2
M2
M2
M2
2.88
6.39
19.77
14.85
M2
11.70
M2
72.91
10.00
BO F N DE 1 1/2" EN SS.HH.
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
7.00
M2
PZA.
PZA.
52.00
6.00
UND
13.00
UND
UND
3.00
13.00
GOLPES EN PUERTA
CIERRE
UMINIZADO PARA PUERTA
E 4" PARA PUERTAS
ENTE DE LA OBRA
STIMIENTO C/MAYOLICA
RIOS Y ACCESORIOS
D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
SA BLANCA DE PRIMERA 545mm X 460mm
INOXIDABLE PARA COCINA
VATORIO
N GRIFERIA
LANCA
AMICA
CO DE CEDRO
FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
267.00
M2
M2
595.15
611.44
M2
M2
11.70
38.34
105.80
GLB
GLB
M
M
1.00
1.00
124.62
44.40
PTO
M2
1.00
6.71
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
XISTENTE, AGUA
"
SE 10 - 1 1/2" ROSCADA
SE 10 - 3/4" ROSCADA
SE 10 - 1" ROSCADA
SE 10 - 1 1/4" ROSCADA
UERTA DE BRONCE 3/4"
UERTA DE BRONCE 1"
A (NICHO DE MAYOLICA)
S BY PASS DE CONCRETO
UE ALTO DE FG Y 2"
/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
GUE Y VENTILACION
VENTILACION EN PVC
ANJAS PARA REDES EXT. SANIT.-ELECT.
CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
P 2" RED EXTERIOR
P 4" RED EXTERIOR
P 6" RED EXTERIOR
ONCE 2"
ONCE 4"
ON REJILLA DE FIERRO
O DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
Unidad
Metrado
UND
PTO
M
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
8.00
3.00
1.00
1.00
1.00
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1.00
M
M
M
33.60
79.94
85.95
PTO
PTO
PTO
PTO
UND
37.00
12.00
4.00
8.00
18.00
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
Unidad
UND
UND
UND
M3
M3
M
M
M
HILLAS (LLAVES)
-2x20, 4-2x16 A, 1-IDF 25AMP
-2x20, 3-2x16 A, 1-IDF 25AMP
-2x16A 1-IDF 25AMP
D EXTERNA DE MEDIDORES
3-1*6+1*6(N)+1*6(T)]mm2
3-1*10+1*10(N)+1*10(T)]mm2
2-1*4+1*4(T)]mm2
SISTEMA PUESTO A TIERRA
SNUDO 1x16 mm2, 20mm PVC-P
Metrado
3.00
1.00
1.00
18.43
18.43
29.00
12.14
31.10
UND
1.00
UND
UND
UND
UND
1.00
1.00
1.00
1.00
M
M
M
21.17
14.15
16.85
18.00
UND
UND
UND
UND
5.00
11.00
16.00
5.00
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
UND
UND
10.00
20.00
UND
20.00
UND
1.00
AMBIENTES DE CLASE
PRESUPUESTO CO
DESCRIPCIN DE PARTIDAS
PRIMEROS AUXILIOS
O
ALES FIJOS (14.80% CD)
% CD)
BRA ACUMULADO
Unidad
Metrado
UND
UND
UND
3.00
2.00
1.00
GLB
1.00
GLB
1.00
GLB
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
UND
1.00
0.1480
0.0520
0.1800
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,500.00
823.03
8.49
470.00
2,500.00
823.03
1,698.00
470.00
154.61
339.54
154.61
339.54
4.44
2.67
105.37
1.56
2.97
22.22
29.70
24.35
105.37
45.57
14.70
66.66
4.96
14.06
6.99
1.65
15.54
17.39
565.84
144.96
55.99
317.79
461.85
516.83
1.40
850.60
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
1.40
850.60
1,500.00
108.85
1,050.00
725.00
1,250.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,250.00
1,030.00
35.52
9,457.56
6.57
15.54
1,769.63
1,279.56
12.46
63.53
11.38
1,221.33
2,470.05
1,138.00
3.85
3.35
10.81
1,988.22
701.59
5,582.50
8.88
17.39
2,709.91
9,991.25
169.77
21.38
177.98
192.93
32.65
301.09
30.07
28.23
5,469.99
3,412.68
85.43
1,637.98
2,322.07
439.59
175.91
5,912.21
272.94
3.97
191.06
69.36
297.96
4.49
8,861.33
3,620.24
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
313.62
50.40
3.97
5,112.01
6,535.37
7,751.90
289.48
32.73
4.42
2,894.80
3,577.06
1,521.89
405.30
50.27
3.97
28,496.64
9,446.74
14,526.15
424.52
52.55
3.97
7,522.49
9,971.36
11,895.75
329.92
60.96
3.97
9,729.34
16,140.99
12,704.00
329.92
53.29
3.97
312.96
37.69
3.97
2.44
148.46
119.90
452.78
7,748.89
10,665.52
4,846.62
5,751.64
42.25
27.61
15,821.78
936.53
12.69
4,752.15
6.49
10.77
12.21
1,798.38
174.47
395.60
107.28
64.68
3.73
10,888.92
11,020.83
1,016.35
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
19.14
20.23
31.38
43.20
12.26
6.37
40.44
1,351.86
8,165.64
4,781.68
11,963.81
1,967.73
1,544.15
1,516.50
33.79
9,637.92
33.92
1,860.51
24.36
49.92
6,192.07
236.62
46.30
11,769.00
49.78
19,863.71
53.21
3,758.22
24.36
12.91
3,607.72
2,570.38
288.90
187.42
479.55
493.92
832.03
1,038.31
6,330.06
11,735.54
308.76
3,612.49
79.77
7,258.27
129.32
4,965.89
69.95
91.54
419.70
915.40
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
124.78
22,460.40
145.63
1,019.41
3.82
2.84
198.64
17.04
53.79
699.27
6.01
8.13
30.05
105.69
6.59
5.74
3,825.69
2,974.01
10.66
18.17
124.72
479.14
6.45
2.93
247.68
261.06
640.10
640.10
24.44
17.58
640.10
640.10
3,035.94
522.13
1,094.93
891.34
1,094.93
5,027.16
275.85
264.23
198.08
450.72
44.99
46.84
40.74
551.70
792.69
1,188.48
1,352.16
494.89
140.52
203.70
81.11
83.41
81.11
1,084.33
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
23.18
10.39
11.01
11.63
13.59
81.82
93.16
26.59
222.85
726.23
68.77
236.08
625.86
400.33
121.11
780.37
475.65
654.56
931.60
159.54
891.40
1,452.46
68.77
236.08
70.07
92.18
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
111.63
228.42
70.07
1,198.34
456.36
59.52
431.07
359.28
521.93
789.82
3,462.80
33.70
261.30
93.22
223.26
1,598.94
27.93
45.13
160.60
625.63
4,307.21
14,004.32
85.54
8.35
11.07
11.07
107.74
624.31
163.10
3,336.06
91.85
33.21
110.70
1,400.62
1,872.93
652.40
24.86
20.72
451.21
376.07
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
14.60
25.99
737.30
259.90
86.73
86.73
819.08
819.08
819.08
188.47
819.08
819.08
819.08
188.47
54.30
56.65
4,903.29
770.44
10.54
189.72
137.60
146.71
122.05
72.19
412.80
2,200.65
2,196.90
288.76
271.19
59.30
720.34
76.27
338.98
231.00
381.35
4,067.85
3,558.00
2,161.02
228.81
1,016.94
693.00
8,008.35
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
2,095.80
2,095.80
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
425.52
425.52
6,932.88
6,932.88
31,863.48
31,863.48
2,514.03
2,514.03
2,244.81
2,244.81
1,494.72
1,494.72
624,653.96
92,448.79
32,482.01
749,584.76
134,925.26
0.00
-
884,510.02
0.00
0.00%
0.00%
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 02
Oct. 2014
Monto S/.
Valoriz. N 01
Set. 2014
Total
Mes
Metrado
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,500.00
827.40
8.49
470.00
2,500.00
827.40
1,698.00
470.00
1.00
1.00
1.00
2,500.00
827.40
470.00
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
2,935.02
2,935.02
1.00
2,935.02
1.40
1.40
707.13
707.13
303.05
-
424.27
-
202.04
505.09
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
0.50
12.50
0.50
0.50
0.11
0.11
750.00
1,360.63
525.00
362.50
192.50
113.30
12.50
0.50
0.50
0.29
0.29
35.52
3,803.48
6.57
15.54
2,024.55
1,746.70
12.46
42.32
11.38
513.85
315.71
853.50
215.70
-
1,417.15
-
200.00
-
107.08
92.45
112.40
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
-
Metrado
-
3.85
3.35
12.36
1,405.25
535.03
4,517.95
8.88
17.39
1,827.68
6,542.64
174.41
188.57
21.57
184.42
200.22
32.65
369.75
30.07
267.47
32.65
28.74
9,986.72
224.40
1,453.60
77.46
3,049.35
2,073.93
902.19
244.77
1,281.18
833.55
4,590.07
331.15
4.00
231.81
69.88
359.18
4.52
9,022.60
2,998.43
374.84
50.40
4.00
5,214.02
5,572.22
5,882.36
4.17
33.17
735.30
347.69
32.73
4.45
4,401.76
4,331.82
1,796.47
242.22
485.74
52.55
4.00
7,402.68
8,957.15
9,591.36
391.14
60.96
4.00
9,672.89
13,034.47
11,826.32
391.14
1,983.08
150.50
132.67
479.57
2,617.20
599.67
1,918.28
205.82
225.73
67.39
0.42
-
25.12
530.70
719.35
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
53.29
4.00
374.18
37.69
4.00
2.44
2,019.69
1,226.76
9,889.58
11,385.40
3,367.80
6,139.80
42.37
27.42
13,887.61
865.65
12.69
4,159.40
7.29
1,358.71
111.70
66.67
3.73
11,676.00
9,595.15
921.76
20.25
21.34
32.49
44.31
22.71
12.40
6.37
41.35
1,537.58
8,781.20
4,624.30
9,858.98
579.56
1,625.76
2,006.30
1,922.78
34.85
11,848.30
27.24
51.66
4,232.28
385.38
47.80
7,426.69
49.52
54.47
56.48
10,773.56
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
54.71
4,154.13
24.50
13.21
2,829.75
1,265.52
288.90
187.42
479.55
493.92
832.03
1,197.61
9,480.70
2,933.88
308.77
3,612.61
79.85
4,143.42
129.32
7,106.13
91.54
457.70
124.78
44,920.80
145.63
1,019.41
3.82
2.84
183.36
17.04
53.79
645.48
6.01
8.13
18.03
97.56
6.59
5.74
4,273.15
3,178.93
10.66
18.16
124.72
637.42
6.45
2.93
354.43
277.76
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
640.10
640.10
24.44
17.57
640.10
640.10
2,220.62
685.23
1,137.45
907.88
1,137.45
6,091.87
275.85
264.23
198.08
450.72
44.99
46.84
80.73
44.50
40.76
77.67
827.55
792.69
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.56
77.67
81.11
83.41
10.39
11.01
11.63
13.59
80.72
97.28
26.73
258.27
726.23
68.77
241.10
81.11
1,417.97
482.93
82.58
512.42
682.90
807.20
778.24
213.84
774.81
726.23
68.77
482.20
92.15
76.06
9.92
24.86
20.72
21.93
26.81
59.91
1,290.10
532.42
69.44
387.57
323.02
467.11
832.72
3,133.29
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
33.70
43.55
46.61
53.59
112.83
233.20
1,280.04
6,444.83
1,375.14
33.70
174.20
186.44
53.59
225.66
2,098.80
2,560.08
6,444.83
1,375.14
25.08
45.25
169.22
842.69
3,617.29
11,684.64
85.54
8.35
11.07
11.07
107.74
624.31
292.28
163.10
2,822.82
100.20
33.21
88.56
1,723.84
1,872.93
292.28
652.40
24.86
20.72
11.12
14.60
25.99
330.39
275.37
187.37
376.68
367.76
86.73
86.73
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
54.30
56.65
54.30
1,889.64
801.60
914.96
10.54
189.72
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
137.60
146.71
122.05
72.19
688.00
1,026.97
1,952.80
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
516,805.72
76,487.25
17,507.07
2,591.05
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Monto S/.
26,873.90
620,166.87
111,630.04
910.37
21,008.49
3,781.53
731,796.91
24,790.02
3.39%
3.39%
Valoriz. N 02
Oct. 2014
Metrado
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 02
Oct. 2014
Monto S/.
Valoriz. N 01
Set. 2014
Total
Mes
Metrado
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,500.00
830.60
8.70
470.00
2,500.00
830.60
1,740.00
470.00
1.00
1.00
1.00
2,500.00
830.60
470.00
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
7,300.35
7,300.35
1.00
7,300.35
1.40
1.40
615.51
615.51
439.65
439.65
615.51
615.51
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
0.50
12.50
0.50
0.50
0.13
0.13
750.00
1,360.63
525.00
362.50
218.75
128.75
35.52
3,803.48
69.01
2,451.24
6.57
15.54
945.62
1,500.23
89.88
28.39
590.51
441.18
12.46
42.32
11.38
516.59
2,912.46
833.47
200.00
-
0.50
12.50
0.50
0.50
0.13
0.13
54.05
68.15
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
-
Metrado
-
161.78
93.98
161.78
3.85
3.35
12.36
1,300.68
535.03
4,175.70
8.88
17.39
1,512.26
4,958.58
71.29
86.18
633.06
1,498.67
99.01
198.96
177.33
191.49
21.75
188.15
203.95
32.73
369.41
30.11
271.20
32.73
29.25
8,125.26
1,177.66
1,465.73
79.02
2,376.02
2,079.01
517.17
84.31
216.96
138.78
4,671.52
33.73
-
733.63
-
20.80
0.42
93.98
330.55
4.05
231.39
70.75
359.38
4.58
9,027.63
3,038.23
12.21
580.18
4,388.03
2,657.22
6.39
-
375.04
50.47
4.05
5,216.81
5,579.96
5,955.89
823.40
3,334.77
11.22
89.75
357.86
347.09
32.81
4.50
5,199.41
5,357.54
2,343.47
485.94
52.64
4.05
7,405.73
8,972.49
9,711.25
391.34
61.08
4.05
9,677.84
13,060.13
11,974.15
391.34
1,984.09
1,833.75
7,426.69
5.50
62.14
185.88
10.16
106.21
109.73
1,389.71
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
53.40
4.05
374.38
37.77
4.05
3.03
2,023.86
1,242.09
9,894.86
11,409.56
3,409.90
7,624.42
42.46
27.65
13,917.11
872.91
12.75
4,179.07
6.87
1,286.61
128.48
76.21
3.74
13,430.01
10,968.14
924.23
20.01
21.10
32.25
44.10
22.47
12.38
6.37
41.22
1,519.36
8,682.44
4,590.14
9,812.25
95.27
1,623.14
2,006.30
1,298.43
34.67
11,787.11
26.73
52.28
4,153.04
390.01
47.96
7,451.55
51.81
56.99
56.33
8,670.31
47.95
54.92
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
54.87
4,166.28
24.47
13.19
2,826.29
1,263.60
288.90
187.42
479.55
493.92
832.03
1,197.61
9,480.70
2,933.88
308.78
3,612.73
79.89
4,145.49
129.32
1,370.79
91.54
457.70
145.63
1,019.41
124.86
34,236.61
3.82
2.92
183.36
17.52
53.79
645.48
6.01
8.13
18.03
97.56
6.59
5.74
4,273.15
3,178.93
10.66
18.17
124.72
637.77
6.45
2.93
68.37
277.76
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
640.10
640.10
24.51
17.58
640.10
640.10
2,226.98
685.62
1,134.70
913.65
1,134.70
6,130.59
277.77
266.15
198.08
450.72
44.99
46.84
80.73
44.52
40.78
77.67
833.31
798.45
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
77.67
81.11
81.56
10.08
10.62
11.13
12.64
81.82
93.16
26.81
252.68
726.23
68.77
241.70
81.11
1,386.52
468.52
79.65
688.39
144.10
818.20
558.96
214.48
505.36
726.23
68.77
483.40
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
1,289.96
532.42
69.44
227.22
189.38
467.11
832.72
1,824.26
8.00
4.00
17.80
20.46
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
33.70
43.55
46.61
53.59
112.41
244.57
6,446.48
1,420.84
33.70
174.20
186.44
53.59
224.82
2,445.70
6,446.48
1,420.84
25.08
45.13
169.82
842.69
3,607.69
8,796.68
66.72
86.02
8.35
11.07
11.07
120.13
624.31
66.72
2,838.66
100.20
33.21
88.56
1,922.08
1,872.93
5.00
-
24.86
20.72
11.12
14.60
21.71
268.24
223.57
127.32
300.76
319.14
86.73
86.73
819.08
819.08
819.08
188.47
819.08
819.08
819.08
188.47
54.30
56.75
54.30
1,607.28
803.01
621.74
10.54
189.72
137.60
153.71
688.00
1,075.97
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
122.27
72.19
1,956.32
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
494,300.35
73,156.45
25,703.62
593,160.42
40,326.72
5,968.35
2,096.99
48,392.06
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Valoriz. N 02
Oct. 2014
Monto S/.
8,710.57
699,929.30
57,102.63
8.16%
8.16%
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,500.00
825.16
8.49
470.00
2,500.00
825.16
1,698.00
470.00
1.00
1.00
200.00
1.00
2,500.00
825.16
1,698.00
470.00
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
677.34
677.34
1.00
677.34
23,869.17
23,869.17
0.60
14,321.50
1.40
1.40
567.17
567.17
405.12
405.12
567.17
567.17
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
35.52
10,697.91
Metrado
106,768.88
PRESUPUESTO CONTRATADO
Precio
Mes
0.15
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
245.00
-
Metrado
1,609.65
-
298.16
32.56
6.57
15.54
3,965.06
843.36
12.46
11.38
724.67
47.23
3.85
3.35
12.36
1,309.58
661.83
4,204.25
8.88
17.39
1,375.25
15,287.20
171.48
21.38
180.69
196.49
32.65
311.84
30.07
28.23
4,091.51
2,986.57
124.68
943.15
1,308.29
654.86
284.16
5,577.12
281.42
3.97
196.99
69.36
306.86
4.49
8,613.56
3,402.61
300.00
1,347.00
230.47
322.52
50.40
3.97
5,182.90
6,444.14
7,086.49
650.00
2,580.50
688.75
297.96
32.73
4.42
3,498.05
4,147.22
1,752.57
414.20
50.27
3.97
46,759.04
14,616.00
23,109.21
433.42
7,056.08
69.00
1,199.91
546.36
277.56
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
688.00
Metrado
2,731.36
1,411.18
52.55
3.97
9,399.09
10,417.16
338.82
60.96
3.97
9,612.32
15,397.28
12,933.78
338.82
53.29
3.97
321.86
37.69
3.97
2.44
152.47
119.90
452.78
9,121.51
12,205.53
4,672.45
6,582.10
42.25
27.61
16,110.77
953.65
12.69
4,838.95
6.58
10.77
12.21
1,156.96
179.64
407.20
107.77
64.90
3.73
13,399.04
6,895.63
746.90
19.28
20.37
31.52
43.34
12.28
6.37
40.55
1,265.54
7,956.73
3,841.66
11,438.29
1,808.97
1,964.19
2,384.34
33.93
6,753.09
24.72
4,776.40
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
50.04
337.27
46.39
8,963.48
50.73
6,799.34
53.30
3,498.61
24.38
12.94
2,945.10
1,128.37
288.90
187.42
479.55
493.92
832.03
1,040.18
6,373.22
7,334.71
308.76
3,612.49
79.77
5,428.35
129.32
5,366.78
76.66
766.60
145.63
1,019.41
124.78
13,682.13
3.82
2.84
152.80
17.04
53.79
537.90
6.01
8.13
18.03
81.30
6.59
5.74
3,603.15
2,993.35
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
10.66
18.17
124.72
563.63
6.45
2.93
267.68
255.50
640.10
640.10
24.44
17.43
640.10
640.10
2,972.39
632.71
1,101.49
893.86
1,101.49
5,354.22
275.85
264.23
198.08
450.72
44.99
46.84
40.76
551.70
792.69
1,188.48
1,352.16
224.95
93.68
203.80
81.11
83.41
10.39
11.01
11.63
13.59
82.28
97.28
26.60
227.87
726.23
68.77
236.76
81.11
1,084.33
379.55
82.58
491.95
372.64
493.68
389.12
159.60
227.87
726.23
68.77
236.76
92.14
76.06
9.92
24.86
1,197.82
456.36
59.52
335.61
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
111.80
228.84
6,173.32
1,352.85
344.78
467.11
628.96
2,695.95
33.70
87.10
93.22
53.59
223.60
1,830.72
6,173.32
1,352.85
25.08
45.13
160.86
561.79
3,120.29
1,246.67
66.72
79.46
8.35
11.07
11.07
95.70
624.31
272.19
163.10
66.72
2,622.18
83.50
33.21
88.56
1,244.10
1,248.62
272.19
163.10
24.86
20.72
14.60
25.99
188.44
157.06
368.65
187.13
86.73
86.73
819.08
819.08
188.47
819.08
819.08
188.47
54.30
56.65
1,859.78
407.88
10.54
126.48
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
137.60
146.71
122.05
72.19
412.80
1,613.81
1,708.70
288.76
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
570,781.77
40,365.16
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Monto S/.
84,475.70
29,680.65
684,938.12
123,288.86
5,974.04
2,098.99
48,438.19
8,718.87
808,226.98
57,157.06
7.07%
7.07%
PRESUPUESTO CONTRATADO
Precio
Mes
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Metrado
Valoriz. N 02
Oct. 2014
Metrado
2,500.00
827.82
8.49
470.00
2,500.00
827.82
1,698.00
470.00
1.00
1.00
1.00
2,500.00
827.82
470.00
200.00
-
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
3,457.11
3,457.11
1.00
3,457.11
1.40
1.40
789.67
789.67
375.83
375.83
526.16
526.16
188.22
188.22
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
0.50
12.00
0.50
0.50
0.11
0.11
750.00
1,306.20
525.00
362.50
192.50
113.30
0.50
13.00
0.50
0.50
0.11
0.11
35.52
5,194.09
99.13
3,521.10
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
445.09
121.64
Metrado
2,924.24
1,890.29
6.57
15.54
2,924.24
1,890.29
12.46
80.48
11.38
734.64
613.26
894.13
3.85
3.35
12.36
1,571.96
728.42
5,046.59
8.88
17.39
2,037.87
8,912.38
229.49
512.50
2,037.87
8,912.38
174.92
21.60
185.08
200.88
32.67
333.51
30.07
268.13
32.67
28.83
10,015.92
1,811.81
149.91
3,059.40
2,075.20
486.92
175.91
260.09
169.23
6,268.80
79.12
0.40
-
1,708.99
74.03
-
4.74
0.41
-
300.95
4.00
210.67
69.88
327.87
4.52
10,088.56
3,707.26
26.68
737.00
8,747.57
3,331.24
343.53
50.41
4.00
6,094.22
7,116.88
7,841.28
1,846.30
7,385.20
317.49
32.74
4.45
4,638.53
5,026.90
2,110.64
435.21
50.28
5,396.60
1,825.16
233.54
151.70
-
0.70
17.47
16.71
133.68
14.61
153.54
474.30
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
-
Metrado
-
4.00
2,530.60
454.43
52.55
4.00
8,288.80
10,723.35
11,784.88
359.83
60.98
4.00
11,064.77
16,317.03
14,232.40
359.83
53.29
4.00
342.87
37.69
4.00
2.57
1,824.34
2,019.69
1,226.76
9,716.94
12,205.53
4,707.76
6,932.78
42.37
27.61
17,779.72
1,101.36
12.69
5,325.10
6.62
10.78
12.21
1,369.21
32.66
73.87
112.09
67.17
3.76
13,936.15
10,112.44
1,004.97
19.48
20.57
31.72
43.54
21.94
12.31
6.37
40.77
1,479.12
9,551.89
4,665.38
12,046.21
113.65
2,046.05
2,135.54
1,528.88
2,382.14
9,528.56
13.17
139.82
2,434.79
124.33
106.25
200.24
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
34.12
8,007.28
25.35
51.18
5,401.83
381.80
47.37
10,094.07
48.84
53.72
52.92
9,846.82
54.28
4,121.48
24.41
13.04
3,483.31
1,379.63
288.97
187.45
479.55
493.92
832.23
1,197.81
9,480.70
7,334.71
308.77
3,612.61
79.86
5,822.59
129.32
1,008.70
91.54
457.70
145.63
1,019.41
124.78
44,920.80
3.82
2.84
198.64
17.04
53.79
699.27
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
6.01
8.13
18.03
105.69
6.59
5.74
3,922.04
3,509.67
10.66
18.17
124.72
696.64
6.45
2.93
50.31
309.99
640.10
640.10
24.44
17.58
640.10
640.10
3,045.71
780.55
1,112.92
898.85
1,112.92
6,031.28
275.85
265.24
198.08
450.72
44.99
46.84
80.73
44.50
40.76
77.68
827.55
795.72
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.56
77.68
81.11
83.41
10.39
11.01
11.63
13.59
82.28
97.28
26.63
81.11
1,417.97
482.93
82.58
512.42
560.59
822.80
583.68
213.04
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
236.00
726.23
68.77
238.37
472.00
726.23
68.77
476.74
92.42
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
111.91
233.09
6,266.62
1,360.77
1,293.88
532.42
69.44
395.77
329.86
467.11
832.72
3,178.23
33.70
174.20
186.44
53.59
223.82
1,631.63
6,266.62
1,360.77
25.08
45.13
165.38
842.69
3,607.69
11,422.80
85.54
8.35
11.07
11.07
107.74
624.31
279.74
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
279.74
652.40
24.86
20.72
11.12
14.60
25.99
330.39
275.37
187.37
376.68
367.76
86.73
86.73
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
54.30
56.65
54.30
1,889.64
801.60
914.96
10.54
189.72
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
563,864.77
83,451.99
29,320.97
676,637.73
121,794.79
62,112.37
9,192.63
3,229.84
74,534.84
13,416.27
798,432.52
87,951.11
11.02%
11.02%
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
2,500.00
827.18
8.49
470.00
2,500.00
827.18
1,698.00
470.00
1.00
1.00
200.00
1.00
2,500.00
827.18
1,698.00
470.00
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
4.44
2.67
3.22
17.85
2.56
183.83
4.02
0.96
57.09
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
4.96
6.99
17.39
181.78
352.30
1,128.26
4,705.91
4,705.91
1.00
4,705.91
99,021.94
99,021.94
0.20
19,804.39
0.40
1.40
1.40
804.61
804.61
574.72
574.72
804.61
804.61
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
35.52
4,452.79
6.57
15.54
1,759.84
2,248.17
267.87
30.00
1,759.91
466.20
114.67
12.46
11.38
473.11
1,298.46
15.00
-
186.90
-
22.97
-
3.85
3.35
12.36
1,699.70
728.42
5,066.86
43.49
81.99
145.69
1,013.40
264.89
173.95
200.00
8.88
17.39
2,237.40
7,282.41
39.00
348.21
346.32
6,055.37
212.96
70.56
173.99
21.55
183.88
199.68
32.66
28.67
8,127.07
1,807.61
148.94
2,360.22
1,628.75
6,234.00
36.65
50.40
64.88
90.00
58.72
0.81
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
-
Metrado
-
334.23
3.99
233.96
69.71
362.22
4.51
8,830.92
2,644.66
350.64
1,581.39
17.07
235.76
377.88
50.41
3.99
6,499.54
6,935.41
7,535.83
944.34
3,767.92
377.74
350.77
32.73
4.44
5,124.75
5,026.35
2,105.89
488.78
52.55
3.99
8,915.35
10,723.35
11,755.42
394.18
60.97
3.99
12,121.04
16,314.35
14,196.82
394.18
53.29
3.99
377.22
37.69
3.99
2.52
1,998.49
2,019.69
1,223.69
10,690.41
12,205.53
4,695.99
6,797.90
42.35
27.61
17,771.33
1,101.36
12.69
5,325.10
7.13
1,882.89
121.79
72.31
3.75
15,142.15
10,886.27
1,002.30
441.93
1,763.30
189.72
2,004.29
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
20.31
21.40
32.55
44.37
22.76
12.40
6.37
1,542.14
9,937.30
4,787.45
12,275.85
675.52
2,061.00
2,135.54
34.90
8,190.33
27.37
51.60
5,832.27
384.94
47.81
10,187.83
50.86
55.95
56.82
11,043.54
54.72
4,154.89
24.50
13.22
3,496.15
1,398.68
288.95
187.46
479.55
493.92
832.18
1,197.87
9,480.70
7,334.71
308.77
3,612.61
79.85
5,821.86
91.53
457.65
124.78
34,701.32
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
145.63
1,019.41
3.82
2.84
198.64
17.04
53.79
699.27
6.01
8.13
18.03
105.69
6.59
5.74
3,922.04
3,509.67
10.65
18.17
124.61
696.64
2.93
261.36
640.10
640.10
24.47
17.58
640.10
640.10
3,049.45
780.55
1,139.64
908.59
1,139.64
6,096.64
276.75
265.13
198.08
450.72
44.99
46.84
80.73
44.50
38.52
77.39
830.25
795.39
1,386.56
1,352.16
269.94
140.52
80.73
44.50
231.12
77.39
81.11
83.41
81.11
1,417.97
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
23.18
10.39
11.01
11.63
13.59
80.72
97.28
26.74
260.51
726.23
68.77
241.28
625.86
482.93
82.58
394.84
334.99
807.20
583.68
213.92
521.02
726.23
68.77
482.56
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.91
238.75
6,453.09
1,376.47
1,289.96
532.42
69.44
360.22
300.23
467.11
832.72
2,995.50
33.70
174.20
186.44
53.59
225.82
1,910.00
6,453.09
1,376.47
25.08
45.25
169.57
842.69
3,617.29
12,811.01
66.72
79.46
8.35
11.07
11.07
95.70
624.31
293.38
66.72
2,940.02
100.20
44.28
88.56
1,722.60
1,872.93
293.38
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
163.10
652.40
24.86
20.72
11.12
14.60
25.99
352.02
293.40
370.30
362.81
274.19
86.73
86.73
819.08
819.08
819.08
188.47
819.08
819.08
819.08
188.47
54.30
56.65
21.08
1,838.06
801.60
701.96
10.54
189.72
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
720.34
228.81
462.00
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
120.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
643,762.18
95,276.80
33,475.63
772,514.61
139,052.63
57,971.50
8,579.78
3,014.52
69,565.80
12,521.84
911,567.24
82,087.64
9.01%
9.01%
PRESUPUESTO CONTRATADO
Precio
2,500.00
827.47
Valoriz. N 01
Set. 2014
Total
Metrado
2,500.00
827.47
1.00
1.00
Mes
Monto S/.
2,500.00
827.47
Valoriz. N 02
Oct. 2014
Metrado
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Metrado
8.49
470.00
1,698.00
470.00
200.00
1.00
1,698.00
470.00
154.61
339.54
154.61
339.54
1.00
1.00
154.61
339.54
2,984.40
2,984.40
1.00
2,984.40
1.40
1.40
868.94
868.94
620.67
620.67
868.94
868.94
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
0.50
20.00
1.00
1.00
0.50
0.50
750.00
2,177.00
1,050.00
725.00
875.00
515.00
35.52
4,452.79
125.36
4,452.79
6.57
15.54
1,100.67
2,344.99
167.53
150.90
1,100.67
2,344.99
12.46
11.38
602.07
674.27
48.32
-
602.07
-
3.85
3.35
12.36
1,667.36
728.42
6,431.16
433.08
217.44
-
1,667.36
728.42
-
8.88
17.39
2,372.82
6,032.07
267.21
346.87
2,372.82
6,032.07
174.33
21.57
184.31
200.11
32.67
28.73
10,581.83
1,809.29
149.29
3,261.79
2,215.68
6,247.05
83.88
0.81
-
1,809.29
149.29
-
12.14
11.41
3.91
-
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
-
Metrado
-
0.49
12.23
330.96
4.00
231.67
69.88
358.99
4.52
11,046.12
3,707.26
30.77
820.19
11,046.12
3,707.26
374.65
50.41
4.00
6,646.29
7,116.88
7,841.28
392.06
1,568.24
347.50
32.75
4.45
4,920.60
5,028.44
2,110.64
485.55
52.55
4.00
8,856.43
10,723.35
11,784.88
390.95
60.98
4.00
12,115.54
16,317.03
14,232.40
390.95
53.29
4.00
373.99
37.70
4.00
2.83
1,982.12
2,019.69
1,226.76
10,598.88
12,208.77
4,707.76
7,634.15
42.37
27.61
17,779.72
1,101.36
11.56
4,850.92
7.08
1,698.00
121.35
72.12
3.76
15,087.45
10,857.67
1,004.97
589.24
2,356.96
17.74
141.18
1,568.26
12.74
138.19
426.87
2,356.98
62.17
90.33
160.37
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
20.24
21.33
32.48
44.30
12.40
6.37
1,536.82
9,904.80
4,777.16
12,256.48
2,061.00
2,135.54
34.84
8,176.25
27.23
51.64
5,802.44
385.23
47.80
10,185.70
50.78
55.86
56.47
13,296.43
54.71
4,154.13
24.50
13.21
3,496.15
1,397.62
288.96
187.44
479.55
493.92
832.20
1,197.74
9,480.70
7,334.71
308.77
3,612.61
79.85
5,821.86
91.53
457.65
145.63
1,019.41
124.78
48,140.12
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
3.82
2.84
198.64
17.04
53.79
699.27
6.01
8.13
18.03
105.69
6.59
5.74
3,922.04
3,509.67
10.65
18.17
124.61
696.64
2.93
309.99
640.10
640.10
24.46
17.58
640.10
640.10
3,048.21
780.55
1,137.37
907.88
1,137.37
6,091.87
276.86
265.24
198.08
450.72
44.99
46.84
80.73
44.50
40.78
77.67
830.58
795.72
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.68
77.67
81.11
83.41
23.18
10.39
81.11
1,417.97
625.86
482.93
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
11.01
11.63
13.59
80.72
97.28
26.73
258.22
726.23
68.77
241.64
82.58
609.41
516.42
807.20
778.24
213.84
774.66
726.23
68.77
483.28
92.15
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.83
238.80
6,439.39
1,375.15
1,290.10
532.42
69.44
320.69
267.29
467.11
832.72
3,178.23
33.70
174.20
186.44
53.59
225.66
2,149.20
6,439.39
1,375.15
25.08
45.49
169.21
842.69
3,636.47
14,433.61
85.54
8.35
11.07
11.07
107.74
624.31
292.22
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
292.22
652.40
24.86
278.18
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
20.72
11.12
14.60
25.99
231.86
204.05
243.82
339.17
86.73
86.73
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
54.30
56.65
21.08
1,395.51
739.28
386.82
10.54
189.72
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
2,457.00
2,457.00
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
565,264.67
83,659.17
29,393.76
678,317.60
122,097.17
56,742.25
8,397.85
2,950.60
68,090.70
12,256.33
800,414.77
80,347.03
10.04%
10.04%
PRESUPUESTO CONTRATADO
Precio
2,500.00
824.67
8.49
470.00
Valoriz. N 01
Set. 2014
Total
Metrado
2,500.00
824.67
1,698.00
470.00
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
154.61
339.54
154.61
339.54
4.44
2.67
1.56
77.92
51.48
511.98
4.96
6.99
15.54
17.39
328.85
1,275.12
3,649.10
4,083.52
6,373.32
6,373.32
1.40
1.40
764.40
764.40
1,500.00
108.85
1,050.00
725.00
1,750.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
35.52
4,452.79
15.54
1,635.27
12.46
11.38
616.27
1,284.23
3.85
3.35
12.36
1,627.55
728.42
5,225.07
8.88
17.39
1,874.12
2,859.79
176.91
21.73
187.62
7,936.18
1,822.71
151.97
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
203.42
32.74
29.19
2,308.82
1,574.14
6,347.07
327.40
4.05
229.18
70.75
356.07
4.58
10,956.27
3,756.47
371.73
50.48
4.05
6,594.49
7,126.77
7,939.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
388.03
53.40
4.05
371.07
37.77
4.05
2.83
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
42.40
27.61
17,792.31
1,101.36
12.71
5,333.50
6.83
1,403.77
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
19.92
20.92
32.02
43.87
12.11
6.37
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
34.51
8,098.81
26.28
51.92
5,600.01
387.32
47.79
10,183.57
51.63
56.79
55.95
11,135.17
54.78
4,159.45
24.46
13.18
3,490.44
1,394.44
228.74
162.09
384.42
384.03
658.77
1,035.76
7,599.98
5,702.85
308.78
3,612.73
79.85
5,821.86
91.53
915.30
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
145.63
1,019.41
124.78
33,316.26
3.82
2.84
198.64
17.04
53.79
699.27
6.01
8.13
18.03
105.69
6.59
5.74
3,922.04
3,509.67
10.65
18.17
124.61
696.64
2.93
309.99
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
1,132.40
912.05
1,132.40
6,119.86
277.29
265.67
198.08
450.72
44.99
46.84
80.73
44.52
40.78
71.65
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
81.11
83.41
23.18
10.39
11.01
11.63
13.59
82.28
97.28
26.79
250.47
839.46
68.77
240.79
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
214.32
751.41
839.46
68.77
240.79
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.33
244.23
6,425.02
1,419.70
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
1,419.70
25.08
45.13
169.00
842.69
3,607.69
14,525.55
85.54
8.35
11.07
11.07
107.74
3,164.98
100.20
44.28
88.56
1,939.32
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
624.31
290.85
163.10
1,872.93
290.85
163.10
24.86
20.72
11.12
14.60
25.99
458.17
381.87
322.48
177.24
808.29
86.73
86.73
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
54.45
56.65
21.08
1,152.71
801.60
355.20
10.54
189.72
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
271.19
59.30
2,711.90
1,186.00
38.90
778.00
720.34
720.34
1
PRESUPUESTO CONTRATADO
Precio
Valoriz. N 01
Set. 2014
Total
Metrado
Mes
Valoriz. N 02
Oct. 2014
Monto S/.
Metrado
76.27
231.00
120.00
228.81
462.00
120.00
2,457.00
2,457.00
698.60
698.60
141.84
141.84
2,280.16
2,280.16
10,621.16
10,621.16
838.01
838.01
748.27
748.27
498.24
498.24
549,552.27
81,333.74
28,576.72
659,462.73
118,703.29
0.00
-
778,166.02
0.00
0.00%
0.00%
ORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA
CARRILLO
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
200.00
1.00
1.00
1.00
607.57
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
607.57
0.50
25.00
1.00
1.00
0.50
0.50
266.26
269.35
82.34
24.50
9.72
-
516.42
209.43
516.42
305.17
574.54
32.22
159.62
0.48
8.49
71.12
-
29.74
806.29
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
16.30
129.67
1,952.62
6.00
65.57
344.32
2,996.41
1,920.00
81.20
136.31
217.98
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
7.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
15.00
60.00
3.00
3.00
3.00
3.00
21.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
1.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
1.00
1.00
1.00
1.00
0.00
-
0.00
-
0.00
-
0.00
0.00%
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00%
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
1,698.00
-
Mes
Valoriz. N 04
2015
Metrado
Mes
Monto S/.
Mes Dic.
Monto S/.
Valoriz. N 04
2015
Metrado
Valoriz. N 05
Abr. 2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
282.86
707.13
1,360.63
525.00
362.50
507.50
298.70
0.25
0.30
0.30
3,803.48
607.40
1,746.70
7.46
-
41.24
-
375.00
525.00
309.00
513.85
-
0.25
0.30
0.30
375.00
525.00
309.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
1,827.68
3,925.44
1,453.60
77.46
-
9,022.60
2,398.76
Mes
Monto S/.
255.50
-
Valoriz. N 04
2015
Metrado
983.68
-
1.19
79.86
224.40
2,295.03
0.70
17.47
231.81
69.88
Mes Dic.
Monto S/.
73.00
127.77
292.42
57.26
15.23
63.52
79.86
Valoriz. N 05
Abr. 2015
Metrado
281.05
428.02
3,614.36
9,986.72
3,049.35
2,073.93
2,295.03
15.97
36.56
-
1,564.21
1,671.67
2,941.18
9.74
77.39
735.30
3,649.82
3,900.56
2,941.18
1,077.88
12.66
132.35
161.48
4,401.76
4,331.82
718.59
2,877.40
12.19
136.36
1,198.92
5,922.14
7,165.72
4,795.68
3.05
34.09
-
1,480.54
1,791.43
-
19.78
171.06
2,956.58
7,738.31
10,427.57
11,826.32
4.95
42.76
-
1,934.58
2,606.89
-
5.07
1,983.08
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
37.90
306.69
841.95
2,516.31
Valoriz. N 04
2015
Metrado
2,019.69
1,226.76
3,367.80
6,139.80
Mes Dic.
Monto S/.
26.43
302.08
-
Metrado
9,889.58
11,385.40
-
196.66
2,495.64
93.19
679.36
20.91
28.78
-
2,335.20
1,919.03
-
83.62
115.14
247.12
9,340.80
7,676.12
921.76
Valoriz. N 05
Abr. 2015
196.66
18.94
37.97
164.58
56.93
89.00
-
135.99
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
216.00
26,952.48
4.90
713.59
48.00
6.00
183.36
17.04
12.00
645.48
3.00
12.00
18.03
97.56
1.73
3.83
11.86
3.56
499.22
718.57
5,688.42
1,760.33
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
3.00
3.00
7.00
3.00
-
827.55
792.69
1,386.56
1,352.16
-
1.00
-
81.11
-
46.48
7.50
44.06
50.25
10.00
8.00
8.00
3.00
1.00
1.00
-
482.93
82.58
512.42
682.90
807.20
778.24
213.84
774.81
726.23
68.77
-
14.00
21.30
31.06
-
1,290.10
467.11
832.72
-
7.00
7.00
52.30
532.42
69.44
3,133.29
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
4.00
4.00
1.00
-
33.70
174.20
186.44
53.59
-
9.00
-
33.60
79.94
-
842.69
3,617.29
-
33.00
12.00
3.00
8.00
16.00
-
2,822.82
100.20
33.21
88.56
1,723.84
-
16.85
25.80
14.15
187.37
376.68
367.76
1.00
86.73
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
40,737.78
6,029.19
108,693.97
16,086.71
120,668.30
17,858.91
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
2,118.36
48,885.33
8,799.36
5,652.09
130,432.77
23,477.90
6,274.75
144,801.96
26,064.35
57,684.69
7.88%
11.27%
153,910.67
21.03%
32.30%
170,866.31
23.35%
55.65%
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
1,740.00
-
Mes
Valoriz. N 04
2015
Metrado
Mes
Monto S/.
Mes Dic.
Monto S/.
Valoriz. N 04
2015
Metrado
Valoriz. N 05
Abr. 2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
750.00
1,360.63
525.00
362.50
218.75
128.75
355.11
1,059.05
-
0.50
0.50
875.00
515.00
38.07
1,352.25
41.46
-
516.59
-
0.15
0.15
262.50
154.50
34.41
-
1,456.23
-
13.76
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
622.85
314.83
1,999.60
879.21
3,459.91
452.40
79.02
2,748.92
Mes
Monto S/.
74.70
12.86
33.79
Valoriz. N 04
2015
Metrado
287.58
279.71
988.30
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
0.49
17.47
161.97
70.75
2,296.44
-
6.52
83.19
2,343.16
381.01
4,207.95
4,529.68
1,449.33
2.69
20.81
289.33
1,008.86
1,050.28
1,171.79
1,909.00
2,038.81
836.46
9.48
101.15
334.89
3,290.41
3,318.73
1,507.01
4,937.15
5,590.89
-
3.56
47.20
564.09
1,728.00
2,484.34
2,284.56
6,702.31
5,628.33
19.78
61.33
1,566.87
7,742.27
3,745.79
6,345.82
2.47
21.38
-
967.78
1,306.01
-
5.07
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
21.14
241.66
841.95
2,516.31
7,915.89
9,127.65
3,409.90
7,624.42
35.67
115.14
192.20
Valoriz. N 04
2015
Metrado
6,160.62
205.40
4,583.40
8,774.51
718.83
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
37.90
306.69
5.29
60.42
-
196.66
18.94
196.66
-
20.91
28.78
-
2,507.44
-
2,686.00
2,193.63 -
0.00
0.00
-
75.93
411.49
142.33
222.50
131.11
314.96
-
339.98
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
7.42
959.55
3.50
320.39
4.90
713.59
164.52
20,541.97
48.00
6.00
183.36
17.52
12.00
645.48
3.00
12.00
18.03
97.56
1.73
3.83
11.86
3.56
499.22
718.57
5,688.42
1,760.33
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
0.50
-
3.00
3.00
7.00
3.00
1.00
6.00
1.00
833.31
798.45
1,386.56
1,352.16
44.52
244.68
77.67
1.00
-
81.11
-
10.00
46.48
7.50
61.85
11.40
10.00
6.00
1.00
1.00
-
815.60
468.52
79.65
688.39
144.10
818.20
558.96
726.23
68.77
-
6.00
3.00
3.50
10.60
-
552.84
228.18
76.76
284.19
-
7.00
-
69.44
-
737.12
304.24
390.35
548.53
-
320.05
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
4.00
4.00
1.00
-
1.00
600.65
-
18.00
-
33.70
174.20
186.44
53.59
-
189.72
-
10.00
-
1.00
33.00
11.00
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
66,129.80
9,787.21
3,438.75
79,355.76
86,594.14
12,815.93
4,502.90
103,912.97
54,063.71
8,001.43
2,811.31
64,876.45
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Metrado
14,284.04
18,704.33
11,677.76
93,639.80
13.38%
21.54%
122,617.30
17.52%
39.06%
76,554.21
10.94%
49.99%
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Valoriz. N 05
Abr. 2015
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
3,580.38
0.15
3,580.38
240.94
8,558.33
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
1,958.90
506.01
9,501.20
Mes
Monto S/.
16.28
-
Valoriz. N 04
2015
Metrado
253.01
-
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
238.11
98.78
-
916.70
330.91
-
34.02
39.51
170.08
130.96
132.37
2,102.13
34.02
123.90
10.11
1,100.20
175.81
10.11
175.82
10.11
14.32
97.78
0.69
3.36
28.05
138.29
2,454.91
2,090.60
124.68
660.21
915.80
3,903.98
1,034.83
22.46
75.78
6,890.85
340.26
2,734.34
12.86
102.29
446.26
4,146.32
5,155.32
1,771.65
1,226.80
9.39
101.37
118.95
2,798.44
3,317.77
525.76
5,820.96
23,109.21
11.40
4,939.25
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
5,602.37
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
524.79
2,083.42
125.20
-
6,579.37
-
3,257.88
12,933.78
19.86
176.81
-
6,728.63
10,778.09
-
114.05
1,176.94
2,697.58
452.78
4,672.45
6,582.10
19.84
226.69
-
6,385.06
8,543.87
-
99.46
85.00
160.19
10,719.24
5,516.50
597.52
228.79
2,903.37
8.50
97.15
228.79
20.72
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.73
3.33
7.97
8.91
24.90
3,220.07
6.00
459.96
4.20
611.65
65.79
8,209.28
40.00
6.00
152.80
17.04
10.00
537.90
3.00
10.00
18.03
81.30
499.22
624.11
3,823.93
4,400.83
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
2.00
3.00
6.00
3.00
-
551.70
792.69
1,188.48
1,352.16
-
7.00
36.53
7.50
42.30
27.42
1.00
1.00
-
583.87
379.55
82.58
491.95
372.64
726.23
68.77
-
9.00
4.00
4.00
-
829.26
304.24
39.68
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
2.00
2.00
1.00
-
33.70
87.10
93.22
53.59
-
8.00
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
26,144.83
106,528.72
90,236.63
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
3,869.43
1,359.53
31,373.79
5,647.28
15,766.25
5,539.49
127,834.46
23,010.20
13,355.02
4,692.30
108,283.95
19,491.11
37,021.07
4.58%
11.65%
150,844.66
18.66%
30.32%
127,775.06
15.81%
46.13%
0.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
1,698.00
-
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
263.51
263.51
750.00
1,415.05
525.00
362.50
192.50
113.30
0.48
0.48
840.00
494.40
47.10
1,672.99
0.20
0.20
350.00
206.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
899.13
508.20
829.12
75.88
-
210.67
69.88
5,740.39
6,738.81
4,638.53
5,026.90
2,110.64
-
Mes
Monto S/.
-
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
-
Valoriz. N 05
Abr. 2015
Metrado
47.17
-
587.71
-
11.79
6.10
-
146.93
490.61
-
93.10
22.25
-
358.44
74.54
-
40.83
21.74
285.81
157.20
72.84
3,532.61
4.76
173.95
102.82
5,015.04
29.62
9.14
38.11
-
5,180.26
1,835.64
1,245.12
-
43.49
4.09
83.19
1,340.99
376.02
1.03
7.50
114.02
353.84
378.08
456.08
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
-
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5,984.84
7,347.54
-
3.25
43.83
564.08
1,475.08
2,303.48
2,256.32
9,739.16
27.68
240.82
1,123.31
9,958.30
14,685.33
4,493.24
306.69
22.67
259.07
1,176.94
2,697.58
1,226.76
7,773.55
9,764.42
4,707.76
6,932.78
13,936.15
7,136.81
752.90
-
29.25
67.04
-
1,964.39
252.07
-
5.07
37.90
-
251.78
-
15.06
-
1,824.34
2,019.69
-
3,195.06
-
1,011.24
-
5.67
64.77
251.78
23.93
75.93
464.36
147.08
276.67
166.21
335.25
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.46
706.09
3.50
320.39
4.90
713.59
216.00
26,952.48
52.00
6.00
198.64
17.04
13.00
699.27
1.73
3.83
11.86
8.91
499.34
718.68
5,688.42
4,400.83
234.68
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Metrado
1.00
-
3.00
3.00
7.00
3.00
6.00
1.00
6.00
1.00
827.55
795.72
1,386.56
1,352.16
269.94
44.50
244.56
77.68
1.00
-
46.48
7.50
44.06
41.25
-
482.93
82.58
512.42
560.59
-
81.11
-
3.00
13.00
Valoriz. N 05
Abr. 2015
18.03
105.69
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
-
21.30
31.06
-
Valoriz. N 04
2015
Metrado
467.11
832.72
-
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
-
726.23
68.77
-
14.00
7.00
1.00
4.00
4.00
1.00
-
1,293.88
532.42
33.70
174.20
186.44
53.59
-
33.60
-
842.69
-
7.00
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
1.00
1.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
1.00
1.00
1.00
77,328.92
11,444.68
4,021.10
92,794.70
16,703.05
81,225.37
12,021.35
4,223.72
97,470.44
17,544.68
72,855.14
10,782.56
3,788.47
87,426.17
15,736.71
109,497.75
13.71%
24.73%
115,015.12
14.41%
39.13%
103,162.88
12.92%
52.06%
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
17.85
2.56
183.83
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
181.78
352.30
1,128.26
39,608.78
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Valoriz. N 05
Abr. 2015
Monto S/.
Metrado
0.30
29,706.58
0.10
9,902.19
3,196.80
35.36
1,255.99
1,781.97
286.21
-
1,019.82
582.73
2,472.00
1,891.08
1,227.04
1,265.42
148.94
-
132.44
127.95
25.16
108.72
509.91
1,581.46
542.20
3,117.00
46.71
5.91
24.94
-
8,127.07
1,180.11
814.38
-
0.01
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
-
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
6,181.65
1,063.28
7.31
-
2,649.28
-
1,507.17
17.20
137.58
566.60
6,499.54
6,935.41
2,260.75
842.36
14.61
153.57
284.58
5,124.75
5,026.35
1,263.54
7,997.12
14.59
163.25
500.00
7,132.28
8,578.68
1,995.00
3.65
40.81
-
1,783.07
2,144.67
-
12.30
107.03
3,558.10
4,848.41
6,525.74
14,196.82
9.23
80.27
-
3,636.31
4,894.31
-
9.23
80.28
-
306.69
1,176.94
2,697.58
1,223.69
4,695.99
6,797.90
19.84
226.69
-
7,483.29
8,543.87
-
5.07
37.90
8.50
97.15
-
251.78
3,195.06
158.45
1,129.73
87.03
105.39
187.10
10,599.51
7,620.39
701.61
251.78
23.93
167.85
-
37.30
45.17
80.19
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
75.93
464.36
147.08
276.67
166.21
335.25
234.68
5.00
457.65
166.86
20,820.79
1.73
3.83
11.86
8.91
499.31
718.72
5,688.42
4,400.83
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
4.20
611.65
52.00
6.00
198.64
17.04
13.00
699.27
3.00
13.00
18.03
105.69
3.00
3.00
7.00
3.00
-
830.25
795.39
1,386.56
1,352.16
-
1.00
-
81.11
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
46.48
7.50
33.95
24.65
10.00
6.00
1.00
1.00
-
482.93
82.58
394.84
334.99
807.20
583.68
726.23
68.77
-
7.00
21.30
31.06
50.00
1.00
4.00
4.00
1.00
-
69.44
467.11
832.72
2,995.50
33.70
174.20
186.44
53.59
-
8.00
-
79.94
75.55
3,617.29
12,811.01
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
72,938.95
10,794.96
3,792.83
87,526.74
15,754.81
122,467.27
18,125.16
6,368.30
146,960.73
26,452.93
135,159.30
20,003.58
7,028.28
162,191.16
29,194.41
103,281.55
11.33%
20.34%
173,413.66
19.02%
39.36%
191,385.57
21.00%
60.35%
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
0.25
0.25
0.25
2,116.37
2,283.26
127.74
-
48.56
108.72
375.00
437.50
257.50
8,465.46
3,123.53
0.15
5.00
0.15
0.15
520.32
4.89
63.91
-
225.00
544.25
262.50
154.50
6,431.16
978.54
2,087.94
-
108.72
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
162.17
48.92
6,646.29
7,116.88
6,273.04
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
4,427.15
4,525.72
1,899.57
1.42
15.35
47.43
493.45
502.71
211.06
9,427.92
16.42
183.65
-
7,970.79
9,651.02
-
1.82
20.41
-
27.89
240.82
3,558.10
10,903.99
14,685.33
14,232.40
3.10
26.76
-
5.07
37.90
306.69
1,176.94
2,697.58
1,982.12
2,019.69
1,226.76
4,707.76
7,634.15
28.34
323.84
-
7,543.72
6,514.60
602.98
251.78
-
62.17
60.22
106.91
2,910.55
-
7,543.72
4,343.07
401.99
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
75.93
464.36
147.08
276.67
166.21
335.25
234.68
213.09
7.46
3.00
274.59
4.20
611.65
231.48
28,884.07
1.73
3.83
11.86
8.91
499.32
718.64
5,688.42
4,400.83
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
52.00
6.00
198.64
17.04
13.00
699.27
3.00
13.00
18.03
105.69
3.00
3.00
7.00
3.00
1.00
6.00
1.00
830.58
795.72
1,386.56
1,352.16
44.50
244.68
77.67
1.00
-
10.00
20.00
46.48
834.10
463.60
482.93
81.11
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
-
14.00
7.00
21.30
31.06
-
Valoriz. N 04
2015
Metrado
1,290.10
532.42
467.11
832.72
-
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
7.50
52.40
38.00
10.00
8.00
1.00
1.00
-
82.58
609.41
516.42
807.20
778.24
726.23
68.77
-
1.00
4.00
4.00
1.00
2.00
-
33.70
174.20
186.44
53.59
225.66
-
9.00
-
20.00
-
1,710.80
-
17.00
-
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
18.35
16.70
13.05
204.05
243.82
339.17
1.00
86.73
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
3.00
2.00
1.00
1.00
18.00
189.72
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 02
Oct. 2014
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
1.00
1.00
1.00
1.00
1.00
1.00
1.00
59,716.33
8,838.02
3,105.25
71,659.60
12,898.73
92,083.68
13,628.38
4,788.35
110,500.41
19,890.07
81,548.64
12,069.20
4,240.53
97,858.37
17,614.51
84,558.33
10.56%
20.60%
130,390.48
16.29%
36.89%
115,472.88
14.43%
51.32%
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Valoriz. N 02
Oct. 2014
Mes
Monto S/.
Valoriz. N 03
Nov. 2014
Metrado
Mes
Monto S/.
Valoriz. N 04
2015
Metrado
Mes Dic.
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
0.00
-
0.00
-
0.00
-
0.00
0.00%
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00%
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
2,500.00
823.03
1,698.00
470.00
154.61
339.54
850.60
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
850.60
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Monto S/.
-
Metrado
-
9,457.56
1,769.63
1,279.56
916.06
617.51
-
150.00
125.00
103.00
0.40
0.40
0.40
73.52
9.72
-
0.10
0.10
0.10
Valoriz. N 08
Jul. 2015
750.00
2,721.25
1,050.00
725.00
625.00
515.00
305.27
617.51
-
600.00
500.00
412.00
Mes
19.44
-
1,988.22
701.59
5,582.50
2,709.91
9,991.25
5,469.99
3,412.68
85.43
1,637.98
2,322.07
-
8,861.33
3,620.24
209.43
5,912.21
1.46
5.85
-
0.70
17.47
191.06
69.36
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
5,112.01
6,535.37
7,751.90
1,736.88
2,146.24
1,521.89
-
4.00
43.72
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
1,157.92
1,430.82
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
70.31
187.92
3,658.98
17.72
189.75
-
7,522.49
9,971.36
-
7,622.40
29.49
264.78
-
9,729.34
16,140.99
-
0.45
2.25
114.05
24.76
282.98
1,220.81
2,357.23
148.46
119.90
452.78
7,748.89
10,665.52
4,846.62
5,751.64
374.48
33.92
15,821.78
936.53
374.48
4,752.15
8,711.14
8,816.53
813.07
20.30
34.08
54.50
2,177.78
2,204.29
203.29
1,280.00
277.10
16.20
32.40
11,895.75
28,496.64
9,446.74
14,526.15
5,081.60
1,798.38
174.47
395.60
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
70.63
403.64
152.38
276.94
160.50
242.41
37.50
1,351.86
8,165.64
4,781.68
11,963.81
1,967.73
1,544.15
1,516.50
285.23
9,637.92
254.19
4.74
6,192.07
236.62
152.51
7,061.21
101.68
4,707.78
159.61
7,945.39
239.42
11,918.33
70.63
3,758.22
148.10
199.10
3,607.72
2,570.38
1.72
3.32
7.92
14.25
496.91
622.23
3,798.04
7,038.36
1.16
2.22
5.28
9.51
7.02
2,167.50
4.68
54.59
4,354.64
38.40
4,965.89
6.00
10.00
419.70
915.40
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
108.00
13,476.24
72.00
7.00
1,019.41
52.00
6.00
198.64
17.04
13.00
699.27
5.00
13.00
30.05
105.69
348.32
310.87
2,295.43
1,784.39
232.21
207.25
7.02
15.82
74.83
287.45
4.68
10.55
23.04
53.46
148.61
156.64
15.36
35.64
0.75
0.75
-
480.08
480.08
-
0.25
0.25
-
160.03
160.03
-
1.00
-
1,094.93
-
5.64
5,027.16
2.00
3.00
6.00
3.00
11.00
3.00
5.00
551.70
792.69
1,188.48
1,352.16
494.89
140.52
203.70
1.00
13.00
81.11
1,084.33
86.95
20.79
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
27.00
38.53
11.00
67.10
35.00
8.00
10.00
2.00
1.00
1.00
625.86
400.33
121.11
780.37
475.65
654.56
931.60
1,452.46
68.77
236.08
6.00
4.00
-
1.00
13.00
6.00
6.00
17.34
17.34
23.80
29.46
57.80
1.00
6.00
2.00
2.00
-
70.07
1,198.34
456.36
59.52
431.07
359.28
521.93
789.82
3,462.80
33.70
261.30
93.22
223.26
-
22.40
57.26
-
625.63
2,584.14
-
52.32
8,402.59
39.00
11.00
3.00
10.00
13.00
-
3,336.06
91.85
33.21
110.70
1,400.62
-
3.00
4.00
1,872.93
652.40
18.15
18.15
451.21
376.07
1,598.94
159.54
891.40
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
50.50
10.00
737.30
259.90
1.00
86.73
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
90.30
13.60
4,903.29
770.44
18.00
189.72
3.00
15.00
18.00
4.00
412.80
2,200.65
2,196.90
288.76
4,067.85
3,558.00
2,161.02
228.81
1,016.94
693.00
8,008.35
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
2,095.80
Valoriz. N 05
Abr. 2015
Mes
Monto S/.
Valoriz. N 06
May. 2015
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
425.52
6,932.88
31,863.48
2,514.03
2,244.81
1,494.72
214,116.73
31,689.28
11,134.07
256,940.08
46,249.21
249,171.08
36,877.32
12,956.90
299,005.30
53,820.95
118,806.52
17,583.36
6,177.94
142,567.82
25,662.21
303,189.29
34.28%
34.28%
352,826.25
39.89%
74.17%
168,230.03
19.02%
93.19%
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Mes
Metrado
Valoriz. N 07
Jun. 2015
Monto S/.
Valoriz. N 06
May. 2015
Monto S/.
Mes
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Monto S/.
Mes
Metrado
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
315.71
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
53.51
451.83
36.50
15.97
36.55
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
140.53
53.50
451.76
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
131.11
12.63
5,555.05
346.26
131.11
1,663.76
93.19
679.36
8,332.57
519.39
Valoriz. N 08
Jul. 2015
768.79
3,512.22
1,849.72
3,943.59
-
37.97
246.91
85.40
133.50
25.52
131.11
314.96
-
768.79
5,268.97
2,774.58
5,915.39
579.56
1,625.76
2,006.30
-
4,739.32
203.99
7,108.98
155.37
7.46
4,232.28
385.38
93.22
4,455.92
62.15
2,970.53
1.10
54.47
190.75
10,773.56
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
69.30
95.80
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
1,697.85
1,265.52
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
75.93
4,154.13
46.20
-
1,131.90
-
54.95
7,106.13
5.00
457.70
2.10
11.70
-
3,612.61
-
305.82
389.05
332.29
2,563.84
1,907.34
7.02
21.06
74.83
382.45
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.75
0.75
-
480.08
480.08
-
0.25
0.25
-
160.03
160.03
-
1.00
-
1,137.45
-
6.71
6,091.87
6.00
3.00
1.00
1.00
6.00
1.00
269.94
140.52
80.73
44.50
244.56
77.67
17.00
2.00
1,417.97
482.20
15.59
15.59
-
387.57
323.02
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
2,098.80
-
2.00
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
225.66
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
2.00
-
2,560.08
-
41.43
7,010.78
3.00
1.00
4.00
1,872.93
292.28
652.40
13.29
13.29
-
1.00
1.00
1.00
1.00
18.00
330.39
275.37
872.53
872.53
872.53
188.47
189.72
34.80
14.15
16.85
-
1,889.64
801.60
914.96
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
5.00
7.00
16.00
5.00
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
688.00
1,026.97
1,952.80
360.95
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
698.60
141.84
2,280.16
10,621.16
838.01
748.27
498.24
57,653.77
8,532.76
57,081.74
8,448.10
61,217.88
9,060.25
Valoriz. N 05
Abr. 2015
Mes
Monto S/.
Valoriz. N 06
May. 2015
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
2,998.00
69,184.53
12,453.22
2,968.25
68,498.09
12,329.66
3,183.33
73,461.46
13,223.06
81,637.75
11.16%
66.81%
80,827.75
11.05%
77.85%
86,684.52
11.85%
89.70%
Valoriz. N 08
Jul. 2015
Metrado
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Mes
Metrado
Valoriz. N 07
Jun. 2015
Monto S/.
Valoriz. N 06
May. 2015
Monto S/.
Mes
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Monto S/.
Mes
Metrado
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.10
0.10
582.32
-
20.65
-
175.00
103.00
873.91
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
101.36
65.73
176.06
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
390.24
220.20
2,176.10
-
45.82
6.15
31.94
8,125.26
1,177.66
934.25
0.21
-
69.42
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
11.65
63.52
0.80
4.24
-
2,376.02
2,079.01
216.96
138.78
-
1.52
17.04
-
740.57
896.99
-
2.47
21.38
-
967.78
1,305.77
-
1,984.09
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
2,023.86
1,242.09
1,978.97
2,282.06
8,350.27
523.75
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
131.11
12.63
5,566.85
349.16
131.11
1,671.63
187.28
0.51
0.30
-
1,519.36
8,682.44
4,590.14
9,812.25
1,623.14
2,006.30
-
4.24
-
11,787.11
1,286.61
95.27
-
93.22
7.46
2,491.77
390.01
62.15
-
1,661.27
-
93.22
4,470.83
62.15
2,980.71
1.10
56.99
153.92
8,670.31
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
45.55
2,499.33
30.38
1,666.95
69.30
57.48
1,695.77
758.16
46.20
38.32
1,130.51
505.44
3.18
411.24
1.50
137.31
2.10
305.82
11.70
3,612.73
-
1.15
2.56
7.91
2.38
36.32
389.06
332.29
2,563.91
1,907.34
259.37
221.53
7.02
21.06
74.83
382.66
4.68
14.04
6.36
56.88
41.02
166.66
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
Metrado
0.25
0.75
-
160.03
480.08
-
0.25
0.25
-
160.03
160.03
-
1.00
-
1,134.70
-
6.71
6,130.59
6.00
3.00
1.00
-
269.94
140.52
80.73
-
7.00
-
570.92
-
8.00
2.00
2.00
9.14
9.14
30.45
227.22
189.38
1,824.26
Valoriz. N 08
Jul. 2015
214.48
505.36
483.40
-
54.51
23.40
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
2,445.70
-
66.72
2,838.66
1,321.43
86.73
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
2.00
-
224.82
-
33.60
-
842.69
-
47.96
31.08
2,164.43
5,278.01
12.00
3.00
8.00
-
100.20
33.21
88.56
-
3.00
1,872.93
10.79
10.79
11.45
20.60
14.70
268.24
223.57
127.32
300.76
319.14
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
29.60
14.15
11.45
1,607.28
803.01
621.74
5.00
7.00
688.00
1,075.97
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
16.00
5.00
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
1,956.32
360.95
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
698.60
141.84
2,280.16
10,621.16
838.01
748.27
498.24
96,815.91
14,328.76
5,034.43
116,179.10
63,624.92
9,416.49
3,308.50
76,349.91
41,227.62
6,101.69
2,143.84
49,473.15
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
20,912.24
13,742.98
8,905.17
137,091.34
19.59%
69.58%
90,092.89
12.87%
82.45%
58,378.32
8.34%
90.79%
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Valoriz. N 08
Jul. 2015
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.10
2,386.92
60.24
2,139.58
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
60.35
5.43
396.50
84.34
58.16
4.15
724.67
47.23
420.43
68.03
-
261.92
-
175.82
30.97
175.82
275.05
3,057.44
9.54
41.91
1.44
12.02
-
1,636.61
895.97
282.95
392.49
-
0.70
17.47
196.99
69.36
5.61
151.56
1,722.71
680.52
3.21
25.57
-
1,036.58
1,288.83
-
2.35
25.34
-
699.61
829.44
-
90.31
232.60
-
37,406.40
11,692.80
-
4.88
2,116.82
59.27
136.06
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
53.66
-
2,819.73
-
8.51
75.77
-
2,883.70
4,619.18
-
2,736.45
3,661.66
-
9,666.46
572.19
152.53
13.82
6,444.31
381.46
152.53
1,935.58
16.68
33.35
179.64
407.20
45.94
273.42
85.31
184.74
103.12
215.84
41.16
885.72
5,569.57
2,688.97
8,006.63
1,266.31
1,374.90
1,669.04
199.03
6,753.09
13.13
78.12
24.37
52.78
29.46
61.67
11.76
154.57
253.15
1,591.30
768.14
2,287.49
361.77
392.84
476.87
3,820.97
24.87
21.25
40.05
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
5.39
Valoriz. N 08
Jul. 2015
Metrado
269.72
115.93
5,377.99
80.42
4,079.71
39.38
2,098.95
72.48
52.32
1,767.06
677.02
2.80
328.05
312.89
407.76
2,161.85
1,795.99
11.70
3,612.49
47.63
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
7.02
18.61
74.83
338.14
24.90
52.32
160.61
153.30
0.75
0.75
-
480.08
480.08
-
1.00
-
1,101.49
-
5.00
2.00
5.00
224.95
93.68
203.80
1.00
6.00
6.00
4.00
-
81.11
500.46
493.68
389.12
-
4.00
2.00
2.00
-
368.56
152.12
19.84
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
1,830.72
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
21.30
14.07
2.00
-
467.11
377.22
223.60
-
9.39
45.00
-
251.75
2,695.95
-
22.40
-
561.79
-
41.48
4.65
1,871.99
748.00
20.00
6.00
2.00
4.00
8.00
-
1,589.20
50.10
22.14
44.28
765.60
-
1.00
13.00
4.00
1.00
4.00
5.00
2.00
1.00
1.00
66.72
1,032.98
33.40
11.07
44.28
478.50
1,248.62
272.19
163.10
7.58
7.58
25.25
7.20
188.44
157.06
368.65
187.13
1.00
1.00
1.00
1.00
819.08
819.08
188.47
34.25
7.20
1,859.78
407.88
12.00
126.48
86.73
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
3.00
11.00
14.00
4.00
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
412.80
1,613.81
1,708.70
288.76
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
698.60
141.84
2,280.16
10,621.16
838.01
748.27
498.24
50,132.05
62,495.17
115,480.95
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Valoriz. N 05
Abr. 2015
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
7,419.54
2,606.87
60,158.46
10,828.52
9,249.29
3,249.75
74,994.21
13,498.96
17,091.18
6,005.01
138,577.14
24,943.89
70,986.98
8.78%
54.91%
88,493.17
10.95%
65.86%
163,521.03
20.23%
86.09%
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Valoriz. N 08
Jul. 2015
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.10
0.10
175.00
103.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
1.52
-
40.83
21.75
122.49
1,253.82
22.91
6.09
25.41
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
122.65
-
157.20
72.86
1,513.98
4,006.54
1,223.76
830.08
-
12.40
36.30
5,396.60
1,825.16
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
632.65
Valoriz. N 08
Jul. 2015
Metrado
2,530.60
1.82
20.41
-
828.88
1,072.55
-
3.08
26.76
-
1,106.48
1,631.82
-
1,943.39
2,441.11
-
10,667.92
660.71
167.85
15.96
7,111.80
440.66
167.85
2,130.04
3.03
-
32.66
-
1,479.12
9,551.89
4,665.38
12,046.21
2,046.05
2,135.54
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
8,007.28
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
213.09
7.46
5,401.83
381.80
127.85
6,056.25
111.64
5,907.99
45.56
2,473.00
85.62
63.48
2,089.98
827.78
7.02
2,167.57
43.75
3,493.88
2.10
305.82
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
357.09
366.86
2,353.22
2,105.78
7.02
23.00
74.83
417.91
4.68
63.48
30.19
186.00
0.75
-
480.08
-
1.00
-
1,112.92
-
3.00
1.00
-
140.52
80.73
-
10.00
6.00
-
822.80
583.68
-
640.10
-
6.71
17.00
-
6,031.28
1,417.97
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
1,631.63
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
7.00
15.92
15.92
53.05
-
69.44
395.77
329.86
3,178.23
-
47.96
-
2,164.43
-
37.00
12.00
4.00
8.00
18.00
-
3,164.98
100.20
44.28
88.56
1,939.32
-
3.00
1.00
4.00
13.29
13.29
16.85
25.80
14.15
330.39
275.37
187.37
376.68
367.76
1.00
86.73
1,872.93
279.74
652.40
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
18.00
189.72
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
698.60
141.84
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
2,280.16
10,621.16
838.01
748.27
498.24
90,238.47
13,355.29
4,692.40
108,286.16
19,491.51
70,406.71
10,420.19
3,661.15
84,488.05
15,207.85
27,559.14
4,078.75
1,433.08
33,070.97
5,952.77
127,777.67
16.00%
68.06%
99,695.90
12.49%
80.55%
39,023.74
4.89%
85.43%
Valoriz. N 05
Abr. 2015
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.07
-
44.15
5.91
24.94
108.72
169.98
1,180.11
814.38
3,117.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
0.70
17.47
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
233.96
69.71
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
3,636.31
4,894.43
-
1,998.49
2,019.69
3,207.12
3,661.66
-
10,662.88
660.71
2,130.04
-
4,542.65
3,265.88
300.69
167.85
15.96
7,108.45
440.66
105.63
753.14
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
1,542.14
9,937.30
4,787.45
12,275.85
2,061.00
2,135.54
8,190.33
29.68
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
675.52
-
213.09
7.46
5,832.27
384.94
127.85
6,112.51
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
85.24
4,075.32
1.10
55.95
194.36
11,043.54
45.56
2,493.04
30.37
1,661.85
85.62
63.48
2,097.69
839.21
57.08
42.32
1,398.46
559.47
11.70
3,612.61
1.15
2.56
7.91
5.94
51.04
111.24
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
2.80
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
407.76
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
357.09
366.86
2,353.22
2,105.78
238.06
244.58
7.02
23.00
74.76
417.91
4.68
15.34
53.52
156.81
0.75
0.75
-
480.08
480.08
-
0.25
0.25
-
160.03
160.03
-
1.00
-
1,139.64
-
6.71
6,096.64
6.00
3.00
1.00
1.00
6.00
1.00
269.94
140.52
80.73
44.50
231.12
77.39
17.00
1,417.97
74.78
26.64
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
27.00
8.00
2.00
2.00
625.86
213.92
521.02
482.56
14.00
7.00
14.49
14.49
-
1,289.96
532.42
360.22
300.23
-
33.60
-
842.69
-
1.00
37.00
12.00
4.00
8.00
18.00
-
66.72
2,940.02
100.20
44.28
88.56
1,722.60
-
1,910.00
-
Valoriz. N 07
Jun. 2015
Metrado
Mes
Monto S/.
-
2.00
-
3.00
1.00
Valoriz. N 08
Jul. 2015
Metrado
225.82
-
1,872.93
293.38
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
4.00
652.40
10.55
274.19
14.16
14.16
33.30
24.85
-
352.02
293.40
370.30
362.81
-
1.00
86.73
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
33.85
14.15
33.30
1,838.06
801.60
701.96
18.00
189.72
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
120.00
2,457.00
698.60
141.84
2,280.16
10,621.16
838.01
748.27
498.24
114,888.41
17,003.48
5,974.20
137,866.09
24,815.90
68,892.98
10,196.16
3,582.43
82,671.57
14,880.88
27,839.55
4,120.25
1,447.66
33,407.46
6,013.34
162,681.99
17.85%
78.20%
97,552.45
10.70%
88.90%
39,420.80
4.32%
93.23%
Valoriz. N 05
Abr. 2015
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.10
0.10
0.10
3,123.53
150.00
175.00
103.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
0.21
5.24
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
69.50
20.96
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
883.70
1,072.55
-
1,211.95
1,631.82
-
10,598.88
12,208.77
-
419.63
39.89
17,779.72
1,101.36
167.85
1,940.37
239.83
1,698.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1,536.82
9,904.80
4,777.16
12,256.48
2,061.00
2,135.54
8,176.25
5,802.44
385.23
127.85
6,111.23
85.24
4,074.47
0.66
33.51
0.44
22.34
235.46
13,296.43
45.56
2,492.59
30.37
1,661.54
85.62
105.80
2,097.69
1,397.62
57.08
-
1,398.46
-
1.15
2.56
7.91
5.94
332.88
479.10
3,792.28
2,933.88
1,445.04
7.02
2,167.57
4.68
43.75
3,493.44
2.80
407.76
-
2.00
183.06
154.32
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
357.09
366.86
2,353.22
2,105.78
238.06
244.58
7.02
23.00
74.76
417.91
4.68
15.34
63.48
186.00
0.75
0.75
-
480.08
480.08
-
0.25
0.25
-
160.03
160.03
-
1.00
-
1,137.37
-
6.71
6,091.87
6.00
3.00
1.00
-
269.94
140.52
80.73
-
7.00
7.00
-
583.87
162.26
-
74.77
26.64
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
2,149.20
-
1,454.18
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
8.00
3.00
2.00
Valoriz. N 08
Jul. 2015
Metrado
213.84
774.66
483.28
7.00
12.90
12.90
53.05
-
69.44
320.69
267.29
3,178.23
-
33.60
47.96
51.18
842.69
2,181.70
8,660.17
12.00
4.00
8.00
18.00
-
100.20
44.28
88.56
1,939.32
-
3.00
1.00
4.00
11.19
278.18
1,872.93
292.22
652.40
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
-
11.19
-
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
231.86
-
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
25.70
13.05
18.35
1,395.51
739.28
386.82
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
2,711.90
1,186.00
778.00
720.34
228.81
462.00
120.00
2,457.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Metrado
698.60
141.84
2,280.16
10,621.16
838.01
748.27
498.24
112,438.62
16,640.92
5,846.81
134,926.35
24,286.74
85,826.44
12,702.31
4,462.97
102,991.72
18,538.51
32,351.98
4,788.09
1,682.30
38,822.37
6,988.03
159,213.09
19.89%
71.21%
121,530.23
15.18%
86.39%
45,810.40
5.72%
92.12%
Valoriz. N 05
Abr. 2015
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.25
1.00
200.00
1.00
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1.00
1.00
0.50
546.00
546.00
0.50
25.00
1.00
1.00
1.00
0.50
125.36
105.23
422.74
217.44
422.74
168.84
131.56
44.86
83.88
0.81
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
11.35
48.08
217.44
0.70
17.47
30.77
820.19
17.74
141.18
1,960.32
14.61
153.57
474.30
18.24
204.06
2,946.22
12.30
107.03
3,558.10
5.07
37.90
306.69
1,176.94
2,697.58
251.77
23.93
293.74
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
124.33
150.55
267.28
7.02
127.85
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
160.20
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
1.00
17.00
24.00
46.48
7.50
53.20
57.25
8.00
8.00
1.00
1.00
1.00
14.00
7.00
7.00
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
-
33.60
47.96
-
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Valoriz. N 05
Abr. 2015
Mes
Valoriz. N 06
May. 2015
Monto S/.
Metrado
Mes
Valoriz. N 07
Jun. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
0.00
-
0.00
-
0.00
-
0.00
0.00%
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00%
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
6.69
9.12
1.00
29.21
4.95
3.00
114.08
10.31
8.01
192.60
29.72
29.72
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1,235.02
-
439.59
175.91
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
335.12
416.07
2,532.02
4,697.18
1,445.00
54.85
36.40
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
8,984.16
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1,530.26
1,189.62
49.89
191.69
99.07
104.43
2,125.06
365.49
37.27
8.91
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
38.18
34.88
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
25,915.58
3,835.51
1,347.61
31,098.70
5,597.77
0.00
-
0.00
-
36,696.47
4.15%
97.34%
0.00
0.00%
97.34%
0.00
0.00%
97.34%
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 09
Ago. 2015
Monto S/.
Mes
Metrado
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Valoriz. N 11
Oct. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
2.44
8.14
2.40
12.77
-
902.19
244.77
640.59
416.78
-
2.40
12.77
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
46.50
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1.15
2.56
7.91
2.38
194.53
166.15
1,281.95
953.68
64.85
55.38
10.53
191.22
4.68
3.51
332.81
479.05
3,792.28
1,173.55
51.89
144.00
94.80
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
90.86
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
-
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
20.72
3,505.39
6.91
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
13,914.26
2,059.31
Valoriz. N 08
Jul. 2015
Mes
Monto S/.
Valoriz. N 09
Ago. 2015
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
0.00
-
0.00
-
723.54
16,697.11
3,005.48
0.00
0.00%
89.70%
0.00
0.00%
89.70%
19,702.59
2.69%
92.39%
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 09
Ago. 2015
Monto S/.
Mes
Metrado
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Valoriz. N 11
Oct. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
332.81
479.05
3,792.28
1,173.55
2,901.60
109.68
13,694.64
1,709.25
1,271.58
49.89
255.11
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
1,336.04
411.37
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
-
20.72
Valoriz. N 10
Set. 2015
Metrado
3,518.67
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
13,712.52
2,029.45
713.05
16,455.02
17,213.30
2,547.57
895.09
20,655.96
0.00
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Metrado
2,961.90
3,718.07
19,416.92
2.77%
93.57%
24,374.03
3.48%
97.05%
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Valoriz. N 10
Set. 2015
Mes
Monto S/.
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
0.00
0.00%
97.05%
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
198.54
1,681.70
-
59.27
1,673.19
1.05
4.73
-
327.43
142.08
-
1.05
4.73
-
22.58
58.15
-
9,352.64
2,923.20
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
0.45
2.25
-
5.88
2,679.81
1,379.13
149.38
-
6.57
39.07
12.20
26.40
14.73
30.84
-
152.47
119.90
-
126.67
795.86
384.54
1,144.18
180.88
196.45
-
38.64
955.28
175.83
-
0.01
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
-
38.65
-
Valoriz. N 10
Set. 2015
Metrado
1,792.97
-
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1.35
67.56 -
0.00
38.64
1,792.70 -
0.00
53.61
13.13
699.83
13.13
699.83
24.16
17.44
589.02
225.67
24.16
17.44
589.02
225.67
1.15
2.22
5.32
5.94
3,799.45
16.60
43.86
218.71
208.60
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
4.68
12.41
16.60
34.88
0.15
0.15
-
96.02
96.02
-
5.99
5,354.22
6.00
1.00
-
159.60
227.87
-
1.00
6.75
167.81
6.75
0.10
0.05
121.62
36.30
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
8.32
-
172.39
-
8.32
-
27.66
3.10
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
9,888.01
20,357.47
11,073.50
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Metrado
1,463.43
514.18
11,865.62
2,135.81
3,012.91
1,058.59
24,428.97
4,397.21
1,638.88
575.82
13,288.20
2,391.88
14,001.43
1.73%
87.82%
28,826.18
3.57%
91.39%
15,680.08
1.94%
93.33%
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
206.83
6.05
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
42.62
1.10
57.08
42.32
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
8.00
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
2.00
-
2.00
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1.00
1.00
1.00
1.00
34.80
14.15
16.85
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
0.00
-
0.00
-
0.00
-
0.00
0.00%
85.43%
0.00
0.00%
85.43%
0.00
0.00%
85.43%
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
332.87
479.15
3,792.28
2,933.88
4,075.54
13,880.53
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1,568.82
1,403.89
49.84
278.73
1,829.87
468.33
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
31,093.73
4,601.87
1,616.87
37,312.47
6,716.24
0.00
-
0.00
-
44,028.71
4.83%
98.06%
0.00
0.00%
98.06%
0.00
0.00%
98.06%
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
19,256.05
29.16
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
1,568.82
1,403.89
49.84
278.73
1,828.87
468.33
31.74
93.00
10.58
49.85
17.76
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
17.06
2,886.72
31.98
17.06
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Valoriz. N 08
Jul. 2015
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
24,854.53
3,678.47
1,292.44
29,825.44
5,368.58
0.00
-
2,979.72
441.00
154.95
3,575.67
643.62
35,194.02
4.40%
96.51%
0.00
0.00%
96.51%
4,219.29
0.53%
97.04%
Mes
Monto S/.
625.00
824.67
1,698.00
470.00
Valoriz. N 09
Ago. 2015
Metrado
0.25
-
Mes
Monto S/.
625.00
-
Valoriz. N 10
Set. 2015
Metrado
0.25
-
Mes
Monto S/.
625.00
-
Valoriz. N 11
Oct. 2015
Metrado
0.20
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
154.61
339.54
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
17.55
19.28
328.19
66.30
182.42
234.82
234.82
3,186.66
0.25
764.40
764.40
0.25
750.00
2,721.25
1,050.00
725.00
1,750.00
515.00
0.50
0.50
4,452.79
1,635.27
1,627.55
728.42
5,225.07
1,499.30
2,287.83
7,936.18
1,822.71
151.97
42.21
32.89
-
750.00
515.00
1,593.33
374.82
571.96
-
24.73
-
308.14
-
24.73
-
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
2,308.82
1,574.14
6,347.07
229.18
70.75
10,956.27
3,756.47
6,594.49
7,126.77
7,939.30
5,024.96
5,040.17
2,134.35
8,803.17
10,743.76
11,932.19
4,772.77
6,538.46
14,410.31
18.45
160.55
-
7,159.15
9,808.00
-
1,967.31
2,023.86
1,242.09
4,766.61
7,634.15
28.34
323.84
-
10,516.12
12,231.44
-
10,675.05
660.71
167.86
15.96
7,117.26
440.66
3,733.44
125.89
1,600.06
205.53
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
15,934.13
11,450.83
1,007.65
Mes
Monto S/.
-
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
45.56
278.62
88.25
166.00
99.72
201.15
907.56
5,828.73
2,825.77
7,282.42
1,207.61
1,281.33
30.37
185.74
58.83
110.67
66.49
134.10
604.97
3,885.68
1,883.74
4,855.09
805.19
854.22
140.81
4,859.35
93.87
3,239.45
213.09
7.46
5,600.01
387.32
85.24
4,073.62
1.10
56.79
199.02
11,135.17
30.37
1,663.67
142.70
105.80
3,490.44
1,394.44
6,109.95
2,167.64
45.56
-
1.72
3.83
11.86
8.91
2,495.78
-
393.43
620.80
4,559.22
3,421.71
1,445.09
1.16
2.56
7.91
5.94
4.68
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
2.00
107.58
11.00
3.00
2.00
18.03
16.26
11.00
595.15
611.44
11.70
38.34
105.80
0.25
-
19,989.76
160.03
-
Mes
106.80
13,326.50
52.00
6.00
0.50
0.50
-
320.05
320.05
-
0.20
0.25
-
3.36
3,059.93
1.00
3.36
2.00
2.00
3.00
2.00
2.00
2.00
-
554.58
531.34
594.24
901.44
89.98
93.68
-
1.00
1.00
4.00
1.00
4.00
1.00
1.00
1.00
6.00
1.00
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Metrado
81.11
1,417.97
556.32
482.93
82.58
618.72
778.03
658.24
778.24
839.46
68.77
240.79
0.10
-
1.16
-
4.00
-
107.16
-
1,289.96
532.42
69.44
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
-
16.64
16.64
-
413.67
344.78
-
1.00
1.00
6,425.02
1,419.70
34.38
5,810.22
842.69
2,164.43
-
22.00
8.00
2.00
4.00
10.00
1,881.88
66.80
22.14
44.28
1,077.40
Valoriz. N 11
Oct. 2015
4.00
3.00
31.98
34.38
15.00
4.00
2.00
4.00
8.00
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
-
Mes
Monto S/.
-
11.05
11.05
17.40
7.26
18.66
Valoriz. N 10
Set. 2015
Metrado
274.70
228.96
193.49
106.00
484.97
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
3.00
1.00
1.00
7.38
7.38
11.60
4.88
12.44
1.00
18.00
5.00
11.00
16.00
5.00
5.00
20.00
1.00
1.00
1.00
1.00
7.00
10.00
20.00
20.00
1.00
10.59
7.08
8.43
86.73
576.35
400.80
177.60
1.00
1.00
1.00
1.00
10.59
7.08
8.43
Valoriz. N 08
Jul. 2015
Mes
Valoriz. N 09
Ago. 2015
Monto S/.
Metrado
Mes
Monto S/.
Valoriz. N 10
Set. 2015
Metrado
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Metrado
3.00
2.00
1.00
268,366.80
39,718.29
13,955.07
322,040.16
57,967.23
92,693.44
13,718.63
4,820.06
111,232.13
20,021.78
82,838.60
12,260.11
4,307.61
99,406.32
17,893.14
380,007.39
48.83%
48.83%
131,253.91
16.87%
65.70%
117,299.46
15.07%
80.77%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
823.03
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
29.70
24.35
105.37
45.57
14.70
66.66
6.69
9.12
1.00
29.21
4.95
3.00
29.70
24.35
105.37
45.57
14.70
66.66
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
565.84
144.96
55.99
317.79
461.85
516.83
114.08
10.31
8.01
192.60
29.72
29.72
565.84
144.96
55.99
317.79
461.85
516.83
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
607.57
850.60
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
607.57
850.60
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,250.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
266.26
9,457.56
100.00%
269.35
82.34
1,769.63
1,279.56
100.00%
100.00%
98.02
38.88
100.00
1,221.33
2,470.04
1,138.00
100.00%
100.00%
100.00%
100.00
1,138.00
516.42
209.43
516.42
1,988.22
701.59
5,582.50
100.00%
100.00%
100.00%
305.17
574.54
2,709.91
9,991.25
100.00%
100.00%
32.22
159.62
0.48
8.49
71.12
1.46
5.85
209.43
5,469.99
3,412.68
85.43
1,637.98
2,322.07
439.59
175.91
5,912.21
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.70
17.47
191.06
69.36
100.00%
100.00%
29.74
806.29
8,861.33
3,620.24
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
16.30
129.67
1,952.62
5,112.01
6,535.37
7,751.90
100.00%
100.00%
100.00%
10.00
109.29
344.32
2,894.80
3,577.06
1,521.89
100.00%
100.00%
100.00%
70.31
187.92
3,658.98
28,496.64
9,446.74
14,526.15
100.00%
100.00%
100.00%
17.72
189.75
2,996.41
7,522.49
9,971.36
11,895.75
100.00%
100.00%
100.00%
29.49
264.78
3,200.00
9,729.34
16,140.99
12,704.00
100.00%
100.00%
100.00%
0.45
2.25
114.05
24.76
282.98
1,220.81
2,357.23
148.46
119.90
452.78
7,748.89
10,665.52
4,846.62
5,751.64
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
374.48
33.92
15,821.78
936.53
100.00%
100.00%
374.48
4,752.15
100.00%
277.10
16.20
32.40
1,798.38
174.47
395.60
100.00%
100.00%
100.00%
101.50
170.39
272.48
10,888.92
11,020.82
1,016.36
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
70.63
403.64
152.38
276.94
160.50
242.41
37.50
1,351.86
8,165.64
4,781.68
11,963.81
1,967.73
1,544.15
1,516.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
285.23
9,637.92
100.00%
54.85
1,860.51
100.00%
254.19
4.74
6,192.07
236.62
100.00%
100.00%
254.19
11,768.99
100.00%
399.03
19,863.72
100.00%
70.63
3,758.22
100.00%
148.10
199.10
3,607.72
2,570.38
100.00%
100.00%
2.88
5.54
13.20
23.76
832.03
1,038.30
6,330.06
11,735.54
100.00%
100.00%
100.00%
100.00%
11.70
3,612.50
100.00%
90.99
7,258.27
100.00%
38.40
4,965.89
100.00%
6.00
10.00
419.70
915.40
100.00%
100.00%
1,860.51
2,903.63
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
180.00
22,460.40
100.00%
7.00
1,019.41
100.00%
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
5.00
13.00
30.05
105.69
100.00%
100.00%
580.53
518.12
3,825.69
2,974.01
100.00%
100.00%
11.70
26.37
124.72
479.14
100.00%
100.00%
38.40
89.10
247.68
261.07
100.00%
100.00%
1.00
1.00
124.22
29.70
640.11
640.11
3,035.94
522.13
100.00%
100.00%
100.00%
100.00%
1.00
5.64
1,094.93
5,027.16
100.00%
100.00%
2.00
3.00
6.00
3.00
11.00
3.00
5.00
551.70
792.69
1,188.48
1,352.16
494.89
140.52
203.70
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
13.00
81.11
1,084.33
100.00%
100.00%
910.88
156.64
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
27.00
38.53
11.00
67.10
35.00
8.00
10.00
6.00
4.00
2.00
1.00
1.00
625.86
400.33
121.11
780.37
475.65
654.56
931.60
159.54
891.40
1,452.46
68.77
236.08
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
13.00
6.00
6.00
17.34
17.34
23.80
29.46
57.80
1.00
6.00
2.00
2.00
7.00
70.07
1,198.34
456.36
59.52
431.07
359.28
521.93
789.82
3,462.80
33.70
261.30
93.22
223.26
1,598.94
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
22.40
95.44
87.20
625.63
4,307.20
14,004.32
100.00%
100.00%
100.00%
39.00
11.00
3.00
10.00
13.00
3.00
4.00
3,336.06
91.85
33.21
110.70
1,400.62
1,872.93
652.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
18.15
18.15
451.21
376.07
100.00%
100.00%
1,723.06
5,601.73
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
50.50
10.00
737.30
259.90
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
100.00%
100.00%
100.00%
100.00%
90.30
13.60
4,903.29
770.44
100.00%
100.00%
18.00
189.72
100.00%
3.00
15.00
18.00
4.00
412.80
2,200.65
2,196.90
288.76
100.00%
100.00%
100.00%
100.00%
15.00
60.00
3.00
3.00
3.00
3.00
21.00
4,067.85
3,558.00
2,161.02
228.81
1,016.94
693.00
8,008.35
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
2,095.80
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
425.52
100.00%
1.00
6,932.88
100.00%
1.00
31,863.48
100.00%
1.00
2,514.03
100.00%
1.00
2,244.81
100.00%
1.00
1,494.72
100.00%
15,506.06
2,294.90
806.32
18,607.28
3,349.31
1,137.99
168.42
59.18
1,365.59
245.81
624,653.96
92,448.79
32,482.01
749,584.76
134,925.26
21,956.59
2.48%
99.82%
1,611.40
0.18%
100.00%
884,510.02
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
TOTAL ACUMULADO
Metrado
Mes
Monto S/.
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
827.40
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
1.00
2,935.02
100.00%
505.09
505.09
707.13
707.13
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.26
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
107.08
3,803.48
100.00%
308.15
112.40
2,024.55
1,746.70
100.00%
100.00%
41.24
7.46
75.00
513.85
315.71
853.50
100.00%
100.00%
100.00%
75.00
853.50
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
365.00
159.71
365.53
1,405.26
535.03
4,517.95
100.00%
100.00%
100.00%
205.82
376.23
1,827.68
6,542.64
100.00%
100.00%
57.26
1.19
67.39
0.42
15.23
63.52
2.44
8.14
4.79
25.53
159.71
9,986.72
224.40
1,453.60
77.46
3,049.35
2,073.93
902.19
244.77
1,281.18
833.56
4,590.06
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.70
17.47
231.81
69.88
100.00%
100.00%
25.12
663.37
9,022.60
2,998.43
100.00%
100.00%
13.91
110.56
1,470.59
5,214.03
5,572.23
5,882.36
100.00%
100.00%
100.00%
12.66
132.35
403.70
4,401.76
4,331.82
1,796.47
100.00%
100.00%
100.00%
15.24
170.45
2,397.84
7,402.68
8,957.15
9,591.36
100.00%
100.00%
100.00%
24.73
213.82
2,956.58
9,672.89
13,034.46
11,826.32
100.00%
100.00%
100.00%
5.07
1,983.08
100.00%
640.59
416.78
-
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
37.90
306.69
26.43
302.08
841.95
2,516.31
2,019.69
1,226.76
9,889.58
11,385.40
3,367.80
6,139.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
327.77
31.57
13,887.62
865.65
100.00%
100.00%
327.77
4,159.40
100.00%
186.38
1,358.72
100.00%
104.53
143.92
247.12
11,676.00
9,595.15
921.76
100.00%
100.00%
100.00%
75.93
411.49
142.33
222.50
25.52
131.11
314.96
46.50
1,537.58
8,781.19
4,624.30
9,858.98
579.56
1,625.76
2,006.30
1,922.78
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
339.98
11,848.30
100.00%
155.37
7.46
4,232.28
385.38
100.00%
100.00%
155.37
7,426.45
100.00%
1.10
54.47
100.00%
190.75
10,773.56
100.00%
1,922.78
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
75.93
4,154.13
100.00%
115.50
95.80
2,829.75
1,265.52
100.00%
100.00%
2.88
6.39
19.77
5.94
832.03
1,197.62
9,480.70
2,933.88
100.00%
100.00%
100.00%
100.00%
11.70
3,612.61
100.00%
51.89
4,143.42
100.00%
54.95
7,106.13
100.00%
5.00
457.70
100.00%
360.00
44,920.80
100.00%
7.00
1,019.41
100.00%
48.00
6.00
183.36
17.04
100.00%
100.00%
12.00
645.48
100.00%
3.00
12.00
18.03
97.56
100.00%
100.00%
427.37
317.90
648.43
553.82
4,273.16
3,178.92
100.00%
100.00%
49.89
63.74
11.70
35.10
124.72
637.41
100.00%
100.00%
54.95
94.80
354.43
277.76
100.00%
100.00%
4,143.42
17,968.32
277.76
54.95
-
354.43
-
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
2,220.62
-
39.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
685.23
Monto S/.
1.00
1.00
90.86
39.00
640.11
640.11
2,220.62
685.23
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,137.45
6,091.87
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
827.55
792.69
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.56
77.67
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
46.48
7.50
44.06
50.25
10.00
8.00
8.00
3.00
1.00
1.00
2.00
81.11
1,417.97
482.93
82.58
512.42
682.90
807.20
778.24
213.84
774.81
726.23
68.77
482.20
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
14.00
7.00
7.00
15.59
15.59
21.30
31.06
52.30
1,290.10
532.42
69.44
387.57
323.02
467.11
832.72
3,133.29
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
1.00
1.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
6,444.83
1,375.14
Monto S/.
1.00
4.00
4.00
1.00
2.00
9.00
2.00
1.00
1.00
33.70
174.20
186.44
53.59
225.66
2,098.80
2,560.08
6,444.83
1,375.14
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
33.60
79.94
69.05
842.69
3,617.29
11,684.63
100.00%
100.00%
100.00%
33.00
12.00
3.00
8.00
16.00
3.00
1.00
4.00
2,822.82
100.20
33.21
88.56
1,723.84
1,872.93
292.28
652.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
13.29
13.29
16.85
25.80
14.15
330.39
275.37
187.37
376.68
367.76
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
34.80
14.15
16.85
1,889.64
801.60
914.96
100.00%
100.00%
100.00%
18.00
189.72
100.00%
1,168.46
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
5.00
7.00
16.00
5.00
688.00
1,026.97
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
29,617.63
4,383.41
9,713.32
1,437.57
516,805.72
76,487.25
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1,540.12
35,541.16
6,397.41
505.09
11,655.98
2,098.08
26,873.90
620,166.87
111,630.04
41,938.57
5.73%
98.12%
13,754.06
1.88%
100.00%
731,796.91
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
TOTAL ACUMULADO
Metrado
Mes
Monto S/.
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
830.60
1,740.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
1.00
7,300.35
100.00%
439.65
439.65
615.51
615.51
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.26
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
107.08
3,803.49
100.00%
143.93
96.54
945.62
1,500.23
100.00%
100.00%
41.46
68.82
73.24
516.59
2,912.46
833.47
100.00%
100.00%
100.00%
73.24
833.47
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
337.84
159.71
337.84
1,300.67
535.03
4,175.70
100.00%
100.00%
100.00%
170.30
285.14
1,512.27
4,958.58
100.00%
100.00%
1.40
2.80
-
45.82
6.15
67.39
0.42
11.65
63.52
1.40
2.80
0.80
4.24
159.71
8,125.26
1,177.66
1,465.74
79.02
2,376.02
2,079.01
517.17
84.31
216.96
138.78
4,671.47
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.70
17.47
231.39
70.75
100.00%
100.00%
25.12
663.37
9,027.63
3,038.23
100.00%
100.00%
13.91
110.56
1,470.59
5,216.81
5,579.96
5,955.89
100.00%
100.00%
100.00%
14.98
163.29
520.77
5,199.41
5,357.54
2,343.47
100.00%
100.00%
100.00%
15.24
170.45
2,397.84
7,405.72
8,972.22
9,711.25
100.00%
100.00%
100.00%
24.73
213.82
2,956.58
9,677.83
13,059.88
11,974.15
100.00%
100.00%
100.00%
5.07
1,984.09
100.00%
517.17
84.31
-
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
37.90
306.69
26.43
302.08
841.95
2,516.31
2,023.86
1,242.09
9,894.86
11,409.71
3,409.90
7,624.42
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
327.77
31.57
13,917.12
872.91
100.00%
100.00%
327.77
4,179.07
100.00%
187.28
1,286.61
100.00%
104.53
143.92
247.12
13,430.53
10,967.84
924.23
100.00%
100.00%
100.00%
75.93
411.49
142.33
222.50
4.24
131.11
314.96
31.50
1,519.36
8,682.44
4,590.14
9,812.25
95.27
1,623.14
2,006.30
1,298.43
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
31.50
1,298.43
339.98
11,787.11
100.00%
155.37
7.46
4,153.04
390.01
100.00%
100.00%
155.37
7,451.54
100.00%
1.10
56.99
100.00%
153.92
8,670.31
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
75.93
4,166.28
100.00%
115.50
95.80
2,826.28
1,263.60
100.00%
100.00%
2.88
6.39
19.77
5.94
832.03
1,197.62
9,480.70
2,933.88
100.00%
100.00%
100.00%
100.00%
11.70
3,612.73
100.00%
51.89
4,145.49
100.00%
15.57
1,243.89
10.60
1,370.79
100.00%
5.00
457.70
100.00%
7.00
1,019.41
100.00%
274.20
34,236.61
100.00%
48.00
6.00
183.36
17.52
100.00%
100.00%
12.00
645.48
100.00%
3.00
12.00
18.03
97.56
100.00%
100.00%
648.43
553.82
4,273.16
3,178.92
100.00%
100.00%
11.70
35.10
124.72
637.77
100.00%
100.00%
10.60
94.80
68.37
277.77
100.00%
100.00%
4.24
37.92
27.35
111.11
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
36.35
15.60
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
890.94
274.25
Monto S/.
1.00
1.00
90.86
39.00
640.11
640.11
2,226.98
685.62
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,134.70
6,130.59
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
833.31
798.45
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
77.67
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
46.48
7.50
61.85
11.40
10.00
6.00
8.00
2.00
1.00
1.00
2.00
81.11
1,386.52
468.52
79.65
688.39
144.10
818.20
558.96
214.48
505.36
726.23
68.77
483.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
14.00
7.00
7.00
9.14
9.14
21.30
31.06
30.45
1,289.96
532.42
69.44
227.22
189.38
467.11
832.72
1,824.26
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
6,446.48
1,420.84
1.00
4.00
4.00
1.00
2.00
10.00
1.00
1.00
33.70
174.20
186.44
53.59
224.82
2,445.70
6,446.48
1,420.84
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
31.98
-
1,443.26
-
33.60
79.94
51.80
842.69
3,607.69
8,796.68
100.00%
100.00%
100.00%
1.00
33.00
12.00
3.00
8.00
16.00
3.00
66.72
2,838.66
100.20
33.21
88.56
1,922.08
1,872.93
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.79
10.79
11.45
20.60
14.70
268.24
223.57
127.32
300.76
319.14
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
100.00%
100.00%
100.00%
100.00%
29.60
14.15
11.45
1,607.28
803.01
621.74
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
7.00
688.00
1,075.97
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
16.00
5.00
1,956.32
360.95
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
0.00
14,591.70
2,159.57
758.77
17,510.04
494,300.35
73,156.45
25,703.62
593,160.42
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Monto S/.
0.00
0.00%
97.05%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
TOTAL ACUMULADO
Metrado
Monto S/.
3,151.81
106,768.88
20,661.85
2.95%
100.00%
699,929.30
100.00%
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
825.16
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
1.00
677.34
100.00%
1.00
23,869.18
100.00%
405.12
405.12
567.17
567.17
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
301.18
10,697.91
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
603.51
54.27
3,965.05
843.36
100.00%
100.00%
58.16
4.15
724.67
47.23
100.00%
100.00%
340.15
197.56
340.15
1,309.58
661.82
4,204.26
100.00%
100.00%
100.00%
154.87
879.07
1,375.25
15,287.09
100.00%
100.00%
57.57
1,001.09
23.86
139.69
0.69
4.80
40.07
2.10
9.45
197.56
4,091.52
2,986.57
124.68
943.16
1,308.29
654.86
284.16
5,577.17
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.70
17.47
196.99
69.36
100.00%
100.00%
28.07
757.82
8,613.56
3,402.61
100.00%
100.00%
16.07
127.86
1,785.01
5,182.90
6,444.15
7,086.49
100.00%
100.00%
100.00%
11.74
126.71
396.51
3,498.05
4,147.21
1,752.56
100.00%
100.00%
100.00%
112.89
290.75
5,820.96
46,759.04
14,616.00
23,109.21
100.00%
100.00%
100.00%
16.28
7,056.07
100.00%
327.43
142.08
-
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
178.86
2,623.97
9,399.10
10,417.15
100.00%
100.00%
28.37
252.58
3,257.88
9,612.33
15,397.27
12,933.78
100.00%
100.00%
100.00%
0.45
2.25
114.05
28.34
323.84
1,176.94
2,697.58
152.47
119.90
452.78
9,121.51
12,205.53
4,672.45
6,582.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
381.32
34.54
16,110.77
953.65
100.00%
100.00%
381.32
4,838.95
100.00%
175.83
16.68
33.35
1,156.96
179.64
407.20
100.00%
100.00%
100.00%
124.33
106.25
200.24
13,399.05
6,895.63
746.90
100.00%
100.00%
100.00%
65.64
390.61
121.88
263.92
147.31
308.35
58.80
1,265.54
7,956.73
3,841.65
11,438.30
1,808.96
1,964.19
2,384.34
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
199.03
6,753.09
100.00%
0.15
193.22
4,776.40
100.00%
1,156.96
-
238.43
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
6.74
337.28
100.00%
0.19
193.22
8,963.47
100.00%
2,719.64
134.03
6,799.35
100.00%
65.64
3,498.61
100.00%
120.80
87.20
2,945.10
1,128.36
100.00%
100.00%
2.88
5.55
13.29
14.85
832.03
1,040.18
6,373.22
7,334.71
100.00%
100.00%
100.00%
100.00%
11.70
3,612.49
100.00%
68.05
5,428.35
100.00%
41.50
5,366.78
100.00%
10.00
766.60
100.00%
332.81
416.07
2,549.29
2,933.88
2,146.71
20.42
-
1,628.90
-
4.00
7.00
1,019.41
100.00%
109.65
13,682.13
100.00%
40.00
6.00
152.80
17.04
100.00%
100.00%
10.00
537.90
100.00%
3.00
10.00
18.03
81.30
100.00%
100.00%
546.76
521.49
3,603.15
2,993.35
100.00%
100.00%
5,472.85
1,441.30
1,197.36
306.64
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
49.89
225.49
11.70
31.02
124.72
563.63
100.00%
100.00%
107.07
102.20
41.50
87.20
267.68
255.50
100.00%
100.00%
1.00
1.00
121.62
36.30
640.11
640.12
2,972.39
632.71
100.00%
100.00%
100.00%
100.00%
64.01
32.01
2,972.39
632.71
0.05
-
32.01
-
1.00
5.99
1,101.49
5,354.22
100.00%
100.00%
2.00
3.00
6.00
3.00
5.00
2.00
5.00
551.70
792.69
1,188.48
1,352.16
224.95
93.68
203.80
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
236.76
1.00
13.00
36.53
7.50
42.30
27.42
6.00
4.00
6.00
1.00
1.00
1.00
1.00
81.11
1,084.33
379.55
82.58
491.95
372.64
493.68
389.12
159.60
227.87
726.23
68.77
236.76
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
167.81
13.00
6.00
6.00
13.50
1,197.82
456.36
59.52
335.62
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
172.39
-
1.00
1.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
6,173.32
1,352.85
Monto S/.
16.64
21.30
23.46
45.00
1.00
2.00
2.00
1.00
2.00
8.00
1.00
1.00
344.78
467.11
628.97
2,695.95
33.70
87.10
93.22
53.59
223.60
1,830.72
6,173.32
1,352.85
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
22.40
69.14
7.75
561.79
3,120.29
1,246.67
100.00%
100.00%
100.00%
1.00
33.00
10.00
3.00
8.00
13.00
2.00
1.00
1.00
66.72
2,622.18
83.50
33.21
88.56
1,244.10
1,248.62
272.19
163.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
7.58
7.58
25.25
7.20
188.44
157.06
368.65
187.13
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
819.08
819.08
188.47
100.00%
100.00%
100.00%
34.25
7.20
1,859.78
407.88
100.00%
100.00%
12.00
126.48
100.00%
1,248.30
498.67
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
3.00
11.00
14.00
4.00
412.80
1,613.81
1,708.70
288.76
100.00%
100.00%
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
27,584.46
10,494.81
570,781.77
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
4,082.50
1,434.39
33,101.35
5,958.24
1,553.23
545.73
12,593.77
2,266.88
84,475.70
29,680.65
684,938.12
123,288.86
39,059.59
4.83%
98.16%
14,860.65
1.84%
100.00%
808,226.98
100.00%
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
827.82
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
1.00
3,457.11
100.00%
564.05
564.05
789.67
789.67
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
146.23
5,194.09
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
78.57
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
894.13
Monto S/.
445.09
121.64
2,924.24
1,890.29
100.00%
100.00%
58.96
7.62
78.57
734.64
613.26
894.13
100.00%
100.00%
100.00%
408.30
217.44
408.30
1,571.97
728.44
5,046.59
100.00%
100.00%
100.00%
229.49
512.50
2,037.87
8,912.38
100.00%
100.00%
1.46
5.85
0.97
5.18
-
57.26
83.88
0.81
15.23
63.52
1.46
5.85
0.97
5.18
217.44
10,015.92
1,811.81
149.91
3,059.40
2,075.20
486.92
175.91
260.09
169.23
6,268.86
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.70
17.47
210.67
69.88
100.00%
100.00%
30.77
820.19
10,088.56
3,707.26
100.00%
100.00%
17.74
141.18
1,960.32
6,094.23
7,116.89
7,841.28
100.00%
100.00%
100.00%
14.61
153.54
474.30
4,638.53
5,026.90
2,110.64
100.00%
100.00%
100.00%
12.40
36.30
5,396.60
1,825.16
100.00%
100.00%
486.92
175.91
260.09
169.23
-
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
632.65
2,530.60
100.00%
18.24
204.06
2,946.22
8,288.80
10,723.57
11,784.88
100.00%
100.00%
100.00%
30.75
267.58
3,558.10
11,064.78
16,317.15
14,232.40
100.00%
100.00%
100.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,824.34
2,019.69
1,226.76
9,716.94
12,205.53
4,707.76
6,932.78
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
419.63
39.89
17,779.72
1,101.37
100.00%
100.00%
419.63
5,325.10
100.00%
206.83
3.03
6.05
1,369.21
32.66
73.87
100.00%
100.00%
100.00%
124.33
150.55
267.28
13,936.15
10,112.44
1,004.97
100.00%
100.00%
100.00%
75.93
464.36
147.08
276.67
5.18
166.21
335.25
37.50
1,479.12
9,551.89
4,665.38
12,046.21
113.65
2,046.05
2,135.54
1,528.88
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1,369.21
73.87
5.18
37.50
113.65
1,528.88
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
234.68
8,007.28
100.00%
213.09
7.46
5,401.83
381.80
100.00%
100.00%
213.09
10,094.06
100.00%
1.10
53.72
100.00%
2,018.81
53.72
42.62
-
2,019.00
-
74.43
3,938.84
186.07
9,846.83
100.00%
30.37
1,648.48
75.93
4,121.48
100.00%
142.70
105.80
3,483.30
1,379.63
100.00%
100.00%
1,393.32
551.85
1.15
2.56
7.91
5.94
332.89
479.12
3,792.28
2,933.88
2.88
6.39
19.77
14.85
832.23
1,197.80
9,480.70
7,334.71
100.00%
100.00%
100.00%
100.00%
4.68
1,445.04
11.70
3,612.61
100.00%
29.16
2,328.72
72.91
5,822.60
100.00%
2.34
302.61
7.80
1,008.70
100.00%
1.50
137.31
5.00
457.70
100.00%
7.00
1,019.41
100.00%
360.00
44,920.80
100.00%
144.00
17,968.32
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
3.00
13.00
18.03
105.69
100.00%
100.00%
238.06
244.58
1,568.82
1,403.89
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
4.68
15.34
49.89
278.73
11.70
38.34
124.72
696.64
100.00%
100.00%
3.12
42.32
20.12
124.00
7.80
105.80
50.31
310.00
100.00%
100.00%
0.25
124.62
44.40
160.03
3,045.71
780.55
1.00
1.00
124.62
44.40
640.10
640.11
3,045.71
780.55
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,112.92
6,031.28
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
827.55
795.72
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.56
77.68
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
46.48
7.50
44.06
41.25
10.00
6.00
8.00
81.11
1,417.97
482.93
82.58
512.42
560.59
822.80
583.68
213.04
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
213.04
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
472.00
-
2.00
476.74
2.00
1.00
1.00
2.00
472.00
726.23
68.77
476.74
100.00%
100.00%
100.00%
100.00%
223.82
-
1.00
1.00
6,266.62
1,360.77
14.00
7.00
7.00
15.92
15.92
21.30
31.06
53.05
1.00
4.00
4.00
1.00
2.00
7.00
1.00
1.00
1,293.88
532.42
69.44
395.77
329.86
467.11
832.72
3,178.23
33.70
174.20
186.44
53.59
223.82
1,631.63
6,266.62
1,360.77
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
31.98
69.07
1,443.26
11,422.80
33.60
79.94
69.07
842.69
3,607.69
11,422.80
100.00%
100.00%
100.00%
37.00
12.00
4.00
8.00
18.00
3.00
1.00
4.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
279.74
652.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
13.29
13.29
16.85
25.80
14.15
330.39
275.37
187.37
376.68
367.76
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
872.53
872.53
872.53
188.47
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
1,889.64
801.60
914.96
34.80
14.15
16.85
1,889.64
801.60
914.96
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
12,781.90
1,891.72
664.66
15,338.28
2,760.89
69,356.75
10,264.80
3,606.55
83,228.10
14,981.06
563,864.77
83,451.99
29,320.97
676,637.73
121,794.79
18,099.17
2.27%
87.70%
98,209.16
12.30%
100.00%
798,432.52
100.00%
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
200.00
1.00
2,500.00
827.18
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
4.02
0.96
57.09
17.85
2.56
183.83
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
36.65
50.40
64.88
181.78
352.30
1,128.26
100.00%
100.00%
100.00%
1.00
4,705.91
100.00%
1.00
99,021.94
100.00%
574.72
574.72
804.61
804.61
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
125.36
4,452.79
100.00%
267.86
144.67
1,759.84
2,248.17
100.00%
100.00%
37.97
114.10
473.11
1,298.46
100.00%
100.00%
114.10
1,298.46
441.48
217.44
409.94
1,699.71
728.42
5,066.86
100.00%
100.00%
100.00%
251.96
418.77
2,237.40
7,282.41
100.00%
100.00%
46.71
83.88
0.81
11.82
49.87
217.44
8,127.07
1,807.62
148.94
2,360.22
1,628.76
6,234.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
0.70
17.47
233.96
69.71
100.00%
100.00%
24.38
586.40
8,830.93
2,644.67
100.00%
100.00%
17.20
137.58
1,888.68
6,499.54
6,935.41
7,535.84
100.00%
100.00%
100.00%
14.61
153.57
474.30
5,124.75
5,026.35
2,105.90
100.00%
100.00%
100.00%
18.24
204.06
2,946.22
8,915.35
10,723.35
11,755.42
100.00%
100.00%
100.00%
30.75
267.58
3,558.10
12,121.03
16,314.48
14,196.82
100.00%
100.00%
100.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,998.49
2,019.69
1,223.69
10,690.41
12,205.53
4,695.99
6,797.90
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
419.63
39.89
17,771.33
1,101.37
100.00%
100.00%
419.63
5,325.10
100.00%
264.08
1,882.87
100.00%
124.33
150.55
267.28
15,142.16
10,886.27
1,002.30
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
75.93
464.36
147.08
276.67
29.68
166.21
335.25
1,542.14
9,937.30
4,787.45
12,275.85
675.52
2,061.00
2,135.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
234.68
8,190.33
100.00%
213.09
7.46
5,832.27
384.94
100.00%
100.00%
213.09
10,187.83
100.00%
1.10
55.95
100.00%
194.36
11,043.54
100.00%
75.93
4,154.89
100.00%
142.70
105.80
3,496.15
1,398.68
100.00%
100.00%
2.88
6.39
19.77
14.85
832.18
1,197.87
9,480.70
7,334.71
100.00%
100.00%
100.00%
100.00%
11.70
3,612.61
100.00%
72.91
5,821.86
100.00%
21.87
1,746.32
5.00
457.65
100.00%
278.10
34,701.32
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
7.00
1,019.41
100.00%
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
3.00
13.00
18.03
105.69
100.00%
100.00%
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
11.70
38.34
124.60
696.64
100.00%
100.00%
35.68
104.54
89.20
261.35
100.00%
49.84
17.76
1,219.58
312.22
1.00
1.00
124.62
44.40
640.11
640.11
3,049.45
780.55
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,139.64
6,096.64
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
830.25
795.39
1,386.56
1,352.16
269.94
140.52
80.73
44.50
231.12
77.39
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
81.11
1,417.97
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
1.00
1.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
27.00
46.48
7.50
33.95
24.65
10.00
6.00
8.00
2.00
1.00
1.00
2.00
625.86
482.93
82.58
394.84
334.99
807.20
583.68
213.92
521.02
726.23
68.77
482.56
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
14.00
7.00
7.00
14.49
14.49
21.30
31.06
50.00
1.00
4.00
4.00
1.00
2.00
8.00
1.00
1.00
1,289.96
532.42
69.44
360.22
300.23
467.11
832.72
2,995.50
33.70
174.20
186.44
53.59
225.82
1,910.00
6,453.09
1,376.47
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
33.60
79.94
75.55
842.69
3,617.29
12,811.01
100.00%
100.00%
100.00%
1.00
37.00
12.00
4.00
8.00
18.00
3.00
1.00
66.72
2,940.02
100.20
44.28
88.56
1,722.60
1,872.93
293.38
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
6,453.09
1,376.47
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
4.00
652.40
100.00%
14.16
14.16
33.30
24.85
10.55
352.02
293.40
370.30
362.81
274.19
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
100.00%
100.00%
100.00%
100.00%
33.85
14.15
33.30
1,838.06
801.60
701.96
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
720.34
228.81
462.00
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
120.00
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
0.00
-
12,510.49
1,851.55
650.55
15,012.59
2,702.27
643,762.18
95,276.80
33,475.63
772,514.61
139,052.63
0.00
0.00%
98.06%
17,714.86
1.94%
100.00%
911,567.24
100.00%
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
1.00
1.00
Monto S/.
2,500.00
827.47
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
200.00
1.00
1,698.00
470.00
100.00%
100.00%
1.00
1.00
154.61
339.54
100.00%
100.00%
1.00
2,984.40
100.00%
620.67
620.67
868.94
868.94
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
125.36
4,452.79
100.00%
167.53
150.90
1,100.67
2,344.99
100.00%
100.00%
48.32
59.25
602.07
674.27
100.00%
100.00%
59.25
674.27
433.08
217.44
520.32
1,667.36
728.42
6,431.16
100.00%
100.00%
100.00%
267.21
346.87
2,372.82
6,032.07
100.00%
100.00%
60.70
83.88
0.81
16.30
67.82
217.44
10,581.83
1,809.29
149.29
3,261.80
2,215.68
6,247.06
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
0.70
17.47
231.67
69.88
100.00%
100.00%
30.77
820.19
11,046.12
3,707.26
100.00%
100.00%
17.74
141.18
1,960.32
6,646.29
7,116.88
7,841.28
100.00%
100.00%
100.00%
14.16
153.54
474.30
4,920.60
5,028.43
2,110.63
100.00%
100.00%
100.00%
18.24
204.06
2,946.22
8,854.49
10,723.57
11,784.88
99.98%
100.00%
100.00%
30.99
267.58
3,558.10
12,115.94
16,317.15
14,232.40
100.00%
100.00%
100.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,982.12
2,019.69
1,226.76
10,598.88
12,208.77
4,707.76
7,634.15
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
419.63
39.89
17,779.72
1,101.36
100.00%
100.00%
419.63
4,850.92
100.00%
239.83
1,698.00
100.00%
124.33
150.55
267.28
15,087.44
10,857.67
1,004.97
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
75.93
464.36
147.08
276.67
166.21
335.25
1,536.82
9,904.80
4,777.16
12,256.48
2,061.00
2,135.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
234.68
8,176.25
100.00%
213.09
7.46
5,802.44
385.23
100.00%
100.00%
213.09
10,185.70
100.00%
1.10
55.85
100.00%
235.46
13,296.43
100.00%
75.93
4,154.13
100.00%
142.70
105.80
3,496.15
1,397.62
100.00%
100.00%
2.88
6.39
19.77
14.85
832.20
1,197.74
9,480.70
7,334.71
100.00%
100.00%
100.00%
100.00%
11.70
3,612.61
100.00%
72.91
5,821.87
100.00%
5.00
457.65
100.00%
7.00
1,019.41
100.00%
385.80
48,140.12
100.00%
2,328.43
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
3.00
13.00
18.03
105.69
100.00%
100.00%
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
11.70
38.34
124.60
696.64
100.00%
100.00%
31.00
105.80
310.00
100.00%
1,219.33
312.22
1.00
1.00
124.62
44.40
640.11
640.11
3,048.20
780.55
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,137.37
6,091.87
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
830.58
795.72
1,386.56
1,352.16
269.94
140.52
80.73
44.50
244.68
77.67
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
27.00
46.48
81.11
1,417.97
625.86
482.93
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
1.00
1.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
6,439.39
1,375.15
Monto S/.
7.50
52.40
38.00
10.00
8.00
8.00
3.00
1.00
1.00
2.00
82.58
609.41
516.42
807.20
778.24
213.84
774.66
726.23
68.77
483.28
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
14.00
7.00
7.00
12.90
12.90
21.30
31.06
53.05
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1.00
1,290.10
532.42
69.44
320.69
267.29
467.11
832.72
3,178.23
33.70
174.20
186.44
53.59
225.66
2,149.20
6,439.39
1,375.15
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
33.60
79.94
85.30
842.69
3,636.47
14,433.61
100.00%
100.00%
100.00%
37.00
12.00
4.00
8.00
18.00
3.00
1.00
4.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
292.22
652.40
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
11.19
278.18
100.00%
1,454.77
2,886.72
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
11.19
18.35
16.70
13.05
231.86
204.05
243.82
339.17
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
25.70
13.05
18.35
1,395.51
739.28
386.82
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 11
Oct. 2015
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
8,232.47
1,218.41
428.09
9,878.97
1,778.21
8,490.00
1,256.52
441.48
10,188.00
1,833.84
565,264.67
83,659.17
29,393.76
678,317.60
122,097.17
11,657.18
1.46%
98.50%
12,021.84
1.50%
100.00%
800,414.77
100.00%
Mes
Monto S/.
500.00
-
Valoriz. N 12
Nov. 2015
Metrado
0.05
-
Mes
Monto S/.
125.00
-
TOTAL ACUMULADO
Metrado
1.00
1.00
200.00
1.00
Monto S/.
2,500.00
824.67
1,698.00
470.00
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
1.00
154.61
339.54
100.00%
100.00%
77.92
51.48
511.98
17.55
19.28
328.19
77.92
51.48
511.98
100.00%
100.00%
100.00%
328.85
1,275.12
3,649.10
4,083.52
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
100.00%
100.00%
100.00%
100.00%
1,593.33
1.00
6,373.32
100.00%
546.00
546.00
764.40
764.40
100.00%
100.00%
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1,030.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
125.36
4,452.79
100.00%
105.23
1,635.27
100.00%
49.46
112.85
616.28
1,284.23
100.00%
100.00%
308.14
-
112.85
1,284.23
422.74
217.44
422.74
1,627.55
728.42
5,225.07
100.00%
100.00%
100.00%
211.05
164.45
1,874.12
2,859.79
100.00%
100.00%
44.86
83.88
0.81
7,936.18
1,822.71
151.97
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
11.35
48.08
217.44
2,308.82
1,574.14
6,347.07
100.00%
100.00%
100.00%
0.70
17.47
229.18
70.75
100.00%
100.00%
30.77
820.19
10,956.27
3,756.47
100.00%
100.00%
17.74
141.18
1,960.32
6,594.49
7,126.77
7,939.30
100.00%
100.00%
100.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
100.00%
100.00%
100.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
100.00%
100.00%
100.00%
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
100.00%
100.00%
100.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
419.63
39.89
17,792.31
1,101.37
100.00%
100.00%
419.63
5,333.50
100.00%
205.53
1,403.77
100.00%
1,403.77
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
100.00%
100.00%
100.00%
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.51
12,137.51
2,012.80
2,135.55
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
234.68
8,098.80
100.00%
213.09
7.46
5,600.01
387.32
100.00%
100.00%
213.09
10,183.57
100.00%
1.10
56.79
100.00%
199.02
11,135.17
100.00%
75.93
4,159.45
100.00%
142.70
105.80
3,490.44
1,394.44
100.00%
100.00%
2.88
6.39
19.77
14.85
658.77
1,035.75
7,599.98
5,702.85
100.00%
100.00%
100.00%
100.00%
11.70
3,612.73
100.00%
265.34
414.95
3,040.76
2,281.14
72.91
5,821.86
72.91
5,821.86
100.00%
10.00
915.30
10.00
915.30
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
7.00
1,019.41
100.00%
267.00
33,316.26
100.00%
52.00
6.00
198.64
17.04
100.00%
100.00%
591.69
13.00
699.27
100.00%
89.43
3.00
13.00
18.03
105.69
100.00%
100.00%
3,922.04
3,509.67
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
124.61
696.64
11.70
38.34
124.61
696.64
100.00%
100.00%
309.99
105.80
309.99
100.00%
1.00
1.00
124.62
44.40
640.11
640.11
3,051.94
780.55
100.00%
100.00%
100.00%
100.00%
7.00
198.64
17.04
128.02
160.03
-
0.05
0.25
124.62
44.40
1,019.41
32.01
160.03
3,051.94
780.55
1,132.40
3,059.93
1.00
6.71
1,132.40
6,119.86
100.00%
100.00%
277.29
265.67
792.32
450.72
179.96
46.84
80.73
44.52
244.68
71.65
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
107.16
751.41
1,443.26
5,810.22
1,283.10
33.40
22.14
44.28
861.92
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
8.00
3.00
1.00
1.00
1.00
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
214.32
751.41
839.46
68.77
240.79
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
1,419.70
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
33.60
79.94
85.95
842.69
3,607.69
14,525.55
100.00%
100.00%
100.00%
37.00
12.00
4.00
8.00
18.00
3,164.98
100.20
44.28
88.56
1,939.32
100.00%
100.00%
100.00%
100.00%
100.00%
17.19
2,905.11
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
1,872.93
290.85
163.10
3.00
1.00
1.00
1,872.93
290.85
163.10
100.00%
100.00%
100.00%
183.47
152.91
128.99
71.25
323.32
18.43
18.43
29.00
12.14
31.10
458.17
381.87
322.48
177.25
808.29
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
872.53
872.53
872.53
188.47
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
576.35
400.80
177.60
21.17
14.15
16.85
1,152.70
801.60
355.20
100.00%
100.00%
100.00%
189.72
18.00
189.72
100.00%
688.00
1,613.81
1,952.80
360.95
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
2,711.90
1,186.00
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
778.00
20.00
778.00
100.00%
720.34
1.00
720.34
100.00%
Valoriz. N 11
Oct. 2015
Mes
Monto S/.
Valoriz. N 12
Nov. 2015
Metrado
228.81
462.00
120.00
Mes
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
3.00
2.00
1.00
228.81
462.00
120.00
100.00%
100.00%
100.00%
1.00
2,457.00
1.00
2,457.00
100.00%
1.00
698.60
1.00
698.60
100.00%
1.00
141.84
1.00
141.84
100.00%
1.00
2,280.16
1.00
2,280.16
100.00%
1.00
10,621.16
1.00
10,621.16
100.00%
1.00
838.01
1.00
838.01
100.00%
1.00
748.27
1.00
748.27
100.00%
1.00
498.24
1.00
498.24
100.00%
71,274.75
10,548.66
3,706.29
85,529.70
15,395.35
34,378.68
5,088.04
1,787.69
41,254.41
7,425.79
549,552.27
81,333.74
28,576.72
659,462.73
118,703.29
100,925.05
12.97%
93.74%
48,680.20
6.26%
100.00%
778,166.02
100.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
SALDO DE OBRA
Metrado
Monto S/.
%
-
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
0.00
0.00
Monto S/.
0.00
0.00
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
0.00
0.00
0.00
0.00
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
SALDO DE OBRA
Metrado
Monto S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.03.04
01.01.03.05
01.01.03.06
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
CARTEL DE OBRA 2.40M X 3.60M
CERCO PROVISIONAL DE ESTERAS
SERVICIOS HIGIENICOS
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
ENERGIA ELECTRICA PARA LA CONSTRUCCION
REMOCIONES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE DE PORTON (3.00 x 2.40)
DESMONTAJE DE TECHO DE ETERNIT/CALAMINA
DESMONTAJE DE FALSO CIELO RASO
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICCIONES
DEMOLICION DE PISO DE CONCRETO INC. F.P.
DEMOLICION DE LADRILLO KK C/MAQUINA
DEMOLICION MUROS DE ADOBE C/MAQUINA
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
823.03
8.49
470.00
2,500.00
823.03
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
UND
M2
M2
UND
6.69
9.12
1.00
29.21
4.95
3.00
4.44
2.67
105.37
1.56
2.97
22.22
29.70
24.35
105.37
45.57
14.70
66.66
114.08
10.31
8.01
4.96
14.06
6.99
565.84
144.96
55.99
M2
M3
M3
554
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.01.04.04
01.01.04.05
01.01.04.06
01.01.05
01.01.05.01
01.01.05.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
RASQUETEO Y DESMANCHADO DE MURO PARA PINTURA
ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION
ELIMINACION DE DEMOLICIONES
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINIST. DEL PLAN DE SEGURIDAD Y SALUD
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M3
M3
192.60
29.72
29.72
1.65
15.54
17.39
317.79
461.85
516.83
M2
M2
607.57
607.57
1.40
1.40
850.60
850.60
1.00
25.00
1.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,250.00
1,030.00
1,500.00
2,721.25
1,050.00
725.00
1,250.00
1,030.00
266.26
35.52
9,457.56
GLB
UND
GLB
GLB
GLB
GLB
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
M3
CORTES
555
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.03.02
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06.
02.02.05
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO CON MATERIAL DE FILTRO PARA MURO DE CONTENCION
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
GRADAS EN PISO, CONCRETO F'C=175 Kg/cm2
GRADAS , ENCOFRADO Y DESENCOFRADO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M3
M3
269.35
82.34
6.57
15.54
1,769.63
1,279.56
M3
M3
M2
98.02
38.88
100.00
12.46
63.53
11.38
1,221.33
2,470.05
1,138.00
M2
M2
M2
516.42
209.43
516.42
3.85
3.35
10.81
1,988.22
701.59
5,582.50
M3
M3
305.17
574.54
8.88
17.39
2,709.91
9,991.25
M3
M2
M3
M3
M3
M2
M2
32.22
159.62
0.48
8.49
71.12
1.46
5.85
169.77
21.38
177.98
192.93
32.65
301.09
30.07
5,469.99
3,412.68
85.43
1,637.98
2,322.07
439.59
175.91
556
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
MUROS REFORZADOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
209.43
28.23
5,912.21
M3
KG
0.70
17.47
272.94
3.97
191.06
69.36
M3
KG
29.74
806.29
297.96
4.49
8,861.33
3,620.24
M3
M2
KG
16.30
129.67
1,952.62
313.62
50.40
3.97
5,112.01
6,535.37
7,751.90
M3
M2
KG
10.00
109.29
344.32
289.48
32.73
4.42
2,894.80
3,577.06
1,521.89
557
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.08
02.03.08.01
02.03.08.02
02.03.08.03
02.03.08.04
02.03.08.05
02.03.08.06
02.03.08.07
02.04
02.04.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
MUROS REFORZADOS - CONCRETO F'C=175 Kg/cm2
MUROS REFORZADOS - ENCOFRADO Y DESENCOFRADO
MUROS REFORZADOS - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M3
M2
KG
70.31
187.92
3,658.98
405.30
50.27
3.97
28,496.64
9,446.74
14,526.15
M3
M2
KG
17.72
189.75
2,996.41
424.52
52.55
3.97
7,522.49
9,971.36
11,895.75
M3
M2
KG
29.49
264.78
3,200.00
329.92
60.96
3.97
9,729.34
16,140.99
12,704.00
M3
M2
KG
M3
M2
KG
UND
0.45
2.25
114.05
24.76
282.98
1,220.81
2,357.23
329.92
53.29
3.97
312.96
37.69
3.97
2.44
148.46
119.90
452.78
7,748.89
10,665.52
4,846.62
5,751.64
374.48
42.25
15,821.78
M2
558
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
02.06.02
02.06.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
TUBERIA DE DRENAJE DE =3" EN MURO DE COMNTENCION
TUBERIA DE DRENAJE PERFORADA DE =4" EN MURO DE COMNTENCION
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
33.92
27.61
936.53
M2
374.48
12.69
4,752.15
M
M
M
277.10
16.20
32.40
6.49
10.77
12.21
1,798.38
174.47
395.60
M2
M2
KG
101.50
170.39
272.48
107.28
64.68
3.73
10,888.92
11,020.83
1,016.35
M2
M2
M2
70.63
403.64
152.38
19.14
20.23
31.38
1,351.86
8,165.64
4,781.68
559
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.01.01
03.03.02
03.03.02.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
REVESTIMIENTO CON CEMENTO PULIDO COLOREADO PASO Y CONTRAPASO
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
FALSO CIELO RASO
FALSO CIELORASO CON PLANCHA FIBROCEMENTO DE 1.22X2.44x6MM
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M
M
M
276.94
160.50
242.41
37.50
43.20
12.26
6.37
40.44
11,963.81
1,967.73
1,544.15
1,516.50
M2
285.23
33.79
9,637.92
M2
54.85
33.92
1,860.51
M2
M2
254.19
4.74
24.36
49.92
6,192.07
236.62
M2
254.19
46.30
11,769.00
M2
399.03
49.78
19,863.71
M2
70.63
53.21
3,758.22
560
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
BARANDAS METALICAS
BARANDA DE TUBO DE 2" x 1 1/2" FG H=0.85M
PASAMANOS
PASAMANO DE TUBO F N DE 2"
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
M
148.10
199.10
24.36
12.91
3,607.72
2,570.38
M2
M2
M2
M2
2.88
5.54
13.20
23.76
288.90
187.42
479.55
493.92
832.03
1,038.31
6,330.06
11,735.54
M2
11.70
308.76
3,612.49
M2
90.99
79.77
7,258.27
38.40
129.32
4,965.89
6.00
69.95
419.70
561
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.07.04.02
03.07.05
03.07.05.01
03.07.06
03.07.06.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
10.00
91.54
915.40
M2
180.00
124.78
22,460.40
7.00
145.63
1,019.41
PZA.
PZA.
52.00
6.00
3.82
2.84
198.64
17.04
UND
13.00
53.79
699.27
UND
UND
5.00
13.00
6.01
8.13
30.05
105.69
M2
M2
580.53
518.12
6.59
5.74
3,825.69
2,974.01
M2
M2
11.70
26.37
10.66
18.17
124.72
479.14
562
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.09.03
03.09.03.01
03.09.03.02
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ANTICORROSIVA Y ESMALTE EN BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZXA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
Unidad
M
M
Metrado
PRESUPUESTO
Precio
Parcial
38.40
89.10
6.45
2.93
247.68
261.06
GLB
GLB
M
M
1.00
1.00
124.22
29.70
640.10
640.10
24.44
17.58
640.10
640.10
3,035.94
522.13
PTO
M2
1.00
5.64
1,094.93
891.34
1,094.93
5,027.16
PZA
PTO
PTO
PTO
2.00
3.00
6.00
3.00
275.85
264.23
198.08
450.72
551.70
792.69
1,188.48
1,352.16
563
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
DESCRIPCIN
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
PAPELERA DE CERAMICA
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIESGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
EMPALME A RED EXISTENTE, DE DESAGUE
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
11.00
3.00
5.00
44.99
46.84
40.74
494.89
140.52
203.70
UND
PTO
M
M
M
M
M
UND
UND
UND
UND
UND
UND
UND
1.00
13.00
27.00
38.53
11.00
67.10
35.00
8.00
10.00
6.00
4.00
2.00
1.00
1.00
81.11
83.41
23.18
10.39
11.01
11.63
13.59
81.82
93.16
26.59
222.85
726.23
68.77
236.08
81.11
1,084.33
625.86
400.33
121.11
780.37
475.65
654.56
931.60
159.54
891.40
1,452.46
68.77
236.08
PTO
1.00
70.07
70.07
564
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
13.00
6.00
6.00
17.34
17.34
23.80
29.46
57.80
1.00
6.00
2.00
2.00
7.00
92.18
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
111.63
228.42
1,198.34
456.36
59.52
431.07
359.28
521.93
789.82
3,462.80
33.70
261.30
93.22
223.26
1,598.94
M
M
M
22.40
95.44
87.20
27.93
45.13
160.60
625.63
4,307.21
14,004.32
PTO
PTO
39.00
11.00
85.54
8.35
3,336.06
91.85
565
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.06
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P35 mm
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PTO
PTO
UND
UND
UND
3.00
10.00
13.00
3.00
4.00
11.07
11.07
107.74
624.31
163.10
33.21
110.70
1,400.62
1,872.93
652.40
M3
M3
M
M
18.15
18.15
50.50
10.00
24.86
20.72
14.60
25.99
451.21
376.07
737.30
259.90
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
819.08
819.08
819.08
188.47
90.30
13.60
54.30
56.65
4,903.29
770.44
M
M
566
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
18.00
10.54
189.72
UND
UND
UND
UND
3.00
15.00
18.00
4.00
137.60
146.71
122.05
72.19
412.80
2,200.65
2,196.90
288.76
UND
UND
UND
UND
UND
15.00
60.00
3.00
3.00
3.00
271.19
59.30
720.34
76.27
338.98
4,067.85
3,558.00
2,161.02
228.81
1,016.94
567
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
DESCRIPCIN
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
3.00
21.00
231.00
381.35
693.00
8,008.35
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
GLB
1.00
2,457.00
2,457.00
GLB
1.00
2,095.80
2,095.80
GLB
1.00
425.52
425.52
UND
1.00
6,932.88
6,932.88
568
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
1.00
31,863.48
31,863.48
UND
1.00
2,514.03
2,514.03
UND
1.00
2,244.81
2,244.81
UND
1.00
1,494.72
1,494.72
COSTO DIRECTO
624,653.96
0.1480
92,448.79
0.0520
32,482.01
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
749,584.76
0.1800
134,925.26
884,510.02
569
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1.00
1.00
200.00
1.00
2,500.00
823.03
1,698.00
470.00
1.00
1.00
200.00
1.00
2,500.00
823.03
1,698.00
470.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
154.61
339.54
1.00
1.00
154.61
339.54
0.00%
0.00%
6.69
9.12
1.00
29.21
4.95
3.00
29.70
24.35
105.37
45.57
14.70
66.66
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
114.08
10.31
8.01
565.84
144.96
55.99
100.00%
100.00%
100.00%
570
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
-
SALDO
Parcial
Metrado
-
192.60
29.72
29.72
607.57
607.57
850.60
850.60
607.57
607.57
850.60
850.60
0.50
25.00
1.00
1.00
0.50
0.50
750.00
2,721.25
1,050.00
725.00
625.00
515.00
0.50
25.00
1.00
1.00
0.50
0.50
750.00
2,721.25
1,050.00
725.00
625.00
515.00
0.50
0.50
0.50
266.26
9,457.56
266.26
9,457.56
317.79
461.85
516.83
750.00
625.00
515.00
100.00%
100.00%
100.00%
0.00%
0.00%
50.00%
0.00%
0.00%
0.00%
50.00%
50.00%
0.00%
571
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
-
269.35
82.34
1,769.63
1,279.56
269.35
82.34
1,769.63
1,279.56
24.50
9.72
305.27
617.51
-
24.50
9.72
-
305.27
617.51
-
516.42
209.43
516.42
1,988.22
701.59
5,582.50
516.42
209.43
516.42
1,988.22
701.59
5,582.50
0.00%
0.00%
0.00%
305.17
574.54
2,709.91
9,991.25
305.17
574.54
2,709.91
9,991.25
0.00%
0.00%
32.22
159.62
0.48
8.49
71.12
5,469.99
3,412.68
85.43
1,637.98
2,322.07
-
32.22
159.62
0.48
8.49
71.12
-
5,469.99
3,412.68
85.43
1,637.98
2,322.07
-
1.46
5.85
73.52
29.16
100.00
916.06
1,852.53
1,138.00
439.59
175.91
0.00%
0.00%
75.01%
75.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
572
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
209.43
5,912.21
100.00%
0.70
17.47
191.06
69.36
100.00%
100.00%
29.74
806.29
8,861.33
3,620.24
29.74
806.29
8,861.33
3,620.24
0.00%
0.00%
16.30
129.67
1,952.62
5,112.01
6,535.37
7,751.90
16.30
129.67
1,952.62
5,112.01
6,535.37
7,751.90
0.00%
0.00%
0.00%
6.00
65.57
344.32
1,736.88
2,146.24
1,521.89
6.00
65.57
344.32
1,736.88
2,146.24
1,521.89
4.00
43.72
-
1,157.92
1,430.82
-
40.00%
40.00%
0.00%
573
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
-
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACUMULADO
Metrado
Parcial
-
Metrado
-
SALDO
Parcial
70.31
187.92
3,658.98
28,496.64
9,446.74
14,526.15
100.00%
100.00%
100.00%
2,996.41
11,895.75
2,996.41
11,895.75
17.72
189.75
-
7,522.49
9,971.36
-
100.00%
100.00%
0.00%
1,920.00
7,622.40
1,920.00
7,622.40
29.49
264.78
1,280.00
9,729.34
16,140.99
5,081.60
100.00%
100.00%
40.00%
0.45
2.25
114.05
24.76
282.98
1,220.81
2,357.23
148.46
119.90
452.78
7,748.89
10,665.52
4,846.62
5,751.64
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
374.48
15,821.78
100.00%
574
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
33.92
936.53
100.00%
374.48
4,752.15
100.00%
277.10
16.20
32.40
1,798.38
174.47
395.60
100.00%
100.00%
100.00%
20.30
34.08
54.50
2,177.78
2,204.29
203.29
20.00%
20.00%
20.00%
70.63
403.64
152.38
1,351.86
8,165.64
4,781.68
100.00%
100.00%
100.00%
81.20
136.31
217.98
8,711.14
8,816.53
813.07
-
81.20
136.31
217.98
-
8,711.14
8,816.53
813.07
-
575
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
276.94
160.50
242.41
37.50
11,963.81
1,967.73
1,544.15
1,516.50
100.00%
100.00%
100.00%
100.00%
285.23
9,637.92
100.00%
54.85
1,860.51
100.00%
254.19
4.74
6,192.07
236.62
100.00%
100.00%
254.19
11,769.00
100.00%
399.03
19,863.71
100.00%
70.63
3,758.22
100.00%
576
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
148.10
199.10
3,607.72
2,570.38
100.00%
100.00%
2.88
5.54
13.20
23.76
832.03
1,038.31
6,330.06
11,735.54
100.00%
100.00%
100.00%
100.00%
11.70
3,612.49
100.00%
90.99
7,258.27
100.00%
38.40
4,965.89
100.00%
6.00
419.70
100.00%
577
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
10.00
915.40
100.00%
180.00
22,460.40
100.00%
7.00
1,019.41
100.00%
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
5.00
13.00
30.05
105.69
100.00%
100.00%
580.53
518.12
3,825.69
2,974.01
100.00%
100.00%
11.70
26.37
124.72
479.14
100.00%
100.00%
578
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
38.40
89.10
247.68
261.06
100.00%
100.00%
1.00
1.00
124.22
29.70
640.10
640.10
3,035.94
522.13
100.00%
100.00%
100.00%
100.00%
1.00
5.64
1,094.93
5,027.16
100.00%
100.00%
2.00
3.00
6.00
3.00
551.70
792.69
1,188.48
1,352.16
100.00%
100.00%
100.00%
100.00%
579
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
11.00
3.00
5.00
494.89
140.52
203.70
100.00%
100.00%
100.00%
1.00
13.00
27.00
38.53
11.00
67.10
35.00
8.00
10.00
6.00
4.00
2.00
1.00
1.00
81.11
1,084.33
625.86
400.33
121.11
780.37
475.65
654.56
931.60
159.54
891.40
1,452.46
68.77
236.08
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
70.07
100.00%
580
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
-
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
7.00
AVANCE ACUMULADO
Metrado
Parcial
1,598.94
7.00
Metrado
1,598.94
SALDO
Parcial
13.00
6.00
6.00
17.34
17.34
23.80
29.46
57.80
1.00
6.00
2.00
2.00
-
1,198.34
456.36
59.52
431.07
359.28
521.93
789.82
3,462.80
33.70
261.30
93.22
223.26
-
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
22.40
95.44
87.20
625.63
4,307.21
14,004.32
100.00%
100.00%
100.00%
39.00
11.00
3,336.06
91.85
100.00%
100.00%
581
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
3.00
10.00
13.00
3.00
4.00
33.21
110.70
1,400.62
1,872.93
652.40
100.00%
100.00%
100.00%
100.00%
100.00%
18.15
18.15
50.50
10.00
451.21
376.07
737.30
259.90
100.00%
100.00%
100.00%
100.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
819.08
819.08
819.08
188.47
100.00%
100.00%
100.00%
100.00%
90.30
13.60
4,903.29
770.44
100.00%
100.00%
582
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
18.00
189.72
100.00%
3.00
15.00
18.00
4.00
412.80
2,200.65
2,196.90
288.76
100.00%
100.00%
100.00%
100.00%
15.00
60.00
3.00
3.00
3.00
4,067.85
3,558.00
2,161.02
228.81
1,016.94
15.00
60.00
3.00
3.00
3.00
4,067.85
3,558.00
2,161.02
228.81
1,016.94
0.00%
0.00%
0.00%
0.00%
0.00%
583
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
3.00
21.00
693.00
8,008.35
3.00
21.00
693.00
8,008.35
0.00%
0.00%
10.00
20.00
2,711.90
1,186.00
10.00
20.00
2,711.90
1,186.00
0.00%
0.00%
20.00
778.00
20.00
778.00
0.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
0.00%
0.00%
0.00%
0.00%
1.00
2,457.00
1.00
2,457.00
0.00%
1.00
2,095.80
1.00
2,095.80
0.00%
1.00
425.52
1.00
425.52
0.00%
1.00
6,932.88
1.00
6,932.88
0.00%
584
DE OBRA N 05
- CASA HOGAR DE MARIA
4/2015 AL 30/04/2015
DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SEGUNDO RUIZ RETEGUI
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
AVANCE ANTERIOR
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1.00
31,863.48
1.00
31,863.48
0.00%
1.00
2,514.03
1.00
2,514.03
0.00%
1.00
2,244.81
1.00
2,244.81
0.00%
1.00
1,494.72
1.00
1,494.72
0.00%
0.00
214,116.73
214,116.73
410,537.22
31,689.28
31,689.28
60,759.51
11,134.07
11,134.07
21,347.94
256,940.08
256,940.08
492,644.67
46,249.21
46,249.21
88,676.04
303,189.31
581,320.73
0.00
0.00
303,189.31
34.28%
65.72%
585
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.06
01.01.05
01.01.05.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
CARTEL DE OBRA 2.40M X 3.60M
CERCO PROVISIONAL DE ESTERAS
SERVICIOS HIGIENICOS
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
ENERGIA ELECTRICA PARA LA CONSTRUCCION
REMOCIONES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE DE TECHO DE ETERNIT/CALAMINA
DEMOLICCIONES
DEMOLICION DE PISO DE CONCRETO INC. F.P.
DEMOLICION MUROS DE ADOBE C/MAQUINA
ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION
ELIMINACION DE DEMOLICIONES
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
824.67
8.49
470.00
2,500.00
824.67
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
M2
17.55
19.28
328.19
4.44
2.67
1.56
77.92
51.48
511.98
M2
M3
M3
M3
66.30
182.42
234.82
234.82
4.96
6.99
15.54
17.39
328.85
1,275.12
3,649.10
4,083.52
1.00
6,373.32
6,373.32
GLB
586
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
Unidad
M2
M2
Metrado
PRESUPUESTO
Precio
Parcial
546.00
546.00
1.40
1.40
764.40
764.40
GLB
UND
GLB
GLB
GLB
1.00
25.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,750.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
GLB
1.00
1,030.00
1,030.00
M3
125.36
35.52
4,452.79
M3
105.23
15.54
1,635.27
M3
M2
49.46
112.85
12.46
11.38
616.27
1,284.23
M2
422.74
3.85
1,627.55
587
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
217.44
422.74
3.35
12.36
728.42
5,225.07
M3
M3
211.05
164.45
8.88
17.39
1,874.12
2,859.79
M3
M2
M3
M3
M3
M2
44.86
83.88
0.81
11.35
48.08
217.44
176.91
21.73
187.62
203.42
32.74
29.19
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
M3
KG
0.70
17.47
327.40
4.05
229.18
70.75
M3
KG
30.77
820.19
356.07
4.58
10,956.27
3,756.47
M3
17.74
371.73
6,594.49
588
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
KG
141.18
1,960.32
50.48
4.05
7,126.77
7,939.30
M3
M2
KG
14.61
153.57
474.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
M3
M2
KG
18.24
204.06
2,946.22
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
M3
M2
KG
30.75
267.58
3,558.10
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
589
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
Unidad
M3
M2
KG
M3
M2
KG
UND
Metrado
PRESUPUESTO
Precio
Parcial
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
388.03
53.40
4.05
371.07
37.77
4.05
2.83
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
M2
M
419.63
39.89
42.40
27.61
17,792.31
1,101.36
M2
419.63
12.71
5,333.50
205.53
6.83
1,403.77
M2
M2
KG
124.33
150.55
267.28
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
590
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
166.21
335.25
19.92
20.92
32.02
43.87
12.11
6.37
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
M2
234.68
34.51
8,098.81
M2
M2
213.09
7.46
26.28
51.92
5,600.01
387.32
M2
213.09
47.79
10,183.57
591
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
SARDINEL EN DUCHA REVESTIDO CON CERAMICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
ML
1.10
51.63
56.79
M2
199.02
55.95
11,135.17
M2
75.93
54.78
4,159.45
M
M
142.70
105.80
24.46
13.18
3,490.44
1,394.44
M2
M2
M2
M2
2.88
6.39
19.77
14.85
228.74
162.09
384.42
384.03
658.77
1,035.76
7,599.98
5,702.85
M2
11.70
308.78
3,612.73
M2
72.91
79.85
5,821.86
592
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
10.00
91.53
915.30
7.00
145.63
1,019.41
267.00
124.78
33,316.26
PZA.
PZA.
52.00
6.00
3.82
2.84
198.64
17.04
UND
13.00
53.79
699.27
UND
UND
3.00
13.00
6.01
8.13
18.03
105.69
595.15
6.59
3,922.04
M2
M2
593
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
611.44
5.74
3,509.67
M2
M2
11.70
38.34
10.65
18.17
124.61
696.64
105.80
2.93
309.99
GLB
GLB
M
M
1.00
1.00
124.62
44.40
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
PTO
M2
1.00
6.71
1,132.40
912.05
1,132.40
6,119.86
PZA
PTO
PTO
PTO
UND
3.00
3.00
7.00
3.00
6.00
277.29
265.67
198.08
450.72
44.99
831.87
797.01
1,386.56
1,352.16
269.94
594
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
DESCRIPCIN
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
3.00
1.00
1.00
6.00
1.00
46.84
80.73
44.52
40.78
71.65
140.52
80.73
44.52
244.68
71.65
UND
PTO
M
M
M
M
M
UND
UND
UND
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
8.00
81.11
83.41
23.18
10.39
11.01
11.63
13.59
82.28
97.28
26.79
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
214.32
595
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
DESCRIPCIN
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 4"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
TANQUE SEPTICO DE 5 M3
POZO PERCOLADOR
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
3.00
1.00
1.00
1.00
250.47
839.46
68.77
240.79
751.41
839.46
68.77
240.79
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1.00
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.33
244.23
6,425.02
1,419.70
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
1,419.70
596
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
MURETE F'C=140 KG/CM2 (1.80X0.70X0.30) TARRAJEO ENTERRADO 0.40
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P20 mm
TUBERIA PVC - P 35 mm
TUBERIA PVC - P 50 mm
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
M
M
33.60
79.94
85.95
25.08
45.13
169.00
842.69
3,607.69
14,525.55
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
85.54
8.35
11.07
11.07
107.74
624.31
290.85
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
M3
M3
M
M
M
18.43
18.43
29.00
12.14
31.10
24.86
20.72
11.12
14.60
25.99
458.17
381.87
322.48
177.24
808.29
597
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
M
M
M
21.17
14.15
16.85
54.45
56.65
21.08
1,152.71
801.60
355.20
18.00
10.54
189.72
UND
UND
UND
UND
5.00
11.00
16.00
5.00
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
UND
5.00
271.19
1,355.95
598
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
DESCRIPCIN
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
UND
20.00
1.00
1.00
1.00
1.00
7.00
59.30
720.34
76.27
338.98
231.00
381.35
1,186.00
720.34
76.27
338.98
231.00
2,669.45
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
1.00
3.00
720.34
76.27
720.34
228.81
599
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Parcial
UND
UND
2.00
1.00
231.00
120.00
462.00
120.00
GLB
1.00
2,457.00
2,457.00
GLB
1.00
698.60
698.60
GLB
1.00
141.84
141.84
UND
1.00
2,280.16
2,280.16
UND
1.00
10,621.16
10,621.16
UND
1.00
838.01
838.01
UND
1.00
748.27
748.27
UND
1.00
498.24
498.24
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
Metrado
PRESUPUESTO
Precio
549,552.27
0.1480
81,333.74
600
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
UTILIDAD (5.20 % CD)
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
0.0520
28,576.72
SUB TOTAL
I.G.V. 18%
659,462.73
0.1800
118,703.29
COSTO TOTAL
778,166.02
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
601
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Item
DESCRIPCIN
Unidad
Item
DESCRIPCIN
Unidad
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
Metrado
PRESUPUESTO
Precio
Parcial
Metrado
PRESUPUESTO
Precio
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
824.67
8.49
470.00
2,500.00
824.67
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
M2
17.55
19.28
328.19
4.44
2.67
1.56
77.92
51.48
511.98
M2
M3
66.30
182.42
4.96
6.99
328.85
1,275.12
602
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
Unidad
01.01.04.03
01.01.04.06
01.01.05
01.01.05.01
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
M3
M3
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
Metrado
PRESUPUESTO
Precio
Parcial
234.82
234.82
15.54
17.39
3,649.10
4,083.52
1.00
6,373.32
6,373.32
546.00
546.00
1.40
1.40
764.40
764.40
GLB
UND
GLB
GLB
GLB
1.00
25.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,750.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
GLB
1.00
1,030.00
1,030.00
M3
125.36
35.52
4,452.79
M3
105.23
15.54
1,635.27
GLB
M2
M2
603
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
SEMBRADO DE GRASS
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M3
M2
49.46
112.85
12.46
11.38
616.27
1,284.23
M2
M2
M2
422.74
217.44
422.74
3.85
3.35
12.36
1,627.55
728.42
5,225.07
M3
M3
211.05
164.45
8.88
17.39
1,874.12
2,859.79
M3
M2
M3
M3
M3
M2
44.86
83.88
0.81
11.35
48.08
217.44
176.91
21.73
187.62
203.42
32.74
29.19
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
M3
KG
0.70
17.47
327.40
4.05
229.18
70.75
604
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M3
KG
30.77
820.19
356.07
4.58
10,956.27
3,756.47
M3
M2
KG
17.74
141.18
1,960.32
371.73
50.48
4.05
6,594.49
7,126.77
7,939.30
M3
M2
KG
14.61
153.57
474.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
M3
M2
KG
18.24
204.06
2,946.22
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
M3
M2
KG
30.75
267.58
3,558.10
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
M3
M2
5.07
37.90
388.03
53.40
1,967.31
2,023.86
605
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
Unidad
KG
M3
M2
KG
UND
Metrado
PRESUPUESTO
Precio
Parcial
306.69
28.34
323.84
1,176.94
2,697.58
4.05
371.07
37.77
4.05
2.83
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
M2
M
419.63
39.89
42.40
27.61
17,792.31
1,101.36
M2
419.63
12.71
5,333.50
205.53
6.83
1,403.77
M2
M2
KG
124.33
150.55
267.28
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
M2
M2
75.93
464.36
19.92
20.92
1,512.53
9,714.41
606
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
SARDINEL EN DUCHA REVESTIDO CON CERAMICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M
M
147.08
276.67
166.21
335.25
32.02
43.87
12.11
6.37
4,709.50
12,137.51
2,012.80
2,135.54
M2
234.68
34.51
8,098.81
M2
M2
213.09
7.46
26.28
51.92
5,600.01
387.32
M2
213.09
47.79
10,183.57
ML
1.10
51.63
56.79
M2
199.02
55.95
11,135.17
M2
75.93
54.78
4,159.45
607
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
M
142.70
105.80
24.46
13.18
3,490.44
1,394.44
M2
M2
M2
M2
2.88
6.39
19.77
14.85
228.74
162.09
384.42
384.03
658.77
1,035.76
7,599.98
5,702.85
M2
11.70
308.78
3,612.73
M2
72.91
79.85
5,821.86
10.00
91.53
915.30
7.00
145.63
1,019.41
267.00
124.78
33,316.26
M2
608
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PZA.
PZA.
52.00
6.00
3.82
2.84
198.64
17.04
UND
13.00
53.79
699.27
UND
UND
3.00
13.00
6.01
8.13
18.03
105.69
M2
M2
595.15
611.44
6.59
5.74
3,922.04
3,509.67
M2
M2
11.70
38.34
10.65
18.17
124.61
696.64
105.80
2.93
309.99
GLB
GLB
M
M
1.00
1.00
124.62
44.40
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
609
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.11
03.11.01
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
DESCRIPCIN
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PTO
M2
1.00
6.71
1,132.40
912.05
1,132.40
6,119.86
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
277.29
265.67
198.08
450.72
44.99
46.84
80.73
44.52
40.78
71.65
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
UND
PTO
M
M
1.00
17.00
24.00
46.48
81.11
83.41
23.18
10.39
81.11
1,417.97
556.32
482.93
610
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
DESCRIPCIN
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
M
M
UND
UND
UND
UND
UND
UND
UND
7.50
53.30
57.25
8.00
8.00
8.00
3.00
1.00
1.00
1.00
11.01
11.63
13.59
82.28
97.28
26.79
250.47
839.46
68.77
240.79
82.58
619.88
778.03
658.24
778.24
214.32
751.41
839.46
68.77
240.79
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
611
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 4"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
TANQUE SEPTICO DE 5 M3
POZO PERCOLADOR
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
MURETE F'C=140 KG/CM2 (1.80X0.70X0.30) TARRAJEO ENTERRADO 0.40
BUZON
CANALIZACION Y/O TUBERIAS
Unidad
UND
UND
UND
UND
UND
UND
Metrado
PRESUPUESTO
Precio
Parcial
4.00
1.00
2.00
9.00
1.00
1.00
46.61
53.59
112.33
244.23
6,425.02
1,419.70
186.44
53.59
224.66
2,198.07
6,425.02
1,419.70
M
M
M
33.60
79.94
85.95
25.08
45.13
169.00
842.69
3,607.69
14,525.55
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
85.54
8.35
11.07
11.07
107.74
624.31
290.85
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
612
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P20 mm
TUBERIA PVC - P 35 mm
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
Unidad
M3
M3
M
M
M
Metrado
PRESUPUESTO
Precio
Parcial
18.43
18.43
29.00
12.14
31.10
24.86
20.72
11.12
14.60
25.99
458.17
381.87
322.48
177.24
808.29
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
M
M
M
21.17
14.15
16.85
54.45
56.65
21.08
1,152.71
801.60
355.20
18.00
10.54
189.72
UND
UND
5.00
11.00
137.60
146.71
688.00
1,613.81
613
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.07.03
05.07.04
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
DESCRIPCIN
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
16.00
5.00
122.05
72.19
1,952.80
360.95
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
614
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.05
06.05.01
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
1.00
2,457.00
2,457.00
GLB
1.00
698.60
698.60
GLB
1.00
141.84
141.84
UND
1.00
2,280.16
2,280.16
UND
1.00
10,621.16
10,621.16
UND
1.00
838.01
838.01
UND
1.00
748.27
748.27
UND
1.00
498.24
498.24
COSTO DIRECTO
549,552.27
0.1480
81,333.74
0.0520
28,576.72
615
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
SUB TOTAL
I.G.V. 18%
659,462.73
0.1800
118,703.29
COSTO TOTAL
778,166.02
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
616
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Item
DESCRIPCIN
Unidad
Item
DESCRIPCIN
Unidad
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.06
Metrado
Metrado
PRESUPUESTO
Precio
PRESUPUESTO
Precio
Parcial
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
824.67
8.49
470.00
2,500.00
824.67
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
M2
17.55
19.28
328.19
4.44
2.67
1.56
77.92
51.48
511.98
M2
M3
M3
M3
66.30
182.42
234.82
234.82
4.96
6.99
15.54
17.39
328.85
1,275.12
3,649.10
4,083.52
617
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
01.01.05
01.01.05.01
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.01.03.02
Unidad
GLB
Metrado
PRESUPUESTO
Precio
Parcial
1.00
6,373.32
6,373.32
546.00
546.00
1.40
1.40
764.40
764.40
GLB
UND
GLB
GLB
GLB
1.00
25.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,750.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
GLB
1.00
1,030.00
1,030.00
M3
125.36
35.52
4,452.79
M3
105.23
15.54
1,635.27
M3
M2
49.46
112.85
12.46
11.38
616.27
1,284.23
M2
M2
618
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M2
422.74
217.44
422.74
3.85
3.35
12.36
1,627.55
728.42
5,225.07
M3
M3
211.05
164.45
8.88
17.39
1,874.12
2,859.79
M3
M2
M3
M3
M3
M2
44.86
83.88
0.81
11.35
48.08
217.44
176.91
21.73
187.62
203.42
32.74
29.19
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
M3
KG
0.70
17.47
327.40
4.05
229.18
70.75
M3
KG
30.77
820.19
356.07
4.58
10,956.27
3,756.47
619
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M3
M2
KG
17.74
141.18
1,960.32
371.73
50.48
4.05
6,594.49
7,126.77
7,939.30
M3
M2
KG
14.61
153.57
474.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
M3
M2
KG
18.24
204.06
2,946.22
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
M3
M2
KG
30.75
267.58
3,558.10
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
M3
M2
KG
M3
5.07
37.90
306.69
28.34
388.03
53.40
4.05
371.07
1,967.31
2,023.86
1,242.09
10,516.12
620
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
Unidad
M2
KG
UND
Metrado
PRESUPUESTO
Precio
Parcial
323.84
1,176.94
2,697.58
37.77
4.05
2.83
12,231.44
4,766.61
7,634.15
M2
M
419.63
39.89
42.40
27.61
17,792.31
1,101.36
M2
419.63
12.71
5,333.50
205.53
6.83
1,403.77
M2
M2
KG
124.33
150.55
267.28
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
M2
M2
M2
M2
75.93
464.36
147.08
276.67
19.92
20.92
32.02
43.87
1,512.53
9,714.41
4,709.50
12,137.51
621
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
SARDINEL EN DUCHA REVESTIDO CON CERAMICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
M
166.21
335.25
12.11
6.37
2,012.80
2,135.54
M2
234.68
34.51
8,098.81
M2
M2
213.09
7.46
26.28
51.92
5,600.01
387.32
M2
213.09
47.79
10,183.57
ML
1.10
51.63
56.79
M2
199.02
55.95
11,135.17
M2
75.93
54.78
4,159.45
M
M
142.70
105.80
24.46
13.18
3,490.44
1,394.44
622
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M2
M2
2.88
6.39
19.77
14.85
228.74
162.09
384.42
384.03
658.77
1,035.76
7,599.98
5,702.85
M2
11.70
308.78
3,612.73
M2
72.91
79.85
5,821.86
10.00
91.53
915.30
7.00
145.63
1,019.41
267.00
124.78
33,316.26
52.00
6.00
3.82
2.84
198.64
17.04
M2
PZA.
PZA.
623
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.08.02
03.08.02.01
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
13.00
53.79
699.27
UND
UND
3.00
13.00
6.01
8.13
18.03
105.69
M2
M2
595.15
611.44
6.59
5.74
3,922.04
3,509.67
M2
M2
11.70
38.34
10.65
18.17
124.61
696.64
105.80
2.93
309.99
GLB
GLB
M
M
1.00
1.00
124.62
44.40
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
PTO
1.00
1,132.40
1,132.40
624
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.11.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
6.71
912.05
6,119.86
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
277.29
265.67
198.08
450.72
44.99
46.84
80.73
44.52
40.78
71.65
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
UND
PTO
M
M
M
M
1.00
17.00
24.00
46.48
7.50
53.30
81.11
83.41
23.18
10.39
11.01
11.63
81.11
1,417.97
556.32
482.93
82.58
619.88
625
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
DESCRIPCIN
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 4"
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M
UND
UND
UND
UND
UND
UND
UND
57.25
8.00
8.00
8.00
3.00
1.00
1.00
1.00
13.59
82.28
97.28
26.79
250.47
839.46
68.77
240.79
778.03
658.24
778.24
214.32
751.41
839.46
68.77
240.79
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
626
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.03.13
04.03.14
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
TANQUE SEPTICO DE 5 M3
POZO PERCOLADOR
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
MURETE F'C=140 KG/CM2 (1.80X0.70X0.30) TARRAJEO ENTERRADO 0.40
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
Unidad
UND
UND
UND
UND
Metrado
PRESUPUESTO
Precio
Parcial
2.00
9.00
1.00
1.00
112.33
244.23
6,425.02
1,419.70
224.66
2,198.07
6,425.02
1,419.70
M
M
M
33.60
79.94
85.95
25.08
45.13
169.00
842.69
3,607.69
14,525.55
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
85.54
8.35
11.07
11.07
107.74
624.31
290.85
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
M3
M3
18.43
18.43
24.86
20.72
458.17
381.87
627
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.02.03
05.02.04
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
TUBERIA PVC - P20 mm
TUBERIA PVC - P 35 mm
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
Unidad
M
M
M
Metrado
PRESUPUESTO
Precio
Parcial
29.00
12.14
31.10
11.12
14.60
25.99
322.48
177.24
808.29
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
M
M
M
21.17
14.15
16.85
54.45
56.65
21.08
1,152.71
801.60
355.20
18.00
10.54
189.72
UND
UND
UND
UND
5.00
11.00
16.00
5.00
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
628
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
DESCRIPCIN
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
GLB
1.00
2,457.00
2,457.00
629
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
1.00
698.60
698.60
GLB
1.00
141.84
141.84
UND
1.00
2,280.16
2,280.16
UND
1.00
10,621.16
10,621.16
UND
1.00
838.01
838.01
UND
1.00
748.27
748.27
UND
1.00
498.24
498.24
COSTO DIRECTO
549,552.27
0.1480
81,333.74
0.0520
28,576.72
SUB TOTAL
I.G.V. 18%
659,462.73
0.1800
118,703.29
630
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
COSTO TOTAL
778,166.02
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
631
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.06
01.01.05
01.01.05.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
CARTEL DE OBRA 2.40M X 3.60M
CERCO PROVISIONAL DE ESTERAS
SERVICIOS HIGIENICOS
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
ENERGIA ELECTRICA PARA LA CONSTRUCCION
REMOCIONES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE DE TECHO DE ETERNIT/CALAMINA
DEMOLICCIONES
DEMOLICION DE PISO DE CONCRETO INC. F.P.
DEMOLICION MUROS DE ADOBE C/MAQUINA
ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION
ELIMINACION DE DEMOLICIONES
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
824.67
8.49
470.00
2,500.00
824.67
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
M2
17.55
19.28
328.19
4.44
2.67
1.56
77.92
51.48
511.98
M2
M3
M3
M3
66.30
182.42
234.82
234.82
4.96
6.99
15.54
17.39
328.85
1,275.12
3,649.10
4,083.52
1.00
6,373.32
6,373.32
GLB
632
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
01.01.06
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
Unidad
M2
M2
Metrado
PRESUPUESTO
Precio
Parcial
546.00
546.00
1.40
1.40
764.40
764.40
GLB
UND
GLB
GLB
GLB
1.00
25.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,750.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
GLB
1.00
1,030.00
1,030.00
M3
125.36
35.52
4,452.79
M3
105.23
15.54
1,635.27
M3
M2
49.46
112.85
12.46
11.38
616.27
1,284.23
M2
422.74
3.85
1,627.55
633
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
217.44
422.74
3.35
12.36
728.42
5,225.07
M3
M3
211.05
164.45
8.88
17.39
1,874.12
2,859.79
M3
M2
M3
M3
M3
M2
44.86
83.88
0.81
11.35
48.08
217.44
176.91
21.73
187.62
203.42
32.74
29.19
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
M3
KG
0.70
17.47
327.40
4.05
229.18
70.75
M3
KG
30.77
820.19
356.07
4.58
10,956.27
3,756.47
M3
17.74
371.73
6,594.49
634
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
KG
141.18
1,960.32
50.48
4.05
7,126.77
7,939.30
M3
M2
KG
14.61
153.57
474.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
M3
M2
KG
18.24
204.06
2,946.22
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
M3
M2
KG
30.75
267.58
3,558.10
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
M3
M2
KG
M3
M2
KG
5.07
37.90
306.69
28.34
323.84
1,176.94
388.03
53.40
4.05
371.07
37.77
4.05
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
635
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
Unidad
UND
Metrado
PRESUPUESTO
Precio
Parcial
2,697.58
2.83
7,634.15
M2
M
419.63
39.89
42.40
27.61
17,792.31
1,101.36
M2
419.63
12.71
5,333.50
205.53
6.83
1,403.77
M2
M2
KG
124.33
150.55
267.28
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
166.21
335.25
19.92
20.92
32.02
43.87
12.11
6.37
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
636
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
SARDINEL EN DUCHA REVESTIDO CON CERAMICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
234.68
34.51
8,098.81
M2
M2
213.09
7.46
26.28
51.92
5,600.01
387.32
M2
213.09
47.79
10,183.57
ML
1.10
51.63
56.79
M2
199.02
55.95
11,135.17
M2
75.93
54.78
4,159.45
M
M
142.70
105.80
24.46
13.18
3,490.44
1,394.44
637
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M2
M2
2.88
6.39
19.77
14.85
228.74
162.09
384.42
384.03
658.77
1,035.76
7,599.98
5,702.85
M2
11.70
308.78
3,612.73
M2
72.91
79.85
5,821.86
10.00
91.53
915.30
7.00
145.63
1,019.41
267.00
124.78
33,316.26
PZA.
PZA.
52.00
6.00
3.82
2.84
198.64
17.04
UND
13.00
53.79
699.27
M2
638
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.08.03
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
ACCESORIOS DE CIERRE
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
Unidad
UND
UND
Metrado
PRESUPUESTO
Precio
Parcial
3.00
13.00
6.01
8.13
18.03
105.69
M2
M2
595.15
611.44
6.59
5.74
3,922.04
3,509.67
M2
M2
11.70
38.34
10.65
18.17
124.61
696.64
105.80
2.93
309.99
GLB
GLB
M
M
1.00
1.00
124.62
44.40
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
PTO
M2
1.00
6.71
1,132.40
912.05
1,132.40
6,119.86
639
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
DESCRIPCIN
APARATOS SANITARIOS Y ACCESORIOS
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
277.29
265.67
198.08
450.72
44.99
46.84
80.73
44.52
40.78
71.65
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
UND
PTO
M
M
M
M
M
UND
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
81.11
83.41
23.18
10.39
11.01
11.63
13.59
82.28
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
640
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
DESCRIPCIN
VALVULA DE COMPUERTA DE BRONCE 1"
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 4"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
UND
8.00
8.00
3.00
1.00
1.00
1.00
97.28
26.79
250.47
839.46
68.77
240.79
778.24
214.32
751.41
839.46
68.77
240.79
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.33
244.23
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
641
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.03.15
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
TANQUE SEPTICO DE 5 M3
POZO PERCOLADOR
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
MURETE F'C=140 KG/CM2 (1.80X0.70X0.30) TARRAJEO ENTERRADO 0.40
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P20 mm
TUBERIA PVC - P 35 mm
Unidad
UND
UND
Metrado
PRESUPUESTO
Precio
Parcial
1.00
1.00
6,425.02
1,419.70
6,425.02
1,419.70
M
M
M
33.60
79.94
85.95
25.08
45.13
169.00
842.69
3,607.69
14,525.55
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
85.54
8.35
11.07
11.07
107.74
624.31
290.85
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
M3
M3
M
M
18.43
18.43
29.00
12.14
24.86
20.72
11.12
14.60
458.17
381.87
322.48
177.24
642
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.02.05
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
Unidad
M
Metrado
PRESUPUESTO
Precio
Parcial
31.10
25.99
808.29
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
M
M
M
21.17
14.15
16.85
54.45
56.65
21.08
1,152.71
801.60
355.20
18.00
10.54
189.72
UND
UND
UND
UND
5.00
11.00
16.00
5.00
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
643
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
DESCRIPCIN
MESAS PARA NIOS
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
UND
UND
5.00
20.00
1.00
1.00
1.00
1.00
7.00
271.19
59.30
720.34
76.27
338.98
231.00
381.35
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
GLB
1.00
2,457.00
2,457.00
644
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
1.00
698.60
698.60
GLB
1.00
141.84
141.84
UND
1.00
2,280.16
2,280.16
UND
1.00
10,621.16
10,621.16
UND
1.00
838.01
838.01
UND
1.00
748.27
748.27
UND
1.00
498.24
498.24
COSTO DIRECTO
549,552.27
0.1480
81,333.74
0.0520
28,576.72
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
659,462.73
0.1800
118,703.29
778,166.02
645
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
646
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.06
01.01.05
01.01.05.01
01.01.06
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES
CONSTRUCCIONES PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
CARTEL DE OBRA 2.40M X 3.60M
CERCO PROVISIONAL DE ESTERAS
SERVICIOS HIGIENICOS
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCION
ENERGIA ELECTRICA PARA LA CONSTRUCCION
REMOCIONES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE DE TECHO DE ETERNIT/CALAMINA
DEMOLICCIONES
DEMOLICION DE PISO DE CONCRETO INC. F.P.
DEMOLICION MUROS DE ADOBE C/MAQUINA
ACARREO INTERNO, MAT. PROCEDENTE DE DEMOLICION
ELIMINACION DE DEMOLICIONES
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
TRAZO, NIVELES Y REPLANTEO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
UND
ML
GLB
1.00
1.00
200.00
1.00
2,500.00
824.67
8.49
470.00
2,500.00
824.67
1,698.00
470.00
GLB
GLB
1.00
1.00
154.61
339.54
154.61
339.54
M2
M2
M2
17.55
19.28
328.19
4.44
2.67
1.56
77.92
51.48
511.98
M2
M3
M3
M3
66.30
182.42
234.82
234.82
4.96
6.99
15.54
17.39
328.85
1,275.12
3,649.10
4,083.52
1.00
6,373.32
6,373.32
GLB
647
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
Unidad
01.01.06.01
01.01.06.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
M2
M2
01.02.06
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.01.03.02
02.01.04
02.01.04.01
02.01.04.02
Metrado
PRESUPUESTO
Precio
Parcial
546.00
546.00
1.40
1.40
764.40
764.40
GLB
UND
GLB
GLB
GLB
1.00
25.00
1.00
1.00
1.00
1,500.00
108.85
1,050.00
725.00
1,750.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
GLB
1.00
1,030.00
1,030.00
M3
125.36
35.52
4,452.79
M3
105.23
15.54
1,635.27
M3
M2
49.46
112.85
12.46
11.38
616.27
1,284.23
M2
M2
422.74
217.44
3.85
3.35
1,627.55
728.42
648
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
SOBRECIMIENTO, CONCRETO 1:8+25% P.M. F'C>=100 Kg/cm2
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
CIMIENTOS REFORZADOS
CIMIENTOS REFORZADOS, CONCRETO F'C=175 Kg/cm2
CIMIENTOS REFORZADOS, ACEROS FY=4200 Kg/cm2
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
422.74
12.36
5,225.07
M3
M3
211.05
164.45
8.88
17.39
1,874.12
2,859.79
M3
M2
M3
M3
M3
M2
44.86
83.88
0.81
11.35
48.08
217.44
176.91
21.73
187.62
203.42
32.74
29.19
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
M3
KG
0.70
17.47
327.40
4.05
229.18
70.75
M3
KG
30.77
820.19
356.07
4.58
10,956.27
3,756.47
M3
M2
17.74
141.18
371.73
50.48
6,594.49
7,126.77
649
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.01
02.03.07.02
02.03.07.03
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSAS MACIZAS - CONCRETO F'C=201 Kg/cm2 - 01 PISO
LOSAS MACIZAS - ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
KG
1,960.32
4.05
7,939.30
M3
M2
KG
14.61
153.57
474.30
343.94
32.82
4.50
5,024.96
5,040.17
2,134.35
M3
M2
KG
18.24
204.06
2,946.22
482.63
52.65
4.05
8,803.17
10,743.76
11,932.19
M3
M2
KG
30.75
267.58
3,558.10
388.03
61.09
4.05
11,931.92
16,346.46
14,410.31
M3
M2
KG
M3
M2
KG
UND
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
388.03
53.40
4.05
371.07
37.77
4.05
2.83
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
650
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M
419.63
39.89
42.40
27.61
17,792.31
1,101.36
M2
419.63
12.71
5,333.50
205.53
6.83
1,403.77
M2
M2
KG
124.33
150.55
267.28
128.16
76.06
3.77
15,934.13
11,450.83
1,007.65
M2
M2
M2
M2
M
M
75.93
464.36
147.08
276.67
166.21
335.25
19.92
20.92
32.02
43.87
12.11
6.37
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
651
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
SARDINELES
SARDINEL EN DUCHA REVESTIDO CON CERAMICA
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CN C/TRIPLAY 9mm (1.40m x 1.60m), CAB. SS.HH. 780
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
234.68
34.51
8,098.81
M2
M2
213.09
7.46
26.28
51.92
5,600.01
387.32
M2
213.09
47.79
10,183.57
ML
1.10
51.63
56.79
M2
199.02
55.95
11,135.17
M2
75.93
54.78
4,159.45
M
M
142.70
105.80
24.46
13.18
3,490.44
1,394.44
2.88
228.74
658.77
M2
652
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.06.01.02
03.06.01.03
03.06.01.04
03.07
03.07.01
03.07.01.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.08
03.08.01
03.08.01.01
03.08.01.02
03.08.02
03.08.02.01
03.08.03
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
PUERTA CEDRO MACHIMBRADA C/VISOR - AULA 2006
CARPINTERIA METALICA Y HERRERIA
PUERTAS DE FIERRO
PUERTA DE INGRESO PRINCIPAL CON PERFILES 3/16"
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
ESCALERA
ESCALERA GATO, TUBO F G 1 1/2" Y 1" TANQUE ELEVADO
CERCOS
CERCO MALLA ELECT. 2" x 2" C/PERFIL .COLUM.FG ESTNDAR 2"(SISTEMIC).
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 3" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
M2
M2
M2
6.39
19.77
14.85
162.09
384.42
384.03
1,035.76
7,599.98
5,702.85
M2
11.70
308.78
3,612.73
M2
72.91
79.85
5,821.86
10.00
91.53
915.30
7.00
145.63
1,019.41
267.00
124.78
33,316.26
PZA.
PZA.
52.00
6.00
3.82
2.84
198.64
17.04
UND
13.00
53.79
699.27
M2
653
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.08.03.01
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.01
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.01
03.10.02
03.10.03
03.10.04
03.11
03.11.01
03.11.02
04
04.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CERROJO DE 3" ALUMINIZADO PARA PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS - EN PTA/VENT.
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA
LIMPIEZA FINAL DE LA OBRA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
ASTA DE BANDERA TIPICO
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
Unidad
UND
UND
Metrado
PRESUPUESTO
Precio
Parcial
3.00
13.00
6.01
8.13
18.03
105.69
M2
M2
595.15
611.44
6.59
5.74
3,922.04
3,509.67
M2
M2
11.70
38.34
10.65
18.17
124.61
696.64
105.80
2.93
309.99
GLB
GLB
M
M
1.00
1.00
124.62
44.40
640.10
640.10
24.49
17.58
640.10
640.10
3,051.94
780.55
PTO
M2
1.00
6.71
1,132.40
912.05
1,132.40
6,119.86
654
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.01.08
04.01.09
04.01.10
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
DESCRIPCIN
INODORO BLANCO D/LOSA 1RA. NACIONAL + T.ALTO DE PVC INC. ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1RA. CALIDAD P/NIOS (NAC. BLANCO)
LAVATORIO DE LOSA BLANCA DE PRIMERA 545mm X 460mm
LAVADERO ACERO INOXIDABLE PARA COCINA
GRIFERA PARA LAVATORIO
GRIFERA PARA LAVADERO
DUCHA SIMPLE CON GRIFERIA
JABONERA LOSA BLANCA
PAPELERA DE CERAMICA
ESPEJO CON MARCO DE CEDRO
SISTEMA DE AGUA FRIA, AGUA CALIENTE Y CONTRA INCENDIOS
SISTEMA DE AGUA FRIA
EMPALME A RED EXISTENTE, AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA DE FG 1"
TUBERIA PVC CLASE 10 - 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 - 3/4" ROSCADA
TUBERIA PVC CLASE 10 - 1" ROSCADA
TUBERIA PVC CLASE 10 - 1 1/4" ROSCADA
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA DE COMPUERTA DE BRONCE 1"
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
PZA
PTO
PTO
PTO
UND
UND
UND
UND
UND
UND
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
277.29
265.67
198.08
450.72
44.99
46.84
80.73
44.52
40.78
71.65
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
UND
PTO
M
M
M
M
M
UND
UND
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
81.11
83.41
23.18
10.39
11.01
11.63
13.59
82.28
97.28
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
655
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06
04.03.07
04.03.08
04.03.09
04.03.10
04.03.11
04.03.12
04.03.13
04.03.14
04.03.15
DESCRIPCIN
CAJA PARA VALVULA (NICHO DE MAYOLICA)
CAJA DE VALVULAS BY PASS DE CONCRETO
TANQUE POLIETILENO DE 2500 Lts
REBOSE DE TANQUE ALTO DE FG Y 2"
LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJA CONC. F'C=175 Kg/cm2 S/D
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
SOMBRERO PARA VENTILACION EN PVC
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - SAP 2" RED EXTERIOR
TUBERIA PVC - SAP 4" RED EXTERIOR
TUBERIA PVC - SAP 6" RED EXTERIOR
REGISTRO DE BRONCE 2"
REGISTRO DE BRONCE 4"
SUMIDERO DE BRONCE 2"
SUMIDERO DE BRONCE 4"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REGISTRO DE ALB.DE 12" X 24" C/ TRAPA CONCRETO
TANQUE SEPTICO DE 5 M3
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
8.00
3.00
1.00
1.00
1.00
26.79
250.47
839.46
68.77
240.79
214.32
751.41
839.46
68.77
240.79
PTO
PTO
UND
M3
M3
M
M
M
UND
UND
UND
UND
UND
UND
UND
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
92.14
76.06
9.92
24.86
20.72
21.93
26.81
59.91
33.70
43.55
46.61
53.59
112.33
244.23
6,425.02
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
656
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.03.16
04.04
04.04.01
04.04.02
04.04.03
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.01.07
05.01.08
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
POZO PERCOLADOR
SISTEMA DE DRENAJE PLUVIAL
TUBERIA DE BAJADA PVC - SAP 3" P/ LLUVIAS
CANALETA DE FIERRO GALVANIZADO
CANALETA DE CONC. 175 P/ EVAC, PLUVIAL CON RELLIJA (Y-Y)
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
MURETE F'C=140 KG/CM2 (1.80X0.70X0.30) TARRAJEO ENTERRADO 0.40
BUZON
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P20 mm
TUBERIA PVC - P 35 mm
TUBERIA PVC - P 50 mm
Unidad
UND
Metrado
PRESUPUESTO
Precio
Parcial
1.00
1,419.70
1,419.70
M
M
M
33.60
79.94
85.95
25.08
45.13
169.00
842.69
3,607.69
14,525.55
PTO
PTO
PTO
PTO
UND
UND
UND
UND
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
85.54
8.35
11.07
11.07
107.74
624.31
290.85
163.10
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
M3
M3
M
M
M
18.43
18.43
29.00
12.14
31.10
24.86
20.72
11.12
14.60
25.99
458.17
381.87
322.48
177.24
808.29
657
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.03
05.03.01
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.03
05.07.04
06
06.01
06.01.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
DESCRIPCIN
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 4-2x16 A, 1-IDF 25AMP
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TAB. AUT. 2-2x20, 1-2x16A 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*6+1*6(N)+1*6(T)]mm2
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
ALIM. CAB. N2XH*[2-1*4+1*4(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 2/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ. MET. EMPOTRADO AF SIMILAR RES-M-MS-122
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
EQUIPAMIENTO CON MOBILIARIO
EQUIPAMIENTO EN AMBIENTES DE CLASE
MESAS PARA NIOS
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
1.00
86.73
86.73
UND
UND
UND
UND
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
872.53
872.53
872.53
188.47
M
M
M
21.17
14.15
16.85
54.45
56.65
21.08
1,152.71
801.60
355.20
18.00
10.54
189.72
UND
UND
UND
UND
5.00
11.00
16.00
5.00
137.60
146.71
122.05
72.19
688.00
1,613.81
1,952.80
360.95
UND
5.00
271.19
1,355.95
658
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.02
06.02.01
06.02.02
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.05
06.05.01
07
07.01
07.01.01
DESCRIPCIN
SILLAS PARA NIOS
ESCRITORIOS
SILLAS PARA PROFESORES
PIZARRAS ACRILICAS
ESTANTES
MUEBLES DE MADERA PARA SECTORES EDUCATIVOS
EQUIPAMIENTO COMEDOR
MESAS PARA COMEDOR
SILLAS PARA COMEDOR
EQUIPAMIENTO EN SUM
SILLAS PLASTICAS PARA SUM
EQUIPAMIENTO EN DIRECCION
ESCRITORIOS
SILLAS
ESTANTES
BOTIQUIN BASICO PRIMEROS AUXILIOS
EQUIPAMIENTO AREA DE JUEGOS
JUEGOS RECREATIVOS
IMPLEMENTACION DE KITS Y MODULOS EDUCATIVOS ADECUADOS
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
IMPLEMENTACION DE KITS BASICO PARA ESTUDIANTES
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
UND
UND
UND
UND
UND
UND
20.00
1.00
1.00
1.00
1.00
7.00
59.30
720.34
76.27
338.98
231.00
381.35
1,186.00
720.34
76.27
338.98
231.00
2,669.45
UND
UND
10.00
20.00
271.19
59.30
2,711.90
1,186.00
UND
20.00
38.90
778.00
UND
UND
UND
UND
1.00
3.00
2.00
1.00
720.34
76.27
231.00
120.00
720.34
228.81
462.00
120.00
GLB
1.00
2,457.00
2,457.00
GLB
1.00
698.60
698.60
659
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.07
07.01.01
DESCRIPCIN
KIT DE MATERIAL DIDACTICO PARA AULAS
KIT DE MATERIAL DIDACTICO PARA AULAS
IMPLEMENTACION DE MODULO DE COMUNICACIN
IMPLEMENTACION MODULO DE COMUNICACIN
IMPLEMENTACION DE MODULO DE MATEMATICA
IMPLEMENTACION MODULO DE MATEMATICA
IMPLEMENTACION DE MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION MODULO DE CIENCIA Y AMBIENTE
IMPLEMENTACION DE MODULO PSICOMOTRICIDAD
IMPLEMENTACION MODULO DE PSICOMOTRICIDAD
IMPLEMENTACION DE MODULO DE BIBLIOTECA DE AULA
IMPLMENTACION MODULO DE BIBLIOTECA DE AULA
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
GLB
1.00
141.84
141.84
UND
1.00
2,280.16
2,280.16
UND
1.00
10,621.16
10,621.16
UND
1.00
838.01
838.01
UND
1.00
748.27
748.27
UND
1.00
498.24
498.24
COSTO DIRECTO
549,552.27
0.1480
81,333.74
0.0520
28,576.72
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
659,462.73
0.1800
118,703.29
778,166.02
660
VALORIZACION DE OBRA N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
Parcial
661
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
0.25
1.00
200.00
1.00
625.00
824.67
1,698.00
470.00
0.25
1.00
200.00
1.00
625.00
824.67
1,698.00
470.00
1.00
1.00
154.61
339.54
1.00
1.00
154.61
339.54
0.75
-
1,875.00
-
75.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17.55
19.28
328.19
77.92
51.48
511.98
100.00%
100.00%
100.00%
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
100.00%
100.00%
100.00%
100.00%
0.50
3,186.66
50.00%
0.50
3,186.66
0.50
3,186.66
662
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
546.00
546.00
764.40
764.40
546.00
546.00
764.40
764.40
0.50
25.00
1.00
1.00
1.00
750.00
2,721.25
1,050.00
725.00
1,750.00
0.50
25.00
1.00
1.00
1.00
750.00
2,721.25
1,050.00
725.00
1,750.00
0.50
-
750.00
-
50.00%
0.00%
0.00%
0.00%
0.00%
0.50
515.00
0.50
515.00
0.50
515.00
50.00%
125.36
4,452.79
125.36
4,452.79
0.00%
105.23
1,635.27
105.23
1,635.27
0.00%
422.74
1,627.55
422.74
1,627.55
49.46
112.85
-
616.27
1,284.23
-
0.00%
0.00%
100.00%
100.00%
0.00%
663
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
-
217.44
422.74
728.42
5,225.07
217.44
422.74
728.42
5,225.07
168.84
131.56
1,499.30
2,287.83
168.84
131.56
1,499.30
2,287.83
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.70
17.47
229.18
70.75
0.70
17.47
229.18
70.75
0.00%
0.00%
30.77
820.19
10,956.27
3,756.47
30.77
820.19
10,956.27
3,756.47
0.00%
0.00%
17.74
6,594.49
17.74
6,594.49
0.00%
42.21
32.89
374.82
571.96
0.00%
0.00%
20.00%
20.00%
664
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
141.18
1,960.32
7,126.77
7,939.30
141.18
1,960.32
7,126.77
7,939.30
0.00%
0.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
0.00%
0.00%
0.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
0.00%
0.00%
0.00%
12.30
107.03
3,558.10
4,772.77
6,538.46
14,410.31
12.30
107.03
3,558.10
4,772.77
6,538.46
14,410.31
18.45
160.55
-
7,159.15
9,808.00
-
60.00%
60.00%
0.00%
665
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
5.07
37.90
306.69
1,176.94
2,697.58
1,967.31
2,023.86
1,242.09
4,766.61
7,634.15
5.07
37.90
306.69
1,176.94
2,697.58
1,967.31
2,023.86
1,242.09
4,766.61
7,634.15
28.34
323.84
-
10,516.12
12,231.44
-
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
251.77
23.93
10,675.05
660.71
251.77
23.93
10,675.05
660.71
167.86
15.96
7,117.26
440.66
40.00%
40.01%
293.74
3,733.44
293.74
3,733.44
125.89
1,600.06
30.00%
205.53
1,403.77
100.00%
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
0.00%
0.00%
0.00%
666
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
234.68
8,098.81
100.00%
213.09
7.46
5,600.01
387.32
100.00%
100.00%
85.24
4,073.62
40.00%
127.85
6,109.95
127.85
6,109.95
667
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.10
56.79
100.00%
199.02
11,135.17
100.00%
75.93
4,159.45
100.00%
142.70
105.80
3,490.44
1,394.44
100.00%
100.00%
2.88
6.39
19.77
14.85
658.77
1,035.76
7,599.98
5,702.85
100.00%
100.00%
100.00%
100.00%
4.68
1,445.09
40.00%
72.91
5,821.86
100.00%
7.02
-
2,167.64
-
7.02
-
2,167.64
-
668
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
10.00
915.30
100.00%
7.00
1,019.41
100.00%
106.80
13,326.50
40.00%
160.20
19,989.76
160.20
19,989.76
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
3.00
13.00
18.03
105.69
100.00%
100.00%
595.15
3,922.04
100.00%
669
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
611.44
3,509.67
100.00%
11.70
38.34
124.61
696.64
100.00%
100.00%
105.80
309.99
100.00%
1.00
1.00
124.62
44.40
640.10
640.10
3,051.94
780.55
100.00%
100.00%
100.00%
100.00%
1.00
6.71
1,132.40
6,119.86
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
831.87
797.01
1,386.56
1,352.16
269.94
100.00%
100.00%
100.00%
100.00%
100.00%
670
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
-
1.00
17.00
24.00
46.48
7.50
53.20
57.25
8.00
8.00
-
AVANCE ACUMULADO
Metrado
Parcial
-
81.11
1,417.97
556.32
482.93
82.58
618.72
778.03
658.24
778.24
-
1.00
17.00
24.00
46.48
7.50
53.20
57.25
8.00
8.00
-
Metrado
-
81.11
1,417.97
556.32
482.93
82.58
618.72
778.03
658.24
778.24
-
SALDO
Parcial
3.00
1.00
1.00
6.00
1.00
140.52
80.73
44.52
244.68
71.65
100.00%
100.00%
100.00%
100.00%
100.00%
0.10
8.00
1.16
214.32
0.00%
0.00%
0.00%
0.00%
0.00%
0.19%
0.00%
0.00%
0.00%
100.00%
671
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.00
1.00
1.00
839.46
68.77
240.79
1.00
1.00
1.00
839.46
68.77
240.79
3.00
-
751.41
-
100.00%
0.00%
0.00%
0.00%
14.00
7.00
7.00
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
-
1,289.96
532.42
69.44
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
-
14.00
7.00
7.00
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
-
1,289.96
532.42
69.44
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
-
16.64
16.64
1.00
1.00
413.67
344.78
6,425.02
1,419.70
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
672
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
33.60
47.96
-
AVANCE ACUMULADO
Metrado
Parcial
842.69
2,164.43
-
33.60
47.96
-
Metrado
842.69
2,164.43
-
SALDO
Parcial
31.98
85.95
1,443.26
14,525.55
0.00%
40.01%
100.00%
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
18.43
18.43
29.00
12.14
31.10
458.17
381.87
322.48
177.24
808.29
100.00%
100.00%
100.00%
100.00%
100.00%
673
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
21.17
14.15
16.85
1,152.71
801.60
355.20
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
5.00
1,355.95
100.00%
674
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
20.00
1.00
1.00
1.00
1.00
7.00
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
720.34
228.81
100.00%
100.00%
675
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
2.00
1.00
462.00
120.00
100.00%
100.00%
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
0.00
268,366.80
268,366.80
281,185.48
39,718.29
39,718.29
41,615.45
676
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
SALDO
Parcial
13,955.07
13,955.07
14,621.64
0.00
322,040.16
322,040.16
337,422.57
57,967.23
57,967.23
60,736.06
380,007.41
398,158.65
0.00
380,007.41
48.83%
51.17%
DE OBRA N 09
8/2015 AL 31/08/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
677
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
11/9/2015
Metrado
Fecha de Trmino:
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
0.25
1.00
200.00
1.00
625.00
824.67
1,698.00
470.00
1.00
1.00
154.61
339.54
0.25
-
AVANCE ACUMULADO
Metrado
Parcial
625.00
-
1,250.00
824.67
1,698.00
470.00
154.61
339.54
1.00
1.00
SALDO
Parcial
Metrado
0.50
1.00
200.00
1.00
0.50
-
1,250.00
-
50.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17.55
19.28
328.19
77.92
51.48
511.98
100.00%
100.00%
100.00%
66.30
182.42
328.85
1,275.12
100.00%
100.00%
678
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
-
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
-
234.82
234.82
3,649.10
4,083.52
100.00%
100.00%
0.50
3,186.66
50.00%
0.50
3,186.66
0.50
3,186.66
546.00
546.00
764.40
764.40
546.00
546.00
764.40
764.40
0.00%
0.00%
0.50
25.00
1.00
1.00
1.00
750.00
2,721.25
1,050.00
725.00
1,750.00
0.50
-
750.00
-
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.50
515.00
0.50
515.00
1.00
1,030.00
0.00%
125.36
4,452.79
125.36
4,452.79
0.00%
105.23
1,635.27
105.23
1,635.27
0.00%
679
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
-
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACUMULADO
Metrado
Parcial
422.74
217.44
422.74
1,627.55
728.42
5,225.07
168.84
131.56
1,499.30
2,287.83
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.70
17.47
229.18
70.75
42.21
32.89
SALDO
Parcial
Metrado
-
49.46
112.85
616.27
1,284.23
100.00%
100.00%
422.74
217.44
422.74
1,627.55
728.42
5,225.07
0.00%
0.00%
0.00%
211.05
164.45
1,874.12
2,859.79
0.00%
0.00%
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.70
17.47
229.18
70.75
0.00%
0.00%
374.82
571.96
680
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
30.77
820.19
10,956.27
3,756.47
30.77
820.19
10,956.27
3,756.47
0.00%
0.00%
17.74
141.18
1,960.32
6,594.49
7,126.77
7,939.30
17.74
141.18
1,960.32
6,594.49
7,126.77
7,939.30
0.00%
0.00%
0.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
0.00%
0.00%
0.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
0.00%
0.00%
0.00%
12.30
107.03
3,558.10
4,772.77
6,538.46
14,410.31
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
0.00%
0.00%
0.00%
5.07
37.90
1,967.31
2,023.86
5.07
37.90
1,967.31
2,023.86
0.00%
0.00%
18.45
160.55
-
7,159.15
9,808.00
-
681
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
306.69
1,176.94
2,697.58
1,242.09
4,766.61
7,634.15
28.34
323.84
-
10,516.12
12,231.44
-
306.69
28.34
323.84
1,176.94
2,697.58
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
0.00%
0.00%
0.00%
0.00%
0.00%
251.77
23.93
10,675.05
660.71
167.86
15.96
7,117.26
440.66
419.63
39.89
17,792.31
1,101.36
0.00%
0.00%
293.74
3,733.44
125.89
1,600.06
419.63
5,333.50
0.00%
124.33
150.55
267.28
-
15,934.13
11,450.83
1,007.65
-
45.56
278.62
907.56
5,828.73
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
45.56
278.62
907.56
5,828.73
205.53
30.37
185.74
1,403.77
604.97
3,885.68
100.00%
0.00%
0.00%
0.00%
40.00%
40.00%
682
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
88.25
166.00
99.72
201.15
2,825.77
7,282.42
1,207.61
1,281.33
88.25
166.00
99.72
201.15
2,825.77
7,282.42
1,207.61
1,281.33
58.83
110.67
66.49
134.10
1,883.74
4,855.09
805.19
854.22
40.00%
40.00%
40.00%
40.00%
140.81
4,859.35
140.81
4,859.35
93.87
3,239.45
40.00%
213.09
7.46
5,600.01
387.32
100.00%
100.00%
85.24
4,073.62
40.00%
127.85
6,109.95
127.85
6,109.95
1.10
56.79
100.00%
199.02
11,135.17
100.00%
30.37
1,663.67
40.00%
45.56
2,495.78
45.56
2,495.78
683
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
7.02
2,167.64
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
1.72
3.83
11.86
8.91
AVANCE ACUMULADO
Metrado
Parcial
-
393.43
620.80
4,559.22
3,421.71
Metrado
-
SALDO
Parcial
142.70
105.80
3,490.44
1,394.44
100.00%
100.00%
1.72
3.83
11.86
8.91
393.43
620.80
4,559.22
3,421.71
1.16
2.56
7.91
5.94
265.34
414.95
3,040.76
2,281.14
40.28%
40.06%
40.01%
40.00%
2,167.64
4.68
1,445.09
40.00%
7.02
72.91
5,821.86
100.00%
10.00
915.30
100.00%
7.00
1,019.41
100.00%
106.80
13,326.50
40.00%
160.20
19,989.76
160.20
19,989.76
684
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
52.00
6.00
198.64
17.04
100.00%
100.00%
13.00
699.27
100.00%
3.00
13.00
18.03
105.69
100.00%
100.00%
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
11.70
38.34
124.61
696.64
100.00%
100.00%
105.80
309.99
100.00%
0.25
-
0.75
1.00
124.62
44.40
480.08
640.10
3,051.94
780.55
75.00%
100.00%
100.00%
100.00%
160.03
-
0.25
-
160.03
-
685
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1.00
6.71
1,132.40
6,119.86
100.00%
100.00%
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
24.00
46.48
81.11
1,417.97
556.32
482.93
1.00
17.00
24.00
46.48
81.11
1,417.97
556.32
482.93
0.00%
0.00%
0.00%
0.00%
686
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
7.50
53.20
57.25
8.00
8.00
1.00
1.00
1.00
82.58
618.72
778.03
658.24
778.24
839.46
68.77
240.79
0.10
-
1.16
-
7.50
53.30
57.25
8.00
8.00
1.00
1.00
1.00
82.58
619.88
778.03
658.24
778.24
839.46
68.77
240.79
14.00
7.00
7.00
21.30
31.06
55.45
1.00
4.00
1,289.96
532.42
69.44
467.11
832.72
3,322.01
33.70
174.20
16.64
16.64
-
413.67
344.78
-
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
SALDO
Parcial
Metrado
8.00
3.00
-
214.32
751.41
-
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
687
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
4.00
1.00
2.00
9.00
-
186.44
53.59
224.66
2,198.07
-
4.00
1.00
2.00
9.00
-
186.44
53.59
224.66
2,198.07
-
1.00
1.00
6,425.02
1,419.70
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
33.60
47.96
-
842.69
2,164.43
-
33.60
47.96
-
842.69
2,164.43
-
31.98
85.95
1,443.26
14,525.55
0.00%
40.01%
100.00%
22.00
8.00
2.00
4.00
10.00
-
1,881.88
66.80
22.14
44.28
1,077.40
-
15.00
4.00
2.00
4.00
8.00
3.00
1.00
1.00
1,283.10
33.40
22.14
44.28
861.92
1,872.93
290.85
163.10
40.54%
33.33%
50.00%
50.00%
44.44%
100.00%
100.00%
100.00%
22.00
8.00
2.00
4.00
10.00
-
1,881.88
66.80
22.14
44.28
1,077.40
-
688
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
11.05
11.05
17.40
7.26
18.66
AVANCE ACUMULADO
Metrado
Parcial
274.70
228.96
193.49
106.00
484.97
11.05
11.05
17.40
7.26
18.66
Metrado
274.70
228.96
193.49
106.00
484.97
SALDO
Parcial
7.38
7.38
11.60
4.88
12.44
183.47
152.91
128.99
71.25
323.32
40.04%
40.04%
40.00%
40.20%
40.00%
1.00
86.73
100.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
21.17
14.15
16.85
1,152.71
801.60
355.20
100.00%
100.00%
100.00%
18.00
189.72
100.00%
5.00
11.00
688.00
1,613.81
100.00%
100.00%
689
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
16.00
5.00
1,952.80
360.95
100.00%
100.00%
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
690
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.00
2,457.00
100.00%
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
268,366.80
92,693.44
361,060.23
188,492.06
39,718.29
13,718.63
53,436.91
27,896.82
13,955.07
4,820.06
18,775.13
9,801.59
691
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
SALDO
Parcial
322,040.16
111,232.13
433,272.27
226,190.47
57,967.23
20,021.78
77,989.01
40,714.28
380,007.39
131,253.91
511,261.30
266,904.75
16.87%
34.30%
DE OBRA N 10
9/2015 AL 30/09/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
692
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
0.50
1.00
200.00
1.00
1,250.00
824.67
1,698.00
470.00
1.00
1.00
154.61
339.54
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
0.25
-
AVANCE ACUMULADO
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
625.00
-
Metrado
Metrado
0.75
1.00
200.00
1.00
1,875.00
824.67
1,698.00
470.00
154.61
339.54
1.00
1.00
SALDO
Parcial
SALDO
Parcial
0.25
-
%
%
625.00
-
25.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17.55
19.28
328.19
77.92
51.48
511.98
100.00%
100.00%
100.00%
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
100.00%
100.00%
100.00%
100.00%
693
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
0.50
3,186.66
546.00
546.00
764.40
764.40
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1.00
Metrado
546.00
546.00
764.40
764.40
0.00%
0.00%
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
0.00%
0.00%
0.00%
0.00%
0.00%
1,030.00
1.00
1,030.00
0.00%
125.36
4,452.79
125.36
4,452.79
0.00%
105.23
1,635.27
105.23
1,635.27
0.00%
24.73
-
308.14
-
24.73
-
308.14
-
0.25
4,779.99
1,593.33
SALDO
Parcial
0.75
0.25
AVANCE ACUMULADO
Metrado
Parcial
24.73
112.85
1,593.33
308.14
1,284.23
25.00%
50.00%
100.00%
694
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
422.74
217.44
422.74
1,627.55
728.42
5,225.07
422.74
217.44
422.74
1,627.55
728.42
5,225.07
0.00%
0.00%
0.00%
211.05
164.45
1,874.12
2,859.79
211.05
164.45
1,874.12
2,859.79
0.00%
0.00%
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.70
17.47
229.18
70.75
0.70
17.47
229.18
70.75
0.00%
0.00%
30.77
820.19
10,956.27
3,756.47
30.77
820.19
10,956.27
3,756.47
0.00%
0.00%
695
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
17.74
141.18
1,960.32
6,594.49
7,126.77
7,939.30
17.74
141.18
1,960.32
6,594.49
7,126.77
7,939.30
0.00%
0.00%
0.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
0.00%
0.00%
0.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
0.00%
0.00%
0.00%
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
0.00%
0.00%
0.00%
5.07
37.90
306.69
28.34
1,967.31
2,023.86
1,242.09
10,516.12
5.07
37.90
306.69
28.34
1,967.31
2,023.86
1,242.09
10,516.12
0.00%
0.00%
0.00%
0.00%
696
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
323.84
1,176.94
2,697.58
12,231.44
4,766.61
7,634.15
323.84
1,176.94
2,697.58
12,231.44
4,766.61
7,634.15
0.00%
0.00%
0.00%
419.63
39.89
17,792.31
1,101.36
419.63
39.89
17,792.31
1,101.36
0.00%
0.00%
419.63
5,333.50
419.63
5,333.50
0.00%
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
45.56
278.62
88.25
166.00
907.56
5,828.73
2,825.77
7,282.42
30.37
185.74
58.83
110.67
604.97
3,885.68
1,883.74
4,855.09
205.53
1,403.77
100.00%
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
0.00%
0.00%
0.00%
75.93
464.36
147.08
276.67
1,512.53
9,714.41
4,709.50
12,137.51
0.00%
0.00%
0.00%
0.00%
697
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
99.72
201.15
1,207.61
1,281.33
66.49
134.10
805.19
854.22
166.21
335.25
2,012.80
2,135.54
0.00%
0.00%
140.81
4,859.35
93.87
3,239.45
234.68
8,098.81
0.00%
213.09
7.46
5,600.01
387.32
213.09
7.46
5,600.01
387.32
0.00%
0.00%
85.24
4,073.62
213.09
10,183.57
0.00%
127.85
6,109.95
1.10
56.79
1.10
56.79
0.00%
199.02
11,135.17
199.02
11,135.17
0.00%
30.37
1,663.67
75.93
4,159.45
0.00%
142.70
105.80
3,490.44
1,394.44
142.70
105.80
3,490.44
1,394.44
0.00%
0.00%
45.56
-
2,495.78
-
698
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
1.72
3.83
11.86
8.91
393.43
620.80
4,559.22
3,421.71
7.02
2,167.64
4.68
AVANCE ACUMULADO
Metrado
Parcial
1,445.09
SALDO
Parcial
Metrado
1.72
3.83
11.86
8.91
393.43
620.80
4,559.22
3,421.71
1.16
2.56
7.91
5.94
11.70
3,612.73
265.34
414.95
3,040.76
2,281.14
40.28%
40.06%
40.01%
40.00%
0.00%
72.91
5,821.86
100.00%
10.00
915.30
100.00%
7.00
1,019.41
100.00%
160.20
19,989.76
106.80
13,326.50
267.00
33,316.26
52.00
6.00
198.64
17.04
0.00%
100.00%
100.00%
699
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
2.00
107.58
2.00
107.58
11.00
591.69
84.62%
3.00
2.00
18.03
16.26
3.00
2.00
18.03
16.26
11.00
89.43
0.00%
84.62%
595.15
611.44
3,922.04
3,509.67
100.00%
100.00%
11.70
38.34
124.61
696.64
100.00%
100.00%
105.80
309.99
100.00%
0.25
0.50
124.62
44.40
160.03
320.05
3,051.94
780.55
25.00%
50.00%
100.00%
100.00%
1.00
1,132.40
100.00%
0.25
-
160.03
-
0.50
0.50
-
320.05
320.05
-
0.75
0.50
-
480.08
320.05
-
700
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
3.36
3,059.93
3.36
3,059.93
3.36
3,059.93
50.00%
2.00
2.00
3.00
2.00
2.00
2.00
-
554.58
531.34
594.24
901.44
89.98
93.68
-
2.00
2.00
3.00
2.00
2.00
2.00
-
554.58
531.34
594.24
901.44
89.98
93.68
-
1.00
1.00
4.00
1.00
4.00
1.00
1.00
1.00
6.00
1.00
277.29
265.67
792.32
450.72
179.96
46.84
80.73
44.52
244.68
71.65
33.33%
33.33%
57.14%
33.33%
66.67%
33.33%
100.00%
100.00%
100.00%
100.00%
1.00
17.00
24.00
46.48
7.50
53.30
81.11
1,417.97
556.32
482.93
82.58
619.88
1.00
17.00
24.00
46.48
7.50
53.30
81.11
1,417.97
556.32
482.93
82.58
619.88
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
701
DE OBRA N 08
7/2015 AL 31/07/2015
778.03
658.24
778.24
839.46
68.77
240.79
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
4.00
-
AVANCE ACUMULADO
Metrado
Parcial
107.16
-
57.25
8.00
8.00
4.00
1.00
1.00
1.00
778.03
658.24
778.24
107.16
839.46
68.77
240.79
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
SALDO
Parcial
Metrado
4.00
3.00
-
107.16
751.41
-
0.00%
0.00%
0.00%
50.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
702
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
-
2.00
9.00
-
224.66
2,198.07
-
1.00
1.00
6,425.02
1,419.70
2.00
9.00
1.00
1.00
224.66
2,198.07
6,425.02
1,419.70
0.00%
0.00%
0.00%
0.00%
33.60
47.96
-
842.69
2,164.43
-
34.38
5,810.22
33.60
47.96
34.38
842.69
2,164.43
5,810.22
31.98
51.57
1,443.26
8,715.33
0.00%
40.01%
60.00%
22.00
8.00
2.00
4.00
10.00
-
1,881.88
66.80
22.14
44.28
1,077.40
-
22.00
8.00
2.00
4.00
10.00
-
1,881.88
66.80
22.14
44.28
1,077.40
-
15.00
4.00
2.00
4.00
8.00
3.00
1.00
1.00
1,283.10
33.40
22.14
44.28
861.92
1,872.93
290.85
163.10
40.54%
33.33%
50.00%
50.00%
44.44%
100.00%
100.00%
100.00%
11.05
11.05
274.70
228.96
11.05
11.05
274.70
228.96
7.38
7.38
183.47
152.91
40.04%
40.04%
703
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
193.49
106.00
484.97
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACUMULADO
Metrado
Parcial
-
193.49
106.00
484.97
1.00
86.73
1.00
10.59
7.08
8.43
86.73
576.35
400.80
177.60
Metrado
17.40
7.26
18.66
10.59
7.08
8.43
SALDO
Parcial
11.60
4.88
12.44
-
128.99
71.25
323.32
-
40.00%
40.20%
40.00%
0.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
100.00%
100.00%
100.00%
100.00%
10.59
7.08
8.43
576.35
400.80
177.60
50.00%
50.00%
50.00%
18.00
189.72
100.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
100.00%
100.00%
100.00%
100.00%
576.35
400.80
177.60
704
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
10.00
20.00
2,711.90
1,186.00
100.00%
100.00%
20.00
778.00
100.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
100.00%
100.00%
100.00%
100.00%
1.00
2,457.00
100.00%
705
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
361,060.23
82,838.60
443,898.82
105,653.46
53,436.91
12,260.11
65,697.03
15,636.71
18,775.13
4,307.61
23,082.74
5,493.98
433,272.27
99,406.32
532,678.59
126,784.15
77,989.01
17,893.14
95,882.15
22,821.15
706
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
65.70%
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
117,299.46
AVANCE ACUMULADO
Metrado
Parcial
15.07%
Metrado
628,560.74
80.77%
SALDO
Parcial
149,605.30
%
19.23%
DE OBRA N 11
0/2015 AL 31/10/2015
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
SALDO
Parcial
707
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
0.75
1.00
200.00
1.00
1,875.00
824.67
1,698.00
470.00
1.00
1.00
154.61
339.54
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
0.20
-
AVANCE ACUMULADO
Metrado
Parcial
500.00
-
SALDO
Parcial
Metrado
0.05
-
0.95
1.00
200.00
1.00
2,375.00
824.67
1,698.00
470.00
125.00
-
5.00%
0.00%
0.00%
0.00%
1.00
1.00
154.61
339.54
0.00%
0.00%
17.55
19.28
328.19
77.92
51.48
511.98
17.55
19.28
328.19
77.92
51.48
511.98
0.00%
0.00%
0.00%
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
0.00%
0.00%
0.00%
0.00%
0.25
1,593.33
1.00
6,373.32
0.00%
0.75
4,779.99
708
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
546.00
546.00
764.40
764.40
546.00
546.00
764.40
764.40
0.00%
0.00%
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1,030.00
1.00
1,030.00
0.00%
125.36
4,452.79
125.36
4,452.79
0.00%
105.23
1,635.27
105.23
1,635.27
0.00%
24.73
-
308.14
-
49.46
-
616.27
-
422.74
1,627.55
422.74
1,627.55
24.73
-
308.14
-
112.85
-
1,284.23
-
0.00%
100.00%
0.00%
709
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
217.44
422.74
728.42
5,225.07
217.44
422.74
728.42
5,225.07
0.00%
0.00%
211.05
164.45
1,874.12
2,859.79
211.05
164.45
1,874.12
2,859.79
0.00%
0.00%
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.70
17.47
229.18
70.75
0.70
17.47
229.18
70.75
0.00%
0.00%
30.77
820.19
10,956.27
3,756.47
30.77
820.19
10,956.27
3,756.47
0.00%
0.00%
17.74
6,594.49
17.74
6,594.49
0.00%
710
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
141.18
1,960.32
7,126.77
7,939.30
141.18
1,960.32
7,126.77
7,939.30
0.00%
0.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
0.00%
0.00%
0.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
0.00%
0.00%
0.00%
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
0.00%
0.00%
0.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
5.07
37.90
306.69
28.34
323.84
1,176.94
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
711
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
2,697.58
7,634.15
2,697.58
7,634.15
0.00%
419.63
39.89
17,792.31
1,101.36
419.63
39.89
17,792.31
1,101.36
0.00%
0.00%
419.63
5,333.50
419.63
5,333.50
0.00%
205.53
1,403.77
0.00%
205.53
1,403.77
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
0.00%
0.00%
0.00%
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
712
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
234.68
8,098.81
234.68
8,098.81
0.00%
213.09
7.46
5,600.01
387.32
213.09
7.46
5,600.01
387.32
0.00%
0.00%
213.09
10,183.57
213.09
10,183.57
0.00%
1.10
56.79
1.10
56.79
0.00%
199.02
11,135.17
199.02
11,135.17
0.00%
75.93
4,159.45
75.93
4,159.45
0.00%
142.70
105.80
3,490.44
1,394.44
142.70
105.80
3,490.44
1,394.44
0.00%
0.00%
713
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
1.72
3.83
11.86
8.91
393.43
620.80
4,559.22
3,421.71
1.16
2.56
7.91
5.94
265.34
414.95
3,040.76
2,281.14
11.70
3,612.73
SALDO
Parcial
Metrado
2.88
6.39
19.77
14.85
658.77
1,035.76
7,599.98
5,702.85
0.00%
0.00%
0.00%
0.00%
11.70
3,612.73
0.00%
72.91
5,821.86
100.00%
10.00
915.30
100.00%
7.00
1,019.41
100.00%
267.00
2.00
33,316.26
107.58
267.00
33,316.26
0.00%
52.00
6.00
198.64
17.04
52.00
6.00
198.64
17.04
0.00%
0.00%
11.00
591.69
13.00
699.27
0.00%
714
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
18.03
16.26
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
11.00
89.43
3.00
13.00
18.03
105.69
0.00%
0.00%
595.15
611.44
3,922.04
3,509.67
595.15
611.44
3,922.04
3,509.67
0.00%
0.00%
11.70
38.34
124.61
696.64
11.70
38.34
124.61
696.64
0.00%
0.00%
105.80
309.99
105.80
309.99
0.00%
0.75
0.50
-
480.08
320.05
-
0.20
0.25
-
128.02
160.03
-
0.95
0.75
-
608.10
480.08
-
3.36
3,059.93
1.00
3.36
1,132.40
3,059.93
1.00
6.71
1,132.40
6,119.86
0.05
0.25
124.62
44.40
-
32.01
160.03
3,051.94
780.55
-
5.00%
25.00%
100.00%
100.00%
0.00%
0.00%
715
DE OBRA N 08
7/2015 AL 31/07/2015
554.58
531.34
594.24
901.44
89.98
93.68
-
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
1.00
1.00
4.00
1.00
4.00
1.00
1.00
1.00
6.00
1.00
AVANCE ACUMULADO
Metrado
Parcial
277.29
265.67
792.32
450.72
179.96
46.84
80.73
44.52
244.68
71.65
SALDO
Parcial
Metrado
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
716
DE OBRA N 08
7/2015 AL 31/07/2015
778.24
107.16
839.46
68.77
240.79
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
4.00
3.00
-
AVANCE ACUMULADO
Metrado
Parcial
107.16
751.41
-
SALDO
Parcial
Metrado
8.00
8.00
3.00
1.00
1.00
1.00
778.24
214.32
751.41
839.46
68.77
240.79
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
717
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
1.00
1.00
6,425.02
1,419.70
33.60
47.96
34.38
842.69
2,164.43
5,810.22
31.98
34.38
22.00
8.00
2.00
4.00
10.00
-
1,881.88
66.80
22.14
44.28
1,077.40
-
11.05
11.05
17.40
7.26
274.70
228.96
193.49
106.00
AVANCE ACUMULADO
Metrado
Parcial
-
SALDO
Parcial
Metrado
-
1.00
1.00
6,425.02
1,419.70
1,443.26
5,810.22
33.60
79.94
68.76
842.69
3,607.69
11,620.44
15.00
4.00
2.00
4.00
8.00
3.00
1.00
1.00
1,283.10
33.40
22.14
44.28
861.92
1,872.93
290.85
163.10
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.38
7.38
11.60
4.88
183.47
152.91
128.99
71.25
18.43
18.43
29.00
12.14
458.17
381.87
322.48
177.24
0.00%
0.00%
0.00%
0.00%
17.19
2,905.11
0.00%
0.00%
0.00%
0.00%
20.00%
718
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
18.66
484.97
1.00
86.73
10.59
7.08
8.43
576.35
400.80
177.60
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
12.44
-
AVANCE ACUMULADO
Metrado
Parcial
323.32
-
SALDO
Parcial
Metrado
31.10
808.29
0.00%
1.00
86.73
0.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
0.00%
0.00%
0.00%
0.00%
10.59
7.08
8.43
576.35
400.80
177.60
21.17
14.15
16.85
1,152.71
801.60
355.20
0.00%
0.00%
0.00%
18.00
189.72
18.00
189.72
0.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
0.00%
0.00%
0.00%
0.00%
719
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
5.00
20.00
1.00
1.00
1.00
1.00
7.00
1,355.95
1,186.00
720.34
76.27
338.98
231.00
2,669.45
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,711.90
1,186.00
0.00%
0.00%
778.00
10.00
20.00
20.00
2,711.90
1,186.00
10.00
20.00
20.00
778.00
0.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
0.00%
0.00%
0.00%
0.00%
1.00
2,457.00
100.00%
720
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1.00
698.60
100.00%
1.00
141.84
100.00%
1.00
2,280.16
100.00%
1.00
10,621.16
100.00%
1.00
838.01
100.00%
1.00
748.27
100.00%
1.00
498.24
100.00%
443,898.82
71,274.75
515,173.57
34,378.72
65,697.03
10,548.66
76,245.69
5,088.05
23,082.74
3,706.29
26,789.03
1,787.69
532,678.59
85,529.70
618,208.29
41,254.46
95,882.15
15,395.35
111,277.49
7,425.80
628,560.74
80.77%
100,925.05
12.97%
729,485.78
93.74%
48,680.26
6.26%
721
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
SALDO
Parcial
DE OBRA N 12
0/2015 AL 31/10/2015
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
SALDO
Parcial
722
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
0.95
1.00
200.00
1.00
2,375.00
824.67
1,698.00
470.00
1.00
1.00
154.61
339.54
0.05
-
17.55
19.28
328.19
77.92
51.48
511.98
66.30
182.42
234.82
234.82
1.00
AVANCE ACUMULADO
Metrado
Parcial
125.00
-
SALDO
Parcial
Metrado
1.00
1.00
200.00
1.00
2,500.00
824.67
1,698.00
470.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
154.61
339.54
0.00%
0.00%
17.55
19.28
328.19
77.92
51.48
511.98
0.00%
0.00%
0.00%
328.85
1,275.12
3,649.10
4,083.52
66.30
182.42
234.82
234.82
328.85
1,275.12
3,649.10
4,083.52
0.00%
0.00%
0.00%
0.00%
6,373.32
1.00
6,373.32
0.00%
723
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
546.00
546.00
764.40
764.40
546.00
546.00
764.40
764.40
0.00%
0.00%
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
1.00
25.00
1.00
1.00
1.00
1,500.00
2,721.25
1,050.00
725.00
1,750.00
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1,030.00
1.00
1,030.00
0.00%
125.36
4,452.79
125.36
4,452.79
0.00%
105.23
1,635.27
105.23
1,635.27
0.00%
49.46
-
616.27
-
49.46
112.85
616.27
1,284.23
0.00%
0.00%
422.74
217.44
1,627.55
728.42
422.74
217.44
1,627.55
728.42
0.00%
0.00%
112.85
-
1,284.23
-
724
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
422.74
5,225.07
422.74
5,225.07
0.00%
211.05
164.45
1,874.12
2,859.79
211.05
164.45
1,874.12
2,859.79
0.00%
0.00%
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
44.86
83.88
0.81
11.35
48.08
217.44
7,936.18
1,822.71
151.97
2,308.82
1,574.14
6,347.07
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.70
17.47
229.18
70.75
0.70
17.47
229.18
70.75
0.00%
0.00%
30.77
820.19
10,956.27
3,756.47
30.77
820.19
10,956.27
3,756.47
0.00%
0.00%
17.74
141.18
6,594.49
7,126.77
17.74
141.18
6,594.49
7,126.77
0.00%
0.00%
725
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1,960.32
7,939.30
1,960.32
7,939.30
0.00%
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
14.61
153.57
474.30
5,024.96
5,040.17
2,134.35
0.00%
0.00%
0.00%
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
18.24
204.06
2,946.22
8,803.17
10,743.76
11,932.19
0.00%
0.00%
0.00%
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
30.75
267.58
3,558.10
11,931.92
16,346.46
14,410.31
0.00%
0.00%
0.00%
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
5.07
37.90
306.69
28.34
323.84
1,176.94
2,697.58
1,967.31
2,023.86
1,242.09
10,516.12
12,231.44
4,766.61
7,634.15
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
726
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
419.63
39.89
17,792.31
1,101.36
419.63
39.89
17,792.31
1,101.36
0.00%
0.00%
419.63
5,333.50
419.63
5,333.50
0.00%
205.53
1,403.77
205.53
1,403.77
0.00%
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
124.33
150.55
267.28
15,934.13
11,450.83
1,007.65
0.00%
0.00%
0.00%
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
75.93
464.36
147.08
276.67
166.21
335.25
1,512.53
9,714.41
4,709.50
12,137.51
2,012.80
2,135.54
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
727
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
234.68
8,098.81
234.68
8,098.81
0.00%
213.09
7.46
5,600.01
387.32
213.09
7.46
5,600.01
387.32
0.00%
0.00%
213.09
10,183.57
213.09
10,183.57
0.00%
1.10
56.79
1.10
56.79
0.00%
199.02
11,135.17
199.02
11,135.17
0.00%
75.93
4,159.45
75.93
4,159.45
0.00%
142.70
105.80
3,490.44
1,394.44
142.70
105.80
3,490.44
1,394.44
0.00%
0.00%
2.88
658.77
2.88
658.77
0.00%
728
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
6.39
19.77
14.85
1,035.76
7,599.98
5,702.85
6.39
19.77
14.85
1,035.76
7,599.98
5,702.85
0.00%
0.00%
0.00%
11.70
3,612.73
11.70
3,612.73
0.00%
72.91
5,821.86
72.91
5,821.86
0.00%
10.00
915.30
10.00
915.30
0.00%
7.00
1,019.41
7.00
1,019.41
0.00%
267.00
33,316.26
267.00
33,316.26
0.00%
52.00
6.00
198.64
17.04
52.00
6.00
198.64
17.04
0.00%
0.00%
13.00
699.27
13.00
699.27
0.00%
729
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
3.00
13.00
18.03
105.69
3.00
13.00
18.03
105.69
0.00%
0.00%
595.15
611.44
3,922.04
3,509.67
595.15
611.44
3,922.04
3,509.67
0.00%
0.00%
11.70
38.34
124.61
696.64
11.70
38.34
124.61
696.64
0.00%
0.00%
105.80
309.99
105.80
309.99
0.00%
0.95
0.75
-
608.10
480.08
-
1.00
1.00
124.62
44.40
640.10
640.10
3,051.94
780.55
0.00%
0.00%
0.00%
0.00%
1.00
6.71
1,132.40
6,119.86
1.00
6.71
1,132.40
6,119.86
0.00%
0.00%
0.05
0.25
124.62
44.40
-
32.01
160.03
3,051.94
780.55
-
730
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
3.00
3.00
7.00
3.00
6.00
3.00
1.00
1.00
6.00
1.00
831.87
797.01
1,386.56
1,352.16
269.94
140.52
80.73
44.52
244.68
71.65
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
1.00
17.00
24.00
46.48
7.50
53.30
57.25
8.00
8.00
81.11
1,417.97
556.32
482.93
82.58
619.88
778.03
658.24
778.24
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
731
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
8.00
3.00
1.00
1.00
1.00
214.32
751.41
839.46
68.77
240.79
8.00
3.00
1.00
1.00
1.00
214.32
751.41
839.46
68.77
240.79
0.00%
0.00%
0.00%
0.00%
0.00%
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
14.00
7.00
7.00
16.64
16.64
21.30
31.06
55.45
1.00
4.00
4.00
1.00
2.00
9.00
1.00
1,289.96
532.42
69.44
413.67
344.78
467.11
832.72
3,322.01
33.70
174.20
186.44
53.59
224.66
2,198.07
6,425.02
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
732
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
1.00
1,419.70
33.60
79.94
68.76
842.69
3,607.69
11,620.44
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
18.43
18.43
29.00
12.14
31.10
458.17
381.87
322.48
177.24
808.29
17.19
AVANCE ACUMULADO
Metrado
Parcial
-
SALDO
Parcial
Metrado
1.00
1,419.70
0.00%
33.60
79.94
85.95
842.69
3,607.69
14,525.55
0.00%
0.00%
0.00%
37.00
12.00
4.00
8.00
18.00
3.00
1.00
1.00
3,164.98
100.20
44.28
88.56
1,939.32
1,872.93
290.85
163.10
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
18.43
18.43
29.00
12.14
31.10
458.17
381.87
322.48
177.24
808.29
0.00%
0.00%
0.00%
0.00%
0.00%
2,905.11
733
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1.00
86.73
1.00
86.73
0.00%
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
1.00
1.00
1.00
1.00
872.53
872.53
872.53
188.47
0.00%
0.00%
0.00%
0.00%
21.17
14.15
16.85
1,152.71
801.60
355.20
21.17
14.15
16.85
1,152.71
801.60
355.20
0.00%
0.00%
0.00%
18.00
189.72
18.00
189.72
0.00%
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
5.00
11.00
16.00
5.00
688.00
1,613.81
1,952.80
360.95
0.00%
0.00%
0.00%
0.00%
5.00
1,355.95
5.00
1,355.95
0.00%
734
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
20.00
1.00
1.00
1.00
1.00
7.00
1,186.00
720.34
76.27
338.98
231.00
2,669.45
20.00
1.00
1.00
1.00
1.00
7.00
1,186.00
720.34
76.27
338.98
231.00
2,669.45
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10.00
20.00
20.00
2,711.90
1,186.00
0.00%
0.00%
10.00
20.00
20.00
2,711.90
1,186.00
778.00
778.00
0.00%
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
1.00
3.00
2.00
1.00
720.34
228.81
462.00
120.00
0.00%
0.00%
0.00%
0.00%
1.00
2,457.00
1.00
2,457.00
0.00%
1.00
698.60
1.00
698.60
0.00%
735
DE OBRA N 08
7/2015 AL 31/07/2015
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1.00
141.84
1.00
141.84
0.00%
1.00
2,280.16
1.00
2,280.16
0.00%
1.00
10,621.16
1.00
10,621.16
0.00%
1.00
838.01
1.00
838.01
0.00%
1.00
748.27
1.00
748.27
0.00%
1.00
498.24
1.00
498.24
0.00%
515,173.59
34,378.68
549,552.27
0.00
76,245.69
5,088.04
81,333.74
26,789.03
1,787.69
28,576.72
618,208.31
41,254.41
659,462.73
0.00
111,277.50
7,425.79
118,703.29
729,485.81
93.74%
48,680.20
6.26%
778,166.02
100.00%
0.00
0.00%
736
DE OBRA N 08
7/2015 AL 31/07/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
S/. 659,462.73
1.00000
9/3/2014
240 D.C.
4/30/2015
SALDO
Parcial
737
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA,
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
VAL. N 01
14
SET.
VAL. N 02
OCT. 14
VAL. N 03
NOV. 14
VAL. N 04
14
DIC.
VAL. N 05
ABR. 15
VAL. N 06
MAY. 15
VAL. N 07
JUN. 15
VAL. N 08
15
JUL.
VAL. N 09
AGO. 15
VAL. N 10
15
SET.
VAL. N 11
15
OCT. VAL. N 12
15
NOV.
TOTAL (S/.)
S/. 411,595.92
S/. 717,111.78
S/. 665,438.06
S/. 883,540.77
S/. 788,998.85
S/. 509,380.37
S/. 448,597.41
S/. 156,317.06
S/. 132,967.30
S/. 197,996.74
S/. 192,808.48
S/. 5,434,782.82
S/. 330,030.08
S/. 411,595.92
S/. 717,111.78
S/. 665,438.06
S/. 883,540.77
S/. 788,998.85
S/. 509,380.37
S/. 448,597.41
S/. 156,317.06
S/. 132,967.30
S/. 197,996.74
S/. 192,808.48
S/. 5,434,782.83
S/. 59,405.41
S/. 74,087.27
S/. 129,080.12
S/. 119,778.85
S/. 159,037.34
S/. 142,019.79
S/. 91,688.47
S/. 80,747.53
S/. 28,137.07
S/. 23,934.11
S/. 35,639.41
S/. 34,705.53
S/. 978,260.90
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
TOTAL DE REAJUSTES ( R )
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
s/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
S/. 0.00
REAJUSTES
TOTAL DE DEDUCCIONES ( D )
s/. 0.00
s/. 0.00
s/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
AMORTIZACIONES
AMORTIZACIN DE ADELANTO DIRECTO
AMORTIZACIN DE ADELANTO DE MATERIALES
TOTAL AMORTIZACIONES ( A )
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 217,391.31
S/. 82,319.18
S/. 143,422.36
S/. 133,087.61
S/. 342,035.09
S/. 305,436.16
S/. 317,974.21
S/. 216,764.98
S/. 87,749.52
S/. 132,967.30
S/. 124,758.00
s/. 0.00
S/. 2,103,905.72
S/. 217,391.31
S/. 82,319.18
S/. 143,422.36
S/. 133,087.61
S/. 342,035.09
S/. 305,436.16
S/. 317,974.21
S/. 216,764.98
S/. 87,749.52
S/. 132,967.30
S/. 124,758.00
S/. 0.00
S/. 2,103,905.72
S/. 39,130.44
S/. 14,817.45
S/. 25,816.02
S/. 23,955.77
S/. 61,566.32
S/. 54,978.51
S/. 57,235.36
S/. 39,017.70
S/. 15,794.91
S/. 23,934.11
S/. 22,456.44
S/. 0.00
S/. 378,703.03
S/. 112,638.77
S/. 329,276.74
S/. 573,689.42
S/. 532,350.45
S/. 541,505.68
S/. 483,562.69
S/. 191,406.16
S/. 231,832.43
S/. 68,567.54
S/. 0.00
S/. 73,238.74
S/. 192,808.48
S/. 3,330,877.10
S/. 20,274.98
S/. 59,269.81
S/. 103,264.10
S/. 95,823.08
S/. 97,471.02
S/. 87,041.28
S/. 34,453.11
S/. 41,729.84
S/. 12,342.16
S/. 0.00
S/. 13,182.97
S/. 34,705.53
S/. 599,557.88
S/. 132,913.75
S/. 388,546.55
S/. 676,953.52
S/. 628,173.53
S/. 638,976.70
S/. 570,603.97
S/. 225,859.27
S/. 273,562.27
S/. 80,909.70
S/. 0.00
S/. 86,421.71
S/. 227,514.01
S/. 3,930,434.98
S/.132,913.75
S/.388,546.55
S/.676,953.52
S/.628,173.53
S/.638,976.70
S/.570,603.97
S/.225,859.27
S/.273,562.27
S/.80,909.70
S/.0.00
S/.86,421.71
S/.227,514.01
S/.3,930,434.98
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
S/. 51,779.89
S/. 36,779.89
S/. 15,000.00
0.00
0.00
0.00
0.00
0.00
138.59
39.05
43
S/. 51,520.42
S/. 29,520.42
S/. 22,000.00
0.000
0.000
0.000
0.000
692.050
0.000
447.960
S/. 58,424.83
S/. 38,424.83
S/. 20,000.00
0.000
0.000
0.000
0.000
1,130.000
0.000
403.050
AF
AGREGADO FINO
S/. 33,681.95
S/. 12,232.80
S/. 21,449.15
0.000
0.000
0.000
0.000
0.000
0.000
0.000
30
S/. 0.00
S/. 0.00
S/. 0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
17
BLOQUE Y LADRILLO
S/. 37,967.31
S/. 17,967.31
S/. 20,000.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
233,374.41
134,925.26
98,449.15
0.00
0.00
0.00
0.00
1,822.05
138.59
890.06
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
SIMBOLO
CODIGO
21
MATERIAL
TOTAL
Reint. que no
Reint. que no
Reint. que no
corresponde Val. SET corresponde Val. OCT corresponde Val. NOV
'14
'14
'14
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
SIMBOLO
CODIGO
21
S/. 43,296.48
S/. 26,296.48
S/. 17,000.00
0.00
0.00
0.00
0.00
38.30
147.53
132.83
43
S/. 59,068.17
S/. 22,068.17
S/. 37,000.00
0.000
23.260
92.610
208.710
238.780
327.230
313.400
S/. 79,225.91
S/. 33,225.91
S/. 46,000.00
0.000
340.080
399.640
637.210
752.380
485.560
487.820
AF
AGREGADO FINO
S/. 37,071.06
S/. 15,071.06
S/. 22,000.00
0.00
20.70
73.79
96.33
0.00
0.00
0.00
30
S/. 20,000.00
S/. 0.00
S/. 20,000.00
0.00
0.00
0.00
0.00
315.53
386.60
470.25
17
BLOQUE Y LADRILLO
S/. 37,968.42
S/. 14,968.42
S/. 23,000.00
0.000
14.220
157.100
45.070
214.110
167.710
159.820
276,630.04
111,630.04
165,000.00
0.00
398.26
723.14
987.32
1,559.10
1,514.63
1,564.12
TOTAL
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
S/. 43,134.14
S/. 26,134.14
S/. 17,000.00
0.00
0.00
0.00
0.00
67.00
171.29
93.18
43
S/. 56,428.82
S/. 22,428.82
S/. 34,000.00
0.00
39.29
76.76
97.29
417.18
379.47
219.59
S/. 60,441.80
S/. 26,441.80
S/. 34,000.00
0.00
162.15
280.56
503.14
607.03
238.46
434.22
AF
AGREGADO FINO
S/. 34,860.80
S/. 14,860.80
S/. 20,000.00
0.00
30.66
115.32
84.66
0.00
0.00
0.00
30
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17
BLOQUE Y LADRILLO
S/. 41,903.31
S/. 16,903.31
S/. 25,000.00
0.00
26.58
144.04
46.48
364.32
191.11
110.62
236,768.88
106,768.88
130,000.00
0.00
258.68
616.68
731.57
1,455.53
980.33
857.61
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
SIMBOLO
CODIGO
21
MATERIAL
TOTAL
Reint. que no
Reint. que no
Reint. que no
corresponde Val. SET corresponde Val. OCT corresponde Val. NOV
'14
'14
'14
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
SIMBOLO
CODIGO
21
S/. 58,196.67
S/. 34,196.67
S/. 24,000.00
0.00
0.00
0.00
0.00
39.78
192.92
299.29
43
S/. 68,136.49
S/. 28,136.49
S/. 40,000.00
0.00
14.93
90.77
156.07
207.63
358.26
591.20
S/. 75,807.30
S/. 33,807.30
S/. 42,000.00
0.00
132.54
356.78
868.10
607.95
484.24
419.10
AF
AGREGADO FINO
S/. 33,345.39
S/. 9,345.39
S/. 24,000.00
0.00
4.40
51.46
51.25
0.00
0.00
0.00
30
S/. 10,000.00
S/. 0.00
S/. 10,000.00
0.00
0.00
0.00
0.00
179.52
276.95
580.43
17
BLOQUE Y LADRILLO
S/. 34,017.69
S/. 18,017.69
S/. 16,000.00
0.00
6.54
110.38
48.32
117.52
116.95
193.03
279,503.54
123,503.54
156,000.00
0.00
158.41
609.39
1,123.74
1,152.40
1,429.32
2,083.05
TOTAL
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
S/. 46,290.95
S/. 31,290.95
S/. 15,000.00
0.00
0.00
0.00
0.00
64.95
197.13
64.78
43
S/. 56,833.77
S/. 26,833.77
S/. 30,000.00
0.00
45.94
72.00
131.10
388.83
419.92
146.79
S/. 68,862.33
S/. 28,862.33
S/. 40,000.00
0.00
413.30
286.82
738.98
616.64
575.20
210.90
AF
AGREGADO FINO
S/. 39,143.43
S/. 14,143.43
S/. 25,000.00
0.00
38.66
116.66
123.02
0.00
0.00
0.00
30
S/. 24,820.29
S/. 24,820.29
S/. 0.00
0.00
222.70
356.59
401.83
667.41
370.83
134.99
17
BLOQUE Y LADRILLO
S/. 34,376.77
S/. 9,376.77
S/. 25,000.00
0.00
16.05
69.77
32.34
220.46
135.20
46.84
270,327.55
135,327.55
135,000.00
0.00
736.65
901.84
1,427.27
1,958.29
1,698.28
604.30
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
SIMBOLO
CODIGO
21
MATERIAL
TOTAL
Reint. que no
Reint. que no
Reint. que no
corresponde Val. SET corresponde Val. OCT corresponde Val. NOV
'14
'14
'14
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
SIMBOLO
CODIGO
21
S/. 47,193.00
S/. 42,693.00
S/. 4,500.00
0.00
0.00
0.00
0.00
0.00
29.59
51.18
43
S/. 69,232.69
S/. 39,232.69
S/. 30,000.00
0.00
37.45
93.81
210.16
427.76
355.04
128.13
S/. 78,215.32
S/. 48,215.32
S/. 30,000.00
0.00
305.44
677.66
1,074.14
1,150.94
440.98
166.92
AF
AGREGADO FINO
S/. 46,280.29
S/. 34,280.29
S/. 12,000.00
0.00
29.84
143.90
186.74
0.00
0.00
0.00
30
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17
BLOQUE Y LADRILLO
S/. 48,841.87
S/. 20,841.87
S/. 28,000.00
0.00
35.80
86.83
49.53
231.66
234.58
85.00
289,763.17
185,263.17
104,500.00
0.00
408.53
1,002.20
1,520.57
1,810.36
1,060.19
431.23
TOTAL
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
S/. 49,208.83
S/. 31,208.83
S/. 18,000.00
0.00
0.00
0.00
0.00
77.81
231.06
73.12
43
S/. 62,516.16
S/. 29,516.16
S/. 33,000.00
0.00
35.48
81.63
146.75
484.49
511.88
172.32
S/. 73,285.66
S/. 35,285.66
S/. 38,000.00
0.00
473.82
321.81
409.32
760.42
346.97
367.56
AF
AGREGADO FINO
S/. 31,728.20
S/. 16,728.20
S/. 15,000.00
0.00
28.78
127.44
132.70
0.00
0.00
0.00
30
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17
BLOQUE Y LADRILLO
S/. 37,924.66
S/. 22,924.66
S/. 15,000.00
0.00
22.82
145.64
66.66
402.31
245.12
82.54
254,663.52
135,663.52
119,000.00
0.00
560.90
676.52
755.43
1,725.03
1,335.03
695.54
TOTAL ADELANTO
OTORGADO
PRIMER ADELANTO
OTORGADO
SEGUNDO ADELANTO
OTORGADO
SIMBOLO
CODIGO
21
MATERIAL
TOTAL
Reint. que no
Reint. que no
Reint. que no
corresponde Val. SET corresponde Val. OCT corresponde Val. NOV
'14
'14
'14
Reint. que no
corresponde Val. DIC
'14
Reint. que no
Reint. que no
Reint. que no
corresponde Val. ABR corresponde Val. MAY corresponde Val. JUN
'15
'15
'15
SIMBOLO
CODIGO
21
S/. 48,696.19
S/. 40,696.19
S/. 8,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43
S/. 64,193.59
S/. 32,193.59
S/. 32,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/. 79,973.54
S/. 38,973.54
S/. 41,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
AF
AGREGADO FINO
S/. 42,748.04
S/. 14,748.04
S/. 28,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17
BLOQUE Y LADRILLO
S/. 27,263.28
S/. 27,263.28
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
262,874.64
153,874.64
109,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
Reint. que no
corresponde Val.
NOV '15
TOTAL
223.35
47.99
0.00
0.00
0.00
448.98
406.640
83.660
0.000
0.000
0.000
1,630.31
0.000
0.000
0.000
0.000
0.000
1,533.05
2.050
0.000
0.000
0.000
0.000
2.05
0.000
0.000
0.000
0.000
0.000
0.00
181.900
0.000
0.000
0.000
0.000
181.90
813.94
131.65
0.00
0.00
0.00
3,796.29
-1,822
1,974
Reint. que no
corresponde Val.
NOV '15
TOTAL
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
0.00
0.00
23.48
49.99
0.00
392.13
0.000
0.000
49.580
106.340
0.000
1,359.91
0.000
0.000
0.000
0.000
0.000
3,102.69
0.00
0.00
0.00
0.00
0.00
190.82
0.00
0.00
138.95
320.67
0.00
1,632.00
0.000
0.000
10.710
37.810
0.000
806.55
0.00
0.00
222.72
514.81
0.00
7,484.10
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
-1,822
5,662
Reint. que no
corresponde Val.
NOV '15
TOTAL
25.78
30.26
0.00
0.00
0.00
387.51
88.66
52.51
0.00
0.00
0.00
1,370.75
0.00
0.00
0.00
0.00
0.00
2,225.56
2.18
0.00
0.00
0.00
0.00
232.82
0.00
0.00
0.00
0.00
0.00
0.00
31.78
8.56
0.00
0.00
0.00
923.49
148.40
91.33
0.00
0.00
0.00
5,140.13
-1,822
3,318
Reint. que no
corresponde Val.
NOV '15
TOTAL
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
21.31
41.04
22.32
55.61
0.00
672.27
61.44
59.69
39.46
99.04
0.00
1,678.49
0.00
0.00
0.00
0.00
0.00
2,868.71
0.57
0.00
0.00
0.00
0.00
107.68
56.97
143.98
72.36
195.42
0.00
1,505.63
14.27
6.31
4.00
16.52
0.00
633.84
154.56
251.02
138.14
366.59
0.00
7,466.62
-1,822
5,645
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
Reint. que no
corresponde Val.
NOV '15
TOTAL
0.00
0.00
0.00
23.37
0.00
350.23
0.00
0.00
0.00
47.75
0.00
1,252.33
0.00
0.00
0.00
0.00
0.00
2,841.84
0.00
0.00
0.00
0.00
0.00
278.34
0.00
0.00
0.00
0.00
0.00
2,154.35
0.00
0.00
0.00
12.69
0.00
533.35
0.00
0.00
0.00
83.81
0.00
7,410.44
-1,822
5,588
Reint. que no
corresponde Val.
NOV '15
TOTAL
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
47.55
0.00
0.00
0.00
0.00
128.32
173.71
0.00
0.00
0.00
0.00
1,426.06
0.00
0.00
0.00
0.00
0.00
3,816.08
4.34
0.00
0.00
0.00
0.00
364.82
0.00
0.00
0.00
0.00
0.00
0.00
82.42
0.00
0.00
0.00
0.00
805.82
308.02
0.00
0.00
0.00
0.00
6,541.10
-1,822
4,719
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
Reint. que no
corresponde Val.
NOV '15
TOTAL
46.73
0.00
5.24
14.47
0.00
448.43
160.69
0.00
11.05
30.75
0.00
1,635.04
0.00
0.00
0.00
0.00
0.00
2,679.90
4.10
0.00
0.00
0.00
0.00
293.02
0.00
0.00
0.00
0.00
0.00
0.00
54.76
0.00
1.64
7.53
0.00
1,029.02
266.28
0.00
17.93
52.75
0.00
6,085.41
Reint. que no
corresponde Val.
NOV '15
TOTAL
Reint. que no
corresponde Val. JUL
'15
Reint. que no
Reint. que no
Reint. que no
corresponde Val. AGOS corresponde Val. SET corresponde Val. OCT
'15
'15
'15
33.18
0.00
147.58
126.98
0.00
307.74
0.00
271.77
295.17
255.92
0.00
822.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.18
271.77
442.75
382.90
0.00
1,130.60
NOMBRE DE OBRA
PROCESO
ENTIDAD
CONTRATISTA
: CONSORCIO ILUCAN
749,584.76
PRESUP. CONTRATADO:
749,584.76
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
134,925.26
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
1,365.59
36,779.89
458.79
43
1
2
3
4
5
6
7
8
9
10
11
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
29,520.42
659.07
12
Nov-15
1,365.59
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
1,365.59
24,385.19
481.01
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
1,365.59
12,232.80
523.47
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
10,160.62
572.18
Bloque Ladrillo
17
1
2
3
Sep-14
Oct-14
Nov-14
0.00
0.00
0.00
7,806.69
572.18
4
5
6
7
8
9
10
11
12
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
Acero Construccin
*Malla de Acero F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
7,253.12
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
6,786.51
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
98,449.15
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
15,000.00
450.61
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
22,000.00
668.55
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
20,000.00
501.62
Agregado Fino
1
2
3
4
5
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
0.00
0.00
0.00
0.00
0.00
21,449.15
530.09
Bloque Ladrillo
6
7
8
9
10
11
12
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
256,940.08
299,005.30
142,567.82
31,098.70
0.00
0.00
18,607.28
20,000.00
575.56
620,166.87
PRESUP. CONTRATADO:
620,166.87
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
111,630.04
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
26,296.48
458.79
11
12
Oct-15
Nov-15
35,541.16
11,655.98
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
22,068.17
659.07
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
16,142.60
481.01
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
8,203.06
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
Sep-14
Oct-14
21,008.49
48,885.33
6,868.00
523.47
3
4
5
6
7
8
9
10
11
12
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
8,093.06
572.18
Bloque Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
6,875.36
572.18
Acero Construccin
*Malla de Acero F.P. Antigua
1
2
3
4
5
6
7
8
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
6,977.30
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
9
10
11
12
Aug-15
Sep-15
Oct-15
Nov-15
0.00
16,697.11
35,541.16
11,655.98
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
10,106.01
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
165,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
17,000.00
450.61
43
1
2
3
4
Sep-14
Oct-14
Nov-14
Dec-14
21,008.49
48,885.33
130,432.77
144,801.96
37,000.00
668.55
5
6
7
8
9
10
11
12
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
46,000.00
501.62
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
22,000.00
530.09
Bloque y Ladrillo
17
1
2
3
4
5
6
7
8
9
10
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
23,000.00
575.56
30
11
12
Oct-15
Nov-15
35,541.16
11,655.98
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
21,008.49
48,885.33
130,432.77
144,801.96
69,184.53
68,498.09
73,461.46
0.00
0.00
16,697.11
35,541.16
11,655.98
20,000.00
407.64
593,160.42
PRESUP. CONTRATADO:
593,160.42
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
106,768.88
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
26,134.14
458.79
43
Sep-14
48,392.06
22,428.82
659.07
Carpinteria
2
3
4
5
6
7
8
9
10
11
12
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
14,071.41
481.01
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
7,490.67
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
7,370.13
523.47
8
9
10
11
12
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
16,455.02
20,655.96
0.00
0.00
17,510.04
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
8,311.18
572.18
Bloque Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
8,592.14
572.18
Acero Construccin
*Malla de Acero F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
5,790.37
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
6,580.02
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
130,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
17,000.00
450.61
43
1
2
3
4
5
6
7
8
9
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
34,000.00
668.55
10
11
12
Sep-15
Oct-15
Nov-15
0.00
0.00
17,510.04
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
34,000.00
501.62
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
20,000.00
530.09
Bloque y Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,392.06
79,355.76
103,912.97
64,876.45
116,179.10
76,349.91
49,473.15
16,455.02
20,655.96
0.00
0.00
17,510.04
25,000.00
575.56
684,938.12
PRESUP. CONTRATADO:
684,938.12
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
123,503.54
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
34,196.67
458.79
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
28,136.49
659.07
Acero Construccin
Corrugado
1
2
3
4
5
6
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
22,704.52
481.01
7
8
9
10
11
12
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
9,345.39
523.47
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
9,366.84
572.18
Bloque Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
8,650.85
572.18
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
11,102.78
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
156,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
24,000.00
450.61
43
1
2
3
4
5
6
7
8
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
40,000.00
668.55
9
10
11
12
Aug-15
Sep-15
Oct-15
Nov-15
24,428.97
13,288.20
33,101.35
12,593.77
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
42,000.00
501.62
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
24,000.00
530.09
Bloque y Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
16,000.00
575.56
30
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
48,438.19
31,373.79
127,834.46
108,283.95
60,158.46
74,994.21
138,577.14
11,865.62
24,428.97
13,288.20
33,101.35
12,593.77
10,000.00
407.64
676,637.73
PRESUP. CONTRATADO:
676,637.73
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
135,327.55
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
31,290.95
458.79
43
1
2
3
4
5
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
26,833.77
659.07
6
7
8
9
10
11
12
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
19,346.55
481.01
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
6,791.41
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
7,352.02
523.47
12
Nov-15
83,228.10
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
11,037.49
572.18
Bloque Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
9,376.77
572.18
Acero Construccin
Corrugado
Malla de Aceroen F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
9,515.79
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
Sep-14
Oct-14
Nov-14
74,534.84
92,794.70
97,470.44
13,782.80
481.01
4
5
6
7
8
9
10
11
12
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
135,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
15,000.00
450.61
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
30,000.00
668.55
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
40,000.00
501.62
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
25,000.00
530.09
Bloque y Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
74,534.84
92,794.70
97,470.44
87,426.17
108,286.16
84,488.05
33,070.97
0.00
0.00
0.00
15,338.28
83,228.10
25,000.00
575.56
PRESUP. BASE:
772,514.61
PRESUP. CONTRATADO:
772,514.61
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
185,263.17
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
42,693.00
458.79
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
39,232.69
659.07
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
30,760.25
481.01
10
11
12
Sep-15
Oct-15
Nov-15
0.00
0.00
15,012.59
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
23,015.93
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
11,264.35
523.47
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
9,238.55
572.18
Bloque Ladrillo
17
Sep-14
69,565.80
11,603.32
572.18
Acero Construccin
Corrugado
Malla de Aceroen F.P. Antigua
2
3
4
5
6
7
8
9
10
11
12
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
17,455.07
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
104,500.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
4,500.00
450.61
12
Nov-15
15,012.59
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
30,000.00
668.55
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
30,000.00
501.62
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
69,565.80
87,526.74
146,960.73
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
12,000.00
530.09
Bloque y Ladrillo
17
1
2
3
Sep-14
Oct-14
Nov-14
69,565.80
87,526.74
146,960.73
28,000.00
575.56
4
5
6
7
8
9
10
11
12
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
162,191.16
137,866.09
82,671.57
33,407.46
37,312.47
0.00
0.00
0.00
15,012.59
678,317.60
PRESUP. CONTRATADO:
678,317.60
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
135,663.52
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
31,208.83
458.79
43
1
2
3
4
5
6
7
8
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
29,516.16
659.07
9
10
11
12
Aug-15
Sep-15
Oct-15
Nov-15
0.00
3,575.67
9,878.97
10,188.00
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
16,892.81
481.01
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
8,776.48
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
7,951.73
523.47
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
12,569.03
572.18
Bloque Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
10,355.63
572.18
Acero Construccin
Corrugado
Malla de Acero en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
9,118.25
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
4
5
6
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
9,274.60
481.01
7
8
9
10
11
12
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
119,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
18,000.00
450.61
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
33,000.00
668.55
Acero Construccin
Corrugado
1
2
Sep-14
Oct-14
68,090.70
71,659.60
38,000.00
501.62
3
4
5
6
7
8
9
10
11
12
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
15,000.00
530.09
Bloque y Ladrillo
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
68,090.70
71,659.60
110,500.41
97,858.37
134,926.35
102,991.72
38,822.37
29,825.44
0.00
3,575.67
9,878.97
10,188.00
15,000.00
575.56
659,462.73
PRESUP. CONTRATADO:
659,462.73
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
153,874.64
Sep-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
40,696.19
458.79
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
32,193.59
659.07
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
17,124.51
481.01
Agregado Fino
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
7,037.81
523.47
Agregado Fino
*Grueso en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
7,710.23
523.47
Bloque Ladrillo
*Ceramico en F.P. Antigua
17
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
10,987.68
572.18
Bloque Ladrillo
17
1
2
3
4
Sep-14
Oct-14
Nov-14
Dec-14
0.00
0.00
0.00
0.00
16,275.60
572.18
5
6
7
8
9
10
11
12
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
Acero Construccin
Corrugado
Malla de Aceroen F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
11,487.98
481.01
Acero Construccin
*Tuberia de Acero Galv.
en F.P. Antigua
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
10,361.05
481.01
Material
Denominacin
No.
Mes
Adelanto Pagado
Monto S/.
Monto
SIN IGV =
Indice mes
del Pago
Ima
109,000.00
Dec-14
Cemento Portland
Tipo I
21
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
8,000.00
450.61
43
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
32,000.00
668.55
Acero Construccin
Corrugado
1
2
3
4
5
6
7
8
9
10
11
12
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
41,000.00
501.62
Agregado Fino
1
2
3
4
5
6
Sep-14
Oct-14
Nov-14
Dec-14
Apr-15
May-15
0.00
0.00
0.00
0.00
0.00
0.00
28,000.00
530.09
7
8
9
10
11
12
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
0.00
322,040.16
111,232.13
99,406.32
85,529.70
41,254.41
Notas:
1. Cuando el adelanto utilizado (U) alcanza el mismo monto que el Adelanto Deflactado, deben interrumpirse las Deducciones
2. Los Reintegros que NO corresponden NUNCA sern inferiores a CERO (0)
CIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
SUPERVISIN
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.079
100.00%
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
36,072.82
0.00
0.00
0.00
0.00
20,298.27
23,621.42
11,262.86
2,456.80
0.00
0.00
0.00
0.00
57,639.35
0.00
0.00
0.00
0.00
0.00
138.59
39.05
3.33
0.00
0.00
0.00
0.00
180.97
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
0.109
100.00%
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
29,165.23
0.00
0.00
0.00
0.00
28,006.47
32,591.58
15,539.89
3,389.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
692.05
0.00
447.96
113.33
0.00
0.00
0.00
692.02
29,165.23
0.00
79,527.70
0.00
1,253.34
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.086
100.00%
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
23,980.64
0.00
0.00
0.00
0.00
22,096.85
25,714.46
12,260.83
2,674.49
0.00
0.00
0.00
0.00
62,746.63
0.00
0.00
0.00
0.00
1,130.00
0.00
403.05
0.00
0.00
0.00
0.00
0.00
1,533.05
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.051
100.00%
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
12,092.59
0.00
0.00
0.00
0.00
13,103.94
15,249.27
7,270.96
1,586.03
0.00
0.00
0.00
0.00
37,210.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.05
0.00
0.00
0.00
0.00
2.05
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.051
100.00%
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
10,221.18
0.00
0.00
0.00
0.00
0.00
13,103.94
15,249.27
7,270.96
0.00
0.00
0.00
0.00
35,624.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
90.95
0.00
0.00
0.00
0.00
90.95
575.59
572.18
573.76
578.72
0.051
100.00%
7,853.22
7,853.22
7,853.22
0.00
0.00
0.00
0.00
0.00
0.00
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
7,853.22
7,853.22
7,853.22
7,853.22
7,853.22
7,853.22
7,853.22
7,853.22
7,853.22
0.00
0.00
13,103.94
15,249.27
7,270.96
0.00
0.00
0.00
0.00
35,624.17
0.00
0.00
0.00
0.00
90.95
0.00
0.00
0.00
0.00
90.95
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.086
100.00%
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
7,132.79
0.00
0.00
0.00
0.00
0.00
22,096.85
25,714.46
12,260.83
0.00
0.00
0.00
0.00
60,072.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.086
100.00%
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
6,673.92
0.00
0.00
0.00
0.00
0.00
22,096.85
25,714.46
12,260.83
0.00
0.00
0.00
0.00
60,072.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
O QUE NO CORRESPONDE
Indice
Base
Imo
May-14
Imr
Imr
3,151.31
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
% en
Monom.
%
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.079
100.00%
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
0.00
0.00
0.00
0.00
0.00
20,298.27
23,621.42
11,262.86
2,456.80
0.00
0.00
0.00
57,639.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
220.02
47.99
0.00
0.00
0.00
268.01
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.109
100.00%
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
21,427.09
0.00
0.00
0.00
0.00
0.00
28,006.47
32,591.58
15,539.89
3,389.76
0.00
0.00
0.00
79,527.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
293.31
83.66
0.00
0.00
0.00
376.97
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.086
100.00%
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
18,860.09
0.00
0.00
0.00
0.00
0.00
22,096.85
25,714.46
12,260.83
2,674.49
0.00
0.00
0.00
62,746.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
517.47
523.47
0.00
0.00
0.00
0.00
0.051
100.00%
20,938.50
20,938.50
20,938.50
20,938.50
20,938.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.051
100.00%
20,938.50
20,938.50
20,938.50
20,938.50
20,938.50
20,938.50
20,938.50
13,103.94
15,249.27
7,270.96
1,586.03
0.00
0.00
0.00
37,210.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
20,001.04
0.00
0.00
0.00
0.00
0.00
13,103.94
15,249.27
7,270.96
1,586.03
0.00
0.00
0.00
37,210.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
O QUE NO CORRESPONDE
SPONDE A I.E.I. N567 CASA HOGAR DE MARIA
644.98
3,796.29
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
0.072
100.00%
1,512.61
3,519.74
9,391.16
10,425.74
4,981.29
4,931.86
5,289.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28.94
18.34
0.00
0.00
0.00
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
25,790.94
459.40
459.40
25,790.94
25,790.94
0.00
0.00
40,051.63
0.00
0.00
47.28
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.099
100.00%
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
21,802.65
2,079.84
4,839.65
12,912.84
14,335.39
6,849.27
6,781.31
7,272.68
0.00
0.00
0.00
0.00
0.00
55,070.98
0.00
23.26
92.61
208.71
169.25
212.98
209.64
0.00
0.00
0.00
0.00
0.00
916.45
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.101
100.00%
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
15,874.79
2,121.86
4,937.42
13,173.71
14,625.00
6,987.64
6,918.31
7,419.61
0.00
0.00
0.00
0.00
0.00
56,183.55
0.00
113.36
399.64
637.21
357.34
242.78
243.91
0.00
0.00
0.00
0.00
0.00
1,994.24
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.052
100.00%
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
8,109.04
1,092.44
2,542.04
6,782.50
7,529.70
3,597.60
3,561.90
3,820.00
0.00
0.00
0.00
0.00
0.00
28,926.18
0.00
9.63
73.79
96.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
179.75
449.97
523.47
525.43
0.052
100.00%
5,903.67
5,903.67
1,092.44
2,542.04
0.00
11.07
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
5,903.67
5,903.67
5,903.67
5,903.67
5,903.67
5,903.67
5,903.67
5,903.67
5,903.67
12,092.59
6,782.50
7,529.70
3,597.60
3,561.90
3,820.00
0.00
0.00
0.00
0.00
0.00
28,926.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.07
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.053
100.00%
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
8,141.29
1,113.45
2,590.92
6,912.94
7,674.50
3,666.78
3,630.40
3,893.46
0.00
0.00
0.00
0.00
0.00
29,482.45
0.00
7.11
78.55
45.07
70.01
56.77
55.20
0.00
0.00
0.00
0.00
0.00
312.71
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.053
100.00%
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
6,916.33
1,113.45
2,590.92
6,912.94
7,674.50
3,666.78
3,630.40
3,893.46
0.00
0.00
0.00
0.00
0.00
29,482.45
0.00
7.11
78.55
0.00
70.01
56.77
55.20
0.00
0.00
0.00
0.00
0.00
267.64
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
0.101
100.00%
6,861.54
6,861.54
6,861.54
6,861.54
6,861.54
6,861.54
6,861.54
6,861.54
2,121.86
4,937.42
13,173.71
14,625.00
6,987.64
6,918.31
7,419.61
0.00
0.00
113.36
0.00
0.00
0.00
0.00
0.00
0.00
462.12
457.96
461.49
469.48
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.101
100.00%
6,861.54
6,861.54
6,861.54
6,861.54
0.00
0.00
0.00
0.00
56,183.55
0.00
0.00
0.00
0.00
113.36
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
9,938.35
2,121.86
4,937.42
13,173.71
14,625.00
6,987.64
6,918.31
7,419.61
0.00
0.00
0.00
0.00
0.00
56,183.55
0.00
113.36
0.00
0.00
357.34
242.78
243.91
0.00
0.00
0.00
0.00
0.00
957.39
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
4,799.89
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.072
100.00%
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
0.00
0.00
0.00
10,425.74
4,981.29
4,931.86
5,289.23
0.00
0.00
1,202.19
2,558.96
0.00
29,389.27
0.00
0.00
0.00
0.00
38.30
118.59
114.49
0.00
0.00
23.48
49.99
0.00
344.85
651.14
659.07
662.20
663.74
668.55
0.099
100.00%
36,036.47
36,036.47
36,036.47
36,036.47
0.00
0.00
0.00
14,335.39
0.00
0.00
0.00
0.00
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
36,036.47
36,036.47
36,036.47
36,036.47
36,036.47
36,036.47
36,036.47
36,036.47
6,849.27
6,781.31
7,272.68
0.00
0.00
1,653.01
3,518.57
0.00
40,410.23
69.53
114.25
103.76
0.00
0.00
49.58
106.34
0.00
443.46
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.072
100.00%
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
43,378.21
0.00
0.00
0.00
10,425.74
4,981.29
4,931.86
5,289.23
0.00
0.00
1,202.19
2,558.96
0.00
29,389.27
0.00
0.00
0.00
0.00
37.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37.70
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.052
100.00%
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
21,476.24
0.00
0.00
0.00
7,529.70
3,597.60
3,561.90
3,820.00
0.00
0.00
868.25
1,848.14
0.00
21,225.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
0.081
100.00%
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
23,001.20
0.00
0.00
0.00
11,728.96
5,603.95
5,548.35
5,950.38
0.00
0.00
1,352.47
0.00
0.00
0.00
0.00
74.09
54.17
49.42
0.00
0.00
10.71
583.12
586.80
385.05
396.99
403.12
404.73
407.64
429.32
434.47
438.07
442.52
450.46
447.20
450.53
462.65
0.081
100.00%
23,001.20
23,001.20
2,878.83
0.00
33,062.94
37.81
0.00
226.20
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
18,891.67
0.00
0.00
0.00
11,728.96
5,603.95
5,548.35
5,950.38
0.00
0.00
1,352.47
2,878.83
0.00
33,062.94
0.00
0.00
0.00
0.00
315.53
386.60
470.25
0.00
0.00
138.95
320.67
0.00
1,632.00
O QUE NO CORRESPONDE
RRESPONDE A I.E.I. N523 CEDROPAMPA
2,684.21
7,484.10
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.075
100.00%
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
25,631.73
3,629.40
5,951.68
7,793.47
4,865.73
8,713.43
5,726.24
3,710.49
1,234.13
0.00
0.00
0.00
0.00
41,624.57
0.00
0.00
0.00
0.00
0.00
33.60
12.86
1.67
0.00
0.00
0.00
0.00
48.13
651.14
659.07
0.103
100.00%
22,158.95
4,984.38
0.00
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
8,173.64
10,703.04
6,682.27
11,966.45
7,864.04
5,095.73
1,694.87
0.00
0.00
0.00
0.00
57,164.42
39.29
76.76
97.29
295.70
246.98
146.89
56.67
0.00
0.00
0.00
0.00
959.58
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.089
100.00%
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
13,837.97
4,306.89
7,062.66
9,248.25
5,774.00
10,339.94
6,795.14
4,403.11
1,464.50
0.00
0.00
0.00
0.00
49,394.49
0.00
162.15
280.56
251.57
528.77
238.46
144.74
0.00
0.00
0.00
0.00
0.00
1,606.25
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.051
100.00%
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
7,404.81
2,468.00
4,047.14
5,299.56
3,308.70
5,925.13
3,893.85
2,523.13
839.21
0.00
0.00
0.00
0.00
28,304.72
0.00
15.33
57.66
42.33
0.00
0.00
0.00
1.09
0.00
0.00
0.00
0.00
116.41
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
0.051
100.00%
7,285.66
7,285.66
7,285.66
7,285.66
7,285.66
7,285.66
7,285.66
2,468.00
4,047.14
5,299.56
3,308.70
5,925.13
3,893.85
2,523.13
0.00
15.33
57.66
42.33
0.00
0.00
0.00
524.14
523.77
523.82
524.24
527.63
7,285.66
7,285.66
7,285.66
7,285.66
7,285.66
839.21
0.00
0.00
0.00
0.00
28,304.72
1.09
0.00
0.00
0.00
0.00
116.41
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.061
100.00%
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
8,360.71
2,951.92
4,840.70
6,338.69
3,957.46
7,086.93
4,657.34
3,017.86
1,003.76
0.00
0.00
0.00
0.00
33,854.66
0.00
13.29
72.02
23.24
135.31
72.82
42.78
12.56
0.00
0.00
0.00
0.00
372.02
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.061
100.00%
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
8,643.34
2,951.92
4,840.70
6,338.69
3,957.46
7,086.93
4,657.34
3,017.86
1,003.76
0.00
0.00
0.00
0.00
33,854.66
0.00
13.29
72.02
23.24
135.31
72.82
42.78
12.56
0.00
0.00
0.00
0.00
372.02
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.089
100.00%
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
5,694.31
4,306.89
7,062.66
9,248.25
5,774.00
10,339.94
6,795.14
4,403.11
1,464.50
0.00
0.00
0.00
0.00
49,394.49
0.00
0.00
0.00
0.00
0.00
0.00
144.74
0.00
0.00
0.00
0.00
0.00
144.74
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.089
100.00%
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
6,470.86
4,306.89
7,062.66
9,248.25
5,774.00
10,339.94
6,795.14
4,403.11
1,464.50
0.00
0.00
0.00
0.00
49,394.49
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
0.00
0.00
0.00
251.57
0.00
0.00
144.74
0.00
0.00
0.00
0.00
0.00
396.31
4,131.87
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.075
100.00%
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
16,975.85
0.00
0.00
0.00
4,865.73
8,713.43
5,726.24
3,710.49
1,234.13
1,549.20
0.00
0.00
0.00
25,799.22
0.00
0.00
0.00
0.00
67.00
137.69
80.32
24.11
30.26
0.00
0.00
0.00
339.38
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
0.103
100.00%
33,114.59
33,114.59
33,114.59
33,114.59
33,114.59
33,114.59
33,114.59
33,114.59
33,114.59
0.00
0.00
0.00
6,682.27
11,966.45
7,864.04
5,095.73
1,694.87
2,127.56
0.00
0.00
0.00
0.00
121.48
132.49
72.70
31.99
52.51
688.08
688.23
692.02
33,114.59
33,114.59
33,114.59
0.00
0.00
0.00
35,430.92
0.00
0.00
0.00
411.17
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.089
100.00%
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
32,062.16
0.00
0.00
0.00
5,774.00
10,339.94
6,795.14
4,403.11
1,464.50
1,838.38
0.00
0.00
0.00
30,615.07
0.00
0.00
0.00
0.00
78.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78.26
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.051
100.00%
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
19,523.85
0.00
0.00
0.00
3,308.70
5,925.13
3,893.85
2,523.13
839.21
1,053.45
0.00
0.00
0.00
17,543.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.061
100.00%
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
0.00
0.00
0.00
3,957.46
7,086.93
4,657.34
3,017.86
1,003.76
1,260.01
0.00
0.00
0.00
20,983.36
0.00
0.00
0.00
0.00
93.70
45.47
25.06
6.66
8.56
0.00
0.00
0.00
179.45
O QUE NO CORRESPONDE
1,008.26
5,140.13
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.086
100.00%
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
4,165.68
2,698.15
10,993.76
9,312.42
5,173.63
6,449.50
11,917.63
1,020.44
0.00
0.00
0.00
0.00
51,731.21
0.00
0.00
0.00
0.00
0.00
37.84
41.32
1.38
0.00
0.00
0.00
0.00
80.54
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.099
100.00%
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
22,158.95
4,795.38
3,106.01
12,655.61
10,720.11
5,955.69
7,424.43
13,719.14
1,174.70
0.00
0.00
0.00
0.00
59,551.07
0.00
14.93
90.77
156.07
147.17
233.18
395.47
39.27
0.00
0.00
0.00
0.00
1,076.86
473.03
481.01
491.87
495.36
501.62
505.20
497.61
0.092
100.00%
22,327.85
22,327.85
22,327.85
22,327.85
22,327.85
22,327.85
4,456.31
2,886.39
11,760.77
9,962.12
5,534.58
6,899.47
0.00
66.27
356.78
434.05
283.03
242.12
496.56
458.09
462.12
457.96
461.49
469.48
22,327.85
22,327.85
22,327.85
22,327.85
22,327.85
22,327.85
12,749.10
1,091.64
0.00
0.00
0.00
0.00
55,340.38
419.10
0.00
0.00
0.00
0.00
0.00
1,801.35
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.075
49.33%
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
9,238.27
1,792.20
1,160.82
4,729.84
4,006.48
2,225.85
2,774.77
5,127.32
439.02
0.00
0.00
0.00
0.00
22,256.30
0.00
4.40
51.46
51.25
0.00
0.00
0.00
0.57
0.00
0.00
0.00
0.00
107.68
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.075
50.67%
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
9,422.67
1,840.66
1,192.21
4,857.74
4,114.82
2,286.04
2,849.80
5,265.97
450.90
0.00
0.00
0.00
0.00
22,858.14
0.00
3.27
55.19
24.16
43.65
44.56
74.65
5.64
0.00
0.00
0.00
0.00
251.12
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.075
50.67%
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
8,702.40
1,840.66
1,192.21
4,857.74
4,114.82
2,286.04
2,849.80
5,265.97
450.90
0.00
0.00
0.00
0.00
0.00
3.27
55.19
24.16
43.65
44.56
74.65
5.64
0.00
0.00
0.00
0.00
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.092
100.00%
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
10,918.59
22,858.14
251.12
4,456.31
2,886.39
11,760.77
9,962.12
5,534.58
6,899.47
12,749.10
1,091.64
0.00
0.00
0.00
0.00
55,340.38
0.00
66.27
0.00
434.05
283.03
242.12
0.00
0.00
0.00
0.00
0.00
0.00
1,025.47
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
4,594.14
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.086
100.00%
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
23,965.91
0.00
0.00
0.00
9,312.42
5,173.63
6,449.50
11,917.63
1,020.44
2,100.89
1,142.79
2,846.72
0.00
39,964.02
0.00
0.00
0.00
0.00
39.78
155.08
257.97
19.93
41.04
22.32
55.61
0.00
591.73
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
0.099
100.00%
38,958.34
38,958.34
38,958.34
38,958.34
38,958.34
38,958.34
38,958.34
38,958.34
0.00
0.00
0.00
10,720.11
5,955.69
7,424.43
13,719.14
1,174.70
0.00
0.00
0.00
0.00
60.46
125.08
195.73
22.17
684.62
688.08
688.23
692.02
38,958.34
38,958.34
38,958.34
38,958.34
2,418.47
1,315.53
3,277.03
0.00
46,005.10
59.69
39.46
99.04
0.00
601.63
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.092
100.00%
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
39,606.20
0.00
0.00
0.00
9,962.12
5,534.58
6,899.47
12,749.10
1,091.64
2,247.47
1,222.51
3,045.32
0.00
42,752.21
0.00
0.00
0.00
0.00
41.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
41.89
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.075
49.33%
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
23,428.63
0.00
0.00
0.00
4,006.48
2,225.85
2,774.77
5,127.32
439.02
903.87
491.66
1,224.74
0.00
17,193.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.075
50.67%
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
16,000.83
0.00
0.00
0.00
4,114.82
2,286.04
2,849.80
5,265.97
450.90
928.31
504.95
1,257.86
0.00
17,658.65
0.00
0.00
0.00
0.00
30.22
27.83
43.73
2.99
6.31
4.00
16.52
0.00
131.60
385.05
396.99
403.12
404.73
407.64
429.32
434.47
438.07
442.52
450.46
447.20
450.53
462.65
0.053
100.00%
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
9,445.83
0.00
0.00
0.00
5,739.05
3,188.40
3,974.69
7,344.59
628.88
1,294.74
704.27
1,754.37
0.00
24,628.99
O QUE NO CORRESPONDE
ORRESPONDE A I.E.I. N564- EL ARENAL
0.00
0.00
0.00
0.00
179.52
276.95
580.43
56.97
143.98
72.36
195.42
0.00
1,505.63
2,872.48
7,466.62
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.078
100.00%
30,689.40
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
33,539.26
5,813.72
7,237.99
7,602.69
6,819.24
8,446.32
6,590.07
2,579.54
0.00
0.00
0.00
0.00
0.00
45,089.57
0.00
0.00
0.00
0.00
0.00
38.66
8.94
0.00
0.00
0.00
0.00
0.00
47.60
651.14
659.07
662.20
663.74
668.55
675.16
0.103
100.00%
26,510.90
26,510.90
26,510.90
26,510.90
26,510.90
7,677.09
9,557.85
10,039.46
9,004.90
11,153.47
0.00
45.94
72.00
131.10
275.61
679.52
677.84
680.84
684.62
688.08
688.23
692.02
26,510.90
26,510.90
26,510.90
26,510.90
26,510.90
26,510.90
26,510.90
8,702.27
3,406.31
0.00
0.00
0.00
0.00
0.00
59,541.35
273.31
98.19
0.00
0.00
0.00
0.00
0.00
896.15
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.097
100.00%
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
19,025.59
7,229.88
9,001.09
9,454.63
8,480.34
10,503.76
8,195.34
3,207.88
0.00
0.00
0.00
0.00
0.00
56,072.92
0.00
206.65
286.82
369.49
537.15
287.60
105.45
0.00
0.00
0.00
0.00
0.00
1,793.16
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.055
100.00%
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
6,713.57
4,099.42
5,103.71
5,360.87
4,808.44
5,955.74
4,646.84
1,818.90
0.00
0.00
0.00
0.00
0.00
31,793.92
0.00
19.33
58.33
61.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
139.17
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
0.055
100.00%
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
7,267.75
4,099.42
5,103.71
5,360.87
4,808.44
5,955.74
4,646.84
1,818.90
0.00
0.00
0.00
0.00
0.00
19.33
58.33
61.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
527.63
7,267.75
0.00
31,793.92
0.00
139.17
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.063
100.00%
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
11,103.27
4,695.69
5,846.07
6,140.64
5,507.85
6,822.03
5,322.75
2,083.47
0.00
0.00
0.00
0.00
0.00
36,418.50
0.00
16.05
69.77
32.34
130.26
83.23
29.54
0.00
0.00
0.00
0.00
0.00
361.19
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.063
100.00%
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
9,432.65
4,695.69
5,846.07
6,140.64
5,507.85
6,822.03
5,322.75
2,083.47
0.00
0.00
0.00
0.00
0.00
36,418.50
0.00
16.05
69.77
32.34
130.26
83.23
29.54
0.00
0.00
0.00
0.00
0.00
361.19
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.097
100.00%
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
9,357.92
7,229.88
9,001.09
9,454.63
8,480.34
10,503.76
8,195.34
3,207.88
0.00
0.00
0.00
0.00
0.00
56,072.92
0.00
206.65
0.00
369.49
0.00
287.60
105.45
0.00
0.00
0.00
0.00
0.00
969.19
473.03
481.01
491.87
495.36
0.097
100.00%
13,554.14
13,554.14
13,554.14
7,229.88
9,001.09
9,454.63
0.00
206.65
286.82
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
13,554.14
13,554.14
13,554.14
13,554.14
13,554.14
13,554.14
13,554.14
13,554.14
13,554.14
8,480.34
10,503.76
8,195.34
3,207.88
0.00
0.00
0.00
0.00
0.00
56,072.92
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
369.49
537.15
287.60
105.45
0.00
0.00
0.00
0.00
0.00
1,793.16
6,499.98
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.078
100.00%
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
14,978.70
0.00
0.00
0.00
6,819.24
8,446.32
6,590.07
2,579.54
0.00
0.00
0.00
1,196.39
0.00
25,631.56
0.00
0.00
0.00
0.00
64.95
158.47
55.84
0.00
0.00
0.00
23.37
0.00
302.63
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.103
100.00%
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
0.00
0.00
0.00
9,004.90
11,153.47
8,702.27
3,406.31
0.00
0.00
0.00
1,579.84
0.00
33,846.79
0.00
0.00
0.00
0.00
113.22
146.61
48.60
0.00
0.00
0.00
47.75
0.00
356.18
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.097
100.00%
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
37,720.19
0.00
0.00
0.00
8,480.34
10,503.76
8,195.34
3,207.88
0.00
0.00
0.00
1,487.81
0.00
31,875.13
0.00
0.00
0.00
0.00
79.49
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.49
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.055
100.00%
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
24,404.82
0.00
0.00
0.00
4,808.44
5,955.74
4,646.84
1,818.90
0.00
0.00
0.00
843.61
0.00
18,073.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.063
100.00%
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
25,001.30
0.00
0.00
0.00
5,507.85
6,822.03
5,322.75
2,083.47
0.00
0.00
0.00
966.31
0.00
20,702.41
0.00
0.00
0.00
0.00
90.20
51.97
17.30
0.00
0.00
0.00
12.69
0.00
172.16
O QUE NO CORRESPONDE
RRESPONDE A E.I. N563- GRAMALOTILLO
910.46
7,410.44
SIN IGV)
SIN IGV)
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.061
100.00%
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
41,872.25
4,243.51
5,339.13
8,964.60
9,893.66
8,409.83
5,042.97
2,037.86
2,276.06
0.00
0.00
0.00
0.00
46,207.62
0.00
0.00
0.00
0.00
0.00
29.59
7.07
3.09
0.00
0.00
0.00
0.00
39.75
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.089
100.00%
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
38,760.64
6,191.36
7,789.88
13,079.50
14,435.01
12,270.08
7,357.77
2,973.26
3,320.81
0.00
0.00
0.00
0.00
67,417.67
0.00
37.45
93.81
210.16
303.20
231.08
85.71
111.03
0.00
0.00
0.00
0.00
1,072.44
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
0.076
100.00%
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
5,287.00
6,652.03
11,169.02
12,326.53
10,477.82
6,283.04
2,538.97
2,835.75
0.00
0.00
152.72
338.83
537.07
535.82
220.49
83.46
0.00
0.00
457.96
461.49
469.48
30,249.94
30,249.94
30,249.94
0.00
0.00
0.00
57,570.16
0.00
0.00
0.00
1,868.39
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.097
46.39%
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
22,752.13
3,130.48
3,938.72
6,613.27
7,298.64
6,204.01
3,720.24
1,503.34
1,679.07
0.00
0.00
0.00
0.00
34,087.77
0.00
14.92
71.95
93.37
0.00
0.00
0.00
2.17
0.00
0.00
0.00
0.00
182.41
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.097
46.39%
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
11,135.24
3,130.48
3,938.72
6,613.27
7,298.64
6,204.01
3,720.24
1,503.34
1,679.07
0.00
0.00
0.00
0.00
34,087.77
0.00
14.92
71.95
93.37
0.00
0.00
0.00
2.17
0.00
0.00
0.00
0.00
182.41
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.097
100.00%
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
9,293.61
6,747.88
8,490.09
14,255.19
15,732.54
13,373.01
8,019.14
3,240.52
3,619.31
0.00
0.00
0.00
0.00
73,477.68
0.00
23.31
0.00
0.00
0.00
125.39
45.94
45.27
0.00
0.00
0.00
0.00
239.91
575.59
572.18
0.097
53.61%
11,672.47
3,617.40
0.00
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.076
100.00%
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
11,672.47
4,551.37
7,641.92
8,433.90
7,169.00
4,298.90
1,737.18
1,940.24
0.00
0.00
0.00
0.00
39,389.91
12.49
86.83
49.53
136.88
67.22
24.63
24.27
0.00
0.00
0.00
0.00
401.85
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
17,165.49
5,287.00
6,652.03
11,169.02
12,326.53
10,477.82
6,283.04
2,538.97
2,835.75
0.00
0.00
0.00
0.00
57,570.16
0.00
152.72
338.83
537.07
535.82
220.49
83.46
0.00
0.00
0.00
0.00
0.00
1,868.39
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
5,855.55
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
0.061
100.00%
0.00
0.00
0.00
9,893.66
8,409.83
5,042.97
2,037.86
2,276.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44.11
44.46
0.00
0.00
0.00
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
4,493.61
459.40
4,493.61
0.00
27,660.38
0.00
88.57
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.089
100.00%
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
29,218.76
0.00
0.00
0.00
14,435.01
12,270.08
7,357.77
2,973.26
3,320.81
0.00
0.00
0.00
0.00
40,356.93
0.00
0.00
0.00
0.00
124.56
123.96
42.42
62.68
0.00
0.00
0.00
0.00
353.62
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.076
100.00%
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
28,290.14
0.00
0.00
0.00
12,326.53
10,477.82
6,283.04
2,538.97
2,835.75
0.00
0.00
0.00
0.00
34,462.11
0.00
0.00
0.00
0.00
79.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
79.30
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.097
46.39%
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
11,714.31
0.00
0.00
0.00
7,298.64
6,204.01
3,720.24
1,503.34
1,679.07
0.00
0.00
0.00
0.00
20,405.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
0.097
53.61%
28,001.46
28,001.46
28,001.46
0.00
0.00
0.00
0.00
0.00
0.00
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
28,001.46
28,001.46
28,001.46
28,001.46
28,001.46
28,001.46
28,001.46
28,001.46
28,001.46
8,433.90
7,169.00
4,298.90
1,737.18
1,940.24
0.00
0.00
0.00
0.00
23,579.22
O QUE NO CORRESPONDE
ORRESPONDE A - I.E.I. N535- LA JAYUA
0.00
94.78
41.97
14.43
12.88
0.00
0.00
0.00
0.00
164.06
685.55
6,541.10
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.075
100.00%
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
30,608.86
5,106.80
5,374.47
8,287.53
7,339.38
10,119.48
7,724.38
2,911.68
2,236.91
0.00
0.00
0.00
0.00
49,100.63
0.00
0.00
0.00
0.00
0.00
45.32
10.09
3.03
0.00
0.00
0.00
0.00
58.44
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
0.103
100.00%
29,161.02
29,161.02
29,161.02
29,161.02
29,161.02
29,161.02
29,161.02
29,161.02
7,013.34
7,380.94
11,381.54
10,079.41
13,897.41
10,608.15
3,998.70
3,072.02
0.00
35.48
81.63
146.75
343.41
333.16
115.27
102.71
684.62
688.08
688.23
692.02
29,161.02
29,161.02
29,161.02
29,161.02
0.00
0.00
0.00
0.00
67,431.51
0.00
0.00
0.00
0.00
1,158.41
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.096
100.00%
16,612.55
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
30,249.94
6,536.71
6,879.32
10,608.04
9,394.40
12,952.93
9,887.21
3,726.95
2,863.24
0.00
0.00
0.00
0.00
62,848.80
0.00
157.94
321.81
409.32
662.39
346.97
122.52
0.00
0.00
0.00
0.00
0.00
2,020.95
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.053
100.00%
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
8,675.88
3,608.81
3,797.96
5,856.52
5,186.49
7,151.10
5,458.56
2,057.59
1,580.75
0.00
0.00
0.00
0.00
34,697.78
0.00
14.39
63.72
66.35
0.00
0.00
0.00
2.05
0.00
0.00
0.00
0.00
146.51
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.053
100.00%
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
7,860.59
3,608.81
3,797.96
5,856.52
5,186.49
7,151.10
5,458.56
2,057.59
1,580.75
0.00
0.00
0.00
0.00
34,697.78
0.00
14.39
63.72
66.35
0.00
0.00
0.00
2.05
0.00
0.00
0.00
0.00
146.51
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.058
100.00%
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
12,643.94
3,949.26
4,156.26
6,409.02
5,675.79
7,825.73
5,973.52
2,251.70
1,729.88
0.00
0.00
0.00
0.00
37,971.16
0.00
11.41
72.82
33.33
149.42
93.40
31.92
21.64
0.00
0.00
0.00
0.00
413.94
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.058
100.00%
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
10,417.35
3,949.26
4,156.26
6,409.02
5,675.79
7,825.73
5,973.52
2,251.70
1,729.88
0.00
0.00
0.00
0.00
37,971.16
0.00
11.41
72.82
33.33
149.42
93.40
31.92
21.64
0.00
0.00
0.00
0.00
413.94
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.096
100.00%
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
8,966.98
6,536.71
6,879.32
10,608.04
9,394.40
12,952.93
9,887.21
3,726.95
2,863.24
0.00
0.00
0.00
0.00
62,848.80
0.00
157.94
0.00
0.00
0.00
0.00
122.52
0.00
0.00
0.00
0.00
0.00
280.46
473.03
481.01
491.87
495.36
501.62
505.20
497.61
0.096
100.00%
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
6,536.71
6,879.32
10,608.04
9,394.40
12,952.93
9,887.21
0.00
157.94
0.00
0.00
0.00
0.00
496.56
458.09
462.12
457.96
461.49
469.48
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
3,726.95
2,863.24
0.00
0.00
0.00
0.00
62,848.80
O QUE NO CORRESPONDE
Indice
Base
Imo
Imr
Imr
122.52
0.00
0.00
0.00
0.00
0.00
280.46
4,919.62
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.075
100.00%
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
17,974.43
0.00
0.00
0.00
7,339.38
10,119.48
7,724.38
2,911.68
2,236.91
0.00
268.18
740.92
0.00
31,340.93
0.00
0.00
0.00
0.00
77.81
185.74
63.03
43.70
0.00
5.24
14.47
0.00
389.99
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.103
100.00%
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
32,140.63
0.00
0.00
0.00
10,079.41
13,897.41
10,608.15
3,998.70
3,072.02
0.00
368.29
1,017.53
0.00
43,041.51
0.00
0.00
0.00
0.00
141.08
178.72
57.05
57.98
0.00
11.05
30.75
0.00
476.63
473.03
481.01
491.87
0.096
100.00%
35,834.18
35,834.18
0.00
0.00
0.00
0.00
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.00
0.00
98.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
98.03
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.053
100.00%
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
14,642.89
0.00
0.00
0.00
5,186.49
7,151.10
5,458.56
2,057.59
1,580.75
0.00
189.51
523.59
0.00
22,147.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.058
100.00%
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
15,000.78
0.00
0.00
0.00
5,675.79
7,825.73
5,973.52
2,251.70
1,729.88
0.00
207.39
572.98
0.00
24,236.99
0.00
0.00
0.00
0.00
103.47
58.32
18.70
11.48
0.00
1.64
7.53
0.00
201.14
0.00
9,394.40
12,952.93
9,887.21
3,726.95
2,863.24
0.00
343.26
948.38
0.00
40,116.37
517.47
O QUE NO CORRESPONDE
ORRESPONDE A I.E.I. N555- MIRAFLORES
SIN IGV)
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
35,834.18
1,165.79
6,085.41
Indice
Base
Imo
Imr
Imr
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
% en
Monom.
%
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
May-14
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.076
100.00%
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
39,913.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,475.05
0.00
0.00
0.00
0.00
24,475.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33.18
0.00
0.00
0.00
0.00
33.18
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.099
100.00%
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
31,806.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,881.98
0.00
0.00
0.00
0.00
31,881.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.090
100.00%
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
16,840.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,983.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,983.61
0.00
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.054
100.00%
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
6,957.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,390.17
0.00
0.00
0.00
0.00
17,390.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
517.47
523.47
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
0.054
100.00%
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
7,621.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,390.17
0.00
0.00
0.00
0.00
17,390.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.055
100.00%
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
11,053.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,712.21
0.00
0.00
0.00
0.00
17,712.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
575.59
572.18
573.76
578.72
575.56
0.055
100.00%
16,372.59
16,372.59
16,372.59
16,372.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
16,372.59
16,372.59
16,372.59
16,372.59
16,372.59
16,372.59
16,372.59
16,372.59
0.00
0.00
0.00
17,712.21
0.00
0.00
0.00
0.00
17,712.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.090
100.00%
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
11,297.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,983.61
0.00
0.00
0.00
0.00
28,983.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
473.03
481.01
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
0.090
100.00%
10,189.16
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
9,120.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,983.61
0.00
0.00
0.00
0.00
28,983.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
O QUE NO CORRESPONDE
Indice
Base
Imo
May-14
Imr
Imr
33.18
Adelanto
Adelanto
Reintegros
Coef.
Incid. Mon.
C
Deflactado
Utilizado
A*Imo / Ima
U = V *C*%
que NO corresp.
D
U*(Imr-Ima)/Imo
% en
Monom.
%
449.97
458.79
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
0.076
100.00%
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
7,988.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,475.05
8,453.64
7,554.88
6,500.26
0.00
46,983.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
147.58
126.98
0.00
274.56
651.14
659.07
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
0.099
100.00%
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
31,166.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,881.98
11,011.98
9,841.23
8,467.44
0.00
61,202.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
271.77
295.17
255.92
0.00
822.86
473.03
481.01
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
0.090
100.00%
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
38,663.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,983.61
10,010.89
8,946.57
7,697.67
0.00
55,638.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
517.47
523.47
525.43
529.10
530.09
520.55
520.47
0.054
100.00%
27,333.40
27,333.40
27,333.40
27,333.40
27,333.40
27,333.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
521.08
524.14
523.77
523.82
524.24
527.63
O QUE NO CORRESPONDE
RRESPONDE A E.I. N579- VALLE GRANDE
27,333.40
27,333.40
27,333.40
27,333.40
27,333.40
27,333.40
0.00
17,390.17
6,006.54
5,367.94
4,618.60
0.00
33,383.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,097.42
1,130.60
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VA
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
CONCEPTO
Base a
May-14
Ka
Sep-14
47
498.10
523.70
30
385.05
396.99
43
651.14
659.07
473.03
481.01
21
449.97
458.79
17
BLOQUE Y LADRILLO
575.59
572.18
AGREGADO FINO
517.47
523.47
39
400.34
403.02
32
FLETE TERRESTRE
465.69
468.49
: MAYO - 2014
SUPUESTO CONTRACTUAL
INDICES UNIFICADOS MENSUALES
Oct-14
Nov-14
Dec-14
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
523.70
523.70
523.70
523.15
523.15
544.59
544.59
544.59
544.59
544.59
544.59
403.12
404.73
407.64
429.32
434.47
438.07
442.52
450.46
447.20
450.53
462.65
662.20
663.74
668.55
675.16
679.52
677.84
680.84
684.62
688.08
688.23
692.02
491.87
495.36
501.62
505.20
497.61
496.56
458.09
462.12
457.96
461.49
469.48
450.85
450.61
450.61
454.07
461.43
460.35
459.40
459.40
459.40
459.40
459.40
573.76
578.72
575.56
583.17
581.18
580.34
579.38
579.47
580.12
583.12
586.80
525.43
529.10
530.09
520.55
520.47
521.08
524.14
523.77
523.82
524.24
527.63
404.55
403.94
404.87
411.50
413.82
415.20
417.07
418.64
418.76
419.35
420.80
468.49
468.49
468.56
469.08
469.08
466.15
466.15
466.15
467.08
467.08
467.08
NOMBRE DE OBRA
PROCESO
ENTIDAD
CONTRATISTA
CURVA "S" D
100%
90%
80%
70%
60%
50%
60%
50%
39.08%
40%
30%
30.42%
26.84%
21.19%
20%
13.65%
11.64%
10%
6.07%
4.89%
0.00%
0%
INICIO 03/09/2014
Sep-14
Oct-14
Nov-14
INICIO
03/09/2014
Sep-14
0.00%
4.89%
0.00%
6.07%
DESCRIPCION
Dec-1
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILL
JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
: LICITACIN PBLICA N 001-2014/GR.CAJ-GSRC
:GERENCIA SUB REGIONAL DE CUTERVO
: CONSORCIO ILUCAN
SUPERVISIN
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
69.86%
55.34%
48.21%
55.34%
48.21%
39.08%
39.08%
39.08%
39.08%
34.00%
30.42%
30.42%
30.42%
30.42%
Dec-14
Jan-15
Feb-15
Mar-15
26.84%
21.19%
Nov-14
Apr-15
May-15
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
11.64%
21.19%
30.42%
30.42%
30.42%
30.42%
13.65%
26.84%
39.08%
39.08%
39.08%
39.08%
99.68%
97.25%
95.61%
90.36%
92.81%
87.49%
79.23%
69.86%
65.18%
48.21%
79.15%
89.85%
96.45%
100.00%
65.18%
48.21%
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
34.00%
48.21%
65.18%
79.15%
89.85%
95.61%
97.25%
55.34%
69.86%
79.23%
87.49%
90.36%
92.81%
96.45%
99.68%
97.25%
100.00%
100.00%
96.45%
LEYENDA
CURVA DE AVANCE
PROGRAMADO
CURVA DE AVANCE
REAL
Oct-15
Nov-15
Dec-15
Nov-15
Dec-15
99.68%
100.00%
100.00%
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLOR
PROCESO
ENTIDAD
CONTRATISTA
C
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
DESCRIPCIN
S/. 23,290.71
S/. 60,468.18
S/. 56,266.94
S/. 78,463.19
S/. 0.00
S/. 23,290.71
S/. 83,758.89
S/. 140,025.83
S/. 218,489.02
S/. 218,489.02
% MENSUAL
3.11%
8.07%
7.51%
10.47%
0.00%
% ACUMULADO
3.11%
11.17%
18.68%
29.15%
29.15%
S/. 24,241.09
S/. 30,721.54
S/. 56,883.05
S/. 40,890.59
S/. 0.00
S/. 24,241.09
S/. 54,962.63
S/. 111,845.68
S/. 152,736.27
S/. 152,736.27
% MENSUAL
3.91%
4.95%
9.17%
6.59%
0.00%
% ACUMULADO
3.91%
8.86%
18.03%
24.63%
24.63%
S/. 28,561.78
S/. 30,352.45
S/. 55,037.40
S/. 44,021.05
S/. 0.00
S/. 28,561.78
S/. 58,914.23
S/. 113,951.63
S/. 157,972.68
S/. 157,972.68
% MENSUAL
4.82%
5.12%
9.28%
7.42%
0.00%
% ACUMULADO
4.82%
9.93%
19.21%
26.63%
26.63%
S/. 42,710.94
S/. 49,883.78
S/. 84,398.12
S/. 116,456.77
S/. 0.00
S/. 42,710.94
S/. 92,594.72
S/. 176,992.84
S/. 293,449.61
S/. 293,449.61
% MENSUAL
6.24%
7.28%
12.32%
17.00%
0.00%
% ACUMULADO
6.24%
13.52%
25.84%
42.84%
42.84%
S/. 27,149.08
S/. 43,523.13
S/. 62,886.33
S/. 54,643.86
S/. 0.00
S/. 27,149.08
S/. 70,672.21
S/. 133,558.54
S/. 188,202.40
S/. 188,202.40
% MENSUAL
4.01%
6.43%
9.29%
8.08%
0.00%
% ACUMULADO
4.01%
10.44%
19.74%
27.81%
27.81%
S/. 54,980.40
S/. 70,219.38
S/. 86,316.10
S/. 77,358.90
S/. 0.00
S/. 54,980.40
S/. 125,199.78
S/. 211,515.88
S/. 288,874.78
S/. 288,874.78
% MENSUAL
7.12%
9.09%
11.17%
10.01%
0.00%
% ACUMULADO
7.12%
16.21%
27.38%
37.39%
37.39%
S/. 25,011.74
S/. 42,911.73
S/. 60,300.07
S/. 46,303.88
S/. 0.00
S/. 25,011.74
S/. 67,923.47
S/. 128,223.54
S/. 174,527.42
S/. 174,527.42
% MENSUAL
3.69%
6.33%
8.89%
6.83%
0.00%
% ACUMULADO
3.69%
10.01%
18.90%
25.73%
25.73%
S/. 39,748.87
S/. 38,885.29
S/. 56,918.24
S/. 43,373.54
S/. 0.00
S/. 39,748.87
S/. 78,634.16
S/. 135,552.40
S/. 178,925.94
S/. 178,925.94
% MENSUAL
6.03%
5.90%
8.63%
6.58%
0.00%
% ACUMULADO
6.03%
11.92%
20.55%
27.13%
27.13%
TOTAL
AVANCE MENSUAL PROGR. (SIN IGV)
S/. 265,694.61
S/. 366,965.48
S/. 519,006.25
S/. 501,511.78
S/. 0.00
S/. 265,694.61
S/. 632,660.09
S/. 1,151,666.34
S/. 1,653,178.12
S/. 1,653,178.12
% MENSUAL
4.89%
6.75%
9.55%
9.23%
0.00%
% ACUMULADO
4.89%
11.64%
21.19%
30.42%
30.42%
E CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
SUPERVISIN
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2014
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
S/. 0.00
S/. 0.00
S/. 30,725.37
S/. 77,993.37
S/. 128,182.68
S/. 119,046.47
S/. 113,708.76
S/. 218,489.02
S/. 218,489.02
S/. 249,214.39
S/. 327,207.76
S/. 455,390.44
S/. 574,436.91
S/. 688,145.67
0.00%
0.00%
4.10%
10.40%
17.10%
15.88%
15.17%
29.15%
29.15%
33.25%
43.65%
60.75%
76.63%
91.80%
S/. 0.00
S/. 0.00
S/. 20,949.90
S/. 95,627.67
S/. 112,549.81
S/. 82,720.46
S/. 122,852.43
S/. 152,736.27
S/. 152,736.27
S/. 173,686.17
S/. 269,313.84
S/. 381,863.65
S/. 464,584.11
S/. 587,436.54
0.00%
0.00%
3.38%
15.42%
18.15%
13.34%
19.81%
24.63%
24.63%
28.01%
43.43%
61.57%
74.91%
94.72%
S/. 0.00
S/. 0.00
S/. 20,964.80
S/. 93,705.12
S/. 111,350.44
S/. 76,773.51
S/. 99,524.93
S/. 157,972.68
S/. 157,972.68
S/. 178,937.48
S/. 272,642.60
S/. 383,993.04
S/. 460,766.55
S/. 560,291.48
0.00%
0.00%
3.53%
15.80%
18.77%
12.94%
16.78%
26.63%
26.63%
30.17%
45.96%
64.74%
77.68%
94.46%
S/. 0.00
S/. 0.00
S/. 21,060.50
S/. 88,739.52
S/. 105,240.38
S/. 69,436.29
S/. 73,939.51
S/. 293,449.61
S/. 293,449.61
S/. 314,510.11
S/. 403,249.63
S/. 508,490.01
S/. 577,926.30
S/. 651,865.81
0.00%
0.00%
3.07%
12.96%
15.36%
10.14%
10.80%
42.84%
42.84%
45.92%
58.87%
74.24%
84.38%
95.17%
S/. 0.00
S/. 0.00
S/. 23,513.22
S/. 102,982.86
S/. 69,779.29
S/. 0.00
S/. 0.00
S/. 188,202.40
S/. 188,202.40
S/. 211,715.62
S/. 314,698.48
S/. 384,477.77
S/. 384,477.77
S/. 384,477.77
0.00%
0.00%
3.48%
15.22%
10.31%
0.00%
0.00%
27.81%
27.81%
31.29%
46.51%
56.82%
56.82%
56.82%
S/. 0.00
S/. 0.00
S/. 25,872.71
S/. 103,565.09
S/. 126,386.50
S/. 103,701.42
S/. 90,696.00
S/. 288,874.78
S/. 288,874.78
S/. 314,747.49
S/. 418,312.58
S/. 544,699.08
S/. 648,400.50
S/. 739,096.50
0.00%
0.00%
3.35%
13.41%
16.36%
13.42%
11.74%
37.39%
37.39%
40.74%
54.15%
70.51%
83.93%
95.67%
S/. 0.00
S/. 0.00
S/. 25,826.84
S/. 104,481.00
S/. 142,903.89
S/. 164,760.83
S/. 32,948.68
S/. 174,527.42
S/. 174,527.42
S/. 200,354.26
S/. 304,835.26
S/. 447,739.15
S/. 612,499.98
S/. 645,448.66
0.00%
0.00%
3.81%
15.40%
21.07%
24.29%
4.86%
25.73%
25.73%
29.54%
44.94%
66.01%
90.30%
95.15%
S/. 0.00
S/. 0.00
S/. 25,893.99
S/. 105,215.78
S/. 125,476.06
S/. 142,800.55
S/. 48,281.46
S/. 178,925.94
S/. 178,925.94
S/. 204,819.93
S/. 310,035.71
S/. 435,511.77
S/. 578,312.32
S/. 626,593.78
0.00%
0.00%
3.93%
15.95%
19.03%
21.65%
7.32%
27.13%
27.13%
31.06%
47.01%
66.04%
87.69%
95.02%
S/. 0.00
S/. 0.00
S/. 194,807.33
S/. 772,310.41
S/. 921,869.05
S/. 759,239.53
S/. 581,951.77
S/. 1,653,178.12
S/. 1,653,178.12
S/. 1,847,985.45
S/. 2,620,295.86
S/. 3,542,164.91
S/. 4,301,404.44
S/. 4,883,356.21
0.00%
0.00%
3.58%
14.21%
16.96%
13.97%
10.71%
30.42%
30.42%
34.00%
48.21%
65.18%
79.15%
89.85%
Sep-15
Oct-15
Nov-15
Dec-15
TOTAL
S/. 61,439.06
S/. 0.00
S/. 0.00
S/. 0.00
S/. 749,584.73
S/. 749,584.73
S/. 749,584.73
S/. 749,584.73
8.20%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
S/. 32,730.33
S/. 0.00
S/. 0.00
S/. 0.00
S/. 620,166.87
S/. 620,166.87
S/. 620,166.87
S/. 620,166.87
5.28%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
S/. 0.00
S/. 0.00
S/. 0.00
S/. 593,160.42
S/. 593,160.42
S/. 593,160.42
S/. 593,160.42
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
S/. 0.00
S/. 0.00
S/. 0.00
S/. 684,938.13
S/. 684,938.13
S/. 684,938.13
S/. 684,938.13
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
S/. 89,431.40
S/. 131,966.70
S/. 17,401.20
S/. 437,838.41
S/. 527,269.81
S/. 659,236.51
S/. 676,637.71
13.22%
19.50%
2.57%
64.71%
77.92%
97.43%
100.00%
S/. 33,418.12
S/. 0.00
S/. 0.00
S/. 684,938.13
100.00%
S/. 53,360.64
7.89%
S/. 593,160.42
100.00%
S/. 33,072.32
4.83%
S/. 620,166.87
100.00%
S/. 32,868.94
5.54%
S/. 749,584.73
S/. 676,637.71
100.00%
S/. 0.00
S/. 772,514.62
S/. 772,514.62
S/. 772,514.62
S/. 772,514.62
S/. 772,514.62
4.33%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
S/. 32,868.94
S/. 0.00
S/. 0.00
S/. 0.00
S/. 678,317.60
S/. 678,317.60
S/. 678,317.60
S/. 678,317.60
4.85%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
S/. 32,868.94
S/. 0.00
S/. 0.00
S/. 0.00
S/. 659,462.72
S/. 659,462.72
S/. 659,462.72
S/. 659,462.72
4.98%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
S/. 312,627.29
S/. 89,431.40
S/. 131,966.70
S/. 17,401.20
S/. 5,195,983.50
S/. 5,285,414.90
S/. 5,417,381.60
S/. 5,434,782.83
5.75%
1.65%
2.43%
0.32%
95.61%
97.25%
99.68%
100.00%
S/. 678,317.60
S/. 659,462.72
100.00%
S/. 5,434,782.83
100.00%
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HO
MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
AO 2014
TEM
DESCRIPCIN
TOTAL
S/. 30,254.31
S/. 12,442.23
S/. 2,332.03
S/. 171.65
S/. 248.92
S/. 1,541.19
S/. 4,210.34
S/. 4,210.34
S/. 2,109.45
S/. 130.00
S/. 1,698.65
S/. 8,423.32
S/. 1,226.15
S/. 219.15
S/. 316.88
S/. 2,358.32
S/. 1,864.40
S/. 1,864.40
S/. 609.77
S/. 130.00
S/. 1,698.65
S/. 9,388.76
S/. 29.93
S/. 244.04
S/. 188.24
S/. 5,728.80
S/. 1,927.49
S/. 1,270.26
S/. 151,784.23
S/. 121,183.74
S/. 2,868.60
S/. 78,940.14
S/. 39,375.00
S/. 4,768.28
S/. 15.83
SISTEMA DE CAPTACION
CAPTACION EN QUEBRADA
OBRAS PROVISIONALES
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
Pgina 837
ENERO
28 DAS
FEBRERO
28 DAS
MARZO
18 DAS
S/. 2,332.03
S/. 171.65
S/. 248.92
S/. 1,541.19
S/. 4,210.34
S/. 2,109.45
S/. 130.00
S/. 1,698.65
S/. 1,226.15
S/. 219.15
S/. 316.88
S/. 2,358.32
S/. 466.10
S/. 29.93
S/. 244.04
S/. 188.24
S/. 3,580.50
S/. 1,398.30
S/. 609.77
S/. 130.00
S/. 1,698.65
S/. 2,148.30
S/. 1,927.49
S/. 1,270.26
S/. 2,868.60
S/. 78,940.14
S/. 19,687.50
S/. 9,843.75
ABRIL
30 DAS
AO 2014
TEM
DESCRIPCIN
TOTAL
S/. 185.99
S/. 2,175.72
S/. 416.81
S/. 1,973.93
S/. 6,664.47
S/. 18.08
S/. 132.93
S/. 2,484.68
S/. 1,144.46
S/. 2,884.32
S/. 15,936.36
S/. 59.13
S/. 367.39
S/. 2,026.72
S/. 3,348.27
S/. 387.00
S/. 9,747.85
S/. 3,231.38
S/. 7.44
S/. 82.19
S/. 1,708.72
S/. 229.70
S/. 1,203.33
S/. 55,046.87
S/. 3,574.34
S/. 23,851.45
S/. 25,512.11
S/. 1,019.13
S/. 1,089.84
S/. 265,852.62
S/. 2,332.03
S/. 2,332.03
S/. 21,595.66
S/. 1,783.14
S/. 17,468.99
S/. 2,343.53
S/. 197,168.07
S/. 13,203.02
S/. 113,799.63
S/. 26,687.88
S/. 665.84
S/. 0.00
S/. 2,313.74
S/. 14,413.15
S/. 26,084.81
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
REVOQUES, ENLUCIDOS Y MOLDURAS
ACCESORIOS
VALVULA DE PURGA
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
REVOQUES, ENLUCIDOS Y MOLDURAS
ACCESORIOS
PASE AEREO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
REVOQUES, ENLUCIDOS Y MOLDURAS
CABLES Y ACERO
CAMARA ROMPE PRESION T-7
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO ARMADO
REVOQUES, ENLUCIDOS Y MOLDURAS
ACCESORIOS
CAMARA DE CARGA - ALMACENAMIENTO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
IMPERMEABILIZACION DE PISO Y TALUD
SUMINISTRO Y COLOCACION DE ACCESORIOS DE VAL. EN CAMARA DE CARGA
SUMINISTRO E INSTALACION DE FILTRO Y ACCESORIOS
LINEA DE DISTRIBUCION
OBRAS CIVILES
OBRAS PROVISIONALES
CAJA DE VALVULAS
VALVULA DE AIRE
ARCO DE RIEGO
DADO DE ANCLAJE
SISTEMA DE RIEGO
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
RED DE TUBERIA MATRICES Y SECUNDARIAS
PURGA EN REDES MATRICES
ACCESORIOS DE PVC EN LA RED MATRIZ
VALVULA DE AIRE
PRUEBA HIDRAULICA EN TUBERIA
GASTOS VARIOS INCL/FLETE INSUMOS Y EQUIPOS
Pgina 838
ENERO
28 DAS
FEBRERO
28 DAS
MARZO
18 DAS
ABRIL
30 DAS
AO 2014
TEM
DESCRIPCIN
TOTAL
ENERO
28 DAS
FEBRERO
28 DAS
MARZO
18 DAS
ABRIL
30 DAS
S/. 44,756.86
S/. 0.00
S/. 12,996.06
S/. 26,562.84
S/. 5,197.96
S/. 0.00
OBRAS PARCELARIAS
RED DE TUBERIA MATRICES Y SECUNDARIAS
ARCO DE RIEGO
VALVULAS
PURGA PORTALATERAL
LINEA DE RIEGO POR GOTEO
COSTO DIRECTO
S/. 502,938.03
S/. 21,071.54
S/. 110,679.01
S/. 9,843.75
S/. 0.00
S/. 100,587.61
S/. 4,214.31
S/. 22,135.80
S/. 1,968.75
S/. 0.00
S/. 18,980.47
S/. 795.22
S/. 4,176.94
S/. 371.50
S/. 0.00
SUB TOTAL
S/. 622,506.11
S/. 26,081.07
S/. 136,991.75
S/. 12,184.00
S/. 0.00
S/. 112,051.10
S/. 4,694.59
S/. 24,658.51
S/. 2,193.12
S/. 0.00
TOTAL PRESUPUESTO
S/. 734,557.21
S/. 30,775.66
S/. 161,650.26
S/. 14,377.12
S/. 0.00
UTILIDAD (3.773919%)
100.00%
Pgina 839
4.19%
22.01%
1.96%
0.00%
4.19%
26.20%
28.16%
28.16%
AO 2014
MAYO
31 DAS
JUNIO
30 DAS
JULIO
31 DIAS
S/. 9,843.75
S/. 15.83
Pgina 840
AGOSTO
12 DIAS
AO 2014
MAYO
31 DAS
JUNIO
30 DAS
JULIO
31 DIAS
AGOSTO
12 DIAS
S/. 185.99
S/. 2,175.72
S/. 416.81
S/. 1,973.93
S/. 18.08
S/. 132.93
S/. 2,484.68
S/. 1,144.46
S/. 2,884.32
S/. 59.13
S/. 367.39
S/. 2,026.72
S/. 3,348.27
S/. 290.25
S/. 96.75
S/. 9,747.85
S/. 7.44
S/. 82.19
S/. 1,708.72
S/. 229.70
S/. 1,203.33
S/. 3,574.34
S/. 23,851.45
S/. 20,409.69
S/. 5,102.42
S/. 1,019.13
S/. 1,089.84
S/. 2,332.03
S/. 1,783.14
S/. 17,468.99
S/. 2,343.53
S/. 13,203.02
S/. 2,275.99
S/. 68,279.78
S/. 1,738.99
S/. 36,415.88
S/. 24,019.09
S/. 399.50
S/. 6,827.98
S/. 2,668.79
S/. 266.34
S/. 13,911.90
S/. 2,313.74
S/. 14,413.15
S/. 10,433.92
Pgina 841
AO 2014
MAYO
31 DAS
S/. 2,599.21
JUNIO
30 DAS
JULIO
31 DIAS
S/. 10,396.85
S/. 24,791.98
AGOSTO
12 DIAS
S/. 1,770.86
S/. 5,197.96
S/. 39,354.72
S/. 118,105.08
S/. 159,748.62
S/. 44,135.31
S/. 7,870.94
S/. 23,621.02
S/. 31,949.72
S/. 8,827.06
S/. 1,485.22
S/. 4,457.19
S/. 6,028.78
S/. 1,665.63
S/. 48,710.88
S/. 146,183.29
S/. 197,727.13
S/. 54,628.00
S/. 8,767.96
S/. 26,312.99
S/. 35,590.88
S/. 9,833.04
S/. 57,478.84
S/. 172,496.28
S/. 233,318.01
S/. 64,461.04
7.82%
23.48%
31.76%
8.78%
35.98%
59.46%
91.22%
68.24%
Pgina 842
OBRA
: INSTALACION DEL SISTEMA DE RIEGO TECNIFICADO POR GOTEO EN EL CASERIO LA YUNGA SANTA ROSA - JAEN - CAJAMARCA
PROPIETARIO
CONTRATISTA
SUPERVISION
VALOR REFERENCIAL
: S/. 1265,049.83
(inc. IGV)
(inc. IGV)
FECHA BASE
: DICIEMBRE - 2013
FECHA DE INICIO
DESCRIPCION
PARCIAL
(S/.)
MES 1
MES 2
Jan-14
Feb-14
Del 04 al 30
Del 01 al 28
502,938.03
21,071.54
110,679.01
COSTO DIRECTO
502,938.03
21,071.54
110,679.01
100,587.61
4,214.31
22,135.80
18,980.47
795.22
4,176.94
622,506.11
26,081.07
136,991.75
IGV (18.00 %)
TOTAL
PORCENTAJE ACUMULADO
112,051.10
4,694.59
24,658.51
734,557.21
30,775.66
161,650.26
PARCIAL
ACUMULADO
4.19%
4.19%
22.01%
26.20%
AMPLIACIN DE PLAZO 01
: 07 d.c.
AMPLIACIN DE PLAZO 03
: 05 d.c.
AMPLIACIN DE PLAZO 04
: 44 d.c.
AMPLIACIN DE PLAZO 07
: 15 d.c.
FECHA DE TRMINO
MES 4
MES 5
MES 6
MES 7
Mar-14
May-14
Jun-14
Jul-14
Aug-14
Del 01 al 16
Del 01 al 31
Del 01 al 30
Del 01 al 31
Del 01 al 12
9,843.75
39,354.72
118,105.08
159,748.62
44,135.31
9,843.75
39,354.72
118,105.08
159,748.62
44,135.31
1,968.75
7,870.94
23,621.02
31,949.72
8,827.06
371.50
1,485.22
4,457.19
6,028.78
1,665.63
12,184.00
48,710.88
146,183.29
197,727.13
54,628.00
2,193.12
8,767.96
26,312.99
35,590.88
9,833.04
14,377.11
57,478.84
172,496.28
233,318.01
64,461.04
1.96%
28.16%
7.82%
35.98%
23.48%
59.46%
31.76%
91.22%
8.78%
100.00%
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: MAYO - 2014
: SUMA ALZADA
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
03/09-30/09
01/10-31/10
01/11-30/11
01/12 -31/12
01/01-31/01
01/02-28/02
01/03-31/03
01/04-30/04
01/05-31/05
01/06-30/06
01/07-31/07
01/08-31/08
01/09-30/09
01/10-31/10
01/11-30/11
01/12-03/12
19,408.93
50,390.15
46,889.12
65,385.99
0.00
0.00
0.00
25,604.48
64,994.48
106,818.90
99,205.39
94,757.30
51,199.22
0.00
0.00
0.00
624,653.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
214,116.73
249,171.08
118,806.52
25,915.58
0.00
0.00
15,506.07
1,137.99
0.00
624,653.94
0.00
20,200.91
25,601.28
47,402.54
34,075.49
0.00
0.00
0.00
17,458.25
79,689.73
93,791.51
68,933.72
102,377.03
27,275.28
0.00
0.00
0.00
516,805.73
17,507.08
40,737.78
108,693.98
120,668.30
0.00
0.00
0.00
57,653.78
57,081.74
61,217.88
0.00
0.00
13,914.26
29,617.63
9,713.32
0.00
516,805.73
0.00
23,801.48
25,293.71
45,864.50
36,684.21
0.00
0.00
0.00
17,470.67
78,087.60
92,792.03
63,977.93
82,937.44
27,390.78
0.00
0.00
0.00
494,300.35
40,326.72
66,129.80
86,594.14
54,063.71
0.00
0.00
0.00
96,815.92
63,624.93
41,227.63
13,712.52
17,213.30
0.00
0.00
14,591.70
0.00
494,300.35
0.00
35,592.45
41,569.82
70,331.77
97,047.31
0.00
0.00
0.00
17,550.42
73,949.60
87,700.32
57,863.58
61,616.26
27,560.27
0.00
0.00
0.00
570,781.78
40,365.16
26,144.83
106,528.72
90,236.63
0.00
0.00
0.00
50,132.05
62,495.18
115,480.95
9,888.02
20,357.48
11,073.50
27,584.46
10,494.81
0.00
570,781.78
0.00
22,624.23
36,269.28
52,405.28
45,536.55
0.00
0.00
0.00
19,594.35
85,819.05
58,149.41
0.00
0.00
44,467.20
74,526.17
109,972.25
14,501.00
563,864.76
62,112.37
77,328.92
81,225.37
72,855.14
0.00
0.00
0.00
90,238.47
70,406.71
27,559.14
0.00
0.00
0.00
12,781.90
69,356.75
0.00
563,864.76
0.00
45,817.00
58,516.15
71,930.08
64,465.75
0.00
0.00
0.00
21,560.59
86,304.24
105,322.08
86,417.85
75,580.00
27,848.43
0.00
0.00
0.00
643,762.18
57,971.50
72,938.95
122,467.28
135,159.30
0.00
0.00
0.00
114,888.41
68,892.98
27,839.55
31,093.73
0.00
0.00
0.00
12,510.49
0.00
643,762.18
0.00
20,843.12
PRESUPUESTO
COSTO DIRECTO
TOTAL
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
03/09-30/09
01/10-31/10
01/11-30/11
01/12 -31/12
01/01-31/01
01/02-28/02
01/03-31/03
Apr-15
May-15
Jun-15
Jul-15
Aug-15
01/04-30/04
01/05-31/05
01/06-30/06
01/07-31/07
01/08-31/08
Sep-15
01/09-30/09
Oct-15
Nov-15
Dec-15
01/10-31/10
01/11-30/11
01/12-03/12
TOTAL
SALDO DE OBRA
35,759.78
50,250.06
38,586.57
0.00
0.00
0.00
21,522.37
87,067.50
119,086.58
137,300.69
27,457.23
27,390.78
0.00
0.00
0.00
565,264.67
56,742.25
59,716.33
92,083.68
81,548.64
0.00
0.00
0.00
112,438.63
85,826.43
32,351.98
24,854.53
0.00
2,979.73
8,232.48
8,490.00
0.00
565,264.67
0.00
33,124.06
32,404.41
47,431.87
36,144.62
0.00
0.00
0.00
21,578.33
87,679.82
104,563.38
119,000.46
40,234.55
27,390.78
0.00
0.00
0.00
549,552.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
268,366.80
92,693.44
82,838.60
71,274.75
34,378.68
0.00
549,552.27
0.00
221,412.18
305,804.57
432,505.21
417,926.48
0.00
0.00
0.00
162,339.44
643,592.01
768,224.21
632,699.61
484,959.81
260,522.74
74,526.17
109,972.25
14,501.00
4,528,985.68
275,025.07
342,996.60
597,593.15
554,531.72
0.00
0.00
0.00
736,283.98
657,499.04
424,483.64
373,831.18
130,264.22
110,806.08
164,997.28
160,673.73
0.00
4,528,985.68
0.00
GASTOS GENERALES
14.80%
32,769.00
45,259.08
64,010.77
61,853.12
0.00
0.00
0.00
24,026.24
95,251.62
113,697.18
93,639.54
71,774.05
38,557.37
11,029.87
16,275.89
2,146.15
670,289.88
40,703.71
50,763.50
88,443.79
82,070.69
0.00
0.00
0.00
108,970.03
97,309.86
62,823.58
55,327.01
19,279.10
16,399.30
24,419.60
23,779.71
0.00
670,289.88
0.00
UTILIDADES
5.20%
11,513.43
15,901.84
22,490.27
21,732.18
0.00
0.00
0.00
8,441.65
33,466.78
39,947.66
32,900.38
25,217.91
13,547.18
3,875.36
5,718.56
754.05
235,507.25
14,301.30
17,835.82
31,074.84
28,835.65
0.00
0.00
0.00
38,286.77
34,189.95
22,073.15
19,439.22
6,773.74
5,761.92
8,579.86
8,355.03
0.00
235,507.25
0.00
265,694.61
366,965.49
519,006.25
501,511.78
0.00
0.00
0.00
194,807.33
772,310.41
921,869.05
759,239.53
581,951.77
312,627.29
89,431.40
131,966.70
17,401.20
5,434,782.83
330,030.08
411,595.92
717,111.78
665,438.06
0.00
0.00
0.00
883,540.78
788,998.85
509,380.37
448,597.41
156,317.06
132,967.30
197,996.74
192,808.47
0.00
5,434,782.83
0.00
47,825.03
66,053.79
93,421.13
90,272.12
0.00
0.00
0.00
35,065.32
139,015.87
165,936.43
136,663.12
104,751.32
56,272.91
16,097.65
23,754.01
3,132.22
978,260.92
59,405.41
74,087.27
129,080.12
119,778.85
0.00
0.00
0.00
159,037.34
142,019.79
91,688.47
80,747.53
28,137.07
23,934.11
35,639.41
34,705.52
0.00
978,260.92
0.00
313,519.64
433,019.28
612,427.38
591,783.90
0.00
0.00
0.00
229,872.65
911,326.28
1,087,805.48
895,902.65
686,703.09
368,900.20
105,529.05
155,720.71
20,533.42
6,413,043.74
389,435.49
485,683.19
846,191.90
785,216.91
0.00
0.00
0.00
1,042,578.12
931,018.64
601,068.84
529,344.94
184,454.13
156,901.41
233,636.15
227,513.99
0.00
6,413,043.74
SUB-TOTAL
IGV
TOTAL
18.00%
AVANCE FSICO %
4.89%
6.75%
9.55%
9.23%
0.00%
0.00%
0.00%
3.58%
14.21%
16.96%
13.97%
10.71%
5.75%
1.65%
2.43%
0.32%
4.89%
11.64%
21.19%
30.42%
30.42%
30.42%
30.42%
34.00%
48.21%
65.17%
79.14%
89.85%
95.60%
97.25%
99.68%
100.00%
100.00%
6.07%
7.57%
13.19%
12.24%
0.00%
0.00%
0.00%
16.26%
14.52%
9.37%
8.25%
2.88%
2.45%
3.64%
3.55%
0.00%
6.07%
13.65%
26.84%
39.08%
39.08%
39.08%
39.08%
55.34%
69.86%
79.23%
87.49%
90.36%
92.81%
96.45%
100.00%
100.00%
100.00%
0.00
0.00%
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
01
Aug-2015
S/. 145,963.45
S/. 145,963.45
S/. 145,963.45
S/. 145,963.45
02
Sep-2015
S/. 50,233.53
S/. 50,233.53
S/. 196,196.98
S/. 196,196.98
03
Oct-2015
S/. 38,314.81
S/. 38,314.81
S/. 234,511.79
S/. 234,511.79
04
Nov-2015
S/. 13,285.28
S/. 13,285.28
S/. 247,797.07
S/. 247,797.07
S/. 247,797.09
S/. 247,797.09
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Aug-2015
S/. 20,214.50
S/. 20,214.50
S/. 20,214.50
S/. 20,214.50
02
Sep-2015
S/. 45,649.08
S/. 45,649.08
S/. 65,863.58
S/. 65,863.58
03
Oct-2015
S/. 2,566.86
S/. 2,566.86
S/. 68,430.44
S/. 68,430.44
04
Nov-2015
S/. 0.00
S/. 0.00
S/. 68,430.44
S/. 68,430.44
S/. 68,430.44
S/. 68,430.44
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
01
Aug-2015
S/. 31,301.44
S/. 31,301.44
S/. 31,301.44
S/. 31,301.44
02
Sep-2015
S/. 0.00
S/. 0.00
S/. 31,301.44
S/. 31,301.44
03
Oct-2015
S/. 0.00
S/. 0.00
S/. 31,301.44
S/. 31,301.44
04
Nov-2015
S/. 0.00
S/. 0.00
S/. 31,301.44
S/. 31,301.44
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
S/. 31,301.44
S/. 31,301.44
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
01
Aug-2015
S/. 45,439.06
S/. 45,439.06
S/. 45,439.06
S/. 45,439.06
02
Sep-2015
S/. 49,026.26
S/. 49,026.26
S/. 94,465.32
S/. 94,465.32
03
Oct-2015
S/. 3,430.02
S/. 3,430.02
S/. 97,895.34
S/. 97,895.34
04
Nov-2015
S/. 0.00
S/. 0.00
S/. 97,895.34
S/. 97,895.34
S/. 97,895.35
S/. 97,895.35
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
Aug-2015
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
02
Sep-2015
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
03
Oct-2015
S/. 78,488.77
S/. 78,488.77
S/. 78,488.77
S/. 78,488.77
04
Nov-2015
S/. 25,959.41
S/. 25,959.41
S/. 104,448.18
S/. 104,448.18
S/. 104,448.18
S/. 104,448.20
TOTAL
MES
REAL
PROGRAMADO
(VR)
(VP)
MONTO ACUMULADO
REAL
PROGRAMADO
01
Aug-2015
S/. 27,166.82
S/. 27,166.82
S/. 27,166.82
S/. 27,166.82
02
Sep-2015
S/. 64,201.40
S/. 64,201.40
S/. 91,368.22
S/. 91,368.22
03
Oct-2015
S/. 3,354.15
S/. 3,354.15
S/. 94,722.37
S/. 94,722.37
04
Nov-2015
S/. 0.00
S/. 0.00
S/. 94,722.37
S/. 94,722.37
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
S/. 94,722.37
S/. 94,722.39
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
1.017
S/. 2,481.38
Sep-2014
1.017
Oct-2014
Nov-2014
MES
DE
REAJUSTE
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
Aug-2014
S/. 2,481.38
S/. 2,481.38
S/. 0.00
S/. 0.00
S/. 853.97
S/. 853.97
S/. 853.97
S/. 0.00
S/. 0.00
1.020
S/. 766.30
S/. 766.30
S/. 766.30
S/. 0.00
S/. 0.00
1.025
S/. 332.13
S/. 332.13
S/. 332.13
S/. 0.00
S/. 0.00
S/. 4,433.78
S/. 4,433.78
S/. 4,433.78
S/. 0.00
REAJUSTE
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
1.015
S/. 303.22
S/. 303.22
S/. 303.22
S/. 0.00
S/. 0.00
Sep-2014
1.015
S/. 684.74
S/. 684.74
S/. 684.74
S/. 0.00
S/. 0.00
Oct-2014
1.016
S/. 41.07
S/. 41.07
S/. 41.07
S/. 0.00
S/. 0.00
Nov-2014
1.022
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,029.03
S/. 1,029.03
S/. 1,029.03
S/. 0.00
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
1.017
S/. 532.12
Sep-2014
1.016
Oct-2014
Nov-2014
MES
DE
REAJUSTE
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
Aug-2014
S/. 532.12
S/. 532.12
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.019
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.023
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 532.12
S/. 532.12
S/. 0.00
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
1.013
S/. 590.71
Sep-2014
1.014
Oct-2014
Nov-2014
MES
DE
REAJUSTE
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
Aug-2014
S/. 590.71
S/. 590.71
S/. 0.00
S/. 0.00
S/. 686.37
S/. 686.37
S/. 686.37
S/. 0.00
S/. 0.00
1.015
S/. 51.45
S/. 51.45
S/. 51.45
S/. 0.00
S/. 0.00
1.019
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,328.53
S/. 1,328.53
S/. 1,328.53
S/. 0.00
REAJUSTE
MES
DE
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
1.014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Sep-2014
1.014
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
Oct-2014
1.016
S/. 1,255.82
S/. 1,255.82
S/. 1,255.82
S/. 0.00
S/. 0.00
Nov-2014
1.021
S/. 545.15
S/. 545.15
S/. 545.15
S/. 0.00
S/. 0.00
S/. 1,800.97
S/. 1,800.97
S/. 1,800.97
S/. 0.00
REAJUSTE
DEDUCCIONES
REAL
PROGRAMADO
VR*(K-1)
VP*(K-1)
1.015
S/. 407.50
Sep-2014
1.015
Oct-2014
Nov-2014
MES
DE
REAJUSTE
RECONOCIDO
ADELANTO DIRECTO
ADELANTO
MATERIALES
Aug-2014
S/. 407.50
S/. 407.50
S/. 0.00
S/. 0.00
S/. 963.02
S/. 963.02
S/. 963.02
S/. 0.00
S/. 0.00
1.017
S/. 57.02
S/. 57.02
S/. 57.02
S/. 0.00
S/. 0.00
1.021
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 1,427.54
S/. 1,427.54
S/. 0.00
ONAL N 01
REAJUSTE TOTAL
S/. 2,481.38
S/. 853.97
S/. 766.30
S/. 332.13
S/. 4,433.78
REAJUSTE TOTAL
ONAL N 01
S/. 303.22
S/. 684.74
S/. 41.07
S/. 0.00
S/. 1,029.03
REAJUSTE TOTAL
S/. 532.12
S/. 0.00
S/. 0.00
S/. 0.00
ONAL N 01
S/. 532.12
ONAL N 01
REAJUSTE TOTAL
S/. 590.71
S/. 686.37
S/. 51.45
S/. 0.00
S/. 1,328.53
REAJUSTE TOTAL
ONAL N 01
S/. 0.00
S/. 0.00
S/. 1,255.82
S/. 545.15
S/. 1,800.97
REAJUSTE TOTAL
S/. 407.50
S/. 963.02
S/. 57.02
S/. 0.00
ONAL N 01
S/. 1,427.54
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
CONTRATISTA
MODALIDAD
FECHA BASE
: SUMA ALZADA
: MAYO - 2015
SIMBOLO
CODIGO
DESCRIPCIN
47
0.311
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.324
544.59
0.324
544.59
0.324
544.59
0.324
0.115
100.000%
422.94
450.46
0.122
447.20
0.122
450.53
0.123
462.65
0.126
0.109
100.000%
677.34
684.62
0.110
688.08
0.111
688.23
0.111
692.02
0.111
0.086
100.000%
515.52
462.12
0.077
457.96
0.076
461.49
0.077
469.48
0.078
21
0.079
100.000%
454.07
459.40
0.080
459.40
0.08
459.40
0.08
459.40
0.08
17
BLOQUE Y LADRILLO
0.051
100.000%
580.12
579.47
0.051
580.12
0.051
583.12
0.051
586.80
0.052
AF
AGREGADO FINO
0.051
100.000%
524.27
523.77
0.051
523.82
0.051
524.24
0.051
527.63
0.051
GGU
39
0.198
100.000%
409.90
418.64
0.202
418.76
0.202
419.35
0.203
420.80
0.203
K1 =
1.017
K2 =
1.017
K3 =
1.020
K4 =
1.025
12
#REF!
COEFICIENTE DE REAJUSTE
3
12
12
12
SIMBOLO
CODIGO
DESCRIPCIN
47
0.343
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.357
544.59
0.357
544.59
0.357
544.59
0.357
0.081
100.000%
422.94
450.46
0.086
447.20
0.086
450.53
0.086
462.65
0.089
0.099
100.000%
677.34
684.62
0.100
688.08
0.101
688.23
0.101
692.02
0.101
0.101
100.000%
515.52
462.12
0.091
457.96
0.09
461.49
0.09
469.48
0.092
21
0.072
100.000%
454.07
459.40
0.073
459.40
0.073
459.40
0.073
459.40
0.073
17
BLOQUE Y LADRILLO
0.053
100.000%
580.12
579.47
0.053
580.12
0.053
583.12
0.053
586.80
0.054
AF
AGREGADO FINO
0.052
100.000%
524.27
523.77
0.052
523.82
0.052
524.24
0.052
527.63
0.052
GGU
39
0.199
100.000%
409.90
418.64
0.203
418.76
0.203
419.35
0.204
420.80
0.204
K1 =
1.015
K2 =
1.015
K3 =
1.016
K4 =
1.022
COEFICIENTE DE REAJUSTE
SIMBOLO
CODIGO
DESCRIPCIN
47
0.335
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.349
544.59
0.349
544.59
0.349
544.59
0.349
0.088
100.000%
422.94
450.46
0.094
447.20
0.093
450.53
0.094
462.65
0.096
0.103
100.000%
677.34
684.62
0.104
688.08
0.105
688.23
0.105
692.02
0.105
0.089
100.000%
515.52
462.12
0.08
457.96
0.079
461.49
0.08
469.48
0.081
21
0.075
100.000%
454.07
459.40
0.076
459.40
0.076
459.40
0.076
459.40
0.076
17
BLOQUE Y LADRILLO
0.061
100.000%
580.12
579.47
0.061
580.12
0.061
583.12
0.061
586.80
0.062
AF
AGREGADO FINO
0.051
100.000%
524.27
523.77
0.051
523.82
0.051
524.24
0.051
527.63
0.051
GGU
39
0.198
100.000%
409.90
418.64
0.202
418.76
0.202
419.35
0.203
420.80
0.203
K1 =
1.017
K2 =
1.016
K3 =
1.019
K4 =
1.023
COEFICIENTE DE REAJUSTE
SIMBOLO
CODIGO
DESCRIPCIN
47
0.335
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.349
544.59
0.349
544.59
0.349
544.59
0.349
0.053
100.000%
422.94
450.46
0.056
447.20
0.056
450.53
0.056
462.65
0.058
0.099
100.000%
677.34
684.62
0.100
688.08
0.101
688.23
0.101
692.02
0.101
0.092
100.000%
515.52
462.12
0.082
457.96
0.082
461.49
0.082
469.48
0.084
21
0.086
100.000%
454.07
459.40
0.087
459.40
0.087
459.40
0.087
459.40
0.087
BA
4
17
AGREGADO FINO
BLOQUE Y LADRILLO
0.075
49.333%
50.667%
524.27
580.12
523.77
579.47
0.037
0.038
523.82
580.12
0.037
0.038
524.24
583.12
0.037
0.038
527.63
586.80
0.037
0.038
32
FLETE TERRESTRE
0.062
100.000%
469.08
466.15
0.062
467.08
0.062
467.08
0.062
467.08
0.062
GGU
39
0.198
100.000%
409.90
418.64
0.202
418.76
0.202
419.35
0.203
420.80
0.203
K1 =
1.013
K2 =
1.014
K3 =
1.015
K4 =
1.019
COEFICIENTE DE REAJUSTE
SIMBOLO
CODIGO
DESCRIPCIN
47
0.323
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.336
544.59
0.336
544.59
0.336
544.59
0.336
0.083
100.000%
422.94
450.46
0.088
447.20
0.088
450.53
0.088
462.65
0.091
0.103
100.000%
677.34
684.62
0.104
688.08
0.105
688.23
0.105
692.02
0.105
0.097
100.000%
515.52
462.12
0.087
457.96
0.086
461.49
0.087
469.48
0.088
21
0.078
100.000%
454.07
459.40
0.079
459.40
0.079
459.40
0.079
459.40
0.079
17
BLOQUE Y LADRILLO
0.063
100.000%
580.12
579.47
0.063
580.12
0.063
583.12
0.063
586.80
0.064
AF
AGREGADO FINO
0.055
100.000%
524.27
523.77
0.055
523.82
0.055
524.24
0.055
527.63
0.055
GGU
39
0.198
100.000%
409.90
418.64
0.202
418.76
0.202
419.35
0.203
420.80
0.203
K1 =
1.014
K2 =
1.014
K3 =
1.016
K4 =
1.021
COEFICIENTE DE REAJUSTE
SIMBOLO
CODIGO
DESCRIPCIN
47
0.338
30
43
COEF. DE INCIDENCIA
INCIDENCIA
PORCENTUAL (%)
INDICE BASE
marzo-15
I.U - AGO 15
Coeficiente
I.U - SET 15
Coeficiente
I.U - OCT 15
Coeficiente
I.U - NOV 15
Coeficiente
100.000%
523.15
544.59
0.352
544.59
0.352
544.59
0.352
544.59
0.352
0.079
100.000%
422.94
450.46
0.084
447.20
0.084
450.53
0.084
462.65
0.086
0.103
100.000%
677.34
684.62
0.104
688.08
0.105
688.23
0.105
692.02
0.105
0.096
100.000%
515.52
462.12
0.086
457.96
0.085
461.49
0.086
469.48
0.087
21
0.075
100.000%
454.07
459.40
0.076
459.40
0.076
459.40
0.076
459.40
0.076
17
BLOQUE Y LADRILLO
0.058
100.000%
580.12
579.47
0.058
580.12
0.058
583.12
0.058
586.80
0.059
AF
AGREGADO FINO
0.053
100.000%
524.27
523.77
0.053
523.82
0.053
524.24
0.053
527.63
0.053
GGU
39
0.198
100.000%
409.90
418.64
0.202
418.76
0.202
419.35
0.203
420.80
0.203
K1 =
1.015
K2 =
1.015
K3 =
1.017
K4 =
1.021
COEFICIENTE DE REAJUSTE
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
m2
195.30
1.40
273.42
195.30
273.42
892.71
31,709.06
m3
892.71
35.52
31,709.06
m3
m3
458.33
77.49
12.46
80.48
5,710.79
6,236.40
m3
564.69
8.88
5,014.45
508.22
4,513.00
m2
195.30
21.60
4,218.48
195.30
4,218.48
m3
kg
97.65
1,624.59
327.87
4.52
32,016.51
7,343.15
9.77
1,624.59
3,201.65
7,343.15
87.89
-
m3
m2
kg
88.20
504.00
6,243.02
435.21
50.28
4.00
38,385.52
25,341.12
24,972.08
1,872.91
7,491.62
61.74
352.80
3,745.81
m
und
64.50
6.00
6.62
10.78
426.99
64.68
M2
M2
84.05
84.05
1.40
1.40
117.67
117.67
84.05
84.05
117.67
117.67
M3
25.37
35.52
901.05
25.37
901.05
M3
128.37
6.57
843.39
128.37
843.39
45.83
7.75
6.00
-
ADMINISTRACION
01.01.07
01.01.07.01
01.01.07.02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
02.01.02.02
02.01.03
02.01.03.01
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.06
DESCRIPCIN DE PARTIDAS
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
FALSO PISO MEZCLA 1:8, E=4"
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
M3
7.87
15.54
122.33
Metrado
7.87
Monto S/.
122.33
Metrado
M3
11.41
12.46
142.15
11.41
142.15
M2
M2
M2
74.11
45.86
74.11
3.85
3.35
12.36
285.32
153.62
915.98
74.11
45.86
74.11
285.32
153.62
915.98
M3
M3
21.83
175.87
8.88
17.39
193.86
3,058.46
21.83
175.87
193.86
3,058.46
M3
M2
M3
M2
2.49
20.80
0.18
45.86
171.48
21.38
180.69
28.23
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
02.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
M3
KG
6.39
176.62
306.86
4.49
1,959.30
793.01
6.39
176.62
1,959.30
793.01
M3
M2
KG
4.43
35.45
357.86
322.52
50.40
3.97
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
M3
M2
KG
4.29
43.38
140.04
297.96
32.73
4.42
1,278.39
1,419.68
618.97
4.29
43.38
140.04
1,278.39
1,419.68
618.97
M3
M2
KG
4.06
46.59
536.50
433.42
52.55
3.97
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
M3
M2
KG
8.05
69.26
1,052.27
338.82
60.96
3.97
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
M3
M2
KG
UND
7.57
86.53
338.14
720.76
321.86
37.69
3.97
2.44
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
M2
M
104.55
9.47
42.25
27.61
4,417.19
261.47
104.55
9.47
4,417.19
261.47
M2
104.55
12.69
1,326.72
104.55
1,326.72
40.08
6.58
263.73
40.08
263.73
-
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
DESCRIPCIN DE PARTIDAS
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
M2
M2
KG
56.58
26.10
70.24
107.77
64.90
3.73
6,097.09
1,693.70
262.00
Metrado
56.58
26.10
70.24
Monto S/.
6,097.09
1,693.70
262.00
Metrado
M2
M2
M2
M2
M
M
18.93
141.51
28.39
69.26
30.97
135.84
19.28
20.37
31.52
43.34
12.28
6.37
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
M2
86.53
33.93
2,935.83
86.53
2,935.83
M2
M2
45.86
2.00
24.72
50.04
1,133.60
99.98
45.86
2.00
1,133.60
99.98
M2
45.86
46.39
2,127.33
45.86
2,127.33
M2
28.25
50.73
1,433.17
28.25
1,433.17
M2
18.93
53.30
1,008.97
18.93
1,008.97
M
M
38.10
28.70
24.38
12.94
928.88
371.38
38.10
28.70
928.88
371.38
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
03.06
03.06.01
03.06.01.02
03.06.01.03
03.07
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.08
03.08.01
03.08.01.01
03.08.02
03.08.02.01
03.08.03
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.03
03.10.04
03.11
03.11.02
04
04.01.01
05
05.01
05.01.01
05.01.01
05.01.02
DESCRIPCIN DE PARTIDAS
CARPINTERIA DE MADERA
PUERTAS
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
CARPINTERIA METALICA Y HERRERIA
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
CONEXIN A RED EXIATENTE
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
2.00
10.59
374.47
5,078.43
Metrado
M2
M2
2.00
10.59
187.42
479.55
374.47
5,078.43
M2
15.50
79.77
1,236.75
5.00
76.66
383.30
PZA.
16.00
3.82
61.12
16.00
61.12
UND
4.00
53.79
215.16
4.00
215.16
UND
4.00
8.13
32.52
4.00
32.52
M2
M2
155.79
169.90
6.59
5.74
1,026.62
975.23
155.79
169.90
1,026.62
975.23
M2
10.59
18.17
192.42
10.59
192.42
28.70
2.93
84.09
28.70
84.09
M
M
31.52
12.00
24.44
17.43
770.35
209.16
M2
2.33
893.86
2,083.59
2.33
2,083.59
GLB
1.00
4,488.95
4,488.95
1.00
4,488.95
PTO
PTO
PTO
1.00
9.00
4.00
66.72
79.46
8.35
66.72
715.14
33.40
1.00
9.00
4.00
66.72
715.14
33.40
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
05.02.02
05.02.05
05.03
05.03.01
05.04
05.04.02
05.04.04
05.05
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.04
DESCRIPCIN DE PARTIDAS
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
ARTEF. FLUORECENTE 2/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122(SIM. BE JOSFEL) C/
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
PTO
PTO
UND
UND
1.00
2.00
6.00
1.00
11.07
11.07
95.70
624.31
11.07
22.14
574.20
624.31
Metrado
1.00
2.00
6.00
1.00
Monto S/.
11.07
22.14
574.20
624.31
Metrado
M3
M3
M
1.08
1.08
7.20
24.86
20.72
25.99
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
UND
1.00
86.73
86.73
1.00
86.73
UND
UND
1.00
1.00
819.08
188.47
819.08
188.47
1.00
1.00
819.08
188.47
7.20
56.65
407.88
7.20
407.88
6.00
10.54
63.24
6.00
63.24
UND
UND
UND
3.00
4.00
2.00
146.71
122.05
72.19
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01
02.01.01
02.01.01.01
02.01.05
02.01.05.01
02.01.05.02
01.01.04.02
02.02
02.02.02
02.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
03.01
03.01.02
03.02
03.02.01
03.02.02
03.03.01
03.03.01.01
03.07
03.07.02.01
03.08
03.08.01.01
03.08.02.01
DESCRIPCIN DE PARTIDAS
CISTERNA
OBRAS PROVISIONALES Y TRABAJOS PROVISIONALES
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS E=2", 1:12 C:H
OBRAS DE CONCRETO ARMADO
CISTERNA
CISTERNA - CONCRETO F'C=210 Kg/cm2
CISTERNA - ENCOFRADO Y DESENCOFRADO
CISTERNA - ACERO F'Y=4200 kg/cm2
LOSAS
LOSA MACISA - CONCRETO F'C=210 Kg/cm2
LOSA MACISA - ENCOFRADO Y DESENCOFRADO
LOSA MACISA - ACERO F'Y=4200 kg/cm2
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
REVOQUES Y REVESTIMIENTOS
TARRAJEO EN CISTERNA CON IMPERMEABILIZANTE
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
CARPINTERIA METALICA Y HERRERIA
PUERTA METLICA P/CASETA INC/ACCESORIOS
CERRAJERIA
BISAGRA CAPUCHINA
CERRADURA TRES GOLPES
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
M2
M2
4.41
4.41
1.40
1.40
6.17
6.17
2.21
2.21
3.09
3.09
2.21
2.21
M3
7.28
35.52
258.46
3.64
129.23
3.64
M3
M3
M2
8.73
8.73
4.41
8.88
17.39
3.35
77.54
151.85
14.77
4.37
4.37
2.21
38.77
75.92
7.39
4.37
4.37
2.21
M2
4.41
21.38
94.29
2.21
47.14
2.21
M3
M2
KG
3.22
14.40
272.25
405.30
50.27
3.97
1,306.97
723.89
1,080.83
1.61
7.20
136.13
653.49
361.94
540.42
1.61
7.20
136.13
M3
M2
KG
0.27
2.25
57.02
329.92
53.29
3.97
89.08
119.90
226.37
0.14
1.13
28.51
44.54
59.95
113.18
0.14
1.13
28.51
M2
14.30
64.68
924.92
7.15
462.46
7.15
M2
M2
14.40
33.55
22.23
20.23
320.11
678.72
7.20
16.78
160.06
339.36
7.20
16.78
M2
3.24
33.79
109.48
1.62
54.74
1.62
M2
2.20
285.00
627.00
1.10
313.50
1.10
PZA.
UND
3.00
1.00
3.00
53.79
9.00
53.79
1.50
0.50
4.50
26.90
1.50
0.50
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
03.09
03.09.03.01
DESCRIPCIN DE PARTIDAS
PINTURA
PINTURA ESMALTE DOS MANOS EN MUROS Y COLUMNAS
Unidad
M2
Metrado
33.55
P. UNIT
2.93
Monto S/.
98.30
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
16.78
Monto S/.
49.15
Metrado
16.78
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
01.00
02.00
03.00
04.00
05.00
05.01
07.00
08.00
DESCRIPCIN DE PARTIDAS
ACCESORIOS DE SUCCION
ACCESORIOS DE IMPULSION
ACCESORIOS DE ADUCCION
ACCESORIOS DE LIMPIEZA Y REBOSE
SUMINISTRO E INSTALACION DE ELECTROBOMBA
SUMINISTRO E INSTALACION DE ELECTROBOMBA
CAJA DE PASE GALVANIZADA DE 150x150x100 mm
TABLERO ARRANQUE- PARADA
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
-
Metrado
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
502.00
786.93
499.18
535.69
2.00
1.00
1.00
1,108.25
250.32
433.16
2,216.50
250.32
433.16
M2
M2
166.35
166.35
1.40
1.40
232.89
232.89
87.35
87.35
122.29
122.29
M3
59.64
15.54
926.81
31.32
486.66
M3
M3
71.57
71.57
8.88
17.39
635.52
1,244.57
37.58
37.58
333.71
653.52
M3
M3
M2
39.76
7.46
59.64
169.77
192.93
32.65
6,750.06
1,438.29
1,947.25
20.88
3.91
31.32
3,544.44
755.24
1,022.49
166.35
12.91
2,147.58
87.35
1,127.69
M2
465.78
124.78
58,120.03
244.58
30,518.69
269.70
2.93
790.22
UND
UND
UND
CERCO PERIMETRICO
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01.02
02.01.02.02
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.03
02.02.06
03.05
03.05.02
03.05.02.02
03.07
03.07.02
03.07.02.01
03.09
03.09.03.01
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA METALICA Y HERRERIA
CERCOS
CERCO MALLA ELECT. 2"2" C/PERF. COLUM. FG ESTNDAR 2" (SISTEMIC)
PINTURA
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
COSTO DIRECTO
369,286.59
199,233.07
PRESUPUESTO DEDUCTIVO
162,789.01
77,596.86
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
PARCIAL
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
206,497.58
121,636.21
0.1480
30,561.64
18,002.16
0.0520
10,737.87
6,325.08
247,797.09
145,963.45
44,603.48
26,273.42
292,400.57
172,236.87
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
0.1800
Metrado
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
m2
117.50
1.40
164.50
117.50
164.50
m3
265.15
35.52
9,418.13
265.15
9,418.13
m3
m3
128.43
33.85
12.46
80.48
1,600.24
2,724.25
64.22
16.93
800.12
1,362.12
m3
177.74
8.88
1,578.33
m2
77.50
21.60
1,674.00
77.50
1,674.00
m3
kg
31.00
448.33
327.87
4.52
10,163.97
2,026.45
224.17
1,013.23
31.00
224.17
m3
m2
kg
31.63
230.00
1,929.80
435.21
50.28
4.00
13,765.69
11,564.40
7,719.20
964.90
3,859.60
31.63
230.00
964.90
m
und
28.25
4.00
6.62
10.78
187.02
43.12
62,629.30
5,603.93
57,025.37
18,291.70
1,446.28
16,845.42
177.74
-
4.00
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
Unidad
0.1480
0.0520
0.1800
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
8,439.75
2,965.32
68,430.44
12,317.48
Metrado
Monto S/.
2,493.12
875.96
20,214.50
3,638.61
80,747.92
23,853.11
Metrado
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
m2
70.00
1.40
m3
108.92
m3
m3
98.00
70.00
98.00
35.52
3,868.84
108.92
3,868.84
42.98
17.08
12.46
80.48
535.53
1,374.60
42.98
17.08
535.53
1,374.60
m3
85.72
8.88
761.19
85.72
761.19
m2
42.00
21.60
907.20
42.00
907.20
m3
kg
16.80
250.70
327.87
4.52
5,508.22
1,133.16
16.80
250.70
5,508.22
1,133.16
m3
m2
kg
15.40
112.00
840.28
435.21
50.28
4.00
6,702.23
5,631.36
3,361.12
15.40
112.00
840.28
6,702.23
5,631.36
3,361.12
m
und
15.75
2.00
6.62
10.78
104.27
21.56
15.75
2.00
104.27
21.56
0.1480
0.0520
30,007.28
3,922.75
26,084.53
3,860.51
1,356.40
31,301.44
30,007.28
3,922.75
26,084.53
3,860.51
1,356.40
31,301.44
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
I.G.V. 18%
COSTO TOTAL
Unidad
0.1800
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
5,634.26
Metrado
Monto S/.
5,634.26
36,935.70
36,935.70
Metrado
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
154.10
m2
1.40
215.74
154.10
215.74
387.27
13,755.83
m3
387.27
35.52
13,755.83
m3
m3
188.47
43.81
12.46
80.48
2,348.34
3,525.83
m3
258.44
8.88
2,294.95
232.60
2,065.45
m2
105.65
21.60
2,282.04
105.65
2,282.04
m3
kg
47.92
767.53
327.87
4.52
15,711.53
3,469.24
14.38
767.53
4,713.46
3,469.24
33.54
-
m3
m2
kg
41.76
290.65
2,930.30
435.21
50.28
4.00
18,174.37
14,613.88
11,721.20
10.44
72.66
1,465.15
4,543.59
3,653.47
5,860.60
31.32
217.99
1,465.15
m
und
32.05
4.00
6.62
10.78
212.17
43.12
8.01
1.00
53.04
10.78
3.00
0.1480
88,368.24
6,788.78
81,579.46
12,073.76
40,623.24
2,757.36
37,865.88
5,604.15
94.24
21.91
25.84
-
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
Unidad
0.0520
0.1800
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
4,242.13
97,895.35
17,621.16
Metrado
Monto S/.
1,969.03
45,439.06
8,179.03
115,516.51
53,618.09
Metrado
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
CERCO
Cerco malla Elec.2"x2" C/Perf. Colum. FG Estndar 2" (Sistemic.)
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
m2
150.50
1.40
210.70
m3
434.77
35.52
15,443.03
m3
m3
214.20
48.89
12.46
80.48
2,668.93
3,934.67
m3
286.74
8.88
2,546.25
m2
115.50
21.60
2,494.80
m3
kg
55.20
903.57
327.87
4.52
18,098.42
4,084.14
m3
m2
kg
44.17
320.00
3,446.78
435.21
50.28
4.00
19,223.23
16,089.60
13,787.12
m
und
42.75
4.00
6.62
10.78
283.01
43.12
m2
75.60
124.78
9,433.37
108,340.39
21,300.24
87,040.15
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
Unidad
0.1480
0.0520
0.1800
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
12,881.94
4,526.09
104,448.18
18,800.67
Metrado
Monto S/.
0.00
-
123,248.85
0.00
Metrado
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
Unidad
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
Valorizacin N 01
Valorizacin N
Mes Setiembre
Metrado
Monto S/.
Metrado
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
UTILIDAD (5.20 % CD)
193.90
m2
1.40
271.46
193.90
271.46
336.04
11,936.14
m3
336.04
35.52
11,936.14
m3
m3
143.49
48.35
12.46
80.48
1,787.89
3,891.21
m3
250.32
8.88
2,222.84
225.29
2,000.56
m2
120.90
21.60
2,611.44
120.90
2,611.44
m3
kg
48.36
757.54
327.87
4.52
15,855.79
3,424.08
4.84
757.54
1,585.58
3,424.08
43.52
-
m3
m2
kg
44.41
323.00
2,803.02
435.21
50.28
4.00
19,327.68
16,240.44
11,212.08
840.91
3,363.62
44.41
323.00
1,962.11
m
und
48.00
6.00
6.62
10.78
317.76
64.68
0.1480
0.0520
89,163.49
10,228.17
78,935.32
11,682.43
4,104.64
25,192.88
2,553.86
22,639.02
3,350.57
1,177.23
71.75
24.18
25.03
-
6.00
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN,
EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TEM
DESCRIPCIN DE PARTIDAS
SUB TOTAL
I.G.V. 18%
COSTO TOTAL
Unidad
0.1800
Metrado
P. UNIT
Monto S/.
Valorizacin N 01
Valorizacin N
Mes Setiembre
94,722.39
17,050.03
Metrado
Monto S/.
27,166.82
4,890.03
111,772.42
32,056.85
Metrado
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
195.30
273.42
100.00%
0.00%
892.71
31,709.06
100.00%
0.00%
571.08
623.64
-
28,814.85
-
412.50
69.74
5,139.71
5,612.76
458.33
77.49
5,710.79
6,236.40
100.00%
100.00%
0.00%
0.00%
56.47
501.44
564.69
5,014.44
100.00%
0.00%
195.30
4,218.48
100.00%
0.00%
97.65
1,624.59
32,016.50
7,343.15
100.00%
100.00%
0.00%
0.00%
26,869.87
17,738.78
14,983.25
26.46
151.20
624.30
11,515.66
7,602.34
2,497.21
88.20
504.00
6,243.02
38,385.53
25,341.12
24,972.08
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
64.68
-
64.50
-
426.99
-
64.50
6.00
-
426.99
64.68
100.00%
100.00%
0.00%
0.00%
84.05
84.05
117.67
117.67
100.00%
100.00%
0.00%
0.00%
25.37
901.05
100.00%
0.00%
128.37
843.39
100.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
-
Metrado
-
Monto S/.
-
Metrado
TOTAL ACUMULADO
SALDO OBRA
Monto S/.
-
Metrado
7.87
Monto S/.
122.33
%
100.00%
11.41
142.15
74.11
45.86
74.11
Metrado
-
Monto S/.
-
100.00%
0.00%
285.32
153.62
915.98
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
21.83
175.87
193.86
3,058.46
100.00%
100.00%
0.00%
0.00%
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
6.39
176.62
1,959.30
793.01
100.00%
100.00%
0.00%
0.00%
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
4.29
43.38
140.04
1,278.39
1,419.68
618.97
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
104.55
9.47
4,417.19
261.47
100.00%
100.00%
0.00%
0.00%
104.55
1,326.72
100.00%
0.00%
40.08
263.73
100.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
-
Metrado
-
Monto S/.
-
Metrado
TOTAL ACUMULADO
SALDO OBRA
Monto S/.
-
Metrado
56.58
26.10
70.24
Monto S/.
6,097.09
1,693.70
262.00
%
100.00%
100.00%
100.00%
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
86.53
Metrado
-
Monto S/.
-
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,935.83
100.00%
0.00%
45.86
2.00
1,133.60
99.98
100.00%
100.00%
0.00%
0.00%
45.86
2,127.33
100.00%
0.00%
28.25
1,433.17
100.00%
0.00%
18.93
1,008.97
100.00%
0.00%
38.10
28.70
928.88
371.38
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
TOTAL ACUMULADO
Monto S/.
15.50
5.00
Monto S/.
Metrado
Monto S/.
2.00
10.59
374.47
5,078.43
100.00%
100.00%
0.00%
0.00%
1,236.75
15.50
1,236.75
100.00%
0.00%
383.30
5.00
383.30
100.00%
0.00%
16.00
61.12
100.00%
0.00%
4.00
215.16
100.00%
0.00%
4.00
32.52
100.00%
0.00%
155.79
169.90
1,026.62
975.23
100.00%
100.00%
0.00%
0.00%
10.59
192.42
100.00%
0.00%
28.70
84.09
100.00%
0.00%
31.52
12.00
770.35
209.16
100.00%
100.00%
0.00%
0.00%
2.33
2,083.59
100.00%
0.00%
1.00
4,488.95
100.00%
0.00%
1.00
9.00
4.00
66.72
715.14
33.40
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
31.52
12.00
Metrado
SALDO OBRA
770.35
209.16
Valorizacin N 03
Valorizacin N 04
Monto S/.
-
Metrado
-
Monto S/.
-
Metrado
TOTAL ACUMULADO
SALDO OBRA
Monto S/.
-
Metrado
1.00
2.00
6.00
1.00
Monto S/.
11.07
22.14
574.20
624.31
%
100.00%
100.00%
100.00%
100.00%
1.08
1.08
7.20
26.85
22.38
187.13
1.00
Metrado
-
Monto S/.
-
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
86.73
100.00%
0.00%
1.00
1.00
819.08
188.47
100.00%
100.00%
0.00%
0.00%
7.20
407.88
100.00%
0.00%
6.00
63.24
100.00%
0.00%
3.00
4.00
2.00
440.13
488.20
144.38
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
3.09
3.09
4.41
4.41
6.18
6.18
100.00%
100.00%
0.00%
0.00%
129.23
7.28
258.46
100.00%
0.00%
38.77
75.92
7.39
8.73
8.73
4.41
77.54
151.84
14.78
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
47.14
4.41
94.28
100.00%
0.00%
653.49
361.94
540.42
3.22
14.40
272.25
1,306.98
723.88
1,080.84
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
44.54
59.95
113.18
0.27
2.25
57.02
89.08
119.90
226.36
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
462.46
14.30
924.92
100.00%
0.00%
160.06
339.36
14.40
33.55
320.12
678.72
100.00%
100.00%
0.00%
0.00%
54.74
3.24
109.48
100.00%
0.00%
313.50
2.20
627.00
100.00%
0.00%
4.50
26.90
3.00
1.00
9.00
53.80
100.00%
100.00%
0.00%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
49.15
Metrado
Monto S/.
-
Metrado
TOTAL ACUMULADO
Monto S/.
-
Metrado
33.55
Monto S/.
98.30
SALDO OBRA
%
100.00%
Metrado
Monto S/.
-
%
0.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
-
Metrado
-
Monto S/.
-
Metrado
TOTAL ACUMULADO
1.00
1.00
1.00
1.00
Monto S/.
502.00
786.93
499.18
535.69
2.00
1.00
1.00
2,216.50
250.32
433.16
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
2.00
1.00
1.00
2,216.50
250.32
433.16
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
79.00
79.00
110.60
110.60
166.35
166.35
232.89
232.89
100.00%
100.00%
0.00%
0.00%
28.32
440.14
59.64
926.80
100.00%
0.00%
33.99
33.99
301.81
591.05
71.57
71.57
635.52
1,244.57
100.00%
100.00%
0.00%
0.00%
18.88
3.54
28.32
3,205.62
683.05
924.75
39.76
7.46
59.64
6,750.06
1,438.29
1,947.24
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
139.73
-
17,436.01
-
79.00
1,019.89
166.35
2,147.58
100.00%
0.00%
81.47
10,165.33
465.78
58,120.03
100.00%
0.00%
269.70
790.22
269.70
790.22
100.00%
0.00%
93,154.97
57,099.74
19,798.78
369,286.59
51,293.70
25,170.73
8,727.72
162,789.01
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
41,861.27
31,929.01
11,071.06
206,497.58
6,195.47
4,725.49
1,638.52
30,561.64
2,176.79
1,660.31
575.70
10,737.87
50,233.53
38,314.81
13,285.28
247,797.09
9,042.04
6,896.67
2,391.35
44,603.48
59,275.57
45,211.48
15,676.63
292,400.57
100.00%
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
Valorizacin N 02
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
117.50
164.50
100.00%
0.00%
265.15
9,418.13
100.00%
0.00%
128.43
33.85
1,600.24
2,724.24
100.00%
100.00%
0.00%
0.00%
64.22
16.93
800.12
1,362.12
177.74
1,578.33
100.00%
0.00%
77.50
1,674.00
100.00%
0.00%
10,163.97
1,013.23
31.00
448.33
10,163.97
2,026.46
100.00%
100.00%
0.00%
0.00%
13,765.69
11,564.40
3,859.60
31.63
230.00
1,929.80
13,765.69
11,564.40
7,719.20
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
28.25
4.00
187.02
43.12
100.00%
100.00%
0.00%
0.00%
1,578.33
-
43.12
41,988.34
3,947.44
38,040.90
28.25
-
187.02
-
2,349.26
210.21
2,139.05
62,629.30
5,603.93
57,025.37
Valorizacin N 03
Valorizacin N 04
Monto S/.
5,630.05
1,978.13
45,649.08
8,216.83
53,865.91
Metrado
Monto S/.
316.58
111.23
2,566.86
462.03
3,028.89
Metrado
TOTAL ACUMULADO
Monto S/.
0.00
0.00
Metrado
Monto S/.
8,439.75
2,965.32
68,430.44
12,317.48
80,747.92
SALDO OBRA
%
Metrado
Monto S/.
0.00
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
Valorizacin N 02
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
###
70.00
98.00
100.00%
0.00%
###
###
###
###
108.92
3,868.84
100.00%
0.00%
42.98
17.08
535.53
1,374.60
100.00%
100.00%
0.00%
0.00%
###
###
###
85.72
761.19
100.00%
0.00%
42.00
907.20
100.00%
0.00%
###
###
###
###
###
###
16.80
250.70
5,508.22
1,133.16
100.00%
100.00%
0.00%
0.00%
15.40
112.00
840.28
6,702.23
5,631.36
3,361.12
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
###
###
15.75
2.00
104.27
21.56
100.00%
100.00%
0.00%
0.00%
0.00
###
0.00
0.00
30,007.28
3,922.75
26,084.53
3,860.51
1,356.40
31,301.44
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
-
0.00
Monto S/.
0.00
Metrado
TOTAL ACUMULADO
Monto S/.
0.00
Metrado
Monto S/.
5,634.26
36,935.70
SALDO OBRA
%
Metrado
Monto S/.
0.00
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
Valorizacin N 02
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
154.10
215.74
100.00%
0.00%
387.27
13,755.83
100.00%
0.00%
188.47
43.81
2,348.34
3,525.82
100.00%
100.00%
0.00%
0.00%
1,174.17
1,762.91
94.24
21.91
1,174.17
1,762.91
258.44
2,294.94
100.00%
0.00%
105.65
2,282.04
100.00%
0.00%
10,998.07
-
47.92
767.53
15,711.53
3,469.24
100.00%
100.00%
0.00%
0.00%
13,630.78
10,960.41
5,860.60
41.76
290.65
2,930.30
18,174.37
14,613.88
11,721.20
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
32.05
4.00
212.17
43.12
100.00%
100.00%
0.00%
0.00%
229.49
-
32.34
44,648.77
3,793.55
40,855.22
6,046.57
24.04
-
159.13
-
3,096.21
237.86
2,858.35
423.04
88,368.24
6,788.78
81,579.46
12,073.76
Valorizacin N 03
Valorizacin N 04
Monto S/.
2,124.47
49,026.26
8,824.73
57,850.99
Metrado
Monto S/.
148.63
3,430.02
617.40
4,047.42
Metrado
TOTAL ACUMULADO
Monto S/.
0.00
0.00
Metrado
Monto S/.
4,242.13
97,895.35
17,621.16
115,516.51
SALDO OBRA
%
Metrado
Monto S/.
0.00
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
Valorizacin N 02
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
150.50
210.70
150.50
210.70
100.00%
0.00%
434.77
15,443.03
434.77
15,443.03
100.00%
0.00%
214.20
48.89
2,668.93
3,934.67
100.00%
100.00%
0.00%
0.00%
214.20
48.89
2,668.93
3,934.67
286.74
2,546.25
286.74
2,546.25
100.00%
0.00%
115.50
2,494.80
115.50
2,494.80
100.00%
0.00%
55.20
903.57
18,098.42
4,084.14
55.20
903.57
18,098.42
4,084.14
100.00%
100.00%
0.00%
0.00%
30.92
224.00
3,446.78
13,456.26
11,262.72
13,787.12
13.25
96.00
-
5,766.97
4,826.88
-
44.17
320.00
3,446.78
19,223.23
16,089.60
13,787.12
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
2.80
30.18
42.75
1.20
283.01
12.94
42.75
4.00
283.01
43.12
100.00%
100.00%
0.00%
0.00%
75.60
9,433.37
75.60
9,433.37
100.00%
0.00%
81,413.62
16,006.31
65,407.31
26,926.77
5,293.93
21,632.84
108,340.39
21,300.24
87,040.15
Valorizacin N 03
Valorizacin N 04
Monto S/.
0.00
-
Metrado
Monto S/.
9,680.28
3,401.18
78,488.77
14,127.98
0.00
92,616.75
Metrado
Monto S/.
3,201.66
1,124.91
25,959.41
4,672.69
30,632.10
TOTAL ACUMULADO
Metrado
Monto S/.
12,881.94
4,526.09
104,448.18
18,800.67
123,248.85
SALDO OBRA
%
Metrado
Monto S/.
0.00
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
Metrado
Monto S/.
Valorizacin N 02
Valorizacin N 03
Valorizacin N 04
Monto S/.
Metrado
Monto S/.
TOTAL ACUMULADO
Metrado
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
TOTAL ACUMULADO
Monto S/.
Metrado
Monto S/.
SALDO OBRA
%
Metrado
Monto S/.
193.90
271.46
100.00%
0.00%
336.04
11,936.14
100.00%
0.00%
143.49
48.35
1,787.88
3,891.20
100.00%
100.00%
0.00%
0.00%
893.94
1,945.60
71.75
24.18
893.94
1,945.60
250.32
2,222.84
100.00%
0.00%
120.90
2,611.44
100.00%
0.00%
14,270.21
-
48.36
757.54
15,855.79
3,424.08
100.00%
100.00%
0.00%
0.00%
19,327.68
16,240.44
7,848.46
44.41
323.00
2,803.02
19,327.68
16,240.44
11,212.08
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
48.00
6.00
317.76
64.68
100.00%
100.00%
0.00%
0.00%
222.28
-
64.68
60,813.29
7,312.12
53,501.17
7,918.17
2,782.06
48.00
-
317.76
-
3,157.30
362.18
2,795.12
413.68
145.35
89,163.49
10,228.17
78,935.32
11,682.43
4,104.64
Valorizacin N 03
Valorizacin N 04
Monto S/.
64,201.40
11,556.25
75,757.65
Metrado
Monto S/.
3,354.15
603.75
3,957.90
Metrado
TOTAL ACUMULADO
Monto S/.
0.00
0.00
Metrado
Monto S/.
94,722.39
17,050.03
111,772.42
SALDO OBRA
%
Metrado
Monto S/.
0.00
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
m2
195.30
1.40
m3
892.71
35.52
m3
m3
458.33
77.49
12.46
80.48
m3
564.69
8.88
m2
195.30
21.60
m3
kg
97.65
1,624.59
327.87
4.52
m3
88.20
435.21
907
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
PRESUPUESTO
Precio
m2
kg
504.00
6,243.02
50.28
4.00
m
und
64.50
6.00
6.62
10.78
M2
M2
84.05
84.05
1.40
1.40
M3
25.37
35.52
M3
M3
128.37
7.87
6.57
15.54
M3
11.41
12.46
ADMINISTRACION
01.01.07
01.01.07.01
01.01.07.02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.04
908
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.06
02.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
M2
74.11
45.86
74.11
3.85
3.35
12.36
M3
M3
21.83
175.87
8.88
17.39
M3
M2
M3
M2
2.49
20.80
0.18
45.86
171.48
21.38
180.69
28.23
M3
KG
6.39
176.62
306.86
4.49
M3
M2
KG
4.43
35.45
357.86
322.52
50.40
3.97
909
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
Unidad
Metrado
PRESUPUESTO
Precio
M3
M2
KG
4.29
43.38
140.04
297.96
32.73
4.42
M3
M2
KG
4.06
46.59
536.50
433.42
52.55
3.97
M3
M2
KG
8.05
69.26
1,052.27
338.82
60.96
3.97
M3
M2
KG
UND
7.57
86.53
338.14
720.76
321.86
37.69
3.97
2.44
M2
M
104.55
9.47
42.25
27.61
910
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.05.01
02.05.01.01
02.06
02.06.01
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
Unidad
Metrado
PRESUPUESTO
Precio
M2
104.55
12.69
40.08
6.58
M2
M2
KG
56.58
26.10
70.24
107.77
64.90
3.73
M2
M2
M2
M2
M
M
18.93
141.51
28.39
69.26
30.97
135.84
19.28
20.37
31.52
43.34
12.28
6.37
M2
86.53
33.93
911
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.02
03.06.01.03
03.07
03.07.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
CARPINTERIA METALICA Y HERRERIA
VENTANAS DE ALUMINIO
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
45.86
2.00
24.72
50.04
M2
45.86
46.39
M2
28.25
50.73
M2
18.93
53.30
M
M
38.10
28.70
24.38
12.94
M2
M2
2.00
10.59
187.42
479.55
912
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.07.02.01
03.07.03
03.07.03.01
03.08
03.08.01
03.08.01.01
03.08.02
03.08.02.01
03.08.03
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.03
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
Unidad
Metrado
PRESUPUESTO
Precio
M2
15.50
79.77
5.00
76.66
PZA.
16.00
3.82
UND
4.00
53.79
UND
4.00
8.13
M2
M2
155.79
169.90
6.59
5.74
M2
10.59
18.17
28.70
2.93
31.52
24.44
913
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.10.04
03.11
03.11.02
04
04.01.01
05
05.01
05.01.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
05.02.02
05.02.05
05.03
05.03.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
CONEXIN A RED EXIATENTE
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
Unidad
Metrado
PRESUPUESTO
Precio
12.00
17.43
M2
2.33
893.86
GLB
1.00
4,488.95
PTO
PTO
PTO
PTO
PTO
UND
UND
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
79.46
8.35
11.07
11.07
95.70
624.31
M3
M3
M
1.08
1.08
7.20
24.86
20.72
25.99
UND
1.00
86.73
914
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.04
05.04.02
05.04.04
05.05
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.04
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01
02.01.01
02.01.01.01
02.01.05
DESCRIPCIN
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
UND
UND
1.00
1.00
819.08
188.47
M
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
M
ARTEFACTOS
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
UND
ARTEF. FLUORECENTE 2/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122(SIM. BE JOSFEL) C/SOPORTUND
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
UND
CISTERNA
OBRAS PROVISIONALES Y TRABAJOS PROVISIONALES
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
M2
REPLANTEO DURANTE EL PROCESO
M2
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
M3
ELIMINACION DE MATERIAL EXCEDENTE
7.20
56.65
6.00
10.54
3.00
4.00
2.00
146.71
122.05
72.19
4.41
4.41
1.40
1.40
7.28
35.52
915
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.05.01
02.01.05.02
01.01.04.02
02.02
02.02.02
02.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS E=2", 1:12 C:H
OBRAS DE CONCRETO ARMADO
CISTERNA
CISTERNA - CONCRETO F'C=210 Kg/cm2
CISTERNA - ENCOFRADO Y DESENCOFRADO
CISTERNA - ACERO F'Y=4200 kg/cm2
LOSAS
LOSA MACISA - CONCRETO F'C=210 Kg/cm2
LOSA MACISA - ENCOFRADO Y DESENCOFRADO
LOSA MACISA - ACERO F'Y=4200 kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
M3
M3
M2
8.73
8.73
4.41
8.88
17.39
3.35
M2
4.41
21.38
M3
M2
KG
3.22
14.40
272.25
405.30
50.27
3.97
M3
M2
KG
0.27
2.25
57.02
329.92
53.29
3.97
916
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
03.01
03.01.02
03.02
03.02.01
03.02.02
03.03.01
03.03.01.01
03.07
03.07.02.01
03.08
03.08.01.01
03.08.02.01
03.09
03.09.03.01
01.00
02.00
03.00
04.00
05.00
ACCESORIOS DE SUCCION
ACCESORIOS DE IMPULSION
ACCESORIOS DE ADUCCION
ACCESORIOS DE LIMPIEZA Y REBOSE
SUMINISTRO E INSTALACION DE ELECTROBOMBA
Unidad
Metrado
PRESUPUESTO
Precio
M2
14.30
64.68
M2
M2
14.40
33.55
22.23
20.23
M2
3.24
33.79
M2
2.20
285.00
PZA.
UND
3.00
1.00
3.00
53.79
33.55
2.93
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
M2
917
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.01
07.00
08.00
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
SUMINISTRO E INSTALACION DE ELECTROBOMBA
CAJA DE PASE GALVANIZADA DE 150x150x100 mm
TABLERO ARRANQUE- PARADA
Unidad
UND
UND
UND
Metrado
PRESUPUESTO
Precio
2.00
1.00
1.00
1,108.25
250.32
433.16
M2
M2
166.35
166.35
1.40
1.40
M3
59.64
15.54
M3
M3
71.57
71.57
8.88
17.39
M3
M3
M2
39.76
7.46
59.64
169.77
192.93
32.65
CERCO PERIMETRICO
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01.02
02.01.02.02
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.03
02.02.06
918
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.05
03.05.02
03.05.02.02
03.07
03.07.02
03.07.02.01
03.09
03.09.03.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA METALICA Y HERRERIA
CERCOS
CERCO MALLA ELECT. 2"2" C/PERF. COLUM. FG ESTNDAR 2" (SISTEMIC)
PINTURA
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
Unidad
Metrado
PRESUPUESTO
Precio
166.35
12.91
M2
465.78
124.78
269.70
2.93
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
919
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
920
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
m2
195.30
1.40
m3
892.71
35.52
m3
m3
458.33
77.49
12.46
80.48
m3
564.69
8.88
m2
195.30
21.60
m3
kg
97.65
1,624.59
327.87
4.52
m3
m2
88.20
504.00
435.21
50.28
921
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
kg
Metrado
PRESUPUESTO
Precio
6,243.02
4.00
m
und
64.50
6.00
6.62
10.78
M2
M2
84.05
84.05
1.40
1.40
M3
25.37
35.52
M3
M3
128.37
7.87
6.57
15.54
M3
11.41
12.46
M2
74.11
3.85
ADMINISTRACION
01.01.07
01.01.07.01
01.01.07.02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.04
02.01.04.01
922
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.06
02.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
45.86
74.11
3.35
12.36
M3
M3
21.83
175.87
8.88
17.39
M3
M2
M3
M2
2.49
20.80
0.18
45.86
171.48
21.38
180.69
28.23
M3
KG
6.39
176.62
306.86
4.49
M3
M2
KG
4.43
35.45
357.86
322.52
50.40
3.97
M3
4.29
297.96
923
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
Unidad
Metrado
PRESUPUESTO
Precio
M2
KG
43.38
140.04
32.73
4.42
M3
M2
KG
4.06
46.59
536.50
433.42
52.55
3.97
M3
M2
KG
8.05
69.26
1,052.27
338.82
60.96
3.97
M3
M2
KG
UND
7.57
86.53
338.14
720.76
321.86
37.69
3.97
2.44
M2
M
104.55
9.47
42.25
27.61
924
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
Unidad
Metrado
PRESUPUESTO
Precio
M2
104.55
12.69
40.08
6.58
M2
M2
KG
56.58
26.10
70.24
107.77
64.90
3.73
M2
M2
M2
M2
M
M
18.93
141.51
28.39
69.26
30.97
135.84
19.28
20.37
31.52
43.34
12.28
6.37
M2
86.53
33.93
925
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.02
03.06.01.03
03.07
03.07.02
03.07.02.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
CARPINTERIA METALICA Y HERRERIA
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
45.86
2.00
24.72
50.04
M2
45.86
46.39
M2
28.25
50.73
M2
18.93
53.30
M
M
38.10
28.70
24.38
12.94
M2
M2
2.00
10.59
187.42
479.55
M2
15.50
79.77
926
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.07.03
03.07.03.01
03.08
03.08.01
03.08.01.01
03.08.02
03.08.02.01
03.08.03
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.03
03.10.04
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
Unidad
M
Metrado
PRESUPUESTO
Precio
5.00
76.66
PZA.
16.00
3.82
UND
4.00
53.79
UND
4.00
8.13
M2
M2
155.79
169.90
6.59
5.74
M2
10.59
18.17
28.70
2.93
M
M
31.52
12.00
24.44
17.43
927
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.11
03.11.02
04
04.01.01
05
05.01
05.01.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
05.02.02
05.02.05
05.03
05.03.01
05.04
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
OTROS
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
CONEXIN A RED EXIATENTE
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
Unidad
Metrado
PRESUPUESTO
Precio
M2
2.33
893.86
GLB
1.00
4,488.95
PTO
PTO
PTO
PTO
PTO
UND
UND
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
79.46
8.35
11.07
11.07
95.70
624.31
M3
M3
M
1.08
1.08
7.20
24.86
20.72
25.99
UND
1.00
86.73
928
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.04.02
05.04.04
05.05
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.04
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01
02.01.01
02.01.01.01
02.01.05
02.01.05.01
DESCRIPCIN
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
UND
UND
1.00
1.00
819.08
188.47
M
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
M
ARTEFACTOS
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
UND
ARTEF. FLUORECENTE 2/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122(SIM. BE JOSFEL) C/SOPORTUND
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
UND
CISTERNA
OBRAS PROVISIONALES Y TRABAJOS PROVISIONALES
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
M2
REPLANTEO DURANTE EL PROCESO
M2
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
M3
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
M3
7.20
56.65
6.00
10.54
3.00
4.00
2.00
146.71
122.05
72.19
4.41
4.41
1.40
1.40
7.28
35.52
8.73
8.88
929
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.01.05.02
01.01.04.02
02.02
02.02.02
02.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
03.01
03.01.02
03.02
03.02.01
03.02.02
03.03.01
Unidad
Metrado
PRESUPUESTO
Precio
M3
M2
8.73
4.41
17.39
3.35
M2
4.41
21.38
M3
M2
KG
3.22
14.40
272.25
405.30
50.27
3.97
M3
M2
KG
0.27
2.25
57.02
329.92
53.29
3.97
M2
14.30
64.68
M2
M2
14.40
33.55
22.23
20.23
930
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
03.03.01.01
03.07
03.07.02.01
03.08
03.08.01.01
03.08.02.01
03.09
03.09.03.01
01.00
02.00
03.00
04.00
05.00
05.01
07.00
08.00
ACCESORIOS DE SUCCION
ACCESORIOS DE IMPULSION
ACCESORIOS DE ADUCCION
ACCESORIOS DE LIMPIEZA Y REBOSE
SUMINISTRO E INSTALACION DE ELECTROBOMBA
SUMINISTRO E INSTALACION DE ELECTROBOMBA
CAJA DE PASE GALVANIZADA DE 150x150x100 mm
TABLERO ARRANQUE- PARADA
Unidad
Metrado
PRESUPUESTO
Precio
M2
3.24
33.79
M2
2.20
285.00
PZA.
UND
3.00
1.00
3.00
53.79
33.55
2.93
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
2.00
1.00
1.00
1,108.25
250.32
433.16
M2
UND
UND
UND
CERCO PERIMETRICO
01.00.00
01.01.04
931
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
01.01.04.01
01.01.04.02
02.01.02
02.01.02.02
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.03
02.02.06
03.05
03.05.02
03.05.02.02
03.07
03.07.02
03.07.02.01
03.09
03.09.03.01
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA METALICA Y HERRERIA
CERCOS
CERCO MALLA ELECT. 2"2" C/PERF. COLUM. FG ESTNDAR 2" (SISTEMIC)
PINTURA
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
166.35
166.35
1.40
1.40
M3
59.64
15.54
M3
M3
71.57
71.57
8.88
17.39
M3
M3
M2
39.76
7.46
59.64
169.77
192.93
32.65
166.35
12.91
M2
465.78
124.78
269.70
2.93
932
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
933
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Obra
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Unidad
Metrado
PRESUPUESTO
Precio
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
m2
m3
195.30
892.71
1.40
35.52
934
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
PRESUPUESTO
Precio
m3
m3
458.33
77.49
12.46
80.48
m3
564.69
8.88
m2
195.30
21.60
m3
kg
97.65
1,624.59
327.87
4.52
m3
m2
kg
88.20
504.00
6,243.02
435.21
50.28
4.00
m
und
64.50
6.00
6.62
10.78
ADMINISTRACION
01.01.07
935
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.01.07.01
01.01.07.02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.03
02.01.03.01
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
TRAZO Y REPLANTEO PRELIMINAR
REPLANTEO DURANTE EL PROCESO
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
CORTES
CORTE MASIVO DE TERRENO A MAQUINA
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
84.05
84.05
1.40
1.40
M3
25.37
35.52
M3
M3
128.37
7.87
6.57
15.54
M3
11.41
12.46
M2
M2
M2
74.11
45.86
74.11
3.85
3.35
12.36
M3
M3
21.83
175.87
8.88
17.39
M3
2.49
171.48
936
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.02.02
02.02.03
02.02.06
02.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
Unidad
Metrado
PRESUPUESTO
Precio
M2
M3
M2
20.80
0.18
45.86
21.38
180.69
28.23
M3
KG
6.39
176.62
306.86
4.49
M3
M2
KG
4.43
35.45
357.86
322.52
50.40
3.97
M3
M2
KG
4.29
43.38
140.04
297.96
32.73
4.42
M3
M2
KG
4.06
46.59
536.50
433.42
52.55
3.97
937
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
03
03.01
03.01.01
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
Unidad
M3
M2
KG
Metrado
PRESUPUESTO
Precio
8.05
69.26
1,052.27
338.82
60.96
3.97
M3
M2
KG
UND
7.57
86.53
338.14
720.76
321.86
37.69
3.97
2.44
M2
M
104.55
9.47
42.25
27.61
M2
104.55
12.69
40.08
6.58
M2
56.58
107.77
938
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
Unidad
Metrado
PRESUPUESTO
Precio
M2
KG
26.10
70.24
64.90
3.73
M2
M2
M2
M2
M
M
18.93
141.51
28.39
69.26
30.97
135.84
19.28
20.37
31.52
43.34
12.28
6.37
M2
86.53
33.93
M2
M2
45.86
2.00
24.72
50.04
M2
45.86
46.39
M2
28.25
50.73
939
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
03.06.01.02
03.06.01.03
03.07
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.08
03.08.01
03.08.01.01
03.08.02
03.08.02.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
CARPINTERIA METALICA Y HERRERIA
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
Unidad
Metrado
PRESUPUESTO
Precio
M2
18.93
53.30
M
M
38.10
28.70
24.38
12.94
M2
M2
2.00
10.59
187.42
479.55
M2
15.50
79.77
5.00
76.66
PZA.
16.00
3.82
UND
4.00
53.79
940
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.08.03
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.02
03.09.03
03.09.03.01
03.10
03.10.03
03.10.04
03.11
03.11.02
04
04.01.01
05
05.01
05.01.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
ACCESORIOS DE CIERRE
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA BARNIS EN CARP. DE MADERA
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
CONEXIN A RED EXIATENTE
Unidad
UND
Metrado
PRESUPUESTO
Precio
4.00
8.13
M2
M2
155.79
169.90
6.59
5.74
M2
10.59
18.17
28.70
2.93
M
M
31.52
12.00
24.44
17.43
M2
2.33
893.86
GLB
1.00
4,488.95
PTO
1.00
66.72
941
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
05.02.02
05.02.05
05.03
05.03.01
05.04
05.04.02
05.04.04
05.05
05.05.02
05.06
05.06.01
05.07
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
ARTEFACTOS
Unidad
Metrado
PRESUPUESTO
Precio
PTO
PTO
PTO
PTO
UND
UND
9.00
4.00
1.00
2.00
6.00
1.00
79.46
8.35
11.07
11.07
95.70
624.31
M3
M3
M
1.08
1.08
7.20
24.86
20.72
25.99
UND
1.00
86.73
UND
UND
1.00
1.00
819.08
188.47
7.20
56.65
6.00
10.54
942
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.07.01
05.07.02
05.07.04
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01
02.01.01
02.01.01.01
02.01.05
02.01.05.01
02.01.05.02
01.01.04.02
02.02
02.02.02
02.03
02.03.05
02.03.05.01
DESCRIPCIN
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
3.00
4.00
2.00
146.71
122.05
72.19
4.41
4.41
1.40
1.40
7.28
35.52
8.73
8.73
4.41
8.88
17.39
3.35
4.41
21.38
3.22
405.30
943
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.03.05.02
02.03.05.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
03.01
03.01.02
03.02
03.02.01
03.02.02
03.03.01
03.03.01.01
03.07
03.07.02.01
03.08
03.08.01.01
03.08.02.01
03.09
Unidad
Metrado
PRESUPUESTO
Precio
M2
KG
14.40
272.25
50.27
3.97
M3
M2
KG
0.27
2.25
57.02
329.92
53.29
3.97
M2
14.30
64.68
M2
M2
14.40
33.55
22.23
20.23
M2
3.24
33.79
M2
2.20
285.00
PZA.
UND
3.00
1.00
53.79
3.00
944
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
03.09.03.01
01.00
02.00
03.00
04.00
05.00
05.01
07.00
08.00
ACCESORIOS DE SUCCION
ACCESORIOS DE IMPULSION
ACCESORIOS DE ADUCCION
ACCESORIOS DE LIMPIEZA Y REBOSE
SUMINISTRO E INSTALACION DE ELECTROBOMBA
SUMINISTRO E INSTALACION DE ELECTROBOMBA
CAJA DE PASE GALVANIZADA DE 150x150x100 mm
TABLERO ARRANQUE- PARADA
Unidad
M2
Metrado
PRESUPUESTO
Precio
33.55
2.93
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
2.00
1.00
1.00
1,108.25
250.32
433.16
M2
M2
166.35
166.35
1.40
1.40
M3
59.64
15.54
M3
M3
71.57
71.57
8.88
17.39
UND
UND
UND
CERCO PERIMETRICO
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01.02
02.01.02.02
02.01.05
02.01.05.01
02.01.05.02
945
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.02
02.02.01
02.02.03
02.02.06
03.05
03.05.02
03.05.02.02
03.07
03.07.02
03.07.02.01
03.09
03.09.03.01
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA METALICA Y HERRERIA
CERCOS
CERCO MALLA ELECT. 2"2" C/PERF. COLUM. FG ESTNDAR 2" (SISTEMIC)
PINTURA
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
Unidad
Metrado
PRESUPUESTO
Precio
M3
M3
M2
39.76
7.46
59.64
169.77
192.93
32.65
166.35
12.91
M2
465.78
124.78
269.70
2.93
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
946
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
UTILIDAD (5.20 % CD)
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
Unidad
Metrado
PRESUPUESTO
Precio
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
947
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
Item
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
m2
195.30
1.40
m3
892.71
35.52
m3
m3
458.33
77.49
12.46
80.48
m3
564.69
8.88
m2
195.30
21.60
948
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
PRESUPUESTO
Precio
m3
kg
97.65
1,624.59
327.87
4.52
m3
m2
kg
88.20
504.00
6,243.02
435.21
50.28
4.00
m
und
64.50
6.00
6.62
10.78
M2
M2
84.05
84.05
1.40
1.40
M3
25.37
35.52
M3
128.37
6.57
ADMINISTRACION
01.01.07
01.01.07.01
01.01.07.02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
949
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.02.02
02.01.03
02.01.03.01
02.01.04
02.01.04.01
02.01.04.02
02.01.04.03
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.02
02.02.03
02.02.06
02.03
02.03.02
02.03.02.01
02.03.02.02
02.03.03
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
CORTE DE TERRENO EN FORMA MANUAL
RELLENOS
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
NIVELACION INTERIOR Y APISONADO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VEREDAS
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES
ELIMINACION DE MATERIAL EXCEDENTE
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAV. DISTANCIAS CORTAS
ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS 1:10+30% P.G. F'C>=100 Kg/cm2
SOLADO PARA ZAPATAS E=2", 1:12 C:H
DADOS DE CONCRETO 1:8+25% P.M.
FALSO PISO MEZCLA 1:8, E=4"
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS- CONCRETO F'C=210 KG/CM2
ZAPATAS - ACERO DE REFUERZO FY=4200 Kg/m2
VIGAS DE CIMENTACION
Unidad
Metrado
PRESUPUESTO
Precio
M3
7.87
15.54
M3
11.41
12.46
M2
M2
M2
74.11
45.86
74.11
3.85
3.35
12.36
M3
M3
21.83
175.87
8.88
17.39
M3
M2
M3
M2
2.49
20.80
0.18
45.86
171.48
21.38
180.69
28.23
M3
KG
6.39
176.62
306.86
4.49
950
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.03.03.01
02.03.03.02
02.03.03.03
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
02.03.07.07
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
VIGAS DE CIMENTACION - CONCRETO F'C=201 Kg/cm2
VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
VIGAS DE CIMENTACION - ACERO F'Y=4200 kg/cm2
SOBRECIMIENTO REFORZADOS
SOBRECIMIENTO REFORZADO - CONCRETO F'C=175 Kg/cm2
SOBRECIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO - ACERO F'Y=4200 kg/cm2
COLUMNAS
COLUMNAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
COLUMNAS - ENCOFRADO Y DESENCOFRADO
COLUMNAS - ACERO F'Y=4200 kg/cm2
VIGAS
VIGAS - CONCRETO F'C=210 Kg/cm2 - 01 PISO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS - ACERO F'Y=4200 kg/cm2
LOSAS
LOSA ALIGERADA - CONCRETO F'C=210 Kg/cm2 - 01 PISO
LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA - ACERO F'Y=4200 kg/cm2
LOSA ALIGERADA - LADRILLO HUECO 15X30X30 cm
Unidad
Metrado
PRESUPUESTO
Precio
M3
M2
KG
4.43
35.45
357.86
322.52
50.40
3.97
M3
M2
KG
4.29
43.38
140.04
297.96
32.73
4.42
M3
M2
KG
4.06
46.59
536.50
433.42
52.55
3.97
M3
M2
KG
8.05
69.26
1,052.27
338.82
60.96
3.97
7.57
86.53
338.14
720.76
321.86
37.69
3.97
2.44
M3
M2
KG
UND
951
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.04
02.04.01
02.04.02
02.05
02.05.01
02.05.01.01
02.06
02.06.01
COBERTURA
COBERTURA CON LAMINA DE POLIPROPILENO TEJA OPACA 1.15m x 0.76m
CUMBRERA DE TEJA OPACA DE POLIPROPILENO 0.76m x 0.60m
ESTRUCTURA DE MADERA
CORREAS
LISTONES DE MADERA P/FIJAR COBERTURA ALIGERADA
VARIOS
JUNTA DE DILATACION O RELLENO CON MORTERO ASFALTICO E=1"
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA; MEZCLA 1:1:4 (E=1.5cm)
MUROS DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:1:4 (E=1.5cm)
ALAMBRE N 8 DE REFUERZO HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO C:A, 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES 1:5
Unidad
Metrado
PRESUPUESTO
Precio
M2
M
104.55
9.47
42.25
27.61
M2
104.55
12.69
40.08
6.58
M2
M2
KG
56.58
26.10
70.24
107.77
64.90
3.73
M2
M2
M2
M2
M
18.93
141.51
28.39
69.26
30.97
19.28
20.37
31.52
43.34
12.28
952
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.02.06
03.03
03.03.01
03.03.01.01
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.03
03.04.03.01
03.05
03.05.01
03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.06
03.06.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
BRUAS SEGN DETALLE (1x1 cm)
CIELO RASO Y FALSO CIELO RASO
CIELO RASO
CIELO RASO CON MEZCLA C:A, 1:5
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40mm
CONTRAPISO DE 6" ACABADO PULIDO, ZONA MUEBLES BAJOS
PISOS
PISO CERAMICO 0.30x0.30m SERIE COLOR - NACIONAL
PATIOS Y VEREDAS
PATIO Y VEREDA CONCRETO F'C=175 Kg/cm2 E=4" FROTACHADO Y BRUADO
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO DE 0.30m x 0.20m
CONTRAZOCALOS
CONTRAZOCALOS DE LOSETA VENECIANA 0.10m x 0.30m CLARO
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
CARPINTERIA DE MADERA
PUERTAS
Unidad
Metrado
PRESUPUESTO
Precio
135.84
6.37
M2
86.53
33.93
M2
M2
45.86
2.00
24.72
50.04
M2
45.86
46.39
M2
28.25
50.73
M2
18.93
53.30
M
M
38.10
28.70
24.38
12.94
953
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.06.01.02
03.06.01.03
03.07
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.08
03.08.01
03.08.01.01
03.08.02
03.08.02.01
03.08.03
03.08.03.02
03.09
03.09.01
03.09.01.01
03.09.01.02
03.09.02
03.09.02.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
PTA. CEDRO Y C/TRIPLAY 6mm (Mueble Bajo)
PUERTA CEDRO MACHIMBRADA
CARPINTERIA METALICA Y HERRERIA
VENTANAS DE ALUMINIO
VENTANAS DE VIDRIO SEMIDOBLE IMPORTADO CON ACCES. ALUMINIO INC. MARCO
PASAMANOS
PASAMANO DE TUBO F N DE 1 1/2" EN SS.HH.
CERRAJERIA
BISAGRAS
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA
ACCESORIOS DE CIERRE
MANIJA DE BRONCE 4" PARA PUERTAS
PINTURA
PINTURA DE CIELOS RASOS, VIGAS, COLUMNAS Y PAREDES
PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS
PINTURA LATEX DOS MANOS EN MUROS Y COLUMNAS
PINTURA DE PUERTAS Y VENTANAS
PINTURA BARNIS EN CARP. DE MADERA
Unidad
Metrado
PRESUPUESTO
Precio
M2
M2
2.00
10.59
187.42
479.55
M2
15.50
79.77
5.00
76.66
PZA.
16.00
3.82
UND
4.00
53.79
UND
4.00
8.13
M2
M2
155.79
169.90
6.59
5.74
M2
10.59
18.17
954
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.09.03
03.09.03.01
03.10
03.10.03
03.10.04
03.11
03.11.02
04
04.01.01
05
05.01
05.01.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
PINTURA DE CONTRAZOCALOS Y BARANDAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
VARIOS, LIMPIEZA Y JARDINERIA
JUNTA C/SILICONA E=1.00cm x 2" VENTANA - MADERA
JUNTA DE DILATACION CON ESPUMA PLASTICA +JEBE MICROPOROSO
OTROS
MESA C.A. RESVESTIMIENTO C/MAYOLICA
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
SALIDA PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
CONEXIN A RED EXIATENTE
SALIDA DE TECHO (CENTRO DE LUZ)
INTERRUPTOR DE 01 GOLPES
INERRUPTOR DE 02 GOLPES
INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA
POZO PUESTA A TIERRA - 2004 P-1 (R<15 OHMS)
CANALIZACION Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
Unidad
Metrado
PRESUPUESTO
Precio
28.70
2.93
M
M
31.52
12.00
24.44
17.43
M2
2.33
893.86
GLB
1.00
4,488.95
PTO
PTO
PTO
PTO
PTO
UND
UND
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
79.46
8.35
11.07
11.07
95.70
624.31
M3
1.08
24.86
955
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.02.02
05.02.05
05.03
05.03.01
05.04
05.04.02
05.04.04
05.05
05.05.02
05.06
05.06.01
05.07
05.07.01
05.07.02
05.07.04
01.00.00
01.01.04
01.01.04.01
01.01.04.02
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. ELEC.SANIT).
TUBERIA PVC - P 50 mm
CAJAS
CAJA DE PASE FG 12x12x6"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-3x25, 1-2x20, 3-2x16 A, 1-IDF 25AMP
TG 1-3x40; 2-3x25A; 2-2x20A
CONEXIONES A RED EXTERNA DE MEDIDORES
ALIM. CAB. N2XH*[3-1*10+1*10(N)+1*10(T)]mm2
Unidad
Metrado
PRESUPUESTO
Precio
M3
M
1.08
7.20
20.72
25.99
UND
1.00
86.73
UND
UND
1.00
1.00
819.08
188.47
M
INSTALACION DEL SISTEMA PUESTO A TIERRA
CABLE COBRE DESNUDO 1x16 mm2, 20mm PVC-P
M
ARTEFACTOS
ARTEF. FLUORECENTE 3/36W (SIM. BE JOSFEL) C/SOPORTE
UND
ARTEF. FLUORECENTE 2/36W C/REJ.MET.EMPOTRADO AF SIMILAR RES-M MS-122(SIM. BE JOSFEL) C/SOPORTUND
ARTEF. T/PLASTICO CUADRADO C/LAMP FLUORESCENTE CIRCULAR 32W
UND
CISTERNA
OBRAS PROVISIONALES Y TRABAJOS PROVISIONALES
TRAZO, NIVELES Y REPLANTEO
TRAZO Y REPLANTEO PRELIMINAR
M2
REPLANTEO DURANTE EL PROCESO
M2
7.20
56.65
6.00
10.54
3.00
4.00
2.00
146.71
122.05
72.19
4.41
4.41
1.40
1.40
956
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
02.01
02.01.01
02.01.01.01
02.01.05
02.01.05.01
02.01.05.02
01.01.04.02
02.02
02.02.02
02.03
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.07
02.03.07.04
02.03.07.05
02.03.07.06
MOVIMIENTO DE TIERRAS
EXCAVACIONES
EXCAVACION DE ZANJAS Y ZAPATAS RT<2 Kg/cm2 H=1.50M
03.01
Unidad
Metrado
PRESUPUESTO
Precio
M3
7.28
35.52
M3
M3
M2
8.73
8.73
4.41
8.88
17.39
3.35
M2
4.41
21.38
M3
M2
KG
3.22
14.40
272.25
405.30
50.27
3.97
M3
M2
KG
0.27
2.25
57.02
329.92
53.29
3.97
957
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
03.01.02
03.02
03.02.01
03.02.02
03.03.01
03.03.01.01
03.07
03.07.02.01
03.08
03.08.01.01
03.08.02.01
03.09
03.09.03.01
01.00
02.00
03.00
04.00
05.00
05.01
ACCESORIOS DE SUCCION
ACCESORIOS DE IMPULSION
ACCESORIOS DE ADUCCION
ACCESORIOS DE LIMPIEZA Y REBOSE
SUMINISTRO E INSTALACION DE ELECTROBOMBA
SUMINISTRO E INSTALACION DE ELECTROBOMBA
Unidad
Metrado
PRESUPUESTO
Precio
M2
14.30
64.68
M2
M2
14.40
33.55
22.23
20.23
M2
3.24
33.79
M2
2.20
285.00
PZA.
UND
3.00
1.00
3.00
53.79
33.55
2.93
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
2.00
1,108.25
M2
UND
958
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
07.00
08.00
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
CAJA DE PASE GALVANIZADA DE 150x150x100 mm
TABLERO ARRANQUE- PARADA
Unidad
UND
UND
Metrado
PRESUPUESTO
Precio
1.00
1.00
250.32
433.16
M2
M2
166.35
166.35
1.40
1.40
M3
59.64
15.54
M3
M3
71.57
71.57
8.88
17.39
39.76
7.46
59.64
169.77
192.93
32.65
166.35
12.91
CERCO PERIMETRICO
01.00.00
01.01.04
01.01.04.01
01.01.04.02
02.01.02
02.01.02.02
02.01.05
02.01.05.01
02.01.05.02
02.02
02.02.01
02.02.03
02.02.06
M3
M3
M2
03.05
03.05.02
03.05.02.02
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR ALTURA 30cm MEZ. 1:2 E=1.5 cm
959
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
03.07
03.07.02
03.07.02.01
03.09
03.09.03.01
Inspector:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV
DESCRIPCIN
CARPINTERIA METALICA Y HERRERIA
CERCOS
CERCO MALLA ELECT. 2"2" C/PERF. COLUM. FG ESTNDAR 2" (SISTEMIC)
PINTURA
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO DE CEMENTO H=0.30m
Unidad
Metrado
PRESUPUESTO
Precio
M2
465.78
124.78
269.70
2.93
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
960
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
273.42
0.00
195.30
273.42
195.30
273.42
0.00
0.00%
31,709.06
0.00
892.71
31,709.06
892.71
31,709.06
0.00
0.00%
5,710.79
6,236.40
0.00
0.00
5,014.45
0.00
508.22
4,513.00
4,218.48
0.00
195.30
32,016.51
7,343.15
0.00
0.00
9.77
1,624.59
38,385.52
0.00
0.00
0.00
458.33
77.49
5,710.79
6,236.40
100.00%
100.00%
508.22
4,513.00
56.47
501.44
10.00%
4,218.48
195.30
4,218.48
0.00
0.00%
3,201.65
7,343.15
9.77
1,624.59
3,201.65
7,343.15
87.89
-
28,814.85
0.00
90.00%
0.00%
0.00
88.20
38,385.52
100.00%
961
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
25,341.12
24,972.08
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
1,872.91
7,491.62
-
AVANCE ACUMULADO
Metrado
Parcial
0.00
1,872.91
7,491.62
-
Metrado
504.00
4,370.11
25,341.12
17,480.46
%
100.00%
70.00%
426.99
64.68
100.00%
100.00%
426.99
64.68
0.00
0.00
117.67
117.67
0.00
0.00
84.05
84.05
117.67
117.67
84.05
84.05
117.67
117.67
0.00
0.00
0.00%
0.00%
901.05
0.00
25.37
901.05
25.37
901.05
0.00
0.00%
843.39
122.33
0.00
0.00
128.37
7.87
843.39
122.33
128.37
7.87
843.39
122.33
0.00
0.00
0.00%
0.00%
142.15
0.00
11.41
142.15
11.41
142.15
0.00
0.00%
0.00
0.00
64.50
6.00
SALDO
Parcial
962
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
285.32
153.62
915.98
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
74.11
285.32
45.86
153.62
74.11
915.98
AVANCE ACUMULADO
Metrado
Parcial
74.11
285.32
45.86
153.62
74.11
915.98
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
193.86
3,058.46
0.00
0.00
21.83
175.87
193.86
3,058.46
21.83
175.87
193.86
3,058.46
0.00
0.00
0.00%
0.00%
427.19
444.60
33.25
1,294.56
0.00
0.00
0.00
0.00
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,959.30
793.01
0.00
0.00
6.39
176.62
1,959.30
793.01
6.39
176.62
1,959.30
793.01
0.00
0.00
0.00%
0.00%
1,429.25
1,786.78
1,420.71
0.00
0.00
0.00
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
0.00
0.00
0.00
0.00%
0.00%
0.00%
963
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,278.39
1,419.68
618.97
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
4.29
1,278.39
43.38
1,419.68
140.04
618.97
AVANCE ACUMULADO
Metrado
Parcial
4.29
1,278.39
43.38
1,419.68
140.04
618.97
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
1,758.99
2,448.30
2,129.91
0.00
0.00
0.00
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,729.17
4,222.02
4,177.49
0.00
0.00
0.00
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,436.81
3,261.16
1,342.40
1,758.66
0.00
0.00
0.00
0.00
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4,417.19
261.47
0.00
0.00
104.55
9.47
4,417.19
261.47
104.55
9.47
4,417.19
261.47
0.00
0.00
0.00%
0.00%
964
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1,326.72
0.00
104.55
1,326.72
104.55
1,326.72
0.00
0.00%
263.73
0.00
40.08
263.73
40.08
263.73
0.00
0.00%
6,097.09
1,693.70
262.00
0.00
0.00
0.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
364.97
2,882.64
894.76
3,001.68
380.31
865.30
0.00
0.00
0.00
0.00
0.00
0.00
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,935.83
0.00
86.53
2,935.83
86.53
2,935.83
0.00
0.00%
965
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1,133.60
99.98
0.00
0.00
45.86
2.00
1,133.60
99.98
45.86
2.00
1,133.60
99.98
0.00
0.00
0.00%
0.00%
2,127.33
0.00
45.86
2,127.33
45.86
2,127.33
0.00
0.00%
1,433.17
0.00
28.25
1,433.17
28.25
1,433.17
0.00
0.00%
1,008.97
0.00
18.93
1,008.97
18.93
1,008.97
0.00
0.00%
928.88
371.38
0.00
0.00
38.10
28.70
928.88
371.38
38.10
28.70
928.88
371.38
0.00
0.00
0.00%
0.00%
374.47
5,078.43
0.00
0.00
2.00
10.59
374.47
5,078.43
2.00
10.59
374.47
5,078.43
0.00
0.00
0.00%
0.00%
966
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,236.75
AVANCE ANTERIOR
Metrado
Parcial
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
0.00
5.00
SALDO
Parcial
1,236.75
%
100.00%
383.30
100.00%
0.00
61.12
0.00
16.00
61.12
16.00
61.12
0.00
0.00%
215.16
0.00
4.00
215.16
4.00
215.16
0.00
0.00%
32.52
0.00
4.00
32.52
4.00
32.52
0.00
0.00%
1,026.62
975.23
0.00
0.00
155.79
169.90
1,026.62
975.23
155.79
169.90
1,026.62
975.23
0.00
0.00
0.00%
0.00%
192.42
0.00
10.59
192.42
10.59
192.42
0.00
0.00%
84.09
0.00
28.70
84.09
28.70
84.09
0.00
0.00%
770.35
0.00
770.35
100.00%
0.00
Metrado
15.50
383.30
AVANCE ACUMULADO
Metrado
Parcial
-
0.00
31.52
967
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
209.16
AVANCE ANTERIOR
Metrado
Parcial
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
-
0.00
Metrado
12.00
SALDO
Parcial
209.16
%
100.00%
2,083.59
0.00
2.33
2,083.59
2.33
2,083.59
0.00
0.00%
4,488.95
0.00
1.00
4,488.95
1.00
4,488.95
0.00
0.00%
66.72
715.14
33.40
11.07
22.14
574.20
624.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.85
22.38
187.13
0.00
0.00
0.00
1.08
1.08
7.20
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
0.00
0.00
0.00
0.00%
0.00%
0.00%
86.73
0.00
1.00
86.73
1.00
86.73
0.00
0.00%
968
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
819.08
188.47
0.00
0.00
1.00
1.00
819.08
188.47
1.00
1.00
819.08
188.47
0.00
0.00
0.00%
0.00%
407.88
0.00
7.20
407.88
7.20
407.88
0.00
0.00%
63.24
0.00
6.00
63.24
6.00
63.24
0.00
0.00%
440.13
488.20
144.38
0.00
0.00
0.00
3.00
4.00
2.00
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.17
6.17
0.00
0.00
2.21
2.21
3.09
3.09
2.21
2.21
3.09
3.09
2.21
2.21
3.09
3.09
50.00%
50.00%
258.46
0.00
3.64
129.23
3.64
129.23
3.64
129.23
50.00%
969
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
77.54
151.85
14.77
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
4.37
38.77
4.37
75.92
2.21
7.39
AVANCE ACUMULADO
Metrado
Parcial
4.37
38.77
4.37
75.92
2.21
7.39
Metrado
4.37
4.37
2.21
SALDO
Parcial
38.77
75.92
7.39
%
50.00%
50.00%
50.00%
94.29
0.00
2.21
47.14
2.21
47.14
2.21
47.14
50.00%
1,306.97
723.89
1,080.83
0.00
0.00
0.00
1.61
7.20
136.13
653.49
361.94
540.42
1.61
7.20
136.13
653.49
361.94
540.42
1.61
7.20
136.13
653.49
361.94
540.42
50.00%
50.00%
50.00%
89.08
119.90
226.37
0.00
0.00
0.00
0.14
1.13
28.51
44.54
59.95
113.18
0.14
1.13
28.51
44.54
59.95
113.18
0.14
1.13
28.51
44.54
59.95
113.18
50.00%
50.00%
50.00%
970
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
924.92
0.00
7.15
462.46
7.15
462.46
7.15
462.46
50.00%
320.11
678.72
0.00
0.00
7.20
16.78
160.06
339.36
7.20
16.78
160.06
339.36
7.20
16.78
160.06
339.36
50.00%
50.00%
109.48
0.00
1.62
54.74
1.62
54.74
1.62
54.74
50.00%
627.00
0.00
1.10
313.50
1.10
313.50
1.10
313.50
50.00%
9.00
53.79
0.00
0.00
1.50
0.50
4.50
26.90
1.50
0.50
4.50
26.90
1.50
0.50
4.50
26.90
50.00%
50.00%
98.30
0.00
16.78
49.15
16.78
49.15
16.78
49.15
50.00%
502.00
786.93
499.18
535.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
100.00%
100.00%
100.00%
100.00%
971
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
2,216.50
250.32
433.16
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
-
0.00
0.00
0.00
Metrado
2.00
1.00
1.00
SALDO
Parcial
2,216.50
250.32
433.16
%
100.00%
100.00%
100.00%
232.89
232.89
0.00
0.00
87.35
87.35
122.29
122.29
87.35
87.35
122.29
122.29
79.00
79.00
110.60
110.60
47.49%
47.49%
926.81
0.00
31.32
486.66
31.32
486.66
28.32
440.14
47.49%
635.52
1,244.57
0.00
0.00
37.58
37.58
333.71
653.52
37.58
37.58
333.71
653.52
33.99
33.99
301.81
591.05
47.49%
47.49%
6,750.06
1,438.29
1,947.25
0.00
0.00
0.00
20.88
3.91
31.32
3,544.44
755.24
1,022.49
20.88
3.91
31.32
3,544.44
755.24
1,022.49
18.88
3.54
28.32
3,205.62
683.05
924.75
47.49%
47.49%
47.49%
972
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
2,147.58
0.00
87.35
1,127.69
87.35
1,127.69
79.00
1,019.89
47.49%
58,120.03
0.00
244.58
30,518.69
244.58
30,518.69
221.20
27,601.34
47.49%
790.22
0.00
0.00
269.70
790.22
100.00%
369,286.59
0.00
199,233.07
199,233.07
170,053.48
162,789.01
77,596.86
77,596.86
85,192.15
206,497.58
121,636.21
121,636.21
84,861.33
30,561.64
18,002.16
18,002.16
12,559.48
10,737.87
6,325.08
6,325.08
4,412.79
247,797.09
0.00
145,963.45
145,963.45
101,833.60
44,603.48
26,273.42
26,273.42
18,330.05
292,400.57
0.00
0.00%
172,236.87
58.90%
172,236.87
58.90%
120,163.65
41.10%
973
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
2 DE ADICIONAL DE OBRA N 01
EL 01/09/2015 AL 30/09/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
974
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
273.42
195.30
273.42
195.30
273.42
0.00
0.00%
31,709.06
892.71
31,709.06
892.71
31,709.06
0.00
0.00%
45.83
7.75
571.08
623.64
412.50
69.74
5,139.71
5,612.76
90.00%
90.00%
56.47
501.44
10.00%
5,710.79
6,236.40
0.00
0.00
45.83
7.75
571.08
623.64
5,014.45
508.22
4,513.00
508.22
4,513.00
4,218.48
195.30
4,218.48
195.30
4,218.48
0.00
0.00%
32,016.51
7,343.15
9.77
1,624.59
3,201.65
7,343.15
87.89
-
28,814.85
-
97.65
1,624.59
32,016.51
7,343.15
0.00
0.00
0.00%
0.00%
0.00
0.00
61.74
352.80
26,869.87
17,738.78
61.74
352.80
26,869.87
17,738.78
11,515.66
7,602.34
30.00%
30.00%
38,385.52
25,341.12
26.46
151.20
975
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
24,972.08
426.99
64.68
AVANCE ANTERIOR
Metrado
Parcial
1,872.91
7,491.62
-
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
3,745.81
14,983.25
6.00
64.68
AVANCE ACUMULADO
Metrado
Parcial
5,618.72
22,474.87
6.00
0.00
64.68
Metrado
624.30
64.50
-
SALDO
Parcial
2,497.21
%
10.00%
426.99
0.00
100.00%
0.00%
117.67
117.67
84.05
84.05
117.67
117.67
84.05
84.05
117.67
117.67
0.00
0.00
0.00%
0.00%
901.05
25.37
901.05
25.37
901.05
0.00
0.00%
843.39
122.33
128.37
7.87
843.39
122.33
128.37
7.87
843.39
122.33
0.00
0.00
0.00%
0.00%
142.15
11.41
142.15
11.41
142.15
0.00
0.00%
285.32
74.11
285.32
74.11
285.32
0.00
0.00%
976
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
153.62
915.98
AVANCE ANTERIOR
Metrado
Parcial
45.86
153.62
74.11
915.98
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
45.86
153.62
74.11
915.98
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
193.86
3,058.46
21.83
175.87
193.86
3,058.46
21.83
175.87
193.86
3,058.46
0.00
0.00
0.00%
0.00%
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,959.30
793.01
6.39
176.62
1,959.30
793.01
6.39
176.62
1,959.30
793.01
0.00
0.00
0.00%
0.00%
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,278.39
4.29
1,278.39
4.29
1,278.39
0.00
0.00%
977
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,419.68
618.97
AVANCE ANTERIOR
Metrado
Parcial
43.38
1,419.68
140.04
618.97
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
43.38
1,419.68
140.04
618.97
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4,417.19
261.47
104.55
9.47
4,417.19
261.47
104.55
9.47
4,417.19
261.47
0.00
0.00
0.00%
0.00%
978
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,326.72
AVANCE ANTERIOR
Metrado
Parcial
104.55
1,326.72
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
104.55
1,326.72
SALDO
Parcial
Metrado
-
0.00
%
0.00%
263.73
40.08
263.73
40.08
263.73
0.00
0.00%
6,097.09
1,693.70
262.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,935.83
86.53
2,935.83
86.53
2,935.83
0.00
0.00%
979
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1,133.60
99.98
45.86
2.00
1,133.60
99.98
45.86
2.00
1,133.60
99.98
0.00
0.00
0.00%
0.00%
2,127.33
45.86
2,127.33
45.86
2,127.33
0.00
0.00%
1,433.17
28.25
1,433.17
28.25
1,433.17
0.00
0.00%
1,008.97
18.93
1,008.97
18.93
1,008.97
0.00
0.00%
928.88
371.38
38.10
28.70
928.88
371.38
38.10
28.70
928.88
371.38
0.00
0.00
0.00%
0.00%
374.47
5,078.43
2.00
10.59
374.47
5,078.43
2.00
10.59
374.47
5,078.43
0.00
0.00
0.00%
0.00%
0.00
1,236.75
100.00%
1,236.75
0.00
15.50
980
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
383.30
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
0.00
SALDO
Parcial
Metrado
0.00
5.00
383.30
100.00%
61.12
16.00
61.12
16.00
61.12
0.00
0.00%
215.16
4.00
215.16
4.00
215.16
0.00
0.00%
32.52
4.00
32.52
4.00
32.52
0.00
0.00%
1,026.62
975.23
155.79
169.90
1,026.62
975.23
155.79
169.90
1,026.62
975.23
0.00
0.00
0.00%
0.00%
192.42
10.59
192.42
10.59
192.42
0.00
0.00%
84.09
28.70
84.09
28.70
84.09
0.00
0.00%
0.00
0.00
770.35
209.16
100.00%
100.00%
770.35
209.16
0.00
0.00
31.52
12.00
981
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
2,083.59
2.33
2,083.59
2.33
2,083.59
0.00
0.00%
4,488.95
1.00
4,488.95
1.00
4,488.95
0.00
0.00%
66.72
715.14
33.40
11.07
22.14
574.20
624.31
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
0.00
0.00
0.00
0.00%
0.00%
0.00%
86.73
1.00
86.73
1.00
86.73
0.00
0.00%
982
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
819.08
188.47
AVANCE ANTERIOR
Metrado
Parcial
1.00
819.08
1.00
188.47
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
1.00
819.08
1.00
188.47
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
407.88
7.20
407.88
7.20
407.88
0.00
0.00%
63.24
6.00
63.24
6.00
63.24
0.00
0.00%
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.17
6.17
2.21
2.21
3.09
3.09
2.21
2.21
3.09
3.09
4.41
4.41
6.17
6.17
0.00
0.00
0.00%
0.00%
258.46
3.64
129.23
3.64
129.23
7.28
258.46
0.00
0.00%
77.54
4.37
38.77
4.37
38.77
8.73
77.54
0.00
0.00%
983
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
151.85
14.77
AVANCE ANTERIOR
Metrado
Parcial
4.37
75.92
2.21
7.39
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
4.37
75.92
2.21
7.39
AVANCE ACUMULADO
Metrado
Parcial
8.73
151.85
4.41
14.77
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
94.29
2.21
47.14
2.21
47.14
4.41
94.29
0.00
0.00%
1,306.97
723.89
1,080.83
1.61
7.20
136.13
653.49
361.94
540.42
1.61
7.20
136.13
653.49
361.94
540.42
3.22
14.40
272.25
1,306.97
723.89
1,080.83
0.00
0.00
0.00
0.00%
0.00%
0.00%
89.08
119.90
226.37
0.14
1.13
28.51
44.54
59.95
113.18
0.14
1.13
28.51
44.54
59.95
113.18
0.27
2.25
57.02
89.08
119.90
226.37
0.00
0.00
0.00
0.00%
0.00%
0.00%
924.92
7.15
462.46
7.15
462.46
14.30
924.92
0.00
0.00%
320.11
7.20
16.78
160.06
339.36
7.20
16.78
160.06
339.36
14.40
33.55
320.11
678.72
0.00
0.00
0.00%
0.00%
678.72
984
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
109.48
AVANCE ANTERIOR
Metrado
Parcial
1.62
54.74
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
1.62
54.74
AVANCE ACUMULADO
Metrado
Parcial
3.24
109.48
SALDO
Parcial
Metrado
-
0.00
%
0.00%
627.00
1.10
313.50
1.10
313.50
2.20
627.00
0.00
0.00%
9.00
53.79
1.50
0.50
4.50
26.90
1.50
0.50
4.50
26.90
3.00
1.00
9.00
53.79
0.00
0.00
0.00%
0.00%
98.30
16.78
49.15
16.78
49.15
33.55
98.30
0.00
0.00%
502.00
786.93
499.18
535.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
100.00%
100.00%
100.00%
100.00%
2,216.50
250.32
433.16
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
2,216.50
250.32
433.16
100.00%
100.00%
100.00%
985
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
232.89
232.89
AVANCE ANTERIOR
Metrado
Parcial
87.35
122.29
87.35
122.29
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
87.35
122.29
87.35
122.29
Metrado
79.00
79.00
SALDO
Parcial
110.60
110.60
%
47.49%
47.49%
926.81
31.32
486.66
31.32
486.66
28.32
440.14
47.49%
635.52
1,244.57
37.58
37.58
333.71
653.52
37.58
37.58
333.71
653.52
33.99
33.99
301.81
591.05
47.49%
47.49%
6,750.06
1,438.29
1,947.25
20.88
3.91
31.32
3,544.44
755.24
1,022.49
20.88
3.91
31.32
3,544.44
755.24
1,022.49
18.88
3.54
28.32
3,205.62
683.05
924.75
47.49%
47.49%
47.49%
2,147.58
87.35
1,127.69
87.35
1,127.69
79.00
1,019.89
47.49%
58,120.03
244.58
30,518.69
244.58
30,518.69
221.20
27,601.34
47.49%
0.00
0.00
269.70
790.22
100.00%
790.22
986
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
369,286.59
199,233.07
93,154.97
292,388.02
76,898.52
162,789.01
77,596.86
51,293.70
128,890.56
33,898.45
206,497.58
121,636.21
41,861.27
163,497.46
43,000.07
30,561.64
18,002.16
6,195.47
24,197.62
6,364.01
10,737.87
6,325.08
2,176.79
8,501.87
2,236.00
247,797.09
145,963.45
50,233.53
196,196.95
51,600.08
44,603.48
26,273.42
9,042.04
35,315.45
9,288.01
292,400.57
172,236.87
58.90%
59,275.57
20.27%
231,512.40
79.18%
60,888.09
20.82%
3 DE ADICIONAL DE OBRA N 01
EL 01/10/2015 AL 31/10/2015
987
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 247,797.09
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
273.42
195.30
273.42
195.30
273.42
0.00
0.00%
31,709.06
892.71
31,709.06
892.71
31,709.06
0.00
0.00%
988
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
5,710.79
6,236.40
AVANCE ANTERIOR
Metrado
Parcial
45.83
571.08
7.75
623.64
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
412.50
5,139.71
69.74
5,612.76
5,014.45
508.22
4,513.00
56.47
4,218.48
195.30
4,218.48
32,016.51
7,343.15
97.65
1,624.59
32,016.51
7,343.15
38,385.52
25,341.12
24,972.08
61.74
352.80
5,618.72
26,869.87
17,738.78
22,474.87
26.46
151.20
624.30
426.99
64.68
6.00
0.00
64.68
64.50
-
501.44
AVANCE ACUMULADO
Metrado
Parcial
458.33
5,710.79
77.49
6,236.40
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
564.69
5,014.45
0.00
0.00%
195.30
4,218.48
0.00
0.00%
97.65
1,624.59
32,016.51
7,343.15
0.00
0.00
0.00%
0.00%
11,515.66
7,602.34
2,497.21
88.20
504.00
6,243.02
38,385.52
25,341.12
24,972.08
0.00
0.00
0.00
0.00%
0.00%
0.00%
426.99
-
64.50
6.00
426.99
64.68
0.00
0.00
0.00%
0.00%
989
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
117.67
117.67
AVANCE ANTERIOR
Metrado
Parcial
84.05
117.67
84.05
117.67
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
84.05
117.67
84.05
117.67
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
901.05
25.37
901.05
25.37
901.05
0.00
0.00%
843.39
122.33
128.37
7.87
843.39
122.33
128.37
7.87
843.39
122.33
0.00
0.00
0.00%
0.00%
142.15
11.41
142.15
11.41
142.15
0.00
0.00%
285.32
153.62
915.98
74.11
45.86
74.11
285.32
153.62
915.98
74.11
45.86
74.11
285.32
153.62
915.98
0.00
0.00
0.00
0.00%
0.00%
0.00%
193.86
3,058.46
21.83
175.87
193.86
3,058.46
21.83
175.87
193.86
3,058.46
0.00
0.00
0.00%
0.00%
427.19
2.49
427.19
2.49
427.19
0.00
0.00%
990
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
444.60
33.25
1,294.56
AVANCE ANTERIOR
Metrado
Parcial
20.80
444.60
0.18
33.25
45.86
1,294.56
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
20.80
444.60
0.18
33.25
45.86
1,294.56
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
1,959.30
793.01
6.39
176.62
1,959.30
793.01
6.39
176.62
1,959.30
793.01
0.00
0.00
0.00%
0.00%
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
4.43
35.45
357.86
1,429.25
1,786.78
1,420.71
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,278.39
1,419.68
618.97
4.29
43.38
140.04
1,278.39
1,419.68
618.97
4.29
43.38
140.04
1,278.39
1,419.68
618.97
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
0.00
0.00
0.00
0.00%
0.00%
0.00%
991
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
2,729.17
4,222.02
4,177.49
AVANCE ANTERIOR
Metrado
Parcial
8.05
2,729.17
69.26
4,222.02
1,052.27
4,177.49
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
8.05
2,729.17
69.26
4,222.02
1,052.27
4,177.49
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
4,417.19
261.47
104.55
9.47
4,417.19
261.47
104.55
9.47
4,417.19
261.47
0.00
0.00
0.00%
0.00%
1,326.72
104.55
1,326.72
104.55
1,326.72
0.00
0.00%
263.73
40.08
263.73
40.08
263.73
0.00
0.00%
6,097.09
56.58
6,097.09
56.58
6,097.09
0.00
0.00%
992
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,693.70
262.00
AVANCE ANTERIOR
Metrado
Parcial
26.10
1,693.70
70.24
262.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
26.10
1,693.70
70.24
262.00
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
18.93
141.51
28.39
69.26
30.97
135.84
364.97
2,882.64
894.76
3,001.68
380.31
865.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2,935.83
86.53
2,935.83
86.53
2,935.83
0.00
0.00%
1,133.60
99.98
45.86
2.00
1,133.60
99.98
45.86
2.00
1,133.60
99.98
0.00
0.00
0.00%
0.00%
2,127.33
45.86
2,127.33
45.86
2,127.33
0.00
0.00%
1,433.17
28.25
1,433.17
28.25
1,433.17
0.00
0.00%
993
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
1,008.97
18.93
1,008.97
18.93
1,008.97
0.00
0.00%
928.88
371.38
38.10
28.70
928.88
371.38
38.10
28.70
928.88
371.38
0.00
0.00
0.00%
0.00%
374.47
5,078.43
2.00
10.59
374.47
5,078.43
2.00
10.59
374.47
5,078.43
0.00
0.00
0.00%
0.00%
1,236.75
0.00
0.00
15.50
1,236.75
100.00%
383.30
0.00
0.00
5.00
383.30
100.00%
61.12
16.00
61.12
16.00
61.12
0.00
0.00%
215.16
4.00
215.16
4.00
215.16
0.00
0.00%
994
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
32.52
4.00
32.52
4.00
32.52
0.00
0.00%
1,026.62
975.23
155.79
169.90
1,026.62
975.23
155.79
169.90
1,026.62
975.23
0.00
0.00
0.00%
0.00%
192.42
10.59
192.42
10.59
192.42
0.00
0.00%
84.09
28.70
84.09
28.70
84.09
0.00
0.00%
0.00
0.00
770.35
209.16
100.00%
100.00%
770.35
209.16
0.00
0.00
31.52
12.00
2,083.59
2.33
2,083.59
2.33
2,083.59
0.00
0.00%
4,488.95
1.00
4,488.95
1.00
4,488.95
0.00
0.00%
66.72
1.00
66.72
1.00
66.72
0.00
0.00%
995
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
715.14
33.40
11.07
22.14
574.20
624.31
AVANCE ANTERIOR
Metrado
Parcial
9.00
715.14
4.00
33.40
1.00
11.07
2.00
22.14
6.00
574.20
1.00
624.31
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
9.00
715.14
4.00
33.40
1.00
11.07
2.00
22.14
6.00
574.20
1.00
624.31
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
1.08
1.08
7.20
26.85
22.38
187.13
0.00
0.00
0.00
0.00%
0.00%
0.00%
86.73
1.00
86.73
1.00
86.73
0.00
0.00%
819.08
188.47
1.00
1.00
819.08
188.47
1.00
1.00
819.08
188.47
0.00
0.00
0.00%
0.00%
407.88
7.20
407.88
7.20
407.88
0.00
0.00%
63.24
6.00
63.24
6.00
63.24
0.00
0.00%
996
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
440.13
488.20
144.38
AVANCE ANTERIOR
Metrado
Parcial
3.00
440.13
4.00
488.20
2.00
144.38
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
3.00
440.13
4.00
488.20
2.00
144.38
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
6.17
6.17
4.41
4.41
6.17
6.17
4.41
4.41
6.17
6.17
0.00
0.00
0.00%
0.00%
258.46
7.28
258.46
7.28
258.46
0.00
0.00%
77.54
151.85
14.77
8.73
8.73
4.41
77.54
151.85
14.77
8.73
8.73
4.41
77.54
151.85
14.77
0.00
0.00
0.00
0.00%
0.00%
0.00%
94.29
4.41
94.29
4.41
94.29
0.00
0.00%
1,306.97
3.22
1,306.97
3.22
1,306.97
0.00
0.00%
997
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
723.89
1,080.83
AVANCE ANTERIOR
Metrado
Parcial
14.40
723.89
272.25
1,080.83
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
14.40
723.89
272.25
1,080.83
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
89.08
119.90
226.37
0.27
2.25
57.02
89.08
119.90
226.37
0.27
2.25
57.02
89.08
119.90
226.37
0.00
0.00
0.00
0.00%
0.00%
0.00%
924.92
14.30
924.92
14.30
924.92
0.00
0.00%
320.11
678.72
14.40
33.55
320.11
678.72
14.40
33.55
320.11
678.72
0.00
0.00
0.00%
0.00%
109.48
3.24
109.48
3.24
109.48
0.00
0.00%
627.00
2.20
627.00
2.20
627.00
0.00
0.00%
9.00
3.00
1.00
9.00
3.00
1.00
9.00
53.79
53.79
0.00
0.00
0.00%
0.00%
53.79
998
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
98.30
AVANCE ANTERIOR
Metrado
Parcial
33.55
98.30
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
33.55
98.30
SALDO
Parcial
Metrado
-
0.00
%
0.00%
502.00
786.93
499.18
535.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
100.00%
100.00%
100.00%
100.00%
2,216.50
250.32
433.16
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.00
1.00
2,216.50
250.32
433.16
100.00%
100.00%
100.00%
232.89
232.89
87.35
87.35
122.29
122.29
79.00
79.00
110.60
110.60
166.35
166.35
232.89
232.89
0.00
0.00
0.00%
0.00%
926.81
31.32
486.66
28.32
440.14
59.64
926.81
0.00
0.00%
635.52
1,244.57
37.58
37.58
333.71
653.52
33.99
33.99
301.81
591.05
71.57
71.57
635.52
1,244.57
0.00
0.00
0.00%
0.00%
999
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
AVANCE ACTUAL
Metrado
Parcial
6,750.06
1,438.29
1,947.25
20.88
3.91
31.32
3,544.44
755.24
1,022.49
2,147.58
87.35
1,127.69
58,120.03
244.58
30,518.69
790.22
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
18.88
3.54
28.32
139.73
-
AVANCE ACUMULADO
Metrado
Parcial
3,205.62
683.05
924.75
17,436.01
-
39.76
7.46
59.64
6,750.06
1,438.29
1,947.25
87.35
1,127.69
384.31
-
SALDO
Parcial
Metrado
-
%
0.00
0.00
0.00
0.00%
0.00%
0.00%
79.00
1,019.89
47.49%
47,954.70
81.47
10,165.33
17.49%
0.00
269.70
790.22
100.00%
369,286.59
292,388.02
57,099.74
349,487.78
19,798.78
162,789.01
128,890.56
25,170.73
154,061.29
8,727.72
206,497.58
163,497.46
31,929.01
195,426.49
11,071.06
30,561.64
24,197.62
4,725.49
28,923.12
1,638.52
1000
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
10,737.87
8,501.87
1,660.31
10,162.18
575.70
247,797.09
196,196.95
38,314.81
234,511.79
13,285.28
44,603.48
35,315.45
6,896.67
42,212.12
2,391.35
292,400.57
231,512.40
79.18%
45,211.48
15.46%
276,723.91
94.64%
15,676.63
5.36%
4 DE ADICIONAL DE OBRA N 01
EL 01/11/2015 AL 30/11/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
o Referencial C/IGV:
o Referencial S/IGV:
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
1001
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
RESUPUESTO
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ANTERIOR
Metrado
Parcial
S/. 247,797.09
AVANCE ACTUAL
Metrado
Parcial
AVANCE ANTERIOR
Metrado
Parcial
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
9/17/2015
11/9/2015
Metrado
Fecha de Trmino:
Fecha de Trmino:
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
273.42
195.30
273.42
195.30
273.42
0.00
0.00%
31,709.06
892.71
31,709.06
892.71
31,709.06
0.00
0.00%
5,710.79
6,236.40
458.33
77.49
5,710.79
6,236.40
458.33
77.49
5,710.79
6,236.40
0.00
0.00
0.00%
0.00%
5,014.45
564.69
5,014.45
564.69
5,014.45
0.00
0.00%
4,218.48
195.30
4,218.48
195.30
4,218.48
0.00
0.00%
1002
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
32,016.51
7,343.15
AVANCE ANTERIOR
Metrado
Parcial
97.65
32,016.51
1,624.59
7,343.15
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
97.65
32,016.51
1,624.59
7,343.15
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
38,385.52
25,341.12
24,972.08
88.20
504.00
6,243.02
38,385.52
25,341.12
24,972.08
88.20
504.00
6,243.02
38,385.52
25,341.12
24,972.08
0.00
0.00
0.00
0.00%
0.00%
0.00%
426.99
64.68
64.50
6.00
426.99
64.68
64.50
6.00
426.99
64.68
0.00
0.00
0.00%
0.00%
117.67
117.67
84.05
84.05
117.67
117.67
84.05
84.05
117.67
117.67
0.00
0.00
0.00%
0.00%
901.05
25.37
901.05
25.37
901.05
0.00
0.00%
843.39
128.37
843.39
128.37
843.39
0.00
0.00%
1003
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
122.33
AVANCE ANTERIOR
Metrado
Parcial
7.87
122.33
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
7.87
122.33
SALDO
Parcial
Metrado
-
0.00
%
0.00%
142.15
11.41
142.15
11.41
142.15
0.00
0.00%
285.32
153.62
915.98
74.11
45.86
74.11
285.32
153.62
915.98
74.11
45.86
74.11
285.32
153.62
915.98
0.00
0.00
0.00
0.00%
0.00%
0.00%
193.86
3,058.46
21.83
175.87
193.86
3,058.46
21.83
175.87
193.86
3,058.46
0.00
0.00
0.00%
0.00%
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
2.49
20.80
0.18
45.86
427.19
444.60
33.25
1,294.56
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1,959.30
793.01
6.39
176.62
1,959.30
793.01
6.39
176.62
1,959.30
793.01
0.00
0.00
0.00%
0.00%
1004
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
1,429.25
1,786.78
1,420.71
AVANCE ANTERIOR
Metrado
Parcial
4.43
1,429.25
35.45
1,786.78
357.86
1,420.71
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
4.43
1,429.25
35.45
1,786.78
357.86
1,420.71
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
1,278.39
1,419.68
618.97
4.29
43.38
140.04
1,278.39
1,419.68
618.97
4.29
43.38
140.04
1,278.39
1,419.68
618.97
0.00
0.00
0.00
0.00%
0.00%
0.00%
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
4.06
46.59
536.50
1,758.99
2,448.30
2,129.91
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
8.05
69.26
1,052.27
2,729.17
4,222.02
4,177.49
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
7.57
86.53
338.14
720.76
2,436.81
3,261.16
1,342.40
1,758.66
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1005
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
4,417.19
261.47
104.55
9.47
4,417.19
261.47
104.55
9.47
4,417.19
261.47
0.00
0.00
0.00%
0.00%
1,326.72
104.55
1,326.72
104.55
1,326.72
0.00
0.00%
263.73
40.08
263.73
40.08
263.73
0.00
0.00%
6,097.09
1,693.70
262.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
56.58
26.10
70.24
6,097.09
1,693.70
262.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
364.97
2,882.64
894.76
3,001.68
380.31
18.93
141.51
28.39
69.26
30.97
364.97
2,882.64
894.76
3,001.68
380.31
18.93
141.51
28.39
69.26
30.97
364.97
2,882.64
894.76
3,001.68
380.31
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
1006
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
865.30
AVANCE ANTERIOR
Metrado
Parcial
135.84
865.30
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
135.84
865.30
SALDO
Parcial
Metrado
-
0.00
%
0.00%
2,935.83
86.53
2,935.83
86.53
2,935.83
0.00
0.00%
1,133.60
99.98
45.86
2.00
1,133.60
99.98
45.86
2.00
1,133.60
99.98
0.00
0.00
0.00%
0.00%
2,127.33
45.86
2,127.33
45.86
2,127.33
0.00
0.00%
1,433.17
28.25
1,433.17
28.25
1,433.17
0.00
0.00%
1,008.97
18.93
1,008.97
18.93
1,008.97
0.00
0.00%
928.88
371.38
38.10
28.70
928.88
371.38
38.10
28.70
928.88
371.38
0.00
0.00
0.00%
0.00%
1007
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
374.47
5,078.43
AVANCE ANTERIOR
Metrado
Parcial
2.00
374.47
10.59
5,078.43
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
2.00
374.47
10.59
5,078.43
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
1,236.75
0.00
15.50
1,236.75
15.50
1,236.75
0.00
0.00%
383.30
0.00
5.00
383.30
5.00
383.30
0.00
0.00%
61.12
16.00
61.12
16.00
61.12
0.00
0.00%
215.16
4.00
215.16
4.00
215.16
0.00
0.00%
32.52
4.00
32.52
4.00
32.52
0.00
0.00%
1,026.62
975.23
155.79
169.90
1,026.62
975.23
155.79
169.90
1,026.62
975.23
0.00
0.00
0.00%
0.00%
192.42
10.59
192.42
10.59
192.42
0.00
0.00%
1008
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
84.09
770.35
209.16
28.70
-
AVANCE ACTUAL
Metrado
Parcial
84.09
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
31.52
12.00
AVANCE ACUMULADO
Metrado
Parcial
-
770.35
209.16
SALDO
Parcial
Metrado
28.70
84.09
0.00
0.00%
31.52
12.00
770.35
209.16
0.00
0.00
0.00%
0.00%
2,083.59
2.33
2,083.59
2.33
2,083.59
0.00
0.00%
4,488.95
1.00
4,488.95
1.00
4,488.95
0.00
0.00%
66.72
715.14
33.40
11.07
22.14
574.20
624.31
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
1.00
9.00
4.00
1.00
2.00
6.00
1.00
66.72
715.14
33.40
11.07
22.14
574.20
624.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.85
1.08
26.85
1.08
26.85
0.00
0.00%
1009
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
22.38
187.13
AVANCE ANTERIOR
Metrado
Parcial
1.08
22.38
7.20
187.13
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
1.08
22.38
7.20
187.13
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
86.73
1.00
86.73
1.00
86.73
0.00
0.00%
819.08
188.47
1.00
1.00
819.08
188.47
1.00
1.00
819.08
188.47
0.00
0.00
0.00%
0.00%
407.88
7.20
407.88
7.20
407.88
0.00
0.00%
63.24
6.00
63.24
6.00
63.24
0.00
0.00%
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
3.00
4.00
2.00
440.13
488.20
144.38
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.17
6.17
4.41
4.41
6.17
6.17
4.41
4.41
6.17
6.17
0.00
0.00
0.00%
0.00%
1010
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
258.46
7.28
258.46
7.28
258.46
0.00
0.00%
77.54
151.85
14.77
8.73
8.73
4.41
77.54
151.85
14.77
8.73
8.73
4.41
77.54
151.85
14.77
0.00
0.00
0.00
0.00%
0.00%
0.00%
94.29
4.41
94.29
4.41
94.29
0.00
0.00%
1,306.97
723.89
1,080.83
3.22
14.40
272.25
1,306.97
723.89
1,080.83
3.22
14.40
272.25
1,306.97
723.89
1,080.83
0.00
0.00
0.00
0.00%
0.00%
0.00%
89.08
119.90
226.37
0.27
2.25
57.02
89.08
119.90
226.37
0.27
2.25
57.02
89.08
119.90
226.37
0.00
0.00
0.00
0.00%
0.00%
0.00%
1011
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
924.92
AVANCE ANTERIOR
Metrado
Parcial
14.30
924.92
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
14.30
924.92
SALDO
Parcial
Metrado
-
0.00
%
0.00%
320.11
678.72
14.40
33.55
320.11
678.72
14.40
33.55
320.11
678.72
0.00
0.00
0.00%
0.00%
109.48
3.24
109.48
3.24
109.48
0.00
0.00%
627.00
2.20
627.00
2.20
627.00
0.00
0.00%
9.00
53.79
3.00
1.00
9.00
53.79
3.00
1.00
9.00
53.79
0.00
0.00
0.00%
0.00%
98.30
33.55
98.30
33.55
98.30
0.00
0.00%
502.00
786.93
499.18
535.69
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
1.00
1.00
1.00
1.00
502.00
786.93
499.18
535.69
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
2,216.50
0.00
2.00
2,216.50
2.00
2,216.50
0.00
0.00%
1012
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
Parcial
250.32
433.16
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
1.00
250.32
1.00
433.16
AVANCE ACUMULADO
Metrado
Parcial
1.00
250.32
1.00
433.16
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
232.89
232.89
166.35
166.35
232.89
232.89
166.35
166.35
232.89
232.89
0.00
0.00
0.00%
0.00%
926.81
59.64
926.81
59.64
926.81
0.00
0.00%
635.52
1,244.57
71.57
71.57
635.52
1,244.57
71.57
71.57
635.52
1,244.57
0.00
0.00
0.00%
0.00%
6,750.06
1,438.29
1,947.25
39.76
7.46
59.64
6,750.06
1,438.29
1,947.25
39.76
7.46
59.64
6,750.06
1,438.29
1,947.25
0.00
0.00
0.00
0.00%
0.00%
0.00%
2,147.58
87.35
1,127.69
166.35
2,147.58
0.00
0.00%
79.00
1,019.89
1013
1 DE ADICIONAL DE OBRA N 01
EL 01/08/2015 AL 31/08/2015
ALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 884,510.02
S/. 749,584.76
S/. 443,143.91
o Referencial C/IGV:
o Referencial S/IGV:
o Adicional N01 S/IGV
RESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
58,120.03
790.22
384.31
-
S/. 749,584.76
1.00000
9/3/2014
240 D.C.
4/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
47,954.70
81.47
10,165.33
465.78
58,120.03
0.00
0.00%
0.00
269.70
790.22
269.70
790.22
0.00
0.00%
369,286.59
349,487.78
19,798.81
369,286.59
0.00
162,789.01
154,061.29
8,727.72
162,789.01
206,497.58
195,426.49
11,071.09
206,497.58
30,561.64
28,923.12
1,638.52
30,561.64
10,737.87
10,162.18
575.70
10,737.87
247,797.09
234,511.79
13,285.31
247,797.09
0.00
44,603.48
42,212.12
2,391.36
44,603.48
292,400.57
276,723.91
94.64%
15,676.67
5.36%
292,400.57
100.00%
0.00
0.00%
1014
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
m2
117.50
1.40
m3
265.15
35.52
m3
m3
128.43
33.85
12.46
80.48
m3
177.74
8.88
m2
77.50
21.60
m3
kg
31.00
448.33
327.87
4.52
m3
m2
31.63
230.00
435.21
50.28
1015
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
kg
m
und
Metrado
PRESUPUESTO
Precio
1,929.80
4.00
28.25
4.00
6.62
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
m2
117.50
1.40
1017
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
PRESUPUESTO
Precio
m3
265.15
35.52
m3
m3
128.43
33.85
12.46
80.48
m3
177.74
8.88
m2
77.50
21.60
m3
kg
31.00
448.33
327.87
4.52
m3
m2
kg
31.63
230.00
1,929.80
435.21
50.28
4.00
m
und
28.25
4.00
6.62
10.78
1018
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1019
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Obra
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Unidad
Metrado
PRESUPUESTO
Precio
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
m2
m3
117.50
265.15
1.40
35.52
1020
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
PRESUPUESTO
Precio
m3
m3
128.43
33.85
12.46
80.48
m3
177.74
8.88
m2
77.50
21.60
m3
kg
31.00
448.33
327.87
4.52
m3
m2
kg
31.63
230.00
1,929.80
435.21
50.28
4.00
m
und
28.25
4.00
6.62
10.78
COSTO DIRECTO
1021
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1022
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
164.50
0.00
117.50
164.50
117.50
164.50
0.00
0.00%
9,418.13
0.00
265.15
9,418.13
265.15
9,418.13
0.00
0.00%
1,600.24
2,724.25
0.00
0.00
64.22
16.93
800.12
1,362.12
64.22
16.93
800.12
1,362.12
64.22
16.93
800.12
1,362.12
50.00%
50.00%
1,578.33
0.00
0.00
177.74
1,578.33
100.00%
1,674.00
0.00
77.50
1,674.00
77.50
1,674.00
0.00
0.00%
10,163.97
2,026.45
0.00
0.00
224.17
1,013.23
224.17
0.00
1,013.23
31.00
224.17
10,163.97
1,013.23
100.00%
50.00%
13,765.69
11,564.40
0.00
0.00
0.00
0.00
31.63
230.00
13,765.69
11,564.40
100.00%
100.00%
1023
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
Parcial
7,719.20
187.02
43.12
AVANCE ANTERIOR
Metrado
Parcial
0.00
-
0.00
0.00
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
964.90
3,859.60
-
AVANCE ACUMULADO
Metrado
Parcial
964.90
3,859.60
-
0.00
0.00
Metrado
964.90
28.25
4.00
SALDO
Parcial
3,859.60
%
50.00%
187.02
43.12
100.00%
100.00%
62,629.30
0.00
18,291.70
18,291.70
44,337.60
5,603.93
0.00
1,446.28
1,446.28
4,157.65
57,025.37
16,845.42
16,845.42
40,179.95
8,439.75
2,493.12
2,493.12
5,946.63
2,965.32
875.96
875.96
2,089.36
68,430.44
0.00
20,214.50
20,214.50
48,215.94
12,317.48
3,638.61
3,638.61
8,678.87
80,747.92
0.00
0.00%
23,853.11
29.54%
23,853.11
29.54%
56,894.81
70.46%
02 DE ADICIONAL DE OBRA N 01
1024
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
164.50
117.50
164.50
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
117.50
SALDO
Parcial
Metrado
164.50
0.00
0.00%
1025
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
265.15
9,418.13
265.15
9,418.13
1,600.24
2,724.25
64.22
16.93
800.12
1,362.12
64.22
16.93
800.12
1,362.12
177.74
1,578.33
77.50
0.00
177.74
0.00
0.00%
800.12
1,362.12
50.00%
50.00%
0.00
0.00%
1,674.00
0.00
0.00%
64.22
16.93
77.50
1,674.00
10,163.97
2,026.45
224.17
0.00
1,013.23
31.00
224.17
10,163.97
1,013.23
31.00
448.33
10,163.97
2,026.45
0.00
0.00
0.00%
0.00%
13,765.69
11,564.40
7,719.20
964.90
0.00
0.00
3,859.60
31.63
230.00
964.90
13,765.69
11,564.40
3,859.60
31.63
230.00
1,929.80
13,765.69
11,564.40
7,719.20
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
4.00
43.12
4.00
0.00
43.12
187.02
0.00
100.00%
0.00%
1,674.00
187.02
43.12
1,578.33
SALDO
Parcial
Metrado
9,418.13
1,578.33
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
28.25
-
1026
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
Parcial
AVANCE ANTERIOR
Metrado
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
62,629.30
18,291.70
41,988.34
60,280.03
2,349.26
5,603.93
1,446.28
3,947.44
5,393.72
210.21
57,025.37
16,845.42
38,040.90
54,886.31
2,139.05
8,439.75
2,493.12
5,630.05
8,123.17
316.58
2,965.32
875.96
1,978.13
2,854.09
111.23
68,430.44
20,214.50
45,649.08
65,863.57
2,566.86
12,317.48
3,638.61
8,216.83
11,855.44
462.03
80,747.92
23,853.11
29.54%
53,865.91
66.71%
77,719.01
96.25%
3,028.89
3.75%
03 DE ADICIONAL DE OBRA N 01
1027
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 68,430.44
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
164.50
117.50
164.50
117.50
164.50
0.00
0.00%
9,418.13
265.15
9,418.13
265.15
9,418.13
0.00
0.00%
1028
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
Parcial
1,600.24
2,724.25
AVANCE ANTERIOR
Metrado
Parcial
64.22
800.12
16.93
1,362.12
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
64.22
800.12
16.93
1,362.12
AVANCE ACUMULADO
Metrado
Parcial
128.43
1,600.24
33.85
2,724.25
SALDO
Parcial
Metrado
-
0.00
0.00
%
0.00%
0.00%
1,578.33
177.74
1,578.33
177.74
1,578.33
0.00
0.00%
1,674.00
77.50
1,674.00
77.50
1,674.00
0.00
0.00%
10,163.97
2,026.45
31.00
448.33
10,163.97
2,026.45
31.00
448.33
10,163.97
2,026.45
0.00
0.00
0.00%
0.00%
13,765.69
11,564.40
7,719.20
31.63
230.00
1,929.80
13,765.69
11,564.40
7,719.20
31.63
230.00
1,929.80
13,765.69
11,564.40
7,719.20
0.00
0.00
0.00
0.00%
0.00%
0.00%
187.02
43.12
4.00
0.00
43.12
28.25
4.00
187.02
43.12
0.00
0.00
0.00%
0.00%
62,629.30
60,280.03
28.25
-
187.02
2,349.26
62,629.30
0.00
1029
01 DE ADICIONAL DE OBRA N 01
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 731,796.90
S/. 620,166.86
S/. 75,155.16
Referencial C/IGV:
Referencial S/IGV:
Adicional N01 S/IGV:
ESUPUESTO
Parcial
AVANCE ANTERIOR
Metrado
Parcial
S/. 620,166.86
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
5,603.93
5,393.72
210.21
5,603.93
0.00
57,025.37
54,886.31
2,139.05
57,025.37
0.00
8,439.75
8,123.17
316.58
8,439.75
2,965.32
2,854.09
111.23
2,965.32
68,430.44
65,863.57
2,566.86
68,430.44
0.00
12,317.48
11,855.44
462.03
12,317.48
80,747.92
77,719.01
96.25%
3,028.89
3.75%
80,747.92
100.00%
0.00
0.00%
1030
VALORIZACION N01 DE AD
FRMULA 1: I.E.I. N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
m2
70.00
1.40
m3
108.92
35.52
m3
m3
42.98
17.08
12.46
80.48
m3
85.72
8.88
m2
42.00
21.60
m3
kg
16.80
250.70
327.87
4.52
m3
m2
15.40
112.00
435.21
50.28
1031
VALORIZACION N01 DE AD
FRMULA 1: I.E.I. N
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
kg
m
und
Metrado
PRESUPUESTO
Precio
840.28
4.00
15.75
2.00
6.62
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1032
LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
RA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 36,008.74
Referencial C/IGV:
Referencial S/IGV:
Referencial Adicional N01 S/IGV:
PRESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
98.00
0.00
70.00
98.00
70.00
98.00
0.00
3,868.84
0.00
108.92
3,868.84
108.92
3,868.84
0.00
535.53
1,374.60
0.00
0.00
42.98
17.08
535.53
1,374.60
42.98
17.08
535.53
1,374.60
0.00
0.00
761.19
0.00
85.72
761.19
85.72
761.19
0.00
907.20
0.00
42.00
907.20
42.00
907.20
0.00
5,508.22
1,133.16
0.00
0.00
16.80
250.70
5,508.22
1,133.16
16.80
250.70
5,508.22
1,133.16
0.00
0.00
6,702.23
5,631.36
0.00
0.00
15.40
112.00
6,702.23
5,631.36
15.40
112.00
6,702.23
5,631.36
0.00
0.00
1033
LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
RA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 36,008.74
Referencial C/IGV:
Referencial S/IGV:
Referencial Adicional N01 S/IGV:
PRESUPUESTO
Parcial
3,361.12
104.27
21.56
AVANCE ANTERIOR
Metrado
Parcial
0.00
-
0.00
0.00
AVANCE ACTUAL
Metrado
Parcial
840.28
3,361.12
15.75
2.00
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
104.27
21.56
AVANCE ACUMULADO
Metrado
Parcial
840.28
3,361.12
15.75
2.00
104.27
21.56
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
30,007.28
0.00
30,007.28
30,007.28
0.00
3,922.75
0.00
3,922.75
3,922.75
0.00
26,084.53
0.00
26,084.53
26,084.53
0.00
3,860.51
3,860.51
3,860.51
1,356.40
1,356.40
1,356.40
31,301.44
0.00
31,301.44
31,301.44
0.00
5,634.26
5,634.26
5,634.26
36,935.70
0.00
0.00%
36,935.70
100.00%
36,935.70
100.00%
0.00
1034
SALDO
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1035
SALDO
%
0.00%
0.00%
0.00%
0.00%
1036
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Unidad
m2
Metrado
154.10
PRESUPUESTO
Precio
1.40
m3
387.27
35.52
m3
m3
188.47
43.81
12.46
80.48
m3
258.44
8.88
m2
105.65
21.60
m3
kg
47.92
767.53
327.87
4.52
m3
m2
41.76
290.65
435.21
50.28
1037
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
Metrado
kg
m
und
PRESUPUESTO
Precio
2,930.30
4.00
32.05
4.00
6.62
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
Unidad
PRESUPUESTO
Precio
Metrado
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.00.00
01.01.01
02.00.00
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
Unidad
m2
Metrado
154.10
PRESUPUESTO
Precio
1.40
1039
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
DESCRIPCIN
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Unidad
Metrado
PRESUPUESTO
Precio
m3
387.27
35.52
m3
m3
188.47
43.81
12.46
80.48
m3
258.44
8.88
m2
105.65
21.60
m3
kg
47.92
767.53
327.87
4.52
m3
m2
kg
41.76
290.65
2,930.30
435.21
50.28
4.00
32.05
6.62
1040
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.00.02
DESCRIPCIN
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
Unidad
PRESUPUESTO
Precio
Metrado
und
4.00
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
FRMULA 1: I.E.I. N 5
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
DESCRIPCIN
Obra
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
Unidad
Metrado
PRESUPUESTO
Precio
DESCRIPCIN
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
Unidad
m2
m3
Metrado
154.10
387.27
PRESUPUESTO
Precio
1.40
35.52
1042
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
DESCRIPCIN
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
Unidad
Metrado
PRESUPUESTO
Precio
m3
m3
188.47
43.81
12.46
80.48
m3
258.44
8.88
m2
105.65
21.60
m3
kg
47.92
767.53
327.87
4.52
m3
m2
kg
41.76
290.65
2,930.30
435.21
50.28
4.00
m
und
32.05
4.00
6.62
10.78
1043
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01 S
Unidad
Metrado
PRESUPUESTO
Precio
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1044
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
215.74
0.00
154.10
215.74
154.10
215.74
0.00
0.00%
13,755.83
0.00
387.27
13,755.83
387.27
13,755.83
0.00
0.00%
2,348.34
3,525.83
0.00
0.00
2,294.95
0.00
232.60
2,065.45
2,282.04
0.00
105.65
15,711.53
3,469.24
0.00
0.00
18,174.37
14,613.88
0.00
0.00
0.00
0.00
188.47
43.81
2,348.34
3,525.83
100.00%
100.00%
232.60
2,065.45
25.84
229.49
10.00%
2,282.04
105.65
2,282.04
0.00
0.00%
14.38
767.53
4,713.46
3,469.24
14.38
767.53
4,713.46
3,469.24
33.54
-
10,998.07
0.00
70.00%
0.00%
10.44
72.66
4,543.59
3,653.47
10.44
72.66
4,543.59
3,653.47
31.32
217.99
13,630.78
10,960.41
75.00%
75.00%
1045
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
Parcial
11,721.20
212.17
43.12
AVANCE ANTERIOR
Metrado
Parcial
0.00
-
0.00
0.00
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
1,465.15
5,860.60
8.01
1.00
53.04
10.78
AVANCE ACUMULADO
Metrado
Parcial
1,465.15
5,860.60
8.01
1.00
53.04
10.78
Metrado
1,465.15
24.04
3.00
SALDO
Parcial
5,860.60
%
50.00%
159.13
32.34
75.00%
75.00%
88,368.24
0.00
40,623.24
40,623.24
47,744.99
6,788.78
0.00
2,757.36
2,757.36
4,031.42
81,579.46
0.00
37,865.88
37,865.88
43,713.57
12,073.76
5,604.15
5,604.15
6,469.61
4,242.13
1,969.03
1,969.03
2,273.11
97,895.35
0.00
45,439.06
45,439.06
52,456.29
17,621.16
8,179.03
8,179.03
9,442.13
115,516.51
0.00
0.00%
53,618.09
46.42%
53,618.09
46.42%
61,898.42
53.58%
02 DE ADICIONAL DE OBRA N 01
1046
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
215.74
154.10
215.74
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
154.10
SALDO
Parcial
Metrado
215.74
0.00
0.00%
1047
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
13,755.83
2,348.34
3,525.83
387.27
-
AVANCE ACTUAL
Metrado
Parcial
13,755.83
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
-
SALDO
Parcial
Metrado
387.27
13,755.83
94.24
21.91
%
0.00
0.00%
1,174.17
1,762.91
50.00%
50.00%
0.00
0.00
94.24
21.91
1,174.17
1,762.91
94.24
21.91
1,174.17
1,762.91
25.84
229.49
258.44
2,294.95
0.00
0.00%
105.65
2,282.04
0.00
0.00%
2,294.95
232.60
2,065.45
2,282.04
105.65
2,282.04
15,711.53
3,469.24
14.38
767.53
4,713.46
3,469.24
33.54
-
10,998.07
-
47.92
767.53
15,711.53
3,469.24
0.00
0.00
0.00%
0.00%
18,174.37
14,613.88
11,721.20
10.44
72.66
1,465.15
4,543.59
3,653.47
5,860.60
31.32
217.99
1,465.15
13,630.78
10,960.41
5,860.60
41.76
290.65
2,930.30
18,174.37
14,613.88
11,721.20
0.00
0.00
0.00
0.00%
0.00%
0.00%
212.17
8.01
53.04
8.01
53.04
159.13
75.00%
24.04
1048
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ANTERIOR
Metrado
Parcial
1.00
10.78
AVANCE ACTUAL
Metrado
Parcial
3.00
32.34
AVANCE ACUMULADO
Metrado
Parcial
4.00
43.12
88,368.24
40,623.24
44,648.77
85,272.02
3,096.21
6,788.78
2,757.36
3,793.55
6,550.92
237.86
81,579.46
37,865.88
40,855.22
78,721.10
2,858.35
12,073.76
5,604.15
6,046.57
11,650.72
423.04
4,242.13
1,969.03
2,124.47
4,093.50
148.63
97,895.35
45,439.06
49,026.26
94,465.32
3,430.02
17,621.16
8,179.03
8,824.73
17,003.76
617.40
115,516.51
53,618.09
Parcial
43.12
46.42%
57,850.99
50.08%
111,469.08
SALDO
Parcial
Metrado
-
96.50%
%
0.00
4,047.42
0.00%
3.50%
03 DE ADICIONAL DE OBRA N 01
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 97,895.35
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
215.74
154.10
215.74
154.10
215.74
0.00
0.00%
13,755.83
387.27
13,755.83
387.27
13,755.83
0.00
0.00%
1050
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
2,348.34
3,525.83
94.24
21.91
1,174.17
1,762.91
94.24
21.91
2,294.95
258.44
2,294.95
2,282.04
105.65
2,282.04
15,711.53
3,469.24
47.92
767.53
18,174.37
14,613.88
11,721.20
212.17
43.12
AVANCE ACUMULADO
Metrado
Parcial
188.47
43.81
2,348.34
3,525.83
0.00
0.00
0.00%
0.00%
258.44
2,294.95
0.00
0.00%
105.65
2,282.04
0.00
0.00%
15,711.53
3,469.24
47.92
767.53
15,711.53
3,469.24
0.00
0.00
0.00%
0.00%
41.76
290.65
2,930.30
18,174.37
14,613.88
11,721.20
41.76
290.65
2,930.30
18,174.37
14,613.88
11,721.20
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.01
4.00
53.04
43.12
32.05
4.00
212.17
43.12
0.00
0.00
0.00%
0.00%
24.04
-
1,174.17
1,762.91
SALDO
Parcial
Metrado
159.13
-
1051
01 DE ADICIONAL DE OBRA N 01
ADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE
VINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 808,227.00
S/. 684,938.14
S/. 106,041.89
al C/IGV:
al S/IGV:
al Adicional N01 S/IGV:
UPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 684,938.14
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
88,368.24
85,272.02
3,096.21
88,368.24
0.00
6,788.78
6,550.92
237.86
6,788.78
0.00
81,579.46
78,721.10
2,858.35
81,579.46
0.00
12,073.76
11,650.72
423.04
12,073.76
4,242.13
4,093.50
148.63
4,242.13
97,895.35
94,465.32
3,430.02
97,895.35
0.00
17,621.16
17,003.76
617.40
17,621.16
115,516.51
111,469.08
96.50%
4,047.42
3.50%
115,516.51
100.00%
0.00
0.00%
1052
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Unidad
m2
Metrado
150.50
PRESUPUESTO
Precio
1.40
m3
434.77
35.52
m3
m3
214.20
48.89
12.46
80.48
m3
286.74
8.88
m2
115.50
21.60
m3
kg
55.20
903.57
327.87
4.52
m3
m2
44.17
320.00
435.21
50.28
1053
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
06.00.00
06.00.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
CERCO
Cerco malla Elec.2"x2" C/Perf. Colum. FG Estndar 2" (Sistemic.)
Unidad
kg
Metrado
PRESUPUESTO
Precio
3,446.78
4.00
m
und
42.75
4.00
6.62
10.78
m2
75.60
124.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1054
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
1055
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
VALORIZACION N04 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.00.00
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
OBRAS PRELIMINARES
1056
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Unidad
m2
Metrado
150.50
PRESUPUESTO
Precio
1.40
m3
434.77
35.52
m3
m3
214.20
48.89
12.46
80.48
m3
286.74
8.88
m2
115.50
21.60
m3
kg
55.20
903.57
327.87
4.52
m3
m2
kg
44.17
320.00
3,446.78
435.21
50.28
4.00
1057
VALORIZACION N03 DE AD
FRMULA 1: I.E.I. N 5
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.00.01
05.00.02
06.00.00
06.00.01
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
CERCO
Cerco malla Elec.2"x2" C/Perf. Colum. FG Estndar 2" (Sistemic.)
Unidad
Metrado
PRESUPUESTO
Precio
m
und
42.75
4.00
6.62
10.78
m2
75.60
124.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1058
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 104,448.18
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
210.70
0.00
150.50
210.70
150.50
210.70
0.00
15,443.03
0.00
434.77
15,443.03
434.77
15,443.03
0.00
2,668.93
3,934.67
0.00
0.00
2,546.25
0.00
286.74
2,546.25
286.74
2,546.25
0.00
2,494.80
0.00
115.50
2,494.80
115.50
2,494.80
0.00
18,098.42
4,084.14
0.00
0.00
55.20
903.57
18,098.42
4,084.14
55.20
903.57
18,098.42
4,084.14
0.00
0.00
19,223.23
16,089.60
0.00
0.00
30.92
224.00
13,456.26
11,262.72
30.92
224.00
13,456.26
11,262.72
0.00
0.00
214.20
48.89
13.25
96.00
2,668.93
3,934.67
5,766.97
4,826.88
1059
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 104,448.18
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
13,787.12
AVANCE ANTERIOR
Metrado
Parcial
-
0.00
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
3,446.78
13,787.12
283.01
43.12
0.00
0.00
2.80
9,433.37
0.00
30.18
-
AVANCE ACUMULADO
Metrado
Parcial
3,446.78
13,787.12
SALDO
Parcial
Metrado
-
0.00
2.80
0.00
30.18
42.75
1.20
283.01
12.94
0.00
75.60
9,433.37
108,340.39
0.00
81,413.62
81,413.62
26,926.77
21,300.24
0.00
16,006.31
16,006.31
5,293.93
87,040.15
0.00
65,407.31
65,407.31
21,632.84
12,881.94
9,680.28
9,680.28
3,201.66
4,526.09
3,401.18
3,401.18
1,124.91
104,448.18
0.00
78,488.77
78,488.77
25,959.41
18,800.67
14,127.98
14,127.98
4,672.69
123,248.85
0.00
0.00%
92,616.75
75.15%
92,616.75
75.15%
30,632.10
1060
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1061
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1062
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 104,448.18
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
210.70
15,443.03
2,668.93
3,934.67
AVANCE ANTERIOR
Metrado
Parcial
150.50
210.70
434.77
-
15,443.03
0.00
0.00
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
214.20
48.89
2,668.93
3,934.67
AVANCE ACUMULADO
Metrado
Parcial
150.50
210.70
SALDO
Parcial
Metrado
-
0.00
434.77
15,443.03
0.00
214.20
48.89
2,668.93
3,934.67
0.00
0.00
2,546.25
286.74
2,546.25
286.74
2,546.25
0.00
2,494.80
115.50
2,494.80
115.50
2,494.80
0.00
18,098.42
4,084.14
55.20
903.57
18,098.42
4,084.14
55.20
903.57
18,098.42
4,084.14
0.00
0.00
19,223.23
16,089.60
13,787.12
30.92
224.00
3,446.78
13,456.26
11,262.72
13,787.12
44.17
320.00
3,446.78
19,223.23
16,089.60
13,787.12
0.00
0.00
0.00
13.25
96.00
-
5,766.97
4,826.88
-
1063
CALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR D
, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 798,432.52
S/. 676,637.73
S/. 104,448.18
Referencial C/IGV:
Referencial S/IGV:
dicional N01 S/IGV:
ESUPUESTO
Parcial
283.01
43.12
9,433.37
AVANCE ANTERIOR
Metrado
Parcial
0.00
2.80
30.18
-
0.00
S/. 676,637.73
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
42.75
283.01
1.20
12.94
75.60
9,433.37
AVANCE ACUMULADO
Metrado
Parcial
42.75
283.01
4.00
43.12
75.60
9,433.37
SALDO
Parcial
Metrado
-
0.00
0.00
0.00
108,340.39
81,413.62
26,926.77
108,340.39
0.00
21,300.24
16,006.31
5,293.93
21,300.24
0.00
87,040.15
65,407.31
21,632.84
87,040.15
0.00
12,881.94
9,680.28
3,201.66
12,881.94
4,526.09
3,401.18
1,124.91
4,526.09
104,448.18
78,488.77
25,959.41
104,448.18
0.00
18,800.67
14,127.98
4,672.69
18,800.67
123,248.85
92,616.75
75.15%
30,632.10
24.85%
123,248.85
100.00%
0.00
1064
SALDO
%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
30.00%
30.00%
1065
SALDO
%
0.00%
100.00%
30.00%
100.00%
24.85%
1066
SALDO
%
1067
SALDO
%
SALDO
%
1068
SALDO
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1069
SALDO
%
0.00%
0.00%
0.00%
0.00%
1070
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.00.00
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
DESCRIPCIN
MUROS DE CONTENCION
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Unidad
m2
Metrado
193.90
PRESUPUESTO
Precio
1.40
m3
336.04
35.52
m3
m3
143.49
48.35
12.46
80.48
m3
250.32
8.88
m2
120.90
21.60
m3
kg
48.36
757.54
327.87
4.52
m3
m2
44.41
323.00
435.21
50.28
1071
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
DESCRIPCIN
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
kg
m
und
Metrado
PRESUPUESTO
Precio
2,803.02
4.00
48.00
6.00
6.62
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
PARCIAL
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1072
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
Unidad
Metrado
PRESUPUESTO
Precio
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
OBRAS PRELIMINARES
1073
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
01.01.01
02.00.00
02.01.00
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
DESCRIPCIN
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Unidad
m2
Metrado
193.90
PRESUPUESTO
Precio
1.40
336.04
35.52
m3
m3
143.49
48.35
12.46
80.48
m3
250.32
8.88
m2
120.90
21.60
m3
kg
48.36
757.54
327.87
4.52
m3
m2
kg
44.41
323.00
2,803.02
435.21
50.28
4.00
m3
1074
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
05.00.01
05.00.02
DESCRIPCIN
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
Unidad
m
und
Metrado
48.00
6.00
PRESUPUESTO
Precio
6.62
10.78
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
DESCRIPCIN
Unidad
PRESUPUESTO
Precio
Metrado
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
Supervisor
Residente
Proyectista
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Adicional N01 S/IGV:
DESCRIPCIN
Unidad
Metrado
PRESUPUESTO
Precio
MUROS DE CONTENCION
01.00.00
01.01.01
02.00.00
02.01.00
OBRAS PRELIMINARES
Trazo y replanteo en terreno normal con equipo
MOVIMIENTO DE TIERRAS
EXCAVACIONES
m2
193.90
1.40
1076
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
02.01.01
02.02.00
02.02.01
02.02.02
02.03.00
02.03.01
03.00.00
03.01.00
04.00.00
04.01.00
04.01.01
04.01.02
04.02.00
04.02.01
04.02.02
04.02.03
05.00.00
05.00.01
05.00.02
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
DESCRIPCIN
Excavacin de zanjas y zapatas RT < 2 kg/cm 2: H=3.5 m; H=2.00 m
Rellenos
Relleno Compactado con Equipo Material Propio
Relleno con material de filtro para Muro de Contencin
ELIMINACION DE MATERIAL EXCEDENTE
Acarreo interno, material procedente de excavaciones distancias cortas
OBRAS DE CONCRETO SIMPLE
Solados para zapatas e=2" 1:12 Cem/Horm.
OBRAS DE CONCRETO ARMADO
ZAPATAS EN MURO DE CONTENCION
Zapatas en Muros de Contencin Concreto F'c=210 Kg/cm2
Zapatas en Muros de Contencion Acero corrugado de grado 60.
PANTALLA MURO DE CONTENCION
Pantalla en muro de Contencion Concreto f'c 210 Kg/cm 2
Pantalla en muro de Contencion Encofrado y Desencofrado
Pantalla en muro de Contencion Acero corrugado de grado 60.
VARIOS
Junta de dilatacin relleno con mortero asfltico E=1"
Tubera de drenaje, Tubo PVC 3", en muro de contencin
Unidad
m3
Metrado
336.04
PRESUPUESTO
Precio
35.52
m3
m3
143.49
48.35
12.46
80.48
m3
250.32
8.88
m2
120.90
21.60
m3
kg
48.36
757.54
327.87
4.52
m3
m2
kg
44.41
323.00
2,803.02
435.21
50.28
4.00
48.00
6.00
6.62
10.78
und
1077
Proceso
Entidad
Ubicacin
Contratista
:
:
:
:
Item
DESCRIPCIN
Supervisor:
Residente:
Proyectista:
Monto Referencial C/IGV:
Monto Referencial S/IGV:
Monto Referencial Adicional N01
Unidad
Metrado
PRESUPUESTO
Precio
COSTO DIRECTO
PRESUPUESTO DEDUCTIVO
COSTO DIRECTO
GASTOS GENERALES FIJOS (14.80% CD)
0.1480
0.0520
SUB TOTAL
I.G.V. 18%
0.1800
COSTO TOTAL
1078
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
271.46
0.00
193.90
271.46
193.90
271.46
0.00
0.00%
11,936.14
0.00
336.04
11,936.14
336.04
11,936.14
0.00
0.00%
1,787.89
3,891.21
0.00
0.00
2,222.84
0.00
225.29
2,000.56
2,611.44
0.00
120.90
15,855.79
3,424.08
0.00
0.00
4.84
757.54
19,327.68
16,240.44
0.00
0.00
0.00
0.00
143.49
48.35
1,787.89
3,891.21
100.00%
100.00%
225.29
2,000.56
25.03
222.28
10.00%
2,611.44
120.90
2,611.44
0.00
0.00%
1,585.58
3,424.08
4.84
757.54
1,585.58
3,424.08
43.52
-
14,270.21
0.00
90.00%
0.00%
0.00
0.00
44.41
323.00
19,327.68
16,240.44
100.00%
100.00%
1079
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
11,212.08
317.76
64.68
0.00
0.00
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
840.91
3,363.62
-
AVANCE ACUMULADO
Metrado
Parcial
840.91
3,363.62
-
0.00
0.00
Metrado
1,962.11
48.00
6.00
SALDO
Parcial
7,848.46
%
70.00%
317.76
64.68
100.00%
100.00%
89,163.49
0.00
25,192.88
25,192.88
63,970.61
10,228.17
0.00
2,553.86
2,553.86
7,674.31
78,935.32
0.00
22,639.02
22,639.02
56,296.30
11,682.43
3,350.57
3,350.57
8,331.85
4,104.64
1,177.23
1,177.23
2,927.41
94,722.39
0.00
27,166.82
27,166.82
67,555.56
17,050.03
4,890.03
4,890.03
12,160.00
111,772.42
0.00
0.00%
32,056.85
28.68%
32,056.85
28.68%
79,715.56
71.32%
1080
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
02 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
AVANCE ACTUAL
Metrado
Parcial
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACUMULADO
Metrado
Parcial
Metrado
SALDO
Parcial
1081
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
271.46
11,936.14
1,787.89
3,891.21
336.04
-
11,936.14
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
AVANCE ACUMULADO
Metrado
Parcial
193.90
271.46
336.04
11,936.14
SALDO
Parcial
Metrado
0.00
0.00%
0.00
0.00%
893.94
1,945.60
50.00%
50.00%
0.00
0.00
71.75
24.18
893.94
1,945.60
71.75
24.18
893.94
1,945.60
71.75
24.18
25.03
222.28
250.32
2,222.84
0.00
0.00%
120.90
2,611.44
0.00
0.00%
2,222.84
225.29
2,000.56
2,611.44
120.90
2,611.44
15,855.79
3,424.08
4.84
757.54
1,585.58
3,424.08
43.52
-
14,270.21
-
48.36
757.54
15,855.79
3,424.08
0.00
0.00
0.00%
0.00%
19,327.68
16,240.44
11,212.08
840.91
0.00
0.00
3,363.62
44.41
323.00
1,962.11
19,327.68
16,240.44
7,848.46
44.41
323.00
2,803.02
19,327.68
16,240.44
11,212.08
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1082
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ANTERIOR
Metrado
Parcial
0.00
0.00
AVANCE ACTUAL
Metrado
Parcial
6.00
64.68
AVANCE ACUMULADO
Metrado
Parcial
0.00
6.00
64.68
89,163.49
25,192.88
60,813.29
86,006.17
10,228.17
2,553.86
7,312.12
9,865.99
362.18
78,935.32
22,639.02
53,501.17
76,140.18
2,795.12
11,682.43
3,350.57
7,918.17
11,268.75
413.68
4,104.64
1,177.23
2,782.06
3,959.29
145.35
94,722.39
27,166.82
64,201.40
91,368.22
3,354.15
17,050.03
4,890.03
11,556.25
16,446.28
603.75
111,772.42
32,056.85
Parcial
317.76
64.68
28.68%
75,757.65
67.78%
107,814.50
Metrado
48.00
96.46%
96.46%
SALDO
Parcial
317.76
0.00
%
100.00%
0.00%
3,157.30
3.54%
3,957.90
3.54%
03 DE ADICIONAL DE OBRA N 01
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
SALDO
Parcial
Metrado
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
ING. JHONY ALAN VENTURA CARRILLO
ING. SANTOS ALARCON PEREZ
ING. SILVIA Y. JIMENEZ BARTUREN
S/. 800,414.78
S/. 678,317.61
S/. 94,722.39
erencial C/IGV:
erencial S/IGV:
cional N01 S/IGV:
SUPUESTO
AVANCE ANTERIOR
Metrado
Parcial
Parcial
271.46
193.90
271.46
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
193.90
271.46
SALDO
Parcial
Metrado
0.00
0.00%
1084
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
11,936.14
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
-
1,787.89
3,891.21
71.75
24.18
893.94
1,945.60
71.75
24.18
2,222.84
250.32
2,222.84
2,611.44
120.90
2,611.44
15,855.79
3,424.08
48.36
757.54
19,327.68
16,240.44
11,212.08
317.76
64.68
SALDO
Parcial
Metrado
0.00
0.00%
143.49
48.35
1,787.89
3,891.21
0.00
0.00
0.00%
0.00%
250.32
2,222.84
0.00
0.00%
120.90
2,611.44
0.00
0.00%
15,855.79
3,424.08
48.36
757.54
15,855.79
3,424.08
0.00
0.00
0.00%
0.00%
44.41
323.00
2,803.02
19,327.68
16,240.44
11,212.08
44.41
323.00
2,803.02
19,327.68
16,240.44
11,212.08
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
6.00
0.00
64.68
48.00
6.00
317.76
64.68
0.00
0.00
0.00%
0.00%
48.00
-
893.94
1,945.60
AVANCE ACUMULADO
Metrado
Parcial
336.04
11,936.14
317.76
-
1085
01 DE ADICIONAL DE OBRA N 01
LIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR
ROVINCIA DE CUTERVO, REGION CAJAMARCA"
erencial C/IGV:
erencial S/IGV:
erencial Adicional N01 S/IGV:
SUPUESTO
Parcial
S/. 678,317.61
1.00000
9/3/2014
270 D.C.
5/30/2015
9/17/2015
11/9/2015
AVANCE ACTUAL
Metrado
Parcial
AVANCE ACUMULADO
Metrado
Parcial
Metrado
89,163.49
86,006.17
3,157.30
89,163.49
10,228.17
9,865.99
362.18
10,228.17
0.00
78,935.32
76,140.18
2,795.12
78,935.32
0.00
11,682.43
11,268.75
413.68
11,682.43
4,104.64
3,959.29
145.35
4,104.64
94,722.39
91,368.22
3,354.15
94,722.39
0.00
17,050.03
16,446.28
603.75
17,050.03
111,772.42
107,814.50
96.46%
3,957.90
3.54%
111,772.42
100.00%
SALDO
Parcial
100.00%
0.00
0.00
0.00%
0.00%
1086
NOMBRE DE OBRA
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES
GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMA
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
CONCEPTO
Base a
INDICES
Ka
Mar-15
Aug-15
47
523.15
544.59
30
422.94
450.46
43
677.34
684.62
515.52
462.12
21
454.07
459.40
17
BLOQUE Y LADRILLO
580.12
579.47
AGREGADO FINO
524.27
523.77
39
409.90
418.64
32
FLETE TERRESTRE
469.08
466.15
: MAYO - 2014
Oct-15
Nov-15
544.59
544.59
544.59
447.20
450.53
462.65
688.08
688.23
692.02
457.96
461.49
469.48
459.40
459.40
459.40
580.12
583.12
586.80
523.82
524.24
527.63
418.76
419.35
420.80
467.08
467.08
467.08
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 02
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
01
01.01
BLOQUE E
CORTE, PICADOS Y SIMILARES
PICADO EN MUROS PARA EXTRACCION DE TUBERIAS DE PVC 4" Y ACCESORIOS
EXTRACCION DE MATERIAL GRANULAR EN ZONA DE DEMOLICION
SUMINISTRO Y REPARACION DE TUBERIAS
SUMINISTRO Y REPARACION DE TUBERIA PVC 4" PARA DESAGUE
SUMINISTRO Y REPARACION DE ACCESORIOS
SUMINISTRO Y REPARACION DE CODOS PVC SAL 4x45
SUMINISTRO Y REPARACION DE CODOS PVC SAL 4x90
RESANE EN GENERAL
RESANES Y TARRAJEO DE PICADO EN MUROS
BLOQUE F
CORTE, PICADOS Y SIMILARES
PICADO EN MUROS PARA EXTRACCION DE TUBERIAS DE PVC 4" Y ACCESORIOS
EXTRACCION DE MATERIAL GRANULAR EN ZONA DE DEMOLICION
SUMINISTRO Y REPARACION DE TUBERIAS
SUMINISTRO Y REPARACION DE TUBERIA PVC 4" PARA DESAGUE
SUMINISTRO Y REPARACION DE ACCESORIOS
SUMINISTRO Y REPARACION DE CODOS PVC SAL 4x45
SUMINISTRO Y REPARACION DE CODOS PVC SAL 4x90
RESANE EN GENERAL
RESANES Y TARRAJEO DE PICADO EN MUROS
BLOQUE G
CORTE, PICADOS Y SIMILARES
PICADO EN MUROS PARA EXTRACCION DE TUBERIAS DE PVC 4" Y ACCESORIOS
EXTRACCION DE MATERIAL GRANULAR EN ZONA DE DEMOLICION
SUMINISTRO Y REPARACION DE TUBERIAS
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.03.02
01.01.04
01.01.04.01
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.02
01.02.02.01
01.02.03
01.02.03.01
01.02.03.02
01.02.04
01.02.04.01
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.02
UNIDAD
METRADO
P. UNIT
MONTO S/.
MES MARZO 2
METRADO
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 02
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
01.03.02.01
01.03.02.02
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.03.05
01.03.04
01.03.04.01
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
01.04.02.01
01.04.02.02
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.03.04
01.04.04
01.04.04.01
02
02.01
02.01.01
02.01.01.01
BLOQUE F
CORTE, PICADOS Y SIMILARES
CORTE Y PICADOS EN PISOS PARA EXTRACCION DE TUBERIAS
UNIDAD
METRADO
P. UNIT
MONTO S/.
MES MARZO 2
METRADO
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 02
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
02.01.01.02
02.01.02
02.01.02.01
02.01.02.02
02.01.02.03
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.03
02.02.03.01
02.02.03.02
02.02.04
02.02.04.01
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.02
03.01.02.01
03.01.02.02
03.01.03
03.01.03.01
BLOQUE E
CORTE, PICADOS Y SIMILARES
PICADO EN PISO PARA EXTRACCION DE TUBERIAS
PICADO EN MUROS PARA EXTRACCION DE TUBERIAS
REPARACION DE SALIDA PARA DESAGUE
SALIDA DE DESAGUE DE 2" PVC-SAL
SALIDA DE DESAGUE DE 4" PVC-SAL
SUMINISTRO Y REPARACION DE ACCESORIOS
SUMIDERO DE 3"
UNIDAD
METRADO
P. UNIT
MONTO S/.
MES MARZO 2
METRADO
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 02
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
03.01.03.02
03.01.03.03
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
REGISTRO 3"
REGISTRO 2"
BLOQUE F
REPARACION DE SALIDA PARA DESAGUE
SALIDA DE DESAGUE DE 2" PVC-SAL
SALIDA DE DESAGUE DE 4" PVC-SAL
SALIDA DE VENTILACION DE 2" PARA DESAGUE
SUMINISTRO Y REPARACION DE ACCESORIOS
REGISTRO 2"
REGISTRO 4"
SUMIDERO DE 3"
VARIOS
RELLENO COMPACTADO DE AREA DE BAO PARA FALSO PISO
CONCRETO fc = 100 kg/cm2 EN FALSO PISO, E=4"
CONTRAPISO DE 40mm
04
04.01
04.01.01
04.01.01.01
04.01.01.02
TANQUE ELEVADO
REBOSE
SUMINISTRO E INSTALACION DE TUBERIA FG 6"
SUMINISTRO E INSTALACION DE ABRAZADERAS DE DOS OREJAS DE FG 6"
05
05.01
05.01.01
05.02
05.02.01
05.03
05.03.01
BLOQUE E
CAJA NICHO PARA VALVULAS INCLUYE TAPA (0.40x0.60x0.50m)
BLOQUE G
CAJA NICHO PARA VALVULAS INCLUYE TAPA (0.40x0.60x0.50m)
BLOQUE H
CAJA NICHO PARA VALVULAS INCLUYE TAPA (0.40x0.60x0.50m)
UNIDAD
METRADO
P. UNIT
MONTO S/.
MES MARZO 2
METRADO
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 02
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
UNIDAD
COSTO DIRECTO
METRADO
P. UNIT
MES MARZO 2
MONTO S/.
METRADO
S/. 0.00
1.00%
S/. 0.00
14.20%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
Ministerial N 139-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 02
: S/. 26,150.39
(inc. IGV)
PRESUP. ADICIONAL N 02
: S/. 21,975.12
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
Ministerial N 139-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 02
: S/. 26,150.39
(inc. IGV)
PRESUP. ADICIONAL N 02
: S/. 21,975.12
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
Ministerial N 139-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 02
: S/. 26,150.39
(inc. IGV)
PRESUP. ADICIONAL N 02
: S/. 21,975.12
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
Ministerial N 139-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 02
: S/. 26,150.39
(inc. IGV)
PRESUP. ADICIONAL N 02
: S/. 21,975.12
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
Ministerial N 139-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 02
: S/. 26,150.39
(inc. IGV)
PRESUP. ADICIONAL N 02
: S/. 21,975.12
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
SALDO CONTRACTUAL
MONTO S/.
METRADO
MONTO S/.
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 03
: "TRABAJOS DE MOVIMIENTO DE TIERRA EN PISTAS DE BLOQUES U e I y OBRAS COMPLEMENTARIAS PARA INSTALACIN DE BASCULA ESTATICA DE CAMIONES".
(Aprobado segn Resolucin Ministerial N 170-2011-MTC/02)
CONTRATISTA
SUPERVISIN
UBICACIN
ADICIONAL N 03 - TRABAJOS DE MOVIMIENTO DE TIERRA EN PISTAS DE BLOQUES U e I y OBRAS COMPLEMENTARIAS PARA INSTALACI
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
01.00.00
01.01.00
01.01.01
01.02.00
01.02.01
01.02.02
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DURANTE LA OBRA CON EQUIPO
MOVIMIENTO DE TIERRAS
EXCAVACION Y ELIMINACION DE MATERIAL EXCEDENTE
NIVELACION, REFINE, CONFORMACION Y COMPACTACION EN PISTAS
02.00.00
02.01.00
02.01.01
02.01.02
02.01.03
02.02.00
02.02.01
02.02.02
02.02.03
02.03.00
02.03.01
02.03.02
02.04.00
02.04.01
MOVIMIENTO DE TIERRAS
EXCAV. ZANJAS MANUAL EN T. NATURAL H=1.50M P/TUB EN ZONA DE LA BALANZA
REFINE Y NIVELACION FONDO DE ZANJA T. NORMAL P/TUB
CAMA DE ARENA E=0.10 M ZANJA P/INST. DE TUB.
SUMINISTRO E INSTALACION DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIAS PVC 4" EN ZONA DE LA BALANZA
SUMINISTRO E INSTALACION DE TUBERIAS PVC 6" EN ZONA DE LA BALANZA
SUMINISTRO E INSTALACION DE TUBERIAS PVC 8" EN ZONA DE LA BALANZA
CAJA DE REGISTRO PARA AGUA PLUVIALES
CAJA DE REGISTRO CON REJILLA 2.00x0.60m
CAJA DE REGISTRO 1.00x1.00m
BUZON
BUZON DE DESAGUE CON TAPA DE FIERRO
03.00.00
INSTALACIONES ELECTRICAS
03.01.00
03.01.01
POZO A TIERRA
POZO A TIERRA PARA 5 Ohm
UNIDAD
METRADO
P. UNIT
MONTO S/.
MES MARZO 2
METRADO
CONSORCIO BINACIONAL
COSTO DIRECTO
S/. 0.00
1.00%
S/. 0.00
14.20%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 03
: S/. 43,080.44
(inc. IGV)
PRESUP. ADICIONAL N 03
: S/. 36,508.85
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 04
CONTRATISTA
SUPERVISIN
UBICACIN
VALORIZACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
01.00.00
INSTALACIONES ELECTRICAS
01.01
01.01.01
01.01.02
01.01.03
01.02
01.02.01
01.02.02
01.02.03
01.03
01.03.01
01.03.02
01.03.03
01.04
01.04.01
01.04.02
01.04.03
GARITA DE INGRESO
SALIDA DE ALUMBRADO , INCLUYE CAJA, TUB. CONDUIT
ARTEFACTO TIPO F-2
INSTALACIONES DE CAJA DE PASO CONDUIT TIPO T
GARITA DE SALIDA
SALIDA DE ALUMBRADO , INCLUYE CAJA, TUB. CONDUIT
ARTEFACTO TIPO F-2
INSTALACIONES DE CAJA DE PASO CONDUIT TIPO T
GARITA DE CONTROL PEATONAL
SALIDA DE ALUMBRADO , INCLUYE CAJA, TUB. CONDUIT
ARTEFACTO TIPO F-2
INSTALACIONES DE CAJA DE PASO CONDUIT TIPO T
CONTROL DE CAMIONES
SALIDA DE ALUMBRADO , INCLUYE CAJA, TUB. CONDUIT
ARTEFACTO TIPO F-2
INSTALACIONES DE CAJA DE PASO CONDUIT TIPO T
UNIDAD
METRADO
P. UNIT
MONTO S/.
3/4",ETC
3/4",ETC
3/4",ETC
3/4",ETC
COSTO DIRECTO
S/. 0.00
1.00%
S/. 0.00
14.20%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
MES ABRIL 2
METRADO
CONSORCIO BINACIONAL
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 04
: S/. 27,466.93
(inc. IGV)
PRESUP. ADICIONAL N 04
: S/. 23,277.06
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
SALDO CONTRACTUAL
MONTO S/.
METRADO
MONTO S/.
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIM
ENTIDAD
OBRA ADICIONAL N 05
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
01.00.00
OBRAS PRELIMINARES
01.01
TRAZO Y REPLANTEO
02.00.00
MOVIMIENTO DE TIERRAS
02.01
02.02
02.03
02.04
02.05
03.00.00
03.01
03.01.01
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.02
03.03.03
04.00.00
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
CAMARA DE BOMBEO
CONCRETO SIMPLE
SOLADO F'C=100KG/CM2 e=10cm EN CAMARA DE BOMBEO (cem. Tipo V)
CONCRETO ARMADO
ACERO FY=4200KG/CM2 GRADO 60
ENCOFRADO Y DESENCOFRADO EN CAMARA DE BOMBEO
CONCRETO F`C= 280 KG/cm2 PARA CAMARA DE BOMBEO (Cem.Tipo V)
PUERTAS Y VENTANAS
PUERTA METALICA 1.00X2.10m (INC. COLOCACION)
VENTANA METALICA 0.60X1.00 (INC. COLOCACION)
TAPA DE CONCRETO 0.50X1.00. e=0.05m. CON MARCO DE ACERO (INC. COLOCACION)
UNIDAD
METRADO
P. UNIT
MONTO S/.
CONSORCIO BINACIONAL
04.03
04.03.01
04.03.02
05.00.00
05.01
05.02
05.03
05.04
TAPA Y REJILLA
TAPA METALICA DE 2 HOJAS DE 1.60 X 2.10 m, C/PLANCHA ESTRIADA DE 3/16"
REJILLA METALICA DE ACERO INOXIDABLE DE 16 PLATINAS DE 1"x1/8" Y 10 PLATINAS
DE 1"x1/8" PARA TUB. 10" SERIE A-20
VARIOS
SUMINISTRO Y COLOCACION DE TUBERIA PVC SAP 4"
CAJA DE CONCRETO 0.80x0.50m (Inc. tapa de rejilla y acero)
PISO DE MAMPOSTERIA DE PIEDRA (incl. Extr. y selec. de piedra, asent. con mort. 1:5 y acabado decorativo )
GARGOLAS DE CONCRETO DE 0.3 x0.3 x 0.3
COSTO DIRECTO
S/. 0.00
1.00%
S/. 0.00
14.20%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
rial N 232-2011-MTC/02)
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 05
: S/. 131,743.85
(inc. IGV)
PRESUP. ADICIONAL N 05
: S/. 111,647.33
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACI
ENTIDAD
OBRA ADICIONAL N 06
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
01.00.00
BLOQUE E1
01.02
01.02.01
DUCTOS
DUCTOS DE VENTILACION
02.00.00
BLOQUE F
02.03
02.03.02
DUCTOS
DUCTOS DE AIRE ACONDICIONADO
03.00.00
BLOQUE G
03.03
03.03.02
DUCTOS
DUCTOS DE AIRE ACONDICIONADO
04.00.00
BLOQUE H1
04.03
04.03.01
DUCTOS
DUCTOS DE VENTILACION
05.00.00
BLOQUE I
05.03
05.03.01
05.03.02
DUCTOS
DUCTOS DE VENTILACION
DUCTOS DE AIRE ACONDICIONADO
06.00.00
BLOQUE M
06.03
06.03.01
06.03.02
DUCTOS
DUCTOS DE VENTILACION
DUCTOS DE AIRE ACONDICIONADO
07.00.00
BLOQUE P
07.02
07.02.01
DUCTOS
DUCTOS DE VENTILACION
08.00.00
BLOQUE Q1
08.02
DUCTOS
UNIDAD
METRADO
P. UNIT
MONTO S/.
CONSORCIO BINACIONAL
08.02.01
08.02.02
DUCTOS DE VENTILACION
DUCTOS DE AIRE ACONDICIONADO
COSTO DIRECTO
S/. 0.00
1.00%
S/. 0.00
9.75%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
FRONTERIZA - CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 06
: S/. 504,322.41
(inc. IGV)
PRESUP. ADICIONAL N 06
: S/. 427,391.87
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER, PRIME
ENTIDAD
OBRA ADICIONAL N 07
CONTRATISTA
SUPERVISIN
UBICACIN
PRESUPUESTO
TEM
DESCRIPCIN DE PARTIDAS
13.00.00
13.03
13.03.03
13.03.04
13.03.06
ALUMBRADO PUBLICO
SUMINISTRO E INSTALACION POSTE TRONCO CONICO H=18 mt - 3 REFLECTORES
SUMINISTRO E INSTALACION POSTE TRONCO CONICO H=18 mt - 4 REFLECTORES
SUMINISTRO E INSTALACION POSTE TRONCO CONICO H=18 mt - 2 REFLECTORES
UNIDAD
COSTO DIRECTO
METRADO
P. UNIT
MES ABRIL 20
MONTO S/.
METRADO
S/. 0.00
1.00%
S/. 0.00
14.20%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 07
: S/. 208,228.97
(inc. IGV)
PRESUP. ADICIONAL N 07
: S/. 176,465.23
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
METRADO
SALDO CONTRACTUAL
MONTO S/.
METRADO
MONTO S/.
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER
ENTIDAD
OBRA ADICIONAL N 08
: "TRABAJOS ADICIONALES POR MAYORES METRADOS Y PARTIDAS NUEVAS DIVERSAS, RELACIONADAS A: SEALES INFORMATIVAS, TRABAJOS COMPLEMENTARIO
ARQUITECTURA, INSTALACIONES ELECTRICAS, SANITARIAS Y ELECTROMECANICAS"
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
21.03.00
SEALIZACIN INFORMATIVA
21.03.01
21.03.02
01.00.00
JUNTAS
01.01.00
02.00.00
02.01.00
02.01.01
03.02.00
03.02.01
02.03.00
02.03.01
02.03.02
LLENADO
SUMINISTRO E INSTALACION
REBOSE
SUMINISTRO E INSTALACION
DISTRIBUCION
SUMINISTRO E INSTALACION
SUMINISTRO E INSTALACION
21.00.00
21.05.00
03.00.00
AIRE ACONDICIONADO
03.01.00
03.01.01
03.02.00
03.02.01
03.03.00
03.03.01
03.03.01.01
CONCRETO ARMADO
BASE DE CONCRETO f'c=175 kg/cm ANTI VIBRATORIO DE EQUIPOS DE AIRE ACONDICIONADO
SENSORES DE OCUPANCIA
SUMINISTRO E INSTALACION DE SENSORES DE OCUPANCIA
TABLEROS
BLOQUE E
TABLERO ELECTRICO BLOQUE E EN AIRE ACONDICIONADO
UNIDAD
METRADO
P. UNIT
MONTO S/.
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER
ENTIDAD
OBRA ADICIONAL N 08
: "TRABAJOS ADICIONALES POR MAYORES METRADOS Y PARTIDAS NUEVAS DIVERSAS, RELACIONADAS A: SEALES INFORMATIVAS, TRABAJOS COMPLEMENTARIO
ARQUITECTURA, INSTALACIONES ELECTRICAS, SANITARIAS Y ELECTROMECANICAS"
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
03.03.02
03.03.02.01
03.03.03
03.03.03.01
03.03.04
03.03.04.01
BLOQUE
TABLERO
BLOQUE
TABLERO
BLOQUE
TABLERO
F
ELECTRICO BLOQUE F EN AIRE ACONDICIONADO
G
ELECTRICO BLOQUE G EN AIRE ACONDICIONADO
H
ELECTRICO BLOQUE H EN AIRE ACONDICIONADO
13.02.00
ALIMENTADORES
13.02.01
13.02.10.01
13.02.10.01.01
13.02.10.02
13.02.10.02.01
13.02.10.03
13.02.10.03.01
13.02.10.04
13.02.10.04.01
13.02.10.05
13.02.10.05.01
13.02.10.06
13.02.10.06.01
13.02.10.07
13.02.10.07.01
13.02.10.08
PORTAMEDIDORES TRIFASICOS
BLOQUE E
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE F
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE G
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE H
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE T
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE I
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE U
CAJA PORTAMEDIDORES TRIFASICAS
BLOQUE Q
EN BLOQUE E
EN BLOQUE F
EN BLOQUE G
EN BLOQUE H
EN BLOQUE T
EN BLOQUE I
EN BLOQUE U
UNIDAD
METRADO
P. UNIT
MONTO S/.
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER
ENTIDAD
OBRA ADICIONAL N 08
: "TRABAJOS ADICIONALES POR MAYORES METRADOS Y PARTIDAS NUEVAS DIVERSAS, RELACIONADAS A: SEALES INFORMATIVAS, TRABAJOS COMPLEMENTARIO
ARQUITECTURA, INSTALACIONES ELECTRICAS, SANITARIAS Y ELECTROMECANICAS"
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
13.02.10.08.01
13.02.10.09
13.02.10.09.01
13.03.00
ALUMBRADO PUBLICO
13.03.01
12.03.00
12.03.01
12.03.04
05.00.00
TABIQUERIAS
05.01.00
05.02.00
05.03.00
TABIQUERIA SSHH
TABIQUES DOBLE PLACA SUPERBOARD E=6 MM.
TABIQUERIA DE MADERA, E=10CM
06.00.00
06.01.00
06.01.01
06.01.02
06.02.00
06.02.01
06.03.00
06.03.01
06.03.01.01
06.03.01.02
06.03.02
MOVIMIENTO DE TIERRAS
EXCAVACION PARA CIMIENTOS DE ZAPATAS
NIVELACION, CONFORMACION Y COMPACTACIUON DEL FONDO DE ZAPATA
CONCRETO SIMPLE
SOLADO DE CONCRETO F'c=100 kg/cm2 EN ZAPATAS
CONCRETO ARMADO
ZAPATAS
ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS
CONCRETO PARA ZAPATAS f'c=210 kg/cm2
COLUMNETAS
UNIDAD
METRADO
P. UNIT
MONTO S/.
CONSORCIO BINACIONAL
CONTRATO DE EJECUCIN DE OBRA N
: 141-2010-MTC/20 "EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIN PER
ENTIDAD
OBRA ADICIONAL N 08
: "TRABAJOS ADICIONALES POR MAYORES METRADOS Y PARTIDAS NUEVAS DIVERSAS, RELACIONADAS A: SEALES INFORMATIVAS, TRABAJOS COMPLEMENTARIO
ARQUITECTURA, INSTALACIONES ELECTRICAS, SANITARIAS Y ELECTROMECANICAS"
CONTRATISTA
SUPERVISIN
UBICACIN
TEM
DESCRIPCIN DE PARTIDAS
06.03.02.01
06.03.02.02
06.03.02.03
14.00.00
BLOQUES VARIOS
14.03.07
14.03.07.01
14.03.07.02
14.03.07.03
UNIDAD
COSTO DIRECTO
METRADO
P. UNIT
MONTO S/.
S/. 0.00
1.00%
S/. 0.00
10.05%
S/. 0.00
UTILIDAD
9.00%
S/. 0.00
SUB-TOTAL
S/. 0.00
I.G.V
0.00
TOTAL
0.00
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 08
: S/. 404,665.02
(inc. IGV)
97-2011-MTC/02)
PRESUP. ADICIONAL N 08
: S/. 342,936.46
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 08
: S/. 404,665.02
(inc. IGV)
97-2011-MTC/02)
PRESUP. ADICIONAL N 08
: S/. 342,936.46
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 08
: S/. 404,665.02
(inc. IGV)
97-2011-MTC/02)
PRESUP. ADICIONAL N 08
: S/. 342,936.46
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
MONTO S/.
SALDO CONTRACTUAL
%
METRADO
MONTO S/.
CONSORCIO BINACIONAL
- CEBAF - EDIFICACIN PER, PRIMERA ETAPA"
VALOR REFERENCIAL
MONTO CONTRATADO
PRESUP. ADICIONAL N 08
: S/. 404,665.02
(inc. IGV)
97-2011-MTC/02)
PRESUP. ADICIONAL N 08
: S/. 342,936.46
(Sin IGV)
VALORIZACIN N 01
TOTAL ACUMULADO
MONTO S/.
METRADO
SALDO CONTRACTUAL
MONTO S/.
METRADO
MONTO S/.
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
S/. 0.00
#DIV/0!
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE,
GRAMALOTILLO, CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
NOMBRE DE OBRA
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
SUB TOTAL
VALORIZACIN
N 01
VALORIZACIN
N 02
VALORIZACIN
N 03
VALORIZACIN
N 04
TOTAL
ACUMULADO
(S/.)
S/. 247,797.09
S/. 145,963.45
S/. 50,233.53
S/. 38,314.81
S/. 13,285.28
S/. 247,797.09
S/. 68,430.44
S/. 20,214.50
S/. 45,649.08
S/. 2,566.86
S/. 0.00
S/. 68,430.44
S/. 31,301.44
S/. 31,301.44
S/. 0.00
S/. 0.00
S/. 0.00
S/. 31,301.44
S/. 97,895.35
S/. 45,439.06
S/. 49,026.26
S/. 3,430.02
S/. 0.00
S/. 97,895.35
S/. 104,448.18
S/. 0.00
S/. 0.00
S/. 78,488.77
S/. 25,959.41
S/. 104,448.18
S/. 94,722.39
S/. 27,166.82
S/. 64,201.40
S/. 3,354.15
S/. 0.00
S/. 94,722.39
S/. 644,594.89
S/. 270,085.27
S/. 209,110.27
S/. 126,154.61
S/. 39,244.69
S/. 644,594.89
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
NOMBRE DE OBRA
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
TOTAL (S/.)
VAL. N 01- AGOS. 15
VAL. N 02 - SET. 15
VAL. N 03 - OCT. 15
VALORIZACIN ADICIONAL
I.E.I. N567 CASA HOGAR DE MARIA
S/. 145,963.45
S/. 50,233.53
S/. 38,314.81
S/. 13,285.28
S/. 247,797.09
S/. 20,214.50
S/. 45,649.08
S/. 2,566.86
S/. 0.00
S/. 68,430.44
S/. 31,301.44
S/. 0.00
S/. 0.00
S/. 0.00
S/. 31,301.44
S/. 45,439.06
S/. 49,026.26
S/. 3,430.02
S/. 0.00
S/. 97,895.35
S/. 0.00
S/. 0.00
S/. 78,488.77
S/. 25,959.41
S/. 104,448.18
S/. 27,166.82
S/. 64,201.40
S/. 3,354.15
S/. 0.00
S/. 94,722.39
S/. 270,085.27
S/. 209,110.27
S/. 126,154.61
S/. 39,244.69
S/. 644,594.89
S/. 48,615.35
S/. 37,639.85
S/. 22,707.83
S/. 7,064.04
S/. 116,027.08
S/. 4,314.93
S/. 3,188.10
S/. 2,171.66
S/. 877.28
S/. 10,551.97
S/. 2,481.38
S/. 853.97
S/. 766.30
S/. 332.13
S/. 4,433.78
S/. 303.22
S/. 684.74
S/. 41.07
S/. 0.00
S/. 1,029.03
S/. 532.12
S/. 0.00
S/. 0.00
S/. 0.00
S/. 532.12
S/. 590.71
S/. 686.37
S/. 51.45
S/. 0.00
S/. 1,328.53
I.G.V
REAJUSTES
REAJUSTE
I.E.I. N567 CASA HOGAR DE MARIA
S/. 0.00
S/. 0.00
S/. 1,255.82
S/. 545.15
S/. 1,800.97
S/. 407.50
S/. 963.02
S/. 57.02
S/. 0.00
S/. 1,427.54
S/. 4,314.93
S/. 3,188.10
S/. 2,171.66
S/. 877.28
S/. 10,551.97
S/. 776.69
S/. 573.86
S/. 390.90
S/. 157.91
S/. 1,899.36
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
TOTAL AMORTIZACIONES ( A )
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 274,400.20
S/. 212,298.37
S/. 128,326.27
S/. 40,121.97
S/. 655,146.81
S/. 49,392.04
S/. 38,213.71
S/. 23,098.73
S/. 7,221.95
S/. 117,926.43
S/. 323,792.24
S/. 250,512.08
S/. 151,425.00
S/. 47,343.92
S/. 773,073.24
S/. 323,792.24
S/. 250,512.08
S/. 151,425.00
S/. 47,343.92
S/. 773,073.24
TOTAL DE REAJUSTES ( R )
I.G.V
AMORTIZACIONES
: "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRAMALOTILLO,
CONTULIAN, EL ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
NOMBRE DE OBRA
PROCESO
SUPERVISIN
ENTIDAD
MODALIDAD
: SUMA ALZADA
CONTRATISTA
: CONSORCIO ILUCAN
FECHA BASE
: MAYO - 2014
RESUMEN DE LAS VALORIZACIONES DE ADICIONALES DE OBRA CANCELADAS POR LA ENTIDAD (GERENCIA SUB REGIONAL CUTERVO)
VAL. N 01
15
AGO. VAL. N 02
15
SET.
VAL. N 03
OCT. 15
VAL. N 04
NOV. 15
VALORIZACIN ADICIONALES
S/. 270,085.26
S/. 209,110.26
S/. 126,154.60
S/. 39,244.76
S/. 270,085.26
S/. 209,110.26
S/. 126,154.60
S/. 39,244.76
S/. 48,615.35
S/. 37,639.85
S/. 22,707.83
S/. 7,064.06
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
TOTAL DE REAJUSTES ( R )
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
s/. 0.00
TOTAL AMORTIZACIONES ( A )
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
I.G.V
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 270,085.26
S/. 48,615.35
S/. 318,700.61
S/. 209,110.26
S/. 37,639.85
S/. 246,750.11
S/. 126,154.60
S/. 22,707.83
S/. 148,862.43
S/. 39,244.76
S/. 7,064.06
S/. 46,308.82
S/. 318,700.61
S/. 246,750.11
S/. 148,862.43
S/. 46,308.82
REAJUSTES
REAJUSTE
AMORTIZACIONES
TOTAL (S/.)
S/. 644,594.89
S/. 644,594.89
S/. 116,027.09
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
s/. 0.00
S/. 0.00
S/. 0.00
S/. 644,594.89
S/. 116,027.09
S/. 760,621.98
S/. 760,621.98
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
AD 01
01.00.00
01.01
METRADO
01.01.01
424.32
01.01.02
286.61
m3
16.66
und
2.00
01.02
01.02.01
01.03
01.03.01
01.04
CONCRETO SIMPLE
DADO DE PROTECCION DE CONCRETO POBRE
CONCRETO ARMADO
CAJAS DE PASE PARA ALIMENTADORES ELECTRICOS
CABLES ALIMENTADORES
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
01.04.01
214.20
01.04.02
302.40
01.04.03
105.00
01.05
VARIOS
01.05.01
MURETE PARA PORTA MEDIDORES - LADRILLO CABEZA KING-KONG CON MEZCLA 1:5-1.5CM (0.80x0.60x0.25)
m2
12.96
01.05.02
m2
15.60
3,130.14
m3
3.72
02.00.00
02.01
02.01.01
02.02
02.02.01
02.03
RED DE TELEFONIA
TENDIDO DE TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC - SAP DE 2"
CONCRETO SIMPLE
DADO DE PROTECCION DE CONCRETO POBRE
CONCRETO ARMADO
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
02.03.01
02.04
02.04.01
03.00.00
03.01
04.00.00
04.01
METRADO
und
51.00
m2
18.36
und
10.00
VARIOS
ACABADO FROTACHADO MEZCLA 1:4, INTERIOR DE BUZONES
POZO A TIERRA
POZO DE TIERRA
ILUMINACION
INTERIORES
04.01.01
und
33.00
04.01.02
und
11.00
04.01.03
ARTEFACTO TIPO S
und
13.00
04.01.04
und
6.00
04.01.05
und
65.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
04.01.06
04.02
04.02.01
05.00.00
05.01
METRADO
und
4.00
und
1.00
EXTERIORES
ARTEFACTO TIPO B-1
PARTIDAS NUEVAS EN INSTALACIONES ELECTRICAS
BLOQUE E
05.01.01
PICADO DE PARED
9.10
05.01.02
RESANE DE PARED
9.10
05.01.03
34.55
05.01.04
m3
6.22
05.01.05
m3
5.16
05.01.06
4.10
05.01.07
18.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
05.01.08
95.85
05.01.09
6.00
05.01.10
28.30
05.02
BLOQUE F
05.02.01
PICADO DE PARED
31.75
05.02.02
38.80
05.02.03
RESANE DE PARED
m3
31.75
05.02.04
m3
1.00
05.02.05
m3
7.45
05.02.06
189.14
05.02.07
7.50
05.02.08
103.50
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
05.02.09
6.00
05.02.10
31.05
05.03
BLOQUE G
05.03.01
PICADO DE PARED
5.57
05.03.02
19.60
05.03.03
RESANE DE PARED
m3
5.57
05.03.04
m3
7.45
05.03.05
m3
1.40
05.03.06
74.90
05.03.07
43.10
05.03.08
6.00
05.03.09
10.10
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
05.04
METRADO
BLOQUE H
05.04.01
PICADO DE PARED
7.60
05.04.02
33.25
05.04.03
RESANE DE PARED
m3
7.60
05.04.04
m3
5.35
05.04.05
m3
0.23
05.04.06
22.40
05.04.07
57.60
05.04.08
6.00
05.04.09
45.03
06.00.00
06.01
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
06.01.01
06.02
METRADO
und
1.00
BLOQUE F
06.02.01
TABLERO ELECTRICO TD - F1
und
1.00
06.02.02
TABLERO ELECTRICO TD - F2
und
1.00
06.02.03
TABLERO ELECTRICO TD - F3
und
1.00
06.02.04
TABLERO ELECTRICO TD - F4
und
1.00
06.03
BLOQUE G
06.03.01
und
1.00
06.03.02
und
1.00
06.04
BLOQUE H1
06.04.01
TABLERO ELECTRICO TD - H1
und
1.00
06.04.02
TABLERO ELECTRICO TD - H2
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
06.04.03
06.05
TABLERO ELECTRICO TD - H3
METRADO
und
1.00
BLOQUE M
06.05.01
und
1.00
06.05.02
und
1.00
06.05.03
und
1.00
und
1.00
und
1.00
06.06
06.06.01
06.07
06.07.01
06.08
BLOQUE T
TABLERO ELECTRICO TD-1 DEL BLOQUE T
BLOQUE U
TABLERO ELECTRICO TD-1 DEL BLOQUE U
BLOQUE I
06.08.01
und
1.00
06.08.02
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
06.08.03
06.09
06.09.01
06.10
METRADO
und
1.00
und
1.00
BLOQUE Q
TABLERO ELECTRICO TD - 1 EN BLOQUE Q
SUB-TABLEROS DE SERVICIOS GENERALES
06.10.01
und
1.00
06.10.02
und
1.00
06.10.03
und
1.00
06.10.04
und
1.00
06.10.05
und
1.00
AD 02
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
AD 02
METRADO
INTERIORES DE BLOQUES
01
01.01
BLOQUE E
01.01.01
01.01.01.01
22.20
01.01.01.02
22.20
01.01.02
01.01.02.01
22.20
01.01.03
01.01.03.01
und
10.00
01.01.03.02
und
15.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
01.01.04
RESANE EN GENERAL
01.01.04.01
01.02
BLOQUE F
01.02.01
01.02.01.01
METRADO
60.50
5.50
01.02.01.02
5.50
01.02.02
01.02.02.01
5.50
01.02.03
01.02.03.01
und
3.00
01.02.03.02
und
2.00
01.02.04
RESANE EN GENERAL
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
01.02.04.01
01.03
BLOQUE G
01.03.01
01.03.01.01
METRADO
5.50
22.40
01.03.01.02
22.40
01.03.02
01.03.02.01
11.40
01.03.02.02
11.20
01.03.03
01.03.03.01
und
7.00
01.03.03.02
und
4.00
01.03.03.03
und
4.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
01.03.03.04
und
4.00
01.03.03.05
und
4.00
01.03.04
RESANE EN GENERAL
01.03.04.01
23.00
01.04
BLOQUE H
01.04.01
01.04.01.01
CORTE Y PICADOS EN PISOS PARA EXTRACCION DE TUBERIAS Y ACCESORIOS DE PVC DE 4"Y 6"
6.00
01.04.01.02
6.00
01.04.02
01.04.02.01
7.50
01.04.02.02
8.00
01.04.03
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
01.04.03.01
und
4.00
01.04.03.02
und
1.00
01.04.03.03
und
3.00
01.04.03.04
und
3.00
01.04.04
RESANE EN GENERAL
01.04.04.01
14.00
02
02.01
BLOQUE F
02.01.01
02.01.01.01
m2
27.60
02.01.01.02
19.50
02.01.02
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
02.01.02.01
pto
6.00
02.01.02.02
pto
5.00
02.01.02.03
pto
4.00
02.02
BLOQUE G
02.02.01
02.02.01.01
10.00
02.02.01.02
11.70
02.02.02
02.02.02.01
pto
6.00
02.02.02.02
pto
4.00
02.02.02.03
pto
2.00
02.02.03
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
02.02.03.01
und
3.00
02.02.03.02
und
3.00
02.02.04
RESANE EN GENERAL
02.02.04.01
11.70
03
03.01
BLOQUE E
03.01.01
03.01.01.01
45.70
03.01.01.02
7.50
03.01.02
03.01.02.01
pto
15.00
03.01.02.02
pto
9.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
03.01.03
03.01.03.01
SUMIDERO DE 3"
und
1.00
03.01.03.02
REGISTRO 3"
und
3.00
03.01.03.03
REGISTRO 2"
und
8.00
03.02
BLOQUE F
03.02.01
03.02.01.01
pto
10.00
03.02.01.02
pto
5.00
03.02.01.03
pto
2.00
03.02.02
03.02.02.01
REGISTRO 2"
und
2.00
03.02.02.02
REGISTRO 4"
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
03.02.02.03
SUMIDERO DE 3"
03.02.03
VARIOS
03.02.03.01
METRADO
und
4.00
m2
27.60
03.02.03.02
m2
27.60
03.02.03.03
CONTRAPISO DE 40mm
m2
27.60
04
04.01
TANQUE ELEVADO
04.01.01
REBOSE
04.01.01.01
7.00
04.01.01.02
und
5.00
05
05.01
BLOQUE E
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
05.01.01
05.02
BLOQUE G
05.02.01
05.03
BLOQUE H
05.03.01
AD 03
01.00.00
01.01.00
OBRAS PRELIMINARES
METRADO
und
2.00
und
1.00
und
2.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
01.01.01
01.02.00
MOVIMIENTO DE TIERRAS
01.02.01
METRADO
m2
1,431.39
m3
256.05
01.02.02
m2
1,431.39
02.00.00
02.01.00
MOVIMIENTO DE TIERRAS
02.01.01
170.15
02.01.02
170.15
02.01.03
170.15
02.02.00
02.02.01
56.55
02.02.02
77.65
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
02.02.03
02.03.00
02.03.01
METRADO
35.95
und
1.00
02.03.02
und
1.00
02.04.00
BUZON
02.04.01
und
1.00
03.00.00
INSTALACIONES ELECTRICAS
03.01.00
POZO A TIERRA
03.01.01
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
AD 04
METRADO
01.00.00
INSTALACIONES ELECTRICAS
01.01
GARITA DE INGRESO
01.01.01
pto
12.00
01.01.02
und
12.00
01.01.03
und
13.00
01.02
GARITA DE SALIDA
01.02.01
pto
8.00
01.02.02
und
8.00
01.02.03
und
9.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
01.03
METRADO
01.03.01
pto
21.00
01.03.02
und
21.00
01.03.03
und
22.00
01.04
CONTROL DE CAMIONES
01.04.01
pto
16.00
01.04.02
und
16.00
01.04.03
und
17.00
AD 05
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
AD 05
METRADO
EN EL CEBAF - PERU
01.00.00
OBRAS PRELIMINARES
01.01
TRAZO Y REPLANTEO
02.00.00
MOVIMIENTO DE TIERRAS
m2
18.66
02.01
m3
244.72
02.02
NIVELACION,CONFORMACION Y COMPACTACION
m2
39.21
02.03
m2
34.21
02.04
m3
128.21
02.05
m3
305.90
03.00.00
03.01
CAMARA DE BOMBEO
CONCRETO SIMPLE
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
03.01.01
03.02
METRADO
m3
34.21
CONCRETO ARMADO
03.02.01
kg
1,800.78
03.02.02
m2
290.80
03.02.03
m3
49.31
03.03
PUERTAS Y VENTANAS
03.03.01
und
1.00
03.03.02
und
1.00
03.03.03
und
4.00
m2
5.00
04.00.00
04.01
04.01.01
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
04.02
METRADO
CONCRETO ARMADO
04.02.01
kg
903.88
04.02.02
m2
34.96
04.02.03
m3
4.15
04.03
TAPA Y REJILLA
04.03.01
und
1.00
04.03.02
und
1.00
8.45
VARIOS
05.01
05.02
und
2.00
05.03
PISO DE MAMPOSTERIA DE PIEDRA (incl. Extr. y selec. de piedra, asent. con mort. 1:5 y acabado decorativo )
m2
17.60
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
05.04
AD 06
und
2.00
Kg
153.84
01.00.00
BLOQUE E1
01.02
DUCTOS
01.02.01
METRADO
DUCTOS DE VENTILACION
02.00.00
BLOQUE F
02.03
DUCTOS
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
02.03.02
03.00.00
BLOQUE G
03.03
DUCTOS
03.03.02
04.00.00
BLOQUE H1
04.03
DUCTOS
04.03.01
DUCTOS DE VENTILACION
05.00.00
BLOQUE I
05.03
DUCTOS
METRADO
Kg
2,180.30
Kg
1,937.83
Kg
79.44
05.03.01
DUCTOS DE VENTILACION
Kg
9.04
05.03.02
Kg
198.47
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
06.00.00
BLOQUE M
06.03
DUCTOS
METRADO
06.03.01
DUCTOS DE VENTILACION
Kg
97.79
06.03.02
Kg
342.12
Kg
94.38
07.00.00
BLOQUE P
07.02
DUCTOS
07.02.01
DUCTOS DE VENTILACION
08.00.00
BLOQUE Q1
08.02
DUCTOS
08.02.01
DUCTOS DE VENTILACION
Kg
26.11
08.02.02
Kg
214.13
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
AD 07
METRADO
13.00.00
13.03
ALUMBRADO PUBLICO
13.03.03
Und
7.00
13.03.04
Und
4.00
13.03.06
Und
2.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
21.03.00
SEALIZACIN INFORMATIVA
21.03.01
und
27.00
21.03.02
und
4.00
01.00.00
JUNTAS
01.01.00
5,457.82
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
02.00.00
02.01.00
LLENADO
02.01.01
03.02.00
REBOSE
03.02.01
02.03.00
DISTRIBUCION
02.03.01
METRADO
33.00
22.28
26.22
02.03.02
5.80
21.00.00
21.05.00
m2
2,785.59
03.00.00
AIRE ACONDICIONADO
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
03.01.00
CONCRETO ARMADO
03.01.01
03.02.00
SENSORES DE OCUPANCIA
03.02.01
03.03.00
TABLEROS
03.03.01
BLOQUE E
03.03.01.01
03.03.02
BLOQUE F
03.03.02.01
03.03.03
BLOQUE G
03.03.03.01
03.03.04
BLOQUE H
METRADO
und
17.00
pto
55.00
und
1.00
und
1.00
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
03.03.04.01
13.02.00
ALIMENTADORES
13.02.01
PORTAMEDIDORES TRIFASICOS
13.02.10.01
BLOQUE E
13.02.10.01.01
13.02.10.02
BLOQUE F
13.02.10.02.01
13.02.10.03
BLOQUE G
13.02.10.03.01
13.02.10.04
BLOQUE H
13.02.10.04.01
13.02.10.05
BLOQUE T
METRADO
und
1.00
und
1.00
und
4.00
und
1.00
und
4.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
13.02.10.05.01
13.02.10.06
BLOQUE I
13.02.10.06.01
13.02.10.07
BLOQUE U
13.02.10.07.01
13.02.10.08
BLOQUE Q
13.02.10.08.01
13.02.10.09
BLOQUE M
13.02.10.09.01
13.03.00
ALUMBRADO PUBLICO
13.03.01
12.03.00
METRADO
und
1.00
und
3.00
und
1.00
und
1.00
und
3.00
und
1.00
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
12.03.01
und
22.00
12.03.04
und
12.00
05.00.00
TABIQUERIAS
05.01.00
TABIQUERIA SSHH
m2
42.85
05.02.00
m2
131.02
05.03.00
m2
74.85
06.00.00
06.01.00
MOVIMIENTO DE TIERRAS
06.01.01
m3
10.56
06.01.02
m2
10.56
06.02.00
CONCRETO SIMPLE
06.02.01
m2
10.56
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
METRADO
06.03.00
CONCRETO ARMADO
06.03.01
ZAPATAS
06.03.01.01
kg
453.02
06.03.01.02
m3
10.56
06.03.02
COLUMNETAS
06.03.02.01
m2
11.20
06.03.02.02
kg
228.29
06.03.02.03
m3
1.96
14.00.00
BLOQUES VARIOS
14.03.07
14.03.07.01
m3
13.59
14.03.07.02
m2
104.96
CONSORCIO BINACIONAL
CONTROL - VALORIZA
OBRA
: EJECUCIN DEL SALDO DE OBRA DE LA CONSTRUCCIN DEL CENTRO BINACIONAL DE ATENCIN FRONTERIZA - CEBAF - EDIFICACIO
ENTIDAD
: PROVIAS NACIONAL
SUPERVISIN
CONTRATISTA
PLAZO EJECUCIN
MODALIDAD
: PRECIOS UNITARIOS
ITEM
PRESUPUEST
PARTIDA
UND
14.03.07.03
COSTO DIRECTO
GASTOS GENERALES FIJOS
GASTOS GENERALES VARIABLES
UTILIDAD
SUB - TOTAL
IGV
TOTAL
kg
1.00%
9.00%
METRADO
165.31
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
10.38
4,404.44
424.32
4,404.44
0.00
0.00
424.32
4,404.44
13.77
3,946.62
286.61
3,946.62
0.00
0.00
286.61
3,946.62
158.89
2,647.11
16.66
2,647.11
0.00
0.00
16.66
2,647.11
1,865.71
3,731.42
2.00
3,731.42
0.00
0.00
2.00
3,731.42
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
77.88
16,681.90
214.20
16,681.90
0.00
0.00
214.20
16,681.90
118.49
35,831.38
302.40
35,831.38
0.00
0.00
302.40
35,831.38
112.42
11,804.10
105.00
11,804.10
0.00
0.00
105.00
11,804.10
71.31
924.18
12.96
924.18
0.00
0.00
12.96
924.18
34.61
539.92
15.60
539.92
0.00
0.00
15.60
539.92
6.71
21,003.24
3,130.14
21,003.24
0.00
0.00
3,130.14
21,003.24
158.89
591.07
3.72
591.07
0.00
0.00
3.72
591.07
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
119.88
6,113.88
51.00
6,113.88
0.00
0.00
51.00
6,113.88
34.61
635.44
18.36
635.44
0.00
0.00
18.36
635.44
1,095.32
10,953.20
10.00
10,953.20
0.00
0.00
10.00
10,953.20
441.09
14,555.97
0.00
0.00
33.00
14,555.97
33.00
14,555.97
96.00
1,056.00
0.00
0.00
11.00
1,056.00
11.00
1,056.00
193.45
2,514.85
0.00
0.00
13.00
2,514.85
13.00
2,514.85
126.70
760.20
0.00
0.00
6.00
760.20
6.00
760.20
145.00
9,425.00
0.00
0.00
65.00
9,425.00
65.00
9,425.00
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
509.03
2,036.12
0.00
0.00
4.00
2,036.12
4.00
2,036.12
2,146.75
2,146.75
0.00
0.00
1.00
2,146.75
1.00
2,146.75
7.84
71.34
9.10
71.34
0.00
0.00
9.10
71.34
8.84
80.44
9.10
80.44
0.00
0.00
9.10
80.44
10.51
363.12
34.55
363.12
0.00
0.00
34.55
363.12
32.00
199.04
6.22
199.04
0.00
0.00
6.22
199.04
25.76
132.92
5.16
132.92
0.00
0.00
5.16
132.92
3.46
14.19
4.10
14.19
0.00
0.00
4.10
14.19
3.03
54.54
18.00
54.54
0.00
0.00
18.00
54.54
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
3.54
339.31
95.85
339.31
0.00
0.00
95.85
339.31
6.74
40.44
6.00
40.44
0.00
0.00
6.00
40.44
12.62
357.15
28.30
357.15
0.00
0.00
28.30
357.15
7.84
248.92
31.75
248.92
0.00
0.00
31.75
248.92
10.51
407.79
38.80
407.79
0.00
0.00
38.80
407.79
8.84
280.67
31.75
280.67
0.00
0.00
31.75
280.67
25.76
25.76
1.00
25.76
0.00
0.00
1.00
25.76
32.00
238.40
7.45
238.40
0.00
0.00
7.45
238.40
3.46
654.42
189.14
654.42
0.00
0.00
189.14
654.42
3.03
22.73
7.50
22.73
0.00
0.00
7.50
22.73
3.54
366.39
103.50
366.39
0.00
0.00
103.50
366.39
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
6.74
40.44
6.00
40.44
0.00
0.00
6.00
40.44
12.62
391.85
31.05
391.85
0.00
0.00
31.05
391.85
7.84
43.67
5.57
43.67
0.00
0.00
5.57
43.67
10.51
206.00
19.60
206.00
0.00
0.00
19.60
206.00
8.84
49.24
5.57
49.24
0.00
0.00
5.57
49.24
32.00
238.40
7.45
238.40
0.00
0.00
7.45
238.40
25.76
36.06
1.40
36.06
0.00
0.00
1.40
36.06
3.46
259.15
74.90
259.15
0.00
0.00
74.90
259.15
3.54
152.57
43.10
152.57
0.00
0.00
43.10
152.57
6.74
40.44
6.00
40.44
0.00
0.00
6.00
40.44
12.62
127.46
10.10
127.46
0.00
0.00
10.10
127.46
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
7.84
59.58
7.60
59.58
0.00
0.00
7.60
59.58
10.51
349.46
33.25
349.46
0.00
0.00
33.25
349.46
8.84
67.18
7.60
67.18
0.00
0.00
7.60
67.18
32.00
171.20
5.35
171.20
0.00
0.00
5.35
171.20
25.76
5.92
0.23
5.92
0.00
0.00
0.23
5.92
3.46
77.50
22.40
77.50
0.00
0.00
22.40
77.50
3.54
203.90
57.60
203.90
0.00
0.00
57.60
203.90
6.74
40.44
6.00
40.44
0.00
0.00
6.00
40.44
12.62
568.28
45.03
568.28
0.00
0.00
45.03
568.28
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
3,051.87
3,051.87
1.00
3,051.87
0.00
0.00
1.00
3,051.87
1,488.49
1,488.49
1.00
1,488.49
0.00
0.00
1.00
1,488.49
1,215.76
1,215.76
1.00
1,215.76
0.00
0.00
1.00
1,215.76
2,432.19
2,432.19
1.00
2,432.19
0.00
0.00
1.00
2,432.19
1,638.59
1,638.59
1.00
1,638.59
0.00
0.00
1.00
1,638.59
1,787.96
1,787.96
1.00
1,787.96
0.00
0.00
1.00
1,787.96
3,706.11
3,706.11
1.00
3,706.11
0.00
0.00
1.00
3,706.11
1,225.70
1,225.70
1.00
1,225.70
0.00
0.00
1.00
1,225.70
1,225.70
1,225.70
1.00
1,225.70
0.00
0.00
1.00
1,225.70
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
1,916.78
1,916.78
1.00
1,916.78
0.00
0.00
1.00
1,916.78
1,518.71
1,518.71
1.00
1,518.71
0.00
0.00
1.00
1,518.71
1,518.71
1,518.71
1.00
1,518.71
0.00
0.00
1.00
1,518.71
1,627.03
1,627.03
1.00
1,627.03
0.00
0.00
1.00
1,627.03
1,095.00
1,095.00
1.00
1,095.00
0.00
0.00
1.00
1,095.00
1,787.96
1,787.96
1.00
1,787.96
0.00
0.00
1.00
1,787.96
1,095.00
1,095.00
1.00
1,095.00
0.00
0.00
1.00
1,095.00
1,095.00
1,095.00
1.00
1,095.00
0.00
0.00
1.00
1,095.00
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
1,095.00
1,095.00
1.00
1,095.00
0.00
0.00
1.00
1,095.00
1,225.70
1,225.70
1.00
1,225.70
0.00
0.00
1.00
1,225.70
1,235.90
1,235.90
0.00
0.00
1.00
1,235.90
1.00
1,235.90
1,166.07
1,166.07
0.00
0.00
1.00
1,166.07
1.00
1,166.07
932.43
932.43
0.00
0.00
1.00
932.43
1.00
932.43
1,462.89
1,462.89
0.00
0.00
1.00
1,462.89
1.00
1,462.89
1,403.26
1,403.26
0.00
0.00
1.00
1,403.26
1.00
1,403.26
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
10.65
236.43
22.20
236.43
0.00
0.00
22.20
236.43
5.84
129.65
22.20
129.65
0.00
0.00
22.20
129.65
27.94
620.27
22.20
620.27
0.00
0.00
22.20
620.27
14.22
142.20
10.00
142.20
0.00
0.00
10.00
142.20
14.69
220.35
15.00
220.35
0.00
0.00
15.00
220.35
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
11.47
693.94
60.50
693.94
0.00
0.00
60.50
693.94
10.65
58.58
5.50
58.58
0.00
0.00
5.50
58.58
5.84
32.12
5.50
32.12
0.00
0.00
5.50
32.12
27.94
153.67
5.50
153.67
0.00
0.00
5.50
153.67
14.22
42.66
3.00
42.66
0.00
0.00
3.00
42.66
14.69
29.38
2.00
29.38
0.00
0.00
2.00
29.38
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
11.47
63.09
5.50
63.09
0.00
0.00
5.50
63.09
10.65
238.56
22.40
238.56
0.00
0.00
22.40
238.56
5.84
130.82
22.40
130.82
0.00
0.00
22.40
130.82
27.94
318.52
11.40
318.52
0.00
0.00
11.40
318.52
42.94
480.93
11.20
480.93
0.00
0.00
11.20
480.93
14.22
99.54
7.00
99.54
0.00
0.00
7.00
99.54
14.69
58.76
4.00
58.76
0.00
0.00
4.00
58.76
26.63
106.52
4.00
106.52
0.00
0.00
4.00
106.52
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
33.43
133.72
4.00
133.72
0.00
0.00
4.00
133.72
23.72
94.88
4.00
94.88
0.00
0.00
4.00
94.88
11.47
263.81
23.00
263.81
0.00
0.00
23.00
263.81
17.51
105.06
6.00
105.06
0.00
0.00
6.00
105.06
5.84
35.04
6.00
35.04
0.00
0.00
6.00
35.04
27.94
209.55
7.50
209.55
0.00
0.00
7.50
209.55
42.94
343.52
8.00
343.52
0.00
0.00
8.00
343.52
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
14.22
56.88
4.00
56.88
0.00
0.00
4.00
56.88
26.63
26.63
1.00
26.63
0.00
0.00
1.00
26.63
33.43
100.29
3.00
100.29
0.00
0.00
3.00
100.29
23.72
71.16
3.00
71.16
0.00
0.00
3.00
71.16
11.47
160.58
14.00
160.58
0.00
0.00
14.00
160.58
13.03
359.63
27.60
359.63
0.00
0.00
27.60
359.63
10.65
207.68
19.50
207.68
0.00
0.00
19.50
207.68
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
93.05
558.30
6.00
558.30
0.00
0.00
6.00
558.30
103.66
518.30
5.00
518.30
0.00
0.00
5.00
518.30
110.18
440.72
4.00
440.72
0.00
0.00
4.00
440.72
13.56
135.60
10.00
135.60
0.00
0.00
10.00
135.60
10.65
124.61
11.70
124.61
0.00
0.00
11.70
124.61
93.05
558.30
6.00
558.30
0.00
0.00
6.00
558.30
110.18
440.72
4.00
440.72
0.00
0.00
4.00
440.72
103.66
207.32
2.00
207.32
0.00
0.00
2.00
207.32
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
42.50
127.50
3.00
127.50
0.00
0.00
3.00
127.50
42.50
127.50
3.00
127.50
0.00
0.00
3.00
127.50
12.20
142.74
11.70
142.74
0.00
0.00
11.70
142.74
13.56
619.69
45.70
619.69
0.00
0.00
45.70
619.69
10.65
79.88
7.50
79.88
0.00
0.00
7.50
79.88
60.86
912.90
15.00
912.90
0.00
0.00
15.00
912.90
70.44
633.96
9.00
633.96
0.00
0.00
9.00
633.96
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
51.85
51.85
1.00
51.85
0.00
0.00
1.00
51.85
44.70
134.10
3.00
134.10
0.00
0.00
3.00
134.10
40.17
321.36
8.00
321.36
0.00
0.00
8.00
321.36
60.86
608.60
10.00
608.60
0.00
0.00
10.00
608.60
70.44
352.20
5.00
352.20
0.00
0.00
5.00
352.20
62.45
124.90
2.00
124.90
0.00
0.00
2.00
124.90
40.17
80.34
2.00
80.34
0.00
0.00
2.00
80.34
64.78
64.78
1.00
64.78
0.00
0.00
1.00
64.78
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
51.85
METRADO
207.40
N 02
ABRIL '11
PARCIAL
4.00
METRADO
207.40
ACUMULADO
PARCIAL
0.00
METRADO
0.00
TOTAL
4.00
207.40
0.00
29.83
823.31
27.60
823.31
0.00
0.00
27.60
823.31
30.14
831.86
27.60
831.86
0.00
0.00
27.60
831.86
23.34
644.18
27.60
644.18
0.00
0.00
27.60
644.18
89.77
628.39
7.00
628.39
0.00
0.00
7.00
628.39
19.13
95.65
5.00
95.65
0.00
0.00
5.00
95.65
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
214.39
428.78
2.00
428.78
0.00
0.00
2.00
428.78
214.39
214.39
1.00
214.39
0.00
0.00
1.00
214.39
214.39
428.78
2.00
428.78
0.00
0.00
2.00
428.78
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
1.34
1,918.06
1,431.39
1,918.06
0.00
0.00
1,431.39
1,918.06
18.00
4,608.90
256.05
4,608.90
0.00
0.00
256.05
4,608.90
1.95
2,791.21
1,431.39
2,791.21
0.00
0.00
1,431.39
2,791.21
18.57
3,159.69
170.15
3,159.69
0.00
0.00
170.15
3,159.69
1.31
222.90
170.15
222.90
0.00
0.00
170.15
222.90
2.70
459.41
170.15
459.41
0.00
0.00
170.15
459.41
34.70
1,962.29
56.55
1,962.29
0.00
0.00
56.55
1,962.29
72.59
5,636.61
77.65
5,636.61
0.00
0.00
77.65
5,636.61
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
76.18
2,738.67
35.95
2,738.67
0.00
0.00
35.95
2,738.67
1,162.56
1,162.56
1.00
1,162.56
0.00
0.00
1.00
1,162.56
1,219.29
1,219.29
1.00
1,219.29
0.00
0.00
1.00
1,219.29
2,065.62
2,065.62
1.00
2,065.62
0.00
0.00
1.00
2,065.62
1,450.00
1,450.00
1.00
1,450.00
0.00
0.00
1.00
1,450.00
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
176.48
2,117.76
12.00
2,117.76
0.00
0.00
12.00
2,117.76
126.70
1,520.40
12.00
1,520.40
0.00
0.00
12.00
1,520.40
23.94
311.22
13.00
311.22
0.00
0.00
13.00
311.22
176.48
1,411.84
8.00
1,411.84
0.00
0.00
8.00
1,411.84
126.70
1,013.60
8.00
1,013.60
0.00
0.00
8.00
1,013.60
23.94
215.46
9.00
215.46
0.00
0.00
9.00
215.46
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
176.48
3,706.08
21.00
3,706.08
0.00
0.00
21.00
3,706.08
126.70
2,660.70
21.00
2,660.70
0.00
0.00
21.00
2,660.70
23.94
526.68
22.00
526.68
0.00
0.00
22.00
526.68
176.48
2,823.68
16.00
2,823.68
0.00
0.00
16.00
2,823.68
126.70
2,027.20
16.00
2,027.20
0.00
0.00
16.00
2,027.20
23.94
406.98
17.00
406.98
0.00
0.00
17.00
406.98
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
1.34
25.00
18.66
25.00
0.00
0.00
18.66
25.00
35.26
8,628.83
244.72
8,628.83
0.00
0.00
244.72
8,628.83
2.76
108.22
39.21
108.22
0.00
0.00
39.21
108.22
14.97
512.12
34.21
512.12
0.00
0.00
34.21
512.12
25.68
3,292.43
128.21
3,292.43
0.00
0.00
128.21
3,292.43
22.65
6,928.64
305.90
6,928.64
0.00
0.00
305.90
6,928.64
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
36.19
1,238.06
34.21
1,238.06
0.00
0.00
34.21
1,238.06
4.31
7,761.36
1,800.78
7,761.36
0.00
0.00
1,800.78
7,761.36
62.00
18,029.60
290.80
18,029.60
0.00
0.00
290.80
18,029.60
596.60
29,418.35
49.31
29,418.35
0.00
0.00
49.31
29,418.35
1,200.00
1,200.00
1.00
1,200.00
0.00
0.00
1.00
1,200.00
850.00
850.00
1.00
850.00
0.00
0.00
1.00
850.00
480.00
1,920.00
4.00
1,920.00
0.00
0.00
4.00
1,920.00
36.19
180.95
5.00
180.95
0.00
0.00
5.00
180.95
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
4.31
3,895.72
903.88
3,895.72
0.00
0.00
903.88
3,895.72
39.40
1,377.42
34.96
1,377.42
0.00
0.00
34.96
1,377.42
495.82
2,057.65
4.15
2,057.65
0.00
0.00
4.15
2,057.65
650.00
650.00
1.00
650.00
0.00
0.00
1.00
650.00
380.00
380.00
1.00
380.00
0.00
0.00
1.00
380.00
28.27
238.88
8.45
238.88
0.00
0.00
8.45
238.88
238.57
477.14
2.00
477.14
0.00
0.00
2.00
477.14
28.57
502.83
17.60
502.83
0.00
0.00
17.60
502.83
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
109.99
219.98
2.00
219.98
0.00
0.00
2.00
219.98
60.76
9,347.32
153.84
9,347.32
0.00
0.00
153.84
9,347.32
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
67.50
147,170.25
2,180.30
147,170.25
0.00
0.00
2,180.30
147,170.25
67.50
130,803.53
1,937.83
130,803.53
0.00
0.00
1,937.83
130,803.53
60.76
4,826.77
79.44
4,826.77
0.00
0.00
79.44
4,826.77
60.76
549.27
9.04
549.27
0.00
0.00
9.04
549.27
67.50
13,396.73
198.47
13,396.73
0.00
0.00
198.47
13,396.73
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
60.76
5,941.72
97.79
5,941.72
0.00
0.00
97.79
5,941.72
67.50
23,093.10
342.12
23,093.10
0.00
0.00
342.12
23,093.10
60.76
5,734.53
94.38
5,734.53
0.00
0.00
94.38
5,734.53
60.76
1,586.44
26.11
1,586.44
0.00
0.00
26.11
1,586.44
67.50
14,453.78
214.13
14,453.78
0.00
0.00
214.13
14,453.78
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
10,866.49
76,065.43
7.00
76,065.43
0.00
0.00
7.00
76,065.43
11,338.19
45,352.76
4.00
45,352.76
0.00
0.00
4.00
45,352.76
10,331.66
20,663.32
2.00
20,663.32
0.00
0.00
2.00
20,663.32
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
526.89
14,226.03
27.00
14,226.03
0.00
0.00
27.00
14,226.03
2,049.05
8,196.20
4.00
8,196.20
0.00
0.00
4.00
8,196.20
5.68
31,000.42
5,457.82
31,000.42
0.00
0.00
5,457.82
31,000.42
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
934.82
30,849.06
33.00
30,849.06
0.00
0.00
33.00
30,849.06
559.27
12,460.54
22.28
12,460.54
0.00
0.00
22.28
12,460.54
600.81
15,753.24
26.22
15,753.24
0.00
0.00
26.22
15,753.24
254.58
1,476.56
5.80
1,476.56
0.00
0.00
5.80
1,476.56
18.57
51,728.41
2,785.59
51,728.41
0.00
0.00
2,785.59
51,728.41
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
224.51
3,816.67
17.00
3,816.67
0.00
0.00
17.00
3,816.67
485.77
26,717.35
55.00
26,717.35
0.00
0.00
55.00
26,717.35
507.03
507.03
1.00
507.03
0.00
0.00
1.00
507.03
1,358.66
1,358.66
1.00
1,358.66
0.00
0.00
1.00
1,358.66
1,895.44
1,895.44
1.00
1,895.44
0.00
0.00
1.00
1,895.44
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
732.51
732.51
1.00
732.51
0.00
0.00
1.00
732.51
1,459.99
1,459.99
1.00
1,459.99
0.00
0.00
1.00
1,459.99
384.05
1,536.20
4.00
1,536.20
0.00
0.00
4.00
1,536.20
1,395.64
1,395.64
1.00
1,395.64
0.00
0.00
1.00
1,395.64
671.37
2,685.48
4.00
2,685.48
0.00
0.00
4.00
2,685.48
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
277.35
277.35
1.00
277.35
0.00
0.00
1.00
277.35
441.21
1,323.63
3.00
1,323.63
0.00
0.00
3.00
1,323.63
576.41
576.41
1.00
576.41
0.00
0.00
1.00
576.41
276.74
276.74
1.00
276.74
0.00
0.00
1.00
276.74
562.89
1,688.67
3.00
1,688.67
0.00
0.00
3.00
1,688.67
1,619.56
1,619.56
1.00
1,619.56
0.00
0.00
1.00
1,619.56
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
348.27
7,661.94
22.00
7,661.94
0.00
0.00
22.00
7,661.94
26.75
321.00
12.00
321.00
0.00
0.00
12.00
321.00
544.00
23,310.40
42.85
23,310.40
0.00
0.00
42.85
23,310.40
83.98
11,003.06
131.02
11,003.06
0.00
0.00
131.02
11,003.06
154.55
11,568.07
74.85
11,568.07
0.00
0.00
74.85
11,568.07
35.26
372.35
10.56
372.35
0.00
0.00
10.56
372.35
2.37
25.03
10.56
25.03
0.00
0.00
10.56
25.03
15.80
166.85
10.56
166.85
0.00
0.00
10.56
166.85
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
METRADO
N 02
ABRIL '11
PARCIAL
METRADO
ACUMULADO
PARCIAL
METRADO
TOTAL
4.31
1,952.52
453.02
1,952.52
0.00
0.00
453.02
1,952.52
340.00
3,590.40
10.56
3,590.40
0.00
0.00
10.56
3,590.40
51.40
575.68
11.20
575.68
0.00
0.00
11.20
575.68
4.31
983.93
228.29
983.93
0.00
0.00
228.29
983.93
390.00
764.40
1.96
764.40
0.00
0.00
1.96
764.40
390.00
5,300.10
13.59
5,300.10
0.00
0.00
13.59
5,300.10
36.16
3,795.35
104.96
3,795.35
0.00
0.00
104.96
3,795.35
CONSORCIO BINACIONAL
INICIO REAL
TRMINO PROGRAMADO
TRMINO REAL
RESUPUESTO OFERTADO
N 01
MARZO '11
P.U.
TOTAL
S/.
S/.
4.31
METRADO
712.49
1,137,646.54
Err:509
Err:509
Err:509
------------------
N 02
ABRIL '11
PARCIAL
165.31
METRADO
712.49
1,098,951.10
Err:509
Err:509
Err:509
--------------------
Err:509
Err:509
------------------
PARCIAL
0.00
METRADO
0.00
38,695.44
Err:509
Err:509
Err:509
--------------------
Err:509
Err:509
--------------------
Err:509
ACUMULADO
165.31
712.49
1,137,646.54
-------------------Err:509
Err:509
-------------------Err:509
TOTAL
Err:509
--------------------
Err:509
Err:509
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
METRADO
TOTAL
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
100.00%
0.00
0.00
0.00%
CONSORCIO BINACIONAL
SALDO (DEDUCTIVO)
%
100.00%
METRADO
TOTAL
0.00
0.00
0.00
Err:509
Err:509
-------------------Err:509
-------------------Err:509
0.00%
PROCESO
ENTIDAD
CONTRATISTA
: CONSORCIO ILUCAN
I.
ADELANTO DIRECTO
- MONTO PAGADO POR ENTIDAD (GSC)
- MONTO AMORTIZADO POR CONTRATISTA
SALDO A CARGO DEL CONTRATISTA
II.
III.
IV.
V.
INTERESES
- MONTO PAGADO POR ENTIDAD (GSRC)
SERVICIOS DE EDUCACION INICIAL ESCOLARIZADA, EN LAS LOCALIDADES DE CEDROPAMPA, MIRAFLORES, VALLE GRANDE, GRA
ARENAL, LA JAYUA Y CASA HOGAR DE MARA, PROVINCIA DE CUTERVO, REGION CAJAMARCA"
SUPERVISIN
MODALIDAD
: SUMA ALZADA
FECHA BASE
: MAYO - 2014
R ENTIDAD (GSC)
ACIONES (12)
R ENTIDAD (GSC)
ACIONES (04)
MONTO
SIN I.G.V
S/. 2,103,905.72
S/. 2,103,905.72
S/. 0.00
S/. 3,330,877.10
S/. 3,523,939.19
S/. 193,062.09
S/. 644,594.89
S/. 655,146.81
S/. 10,551.92
S/. 137,642.73
S/. 137,642.73
S/. 0.00
S/. 0.00
GO DE VALORIZACIONES
NTRATISTA
S/. 184.22
S/. 184.22
S/. 203,798.23
NTURA CARRILLO
NTRATO DE OBRA
TOTAL
S/. 378,703.03
S/. 378,703.03
S/. 2,482,608.75
S/. 2,482,608.75
S/. 0.00
S/. 0.00
S/. 599,557.88
S/. 634,309.05
S/. 3,930,434.98
S/. 4,158,248.24
S/. 34,751.17
S/. 227,813.26
S/. 116,027.09
S/. 117,926.43
S/. 760,621.98
S/. 773,073.24
S/. 1,899.34
S/. 12,451.26
S/. 24,775.69
S/. 24,775.69
S/. 162,418.42
S/. 162,418.42
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 217.38
S/. 33.16
S/. 217.38
S/. 36,683.67
S/. 240,481.90