Instructor Inputs
The instructions for the faculty regarding the project are:
The project should be allocated to the students individually by the end of the first
cycle of the course.
Students can start the project only after the third experiment session is over.
Ask the students to read the project case study before the first session of the project,
so that they can clarify any doubts.
While allocating the project to the students, explain its scope by referring to the
topics, Project Activities and Project Timelines.
Ask the students to refer to the topic, Project Standards and Guidelines, before
starting the project documentation.
Evaluate the students according to the guidelines given in the Project Evaluation
Guidelines topic.
NIIT
Project 1.3
Existing System
The existing IT system of the office at Stockholm has Windows Server and its associated
network infrastructure. The company has central file servers, application servers, and print
servers that can be accessed only by the authorized users to support the organizational
requirements. The company has implemented AD for centrally managing the network
users, services, and resources. It has implemented appropriate enterprise policies in place
to adequately secure confidential information of the organization. These policies also
ensure that uniform settings can be applied to the users and computers across the domain,
as per the organizational requirements.
The Windows network of the company is configured as the zipent.com domain. The
company provides crucial network services and applications to its employees and
1.4 Project
NIIT
Envisioned System
The management of Zipent Inc. has asked Graeme to plan and design a sophisticated,
high-performance and reliable network infrastructure for the newly opened branch offices.
It is required that the network infrastructure comprising of resources, such as printers and
application servers be deployed at the new branch offices after careful planning. The
management wants that the clients of the branch offices are well connected to the head
office allowing sharing of important documents easily by effectively utilizing the Wide
Area Network (WAN) bandwidth. In addition, the management wants a functionality to
remotely administer and manage the servers located at the branch offices from the head
office. Also, the management wants to ensure that the computers and users of the branch
offices comply with the enterprise policies of the organization. Further, the management
wants to ensure that crucial data at the branch offices is regularly backed up to recover
from any disasters that may happen in future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Graeme has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
Project 1.5
5.
6.
7.
8.
9.
10.
11.
12.
13.
1.6 Project
NIIT
Existing System
The existing IT system of the office at Cape Town utilizes Windows Server and its
associated network infrastructure. The company has central file servers, application
servers, and print servers that can be accessed only by the authorized users to support the
organizational requirements. The company has implemented AD for centrally managing
the network users, services, and resources. The company has implemented appropriate
policies in place that ensure the security of the confidential information. In addition, these
policies are utilized to configure the users and computers, as per the organizational
requirements.
NIIT
Project 1.7
The Windows network of the company is configured as the orgoph.com domain. The
company provides crucial network services and applications to its employees and
global customers through this domain.
Envisioned System
The management of MediClean has asked Jacks to plan and design a sophisticated,
high-performance and reliable network infrastructure for the newly opened branch offices.
The management wants that deployment of the network infrastructure at the new branch
offices, comprising resources, such as printers, application servers is carefully planned.
The management wants that the clients of the branch offices are well connected to the
head office so that they can share important documents easily, whenever required and
effectively utilize the WAN bandwidth. In addition, the management wants a provision to
remotely administer and manage the servers at the branch offices from the head office.
Also, the management wants to ensure that the computers and users of the branch offices
comply with the enterprise policies of the organization. Further, the management wants to
ensure that the crucial data at the branch offices is regularly backed up to recover from
any disasters that may happen in the future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Jacks has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
NIIT
5.
6.
7.
8.
9.
10.
11.
12.
13.
NIIT
Project 1.9
Existing System
The company has implemented AD for centrally managing the network users, services,
and resources. The company has central file servers, application servers, and print servers
that can be accessed only by the authorized users to support the organizational
requirements. The company has appropriate policies in place to ensure the security of the
confidential information, and to control user access and computers as per the
organizational requirements.
The Windows network of the company is configured as the klc.com domain. The
company provides network services to its customers and employees through this domain.
1.10 Project
NIIT
Envisioned System
The management of KL Consultants has asked Vincent to plan and design a sophisticated,
high-performance, and reliable network infrastructure for the newly opened branch
offices. The management wants that the network infrastructure to be deployed at the new
branch offices is carefully planned. This should be done to ensure that a high-performance
network can be achieved as per the requirements of the organization.
The management wants that the network infrastructure comprising resources, such as
printers, application servers to be deployed at the new branch offices is carefully planned.
The management wants that the clients of the branch offices are well connected to the
head office so that they can share important documents easily, whenever required and
effectively utilize the WAN bandwidth. In addition, the management wants a provision to
remotely administer and manage the servers at the branch offices from the head office.
Also, the management wants to ensure that the computers and users of the branch offices
comply with the enterprise policies of the organization. Further, the management wants to
ensure that crucial data at the branch offices is regularly backed up to recover from any
disasters that may happen in future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Vincent has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
Project 1.11
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
1.12 Project
NIIT
Existing System
The existing IT system of N-tech has Windows Server and its associated network
infrastructure. The company has central file and application servers that can be accessed
only by authorized users. The company has implemented AD DS for managing the
database of users, computers, and network devices.
The Windows network of company is configured as gtt.com domain. The company
provides network services to its employees through the gtt.com domain. The company has
proper security and system health policies in place that allow only the validated clients to
NIIT
Project 1.13
gain complete access to the network resources. The roaming clients and executives of the
company are allowed to gain access to the network through a secured Virtual Private
Network (VPN) connection.
The company also provides online services to its clients. This means that it has to handle
the sensitive information of clients, such as credit card numbers. The company has strict
security rules for safeguarding such sensitive information. The central servers are made
compliant with the security policy of company by implementing third party solutions,
such as anti-spyware solutions.
Envisioned System
The management of N-tech has asked Vincent to plan and design a sophisticated,
high-performance and reliable network infrastructure for the newly opened branch offices.
The management wants that the network infrastructure to be deployed at the new branch
offices is carefully planned. This should be done to ensure that a high-performance
network can be achieved, as per the requirements of the organization. The management
wants that the network infrastructure comprising resources, such as printers, application
servers to be deployed at the new branch offices is carefully planned. The management
wants that the clients of the branch offices are well connected to the head office so that
they can share important documents easily, whenever required and effectively utilize the
WAN bandwidth. In addition, the management wants a provision that can be utilized to
remotely administer and manage the servers at the branch offices from the head office.
Also, the management wants to ensure that the computers and users of the branch offices
comply with the enterprise policies of the organization. Further, the management wants to
ensure that crucial data at the branch offices is regularly backed up to recover from any
disasters that may happen in future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Vincent has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
NIIT
NIIT
Project 1.15
Existing System
The existing IT system of the office at Singapore has Windows Server and its associated
network infrastructure. The company has central file servers, application servers, and print
servers that can be accessed only by the authorized users to support the organizational
requirements. The company has implemented AD for centrally managing the network
users, services, and resources. The company has appropriate policies in place to ensure the
security of the confidential information, and to control user access and computers, as per
the organizational requirements.
The Windows network of the company is configured as the metech.com domain. The
company provides crucial network services and applications to its employees and
world-wide customers through this domain.
1.16 Project
NIIT
Envisioned System
The management of MedTech has asked Shawn to plan and design a sophisticated,
high-performance, and reliable network infrastructure for the newly opened branch
offices. The management wants that the network infrastructure comprising resources, such
as printers, application servers to be deployed at the new branch offices is carefully
planned. The management wants that the clients of the branch offices are well connected
to the head office so that they can share important documents easily, whenever required
and effectively utilize the WAN bandwidth. In addition, the management wants a
provision to remotely administer and manage the servers at the branch offices from the
head office. Also, the management wants to ensure that the computers and users of the
branch offices comply with the enterprise policies of the organization. Further, the
management wants to ensure that the crucial data at the branch offices is regularly backed
up to recover from any disasters that may happen in future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Shawn has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
Project 1.17
8.
9.
10.
11.
12.
13.
1.18 Project
NIIT
Project Execution
Phases in Project Execution
The project will be carried out in the following phases:
Analysis: Refers to an in-depth study of the existing requirements of the case study.
The solutions selected are correct according to the requirements of the case
study.
Timeliness - 10 marks
NIIT
Project 1.19
Project Activities
The students will get 12 hours to complete the project. The activities to be performed
during this period are:
1. Analyze the given case study to identify the requirements.
2. Develop strategies to meet the identified requirements. In addition, mention the
rationale for suggesting a specific strategy.
3. Implement the strategy to achieve the desired result.
4. Document the project by using the formats given in the later section.
5. Submit the documentation to the faculty.
6. Present the project to the faculty.
The duration of the project is 12 hours. This duration can be divided phase-wise, as shown
in the following table.
Activity
Duration
Analysis
2 hrs
8 hrs
Documentation
2 hrs
The Project Duration
The detailed timelines for the tasks are mentioned in the following topic, Project
Timelines. The faculty will assign marks to the student based on the evaluation criteria
specified in the topic, Project Evaluation Guidelines.
1.20 Project
NIIT
Project Timelines
During the project analysis and project documentation, students need to work
individually. The following table provides a suggested break-up of activities that the
students should perform to ensure timely completion of the project.
Session #
Task to be Performed
Time
2 hrs
4 hrs
4 hrs
2 hrs
NIIT
Project 1.21
Existing System
The existing IT system of the base office in Dubai has a Windows Server network
infrastructure. The company has central file and application servers that can be accessed
only by the authorized users. The company has implemented AD DS for managing the
database of users, computers, and network devices.
The Windows network of company is configured as sprint.com domain. The company
provides network services to its employees through this domain. The company has proper
security and system health policies in place. These policies allow only those clients whose
health is validated according to the health policies of the organization to access the
network resources. The network of the company is divided into logical networks by using
security protocols.
1.22 Project
NIIT
Envisioned System
The management of Sync Print has asked Simons to plan and design a sophisticated,
high-performance and reliable network infrastructure for the newly opened branch offices.
The management wants that the network infrastructure comprising of resources, such as
printers, application servers to be deployed at the new branch offices is carefully planned.
In addition, the management wants that the clients of the branch offices are well
connected to the head office so that they can share important documents easily, whenever
required and effectively utilize the WAN bandwidth. The management wants a provision
to remotely administer and manage the servers at the branch offices from the head office.
Also, the management wants to ensure that the computers and users of the branch offices
comply with the enterprise policies of the organization. Further, the management wants to
ensure that crucial data at the branch offices is regularly backed up to recover from any
disasters that may happen in future.
To be able to plan and design a sophisticated network infrastructure for the new branch
offices and meet all the organizational goals, Simons has decided to:
Plan for the deployment of servers at the newly opened branch offices.
Plan for the remote administration of the server and client computers located at the
newly opened branch offices from the head office.
Plan for the unique addressing of the server and client computers at the newly opened
branch offices.
Plan for the sharing of data in an optimized manner and ensure the security of local
and shared data.
Project 1.23
8.
9.
10.
11.
12.
13.
Virtual Machine
Zipent, Inc.
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
MediClean, Inc.
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
KL Consultants, Inc.
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
1.24 Project
NIIT
Virtual Machine
N-tech, Inc.
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
MedTech, Inc.
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
Image-DC1
Image-SRV1
Image-SRV2
Image-CL1
Image-CL2
In addition, the students need to use the following virtual machine naming conventions:
Use the Image-SRV1 virtual machine as the Windows Server 2008 R2 member
server.
NIIT
Project 1.25
1.26 Project
NIIT
: B010101
Start Date
: June 1, 2012
End Date
: Alex Norton
: Michael John
Date of Submission
NIIT
Project 1.27
CERTIFICATE
This is to certify that this report titled Sync Print, Inc. embodies the original work done
by Alex Smart in partial fulfillment of the course requirements at NIIT.
Coordinator:
Alex Norton
1.28 Project
NIIT
ACKNOWLEDGEMENT
We have benefited enormously from the feedback and suggestions given to us
by Mr. Alex Norton and other faculty members.
NIIT
Project 1.29
SYSTEM ANALYSIS
System Summary: Sync Print, Inc. has Windows Server 2008 R2 and AD DS for
supporting the network infrastructure and managing database of network resources,
such as users and computers. The company has set up new branch offices due to
organization growth. In order to set up an efficient, secure, and high-performance
network infrastructure for the branch offices to better serve the clientele, the planning
and implementation of the Windows Server environment has been performed.
1.30 Project
NIIT
NIIT
Project 1.31
LOGICAL DIAGRAM
1.32 Project
NIIT
PROJECT DETAILS
Session
No.
Activity
Date
1.
1/07/12
2.
5/07/12
3.
10/07/12
4.
28/07/12
5.
29/07/12
NIIT
Faculty Signature
Project 1.33
1.34 Project
NIIT