12.00 Lakh
(Code No. 175) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist." Rs. 12.00 Lakhs, vid
the District Collector, East Godavari, with R.C. No. 133/ A3 / 2015, Dt.
that a model Anganwadi Center Building was sanctioned at Kesavadasupalem Village - 1 with
number 175 under NABARD RIDF XX for an amount of Rs. 12.00 Lakhs.
Department was identified as executing agency for construction. Hence, the estimate is prepared
provisions.
Provisions :-
1 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils
soils and ordinary soils with Augoring and boring
2 Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
10m including all operational, incidental, labour charges
3 Filling with Sand in trenches, sides of foundations & basement from approved quarry consol
layer by watering and ramming
4 Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coars
foundation levelling courses and below flooring beds
6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded FOUNDATIONS, PLI
centering with up to 3.66, as per APSS. No. 402.
7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded
SLABS, centering with Stell up to 3.66, as per APSS. No. 402.
COLUMUNS, LI
8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded for for Sunshades
402.
9 Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar reinforcem
complete including wastage
10 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cemen
class bricks (Non-Modular or Traditional size) 23x11x7 cm for basement
11 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) using
23x11x7 cm Basement & Super Structure as per (APSS No.501 & 504)
12 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks h
strength of 2.5 N/sq.mm.
13 Supplying, fitting and placing Mild Steel 6mm (Fe 250/tmt IS 1786-1985) bar reinforcem
complete wastage
14 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1
compound per bag of cement
15 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top
4mm thick for finished item of work (APSS 901,903 & 904) for Celling plastering F1.
16 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat
thick for work (APSS 901,903 & 904) for Uneven faces F1.
17 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM
for work (APSS 901,903 & 904) for Even faces F1.
18 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement
mm thick over CC bed
19 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC be
toilets
20 Dadoing with ISO Glazed coloured wall tiles of any size and of 5 to 7 mm thick set over 12
(1:5) Prop.based coat
22 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved
over base coat of cement primer
23 Painting to New wood work with two coats of ready mixed synthetic enamel paint first qua
give an even shade
24 Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (ba
513 of 'D" quality
25 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door fram
extruded PVC section (Nandi or equivalent)
26 Supply and Fixing of Door with Double leaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood
size 75mm x 100mm with Flush Door Shutter
27 Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood
size 75mm x 100mm with Flush Door Shutter
28 NCL or equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDIN
PROVISION)
29 Water supply & Sanitary items
L.S. Provisions
1 Provision for VAT @ 5% on Rs
2 Provision for Price escalation - LS 3 Provision for Seigniorage Charge (Statement enclosed)
4 Providing Electicity arrangements including VAT
5 Provision for NAC @ 0.1%
6 Provision for Insurance @ 0.385%
7 Provision for Paper publication, Unforeseen items and Rounding of
The rates for the estimate are worked out based on 2015-16 Common SSR for building it
will be carried out as per the APSS and other circulars issued by the higher authorities from time to t
Superintending Engi
(R&B) Circle : Ka
C. Piles for building foundations in loamy, clayey soils like Black cotton
d boring
ndations and depositing on bank for all lifts and with an initial lead of
labour charges
nal mix using 20 mm size graded for for Sunshades as per APSS. No.
415/ tmt grade as per IS 1786-1985) bar reinforcement VRCC works
nel walls in Super structure with CM ( 1:8) using 2nd class bricks
e as per (APSS No.501 & 504)
mm thick in CM (1:6) using second class bricks having a crushing
CC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3),
S 901,903 & 904) for Celling plastering F1.
k, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm
Uneven faces F1.
base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
faces F1.
tiles of any size and of 5 to 7 mm thick set over 12mm thick in C.M.
oats of ready mixed synthetic enamel paint first quality all shades to
tilators with sections made of pre - painted steel (base steel as per IS
oilets Door of size 075 x 2.00M providing door frame made of hollow
nt)
eaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood Frame of sections
utter
af shutter, Door Size 1.00x2.13 mtrs with Sal Wood Frame of sections
utter
WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDINGS WITH GRILL
ed out based on 2015-16 Common SSR for building items and the work
rculars issued by the higher authorities from time to time.
GENERAL ABSTRACT
Sl. No.
Description
PART "A"
Construction of Stilt floor
PART "B"
Provision for VAT @ 5% on Rs
L.S
L.S
Total (1 to 3)
Rs 11,27,495
Deputy Executive E
(R&B) Sub-divis
Superintending En
(R&B) Circle :
GENERAL ABSTRACT
Description
Amount
11,03,091
,24,404
11,27,495
Rs 11,27,495
,56,000
,,500
,1,127
8,768
,1,000
,4,341
769
12,00,000
Name of Work:-
ESTIMA
DETAILED CUM ABSTRACT ESTIMATE (GROUND FLOOR)
Measurements
Quantity
Sl.
Description
No
No
L
B
D
3
1
2
4
5
6.00
7
1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations
in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS
2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire
charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and
for finished item of work for piles of following diameters.
300mm dia
For C1 Main Columns
For toilet columns
9
4
x
x
2
1
---
---
4.00
3.00
72.00
12.00
84.00
RM
Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as
per IS 2911 - 1980 as per approved designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for
all depths and for finished item of work for piles of following diameters.
750mm dia
For C1 Main Columns
--
--
18.00
18.00
Nos.
Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work but exincluding
seigniorage charges and dewatering charges in Ordinary Soil-Manual Means-Upto 3M depth
etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M
C1 pile
building
caps
for
main
1.200
1.200
0.50
6.48
For toilets
0.800
0.800
0.35
0.90
/4*0.3*0.3*0.5
-0.64
0.26
7.00
cum
Filling with Sand in trenches, sides of foundations & basement from approved quarry
consolidating deposited layer by watering and ramming, including all operational, incidental,
labour charges, complete including cost and conveyance of sand / gravel, but excluding
Seigniorage charges, etc; for finished item of work. (APSS No 309 & 310). for:-Sand filling
9
4
x
x
1
1
1.20
0.80
1.20
0.80
0.10
0.10
1.30
0.26
Sl.
No
Description
No
Wash area
In basement
Kitchen
Store
Antinatal Room
Verandha
Wash area
Toilets
L
4
1.05
1
1
1
1
1
1
1
x
x
x
x
x
x
x
1
1
1
1
1
1
2
2.52
1.67
4.31
4.04
4.31
2.64
1.82
Measurements
B
5
1.05
2.13
2.13
2.74
6.52
1.30
1.10
1.22
Quantity
D
6.00
0.15
0.90
0.90
0.90
0.90
0.90
0.90
0.90
7
0.17
4.83
3.20
10.62
23.71
5.04
2.61
4.00
0.26
56.00
cum
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5)
hard Granite metal upto Plinth level from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to site and sales & other taxes
on all materials and including all charges for mixing, laying concrete in foundations ramming
in 15 cm layers finishing top surface to the required level curing, but excluding seigniorage
charge etc., complete for finished item of work. (APSS No. 402) for:-Machine Mix-PCC (1:5:10)
NOMINAL MIX
C1 pile caps
For toilets
deduct for pile bores
wash area
Add for variations
9
4
9
1
x
x
x
x
1
1
2
1
---
1.000
2.000
0.100
0.800
0.800
0.100
/4*0.30*0.30*0.10
1.05
1.05
0.15
-------
1.80
0.26
-0.10
0.17
0.17
2.30
cum
For Piles :
For piles
for toilets
For bulbs
Add for variations
9
4
9
x
x
x
2
1
2
9
4
x
x
1
1
/4*0.30
0.300
3.50
/4*0.30
0.300
3.50
4*/3*0.375*0.375*0.375
0.80
0.80
1.80
0.80
0.50
0.35
4.53
1.01
3.97
0.09
9.60
cum
6.48
0.90
Sl.
No
1
Description
2
Add for variations
No
3
L
4
Measurements
B
5
Quantity
D
6.00
7
0.12
7.50
cum
Sl.
No
1
8
Description
No
2
For Plinth beams :For Plinth beams along the
building
For Plinth beams across the
building
L
4
Measurements
B
5
Quantity
D
6.00
8.92
0.23
0.30
1.85
6.52
0.23
0.30
1.35
1
1
1
1
1
x
x
x
x
x
2
1
9
1
1
4.19
2.13
0.23
8.76
1.38
0.23
0.23
0.30
0.23
0.23
0.30
0.30
0.30
0.23
0.23
0.58
0.15
-0.19
0.46
0.07
0.33
4.60
cum
0.23
0.30
3.00
1.86
0.23
0.23
3.00
0.63
0.31
2.80
cum
8.92
0.23
0.30
1.85
6.52
0.23
0.30
1.35
1
1
1
x
x
x
9
2
2
0.23
3.00
1.20
0.30
0.23
0.23
0.30
0.23
0.23
-0.19
0.32
0.13
0.14
3.60
cum
1
1
1
10.12
4.65
4.20
8.17
0.60
3.04
-------
82.68
2.79
12.77
0.16
98.40
sqm
12 For Lintels :
Over Windows W
Over Windows W1
Over Doors D
Over Doors D1
Toilet Doors
Add for variations
1
1
1
1
1
1.80
1.35
1.65
1.50
1.35
0.23
0.23
0.23
0.23
0.23
0.15
0.15
0.15
0.15
0.15
5
3
2
3
2
x
x
x
x
x
0.31
0.14
0.11
0.16
0.09
0.19
1.00
cum
Sl.
No
1
Measurements
Quantity
L
B
D
3
2
4
5
6.00
7
Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed
Hard Granite metal (coarse aggregate) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
for Sun Shade 62.50 mm thick, for Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per
APSS. No. 402. for Sunshades Ground floor.
Description
No
13 a) Ground Floor for 62.50mm average thick 0.75M wide Sun shades
For windows W
4 x
1
1.800
0.750
--For windows W1
3 x
1
1.350
0.750
--Add excess and rounding of ---- LS -----
5.40
3.04
0.56
9.00
Sqm
14 Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done compulsorily including cost and conveyance of
bars from approved sources to site of work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying etc., and sales
& other taxes, on cost of all materials complete for finished item of work for:-HYSD with lap
splicing Lift Manual
720.30
750.00
280.00
460.00
432.00
984.00
100.00
291.67
4017.97
Kgs
Say
4.02
MT
15 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N
including cost, seigniorage and conveyance of all materials and water from approved source to w
and all operational, incidental labour charges such as scafolding, mixing moratar, constructing ma
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) for baseme
Walls
9.60
7.50
2.80
4.60
3.60
12.3
1.00
1
1
1
x
x
x
3
3
1
75.00
100.00
100.00
100.00
120.00
80.00
100.00
8.460
6.970
4.300
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
0.230
0.230
0.230
/
/
/
/
/
/
/
Cum
Cum
Cum
Cum
Cum
Cum
Cum
0.45
0.45
0.45
2.63
2.16
0.45
Sl.
No
1
Description
No
3
1 x
3
1 x
2
Add excess for and rounding of ---- LS ----2
Toilet room walls
Measurements
L
B
4
5
2.270
0.230
3.000
0.230
Quantity
D
6.00
0.45
0.45
7
0.70
0.62
2.42
0.03
9.01
Cum
Brick Masonary 225 mm thick for pannel walls in Super structure with CM (1:8) prop (Cement:Sand
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N
including cost, seigniorage and conveyance of all materials and water from approved source to w
and all operational, incidental labour charges such as scafolding, mixing moratar, constructing ma
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) fo
Structure upto 3.66 M Lift Manual
16 Ground floor for Super Structure
Walls
1 x
1
Deduct Columns -1 x
1
1 x
1
Deduct Columns -1 x
1
1 x
1
Deduct Columns -1 x
1
1 x
1
1 x
1
Deduct Columns -1 x
1
Deduct windows W1
-3 x
1
Deduct Windows W
-5 x
1
Deduct doors D1
-1 x
1
Deduct doors D
-2 x
1
Toilet room walls
2 x
1
2 x
1
deduct doorsD3
2 x
1
Add excess for and rounding of ---- LS -----
8.460
0.230
5.220
0.230
4.310
0.230
3.970
6.450
0.230
0.750
1.200
0.900
0.230
2.270
2.560
0.750
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.20
1.20
2.10
3.00
3.00
3.00
2.10
5.84
-0.16
3.60
-0.16
2.97
-0.16
2.74
4.45
-0.16
-0.62
-1.66
-0.43
-0.32
3.13
3.53
0.72
0.19
23.50
Cum
17 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a c
strength of 2.5 N/sqmm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free end
reinforcement pegged into mortar joints of main brick walls were applicable including co
conveyance of all materials and water from approved sources to work site, and including all oper
incidental, labour charges such as scafolding mixing mortor constructing masonary lift charges,
etc. complete but excluding the cost of steel and its fabrication charges for finished item of work
SS 509 & 501 upto 3.66 M Lift Manual
Ground floor Super structure
Walls
1 x
1 x
1 x
deduct Doors D1 -2 x
deduct Opening -1 x
Toilets
1 x
1
1
1
1
1
1
2.13
4.31
5.30
0.900
0.900
1.82
-------------
3.00
3.00
3.00
2.10
2.10
3.00
6.39
12.92
15.90
-3.78
-1.89
5.46
Sl.
No
1
Description
No
L
4
3
2
Add excess and rounding of ---- LS -----
Measurements
B
5
Quantity
D
6.00
7
0.20
35.20
Sqm
18 Supplying, fitting and placing Mild Steel 6mm (Fe 250/tmt IS 1786-1985) bar reinforcement
VRCC works complete wastage as per drawings and technical specifications Clause 1000 and
1202 MORD & 1100,1600 MORT & H for Bars 6 mm dia including over laps and wastage,
where weldeding require to be done campulsorily
from
approved
sourses
to
site
of
work,
binding
wire,
cover
blocks
and
all
3.520
cum
x 14 kgs/cum
0.050
0.050
MT
19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
proof compound per bag of cement laid over roof when it is green including cost of all m
seigniorage charges, including conveyance charges of materials and including all operational, in
and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, roun
junctions of wall and slab etc,, complete for finished item of work for first floor upto 3.66 M Lift Man
10.12
4.65
8.17
0.60
-----
82.68
2.79
0.03
85.50
Sqm
20 Ceiling Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat
thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like c
sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials,
operational, incidental charges on materials and including cost of all labour charges for mixing
finishing, scafolding, lift charges, curing as directed by Engineer - in - charge etc., complete for
& Even faces and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Plasterin
CM (1:3) & (1:5): 12 mm Scafolding upto 3.66 M Lift Manual
x
x
x
x
x
x
x
x
1
1
1
1
1
1
1
1
2.52
1.67
4.31
4.04
4.31
8.17
10.12
4.77
2.13
2.13
2.74
6.52
1.53
0.60
0.60
0.60
..
..
..
..
..
..
..
..
5.37
3.56
11.80
26.34
6.59
9.80
12.14
2.86
Sl.
No
1
Description
No
3
2
Toilets
2 x
1
Add excess corners and rounding of ---- LS -----
L
4
1.82
Measurements
B
5
1.22
Quantity
D
6.00
..
7
4.44
2.60
85.50
Sqm
21 Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4m
in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cemen
water etc., to site, and sales & other taxes on all materials and including all operational, in
charges on materials and including cost of all labour charges for mixing mortar, finishing, scafold
charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for E
& Uneven Surfaces of Brick Wall for finished item of work. (SS 901,903 & 904) for:-Plastering 2/
(1:4) & (1:6): 20 mm Scafolding upto 3.66 Lift Manual
8.920
---
3.35
59.76
6.970
---
3.35
46.70
5.400
---
3.35
18.09
4.310
---
3.05
13.15
x
1
x
1
x
1
x
1
x
1
x
1
x
1
x
1
of ---- LS -----
2.130
0.750
1.200
0.900
1.050
3.000
2.270
0.750
-----------------
3.05
1.20
1.20
2.10
2.10
3.35
3.00
2.10
6.50
-2.70
-7.20
-5.67
-4.41
20.10
20.43
-3.15
0.90
1
deduct windows W1
-3
deduct Windows W
-5
deduct doors D1
-3
deduct doors D
-2
Toilets
2
3
deduct doors D2
-2
Add excess corners and rounding
162.50
Sqm
22 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm
CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cemen
water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all oper
incidental charges on materials and including cost of all labour charges for mixing mortar, fi
scafolding, lift charges, curing as directed by Engineer - in - charge etc., complete for Internal
faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Pla
2/c in CM (1:4) & (1:6): 12 mm Scafolding upto 3.66 Lift Manual
deduct windows W1
deduct Windows W
---
3.05
54.41
6.970
---
3.05
42.52
5.400
---
3.05
16.47
4.310
---
3.05
13.15
1
-3
-5
x
x
x
1
1
1
2.130
0.750
1.200
-------
3.05
1.20
1.20
6.50
-2.70
-7.20
Sl.
No
1
Description
No
3
-3 x
-2 x
2 x
3 x
deduct doors D2
-2 x
Add excess and rounding of ---- LS ----2
deduct doors D1
deduct doors D
Toilets
1
1
1
1
1
Measurements
L
B
4
5
0.900
--1.050
--3.000
--2.270
--0.750
---
Quantity
D
6.00
2.10
2.10
3.00
3.00
2.10
7
-5.67
-4.41
18.00
20.43
-3.15
1.65
150.00
Sqm
23 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement morta
12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1
filling joints nearly, including cost of all materials like flooring stone, cement, sand, and wat
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., comp
finished item of work, for F1
Kitchen
2.52
2.13
..
5.37
Store
1.67
2.13
..
3.56
Antinatal
4.31
2.74
..
11.80
Hall
4.04
6.52
..
26.34
1 x
1
Verandha
Add excess and rounding of ---- LS -----
4.31
1.30
..
5.60
0.23
52.90
Sqm
24 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed
laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per
jointed neatly with white cement paste to full depth mixed with pigment of matching shade, in
cost of all materials like cement, sand water and tiles, etc., complete for finished item of work
(APSS No.701 & 707). for Lift Manual
Ground Floor Ceramic tiles flooring
2 x
1
Toilet
Add excess and rounding of ---- LS -----
1.82
1.22
---
4.44
0.27
4.71
Sqm
25 Dadoing with ISO Glazed coloured wall tiles of any size and of 5 to 7 mm thick set over 12mm
C.M. (1:5) Prop.based coat and neat cement paint spread at the rate 3.30 Kgs of Cement paste fix
pigments of machine shade, including cost and conveyance of all materials and water etc., from ap
sources to work site all operational, incidental labour charges such as mixing mortar fixing in posi
charges, watering curing etc., complete for finished item of work. (APSS No 701 & 707) for Bath
Lift Manual
1st floor Dadoing for walls
Toilet
2 x
2
2 x
1
deduct doors
2 x
-1
Add excess and rounding of ---- LS -----
1.82
1.22
0.75
-------
1.50
1.50
1.50
10.92
3.66
-2.25
0.65
12.98
Sqm
Measurements
Quantity
Sl.
Description
No
No Providing skirting to internal walls to 15 cm height/risers
L
B
D
of steps with 15 to 18 mm mm thick p
3
1 Shahabad stone
2 length equal to flooring
4 over base coat
5
6.00
7 thick with
stones, set
of CM
(1:3) 12 mm
slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white
paste mixed with pigment of matching shade to full depth, including cost of all materials like Sh
stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for
item of work, including the cost of conveyance of all materials for F1
13.00
Sqm
27 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved
brand and shade over base coat of cement primer grade -I making three coats in all to give
an even shade after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental
and labour charges such as scafolding charges, lift charges, curing etc., complete for
finished item of work in all floors for Walls.(APSS No. 912) in All Floors
150.00
sqm
28 Whiting to new walls and ceiling in two coats with Surya cem or equavalent quality to give an
even shade after thoroughly brushing the surface to remove all loose powdered materials
including cost and conveyance of all materials and water to site, sales & other taxes, all
operational, incidental and labour charges such as cleaning the surface, painting, curing etc.,
complete for finished item of work for internal walls. (APSS No.901 & 908) in All Floors
200.00
sqm
29 Painting to New wood work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coat Primer with Luppam finishing after
thoroughly brushing the surface to remove all remains including cost and conveyance of all
materials to site, sales & other taxes, all operational, incidental and labour charges etc.,
complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
40.00
sqm
30 Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base
per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy
of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated w
microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilato
should be of 33x57mm. All the above closed and seamed sections should be made out of single sh
with stitch at a single place as per enclosed drawings; The ventilators should be paneled with
pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to
mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer
Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the c
/masonry wall by means of self expanding brackets & screws including 10 mm square guard bars
pitch and all taxes complete for finished item of work.
Sl.
No
Description
No
Toilet
L
4
1
0.60
Measurements
B
5
---
Quantity
D
6.00
0.45
7
0.54
0.54
Sqm
Measurements
Quantity
L
B
D
3
1
2
4
5
6.00
7
31 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame m
hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 X 57mm with t
thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. T
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) providi
shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 mm with
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking arrange
The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm section m
and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be hori
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door
during the fabrication of the door shutter at those points wherever the hardware is fixed on to t
shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete with all materials conveyance
including providing all fixtures, as per the given design for finished item of work as directed
Departmental Officers for finished item of work.
Sl.
No
Description
Toilets
No
2.00
2.00
nos
32 Supply and Fixing of Door with Double leaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood F
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with com
ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts
long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long M.S.Powder Coated Aldro
125mm long M.S.Powder Coated butt hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1N
stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials
all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtur
complete for finsihed utem of work.
Building D Doors
2.00
2.00
nos
33 Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood Fr
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with com
ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts
long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No, 300mm long M.S.Powder Coated Aldro
125mm long M.S.Powder Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1N
stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials
all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtur
complete for finsihed item of work.
Building D Doors
2.00
2.00
nos
Measurements
Quantity
L
B
D
3
1
2
4
5
6.00
7
34 NCL or equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDINGS WITH
PROVISION) Providing and fixing of windows made of pre-painted stgeel (Base steel as per IS 513
mm thick galvanized as per IS 277 with Zinc of 150 GSM). Primer coated with epoxy primer
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated w
microns thick alkyd backer. Section for outer frame should be of 72 x 55mm , centre mullion shou
72 x 50mm, section for fixed glass beading section should be of 12 x12 mm and section for
should be of 47x20mm .Outer frame and mullions to have rebate for glazed shutters, fly mesh
20mm provision for Guard bars / Grills. The fly mesh shutter section should be of 20 x40 mm . the
are to be cut to length meter joined with corner bracket. Centre mullion are to be fixed with
cap , seccolor stay, seccolor handles, seccolor latch 2 Nos. of stainless Steel heavy duty Pivot
shall be provided per shutter. The windows should be panneled with 5mm thick pinheaded galss a
Mesh for fly mesh shutter (304 grade).Rubber Gaskets are provided all round the glass . The
Frames should be fixied to the concrete /masonry wall by means of self expanding screws.inc
10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work.
Double shutter Window with vertical mullion 30
(914.4mm x 1219.2mm) / ( 40x40 1219.2mm x 1219.2mm) outer frame section size of 72
shutter frame section size of 47x20mm. Mullion section size of 72x50mm.
Sl.
No
Description
Building D Doors
No
5
3
x
x
1
1
1.2
0.90
1.20
1.20
7.20
3.24
10.44
sqm
Total Amount
Deputy Executi
(R&B) Sub-d
Superintendin
(R&B) Circ
Amount
9
191.00
16044
358.00
6444
231.60
1622
Rate per
8
Amount
9
628.70
35207
3484.40
8014
6742.40
64754
Rate per
8
7564.00
Amount
9
56730
Rate per
8
Amount
9
9480.00
43608
8817.00
24688
8576.00
30874
951.00
93578
9005.00
9005
Rate per
8
681.00
1 Sqm
49445.00
Amount
9
6,129
198769
Rate per
8
4469.00
1 Cum
Amount
9
40,266
4919.00
1 Cum
115,597
Rate per
8
597.00
1 Sqm
52672.00
1 MT
Amount
9
21,014
2,634
332.00
1 Sqm
28,386
Rate per
8
318.00
1 Sqm
Amount
9
27,189
315.00
1 Sqm
51,188
Rate per
8
307.00
1 Sqm
Amount
9
46,050
490.00
1 Sqm
25,921
897.00
1 Sqm
4,225
842.00
1 Sqm
10,929
Rate per
8
543.00
1 Sqm
Amount
9
7,059
126.55
18983
26.30
5260
155.90
6236
Rate per
8
3334.00
1 Sqm
Amount
9
1,800
Rate per
8
or of size 075 x 2.00M providing door frame made of
nt) having dimensions of 40 X 57mm with the wall
h seasoned wood plank at the hinges side. The door
VC DOOR FRAME (Nandi or Equivalent) providing door
n(Nandi or equivalent) of 20mm X 200 mm with the wall
o 4 no's with tongue and groove locking arrangements.
e wall thickness of 1.5mm +/- 0.15mm section mitre-cut
m plastic brackets. The shutter shall be horizontally
ood batons shall be reinforced inside the door shutter
e points wherever the hardware is fixed on to the door
ent) complete with all materials conveyance charges
design for finished item of work as directed by the
4454.00
each
Amount
9
8,908
7043.30
each
14,087
6871.00
each
13,742
Rate per
8
(SUITABLE FOR RESIDENTIAL BUJILDINGS WITH GRILL
of pre-painted stgeel (Base steel as per IS 513 of 0.60
150 GSM). Primer coated with epoxy primer of 5-7
int of 12-16 microns thick and back coated with 5-7
e should be of 72 x 55mm , centre mullion should be of
ion should be of 12 x12 mm and section for shutter
s to have rebate for glazed shutters, fly mesh and a
sh shutter section should be of 20 x40 mm . the section
bracket. Centre mullion are to be fixed with mullion
tch 2 Nos. of stainless Steel heavy duty Pivot hinges
be panneled with 5mm thick pinheaded galss and S.S.
Gaskets are provided all round the glass . The Above
ry wall by means of self expanding screws.including
etc., complete for finished item of work.
Double shutter Window with vertical mullion 30 x 40
m x 1219.2mm) outer frame section size of 72x50mm
ction size of 72x50mm.
5570.00
sqm
Amount
9
58,151
1,103,091
Esti
Measurements
Sl.
No
1
Description of item
No
Quantity
Cum /
Sqm / MT /
Nos
Supply & fixing of PVC low level system parry ware, slim line with internal components & short
bend: 10 Litres capacity Single Flush fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.
toilet
2.00
nos
Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st
qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware /
Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st
quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well
above the joint to stop leakage at the joint etc., complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for
finished item of work.
toilet
2.00
2.00
nos
Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P.
Grating fixing with white cement as per site requirements with standard practice for 100 mm
dia Inlet- 75 mm (3") outlet pipe - 4 Kgs fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.
At for toilets
2.00
2.00
nos
Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend 87.5
Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR Pipe fittings,
Iron Clamps and all other accessories and fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.
W.C to Manhole
To SEPTIC TANK
2.00
4.00
2.00
2.00
Measurements
Sl.
No
Description of item
No
Quantity
Cum /
Sqm / MT /
Nos
6.00
rm
Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua
tech or equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96
mark with lid & manufacture with cover and suitable locking arrangement & making necessary
holes for inlet & outlets and over flow pipes but without fittings & base support for tanks etc.,
complete as directed by the Departmental Officers for finished item of work.
500
500
liters
Supply and fixing of 100 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl
and mosquito proof wire mesh including cost and conveyance of all materials to
site complete for finished item of work.
1.00
Rm
9.00
9.00
Rm
9.00
9.00
Rm
9.00
9.00
rm
Superintending Engineer
(R&B) Circle : Kakinad
1653.00
3,306
Each
1800.00
3,600
Each
374.00
Each
748
Rate /
Per
Amount
550.00
3,300
1 Rm
6.82
3,409
1 Lit
2553.00
2,553
1 Rm
182.00
1,638
1 Rm
241.00
2,169
1 Rm
409.00
3,681
1 Rm
24,404
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
From km
918 / 200
From km
61 / 425
From km
123 / 935
From km
81 / 600
From km
0 / 000
0.000
Working K.M.
c) Total lead
km
=
=
0.000
000
to
000
K.M.
=
944
31
115
91
5
K.M.
/
/
/
/
/
805
735
760
000
200
of
of
of
of
of
NH 16
NH 16 to RP road
NH 216
KANF Road
TA Road
=
=
=
=
=
=
=
Or say:
to
to
to
to
to
to
60
944
31
115
91
5
K.M.
/
/
/
/
/
/
200
805
735
760
000
200
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425
From km
123 / 935
to
115 / 760
From km
81 / 600
to
91 / 000
From km
0 / 000
to
5 / 200
0.000
Working K.M.
K.M.
Total lead
D) Bricks :
a) Digamarru
b) Metalled road length:
From km
139 / 600
to
From km
81 / 600
to
From km
0 / 000
to
Working K.M.
0.000
c) Total lead
123 / 935
91 / 000
5 / 200
K.M.
of
of
of
of
of
of
of
of
of
of
=
=
=
=
=
=
=
=
Or say:
=
=
=
=
=
=
=
=
Or say:
of NH 216
of KANF Road
of TA Road
=
=
=
=
=
Or say:
Executive Engineer (R
(R&B) Division : Amalap
0.000 kms
0.000 kms
2.200 kms
=
=
=
=
=
=
=
Or say:
kms
kms
kms
kms
kms
kms
kms
93.000 kms
0.000 kms
=
=
=
=
=
=
=
=
Or say:
=
=
=
=
=
=
=
=
Or say:
38.405
29.690
8.175
9.400
5.200
0.000
93.070
4.600
26.605
29.690
8.175
9.400
5.200
0.000
83.670
kms
kms
kms
kms
kms
kms
kms
kms
83.000 kms
kms
kms
kms
kms
kms
kms
kms
kms
35.000 kms
=
=
=
=
=
0.110
0.200
12.353
8.175
9.400
5.200
0.000
35.438
15.665
9.400
5.200
0.000
30.265
30.000
kms
kms
kms
kms
kms
kms
NAME OF WORK ::- Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sakhin
Res Item
Size
Code
Unit
Source
Lead in
Kms
Basic cost
Con
chrarges
Load
charges
Un Load
charges
10
11
12
13
Cement 43 Grade
CSSR-A.05
MT
Local
0.00
5200.00
0.00
0.00
0.00
CSSR
MT
Local
0.00
34000.00
0.00
0.00
0.00
Mild Stell do
CSSR
MT
Local
0.00
37500.00
0.00
0.00
0.00
CSSR
MT
Local
0.00
36000.00
0.00
0.00
0.00
M 004
Cum
Gannavaram
35.00
85.13
361.29
0.00
0.00
M 005
Cum
Gannavaram
35.00
152.13
361.29
0.00
0.00
Cum
Gannavaram
35.00
85.13
361.29
0.00
0.00
6 mm Nominal
M-050
Cum
Katheru
93.00
735.00
723.43
0.00
0.00
10 mm Nominal Chips
M-051
Cum
Katheru
93.00
935.00
723.43
0.00
0.00
10
13.20 - 12.50 mm
M-052
Cum
Katheru
93.00
1097.00
723.43
0.00
0.00
11
20 mm Nominal
M-053
Cum
Katheru
93.00
1365.00
723.43
0.00
0.00
12
40 mm Nominal
M-054
Cum
Katheru
93.00
845.00
723.43
0.00
0.00
13
23x11x7 cm
BMT-B.05
Cum
Jonnada
30.00
4700.00
552.72
37.84
37.84
20%
Deduct
Crushing
Charges
Final cost
14
12
13
0.00
5200.00
0.00
34000.00
0.00
38000.00
0.00
36000.00
0.00
446.42
0.00
513.42
0.00
446.42
0.00
1458.43
0.00
1658.43
0.00
1820.43
0.00
2088.43
0.00
0.00
-175.00
1393.43
5328.40
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Manpower
SOR P. No. 230/III/4
Manpower
SOR P. No. 230/III/4
Manpower
SOR P. No. 230/III/4
Manpower
CSSR-M-087
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
cum
cum
cum
cum
2088.43
1820.43
1658.43
1458.43
Unit
Rate
cum
1820.43
cum
cum
1658.43
1458.43
1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clay
cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs includ
incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for
finished item of work for piles of following diameters.
Pile foundation-Manual Means- 1 Rm
Code
up to 300 mm dia
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Unit
Rate
day
cum
320.00
168.32
cum
168.32
2 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Blac
ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved des
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, et
depths and for finished item of work for piles of following diameters.
Unit
Rate
day
cum
320.00
315.52
cum
315.52
3 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. com
item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordin
to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Unit
Rate
day
cum
320.00
116.48
Foundation of Buildings
Seigniorage charges
cum
cum
116.48
30.00
cum
203.84
Excavation Method
4 Filling with sand in trenches, sides of foundations and basement with initial lead in layers not excee
consolidating each deposited layer by watering and ramming including cost and conveyance of water to
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS N
Sand filling
Code
Material
Unit
Rate
cum
KL
446.42
77.00
Light mazdoor
Add LA charges
day
cum
320.00
99.20
cum
553.32
Manpower
SOR P. No. 269/III/4
5 Plain Cement concrete (1:5:10) Proportion nominal mix (coarse aggregate) for foundation levelling courses a
beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry including cost and
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorag
other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
foundations ramming in 15 cm layers finishing top surface to the required level curing etc.,complete for fini
inluding centering, shuttering as per APSS. No. 402. for Machine Mix Base course
Unit
Rate
cum
cum
cum
KL
5.20
1393.43
513.42
77.00
hour
328.60
189.80
day
day
cum
420.00
320.00
486.80
cum
3066.85
6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
up to 3.66, as per APSS. No. 402. for piles
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
189.80
165.70
136.60
hour
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
5934.38
7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
up to 3.66, as per APSS. No. 402. for pile caps
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
hour
189.80
165.70
136.60
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
723.00
Add LA charges
cum
446.00
cum
6657.38
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 89 /
A/Footings
8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, center
3.66, as per APSS. No. 402.
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
189.80
165.70
136.60
hour
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
2410.00
cum
1075.00
cum
8344.38
9 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for COLUMNS, for Casurina Ballies, Bamboos,
Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per APSS. No.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F1
Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including Seigniorage charges)
cum
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35
Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 90 /
Columns
Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77
cum
1497.00
Add LA charges
cum
1268.00
cum
7760.16
10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for LINTELS, for Casurina Ballies, Bamboos,
Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per APSS. N
F1.
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
189.80
165.70
136.60
hour
day
day
day
cum
420.00
375.00
320.00
1636.77
cum
1663.00
Add LA charges
cum
903.00
cum
7926.16
Miscellaneous
SOR P. No. 90 / Lintles
11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for ROOF BEAMS for Casurina Ballies, B
Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F1.
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
day
day
day
cum
420.00
375.00
320.00
878.02
cum
2406.00
Add LA charges
cum
1064.00
cum
7548.09
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 / Beams
12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for ROOF SLAB 125 mm thick , for Casurina
Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M
402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual
F1
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
day
day
day
sqm
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
420.00
375.00
320.00
878.02
BACIC RATE 1
cum
273.00
Add LA charges
cum
121.00
cum
836.60
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for Sun Shade 62.50 mm thick, for Casurina
Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M
402. for Sunshades Ground floor.
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
Machinery
SOR P. No. 325/16
hour
3.23
165.70
2.32
day
day
day
cum
420.00
375.00
320.00
54.60
cum
289.00
Add LA charges
Lift charges F1
Add LA charges
cum
cum
cum
153.00
6.02
6.02
cum
599.50
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
CHAJJAS - SUNSHADES
Hir charges for Centering and Scafafolding Unsupported Hight 62.50
62.50 mm thick
mm thick Chajjas-Sunshades Second floor
Second floor
14 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complet
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36
over laps and wastage, where weldeding require to be done campulsorily including cost and conveya
approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour charge
bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materials for finished
HYSD (F.e 415) F1
Unit
Rate
kg
M.T
70.00
34000.00
day
day
M.T
420.00
320.00
7400.00
M.T
43520.00
15 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars 6 mm
laps and wastage, where weldeding require to be done campulsorily including cost and conveyance of ba
sourses to site of work, binding wire, cover blocks and all incidental,operational, labour charges such as
placing in position, tying etc., and sales and sales & other taxes, on cost of materials for finished item o
STEEL (F.e 250) F1
Unit
Rate
Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4
Binding wire
Reinforcement steel (including loading charges)
(HYSD/TMT)
kg
M.T
70.00
36000.00
day
day
M.T
420.00
320.00
7400.00
M.T
45620.00
16 Brick Masonary 225 mm thick for pannel walls in Basement and Super structure with CM ( 1:8) prop (Cemen
class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm including
and conveyance of all materials and water from approved source to work site and all operational, inciden
such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc., complete for finished it
(APSS No.501 & 504) for Basement
Unit
Rate
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
3933.42
17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) usin
(Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm including cost
conveyance of all materials and water from approved source to work site and all operational, incidental labou
scafolding, mixing moratar, constructing masonary, lift charges, curing etc., complete for finished item of
No.501 & 504) for Super Structure F1
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
304.84
Add LA charges
Lift charges F1
Add LA charges
cum
cum
cum
369.02
91.56
91.56
cum
4329.82
18 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushin
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcement p
joints of main brick walls were applicable including cost and seignorage charges and conveyance of all m
from approved sources to work site and all operational, incidental, labour charges such as scafoldi
constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication c
item of work as per SS 509 & 501 for F1
Code
Material
Unit
Rate
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
68.59
Add LA charges
Lift charges F1
Add LA charges
sqm
sqm
sqm
83.03
13.57
13.57
sqm
525.88
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 91 / Second
floor
19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water pr
bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, incl
charges of materials and including all operational, incidental and labour charges for mixing mortar, laying,
and thread lining, curing, rounding of junctions of wall and slab etc,, complete for finished item of work for F
Unit
Rate
kg
Cum
kg
5.20
513.42
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Lift charges F1
Add LA charges
Sqm
Sqm
20.39
20.39
sqm
292.26
Miscellaneous
20 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complet
of work (APSS 901,903 & 904) for Celling plastering F1.
Ceilling Plastering with CM 2 coats, 12 mm thick F1, Lift Manual.
Code
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 92/ First
floor Celing
Unit
Rate
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
14.32
Add LA charges
Sqm
11.95
Sqm
254.87
21 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm
sponze finishing cost of all materials, seigniorage charges, including conveyance charges of materials
operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complet
of work (APSS 901,903 & 904) for Uneven faces F1.
Unit
Rate
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
420.00
day
day
Sqm
375.00
320.00
206.39
Sqm
6.86
Add LA charges
Sqm
5.87
Sqm
254.44
Miscellaneous
SOR P. No. 91/ First
floor Plastering to
walls
22 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm
finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and includi
incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complete for fini
(APSS 901,903 & 904) for Even faces F1.
Plastering with 12mm thick 2 coats F1
Code
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls
Unit
Rate
kg
cum
5.20
513.42
kg
cum
5.20
513.42
day
day
day
cum
420.00
375.00
320.00
206.39
Sqm
6.86
Add LA charges
cum
5.87
cum
247.41
23 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with whit
full depth mixed with pigment of matching shade, including cost of all materials like cement, sand wa
complete, including seigniorage charges, etc., complete for finished item of work, including the cost of
materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.01
Unit
Rate
Sqm
465.00
Kg
cum
5.20
513.42
White cement
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
758.52
Lift charges F1
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
789.33
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
24 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame made of ho
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm d
seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR
Equivalent) providing door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking arrangem
frame is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm section mitre-cut and joined
125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods.
shall be reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete with all materials co
including providing all fixtures, as per the given design for finished item of work as directed by the Departm
finished item of work.
Code
Considering size of PVC door 0.75 x 2.00M
for PVC door frame (V)
for PVC door frame (H)
Unit
1.50 Sqm
2x 2.00 =
2x 0.75 =
Rate
0.75x 2.00 =
ABSTRACT
Material
BMT-N.46
BMT-N.44
rm
sqm
254.00
1682.00
cum
3920.00
1.00 sqm
1.50 sqm
25 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Shah
equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consist
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to fu
cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charg
for finished item of work, including the cost of conveyance of all materials for F1
Code
Material
BMT-B.05
BMS-W.68
Unit
Rate
Sqm
165.40
Kg
cum
Kg
5.20
513.42
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
223.52
473.23
Basic rate 1
sqm
477.96
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
26 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12
bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, in
materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, l
dressing of flooring stones etc., complete for finished item of work, for F1
Flooring with polished Kadapa/Shahabad 15 to 18mm thick, (1:8), 12 mm thick F1
Code
Material
BMT-B.05
Unit
Rate
Sqm
165.40
Kg
cum
5.20
513.42
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
427.00
Basic rate 1
sqm
431.27
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
27 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Engineer 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and
spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, including cost, seignio
conveyance of all materials and water etc., from approved sources to work site all operational, incidental la
as mixing mortar fixing in position, lift charges, watering curing etc., complete for finished item of work. (AP
for Bath rooms F2
Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), 12 mm thick F2
Code
Material
BMT-C.07
BMS-W.68
Unit
Rate
Sqm
Kg
cum
Kg
413.00
5.20
513.42
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
740.99
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
28 Painting for Ceiling and Walls two coats with whiting of approved quality to give an even shade after thorou
surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyance ch
for All Floors
Painting for Ceiling two coats with whiting for All Floors
Code
Material
BMT-J.27
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
kg
22.08
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
18.75
sqm
23.17
Coefficient
720.000
Amount
3744.00
1.050
539.09
0.200
0%
64.00
0.00
4347.09
Coefficient
480.000
Amount
2496.00
1.050
539.09
0.200
0%
64.00
0.00
3099.09
Coefficient
360.000
Amount
1872.00
1.050
539.09
0.200
0%
64.00
0.00
2475.09
Coefficient
288.000
Amount
1497.60
1.050
539.09
0.200
0%
64.00
0.00
2100.69
Coefficient
240.000
1.050
Amount
1248.00
539.09
0.200
0%
64.00
0.00
1851.09
Coefficient
0.600
0.150
0.150
0.100
Amount
1253.06
273.06
248.76
145.84
1920.72
Coefficient
Amount
0.600
1092.26
0.200
0.200
331.69
291.69
1715.64
Coefficient
0.526
0%
13.615%
or say
Amount
168.32
0.00
168.32
22.92
191.24
191.00
Coefficient
Amount
0.986
0%
315.52
0.00
13.615%
315.52
42.96
358.48
or say
358.00
116.48
0.00
87.36
0.00
13.615%
203.84
27.75
231.59
or say
231.60
446.42
7.70
0.310
0%
99.20
0.00
13.615%
553.32
75.33
628.65
or say
628.70
673.92
1254.09
231.04
92.40
328.60
0.00
0.100
1.390
0%
42.00
444.80
0.00
13.615%
3066.85
417.55
3484.40
or say
3484.40
2080.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
13.615%
5934.38
807.97
6742.35
or say
6742.40
2080.00
1728.65
231.04
92.40
328.60
0%
1.000
0%
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
723.00
0%
0.00
13.615%
6657.38
906.40
7563.78
or say
7564.00
2080.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
2410.00
0%
0.00
13.615%
8344.38
1136.09
9480.47
or say
9480.00
2080.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1497.00
0%
13.615%
or say
0.00
7760.16
1056.55
8816.71
8817.00
2080.00
1728.65
231.04
92.40
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1663.00
0%
0.00
14%
7926.16
1079.15
9005.31
or say
9005.00
2080.00
1728.65
231.04
92.40
0.267
0%
0.267
0%
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
28.14
49.88
800.00
0.00
1.000
2406.00
0%
0.00
14%
7548.09
1027.67
8575.76
or say
8576.00
2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
ACIC RATE 1 CUM
28.14
49.88
800.00
0.00
4508.80
125 mm THICK F1
563.60
1.000
0%
273.00
0.00
13.615%
836.60
113.90
950.50
or say
951.00
113.75
107.56
14.38
5.78
5.59
0%
0.017
0%
0.00
2.82
0.00
0.004
0.008
0.156
0%
1.68
3.00
49.92
0.00
1.000
289.00
0%
1.000
0%
0.00
6.02
0.00
13.615%
599.50
81.62
681.12
or say
681.00
420.00
35700.00
4200.00
3200.00
0.00
14%
43520.00
5925.25
49445.25
or say
49445.00
6.000
1.050
10.000
10.000
0%
420.00
37800.00
4200.00
3200.00
0.00
14%
45620.00
6211.16
51831.16
or say
51831.00
14%
Or say
187.20
2727.94
102.68
100.80
210.00
604.80
0.00
3933.42
535.54
4468.96
4469.00
187.20
2727.94
102.68
100.80
210.00
604.80
0.00
1.000
304.84
0%
1.000
0%
0.00
91.56
0.00
13.615%
4329.82
589.50
4919.32
or say
4919.00
24.96
272.79
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
68.59
0%
1.000
0%
0.00
13.57
0.00
14%
or say
525.88
71.60
597.48
597.00
52.42
10.78
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
1.000
0%
20.39
0.00
292.26
39.79
332.05
332.00
14%
or say
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
14.32
0%
14%
or say
0.00
254.87
34.70
289.57
290.00
4.300
0.018
22.36
9.24
1.450
0.004
7.54
2.05
0.063
26.46
0.147
0.390
0%
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
254.44
34.64
289.08
or say
289.00
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
247.41
33.68
281.09
or say
281.00
488.25
5.460
0.012
28.39
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.59
1.000
0%
1%
22.99
0.00
0.23
789.33
107.47
896.80
897.00
14%
or say
Coefficient
Amount
4.000
1.500
Total
5.500 Rm
1.500 sqm
5.500
1.500
1397.00
2523.00
14%
3920.00
533.71
4453.71
4453.71
x 1.00 sqm
0 sqm
Say
Or say
2969.14
2969.00
1 Sqm
4454.00
1.100
181.94
9.060
0.012
0.500
47.11
6.16
14.50
0.096
0.224
0.310
0%
1%
Basic rate 1 sqm
40.32
84.00
99.20
0.00
4.73
477.96
14%
477.96
65.07
543.03
or say
543.00
1.050
173.67
3.120
0.014
16.22
7.19
0.096
0.224
0.330
0%
1%
Basic rate 1 sqm
40.32
84.00
105.60
0.00
4.27
431.27
14%
431.27
58.72
489.99
or say
490.00
433.65
35.13
6.16
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
1.000
0%
1%
22.99
0.00
0.23
14%
740.99
100.89
841.88
or say
842.00
4.42
0.006
0.015
0.032
0%
2.88
5.63
10.24
0.00
14%
23.17
3.15
26.32
or say
26.30
1 Supply & fixing of PVC low level system parry ware, slim line with internal components &
Litres capacity Single Flush fixing in position including cost and conveyance of all materia
Other taxes on materials to site, Operational and Incidental charges including all labour charg
site etc; complete for finished itemof work.
Code
Material
BMW-G.08
Manpower
BMW-D.12
Unit
Rate
each
1455.00
each
403.00
each
1455.00
2 Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qu
confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with
seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap
shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at
complete including cost and conveyance of all materials to site, cost of CC bed, labou
seigniorage charges etc., complete for finished item of work.
Code
Unit
Material
BMW-D.04
each
Supplying and Fixing European Water
Closet of 1st quality conforming to
Manpower
IS:2556-Part-2-1973
of Hindustan /
BMW-D.15
Add LA charges
each
Neycer or Parryware make white
glazed with 'P' trap
Add Over Head Charges
each
Rate
1584.00
201.00
1584.00
3 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P
with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75
pipe - 4 Kgs fixing in position including cost and conveyance of all materials, Sales tax &
materials to site, Operational and Incidental charges including all labour charges for fixin
complete for finished itemof work.
Code
Material
BMW-C.41
Manpower
Unit
Rate
each
329.00
BMW-C.42
Add LA charges
each
45.00
each
329.00
4 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex
equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96 m
manufacture with cover and suitable locking arrangement & making necessary holes for inle
over flow pipes but without fittings & base support for tanks etc., complete as directed by the
Officers for finished item of work.
Material
BMS-W.29
Miscellaneous
BMW-G.02
lit
6.00
lit
440.00
cum
6000.00
16 Constructing Constructing 457.2 mm x 457.2 mm (1'6"x1'6") dia brick masonry inspection cha
- 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 m
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with
1:3 prop; thick both inside and outside fitted light weight 457.2 mm x 457.2 mm (1'6"x
and cover of 20 Kg. and frames including excavating pits up to a depth of Inspection chamb
mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thic
HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost
charges on all materials and all incidental and operational, labour charges like mixing c
constructing masonry, lift charges, curing etc., complete for finished item of work as
specification.
Code
Material
BMW-B.06
Unit
Rate
each
3825.00
each
3825.00
21 Supply and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fitting
requirement of ASTM-D2846 and are prodiced in CTS(copper tube sizes 1/2ton 2"Ashirvad flow
and SDR 13.5 pipes are made from idntial CPVC compounds having the same physical propert
Cold Water (IA 15778-2007)
22.20 mm dia CPVC SDR 13.50
Code
Material
BMW-I 221
S& F 22.20 mm dia CPVC SDR 13.50
Manpower
BMW-F.80
Add LA charges
Unit
Rate
Rm
160.00
Rm
33.00
each
160.00
Unit
Rate
Rm
212.00
Rm
33.00
each
212.00
Unit
Rate
Rm
360.00
Rm
33.00
each
360.00
24 Supply and fixing of 100 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl and mosq
mesh including cost and conveyance of all materials to site complete for finished item of work
Code
Material
BMW- H05
Manpower
BMW-F.88
Unit
Rate
each
2247.00
Add LA charges
each
31.00
each
2247.00
Code
Material
BMW-G13
Unit
Rate
RM
484.00
RM
484.00
Superintending Engineer
(R&B) Circle : Kakinad
g in Kesavadasupalem - 4
ABARD RIDF XX in E.G. Dist.
Coefficient
1.000
0%
Amount
1455.00
0.00
13.615%
1455.00
198.10
1653.10
or say
1653.00
Amount
1584.00
0.00
13.615%
1584.00
215.66
1799.66
or say
1800.00
Coefficient
1.000
Amount
329.00
0%
0.00
13.615%
329.00
44.79
373.79
or say
374.00
1000.000
0%
13.615%
or say
6000.00
0.00
6000.00
816.90
6816.90
6.82
Coefficient
Amount
1.000
3825.00
14%
3825.00
520.77
4345.77
or say
4346.00
Coefficient
1.000
0%
14%
or say
Coefficient
1.000
0%
14%
or say
Coefficient
1.000
0%
14%
or say
Amount
160.00
0.00
160.00
21.78
181.78
182.00
Amount
212.00
0.00
212.00
28.86
240.86
241.00
Amount
360.00
0.00
360.00
49.01
409.01
409.00
Amount
1.000
2247.00
0%
0.00
2247.00
305.93
2552.93
13.615%
or say
2553.00
Prince/Sudhakar/Kisan/Supreme or
end 87.5 DegreeShoes, Single Tee
accessories and fixing in position
materials to site, Operational and
te for finished itemof work.
Coefficient
Amount
1.000
13.615%
or say
484.00
484.00
65.90
549.90
550.00
Name of work:-
Sl.
No.
Unit
Total qty
provision made
for the estimate
Metal
Sand
Gravel /
Earth /
bricks
Metal
Sand
1 Cum.
7.00
--
--
1.00
--
--
1 Cum.
2.30
0.900
0.450
--
75
50
1 Cum.
6.13
--
--
1.00
--
--
1 Cum.
9.60
0.900
0.450
--
75
50
1 Cum.
7.50
0.900
0.450
--
75
50
1 Cum.
4.60
0.900
0.450
--
75
50
1 Cum.
2.80
0.900
0.450
--
75
50
1 Cum.
3.60
0.900
0.450
--
75
50
1 Sqm.
98.40
0.113
0.056
--
75
50
10
Sand filling
1 Cum.
56.00
--
1.000
--
--
50
11
1 Sqm.
150.00
--
0.015
--
--
50
12
1 Sqm.
9.00
0.06
0.03
--
75
50
13
1 Cum.
32.51
--
0.200
512
--
50
Unit
Total qty
provision made
for the estimate
Sl.
No.
Theoritical requirement of
Material per Unit as per Data
(in Cum.)
Metal
Sand
Gravel /
Earth /
bricks
Metal
Sand
14
1 Sqm.
35.20
--
0.020
99
--
50
15
1 Sqm.
85.50
--
0.021
--
--
50
16
1 Sqm.
162.50
--
0.022
--
--
50
17
1 Sqm.
150.00
--
0.015
--
--
50
18
1 Sqm.
4.71
--
0.012
--
--
50
19
1 Sqm.
12.98
--
0.012
--
--
50
20
1 Sqm.
65.90
--
0.012
--
--
50
Or Say
Total seigniora
Superintending Engineer
Unit
Total qty
provision made
for the estimate
Sl.
No.
Theoritical requirement of
Material per Unit as per Data
(in Cum.)
Metal
Sand
Gravel /
Earth /
bricks
Metal
Sand
Gravel /
Earth /
bricks
Seignorage
charges per Unit
Total Amount
30
30.00
210.12
--
90.00
207.00
30
30.00
184.02
--
90.00
864.37
--
90.00
675.00
--
90.00
414.00
--
90.00
252.00
--
90.00
324.00
--
11.25
1107.00
--
50.00
2800.00
--
0.75
112.50
--
5.63
50.67
0.0385
29.71
965.87
Gravel /
Earth /
bricks
Seignorage
charges per Unit
Total Amount
0.0385
4.81
169.31
--
1.05
89.78
--
1.10
178.75
--
0.75
112.50
--
0.60
2.83
--
0.60
7.79
--
0.60
39.54
8767.05
Total seigniorage amount Rs.
8768.00
Gravel /
Earth /
bricks
(R&B) Circle : Kakinada
Seignorage
charges per Unit
Total Amount
C E R T I F I C A T E
Name of Work:
Certified that the leads provided in the R.M.R of the estimate are shortest and
yield of good quality material from the quarries proposed in the estimate.
2)
Certified that all the distances in the quarry map are correct.
3)
4)
Certified that the routes shown in the quarry map are the shortest for the tra
materials.
5)
6)
Certified that the description of all materials mentioned are correct to the best of
Superintending Enginee
(R&B) Circle : Kakin
C E R T I F I C A T E
vided in the R.M.R of the estimate are shortest and there is sufficient
al from the quarries proposed in the estimate.
own in the quarry map are the shortest for the transportation of the
Code No
Sl.
No
Page No.
M-050
286
M-051
286
M-052
286
M-053
286
M-055
286
BMT-A.01
10
BMT-A.02
10
BMT-A.03
10
BMT-A.04
10
BMT-A.06
10
M-008
M-005
284
284
M-004
284
M-148
79
33
271
271
292
292
292
12
BMT-B.05
26
11
BMT-B.06
27
11
BMT-B.09
30
11
BMT-B.10
31
12
M-182
do
do
BMT-B.12
13
14
290
274
Code No
Sl.
No
Page No.
BMT-B.11
32
12
BMT-B.12
33
12
BMT-B.13
34
12
BMT-B.14
35
12
BMT-C.15
12
BMT-C.01
12
BMT-C.07
12
M-189
BMS-W.68
292
88
257
252
266
268
269
16
18
9
379
do
379
do
379
Code No
Sl.
No
Page No.
41
do
379
do
-- 2 --
Earth / Sand /
Gravel / Lime /
Surki per Cum.
Stones / Cource
aggregate per
Cum.
31.50
44.10
58.90
71.50
84.10
12.60
10.50
30.40
42.60
58.90
71.50
84.10
12.60
10.50
Gannavaram
Jonnada
Jonnada
Local
Katheru
Yetimoga
93 Kms
35 Kms
35 Kms
30 Kms
30 Kms
1 Kms
49 Kms
65 Kms
HBG Metal
1.00Km
0.00
Bricks
Flyash
43.60
Code No
2.00Km
3.00Km
4.00Km
5.00Km
6.00Km
7.00Km
8.00Km
9.00Km
10.00Km
11.00Km
12.00Km
13.00Km
14.00Km
15.00Km
16.00Km
17.00Km
18.00Km
19.00Km
20.00Km
21.00Km
22.00Km
23.00Km
24.00Km
25.00Km
26.00Km
27.00Km
28.00Km
29.00Km
30.00Km
31.00Km
32.00Km
33.00Km
34.00Km
35.00Km
36.00Km
37.00Km
38.00Km
39.00Km
40.00Km
41.00Km
42.00Km
43.00Km
44.00Km
45.00Km
46.00Km
47.00Km
48.00Km
49.00Km
50.00Km
51.00Km
52.00Km
53.00Km
54.00Km
55.00Km
56.00Km
57.00Km
58.00Km
59.00Km
60.00Km
61.00Km
62.00Km
63.00Km
64.00Km
Sl.
No
Page No.
10.49
24.51
35.35
47.95
57.02
67.85
78.69
89.53
100.36
111.20
122.03
132.87
143.71
154.54
165.38
176.21
187.05
197.89
208.72
219.56
230.39
241.23
252.07
262.90
273.74
284.57
295.41
306.25
317.08
326.11
335.14
344.17
353.20
362.23
371.26
380.29
389.32
398.35
407.38
416.41
425.44
434.47
443.50
452.53
461.56
470.59
479.62
488.65
497.68
506.71
515.74
524.77
533.80
542.83
551.86
560.89
569.92
578.95
587.98
597.01
606.04
615.07
624.10
10.84
23.56
34.40
45.24
56.07
66.91
77.74
88.58
99.42
110.25
121.09
131.92
142.76
153.60
164.43
175.27
186.10
196.94
207.78
218.61
229.45
240.28
251.12
261.96
272.79
283.63
294.46
305.30
316.14
325.17
334.20
343.23
352.26
361.29
370.32
379.35
388.38
397.41
406.44
415.47
424.50
433.53
442.56
451.59
460.62
469.65
478.68
487.71
496.74
505.77
514.80
523.83
532.86
541.89
550.92
559.95
568.98
578.01
587.04
596.07
605.10
614.13
623.16
61.06
81.36
98.81
116.27
133.73
151.19
168.65
186.10
203.56
221.02
238.48
255.94
273.39
290.85
308.31
325.77
343.23
360.68
378.14
395.60
413.06
430.52
447.97
465.43
482.89
500.35
517.81
535.26
552.72
567.26
581.79
596.32
610.86
625.39
639.93
654.46
668.99
683.53
698.06
712.60
727.13
741.66
756.20
770.73
785.27
799.80
814.33
828.87
843.40
857.94
872.47
887.00
901.54
916.07
930.61
945.14
959.67
974.21
988.74
1003.28
1017.81
1032.34
1046.88
Code No
65.00Km
66.00Km
67.00Km
68.00Km
69.00Km
70.00Km
71.00Km
72.00Km
73.00Km
74.00Km
75.00Km
76.00Km
77.00Km
78.00Km
79.00Km
80.00Km
81.00Km
82.00Km
83.00Km
84.00Km
85.00Km
86.00Km
87.00Km
88.00Km
89.00Km
90.00Km
91.00Km
92.00Km
93.00Km
94.00Km
95.00Km
96.00Km
97.00Km
98.00Km
99.00Km
100.00Km
Sl.
No
Page No.
633.13
642.16
651.19
660.22
669.25
678.28
687.31
696.34
705.37
714.40
723.43
632.19
641.22
650.25
659.28
668.31
677.34
686.37
695.40
704.43
713.46
722.49
1061.41
1075.95
1090.48
1105.01
1119.55
1134.08
1148.62
1163.15
1177.68
1192.22
1206.75
Code No
Sl.
No
Page No.
Description of Material
Rate
735.00
935.00
1097.00
1365.00
845.00
4700.00
4185.00
17000.00
14500.00
9000.00
80.00
152.13
85.13
225.00
265.00
15.00
18.00
19.00
32.00
45.00
570.00
1291.00
1076.00
2300.00
2000.00
Description of Material
Rate
1700.00
Ceramic tiles 7.3mm thick 1st quality of all shades (as per
manufacture specification
Glazed coloured Tiles of any size Ist Quality
465.00
570.00
460.00
780.00
1048.00
413.00
Water
White cement
Binding wire
HYSD Steel (Fe 415) ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/
EE.III/ DEE10/AE/13305/12, Vol.16 Dated: 30.06.2012.
77.00
29.00
70.00
34000.00
37500.00
5200.00
36000.00
70.00
Seigniorage charges
Metal
Gravel/earth
Sand
Bricks 1000 Nos
Labour Rates
Painer CI - I
Mason CI - I / Brick layer CI - I / Operater concrete / Plumber e
Mason CI -II / Brick layer CI - II / Operater concrete / Painer CI Heavy & Light Mazdoor unskilled
Machinery Rates
Concrete mixer 300/200 ( diesel )
Crew Charge Concrete mixer 300/200 ( diesel )
Concrete mixer 600 / 400 (diesel
Crew Charge Concrete mixer 600 / 400 ( diesel )
Batching plant 0.5 cum ( 6 Cum/hr)
75.00
30.00
50.00
38.50
480.00
420.00
375.00
320.00
328.60
189.80
453.00
189.80
522.50
Description of Material
Crew Charge Batching plant 0.5 cum ( 6 Cum/hr
Needle vibrator 40 mm ( petrol )
Crew Charge Needle vibrator 40 mm ( petrol )
Rate
293.80
165.70
136.60
-- 2 --
Cement in Rs/tonne
(SOR 2011-12. P. No. 376) Loading
Un loading
Steel in Rs/tonne
(SOR 2011-12. P. No. 376) Loading
Un loading
(idle hire charges of trucks are not added)
Bricks 1000 Nos.
Loading
Un loading
16.00
8.00
32.00
16.00
52.80
52.80
63.30
63.30
44.00
44.00
1000 Nos.
50.70
71.00
94.60
114.90
135.20
20.30
16.90
723.43
361.29
361.29
552.72
552.72
43.60
488.65
632.19
Description of Material
Rate
Description of Material
Rate
Description of Material
Rate
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. Dist.
-:oOo:-
195 / 000
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
24 / 600
From km
6 / 500
to
5 / 820
From km
0 / 000
to
0 / 600
of Loop Road
of PR Road
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
160 / 850
From km
0 / 000
to
0 / 230
of Loop Road
From km
36 / 400
to
24 / 600
From km
6 / 500
to
5 / 820
From km
0 / 000
to
0 / 600
of PR Road
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at Ravulapalem
River Bed to panchayat road
From km
0 / 000
to
0 / 230
From km
36 / 400
to
24 / 600
From km
6 / 500
to
From km
0 / 000
to
Working K.M.
50.00
of Loop Road
5 / 820
0 / 600
of PR Road
KM
Total lead
=
Or say:
D) For Bricks :
Bricks from Jonnada
b) Metalled road length:
From km
13 / 932
to
11 / 600
From km
165 / 200
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
24 / 600
From km
6 / 500
to
5 / 820
From km
0 / 000
to
0 / 600
of Loop Road
of PR Road
c) Total lead
=
Or say:
20
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Kadali Irrigation Channel Road from KM 0.000 to 0.941
km
to
941
0.471
195 / 000
to
156 / 595
From km
58 / 250
to
31 / 735
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
58 / 250
to
31 / 735
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
=
58 / 250
Working K.M.
50.00
to
50 / 215
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
58 / 250
to
31 / 735
Working K.M.
c) Total lead
=
Or say:
254
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Sivakodu - Manepalli Road from KM 13.665 to 16.667
km
13
675
to
16
667
1.496
195 / 000
to
156 / 595
From km
58 / 250
to
31 / 735
From km
0 / 941
to
0 / 000
From km
15 / 171
to
13 / 675
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
58 / 250
to
31 / 735
From km
0 / 941
to
0 / 000
From km
15 / 171
to
13 / 675
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
=
58 / 250
to
From km
0 / 941
to
0 / 000
From km
15 / 171
to
13 / 675
Working K.M.
50.00
50 / 215
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
58 / 250
to
31 / 735
From km
0 / 941
to
0 / 000
From km
15 / 171
to
13 / 675
Working K.M.
c) Total lead
=
Or say:
256
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Pulletikurru - Ambajipeta Road from K.M. 0.000 to 6.420
km
to
420
3.210
195 / 000
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
13 / 700
From km
3 / 210
to
0 / 000
of Loop Road
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
160 / 850
From km
0 / 000
to
0 / 230
of Loop Road
From km
36 / 400
to
13 / 700
From km
3 / 210
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 092
From km
6 / 595
to
From km
7 / 270
to
From km
3 / 210
to
Working K.M.
50.00
0 / 000
6 / 000
0 / 000
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
13 / 700
From km
3 / 210
to
0 / 000
of Loop Road
Working K.M.
c) Total lead
=
Or say:
249
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Munganda - K. Munjavaram Road Road from K.M. 0.000 to 3.800
km
to
800
1.900
195 / 000
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
3 / 185
From km
1 / 900
to
0 / 000
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
49 / 092
to
31 / 735
From km
6 / 595
to
3 / 185
From km
1 / 900
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 092
From km
6 / 595
to
From km
1 / 900
to
Working K.M.
50.00
3 / 185
0 / 000
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
3 / 185
From km
1 / 900
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
250
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Pulletikurru - Ambajipeta Road to Bandarulanka Road (via) G. Agraharam from K.M.0.000 to 3.800
Reach proposed in the present estimate:
km
to
547
1.774
195 / 000
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
13 / 700
of Loop Road
From km
5 / 972
to
0 / 000
From km
3 / 210
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
160 / 850
From km
0 / 000
to
0 / 230
of Loop Road
From km
36 / 400
to
13 / 700
From km
5 / 972
to
0 / 000
From km
3 / 210
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 092
From km
6 / 595
to
From km
7 / 270
to
From km
6 / 240
From km
3 / 210
Working K.M.
50.00
0 / 000
6 / 000
to
5 / 972
to
0 / 000
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
160 / 850
From km
0 / 000
to
0 / 230
From km
36 / 400
to
13 / 700
From km
5 / 972
to
0 / 000
From km
3 / 210
to
0 / 000
of Loop Road
Working K.M.
c) Total lead
=
Or say:
254
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Ambajipeta - Gannavaram Road to K. Munjavaram ( via) Pothailanka From K.M. 0.000 to 4.300
Reach proposed in the present estimate:
km
to
300
2.150
195 / 000
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
1 / 049
From km
2 / 150
to
0 / 000
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
49 / 092
to
31 / 735
From km
6 / 595
to
1 / 049
From km
2 / 150
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 092
From km
6 / 595
to
From km
2 / 150
to
Working K.M.
50.00
1 / 049
0 / 000
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
1 / 049
From km
2 / 150
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
252
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Pothavaram - K.Yenugupalli Road from K.M. 0.000 to 6.620
km
to
620
3.310
195 / 000
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
4 / 672
From km
3 / 310
to
0 / 000
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
49 / 092
to
31 / 735
From km
6 / 595
to
4 / 672
From km
3 / 310
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 092
From km
6 / 595
to
From km
3 / 310
to
Working K.M.
50.00
4 / 672
0 / 000
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
49 / 092
to
31 / 735
From km
6 / 595
to
4 / 672
From km
3 / 310
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
250
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:
Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
P. Gannavaram - K. Munjavaram Road from K.M. 0.000 to 10.075
km
to
10
075
5.038
195 / 000
to
156 / 595
From km
49 / 210
to
31 / 735
From km
2 / 150
to
0 / 000
of NH 5 Lalacheruvu to Ethakota
Working K.M.
c) Total lead
=
Or say:
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
55 / 600
to
60 / 200
From km
183 / 200
to
156 / 595
of Vemagiri to Ethakota NH Jn
From km
49 / 210
to
31 / 735
From km
2 / 150
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road
panchayat road
From km
50 / 215
to
49 / 210
From km
2 / 150
to
0 / 000
Working K.M.
50.00
KM
Total lead
=
Or say:
Visakhapatnam Refinery
to
From km
382 / 400
to
156 / 595
From km
49 / 210
to
31 / 735
From km
2 / 150
to
0 / 000
Working K.M.
c) Total lead
=
Or say:
250
KING STRETCH
2.200 kms
34.150 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
49.660 kms
49.000 kms
0.000 kms
4.600 kms
22.350 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
40.260 kms
40.000 kms
2.200 kms
###
1.250 kms
###
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
###
16.760 kms
17.000 kms
###
2.332 kms
4.350 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
19.992 kms
20.000 kms
KING STRETCH
1
0.941 kms
2.200 kms
38.405 kms
26.515 kms
0.471 kms
67.591 kms
58.000 kms
0.000 kms
4.600 kms
26.605 kms
26.515 kms
0.471 kms
58.191 kms
58.000 kms
0.110 kms
###
0.200 kms
###
8.035 kms
0.471 kms
###
8.816 kms
9.000 kms
###
1.600 kms
225.805 kms
26.515 kms
0.471 kms
254.391 kms
254.000 kms
KING STRETCH
7
2.992 kms
2.200 kms
38.405 kms
26.515 kms
0.941 kms
1.496 kms
kms
69.557 kms
69.000 kms
0.000 kms
4.600 kms
26.605 kms
26.515 kms
0.941 kms
1.496 kms
kms
60.157 kms
60.000 kms
0.110 kms
###
0.200 kms
###
8.035 kms
0.941 kms
1.496 kms
kms
###
10.782 kms
11.000 kms
###
1.600 kms
225.805 kms
26.515 kms
0.941 kms
1.496 kms
kms
256.357 kms
256.000 kms
KING STRETCH
20
6.420 kms
2.200 kms
34.150 kms
0.230 kms
22.700 kms
3.210 kms
kms
62.490 kms
62.000 kms
0.000 kms
4.600 kms
22.350 kms
0.230 kms
22.700 kms
3.210 kms
kms
53.090 kms
53.000 kms
0.110 kms
###
0.200 kms
###
1.123 kms
6.595 kms
1.270 kms
3.210 kms
kms
###
12.508 kms
12.000 kms
###
1.600 kms
221.550 kms
0.230 kms
22.700 kms
3.210 kms
kms
249.290 kms
249.000 kms
KING STRETCH
2.200 kms
38.405 kms
17.357 kms
3.410 kms
1.900 kms
kms
63.272 kms
63.000 kms
0.000 kms
4.600 kms
26.605 kms
17.357 kms
3.410 kms
1.900 kms
kms
53.872 kms
54.000 kms
0.110 kms
###
0.200 kms
###
1.123 kms
3.410 kms
1.900 kms
kms
###
6.743 kms
6.000 kms
###
1.600 kms
225.805 kms
17.357 kms
3.410 kms
1.900 kms
kms
250.072 kms
250.000 kms
KING STRETCH
om K.M.0.000 to 3.800
3.547 kms
2.200 kms
34.150 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
67.026 kms
67.000 kms
0.000 kms
4.600 kms
22.350 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
57.626 kms
57.000 kms
0.110 kms
###
0.200 kms
###
1.123 kms
6.595 kms
1.270 kms
0.268 kms
1.774 kms
kms
###
11.340 kms
11.000 kms
###
1.600 kms
221.550 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
253.826 kms
254.000 kms
KING STRETCH
2.200 kms
38.405 kms
17.357 kms
5.546 kms
2.150 kms
kms
65.658 kms
65.000 kms
0.000 kms
4.600 kms
26.605 kms
17.357 kms
5.546 kms
2.150 kms
kms
56.258 kms
56.000 kms
0.110 kms
###
0.200 kms
###
1.123 kms
5.546 kms
2.150 kms
kms
###
9.129 kms
9.000 kms
###
1.600 kms
225.805 kms
17.357 kms
5.546 kms
2.150 kms
kms
252.458 kms
252.000 kms
KING STRETCH
620
6.620 kms
2.200 kms
38.405 kms
17.357 kms
1.923 kms
3.310 kms
kms
63.195 kms
63.000 kms
0.000 kms
4.600 kms
26.605 kms
17.357 kms
1.923 kms
3.310 kms
kms
53.795 kms
54.000 kms
0.110 kms
###
0.200 kms
###
1.123 kms
1.923 kms
3.310 kms
kms
###
6.666 kms
6.000 kms
###
1.600 kms
225.805 kms
17.357 kms
1.923 kms
3.310 kms
kms
249.995 kms
250.000 kms
KING STRETCH
10.075
10.075 kms
2.200 kms
38.405 kms
17.480 kms
5.038 kms
kms
63.123 kms
63.000 kms
0.000 kms
4.600 kms
26.605 kms
17.480 kms
5.038 kms
kms
53.723 kms
53.000 kms
0.110 kms
###
0.200 kms
###
1.005 kms
5.038 kms
kms
###
6.353 kms
6.000 kms
###
1.600 kms
225.805 kms
17.480 kms
5.038 kms
kms
249.923 kms
250.000 kms
Doors
Sl. No.
1
2
2
Windows
Sl. No.
1
2
Ventillators
Sl. No.
1
Columns
Sl. No.
1
Type
D
D1
D2
Type
W
W1
Type
V
Type
C
Size
3'-6" X 7'-0"
3'-0" X 7'-0"
2'-6" X 7'-0"
Size
4'-0" X 4'-0"
2'-6" X 4'-0"
Size
2'-0" X 1'-6"
Size
0'-9" X 1'-0"
Name of Work :-
ve Engineer (R&B),
sion : Razole
12.00 /-
Lakhs
D BUILDINGS DEPARTMENT
B) Section : Malikipuram
B) Sub-division : Razole
B) Division : Amalapuram
T GODAVARI DISTRICT
800000134 of 860
Sl.
No.
1
Description
No.
Measurements
L
B
4
5
D
6
Quantity
7
FOUNDATIONS, PLINTH,
PEDESTALS, PLINTH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS but excluding
cost of steel and its fabrication charges for finished item of work. for: VRCC
Nominal Mix
1 a) 1st floor for Columns
C-1 - 12
12 x
1
Add excess and rounding of ---- LS -----
0.23
0.38
3.05
: M-20
3.20
0.30
3.50
Cum
2
6
2
2
3
2
1
----
x
1
x
1
x
1
x
1
x
1
x
1
x
1
LS -----
2.400
3.450
1.800
1.650
1.500
1.350
3.000
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.15
0.15
0.15
0.15
0.15
0.25
1.10
0.12
0.11
0.16
0.09
0.10
0.07
2.00
Cum
3
-3
-3
4
-2
-2
2
1
1
----
x
1
x
2
x
2
x
1
x
3
x
3
x
1
x
1
x
1
LS -----
16.080
0.230
0.380
9.980
0.380
0.230
1.220
5.720
5.720
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.38
0.38
0.38
0.38
0.38
0.38
0.45
0.38
0.38
4.22
-0.12
-0.20
3.49
-0.20
-0.12
0.25
0.50
0.50
0.68
9.00
Cum
a)
4
Slab 125mm thickness
Description
No.
overall slab
deduct staircase
Add sitout area
Add excess and rounding of
1
-1
1
----
x
1
x
1
x
1
LS -----
Measurements
L
B
16.080
9.98
3.600
2.40
6.300
1.50
800000135 of 860
D
-------
Quantity
160.48
-8.64
9.45
0.71
162.00
Sqm
c)
1st
floor
for
Roof
5
Slab 150mm thickness
Stair first flight
Mid landing
Stair second flight
Add excess and rounding of
1
1
1
----
x
1
x
1
x
1
LS -----
2.800
2.400
2.800
1.20
0.90
1.20
-------
3.36
2.16
3.36
0.12
9.00
Sqm
as per 456 nominal mix using 20 mm size graded machine
crushed Hard Granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying
concrete, curing and vibrating etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work for Sun Shade 62.50 mm thick, for Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring
Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Ground
floor.
6 a) 1st floor for 62.50mm average thick 0.75M wide Sun shades
For windows W1
2 x
1
2.400
0.750
--For Bay windows BW
6 x
1
3.450
0.750
--Add excess and rounding of ---- LS -----
3.60
15.53
0.87
20.00
Sqm
7 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete,
curing etc.,complete for finished item of work, centering with Steel up to 3.66, lift
manuals per APSS. No. 402. for Stairecase steps.
1st floor for Staircase steps
Stair first flight
1 x
9
1.200
Stair second flight
1 x
9
1.200
Add excess and rounding of ---- LS -----
0.30
0.30
0.15
0.15
0.24
0.24
0.02
0.50
Cum
800000136 of 860
Measurements
Sl.
Description
No.
Quantity
No.
L
B
D
8 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 12 mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and excluding Seigniorage charges and including sales &
other taxes on all materials including all operational, incidental and labour charges such
as machine mixing, laying concrete, curing etc.,complete for finished item of work, , lift
manuals per APSS. No. 402. For 'Z' Holdfasts.
1st floor for Bed blocks & 'Z' Hold fasts
for window bed blocks BW
3.450
0.230
0.15
0.71
2.400
0.230
0.15
0.17
for W1
for BW
for Door D
for Door D1
for Door D2
for Door D3
for main door at sitout
Add excess and rounding of
2
6
2
2
2
2
1
----
x
4
x
4
x
6
x
6
x
6
x
6
x
4
LS -----
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.06
0.19
0.10
0.10
0.10
0.10
0.03
0.04
1.60
Cum
Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC
works complete wastage as per drawings and technical specifications Clause 1000 and
1202 MORD & 1100,1600 MORT & H for Bars below 36 mm dia including over laps and
wastage, where weldeding require to be done campulsorily
including cost and
conveyance of bars from approved sourses to site of work, binding wire, cover blocks
and all incidental,operational, labour charges such as cutting, bending, placing in
position, tying etc., and sales and sales & other taxes, on cost of materials for finished
item of work. for HYSD (F.e 415) F1 upto 3.66 M Lift Manual
Lintel concrete
Beams concrete
3.50
Cum
2.00
Cum
9.00
Cum
20.25
Cum
1.35
Cum
1.25
Cum
160 Kgs/Cum
560.00
120 Kgs/Cum
240.00
170 Kgs/Cum
1,530.00
100 Kgs/Cum
2,025.00
100 Kgs/Cum
40 Kgs/Cum
Or say
135.00
50.00
4,540.00
Kgs
4.600
MT
Description
No.
Measurements
B
800000137 of 860
Quantity
Description
No.
Measurements
B
800000138 of 860
Quantity
Description
No.
Measurements
B
800000139 of 860
Quantity
Description
No.
Measurements
B
800000140 of 860
Quantity
Description
No.
Measurements
B
800000141 of 860
Quantity
Description
No.
Measurements
B
800000142 of 860
Quantity
NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by c
roll formed process steel sheet 1.25mm thick bright CRCA "D"confirming to IS 4351 - 1976 s
should be 50 x 60 mm with 32 mm rebate. The corner of the frame should be welded. The fra
should be painted with one coat of primer and finished painted with pure polyester paint, with to
coated thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate
38mm to accommodate 35mm thick door shutter. The frame section should have groove to ins
gasket. The section of the door and fan light frame is to be filled with polyurethane foam. The fra
section should be cut to length, and joined by way of welding and each frame should be provid
with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 Nos. for single shutter, 6 Nos.
double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm x 200mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 N
for single shutter frame. e)Tie Rod 1 No
1st floor
27 D of size 4'-0"x7'-0"
---
---
---
3.00
No.
27 D1 of size 3'-6"x7'-0"
---
---
---
2.00
No.
28 D2 of size 3'-0"x7'-0"
---
---
---
3.00
No.
Supply and Fixing Flush door shutters, solid bond wood block board type with commercial ply on bo
faces.: 35 mmthick conforming to IS:2202 (part-II) 2983, 4mm thick paint grade commercial plywo
on both sides with internal lipping and 230 mm wide push plate and 150 mm wide kickplate on bo
sides with 1.5mm thick prelaminated sheet (decolam or equivalent) including cost and conveyan
of all materials to work site and including all taxes, all labour charges for making, fixing of d
furniture in position as directed by dept. including cost of furniture fittings like tower bolts, aldro
handles etc., for diferent of doors as mentioned in approved drg. for finished item of work.
1st floor
29 D of size 4'-0"x7'-0"
---
---
---
3.00
No.
30 D1 of size 3'-6"x7'-0"
---
---
---
2.00
No.
31 D2 of size 3'-0"x7'-0"
---
---
---
2.00
No.
32 Supply and fixing of PVC doors to the toilets Door of size 0.75 x 2.00M providing door frame made
hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 X 57mm with the w
thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. The do
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) provid
door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groo
locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5m
+/- 0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. T
shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall
reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
the hardware is fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete w
all materials conveyance charges including providing all fixtures, as per the given design for finish
item of work as directed by the Departmental Officers for finished item of work.
800000143 of 860
993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)
Supply and fixing of PVC doors to the toilets Door of size 0.75 x 2.00M providing door frame made
having dimensions of 40 X 57mm with the w
Sl. hollow extruded PVC section (Nandi or equivalent) Measurements
Description
No.
Quantity
plank
No. thickness of 2mm +/- 0.2mm duly reinforced withL seasoned wood
B
D at the hinges side. The do
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) provid
door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groo
locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5m
+/- 0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. T
shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall
reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
the hardware is fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete w
all materials conveyance charges including providing all fixtures, as per the given design for finish
item of work as directed by the Departmental Officers for finished item of work.
1st floor
D3 of size 2'-6"x7'-0"
---
---
---
2.00
No.
Providing and fixing of Windows/Ventilators made of Pre Painted Steel (base steel as per IS 513
6mm thick "D" quality galvanised as per IS 277 with a zinc of 120 GSM). Primer coated with epo
primer of 5 - 7 microns thick finish painted with a polyester paint of 12-16 microns thick and ba
coated with 5 - 7 microns thick allyed backer. Section for outer frame should be of 46x52 mm sect
for shutters should be of 46x46 mm section for mullion should be of 46x70 mm and section
beeding should be of 18x25 mm the glazing should be panelled with 5mm thick plain glass a
4mm pin headed glass for Ventilators with Ethyl Propylene Diamine Monomar (EPDM) Gaskets. T
sections are to be cut to length, mitre joined with corner brackets. Centre Mulions are to be fix
using mullion cap. Handle made of alluminium powder coated with nylon receiver. Gaskets made
Ethyl Propylene Diamine Monomar (EPDM). Corner brackets made of CRCA with Zinc phosphati
Mullion caps made of glass filled nylon. Guard bars of 10mm are to be provided. the above fra
should be fixed to the concrete/masonary wall by means of self expanding screws ( as per approv
drawing)
1st floor
33 W1 of size 6'-0" x 4'-6"
1.80
---
1.35
4.86
sqm
2.85
---
1.35
23.09
No.
0.60
---
0.60
0.72
No.
36 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 m
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and s
vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at s
height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bo
nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted w
one coat of approved steel primer etc., complete for finished item of work as per special spn 1105
1st floor
Varandha
2.40
---
2.67
6.41
6.41
Sqm
800000144 of 860
Measurements
Sl.
Description
No.
Quantity
No.
L
B
D
39 Painting with White washing for Ceiling and Walls two coats with whiting of approved quality to g
an even shade after thoroughly brushing the surface to remove all dirt and remains of loo
powdered materials including cost of all materials, labour charges and incidental such as scafoldi
lift charges etc., complete for finished item of work, including conveyance charges of materials for
Floors
VVIP bed 1&2
DRG/Dining room 1&2
2
2
T.V. Lounge
Stair case area
toilet 1&2
Dressing room 1&2
sitout area
Stair first & second flight
Mid landing
Add excess and rounding of
1
1
2
2
1
2
1
----
x
x
1
1
4.65
4.65
5.26
4.04
..
..
48.92
37.57
x
1
x
1
x
1
x
1
x
1
x
1
x
1
LS -----
5.87
2.40
1.60
1.60
5.87
1.20
2.40
4.04
1.43
2.51
2.51
1.50
2.80
0.90
..
..
..
..
..
..
..
23.71
3.43
8.03
8.03
8.81
6.72
2.16
2.62
150.00
Sqm
40 Painting for Walls with priming coat of approved quality to give an even shade after thoroug
brushing the surface to remove all dirt and remains of loose powdered materials including cost of
materials, labour charges and incidental such as scafolding, lift charges etc., complete for finish
item of work, including conveyance charges of materials for All Floors - for interior walls
First floor & SF
Total plaster area
Deduct external wall area
2 x
2
Add excess and rounding of ---- LS -----
4.04
---
3.05
#VALUE!
-291.71
4.57
#VALUE!
Sqm
41 Painting for Walls with priming coat of approved quality to give an even shade after thoroug
brushing the surface to remove all dirt and remains of loose powdered materials including cost of
materials, labour charges and incidental such as scafolding, lift charges etc., complete for finish
item of work, including conveyance charges of materials for All Floors - for exterior walls
First floor & SF
Outside along X direction
Outside along Y direction
2
2
x
x
1
1
16.08
9.98
-----
3.35
3.35
107.74
66.87
deduct W1
-1
1.8
---
1.35
-4.86
deduct BW
-1
3.45
---
1.35
-27.95
Deduct D
-1
1.2
---
2.1
-2.52
Deduction V
-1
0.6
---
0.6
-0.72
Deduct FG
-1
0.6
---
1.5
-1.80
Stilt floor
Parapet Ist floor
Parapet IInd floor
45.00
2
1.35
---
0.90
4.86
6.00
---
0.90
10.80
16.08
---
0.90
57.89
9.98
---
0.90
35.93
1.35
---
0.90
4.86
Description
No.
1
L
-2
Measurements
B
6.10
---
800000145 of 860
D
0.90
Quantity
-10.98
6.59
291.71
Sqm
42 Providing 110mm dia ISI marked P.V.C down water take pipes-2.5mm thick including cost
necessary P.V.C Bends, Shoes, Iron Clamps and all other accessories and fixing in position includ
cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operational a
Incidental charges including all labour charges for fixing at site etc; complete for finished item
work.
4
8.00
---
---
32.00
RM
43 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Gran
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials l
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniora
charges, sales & other taxes on all materials including all operational, incidental and labour charg
such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and
fabrication charges for finished item of work for Slabs 50 mm thick etc., for Racks & Platform e
as per APSS. No. 402.
1st floor
For bay windows sill
6 x
1
Add excess and rounding of ---- LS -----
3.450
0.75
15.53
0.47
16.00
sqm
Total Amou
Amount
8889.00
1 Cum
31,112
9035.00
1 Cum
18,070
8806.00
1 Cum
79,254
800000146 of 860
964.10
1 Sqm
1092.20
1 Sqm
681.00
1 Sqm
6029.00
1 Cum
Amount
156,185
9,830
13,620
3,015
800000147 of 860
5781.00
1 Cum
50286.00
1 MT
Amount
9,250
231,316
800000148 of 860
Amount
800000149 of 860
Amount
800000150 of 860
Amount
800000151 of 860
Amount
800000152 of 860
Amount
800000153 of 860
Amount
2998.00
Each
8,994
2915.00
Each
5,830
2862.00
Each
8,586
7037.00
Each
21,111
6507.00
Each
13,014
5976.00
Each
11,952
800000154 of 860
4454.00
Each
Amount
8,908
6261.00
30,428
sqm
6261.00
144,566
Each
4983.00
3,588
Each
2844.00
1 Sqm
18,230
800000155 of 860
Amount
26.30
1 Sqm
3,945
54.90
1 Sqm
#VALUE!
800000156 of 860
48.30
1 Sqm
Amount
14,090
372.00
1 RM
11,904
1111.00
1 sqm
Total Amount
17,776
#VALUE!
800000157 of 860
QUARRY CHART
PR Road
KM 24/6
A-G Road
Bricks Kiln
Jonnada 2.332 kms
Lalacheruvu
km 195.000
Amalapuram -
KM 36/4
NH5 Jn. Km 162.100
Loop Road - 0.
Ravulapalem NH5 Jn. Km 160.8
Kms 165.200
Metal Quarry at
Katheru 2.200 kms CT
unit
Qunatity
1Rm
84
1cum
7.00415
1cum
###
160 of 860
Abstract
Description
Sl.
No.
4 Providing Vibrated Cement concrete (1:3:6) as per 456
nominal mix using 40 mm size graded machine crushed
Hard Granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and sales & other taxes on all
materials including all operational, incidental and labour
charges such as machine mixing, laying concrete, curing
and vibrating but excluding Seigniorage charges,
etc.,complete for finished item of work, per APSS. No.
402. for foundations & Basement walls for:-VCC in CM
(1:3:6)
unit
Qunatity
1cum
#REF!
1cum
#REF!
161 of 860
Abstract
Description
Sl.
No.
6 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Foundations- Footings VRCC
: M-20
Nominal Mix Centering with Steel upto 3.66
unit
Qunatity
1cum
###
1cum
7.5
162 of 860
Abstract
Description
Sl.
No.
8 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Plinth-VRCC : M-20 Nominal Mix Centering
with Steel upto 3.66
unit
Qunatity
1cum
4.6
1cum
2.8
163 of 860
Abstract
Description
Sl.
No.
10 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-LINTELS-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual
unit
Qunatity
1cum
#REF!
1cum
3.6
164 of 860
Abstract
Description
Sl.
No.
12 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
120 mm thick-VRCC : M-20 Nominal Mix Floor - 0
Centering with Casurina Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates, Steel
Centring Plates upto 3.66 Lift Manual
unit
Qunatity
1sqm
98.4
1sqm
#REF!
165 of 860
Abstract
Description
Sl.
No.
14 RCC M- 20 Nominal mix (Cement:fine aggregate: coarse
aggregate) corresponding to Table 9 of IS 456 using
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and sales &
other taxes on all materials including all operational,
incidental and labour charges such as machine mixing,
laying concrete, curing but excluding Seigniorage
charges, etc.,complete for RCC SLABS, BEAMS but
excluding cost of steel and its fabrication charges for
finished item of work. for:-Sun Shade -RCC : M-20
Nominal Mix Floor - 0 Centering with Steel upto 3.66
Slab thk 62.50mm Lift Manual
unit
Qunatity
1sqm
#REF!
1cum
#REF!
1cum
56
166 of 860
Abstract
Description
Sl.
No.
17 Brick Masonary 230mm thick for pannel walls in Super
structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scafolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Super Structure for Lift Manual
unit
Qunatity
1cum
#REF!
1sqm
#REF!
167 of 860
Abstract
Description
Sl.
No.
19 RCC M- 20 Nominal mix (Cement:fine aggregate: coarse
aggregate) corresponding to Table 9 of IS 456 using
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and sales &
other taxes on all materials including all operational,
incidental and labour charges such as machine mixing,
laying concrete, curing, but excluding Seigniorage
charges, etc.,complete for FOUNDATIONS, PLINTH,
PEDESTALS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Foundations-VRCC
: M-20 Nominal Mix Centering with Steel upto 3.66
(STRIP BANDS)
unit
Qunatity
1cum
#REF!
1cum
#REF!
168 of 860
Abstract
Description
Sl.
No.
21 Supplying, fitting and placing HYSD (Fe 415/ tmt grade
as per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above,
where welding required to be done compulsorily
including cost and conveyance of bars from approved
sources to site of work, binding wire, cover blocks and
all incidental, operational, labour charges such as
cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Floor 0 Lift Manual
unit
Qunatity
1MT
4.02
1MT
#REF!
169 of 860
Abstract
Description
Sl.
No.
23 Providing impervious coat to exposed RCC roof slab
surfaces to required slopes with CM (1:3) prop. 20mm
thick (average) mixed with water proofing compound,
laid over roof slab when it is green, finished smooth with
a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and
conveyance of all materials like sand, water proofing
compound, water etc., to site, and sales & other taxes
on all materials and operational, incidental, and labour
charges for mixing mortar, laying, lift charges, rendering
smooth and thread lining, curing including rounding of
junctions of wall and slab, but excluding Seigniorage
charges, etc., complete for finished item of work. (APSS
No. 901 & 903) for:-Impervious coat CM(1:3), 20mm Lift
Manual
unit
Qunatity
1sqm
#REF!
1sqm
150
170 of 860
Abstract
Description
Sl.
No.
25 Plastering 20 mm thick in two coats with base coat of 16
mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
External & Uneven Surfaces of Brick Wall for finished
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
CM (1:4) & (1:6): 20 mm Floor - 0 Centering with Steel
upto 3.66 Lift Manual
unit
Qunatity
1sqm
#REF!
1sqm
#REF!
171 of 860
Abstract
Description
Sl.
No.
27 Flooring with vitrified tiles of 1st quality, set over base
coat of cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including
cost of all materials like cement, sand water and tiles
etc., complete, including seigniorage charges, etc.,
complete for finished item of work, , for:-Floring with
vitrified tiles 8 to 10mm thick in CM 1:8 Floor - 1 Lift
Manual
unit
Qunatity
1sqm
210
1sqm
30
1sqm
30
172 of 860
Abstract
Description
Sl.
No.
30 Dadooing to walls with Glazed Tiles of 1st quality and
premium variety and colour as approved by Engineer,
7mm thick of size not less than 200 mm x 300 mm as
per the design and pattern approved by the architect of
approved colour, shade and make set over a base coat
of C.M (1:5) proportion, 12mm thick and neat grey
cement slurry of honey like consistency, spread at the
rate of 3.3kgs per sqm and jointed with white cement or
coloured cement to match the shade of the tiles,
including cost and conveyance of all materials like
cement, sand, water, tiles, coloured cement etc., to site,
cost of materials and all labour charges for mixing of
cement mortar, laying glazed tiles to level, curing, but
excluding Seigniorage charges, etc., complete for
finished item of work as directed by Engineer-in-charge.
for:-Dadooing tiles in CM 1:5 Lift Manual(CLADDING)
unit
Qunatity
1sqm
110
1sqm
90
1sqm
17
173 of 860
Abstract
Description
Sl.
No.
33 Providing mild steel pipes of diferent diameters
including cost and conveyance of all materials, cutting
and bending to required sizes and shapes placing in
position and welding as per approved designs and
drawings to the supplies at the time of execution of work
including cost and conveyance of materials, welding
rods
and
all
all
wastages
such
as
overlaps,couplings,welded
joints
etc.,
and
all
operational, incidental labour charges such as cutting
bending placing in position, welding etc., complete for
finished item of work for AC Sheet Roof First Floor Lift
manual
unit
Qunatity
1mt
0.11
1No
1.00
1No
2.00
1No
1.00
174 of 860
Abstract
Description
Sl.
No.
37 Supplying and fixing Flush Doors by using Salwood
frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 0.9x2.1 m
unit
Qunatity
1No
2.00
1No
1.00
1No
2.00
1No
4.00
175 of 860
Abstract
Description
Sl.
No.
41 Supplying and fixing fully paneled windows by using
Salwood frame of section 100x75 mm and shutter using
Teak wood styles and 20 mm thick teak wood panels
including cost and conveyance of Salwood, Teakwood
and providing MS Grills for safty grill, cost of furniture
fittings and fixing MS safty grills to frame including
labour charges and fixing in position etc., complete for
finished item of work as directed by Engineer - in Charge. for WINDOWS SIZE 0.9x1.07
unit
Qunatity
1No
2.00
1No
3.00
1No
1.00
176 of 860
Abstract
Description
Sl.
No.
44 Painting with White washing for Ceiling and Walls Two
coats with whiting of approved quality to give an even
shade after thoroughly brushing the surface to remove
all dirt and remains of loose powdered materials
including cost of all materials, labour charges and
incidental such as scafolding, lift charges etc., complete
for finished item of work, including conveyance charges
of materials for All Floors
unit
Qunatity
1sqm
230.00
1sqm
#REF!
1sqm
#REF!
1sqm
200
177 of 860
Abstract
Description
unit
Qunatity
Sl.
No.
48 Conveyance of surplus excavated earth with an extra 1Cum..
100
lead of 2 KMs over intial lead & lifts and cost and
transportation by tractors, loading & unloading charges
etc., complete, as directed by the Departmental officers
etc., complete for finished item of work.
RM
20.00
178 of 860
Abstract
Description
Sl.
No.
50 ARCH TYPE WINDOW(TEAK WOOD) 1NO
51 BAY WINDOWS 2 NOS
52 PROVIDING MS RAILING USING 40MM MS PIPES
unit
Qunatity
LS
LS
LS
LS
LS
LS
LS
57 ROUNDING OFF
LS
CIVIL WORK TOTAL
179 of 860
Amount
241.7
20,303
244
1,709
3622.3
8,331
180 of 860
Rate
Amount
5072.5
#REF!
6772
#REF!
181 of 860
Rate
Amount
7104.5
68,232
7407.7
55,558
182 of 860
Rate
Amount
9068.7
41,716
8610
24,108
183 of 860
Rate
Amount
8690.5
#REF!
8150.9
29,343
184 of 860
Rate
Amount
963.7
94,828
1127.9
#REF!
185 of 860
Rate
Amount
664.4
#REF!
19.9
#REF!
714.8
40,029
186 of 860
Rate
Amount
4541.1
#REF!
569.4
#REF!
187 of 860
Rate
Amount
6902.4
#REF!
5604
#REF!
188 of 860
Rate
Amount
64159.2
257,920
58174.2
#REF!
189 of 860
Rate
Amount
319.2
#REF!
300.1
45,015
190 of 860
Rate
Amount
301.2
#REF!
286.4
#REF!
191 of 860
Rate
Amount
1532.3
321,783
1534.6
46,038
855.7
25,671
192 of 860
Rate
Amount
801.2
88,132
645.2
58,068
374.2
6,361
193 of 860
Rate
Amount
64903.6
7,139
7209
7,209
6701.2
13,402
6445.1
6,445
194 of 860
Rate
Amount
6193.3
12,387
6077.5
6,078
20332.8
40,666
12344.3
49,377
195 of 860
Rate
Amount
11209.7
22,419
1723.3
985.2
5,170
985
196 of 860
Rate
Amount
27.1
6,233
92.5
#REF!
154.7
#REF!
146.2
29,240
197 of 860
Rate
Amount
64.8
6,480
365.3
7,306
198 of 860
Rate
Amount
25000
60000
50000
25,000
60,000
50,000
50000
50,000
50000
50,000
50000
50000
50,000
50,000
10217
10,217
#REF!
199 of 860
unit
Qunatity
1Rm
84.00
1cum
7.00
1cum
56.00
200 of 860
Abstract
Description
Sl.
No.
4 Plain Cement Concrete (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) for
foundation levelling courses and below flooring beds
using 40mm size (SS5) hard Granite metal upto Plinth
level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site and sales & other taxes on
all materials and including all charges for mixing, laying
concrete in foundations ramming in 15 cm layers
finishing top surface to the required level curing, but
excluding seigniorage charge etc., complete for finished
item of work. (APSS No. 402) for:-Machine Mix-PCC
(1:5:10) NOMINAL MIX
unit
Qunatity
1cum
2.30
1cum
9.60
201 of 860
Abstract
Description
Sl.
No.
6 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Pile caps -VRCC
: M-20 Nominal Mix
Centering with Steel upto 3.66
unit
Qunatity
1cum
7.50
1cum
4.60
202 of 860
Abstract
Description
Sl.
No.
8 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Columns-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual
unit
Qunatity
1cum
2.80
1cum
3.60
203 of 860
Abstract
Description
Sl.
No.
10 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
120 mm thick-VRCC : M-20 Nominal Mix Floor - 0
Centering with Casurina Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates, Steel
Centring Plates upto 3.66 Lift Manual
unit
Qunatity
1sqm
98.40
1sqm
#REF!
204 of 860
Abstract
Description
Sl.
No.
4 Brick Masonary 230mm thick for pannel walls in Super
structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scafolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Super Structure for Lift Manual
unit
Qunatity
1cum
#REF!
1cum
#REF!
205 of 860
Abstract
Description
Sl.
No.
13 Supplying, fitting and placing HYSD (Fe 415/ tmt grade
as per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above,
where welding required to be done compulsorily
including cost and conveyance of bars from approved
sources to site of work, binding wire, cover blocks and
all incidental, operational, labour charges such as
cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Floor 0 Lift Manual
unit
Qunatity
1MT
4.02
1sqm
150.00
206 of 860
Abstract
Description
Sl.
No.
15 Plastering 20 mm thick in two coats with base coat of 16
mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
External & Uneven Surfaces of Brick Wall for finished
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
CM (1:4) & (1:6): 20 mm Floor - 0 Centering with Steel
upto 3.66 Lift Manual
16 ROUNDING OFF
unit
Qunatity
1sqm
#REF!
1sqm
#REF!
LS
CIVIL WORK TOTAL
Abstract
Sl.
No.
Description
(R&B) Division : Amalapuram
unit
Qunatity
(R&B) Circle : Kakinada
208 of 860
Amount
191
16,044
231.6
1,622
714.8
40,029
209 of 860
Rate
Amount
3484.4
8,014
7563.8
72,643
210 of 860
Rate
Amount
7906.9
59,302
9480.5
43,610
211 of 860
Rate
Amount
8816.7
24,687
8575.8
30,873
212 of 860
Rate
Amount
541.06
53,240
924.9
#REF!
213 of 860
Rate
Amount
4541.1
6029
#REF!
214 of 860
Rate
Amount
49445.3
198,770
289.6
43,440
215 of 860
Rate
Amount
301.2
275.1
#REF!
10217
#REF!
Rate
Amount
217 of 860
11 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80
Unit
Rate
Rm
131.00
Add LA charges
Rm
33.00
each
131.00
1 S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including
the cost of pipe & its fittings & labour charges complete
Code
Unit for finished
Rate itemof work.
Material
BMW-F.85
Rm
269.00
Amount
131.00
0.00
14%
131.00
17.84
148.84
or say
149.00
269.00
2 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
(not requiring blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method
Rate
320.00
166.40
Foundation of Buildings
Seigniorage charges
cum
cum
166.40
30.00
cum
321.20
2 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method
Rate
320.00
116.48
Seigniorage charges
cum
30.00
cum
146.48
1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross draina
appurtenant structures and placing the excavated stuf neatly in specified dump area or disposing of
directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Rate
Out turn of two mazdoors assumed at 4 cum per day.
DATA:
Manpower
SOR P. No. 266/I/10
Work Inspector
day
275.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
198.88
Excavation
Method
Seigniorage charges
cum
30.00
cum
228.88
1 Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers clear
carefully stacking materials useful for reuse if any etc., complete as directed by the Engineer-in-charge of th
Dismantling the existing Manglore tiled roof over ceiling tiles - Unit 1 sqm
Code
Manpower
BMT-S.05
Unit
Rate
sqm
8.30
8.30
cum
8.30
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
390.40
393.79
cum
397.73
1 Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100 metres lead la
etc., complete as directed by the Engineer - in - Charge.
Unreinforced cement concrete upto 15 cm thicknes
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
780.80
784.19
cum
792.03
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
1382.40
1385.79
cum
1399.65
3 Dismantling Brick work including stacking of serviceable materials and disposal of unserviceable materia
metres lead labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge
Brick Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
130.88
134.27
cum
135.61
2 Dismantling Kadapa slabs or Shahabad stone slabs flooring on sand bed carefully stacking materials us
including labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge.
Kadapa slabs or Shahabad stones
Code
Manpower
Unit
Rate
BMT-S.11
sqm
4.20
cum
4.20
cum
4.20
4 Dismantling clearing away and carefully stacking materials useful for reuse Old cement mortar plaster inclu
of serviceable materials and disposal of unserviceable materials within 100 metres lead labour charges etc
finished item of work as directed by the Engineer - in - Charge.
Old cement mortar plaster for 1 sqm
Code
Miscellaneous
BMT-S.08
Old cement mortar plaster
Add LA charges
Add Over Head Charges
Unit
Rate
sqm
cum
2.90
2.90
cum
2.90
5 Removing and Refixing Windows glazed of any thickness fixing the frame, fixing the fixures to the win
Labour charges for making, fabricating office furniture, racks, work-station furniture, cup-board shutters to
boards with ply-wood/ MDF sheets, decolam/ veneer laminations including fixing cutting, making, asse
hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with necessary screws exc
materials, accessories, fittings etc., complete as directed by the Engineer-in-charge of the work
Labour
charges
for making,
fabricatingfixing
officethe
Removing and Refixing
Windows
glazed
of any thickness
Code
Manpower
BMM-V.07
Unit
Rate
sqm
365.00
365.00
sqm
365.00
6 Dismantling the existing Wrought and framed timber in roofs or floors clearing away and carefully stack
useful for reuse if any etc., complete as directed by the Engineer-in-charge of the work
Dismantling the existing Wrought and framed timber in roofs or floors
Code
Unit
Manpower
BMT-S.06
cum
Add LA charges
Add Over Head Charges
Rate
125.00
125.00
cum
125.00
5 Plain Cement concrete (1:6:10) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course
Code
Material
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
Water
Mechinery
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
day
day
cum
420.00
320.00
486.80
cum
3113.06
22 Plain Cement concrete (1:4:8) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
Water
Machinary
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
day
day
cum
420.00
320.00
486.80
cum
3235.33
23 Providing Vibrated Cement concrete (1:3:6) as per 456 nominal mix using 40 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, per APSS. No. 402.
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
4008.82
Water
Mechinery
SOR P. No. 379/16
SOR P. No. 379/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
Miscellaneous
3 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. First Floor
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
2.47
165.70
hour
1.78
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
day
day
day
cum
420.00
375.00
320.00
43.89
BLD-CSTN-6-1
cum
day
day
cum
3099.09
420.00
320.00
55.92
cum
234.94
2 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. Second Floor
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
hour
2.47
165.70
1.78
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
day
day
day
cum
420.00
375.00
320.00
43.89
Lift charges F2
Add LA charges
cum
cum
4.81
4.81
Miscellaneous
Miscellaneous
BLD-CSTN-6-1
cum
day
day
cum
3099.09
420.00
320.00
55.92
Lift charges F2
Add LA charges
cum
cum
5.59
5.59
cum
239.75
6 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for FOOTINGS FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1
Code
Material
Unit
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
420.00
375.00
320.00
1627.99
cum
723.00
Add LA charges
cum
446.00
cum
6922.71
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 /
A/Footings
7 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PEDASTALS FI
Code
Material
Unit
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
420.00
375.00
320.00
1627.99
cum
1025.00
Add LA charges
cum
710.00
cum
7224.71
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 /
B/Pedastals
8 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PLINTH BEAM FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Plinth Beam -F1
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
420.00
375.00
320.00
1627.99
cum
2410.00
Add LA charges
cum
1075.00
cum
8609.71
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89/C/
Plinth beam
9 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
420.00
375.00
320.00
1924.77
BACIC RATE 1 Cum
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns FI
cum
1075.00
Add LA charges
cum
948.00
cum
7571.49
10 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F2
cum
1170.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
948.00
249.85
249.85
cum
7916.34
11 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F3
cum
1265.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1138.00
499.70
499.70
cum
8261.19
12 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F1
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 89 /
Lintels First floor
cum
1518.00
Add LA charges
cum
675.00
cum
8014.49
13 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F2
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Lintels Second floor
cum
1586.00
cum
cum
cum
743.00
249.85
249.85
cum
8332.34
14 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F3
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Lintels Third floor
cum
1653.00
cum
cum
cum
810.00
499.70
499.70
cum
8649.19
15 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS centering with Stell up to
APSS. No. 402. for BEAMS FI
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
513.42
1920.72
77.00
hour
522.50
90.49
165.70
42.07
day
day
day
cum
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams FI
420.00
375.00
320.00
1062.66
BACIC RATE 1 Cum
cum
2071.00
Add LA charges
cum
795.00
cum
6999.98
16 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F2
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Beams Second floor
cum
2151.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
875.00
119.52
119.52
cum
7199.50
17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F3
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Beams Third floor
cum
2230.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
954.00
239.04
239.04
cum
7398.02
17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
11.46
165.70
5.33
day
day
day
cum
420.00
375.00
320.00
132.94
BACIC RATE 1 SQM
cum
232.00
Add LA charges
cum
89.00
cum
848.57
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 / Slabs
up to 150 mm thick
First floor
18 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F2
V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Second floor
cum
241.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
98.00
14.97
14.97
cum
872.54
19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F3
V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Third floor
cum
250.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
107.00
29.94
29.94
cum
896.51
20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
20.27
165.70
9.43
day
day
day
cum
420.00
375.00
320.00
238.99
BACIC RATE 1 SQM
cum
242.00
Add LA charges
cum
93.00
cum
1350.70
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 / Slabs
up to 225 mm thick
First floor
21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor
cum
251.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
102.00
26.87
26.87
cum
1386.57
22 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick RCC Steps for Staircase F3
V.R.C.C. Design Mix M-20 Centering up to 3.66 M RCC Steps for Staircase 225mm thick F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor
cum
261.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
112.00
53.74
53.74
cum
1423.44
19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick SUN SHADES FI
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
3.52
day
day
day
cum
420.00
375.00
320.00
66.12
BACIC RATE 1 SQM
cum
271.00
Add LA charges
cum
104.00
cum
575.46
Mechinery
SOR P. No. 325/9
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 /
CHAJJAS SUNSHADES First
floor
20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F2
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Second
floor
cum
281.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
114.00
6.96
6.96
cum
592.42
21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F3
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Third
floor
cum
292.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
125.00
13.92
13.92
cum
610.38
7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.
Rate
CSSN-A-05
cum
5.20
BLD-CSTN-1.9
cum
1920.72
M 005
cum
513.42
Water
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
day
cum
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
420.00
375.00
320.00
1307.99
SOR P. No. 89 /
B/Pedastals
cum
1025.00
Add LA charges
cum
710.00
cum
6959.38
19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, W
RCC WALLS IN BUILDINGS, for Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall
Centring Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Lintles F2.
Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77
cum
1844.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1084.00
392.63
392.63
cum
8239.79
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F3
Code
Material
Unit
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
Water
Mechinery
SOR P. No. 325/16
hour
328.60
hour
50.68
165.70
36.47
day
day
420.00
375.00
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
Light mazdoor
Add LA charges
day
cum
320.00
878.02
cum
2619.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1277.00
193.03
193.03
cum
7694.12
Miscellaneous
SOR P. No. 90 /
Beams
## Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor
F3
Unit
Rate
cum
cum
5.20
1920.72
cum
513.42
Kl
77.00
hour
328.60
5.12
165.70
3.69
hour
day
day
day
sqm
420.00
375.00
320.00
87.82
sqm
297.00
Add LA charges
Lift charges F2
Add LA charges
sqm
sqm
sqm
145.00
19.33
19.33
cum
741.37
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sun Shades First floor
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1, Lift Manual
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
hour
day
day
day
cum
420.00
375.00
320.00
878.02
BACIC RATE 1 CUM
cum
289.00
Add LA charges
cum
139.00
cum
570.80
20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Third floor.
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 3
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
3.23
165.70
2.32
hour
day
day
day
cum
420.00
375.00
320.00
54.60
SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor
cum
317.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
167.00
12.03
12.03
cum
633.51
1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F1
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
165.70
1.78
hour
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
248.54
21 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F2
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Water
Kl
77.00
hour
328.60
2.47
165.70
1.78
day
day
day
sqm
420.00
375.00
320.00
83.94
Lift charges F2
Add LA charges
sqm
sqm
8.82
8.82
cum
257.36
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
## Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F3
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
Lift charges F3
Add LA charges
Add Over Head Charges
Total rate per 1 sqm
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
165.70
1.78
hour
day
day
day
sqm
420.00
375.00
320.00
83.94
sqm
sqm
17.64
17.64
cum
266.18
1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual
F1
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
723.00
cum
446.00
cum
969.39
1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual
F3
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
sqm
sqm
446.00
17.28
17.28
cum
986.67
5 Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and baseme
lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming
and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P e
Refilling foundation
for finished item of work. (APSS NO. 309 & 310) for Refilling foundations.
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
16.64
Add Over Head Charges
Total rate per 1 cum
cum
16.64
17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure FI
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
304.84
cum
260.71
cum
4238.26
1 Reinforced Brick Masonary walls of 100 mm thick in CM (1:4) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Reinforced Brick Masonary walls of 100 mm in CM(1:4) for F1
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 91 / First
floor
Unit
Rate
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
sqm
68.59
58.66
sqm
524.79
5 Providing Vibrated Cement concrete (1:2:4) as per 456 nominal mix using 20 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No.
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
189.80
165.70
136.60
hour
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
5420.19
10 Providing Cement concrete (1:2:4) as per 456 nominal mix using 12 mm size graded machine crushed
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No
for top of compound wall
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
189.80
day
day
cum
420.00
320.00
486.80
SOR P. No. 89 /
A/Footings
cum
723.00
Add LA charges
cum
446.00
cum
5069.92
19 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 91 / First
floor
Unit
Rate
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
sqm
68.59
58.66
sqm
512.31
6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
Stell up to 3.66, as per APSS. No. 402 for Strip Bands.
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
0.00
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
723.00
Add LA charges
cum
446.00
cum
6491.68
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 89 /
A/Footings
19 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof First Floor Lift manual
Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4
Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Rate
kg
70.00
M.T
38000.00
each
9.00
day
day
day
420.00
420.00
320.00
Hr
61.20
cum
7400.00
Mechinery
Welding Charges (Hire charges of Welding
Machine)
Add LA charges
cum
48852.00
28 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual
Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4
Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Rate
kg
70.00
M.T
38000.00
each
9.00
day
day
day
cum
420.00
420.00
320.00
7400.00
Hr
61.20
Lift charges F2
Add LA charges
cum
cum
740.00
740.00
cum
49592.00
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges
Mechinery
Welding Charges (Hire charges of Welding
Machine)
Miscellaneous
19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for FI
Impervious coat in CM (1:3) 20mm thick FI, Lift Manual.
Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 21/BMTImpervious Water Proof Compound
H.01
Unit
Rate
kg
Cum
5.20
513.42
kg
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Sqm
271.87
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
20 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F3
Impervious coat in CM (1:3) 20mm thickF3
Code
Material
CSSN-A-05
M 005
BMT-H.01
Manpower
CSSR-M-011
CSSR-M-077
CSSR-M-087
Unit
Rate
kg
5.20
Cum
kg
513.42
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Lift charges F3
Add LA charges
Sqm
Sqm
40.78
40.78
sqm
312.65
Miscellaneous
22 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
Ceilling Plastering with CM 2 coats, 12 mm thick F3
finished item of work (APSS 901,903 & 904) for Celling plastering F3.
Code
Unit
Rate
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
23.91
Add LA charges
Lift charges F3
Add LA charges
Sqm
Sqm
Sqm
21.54
41.28
41.28
Sqm
305.74
Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering
1 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in
dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to
seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on
including cost of all labour charges for mixing mortar, finishing, scafolding, lift charges, curing etc., a
Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for fin
work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual
Unit
Rate
kg
cum
5.20
513.42
kg
cum
5.20
513.42
day
day
day
cum
420.00
375.00
320.00
206.39
Sqm
6.86
Add LA charges
cum
5.87
cum
242.17
24 Flooring plastering 20mm thick average in CM (1:4) with sponze finishing.cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth curing, etc,, complete for finished item of work (APSS 901,903 & 904) fo
Unit
Rate
kg
cum
5.20
513.42
day
day
cum
375.00
320.00
86.45
cum
136.54
25 Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards and Labour charges for
of paris false ceiling with for GI channels of perimeter channel 30mm x 27mm x 0.55 thick and ceilin
51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint compound and luppum/ p
per specification without painting including cost of all materials including cost of Plaster of paris shee
finished item of work
Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards
Code
Material
Unit
Rate
Coefficient
BMT-M.54
Sqm
327.00
BMT-M.07
Rm
65.00
BMT-M.05
Rm
74.00
BMT-H.90
kg
14.00
Corpenter CI-1
Painter CI-1
Painter CII-2
Light mazdoor
Add LA charges
day
day
day
day
Sqm
420.00
480.00
375.00
320.00
533.63
sqm
1006.40
Manpower
31 Replacing boken glass pannel with 4mm pin headed glass including cost, conveyance of all materials to
operational, incidental and labour charge etc., complete for finished item of work as directed by the E
Charge.
Replacing boken glass pannel with 4mm pin headed glass
Code
Unit
Rate
Manpower
BMT-I.13, P.No. 27
BMM-V.24, P. No. 83
sqm
220.00
sqm
220.00
Labour charges
sqm
173.00
Add LA charges
173.00
cum
L.S
cum
515.00
16 Supply of NITO bond AR 8 or equivalent chemical including cost and conveyance of all materials to site
taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of NITO bond AR 8 or equivalent chemical
Code
Material
NITO bond AR 8 or equivalent chemical approved
rate
Unit
Rate
lit
440.00
17 Supply of CONPLAST X 421 IC admixure equivalent chemical including cost and conveyance of all ma
including all taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of CONPLAST X 421 IC admixure equivalent chemical
Code
Unit
Rate
Material
CONPLAST X 421 IC admixure equivalent
chemical approved rate
lit
104.00
18 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary soil
For Ordinary soil up to 3 M
3M
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
116.48
Excavation Method
Seigniorage charges
cum
30.00
cum
146.48
4 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost
of purlins,
trusses
& cost of conveyance
of all materials
item of work upto 600 pitch S
Roofing
with 6rafters,
mm thick
corrugated
asbestos cement
sheets finished
F2
Code
Material
BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4
Unit
Rate
t/sqm
nos
nos
nos
1880.00
8.00
0.50
0.20
day
day
cum
375.00
320.00
33.51
Miscellaneous
Sundries including 50 x 6 mm iron wind ties
white lead etc.
L.S
L.S
Lift charges F2
Add LA charges
cum
cum
3.35
3.35
sqm
3001.00
1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F2
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
526.07
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
sqm
554.55
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F3
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
526.07
Lift charges F3
Add LA charges
Add water Charges
sqm
sqm
sqm
45.98
45.98
45.98
sqm
577.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
35 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
843.00
Kg
5.20
cum
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1159.57
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
sqm
1171.17
2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F3
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
843.00
Kg
5.20
cum
513.42
Kg
29.00
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1159.57
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
1217.61
Miscellaneous
34 Flooring with ceramic tiles, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.01
Unit
Rate
Sqm
465.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
762.27
sqm
769.89
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
24 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement
pasteceramic
to full tiles,
depthset
mixed
with coat
pigment
of matching
shade,
cost of all materials like cemen
Flooring with
over base
of cement
mortar (1:8),
12 including
mm thick F3
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
Code
Unit
Rate
conveyance of all materials. for F3
Material
SOR P. No. 12 / BMTC.01
Sqm
465.00
Kg
cum
Kg
5.20
513.42
29.00
day
day
day
420.00
375.00
320.00
Manpower
Add LA charges
Add water Charges
Sqm
sqm
229.92
758.52
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
812.55
Miscellaneous
35 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement paint spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, in
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
finished item of work. (APSS No 701 & 707) for Bath rooms F1
Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), F1
Code
Material
Unit
Rate
Sqm
413.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
sqm
717.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
34 Flooring with Chequered Terrazzo tiles of 22 mm thick (Medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F1
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
420.00
375.00
320.00
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Add LA charges
Add water Charges
Sqm
sqm
229.92
526.07
sqm
531.33
L.S
L.S
sqm
Rate
1880.00
8.00
0.50
0.20
375.00
320.00
33.51
2997.65
32 Supply and fixing of PVC doors to the toilets size 0.90 x 2.10M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.
Code
Considering siz of PVC door 090 x 2.10M
for PVC door frame (V)
for PVC door frame (H)
Unit
2x 2.10 =
2x 0.90 =
0.90x 2.10 =
Rate
ABSTRACT
Material
BMT-N.46
BMT-N.44
rm
sqm
215.00
1570.00
cum
4257.30
33 Gronolithick Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine c
laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m
the top surface to required smoothness and slopes and thread lining including cost of all materials like c
sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but
cost of conveyance of all materials for F1
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size F1
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Unit
Rate
Sqm
1715.64
Kg
cum
5.20
513.42
day
day
day
Sqm
sqm
285.00
260.00
215.00
101.69
217.96
sqm
220.14
29 NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by cold roll fo
steel sheet 1.25mm thick bright CRCA confirming to IS 4351 - 1976 size should be 50 x 60 mm with 32 m
corner of the frame should be welded. The frame should be painted with one coat of primer and finished
pure polyester paint, with total coated thickness of 1.25 mm. Size of door frame section should be of 105x
rebate of 38mm to accommodate 35mm thick door shutter. The frame section should have groove to inse
section of the door and fan light frame is to be filled with polyurethane foam. The frame section should be
and joined by way of welding and each frame should be provided with: a) 2mm thick MS powder coated
100nn long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 No
vertical. c) 40mm x 200mm x 1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Al
1 No. for single shutter frame. e)Tie Rod 1 No
Code
Material
BMT-F.01
Unit
Rate
Rm
233.00
sqm
233.00
32 Cost Suply and Fixing Fly proof mesh ( Netlon make) of superior quality to the existing Windows & Ven
alround Willkro tape ( Male and Female Streep) duly fixing the tape to the Windows & Ventilaters frame us
screws Code
and gum of all materials work site and including all taxes and Unit
all labour charges
Rate for striching, ma
position as directed by Dept| Officers for finished item of work
Unit taken 6' - 0" x 4' - 6" =
###
For Window
27.00 Sft=
For frame
( 6'-0" + 6'-0") + (4'-6' + 4'-6' )
21.00 Rft Or
Material
BMT-F.18
Cost of Fly proof mesh (Netlon)
sqm
155.00
BMT-M.23
Cost of male and female tap
Rm
5.00
Stiching charges
L.S
Rm
15.00
Gum and Screws
L.S
Rm
7.00
Labour charges fixing
L.S
sqm
40.00
Wollon fly proof mesh for Window
Add Over Head Charges
1.00 sqm
2.510 sqm
each
662.25
25 Supply of Best Country Wood ( Sal Wood ) wrought and putup Sal Wood scantlings: any length in length
and conveyance of all materials to work site and all operational, incidential, labour charges, etc., comple
item
of work
Supply of Best Country Wood Sal Wood scantlings: any length wrought and putup
Code
Material
BMT-E.15
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
38847.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
26 Supply of Best Country Wood ( Sal Wood ) wrought and putup in Sal Wood Plancks: any thickness in len
cost and conveyance of all materials to work site and all operational, incidential, labour charges, etc.,
finished item of work
Supply of Best Country Wood Sal Wood Plancks: any thickness wrought and putup
Code
Material
BMT-E.16
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
49491.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
1 Supply of Best Teak Wood wrought and putup Teak Wood scantlings: any length including cost and conv
materials to work site and all operational, incidential, labour charges, etc., complete for finished item of wo
Supply of Best Teak Wood scantlings: any length wrought and putup
Code
Material
BMT-E.06
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
81225.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
2 Supply of Best Teak Wood wrought and putup in Teak Wood Plancks: any thickness in length includ
conveyance of all materials to work site and all operational, incidential, labour charges, etc., complete for
of work
Supply of Best Teak Wood Plancks: any thickness wrought and putup
Code
Material
BMT-E.08
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
116540.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
Code
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Carpenter Cl- I
Light mazdoor
Add LA charges
Unit
Rate
day
day
Sqm
420.00
320.00
10250.00
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.20 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.20 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.52 sqm
Total Frame
35 mm thick
1x1.085x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
512.83
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
5252.99
1.20 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.05 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.05 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.21 sqm
Total Frame
35 mm thick
1x0.935x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
441.92
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4890.50
1.05 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.00 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.00 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.10 sqm
Total Frame
35 mm thick
1x0.855x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
404.11
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4708.28
1.00 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.90 x 2.10 M
Code
Unit
Rate
0.90 M x
For frame
Verticlal
Horizontal
1.89 sqm
2.10 M
Total Frame
35 mm thick
1x0.785x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
371.04
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4528.13
0.90 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.85 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
0.85 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
1.79 sqm
Total Frame
35 mm thick
1x0.755x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
356.85
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4444.91
0.85 x 2.10 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 1.50x1.35
Country wood Framed and Fully Panneled Window Three Shutters
Code
Unit taken 1.50x1.35 ( 3 Shutters) =
1.50 M x
For frame
Verticlal
Horizontal
1.35 M
Unit
Rate
2.025 sqm
ABSTRACT
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
555.75
Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
Nos
Nos
Nos
Nos
Nos
6
6
6
3
3
sqm
14751.20
1.50 x 1.35 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.35
Country wood Framed and Fully Panneled Window Double Shutters
Code
Unit taken 0.90x1.35 ( 2 Shutters) =
0.90 M x
For frame
Verticlal
Horizontal
1.35 M
Unit
Rate
1.215 sqm
ABSTRACT
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
444.41
Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
Nos
Nos
Nos
Nos
Nos
2
4
4
2
2
sqm
8982.41
0.90 x 1.35 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.07
Country wood Framed and Fully Panneled Window Double Shutters
Code
Unit taken 0.90x1.07 ( 2 Shutters) =
0.90 M x
For frame
Verticlal
Horizontal
1.07 M
Unit
Rate
0.963 sqm
Horizontal
ABSTRACT
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
444.41
Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
Nos
Nos
Nos
Nos
Nos
2
4
4
2
2
sqm
8158.72
0.90 x 1.07 M
1 Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.90 x 0.60m
Code
Unit taken 0.90x0.60 =
0.90 M x
For frame
Verticlal
Horizontal
0.60 M
Unit
Rate
0.540 sqm
Cum
49097.00
Sqm
952.25
Sqm
Sqm
334.00
180.36
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
38.64
BMT-I.01
Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
sqm
1533.32
Glazed Ventilator
## Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.60 x 0.45m
Code
0.60 M x
For frame
Verticlal
Horizontal
0.45 M
Unit
Rate
0.270 sqm
Cum
Sqm
49097.00
952.25
Sqm
Sqm
334.00
90.18
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
19.32
BMT-I.01
Add LA charges
sqm
852.14
Glazed Ventilator
Fully Panneled Window=
2.03 sqm
1.00 sqm
LS
28 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 100 x 2.00 Door single le
of with are made of well seasoned best country wood 3"x4" free from all difects such as werping, bend
and
fixed with 6 nos 'Z' hold fasts of size 300x40mm size and withBLD-CSTN-13-12-243
1 1/2 thick best country wood styles and r
Country wood Framed and Planked Doors (Schedule Item No. 297
thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup and con
Code
materials
work site and including all taxes, all laber charges for making,Unit
fixing of doorRate
furniture in position
1/2
21.67
Unit
3'-3
"x6'-7"
= Tower bolts (Ave
sft
2.00 sqm
Dept|taken
Officers
including
Top
: Size), Bottom
Tower bolts 150mm
long, Brass Butt hinges
mm Long, MS-Powder Coated AldropFor
(IS:2681)
frame 250 mm long, Heavy duty Aluminium Door stopper, Alu
Handles (IS:208) 150 mm Long, MS-Powder
Coated Aldrop
(IS:2681)
Verticlal
2 x 6'-7"
x 3" x300
4" =mm long and all labour charges su
by the Departmental Officers for finished
item
of
work.
for
External
doors
(Schedule Item 292)
1/2
Horizontal
1x 3'-3 " x 3" x 4" =
For Shutter frame
Verticlal
Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =
BMT-G.09
BMT-G.08
BMT-G.22
BMT-G.57
BMT-G.34
BMT-G.45
166
164
182
214
191
202
cft
cft
Cum
1390.26
1691.66
10250.00
LS
sqm
8381.98
2.00 sqm
1.00 x 2.00 M
1.00 sqm
29 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 1.00 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 297
7/8" thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup an
Code
Unit
Rate
of all materials work site and including all taxes, all laber charges for
making, fixing
of door furniture
1/2
21.67bolts (Ave
Unit
taken
sft : Size), Bottom2.00
sqm
directed
by 3'-3
Dept| "x6'-7"
Officers =including Top Tower
Tower
bolts 150mm long, Al
hinges (IS:205)- 150 mm Long, MS-Powder
Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
For frame
Aluminium Door Handles (IS:208) 150 mm
Long and all2labour
as diricted by the Department
Verticlal
x 6'-7" charges
x 3" x 4" such
=
finished item of work. for Internal doors (Schedule Item 293) 1/2
Horizontal
1x 3'-3 " x 3" x 4" =
For Shutter frame
Verticlal
Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =
cft
cft
Cum
1390.26
1691.66
10250.00
LS
166
164
183
200
214
191
Nos
Nos
Nos
Nos
Nos
Nos
1
1
6
1
1
1
sqm
7810.98
1.00 x 2.00 M
2.00 sqm
1.00 sqm
30 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 0.75 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 293
7/8" thick Sal wood flanks for pannels as per specifications of APDSS
including cost, wrought and putup an
of all materials work site and including all taxes, all laber charges for making, fixing of door furniture
Fully :Panneled
Internal
Door=
directed by Dept| Officers including
Top Tower bolts (Ave
Size), Bottom
Tower
bolts 150mm long, Al
2.00 sqm
hinges (IS:205)- 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
Fully
Panneled
Internal
Door=
1.50
sqm 150
Aluminium Door Handles
(IS:208)
mm
Long and
all labour
charges such as diricted by the Department
6828.98 x
1.50 sqm
finished item of work. for Internal doors (Schedule Item 293)
2.00 sqm
Furniture - Iron - for Internal doors (Schedule Item 293) as per
above item.
BMT-G.09
BMT-G.08
BMT-G.26
BMT-G.44
BMT-G.57
BMT-G.34
166
164
183
200
214
191
Nos
Nos
Nos
Nos
Nos
Nos
0.75 x 2.00 M
1
1
6
1
1
1
6103.74
31 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.50 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13 - 22- 270
Country wood Framed 1/2
and Fully Panneled Window Three Shutters
35x5mm size with 1 thick best country wood styles and rise using 7/8" thick Sal wood flanks for pannels
Code
Ratecost, wrought an
M.S. Grills (execluding cost of M.S. Grills) as per specifications of Unit
APDSS including
1/2
1.80 sqm
Unit
taken 4'-11"
3'- 11 " =
conveyance
of allxmaterials
work site and 19.46
including allsft
taxes, all laber charges
for making, fixing of Pann
furniture in position as directed by Dept|
For Officers
frame including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium Butt hinges (IS:205)100 mm3 Long,
1/2
Verticlal
x 3'-11Window
" x 21/2"stoppers
x 3" = Aluminium, and all labour
as diricted by the Departmental Officers for finished item of work. 1/2
Horizontal
2 x 4'-11" x 2 " x 3" =
For shutters frame
Verticlal
3 x 2 x 3'-111/2" x 3 1/2" x 1 1/2"=
Horizontal
3 x 2 x 2 x 1'-3" x 3 1/2" x 1 1/2" =
Total Frame
For Shutter Planks
3x 1'-0" x 3'-111/2" x 3/4" =
cft
cft
Cum
0.093
Cum
1390.26
1691.66
10250.00
LS
Nos
Nos
Nos
Nos
Nos
6
12
6
3
1
sqm
7636.89
1.50 x 1.20 M
1.80 sqm
1.00 sqm
32 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.80 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13
- 22270
Country wood Framed 1/2
Fully Panneled Window Three Shutters
35x5mm size with 1 and
thick
best country wood styles and rise using
7/8" thick Sal
wood
flanks for pannels
Code(execluding cost of M.S. Grills) as per specifications of Unit
Ratecost, wrought an
M.S. Grills
APDSS including
Panneled
Window=
conveyance of all materials work
taxes,
all laber
charges for making, fixing of Pann
1.80 site
sqmand including allFully
furniture in position as directed by Dept| Officers including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium
Butt
hinges
(IS:205)100Window=
mm Long, Window stoppers Aluminium, and all labour
Fully
Panneled
2.16
sqm
as diricted by the Departmental Officers for finished item of work.
5863.89 x
2.16 sqm
1.80 sqm
Furniture for Windows Panelled : Thrible Leaf with half
Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56
205
176
164
213
Nos
Nos
Nos
Nos
1.80 x 1.20 M
6
12
6
3
8674.67
7 White washing for Ceiling Single coat with whiting of approved quality to give an even shade after thorou
the surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
and incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyan
materials for All Floors
White washing for Ceiling One coats with whiting for All Floors
Code
Material
BMT-J.27
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087
Unit
Rate
kg
14.00
Painter Cl- I
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
420.00
375.00
320.00
11.30
sqm
12.98
29 Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a
approved cement primer grade I making 3 coats in all to give an even shade after thourughly brushing
remove
all dirt and remains of loose powdered materials, including cost and conveyance of all materials to
Painting to new walls with 2 coats of water proof cement paint (overall 3 coats) for All Floors
all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for Extarn
Unit
Rate
Floors Code
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
BMT-J.24
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
68.33
sqm
119.04
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
23 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming C
(All Colours) of apporved brand and shade making 2 coats in all to give an even shade after thourughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
Extarnal walls for All Floors
Painting to old walls with 2 coats of water proof cement paint (overall 2 coats) for All Floors
Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087
Unit
Rate
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
68.33
Sqm
80.58
sqm
81.39
Miscellaneous
27 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Co
(All Colours) of apporved brand and shade over a base coat of approved cement primer grade I making m
in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of all materials to work site and all operational, incidental, labou
complete for finished item of work as per SS 912 for Extarnal walls for All Floors
Painting to old walls with 1 coat of water proof cement paint (overall 1 coat) for All Floors
Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087
Unit
Rate
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
420.00
375.00
69.39
Sqm
76.39
sqm
77.15
Miscellaneous
27 Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and
base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conv
materials to work site and all operational, incidental, labour charges etc. complete for finished item of w
911 for internal walls for All Floors
Painting to old walls with Distempering, 3 Coats with Oil Bound Distemper
Code
Unit
Rate
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
lit
100.00
day
day
Sqm
480.00
375.00
6.14
kg
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
58.98
sqm
70.71
Miscellaneous
29 Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper of approved brand and sha
coats in all to give an even shade after thourughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls for All Floors
Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper
Code
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
kg
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
58.98
sqm
59.57
Miscellaneous
22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-1 coats-Internal Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
28.46
Sqm
37.46
Miscellaneous
sqm
37.83
1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
63.18
sqm
63.81
Miscellaneous
28 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
10.97
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.22
Manpower
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
79.15
sqm
79.94
Miscellaneous
1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal old Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
61.38
sqm
61.99
Miscellaneous
29 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade over a base coat of appropriate primer of approved bra
coats after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,
and conveyance of all materials to work site and all operational, incidental, labour charges etc. complet
item of work as per SS 911 for internal walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
10.97
lit
136.00
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.25
Manpower
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
75.63
sqm
76.39
Miscellaneous
1 Painting to old walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade after thoroughly brushing the surface to remove all dir
of loose powdered materials, including cost and conveyance of all materials to work site and all operation
labour charges etc. complete for finished item of work as per SS 911 for internal walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
136.00
day
day
Sqm
480.00
375.00
48.78
Miscellaneous
Sundries including brushes, etc.,
Sqm
58.30
sqm
58.88
22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
External walls
Plastic Emulsion paint-1 coat-External Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
20.33
sqm
77.33
1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
sqm
90.86
30 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Plastic Emulsion paint-3 coats-External Walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Painter CI-1
Unit
Rate
lit
100.00
day
480.00
Painter CI-II
Add LA charges
Material
BMT-J.22
Manpower
day
Sqm
375.00
28.46
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
sqm
129.32
30 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade over a base coat of appropriate primer of approved brand, making
thoroughly
brushing
the
surface
to remove
all dirt and remains of loose powdered materials, includ
Acrylic Exterior
Emulsion
paint-3
coats-External
Walls
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for fin
Code
Unit
Rate
work as per SS 911 for external walls
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
Acrylic Exterior Emulsion Asian/ Berger/
BMT-J.25
Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
lit
136.00
equivalent
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
Sqm
76.46
Miscellaneous
Sqm
125.80
Sundries including brushes, etc.,
Add Over Head Charges
sqm
127.06
1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External old Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
Sqm
89.06
Miscellaneous
sqm
89.95
1 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Acrylic Exterior Emulsion paint-2 coats-External old Walls
Code
Material
BMT-J.25
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
136.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
Sqm
85.98
sqm
86.84
Miscellaneous
31 Painting with Synthetic Enamel paints - Two Coats - For New Iron Work of approved brand and shade, mak
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two Coats - For New Iron Work for All Floors
Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
170.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
44.72
sqm
63.42
32 Painting with Synthetic Enamel paints - Three Coats - for New Wood Work of approved brand and shade, m
in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Three Coats - for New Wood Work for All Floors
Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
170.00
day
day
480.00
375.00
Add LA charges
Sqm
65.04
sqm
93.94
30 Painting with Synthetic Enamel paints - Two Coats - for Old Wood work of approved brand and shade, maki
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two coats - for Old Wood Work for All Floors
Code
Material
BMT-J.30
Unit
Rate
lit
170.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
sqm
67.48
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
31 Polishing two coats with french polish of approved brand for new wood work of teak wood frame and shutt
even glossy surface with uniform texture including cleaning the surface of all dirt, dust, etc. , and apply
wood filler, sand papering including cost and conveyance of all materials to work site andall operationa
Polishing two coats with french polish of approved brand
labour charges, etc., complete for finished item of work as per SS 1212. for All Floors
Code
Unit
Rate
Material
Thinner for Melamine polish/ French polish BMT-J.12/P. No. 27
lit
92.00
Sheenlac
BMT-J.10/P. No. 27
Spirit
lit
70.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
130.08
sqm
143.59
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
6 Painting with Synthetic Enamel paints - One Coat - For Old Iron Work of approved brand and shade, ma
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials,
including
cost
and paints
conveyance
of allmaterials
to Work
work for
siteAlland
all operational, incidential, labour
Painting with
Synthetic
Enamel
- One Coats
- For Old Iron
Floors
complete for finished item of work as per SS 1207 & 1212. for All Floors
Code
Unit
Rate
Material
Synthetic Enamel paint (at 20 sqm / litre as
BMT-J.30
lit
170.00
per British Paints (I) Ltd.
Manpower
CSSR-M-035
Painter CI-1
day
480.00
CSSR-M-037
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
sqm
36.96
33 Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon
Cement Primer & Two Coats of Altek Flora/ sai coat/ Neon/indocem super track for internal walls (Emul
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges a
such as scafolding, lift charges etc., complete for finished item of work, including conveyance charges of
All Floors
Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All
Code
Material
BMT-J.36
Unit
Rate
Sqm
95.00
sqm
95.00
28 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cementwith
paint
spread
at Tiles,
the rate
3.30
Cement
paste
fixed
with
of machine shade, in
Dadoing
Glazed
coloured
set over
baseKgs
coat of
of cement
mortar
(1:5),
12 mm
thickpigments
F3
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F3
SOR P. No. 12 / BMTC.07
Sqm
413.00
Kg
cum
5.20
513.42
White cement
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
Lift charges F3
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
764.21
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
56 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate
of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF3pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F3
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
64.00
Add LA charges
cum
64.00
Add water Charges
sqm
64.00
Add Over Head Charges
Total rate per 1 sqm F3
cum
691.78
28 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, la
for dressing of flooring stones etc., complete for finished item of work, for F3
Flooring with Rough Kadapa/Shahabad 50mm thick, (1:8), 12 mm thick F3
Code
Unit
Rate
Basic rate 1 sqm
Lift charges F3
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
477.71
Miscellaneous
Code
Unit
Rate
Basic rate 1 sqm
Lift charges F3
Add LA charges
Add water Charges
cum
cum
sqm
44.70
44.70
44.70
cum
523.11
Miscellaneous
35 Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work
be paid for separately) including cost and conveyance of all materials like cement, fine aggregate
aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
Unit centering,Rate
cost of Code
steel and its fabrication charges for finished item of work, including
shuttering.
Details of cost for 10 posts, i.e., 0.336 Cu. M (1.80M long)
(Details as per Annexure ' X ' at the end of this item)
Material
Cement concrete 1:2:4 (1 cement : 2 coarse
sand :4 graded stone aggregate 12.5 mm
nominal size)
cum
5760.190
Kg
51.83
sqm
121.13
day
day
day
Sqm
420.00
375.00
320.00
175.40
sqm
4677.99
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
BLD-CSTN-6
cum
day
day
cum
4347.09
420.00
320.00
55.92
29 Randam Rubble Stone masonary in CM (1:8) (Cement : Sand) using hard variety of rough stone other than
approved quarry including cost and conveyance of all materials like cement, sand, masonary stones, wate
and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work in foundation & Basement. (APSS No. 615 &
Masonry In C.M (1:8)
R.R. Masonry in CM (1:8)
Code
Unit
Rate
Material
Cement 43 Gr. (including loading charges)
cum
5.20
cum
821.98
cum
713.65
cum
1463.89
cum
513.42
day
day
cum
420.00
320.00
1144.00
cum
2575.03
Manpower
SOR P. No. 266/I/11
SOR P. No. 2268/III/4
26 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-15
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
SOR P. No. 89
cum
723.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
446.00
135.32
135.32
cum
5155.81
19 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
charges, sales & other taxes on
P.C.C. M-10
3.66
Hight First
Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F1
Material
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
328.60
Mechinery
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
4734.49
20 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for Footings F2
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
446.00
67.66
67.66
cum
4802.15
21 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for footings F3
Add LA charges
cum
446.00
Lift charges F3
cum
135.32
Add LA charges
cum
135.32
Add Over Head Charges
cum
4869.81
22 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-20
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
446.00
67.66
67.66
cum
5374.15
23 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
P.C.C. M-20 Centering with Stell up to 3.66 M Hight Third Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F3
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.
cum
723.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
446.00
135.32
135.32
cum
5441.81
23 Supply and placing of the M 35 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance
water etc., to site
Code of all materials like cement, fine aggregate (sand) coarse
Unitaggregate,Rate
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
Material
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
Cement 43
Gr. of
(including
loading
charges) chargescum
5.20 of work (APSS
SCAFFOLDING but excluding
cost
steel and
its fabrication
for finished item
Coarse sand
for mortor
(including
cum
513.42
minimum cement content
420 charges)
Kgs per 1 cum as per IS code from standard suppliers approved by th
Seigniorage
20 mm
Graded HBG
cum curing 1920.72
including pumping, Aggregates
Steel centering,
shuttering,
laying concrete, vibrating,
etc. complete but exc
steelP. and
its fabrication
charges for finished item of work for FOUNDATIONS,
PLINTH,77.00
PEDASTALS, centering
SOR
No. 292/M
189
Water
Kl
to
3.66, as per APSS. No. 402. for FOOTINGS FI
Mechinery
SOR P. No. 379/9
SOR P. No. 379/40
hour
day
day
day
cum
hour
522.50
253.00
165.70
182.09
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
420.00
375.00
320.00
1627.99
BACIC RATE 1 Cum
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1
cum
cum
723.00
446.00
cum
7286.71
28 Supply and fixing anodised aluminium door fixed with all accessories (stappers, bolts and stoppers etc.,
and sectional in accordance with the approved drawings with alluminium single shutter with allround fra
101.60 x 44.45 x2.50 mm (20102) thick and fixed with alluminium single shutter with vertical styles of
44.45 x 2.02 mm (19569) top rail 47.62x44.45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm
bottom rail of sizes 95.25x44.45x2 mm (19505) with archit clural accessories having section 88x40x3.2 mm
5 mm tinted glass sheet with glazing chips of size 79x 17.30 x0.10mm (19352) for height of 1.20 m
cement bonded paticle board ( Bison Lam or equivalent ) of 10mm thick to a hight of 0.91 m at botto
Rubber beading shutters mounted in heavy duty floor spring including cost and conveyance of all m
accessories including labour charges for fabrication and fixing in position as directed by the Engineer in Cha
Code
Unit
Rate
Lenth in RM
Weight RM
5.100
4.200
1.977
1.052
0.900
0.900
0.974
1.072
0.900
1.519
3.900
3.900
3.06
0.097
0.900
1.200
0.900
0.910
Kgs
250.00
BMT-K.80
sqm
534.00
BMT-I.08
BMT-G.65
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53
sqm
each
each
each
each
each
570.00
2422.00
312.00
100.00
69.00
34.00
Manpower
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor
Machinery
Add LA charges
Labour charges for
BMC-X.02
BMC-X.03
day
day
day
day
day
Sqm
420.00
375.00
375.00
375.00
320.00
2268.90
Hr
105.00
Hr
97.00
1.91 Sqm
15262.48
each
15415.10
17,513.87 / 1.89=
28 Supply and fixing double action anodised Aluminium fully glazed door as per approved drawing using sid
top frames with section 101.50 x 44.45 x 2.50 mm with double shutters using shutters frame of size 47 x
mm for top 47 x 44.45 x 1.50 mm for middle and 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertic
Code
Unit
Rate
of size of size 47 x 44.45 x 1.2 mm with necessery glazing clips of size 19 x 17.30 x 0.80 mm and rubber
Size of the door = 2.74 x 2.59 meters ( Double shutters)
Rm necessary
mm thick plain glass with 2 nos floorsprings, 2 nos locks and 4 nos round door 7.92
handles
accessories
(stappers, bolts and stoppers etc.,) including cost and conveyance
materials
A) Material requirement
Lenth in RM of all
Weight
RM and accesso
labour charges for fabrication and fixing in position as directed by the Engineer in Charge. for 1.52 m x
A.As (As
perwith
approved
drawing)
Alround
frame
Double groove
(101.50*44.45*2.50 mm)
7.920
1.983
Vertical member for shutters (47*44.45*1.2 mm))
10.360
0.720
2.740
2.740
2.740
0.900
0.831
1.800
20.720
21.920
0.115
0.115
C) Rubber beeding
3.548
2.000
Kgs
250.00
Rm
sqm
each
each
each
each
each
each
2.00
570.00
ABSTRACT
BMS-W.01
BMS-W.06
BMT-I.08
BMT-G.65
BMT-G.66
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53
Manpower
Machinery
BMC-X.02
BMT-X.03
2422.00
474.00
312.00
100.00
69.00
34.00
day
day
day
day
day
day
Sqm
420.00
375.00
375.00
375.00
320.00
275.00
2024.47
Hr
105.00
Hr
97.00
7.10 Sqm
25153.96
each
25405.50
28,864.46 / 7.10=
18 NCL or Equivalent Door Frames: Providing and fixing door frames fabricated from sections made of ga
powder coated (base steel as per IS 513, galvanised as per IS 277 with zinc of 120 grams / square metre
made section should be with a Powder Coating of pure Polyester Powder of 50-60 microns thick with
thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate of 38mm to
35mm thick door shutter. The frame section should have groove to insert gasket. The section of the door
frame is to be filled with polyurethane foam. The frame section should be cut to length, and joined by w
and each frame should be provided with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 N
shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No. for
frame. e)Tie Rod 1 No
Code
Material
BMT-N.59
Unit
Rate
Rm
385.00
sqm
385.00
22 Providing and fixing 35mm thick RAJSHRI or Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER
sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on o
top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel la
2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel desig
panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam
other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. com
direction of Engineer-in-Charge, manufacture specification and drawing
Code
Material
BMT-N.06
Unit
Rate
sqm
2900.00
sqm
2900.00
1 Windows: Double shutter 4'-0" x 4 '-6" (1219.2x1371.6mm) outer frame section size of 46 x 52 mm
section size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.12)
Code
Material
BMT-P.12
Unit
Rate
sqm
5195.00
sqm
5195.00
Unit
Rate
sqm
5195.00
sqm
5195.00
3 Ventilators: Fixed louvers (Box section) outer frame section size of 33 x 57 mm Mullion section size of 33 x 5
P.20 to 22)
Code
Material
BMT-P.20 to 22
Unit
Rate
sqm
3685.00
sqm
3685.00
4 Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking a
The shutter
1.5mm +/-0.15mm
Codeframe is made of 30mm X 79mm with the wall thickness of
Unit
Rate section mitre-c
at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no'
Material
Supply
andbefixing
of doorinside
shutters
rods. Teak wood batons
shall
reinforced
themade
door of
shutter during the fabrication of the door sh
BMT-N.45
rigid
PVC
extruded
hollow
section(Nandi
sqm
1795.00
points wherever the hardware is fixed onto the door shutter. or
equivalent)
Add Over Head Charges
sqm
1795.00
33 Cost Suply and Fixing M.S Grills approved design including cost Mild steel and all Labour charges for fab
works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, po
including cost of fixing in position as diricted by the Departmental Officers for finished item of work.
Code
kg
Rate
38.00
16.00
kg
3.00
Add LA charges
kg
19.00
kg
57.00
BMM-V.14
865
BMM-V.15
866
Unit
kg
34 Providing 110mm dia ISI marked P.V.C Rain down water take pipes-2.5mm thick including cost of necessar
Shoes, Iron Clamps and all other accessories and fixing in position including cost and conveyance of all m
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges for
etc; complete for finished itemof work.
Code
Material
BMW-G.13
BMW-G.60
BMW-G.63
BMW-G.100
BMW-G.106
Unit
Rate
each
each
each
each
each
383.00
84.00
56.00
15.00
14.00
BMW-G.152
Rm
58.00
Rm
272.74
49 Supply and fixing of CEMENT JALI-50 mm thick fixing in position including cost and conveyance of all ma
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished it
Code
Material
BMS-W.17
Unit
Rate
sqm
335.00
sqm
335.00
50 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft
nominalCode
bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom
locking plates and
Unit
Rate
for inside & outside locking with push-pull operations including cost of hood cover and springs complete
Material
one coat of approved
steelshutter
primer,made
locks,ofball
Rolling
80 xbearings,
1.25 mm all accessories etc complete for finished item o
BMT-F.29
2000.00
special spn: 1108, fixing
in
position
including
cost
and conveyance ofsqm
all materials
to site, Operational a
machine rolled CRCA
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Add Over Head Charges
sqm
2000.00
51 Supply and fixing of Teak wood dias and railing including cost of Teak wood 1 st quality conveyance to site
unloading and all labour charges including making, fixing, finishing etc., complete as directed by the
Officers for Second Floor, Lift Manual
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper (overall 3 coats) for All Floors
Code
Material
BMT-E.06
Unit
Rate
cum
81225.00
cum
81225.00
Corpenter Cl- I
Light mazdoor
Add LA charges
day
day
cum
420.00
320.00
10250.00
Sqm
Sqm
230.00
8122.45
sqm
107719.95
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4
Miscellaneous
BMM-V.23
19 Course Rubble Stone Masonry in CM (1:6) 1st Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) 1st sort
Code
Material
SOR P. No. 73 /
BMS-W.54
Unit
Rate
cum
5.20
cum
821.98
cum
1463.89
cum
513.42
sqm
95.00
day
day
cum
420.00
320.00
1792.40
cum
3503.59
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4
7 Cost and Supply and fabrication of M.S. Cattle trap using 15 Nos of 32mm MS Steel rods welded as equal s
Nos of 75 x 40 x 5 mm MS channel and fixing in position on the already laid concrete walls, including all la
for welding, transporting and fixing in position, cost of welding rods etc., complete as directed by the
Officers for finished item of work.
75 x 40 x 5 mm MS Channels on cross walls
32 mm dia MS rods
6.00 x
15.00 x
1.53 =
4.10 =
ABSTRACT
Material
Miscellaneous
BMM-V.16
kg
38.00
kg
12.00
5405.88
BMM-V.15
kg
3.00
1351.47
cum
23875.97
8 BISON LAM ( Pre Laminated Cement Bonded Particle Board) ALUMINIUM PARTATIONS-Supply and fixing o
aluminum glazed partitions using 10MM BISONLAM and 5.50 mm thick plain glass to full height. Using with
a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodize
microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly
beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and c
all materials etc., complete as directed by the Departmental Officers for finished item of work.
Material
BMT-M.77
ALUMINIUM PARTATIONS
sqm
2625.00
cum
2625.00
Miscellaneous
Add Over Head Charges
Total rate per 1 sqm
10 CUPBOARD FRAMES & SHUTTERS USING BISONLAM (Pre-Laminated Cement Bonded Particle Board) - Supply
BISONPANEL (IS 14276) box type cup board using BISONPANEL for making frame of size 100mm x 35m
sandwiched 20MM boards, one BISONPANEL and one BISONLAM with plain 35mm wood lipping. The Shutter
20MM thick BISONLAM (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hard
powder coated Piano hinges of size x , Aluminum powder coated handles of size 4 (101.6mm), Alu
bolt 4 (101.6mm) Godrej locks, screws, wood lipping and Fevicol etc., complete as directed by the
Officers for finished item of work.
Material
sqm
2250.00
sqm
127.50
cum
2377.50
Miscellaneous
Add Over Head Charges
Total rate per 1 sqm
1 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F2
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F2
Code
Unit
Rate
cum
22.99
Miscellaneous
Lift charges F2
Add LA charges
Add water Charges
cum
sqm
22.99
22.99
cum
1467.54
26 ELIXIR or Equivalent Top Hung in Structural Glazing: Providing and Fixing Top Hung shutters in Struc
fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513
galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72mm. The glass h
made of 304 grade stainless steel of 0.6mm thick. Galvanized steel sections are to be used as stifeners ins
coated steel/powder coated sections as per the design requirement. Design calculations are made to suit w
as given in IS 875. Primer coat with epoxy primer of 5-7 microns thick and back coated with Alkyd backer o
or powder coated with pure polyester powder up to 50-60 microns thick. The outer frame should be of 20m
0.6mm, Shutter section should be of 58mm x 33mm x 0.72 mm, stifener section should be 56mm x 31mm
Bihari Hinges 2 Nos for each shutter and Aluminium Stays 2 Nos. for each shutter, Aluminium Handle
shutter. The rate is inclusive of cost and conveyance of all materials to site, all labour charges, incidental ch
all consumables etc. and scafolding charges, form work etc. complete for finished item of work
Code
Material
BMT-Q.02
Unit
Rate
sqm
4246.00
sqm
4246.00
13 Course Rubble Stone Masonry in CM (1:6) IInd Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) IInd sort
Code
Material
Unit
Rate
kg
5.20
cum
821.98
cum
1463.89
cum
513.42
day
day
cum
420.00
320.00
1372.40
cum
2942.93
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4
35 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F1
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F1
Code
Material
Unit
Rate
Sqm
2300.00
Kg
5.20
cum
513.42
Kg
25.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
223.52
2807.31
Rm
9.00
BMT-B.09
CSSN-A-05
M 005
White cement
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
BMM-V.12
sqm
2865.38
36 Supply & Fixing 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328) The rate is inclusi
conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. a
charges, form work etc. complete for finished item of work
Code
Material
BMT-L.20
Miscellaneous
BMM-V.07
Unit
Rate
sqm
1045.00
sqm
Sqm
317.00
317.00
sqm
1362.00
1 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F2
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F2
Code
Unit
Rate
Basic rate 1 sqm
Lift charges F2
Add LA charges
Add water Charges
sqm
sqm
sqm
22.35
22.35
22.35
sqm
2887.95
lit
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
#REF!
#REF!
#REF!
Sqm
#REF!
sqm
#REF!
Miscellaneous
Miscellaneous
1 Supply and fixing of curtain Glazing made of pre painted steel (base steel as per IS 513 of 0.6 mm th
galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12- 16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
Rate should be 18 x
should Code
be 46 x 52 mm, section for mullion should be 46 x 70 mm andUnit
section for beading
Material
Glazing should be panelled with 5 mm thick plain float Glass with Ethyl Propylene diameine Monomer (EP
The sections are to be cut to length, mitre joined with corner bracket. Centre mullions are to be fixed suin
Mullion
size of
46 x 70mm
Beading
Handle made of high
gradesection
Aluminium
powder
coated
and nylon receiver. Gaskets made of Ethyl propy
section
size of 18
x 25ofmm
Fixed
Glazing
3'Monomer
(EPDM)
Corner
brackets
made
CRCA
with
zinc
phosphating.
made of Glass fill
BMT-Q.12
sqmMullion caps
3673.00
x fixed
4'-0" (914.4x1219.2mm)
grid outer
above frames should0"be
to the concrete / masonry
wall be means of self expanding screws. & comple
size of 46 x 52 mm
item.- Fixed Glazing frame
2'-0" xsection
2'-0" (609.6x609.6mm)
grid outer frames section size of 46 x 52 mm
sqm
3673.00
6 Flush Pointing with CM (1:3) to Brick / CRS Masonry finishing cost of all materials, seigniorage charg
conveyance charges of materials and including all operational, incidental and labour charges for mixing m
rendering smooth curing, etc,, complete for finished item of work
Flush Pointing with CM (1:3) to Brick / CRS Masonry
Code
Material
Unit
Rate
kg
5.20
CSSN-A-05
M 005
cum
513.42
day
day
cum
375.00
320.00
424.30
Manpower
CSSR-M-077
CSSR-M-087
cum
514.58
20 Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-19
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580mm & 630 mm Long fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.02
Manpower
BMW-D.03
Unit
Rate
each
700.00
Add LA charges
each
200.00
each
700.00
21 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindusta
Parryware make white glazed with 'S' trap fixing in position including cost and conveyance of all material
Other taxes
all labour
Code on materials to site, Operational and Incidental charges including
Unit
Rate charges for fixin
complete for finished itemof work.
Material
Supplying and Fixing European Water Closet
of 1st quality conforming to IS:2556-Part-2BMW-D.14
each
1250.00
1973 of Hindustan / Neycer or Parryware
make white glazed with 'S' trap
Manpower
BMW-D.15
Add LA charges
each
175.00
each
1250.00
31 Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S'
flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of ap
with rubber bufer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges a
make etc. complete for finished item of work in all respects: White Colour fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.18
Unit
Rate
each
6500.00
each
6500.00
20 S & F 12.7 mm brass bib cock Indian make 400 grams fixing in position including cost and conveyance of
Sales tax & Other taxes on materials to site, Operational and Incidental charges including all labour charge
site etc; complete for finished itemof work.
Code
Unit
Rate
Material
BMW-E.17
Manpower
BMW-E.18
each
170.00
Add LA charges
each
20.00
each
170.00
31 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position inclu
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
BMW-D.29
Manpower
BMW-D.30
each
810.00
Add LA charges
each
90.00
each
810.00
5 Making drainage connection in the existing inspection including all repairs including all labour charges for
for finished itemof work.
Code
Material
BMW-B.07
Manpower
BMW-B.08
Unit
Rate
each
90.00
Add LA charges
each
50.00
each
90.00
Unit
Rate
BMW-I.17
each
64.00
each
64.00
35 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 412
cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except r
blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping including all labour cha
Code
Unit
Rate
complete for finished itemof work.
Material
Supplying, laying, jointing and testing 152.4
BMW-A.03
Rm
346.00
mm SWG SP-1 pipes
Manpower
BMW-A.06
Add LA charges
Rm
120.00
Add Over Head Charges
each
346.00
35 S&F 12.7 mm dia NP push cock Ist quality fixing in position including cost and conveyance of all material
Other taxes on materials to site, Operational and Incidental charges including all labour charges for fixin
complete
for finished itemof work.
Code
Unit
Rate
Material
S & F CP Short body bib cock fancy type
BMW-E.29
deluxe 400 grams 12.7 mm dia S&F 12.7
each
200.00
mm dia NP push cock Ist quality
Add Over Head Charges
each
200.00
36 Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet fixing in position including cost and conveyance of
Sales tax
& Other taxes on materials to site, Operational and IncidentalUnit
charges including
Code
Rate all labour charge
site etc; complete for finished itemof work.
Material
Supply & Fixing 38.1 mm dia PVC solid waste
BMW-G.06
each
70.00
pipe outlet
Add Over Head Charges
each
70.00
36 Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P coated fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
Supplying & Fixing 12.7 mm PVC connection
BMW-I.48
each
74.00
with brass union nut C.P coated
Manpower
BMW-I.49
Add LA charges
each
14.00
Add Over Head Charges
each
74.00
Unit
Rate
Rm
21.00
Rm
21.00
Unit
Rate
each
30.00
each
30.00
Unit
Rate
each
30.00
each
30.00
18 Cleaning the wash basin with acid and Vim powder including all labour charges etc; complete as dir
Departmental Officers incharge for finished itemof work.
Code
Material
BMW-I.84
Unit
Rate
each
30.00
each
30.00
Unit
Rate
each
30.00
each
30.00
42 Supply and Fixing of Iron Door grilld of size 1.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10
20mm MS squre rods and bottom flower design with 25 x 6mm MS flats providing 150mm Spike at the top
lathe
machine
and weight of MS grade squre and rounds shall conform to IS 4351 - 1976 as per appro
Size (1.50
x 2.40M)
complete
finished
item rods
of work
fixing of gate to compound
wall,
cost
40 x 40mm solid squre
(V) including transportation charges,
6.00 Rm x 12.56
Kgs/
1Rman
2x 2 x 1.50 =
of all materials along with test certificates for raw materials including all tools and all incidental labou
40 x 10mm MS flats (H)
14.40 Rm x 3.14 Kgs/ 1Rm
2x 3for
x 2.40
= item of work.
finished item of work as directed by the Departmental Officers
finished
40 x 10mm MS flats (Curved)
6.00 Rm x 3.14 Kgs/ 1Rm
2x 2 x 1.50 =
20mm MS squre rods (Main Verticals)
2x 5 x (1.50+2.10)/2
2x 5 x (1.20+1.75)/2
2x 2 x 1.20 =
ABSTRACT
Material
Miscellaneous
BMM-V.16
do
kg
38.00
kg
14.00
3602.62
each /L.S
50.00
each /L.S
250.00
cum
15881.16
36 Cost & Supply of New Ceiling tiles from approved source including cost and conveyance of tiles to work an
site for verification as directed by the Departmental Officers.
Cost & Supply of NewCeiling tiles
Code
Material
Unit
Rate
37 Cost & Supply of New Mangalore tiles from approved source including cost and conveyance of tiles to work
at site for verification as directed by the Departmental Officers.
Cost & Supply of New Mangalore tiles
Code
Material
Unit
Rate
38 Cost & Supply of Ridge tiles from approved source including cost and conveyance of tiles to work and stack
verification as directed by the Departmental Officers.
Cost & Supply of Ridge tiles from approved source
Code
Material
Unit
Rate
39 Reroofing with best Manglore tiles over ceiling tiles and cement mortor borders (1:2) including cost and c
all materials from approved source to site of work and all operational, incidential, labour charges such as m
laying tiles in position, including boarders with cement mortor, etc., complete for finished item of work
Reroofing with best Manglore tiles over ceiling tiles - Unit 1 sqm
Code
Material
Unit
Rate
cum
4347.09
day
day
day
Sqm
420.00
375.00
320.00
179.65
sqm
218.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/35
SOR P. No. 269/III/4
40 Labour charges for shifting the racks 12 nos of size 1.80M x 0.75M x 3.05M to out side of the store room
stacking at safety place for taking up repairs to the store room and again shifting back and rearrang
carefully in the store room after repairs including labour charges for all operations etc., as directed by the
charge
Code
Material
Unit
Rate
1 Cost Suply and Fixing of best Salwood SS Fly proof mesh for Door shutter diferent sizes frame with fly
frame size 3" x 1 1/2" thick and beading 3/4" x 1/2" thick including cost, wrought and putup and conv
materials work site and including all taxes, all laber charges for making, fixing of door furniture in position
Dept| Officers including M.S.P.C. hings, tower bolts, M.S. aldop and M.S handle, and all labour charges such
the Departmental Officers for finished item of work.
Code
Unit taken 3'-6" x 7' - 0" =
Unit
24.50
For frame
Verticlal
Horizontal
Beading
Verticlal
Horizontal
sft
Rate
2.28 sqm
ABSTRACT
BMT-E.15
BMT-G.28
BMT-G.14
BMT-G.35
BMT-F.19
BMM-V.07
cft
Nos
Nos
Nos
Sqm
Sqm
Sqm
1100.01
16.00
18.00
23.00
376.00
365.00
832.20
1.00 sqm
sqm
2809.09
2.28 sqm
1 Cost Suply and Fixing of best Salwood Window Double shutters diferent of size shutters frame thick 3 1/2
plank thick 3/4" including cost, wrought and putup and conveyance of all materials work site and includin
laber charges for making, fixing of window furniture in position as directed by Dept| Officers including M
tower bolts, and M.S handle, and all labour charges such as diricted by the Departmental Officers for fin
work.
Code
Unit taken 2' - 6" x 3' - 0" =
Unit
7.50
For shutters frame
Verticlal
Horizontal
sft
Rate
0.70 sqm
ABSTRACT
BMT-E.15
BMT-G.27
BMT-G.31
BMT-G.14
7Kg/1sqm
BMM-V.07
1.00 sqm
cft
Nos
Nos
Nos
kgs
Sqm
Cum
Sqm
1390.26
8.00
45.00
18.00
53.50
10250.00
sqm
1384.95
174.25
0.700 sqm
s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
m depth
BLD CSTN 2.4
Coefficient
Amount
0.520
0%
166.40
0.00
75%
1
124.80
30.00
14%
321.20
43.73
364.93
or say
365.00
epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ing charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
116.48
0.00
30.00
13.615%
146.48
19.94
166.42
or say
166.00
ders upto 0.30 m dia. for foundations of canal cross drainage and other
vated stuf neatly in specified dump area or disposing of the same as
0 m and initial lift upto 3 m.
IRR-CCDW-1-1
Coefficient
Amount
0.025
0.600
0%
1
6.88
192.00
0.00
30.00
14%
228.88
31.16
260.04
or say
260.00
or Mangalore tiles over flat tiles without roof timbers clearing away and
any etc., complete as directed by the Engineer-in-charge of the work.
Coefficient
Amount
1.000
8.30
0%
0.00
14%
or say
8.30
1.13
9.43
9.00
of Lime work unserviceable materials within 100 metres lead and lift
ected by the Enginee - in - Charge.
BLD-CSTN-14-8-295
Coefficient
Amount
1.220
0%
1%
390.40
0.00
3.39
3.94
14%
397.73
54.15
451.88
or say
452.00
ent concrete upto 15 cm thicknes within 100 metres lead labour charges
- Charge.
BLD-CSTN-14-8-296
Coefficient
Amount
2.440
0%
1%
780.80
0.00
3.39
7.84
14%
792.03
107.83
899.86
or say
900.00
1382.40
0.00
3.39
13.86
14%
1399.65
190.56
1590.21
or say
1590.00
130.88
0.00
3.39
1.34
14%
135.61
18.46
154.07
or say
154.00
slabs flooring on sand bed carefully stacking materials useful for reuse
shed item of work as directed by the Engineer - in - Charge.
Coefficient
Amount
1.000
4.20
0%
0.00
14%
4.20
0.57
4.77
or say
5.00
ng materials useful for reuse Old cement mortar plaster including stacking
viceable materials within 100 metres lead labour charges etc; complete for
eer - in - Charge.
Coefficient
Amount
1.000
0%
2.90
0.00
14%
2.90
0.39
3.29
or say
3.30
ny thickness fixing the frame, fixing the fixures to the window shutters
furniture, racks, work-station furniture, cup-board shutters to existing cupveneer laminations including fixing cutting, making, assembling, fixing
eets/ laminations fixing in position with necessary screws excluding cost of
as directed by the Engineer-in-charge of the work
Coefficient
1.000
0%
Amount
365.00
0.00
14%
365.00
49.69
414.69
or say
414.70
Amount
125.00
0%
0.00
14%
125.00
17.02
142.02
or say
142.00
ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix
Coefficient
129.600
Amount
673.92
0.900
1254.09
0.540
277.25
1.200
92.40
1.000
328.60
0%
0.100
1.390
0%
0.00
42.00
444.80
0.00
14%
3113.06
423.84
3536.90
or say
3537.00
ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix
842.40
0.900
1254.09
0.450
231.04
1.200
92.40
1.000
328.60
0%
0.100
1.390
0%
0.00
42.00
444.80
0.00
14%
3235.33
440.49
3675.82
or say
3676.00
as per 456 nominal mix using 40 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
ork, per APSS. No. 402.
Coefficient
216.000
Amount
1123.20
0.450
627.04
0.900
462.08
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
723.00
0%
0.00
14%
4008.82
545.80
4554.62
or say
4554.60
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. First Floor
91.00
77.20
11.81
4.62
4.27
0.00
2.15
0%
0.003
0.007
0.125
0%
0.00
1.26
2.63
40.00
0.00
234.94
BLD-CSTN-6-1
0.015
0.060
0.096
0%
46.49
25.20
30.72
0.00
14%
31.99
369.34
or say
369.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. Second Floor
91.00
77.20
11.81
4.62
0.013
4.27
0%
0.013
0.00
2.15
0%
0.00
0.003
0.007
0.125
0%
1.26
2.63
40.00
0.00
1.000
0%
4.81
0.00
239.75
BLD-CSTN-6-1
0.015
0.060
0.096
0%
46.49
25.20
30.72
0.00
1.000
0%
5.59
0.00
14%
32.64
380.39
or say
380.00
Amount
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
4.600
0%
55.86
100.13
1472.00
0.00
6199.71
1.000
723.00
0%
0.00
14%
6922.71
942.53
7865.24
or say
7865.00
Amount
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
4.600
0%
55.86
100.13
1472.00
0.00
6199.71
1.000
1025.00
0%
0.00
14%
7224.71
983.64
8208.35
or say
8208.00
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
4.600
0%
55.86
100.13
1472.00
0.00
6199.71
1.000
2410.00
0%
0.00
14%
8609.71
1172.21
9781.92
or say
9782.00
Coefficient
350.000
Amount
1820.00
0.400
205.37
0.800
1.200
1536.58
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.167
70.14
0.167
62.63
5.600
1792.00
0%
0.00
BACIC RATE 1 Cum
6496.49
BLD CSTN 3-15:31B
BACIC RATE 1 Cum
1.000
0%
6496.49
1075.00
0.00
14%
7571.49
1030.86
8602.35
or say
8602.00
6496.49
1.000
1170.00
0%
1.000
0%
0.00
249.85
0.00
14%
7916.34
1077.81
8994.15
or say
8994.00
6496.49
1.000
1265.00
0%
1.000
0%
0.00
499.70
0.00
14%
8261.19
1124.76
9385.95
or say
9386.00
1.000
0%
1518.00
0.00
14%
8014.49
1091.17
9105.66
or say
9106.00
1586.00
0%
1.000
0%
0.00
249.85
0.00
14%
8332.34
1134.45
9466.79
or say
9467.00
1653.00
0%
1.000
0%
0.00
499.70
0.00
14%
8649.19
1177.59
9826.78
or say
9827.00
Coefficient
350.000
0.400
0.800
1.200
0.308
0%
0.308
0%
Amount
1820.00
205.37
1536.58
92.40
160.93
0.00
51.04
0.00
0.067
28.14
0.133
49.88
3.077
984.64
0%
0.00
BACIC RATE 1 Cum
4928.98
BLD CSTN 3-15:31B
1.000
0%
4928.98
2071.00
0.00
14%
6999.98
953.05
7953.03
or say
7953.00
1.000
2151.00
0%
1.000
0%
0.00
119.52
0.00
14%
7199.50
980.21
8179.71
or say
8180.00
1.000
2230.00
0%
1.000
0%
0.00
239.04
0.00
14%
7398.02
1007.24
8405.26
or say
8405.00
227.50
0.050
25.67
0.100
0.150
192.07
11.55
0.039
0%
0.039
0%
20.38
0.00
6.46
0.00
0.008
0.017
0.385
0%
BACIC RATE 1 SQM
1.000
0%
3.36
6.38
123.20
0.00
616.57
232.00
0.00
14%
848.57
115.53
964.10
or say
964.00
241.00
0%
1.000
0%
0.00
14.97
0.00
14%
872.54
118.80
991.34
or say
991.00
1.000
250.00
0%
1.000
0%
0.00
29.94
0.00
14%
896.51
122.06
1018.57
or say
1019.00
409.50
0.090
46.21
0.180
0.270
345.73
20.79
0.069
0%
0.069
0%
36.05
0.00
11.43
0.00
0.015
0.030
0.692
0%
BACIC RATE 1 SQM
1.000
0%
6.30
11.25
221.44
0.00
1108.70
242.00
0.00
14%
1350.70
183.90
1534.60
or say
1535.00
1.000
251.00
0%
1.000
0%
0.00
26.87
0.00
14%
1386.57
188.78
1575.35
or say
1575.00
1.000
261.00
0%
1.000
0%
0.00
53.74
0.00
14%
1423.44
193.80
1617.24
or say
1617.00
113.75
0.025
12.84
0.050
0.075
96.04
5.78
0.019
0%
9.93
0.00
0.004
0.008
0.192
0%
BACIC RATE 1 SQM
1.000
1.68
3.00
61.44
0.00
304.46
271.00
0%
0.00
14%
575.46
78.35
653.81
or say
654.00
Coefficient
BACIC RATE 1 SQM
Amount
304.46
1.000
281.00
0%
1.000
0%
0.00
6.96
0.00
14%
592.42
80.66
673.08
or say
673.00
1.000
292.00
0%
1.000
0%
0.00
13.92
0.00
14%
610.38
83.10
693.48
or say
693.00
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
0%
1025.00
0.00
14%
6959.38
947.52
7906.90
or say
7906.90
1820.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1844.00
0%
1.000
0%
0.00
392.63
0.00
14%
8239.79
1121.85
9361.64
or say
9362.00
1820.00
0.900
1728.65
0.450
231.04
1.200
92.40
0.267
87.74
0%
0.267
0%
0.00
44.24
0.00
0.067
0.133
28.14
49.88
2.500
0%
800.00
0.00
1.000
2619.00
0%
1.000
0%
0.00
193.03
0.00
14%
7694.12
1047.55
8741.67
or say
8742.00
182.00
86.43
0.090
46.21
0.120
9.24
0.027
0%
0.027
0%
8.87
0.00
4.47
0.00
0.007
0.013
0.250
0%
2.94
4.88
80.00
0.00
1.000
297.00
0%
1.000
0%
0.00
19.33
0.00
14%
741.37
100.94
842.31
or say
842.00
2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
BACIC RATE 1 CUM
28.14
49.88
800.00
0.00
4508.80
281.80
1.000
0%
289.00
0.00
14%
570.80
77.71
648.51
or say
648.50
113.75
107.56
14.38
5.78
0.017
0%
0.017
0%
5.59
0.00
2.82
0.00
0.004
0.008
0.156
0%
1.68
3.00
49.92
0.00
1.000
317.00
0%
1.000
0%
0.00
12.03
0.00
14%
633.51
86.25
719.76
or say
720.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
14%
248.54
33.84
282.38
or say
282.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.000
0%
1.43
2.51
80.00
0.00
8.82
0.00
14%
257.36
35.04
292.40
or say
292.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
1.000
0%
17.64
0.00
14%
266.18
36.24
302.42
or say
302.00
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
4.27
0.00
0.0034
0.0067
0.250
0%
1.000
0%
1.43
2.51
80.00
0.00
723.00
0.00
14%
969.39
131.98
1101.37
or say
1101.00
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
4.27
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
1.000
723.00
0%
1.000
0%
0.00
17.28
0.00
14%
986.67
134.34
1121.01
or say
1121.00
16.64
0.00
14%
16.64
2.27
18.91
or say
18.90
187.20
2727.94
102.68
0.240
0.560
1.890
0%
100.80
210.00
604.80
0.00
1.000
304.84
0%
0.00
14%
4238.26
577.04
4815.30
or say
4815.30
ick in CM (1:4) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
BLD CSTN 5-12:50
Coefficient
Amount
7.200
51.200
0.020
37.44
272.79
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
0%
68.59
0.00
14%
524.79
71.45
596.24
or say
596.20
as per 456 nominal mix using 20 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402.
Coefficient
320.000
0.900
0.450
1.200
Amount
1664.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
723.00
0%
0.00
14%
5420.19
737.96
6158.15
or say
6158.00
Coefficient
320.000
0.900
0.450
1.200
Amount
1664.00
1544.08
231.04
92.40
1.000
0%
328.60
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
0%
723.00
0.00
14%
5069.92
690.27
5760.19
or say
5760.00
ick in CM (1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
24.96
272.79
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
0%
68.59
0.00
14%
512.31
69.75
582.06
or say
582.00
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
0.000
0%
328.60
0.00
0.00
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
723.00
0%
0.00
14%
6491.68
883.84
7375.52
or say
7375.50
ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof First Floor Lift manual
Amount
3.000
210.00
1.025
38950.00
70.00
630.00
2.500
10.000
10.000
1050.00
4200.00
3200.00
10.000
612.00
0%
0.00
14%
48852.00
6651.20
55503.20
or say
55503.00
ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof Third Floor Lift manual
Amount
3.000
210.00
1.025
38950.00
70.00
630.00
2.500
10.000
10.000
0%
1050.00
4200.00
3200.00
0.00
10.000
612.00
1.000
0%
740.00
0.00
14%
49592.00
6751.95
56343.95
or say
56344.00
roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for
52.42
10.78
0.200
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
14%
271.87
37.02
308.89
or say
308.90
roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for
52.42
0.021
0.200
10.78
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
1.000
0%
40.78
0.00
14%
312.65
42.57
355.22
or say
355.00
ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
BLD CSTN 8-10
r Celling plastering F3.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
23.91
0%
1.000
0%
0.00
41.28
0.00
14%
305.74
41.63
347.37
or say
347.00
coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
onveyance of all materials like cement, sand, water etc., to site, including
all materials, and all operational, incidental charges on materials and
ng mortar, finishing, scafolding, lift charges, curing etc., as directed by
nal & Even faces of Brick Wall and RCC exposed faces for finished item of
CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual
2.640
0.011
13.73
5.65
1.440
0.004
7.49
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
242.17
32.97
275.14
or say
275.10
39.31
10.78
0.094
0.160
0%
35.25
51.20
0.00
Basic rate
136.54
14%
136.54
18.59
155.13
or say
155.00
g 10mm thick plaster of paris boards and Labour charges for fixing plaster
perimeter channel 30mm x 27mm x 0.55 thick and ceiling channels of
and fixing and finishing using joint compound and luppum/ putty finish as
cost of all materials including cost of Plaster of paris sheets/ boards for
336.81
0.640
41.60
0.840
62.16
2.300
32.20
0.260
0.289
0.226
0.628
0%
109.20
138.72
84.75
200.96
0.00
14%
1006.40
137.02
1143.42
or say
1143.00
headed glass including cost, conveyance of all materials to work site, all
c., complete for finished item of work as directed by the Enginee - in -
Coefficient
Amount
1.000
10%
220.00
22.00
1.000
173.00
0%
0.00
100.00
14%
515.00
70.12
585.12
or say
585.00
mical including cost and conveyance of all materials to site including all
eer-in-charge of the work
Coefficient
1.000
Amount
440.00
440.00
Amount
104.00
104.00
epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ng charges etc as per SS - 20 B (APSS 308). For Ordinary soil-Manual up to
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
1
116.48
0.00
30.00
14%
146.48
19.94
166.42
or say
166.00
cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch Second Floor
Coefficient
Amount
14.73
2.203
2.203
2.203
2769.98
17.62
1.10
0.44
0.043
0.054
0%
16.21
17.30
0.00
25.00
150.00
1.000
0%
14%
3.35
0.00
3001.00
408.59
3409.59
341.00
m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
5.26
1.000
0%
1%
22.99
0.00
0.23
14%
or say
554.55
554.55
75.50
630.05
630.00
m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
5.26
1.000
0%
1%
45.98
0.00
0.46
14%
or say
577.77
577.77
78.66
656.43
656.00
oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
885.15
6.060
31.51
0.014
7.19
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
11.60
1171.17
1171.17
14%
159.45
1330.62
or say
1330.60
oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
885.15
6.060
31.51
0.014
7.19
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
11.60
1.000
0%
1%
45.98
0.00
0.46
14%
1217.61
165.78
1383.39
or say
1383.00
of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
488.25
6.180
0.012
32.14
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.62
769.89
769.89
104.82
874.71
874.70
14%
or say
of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials
like CSTN
cement,
BLD
9-6sand water
e charges, etc., complete for finished item of work, including the cost of
Coefficient
Amount
1.050
488.25
5.460
0.012
0.200
28.39
6.16
5.80
0.096
0.224
0.330
40.32
84.00
105.60
0%
1%
1.000
0%
1%
14%
or say
0.00
7.59
45.98
0.00
0.46
812.55
110.63
923.18
923.00
433.65
6.756
0.012
35.13
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
717.77
14%
97.72
815.49
or say
815.50
m thick (Medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
40.32
84.00
105.60
0%
1%
14%
or say
0.00
5.26
531.33
531.33
72.34
603.67
603.70
cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto 600 pitch
BLD-CSTN-8-4
Coefficient
Amount
14.73
2.203
2.203
2.203
2769.98
17.62
1.10
0.44
0.043
0.054
0%
16.21
17.30
0.00
25.00
150.00
14%
2997.65
408.13
3405.78
340.60
s size 0.90 x 2.10M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.
Coefficient
Amount
4.200
1.800
Total
6.000 Rm
1.890 sqm
6.00
1.89
1290.00
2967.30
14%
4257.30
579.63
4836.93
Or say
4837.00
ith (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal
b, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing
lopes and thread lining including cost of all materials like cement, metal,
niorage charges, etc., complete for finished item of work, but excluding the
BLD CSTN 9-13-111
Coefficient
Amount
0.017
29.17
12.000
0.0085
62.40
4.36
0.125
0.006
0.300
20%
1%
35.63
1.56
64.50
20.34
2.18
14%
220.14
29.97
250.11
or say
250.00
d fixing MS. Hallow door frames manufactured by cold roll formed process
ming to IS 4351 - 1976 size should be 50 x 60 mm with 32 mm rebate. The
ame should be painted with one coat of primer and finished painted with
ess of 1.25 mm. Size of door frame section should be of 105x60mm with a
door shutter. The frame section should have groove to insert gasket. The
e filled with polyurethane foam. The frame section should be cut to length,
should be provided with: a) 2mm thick MS powder coated butt hinges of
for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each
s screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver
No
Coefficient
Amount
1.000
233.00
14%
233.00
31.72
264.72
or say
265.00
389.05
32.00
96.00
44.80
100.40
14%
662.25
90.17
752.42
299.77
or say
300.00
ought and putup Sal Wood scantlings: any length in length including cost
and all operational, incidential, labour charges, etc., complete for finished
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%
38847.00
7434.00
2816.00
0.00
49097.00
rought and putup in Sal Wood Plancks: any thickness in length including
k site and all operational, incidential, labour charges, etc., complete for
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%
49491.00
7434.00
2816.00
0.00
59741.00
p Teak Wood scantlings: any length including cost and conveyance of all
dential, labour charges, etc., complete for finished item of work
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%
81225.00
7434.00
2816.00
0.00
91475.00
tup in Teak Wood Plancks: any thickness in length including cost and
all operational, incidential, labour charges, etc., complete for finished item
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%
116540.00
7434.00
2816.00
0.00
126790.00
Coefficient
17.700
8.800
0%
Amount
7434.00
2816.00
0.00
10250.00
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.20 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0090
Cum
Cum
0.0405
Cum
2.2297
Sqm
2.2297
Sqm
0.0405
1988.43
2.2297
1636.60
0.0405
415.13
2.2297
512.83
0%
0.00
150.00
4702.99
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
5252.99
715.19
5968.18
Say
5968.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.05 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0079
Cum
Cum
0.0394
Cum
1.9214
Sqm
1.9214
Sqm
0.0394
1934.42
1.9214
1410.31
0.0394
403.85
1.9214
441.92
0%
0.00
150.00
4340.50
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4890.50
665.84
5556.34
5556.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.00 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0075
Cum
Cum
0.0390
Cum
1.7570
Sqm
1.7570
Sqm
0.0390
1914.78
1.7570
1289.64
0.0390
399.75
1.7570
404.11
0%
0.00
150.00
4158.28
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4708.28
641.03
5349.31
5349.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.90 x 2.10 M
Coefficient
Amount
For Door
0.0315
0.0068
Cum
Cum
0.0383
Cum
1.6132
Sqm
1.6132
Sqm
0.0383
1880.42
1.6132
1184.09
0.0383
392.58
1.6132
371.04
0%
0.00
150.00
3978.13
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4528.13
616.50
5144.63
5145.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.85 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0064
Cum
Cum
0.0379
Cum
1.5515
Sqm
1.5515
Sqm
0.0379
1860.78
1.5515
1138.80
0.0379
388.48
1.5515
356.85
0%
0.00
150.00
3894.91
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4444.91
605.17
5050.08
5050.00
Each
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 1.50x1.35
Coefficient
Amount
For Windows
0.0405
0.0225
Cum
Cum
0.0630
Cum
0.0221
Cum
0.0115
Cum
0.0336
Cum
0.0268
Cum
0.0630
0.0336
0.0268
2.025
3093.11
3073.56
3397.97
1928.31
29.25
1111.50
29.25
468.00
29.25
87.75
0%
0.00
100.00
13260.20
576.00
192.00
414.00
264.00
45.00
14%
14751.20
2008.38
16759.58
Say
16760.00
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.35
Coefficient
Amount
For Windows
0.0304
0.0135
Cum
Cum
0.0439
Cum
0.0110
Cum
Cum
0.0057
0.0167
Cum
0.0152
Cum
0.0439
0.0167
0.0152
1.215
2155.36
1527.63
1927.21
1156.98
23.39
888.82
23.39
374.24
23.39
70.17
0%
0.00
80.00
8180.41
192.00
128.00
276.00
176.00
30.00
14%
8982.41
1222.96
10205.37
Say
10205.00
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.07
Coefficient
Amount
For Windows
0.0135
Cum
Cum
0.0376
Cum
0.0090
Cum
0.0241
0.0047
Cum
0.0137
Cum
0.0152
Cum
0.0376
0.0137
0.0152
0.963
1846.05
1253.21
1927.21
917.02
23.39
888.82
23.39
374.24
23.39
70.17
0%
0.00
80.00
7356.72
192.00
128.00
276.00
176.00
30.00
14%
8158.72
1110.81
9269.53
Say
9270.00
Coefficient
Amount
0.00675
Cum
Cum
0.0135
Cum
0.00675
0.0135
662.81
0.540
514.22
0.54
0%
180.36
0.00
2.034
77.29
2.034
32.54
2.034
6.10
0%
0.00
60.00
1533.32
14%
1533.32
208.76
1742.08
Say
1742.00
Amount
Cum
Cum
0.00788
Cum
0.00788
0.270
386.88
257.11
0.27
0%
90.18
1.017
38.65
1.017
16.27
1.017
3.05
0%
0.00
0.00
60.00
852.14
14%
852.14
116.02
968.16
Say
968.00
8676.65
4284.77
Say
4285.00
alwood) Fully Panneled Door of size 100 x 2.00 Door single leaf door frame
try wood 3"x4" free from all difects such as werping, bending, knot etc.,
40mm size and with 1 1/2 thick best country wood styles and rise using 7/8"
fications of APDSS including cost, wrought and putup and conveyance of all
Coefficient
Amountby
laber charges for making, fixing of door furniture in
position as directed
For Door
: Size), Bottom Tower bolts 150mm long, Brass Butt
hinges (IS:205)- 150
1) 250 mm long, Heavy duty Aluminium Door stopper, Aluminium Door
ated Aldrop (IS:2681) 300 mm long and all labour charges
diricted
1.096 such as Cft
of work. for External doors (Schedule Item 292)
0.274
Cft
0.520
0.116
Cft
Cft
0.436
Cft
2.442
Cft
1.299
Cft
1.299
Cft
2.442
1.299
0.106
3395.01
2197.47
1086.50
150.00
14%
172.00
138.00
996.00
38.00
85.00
124.00
8381.98
1141.21
9523.19
9523.19
Say
9523.00
4761.60
4762.00
1 Sqm
(Salwood) Fully Panneled Door of size 1.00 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
Amountas
axes, all laber charges for making, fixing of doorCoefficient
furniture in position
Forlong,
DoorAluminium Butt
er bolts (Ave : Size), Bottom Tower bolts 150mm
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental
Officers
1.096
Cft for
dule Item 293)
0.274
Cft
0.520
0.116
Cft
Cft
0.436
Cft
2.442
Cft
1.299
Cft
1.299
Cft
2.442
1.299
0.106
3395.01
2197.47
1086.50
150.00
6828.98
86.00
69.00
600.00
104.00
38.00
85.00
7810.98
1063.46
8874.44
Say
8874.00
8874.44
4437.22
4437.00
1 Sqm
(Salwood) Fully Panneled Door of size 0.75 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
axes, all laber charges for making, fixing of door furniture in position as
er bolts (Ave : Size), Bottom Tower bolts 150mm long, Aluminium
Butt
6828.98
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental Officers for
5121.74
dule Item 293)
2.00 sqm
86.00
69.00
600.00
104.00
38.00
85.00
6103.74
14%
831.02
6934.76
Say
6935.00
0.547
Cft
Cft
2.543
Cft
0.742
Cft
0.742
Cft
2.543
0.742
0.093
3535.43
1255.21
953.25
0.866
120.00
5863.89
576.00
384.00
414.00
264.00
15.00
14%
7636.89
1039.76
8676.65
Say
8677.00
8676.65
4820.36
Say
4820.00
576.00
384.00
414.00
264.00
8674.67
14%
1181.06
9855.73
Say
9856.00
1.68
0.003
0.008
0.022
0%
1.26
3.00
7.04
0.00
14%
12.98
1.77
14.75
or say
15.00
proof cement paint of apporved brand and shade over a base coat of
oats in all to give an even shade after thourughly brushing the surface to
d materials, including cost and conveyance of all materials to work site and
BLD CSTN 10-5
complete for finished item of work as per SS 912 for Extarnal walls for All
Coefficient
Amount
0.100
10.00
0.021
0.049
0%
10.08
18.38
0.00
0.350
12.25
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
14%
119.04
16.21
135.25
or say
135.00
12.25
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
1%
0.81
14%
81.39
11.08
92.47
or say
92.00
nd approved Water Proof Cement Paint over Priming Coat, One Coat
ver a base coat of approved cement primer grade I making making 2 coats
y brushing the surface to remove all dirt and remains of loose powdered
ll materials to work site and all operational, incidental, labour charges etc.
12 for Extarnal walls for All Floors
7.00
0.009
0.021
0.150
0%
4.32
8.82
56.25
0.00
1%
0.76
14%
77.15
10.50
87.65
or say
88.00
mixed oil bound wahsable distemper of approved brand and shade over a
brand, making 3 coats in all to give an even shade after thourughly
emains of loose powdered materials, including cost and conveyance of all
idental, labour charges etc. complete for finished item of work as per SS
0.050
5.00
0.0024
0.0133
0%
1.15
4.99
0.00
0.170
10.20
0.036
0.084
0%
17.28
31.50
0.00
1%
14%
or say
0.59
70.71
9.63
80.34
80.30
oats with Oil Bound Distemper of approved brand and shade making 2
ourughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls for All Floors
BLD CSTN 9-10
Coefficient
Amount
0.170
10.20
0.036
0.084
0%
17.28
31.50
0.00
1%
0.59
59.57
8.11
67.68
68.00
14%
or say
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11-i
Coefficient
Amount
0.050
9.00
0.021
0.049
0%
10.08
18.38
0.00
1%
0.37
37.83
14%
5.15
42.98
or say
43.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
14.40
0.036
0.084
0%
17.28
31.50
0.00
1%
0.63
14%
63.81
8.69
72.50
or say
73.00
mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls
5.00
0.008
0.019
0%
3.84
7.13
0.00
0.080
14.40
0.036
0.084
0%
17.28
31.50
0.00
1%
0.79
14%
79.94
10.88
90.82
or say
91.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11 vi
Coefficient
Amount
0.070
12.60
0.036
0.084
0%
17.28
31.50
0.00
1%
0.61
14%
61.99
8.44
70.43
or say
70.00
5.00
0.008
0.019
0%
3.84
7.13
0.00
0.080
10.88
0.036
0.084
0%
17.28
31.50
0.00
1%
0.76
14%
76.39
10.40
86.79
or say
87.00
9.52
0.036
0.084
0%
17.28
31.50
0.00
1%
0.58
14%
58.88
8.02
66.90
or say
67.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-iv
Coefficient
Amount
0.050
9.00
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
14%
77.33
10.53
87.86
or say
88.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.080
14.40
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
14%
90.86
12.37
103.23
or say
103.00
mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v-a
Coefficient
Amount
0.100
10.00
0.021
10.08
0.049
0%
18.38
0.00
0.080
14.40
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
14%
129.32
17.61
146.93
or say
146.90
10.00
0.021
0.049
0%
10.08
18.38
0.00
0.080
10.88
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
1%
1.26
14%
127.06
17.30
144.36
or say
144.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.070
12.60
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
1%
0.89
89.95
14%
12.25
102.20
or say
102.00
9.52
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
1%
0.86
14%
86.84
11.82
98.66
or say
99.00
oats - For New Iron Work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-12-v
Coefficient
Amount
0.110
18.70
0.033
0.077
0%
15.84
28.88
0.00
14%
63.42
8.63
72.05
or say
72.10
Coats - for New Wood Work of approved brand and shade, making 3 coats
brushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
28.90
0.048
0.112
23.04
42.00
0%
0.00
14%
93.94
12.79
106.73
or say
106.70
oats - for Old Wood work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-10-iv
Coefficient
Amount
0.110
18.70
0.036
0.084
0%
17.28
31.50
0.00
67.48
9.19
76.67
77.00
14%
or say
oved brand for new wood work of teak wood frame and shutters to give an
uding cleaning the surface of all dirt, dust, etc. , and applying a coat of
d conveyance of all materials to work site andall operational, incidental,
BLD CSTN 12-15
m of work as per SS 1212. for All Floors
Coefficient
Amount
0.023
2.10
0.163
11.41
0.096
0.224
0%
46.08
84.00
0.00
14%
143.59
19.55
163.14
or say
163.00
oat - For Old Iron Work of approved brand and shade, making 1 coat in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential,
charges, etc.,
BLD labour
CSTN 12-12-ii
207 & 1212. for All Floors
Coefficient
Amount
0.050
8.50
0.021
0.049
0%
10.08
18.38
0.00
36.96
14%
5.03
41.99
or say
42.00
ai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water Based
sai coat/ Neon/indocem super track for internal walls (Emulsion Paint) to
ed materials including cost of all materials, labour charges and incidental
e for finished item of work, including conveyance charges of materials for
t/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All Floors
Coefficient
1.000
Amount
95.00
14%
95.00
12.93
107.93
or say
108.00
433.65
6.756
0.012
35.13
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
1.000
0%
1%
45.98
0.00
0.46
14%
764.21
104.05
868.26
or say
868.00
64.00
0.00
0.64
691.78
94.19
785.97
786.00
thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorage charges, labour charges
or finished item of work, for F3
BLD CSTN 9-23
Coefficient
Amount
Basic rate 1 sqm
431.27
1.000
0%
1%
45.98
0.00
0.46
14%
477.71
65.04
542.75
or say
543.00
44.70
0.00
0.45
14%
523.11
71.22
594.33
or say
594.00
mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete to
conveyance of all materials like cement, fine aggregate (sand) coarse
Seigniorage charges, sales & other taxes on all
materials
including all
BLD
CSTN 14-6
ch as machine mixing, laying concrete, curing etc.,complete but excluding
Amount
shed item of work, including centering, shuttering.Coefficient
0.336
1935.42
26.440
1370.41
9.880
1196.76
0.120
0.120
0.250
0%
50.40
45.00
80.00
0.00
4677.99
636.91
5314.90
531.49
295.27
295.00
14%
or say
0.015
0.060
0.096
0%
65.21
25.20
30.72
0.00
121.13
Cement : Sand) using hard variety of rough stone other than granite from
ce of all materials like cement, sand, masonary stones, water, etc., to site
terials including all labour charges like mixing cement mortar, wall
ed item of work in foundation & Basement. (APSS No. 615 & 601) For RR
BLD CSTN 6-13
Coefficient
Amount
59.400
308.88
0.440
361.67
0.500
356.83
0.160
234.22
0.330
169.43
1.200
2.000
0%
504.00
640.00
0.00
14%
2575.03
350.59
2925.62
or say
2926.00
1.000
723.00
0%
1.000
0%
0.00
135.32
0.00
14%
5155.81
701.96
5857.77
or say
5858.00
1144.00
0.450
231.04
0.900
1.200
1728.65
92.40
1.000
328.60
0%
0.100
1.390
0%
Basic rate 1 cum
1.000
0%
0.00
42.00
444.80
0.00
4011.49
723.00
0.00
14%
4734.49
644.60
5379.09
or say
5379.00
723.00
0%
1.000
0%
0.00
67.66
0.00
14%
4802.15
653.81
5455.96
or say
5456.00
723.00
0.00
135.32
0.00
14%
4869.81
663.02
5532.83
or say
5533.00
1.000
723.00
0%
1.000
0%
0.00
67.66
0.00
14%
5374.15
731.69
6105.84
or say
6106.00
1.000
723.00
0%
1.000
0%
0.00
135.32
0.00
5441.81
14%
740.90
6182.71
or say
6183.00
696.49
0.00
220.88
0.00
0.133
55.86
0.267
100.13
4.600
1472.00
0%
0.00
BACIC RATE 1 Cum
6563.71
BLD CSTN 3-14:31A
BACIC RATE 1 Cum
1.000
0%
6563.71
723.00
0.00
14%
7286.71
992.09
8278.80
or say
8279.00
fixed with all accessories (stappers, bolts and stoppers etc.,) with all sizes
ed drawings with alluminium single shutter with allround frame section of
fixed with alluminium single shutter with vertical styles of sizes 47.62 x
45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm (20060 and
5) with archit clural accessories having section 88x40x3.2 mm (19456) and
of size 79x 17.30 x0.10mm (19352) for height of 1.20 m pre laminated
equivalent ) of 10mm thick to a hight of 0.91 m at bottom panel PVC/
y duty floor spring including cost and conveyance of all materials and
ation and fixing in position as directed by the Engineer in Charge.
Coefficient
Weght
Kg
10.08
4.42
0.88
0.96
1.37
Amount
11.93
0.38
30.02
3.73
33.75 Kgs
1.08 Sqm
0.82 Sqm
33.75
8437.50
1.08
576.72
0.82
467.40
2422.00
312.00
300.00
138.00
34.00
1.00
1.00
3.00
2.00
1.00
0%
331.01
590.39
295.55
295.55
756.40
0.00
1.515
159.04
1.515
146.92
1%
152.62
0.788
1.574
0.788
0.788
2.364
14%
17,513.87 / 1.89=
Or say
15415.10
2098.77
17513.87
9266.60
9267.00
minium fully glazed door as per approved drawing using side vertical and
0 mm with double shutters using shutters frame of size 47 x 44.45 x 1.80
nd 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertical side frames
Coefficient
Amount
ssery glazing clips of size 19 x 17.30 x 0.80 mm and rubber for beeding 5
s, 2 nos locks and 4 nos round door handles necessary fixed with all
Weght
) including cost and conveyance of all materials and
accessories including
sition as directed by the Engineer in Charge. for 1.52Kg
m x 1.32 m as per
15.71
7.46
2.47
2.28
4.93
32.85
1.64
2.38
2.52
39.39 Kgs
69.85
69.85
69.85 RM
7.10
0.71
7.81 Sqm
39.39
9847.50
69.85
7.81
139.70
4451.70
4844.00
948.00
624.00
600.00
276.00
68.00
2.00
2.00
2.00
6.00
4.00
2.00
0%
295.08
527.25
263.63
263.63
674.88
193.33
0.00
5.630
591.15
5.630
546.11
1%
251.54
0.703
1.406
0.703
0.703
2.109
0.703
14%
28,864.46 / 7.10=
Or say
25405.50
3458.96
28864.46
4065.42
4065.00
Coefficient
1.000
Amount
385.00
385.00
14%
52.42
437.42
or say
437.00
Coefficient
Amount
1.000
2900.00
14%
2900.00
394.84
3294.84
or say
3295.00
Amount
1.000
5195.00
14%
5195.00
707.30
5902.30
or say
5902.00
Amount
1.000
5195.00
14%
5195.00
707.30
5902.30
or say
5902.00
Coefficient
Amount
1.000
3685.00
14%
3685.00
501.71
4186.71
or say
4187.00
1795.00
244.39
2039.39
or say
2039.00
sign including cost Mild steel and all Labour charges for fabricating steel
ills, Iron Doors, Windows including cost of welding rods, power charges,
y the Departmental Officers for finished item of work.
Coefficient
1.000
1.000
Amount
38.00
16.00
1.000
3.00
0%
0.00
14%
Say
57.00
7.76
64.76
65.00
1 Kg
Coefficient
0.330
0.330
0.330
0.330
1.000
Amount
126.39
27.72
18.48
4.95
14.00
1.400
14%
or say
81.20
272.74
37.13
309.87
309.90
Amount
1.000
335.00
14%
335.00
45.61
380.61
or say
381.00
272.30
2272.30
or say
2272.00
Coefficient
1.000
Amount
81225.00
10%
8122.50
17.700
8.800
0%
7434.00
2816.00
0.00
35.315
0%
8122.45
0.00
14%
107719.95
14666.07
122386.02
or say
122386.00
Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-2-V
Coefficient
Amount
67.200
349.44
0.940
772.66
0.160
234.22
0.280
143.76
2.222
211.11
2.500
2.320
0%
1050.00
742.40
0.00
14%
3503.59
477.01
3980.60
or say
3981.00
trap using 15 Nos of 32mm MS Steel rods welded as equal spacing over 6
in position on the already laid concrete walls, including all labour charges
on, cost of welding rods etc., complete as directed by the Departmental
62.42
388.07
450.49 Kgs
450.490
17118.62
450.490
0%
5405.88
0.00
450.490
0%
1351.47
0.00
14%
23875.97
3250.71
27126.68
or say
27127.00
1.000
2625.00
14%
2625.00
357.39
2982.39
or say
2982.00
1.000
2250.00
1.000
127.50
14%
2377.50
323.70
2701.20
or say
2701.00
22.99
0%
1%
0.00
0.23
14%
1467.54
199.81
1667.35
or say
1667.00
Coefficient
Amount
1.000
4246.00
14%
4246.00
578.09
4824.09
or say
4824.00
Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-3
Coefficient
Amount
76.800
399.36
0.940
772.66
0.160
234.22
0.320
164.29
1.500
2.320
0%
630.00
742.40
0.00
14%
2942.93
400.68
3343.61
or say
3344.00
1.100
2530.00
6.756
35.13
0.012
6.16
0.500
12.50
0.096
0.224
0.310
0%
1%
40.32
84.00
99.20
0.00
28.07
3.333
30.00
2865.38
14%
2865.38
390.12
3255.50
or say
3256.00
Teak Veneer Decorated Plywood (IS:1328) The rate is inclusive of cost and
charges, incidental charges, cost of all consumables etc. and scafolding
tem of work
Coefficient
Amount
1.000
1045.00
1.000
0%
317.00
0.00
14%
1362.00
185.44
1547.44
or say
1547.00
Coefficient
Basic rate 1 sqm
1.000
0%
1%
Amount
2865.38
22.35
0.00
0.22
14%
2887.95
393.19
3281.14
or say
3281.00
0.170
10.20
0.036
0.084
#REF!
#REF!
#REF!
#REF!
1%
#REF!
#REF!
#REF!
#REF!
#REF!
or say
#REF!
f pre painted steel (base steel as per IS 513 of 0.6 mm thick D quality,
M) Primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
Coefficient
ould be 46 x 70 mm and section for beading should
be 18 x 25Amount
mm. The
plain float Glass with Ethyl Propylene diameine Monomer (EPDM) Gaskets.
ned with corner bracket. Centre mullions are to be fixed suing mullion cap.
er coated and nylon receiver. Gaskets made of Ethyl propylene Diamine
RCA with zinc phosphating. Mullion caps made of Glass
The
1.000filled nylon.
3673.00
/ masonry wall be means of self expanding screws. & complete for finished
mm) grid outer frames section size of 46 x 52 mm
14%
3673.00
500.08
4173.08
or say
4173.00
74.88
0.030
15.40
0.500
0.740
0%
187.50
236.80
0.00
514.58
14%
70.06
584.64
or say
585.00
Amount
700.00
0.00
14%
700.00
95.31
795.31
or say
795.00
1250.00
0.00
14%
1250.00
170.19
1420.19
or say
1420.00
ed make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual
nternal parts of dual flush cistern, ultra solid seat cover of approved make
cock 450 mm long PVC inter connection pipe wall flanges all of approved
ork in all respects: White Colour fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
6500.00
14%
6500.00
884.98
7384.98
or say
7385.00
Amount
1.000
170.00
0%
0.00
14%
170.00
23.15
193.15
or say
193.00
810.00
0%
0.00
14%
810.00
110.28
920.28
or say
920.00
pection including all repairs including all labour charges for etc; complete
Coefficient
Amount
1.000
90.00
0%
0.00
14%
90.00
12.25
102.25
or say
102.00
uding all labour charges for etc; complete for finished itemof work.
Coefficient
Amount
1.000
64.00
14%
64.00
8.71
72.71
or say
73.00
mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight
xcavation of trenches and socket pits in any soil (except rock requiring
efilling with watering and tamping including all labour charges for etc;
Coefficient
Amount
1.000
0%
346.00
0.00
14%
346.00
47.11
393.11
or say
393.00
ng in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges for fixing at site etc;
Coefficient
Amount
1.000
200.00
14%
200.00
27.23
227.23
or say
227.00
pipe outlet fixing in position including cost and conveyance of all materials,
Operational and Incidental charges including all labour
charges for
fixing at
Coefficient
Amount
1.000
70.00
14%
70.00
9.53
79.53
or say
80.00
n with brass union nut C.P coated fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
0%
14%
74.00
0.00
74.00
10.08
84.08
or say
84.00
Amount
1.000
21.00
14%
21.00
2.86
23.86
or say
24.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
46.32
15.07
Total
257.33 Kgs
257.33
9778.54
257.33
0%
3602.62
0.00
40.00
2000.00
2.00
500.00
14%
15881.16
2162.22
18043.38
Or say
18043.00
ved source including cost and conveyance of tiles to work and stacking at
mental Officers.
Coefficient
Amount
12.00
12.00
proved source including cost and conveyance of tiles to work and stacking
rtmental Officers.
Coefficient
Amount
12.00
12.00
urce including cost and conveyance of tiles to work and stacking at site for
fficers.
Coefficient
Amount
24.00
24.00
tiles and cement mortor borders (1:2) including cost and conveyance of
ork and all operational, incidential, labour charges such as mixing mortor,
cement mortor, etc., complete for finished item of work
Coefficient
Amount
0.009
39.12
0.030
0.070
0.440
0%
12.60
26.25
140.80
0.00
14%
218.77
29.79
248.56
or say
249.00
of size 1.80M x 0.75M x 3.05M to out side of the store room and carefully
rs to the store room and again shifting back and rearranging the racks
ing labour charges for all operations etc., as directed by the Engineer - in Coefficient
Amount
9500.00
9500.00
proof mesh for Door shutter diferent sizes frame with fly froof mesh of
4" x 1/2" thick including cost, wrought and putup and conveyance of all
laber charges for making, fixing of door furniture in position as directed by
bolts, M.S. aldop and M.S handle, and all labour charges such as diricted by
work.
Coefficient
For Door
Amount
0.430
0.406
Cft
Cft
0.036
0.034
Cft
Cft
0.906
Cft
0.906
4.00
2.00
1.00
2.28
2.28
0%
996.61
64.00
36.00
23.00
857.28
832.20
0.00
14%
2809.09
382.46
3191.55
3191.55
1399.80
1400.00
1 Sqm
w Double shutters diferent of size shutters frame thick 3 1/2" x 1 1/2" and
putup and conveyance of all materials work site and including all taxes, all
urniture in position as directed by Dept| Officers including M.S.P.C. hings,
harges such as diricted by the Departmental Officers for finished item of
Coefficient
For Window
Amount
0.437
0.164
0.601
Cft
Cft
Cft
0.601
4.00
1.00
2.00
4.90
0.017
0%
14%
835.55
32.00
45.00
36.00
262.15
174.25
0.00
1384.95
188.56
1573.51
1573.51
2247.87
2248.00
1 Sqm
11 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80
Unit
Rate
Rm
131.00
Add LA charges
Rm
33.00
each
131.00
12 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.81
Manpower
BMW-F.82
Unit
Rate
Rm
146.00
Add LA charges
Rm
33.00
each
146.00
13 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.83
Manpower
BMW-F.84
Unit
Rate
Rm
191.00
Add LA charges
Rm
33.00
each
191.00
1 S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including
the cost of pipe & its fittings & labour charges complete
Code
Unit for finished
Rate itemof work.
Material
BMW-F.85
Rm
269.00
Amount
131.00
0.00
14%
131.00
17.84
148.84
or say
149.00
Amount
146.00
0.00
14%
146.00
19.88
165.88
or say
166.00
Amount
191.00
0.00
14%
191.00
26.00
217.00
or say
217.00
269.00
SOR 2014-15
I
Sl
A
B
C
II
Labour
charges
3
4
HIRE CHARGES FOR CENTERING & SCAFFOLDING
FOOTINGS
277.00
446.00
PEDESTALS
315.00
710.00
PLINTH BEAMS
1335.00
1075.00
Sl
Material
Hire
charges
Labour
charges
A
B
C
D
E
F
G
III
Material
Hire
charges
Sl
Material
Hire
charges
Labour
charges
IV
Sl
Material
Hire
charges
Labour
charges
4
Sl
Material
Hire
charges
Labour
charges
5
Centring
Charges for
2011-12
5
& SCAFFOLDING
723.00
1025.00
2410.00
Unit of
Measurement
6
Page No. 84
per 1 cum
per 1 cum
per 1 cum
Centring
Charges for
2011-12
Unit of
Measurement
Unit of
Measurement
Unit of
Measurement
Second Floor
993.00
153.00
1395.00
1170.00
133.00
136.00
143.00
Paga No. 89
Third Floor
1084.00
167.00
1522.00
1277.00
145.00
88.00
91.00
Fourth Floor
1174.00
181.00
971.00
814.00
91.00
95.00
99.00
per
per
per
per
per
per
1
1
1
1
1
1
sqm
sqm
sqm
sqm
sqm
sqm
Centring
Charges for
2011-12
Unit of
Measurement
per
per
per
per
per
per
1
1
1
1
1
1
sqm
sqm
sqm
sqm
sqm
sqm
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
kg
5.20
cum
513.42
Manpower
SOR P. No. 230/III/4
Manpower
SOR P. No. 230/III/4
Manpower
SOR P. No. 230/III/4
Manpower
CSSR-M-087
Light mazdoor
Add LA charges
day
cum
320.00
64.00
Unit
Rate
cum
cum
cum
cum
2088.43
1820.43
1658.43
1458.43
Unit
Rate
cum
1820.43
cum
cum
1658.43
1458.43
1 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
soil-Manual up to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Excavation Method
Unit
Rate
day
cum
320.00
116.48
Foundation of Buildings
Seigniorage charges
cum
cum
116.48
30.00
cum
203.84
2 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
(not requiring blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method
Rate
320.00
166.40
Foundation of Buildings
Seigniorage charges
cum
cum
166.40
30.00
cum
321.20
2 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method
Rate
320.00
116.48
Seigniorage charges
cum
30.00
cum
146.48
1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross draina
appurtenant structures and placing the excavated stuf neatly in specified dump area or disposing of
directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Rate
Out turn of two mazdoors assumed at 4 cum per day.
DATA:
Manpower
SOR P. No. 266/I/10
Work Inspector
day
275.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
198.88
Excavation
Method
Seigniorage charges
cum
30.00
cum
228.88
1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cl
Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved design
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc
all depths and for finished item of work for piles of following diameters.
Pile foundation-Manual Means- 1 Rm
Code
up to 300 mm dia
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Add Over Head Charges
Total rate per 1 Rm
Unit
Rate
day
cum
320.00
168.32
cum
168.32
2 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black co
ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved design
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc
all depths and for finished item of work for piles of following diameters.
Unit
Rate
day
cum
320.00
179.20
cum
179.20
1 Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers clear
carefully stacking materials useful for reuse if any etc., complete as directed by the Engineer-in-charge of th
Dismantling the existing Manglore tiled roof over ceiling tiles - Unit 1 sqm
Code
Unit
Rate
Manpower
BMT-S.05
sqm
8.30
8.30
cum
8.30
and
disposal
of Lime work unserviceable materials within 100 metres
2 Dismantling & Demolishing
including labour charges etc., complete as directed by the Enginee - in - Charge.
Lime work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
390.40
393.79
cum
397.73
1 Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100 metres lead la
etc., complete as directed by the Engineer - in - Charge.
Unreinforced cement concrete upto 15 cm thicknes
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
780.80
784.19
cum
792.03
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
1382.40
1385.79
cum
1399.65
3 Dismantling Brick work including stacking of serviceable materials and disposal of unserviceable materia
metres lead labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge
Brick Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges
BLD-CSTN-14-8
Unit
Rate
day
cum
LS
320.00
130.88
134.27
cum
135.61
2 Dismantling Kadapa slabs or Shahabad stone slabs flooring on sand bed carefully stacking materials us
including labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge.
Kadapa slabs or Shahabad stones
Code
Manpower
BMT-S.11
Unit
Rate
sqm
4.20
cum
4.20
cum
4.20
4 Dismantling clearing away and carefully stacking materials useful for reuse Old cement mortar plaster inclu
of serviceable materials and disposal of unserviceable materials within 100 metres lead labour charges etc
finished item of work as directed by the Engineer - in - Charge.
Old cement mortar plaster for 1 sqm
Code
Unit
Rate
Miscellaneous
BMT-S.08
sqm
cum
2.90
2.90
cum
2.90
5 Removing and Refixing Windows glazed of any thickness fixing the frame, fixing the fixures to the win
Labour charges for making, fabricating office furniture, racks, work-station furniture, cup-board shutters to
boards with ply-wood/ MDF sheets, decolam/ veneer laminations including fixing cutting, making, asse
hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with necessary screws exc
materials, accessories, fittings etc., complete as directed by the Engineer-in-charge of the work
Labour
charges
for making,
fabricatingfixing
officethe
Removing and Refixing
Windows
glazed
of any thickness
Code
Manpower
BMM-V.07
Unit
Rate
sqm
365.00
365.00
sqm
365.00
6 Dismantling the existing Wrought and framed timber in roofs or floors clearing away and carefully stack
useful for reuse if any etc., complete as directed by the Engineer-in-charge of the work
Dismantling the existing Wrought and framed timber in roofs or floors
Code
Unit
Manpower
BMT-S.06
cum
Add LA charges
Add Over Head Charges
Rate
125.00
125.00
cum
125.00
5 Plain Cement concrete (1:5:10) Proportion nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course
Unit
Rate
cum
cum
cum
KL
5.20
1393.43
513.42
77.00
hour
328.60
189.80
day
day
cum
420.00
320.00
486.80
cum
3066.85
Manpower
SOR P. No. 267/I/11
SOR P. No. 269/III/4
4 Plain Cement concrete (1:6:10) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
Water
Mechinery
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
day
day
cum
420.00
320.00
486.80
cum
3113.06
22 Plain Cement concrete (1:4:8) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
Water
Machinary
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
day
day
cum
420.00
320.00
486.80
cum
3235.33
23 Providing Vibrated Cement concrete (1:3:6) as per 456 nominal mix using 40 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, per APSS. No. 402.
Unit
Rate
cum
5.20
cum
1393.43
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
4008.82
Water
Mechinery
SOR P. No. 379/16
SOR P. No. 379/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4
Miscellaneous
3 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. First Floor
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
2.47
165.70
1.78
hour
day
day
day
cum
420.00
375.00
320.00
43.89
BLD-CSTN-6-1
cum
day
day
cum
3099.09
420.00
320.00
55.92
cum
234.94
2 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. Second Floor
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
hour
2.47
165.70
1.78
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
day
day
day
cum
420.00
375.00
320.00
43.89
Lift charges F2
Add LA charges
cum
cum
4.81
4.81
Miscellaneous
BLD-CSTN-6-1
cum
day
day
cum
3099.09
420.00
320.00
55.92
Lift charges F2
Add LA charges
cum
cum
5.59
5.59
cum
239.75
Miscellaneous
6 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for FOOTINGS FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1
Code
Material
Unit
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
420.00
375.00
Light mazdoor
Add LA charges
day
cum
320.00
1627.99
cum
723.00
Add LA charges
cum
446.00
cum
6922.71
Miscellaneous
SOR P. No. 89 /
A/Footings
7 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PEDASTALS FI
Code
Material
Unit
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
420.00
375.00
320.00
1627.99
cum
1025.00
Add LA charges
cum
710.00
cum
7224.71
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 /
B/Pedastals
8 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PLINTH BEAM FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Plinth Beam -F1
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
1920.72
Kl
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
420.00
375.00
320.00
1627.99
cum
2410.00
Add LA charges
cum
1075.00
cum
8609.71
Water
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89/C/
Plinth beam
9 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
391.64
165.70
182.09
day
day
day
cum
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
420.00
375.00
320.00
1924.77
BACIC RATE 1 Cum
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns FI
cum
1075.00
Add LA charges
cum
948.00
cum
7571.49
10 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F2
cum
1170.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
948.00
249.85
249.85
cum
7916.34
11 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F3
cum
1265.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1138.00
499.70
499.70
cum
8261.19
12 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS FI
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F1
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 89 /
Lintels First floor
cum
1518.00
Add LA charges
cum
675.00
cum
8014.49
13 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F2
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Lintels Second floor
cum
1586.00
cum
cum
cum
743.00
249.85
249.85
cum
8332.34
14 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F3
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Lintels Third floor
cum
1653.00
cum
cum
cum
810.00
499.70
499.70
cum
8649.19
15 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS centering with Stell up to
APSS. No. 402. for BEAMS FI
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
513.42
1920.72
77.00
hour
522.50
90.49
165.70
42.07
day
day
day
cum
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams FI
420.00
375.00
320.00
1062.66
BACIC RATE 1 Cum
cum
2071.00
Add LA charges
cum
795.00
cum
6999.98
16 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F2
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F2
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Beams Second floor
cum
2151.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
875.00
119.52
119.52
cum
7199.50
17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F3
V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F3
Code
Unit
Rate
BACIC RATE 1 Cum
Miscellaneous
SOR P. No. 93 /
Beams Third floor
cum
2230.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
954.00
239.04
239.04
cum
7398.02
17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
11.46
165.70
5.33
day
day
day
cum
420.00
375.00
320.00
132.94
BACIC RATE 1 SQM
cum
232.00
Add LA charges
cum
89.00
cum
848.57
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 / Slabs
up to 150 mm thick
First floor
18 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F2
V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Second floor
cum
241.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
98.00
14.97
14.97
cum
872.54
19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F3
V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Third floor
cum
250.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
107.00
29.94
29.94
cum
896.51
20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
20.27
165.70
9.43
day
day
day
cum
420.00
375.00
320.00
238.99
BACIC RATE 1 SQM
cum
242.00
Add LA charges
cum
93.00
cum
1350.70
Mechinery
SOR P. No. 379/9
SOR P. No. 380/41
hour
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 / Slabs
up to 225 mm thick
First floor
21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor
cum
251.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
102.00
26.87
26.87
cum
1386.57
22 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick RCC Steps for Staircase F3
V.R.C.C. Design Mix M-20 Centering up to 3.66 M RCC Steps for Staircase 225mm thick F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor
cum
261.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
112.00
53.74
53.74
cum
1423.44
19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick SUN SHADES FI
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade FI
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
522.50
3.52
day
day
day
cum
420.00
375.00
320.00
66.12
BACIC RATE 1 SQM
cum
271.00
Add LA charges
cum
104.00
cum
575.46
Mechinery
SOR P. No. 325/9
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 89 /
CHAJJAS SUNSHADES First
floor
20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F2
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F2
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Second
floor
cum
281.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
114.00
6.96
6.96
cum
592.42
21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F3
R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F3
Code
Unit
Rate
BACIC RATE 1 SQM
Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Third
floor
cum
292.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
125.00
13.92
13.92
cum
610.38
6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.
cum
Rate
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
723.00
Add LA charges
cum
446.00
cum
6657.38
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 89 /
A/Footings
7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.
Rate
CSSN-A-05
cum
5.20
BLD-CSTN-1.9
cum
1920.72
M 005
cum
513.42
Water
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
day
cum
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
420.00
375.00
320.00
1307.99
SOR P. No. 89 /
B/Pedastals
cum
1025.00
Add LA charges
cum
710.00
cum
6959.38
8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.
Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1307.99
cum
2410.00
Add LA charges
cum
1075.00
cum
8344.38
9 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F1
Code
Unit
Rate
Material
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
day
cum
420.00
375.00
320.00
1636.77
cum
1497.00
Add LA charges
cum
1268.00
cum
7760.16
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
Columns
10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F2
Code
Unit
Rate
Material
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
Manpower
hour
day
day
day
cum
420.00
375.00
320.00
1636.77
cum
1624.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
1395.00
196.32
196.32
cum
7823.48
Miscellaneous
SOR P. No. 90 /
Columns
11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F3
Code
Unit
Rate
Material
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
136.60
day
day
day
cum
420.00
375.00
320.00
1636.77
cum
1751.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
1522.00
392.63
392.63
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
Columns
cum
8146.79
10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for LINTELS, for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402. for Lintles F1.
Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77
cum
1663.00
Add LA charges
cum
903.00
cum
7926.16
19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for LINTELS , for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402. for Lintles F2.
Rate
5.20
1920.72
513.42
77.00
hour
day
day
day
cum
420.00
375.00
320.00
1636.77
cum
1753.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
993.00
196.32
196.32
cum
7952.48
hour
328.60
189.80
165.70
136.60
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
Lintles
19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, W
RCC WALLS IN BUILDINGS, for Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall
Centring Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Lintles F2.
Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77
cum
1844.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1084.00
392.63
392.63
cum
8239.79
11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF BEAMS for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F1.
Code
Material
Unit
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
Water
Mechinery
SOR P. No. 325/16
hour
328.60
hour
50.68
165.70
36.47
day
day
day
cum
420.00
375.00
320.00
878.02
cum
2406.00
Add LA charges
cum
1064.00
cum
7548.09
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
Beams
12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F2
Code
Material
Unit
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
Water
Mechinery
SOR P. No. 325/16
hour
328.60
hour
50.68
165.70
36.47
day
day
day
cum
420.00
375.00
320.00
878.02
cum
2512.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
1170.00
96.52
96.52
cum
7490.61
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 /
Beams
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F3
Code
Material
Unit
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
Water
Mechinery
SOR P. No. 325/16
hour
328.60
hour
50.68
165.70
36.47
day
day
420.00
375.00
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
Light mazdoor
Add LA charges
day
cum
320.00
878.02
cum
2619.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
1277.00
193.03
193.03
cum
7694.12
Miscellaneous
SOR P. No. 90 /
Beams
1 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF SLAB 120 m
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual
F1
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
hour
day
day
day
sqm
420.00
375.00
320.00
878.02
BACIC RATE 1 CUM
cum
273.00
Add LA charges
cum
121.00
cum
814.06
12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF SLAB 150 m
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual
F1
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
hour
day
day
day
sqm
420.00
375.00
320.00
878.02
BACIC RATE 1 CUM
cum
273.00
Add LA charges
cum
121.00
cum
949.32
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
F2
Unit
Rate
cum
cum
5.20
1920.72
cum
513.42
Kl
77.00
hour
day
day
day
sqm
420.00
375.00
320.00
87.82
sqm
285.00
Add LA charges
Lift charges F2
Add LA charges
sqm
sqm
sqm
133.00
9.66
9.66
cum
719.70
hour
328.60
5.12
165.70
3.69
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor
14 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor
F3
Unit
Rate
cum
cum
5.20
1920.72
cum
513.42
Kl
77.00
hour
328.60
5.12
165.70
3.69
hour
day
day
day
sqm
420.00
375.00
320.00
87.82
sqm
297.00
Add LA charges
Lift charges F2
Add LA charges
sqm
sqm
sqm
145.00
19.33
19.33
cum
741.37
13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sun Shades First floor
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1, Lift Manual
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
50.68
165.70
36.47
hour
day
day
day
cum
420.00
375.00
320.00
878.02
BACIC RATE 1 CUM
cum
289.00
Add LA charges
cum
139.00
cum
570.80
20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Second floor.
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 2
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
3.23
165.70
2.32
SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor
hour
day
day
day
cum
420.00
375.00
320.00
54.60
cum
303.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
153.00
6.02
6.02
cum
613.50
20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Third floor.
S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 3
Code
Material
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
3.23
165.70
2.32
hour
day
day
day
cum
420.00
375.00
320.00
54.60
SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor
cum
317.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
167.00
12.03
12.03
cum
633.51
1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F1
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
165.70
1.78
hour
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
248.54
1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F2
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Water
Kl
77.00
hour
328.60
2.47
165.70
1.78
day
day
day
sqm
420.00
375.00
320.00
83.94
Lift charges F2
Add LA charges
sqm
sqm
8.82
8.82
cum
257.36
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
15 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual
F3
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
Lift charges F3
Add LA charges
Add Over Head Charges
Total rate per 1 sqm
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
165.70
1.78
hour
day
day
day
sqm
420.00
375.00
320.00
83.94
sqm
sqm
17.64
17.64
cum
266.18
1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual
F1
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
723.00
cum
446.00
cum
969.39
1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual
F2
Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
day
day
day
sqm
420.00
375.00
320.00
83.94
SOR P. No. 89 /
A/Footings
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
sqm
sqm
446.00
8.64
8.64
cum
978.03
1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual
F3
Code
Material
Unit
Rate
cum
cum
5.20
1715.64
cum
513.42
Kl
77.00
hour
328.60
2.47
day
day
day
sqm
420.00
375.00
320.00
83.94
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
sqm
sqm
446.00
17.28
17.28
cum
986.67
3 Filling with sand in trenches, sides of foundations and basement with initial lead in layers not exceeding
consolidating each deposited layer by watering and ramming including cost and conveyance of water to wo
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (AP
310)
Sand filling
Code
Material
Manpower
SOR P. No. 269/III/4
Unit
Rate
cum
446.42
Light mazdoor
Add LA charges
day
cum
320.00
16.64
cum
463.06
4 Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and baseme
lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming
and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P e
Refilling foundation
for finished item of work. (APSS NO. 309 & 310) for Refilling foundations.
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
16.64
Add Over Head Charges
Total rate per 1 cum
cum
16.64
17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure FI
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
304.84
cum
260.71
cum
4238.26
1 Reinforced Brick Masonary walls of 100 mm thick in CM (1:4) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Reinforced Brick Masonary walls of 100 mm in CM(1:4) for F1
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 91 / First
floor
Unit
Rate
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
sqm
68.59
58.66
sqm
524.79
5 Providing Vibrated Cement concrete (1:2:4) as per 456 nominal mix using 20 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No.
Unit
Rate
cum
cum
cum
Kl
5.20
1920.72
513.42
77.00
hour
328.60
189.80
165.70
136.60
hour
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
5420.19
10 Providing Cement concrete (1:2:4) as per 456 nominal mix using 12 mm size graded machine crushed
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No
for top of compound wall
Unit
Rate
cum
cum
cum
Kl
5.20
1715.64
513.42
77.00
hour
328.60
189.80
day
day
cum
420.00
320.00
486.80
SOR P. No. 89 /
A/Footings
cum
723.00
Add LA charges
cum
446.00
cum
5069.92
20 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
SOR P. No. 91 / First
floor
Unit
Rate
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
sqm
68.59
58.66
sqm
512.31
21 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501 for F2
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Miscellaneous
Unit
Rate
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
SOR P. No. 91 /
Second floor
Sqm
92.96
sqm
sqm
sqm
83.03
13.57
13.57
sqm
550.25
22 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501 for F3
Code
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4
Unit
kg
Nos
Rate
5.20
5.328
Cum
513.42
day
day
day
sqm
420.00
375.00
320.00
135.70
Sqm
117.32
Add LA charges
Lift charges F3
Add LA charges
sqm
sqm
sqm
107.39
27.14
27.14
Sqm
588.18
Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Miscellaneous
SOR P. No. 91 / Third
floor
6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
Stell up to 3.66, as per APSS. No. 402 for Strip Bands.
Rate
cum
5.20
cum
1920.72
cum
513.42
Kl
77.00
hour
328.60
189.80
165.70
0.00
day
day
day
cum
420.00
375.00
320.00
1307.99
cum
723.00
Add LA charges
cum
446.00
cum
6491.68
Water
Mechinery
SOR P. No. 325/16
SOR P. No. 325/40
hour
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
SOR P. No. 89 /
A/Footings
23 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. for Staircase step
P.C.C. M-20
Code
Material
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
328.60
Mechinery
SOR P. No. 379/16
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
5306.49
14 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for HYSD (F.e 415) F1
Unit
Rate
kg
M.T
70.00
34000.00
day
day
M.T
420.00
320.00
7400.00
M.T
43520.00
15 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
HYSD
(F.eapproved
415) F2 sourses
lift manual
bars from
to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting,
bending,
placing
in position, tying etc., and sales and sales
& other taxes,
on cost of materia
Code
Unit
Rate
item
of
work.
for
HYSD
(F.e
415)
F2
Material
SOR P. No. 271/I/3
Binding wire
kg
70.00
Reinforcement steel (including loading
M.T
34000.00
charges) (HYSD/TMT)
Manpower
SOR P. No. 266/I/2
Black smith / Tin smith / Rivetor
day
420.00
SOR P. No. 2269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
7400.00
Miscellaneous
Lift charges F2
cum
740.00
Add LA charges
cum
740.00
Add Over Head Charges
cum
44260.00
16 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
HYSD
(F.eapproved
415) F3 sourses
lift manual
bars
from
to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting,
bending,
placing
in position, tying etc., and sales and sales
& other taxes,
on cost of materia
Code
Unit
Rate
item of work. for HYSD (F.e 415) F3
Material
SOR P. No. 271/I/3
Binding wire
kg
70.00
Reinforcement steel (including loading
charges) (HYSD/TMT)
Manpower
M.T
34000.00
day
day
cum
420.00
320.00
7400.00
Lift charges F3
Add LA charges
cum
cum
1480.00
1480.00
cum
45000.00
Miscellaneous
15 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Ba
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F1
Unit
Rate
kg
70.00
M.T
36000.00
day
day
M.T
420.00
320.00
7400.00
M.T
45620.00
Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4
3 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars
dia including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F2
Unit
Rate
Binding wire
kg
70.00
M.T
36000.00
day
day
cum
420.00
320.00
7400.00
Lift charges F2
cum
740.00
Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4
Miscellaneous
Add LA charges
cum
740.00
cum
46360.00
4 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars
dia including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F3
Unit
Rate
Binding wire
kg
70.00
M.T
36000.00
day
day
cum
420.00
320.00
7400.00
Lift charges F2
Add LA charges
cum
cum
1480.00
1480.00
cum
47100.00
Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4
Miscellaneous
20 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof First Floor Lift manual
Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4
Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Rate
kg
70.00
M.T
38000.00
each
9.00
day
day
day
420.00
420.00
320.00
Hr
61.20
cum
7400.00
Mechinery
Welding Charges (Hire charges of Welding
Machine)
Add LA charges
cum
48852.00
5 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual
Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4
Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Rate
kg
70.00
M.T
38000.00
each
9.00
day
day
day
cum
420.00
420.00
320.00
7400.00
Hr
61.20
Lift charges F2
Add LA charges
cum
cum
740.00
740.00
cum
49592.00
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges
Mechinery
Welding Charges (Hire charges of Welding
Machine)
Miscellaneous
1 Providing mild steel of diferent diameters including cost and conveyance of all materials, cutting an
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual
Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4
Mechinery
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges
Unit
Rate
kg
70.00
M.T
38000.00
each
9.00
day
day
day
cum
420.00
420.00
320.00
7400.00
Hr
61.20
Lift charges F3
Add LA charges
cum
cum
1480.00
1480.00
cum
50332.00
Miscellaneous
16 Brick Masonary 225 mm thick for pannel walls in Basement and Super structure with CM ( 1:8) prop (Cemen
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm i
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Basement
Unit
Rate
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
3933.42
18 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure F2
kg
cum
cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
cum
413.16
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
369.02
91.56
91.56
cum
4438.14
19 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure F3
kg
Nos
Cum
5.20
5.328
513.42
day
day
day
cum
420.00
375.00
320.00
915.60
Sqm
521.42
cum
cum
cum
477.29
183.12
183.12
cum
4637.96
19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for FI
Impervious coat in CM (1:3) 20mm thick FI, Lift Manual.
Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 21/BMTImpervious Water Proof Compound
H.01
Unit
Rate
kg
Cum
5.20
513.42
kg
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Sqm
271.87
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
26 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F2
Impervious coat in CM (1:3) 20mm thickF2
Code
Material
BMT-H.01
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Unit
Rate
kg
5.20
Cum
513.42
kg
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Lift charges F2
Add LA charges
Sqm
Sqm
20.39
20.39
sqm
292.26
Miscellaneous
27 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F3
Impervious coat in CM (1:3) 20mm thickF3
Code
Material
CSSN-A-05
M 005
BMT-H.01
Manpower
CSSR-M-011
CSSR-M-077
CSSR-M-087
Unit
Rate
kg
5.20
Cum
kg
513.42
24.00
day
day
day
Sqm
420.00
375.00
320.00
203.87
Lift charges F3
Add LA charges
Sqm
Sqm
40.78
40.78
sqm
312.65
Miscellaneous
20 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Celling plastering F1.
Unit
Rate
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
14.32
Sqm
11.95
Sqm
254.87
21 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all
operational,
incidental
charges
mixing
Ceilling
Plastering
with and
CM 2labour
coats,
12 mmfor
thick
F2 mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Celling plastering F2.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
Sqm
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
Sqm
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
206.39
Sqm
Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering
Sqm
19.12
Add LA charges
Lift charges F2
Add LA charges
Sqm
Sqm
Sqm
16.75
20.64
20.64
Sqm
280.31
22 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
Ceilling Plastering with CM 2 coats, 12 mm thick F3
finished item of work (APSS 901,903 & 904) for Celling plastering F3.
Code
Unit
Rate
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
23.91
Add LA charges
Lift charges F3
Add LA charges
Sqm
Sqm
Sqm
21.54
41.28
41.28
Sqm
305.74
Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering
21 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth
complete for finished item of work (APSS 901,903 & 904) for Uneven faces F1.
Unit
Rate
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
6.86
Add LA charges
Sqm
5.87
Sqm
254.44
22 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth
Plastering with 20mm thick 2 coats F2
complete for finished item of work (APSS 901,903 & 904) for External walls F2.
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Unit
Rate
kg
Cum
5.20
513.42
kg
Cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
9.29
Add LA charges
Lift charges F2
Add LA charges
Sqm
Sqm
Sqm
8.30
20.64
20.64
sqm
277.51
Miscellaneous
SOR P. No. 91/
Second floor
Plastering to walls
23 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including
allwith
operational,
incidental
andF3labour charges for mixing mortar, laying, rendering smooth
Plastering
20mm thick
2 coats
complete
for
finished
item
of
work
(APSS
901,903 & 904) for External Unit
walls F3.
Code
Rate
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
kg
cum
5.20
513.42
kg
cum
5.20
513.42
day
day
day
Sqm
420.00
375.00
320.00
206.39
Sqm
11.73
Add LA charges
Lift charges F3
Add LA charges
Sqm
Sqm
Sqm
10.74
41.28
41.28
sqm
300.59
Miscellaneous
SOR P. No. 91/ Third
floor Plastering to
walls
1 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in
dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to
seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on
including cost of all labour charges for mixing mortar, finishing, scafolding, lift charges, curing etc., a
Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for fin
work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual
Unit
Rate
kg
cum
5.20
513.42
kg
cum
5.20
513.42
day
day
day
cum
420.00
375.00
320.00
206.39
Sqm
6.86
Add LA charges
cum
5.87
cum
242.17
22 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F1 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Even faces F1.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls
Sqm
6.86
Add LA charges
cum
5.87
cum
247.41
23 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F2 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Internal walls F2.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous
SOR P. No. 77/
Second floor
Plastering to walls
Sqm
9.29
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
8.30
20.64
20.64
cum
270.48
24 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F3 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Internal walls F3.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous
Sqm
11.73
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
10.74
41.28
41.28
cum
293.56
24 Flooring plastering 20mm thick average in CM (1:4) with sponze finishing.cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth curing, etc,, complete for finished item of work (APSS 901,903 & 904) fo
Unit
Rate
kg
cum
5.20
513.42
day
day
cum
375.00
320.00
86.45
cum
136.54
25 Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards and Labour charges for
of paris false ceiling with for GI channels of perimeter channel 30mm x 27mm x 0.55 thick and ceilin
51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint compound and luppum/ p
per specification without painting including cost of all materials including cost of Plaster of paris shee
finished item of work
Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards
Code
Material
Unit
Rate
Coefficient
BMT-M.54
Sqm
327.00
BMT-M.07
Rm
65.00
BMT-M.05
Rm
74.00
BMT-H.90
kg
14.00
Corpenter CI-1
Painter CI-1
Painter CII-2
Light mazdoor
Add LA charges
day
day
day
day
Sqm
420.00
480.00
375.00
320.00
533.63
sqm
1006.40
Manpower
29 Replacing boken glass pannel with 4mm pin headed glass including cost, conveyance of all materials to
operational, incidental and labour charge etc., complete for finished item of work as directed by the E
Charge.
Replacing boken glass pannel with 4mm pin headed glass
Code
Unit
Rate
Manpower
BMT-I.13, P.No. 27
BMM-V.24, P. No. 83
sqm
220.00
sqm
220.00
Labour charges
sqm
173.00
Add LA charges
173.00
cum
L.S
cum
515.00
16 Supply of NITO bond AR 8 or equivalent chemical including cost and conveyance of all materials to site
taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of NITO bond AR 8 or equivalent chemical
Code
Material
NITO bond AR 8 or equivalent chemical approved
rate
Unit
Rate
lit
440.00
17 Supply of CONPLAST X 421 IC admixure equivalent chemical including cost and conveyance of all ma
including all taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of CONPLAST X 421 IC admixure equivalent chemical
Code
Unit
Rate
Material
CONPLAST X 421 IC admixure equivalent
chemical approved rate
lit
104.00
18 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary soil
For Ordinary soil up to 3 M
3M
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
116.48
Excavation Method
Seigniorage charges
cum
30.00
cum
146.48
19 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, , lift manuals per APSS. No. 402. 0 Floor
P.C.C. M-15
Code
Material
0 Floor
Unit
Rate
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
hour
328.60
189.80
day
day
cum
420.00
320.00
486.80
Mechinery
SOR P. No. 379/16
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
cum
723.00
Add LA charges
cum
446.00
cum
4297.49
4 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost
of purlins,
trusses
& cost of conveyance
of all materials
item of work upto 600 pitch S
Roofing
with 6rafters,
mm thick
corrugated
asbestos cement
sheets finished
F2
Code
Material
BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4
Unit
Rate
t/sqm
nos
nos
nos
1880.00
8.00
0.50
0.20
day
day
cum
375.00
320.00
33.51
Miscellaneous
Sundries including 50 x 6 mm iron wind ties
white lead etc.
L.S
L.S
Lift charges F2
Add LA charges
cum
cum
3.35
3.35
sqm
3001.00
Unit
Unit taken 10 sqm
Rate
BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower
Carpenter II class
Man mazdoor
Add LA charges
t/sqm
nos
nos
nos
1880.00
8.00
0.50
0.20
day
day
cum
375.00
320.00
33.41
L.S
2822.56
L.S
Miscellaneous
Lift charges F3
Add LA charges
cum
cum
6.68
6.68
sqm
3004.24
1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F2
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
526.07
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
sqm
554.55
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F3
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
526.07
Lift charges F3
Add LA charges
Add water Charges
sqm
sqm
sqm
45.98
45.98
45.98
sqm
577.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
33 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
843.00
Kg
5.20
cum
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1159.57
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
sqm
1171.17
2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F2
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
843.00
Kg
5.20
cum
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1159.57
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
1194.39
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F3
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
843.00
Kg
5.20
cum
513.42
Kg
29.00
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1159.57
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
1217.61
Miscellaneous
36 Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F1
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.15
Unit
Rate
Sqm
1048.00
Kg
5.20
cum
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
1430.02
sqm
1444.32
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
34 Flooring with ceramic tiles, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1
Code
Material
SOR P. No. 12 / BMTC.01
Unit
Rate
Sqm
465.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
762.27
sqm
769.89
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
35 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F2
Code
Material
SOR P. No. 12 / BMTC.01
Unit
Rate
Sqm
465.00
Kg
cum
Kg
5.20
513.42
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
758.52
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
789.33
Manpower
Miscellaneous
36 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement
pasteceramic
to full tiles,
depthset
mixed
with coat
pigment
of matching
shade,
cost of all materials like cemen
Flooring with
over base
of cement
mortar (1:8),
12 including
mm thick F3
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
Code
Unit
Rate
conveyance of all materials. for F3
Material
SOR P. No. 12 / BMTC.01
Sqm
465.00
Kg
cum
Kg
5.20
513.42
29.00
day
day
day
420.00
375.00
320.00
Manpower
Add LA charges
Add water Charges
Sqm
sqm
229.92
758.52
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
812.55
Miscellaneous
35 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement paint spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, in
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
finished item of work. (APSS No 701 & 707) for Bath rooms F1
Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), F1
Code
Material
Unit
Rate
Sqm
413.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
sqm
717.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
32 Flooring with Chequered Terrazzo tiles of 22 mm thick (Medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F1
Code
Material
SOR P. No. 15 / BMTD.01
Unit
Rate
Sqm
229.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
420.00
375.00
320.00
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Add LA charges
Add water Charges
Sqm
sqm
229.92
526.07
sqm
531.33
L.S
L.S
sqm
Rate
1880.00
8.00
0.50
0.20
375.00
320.00
33.51
2997.65
30 Supply and fixing of PVC doors to the toilets size 0.90 x 2.10M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.
Code
Considering siz of PVC door 090 x 2.10M
for PVC door frame (V)
for PVC door frame (H)
Unit
2x 2.10 =
2x 0.90 =
0.90x 2.10 =
Rate
ABSTRACT
Material
BMT-N.46
BMT-N.44
rm
sqm
215.00
1570.00
cum
4257.30
37 Gronolithick Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine c
laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m
the top surface to required smoothness and slopes and thread lining including cost of all materials like c
sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but
cost of conveyance of all materials for F1
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size F1
Code
Material
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Unit
Rate
Sqm
1715.64
Kg
cum
5.20
513.42
day
day
day
Sqm
sqm
285.00
260.00
215.00
101.69
217.96
sqm
220.14
38 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.
Code
Considering size of PVC door 0.75 x 2.00M
for PVC door frame (V)
for PVC door frame (H)
Unit
1.50 Sqm
2x 2.00 =
2x 0.75 =
Rate
0.75x 2.00 =
ABSTRACT
Material
BMT-N.46
rm
215.00
BMT-N.44
sqm
1570.00
cum
3537.50
1.50 sqm
1.00 sqm
31 Supply and fixing mild steel hallow door frames of Size 3'0" x 7'0" manufactured by cold rolled formed
1.25mm bright CRCA'D' quality MS Grade confirming to IS 4351-1976 suitable for single double leaf dof
frame of section 105x60x30mm rebate including 6 (six) numbers of standard lugs made from flat steel st
than 1.60mm thick including base tie of section 50mm x 25mm minimum free fixed hinges of size 1000 x
numbers for single shutter and 6 ( six ) number for double shutter with one side fixed to for fixing 3 numb
shutter with one side fixed to for fixing 3 numbers rubber bottom inserts in frame necessary arrangeme
hole (10 inches long 12mm dia aldrop of and tower bolts welded to frame at top and bottom and fixin
hinges to frame for wind cleat one number assembled ny mean of welding at corners including painting a
the departmental officers along with test certificate for raw materials and including all tolls cost and con
materials and all incidental for finished item of work.
Code
Door type
Unit
3'-0"
Rate
7'-0"
5.185
20.481
Rm
Kgs
ABSTRACT
Material
BMT-F.01
BMM-V.14
BMM-V.15
Add LA charges
rm
rm
rm
Sqm
389.14
cum
1697.25
233.00
16.00
3.00
6 NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by cold roll fo
steel sheet 1.25mm thick bright CRCA confirming to IS 4351 - 1976 size should be 50 x 60 mm with 32 m
corner of the frame should be welded. The frame should be painted with one coat of primer and finished
Code
Unit
Rate
pure polyester paint,MS.
with
total door
coated
thickness
of 1.25 mm.
Size of door frame section should be of 105x
Hallow
frames
manufactured
by
Material
rebate of 38mm to accommodate
35mm
thick
door
shutter.
The frame section should have groove to inse
cold roll formed
process
steel
sheet
1.25mm
BMT-F.01
Rm
233.00
section
of the door and
fan
lightCRCA
frameconfirming
is to be filled
polyurethane
foam. The frame
section should be
thick
bright
to ISwith
4351
and joined by way of
welding
and
each
frame
should
be
provided
with:
a)
2mm
thick
MS
powder coated
1976 with Hinges tower Bolts etc.
100nn long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 No
Add Over
Head Charges
233.00
vertical. c) 40mm x 200mm
x 1.2mm
hold fasts screwed to stifeners sqm
6 Nos. with split
end tail. d) Nylon Al
1 No. for single shutter frame. e)Tie Rod 1 No
Total rate per 1 Rm
32 Supply and fixing Flush door shutters, solid bond wood block board type with commercial ply on both faces
conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges fo
door shutters of any thickness to the existing door frame including fixing the fixtures to the door shutter for
of work.
Code
Material
BMT-N.17
Miscellaneous
BMM-V.23
Unit
Rate
sqm
734.00
sqm
230.00
Add LA charges
Sqm
230.00
sqm
964.00
30 Cost Suply and Fixing Fly proof mesh ( Netlon make) of superior quality to the existing Windows & Ven
alround Willkro tape ( Male and Female Streep) duly fixing the tape to the Windows & Ventilaters frame us
screws Code
and gum of all materials work site and including all taxes and Unit
all labour charges
Rate for striching, ma
position as directed by Dept| Officers for finished item of work
Unit taken 6' - 0" x 4' - 6" =
###
For Window
27.00 Sft=
For frame
( 6'-0" + 6'-0") + (4'-6' + 4'-6' )
21.00 Rft Or
Material
BMT-F.18
Cost of Fly proof mesh (Netlon)
sqm
155.00
BMT-M.23
Cost of male and female tap
Rm
5.00
Stiching charges
L.S
Rm
15.00
Gum and Screws
L.S
Rm
7.00
Labour
charges
fixing
L.S
sqm
40.00
Wollon fly proof mesh for Window
Add Over Head Charges
1.00 sqm
2.510 sqm
each
662.25
39 Supply of Best Country Wood ( Sal Wood ) wrought and putup Sal Wood scantlings: any length in length
and conveyance of all materials to work site and all operational, incidential, labour charges, etc., comple
item
of work
Supply of Best Country Wood Sal Wood scantlings: any length wrought and putup
Code
Material
BMT-E.15
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
38847.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
40 Supply of Best Country Wood ( Sal Wood ) wrought and putup in Sal Wood Plancks: any thickness in len
cost and conveyance of all materials to work site and all operational, incidential, labour charges, etc.,
finished item of work
Supply of Best Country Wood Sal Wood Plancks: any thickness wrought and putup
Code
Material
Unit
Rate
BMT-E.16
Manpower
cum
49491.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
1 Supply of Best Teak Wood wrought and putup Teak Wood scantlings: any length including cost and conv
materials to work site and all operational, incidential, labour charges, etc., complete for finished item of wo
Supply of Best Teak Wood scantlings: any length wrought and putup
Code
Material
BMT-E.06
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
81225.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
2 Supply of Best Teak Wood wrought and putup in Teak Wood Plancks: any thickness in length includ
conveyance of all materials to work site and all operational, incidential, labour charges, etc., complete for
of work
Supply of Best Teak Wood Plancks: any thickness wrought and putup
Code
Material
BMT-E.08
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Unit
Rate
cum
116540.00
Carpenter Cl- I
Light mazdoor
Add LA charges
day
day
Sqm
420.00
320.00
10250.00
Code
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
Carpenter Cl- I
Light mazdoor
Add LA charges
Unit
Rate
day
day
Sqm
420.00
320.00
10250.00
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.20 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.20 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.52 sqm
Total Frame
Requirement of flush shutter
35 mm thick
1x1.085x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
512.83
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
5252.99
1.20 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.05 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.05 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.21 sqm
Total Frame
Requirement of flush shutter
35 mm thick
1x0.935x2.055 =
Flsh Shtter
ABSTRACT
Cost of Sal wood for frame
Cum
49097.00
BMT-N.17
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
441.92
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4890.50
1.05 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.00 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
1.00 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
2.10 sqm
Total Frame
Requirement of flush shutter
35 mm thick
1x0.855x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
BMM-V.23
sqm
230.00
Add LA charges
Sqm
404.11
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4708.28
1.00 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.90 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
0.90 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
1.89 sqm
Total Frame
35 mm thick
1x0.785x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
371.04
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4528.13
0.90 x 2.10 M
1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.85 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood
Unit
0.85 M x
For frame
Verticlal
Horizontal
2.10 M
Rate
1.79 sqm
Total Frame
35 mm thick
1x0.755x2.055 =
Flsh Shtter
ABSTRACT
BMT-N.17
Cum
49097.00
sqm
734.00
Cum
10250.00
sqm
230.00
Add LA charges
Sqm
356.85
LS
Nos
BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57
Nos
Nos
Nos
Nos
Nos
1
3
1
1
1
sqm
4444.91
0.85 x 2.10 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 1.50x1.35
Country wood Framed and Fully Panneled Window Three Shutters
Code
Unit taken 1.50x1.35 ( 3 Shutters) =
1.50 M x
For frame
Verticlal
Horizontal
1.35 M
Unit
Rate
2.025 sqm
ABSTRACT
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
555.75
Add LA charges
LS
Nos
Nos
Nos
Nos
Nos
6
6
6
3
3
sqm
14751.20
1.50 x 1.35 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.35
Country wood Framed and Fully Panneled Window Double Shutters
Code
Unit taken 0.90x1.35 ( 2 Shutters) =
0.90 M x
For frame
Verticlal
Horizontal
1.35 M
Unit
Rate
1.215 sqm
ABSTRACT
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Add LA charges
Sqm
444.41
LS
Nos
Nos
Nos
Nos
Nos
2
4
4
2
2
sqm
8982.41
0.90 x 1.35 M
1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.07
Country wood Framed and Fully Panneled Window Double Shutters
Code
Unit taken 0.90x1.07 ( 2 Shutters) =
0.90 M x
For frame
Verticlal
Horizontal
1.07 M
Unit
Rate
0.963 sqm
ABSTRACT
BMM-V.14
Cum
Cum
Cum
Sqm
49097.00
91475.00
126790.00
952.25
Kg
38.00
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
444.41
LS
Nos
Nos
Nos
Nos
Nos
2
4
4
2
2
sqm
8158.72
0.90 x 1.07 M
1 Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.90 x 0.60m
Code
0.90 M x
For frame
Verticlal
Horizontal
0.60 M
Unit
Rate
0.540 sqm
Cum
Sqm
49097.00
952.25
Sqm
Sqm
334.00
180.36
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
38.64
BMT-I.01
Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
sqm
1533.32
Glazed Ventilator
## Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.60 x 0.45m
Code
0.60 M x
For frame
Verticlal
Horizontal
0.45 M
Unit
Rate
0.270 sqm
Cum
Sqm
49097.00
952.25
Sqm
Sqm
334.00
90.18
Kg
38.00
BMM-V.14
Kg
16.00
BMM-V.15
Kg
3.00
Sqm
19.32
BMT-I.01
Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)
LS
sqm
852.14
Glazed Ventilator
Fully Panneled Window=
8676.65 x 1.00 sqm
2.03 sqm
42 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 100 x 2.00 Door single le
of with are made of well seasoned best country wood 3"x4" free from all difects such as werping, bend
and
fixed with 6 nos 'Z' hold fasts of size 300x40mm size and withBLD-CSTN-13-12-243
1 1/2 thick best country wood styles and r
Country wood Framed and Planked Doors (Schedule Item No. 297
thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup and con
Code
materials
work site and including all taxes, all laber charges for making,Unit
fixing of doorRate
furniture in position
1/2
21.67
Unit
3'-3
"x6'-7"
= Tower bolts (Ave
sft
2.00 sqm
Dept|taken
Officers
including
Top
: Size), Bottom
Tower bolts 150mm
long, Brass Butt hinges
mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper, Alu
Handles (IS:208) 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 300 mm long and all labour charges su
by the Departmental Officers for finished item of work. for External doors (Schedule Item 292)
For frame
Verticlal
Horizontal
For Shutter frame
Verticlal
Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =
BMT-G.09
BMT-G.08
BMT-G.22
BMT-G.57
BMT-G.34
BMT-G.45
166
164
182
214
191
202
1390.26
1691.66
10250.00
LS
2.00 sqm
1.00 x 2.00 M
1.00 sqm
cft
cft
Cum
sqm
8381.98
43 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 1.00 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 297
7/8" thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup an
Code
Unit
Rate
of all materials work site and including all taxes, all laber charges for
making, fixing
of door furniture
1/2
21.67
Unit
taken
sft : Size), Bottom2.00
sqm
directed
by 3'-3
Dept| "x6'-7"
Officers =including Top Tower bolts (Ave
Tower
bolts 150mm long, Al
hinges (IS:205)- 150 mm Long, MS-Powder
Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
For frame
Aluminium Door Handles (IS:208) 150 mm
Long
as diricted by the Department
Verticlaland all2labour
x 6'-7" charges
x 3" x 4" such
=
finished item of work. for Internal doors (Schedule Item 293) 1/2
Horizontal
1x 3'-3 " x 3" x 4" =
Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =
cft
cft
Cum
1390.26
1691.66
10250.00
LS
166
164
183
200
214
191
1.00 x 2.00 M
2.00 sqm
1.00 sqm
Nos
Nos
Nos
Nos
Nos
Nos
1
1
6
1
1
1
sqm
7810.98
44 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 0.75 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 293
7/8" thick Sal wood flanks for pannels as per specifications of APDSS
including cost, wrought and putup an
of all materials work site and including all taxes, all laber charges for making, fixing of door furniture
Fully :Panneled
Internal
Door=
directed by Dept| Officers including
Top Tower bolts (Ave
Size), Bottom
Tower
bolts 150mm long, Al
2.00 sqm
hinges (IS:205)- 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
Fully
Panneled
Internal
Door=
1.50
sqm 150
Aluminium Door Handles
(IS:208)
mm
Long and
all labour
charges such as diricted by the Department
6828.98 x
1.50 sqm
finished item of work. for Internal doors (Schedule Item 293)
2.00 sqm
Furniture - Iron - for Internal doors (Schedule Item 293) as per
above item.
BMT-G.09
BMT-G.08
BMT-G.26
166
164
183
Nos
Nos
Nos
1
1
6
BMT-G.44
BMT-G.57
BMT-G.34
200
214
191
Nos
Nos
Nos
1
1
1
0.75 x 2.00 M
6103.74
45 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.50 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13 - 22- 270
Country wood Framed 1/2
and Fully Panneled Window Three Shutters
35x5mm size with 1 thick best country wood styles and rise using 7/8" thick Sal wood flanks for pannels
Code(execluding cost of M.S. Grills) as per specifications of Unit
Ratecost, wrought an
M.S. Grills
APDSS including
1.80 sqm
Unit
taken 4'-11"
3'- 111/2" =
conveyance
of allxmaterials
work site and 19.46
including allsft
taxes, all laber charges
for making, fixing of Pann
furniture in position as directed by Dept|
For Officers
frame including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium Butt hinges (IS:205)100 mm3 Long,
1/2
Verticlal
x 3'-11Window
" x 21/2"stoppers
x 3" = Aluminium, and all labour
as diricted by the Departmental Officers for finished item of work. 1/2
Horizontal
2 x 4'-11" x 2 " x 3" =
For shutters frame
Verticlal
3 x 2 x 3'-111/2" x 3 1/2" x 1 1/2"=
Horizontal
3 x 2 x 2 x 1'-3" x 3
1/2
"x1
1/2
"=
Total Frame
For Shutter Planks
3x 1'-0" x 3'-111/2" x 3/4" =
cft
cft
Cum
1390.26
1691.66
10250.00
LS
Nos
Nos
Nos
Nos
Nos
6
12
6
3
1
sqm
7636.89
1.50 x 1.20 M
1.80 sqm
1.00 sqm
46 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.80 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13
- 22270
Country wood Framed 1/2
Fully Panneled Window Three Shutters
35x5mm size with 1 and
thick
best country wood styles and rise using
7/8" thick Sal
wood
flanks for pannels
Code
Unit
Rate
M.S. Grills (execluding cost of M.S. Grills) as per specifications of APDSS including cost, wrought an
Panneled
Window=
conveyance of all materials work
taxes,
all laber
charges for making, fixing of Pann
1.80 site
sqmand including allFully
furniture in position as directed by Dept| Officers including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium
Butt
hinges
(IS:205)100Window=
mm Long, Window stoppers Aluminium, and all labour
Fully
Panneled
2.16
sqm
as diricted by the Departmental Officers for finished item of work.
5863.89 x
2.16 sqm
1.80 sqm
Furniture for Windows Panelled : Thrible Leaf with half
Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56
205
176
164
213
Nos
Nos
Nos
Nos
1.80 x 1.20 M
6
12
6
3
8674.67
26 Painting for Ceiling and Walls two coats with whiting of approved quality to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all ma
charges and incidental such as scafolding, lift charges etc., complete for finished item of work, includin
charges of materials for All Floors
Painting for Ceiling two coats with whiting for All Floors
Code
Material
BMT-J.27
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
kg
14.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
18.75
sqm
21.55
7 White washing for Ceiling Single coat with whiting of approved quality to give an even shade after thorou
the surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
and incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyan
materials for All Floors
White washing for Ceiling One coats with whiting for All Floors
Code
Material
BMT-J.27
Manpower
CSSR-M-035
CSSR-M-037
Painter Cl- I
Painter CI-II
Unit
Rate
kg
14.00
day
day
420.00
375.00
CSSR-M-087
Light mazdoor
Add LA charges
day
Sqm
320.00
11.30
sqm
12.98
27 Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a
approved cement primer grade I making 3 coats in all to give an even shade after thourughly brushing
remove
all dirt and remains of loose powdered materials, including cost and conveyance of all materials to
Painting to new walls with 2 coats of water proof cement paint (overall 3 coats) for All Floors
all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for Extarn
Unit
Rate
Floors Code
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
BMT-J.24
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
68.33
sqm
119.04
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
23 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming C
(All Colours) of apporved brand and shade making 2 coats in all to give an even shade after thourughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
Extarnal walls for All Floors
Painting to old walls with 2 coats of water proof cement paint (overall 2 coats) for All Floors
Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087
Unit
Rate
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
68.33
Sqm
80.58
sqm
81.39
Miscellaneous
27 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Co
(All Colours) of apporved brand and shade over a base coat of approved cement primer grade I making m
in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of all materials to work site and all operational, incidental, labou
complete for finished item of work as per SS 912 for Extarnal walls for All Floors
Painting to old walls with 1 coat of water proof cement paint (overall 1 coat) for All Floors
Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087
Unit
Rate
lit
35.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
420.00
375.00
69.39
Sqm
76.39
sqm
77.15
Miscellaneous
27 Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and
base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conv
materials to work site and all operational, incidental, labour charges etc. complete for finished item of w
911 for internal walls for All Floors
Painting to old walls with Distempering, 3 Coats with Oil Bound Distemper
Code
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
6.14
kg
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
58.98
sqm
70.71
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Miscellaneous
27 Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper of approved brand and sha
coats in all to give an even shade after thourughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls for All Floors
Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper
Code
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
kg
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
58.98
sqm
59.57
Miscellaneous
22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-1 coats-Internal Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
28.46
Sqm
37.46
sqm
37.83
Miscellaneous
1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
63.18
Miscellaneous
sqm
63.81
28 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
10.97
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.22
Manpower
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
79.15
sqm
79.94
Miscellaneous
1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal old Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
61.38
sqm
61.99
Miscellaneous
27 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade over a base coat of appropriate primer of approved bra
coats after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,
and conveyance of all materials to work site and all operational, incidental, labour charges etc. complet
item of work as per SS 911 for internal walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
10.97
lit
136.00
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.25
Manpower
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
75.63
sqm
76.39
Miscellaneous
1 Painting to old walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade after thoroughly brushing the surface to remove all dir
of loose powdered materials, including cost and conveyance of all materials to work site and all operation
labour charges etc. complete for finished item of work as per SS 911 for internal walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
136.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
Sqm
58.30
sqm
58.88
Miscellaneous
22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
External walls
Plastic Emulsion paint-1 coat-External Walls
Code
Material
Unit
Rate
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
20.33
sqm
77.33
1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
sqm
90.86
30 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Plastic Emulsion paint-3 coats-External Walls
Code
Material
BMT-J.01
Manpower
Primer Coat
Cost of Primer
Unit
Rate
lit
100.00
day
day
Sqm
480.00
375.00
28.46
lit
180.00
Painter CI-1
Painter CI-II
Add LA charges
Material
BMT-J.22
Manpower
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
sqm
129.32
28 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade over a base coat of appropriate primer of approved brand, making
thoroughly
brushing
the
surface
to remove
all dirt and remains of loose powdered materials, includ
Acrylic Exterior
Emulsion
paint-3
coats-External
Walls
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for fin
Code
Unit
Rate
work as per SS 911 for external walls
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
Acrylic Exterior Emulsion Asian/ Berger/
BMT-J.25
Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
lit
136.00
equivalent
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
Sqm
76.46
Miscellaneous
Sqm
125.80
Sundries including brushes, etc.,
Add Over Head Charges
sqm
127.06
1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External old Walls
Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4
Unit
Rate
lit
180.00
Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges
day
day
day
Sqm
480.00
375.00
320.00
76.46
Sqm
89.06
sqm
89.95
Miscellaneous
1 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Acrylic Exterior Emulsion paint-2 coats-External old Walls
Code
Material
BMT-J.25
Manpower
Painter CI-1
Unit
Rate
lit
136.00
day
480.00
Painter CI-II
Light mazdoor
Add LA charges
day
day
Sqm
375.00
320.00
76.46
Sqm
85.98
sqm
86.84
Miscellaneous
29 Painting with Synthetic Enamel paints - Two Coats - For New Iron Work of approved brand and shade, mak
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two Coats - For New Iron Work for All Floors
Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
170.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
44.72
sqm
63.42
30 Painting with Synthetic Enamel paints - Three Coats - for New Wood Work of approved brand and shade, m
in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Three Coats - for New Wood Work for All Floors
Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
Unit
Rate
lit
170.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
65.04
sqm
93.94
28 Painting with Synthetic Enamel paints - Two Coats - for Old Wood work of approved brand and shade, maki
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two coats - for Old Wood Work for All Floors
Code
Material
Unit
Rate
BMT-J.30
lit
170.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
48.78
sqm
67.48
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
29 Polishing two coats with french polish of approved brand for new wood work of teak wood frame and shutt
even glossy surface with uniform texture including cleaning the surface of all dirt, dust, etc. , and apply
wood filler, sand papering including cost and conveyance of all materials to work site andall operationa
Polishing two coats with french polish of approved brand
labour charges, etc., complete for finished item of work as per SS 1212. for All Floors
Code
Unit
Rate
Material
Thinner for Melamine polish/ French polish BMT-J.12/P. No. 27
lit
92.00
Sheenlac
BMT-J.10/P. No. 27
Spirit
lit
70.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
480.00
375.00
130.08
sqm
143.59
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
6 Painting with Synthetic Enamel paints - One Coat - For Old Iron Work of approved brand and shade, ma
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials,
including
cost
and paints
conveyance
of allmaterials
to Work
work for
siteAlland
all operational, incidential, labour
Painting with
Synthetic
Enamel
- One Coats
- For Old Iron
Floors
complete for finished item of work as per SS 1207 & 1212. for All Floors
Code
Unit
Rate
Material
Synthetic Enamel paint (at 20 sqm / litre as
BMT-J.30
lit
170.00
per British Paints (I) Ltd.
Manpower
CSSR-M-035
Painter CI-1
day
480.00
CSSR-M-037
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Add Over Head Charges
sqm
36.96
31 Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon
Cement Primer & Two Coats of Altek Flora/ sai coat/ Neon/indocem super track for internal walls (Emul
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges a
such as scafolding, lift charges etc., complete for finished item of work, including conveyance charges of
All Floors
Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All
Code
Material
BMT-J.36
Unit
Rate
Sqm
95.00
sqm
95.00
36 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement with
paintGlazed
spread
at theTiles,
rateset
3.30
Cement
paste
fixed
with12pigments
of machine shade, in
Dadoing
coloured
overKgs
baseofcoat
of cement
mortar
(1:5),
mm thick F2
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F2
SOR P. No. 12 / BMTC.07
Sqm
413.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
740.99
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
37 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement
paint
spread
at Tiles,
the rate
3.30
Cement
paste
fixed
with
of machine shade, in
Dadoing with
Glazed
coloured
set over
baseKgs
coat of
of cement
mortar
(1:5),
12 mm
thickpigments
F3
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F3
SOR P. No. 12 / BMTC.07
Sqm
413.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
710.66
Lift charges F3
Add LA charges
Add water Charges
cum
cum
sqm
45.98
45.98
45.98
cum
764.21
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Miscellaneous
36 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F1
Skirting with ceramic tiles, set over base coat of cement mortar (1:5), 12 mm thick F1
Code
Material
Unit
Rate
Sqm
374.00
Kg
cum
5.20
513.42
Kg
29.00
day
day
Sqm
sqm
420.00
375.00
320.00
520.83
Basic rate 1 sqm
sqm
526.04
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
37 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF2pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F2
Basic rate 1 sqm
Miscellaneous
Lift charges F2
cum
32.00
Add LA charges
cum
32.00
Add water Charges
sqm
32.00
Add Over Head Charges
cum
558.36
38 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate
of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF3pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F3
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
64.00
Add LA charges
cum
64.00
Add water Charges
sqm
64.00
Add Over Head Charges
cum
590.68
38 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, la
Flooring with Rough Kadapa/Shahabad 50mm thick, (1:8), 12 mm thick F1
for dressing of flooring stones etc., complete for finished item of work, for F1
Code
Unit
Rate
Material
SOR P. No. 11 / BMTB.02
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
Sqm
86.00
Kg
cum
5.20
513.42
day
day
day
Sqm
sqm
420.00
375.00
320.00
229.92
343.63
Basic rate 1 sqm
sqm
347.07
39 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials
likeKadapa/Shahabad
flooring stone,50mm
cement,
and
water
etc., complete, including seigniorage charges, la
Flooring
with Rough
thick,sand,
(1:8), 12
mm
thick F2
for dressing
of
flooring
stones
etc.,
complete
for
finished
item
of work, Unit
for F2
Code
Rate
cum
cum
sqm
22.99
22.99
22.99
cum
370.29
40 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials
likeKadapa/Shahabad
flooring stone,50mm
cement,
and
water
etc., complete, including seigniorage charges, la
Flooring
with Rough
thick,sand,
(1:8), 12
mm
thick F3
for dressing of flooring stones etc., complete for finished item of work, for F3
Code
Unit
Rate
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
45.98
Add LA charges
cum
45.98
Add water Charges
sqm
45.98
Add Over Head Charges
cum
393.51
Code
Material
SOR P. No. 11 / BMTB.05
Unit
Rate
Sqm
129.10
Kg
5.20
cum
513.42
Kg
29.00
White cement
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
day
day
day
Sqm
sqm
420.00
375.00
320.00
223.52
433.30
Basic rate 1 sqm
sqm
437.63
cum
460.20
cum
482.78
33 Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work
be paid for separately) including cost and conveyance of all materials like cement, fine aggregate
aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
Unit centering,Rate
cost of Code
steel and its fabrication charges for finished item of work, including
shuttering.
Details of cost for 10 posts, i.e., 0.336 Cu. M (1.80M long)
(Details as per Annexure ' X ' at the end of this item)
Material
Cement concrete 1:2:4 (1 cement : 2 coarse
sand :4 graded stone aggregate 12.5 mm
nominal size)
cum
5760.190
Kg
51.83
sqm
121.13
day
day
day
Sqm
420.00
375.00
320.00
175.40
sqm
4677.99
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
BLD-CSTN-6
cum
day
day
cum
4347.09
420.00
320.00
55.92
6 Randam Rubble Stone masonary in CM (1:8) (Cement : Sand) using hard variety of rough stone other than
approved quarry including cost and conveyance of all materials like cement, sand, masonary stones, wate
and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work in foundation & Basement. (APSS No. 615 &
Masonry In C.M (1:8)
R.R. Masonry in CM (1:8)
Code
Unit
Rate
Material
Cement 43 Gr. (including loading charges)
cum
5.20
cum
821.98
cum
713.65
cum
1463.89
cum
513.42
day
day
cum
420.00
320.00
1144.00
Manpower
SOR P. No. 266/I/11
SOR P. No. 2268/III/4
cum
2575.03
20 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F2
P.C.C. M-15
Code
Rate
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
446.00
67.66
67.66
cum
5088.15
21 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-15
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
SOR P. No. 89
cum
723.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
446.00
135.32
135.32
cum
5155.81
20 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
charges, sales & other taxes on
P.C.C. M-10
3.66
Hight First
Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F1
Material
cum
5.20
cum
513.42
cum
Kl
1920.72
77.00
Mechinery
SOR P. No. 379/16
hour
328.60
189.80
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4
day
day
cum
420.00
320.00
486.80
cum
723.00
Add LA charges
cum
446.00
cum
4734.49
21 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for Footings F2
Add LA charges
cum
446.00
Lift charges F2
cum
67.66
Add LA charges
cum
67.66
Add Over Head Charges
cum
4802.15
22 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for footings F3
Add LA charges
cum
446.00
Lift charges F3
cum
135.32
Add LA charges
cum
135.32
Add Over Head Charges
cum
4869.81
24 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-20
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.
cum
723.00
Add LA charges
Lift charges F2
Add LA charges
cum
cum
cum
446.00
67.66
67.66
cum
5374.15
25 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
P.C.C. M-20 Centering with Stell up to 3.66 M Hight Third Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F3
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.
cum
723.00
Add LA charges
Lift charges F3
Add LA charges
cum
cum
cum
446.00
135.32
135.32
cum
5441.81
25 Supply and placing of the M 35 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance
water etc., to site
Code of all materials like cement, fine aggregate (sand) coarse
Unitaggregate,Rate
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
Material
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
Cement 43
Gr. of
(including
loading
charges) chargescum
5.20 of work (APSS
SCAFFOLDING but excluding
cost
steel and
its fabrication
for finished item
Coarse sand
for mortor
(including
cum
513.42
minimum cement content
420 charges)
Kgs per 1 cum as per IS code from standard suppliers approved by th
Seigniorage
20 mm
Graded HBG
cum curing 1920.72
including pumping, Aggregates
Steel centering,
shuttering,
laying concrete, vibrating,
etc. complete but exc
steelP. and
its fabrication
charges for finished item of work for FOUNDATIONS,
PLINTH,77.00
PEDASTALS, centering
SOR
No. 292/M
189
Water
Kl
to
3.66, as per APSS. No. 402. for FOOTINGS FI
Mechinery
SOR P. No. 379/9
Batching plant 0.5 cum ( 6 Cum/hr)
hour
522.50
Add LA charges on Crew charges
253.00
SOR P. No. 379/40
Needil vibrater 40 mm (petrol)
hour
165.70
Add LA charges on Crew charges
182.09
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4
day
day
day
cum
420.00
375.00
320.00
1627.99
BACIC RATE 1 Cum
V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1
cum
cum
723.00
446.00
cum
7286.71
5 Supply and fixing anodised aluminium door fixed with all accessories (stappers, bolts and stoppers etc.,
and sectional in accordance with the approved drawings with alluminium single shutter with allround fra
101.60 x 44.45 x2.50 mm (20102) thick and fixed with alluminium single shutter with vertical styles of
44.45 x 2.02 mm (19569) top rail 47.62x44.45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm
bottom rail of sizes 95.25x44.45x2 mm (19505) with archit clural accessories having section 88x40x3.2 mm
5 mm tinted glass sheet with glazing chips of size 79x 17.30 x0.10mm (19352) for height of 1.20 m
cement bonded paticle board ( Bison Lam or equivalent ) of 10mm thick to a hight of 0.91 m at botto
Rubber beading shutters mounted in heavy duty floor spring including cost and conveyance of all m
accessories including labour charges for fabrication and fixing in position as directed by the Engineer in Cha
Code
Unit
Rate
Lenth in RM
Weight RM
5.100
1.977
4.200
0.900
1.052
0.974
0.900
0.900
1.072
1.519
3.900
3.900
3.06
0.097
0.900
1.200
0.900
0.910
Kgs
250.00
BMT-K.80
sqm
534.00
BMT-I.08
BMT-G.65
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53
sqm
each
each
each
each
each
570.00
2422.00
312.00
100.00
69.00
34.00
Manpower
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor
Machinery
Add LA charges
Labour charges for
BMC-X.02
day
day
day
day
day
Sqm
420.00
375.00
375.00
375.00
320.00
2268.90
Hr
105.00
1.91 Sqm
BMC-X.03
Hr
97.00
15262.48
each
15415.10
17,513.87 / 1.89=
5 Supply and fixing double action anodised Aluminium fully glazed door as per approved drawing using sid
top frames with section 101.50 x 44.45 x 2.50 mm with double shutters using shutters frame of size 47 x
mm for top 47 x 44.45 x 1.50 mm for middle and 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertic
Code
Unit
Rate
of size of size 47 x 44.45 x 1.2 mm with necessery glazing clips of size 19 x 17.30 x 0.80 mm and rubber
Size of the door = 2.74 x 2.59 meters ( Double shutters)
Rm necessary
mm thick plain glass with 2 nos floorsprings, 2 nos locks and 4 nos round door 7.92
handles
accessories
(stappers, bolts and stoppers etc.,) including cost and conveyance
materials
A) Material requirement
Lenth in RM of all
Weight
RM and accesso
labour charges for fabrication and fixing in position as directed by the Engineer in Charge. for 1.52 m x
A.As (As
perwith
approved
drawing)
Alround
frame
Double groove
(101.50*44.45*2.50 mm)
7.920
1.983
Vertical member for shutters (47*44.45*1.2 mm))
Top rail for the shutters (47*44.45*1.80 mm))
10.360
2.740
2.740
0.720
0.900
0.831
2.740
1.800
20.720
0.115
21.920
0.115
3.548
2.000
Kgs
250.00
Rm
sqm
each
each
each
each
each
each
2.00
570.00
C) Rubber beeding
Manpower
Machinery
BMC-X.02
2422.00
474.00
312.00
100.00
69.00
34.00
day
day
day
day
day
day
Sqm
420.00
375.00
375.00
375.00
320.00
275.00
2024.47
Hr
105.00
7.10 Sqm
BMT-X.03
Hr
25153.96
97.00
each
25405.50
28,864.46 / 7.10=
18 NCL or Equivalent Door Frames: Providing and fixing door frames fabricated from sections made of ga
powder coated (base steel as per IS 513, galvanised as per IS 277 with zinc of 120 grams / square metre
made section should be with a Powder Coating of pure Polyester Powder of 50-60 microns thick with
thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate of 38mm to
35mm thick door shutter. The frame section should have groove to insert gasket. The section of the door
frame is to be filled with polyurethane foam. The frame section should be cut to length, and joined by w
and each frame should be provided with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 N
shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No. for
frame. e)Tie Rod 1 No
Code
Material
BMT-N.59
Unit
Rate
Rm
385.00
sqm
385.00
22 Providing and fixing 35mm thick RAJSHRI or Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER
sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on o
top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel la
2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel desig
panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam
other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. com
direction of Engineer-in-Charge, manufacture specification and drawing
Code
Material
BMT-N.06
Unit
Rate
sqm
2900.00
sqm
2900.00
NCL or Equivalent PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES. Supply and fixing of w
Hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.6 mm thic
galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
33 Windows: Double shutter 4'-0" x 6 '-0" (1219.2x1828.8mm) outer frame section size of 46 x 52 mm
should be 46 x 52 mm section for shutter should be 46 x 46 mm section for mullion should be 46 x 70 mm
section size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.13)
for beading should be 18 x 25 mm and section for louvered ventilation should be 33 x57mm Box section.
Unit for ventilators
Rate with Ethyl propy
should Code
be panelled with
5mm Double
thick plain
float4'-0"
glassx &
4 mm pinhead glass
Windows:
shutter
6 '-0"
monomer
The
sections
are
to
be
cut
to
length
mitre
joined
with
corner
brocket centre mull
Material Gasket (EPDM).
(1219.2x1828.8mm) outer frame section
fixed
using mullion cap.
high grade
aluminium
coated and nylon
receiver. Gaskets
BMT-P.13
size Handle
of 46 x made
52 mmofshutter
frame
section powder sqm
4630.00
propylene Diamine monomer
made
size of 46 (EPDM).
x 46 mmCorner
Mullionbrackets
section size
of of
46 CRCA with Zinc Phosphate. Mullion caps m
filled nylon. The above
should
be fixed to the concrete /masonry wall by means of self expa
x 70 frames
mm (Code
BMT-P.13)
including 10 mm square guard bars with 6" pitch complete for finished item of work.
sqm
4630.00
Unit
Rate
sqm
5195.00
sqm
5195.00
Unit
Rate
sqm
5195.00
sqm
5195.00
36 Ventilators: Fixed louvers (Box section) outer frame section size of 33 x 57 mm Mullion section size of 33 x 5
P.20 to 22)
Code
Material
BMT-P.20 to 22
Unit
Rate
sqm
3685.00
sqm
3685.00
37 Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking a
The shutter
1.5mm +/-0.15mm
Codeframe is made of 30mm X 79mm with the wall thickness of
Unit
Rate section mitre-c
at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no'
Material
Supply
andbefixing
of doorinside
shutters
rods. Teak wood batons
shall
reinforced
themade
door of
shutter during the fabrication of the door sh
BMT-N.45
PVC extruded
hollow
sqm
1795.00
points
wherever the rigid
hardware
is fixed onto
thesection(Nandi
door shutter. or
equivalent)
Add Over Head Charges
sqm
1795.00
47 Cost Suply and Fixing M.S Grills approved design including cost Mild steel and all Labour charges for fab
works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, po
including
cost of fixing in position as diricted by the Departmental Officers
item of work.
Code
Unitfor finishedRate
Cost of Mild steel
kg
38.00
BMM-V.14
865
kg
16.00
BMM-V.15
866
kg
3.00
Add LA charges
kg
19.00
kg
57.00
48 Providing 110mm dia ISI marked P.V.C Rain down water take pipes-2.5mm thick including cost of necessar
Shoes, Iron Clamps and all other accessories and fixing in position including cost and conveyance of all m
tax & Other
all labour charges for
Code taxes on materials to site, Operational and Incidental charges
Unit including Rate
etc; complete for finished itemof work.
Material
110 mm dia 3 M Single Socket PVC/SWR pipe
BMW-G.13
-110
4 Kg/sq.cm
Prince/Sudhakar
or any -ISI
each
383.00
mm dia -- Door
Bend 87.5 Degree
Brand
BMW-G.60
UPVC/SWR
Pipe
fittings
(Prince/Sudhakar
or
each
84.00
110 mm dia - 45 Degree Bend - UPVC/SWR
any
ISI
Brand)
BMW-G.63
Pipe fittings (Prince/Sudhakar or any ISI
each
56.00
110
mm dia - Vent Cowl - UPVC/SWR Pipe
Brand)
Labour
charges for laying, fixing and
BMW-G.100
each
15.00
fittings
or any ISI
Brand)
110
mm(Prince/Sudhakar
- Pipe Clip
- UPVC/SWR
Pipe
fittings
commissioning
the
PVC
pipes
including
BMW-G.106
each
14.00
(Prince/Sudhakar
or any
Brand)
couplers/ bends/ tees
etcISI
any
diameter
BMW-G.152
Rm
58.00
including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with
Add
Over
Head Charges
Rm
272.74
solvent
jointing
as per standard practice
Total rate per 1 Rm
49 Providing 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand inc
necessary P.V.C Bends, Shoes, Iron Clamps and all other accessories and fixing in position including cost an
of all materials,
Sales tax & Other taxes on materials to site, Operational
Code
Unit and Incidental
Rate charges includ
charges for fixing at site etc; complete for finished itemof work.
Material
75 mm dia 3 M Single Socket PVC/SWR pipe BMW-G.11
4
Prince/Sudhakar
or any -ISI
each
202.00
75Kg/sq.cm
mm dia -- Door
Bend 87.5 Degree
Brand
BMW-G.58
UPVC/SWR
fittings (Prince/Sudhakar
each
53.00
75
mm dia Pipe
- 45 Degree
Bend - UPVC/SWRor
any ISI
Brand)
BMW-G.61
Pipe
fittings
(Prince/Sudhakar or any ISI
each
30.00
75
mm dia - Vent Cowl - UPVC/SWR Pipe
Brand)
Labour
charges
for
laying,
fixing
and
BMW-G.98
each
11.00
fittings
or anyPipe
ISI Brand)
75 mm (Prince/Sudhakar
- Pipe Clip
UPVC/SWR
fittings
commissioning
the- PVC
pipes including
BMW-G.104
each
12.00
(Prince/Sudhakar
or any
Brand)
couplers/ bends/ tees
etcISI
any
diameter
BMW-G.152
Rm
58.00
including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with
solvent
jointing
as per standard practice
Add Over
Head Charges
Rm
190.88
Total rate per 1 Rm
49 Supply and fixing of CEMENT JALI-50 mm thick fixing in position including cost and conveyance of all ma
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished it
Code
Material
BMS-W.17
Unit
Rate
sqm
335.00
sqm
335.00
50 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft
nominalCode
bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom
locking plates and
Unit
Rate
for inside & outside locking with push-pull operations including cost of hood cover and springs complete
Material
one coat of approved
steelshutter
primer,made
locks,ofball
Rolling
80 xbearings,
1.25 mm all accessories etc complete for finished item o
BMT-F.29
2000.00
special spn: 1108, fixing
in position
including cost and conveyance ofsqm
all materials
to site, Operational a
machine
rolled CRCA
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Add Over Head Charges
sqm
2000.00
51 Supply and fixing of Teak wood dias and railing including cost of Teak wood 1 st quality conveyance to site
unloading and all labour charges including making, fixing, finishing etc., complete as directed by the
Officers for Second Floor, Lift Manual
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper (overall 3 coats) for All Floors
Code
Material
BMT-E.06
Unit
Rate
cum
81225.00
cum
81225.00
Corpenter Cl- I
Light mazdoor
Add LA charges
day
day
cum
420.00
320.00
10250.00
Sqm
Sqm
230.00
8122.45
sqm
107719.95
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4
Miscellaneous
BMM-V.23
20 Course Rubble Stone Masonry in CM (1:6) 1st Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) 1st sort
Code
Material
SOR P. No. 73 /
BMS-W.54
Unit
Rate
cum
5.20
cum
821.98
cum
1463.89
cum
513.42
sqm
95.00
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4
day
day
cum
420.00
320.00
1792.40
cum
3503.59
7 Cost and Supply and fabrication of M.S. Cattle trap using 15 Nos of 32mm MS Steel rods welded as equal s
Nos of 75 x 40 x 5 mm MS channel and fixing in position on the already laid concrete walls, including all la
for welding, transporting and fixing in position, cost of welding rods etc., complete as directed by the
Officers for finished item of work.
75 x 40 x 5 mm MS Channels on cross walls
32 mm dia MS rods
6.00 x
15.00 x
1.53 =
4.10 =
ABSTRACT
Material
Miscellaneous
BMM-V.16
BMM-V.15
kg
38.00
kg
12.00
5405.88
3.00
1351.47
kg
cum
23875.97
8 BISON LAM ( Pre Laminated Cement Bonded Particle Board) ALUMINIUM PARTATIONS-Supply and fixing o
aluminum glazed partitions using 10MM BISONLAM and 5.50 mm thick plain glass to full height. Using with
a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodize
microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly
beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and c
all materials etc., complete as directed by the Departmental Officers for finished item of work.
Material
BMT-M.77
ALUMINIUM PARTATIONS
sqm
2625.00
cum
2625.00
Miscellaneous
Add Over Head Charges
Total rate per 1 sqm
10 CUPBOARD FRAMES & SHUTTERS USING BISONLAM (Pre-Laminated Cement Bonded Particle Board) - Supply
BISONPANEL (IS 14276) box type cup board using BISONPANEL for making frame of size 100mm x 35m
sandwiched 20MM boards, one BISONPANEL and one BISONLAM with plain 35mm wood lipping. The Shutter
20MM thick BISONLAM (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hard
powder coated Piano hinges of size x , Aluminum powder coated handles of size 4 (101.6mm), Alu
bolt 4 (101.6mm) Godrej locks, screws, wood lipping and Fevicol etc., complete as directed by the
Officers for finished item of work.
Material
BMT-N.32
sqm
2250.00
sqm
127.50
cum
2377.50
Miscellaneous
Add Over Head Charges
Total rate per 1 sqm
1 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F2
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F2
Code
Unit
Rate
Lift charges F2
Add LA charges
Add water Charges
cum
cum
sqm
22.99
22.99
22.99
cum
1467.54
Miscellaneous
26 ELIXIR or Equivalent Top Hung in Structural Glazing: Providing and Fixing Top Hung shutters in Struc
fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513
galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72mm. The glass h
made of 304 grade stainless steel of 0.6mm thick. Galvanized steel sections are to be used as stifeners ins
coated steel/powder coated sections as per the design requirement. Design calculations are made to suit w
as given in IS 875. Primer coat with epoxy primer of 5-7 microns thick and back coated with Alkyd backer o
or powder coated with pure polyester powder up to 50-60 microns thick. The outer frame should be of 20m
0.6mm, Shutter section should be of 58mm x 33mm x 0.72 mm, stifener section should be 56mm x 31mm
Bihari Hinges 2 Nos for each shutter and Aluminium Stays 2 Nos. for each shutter, Aluminium Handle
shutter. The rate is inclusive of cost and conveyance of all materials to site, all labour charges, incidental ch
all consumables etc. and scafolding charges, form work etc. complete for finished item of work
Code
Material
BMT-Q.02
Unit
Rate
sqm
4246.00
sqm
4246.00
13 Course Rubble Stone Masonry in CM (1:6) IInd Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
Unit
Rate
kg
5.20
cum
821.98
cum
1463.89
cum
513.42
day
day
cum
420.00
320.00
1372.40
cum
2942.93
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4
35 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F1
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F1
Code
Material
Unit
Rate
Sqm
2300.00
Kg
5.20
cum
513.42
Kg
25.00
day
day
day
Sqm
sqm
420.00
375.00
320.00
223.52
2807.31
Rm
9.00
BMT-B.09
CSSN-A-05
M 005
White cement
Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4
Miscellaneous
BMM-V.12
sqm
2865.38
36 Supply & Fixing 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328) The rate is inclusi
conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. a
charges, form work etc. complete for finished item of work
Code
Material
BMT-L.20
Miscellaneous
BMM-V.07
Unit
Rate
sqm
1045.00
sqm
Sqm
317.00
317.00
sqm
1362.00
1 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F2
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F2
Code
Unit
Rate
Basic rate 1 sqm
Lift charges F2
Add LA charges
Add water Charges
sqm
sqm
sqm
22.35
22.35
22.35
sqm
2887.95
lit
60.00
Painter CI-1
Painter CI-II
Add LA charges
day
day
Sqm
#REF!
#REF!
#REF!
Sqm
#REF!
sqm
#REF!
Miscellaneous
Miscellaneous
1 Supply and fixing of curtain Glazing made of pre painted steel (base steel as per IS 513 of 0.6 mm th
galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12- 16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
Rate should be 18 x
should Code
be 46 x 52 mm, section for mullion should be 46 x 70 mm andUnit
section for beading
Material
Glazing
should be panelled with 5 mm thick plain float Glass with Ethyl Propylene diameine Monomer (EP
The sections are to be cut to length, mitre joined with corner bracket. Centre mullions are to be fixed suin
Mullion
size of
46 x 70mm
Beading
Handle made of high
gradesection
Aluminium
powder
coated
and nylon receiver. Gaskets made of Ethyl propy
section
size of 18
x 25ofmm
Fixed
Glazing
3'Monomer
(EPDM)
Corner
brackets
made
CRCA
with
zinc
phosphating.
made of Glass fill
BMT-Q.12
sqmMullion caps
3673.00
0"
x
4'-0"
(914.4x1219.2mm)
grid
outer
above frames should be fixed to the concrete / masonry wall be means of self expanding screws. & comple
size of 46 x 52 mm
item.- Fixed Glazing frame
2'-0" xsection
2'-0" (609.6x609.6mm)
grid outer frames section size of 46 x 52 mm
sqm
3673.00
6 Flush Pointing with CM (1:3) to Brick / CRS Masonry finishing cost of all materials, seigniorage charg
conveyance charges of materials and including all operational, incidental and labour charges for mixing m
rendering smooth curing, etc,, complete for finished item of work
Flush Pointing with CM (1:3) to Brick / CRS Masonry
Code
Material
Unit
Rate
kg
5.20
CSSN-A-05
M 005
cum
513.42
day
day
cum
375.00
320.00
424.30
cum
514.58
Manpower
CSSR-M-077
CSSR-M-087
20 Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-19
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580mm & 630 mm Long fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.02
Manpower
BMW-D.03
Unit
Rate
each
700.00
Add LA charges
each
200.00
each
700.00
21 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindusta
Parryware make white glazed with 'S' trap fixing in position including cost and conveyance of all material
Other taxes
all labour
Code on materials to site, Operational and Incidental charges including
Unit
Rate charges for fixin
complete for finished itemof work.
Material
Supplying and Fixing European Water Closet
of 1st quality conforming to IS:2556-Part-2BMW-D.14
each
1250.00
1973 of Hindustan / Neycer or Parryware
make white glazed with 'S' trap
Manpower
BMW-D.15
Add LA charges
each
175.00
Add Over Head Charges
Total rate per each
each
1250.00
31 Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S'
flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of ap
with rubber bufer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges a
make etc. complete for finished item of work in all respects: White Colour fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.18
Unit
Rate
each
6500.00
each
6500.00
20 S & F 12.7 mm brass bib cock Indian make 400 grams fixing in position including cost and conveyance of
Sales tax & Other taxes on materials to site, Operational and Incidental charges including all labour charge
site etc; complete for finished itemof work.
Code
Material
BMW-E.17
Manpower
BMW-E.18
Unit
Rate
each
170.00
Add LA charges
each
20.00
each
170.00
31 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position inclu
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
BMW-D.29
Manpower
BMW-D.30
each
810.00
Add LA charges
each
90.00
each
810.00
5 Making drainage connection in the existing inspection including all repairs including all labour charges for
for finished itemof work.
Code
Material
BMW-B.07
Manpower
BMW-B.08
Unit
Rate
each
90.00
Add LA charges
each
50.00
each
90.00
Unit
Rate
each
64.00
each
64.00
35 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 412
cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except r
blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping including all labour cha
Code
Unit
Rate
complete for finished itemof work.
Material
Supplying, laying, jointing and testing 152.4
BMW-A.03
Rm
346.00
mm SWG SP-1 pipes
Manpower
BMW-A.06
Add LA charges
Rm
120.00
Add Over Head Charges
each
346.00
200.00
each
200.00
36 Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet fixing in position including cost and conveyance of
Sales tax
& Other taxes on materials to site, Operational and IncidentalUnit
charges including
Code
Rate all labour charge
site etc; complete for finished itemof work.
Material
BMW-G.06
each
70.00
each
70.00
36 Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P coated fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
Supplying & Fixing 12.7 mm PVC connection
BMW-I.48
each
74.00
with brass union nut C.P coated
Manpower
BMW-I.49
Add LA charges
each
14.00
Add Over Head Charges
each
74.00
Unit
Rate
Rm
21.00
Rm
21.00
Unit
Rate
each
30.00
each
30.00
Unit
Rate
each
30.00
each
30.00
18 Cleaning the wash basin with acid and Vim powder including all labour charges etc; complete as dir
Departmental Officers incharge for finished itemof work.
Code
Material
BMW-I.84
Unit
Rate
each
30.00
each
30.00
Unit
Rate
each
30.00
each
30.00
42 Supply and Fixing of Iron Door grilld of size 1.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10
20mm MS squre rods and bottom flower design with 25 x 6mm MS flats providing 150mm Spike at the top
lathe
machine
and weight of MS grade squre and rounds shall conform to IS 4351 - 1976 as per appro
Size (1.50
x 2.40M)
complete
finished
item rods
of work
fixing of gate to compound
wall,
cost
40 x 40mm solid squre
(V) including transportation charges,
6.00 Rm x 12.56
Kgs/
1Rman
2x 2 x 1.50 =
of all materials along with test certificates for raw materials including all tools and all incidental labou
40 x 10mm MS flats (H)
14.40 Rm x 3.14 Kgs/ 1Rm
2x 3for
x 2.40
= item of work.
finished item of work as directed by the Departmental Officers
finished
40 x 10mm MS flats (Curved)
6.00 Rm x 3.14 Kgs/ 1Rm
2x 2 x 1.50 =
18.00
Rm x 3.14 Kgs/ 1Rm
(1.50+2.10)/2
20mm MS squre rods (Main Verticals)
2x 5 x
20mm MS squre rods (Intermediate Verticals)
2x 5 x (1.20+1.75)/2
2x 2 x 1.20 =
ABSTRACT
Material
Miscellaneous
BMM-V.16
do
kg
38.00
kg
14.00
3602.62
each /L.S
50.00
each /L.S
250.00
cum
15881.16
36 Cost & Supply of New Ceiling tiles from approved source including cost and conveyance of tiles to work an
site for verification as directed by the Departmental Officers.
Cost & Supply of NewCeiling tiles
Code
Material
Unit
Rate
37 Cost & Supply of New Mangalore tiles from approved source including cost and conveyance of tiles to work
at site for verification as directed by the Departmental Officers.
Cost & Supply of New Mangalore tiles
Code
Material
Unit
Rate
38 Cost & Supply of Ridge tiles from approved source including cost and conveyance of tiles to work and stack
verification as directed by the Departmental Officers.
Cost & Supply of Ridge tiles from approved source
Code
Material
Unit
Rate
39 Reroofing with best Manglore tiles over ceiling tiles and cement mortor borders (1:2) including cost and c
all materials from approved source to site of work and all operational, incidential, labour charges such as m
laying tiles in position, including boarders with cement mortor, etc., complete for finished item of work
Reroofing with best Manglore tiles over ceiling tiles - Unit 1 sqm
Code
Material
Unit
Rate
cum
4347.09
day
day
day
Sqm
420.00
375.00
320.00
179.65
sqm
218.77
Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/35
SOR P. No. 269/III/4
40 Labour charges for shifting the racks 12 nos of size 1.80M x 0.75M x 3.05M to out side of the store room
stacking at safety place for taking up repairs to the store room and again shifting back and rearrang
carefully in the store room after repairs including labour charges for all operations etc., as directed by the
charge
Code
Material
Unit
Rate as per Quatation (1 Job.)
Total rate 1 Job
Rate
1 Cost Suply and Fixing of best Salwood SS Fly proof mesh for Door shutter diferent sizes frame with fly
frame size 3" x 1 1/2" thick and beading 3/4" x 1/2" thick including cost, wrought and putup and conv
materials work site and including all taxes, all laber charges for making, fixing of door furniture in position
Dept| Officers including M.S.P.C. hings, tower bolts, M.S. aldop and M.S handle, and all labour charges such
the Departmental Officers for finished item of work.
Code
Unit taken 3'-6" x 7' - 0" =
Unit
24.50
For frame
Verticlal
Horizontal
Beading
Verticlal
Horizontal
sft
Rate
2.28 sqm
ABSTRACT
BMT-E.15
BMT-G.28
BMT-G.14
BMT-G.35
BMT-F.19
BMM-V.07
cft
Nos
Nos
Nos
Sqm
Sqm
Sqm
1100.01
16.00
18.00
23.00
376.00
365.00
832.20
sqm
2809.09
1.00 sqm
2.28 sqm
1 Cost Suply and Fixing of best Salwood Window Double shutters diferent of size shutters frame thick 3 1/2
plank thick 3/4" including cost, wrought and putup and conveyance of all materials work site and includin
laber charges for making, fixing of window furniture in position as directed by Dept| Officers including M
tower bolts, and M.S handle, and all labour charges such as diricted by the Departmental Officers for fin
work.
Code
Unit taken 2' - 6" x 3' - 0" =
Unit
7.50
For shutters frame
Verticlal
Horizontal
sft
Rate
0.70 sqm
ABSTRACT
BMT-E.15
BMT-G.27
BMT-G.31
BMT-G.14
7Kg/1sqm
BMM-V.07
cft
Nos
Nos
Nos
kgs
Sqm
1390.26
8.00
45.00
18.00
53.50
10250.00
0.601
Cft or
0.70sqm
Or
1.00 sqm
0.017
Cum
Sqm
174.25
sqm
1384.95
0.700 sqm
Coefficient
720.000
Amount
3744.00
1.050
539.09
0.200
0%
64.00
0.00
4347.09
Coefficient
480.000
Amount
2496.00
1.050
539.09
0.200
0%
64.00
0.00
3099.09
Coefficient
360.000
Amount
1872.00
1.050
539.09
0.200
0%
64.00
0.00
2475.09
Coefficient
288.000
Amount
1497.60
1.050
539.09
0.200
0%
64.00
0.00
2100.69
Coefficient
240.000
1.050
Amount
1248.00
539.09
0.200
0%
64.00
0.00
1851.09
Coefficient
0.600
0.150
0.150
0.100
Amount
1253.06
273.06
248.76
145.84
1920.72
Coefficient
Amount
0.600
1092.26
0.200
0.200
331.69
291.69
1715.64
s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary
116.48
0.00
75%
0
87.36
0.00
14%
203.84
27.75
231.59
or say
231.60
s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
m depth
BLD CSTN 2.4
Coefficient
Amount
0.520
0%
166.40
0.00
75%
1
124.80
30.00
14%
321.20
43.73
364.93
or say
365.00
epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ing charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
116.48
0.00
30.00
14%
146.48
19.94
166.42
or say
166.00
ders upto 0.30 m dia. for foundations of canal cross drainage and other
vated stuf neatly in specified dump area or disposing of the same as
0 m and initial lift upto 3 m.
IRR-CCDW-1-1
Coefficient
Amount
0.025
0.600
0%
1
6.88
192.00
0.00
30.00
14%
228.88
31.16
260.04
or say
260.00
cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like
under reams as per IS 2911 - 1980 as per approved designs including all
arges of machinery, augur bore drill and shell equipment, etc, complete for
es of following diameters.
Coefficient
0.526
0%
14%
or say
Amount
168.32
0.00
168.32
22.92
191.24
191.00
es for building foundations in loamy, clayey soils like Black cotton soils and
ment in site as per IS 2911 - 1980 as per approved designs including all
arges of machinery, augur bore drill and shell equipment, etc, complete for
es of following diameters.
Coefficient
Amount
0.560
0%
179.20
0.00
14%
179.20
24.40
203.60
or say
204.00
or Mangalore tiles over flat tiles without roof timbers clearing away and
any etc., complete as directed by the Engineer-in-charge of the work.
Coefficient
Amount
1.000
8.30
0%
0.00
14%
or say
8.30
1.13
9.43
9.00
of Lime work unserviceable materials within 100 metres lead and lift
ected by the Enginee - in - Charge.
BLD-CSTN-14-8-295
Coefficient
Amount
1.220
0%
1%
390.40
0.00
3.39
3.94
14%
397.73
54.15
451.88
or say
452.00
ent concrete upto 15 cm thicknes within 100 metres lead labour charges
- Charge.
BLD-CSTN-14-8-296
Coefficient
Amount
2.440
0%
1%
780.80
0.00
3.39
7.84
14%
792.03
107.83
899.86
or say
900.00
1382.40
0.00
3.39
13.86
14%
1399.65
190.56
1590.21
or say
1590.00
130.88
0.00
3.39
1.34
14%
135.61
18.46
154.07
or say
154.00
slabs flooring on sand bed carefully stacking materials useful for reuse
shed item of work as directed by the Engineer - in - Charge.
Coefficient
Amount
1.000
4.20
0%
0.00
14%
4.20
0.57
4.77
or say
5.00
ng materials useful for reuse Old cement mortar plaster including stacking
viceable materials within 100 metres lead labour charges etc; complete for
eer - in - Charge.
Coefficient
Amount
1.000
0%
2.90
0.00
14%
2.90
0.39
3.29
or say
3.30
ny thickness fixing the frame, fixing the fixures to the window shutters
furniture, racks, work-station furniture, cup-board shutters to existing cupveneer laminations including fixing cutting, making, assembling, fixing
eets/ laminations fixing in position with necessary screws excluding cost of
as directed by the Engineer-in-charge of the work
Coefficient
1.000
0%
Amount
365.00
0.00
14%
365.00
49.69
414.69
or say
414.70
Amount
125.00
0.00
14%
125.00
17.02
142.02
or say
142.00
ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix
673.92
1254.09
231.04
92.40
1.000
0%
328.60
0.00
0.100
1.390
0%
42.00
444.80
0.00
14%
3066.85
417.55
3484.40
or say
3484.40
ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix
673.92
0.900
1254.09
0.540
277.25
1.200
92.40
1.000
328.60
0%
0.100
1.390
0%
0.00
42.00
444.80
0.00
14%
3113.06
423.84
3536.90
or say
3537.00
ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix
162.000
842.40
0.900
1254.09
0.450
231.04
1.200
92.40
1.000
328.60
0%
0.100
1.390
0%
0.00
42.00
444.80
0.00
14%
3235.33
440.49
3675.82
or say
3676.00
as per 456 nominal mix using 40 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
ork, per APSS. No. 402.
Coefficient
216.000
Amount
1123.20
0.450
627.04
0.900
462.08
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
723.00
0%
14%
0.00
4008.82
545.80
4554.62
or say
4554.60
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. First Floor
91.00
77.20
11.81
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.003
0.007
0.125
0%
1.26
2.63
40.00
0.00
234.94
BLD-CSTN-6-1
0.015
0.060
0.096
0%
46.49
25.20
30.72
0.00
14%
31.99
369.34
or say
369.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. Second Floor
91.00
77.20
11.81
4.62
4.27
0%
0.013
0.00
2.15
0%
0.00
0.003
0.007
0.125
0%
1.26
2.63
40.00
0.00
1.000
0%
4.81
0.00
239.75
BLD-CSTN-6-1
0.015
0.060
0.096
0%
46.49
25.20
30.72
0.00
1.000
0%
5.59
0.00
14%
32.64
380.39
or say
380.00
Amount
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
55.86
100.13
4.600
0%
1472.00
0.00
6199.71
1.000
723.00
0%
0.00
14%
6922.71
942.53
7865.24
or say
7865.00
Amount
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
4.600
0%
55.86
100.13
1472.00
0.00
6199.71
1.000
1025.00
0%
14%
0.00
7224.71
983.64
8208.35
or say
8208.00
1820.00
0.400
205.37
0.800
1536.58
1.200
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.133
0.267
4.600
0%
55.86
100.13
1472.00
0.00
6199.71
1.000
2410.00
0%
0.00
14%
8609.71
1172.21
9781.92
or say
9782.00
Coefficient
350.000
Amount
1820.00
0.400
205.37
0.800
1.200
1536.58
92.40
1.333
0%
1.333
0%
696.49
0.00
220.88
0.00
0.167
70.14
0.167
62.63
5.600
1792.00
0%
0.00
BACIC RATE 1 Cum
6496.49
BLD CSTN 3-15:31B
BACIC RATE 1 Cum
1.000
0%
6496.49
1075.00
0.00
14%
7571.49
1030.86
8602.35
or say
8602.00
6496.49
1.000
1170.00
0%
1.000
0%
0.00
249.85
0.00
14%
7916.34
1077.81
8994.15
or say
8994.00
6496.49
1.000
1265.00
0%
1.000
0%
0.00
499.70
0.00
14%
8261.19
1124.76
9385.95
or say
9386.00
1.000
0%
1518.00
0.00
14%
8014.49
1091.17
9105.66
or say
9106.00
1586.00
0%
1.000
0%
0.00
249.85
0.00
14%
8332.34
1134.45
9466.79
or say
9467.00
1653.00
0%
1.000
0%
0.00
499.70
0.00
14%
8649.19
1177.59
9826.78
or say
9827.00
Coefficient
350.000
0.400
0.800
1.200
0.308
0%
0.308
0%
Amount
1820.00
205.37
1536.58
92.40
160.93
0.00
51.04
0.00
0.067
28.14
0.133
49.88
3.077
984.64
0%
0.00
BACIC RATE 1 Cum
4928.98
BLD CSTN 3-15:31B
1.000
0%
4928.98
2071.00
0.00
14%
6999.98
953.05
7953.03
or say
7953.00
1.000
2151.00
0%
1.000
0%
0.00
119.52
0.00
14%
7199.50
980.21
8179.71
or say
8180.00
1.000
2230.00
0%
1.000
0%
0.00
239.04
0.00
14%
7398.02
1007.24
8405.26
or say
8405.00
227.50
0.050
25.67
0.100
0.150
192.07
11.55
0.039
0%
0.039
0%
20.38
0.00
6.46
0.00
0.008
0.017
0.385
0%
BACIC RATE 1 SQM
1.000
0%
3.36
6.38
123.20
0.00
616.57
232.00
0.00
14%
848.57
115.53
964.10
or say
964.00
241.00
0%
1.000
0%
0.00
14.97
0.00
14%
872.54
118.80
991.34
or say
991.00
1.000
250.00
0%
1.000
0%
0.00
29.94
0.00
14%
896.51
122.06
1018.57
or say
1019.00
409.50
0.090
46.21
0.180
0.270
345.73
20.79
0.069
0%
0.069
0%
36.05
0.00
11.43
0.00
0.015
0.030
0.692
0%
BACIC RATE 1 SQM
1.000
0%
6.30
11.25
221.44
0.00
1108.70
242.00
0.00
14%
1350.70
183.90
1534.60
or say
1535.00
1.000
251.00
0%
1.000
0%
0.00
26.87
0.00
14%
1386.57
188.78
1575.35
or say
1575.00
1.000
261.00
0%
1.000
0%
0.00
53.74
0.00
14%
1423.44
193.80
1617.24
or say
1617.00
113.75
0.025
12.84
0.050
0.075
96.04
5.78
0.019
0%
9.93
0.00
0.004
0.008
0.192
0%
BACIC RATE 1 SQM
1.000
1.68
3.00
61.44
0.00
304.46
271.00
0%
0.00
14%
575.46
78.35
653.81
or say
654.00
Coefficient
BACIC RATE 1 SQM
Amount
304.46
1.000
281.00
0%
1.000
0%
0.00
6.96
0.00
14%
592.42
80.66
673.08
or say
673.00
1.000
292.00
0%
1.000
0%
0.00
13.92
0.00
14%
610.38
83.10
693.48
or say
693.00
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
723.00
0%
0.00
14%
6657.38
906.40
7563.78
or say
7563.80
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
0%
1025.00
0.00
14%
6959.38
947.52
7906.90
or say
7906.90
2080.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
2410.00
0%
0.00
14%
8344.38
1136.09
9480.47
or say
9480.50
400.000
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1497.00
0%
0.00
14%
7760.16
1056.55
8816.71
or say
8816.70
1820.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
328.60
0.00
165.70
0.00
1.000
0%
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1624.00
0%
1.000
0%
0.00
196.32
0.00
14%
7823.48
1065.17
8888.65
or say
8889.00
1820.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1751.00
0%
1.000
0%
0.00
392.63
0.00
8146.79
14%
1109.19
9255.98
or say
9256.00
2080.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1663.00
0%
0.00
14%
7926.16
1079.15
9005.31
or say
9005.30
1820.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1753.00
0%
1.000
0%
0.00
196.32
0.00
14%
7952.48
1082.73
9035.21
or say
9035.00
1820.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.167
0.167
4.700
0%
70.14
62.63
1504.00
0.00
1.000
1844.00
0%
1.000
0%
0.00
392.63
0.00
14%
8239.79
1121.85
9361.64
or say
9362.00
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
0.267
87.74
0%
0.267
0%
0.00
44.24
0.00
0.067
0.133
2.500
0%
28.14
49.88
800.00
0.00
1.000
2406.00
0%
0.00
14%
7548.09
1027.67
8575.76
or say
8575.80
350.000
1820.00
0.900
1728.65
0.450
231.04
1.200
92.40
0.267
87.74
0%
0.267
0%
0.00
44.24
0.00
0.067
0.133
2.500
0%
28.14
49.88
800.00
0.00
1.000
2512.00
0%
1.000
0%
0.00
96.52
0.00
14%
7490.61
1019.85
8510.46
or say
8510.00
1820.00
0.900
1728.65
0.450
231.04
1.200
92.40
0.267
87.74
0%
0.267
0%
0.00
44.24
0.00
0.067
0.133
28.14
49.88
2.500
0%
800.00
0.00
1.000
2619.00
0%
1.000
0%
0.00
193.03
0.00
14%
7694.12
1047.55
8741.67
or say
8742.00
2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
BACIC RATE 1 CUM
28.14
49.88
800.00
0.00
4508.80
541.06
1.000
0%
273.00
0.00
14%
814.06
110.83
924.89
or say
924.90
2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
BACIC RATE 1 CUM
28.14
49.88
800.00
0.00
4508.80
676.32
1.000
0%
273.00
0.00
14%
949.32
129.25
1078.57
or say
1078.60
182.00
86.43
0.090
46.21
0.120
9.24
0.027
0%
0.027
0%
8.87
0.00
4.47
0.00
0.007
0.013
0.250
0%
2.94
4.88
80.00
0.00
1.000
285.00
0%
1.000
0%
0.00
9.66
0.00
14%
719.70
97.99
817.69
or say
818.00
182.00
86.43
0.090
46.21
0.120
9.24
0.027
0%
0.027
0%
8.87
0.00
4.47
0.00
0.007
0.013
0.250
0%
2.94
4.88
80.00
0.00
1.000
297.00
0%
1.000
0%
0.00
19.33
0.00
14%
741.37
100.94
842.31
or say
842.00
2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00
0.067
0.133
2.500
0%
BACIC RATE 1 CUM
28.14
49.88
800.00
0.00
4508.80
281.80
1.000
0%
289.00
0.00
14%
570.80
77.71
648.51
or say
648.50
113.75
107.56
14.38
5.78
0.017
0%
0.017
0%
5.59
0.00
2.82
0.00
0.004
0.008
0.156
0%
1.68
3.00
49.92
0.00
1.000
303.00
0%
1.000
0%
0.00
6.02
0.00
14%
613.50
83.53
697.03
or say
697.00
113.75
107.56
14.38
5.78
0.017
0%
0.017
0%
5.59
0.00
2.82
0.00
0.004
0.008
0.156
0%
1.68
3.00
49.92
0.00
1.000
317.00
0%
1.000
0%
0.00
12.03
0.00
14%
633.51
86.25
719.76
or say
720.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
14%
248.54
33.84
282.38
or say
282.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.000
0%
1.43
2.51
80.00
0.00
8.82
0.00
14%
257.36
35.04
292.40
or say
292.00
minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
0.013
0%
4.27
0.00
2.15
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
1.000
0%
17.64
0.00
14%
266.18
36.24
302.42
or say
302.00
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
4.27
0.00
0.0034
0.0067
0.250
0%
1.000
0%
1.43
2.51
80.00
0.00
723.00
0.00
14%
969.39
131.98
1101.37
or say
1101.00
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
4.27
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
1.000
723.00
0%
1.000
0%
0.00
8.64
0.00
14%
978.03
133.16
1111.19
or say
1111.00
91.00
39.46
0.045
23.10
0.060
4.62
0.013
0%
4.27
0.00
0.0034
0.0067
0.250
0%
1.43
2.51
80.00
0.00
1.000
723.00
0%
1.000
0%
0.00
17.28
0.00
14%
986.67
134.34
1121.01
or say
1121.00
tions and basement with initial lead in layers not exceeding 15 cm thick,
g and ramming including cost and conveyance of water to work site and all
harges of T & P etc., complete for finished item of work. (APSS NO. 309 &
BLD CSTN 2-8
Coefficient
Amount
1.000
446.42
0.052
0%
16.64
0.00
14%
463.06
63.05
526.11
or say
526.10
16.64
0.00
14%
16.64
2.27
18.91
or say
18.90
187.20
2727.94
102.68
0.240
0.560
1.890
0%
100.80
210.00
604.80
0.00
1.000
304.84
0%
0.00
14%
4238.26
577.04
4815.30
or say
4815.30
ick in CM (1:4) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
BLD CSTN 5-12:50
Coefficient
Amount
7.200
51.200
0.020
37.44
272.79
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
0%
68.59
0.00
14%
524.79
71.45
596.24
or say
596.20
as per 456 nominal mix using 20 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402.
Coefficient
320.000
0.900
0.450
1.200
Amount
1664.00
1728.65
231.04
92.40
1.000
0%
1.000
0%
328.60
0.00
165.70
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
723.00
0%
0.00
14%
5420.19
737.96
6158.15
or say
6158.00
Coefficient
320.000
0.900
0.450
1.200
Amount
1664.00
1544.08
231.04
92.40
1.000
0%
328.60
0.00
0.100
1.390
0%
42.00
444.80
0.00
1.000
0%
723.00
0.00
14%
5069.92
690.27
5760.19
or say
5760.00
ick in CM (1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
24.96
272.79
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
0%
68.59
0.00
14%
512.31
69.75
582.06
or say
582.00
hick in CM(1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501 for F2
24.96
272.79
10.27
25.20
22.50
88.00
0.00
1.000
92.96
0%
1.000
0%
0.00
13.57
0.00
14%
or say
550.25
74.92
625.17
625.00
hick in CM(1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501 for F3
10.27
0.060
0.060
0.275
0%
25.20
22.50
88.00
0.00
1.000
117.32
0%
1.000
0%
0.00
27.14
0.00
14%
588.18
80.08
668.26
or say
668.00
2080.00
0.900
1728.65
0.450
231.04
1.200
92.40
1.000
0%
0.000
0%
328.60
0.00
0.00
0.00
0.133
0.267
3.600
0%
55.86
100.13
1152.00
0.00
1.000
723.00
0%
0.00
14%
6491.68
883.84
7375.52
or say
7375.50
1716.00
0.450
231.04
0.900
1.200
1728.65
92.40
1.000
328.60
0%
0.100
1.390
0%
Basic rate 1 cum
1.000
0%
0.00
42.00
444.80
0.00
4583.49
723.00
0.00
5306.49
14%
722.48
6028.97
or say
6029.00
420.00
35700.00
4200.00
3200.00
0.00
14%
43520.00
5925.25
49445.25
or say
49445.30
420.00
35700.00
4200.00
3200.00
0.00
740.00
0.00
14%
44260.00
6026.00
50286.00
or say
50286.00
420.00
1.050
35700.00
10.000
10.000
0%
4200.00
3200.00
0.00
1.000
0%
1480.00
0.00
14%
45000.00
6126.75
51126.75
or say
51127.00
420.00
1.050
37800.00
10.000
10.000
0%
4200.00
3200.00
0.00
14%
45620.00
6211.16
51831.16
or say
51831.00
Amount
6.000
420.00
1.050
37800.00
10.000
10.000
0%
1.000
4200.00
3200.00
0.00
740.00
0%
0.00
14%
46360.00
6311.91
52671.91
or say
52672.00
Amount
6.000
420.00
1.050
37800.00
10.000
10.000
0%
4200.00
3200.00
0.00
1.000
0%
1480.00
0.00
14%
47100.00
6412.67
53512.67
or say
53513.00
ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof First Floor Lift manual
Amount
3.000
210.00
1.025
38950.00
70.00
630.00
2.500
10.000
10.000
1050.00
4200.00
3200.00
10.000
612.00
0%
0.00
14%
48852.00
6651.20
55503.20
or say
55503.00
ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof Third Floor Lift manual
Amount
3.000
210.00
1.025
38950.00
70.00
630.00
2.500
10.000
10.000
0%
1050.00
4200.00
3200.00
0.00
10.000
612.00
1.000
0%
740.00
0.00
14%
49592.00
6751.95
56343.95
or say
56344.00
Amount
3.000
210.00
1.025
38950.00
70.00
630.00
2.500
10.000
10.000
0%
1050.00
4200.00
3200.00
0.00
10.000
1.000
0%
612.00
1480.00
0.00
14%
50332.00
6852.70
57184.70
or say
57185.00
14%
Or say
187.20
2727.94
102.68
100.80
210.00
604.80
0.00
3933.42
535.54
4468.96
4469.00
187.20
2727.94
102.68
0.240
0.560
1.890
0%
100.80
210.00
604.80
0.00
1.000
413.16
0%
1.000
0%
0.00
91.56
0.00
14%
4438.14
604.25
5042.39
or say
5042.00
187.20
2727.94
102.68
0.240
0.560
1.890
0%
100.80
210.00
604.80
0.00
1.000
521.42
0%
1.000
0%
0.00
183.12
0.00
14%
4637.96
631.46
5269.42
or say
5269.00
roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for
52.42
10.78
0.200
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
14%
271.87
37.02
308.89
or say
308.90
roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for
52.42
0.021
10.78
0.200
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
1.000
0%
20.39
0.00
292.26
39.79
332.05
332.00
14%
or say
roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for
52.42
0.021
0.200
10.78
4.80
0.066
0.154
0.370
0%
27.72
57.75
118.40
0.00
1.000
0%
40.78
0.00
14%
312.65
42.57
355.22
or say
355.00
ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
r Celling plastering F1.
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
14.32
0%
14%
or say
0.00
254.87
34.70
289.57
289.60
ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Celling plastering F2.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
19.12
0%
1.000
0%
0.00
20.64
0.00
14%
or say
280.31
38.16
318.47
318.00
ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
BLD CSTN 8-10
r Celling plastering F3.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
23.91
0%
1.000
0%
0.00
41.28
0.00
14%
305.74
41.63
347.37
or say
347.00
e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering smooth curing, etc,,
903 & 904) for Uneven faces F1.
4.300
0.018
22.36
9.24
1.450
0.004
7.54
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
254.44
34.64
289.08
or say
289.10
e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering smooth curing, etc,,
BLD CSTN 8-9
903 & 904) for External walls F2.
Coefficient
Amount
4.300
0.018
22.36
9.24
1.450
0.004
7.54
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
9.29
0%
1.000
0%
0.00
20.64
0.00
14%
277.51
37.78
315.29
or say
315.00
e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering
smooth
curing, etc,,
BLD
CSTN 8-9
903 & 904) for External walls F3.
Coefficient
Amount
4.300
0.018
22.36
9.24
1.450
0.004
7.54
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
11.73
0%
1.000
0%
0.00
41.28
0.00
14%
300.59
40.93
341.52
or say
342.00
coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
onveyance of all materials like cement, sand, water etc., to site, including
all materials, and all operational, incidental charges on materials and
ng mortar, finishing, scafolding, lift charges, curing etc., as directed by
nal & Even faces of Brick Wall and RCC exposed faces for finished item of
CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual
2.640
0.011
13.73
5.65
1.440
0.004
7.49
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
242.17
32.97
275.14
or say
275.10
se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
or Even faces F1.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
6.86
0%
0.00
14%
247.41
33.68
281.09
or say
281.10
se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Internal walls F2.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
9.29
0%
1.000
0%
0.00
20.64
0.00
14%
270.48
36.83
307.31
or say
307.00
se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Internal walls F3.
Coefficient
Amount
3.170
0.011
16.48
5.65
1.920
0.004
9.98
2.05
0.063
0.147
0.390
0%
26.46
55.13
124.80
0.00
1.000
11.73
0%
1.000
0%
0.00
41.28
0.00
14%
293.56
39.97
333.53
or say
334.00
39.31
10.78
0.094
0.160
0%
35.25
51.20
0.00
Basic rate
136.54
14%
136.54
18.59
155.13
or say
155.00
g 10mm thick plaster of paris boards and Labour charges for fixing plaster
perimeter channel 30mm x 27mm x 0.55 thick and ceiling channels of
and fixing and finishing using joint compound and luppum/ putty finish as
cost of all materials including cost of Plaster of paris sheets/ boards for
336.81
0.640
41.60
0.840
62.16
2.300
32.20
0.260
0.289
0.226
0.628
0%
109.20
138.72
84.75
200.96
0.00
14%
1006.40
137.02
1143.42
or say
1143.00
headed glass including cost, conveyance of all materials to work site, all
c., complete for finished item of work as directed by the Enginee - in -
Coefficient
Amount
1.000
10%
220.00
22.00
1.000
173.00
0%
0.00
100.00
14%
515.00
70.12
585.12
or say
585.00
mical including cost and conveyance of all materials to site including all
eer-in-charge of the work
Coefficient
1.000
Amount
440.00
440.00
Amount
104.00
104.00
epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ng charges etc as per SS - 20 B (APSS 308). For Ordinary soil-Manual up to
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
1
116.48
0.00
30.00
14%
146.48
19.94
166.42
or say
166.00
1430.00
0.450
231.04
0.900
1.200
1728.65
92.40
1.000
0%
328.60
0.00
0.100
1.390
0%
42.00
444.80
0.00
4297.49
1.000
0.00
0%
0.00
14%
4297.49
585.10
4882.59
or say
4883.00
cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch Second Floor
Coefficient
Amount
14.73
2.203
2.203
2.203
2769.98
17.62
1.10
0.44
0.043
0.054
0%
16.21
17.30
0.00
25.00
150.00
1.000
0%
14%
3.35
0.00
3001.00
408.59
3409.59
341.00
cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch
Coefficient
Amount
14.734
2.203
2.203
2.203
0.043
0.054
0%
2769.99
17.62
1.10
0.44
16.13
17.28
0.00
25.00
150.00
1.000
0%
14%
6.68
0.00
3004.24
409.03
3413.27
341.00
m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
5.26
1.000
0%
1%
22.99
0.00
0.23
14%
or say
554.55
554.55
75.50
630.05
630.00
m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
5.26
1.000
0%
1%
45.98
0.00
0.46
14%
or say
577.77
577.77
78.66
656.43
656.00
oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
885.15
6.060
31.51
0.014
7.19
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
11.60
1171.17
1171.17
14%
159.45
1330.62
or say
1330.60
oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
885.15
6.060
31.51
0.014
7.19
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
11.60
1.000
0%
1%
22.99
0.00
0.23
14%
1194.39
162.62
1357.01
or say
1357.00
oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
885.15
6.060
31.51
0.014
7.19
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
11.60
1.000
0%
1%
45.98
0.00
0.46
14%
1217.61
165.78
1383.39
or say
1383.00
1152.80
6.756
35.13
0.012
6.37
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
14.30
1444.32
14%
1444.32
196.64
1640.96
or say
1641.00
of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
488.25
6.180
0.012
32.14
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.62
769.89
769.89
104.82
874.71
874.70
14%
or say
of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
BLD CSTN 9-6
Coefficient
Amount
1.050
488.25
5.460
0.012
0.200
28.39
6.16
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.59
1.000
0%
1%
22.99
0.00
0.23
789.33
107.47
896.80
897.00
14%
or say
of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials
like CSTN
cement,
BLD
9-6sand water
e charges, etc., complete for finished item of work, including the cost of
Coefficient
Amount
1.050
488.25
5.460
0.012
0.200
28.39
6.16
5.80
0.096
0.224
0.330
40.32
84.00
105.60
0%
1%
1.000
0%
1%
14%
or say
0.00
7.59
45.98
0.00
0.46
812.55
110.63
923.18
923.00
433.65
6.756
0.012
35.13
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
717.77
14%
97.72
815.49
or say
815.50
m thick (Medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050
240.45
6.180
0.012
32.14
6.16
0.600
17.40
0.096
0.224
0.330
40.32
84.00
105.60
0%
1%
14%
or say
0.00
5.26
531.33
531.33
72.34
603.67
603.70
cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto 600 pitch
BLD-CSTN-8-4
Coefficient
Amount
14.73
2.203
2.203
2.203
2769.98
17.62
1.10
0.44
0.043
0.054
0%
16.21
17.30
0.00
25.00
150.00
14%
2997.65
408.13
3405.78
340.60
s size 0.90 x 2.10M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.
Coefficient
Amount
4.200
1.800
Total
6.000 Rm
1.890 sqm
6.00
1.89
1290.00
2967.30
14%
4257.30
579.63
4836.93
Or say
4837.00
ith (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal
b, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing
lopes and thread lining including cost of all materials like cement, metal,
niorage charges, etc., complete for finished item of work, but excluding the
BLD CSTN 9-13-111
Coefficient
Amount
0.017
29.17
12.000
0.0085
62.40
4.36
0.125
0.006
0.300
20%
1%
35.63
1.56
64.50
20.34
2.18
14%
220.14
29.97
250.11
or say
250.00
oor of size 075 x 2.00M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.
Coefficient
Amount
4.000
1.500
Total
5.500 Rm
1.500 sqm
5.500
1182.50
1.500
2355.00
14%
3537.50
481.63
4019.13
4019.13
2679.42
2679.00
1 Sqm
Or say
4019.00
mes of Size 3'0" x 7'0" manufactured by cold rolled formed process with
nfirming to IS 4351-1976 suitable for single double leaf dof door sections,
ing 6 (six) numbers of standard lugs made from flat steel strings not less
on 50mm x 25mm minimum free fixed hinges of size 1000 x 65 x 2mm, 3
er for double shutter with one side fixed to for fixing 3 numbers for double
mbers rubber bottom inserts in frame necessary arrangements for aldrop
d tower bolts welded to frame at top and bottom and fixing 50mm long
ssembled ny mean of welding at corners including painting as directed by
ificate for raw materials and including all tolls cost and conveyance of all
work.
Coefficient
5.185
20.481
20.481
0%
Amount
1208.11
327.70
61.44
0.00
100.00
14%
1697.25
231.08
1928.33
Or say
1928.00
d fixing MS. Hallow door frames manufactured by cold roll formed process
ming to IS 4351 - 1976 size should be 50 x 60 mm with 32 mm rebate. The
ame should be painted with one coat of primer and finished painted with
Coefficient
Amount
ess of 1.25 mm. Size of door frame section should be of 105x60mm with a
door shutter. The frame section should have groove to insert gasket. The
1.000be cut to length,
233.00
e filled with polyurethane foam. The frame section should
should be provided with: a) 2mm thick MS powder coated butt hinges
of
233.00
for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each
14% Aldrop Receiver
31.72
s screwed to stifeners 6 Nos. with split end tail. d) Nylon
264.72
No
or say
265.00
nd wood block board type with commercial ply on both faces.: 35 mmthick
UTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush
door frame including fixing the fixtures to the door shutter for finished item
Coefficient
Amount
1.000
734.00
1.000
230.00
0%
0.00
14%
964.00
131.25
1095.25
or say
1095.00
389.05
32.00
96.00
44.80
100.40
14%
662.25
90.17
752.42
299.77
or say
300.00
ought and putup Sal Wood scantlings: any length in length including cost
and all operational, incidential, labour charges, etc., complete for finished
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%
38847.00
7434.00
2816.00
0.00
49097.00
rought and putup in Sal Wood Plancks: any thickness in length including
k site and all operational, incidential, labour charges, etc., complete for
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%
49491.00
7434.00
2816.00
0.00
59741.00
p Teak Wood scantlings: any length including cost and conveyance of all
dential, labour charges, etc., complete for finished item of work
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%
81225.00
7434.00
2816.00
0.00
91475.00
tup in Teak Wood Plancks: any thickness in length including cost and
all operational, incidential, labour charges, etc., complete for finished item
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%
116540.00
7434.00
2816.00
0.00
126790.00
Coefficient
17.700
8.800
0%
Amount
7434.00
2816.00
0.00
10250.00
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.20 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0090
Cum
Cum
0.0405
Cum
2.2297
Sqm
2.2297
Sqm
0.0405
1988.43
2.2297
1636.60
0.0405
415.13
2.2297
512.83
0%
0.00
150.00
4702.99
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
5252.99
715.19
5968.18
5968.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.05 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0079
Cum
Cum
0.0394
Cum
1.9214
Sqm
1.9214
Sqm
0.0394
1934.42
1.9214
1410.31
0.0394
403.85
1.9214
441.92
0%
0.00
150.00
4340.50
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4890.50
665.84
5556.34
5556.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.00 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0075
Cum
Cum
0.0390
Cum
1.7570
Sqm
1.7570
Sqm
0.0390
1914.78
1.7570
1289.64
0.0390
399.75
1.7570
0%
404.11
0.00
150.00
4158.28
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4708.28
641.03
5349.31
5349.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.90 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0068
Cum
Cum
0.0383
Cum
1.6132
Sqm
1.6132
Sqm
0.0383
1880.42
1.6132
1184.09
0.0383
392.58
1.6132
371.04
0%
0.00
150.00
3978.13
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4528.13
616.50
5144.63
5145.00
Each
ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.85 x 2.10 M
Coefficient
For Door
Amount
0.0315
0.0064
Cum
Cum
0.0379
Cum
1.5515
Sqm
1.5515
Sqm
0.0379
1860.78
1.5515
1138.80
0.0379
388.48
1.5515
356.85
0%
0.00
150.00
3894.91
240.00
124.00
16.00
85.00
38.00
15.00
124.00
48.00
85.00
38.00
15.00
14%
Say
4444.91
605.17
5050.08
5050.00
Each
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 1.50x1.35
Coefficient
Amount
For Windows
0.0225
Cum
Cum
0.0630
Cum
0.0221
0.0115
Cum
Cum
0.0336
Cum
0.0268
Cum
0.0630
0.0336
0.0268
2.025
3093.11
3073.56
3397.97
1928.31
29.25
1111.50
29.25
468.00
29.25
87.75
0.0405
0%
0.00
100.00
13260.20
576.00
192.00
414.00
264.00
45.00
14%
14751.20
2008.38
16759.58
Say
16760.00
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.35
Coefficient
Amount
For Windows
0.0304
0.0135
Cum
Cum
0.0439
Cum
0.0110
0.0057
Cum
Cum
0.0167
Cum
0.0152
Cum
0.0439
0.0167
0.0152
1.215
2155.36
1527.63
1927.21
1156.98
23.39
888.82
23.39
374.24
23.39
70.17
0%
0.00
80.00
8180.41
192.00
128.00
276.00
176.00
30.00
14%
8982.41
1222.96
10205.37
Say
10205.00
y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.07
Coefficient
Amount
For Windows
0.0241
0.0135
Cum
Cum
0.0376
Cum
0.0090
0.0047
Cum
Cum
0.0137
Cum
0.0152
Cum
0.0376
0.0137
0.0152
0.963
1846.05
1253.21
1927.21
917.02
23.39
888.82
23.39
374.24
23.39
70.17
0%
0.00
80.00
7356.72
192.00
128.00
276.00
176.00
30.00
14%
8158.72
1110.81
9269.53
Say
9270.00
Coefficient
Amount
Cum
Cum
0.0135
Cum
0.0135
0.540
0.54
0%
662.81
514.22
180.36
0.00
2.034
77.29
2.034
32.54
2.034
6.10
0%
0.00
60.00
1533.32
14%
1533.32
208.76
1742.08
Say
1742.00
Amount
0.00338
Cum
Cum
0.00788
Cum
0.00450
0.00788
0.270
386.88
257.11
0.27
0%
90.18
1.017
38.65
1.017
16.27
1.017
3.05
0%
0.00
0.00
60.00
852.14
14%
852.14
116.02
968.16
Say
968.00
8676.65
4284.77
Say
4285.00
alwood) Fully Panneled Door of size 100 x 2.00 Door single leaf door frame
try wood 3"x4" free from all difects such as werping, bending, knot etc.,
40mm size and with 1 1/2 thick best country wood styles and rise using 7/8"
fications of APDSS including cost, wrought and putup and conveyance of all
Coefficient
Amountby
laber charges for making, fixing of door furniture in
position as directed
For Door
: Size), Bottom Tower bolts 150mm long, Brass Butt
hinges (IS:205)- 150
1) 250 mm long, Heavy duty Aluminium Door stopper, Aluminium Door
ated Aldrop (IS:2681) 300 mm long and all labour charges such as diricted
of work. for External doors (Schedule Item 292)
1.096
0.274
0.520
Cft
Cft
0.116
Cft
Cft
0.436
Cft
2.442
Cft
1.299
Cft
1.299
Cft
2.442
1.299
0.106
3395.01
2197.47
1086.50
150.00
14%
172.00
138.00
996.00
38.00
85.00
124.00
8381.98
1141.21
9523.19
9523.19
Say
9523.00
4761.60
4762.00
1 Sqm
(Salwood) Fully Panneled Door of size 1.00 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
Amountas
axes, all laber charges for making, fixing of doorCoefficient
furniture in position
Forlong,
DoorAluminium Butt
er bolts (Ave : Size), Bottom Tower bolts 150mm
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental
Officers
1.096
Cft for
dule Item 293)
0.274
Cft
0.520
0.116
Cft
Cft
0.436
Cft
2.442
Cft
1.299
Cft
1.299
Cft
2.442
1.299
0.106
3395.01
2197.47
1086.50
150.00
6828.98
86.00
69.00
600.00
104.00
38.00
85.00
14%
7810.98
1063.46
8874.44
Say
8874.00
8874.44
4437.22
4437.00
1 Sqm
(Salwood) Fully Panneled Door of size 0.75 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
axes, all laber charges for making, fixing of door furniture in position as
er bolts (Ave : Size), Bottom Tower bolts 150mm long, Aluminium
Butt
6828.98
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental Officers for
5121.74
dule Item 293)
2.00 sqm
86.00
69.00
600.00
104.00
38.00
85.00
104.00
38.00
85.00
6103.74
14%
831.02
6934.76
Say
6935.00
Cft
0.547
Cft
2.543
Cft
0.742
Cft
0.742
Cft
2.543
0.742
0.093
3535.43
1255.21
953.25
120.00
5863.89
576.00
384.00
414.00
264.00
15.00
14%
7636.89
1039.76
8676.65
Say
8677.00
8676.65
4820.36
Say
4820.00
576.00
384.00
414.00
264.00
8674.67
14%
1181.06
9855.73
Say
9856.00
2.80
0.006
0.015
0.032
0%
2.88
5.63
10.24
0.00
14%
21.55
2.93
24.48
or say
24.50
1.68
0.003
0.008
1.26
3.00
0.022
0%
7.04
0.00
14%
12.98
1.77
14.75
or say
15.00
proof cement paint of apporved brand and shade over a base coat of
oats in all to give an even shade after thourughly brushing the surface to
d materials, including cost and conveyance of all materials to work site and
BLD CSTN 10-5
complete for finished item of work as per SS 912 for Extarnal walls for All
Coefficient
Amount
0.100
10.00
0.021
0.049
0%
10.08
18.38
0.00
0.350
12.25
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
14%
119.04
16.21
135.25
or say
135.00
12.25
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
1%
0.81
14%
81.39
11.08
92.47
or say
92.00
nd approved Water Proof Cement Paint over Priming Coat, One Coat
ver a base coat of approved cement primer grade I making making 2 coats
y brushing the surface to remove all dirt and remains of loose powdered
ll materials to work site and all operational, incidental, labour charges etc.
12 for Extarnal walls for All Floors
7.00
0.009
0.021
0.150
0%
4.32
8.82
56.25
0.00
1%
0.76
14%
77.15
10.50
87.65
or say
88.00
mixed oil bound wahsable distemper of approved brand and shade over a
brand, making 3 coats in all to give an even shade after thourughly
emains of loose powdered materials, including cost and conveyance of all
idental, labour charges etc. complete for finished item of work as per SS
0.050
5.00
0.0024
0.0133
0%
1.15
4.99
0.00
0.170
10.20
0.036
0.084
0%
17.28
31.50
0.00
1%
14%
or say
0.59
70.71
9.63
80.34
80.30
oats with Oil Bound Distemper of approved brand and shade making 2
ourughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls for All Floors
BLD CSTN 9-10
Coefficient
Amount
0.170
10.20
0.036
0.084
0%
17.28
31.50
0.00
1%
0.59
59.57
8.11
67.68
68.00
14%
or say
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11-i
Coefficient
Amount
0.050
9.00
0.021
0.049
0%
10.08
18.38
0.00
1%
0.37
14%
37.83
5.15
42.98
or say
43.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
14.40
0.036
0.084
0%
17.28
31.50
0.00
1%
0.63
14%
63.81
8.69
72.50
or say
73.00
mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls
5.00
0.008
0.019
0%
3.84
7.13
0.00
0.080
14.40
0.036
0.084
0%
17.28
31.50
0.00
1%
0.79
14%
79.94
10.88
90.82
or say
91.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11 vi
Coefficient
Amount
0.070
12.60
0.036
0.084
0%
17.28
31.50
0.00
1%
0.61
14%
61.99
8.44
70.43
or say
70.00
5.00
0.008
0.019
0%
3.84
7.13
0.00
0.080
10.88
0.036
0.084
0%
17.28
31.50
0.00
1%
0.76
14%
76.39
10.40
86.79
or say
87.00
9.52
0.036
0.084
0%
17.28
31.50
0.00
1%
0.58
14%
58.88
8.02
66.90
or say
67.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-iv
Coefficient
Amount
0.050
9.00
0.015
0.035
0.150
0%
7.20
13.13
48.00
0.00
14%
77.33
10.53
87.86
or say
88.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.080
14.40
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
14%
90.86
12.37
103.23
or say
103.00
mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v-a
Coefficient
Amount
0.100
10.00
0.021
0.049
0%
10.08
18.38
0.00
0.080
14.40
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
14%
129.32
17.61
146.93
or say
146.90
10.00
0.021
0.049
0%
10.08
18.38
0.00
0.080
10.88
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
1%
1.26
14%
127.06
17.30
144.36
or say
144.00
mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.070
12.60
0.021
0.049
0.150
0%
10.08
18.38
48.00
0.00
1%
0.89
14%
89.95
12.25
102.20
or say
102.00
9.52
0.021
10.08
0.049
0.150
0%
1%
18.38
48.00
0.00
0.86
14%
86.84
11.82
98.66
or say
99.00
oats - For New Iron Work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-12-v
Coefficient
Amount
0.110
18.70
0.033
0.077
0%
15.84
28.88
0.00
14%
63.42
8.63
72.05
or say
72.10
Coats - for New Wood Work of approved brand and shade, making 3 coats
brushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
28.90
0.048
0.112
0%
23.04
42.00
0.00
14%
93.94
12.79
106.73
or say
106.70
oats - for Old Wood work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-10-iv
Coefficient
Amount
0.110
18.70
0.036
0.084
0%
17.28
31.50
0.00
67.48
9.19
76.67
77.00
14%
or say
oved brand for new wood work of teak wood frame and shutters to give an
uding cleaning the surface of all dirt, dust, etc. , and applying a coat of
d conveyance of all materials to work site andall operational, incidental,
BLD CSTN 12-15
m of work as per SS 1212. for All Floors
Coefficient
Amount
0.023
2.10
0.163
11.41
0.096
0.224
0%
46.08
84.00
0.00
14%
143.59
19.55
163.14
or say
163.00
oat - For Old Iron Work of approved brand and shade, making 1 coat in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential,
charges, etc.,
BLD labour
CSTN 12-12-ii
207 & 1212. for All Floors
Coefficient
Amount
0.050
8.50
0.021
0.049
0%
10.08
18.38
0.00
14%
36.96
5.03
41.99
or say
42.00
ai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water Based
sai coat/ Neon/indocem super track for internal walls (Emulsion Paint) to
ed materials including cost of all materials, labour charges and incidental
e for finished item of work, including conveyance charges of materials for
t/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All Floors
Coefficient
1.000
Amount
95.00
14%
95.00
12.93
107.93
or say
108.00
433.65
6.756
0.012
35.13
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
1.000
0%
1%
22.99
0.00
0.23
14%
740.99
100.89
841.88
or say
842.00
433.65
6.756
0.012
35.13
6.16
0.200
5.80
0.096
0.224
0.330
0%
1%
40.32
84.00
105.60
0.00
7.11
1.000
0%
1%
45.98
0.00
0.46
14%
764.21
104.05
868.26
or say
868.00
411.40
6.756
0.012
35.13
6.16
0.200
5.80
0.077
0.080
0%
1%
Basic rate 1 sqm
32.34
30.00
0.00
5.21
526.04
14%
526.04
71.62
597.66
or say
598.00
32.00
0.00
0.32
558.36
76.02
634.38
634.00
64.00
0.00
0.64
590.68
80.42
671.10
or say
671.00
thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-2 charges
or finished item of work, for F1
Coefficient
Amount
1.050
90.30
3.120
0.014
16.22
7.19
0.096
0.224
0.330
0%
1%
Basic rate 1 sqm
40.32
84.00
105.60
0.00
3.44
347.07
14%
347.07
47.25
394.32
or say
394.00
thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-2 charges
or finished item of work, for F2
Coefficient
Amount
Basic rate 1 sqm
1.000
0%
1%
347.07
22.99
0.00
0.23
14%
370.29
50.41
420.70
or say
421.00
thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-23 charges
or finished item of work, for F3
Coefficient
Amount
Basic rate 1 sqm
347.07
1.000
0%
1%
45.98
0.00
0.46
14%
393.51
53.58
447.09
or say
447.00
142.01
9.060
47.11
0.012
6.16
0.500
14.50
0.096
0.224
0.310
0%
1%
Basic rate 1 sqm
40.32
84.00
99.20
0.00
4.33
437.63
14%
437.63
59.58
497.21
or say
497.00
22.35
0.00
0.22
460.20
62.66
522.86
523.00
44.70
0.00
0.45
14%
482.78
65.73
548.51
or say
549.00
mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete to
conveyance of all materials like cement, fine aggregate (sand) coarse
Seigniorage charges, sales & other taxes on all materials including all
BLD CSTN 14-6
ch as machine mixing, laying concrete, curing etc.,complete but excluding
Amount
shed item of work, including centering, shuttering.Coefficient
0.336
1935.42
26.440
1370.41
9.880
1196.76
0.120
0.120
0.250
0%
50.40
45.00
80.00
0.00
4677.99
636.91
5314.90
531.49
295.27
295.00
14%
or say
0.015
0.060
0.096
0%
65.21
25.20
30.72
0.00
121.13
Cement : Sand) using hard variety of rough stone other than granite from
ce of all materials like cement, sand, masonary stones, water, etc., to site
terials including all labour charges like mixing cement mortar, wall
ed item of work in foundation & Basement. (APSS No. 615 & 601) For RR
BLD CSTN 6-13
Coefficient
Amount
59.400
308.88
0.440
361.67
0.500
356.83
0.160
234.22
0.330
169.43
1.200
2.000
0%
504.00
640.00
0.00
2575.03
14%
350.59
2925.62
or say
2926.00
1.000
723.00
0%
1.000
0%
0.00
67.66
0.00
14%
5088.15
692.75
5780.90
or say
5781.00
1.000
723.00
0%
1.000
0%
0.00
135.32
0.00
14%
5155.81
701.96
5857.77
or say
5858.00
1144.00
0.450
231.04
0.900
1.200
1728.65
92.40
1.000
0%
0.100
1.390
0%
Basic rate 1 cum
1.000
0%
328.60
0.00
42.00
444.80
0.00
4011.49
723.00
0.00
14%
4734.49
644.60
5379.09
or say
5379.00
723.00
0.00
67.66
0.00
14%
4802.15
653.81
5455.96
or say
5456.00
723.00
0.00
135.32
0.00
14%
4869.81
663.02
5532.83
or say
5533.00
1.000
723.00
0%
1.000
0%
0.00
67.66
0.00
14%
5374.15
731.69
6105.84
or say
6106.00
1.000
723.00
0%
1.000
0%
0.00
135.32
0.00
14%
5441.81
740.90
6182.71
or say
6183.00
696.49
0.00
220.88
0.00
0.133
55.86
0.267
100.13
4.600
1472.00
0%
0.00
BACIC RATE 1 Cum
6563.71
BLD CSTN 3-14:31A
BACIC RATE 1 Cum
1.000
0%
6563.71
723.00
0.00
14%
7286.71
992.09
8278.80
or say
8279.00
fixed with all accessories (stappers, bolts and stoppers etc.,) with all sizes
ed drawings with alluminium single shutter with allround frame section of
fixed with alluminium single shutter with vertical styles of sizes 47.62 x
45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm (20060 and
5) with archit clural accessories having section 88x40x3.2 mm (19456) and
of size 79x 17.30 x0.10mm (19352) for height of 1.20 m pre laminated
equivalent ) of 10mm thick to a hight of 0.91 m at bottom panel PVC/
y duty floor spring including cost and conveyance of all materials and
ation and fixing in position as directed by the Engineer in Charge.
Coefficient
Amount
Weght
Kg
10.08
4.42
0.88
0.96
1.37
11.93
0.38
30.02
3.73
33.75 Kgs
1.08 Sqm
0.82 Sqm
33.75
8437.50
1.08
576.72
0.82
467.40
2422.00
312.00
300.00
138.00
34.00
1.00
1.00
3.00
2.00
1.00
0%
331.01
590.39
295.55
295.55
756.40
0.00
1.515
159.04
0.788
1.574
0.788
0.788
2.364
1.515
146.92
1%
152.62
14%
15415.10
2098.77
17513.87
9266.60
17,513.87 / 1.89=
Or say
9267.00
minium fully glazed door as per approved drawing using side vertical and
0 mm with double shutters using shutters frame of size 47 x 44.45 x 1.80
nd 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertical side frames
Coefficient
Amount
ssery glazing clips of size 19 x 17.30 x 0.80 mm and rubber for beeding 5
s, 2 nos locks and 4 nos round door handles necessary fixed with all
Weght
) including cost and conveyance of all materials and
accessories including
sition as directed by the Engineer in Charge. for 1.52Kg
m x 1.32 m as per
15.71
7.46
2.47
2.28
4.93
32.85
1.64
2.38
2.52
39.39 Kgs
69.85
69.85
69.85 RM
7.10
0.71
7.81 Sqm
39.39
9847.50
69.85
7.81
139.70
4451.70
4844.00
948.00
624.00
600.00
276.00
68.00
2.00
2.00
2.00
6.00
4.00
2.00
0%
295.08
527.25
263.63
263.63
674.88
193.33
0.00
5.630
591.15
0.703
1.406
0.703
0.703
2.109
0.703
5.630
1%
14%
546.11
251.54
25405.50
3458.96
28864.46
4065.42
28,864.46 / 7.10=
Or say
4065.00
Coefficient
Amount
1.000
385.00
14%
385.00
52.42
437.42
or say
437.00
Coefficient
Amount
1.000
2900.00
14%
2900.00
394.84
3294.84
or say
3295.00
OWS, VENTILATORS & DOOR FRAMES. Supply and fixing of windows & top
pre - painted steel (base steel as per IS 513 of -0.6 mm thick 'D" quality,
) primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
9.2x1828.8mm) outer frame section size of 46 x 52 mm shutter frame
uld be 46 x 46 mm section for mullion should be 46 x 70 mm, and section
e of 46 x 70 mm (Code BMT-P.13)
n for louvered ventilation should be 33 x57mm Box section. The windows
Coefficient
Amount
glass & 4 mm pinhead glass for ventilators with Ethyl
propylene
Diamine
be cut to length mitre joined with corner brocket centre mullions are to be
grade aluminium powder coated and nylon receiver. Gaskets
of Ethyl
1.000 made 4630.00
brackets made of CRCA with Zinc Phosphate. Mullion caps made 4630.00
of glass
xed to the concrete /masonry wall by means of self expanding screws.
ch complete for finished item of work.
14%
or say
630.37
5260.37
5260.00
Amount
1.000
5195.00
14%
5195.00
707.30
5902.30
or say
5902.00
Amount
1.000
5195.00
14%
5195.00
707.30
5902.30
or say
5902.00
Amount
1.000
3685.00
14%
3685.00
501.71
4186.71
or say
4187.00
1795.00
244.39
2039.39
or say
2039.00
sign including cost Mild steel and all Labour charges for fabricating steel
ills, Iron Doors, Windows including cost of welding rods, power charges,
y the Departmental Officers for finished item of work.
Coefficient
Amount
1.000
38.00
1.000
16.00
1.000
3.00
0%
0.00
14%
Say
57.00
7.76
64.76
65.00
1 Kg
126.39
27.72
18.48
4.95
14.00
81.20
272.74
37.13
309.87
309.90
66.66
17.49
9.90
3.63
12.00
81.20
14%
190.88
25.99
216.87
or say
217.00
Amount
335.00
14%
335.00
45.61
380.61
or say
381.00
272.30
2272.30
or say
2272.00
Coefficient
1.000
Amount
81225.00
10%
8122.50
17.700
8.800
0%
7434.00
2816.00
0.00
35.315
0%
8122.45
0.00
14%
107719.95
14666.07
122386.02
or say
122386.00
Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-2-V
Coefficient
Amount
67.200
349.44
0.940
772.66
0.160
234.22
0.280
143.76
2.222
211.11
2.500
2.320
0%
1050.00
742.40
0.00
14%
3503.59
477.01
3980.60
or say
3981.00
trap using 15 Nos of 32mm MS Steel rods welded as equal spacing over 6
in position on the already laid concrete walls, including all labour charges
on, cost of welding rods etc., complete as directed by the Departmental
62.42
388.07
450.49 Kgs
450.490
17118.62
450.490
0%
450.490
0%
5405.88
0.00
1351.47
0.00
14%
23875.97
3250.71
27126.68
or say
27127.00
1.000
2625.00
14%
2625.00
357.39
2982.39
or say
2982.00
1.000
2250.00
1.000
127.50
14%
2377.50
323.70
2701.20
or say
2701.00
22.99
0.00
0.23
14%
1467.54
199.81
1667.35
or say
1667.00
Coefficient
Amount
1.000
4246.00
14%
4246.00
578.09
4824.09
or say
4824.00
Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
399.36
0.940
772.66
0.160
234.22
0.320
164.29
1.500
2.320
0%
630.00
742.40
0.00
14%
2942.93
400.68
3343.61
or say
3344.00
1.100
2530.00
6.756
35.13
0.012
6.16
0.500
12.50
0.096
0.224
0.310
0%
1%
40.32
84.00
99.20
0.00
28.07
3.333
30.00
2865.38
14%
2865.38
390.12
3255.50
or say
3256.00
Teak Veneer Decorated Plywood (IS:1328) The rate is inclusive of cost and
charges, incidental charges, cost of all consumables etc. and scafolding
tem of work
Coefficient
Amount
1.000
1045.00
1.000
0%
317.00
0.00
14%
1362.00
185.44
1547.44
or say
1547.00
22.35
0.00
0.22
14%
2887.95
393.19
3281.14
or say
3281.00
0.170
10.20
0.036
0.084
#REF!
#REF!
#REF!
#REF!
1%
#REF!
#REF!
#REF!
#REF!
#REF!
or say
#REF!
f pre painted steel (base steel as per IS 513 of 0.6 mm thick D quality,
M) Primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
Coefficient
ould be 46 x 70 mm and section for beading should
be 18 x 25Amount
mm. The
plain float Glass with Ethyl Propylene diameine Monomer (EPDM) Gaskets.
ned with corner bracket. Centre mullions are to be fixed suing mullion cap.
er coated and nylon receiver. Gaskets made of Ethyl propylene Diamine
RCA with zinc phosphating. Mullion caps made of Glass
The
1.000filled nylon.
3673.00
/ masonry wall be means of self expanding screws. & complete for finished
mm) grid outer frames section size of 46 x 52 mm
14%
3673.00
500.08
4173.08
or say
4173.00
74.88
0.030
15.40
0.500
0.740
0%
187.50
236.80
0.00
14%
514.58
70.06
584.64
or say
585.00
Amount
700.00
0.00
14%
700.00
95.31
795.31
or say
795.00
1250.00
0.00
14%
1250.00
170.19
1420.19
or say
1420.00
ed make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual
nternal parts of dual flush cistern, ultra solid seat cover of approved make
cock 450 mm long PVC inter connection pipe wall flanges all of approved
ork in all respects: White Colour fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
6500.00
14%
6500.00
884.98
7384.98
or say
7385.00
Amount
170.00
0.00
14%
170.00
23.15
193.15
or say
193.00
810.00
0.00
14%
810.00
110.28
920.28
or say
920.00
pection including all repairs including all labour charges for etc; complete
Coefficient
Amount
1.000
90.00
0%
0.00
14%
90.00
12.25
102.25
or say
102.00
uding all labour charges for etc; complete for finished itemof work.
Coefficient
Amount
1.000
64.00
14%
64.00
8.71
72.71
or say
73.00
mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight
xcavation of trenches and socket pits in any soil (except rock requiring
efilling with watering and tamping including all labour charges for etc;
Coefficient
Amount
1.000
0%
346.00
0.00
14%
346.00
47.11
393.11
or say
393.00
ng in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges for fixing at site etc;
Coefficient
Amount
1.000
200.00
14%
200.00
27.23
227.23
or say
227.00
pipe outlet fixing in position including cost and conveyance of all materials,
Operational and Incidental charges including all labour
charges for
fixing at
Coefficient
Amount
1.000
70.00
14%
70.00
9.53
79.53
or say
80.00
n with brass union nut C.P coated fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
0%
74.00
0.00
14%
74.00
10.08
84.08
or say
84.00
Amount
1.000
21.00
14%
21.00
2.86
23.86
or say
24.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
Amount
1.000
30.00
14%
30.00
4.08
34.08
or say
34.00
46.32
15.07
Total
257.33 Kgs
257.33
9778.54
257.33
0%
3602.62
0.00
40.00
2000.00
2.00
500.00
14%
15881.16
2162.22
18043.38
Or say
18043.00
ved source including cost and conveyance of tiles to work and stacking at
mental Officers.
Coefficient
Amount
12.00
12.00
proved source including cost and conveyance of tiles to work and stacking
rtmental Officers.
Coefficient
Amount
12.00
12.00
urce including cost and conveyance of tiles to work and stacking at site for
fficers.
Coefficient
Amount
24.00
24.00
tiles and cement mortor borders (1:2) including cost and conveyance of
ork and all operational, incidential, labour charges such as mixing mortor,
cement mortor, etc., complete for finished item of work
Coefficient
Amount
0.009
39.12
0.030
0.070
0.440
0%
12.60
26.25
140.80
0.00
14%
218.77
29.79
248.56
or say
249.00
of size 1.80M x 0.75M x 3.05M to out side of the store room and carefully
rs to the store room and again shifting back and rearranging the racks
ing labour charges for all operations etc., as directed by the Engineer - in Coefficient
Amount
9500.00
9500.00
proof mesh for Door shutter diferent sizes frame with fly froof mesh of
4" x 1/2" thick including cost, wrought and putup and conveyance of all
laber charges for making, fixing of door furniture in position as directed by
bolts, M.S. aldop and M.S handle, and all labour charges such as diricted by
work.
Coefficient
For Door
Amount
0.430
0.406
Cft
Cft
0.036
0.034
Cft
Cft
0.906
Cft
0.906
4.00
2.00
1.00
2.28
2.28
0%
996.61
64.00
36.00
23.00
857.28
832.20
0.00
2809.09
382.46
3191.55
14%
3191.55
3191.55 x 1.00 sqm
2.28 sqm
Say
1399.80
1400.00
1 Sqm
w Double shutters diferent of size shutters frame thick 3 1/2" x 1 1/2" and
putup and conveyance of all materials work site and including all taxes, all
urniture in position as directed by Dept| Officers including M.S.P.C. hings,
harges such as diricted by the Departmental Officers for finished item of
Coefficient
For Window
Amount
0.437
0.164
0.601
Cft
Cft
Cft
0.601
4.00
1.00
2.00
4.90
0.017
835.55
32.00
45.00
36.00
262.15
174.25
0%
14%
0.00
1384.95
188.56
1573.51
1573.51
2247.87
2248.00
1 Sqm
Name of Work:-
Measurements
L
B
3
2
4
5
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including HIRE CHARGES FOR CENTERING & SCAFFOLDING cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and sales
& other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing but excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS, PLINTH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS
but excluding cost of steel and its fabrication charges for finished item of work. for: VRCC : M-20
Nominal Mix
Description
No
12
0.23
0.38
3
4
x
x
1
1
16.08
9.98
0.23
0.23
3
4
3
3
2
2
1
x
x
x
x
x
x
x
1
1
2
2
3
3
1
16.08
9.98
0.23
0.38
0.38
0.23
5.72
0.23
0.23
0.23
0.23
0.23
0.23
0.23
1
1
-1
x
x
x
1
1
1
16.08
6.32
3.81
9.98
1.22
2.44
1
1
x
x
2
1
3.74
0.90
1.22
2.44
Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and sales & other taxes on all materials including all operational, incidental and labour
charges such as mixing, laying concrete, curing but excluding Seigniorage charges, etc.,complete
but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-
Quantity
D
6
ggregate: coarse aggregate) corresponding to Table 9 of IS
e crushed hard granite metal (coarse aggregate) from
S FOR CENTERING & SCAFFOLDING cost and conveyance
te (sand) coarse aggregate, water etc., to site, and sales
g all operational, incidental and labour charges such as
g but excluding Seigniorage charges, etc.,complete for
TH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS
ation charges for finished item of work. for: VRCC : M-20
3.30
3.46
0.04
3.50
cum
0.38
0.38
4.22
3.49
0.43
8.14
cum
0.38
0.38
0.38
0.38
0.38
0.38
0.38
4.22
3.49
-0.12
-0.20
-0.20
-0.12
0.50
0.43
8.00
cum
-------
160.48
7.71
-9.30
1.11
160.00
sqm
-----
9.13
2.20
0.67
12.00
0
Sub Work : WATER SUPPLY AND SANITARY FOR JUDGE RESIDENTIAL QUEATER
Abstract
All rates/amounts are in INR
Qunatity
Rate
S.No. Description
unit
1cum
110
152.162
1cum
11.5
2536.85
1cum
2.2
3869.937
708 of 860
S.No. Description
unit
Qunatity
Rate
1sqm
130
247.588
1sqm
45
696.572
1MT
0.5
44237.543
709 of 860
S.No. Description
unit
Qunatity
Rate
1cum
34
2039.502
1EACH
1439.25
Supply & fixing of PVC low level system parry ware, slim
line with internal components & short bend: 10 litres
capacity Dual Flush
1EACH
1539
10
1EACH
401.85
11
1EACH
1474.875
12
1EACH
1382.25
13
1EACH
949.05
14
1EACH
712.5
15
16
1EACH
RM
21
114
18.24
142.12
17
RM
121
274.74
18
RM
15
566.2
710 of 860
S.No. Description
unit
Qunatity
Rate
19
LIT
4000
4.668
20
1EACH
15
60.42
21
1EACH
12
95.76
22
1EACH
15
44.46
23
1EACH
12
74.1
24
1EACH
15
64.98
25
1EACH
12
117.42
26
1EACH
20
464.55
27
RM
50
613.035
28
RM
20
419.235
29
RM
60
1246.02
30
RM
30
312.075
31
1EACH
133.38
32
1EACH
146.775
711 of 860
S.No. Description
unit
Qunatity
Rate
33
Supply and fixing wall mirror with provision for over head
shower and 115 mm long bend pipe with wall flange
Jaquar make queen series with 7 years warranty:
Chrome plated
1EACH
4644.36
34
1EACH
249.66
35
Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet
1EACH
12
79.8
36
1EACH
5232.6
37
1EACH
4218
38
Supply & Fixing bath tub over flow set complete with
over flow cap,450mm ball chain with rubber plug 7 Union
bend with brass nuts Jaquar make, Chrome colour with 7
years warranty
1EACH
1073.88
39
1EACH
12
2993.64
40
1EACH
12
477.66
41
42
43
44
45
1EACH
1EACH
1EACH
1EACH
1EACH
10
10
12
8
8
33.06
39.9
60.42
90.06
226.005
46
1EACH
351.975
47
1EACH
12
157.605
48
1EACH
174.705
712 of 860
S.No. Description
unit
Qunatity
Rate
49
Supply & Fixing bath tub over flow set complete with
over flow cap,450mm ball chain with rubber plug 7 Union
bend with brass nuts Jaquar make, Chrome colour with 7
years warranty
1EACH
1073.88
50
1CUM
60
100
51
L.S
52
L.S
53
L.S
713 of 860
29174
8514
714 of 860
Amount
32186
31346
22119
715 of 860
Amount
69343
1439
10773
804
2950
12440
4745
6413
383
16202
33244
8493
716 of 860
Amount
18672
906
1149
667
889
975
1409
9291
30652
8385
74761
9362
667
294
717 of 860
Amount
4644
749
958
5233
4218
2148
35924
5732
331
399
725
720
1808
1408
1891
699
718 of 860
Amount
2148
6000
75000
35000
6686
6,57,806
719 of 860
Estimat
Measurements
Sl.
No
1
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
7.00
4.00
2.50
70.00
4.00
2.20
2.50
22.00
for sewage
60.00
0.45
0.45
12.15
5.85
add
110.00
cum
2
7.00
4.00
0.30
8.40
4.00
2.20
0.30
2.64
0.46
11.5
cum
Measurements
Sl.
No
3
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
6.00
3.00
0.10
1.80
3.00
1.20
0.10
0.36
0.04
2.20
cum
18.00
..
3.00
54.00
21.00
..
0.38
7.98
21.00
..
0.45
9.45
for bottom
6.00
..
3.00
18.00
3.00
25.20
8.40
..
11.40
..
0.38
4.33
11.40
..
0.45
5.13
3.00
..
1.20
3.60
bottom
2.31
130.00
sqm
Measurements
Sl.
No
5
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
25.42
6.76
3.76
3.00
1.50
9.00
3.76
2.96
11.13
-1 x
0.6
0.6
-0.72
0.17
say
45.00
sqm
4.5
cum
100
kg/cum
450.0
0.45
say
0.5
MT
Measurements
Sl.
No
7
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
18.76
0.38
3.00
21.39
9.92
0.38
3.00
11.31
0.45
0.45
0.45
0.09
1.21
34.00
cum
Supplying & Fixing Orissa Pan white glazed W.C 1st quality
ISI marked conforming to IS:2556-Part-3-1981 with "P" or
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm
x 440 mm
At Master bed room toilet
1.00
At 2 Bed rooms
2.00
1.00
1.00
5.00
nos
Supply & fixing of PVC low level system parry ware, slim
line with internal components & short bend: 10 litres
capacity Dual Flush
For all W.C
7.00
nos
10
Supplying and Fixing best Indian make plastic seat and lid
for European water closets with rubber or plastic Buffers
as per IS 2548-1996
for europen W.Cs
x 2
2.00
nos
11
1.00
At Bed rooms
1.00
2.00
nos
Measurements
Sl.
No
12
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
At toilet rooms
x 3
3.00
At dininig hall
x 2
2.00
At out side
x 2
2.00
x 2
2.00
9.00
nos
13
x 3
3.00
At dininig hall
x 2
2.00
5.00
nos
14
1.00
At 2 Bed rooms
2.00
1.00
1.00
5.00
nos
15
x 7
7.00
At urinals
x 4
4.00
At for toilets
x 5
5.00
At kitchen
x 2
2.00
At bath rooms
x 5
5.00
23.00
nos
16
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
6.00
42.00
6.00
42.00
6.00
30.00
114.00
rm
17
6.00
42.00
MH TO MH
15.00
15.00
MH to MH
12.00
36.00
15.00
15.00
10.00
10.00
VENT PIPE
3.00
To SEPTIC TANK
3.00
121.00
rm
18
x 1
15.00
15.00
rm
19
1000
2000.00
liters
20
x 15
15.00
nos
21
x 12
6.00
nos
22
x 15
15.00
nos
23
x 12
6.00
nos
Measurements
Sl.
No
24
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
x 15
15.00
nos
25
x 12
12.00
nos
26
7.00
7.00
At Urinals
4.00
At kitchen sink
2.00
20.00
nos
27
S & F CP Long body bib cock fancy type deluxe 400 grams
12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent
At Toilets, Bath rooms & Outside tap
14
14.00
nos
28
x 8
8.00
nos
29
x 4
4.00
nos
30
x 12
12.00
nos
31
x 5
5.00
nos
32
x 2
2.00
nos
Measurements
Sl.
No
33
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
x 3
3.00
nos
34
Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet
1
x 12
12.00
nos
35
x 12
12.00
nos
36
x 5
5.00
nos
37
x 1
1.00
nos
38
Supply & Fixing bath tub over flow set complete with over
flow cap,450mm ball chain with rubber plug 7 Union bend
with brass nuts Jaquar make, Chrome colour with 7 years
warranty / Jupiter Aqua Lines-JAL or equivalent series
At Bath room
x 2
2.00
nos
39
x 1
1.00
nos
40
Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories
1
x 1
1.00
nos
Measurements
Sl.
No
41
Description of item
No
Quantity
Cum/Sqm/M
t/Nos
x 12
12.00
nos
42
x 12
12.00
nos
43
x 10
10.00
nos
44
45
x 10
10.00
x 12
12.00
46
x 8
8.00
nos
47
x 1
30.00
30.00
Rm
48
x 1
20.00
20.00
Rm
49
Measurements
Sl.
No
Description of item
No
1
x 1
L
50.00
Quantity
Cum/Sqm/M
t/Nos
50.00
Rm
50
x 1
60.00
60.00
Rm
-- LS --
-- LS --
-- LS --
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Rate/Per
Amount
Description
unit
Qunatity
Augoring and boring of holes in site for Bored cast-insitu R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils without
under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and
shell equipment, etc, complete for all depths and for
finished item of work for piles of following diameters.
1Rm
161.04
1cum
40
1cum
740 of 860
Abstract
Sl.
No.
Description
unit
Qunatity
1cum
12
1cum
19
741 of 860
Abstract
Sl.
No.
Description
unit
Qunatity
1cum
1cum
742 of 860
Abstract
Sl.
No.
Description
unit
Qunatity
1MT
1cum
1cum
26
743 of 860
Abstract
Sl.
No.
Description
unit
Qunatity
1sqm
150
1sqm
114
1sqm
265
744 of 860
Abstract
Sl.
No.
Description
unit
Qunatity
1sqm
10.00
LS
LS
LS
745 of 860
Amount
241.7
38,923
244
9,760
3622.3
18,112
746 of 860
Rate
Amount
6772
,81,264
7104.5
1,34,986
747 of 860
Rate
Amount
9068.7
45,344
8610
17,220
748 of 860
Rate
64159.2
Amount
256,637
4165.2
,37,487
4541.1
1,18,069
749 of 860
Rate
Amount
301.2
45,180
286.4
32,650
154.7
40,996
750 of 860
Rate
Amount
124.40
1,244
10000
25000
7128
10,000
25,000
7,128
TOTAL
9,20,000
751 of 860
Name of Work:-
Description
Measurements
L
B
D
2
3
4
5
6
Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building
foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under
reams as per IS 2911 - 1980 as per approved designs including all operations,
incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of
following diameters.
For C3 Main Columns
For C3 Main Columns
DETAILED ESTIMATE
No
11
11
x
x
2
2
---
---
3.66
3.66
Earth work excavation for BUILDING foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work but
exincluding seigniorage charges and dewatering charges in Ordinary Soil-Manual
Means-Upto 3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0
M
C3piller caps
11
1.525
0.915
1.200
C3piller caps
11
1.525
0.915
1.200
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size
(SS5) hard Granite metal upto Plinth level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, and
sales & other taxes on all materials and including all charges for mixing, laying concrete
in foundations ramming in 15 cm layers finishing top surface to the required level
curing, but excluding seigniorage charges, etc., complete for finished item of work.
(APSS No. 402) for:-Machine Mix-PCC (1:5:10) NOMINAL MIX
C3 piller caps
11
1.525
0.915
0.15
C3 piller caps
11
1.525
0.915
0.15
Sl.
No
4
Description
DETAILED ESTIMATE
No
Measurements
L
B
D
Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing,
pouring concrete by tremmy, curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content as per IS code from standard suppliers approved by the department for finished
item of work. BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and
under ream bulbs
C3
11
/4*305
0.305
3.66
C3
11
/4*305
0.305
3.66
For Footings
C3piller caps
11
1.525
0.915
0.6
C3piller caps
11
1.525
0.915
0.6
31.66
0.23
0.30
11
11
x
x
1
1
0.23
0.23
0.23
0.23
1.50
1.50
Sl.
No
8
Description
DETAILED ESTIMATE
No
Measurements
L
B
D
Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia
and above, where welding required to be done compulsorily including cost and
conveyance of bars from approved sources to site of work, binding wire, cover blocks
and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying etc., and sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Lift Manual
12.00
19.00
2.00
5.00
80.00
100.00
120.00
120.00
Kgs
Kgs
Kgs
Kgs
/
/
/
/
Cum
Cum
Cum
Cum
Say
9
Brick Masonry 230mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm
having a crushing strength of 2.5N/sq.mm including cost and conveyance of all
materials and water from approved source to work site and all operational, incidental
labour charges such as scaffolding, mixing moratar, constructing masonary, lift charges,
curing but excluding Seigniorage charges, etc., complete for finished item of work as
per (APSS No.501 & 504) for Basement for Lift Manual
Compond wall
Pedastals
Add for variations
2
22
x
x
1
1
31.66
0.35
0.23
0.35
0.45
0.45
Brick Masonry 230mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm
having a crushing strength of 2.5N/sq.mm including cost and conveyance of all
materials and water from approved source to work site and all operational, incidental
labour charges such as scaffolding, mixing moratar, constructing masonary, lift charges,
curing but excluding Seigniorage charges, etc., complete for finished item of work as
per (APSS No.501 & 504) for Super Structure for Lift Manual
Compond wall
Pedastals
Deduct Iron gate with wicket gate
Add for variations
2
22
-1
x
x
x
1
1
1
31.66
0.35
3.00
0.23
0.35
0.23
1.50
1.50
1.50
Sl.
No
8
Description
Measurements
L
B
D
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site, and sales & other
taxes on all materials, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting Grooves as directed by Engineer - in - charge, but excluding
Seigniorage charges, etc., complete for External & Uneven Surfaces of Brick Wall for
finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Floor - 0 Centering with Steel upto 3.66 Lift Manual
DETAILED ESTIMATE
No
2
2
x
x
1
1
31.66
31.66
-----
0.75
1.50
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site, and sales & other
taxes on all materials, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting Grooves as directed by Engineer - in - charge, but excluding
Seigniorage charges, etc., complete for Internal & Even faces of Brick Wall and RCC
exposed faces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM
(1:4) & (1:6): 12 mm Floor - 0 Centering with Steel upto 3.66 Lift Manual
Compound wall top
Compond wall for above basement
Pedastals
Add for variations
2
2
20
x
x
x
1
1
1
31.66
31.66
0.12
0.23
-----
--1.50
1.50
10 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and
shade over a base coat of appropriate primer of approved brand, making 3 coats after
thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for finished item of work as per SS
911 for external walls
For above Qty item No. 5
For above Qty item No. 6
Add for variations
Sl.
No
Description
DETAILED ESTIMATE
No
Measurements
L
B
D
11 Painting with Synthetic Enamel paints - Three Coats - for New Iron Work of approved
brand and shade, making 3 coats in all to give an even shade after throughly brushing
the surface to remove all dirt and remains of loose powdered materials, including cost
and conveyance of allmaterials to work site and all operational, incidential, labour
charges, etc., complete for finished item of work as per SS 1207 & 1212. for All Floors
For approved Iron gate
12 Provision for ornamental architectural features
13 Provision for S&F IRON gate wicket gate 1 No.
14 Provision for rounding off
80.52
80.52
161.04
Rm
18.42
18.42
3.16
40.00
cum
2.30
2.30
0.40
5.00
cum
DETAILED ESTIMATE
Quantity
5.89
5.89
0.22
12.00
Cum
9.21
9.21
0.58
19.00
cum
4.37
0.63
5.00
cum
0.87
0.87
0.26
2.00
cum
DETAILED ESTIMATE
Quantity
960.00
1900.00
240.00
600.00
300.00
4000.00
Kgs
4.00
6.55
1.21
1.24
9.00
Cum
21.85
4.04
-1.04
1.15
26.00
Cum
DETAILED ESTIMATE
Quantity
47.49
94.98
7.53
150.00
sqm
14.56
94.98
3.60
0.86
114.00
sqm
150.00
114.00
1.00
265.00
sqm
DETAILED ESTIMATE
Quantity
10.00
sqm
-- L.S --- L.S --- L.S --
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work, but exincluding
seigniorage charge and excluding dewatering charges in Ordinary Soil-Manual Means-Upto
3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M
7.00
4.00
2.50
70.00
for sewage
4.00
2.20
2.50
22.00
60.00
0.45
0.45
12.15
add
5.85
110.00
cum
Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5)
hard Granite metal upto Plinth level from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to site, and sales & other
taxes on all materials and including all charges for mixing, laying concrete in foundations
ramming in 15 cm layers finishing top surface to the required level curing, but excluding
seigniorage charges, etc., complete for finished item of work. (APSS No. 402) for:-Machine
Mix-PCC (1:5:10) NOMINAL MIX
7.00
4.00
0.30
8.40
4.00
2.20
0.30
2.64
0.46
11.5
cum
Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site, including sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete for finished item of work, , lift manuals per APSS. No. 402. for bottom of
Septic tank.
6.00
3.00
0.10
1.80
3.00
1.20
0.10
0.36
0.04
2.20
cum
Measurements
Sl.
No
4
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM
(1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab
when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like sand,
water proofing compound, water etc., to site and sales & other taxes on all materials and
operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering
smooth and thread lining, curing including rounding off junctions of wall and slab, but
excluding seigniorage charges, etc., complete for finished item of work. (APSS No. 901 &
903) for:-Impervious coat CM(1:3), 20mm Floor - 0 Lift Manual
18.00
..
3.00
54.00
21.00
..
0.38
7.98
21.00
..
0.45
9.45
for bottom
6.00
..
3.00
18.00
8.40
..
3.00
25.20
11.40
..
0.38
4.33
11.40
..
0.45
5.13
bottom
3.00
..
1.20
3.60
2.31
130.00
sqm
6.76
3.76
25.42
3.00
1.50
9.00
3.76
2.96
11.13
-1 x
0.6
0.6
-0.72
say
45.00
0.17
sqm
Measurements
Sl.
No
6
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done compulsorily including cost and conveyance of
bars from approved sources to site of work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for finished item of work for:-HYSD
with lap splicing Floor - 0 Lift Manual
4.5 cum
100
kg/cum
450.00
0.45
say
0.50
MT
Brick Masonary 230 mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having
a crushing strength of 2.5N/sq.mm including cost and conveyance of all materials and water
from approved source to work site and all operational, incidental labour charges such as
scaffolding, mixing moratar, constructing masonary, lift charges, curing, but excluding
seigniorage charges, etc., complete for finished item of work as per (APSS No.501 & 504)
for Basement
For all round septic tank
18.76
0.38
3.00
21.39
9.92
0.38
3.00
11.31
0.45
0.45
0.45
0.09
1.21
34.00
cum
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x
440 mm fixing in position including constructing Brick masonry seat and CC Squatting plate
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.
1.00
At 2 Bed rooms
2.00
1.00
1.00
5.00
nos
Supply & fixing of PVC low level system parry ware, slim line with internal components &
short bend: 10 Litres capacity Single Flush fixing in position including cost and conveyance
of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental
charges including all labour charges for fixing at site etc; complete for finished itemof work.
For all W.C
2.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
10 Supplying and Fixing best Indian make plastic seat and lid for European water closets with
rubber or plastic Buffers as per IS 2548-1996 fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
for europen W.Cs
2.00
nos
11 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-21973 of Hindustan / Neycer or Parryware make Colour glazed with 'P' trap fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.
At VVIP bed room toilet
1.00
1.00
2.00
nos
12 Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm
nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted
with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams
Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including
wooden block: 550 x 400 mm - Single C.P. Pillar cock fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
At toilet rooms
2.00
At meeting hall
1.00
At Kitchen
1.00
4.00
nos
13 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing
at site etc; complete for finished itemof work.
At toilet rooms
2.00
At meeting hall
1.00
3.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
14 Providing and fixing white glazed flat back bowl urinal of size 440mmx265mmx315mm
with internal flushing system with flat back large integrated overflow of approved make
with CP spreader, C.P. waste coupling, C.P. brass bottle trap, push cock of approved make
including 38.10 mm PVC waste pipe out let, of required length and 12.7 mm PVC
connection with brass union nut C.P coated etc. all complete, fixing in position including
cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.
At toilet rooms
2.00
2.00
nos
15 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with
C.P. Grating fixing with white cement as per site requirements with standard practice for
100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
4.00
At urinals
2.00
At for toilets
2.00
At kitchen
1.00
9.00
nos
16 Providing 75 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend
87.5 Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR
Pipe fittings, Iron Clamps and all other accessories and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
6.00
24.00
6.00
18.00
6.00
12.00
54.00
rm
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
17 Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend
87.5 Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR
Pipe fittings, Iron Clamps and all other accessories and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
W.C to Manhole
6.00
12.00
MH TO MH
15.00
15.00
MH to MH
12.00
36.00
15.00
15.00
10.00
10.00
To SEPTIC TANK
SEPTIC TANK OUT LET
88.00
rm
18 Providing 160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand and 160 mm x 110 mm - Internal Reducer
- UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand) and fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing
at site etc; complete for finished itemof work.
main to septictank
15.00
15.00
rm
19 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex
/Aqua tech or equivalent Polyethylene water storage tank double layer confirming to ISI
12701/96 mark with lid & manufacture with cover and suitable locking arrangement &
making necessary holes for inlet & outlets and over flow pipes but without fittings & base
support for tanks etc., complete as directed by the Departmental Officers for finished item
of work.
1000
1000
liters
20 Providing and fixing 12.7 mm heavy duty NP Sink cock Seiko/ Senior/ Nice or equivalent and
38.10 mm PVC waste pipe out let, of required length and 12.7 mm PVC connection with
brass union nut C.P coated etc. all complete and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
At kitchen sink
1.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
21 S & F CP Long body bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/
Senior/ Nice or equivalent fixing in position including cost and conveyance of all materials,
Sales tax & Other taxes on materials to site, Operational and Incidental charges including
all labour charges for fixing at site etc; complete for finished itemof work.
At Toilets, Bath rooms & Outside tap
5.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
22 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 25
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.
8.00
nos
23 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 20
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.
1
4.00
nos
24 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 15
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.
1
x 12
12.00
nos
25 S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and
aluminium screws fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.
At toilets
2.00
nos
26 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and
aluminium screws fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.
At toilet
2.00
nos
27 S & F 12.7 x 88.9 CP fancy shower fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.
1
1.00
nos
28 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2
mm fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.
Measurements
Sl.
No
Description of item
At Toilets
No
1
L
3
Quantity
Cum/Sq
m/Mt/No
s
3.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
29 Supply & Fixing wall mixer with telephonic shower arrangement with crutch and
telephone shower with flexible tube Jaquar make Continental series Chrome
colour for bath tub with 7 years warranty / Jupiter Aqua Lines-JAL or equivalent
series including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges
for fixing at site etc; complete for finished itemof work.
At Bath room
1.00
nos
30 Supply & Fixing bath tub over flow set complete with over flow cap,450mm ball
chain with rubber plug 7 Union bend with brass nuts Jaquar make, Chrome colour
with 7 years warranty / Jupiter Aqua Lines-JAL or equivalent series including cost
and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
At Bath room
2.00
nos
31 Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm long
bend pipe with wall flange Jaquar make Continental series, Chrome finish with 7
years warranty / Jupiter Aqua Lines-JAL or equivalent series including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
At Bath room
1.00
nos
32 Supplying & fixing stainless steel sink size 20" x18" x 8 " (508x457.2x203.2mm) 1
mm thick with accessories including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof
work.
1.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
4.00
nos
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
34 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 &
4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate
chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged
cover and including cost and conveyance of all materials like cement, sand,
bricks, water etc., to site, cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.
x 12
12.00
nos
x 10
10.00
nos
x 10
10.00
x 12
12.00
8.00
nos
39 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1
30.00
30.00
Rm
40 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
20.00
20.00
Rm
41 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1
50.00
50.00
Rm
Measurements
Sl.
No
Description of item
No
Quantity
Cum/Sq
m/Mt/No
s
42 S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1
60.00
60.00
Rm
-- LS --
-- LS --
-- LS --
Amount
139.40
15,334
1 Cum
3622.30
41,656
1 Cum
4629.00
1 Cum
10,184
Rate/Per
Amount
319.20
41,496
1 Sqm
854.20
1 Sqm
38,439
Rate/Per
Amount
64159.20
32,080
1 MT
4165.20
1,41,617
1 Cum
1803.50
9,018
Each
1760.80
Each
3,522
Rate/Per
Amount
505.00
1,010
Each
1854.60
3,709
Each
1731.70
6,927
Each
1195.00
Each
3,585
Rate/Per
Amount
2473.80
4,948
Each
361.40
3,253
Each
355.40
1 Rm
19,192
Rate/Per
Amount
528.20
46,482
1 Rm
793.40
11,901
1 Rm
8.90
8,900
1 Lit
1464.40
Each
1,464
Rate/Per
Amount
688.60
3,443
Each
Rate/Per
Amount
804.80
6,438
Each
549.50
2,198
Each
408.10
4,897
Each
183.50
367
Each
165.50
331
Each
327.20
Each
327
Rate/Per
Amount
570.20
1,711
Each
Rate/Per
Amount
6132.10
6,132
Each
1431.80
2,864
Each
4391.30
4,391
Each
5313.30
Each
5,313
Rate/Per
Amount
3538.60
14,154
Each
Rate/Per
Amount
604.20
7,250
Each
43.30
433
Each
52.40
524
Each
79.80
958
Each
118.60
949
Each
205.70
6,171
1 Rm
227.30
4,546
1 Rm
295.70
1 Rm
14,785
Rate/Per
Amount
460.60
27,636
1 Rm
80,000
35,000
6,216
6,81,751
Description
unit
Qunatity
1cum
391.1
1cum
20.52
1cum
129.68
1cum
1.74
LS
LS
788 of 860
Amount
13
5,084
838
17,196
144
18,674
197
343
-10000
-10,000
703
703
TOTAL
32,000
789 of 860
Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of
Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
Sub Work:Dismantling the Existing old court building (now occupaied by Bar Association) at Amalapuram in
East Godari District.
DETAILED ESTIMATE
Description
Measurements
L
B
D
2
3
4
5
6
Dismantling Brick work including stacking of serviceable materials and disposal of
unserviceable materials within 100 metres lead labour charges etc; complete for finished
item of work as directed by the Engineer - in - Charge.
Long walls
Cross walls
Front room long walls
Cross walls
Back side rooms long walls
Cross walls
Sloped room long walls
Dias partation wall
2
2
2
1
2
2
x
x
x
x
x
x
1
2
1
1
2
1
24.60
4.90
2.90
4.90
1.75
5.25
0.35
0.35
0.35
0.35
0.35
0.35
3.50
3.50
2.10
3.50
2.80
3.50
1
2
1
1
x
x
x
x
1
1
1
1
4.90
3.65
1.85
4.90
0.35
0.35
0.35
0.35
3.50
2.55
2.10
0.90
Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof
timbers clearing away and carefully stacking materials useful for reuse if any etc., complete
as directed by the Engineer-in-charge of the work.
No
2
2
2
2
x
x
x
x
1
1
1
1
24.60
3.00
5.25
3.95
6.00
3.50
4.50
3.50
---------
Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100
metres lead labour charges etc., complete as directed by the Enginee - in - Charge.
Front rooms floor
Side rooms floor
Old court hall
Dias portion
Cross walls portions
2
3
1
1
1
1
x
x
x
x
x
x
1
1
1
1
1
1
2.50
4.90
7.30
4.90
4.90
3.35
1.90
4.90
4.90
2.40
0.35
1.80
0.15
0.15
0.15
0.15
0.15
0.15
Sl.
No
4
DETAILED ESTIMATE
Description
No
Measurements
L
B
D
Dismantling the existing Wrought and framed timber in roofs or floors clearing away and
carefully stacking materials useful for reuse if any etc., complete as directed by the
Engineer-in-charge of the work
Wooden pillers
Wooden beam
Wooden rafters
1
1
1
1
x
x
x
x
4
1
42
42
0.10
12.50
3.50
3.50
0.10
0.10
0.10
0.10
1.80
0.15
0.05
0.05
Deduct for Salvage of materials (Doors, Windows, Manglore tiles and roof timbers etc;)
DETAILED ESTIMATE
Quantity
7
60.27
24.01
4.26
6.00
6.86
12.86
6.00
6.52
1.36
1.54
129.68
cum
295.20
21.00
47.25
27.65
391.10
cum
1.43
10.80
5.37
1.76
0.26
0.90
20.52
cum
DETAILED ESTIMATE
Quantity
0.07
0.19
0.74
0.74
1.74
Cum
-- L.S --- L.S --
Name Of Work: Construction of Residential quarters for IInd Additional District Judge at Mummidiv
Sub-Work: Providing E.I. to the above building.
Sl No.
Qty.
Description of Item
Rate
90
Mts Supply and Laying of 20mm dia 2.0mm thick PVC pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in Roof Slabs with
all required PVC / Metallic Deep Boxes including masonary work
and labour charges etc., complete.(Data No. 1.13.1)
37.50
60
Mts Supply and Laying of 25mm dia 2.0mm thick PVC pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in Roof Slabs with
all required PVC / Metallic Deep Boxes including masonary work
and labour charges etc., complete.(Data No. 1.13.2)
44.60
50
Mts Supply and laying of 20mm dia 1.5mm thick P.V.C.pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in wall with PVC /
Metallic junction boxes and all required accessories including
masonary work for light, fan and separate plug point with supply
and fixing of suitable size well seasoned wooden deep box
including all labour charges etc., complete.(Data No. 1.9.1)
46.00
50
Mts Supply and laying of 25mm dia 1.5mm thick P.V.C.pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in wall with PVC /
Metallic junction boxes and all required accessories including
masonary work for light, fan and separate plug point with supply
and fixing of suitable size well seasoned wooden deep box
including all labour charges etc., complete.(Data No. 1.9.3)
51.90
Mts Supply and laying of 32mm dia 2.5mm thick P.V.C. pipe ISI Mark of
Sudhakar / Maco Plast / Modi make concealed in wall with all
required PVC / Metallic Junction Boxes including masonary work
and labour charges etc., complete for Run of mains.(Data No.
1.12.5)
69.40
14
33.00
32
Nos Supply and fixing of fan hook in RCC slab of 12/15mm dia MS Rod
while laying the slab. (Data No. 12.1.16)
Pts Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular switch of GM / Anchor / Gold Medal / Million /
Vimal / Maru / Milltec make on 3mm thick hylam sheet suitable to
be fixed on existing wooden / Metallic deep box in existing
surface / consealed pipe wiring including cost and conveyance of
all material and all labour charges etc., complete for light and bell
points in R.B.(Data No. 2.7.2)
300.30
Sl No.
Qty.
15
10
11
12
13
Description of Item
Rate
pts Wiring with run of 3 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular switch of GM / Anchor / Gold Medal / Million /
Vimal / Maru / Milltec make on 3mm thick hylam sheet suitable to
be fixed on existing wooden / Metallic deep box in existing
surface / consealed pipe wiring including cost and conveyance of
all material and all labour charges etc., complete for fan and
Pts Wiring
of 2
14/0.3mm
(1.02.7.5)
Sq.mm) FRLS / HFFR PVC
Exhaustwith
fan run
points
in of
N.R.B.
(Data No.
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular 2 way switch of GM / Anchor / Gold Medal /
Million / Vimal / Maru / Milltec make on 3mm thick hylam sheet
suitable to be fixed on existing wooden / Metallic deep box in
existing surface / consealed pipe wiring including cost and
conveyance of all material and all labour charges etc., complete for
Nos Supply
and
of in
6AR.B.(Data
ISI mark No.
Mini
Modular switch
with 6A 3/2
light and
bellfixing
points
2.7.2)(staircase
point)
pin wall plug socket of GM / Anchor / Gold Medal / Million / Vimal /
Maru / Milltec make on a common switch board with earth
connections in surface / consealed wiring including cost and
conveyance of all material and all labour charges etc., complete in
N.R.B. / R.B. (Data No.2.2.7)
Pts Wiring with run of 3 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of 6A ISI mark Mini
Modular switch with 6A 3/2 pin wall plug socket of GM / Anchor /
Gold Medal / Million / Vimal / Maru / Milltec make on 3mm thick
hylam sheet suitable to be fixed on existing wooden / Metallic deep
box in existing surface / consealed pipe wiring including cost and
coveyance of all material and all labour charges etc., complete in
N.R.B. / R.B. (Data No. 2.6.8)
399.50
Nos Supply and fixing of 16A 3pin / 6A 3pin ISI mark Mini Modular plug
socket with 16 Amps switch, Fuse, Indicator (5 in One) of GM /
Anchor / Gold Medal / Million / Vimal / Maru / Milltec make on 3mm
thick hylam sheet suitable to be fixed on existing wooden / Metallic
deep box in existing surface / consealed pipe wiring including cost
and coveyance of all material and all labour charges etc., complete
in N.R.B. / R.B. (Data No. 2.6.13)
293.10
450.45
95.40
243.10
Sl No.
Qty.
Description of Item
Rate
14
Nos Supply and fixing of 4 Nos 6A 3 pin ISI mark wall plug sockets with
4 Nos 6A Mini Modular type switches with cover frame of GM /
Anchor / Gold Medal / Million / Vimal / Maru / Milltec make on 3mm
thick hylam sheet suitable to be fixed on existing wooden / Metallic
deep box in existing surface / consealed pipe wiring for computer
including cost and conveyance of all material and all labour
charges etc., complete in N.R.B. / R.B. (Data No. 2.6.11)
397.50
15
241.00
16
Nos Supply and fixing of Mini Modular telephone Jack with connector of
makes GM / Anchor / Gold Medal / Million / Vimal / Maru / Milltecon
on existing wooden / Metallic deep box in existing surface /
consealed pipe wiring including cost and coveyance of all material
and all labour charges etc., complete in N.R.B. / R.B. (Data No.
3.2.3)
67.00
17
60
Mts Supply and run of 2 Pair telephone wire of makes Gold Medal /
Million / Finolex / Delton / Surabi / Polycab in existing pipe including
all labour charges etc., complete.(Elec 7.1.1+labour)(10.10+2)
12.10
18
225
50.80
19
75
25.50
Sl No.
Qty.
Description of Item
Rate
20
100
73.70
21
375
12.60
22
10
230.80
23
17
Nos Supply, Transportation and fixing of 1x36/40W box type tube light
luminaire with powder coated CRCA sheet steel housing with VPIT
Ballast and 1No 4'-40W tube Including fixing on wall / ceiling on TW
round blocks and all standrad accessories of makes Crompton /
Bajaj / HPL / Surya / Havells.(Data No. 9.1.1)
718.20
24
713.00
25
Nos Supply, Transportation and Fixing of 12"(300mm) 250V light duty 1656.10
ISI mark of Crompton / Bajaj / Havells / Orint Make exhaust / Fresh
Air fan with metallic body and blades including making hole in wall
and masonary work and all labour charges etc., complete. (Data
No. 12.1.18)
26
27
Sl No.
Qty.
Description of Item
Rate
28
Nos Supply and fixing of Anchor / Gold Medal Olive / Million Zoom make
ISI mark batten holder / slanting holder in lieu of ceiling rose of
light point complete with all connections and all labour charges
with 40W bulb (for new installation).(Data No. 3.1.1)
38.90
29
Nos Supply and fixing of Anchor / Gold Medal / Million / Vimal / Maru
make buzzer on 4"x4" decolam block including giving connections,
cost of all accessories and labour charges etc., complete.(Data No.
3.1.3)
86.10
30
Nos Supply and fixing of Anchor / Gold Medal / Million / Vimal / Maru
make Ding Dong Bell on 4"x7" decolam block including giving
connections, cost of all accessories and labour charges etc.,
complete.(Data No. 3.1.5)
153.00
31
14
32
14
Sl No.
Qty.
Description of Item
Nos Supply and fixing of 19/20mm dia steel tube down rod for ceiling
fan of 1 Mtr Length with bolts and nuts duly painted with matching
colour of fan including all labour charges etc., complete.(Data No.
12.1.17)
Rate
33
10
34
Nos Supply and fixing of 4 way TPN DB with IP-43 Protection with 1 No 6659.30
63A FP Isolator and 12Nos 6-32 A 10kA SP MCBs of Legrand / L &
T / GE / Siemens / Schneider / ABB make including internal
connections and labour charges for Flush Mounting etc., complete.
(Data No. 7.2.13)
35
Nos Supply, Transportation and fixing of 1x18W CFL Integral post top 2456.00
luminaire with conical shape, opel clear acylic diffuser with cast
alluminium capsule with VPIT ballast of makes Crompton / Bajaj /
Surya / K Lite / HPL and fixing of luminaire including 1x18W CFL
Lamp with 1.0 Sqmm flexible copper cable and all labour charges
etc., complete.(Data No. 18.1.1)
36
40
37
No Supply and fixing of 18"X24" peeta board with 3nos 63A Fuse units 1550.00
and 1no neutral link including giving connections with 6Sqmm
flexible copper cable and all labour charges etc., complete.(DATA)
38
39
15
Mts Supply and Run of 4 of 16.0 Sq.mm WPSC (Whether Proof Single
Core) Aluminium cable of ISI mark of Finolex / Polycab / Gold Medal
/ Million / Payal / Sun Light / Power Flex. make along with No.10
SWG G.I bearer wire through PVC cleats with all accessories
including labour charges etc., complete for service mains.(Data No.
8.1.6)
Mts Supply and Run of No. 8 SWG copper wire including cost of all
accessories and labour charges etc., complete. (0.1155Kgs/1Mtr)
(Data No. 5.2.2)
86.00
131.20
69.00
Sl No.
Qty.
Description of Item
Rate
Superintending Engineer (R
(R&B) Circle : Kakinada
Per
Amount
Mtr
3375.00
Mtr
2676.00
Mtr
2300.00
Mtr
2595.00
Mtr
347.00
Each
462.00
Pt
9609.60
Per
Amount
pt
5992.50
Pt
2252.25
Each
858.60
pt
1458.60
Each
586.20
Each
4195.80
Per
Amount
Each
795.00
Each
241.00
Each
201.00
Mtr
726.00
Mtr
11430.00
Mtr
1912.50
Per
Amount
Mtr
7370.00
Mtr
4725.00
Mtr
2308.00
Each
12209.40
Each
2139.00
Each
4968.30
Each
7442.40
Each
3427.60
Per
Amount
Each
233.40
Each
86.10
Each
153.00
Each
23879.80
Each
3724.00
Per
Amount
Each
860.00
Each
6659.30
Each
4912.00
Mtr
5248.00
Each
1550.00
Each
2300.50
Mtr
1035.00
Per
Amount
147244.85
14724.49
161969.34
8098.47
1619.69
1101.39
25000.00
197788.89
2211.11
2,00,000
COM-LDLFT-1:1
Mazdoor
1.00 No
Unit
CPO
Rate per
250
7.00 Cum
14%
250
1.00 Cum
250
Deduct
14%
LEAD UP TO 150 m
COM-LDLFT-1:2
Mazdoor
250
Unit
35
CPO
40.71
35.71
Rate per
COM-LDLFT-1:3
Mazdoor
1.00 No
Unit
250
12.00 MT
CPO
14%
Rate per
1.00 MT
250
250
Deduct
14%
LEAD UP TO 150 m
COM-LDLFT-1:4
Mazdoor
250
Unit
35
CPO
23.75
20.83
Rate per
PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
LEAD UP TO 100 m
COM-LDLFT-1:5
Mazdoor
1.00 No
Unit
CPO
Rate per
250
5.50 Cum
14%
1.00 Cum
250
250
Deduct
14%
LEAD UP TO 150 m
COM-LDLFT-1:6
Mazdoor
250
Unit
35
CPO
51.82
45.45
Rate per
(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
Earth / Sand / Gravel / Murrum / Lime / Surki /Coarse aggregate / Rubble stone / Size stone / Cut stone
Tipper 5 Cum Hire Charges
Sl. No
Description
SSR Page
No.
Fuel Charges
Crew charges
Hours
Rate
Amount
Hours
Rate
Amount
Hours
Rate
Amount
Cost for
5 Cum
(6+9+12)
10
11
12
13
COM-LDLFT-2
COM-LDLFT-2:7
1 LEAD UP TO 1 KM
406
0.15
COM-LDLFT-2:8
454.40
68.16
0.15
239.10
35.87
0.15
124.80
18.72
122.75
2 LEAD UP TO 2 KM
406
0.21
COM-LDLFT-2:9
454.40
95.42
0.21
239.10
50.21
0.21
124.80
26.21
171.84
3 LEAD UP TO 3 KM
406
0.28
COM-LDLFT-2:10
454.40
127.23
0.28
239.10
66.95
0.28
124.80
34.94
229.12
4 LEAD UP TO 4 KM
406
0.34
COM-LDLFT-2:11
454.40
154.50
0.34
239.10
81.29
0.34
124.80
42.43
278.22
5 LEAD UP TO 5 KM
406
0.40
COM-LDLFT-2:12
454.40
181.76
0.40
239.10
95.64
0.40
124.80
49.92
327.32
454.40
27.26
0.06
239.10
14.35
0.06
124.80
7.49
49.10
454.40
22.72
0.05
239.10
11.96
0.05
124.80
6.24
40.92
6 LEAD UPTO 5 to 30
KM/ EVERY KM
406
0.06
COM-LDLFT-2:13
7 LEAD BEYOND 30 KM/
EVERY KM
406
0.05
(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials
Tipper 5 cum Hire Charges
Sl. No
Description
SSR Page
No.
Fuel Charges
Crew charges
Hours
Rate
Amount
Hours
Rate
Amount
Hours
Rate
Amount
Cost for
8 Mt
(6+9+12)
10
11
12
13
COM-LDLFT-2
COM-LDLFT-2:14
1 LEAD UP TO 1 KM
406
0.15
COM-LDLFT-2:15
454.40
68.16
0.15
239.10
35.87
0.15
124.80
18.72
122.75
2 LEAD UP TO 2 KM
406
0.21
COM-LDLFT-2:16
454.40
95.42
0.21
239.10
50.21
0.21
124.80
26.21
171.84
3 LEAD UP TO 3 KM
406
0.28
COM-LDLFT-2:17
454.40
127.23
0.28
239.10
66.95
0.28
124.80
34.94
229.12
4 LEAD UP TO 4 KM
406
0.34
COM-LDLFT-2:18
454.40
154.50
0.34
239.10
81.29
0.34
124.80
42.43
278.22
5 LEAD UP TO 5 KM
406
0.40
COM-LDLFT-2:19
454.40
181.76
0.40
239.10
95.64
0.40
124.80
49.92
327.32
454.40
27.26
0.06
239.10
14.35
0.06
124.80
7.49
49.10
454.40
22.72
0.05
239.10
11.96
0.05
124.80
6.24
40.92
6 LEAD UPTO 5 to 30
KM/ EVERY KM
406
0.06
COM-LDLFT-2:20
7 LEAD BEYOND 30 KM/
EVERY KM
406
0.05
(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood
Tipper 5 cum Hire Charges
Sl. No
Description
SSR Page
No.
Fuel Charges
Crew charges
Hours
Rate
Amount
Hours
Rate
Amount
Hours
Rate
Amount
Cost for
3.40 Cum
(6+9+12)
10
11
12
13
COM-LDLFT-2
COM-LDLFT-2:21
1 LEAD UP TO 1 KM
406
0.15
COM-LDLFT-2:22
454.40
68.16
0.15
239.10
35.87
0.15
124.80
18.72
122.75
2 LEAD UP TO 2 KM
406
0.21
COM-LDLFT-2:23
454.40
95.42
0.21
239.10
50.21
0.21
124.80
26.21
171.84
3 LEAD UP TO 3 KM
406
0.28
COM-LDLFT-2:24
454.40
127.23
0.28
239.10
66.95
0.28
124.80
34.94
229.12
4 LEAD UP TO 4 KM
406
0.34
COM-LDLFT-2:25
454.40
154.50
0.34
239.10
81.29
0.34
124.80
42.43
278.22
5 LEAD UP TO 5 KM
406
0.40
COM-LDLFT-2:26
454.40
181.76
0.40
239.10
95.64
0.40
124.80
49.92
327.32
454.40
27.26
0.06
239.10
14.35
0.06
124.80
7.49
49.10
454.40
22.72
0.05
239.10
11.96
0.05
124.80
6.24
40.92
6 LEAD UPTO 5 to 30
KM/ EVERY KM
406
0.06
COM-LDLFT-2:27
7 LEAD BEYOND 30 KM/
EVERY KM
406
0.05
(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
WATER
Water tanker 8000 ltr
Sl. No
1
Description
SSR Page
No.
Hours
Fuel Charges
Crew charges
Rate
Amount
Hours
Rate
Amount
Hours
Rate
Amount
Cost for
8000 Lit
(6+9+12)
2
COM-LDLFT-2
3
4
COM-LDLFT-2:28
10
11
12
13
1 LEAD UP TO 1 KM
407
0.15
COM-LDLFT-2:29
408.80
61.32
0.15
239.10
35.87
0.15
117.00
17.55
114.74
2 LEAD UP TO 2 KM
407
0.21
COM-LDLFT-2:30
408.80
85.85
0.21
239.10
50.21
0.21
117.00
24.57
160.63
3 LEAD UP TO 3 KM
407
0.28
COM-LDLFT-2:31
408.80
114.46
0.28
239.10
66.95
0.28
117.00
32.76
214.17
4 LEAD UP TO 4 KM
407
0.34
COM-LDLFT-2:31
408.80
138.99
0.34
239.10
81.29
0.34
117.00
39.78
260.06
5 LEAD UP TO 5 KM
407
0.40
COM-LDLFT-2:32
408.80
163.52
0.40
239.10
95.64
0.40
117.00
46.80
305.96
408.80
24.53
0.06
239.10
14.35
0.06
117.00
7.02
45.90
408.80
20.44
0.05
239.10
11.96
0.05
117.00
5.85
38.25
6 LEAD UPTO 5 to 30
KM/ EVERY KM
407
0.06
COM-LDLFT-2:33
7 LEAD BEYOND 30 KM/
EVERY KM
407
0.05
(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
BRICKS
Truck 10 T Hire Charges
Fuel Charges
Crew charges
Hours
Rate
Amount
Hours
Rate
Amount
Hours
Rate
Amount
Cost for
3000 Nos
(6+9+12)
Sl. No
Description
SSR Page
No.
10
11
12
13
1 LEAD UP TO 1 KM
406
0.15
424.50
63.68
0.15
239.10
35.87
0.15
117.00
17.55
117.10
2 LEAD UP TO 2 KM
406
0.21
424.50
89.15
0.21
239.10
50.21
0.21
117.00
24.57
163.93
3 LEAD UP TO 3 KM
406
0.28
424.50
118.86
0.28
239.10
66.95
0.28
117.00
32.76
218.57
4 LEAD UP TO 4 KM
406
0.34
424.50
144.33
0.34
239.10
81.29
0.34
117.00
39.78
265.40
5 LEAD UP TO 5 KM
406
0.40
424.50
169.80
0.40
239.10
95.64
0.40
117.00
46.80
312.24
6 LEAD UPTO 5 to 30
KM/ EVERY KM
406
0.06
424.50
25.47
0.06
239.10
14.35
0.06
117.00
7.02
46.84
406
0.05
424.50
21.23
0.05
239.10
11.96
0.05
117.00
5.85
39.04
CNVEYANCE CALICULATION OF MATERIAL BUILDINGS DATA FOR THE YEAR 2011 - 2012 ( Less 14% Contract Profit & Overhead
Sl.
No.
Nature of Material
Lead
from
Quarry
to site
Km's
Up to 1
Km lead
Charges
Up to 5
Km lead
Charges
Amount
4
Amount
5
Km's
6
Rate
7
Amount
8
Km's
9
Rate
10
Amount
11
12
13
35.0 Kms
24.55
65.46
25.0 Kms
9.82
245.5
5.0 Kms
8.18
40.9
351.86
327.31
10.0 Kms
24.55
65.46
5.0 Kms
9.82
49.1
0.0 Kms
8.18
114.56
90.01
3 HBG Metal
74.0 Kms
24.55
65.46
25.0 Kms
9.82
245.5
44.0 Kms
8.18
359.92
670.88
646.33
4 Bricks
56.0 Kms
39.03
104.08
25.0 Kms
15.61
390.25
26.0 Kms
13.01
338.26
832.59
793.56
Up to 5 Km to 30 Km's
Beyond 30 Km / Every Km
Grand Total
Total
Conveyance (Deduct
(5+8+11)
1 Km lead (12-4))
250
7.00 Cum
14%
500
Deduct 14%
500
500
1.00 Cum
70
81.43
71.43
250
12.00 MT
14%
500
1.00 Cum
70
47.5
250
5.50 Cum
14%
Deduct 14%
500
1.00 MT
COM-LDLFT-1:6
2.00 No
500
500
41.67
Deduct 14%
500
500
70
103.64
90.91
sporting materials by tippers and trucks excluding loading, unloading and hire
C P and OC
14% (13)
Total
(13+14)
14
15
16
17
17.19
139.94
27.99
24.55
24.06
195.90
39.18
34.37
32.08
261.20
52.24
45.82
38.95
317.17
63.43
55.64
45.82
373.14
74.63
65.46
6.87
55.97
11.19
9.82
5.73
46.65
9.33
8.18
sporting materials by tippers and trucks excluding loading, unloading and hire
C P and OC
14% (13)
Total
(13+14)
14
15
16
17
17.19
139.94
17.49
15.34
24.06
195.90
24.49
21.48
32.08
261.20
32.65
28.64
38.95
317.17
39.65
34.78
45.82
373.14
46.64
40.92
6.87
55.97
7.00
6.14
5.73
46.65
5.83
5.12
sporting materials by tippers and trucks excluding loading, unloading and hire
C P and OC
14% (13)
Total
(13+14)
14
15
16
17
17.19
139.94
41.16
36.10
24.06
195.90
57.62
50.54
32.08
261.20
76.82
67.39
38.95
317.17
93.29
81.83
45.82
373.14
109.75
96.27
6.87
55.97
16.46
14.44
5.73
46.65
13.72
12.04
sporting materials by tippers and trucks excluding loading, unloading and hire
WATER
RATE PER
RATE PER
1000 lit
1000 lit
(15/3.40
(13/8 )
)
C P and OC
14% (13)
Total
(13+14)
14
15
16
17
16.06
130.80
16.35
14.34
22.49
183.12
22.89
20.08
29.98
244.15
30.52
26.77
36.41
296.47
37.06
32.51
42.83
348.79
43.60
38.25
6.43
52.33
6.54
5.74
5.36
43.61
5.45
4.78
sporting materials by tippers and trucks excluding loading, unloading and hire
BRICKS
C P and OC
14% (13)
Total
(13+14)
RATE PER
1000 Nos
(15/3)
RATE PER
1000 Nos
(13/8 )
14
15
16
17
16.39
133.49
44.50
39.03
22.95
186.88
62.29
54.64
30.60
249.17
83.06
72.86
37.16
302.56
100.85
88.47
43.71
355.95
118.65
104.08
6.56
53.40
17.80
15.61
5.47
44.51
14.84
13.01
R THE YEAR 2011 - 2012 ( Less 14% Contract Profit & Overhead Charges )
Grand Total
Conveyance (Deduct
1 Km lead (12-4))
13
327.31
90.01
646.33
793.56
quarry
165 / 200
11 / 800
0 / 200
of NH. 5 Road
of Mandapeta - Jonnada road
of Alamuru - Alamuru I.B road
2.200
=
=
=
29.800
2.132
0.200
34.332
B) For gravel:
Kesavaram
Gravel quarry from
Quarry to Road point of 49/6 of Kakinada - Rajahmundry Road
From km
49 / 600
to
46 / 000
of Kakinada - Rajahmundry road
From km
0 / 000
to
6 / 100
of Dwarapudi - Yanam road
From km
0 / 000
to
11 / 800
of Mandapeta Jonnada road
From km
0 / 000
to
0 / 200
of Alamuru - Alamuru I.B road
Or say:
34.000
=
=
=
=
=
2.000
3.600
6.100
11.800
0.200
23.700
11 / 800
0 / 200
Or say:
24.000
0.000
2.000
2.132
0.200
=
=
4.332
Or say:
4.000
D) For Bricks :
Bricks from
Local
Total metalled road length
4.000
Or say:
4.000
2.200 kms
29.800 kms
2.132 kms
0.200 kms
34.332 kms
34.000 kms
2.000
3.600
6.100
11.800
0.200
kms
kms
kms
kms
kms
23.700 kms
24.000 kms
0.000
2.000
2.132
0.200
kms
kms
kms
kms
4.332 kms
4.000 kms
4.000 kms
4.000 kms
1 Earth work excavation for building foundations and depositing on bank for all lifts and with an initial lead
of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting
etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS
20 B (APSS 308). For Ordinary soil-Manual up to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4 Light mazdoor
Add LA charges
Unit
Rate
day
cum
320.00
116.48
0.364
0%
Excavation
Method
Seigniorage charges
cum
30.00
cum
146.48
14%
or say
2 Plain Cement concrete (1:5:10) Proparation nominal mix (coarse aggregate) for foundation levelling
courses and bellow flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying concrete in
foundations ramming in 15 cm layers finishing top surface to the required level curing etc.,complete fo
finished item of work, inluding centering, shuttering as per APSS. No. 402. for Machine Mix Base course
Unit
Rate
cum
cum
cum
KL
5.20
1393.43
513.42
77.00
129.600
0.900
0.450
1.200
hour
328.60
189.80
1.000
0%
day
day
cum
420.00
320.00
486.80
0.100
1.390
0%
cum
3066.85
14%
or say
3 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed
Hard Granite metal (coarse aggregate) from approved quarry including cost and conveyance of al
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labou
charges such as machine mixing, laying concrete, curing etc.,complete for finished item of work
centering with Steel up to 3.66, lift manuals per APSS. No. 402. for Staircase steps
P.C.C. M-20
Code
Material
Unit
Rate
cum
5.20
330.000
cum
513.42
0.450
cum
Kl
1920.72
77.00
0.900
1.200
hour
328.60
1.000
189.80
5%
420.00
320.00
486.80
0.100
1.390
5%
Mechinery
SOR P. No. 379/16
day
day
cum
cum
723.00
1.000
Add LA charges
cum
446.00
5%
cum
5364.86
5%
or say
4 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of wate
proof compound per bag of cement laid over roof when it is green including cost of all materials
seigniorage charges, including conveyance charges of materials and including all operational, incidenta
and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off
junctions of wall and slab etc,, complete for finished item of work
Unit
Rate
kg
cum
kg
5.20
513.42
24.00
10.080
0.021
0.200
day
day
day
cum
420.00
375.00
320.00
203.87
0.066
0.154
0.370
0%
cum
271.87
14%
or say
5 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges
sales & other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing and vibrating etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work for Slab thick 100 mm, centering with Stell up to 3.66, as
per APSS. No. 402.
M - 20 Nominal Mix Centering with Unsuported hight 3.66 M
Code
Unit
Material
Rate
cum
5.20
400.000
cum
1920.72
0.900
cum
513.42
0.450
Kl
77.00
1.200
hour
320.00
1.000
486.80
0%
165.70
1.000
136.60
0%
420.00
375.00
320.00
1307.99
0.133
0.267
3.600
0%
Water
Mechinery
SOR P. No. 379/16
hour
day
day
day
cum
cum
273.00
1.000
Add LA charges
cum
446.00
0%
cum
865.58
14%
or say
6 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete
wastage as per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT &
H for Bars below 36 mm dia including over laps and wastage, where weldeding require to be done
campulsorily including cost and conveyance of bars from approved sourses to site of work, binding wire
cover blocks and all incidental,operational, labour charges such as cutting, bending, placing in position
tying etc., and sales and sales & other taxes, on cost of materials for finished item of work. for HYSD (F.e
415) F1
HYSD (F.e 415) FI lift manual
Code
Material
Unit
Rate
Binding wire
Reinforcement steel (including
loading charges) (HYSD/TMT)
kg
M.T
70.00
34000.00
6.000
1.050
Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4
day
day
cum
420.00
320.00
7400.00
10.000
10.000
0%
cum
43520.00
14%
or say
7 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) using
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm
including cost, seigniorage and conveyance of all materials and water from approved source to work site
and all operational, incidental labour charges such as scaffolding, mixing moratar, constructing masonary
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) for Basement
Unit
Rate
kg
cum
cum
5.20
5.328
513.42
36.000
512.000
0.200
day
day
day
cum
420.00
375.00
320.00
915.60
0.240
0.560
1.890
0%
cum
3933.42
14%
Or say
8 Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3
1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm fixing in position
including constructing Brick masonry seat and CC Squatting plate including cost and conveyance of al
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges including al
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.04
BMW-D.09
BMW-D.10
Manpower
BMW-D.06
Unit
Rate
Coefficient
each
915.00
1.000
each
220.00
1.000
each
65.00
1.000
Add LA charges
each
288.00
0%
each
1200.00
14%
or say
9 Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend
10 litres capacity Dual Flush fixing in position including cost and conveyance of all materials, Sales tax
& Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
BMW-G.09
Manpower
BMW-D.12
Unit
Rate
Coefficient
each
1350.00
1.000
each
403.00
0%
each
1350.00
14%
or say
10 Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber o
plastic Buffers as per IS 2548-1996 fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
Supplying and Fixing best Indian
BMW-D.16
make plastic seat and lid for
Manpower
European water closets with rubber
BMW-D.17
Add LA charges
or plastic Buffers as per IS 25481996
Add Over Head Charges
Total rate per each
Unit
Rate
Coefficient
each
340.00
1.000
each
58.00
0%
each
340.00
14%
or say
11 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 o
Hindustan / Neycer or Parryware make Colour glazed with 'P' trap fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidenta
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
Supplying and Fixing European
each
1250.00
1.000
BMW-D.14
Water
Closet
of
1st
quality
Manpower
conforming
to IS:2556-Part-2-1973
BMW-D.15
Add LA charges
each
201.00
0%
of Hindustan / Neycer or Parryware
make Colour glazed with 'P' trap
Add Over Head Charges
each
1250.00
14%
Total rate per each
or say
12 Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalen
complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-D.24
Manpower
BMW-D.28
Unit
Rate
Coefficient
each
1150.00
1.000
each
288.00
0%
each
1150.00
14%
or say
13 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operationa
and Incidental charges including all labour charges for fixing at site etc; complete for finished itemof work
Code
Material
BMW-D.29
Manpower
BMW-D.30
Unit
Rate
Coefficient
each
810.00
1.000
Add LA charges
each
104.00
0%
each
810.00
14%
or say
14 Providing and fixing white glazed flat back bowl urinal of size 440mmx265mmx315mm with interna
flushing system with flat back large integrated overflow of approved make with CP spreader, C.P. waste
coupling, C.P. brass bottle trap, push cock of approved make including 38.10 mm PVC waste pipe out let,
of required length and 12.7 mm PVC connection with brass union nut C.P coated etc. all complete, fixing
in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
Code
Material
BMW-D.33
BMW-E.03
BMW-E.29
BMW-E.31
Unit
Rate
Coefficient
each
600.00
1.000
each
400.00
1.000
each
200.00
1.000
each
200.00
1.000
BMW-E.33
each
105.00
1.000
BMW-E.35
each
50.00
1.000
each
70.00
1.000
each
74.00
1.000
each
each
each
each
each
each
115.00
35.00
23.00
23.00
12.00
16.00
0%
0%
0%
0%
0%
0%
each
1699.00
14%
BMW-G.06
BMW-I.48
Manpower
BMW-D.36
BMW-E.04
BMW-E.32
BMW-E.34
BMW-E.36
BMW-I.49
LA
LA
LA
LA
LA
LA
charges
charges
charges
charges
charges
charges
=
=
=
=
=
=
(
(
(
(
(
(
BMW-D.33 )
BMW-E.03 )
BMW-E.31 )
BMW-E.33 )
BMW-E.35 )
BMW-I.49 )
or say
15 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating
fixing with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75 mm (3"
outlet pipe - 4 Kgs fixing in position including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Code
Material
BMW-C.41
Manpower
BMW-C.42
Unit
Rate
Coefficient
each
243.00
1.000
each
45.00
0%
each
243.00
14%
or say
or say
Code
Material
BMW-G.35
BMW-G.60
BMW-G.63
BMW-G.69
BMW-G.106
BMW-G.152
Unit
Rate
Coefficient
each
each
each
each
each
Rm
655.00
84.00
56.00
85.00
14.00
58.00
0.330
0.330
0.330
0.330
1.000
1.400
Rm
385.60
14%
or say
Code
Material
BMW-G.54
BMW-G.151
Unit
Rate
Coefficient
each
each
1490.00
177.00
0.330
0.330
Rm
550.11
14%
or say
19 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua tech o
equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96 mark with lid &
manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets
and over flow pipesProviding
but without
fittings
base (at
support for tanks etc., complete as directed by the
& Placing
on &
Terrace
Departmental Officers
for
finished
item
of
work.
all floor levels) polyethylene water
Material
BMW-G.01
Miscellaneous
BMW-G.02
lit
4.40
1.000
lit
0.44
0%
cum
4.40
14%
or say
20 Providing and fixing 12.7 mm heavy duty NP Sink cock Seiko/ Senior/ Nice or equivalent and 38.10 mm
PVC waste pipe out let, of required length and 12.7 mm PVC connection with brass union nut C.P coated
etc. all complete and fixing in position including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Material
S & F 12.7 mm heavy duty NP Sink
cock Seiko/ Senior/ Nice or
each
860.00
1.000
BMW-E.26
equivalent
Supply & Fixing 38.1 mm dia PVC
each
70.00
1.000
BMW-G.06
solid waste pipe outlet
Supplying & Fixing 12.7 mm PVC
connection with brass union nut C.P
each
74.00
1.000
BMW-I.48
coated
Miscellaneous
0%
Add LA charges = ( BMW-E.26 )
each
29.00
BMW-E.27
BMW-E.36
Add LA charges = ( BMW-E.35 )
each
12.00
0%
BMW-I.49
Add LA charges = ( BMW-I.49 )
each
16.00
0%
Add Over Head Charges
cum
1004.00
14%
or say
21 S & F CP Long body bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice o
equivalent fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing at site etc
complete for finished itemof work.
Code
Material
BMW-E.21
Manpower
BMW-E.25
Unit
Rate
Coefficient
each
470.00
1.000
each
40.00
0%
each
470.00
14%
or say
22 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-F.17
Manpower
BMW-F.18
Unit
Rate
Coefficient
each
530.00
1.000
each
36.00
0%
each
530.00
14%
or say
23 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
Unit
Rate
Coefficient
BMW-F.19
each
360.00
1.000
Manpower
BMW-F.20
Add LA charges
each
36.00
0%
each
360.00
14%
or say
24 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 15 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-F.21
Manpower
BMW-F.22
Unit
Rate
Coefficient
each
266.00
1.000
each
36.00
0%
each
266.00
14%
or say
25 S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.20
Manpower
BMW-I.21
Unit
Rate
Coefficient
each
121.00
1.000
each
36.00
0%
each
121.00
14%
or say
26 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.22
Manpower
BMW-I.23
Unit
Rate
Coefficient
each
105.00
1.000
each
55.00
0%
each
105.00
14%
or say
27 S & F 12.7 x 88.9 CP fancy shower fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
BMW-F.106
Manpower
BMW-F.107
Unit
Rate
Coefficient
each
215.00
1.000
Add LA charges
each
18.00
0%
each
215.00
14%
or say
28 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operationa
and Incidental charges including all labour charges for fixing at site etc; complete for finished itemof work
Code
Material
BMW-I.105
Manpower
BMW-I.106
Unit
Rate
Coefficient
each
378.00
1.000
Add LA charges
each
95.00
0%
each
378.00
14%
or say
29 Supply & Fixing wall mixer with telephonic shower arrangement with crutch and telephone shower with
flexible tube Jaquar make Continental series Chrome colour for bath tub with 7 years warranty / Jupite
Aqua Lines-JAL or equivalent series including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Code
Material
BMW-I.179
Unit
Rate
Coefficient
each
4590.00
1.000
each
4590.00
14%
or say
30 Supply & Fixing bath tub over flow set complete with over flow cap,450mm ball chain with rubber plug 7
Union bend with brass nuts Jaquar make, Chrome colour with 7 years warranty / Jupiter Aqua Lines-JAL o
equivalent series including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.180
Unit
Rate
Coefficient
each
942.00
1.000
each
942.00
14%
or say
31 Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm long bend pipe with wal
flange Jaquar make Continental series, Chrome finish with 7 years warranty / Jupiter Aqua Lines-JAL o
equivalent series including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.177
Unit
Rate
Coefficient
each
3252.00
1.000
each
3252.00
14%
or say
32 Supplying & fixing stainless steel sink size 20" x18" x 8 " (508x457.2x203.2mm) 1 mm thick with
accessories including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
Code
Material
BMW-I.123
Manpower
BMW-I.124
Unit
Rate
Coefficient
each
3620.00
1.000
Add LA charges
each
368.00
0%
each
3620.00
14%
or say
33 Constructing Constructing 457.2 mm x 457.2 mm (1'6"x1'6") dia brick masonry inspection chamber as pe
IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cemen
mortar 1:3 prop; thick both inside and outside fitted light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.
frame and cover of 20 Kg. and frames including excavating pits up to a depth of Inspection chamber up to
914.4 mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like
mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.
Code
Material
BMW-B.06
Unit
Rate
Coefficient
each
2626.00
1.000
each
2626.00
14%
or say
34 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating &
Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9"
C.I Frame and hinged cover and including cost and conveyance of all materials like cement, sand, bricks
water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labou
charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished
item of work as per Standard specification.
Code
Material
BMW-A.72
Unit
Rate
Coefficient
each
482.00
1.000
each
482.00
14%
or say
35 S & F GI union 12.70 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.01
each
each
29.00
29.00
1.000
14%
or say
36 S& F GI union 19.05 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.02
each
each
29.00
35.00
1.000
14%
or say
37 S& F GI union 25.4 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.03
each
each
53.00
53.00
1.000
14%
or say
38 S& F GI union 38.1 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.05
each
each
79.00
79.00
1.000
14%
or say
39 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80
Unit
Rate
Coefficient
Rm
131.00
1.000
Add LA charges
Rm
33.00
0%
each
131.00
14%
or say
40 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.81
Manpower
BMW-F.82
Unit
Rate
Coefficient
Rm
146.00
1.000
Add LA charges
Rm
33.00
0%
each
146.00
14%
or say
41 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.83
Manpower
BMW-F.84
Unit
Rate
Coefficient
Rm
191.00
1.000
Add LA charges
Rm
33.00
0%
each
191.00
14%
or say
42 S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.87
Manpower
BMW-F.88
Unit
Rate
Coefficient
Rm
301.00
1.000
Add LA charges
Rm
31.00
0%
each
301.00
14%
or say
undations and depositing on bank for all lifts and with an initial lead
dental, labour charges such as shoring ,sheeting, planking, strutting,
k including seigniorage excluding dewatering charges etc as per SS nual up to 3 M
BLD CSTN 2-1
Amount
116.48
0.00
30.00
146.48
19.94
166.42
166.40
723.00
23.19
5364.86
278.97
5643.83
5643.80
RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water
laid over roof when it is green including cost of all materials,
yance charges of materials and including all operational, incidental
ar, laying, rendering smooth and thread lining, curing, rounding off
te for finished item of work
308.90
320.00
0.00
165.70
0.00
55.86
100.13
1152.00
0.00
5925.78
592.58
273.00
0.00
865.58
117.85
983.43
983.40
420.00
35700.00
4200.00
3200.00
0.00
43520.00
5925.25
49445.25
49445.30
e glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm fixing in position
seat and CC Squatting plate including cost and conveyance of all
n materials to site, Operational and Incidental charges including all
omplete for finished itemof work.
Amount
915.00
220.00
65.00
0.00
1200.00
163.38
1363.38
1363.40
stem parry ware, slim line with internal components & short bend:
g in position including cost and conveyance of all materials, Sales tax
Operational and Incidental charges including all labour charges for
d itemof work.
Amount
1350.00
0.00
1350.00
183.80
1533.80
1533.80
e plastic seat and lid for European water closets with rubber or
d itemof work.
Amount
340.00
0.00
340.00
46.29
386.29
386.30
ke Colour glazed with 'P' trap fixing in position including cost and
Amount
1150.00
0.00
1150.00
156.57
1306.57
1306.60
Amount
810.00
0.00
810.00
110.28
920.28
920.30
Amount
600.00
400.00
200.00
200.00
105.00
50.00
70.00
74.00
0.00
0.00
0.00
0.00
0.00
0.00
1699.00
231.32
1930.32
1930.30
Amount
216.15
27.72
18.48
28.05
14.00
81.20
385.60
52.50
438.10
438.10
Amount
491.70
58.41
550.11
74.90
625.01
625.00
rrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua tech or
ge tank double layer confirming to ISI 12701/96 mark with lid &
locking arrangement & making necessary holes for inlet & outlets
ings & base support for tanks etc., complete as directed by the
m of work.
4.40
0.00
4.40
0.60
5.00
5.00
pe deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or
g cost and conveyance of all materials, Sales tax & Other taxes on
cidental charges including all labour charges for fixing at site etc;
Amount
470.00
0.00
470.00
63.99
533.99
534.00
Amount
360.00
0.00
360.00
49.01
409.01
409.00
et complete with over flow cap,450mm ball chain with rubber plug 7
ake, Chrome colour with 7 years warranty / Jupiter Aqua Lines-JAL or
conveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
942.00
128.25
1070.25
1070.30
rovision for overhead shower and 115mm long bend pipe with wall
es, Chrome finish with 7 years warranty / Jupiter Aqua Lines-JAL or
conveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
3252.00
442.76
3694.76
3694.80
Amount
2626.00
2626.00
357.53
2983.53
2983.50
m SWG gully traps conforming to ISI 651 & 4127 with C.I Grating &
ntermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9")
ding cost and conveyance of all materials like cement, sand, bricks,
e charges on all materials and all incidental and operational, labour
onstructing masonry, lift charges, curing etc., complete for finished
ation.
Amount
482.00
482.00
65.62
547.62
547.60
Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
131.00
0.00
131.00
17.84
148.84
148.80
Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
146.00
0.00
146.00
19.88
165.88
165.90
Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
191.00
0.00
191.00
26.00
217.00
217.00
Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
301.00
0.00
301.00
40.98
341.98
342.00
Toilet
1.50x1.1
5M
V
3.70M
V
V
V
D
D
D
V
V
5.28x1.11M
Bath
1.50x1.1
5M
Bath
1.50x1.1
5M
D
D
D
D
3.70M
V
V
V
V
V
Bath
1.50x1.1
5M
3.70M
V
Bath
1.50x1.1
5M
3.47x0.92M
Toilet
1.50x1.1
5M
Toilet
1.50x1.1
5M
V
Toilet
1.50x1.1
5M
3.70M
3.93M
3.05M
3.05M
3.05M
0.60
11.40M
V
5.28x1.11M