Sie sind auf Seite 1von 860

Specification report to accompany the Estimate for the work of

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code N


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
Estimate Amount Rs:

12.00 Lakh

Authority:- The work "Construction of Model Anganwadi Centre Building in Kesa

(Code No. 175) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist." Rs. 12.00 Lakhs, vid
the District Collector, East Godavari, with R.C. No. 133/ A3 / 2015, Dt.

-08-2015. In the proceeding

that a model Anganwadi Center Building was sanctioned at Kesavadasupalem Village - 1 with
number 175 under NABARD RIDF XX for an amount of Rs. 12.00 Lakhs.

It was also inform

Department was identified as executing agency for construction. Hence, the estimate is prepared
provisions.
Provisions :-

1 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils
soils and ordinary soils with Augoring and boring

2 Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
10m including all operational, incidental, labour charges

3 Filling with Sand in trenches, sides of foundations & basement from approved quarry consol
layer by watering and ramming

4 Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coars
foundation levelling courses and below flooring beds

6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded FOUNDATIONS, PLI
centering with up to 3.66, as per APSS. No. 402.
7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded
SLABS, centering with Stell up to 3.66, as per APSS. No. 402.

COLUMUNS, LI

8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded for for Sunshades
402.

9 Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar reinforcem
complete including wastage

10 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cemen
class bricks (Non-Modular or Traditional size) 23x11x7 cm for basement

11 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) using
23x11x7 cm Basement & Super Structure as per (APSS No.501 & 504)

12 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks h
strength of 2.5 N/sq.mm.

13 Supplying, fitting and placing Mild Steel 6mm (Fe 250/tmt IS 1786-1985) bar reinforcem
complete wastage

14 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1
compound per bag of cement

15 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top
4mm thick for finished item of work (APSS 901,903 & 904) for Celling plastering F1.
16 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat
thick for work (APSS 901,903 & 904) for Uneven faces F1.

17 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM
for work (APSS 901,903 & 904) for Even faces F1.
18 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement
mm thick over CC bed

19 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC be
toilets

20 Dadoing with ISO Glazed coloured wall tiles of any size and of 5 to 7 mm thick set over 12
(1:5) Prop.based coat

21 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm m


Shahabad stone length equal to flooring stones,

22 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved
over base coat of cement primer

23 Painting to New wood work with two coats of ready mixed synthetic enamel paint first qua
give an even shade

24 Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (ba
513 of 'D" quality

25 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door fram
extruded PVC section (Nandi or equivalent)
26 Supply and Fixing of Door with Double leaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood
size 75mm x 100mm with Flush Door Shutter
27 Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood
size 75mm x 100mm with Flush Door Shutter

28 NCL or equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDIN
PROVISION)
29 Water supply & Sanitary items
L.S. Provisions
1 Provision for VAT @ 5% on Rs
2 Provision for Price escalation - LS 3 Provision for Seigniorage Charge (Statement enclosed)
4 Providing Electicity arrangements including VAT
5 Provision for NAC @ 0.1%
6 Provision for Insurance @ 0.385%
7 Provision for Paper publication, Unforeseen items and Rounding of

The rates for the estimate are worked out based on 2015-16 Common SSR for building it
will be carried out as per the APSS and other circulars issued by the higher authorities from time to t

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Eng


(R&B) Sub-division

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engi
(R&B) Circle : Ka

o accompany the Estimate for the work of

entre Building in Kesavadasupalem - 4 (Code No. 178) of


dal Under NABARD RIDF XX in E.G. Dist.
12.00 Lakhs

ruction of Model Anganwadi Centre Building in Kesavadasupalem - 1


NABARD RIDF XX in E.G. Dist." Rs. 12.00 Lakhs, vide proceedings of

No. 133/ A3 / 2015, Dt.

-08-2015. In the proceedings, it was informed

s sanctioned at Kesavadasupalem Village - 1 with Anganwadi code


amount of Rs. 12.00 Lakhs.

It was also informed that the R&B

y for construction. Hence, the estimate is prepared with the following

C. Piles for building foundations in loamy, clayey soils like Black cotton
d boring

ndations and depositing on bank for all lifts and with an initial lead of
labour charges

undations & basement from approved quarry consolidating deposited

rtion nominal mix (cement: fine aggregate: Coarse aggregate) for


ooring beds

nal mix using 20 mm size graded FOUNDATIONS, PLINTH, PEDASTALS,


No. 402.

inal mix using 20 mm size graded


s per APSS. No. 402.

COLUMUNS, LINTELS, BEAMS, &

nal mix using 20 mm size graded for for Sunshades as per APSS. No.
415/ tmt grade as per IS 1786-1985) bar reinforcement VRCC works

walls in Super structure with CM ( 1:8) prop (Cement:Sand) using 2nd


ize) 23x11x7 cm for basement

nel walls in Super structure with CM ( 1:8) using 2nd class bricks
e as per (APSS No.501 & 504)
mm thick in CM (1:6) using second class bricks having a crushing

el 6mm (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works

CC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof

mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3),
S 901,903 & 904) for Celling plastering F1.

k, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm
Uneven faces F1.

base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
faces F1.

d ... mm thick stones, set over base coat of cement mortar (1 : 8) 12


coat of cement mortar (1:8), 12 mm thick over CC bed already laid for

tiles of any size and of 5 to 7 mm thick set over 12mm thick in C.M.

15 cm height/risers of steps with 15 to 18 mm mm thick polished


stones,

Plastic Emulsion paint of superior quality of approved brand and shade

oats of ready mixed synthetic enamel paint first quality all shades to

tilators with sections made of pre - painted steel (base steel as per IS

oilets Door of size 075 x 2.00M providing door frame made of hollow
nt)

eaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood Frame of sections
utter

af shutter, Door Size 1.00x2.13 mtrs with Sal Wood Frame of sections
utter
WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDINGS WITH GRILL

ed out based on 2015-16 Common SSR for building items and the work
rculars issued by the higher authorities from time to time.

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

NAME OF WORK :- Construction of Model Anganwadi Centre Building in Kesavadasu


No. 178) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G.

GENERAL ABSTRACT
Sl. No.

Description

PART "A"
Construction of Stilt floor

Water supply and Sanitation work

PART "B"
Provision for VAT @ 5% on Rs

Provision for Price escalation - LS -

Provision for NAC @ 0.1%

Provision for Seigniorage Charge (Statement enclosed)

Providing Electicity arrangements including VAT

L.S

Provision for Insurance @ 0.385%

L.S

Provision for Paper publication, Unforeseen items and Rounding of

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Total (1 to 3)

Rs 11,27,495

Deputy Executive E
(R&B) Sub-divis

Superintending En
(R&B) Circle :

del Anganwadi Centre Building in Kesavadasupalem - 4 (Code


tipalli Mandal Under NABARD RIDF XX in E.G. Dist.

GENERAL ABSTRACT
Description

Amount
11,03,091
,24,404
11,27,495
Rs 11,27,495

,56,000
,,500
,1,127
8,768
,1,000
,4,341

reseen items and Rounding of

769
12,00,000

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

Name of Work:-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 17


Mandal Under NABARD RIDF XX in E.G. Dist.

ESTIMA
DETAILED CUM ABSTRACT ESTIMATE (GROUND FLOOR)
Measurements
Quantity
Sl.
Description
No
No
L
B
D
3
1
2
4
5
6.00
7
1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations
in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS
2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire
charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and
for finished item of work for piles of following diameters.
300mm dia
For C1 Main Columns
For toilet columns

9
4

x
x

2
1

---

---

4.00
3.00

72.00
12.00
84.00
RM

Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils with Augoring and boring equipment in site as
per IS 2911 - 1980 as per approved designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for
all depths and for finished item of work for piles of following diameters.

750mm dia
For C1 Main Columns

--

--

18.00
18.00
Nos.

Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work but exincluding
seigniorage charges and dewatering charges in Ordinary Soil-Manual Means-Upto 3M depth
etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M

C1 pile
building

caps

for

main

1.200

1.200

0.50

6.48

For toilets

0.800

0.800

0.35

0.90

deduct for pile bores


Add for variations

/4*0.3*0.3*0.5

-0.64
0.26
7.00
cum

Filling with Sand in trenches, sides of foundations & basement from approved quarry
consolidating deposited layer by watering and ramming, including all operational, incidental,
labour charges, complete including cost and conveyance of sand / gravel, but excluding
Seigniorage charges, etc; for finished item of work. (APSS No 309 & 310). for:-Sand filling

Below pile caps


For toilets

9
4

x
x

1
1

1.20
0.80

1.20
0.80

0.10
0.10

1.30
0.26

Sl.
No

Description

No

Wash area
In basement
Kitchen
Store
Antinatal Room
Verandha
Wash area
Toilets

L
4
1.05

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
2

2.52
1.67
4.31
4.04
4.31
2.64
1.82

Measurements
B
5
1.05
2.13
2.13
2.74
6.52
1.30
1.10
1.22

Quantity
D
6.00
0.15
0.90
0.90
0.90
0.90
0.90
0.90
0.90

Add for variations

7
0.17
4.83
3.20
10.62
23.71
5.04
2.61
4.00
0.26
56.00
cum

Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5)
hard Granite metal upto Plinth level from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to site and sales & other taxes
on all materials and including all charges for mixing, laying concrete in foundations ramming
in 15 cm layers finishing top surface to the required level curing, but excluding seigniorage
charge etc., complete for finished item of work. (APSS No. 402) for:-Machine Mix-PCC (1:5:10)
NOMINAL MIX

C1 pile caps
For toilets
deduct for pile bores
wash area
Add for variations

9
4
9
1

x
x
x
x

1
1
2
1
---

1.000
2.000
0.100
0.800
0.800
0.100
/4*0.30*0.30*0.10
1.05
1.05
0.15
-------

1.80
0.26
-0.10
0.17
0.17
2.30
cum

VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table


9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including HIRE CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
to site, and sales & other taxes on all materials including all operational, incidental and
labour charges such as machine mixing, laying concrete, curing but excluding Seigniorage
charges, etc.,complete for FOUNDATIONS, PLINTH, PEDESTALS, PLINTH BEAM, COLUMNS,
LINTLES, ROOF BEAMS, ROOF SALBS but excluding cost of steel and its fabrication charges
for finished item of work. for: VRCC : M-20 Nominal Mix

For Piles :
For piles
for toilets
For bulbs
Add for variations

For Pile caps :


For building
For toilets

9
4
9

x
x
x

2
1
2

9
4

x
x

1
1

/4*0.30
0.300
3.50
/4*0.30
0.300
3.50
4*/3*0.375*0.375*0.375

0.80
0.80

1.80
0.80

0.50
0.35

4.53
1.01
3.97
0.09
9.60
cum
6.48
0.90

Sl.
No
1

Description
2
Add for variations

No
3

L
4

Measurements
B
5

Quantity
D
6.00

7
0.12
7.50
cum

Sl.
No
1
8

Description

No

2
For Plinth beams :For Plinth beams along the
building
For Plinth beams across the
building

L
4

Measurements
B
5

Quantity
D
6.00

8.92

0.23

0.30

1.85

6.52

0.23

0.30

1.35

1
1
1
1
1

x
x
x
x
x

2
1
9
1
1

4.19
2.13
0.23
8.76
1.38

0.23
0.23
0.30
0.23
0.23

0.30
0.30
0.30
0.23
0.23

0.58
0.15
-0.19
0.46
0.07
0.33
4.60
cum

0.23

0.30

3.00

1.86

0.23

0.23

3.00

0.63
0.31
2.80
cum

8.92

0.23

0.30

1.85

6.52

0.23

0.30

1.35

1
1
1

x
x
x

9
2
2

0.23
3.00
1.20

0.30
0.23
0.23

0.30
0.23
0.23

-0.19
0.32
0.13
0.14
3.60
cum

11 For Roof slabs of 125mm thick :


Over entire building
1 x
Front projection
1 x
Toilets
1 x
Add for variations

1
1
1

10.12
4.65
4.20

8.17
0.60
3.04

-------

82.68
2.79
12.77
0.16
98.40
sqm

12 For Lintels :
Over Windows W
Over Windows W1
Over Doors D
Over Doors D1
Toilet Doors
Add for variations

1
1
1
1
1

1.80
1.35
1.65
1.50
1.35

0.23
0.23
0.23
0.23
0.23

0.15
0.15
0.15
0.15
0.15

Deduction for Columns


For toilets
Add for variations

For Columns :For building columns upto


bottom of GF slab
For toilets
Add for variations

10 For Roof beams :For roof beams along the


building
For roof beams across the
building
Deduction for Columns
Toilets
Add for variations

5
3
2
3
2

x
x
x
x
x

0.31
0.14
0.11
0.16
0.09
0.19
1.00
cum

Sl.
No
1

Measurements
Quantity
L
B
D
3
2
4
5
6.00
7
Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed
Hard Granite metal (coarse aggregate) from approved quarry including cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
for Sun Shade 62.50 mm thick, for Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per
APSS. No. 402. for Sunshades Ground floor.
Description

No

13 a) Ground Floor for 62.50mm average thick 0.75M wide Sun shades
For windows W
4 x
1
1.800
0.750
--For windows W1
3 x
1
1.350
0.750
--Add excess and rounding of ---- LS -----

5.40
3.04
0.56
9.00
Sqm

14 Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done compulsorily including cost and conveyance of
bars from approved sources to site of work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying etc., and sales
& other taxes, on cost of all materials complete for finished item of work for:-HYSD with lap
splicing Lift Manual

For piles concrete


For pile caps
For columns
For Plinth beams
For roof beams
For 125mm thick slab
For Lintels
Add for variations

720.30
750.00
280.00
460.00
432.00
984.00
100.00
291.67
4017.97
Kgs
Say
4.02
MT
15 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N
including cost, seigniorage and conveyance of all materials and water from approved source to w
and all operational, incidental labour charges such as scafolding, mixing moratar, constructing ma
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) for baseme

Walls

9.60
7.50
2.80
4.60
3.60
12.3
1.00

1
1
1

x
x
x

3
3
1

75.00
100.00
100.00
100.00
120.00
80.00
100.00

8.460
6.970
4.300

Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs

0.230
0.230
0.230

/
/
/
/
/
/
/

Cum
Cum
Cum
Cum
Cum
Cum
Cum

0.45
0.45
0.45

2.63
2.16
0.45

Sl.
No
1

Description

No

3
1 x
3
1 x
2
Add excess for and rounding of ---- LS ----2
Toilet room walls

Measurements
L
B
4
5
2.270
0.230
3.000
0.230

Quantity
D
6.00
0.45
0.45

7
0.70
0.62
2.42
0.03
9.01
Cum

Brick Masonary 225 mm thick for pannel walls in Super structure with CM (1:8) prop (Cement:Sand
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N
including cost, seigniorage and conveyance of all materials and water from approved source to w
and all operational, incidental labour charges such as scafolding, mixing moratar, constructing ma
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) fo
Structure upto 3.66 M Lift Manual
16 Ground floor for Super Structure
Walls
1 x
1
Deduct Columns -1 x
1
1 x
1
Deduct Columns -1 x
1
1 x
1
Deduct Columns -1 x
1
1 x
1
1 x
1
Deduct Columns -1 x
1
Deduct windows W1
-3 x
1
Deduct Windows W
-5 x
1
Deduct doors D1
-1 x
1
Deduct doors D
-2 x
1
Toilet room walls
2 x
1
2 x
1
deduct doorsD3
2 x
1
Add excess for and rounding of ---- LS -----

8.460
0.230
5.220
0.230
4.310
0.230
3.970
6.450
0.230
0.750
1.200
0.900
0.230
2.270
2.560
0.750

0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230
0.230

3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.20
1.20
2.10
3.00
3.00
3.00
2.10

5.84
-0.16
3.60
-0.16
2.97
-0.16
2.74
4.45
-0.16
-0.62
-1.66
-0.43
-0.32
3.13
3.53
0.72
0.19
23.50
Cum

17 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a c
strength of 2.5 N/sqmm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free end
reinforcement pegged into mortar joints of main brick walls were applicable including co
conveyance of all materials and water from approved sources to work site, and including all oper
incidental, labour charges such as scafolding mixing mortor constructing masonary lift charges,
etc. complete but excluding the cost of steel and its fabrication charges for finished item of work
SS 509 & 501 upto 3.66 M Lift Manual
Ground floor Super structure
Walls
1 x
1 x
1 x
deduct Doors D1 -2 x
deduct Opening -1 x
Toilets
1 x

1
1
1
1
1
1

2.13
4.31
5.30
0.900
0.900
1.82

-------------

3.00
3.00
3.00
2.10
2.10
3.00

6.39
12.92
15.90
-3.78
-1.89
5.46

Sl.
No
1

Description

No

L
4

3
2
Add excess and rounding of ---- LS -----

Measurements
B
5

Quantity
D
6.00

7
0.20
35.20
Sqm

18 Supplying, fitting and placing Mild Steel 6mm (Fe 250/tmt IS 1786-1985) bar reinforcement
VRCC works complete wastage as per drawings and technical specifications Clause 1000 and
1202 MORD & 1100,1600 MORT & H for Bars 6 mm dia including over laps and wastage,
where weldeding require to be done campulsorily
from

approved

sourses

to

site

of

work,

including cost and conveyance of bars

binding

wire,

cover

blocks

and

all

incidental,operational, labour charges such as cutting, bending, placing in position, tying


etc., and sales and sales & other taxes, on cost of materials for finished item of work. for
MILD STEEL (F.e 250) F1
Ground Floor 6mm MS Steel (Fe-250)
1 x
1
Reinforcement brick
masonry

3.520
cum

x 14 kgs/cum

0.050
0.050
MT

19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
proof compound per bag of cement laid over roof when it is green including cost of all m
seigniorage charges, including conveyance charges of materials and including all operational, in
and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, roun
junctions of wall and slab etc,, complete for finished item of work for first floor upto 3.66 M Lift Man

Ground loor Impervious coat in CM (1:3)


Over roof slab
1 x
1
Front projection
1 x
1
Add excess and rounding of ---- LS -----

10.12
4.65

8.17
0.60

-----

82.68
2.79
0.03
85.50
Sqm

20 Ceiling Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat
thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like c
sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials,
operational, incidental charges on materials and including cost of all labour charges for mixing
finishing, scafolding, lift charges, curing as directed by Engineer - in - charge etc., complete for
& Even faces and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Plasterin
CM (1:3) & (1:5): 12 mm Scafolding upto 3.66 M Lift Manual

Ground in CM (1:5) & (1:3)


Kitchen
1
Store
1
Antinatal
1
Hall
1
Verandah
1
Slab Entenstion
2
2
1

x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1

2.52
1.67
4.31
4.04
4.31
8.17
10.12
4.77

2.13
2.13
2.74
6.52
1.53
0.60
0.60
0.60

..
..
..
..
..
..
..
..

5.37
3.56
11.80
26.34
6.59
9.80
12.14
2.86

Sl.
No
1

Description

No

3
2
Toilets
2 x
1
Add excess corners and rounding of ---- LS -----

L
4
1.82

Measurements
B
5
1.22

Quantity
D
6.00
..

7
4.44
2.60
85.50
Sqm

21 Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4m
in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cemen
water etc., to site, and sales & other taxes on all materials and including all operational, in
charges on materials and including cost of all labour charges for mixing mortar, finishing, scafold
charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for E
& Uneven Surfaces of Brick Wall for finished item of work. (SS 901,903 & 904) for:-Plastering 2/
(1:4) & (1:6): 20 mm Scafolding upto 3.66 Lift Manual

Ground in CM (1:6) & (1:4) 20mm thick


2 x
1

8.920

---

3.35

59.76

6.970

---

3.35

46.70

5.400

---

3.35

18.09

4.310

---

3.05

13.15

x
1
x
1
x
1
x
1
x
1
x
1
x
1
x
1
of ---- LS -----

2.130
0.750
1.200
0.900
1.050
3.000
2.270
0.750

-----------------

3.05
1.20
1.20
2.10
2.10
3.35
3.00
2.10

6.50
-2.70
-7.20
-5.67
-4.41
20.10
20.43
-3.15
0.90

1
deduct windows W1
-3
deduct Windows W
-5
deduct doors D1
-3
deduct doors D
-2
Toilets
2
3
deduct doors D2
-2
Add excess corners and rounding

162.50
Sqm

22 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm
CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cemen
water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all oper
incidental charges on materials and including cost of all labour charges for mixing mortar, fi
scafolding, lift charges, curing as directed by Engineer - in - charge etc., complete for Internal
faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Pla
2/c in CM (1:4) & (1:6): 12 mm Scafolding upto 3.66 Lift Manual

Ground Floor in CM (1:6) & (1:4) 12mm thick


2 x
1
8.920

deduct windows W1
deduct Windows W

---

3.05

54.41

6.970

---

3.05

42.52

5.400

---

3.05

16.47

4.310

---

3.05

13.15

1
-3
-5

x
x
x

1
1
1

2.130
0.750
1.200

-------

3.05
1.20
1.20

6.50
-2.70
-7.20

Sl.
No
1

Description

No

3
-3 x
-2 x
2 x
3 x
deduct doors D2
-2 x
Add excess and rounding of ---- LS ----2
deduct doors D1
deduct doors D
Toilets

1
1
1
1
1

Measurements
L
B
4
5
0.900
--1.050
--3.000
--2.270
--0.750
---

Quantity
D
6.00
2.10
2.10
3.00
3.00
2.10

7
-5.67
-4.41
18.00
20.43
-3.15
1.65
150.00
Sqm

23 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement morta
12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1
filling joints nearly, including cost of all materials like flooring stone, cement, sand, and wat
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., comp
finished item of work, for F1
Kitchen

2.52

2.13

..

5.37

Store

1.67

2.13

..

3.56

Antinatal

4.31

2.74

..

11.80

Hall

4.04

6.52

..

26.34

1 x
1
Verandha
Add excess and rounding of ---- LS -----

4.31

1.30

..

5.60
0.23
52.90
Sqm

24 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed
laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per
jointed neatly with white cement paste to full depth mixed with pigment of matching shade, in
cost of all materials like cement, sand water and tiles, etc., complete for finished item of work
(APSS No.701 & 707). for Lift Manual
Ground Floor Ceramic tiles flooring
2 x
1
Toilet
Add excess and rounding of ---- LS -----

1.82

1.22

---

4.44
0.27
4.71
Sqm

25 Dadoing with ISO Glazed coloured wall tiles of any size and of 5 to 7 mm thick set over 12mm
C.M. (1:5) Prop.based coat and neat cement paint spread at the rate 3.30 Kgs of Cement paste fix
pigments of machine shade, including cost and conveyance of all materials and water etc., from ap
sources to work site all operational, incidental labour charges such as mixing mortar fixing in posi
charges, watering curing etc., complete for finished item of work. (APSS No 701 & 707) for Bath
Lift Manual
1st floor Dadoing for walls
Toilet
2 x
2
2 x
1
deduct doors
2 x
-1
Add excess and rounding of ---- LS -----

1.82
1.22
0.75

-------

1.50
1.50
1.50

10.92
3.66
-2.25
0.65
12.98
Sqm

26 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick p


Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with
slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white
paste mixed with pigment of matching shade to full depth, including cost of all materials like Sh
stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for

Measurements
Quantity
Sl.
Description
No
No Providing skirting to internal walls to 15 cm height/risers
L
B
D
of steps with 15 to 18 mm mm thick p
3
1 Shahabad stone
2 length equal to flooring
4 over base coat
5
6.00
7 thick with
stones, set
of CM
(1:3) 12 mm
slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white
paste mixed with pigment of matching shade to full depth, including cost of all materials like Sh
stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for
item of work, including the cost of conveyance of all materials for F1
13.00
Sqm
27 Painting to New walls with two coats of Plastic Emulsion paint of superior quality of approved
brand and shade over base coat of cement primer grade -I making three coats in all to give
an even shade after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental
and labour charges such as scafolding charges, lift charges, curing etc., complete for
finished item of work in all floors for Walls.(APSS No. 912) in All Floors
150.00
sqm
28 Whiting to new walls and ceiling in two coats with Surya cem or equavalent quality to give an
even shade after thoroughly brushing the surface to remove all loose powdered materials
including cost and conveyance of all materials and water to site, sales & other taxes, all
operational, incidental and labour charges such as cleaning the surface, painting, curing etc.,
complete for finished item of work for internal walls. (APSS No.901 & 908) in All Floors

200.00
sqm
29 Painting to New wood work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coat Primer with Luppam finishing after
thoroughly brushing the surface to remove all remains including cost and conveyance of all
materials to site, sales & other taxes, all operational, incidental and labour charges etc.,
complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
40.00
sqm

30 Supply and fixing of Fixed Louvered Ventilators with sections made of pre - painted steel (base
per IS 513 of 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy
of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated w
microns thick alkyd backer with total coated thickness of 0.6mm. Section for louvered ventilato
should be of 33x57mm. All the above closed and seamed sections should be made out of single sh
with stitch at a single place as per enclosed drawings; The ventilators should be paneled with
pinhead glass with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to
mitre joined with corner bracket. Gaskets are to be made of Ethyl propylene Diamine monomer
Corner brackets made of CRCA with Zinc Phosphate. The above frames should be fixed to the c
/masonry wall by means of self expanding brackets & screws including 10 mm square guard bars
pitch and all taxes complete for finished item of work.

Sl.
No

Description

No

Toilet

L
4
1

0.60

Measurements
B
5
---

Quantity
D
6.00
0.45

7
0.54
0.54
Sqm

Measurements
Quantity
L
B
D
3
1
2
4
5
6.00
7
31 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame m
hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 X 57mm with t
thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. T
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) providi
shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 mm with
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking arrange
The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm section m
and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be hori
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door
during the fabrication of the door shutter at those points wherever the hardware is fixed on to t
shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete with all materials conveyance
including providing all fixtures, as per the given design for finished item of work as directed
Departmental Officers for finished item of work.

Sl.
No

Description

Toilets

No

2.00
2.00
nos

32 Supply and Fixing of Door with Double leaf shutter, Door Size 1.05x2.13 mtrs with Sal Wood F
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with com
ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts
long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long M.S.Powder Coated Aldro
125mm long M.S.Powder Coated butt hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1N
stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials
all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtur
complete for finsihed utem of work.

Building D Doors

2.00
2.00
nos

33 Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood Fr
sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with com
ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts
long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No, 300mm long M.S.Powder Coated Aldro
125mm long M.S.Powder Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1N
stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials
all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtur
complete for finsihed item of work.

Building D Doors

2.00
2.00
nos

Measurements
Quantity
L
B
D
3
1
2
4
5
6.00
7
34 NCL or equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUJILDINGS WITH
PROVISION) Providing and fixing of windows made of pre-painted stgeel (Base steel as per IS 513
mm thick galvanized as per IS 277 with Zinc of 150 GSM). Primer coated with epoxy primer
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated w
microns thick alkyd backer. Section for outer frame should be of 72 x 55mm , centre mullion shou
72 x 50mm, section for fixed glass beading section should be of 12 x12 mm and section for
should be of 47x20mm .Outer frame and mullions to have rebate for glazed shutters, fly mesh
20mm provision for Guard bars / Grills. The fly mesh shutter section should be of 20 x40 mm . the
are to be cut to length meter joined with corner bracket. Centre mullion are to be fixed with
cap , seccolor stay, seccolor handles, seccolor latch 2 Nos. of stainless Steel heavy duty Pivot
shall be provided per shutter. The windows should be panneled with 5mm thick pinheaded galss a
Mesh for fly mesh shutter (304 grade).Rubber Gaskets are provided all round the glass . The
Frames should be fixied to the concrete /masonry wall by means of self expanding screws.inc
10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work.
Double shutter Window with vertical mullion 30
(914.4mm x 1219.2mm) / ( 40x40 1219.2mm x 1219.2mm) outer frame section size of 72
shutter frame section size of 47x20mm. Mullion section size of 72x50mm.

Sl.
No

Description

Building D Doors

No

5
3

x
x

1
1

1.2
0.90

1.20
1.20

7.20
3.24
10.44
sqm

Total Amount

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Deputy Executi
(R&B) Sub-d

Superintendin
(R&B) Circ

lding in Kesavadasupalem - 4 (Code No. 178) of Sakhinetipalli


r NABARD RIDF XX in E.G. Dist.
ESTIMATE Rs. 11.03 LAKHS

RACT ESTIMATE (GROUND FLOOR)


Rate per
8

Amount
9

191.00

16044

358.00

6444

231.60

1622

Rate per
8

Amount
9

628.70

35207

3484.40

8014

6742.40

64754

Rate per
8
7564.00

Amount
9
56730

Rate per
8

Amount
9

9480.00

43608

8817.00

24688

8576.00

30874

951.00

93578

9005.00

9005

Rate per
8

681.00
1 Sqm

49445.00

uper structure with CM ( 1:8) prop (Cement:Sand) using


23x11x7 cm having a crushing strength of 2.5N/sq.mm
materials and water from approved source to work site
as scafolding, mixing moratar, constructing masonary,
of work as per (APSS No.501 & 504) for basement

Amount
9

6,129

198769

Rate per
8

4469.00
1 Cum

Amount
9

40,266

uper structure with CM (1:8) prop (Cement:Sand) using


23x11x7 cm having a crushing strength of 2.5N/sqmm
materials and water from approved source to work site
as scafolding, mixing moratar, constructing masonary,
tem of work as per (APSS No.501 & 504) for Super

4919.00
1 Cum

n CM (1:6) using second class bricks having a crushing


m M.S plain rods in ever third layer with free ends of the
ain brick walls were applicable including cost and
ved sources to work site, and including all operational,
xing mortor constructing masonary lift charges, curing,
its fabrication charges for finished item of work as per

115,597

Rate per
8
597.00
1 Sqm

52672.00
1 MT

Amount
9
21,014

2,634

b surface with CM(1:3), 20mm thick with 1kg of water


roof when it is green including cost of all materials,
es of materials and including all operational, incidental
ndering smooth and thread lining, curing, rounding of
d item of work for first floor upto 3.66 M Lift Manual

332.00
1 Sqm

ase coat of 8mm thick in CM (1:5) and top coat of 4mm


uding cost and conveyance of all materials like cement,
charges, sales & other taxes on all materials, and all
including cost of all labour charges for mixing mortar,
ed by Engineer - in - charge etc., complete for Internal
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
ft Manual

28,386

Rate per
8

318.00
1 Sqm

Amount
9

27,189

t of 16 mm thick in CM (1:6) and top coat of 4mm thick


cost and conveyance of all materials like cement, sand,
all materials and including all operational, incidental
our charges for mixing mortar, finishing, scafolding, lift
ted by Engineer - in - charge etc., complete for External
of work. (SS 901,903 & 904) for:-Plastering 2/c in CM
nual

315.00
1 Sqm

t of 8mm thick in CM (1:6) and top coat of 4mm thick in


ost and conveyance of all materials like cement, sand,
sales & other taxes on all materials, and all operational,
ost of all labour charges for mixing mortar, finishing,
gineer - in - charge etc., complete for Internal & Even
nished item of work. (SS 901,903 & 904) for:-Plastering
66 Lift Manual

51,188

Rate per
8

307.00
1 Sqm

Amount
9

46,050

ick stones, set over base coat of cement mortar (1 : 8)


f slab, including pointing with cement mortar 1:3 duly
ls like flooring stone, cement, sand, and water etc.,
harges for dressing of flooring stones etc., complete for

490.00
1 Sqm

25,921

cement mortar (1:8), 12 mm thick over CC bed already


of honey like consistency spread @ 3.3.kgs per sqm &
pth mixed with pigment of matching shade, including
tiles, etc., complete for finished item of work as per

897.00
1 Sqm

4,225

ny size and of 5 to 7 mm thick set over 12mm thick in


spread at the rate 3.30 Kgs of Cement paste fixed with
nveyance of all materials and water etc., from approved
our charges such as mixing mortar fixing in position, lift
ed item of work. (APSS No 701 & 707) for Bath rooms

842.00
1 Sqm

ht/risers of steps with 15 to 18 mm mm thick polished


et over base coat of CM (1:3) 12 mm thick with cement
e of 3.30 kgs per sqm and jointed with white cement
ull depth, including cost of all materials like Shahabad
luding seigniorage charges, etc., complete for finished

10,929

Rate per
8

543.00
1 Sqm

Amount
9

7,059

126.55

18983

26.30

5260

155.90

6236

ith sections made of pre - painted steel (base steel as


with zinc of 120 GSM) primer coated with epoxy primer
er paint of 12-16 microns thick and back coated with 5-7
kness of 0.6mm. Section for louvered ventilator frame
eamed sections should be made out of single sheet and
wings; The ventilators should be paneled with 4 mm
mer Gasket (EPDM). The sections are to be cut to length
be made of Ethyl propylene Diamine monomer(EPDM).
ate. The above frames should be fixed to the concrete
s & screws including 10 mm square guard bars with 6"
ork.

Rate per
8

3334.00
1 Sqm

Amount
9

1,800

Rate per

8
or of size 075 x 2.00M providing door frame made of
nt) having dimensions of 40 X 57mm with the wall
h seasoned wood plank at the hinges side. The door
VC DOOR FRAME (Nandi or Equivalent) providing door
n(Nandi or equivalent) of 20mm X 200 mm with the wall
o 4 no's with tongue and groove locking arrangements.
e wall thickness of 1.5mm +/- 0.15mm section mitre-cut
m plastic brackets. The shutter shall be horizontally
ood batons shall be reinforced inside the door shutter
e points wherever the hardware is fixed on to the door
ent) complete with all materials conveyance charges
design for finished item of work as directed by the

4454.00
each

Amount
9

8,908

er, Door Size 1.05x2.13 mtrs with Sal Wood Frame of


tter Solid Bond Wood black board type with commercial
fixtures such as M.S.Powder Coated Tower Bolts 250mm
ng 2 Nos, 300mm long M.S.Powder Coated Aldrops 1No,
, 300 mm long M.S.Powder Coated Flat latch 1No, Door
her Taxes cost and convenyance of all materials to site
n shutter Fixing in position , with Hardware fixtures etc.,

7043.30
each

14,087

er, Door Size 1.00x2.13 mtrs with Sal Wood Frame of


tter Solid Bond Wood black board type with commercial
fixtures such as M.S.Powder Coated Tower Bolts 200mm
ng 1 No, 300mm long M.S.Powder Coated Aldrops 1No,
s, 300 mm long M.S.Powder Coated Flat latch 1No, Door
her Taxes cost and convenyance of all materials to site
n shutter Fixing in position , with Hardware fixtures etc.,

6871.00
each

13,742

Rate per

8
(SUITABLE FOR RESIDENTIAL BUJILDINGS WITH GRILL
of pre-painted stgeel (Base steel as per IS 513 of 0.60
150 GSM). Primer coated with epoxy primer of 5-7
int of 12-16 microns thick and back coated with 5-7
e should be of 72 x 55mm , centre mullion should be of
ion should be of 12 x12 mm and section for shutter
s to have rebate for glazed shutters, fly mesh and a
sh shutter section should be of 20 x40 mm . the section
bracket. Centre mullion are to be fixed with mullion
tch 2 Nos. of stainless Steel heavy duty Pivot hinges
be panneled with 5mm thick pinheaded galss and S.S.
Gaskets are provided all round the glass . The Above
ry wall by means of self expanding screws.including
etc., complete for finished item of work.
Double shutter Window with vertical mullion 30 x 40
m x 1219.2mm) outer frame section size of 72x50mm
ction size of 72x50mm.

5570.00
sqm

Amount
9

58,151

1,103,091

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

DETAILED CUM ABSTRACT ESTIMATE FOR WATER SUPPLY AND SANITARY


Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code
Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
Sanitary & water supply installations

Esti
Measurements
Sl.
No
1

Description of item

No

Quantity
Cum /
Sqm / MT /
Nos

Supply & fixing of PVC low level system parry ware, slim line with internal components & short
bend: 10 Litres capacity Single Flush fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.

toilet

2.00
nos

Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st
qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware /
Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st
quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well
above the joint to stop leakage at the joint etc., complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for
finished item of work.

toilet

2.00
2.00
nos

Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P.
Grating fixing with white cement as per site requirements with standard practice for 100 mm
dia Inlet- 75 mm (3") outlet pipe - 4 Kgs fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.

At for toilets

2.00
2.00
nos

Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend 87.5
Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR Pipe fittings,
Iron Clamps and all other accessories and fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.

W.C to Manhole
To SEPTIC TANK

2.00

4.00

2.00

2.00

Measurements
Sl.
No

Description of item

No

Quantity
Cum /
Sqm / MT /
Nos
6.00
rm

Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua
tech or equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96
mark with lid & manufacture with cover and suitable locking arrangement & making necessary
holes for inlet & outlets and over flow pipes but without fittings & base support for tanks etc.,
complete as directed by the Departmental Officers for finished item of work.

PVC water storage tank

500

500
liters

Supply and fixing of 100 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl
and mosquito proof wire mesh including cost and conveyance of all materials to
site complete for finished item of work.

1.00
Rm

Supply and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and


fittings to meet the requirement of ASTM-D2846 and are prodiced in CTS(copper
tube sizes 1/2ton 2"Ashirvad flowgurard SDR11 and SDR 13.5 pipes are made
from idntial CPVC compounds having the same physical properties for Hot and
Cold Water (IA 15778-2007)

22.20 mm dia CPVC SDR 13.50


1

9.00

9.00
Rm

28.60 mm dia CPVC SDR 13.50


1

9.00

9.00
Rm

41.30 mm dia CPVC SDR 13.50


1

9.00

9.00
rm

Total for water supply and sanitary

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Deputy Executive Engineer


(R&B) Sub-division : Raz

Superintending Engineer
(R&B) Circle : Kakinad

STIMATE FOR WATER SUPPLY AND SANITARY

ntre Building in Kesavadasupalem - 4 (Code No. 178) of


dal Under NABARD RIDF XX in E.G. Dist.

& water supply installations


Estimate Rs 0.24 Lakhs
Amount
Rate /
Per

1653.00

3,306

Each

1800.00

3,600

Each

374.00
Each

748

Rate /
Per

Amount

550.00

3,300

1 Rm

6.82

3,409

1 Lit

2553.00

2,553

1 Rm

182.00

1,638

1 Rm
241.00

2,169

1 Rm
409.00

3,681

1 Rm
24,404

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 1


Mandal Under NABARD RIDF XX in E.G. Dist.
-:oOo:-

Kesavadasupalem - Kesanapalli Road


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km
906 / 400
to
From km
61 / 425
to
From km
123 / 935
to
From km
81 / 600
to
From km
0 / 000
to
0.000
Working K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
From km
918 / 200
From km
61 / 425
From km
123 / 935
From km
81 / 600
From km
0 / 000
0.000
Working K.M.
c) Total lead

km
=
=

0.000

000

to

000

K.M.

=
944
31
115
91
5
K.M.

/
/
/
/
/

805
735
760
000
200

of
of
of
of
of

NH 16
NH 16 to RP road
NH 216
KANF Road
TA Road

=
=
=
=
=
=
=
Or say:

to
to
to
to
to
to

60
944
31
115
91
5
K.M.

/
/
/
/
/
/

200
805
735
760
000
200

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
61 / 425
From km
123 / 935
to
115 / 760
From km
81 / 600
to
91 / 000
From km
0 / 000
to
5 / 200
0.000
Working K.M.
K.M.
Total lead
D) Bricks :
a) Digamarru
b) Metalled road length:
From km
139 / 600
to
From km
81 / 600
to
From km
0 / 000
to
Working K.M.
0.000
c) Total lead

123 / 935
91 / 000
5 / 200
K.M.

of
of
of
of
of
of

of
of
of
of

Kakinada - Rajahmundry Road


NH 16
NH 16 to RP road
NH 216
KANF Road
TA Road

Rajavaram - Podalada Road


NH 216
KANF Road
TA Road

=
=
=
=
=
=
=
=
Or say:

=
=
=
=
=
=
=
=
Or say:

of NH 216
of KANF Road
of TA Road

=
=
=
=
=
Or say:

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

Executive Engineer (R
(R&B) Division : Amalap

MATERIALS UPTO CENTER OF THE WORKING STRETCH

i Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sakhinetipalli


n E.G. Dist.
-:oOo:-

supalem - Kesanapalli Road


=

0.000 kms
0.000 kms

2.200 kms

=
=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
kms
93.000 kms

0.000 kms

=
=
=
=
=
=
=
=
Or say:

=
=
=
=
=
=
=
=
Or say:

38.405
29.690
8.175
9.400
5.200
0.000
93.070

4.600
26.605
29.690
8.175
9.400
5.200
0.000
83.670

kms
kms
kms
kms
kms
kms
kms
kms
83.000 kms

kms
kms
kms
kms
kms
kms
kms
kms
35.000 kms

=
=
=
=
=

Executive Engineer (R&B)


(R&B) Division : Amalapuram

0.110
0.200
12.353
8.175
9.400
5.200
0.000
35.438

15.665
9.400
5.200
0.000
30.265
30.000

kms
kms
kms
kms
kms
kms

Material Lead Statement (R.M.R)

NAME OF WORK ::- Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sakhin

NABARD RIDF XX in E.G. Dist.


Sl.
No.

Res Item

Size

Code

Unit

Source

Lead in
Kms

Basic cost

Con
chrarges

Load
charges

Un Load
charges

10

11

12

13

Cement 43 Grade

CSSR-A.05

MT

Local

0.00

5200.00

0.00

0.00

0.00

HYSD Steel (F.e 415) do

CSSR

MT

Local

0.00

34000.00

0.00

0.00

0.00

Mild Stell do

CSSR

MT

Local

0.00

37500.00

0.00

0.00

0.00

Mild Stell Bars 6 MM do

CSSR

MT

Local

0.00

36000.00

0.00

0.00

0.00

Coarse Sand for filling

M 004

Cum

Gannavaram

35.00

85.13

361.29

0.00

0.00

Coarse Sand for mortor

M 005

Cum

Gannavaram

35.00

152.13

361.29

0.00

0.00

Coarse Sand for Concrete

Cum

Gannavaram

35.00

85.13

361.29

0.00

0.00

6 mm Nominal

M-050

Cum

Katheru

93.00

735.00

723.43

0.00

0.00

10 mm Nominal Chips

M-051

Cum

Katheru

93.00

935.00

723.43

0.00

0.00

10

13.20 - 12.50 mm

M-052

Cum

Katheru

93.00

1097.00

723.43

0.00

0.00

11

20 mm Nominal

M-053

Cum

Katheru

93.00

1365.00

723.43

0.00

0.00

12

40 mm Nominal

M-054

Cum

Katheru

93.00

845.00

723.43

0.00

0.00

13

Bricks II Class: Non modular

23x11x7 cm

BMT-B.05

Cum

Jonnada

30.00

4700.00

552.72

37.84

37.84

Assistant Executive Engineer (R&B)

Deputy Executive Engineer (R&B),

Executive Engineer (R&B)

(R&B) Section : Malikipuram

(R&B) Sub-division : Razole

(R&B) Division : Amalapuram

Lead Statement (R.M.R)

Building in Kesavadasupalem - 4 (Code No. 178) of Sakhinetipalli Mandal Under

20%

Deduct
Crushing
Charges

Final cost

14

12

13

0.00

5200.00

0.00

34000.00

0.00

38000.00

0.00

36000.00

0.00

446.42

0.00

513.42

0.00

446.42

0.00

1458.43

0.00

1658.43

0.00

1820.43

0.00

2088.43

0.00
0.00

-175.00

1393.43
5328.40

Superintending Engineer (R&B)

(R&B) Circle : Kakinada

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.
NAME OF WORK ::I

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (C


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Task code. Cement morter (1:2) BLD-CSTN-1-3


Code
Material
Cement 43 Gr. (including loading charges)

Unit

Rate

kg

5.20

Coarse sand for mortor (including Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

cum

513.42

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


I

Task code. Cement morter (1:3) BLD-CSTN-1-4


Code
Material
Cement 43 Gr. (including loading charges)

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


II Task code. Cement morter (1:4) BLD-CSTN-1-5
Sl.
Code
No
Material
Cement 43 Gr. (including loading charges)

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


1 Task code. Cement morter (1:5) BLD-CSTN-1-6
Code
Material
CSSR-A-05
Cement 43 Gr. (including loading charges)
M-005
Manpower
CSSR-M-087

Total rate per 1 cum


2 Task code. Cement morter (1:6) BLD-CSTN-1-7
Code
Material
CSSR-A-05
Cement 43 Gr. (including loading charges)
M-005

Coarse sand for mortor (including Seigniorage charges)

Manpower
CSSR-M-087

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

cum
cum
cum
cum

2088.43
1820.43
1658.43
1458.43

Unit

Rate

Aggregate 13.20 - 12.50 mm nominal size

cum

1820.43

Aggregate 10 mm nominal size


Aggregate 6 mm nominal size

cum
cum

1658.43
1458.43

Total rate per 1 cum


I Task code. Aggregate 20 mm Graded HBG
Code
Material
Aggregate 20 mm nominal size
Aggregate 13.20 - 12.50 mm nominal size
Aggregate 10 mm nominal size
Aggregate 6 mm nominal size
Total rate per 1 cum
II Task code. Aggregate 12 mm Graded HBG
Code
Material

Total rate per 1 cum

1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clay
cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs includ
incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for
finished item of work for piles of following diameters.
Pile foundation-Manual Means- 1 Rm
Code
up to 300 mm dia
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

day
cum

320.00
168.32

cum

168.32

Total rate per 1 Rm

2 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Blac
ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved des
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, et
depths and for finished item of work for piles of following diameters.

500 mm to 700mm dia - DOUBLE UNDER REAMING


Code
Total cost for 1 Bulb Each
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

day
cum

320.00
315.52

cum

315.52

Total rate per Each

3 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. com
item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordin
to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges

Unit

Rate

day
cum

320.00
116.48

Foundation of Buildings
Seigniorage charges

cum
cum

116.48
30.00

Add Over Head Charges

cum

203.84

Excavation Method

Total rate per 1 cum

4 Filling with sand in trenches, sides of foundations and basement with initial lead in layers not excee
consolidating each deposited layer by watering and ramming including cost and conveyance of water to
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS N

Sand filling
Code
Material

Unit

Rate

Coarse sand for filling (including Seigniorage charges)


Water

cum
KL

446.42
77.00

Light mazdoor
Add LA charges

day
cum

320.00
99.20

Add Over Head Charges

cum

553.32

Manpower
SOR P. No. 269/III/4

Total rate per 1 cum

5 Plain Cement concrete (1:5:10) Proportion nominal mix (coarse aggregate) for foundation levelling courses a
beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry including cost and
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorag
other taxes on all materials including all operational, incidental and labour charges such as machine mixing,
foundations ramming in 15 cm layers finishing top surface to the required level curing etc.,complete for fini
inluding centering, shuttering as per APSS. No. 402. for Machine Mix Base course

P.C.C. 1:5:10 for Base course


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 40 mm nominal size
Coarse sand for mortor (including Seigniorage charges)
SOR P. No. 292/M- 189
Water
Mechinery
SOR P. No. 3379/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower

Unit

Rate

cum
cum
cum
KL

5.20
1393.43
513.42
77.00

hour

328.60
189.80

SOR P. No. 267/I/11


SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3066.85

Total rate per 1 cum

6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
up to 3.66, as per APSS. No. 402. for piles

M - 20 Nominal Mix Centering with Unsuported hight Footing F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
189.80
165.70
136.60

hour

day
day
day
cum

420.00
375.00
320.00
1307.99

cum

5934.38

Total rate per 1 cum

7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
up to 3.66, as per APSS. No. 402. for pile caps

M - 20 Nominal Mix Centering with Unsuported hight Footing F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1307.99

Hir charges for Centering and Scafafolding Unsupported


Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6657.38

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, center
3.66, as per APSS. No. 402.

M - 20 Nominal Mix Centering with Unsuported hight Plinth Beam -F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
C/Plinth beam

Hir charges for Centering and Scafafolding Unsupported


Hight Plinth beam
Add LA charges

Add Over Head Charges

Total rate per 1 cum

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
189.80
165.70
136.60

hour

day
day
day
cum

420.00
375.00
320.00
1307.99

cum

2410.00

cum

1075.00

cum

8344.38

9 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for COLUMNS, for Casurina Ballies, Bamboos,
Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per APSS. No.

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F1
Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including Seigniorage charges)
cum
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35
Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 90 /
Columns

Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding Unsupported


Hight 3.66M Columns F1

cum

1497.00

Add LA charges

cum

1268.00

Add Over Head Charges

cum

7760.16

Total rate per 1 cum

10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for LINTELS, for Casurina Ballies, Bamboos,
Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per APSS. N
F1.

M - 20 Nominal Mix Centering with Unsuported hight Lintels -F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
189.80
165.70
136.60

hour

SOR P. No. 229/I/11


SOR P. No. 230/II/35
SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding Unsupported


Hight Lintles Floor 1

cum

1663.00

Add LA charges

cum

903.00

Add Over Head Charges

cum

7926.16

Miscellaneous
SOR P. No. 90 / Lintles

Total rate per 1 cum F 1

11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for ROOF BEAMS for Casurina Ballies, B
Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M, as per

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F1.

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
Water

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
878.02

Hir charges for Centering and Scafafolding Unsupported


Hight 3.66M Beams F1

cum

2406.00

Add LA charges

cum

1064.00

Add Over Head Charges

cum

7548.09

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 / Beams

Total rate per 1 cum

12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for ROOF SLAB 125 mm thick , for Casurina
Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M
402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual

F1

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
Water

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

420.00
375.00
320.00
878.02
BACIC RATE 1

BACIC COST OF 1 SQM 125 mm THI


Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

Hir charges for Centering and Scafafolding Unsupported


Hight 3.66M upto 150 mm thick Slab

cum

273.00

Add LA charges

cum

121.00

Add Over Head Charges

cum

836.60

Total rate per 1 cum

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Gran
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreg
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials includi
incidental and labour charges such as machine mixing, laying concrete, curing and vibrating etc.,complete
of steel and its fabrication charges for finished item of work for Sun Shade 62.50 mm thick, for Casurina
Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M
402. for Sunshades Ground floor.

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorage charges)
Water

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

Concrete mixer 300 / 200 (diesel)

hour

328.60

Machinery
SOR P. No. 325/16

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

3.23
165.70
2.32

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
54.60

cum

289.00

Add LA charges
Lift charges F1
Add LA charges

cum
cum
cum

153.00
6.02
6.02

Add Over Head Charges

cum

599.50

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
CHAJJAS - SUNSHADES
Hir charges for Centering and Scafafolding Unsupported Hight 62.50
62.50 mm thick
mm thick Chajjas-Sunshades Second floor
Second floor

Total rate per 1 sqm F 2

14 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complet
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36
over laps and wastage, where weldeding require to be done campulsorily including cost and conveya
approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour charge
bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materials for finished
HYSD (F.e 415) F1

Suppliying, fitting and placing HYSD (F.e 415) FI lift manual


Code
Material
SOR P. No. 271/I/3
Binding wire
Reinforcement steel (including loading charges)
(HYSD/TMT)
Manpower
SOR P. No. 266/I/2
Black smith / Tin smith / Rivetor
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

kg
M.T

70.00
34000.00

day
day
M.T

420.00
320.00
7400.00

M.T

43520.00

Total rate per 1 MT

15 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars 6 mm
laps and wastage, where weldeding require to be done campulsorily including cost and conveyance of ba
sourses to site of work, binding wire, cover blocks and all incidental,operational, labour charges such as
placing in position, tying etc., and sales and sales & other taxes, on cost of materials for finished item o
STEEL (F.e 250) F1

Mils Steel (F.e 250) FI lift manual


Code
Material

Unit

Rate

SOR P. No. 271/I/3

Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4

Binding wire
Reinforcement steel (including loading charges)
(HYSD/TMT)

kg
M.T

70.00
36000.00

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
M.T

420.00
320.00
7400.00

Add Over Head Charges

M.T

45620.00

Total rate per 1 MT

16 Brick Masonary 225 mm thick for pannel walls in Basement and Super structure with CM ( 1:8) prop (Cemen
class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm including
and conveyance of all materials and water from approved source to work site and all operational, inciden
such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc., complete for finished it
(APSS No.501 & 504) for Basement

Brick Masonry in CM (1:8) for Basement


Code
Material
Cement 43 Gr. (including loading charges)
2nd class bricks (Non-Modular or Traditional size)
23x11x7 cm (including seigniorage charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

cum

3933.42

Total Basement rate per 1 cum

17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) usin
(Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm including cost
conveyance of all materials and water from approved source to work site and all operational, incidental labou
scafolding, mixing moratar, constructing masonary, lift charges, curing etc., complete for finished item of
No.501 & 504) for Super Structure F1

Brick Masonry in CM (1:8) for Super Structure F1


Material
Cement 43 Gr. (including loading charges)
2nd class bricks (Non-Modular or Traditional size)
23x11x7 cm (including seigniorage charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Miscellaneous

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

SOR P. No. 91 / Second


floor

Scafafolding charges for Brick Masonry / Stone Masonry

cum

304.84

Add LA charges
Lift charges F1
Add LA charges

cum
cum
cum

369.02
91.56
91.56

Add Over Head Charges

cum

4329.82

Total Super Structure rate per 1 cum F2

18 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushin
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcement p
joints of main brick walls were applicable including cost and seignorage charges and conveyance of all m
from approved sources to work site and all operational, incidental, labour charges such as scafoldi
constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication c
item of work as per SS 509 & 501 for F1

Reinforced Brick Masonary walls of 100 mm in CM(1:6) for F1

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


2nd class bricks (Non-Modular or Traditional size)
23x11x7 cm (including seigniorage charges)
Coarse sand for mortor (including Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry / Stone Masonry


F1

Sqm

68.59

Add LA charges
Lift charges F1
Add LA charges

sqm
sqm
sqm

83.03
13.57
13.57

Add Over Head Charges

sqm

525.88

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 91 / Second
floor

Total rate per 1 sqm

19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water pr
bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, incl
charges of materials and including all operational, incidental and labour charges for mixing mortar, laying,
and thread lining, curing, rounding of junctions of wall and slab etc,, complete for finished item of work for F

Impervious coat in CM (1:3) 20mm thickF2


Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
BMT-H.01
Impervious Water Proof Compound
Manpower

Unit

Rate

kg
Cum
kg

5.20
513.42
24.00

SOR P. No. 266/I/11


SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Lift charges F1
Add LA charges

Sqm
Sqm

20.39
20.39

Add Over Head Charges

sqm

292.26

Miscellaneous

Total rate per 1 sqm

20 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complet
of work (APSS 901,903 & 904) for Celling plastering F1.
Ceilling Plastering with CM 2 coats, 12 mm thick F1, Lift Manual.
Code
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 92/ First
floor Celing

Unit

Rate

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

14.32

Add LA charges

Sqm

11.95

Add Over Head Charges

Sqm

254.87

Scafafolding charges for celing Plastering F1

Total rate per 1 sqm F1

21 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm
sponze finishing cost of all materials, seigniorage charges, including conveyance charges of materials
operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complet
of work (APSS 901,903 & 904) for Uneven faces F1.

Plastering with 20mm thick 2 coats F1, Lift Manual.


Code
Material
Base Coat in CM(1:6), 16 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1

Unit

Rate

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day

420.00

SOR P. No. 267/II/35


SOR P. No. 269/III/4

Mason CI-II / Brick layer CI-II


Light mazdoor
Add LA charges

day
day
Sqm

375.00
320.00
206.39

Sqm

6.86

Add LA charges

Sqm

5.87

Add Over Head Charges

Sqm

254.44

Miscellaneous
SOR P. No. 91/ First
floor Plastering to
walls

Scafafolding charges for Plastering F1

Total rate per 1 sqm F1

22 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm
finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and includi
incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,, complete for fini
(APSS 901,903 & 904) for Even faces F1.
Plastering with 12mm thick 2 coats F1
Code
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls

Unit

Rate

kg
cum

5.20
513.42

kg
cum

5.20
513.42

day
day
day
cum

420.00
375.00
320.00
206.39

Sqm

6.86

Add LA charges

cum

5.87

Add Over Head Charges

cum

247.41

Scafafolding charges for Plastering F1

Total rate per 1 sqm F1

23 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with whit
full depth mixed with pigment of matching shade, including cost of all materials like cement, sand wa
complete, including seigniorage charges, etc., complete for finished item of work, including the cost of
materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.01

Unit

Rate

Ceramic tiles 7.3mm thick 1st quality

Sqm

465.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including Seigniorage charges)

Kg
cum

5.20
513.42

SOR P. No. 88 / BMS-W.68

White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
758.52

Lift charges F1
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

789.33

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

24 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame made of ho
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm d
seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR
Equivalent) providing door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking arrangem
frame is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm section mitre-cut and joined
125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods.
shall be reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete with all materials co
including providing all fixtures, as per the given design for finished item of work as directed by the Departm
finished item of work.

Code
Considering size of PVC door 0.75 x 2.00M
for PVC door frame (V)
for PVC door frame (H)

for PVC door Shutter

Unit
1.50 Sqm
2x 2.00 =
2x 0.75 =

Rate

0.75x 2.00 =
ABSTRACT

Material
BMT-N.46
BMT-N.44

PVC door frame


PVC door Shutter

rm
sqm

254.00
1682.00

Add Over Head Charges

cum

3920.00

1.00 sqm

1.50 sqm

Considering size of PVC Door=

Considering size of PVC Door=

4453.71 x 1.00 sqm


1.50 sqm
Total rate per 1sqm

Total rate per each PVC door =

25 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Shah
equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consist
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to fu
cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charg
for finished item of work, including the cost of conveyance of all materials for F1

Skirting with 15 to 18mm thick polished shabad stones, (1:3), 12 mm thick F1

Code
Material
BMT-B.05

BMS-W.68

Unit

Rate

Polished Shahabad/ Tandur stone slabs of 15 to 18 mm


thick (0.457x0.304) or any other size as specified

Sqm

165.40

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including Seigniorage charges)
White cement

Kg
cum
Kg

5.20
513.42
29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
223.52
473.23
Basic rate 1

Add Over Head Charges

sqm

477.96

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

26 Flooring with polished Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12
bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, in
materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, l
dressing of flooring stones etc., complete for finished item of work, for F1
Flooring with polished Kadapa/Shahabad 15 to 18mm thick, (1:8), 12 mm thick F1

Code
Material
BMT-B.05

Unit

Rate

Polished Shahabad/ Tandur stone slabs of 15 to 18 mm


thick (0.457x0.304) or any other size as specified

Sqm

165.40

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including Seigniorage charges)

Kg
cum

5.20
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
427.00
Basic rate 1

Add Over Head Charges

sqm

431.27

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

27 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Engineer 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and
spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, including cost, seignio
conveyance of all materials and water etc., from approved sources to work site all operational, incidental la
as mixing mortar fixing in position, lift charges, watering curing etc., complete for finished item of work. (AP
for Bath rooms F2

Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), 12 mm thick F2

Code
Material
BMT-C.07

BMS-W.68

Unit

Rate

Glazed coloured Tiles of any size Ist Quality


Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including Seigniorage charges)
White cement

Sqm
Kg
cum
Kg

413.00
5.20
513.42
29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

740.99

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm F2

28 Painting for Ceiling and Walls two coats with whiting of approved quality to give an even shade after thorou
surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyance ch
for All Floors
Painting for Ceiling two coats with whiting for All Floors

Code
Material
BMT-J.27
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

kg

22.08

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
18.75

Add Over Head Charges

sqm

23.17

Surya Cem or equivalent quality

Total rate per 1 sqm

palem - 4 (Code No. 178) of

Coefficient
720.000

Amount
3744.00

1.050

539.09

0.200
0%

64.00
0.00
4347.09

Coefficient
480.000

Amount
2496.00

1.050

539.09

0.200
0%

64.00
0.00
3099.09

Coefficient
360.000

Amount
1872.00

1.050

539.09

0.200
0%

64.00
0.00
2475.09

Coefficient
288.000

Amount
1497.60

1.050

539.09

0.200
0%

64.00
0.00
2100.69

Coefficient
240.000
1.050

Amount
1248.00
539.09

0.200
0%

64.00
0.00
1851.09

Coefficient
0.600
0.150
0.150
0.100

Amount
1253.06
273.06
248.76
145.84
1920.72

Coefficient

Amount

0.600

1092.26

0.200
0.200

331.69
291.69
1715.64

n loamy, clayey soils like Black


esigns including all operations,
complete for all depths and for

Coefficient

0.526
0%

13.615%
or say

Amount

168.32
0.00
168.32
22.92
191.24
191.00

oils like Black cotton soils and


approved designs including all
quipment, etc, complete for all

Coefficient

Amount

0.986
0%

315.52
0.00

13.615%

315.52
42.96
358.48

or say

358.00

and with an initial lead of 10m


ting, etc. complete for finished
08). For Ordinary soil-Manual up

BLD CSTN 2-1


Coefficient
Amount
0.364
0%
75%
0

116.48
0.00
87.36
0.00

13.615%

203.84
27.75
231.59

or say

231.60

rs not exceeding 15 cm thick,


e of water to work site and all
work. (APSS NO. 309 & 310)

BLD CSTN 2-8


Coefficient
Amount
1.000
0.100

446.42
7.70

0.310
0%

99.20
0.00

13.615%

553.32
75.33
628.65

or say

628.70

ling courses and bellow flooring


ding cost and conveyance of all
g Seigniorage charges, sales &
chine mixing, laying concrete in
plete for finished item of work,

BLD CSTN 3-7:24


Coefficient
Amount
129.600
0.900
0.450
1.200
1.000
0%

673.92
1254.09
231.04
92.40
328.60
0.00

0.100
1.390
0%

42.00
444.80
0.00

13.615%

3066.85
417.55
3484.40

or say

3484.40

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
EDASTALS, centering with Stell

BLD CSTN 3-13:30A


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

13.615%

5934.38
807.97
6742.35

or say

6742.40

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
EDASTALS, centering with Stell

BLD CSTN 3-13:30A


Coefficient
Amount
400.000
0.900
0.450
1.200
1.000

2080.00
1728.65
231.04
92.40
328.60

0%
1.000
0%

0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

723.00

0%

0.00

13.615%

6657.38
906.40
7563.78

or say

7564.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
STALS, centering with Stell up to

BLD CSTN 3-13:30A


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

2410.00

0%

0.00

13.615%

8344.38
1136.09
9480.47

or say

9480.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
es, Bamboos, Wooden Reapers,
per APSS. No. 402.

BLD CSTN 3-13:30B


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1497.00

0%

13.615%
or say

0.00
7760.16
1056.55
8816.71
8817.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
es, Bamboos, Wooden Reapers,
s per APSS. No. 402. for Lintles

BLD CSTN 3-13:30B


Coefficient
Amount
400.000
0.900
0.450
1.200
1.000
0%
1.000
0%

2080.00
1728.65
231.04
92.40
328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1663.00

0%

0.00

14%

7926.16
1079.15
9005.31

or say

9005.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
rina Ballies, Bamboos, Wooden
66 M, as per APSS. No. 402.

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

0.267
0%
0.267
0%

87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%

28.14
49.88
800.00
0.00

1.000

2406.00

0%

0.00

14%

7548.09
1027.67
8575.76

or say

8576.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
, for Casurina Ballies, Bamboos,
height 3.66 M, as per APSS. No.

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.450
0.900
1.200
0.267
0%
0.267
0%

2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%
ACIC RATE 1 CUM

28.14
49.88
800.00
0.00
4508.80

125 mm THICK F1

563.60

1.000
0%

273.00
0.00

13.615%

836.60
113.90
950.50

or say

951.00

ed Hard Granite metal (coarse


t, fine aggregate (sand) coarse
terials including all operational,
tc.,complete but excluding cost
for Casurina Ballies, Bamboos,
height 3.66 M, as per APSS. No.

BLD CSTN 3-13:30C


Coefficient
Amount
21.875
0.056
0.028
0.075
0.017

113.75
107.56
14.38
5.78
5.59

0%
0.017
0%

0.00
2.82
0.00

0.004
0.008
0.156
0%

1.68
3.00
49.92
0.00

1.000

289.00

0%
1.000
0%

0.00
6.02
0.00

13.615%

599.50
81.62
681.12

or say

681.00

orks complete wastage as per


Bars below 36 mm dia including
and conveyance of bars from
abour charges such as cutting,
s for finished item of work. for

BLD CSTN 4-1


Coefficient
Amount
6.000
1.050
10.000
10.000
0%

420.00
35700.00
4200.00
3200.00
0.00

14%

43520.00
5925.25
49445.25

or say

49445.00

works complete wastage as per


r Bars 6 mm dia including over
veyance of bars from approved
rges such as cutting, bending,
nished item of work. for MILD

BLD CSTN 4-1


Coefficient
Amount

6.000
1.050
10.000
10.000
0%

420.00
37800.00
4200.00
3200.00
0.00

14%

45620.00
6211.16
51831.16

or say

51831.00

prop (Cement:Sand) using 2nd


.mm including cost, seigniorage
onal, incidental labour charges
for finished item of work as per

BLD CSTN 5-5:43


Coefficient
Amount
36.000
512.000
0.200
0.240
0.560
1.890
0%

14%

Or say

187.20
2727.94
102.68
100.80
210.00
604.80
0.00
3933.42
535.54
4468.96
4469.00

nt:Sand) using 2nd class bricks


ncluding cost, seigniorage and
cidental labour charges such as
shed item of work as per (APSS

BLD CSTN 5-5:43


36.000
512.000
0.200
0.240
0.560
1.890
0%

187.20
2727.94
102.68
100.80
210.00
604.80
0.00

1.000

304.84

0%
1.000
0%

0.00
91.56
0.00

13.615%

4329.82
589.50
4919.32

or say

4919.00

ing a crushing strength of 2.5


nforcement pegged into mortar
ance of all materials and water
as scafolding mixing mortor
fabrication charges for finished

BLD CSTN 5-12:50


Coefficient
Amount
4.800
51.200
0.020

24.96
272.79
10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000

68.59

0%
1.000
0%

0.00
13.57
0.00

14%
or say

525.88
71.60
597.48
597.00

g of water proof compound per


charges, including conveyance
ortar, laying, rendering smooth
of work for F1

BLD CSTN 10-25


Coefficient
Amount
10.080
0.021
0.200

52.42
10.78
4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

1.000
0%

20.39
0.00
292.26
39.79
332.05
332.00

14%
or say

oat in CM (1:3), 4mm thick with


of materials and including all
etc,, complete for finished item

BLD CSTN 8-10


Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

14.32

0%

14%
or say

0.00
254.87
34.70
289.57
290.00

M (1:4), 4mm thick with Dubara


of materials and including all
etc,, complete for finished item

BLD CSTN 8-9


Coefficient
Amount

4.300
0.018

22.36
9.24

1.450
0.004

7.54
2.05

0.063

26.46

0.147
0.390
0%

55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

254.44
34.64
289.08

or say

289.00

M (1:3), 4mm thick with sponze


s and including all operational,
plete for finished item of work
BLD CSTN 8-10
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

247.41
33.68
281.09

or say

281.00

ed already laid or RCC roof slab,


atly with white cement paste to
ent, sand water and tiles etc.,
the cost of conveyance of all

BLD CSTN 9-6


Coefficient
Amount
1.050

488.25

5.460
0.012

28.39
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.59

1.000
0%
1%

22.99
0.00
0.23
789.33
107.47
896.80
897.00

14%
or say

made of hollow extruded PVC


+/- 0.2mm duly reinforced with
ed. PVC DOOR FRAME (Nandi or
alent) of 20mm X 200 mm with
king arrangements. The shutter
ut and joined at 4 corners with
mm PVC rods. Teak wood batons
oints wherever the hardware is
materials conveyance charges
y the Departmental Officers for

Coefficient

Amount
4.000
1.500

Total

5.500 Rm
1.500 sqm

5.500
1.500

1397.00
2523.00

14%

3920.00
533.71
4453.71
4453.71

x 1.00 sqm
0 sqm
Say

Or say

2969.14
2969.00
1 Sqm
4454.00

polished Shahabad stone length


y like consistency spread at the
g shade to full depth, including
niorage charges, etc., complete

BLD CSTN 9-23


Coefficient
Amount

1.100

181.94

9.060
0.012
0.500

47.11
6.16
14.50

0.096
0.224
0.310
0%
1%
Basic rate 1 sqm

40.32
84.00
99.20
0.00
4.73
477.96

14%

477.96
65.07
543.03

or say

543.00

tar (1 : 8) 12 mm thick over CC


nts nearly, including cost of all
e charges, labour charges for

BLD CSTN 9-2


Coefficient
Amount

1.050

173.67

3.120
0.014

16.22
7.19

0.096
0.224
0.330
0%
1%
Basic rate 1 sqm

40.32
84.00
105.60
0.00
4.27
431.27

14%

431.27
58.72
489.99

or say

490.00

by Engineer - in - Charge of size


sed coat and neat cement paint
g cost, seigniorage charges and
incidental labour charges such
m of work. (APSS No 701 & 707)

BLD CSTN 9-6


Coefficient
Amount
1.050
6.756
0.012
0.200

433.65
35.13
6.16
5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11

1.000
0%
1%

22.99
0.00
0.23

14%

740.99
100.89
841.88

or say

842.00

e after thoroughly brushing the


materials, labour charges and
onveyance charges of materials

BLD CSTN 9-5


Coefficient
Amount
0.200

4.42

0.006
0.015
0.032
0%

2.88
5.63
10.24
0.00

14%

23.17
3.15
26.32

or say

26.30

NAME OF WORK ::-

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.
Water Supply & Sanitation
Construction of Model Anganwadi Centre Building in Kesavadasu
(Code No. 178) of Sakhinetipalli Mandal Under NABARD RIDF XX in

1 Supply & fixing of PVC low level system parry ware, slim line with internal components &
Litres capacity Single Flush fixing in position including cost and conveyance of all materia
Other taxes on materials to site, Operational and Incidental charges including all labour charg
site etc; complete for finished itemof work.

Code
Material
BMW-G.08
Manpower
BMW-D.12

Supply & fixing of PVC low level


system parry ware, slim line with
internal components & short bend:
10 Litres capacity Single Flush
Add LA charges

Unit

Rate

each

1455.00

each

403.00

Add Over Head Charges

each

1455.00

Total rate per each

2 Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qu
confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with

seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap
shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at

complete including cost and conveyance of all materials to site, cost of CC bed, labou
seigniorage charges etc., complete for finished item of work.
Code
Unit
Material
BMW-D.04
each
Supplying and Fixing European Water
Closet of 1st quality conforming to
Manpower
IS:2556-Part-2-1973
of Hindustan /
BMW-D.15
Add LA charges
each
Neycer or Parryware make white
glazed with 'P' trap
Add Over Head Charges

each

Rate
1584.00
201.00

1584.00

Total rate per each

3 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P
with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75
pipe - 4 Kgs fixing in position including cost and conveyance of all materials, Sales tax &
materials to site, Operational and Incidental charges including all labour charges for fixin
complete for finished itemof work.

Code
Material
BMW-C.41
Manpower

Supplying & fixing CI Nahany traps


1st quality ISI marked conforming to
IS:1729-1979 with C.P. Grating fixing
with white cement as per site
requirements with standard practice
for 100 mm dia Inlet- 75 mm (3")

Unit

Rate

each

329.00

BMW-C.42

Add LA charges

each

45.00

Add Over Head Charges

each

329.00

Total rate per each

4 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex
equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96 m
manufacture with cover and suitable locking arrangement & making necessary holes for inle
over flow pipes but without fittings & base support for tanks etc., complete as directed by the
Officers for finished item of work.

Material
BMS-W.29
Miscellaneous
BMW-G.02

Sintex /Aqua tech or equivalent


Polyethylene water storage tank
double
labour charges only

Add Over Head Charges

lit

6.00

lit

440.00

cum

6000.00

Total rate per 1 lit. capacity Syntex tank

16 Constructing Constructing 457.2 mm x 457.2 mm (1'6"x1'6") dia brick masonry inspection cha
- 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 m
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with
1:3 prop; thick both inside and outside fitted light weight 457.2 mm x 457.2 mm (1'6"x
and cover of 20 Kg. and frames including excavating pits up to a depth of Inspection chamb
mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thic
HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost
charges on all materials and all incidental and operational, labour charges like mixing c
constructing masonry, lift charges, curing etc., complete for finished item of work as
specification.

Code
Material
BMW-B.06

Constructing Constructing 457.2 mm


x 457.2 mm (1'6"x1'6") dia brick
masonry inspection chamber as per
IS - 4111: Part-1:1986
Add Over Head Charges

Total rate per each

Unit

Rate

each

3825.00

each

3825.00

21 Supply and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fitting
requirement of ASTM-D2846 and are prodiced in CTS(copper tube sizes 1/2ton 2"Ashirvad flow
and SDR 13.5 pipes are made from idntial CPVC compounds having the same physical propert
Cold Water (IA 15778-2007)
22.20 mm dia CPVC SDR 13.50
Code
Material
BMW-I 221
S& F 22.20 mm dia CPVC SDR 13.50
Manpower
BMW-F.80
Add LA charges

Add Over Head Charges

Unit

Rate

Rm

160.00

Rm

33.00

each

160.00

Unit

Rate

Rm

212.00

Rm

33.00

each

212.00

Unit

Rate

Rm

360.00

Rm

33.00

each

360.00

Total rate per 1 Rm


22 28.60 mm dia CPVC SDR 13.50
Code
Material
BMW-i222
S& F 28.60 mm dia CPVC SDR 13.50
Manpower
BMW-F.82
Add LA charges

Add Over Head Charges


Total rate per 1 Rm
23 41.30 mm dia CPVC SDR 13.50
Code
Material
BMW-I.224
S& F 41.30 mm dia CPVC SDR 13.50
Manpower
BMW-F.84
Add LA charges

Add Over Head Charges


Total rate per 1 Rm

24 Supply and fixing of 100 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl and mosq
mesh including cost and conveyance of all materials to site complete for finished item of work
Code
Material
BMW- H05
Manpower
BMW-F.88

Unit

Rate

S& F vent cowl

each

2247.00

Add LA charges

each

31.00

Add Over Head Charges

each

2247.00

Total rate per 1 Rm

25 Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kis


any ISI Brand including cost of necessary Door Bend 87.5 Degree , Plain Bend 87.5 DegreeSh
with Door, Pipe Clip - UPVC/SWR Pipe fittings, Iron Clamps and all other accessories and fix
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site, O
Incidental charges including all labour charges for fixing at site etc; complete for finished item

Code
Material
BMW-G13

Add Over Head Charges

Unit

Rate

RM

484.00

RM

484.00

Total rate per each

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Deputy Executive Engineer


(R&B) Sub-division : Raz

Superintending Engineer
(R&B) Circle : Kakinad

g in Kesavadasupalem - 4
ABARD RIDF XX in E.G. Dist.

nal components & short bend: 10


ance of all materials, Sales tax &
ing all labour charges for fixing at

Coefficient
1.000
0%

Amount
1455.00
0.00

13.615%

1455.00
198.10
1653.10

or say

1653.00

Water Closet 1st qualityISI marked

ware / Neycer with brick masonry

y , P trap or S trap of Indian W.C.

o stop leakage at the joint etc.,


of CC bed, labour charges and
Coefficient
1.000
0%

Amount
1584.00
0.00

13.615%

1584.00
215.66
1799.66

or say

1800.00

1729-1979 with C.P. Grating fixing


0 mm dia Inlet- 75 mm (3") outlet
erials, Sales tax & Other taxes on
ur charges for fixing at site etc;

Coefficient
1.000

Amount
329.00

0%

0.00

13.615%

329.00
44.79
373.79

or say

374.00

capacity of Sintex /Aqua tech or


o ISI 12701/96 mark with lid &
ssary holes for inlet & outlets and
e as directed by the Departmental

1000.000
0%

13.615%
or say

6000.00
0.00
6000.00
816.90
6816.90
6.82

onry inspection chamber as per IS


ay Bricks of 225 mm thick from
ing plastering with cement mortar
x 457.2 mm (1'6"x1'6") C.I frame
f Inspection chamber up to 914.4
1:4:8) 150 mm thick using 40 mm
andard specification and including
etc., to site, cost of seigniorage
rges like mixing cement mortar,
item of work as per Standard

Coefficient

Amount

1.000

3825.00

14%

3825.00
520.77
4345.77

or say

4346.00

C pipes and fittings to meet the


2ton 2"Ashirvad flowgurard SDR11
me physical properties for Hot and

Coefficient
1.000
0%

14%
or say

Coefficient
1.000
0%

14%
or say

Coefficient
1.000
0%

14%
or say

Amount
160.00
0.00
160.00
21.78
181.78
182.00

Amount
212.00
0.00
212.00
28.86
240.86
241.00

Amount
360.00
0.00
360.00
49.01
409.01
409.00

AC cowl and mosquito proof wire


nished item of work.
Coefficient

Amount

1.000

2247.00

0%

0.00
2247.00
305.93
2552.93

13.615%

or say

2553.00

Prince/Sudhakar/Kisan/Supreme or
end 87.5 DegreeShoes, Single Tee
accessories and fixing in position
materials to site, Operational and
te for finished itemof work.

Coefficient

Amount

1.000

13.615%
or say

Executive Engineer (R&B),


B) Sub-division : Razole

ntending Engineer (R&B)


&B) Circle : Kakinada

484.00
484.00
65.90
549.90
550.00

Name of work:-

Construction of Model Anganwadi Centre Building in Kesavadasupale


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Sl.
No.

Short description of Item

Unit

Total qty
provision made
for the estimate

Statement showing the Seigniorages per Unit rate


Theoritical requirement of
Material per Unit as per Data
(in Cum.)

Seignorage charges per C

Metal

Sand

Gravel /
Earth /
bricks

Metal

Sand

I) CONSTRUCTION OF GROUND FLOOR


1

Earth work excavation for BUILDING foundations

1 Cum.

7.00

--

--

1.00

--

--

Plain Cement Concrete (1:5:10)

1 Cum.

2.30

0.900

0.450

--

75

50

Augoring and boring

1 Cum.

6.13

--

--

1.00

--

--

VRCC : M-20 for Piles concreate

1 Cum.

9.60

0.900

0.450

--

75

50

VRCC : M-20 for pile caps

1 Cum.

7.50

0.900

0.450

--

75

50

VRCC : M-20 for Plinth beam

1 Cum.

4.60

0.900

0.450

--

75

50

VRCC : M-20 for Columns

1 Cum.

2.80

0.900

0.450

--

75

50

VRCC : M-20 for Roof beams

1 Cum.

3.60

0.900

0.450

--

75

50

VRCC : M-20 for Roof Slab 125mm thick

1 Sqm.

98.40

0.113

0.056

--

75

50

10

Sand filling

1 Cum.

56.00

--

1.000

--

--

50

11

Ceiling Plastering 12 mm thick in two coats in CM (1:5) &


in CM (1:3)

1 Sqm.

150.00

--

0.015

--

--

50

12

RCC : M-20 for Sun Shade 62.50mm thick

1 Sqm.

9.00

0.06

0.03

--

75

50

13

Brick work in CM (1:8)

1 Cum.

32.51

--

0.200

512

--

50

Short description of Item

Unit

Total qty
provision made
for the estimate

Sl.
No.

Theoritical requirement of
Material per Unit as per Data
(in Cum.)

Seignorage charges per C

Metal

Sand

Gravel /
Earth /
bricks

Metal

Sand

14

Reinforced Brick masonry 100mm thick in CM (1:4)

1 Sqm.

35.20

--

0.020

99

--

50

15

Impervious coat Plastering 20mm thick in C.M (1:3)

1 Sqm.

85.50

--

0.021

--

--

50

16

Plastering 20 mm thick in two coats in CM (1:6) & in CM


(1:4)

1 Sqm.

162.50

--

0.022

--

--

50

17

Plastering 12mm thick in two coats in CM (1:6) & in CM


(1:4)

1 Sqm.

150.00

--

0.015

--

--

50

18

Flooring with ceramic tiles in CM (1:5), 12 mm thick

1 Sqm.

4.71

--

0.012

--

--

50

19

Dadooing to walls with Glazed tiles in CM (1:6), 12 mm


thick

1 Sqm.

12.98

--

0.012

--

--

50

20

Flooring with shahabad

1 Sqm.

65.90

--

0.012

--

--

50

Or Say

Total seigniora

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer


(R&B) Sub-division : Raz

Executive Engineer (R&B)

Superintending Engineer

Short description of Item

Unit

Total qty
provision made
for the estimate

Sl.
No.

(R&B) Division : Amalapuram

Theoritical requirement of
Material per Unit as per Data
(in Cum.)
Metal

Sand

Gravel /
Earth /
bricks

Seignorage charges per C

Metal

Sand

(R&B) Circle : Kakinad

n of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of


alli Mandal Under NABARD RIDF XX in E.G. Dist.

Gravel /
Earth /
bricks

Seignorage
charges per Unit

the Seigniorages per Unit rate

Total Amount

30

30.00

210.12

--

90.00

207.00

30

30.00

184.02

--

90.00

864.37

--

90.00

675.00

--

90.00

414.00

--

90.00

252.00

--

90.00

324.00

--

11.25

1107.00

--

50.00

2800.00

--

0.75

112.50

--

5.63

50.67

0.0385

29.71

Seignorage charges per Cum.

965.87

Gravel /
Earth /
bricks

Seignorage
charges per Unit

Total Amount

0.0385

4.81

169.31

--

1.05

89.78

--

1.10

178.75

--

0.75

112.50

--

0.60

2.83

--

0.60

7.79

--

0.60

39.54

Seignorage charges per Cum.

8767.05
Total seigniorage amount Rs.

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)

8768.00

Gravel /
Earth /
bricks
(R&B) Circle : Kakinada

Seignorage
charges per Unit

Seignorage charges per Cum.

Total Amount

C E R T I F I C A T E
Name of Work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem


178) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G.
1)

Certified that the leads provided in the R.M.R of the estimate are shortest and
yield of good quality material from the quarries proposed in the estimate.

2)

Certified that all the distances in the quarry map are correct.

3)

Certified that the quarries provided are the nearest.

4)

Certified that the routes shown in the quarry map are the shortest for the tra
materials.

5)

Certified that all the materials can be easily quarried.

6)

Certified that the description of all materials mentioned are correct to the best of

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Deputy Executive Engine


(R&B) Sub-division : R

Superintending Enginee
(R&B) Circle : Kakin

C E R T I F I C A T E

Anganwadi Centre Building in Kesavadasupalem - 4 (Code No.


netipalli Mandal Under NABARD RIDF XX in E.G. Dist.

vided in the R.M.R of the estimate are shortest and there is sufficient
al from the quarries proposed in the estimate.

es in the quarry map are correct.

rovided are the nearest.

own in the quarry map are the shortest for the transportation of the

ls can be easily quarried.

n of all materials mentioned are correct to the best of my knowledge.

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

A.P Stadard Building Data Materials,Hire chrges of machinary,Labour, Seigniorage &

Code No

Sl.
No

Page No.

M-050

286

M-051

286

M-052

286

M-053

286

M-055

286

BMT-A.01

10

BMT-A.02

10

BMT-A.03

10

BMT-A.04

10

BMT-A.06

10

M-008
M-005

284
284

M-004

284

M-148
79

33

271
271
292
292
292
12

BMT-B.05

26

11

BMT-B.06

27

11

BMT-B.09

30

11

BMT-B.10

31

12

M-182
do
do
BMT-B.12

13
14

290
274

Code No

Sl.
No

Page No.

BMT-B.11

32

12

BMT-B.12

33

12

BMT-B.13

34

12

BMT-B.14

35

12

BMT-C.15

12

BMT-C.01

12

BMT-C.07

12

M-189
BMS-W.68

292
88
257

252
266
268
269
16
18
9

379
do
379
do
379

Code No

Sl.
No

Page No.

41

do
379
do
-- 2 --

Earth / Sand /
Gravel / Lime /
Surki per Cum.

Stones / Cource
aggregate per
Cum.

31.50
44.10
58.90
71.50
84.10
12.60
10.50

30.40
42.60
58.90
71.50
84.10
12.60
10.50

Quarry lead of Rajahmundry


Lead charges deduct contractor profit & Over head charges 1
Katheru
Gannavaram

Gannavaram
Jonnada

Jonnada
Local

Katheru
Yetimoga

93 Kms
35 Kms
35 Kms
30 Kms
30 Kms
1 Kms
49 Kms
65 Kms
HBG Metal

1.00Km

0.00

Sand for Mortor


Sand for filling
0.00

Bricks
Flyash
43.60

Code No
2.00Km
3.00Km
4.00Km
5.00Km
6.00Km
7.00Km
8.00Km
9.00Km
10.00Km
11.00Km
12.00Km
13.00Km
14.00Km
15.00Km
16.00Km
17.00Km
18.00Km
19.00Km
20.00Km
21.00Km
22.00Km
23.00Km
24.00Km
25.00Km
26.00Km
27.00Km
28.00Km
29.00Km
30.00Km
31.00Km
32.00Km
33.00Km
34.00Km
35.00Km
36.00Km
37.00Km
38.00Km
39.00Km
40.00Km
41.00Km
42.00Km
43.00Km
44.00Km
45.00Km
46.00Km
47.00Km
48.00Km
49.00Km
50.00Km
51.00Km
52.00Km
53.00Km
54.00Km
55.00Km
56.00Km
57.00Km
58.00Km
59.00Km
60.00Km
61.00Km
62.00Km
63.00Km
64.00Km

Sl.
No

Page No.
10.49
24.51
35.35
47.95
57.02
67.85
78.69
89.53
100.36
111.20
122.03
132.87
143.71
154.54
165.38
176.21
187.05
197.89
208.72
219.56
230.39
241.23
252.07
262.90
273.74
284.57
295.41
306.25
317.08
326.11
335.14
344.17
353.20
362.23
371.26
380.29
389.32
398.35
407.38
416.41
425.44
434.47
443.50
452.53
461.56
470.59
479.62
488.65
497.68
506.71
515.74
524.77
533.80
542.83
551.86
560.89
569.92
578.95
587.98
597.01
606.04
615.07
624.10

10.84
23.56
34.40
45.24
56.07
66.91
77.74
88.58
99.42
110.25
121.09
131.92
142.76
153.60
164.43
175.27
186.10
196.94
207.78
218.61
229.45
240.28
251.12
261.96
272.79
283.63
294.46
305.30
316.14
325.17
334.20
343.23
352.26
361.29
370.32
379.35
388.38
397.41
406.44
415.47
424.50
433.53
442.56
451.59
460.62
469.65
478.68
487.71
496.74
505.77
514.80
523.83
532.86
541.89
550.92
559.95
568.98
578.01
587.04
596.07
605.10
614.13
623.16

61.06
81.36
98.81
116.27
133.73
151.19
168.65
186.10
203.56
221.02
238.48
255.94
273.39
290.85
308.31
325.77
343.23
360.68
378.14
395.60
413.06
430.52
447.97
465.43
482.89
500.35
517.81
535.26
552.72
567.26
581.79
596.32
610.86
625.39
639.93
654.46
668.99
683.53
698.06
712.60
727.13
741.66
756.20
770.73
785.27
799.80
814.33
828.87
843.40
857.94
872.47
887.00
901.54
916.07
930.61
945.14
959.67
974.21
988.74
1003.28
1017.81
1032.34
1046.88

Code No
65.00Km
66.00Km
67.00Km
68.00Km
69.00Km
70.00Km
71.00Km
72.00Km
73.00Km
74.00Km
75.00Km
76.00Km
77.00Km
78.00Km
79.00Km
80.00Km
81.00Km
82.00Km
83.00Km
84.00Km
85.00Km
86.00Km
87.00Km
88.00Km
89.00Km
90.00Km
91.00Km
92.00Km
93.00Km
94.00Km
95.00Km
96.00Km
97.00Km
98.00Km
99.00Km
100.00Km

Sl.
No

Page No.
633.13
642.16
651.19
660.22
669.25
678.28
687.31
696.34
705.37
714.40
723.43

632.19
641.22
650.25
659.28
668.31
677.34
686.37
695.40
704.43
713.46
722.49

1061.41
1075.95
1090.48
1105.01
1119.55
1134.08
1148.62
1163.15
1177.68
1192.22
1206.75

Code No

Sl.
No

Page No.

Data Materials,Hire chrges of machinary,Labour, Seigniorage & Conveyanance chrges etc.,

Description of Material

Rate

Aggregates 6mm nomonal size( incuding blasting


(Rs70),crusing (25%) & Rs 50seigniorage charges)

735.00

Aggregates 10mm nomonal size( incuding blasting


(Rs70),crusing (25%) & Rs 50seigniorage charges)

935.00

Aggregates 13.2/12.5mm nomonal size( incuding blasting


(Rs70),crusing (25%) & Rs50seigniorage charges)

1097.00

Aggregates 20mm nomonal size( incuding blasting


(Rs70),crusing (25%) &Rs 50 seigniorage charges)

1365.00

Aggregates 40mm nomonal size( incuding blasting


(Rs70),crusing (25%) & Rs 50-seigniorage charges)

845.00

Bricks second class or ground moulded (Non-Modular or


traditional size) 23 x 11 x 7 cm

4700.00

--- do --- moudular of size 19 x 9 x 9 cm

4185.00

Fly ash cement/lime solid blocks with compressive strength of


75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 (ex-quarry price excluding cost of conveyance, loading & unloading) 290 x 225
x 140 mm

17000.00

Fly ash lime solid blocks(50 Kgs/ sq.cm)


290mmx200mmx140mm
Flyash lime solid blocks(50 Kgs/ sq.cm)
290mmx100mmx140mm

14500.00

Gravel / quarry spall


Coarse sand for mortar( incuding Rs 40-seigniorage
charges )
Coarce sand for filling( incuding Rs 40/- seigniorage
charges )
Random Rubble Stone
Un-coursed rubble stones ( at quarry )(including seigniorage
charges and loading charges)
Coursed rubble stone 30 x 30 x 45 cm(including seigniorage
Coursed
charges) rubble
(Each)stone 30 x 30 x 60 cm(including seigniorage
Through
charges and bond stone - (a) 20X20x30 to 45 cm long
Through and bond stone - (b) 25X25x45 to 60 cm long
Through and bond stone - (c) 30X30x65 to 75 cm long
Polished Marble slabs of any variety (Such as Dongari/
Adanga/ Marodh/ Rajganpur etc) 16 mm to 20 mm (average)
thick (size 0.457 M x 0.457 M) / (0.6M x 0.6M) (1 Sqm)
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick
(0.457x0.304) or any other size as specified ( 10 Sqm )
Polished black Kadapa slabs minimum of 15 mm thick
(0.457x0.457M) (10 Sqm)
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M)
other than black/ premium colours
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M)
other than black and regular colours (1 sqm)

9000.00
80.00
152.13
85.13
225.00
265.00
15.00
18.00
19.00
32.00
45.00
570.00
1291.00
1076.00
2300.00
2000.00

Description of Material

Rate

High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M)


black (1 sqm)
Polished Marble slabs of any variety (Such as Dongari/
Adanga/ Marodh/ Rajganpur etc) 16 mm to 20 mm (average)
thick (size 0.457 M x 0.457 M) / (0.6M x 0.6M) (1 Sqm)
Polished Marble slabs of any variety (Such as Dongari/
Adanga/ Marodh/ Rajganpur etc) polished 16 mm to 20 mm
(average) thick 0.305 M x 0.305 M (1 sqm)
Polished Marble slabs of any variety and gang saw cut (Such
as Dongari/ Adanga/ Marodh/ Rajganpur etc) 16 mm to 20
mm (average) thick ( 0.610 M width of any length) (1 sqm)
Vitrified polished floor tiles of size not less than 598 x 598 mm
x 8 mm thickness glossy finish permium colours

1700.00

Ceramic tiles 7.3mm thick 1st quality of all shades (as per
manufacture specification
Glazed coloured Tiles of any size Ist Quality

465.00

570.00

460.00

780.00

1048.00

413.00

Water
White cement
Binding wire
HYSD Steel (Fe 415) ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/
EE.III/ DEE10/AE/13305/12, Vol.16 Dated: 30.06.2012.

77.00
29.00
70.00
34000.00

Mild Steel ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/ EE.III/


DEE10/ AE/13305/12, Vol.16 Dated: 30.06.2012.

37500.00

Cement 43 Grade ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/


EE.III/ DEE10/ AE/13305/12, Vol.16 Dated: 30.06.2012.

5200.00

Mild Steel 6mm ENC(I.W) I&CAD Lr. No. ENC/IW/P&M/


EE.III/ DEE10/ AE/13305/12, Vol.16 Dated: 30.06.2012.

36000.00

Blasting charges HBG Metal

70.00

Seigniorage charges
Metal
Gravel/earth
Sand
Bricks 1000 Nos
Labour Rates
Painer CI - I
Mason CI - I / Brick layer CI - I / Operater concrete / Plumber e
Mason CI -II / Brick layer CI - II / Operater concrete / Painer CI Heavy & Light Mazdoor unskilled
Machinery Rates
Concrete mixer 300/200 ( diesel )
Crew Charge Concrete mixer 300/200 ( diesel )
Concrete mixer 600 / 400 (diesel
Crew Charge Concrete mixer 600 / 400 ( diesel )
Batching plant 0.5 cum ( 6 Cum/hr)

75.00
30.00
50.00
38.50
480.00
420.00
375.00
320.00
328.60
189.80
453.00
189.80
522.50

Description of Material
Crew Charge Batching plant 0.5 cum ( 6 Cum/hr
Needle vibrator 40 mm ( petrol )
Crew Charge Needle vibrator 40 mm ( petrol )

Rate
293.80
165.70
136.60

-- 2 --

C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS


Earth / Sand /Gravel Murrum/ / Surki/ Rs / cum
(SOR 2011-12. P. No. 376) Loading
Un loading
Rubble/ size stone/ cut stone/ Coarse aggregate, Lime in Rs/cum
(SOR 2011-12. P. No. 376) Loading
Un loading

Cement in Rs/tonne
(SOR 2011-12. P. No. 376) Loading
Un loading
Steel in Rs/tonne
(SOR 2011-12. P. No. 376) Loading
Un loading
(idle hire charges of trucks are not added)
Bricks 1000 Nos.
Loading
Un loading

For Brick lead charges only


Lead up to 1 Km
Lead up to 2 Km
Lead up to 3 Km
Lead up to 4 Km
Lead up to 5 Km
for Every km beyond 5 km up to 30 km
for Every km beyond 30 km

Quarry lead of Rajahmundry


d charges deduct contractor profit & Over head charges 14% less
HBG metal
Sand for Mortar
Sand for filling
Bricks
Country Bricks
Flyash lime solid bricks
Rough Stone OTG veraity, CR Stone & Bond Stone
Shell lime
LEAD CALICULATIONS

Rough Stone OTG veraity, CR Stone & Bond Stone

16.00
8.00
32.00
16.00

52.80
52.80
63.30
63.30
44.00
44.00

1000 Nos.
50.70
71.00
94.60
114.90
135.20
20.30
16.90

723.43
361.29
361.29
552.72
552.72
43.60
488.65
632.19

Description of Material

Rate

Description of Material

Rate

Description of Material

Rate

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. Dist.
-:oOo:-

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

160 / 850

From km

0 / 000

to

0 / 230

From km

36 / 400

to

24 / 600

From km

6 / 500

to

5 / 820

From km

0 / 000

to

0 / 600

of Lalacheruvu to Ravulapalem NH5

of Loop Road

of Amalapuram - Bobbarlanka Road

of Palivela - Pallipalem Road

of PR Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

160 / 850

of Vemagiri to Ravulapalem Road

From km

0 / 000

to

0 / 230

of Loop Road

From km

36 / 400

to

24 / 600

of Amalapuram - Bobbarlanka Road

From km

6 / 500

to

5 / 820

of Palivela - Pallipalem Road

From km

0 / 000

to

0 / 600

of PR Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at Ravulapalem
River Bed to panchayat road

panchayat road to ravulapalem

From km

0 / 000

to

0 / 230

From km

36 / 400

to

24 / 600

From km

6 / 500

to

From km

0 / 000

to

Working K.M.

50.00

of Loop Road

of Amalapuram - Bobbarlanka Road

5 / 820

of Palivela - Pallipalem Road

0 / 600

of PR Road

KM

Total lead

=
Or say:

D) For Bricks :
Bricks from Jonnada
b) Metalled road length:
From km

13 / 932

to

11 / 600

From km

165 / 200

to

160 / 850

From km

0 / 000

to

0 / 230

From km

36 / 400

to

24 / 600

From km

6 / 500

to

5 / 820

From km

0 / 000

to

0 / 600

of Mandapeta - Jonnada road

of Vijayawada - Visakhapatnam road (NH.5)

of Loop Road

of Amalapuram - Bobbarlanka Road

of Palivela - Pallipalem Road

of PR Road

c) Total lead

=
Or say:

Asst. Executive Engineer (R&B),

Dy. Executive Engineer (R&B),

(R&B) Section : Gannavaram

(R&B) Sub-divn., : Kothapeta

Executive Engineer (R&B),

Superintending Engineer (R&B),

20

(R&B) Division : Amalapuram

(R&B) Circle : Kakinada

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Kadali Irrigation Channel Road from KM 0.000 to 0.941

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

941

0.471

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

58 / 250

to

31 / 735

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

58 / 250

to

31 / 735

of Rajavaram - Podalada Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road
From km

=
58 / 250

Working K.M.

50.00

to

50 / 215

of Rajavaram - Podalada Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

58 / 250

to

31 / 735

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

Working K.M.

c) Total lead

=
Or say:

254

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Sivakodu - Manepalli Road from KM 13.665 to 16.667

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

13

675

to

16

667

1.496

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

58 / 250

to

31 / 735

From km

0 / 941

to

0 / 000

From km

15 / 171

to

13 / 675

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

of Kadali - Irrigation channel Road

of Sivakodu - Manepalli Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

58 / 250

to

31 / 735

of Rajavaram - Podalada Road

From km

0 / 941

to

0 / 000

of Kadali - Irrigation channel Road

From km

15 / 171

to

13 / 675

of Sivakodu - Manepalli Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road
From km

=
58 / 250

to

From km

0 / 941

to

0 / 000

From km

15 / 171

to

13 / 675

Working K.M.

50.00

50 / 215

of Rajavaram - Podalada Road

of Kadali - Irrigation channel Road

of Sivakodu - Manepalli Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

58 / 250

to

31 / 735

From km

0 / 941

to

0 / 000

From km

15 / 171

to

13 / 675

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

of Kadali - Irrigation channel Road

of Sivakodu - Manepalli Road

Working K.M.

c) Total lead

=
Or say:

256

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Pulletikurru - Ambajipeta Road from K.M. 0.000 to 6.420

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

420

3.210

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

160 / 850

From km

0 / 000

to

0 / 230

From km

36 / 400

to

13 / 700

From km

3 / 210

to

0 / 000

of Lalacheruvu to Ravulapalem NH5

of Loop Road

of Amalapuram - Bobbarlanka Road

of Pulletikurru - Ambajipeta Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

160 / 850

of Vemagiri to Ravulapalem Road

From km

0 / 000

to

0 / 230

of Loop Road

From km

36 / 400

to

13 / 700

of Amalapuram - Bobbarlanka Road

From km

3 / 210

to

0 / 000

of Pulletikurru - Ambajipeta Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 092

From km

6 / 595

to

From km

7 / 270

to

From km

3 / 210

to

Working K.M.

50.00

of Rajavaram - Podalada Road

0 / 000

of Ambajipeta - Gannavaram Road

6 / 000

of Amalapuram - Bobbarlanka Road

0 / 000

of Pulletikurru - Ambajipeta Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

160 / 850

From km

0 / 000

to

0 / 230

From km

36 / 400

to

13 / 700

From km

3 / 210

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Loop Road

of Amalapuram - Bobbarlanka Road

of Pulletikurru - Ambajipeta Road

Working K.M.

c) Total lead

=
Or say:

249

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Munganda - K. Munjavaram Road Road from K.M. 0.000 to 3.800

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

800

1.900

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

3 / 185

From km

1 / 900

to

0 / 000

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of Munganda - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

49 / 092

to

31 / 735

of Rajavaram - Podalada Road

From km

6 / 595

to

3 / 185

of Ambajipeta - Gannavaram Road

From km

1 / 900

to

0 / 000

of Munganda - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 092

From km

6 / 595

to

From km

1 / 900

to

Working K.M.

50.00

of Rajavaram - Podalada Road

3 / 185

of Ambajipeta - Gannavaram Road

0 / 000

of Munganda - K. Munjavaram Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

3 / 185

From km

1 / 900

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of Munganda - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

250

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.

Pulletikurru - Ambajipeta Road to Bandarulanka Road (via) G. Agraharam from K.M.0.000 to 3.800
Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

547

1.774

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

160 / 850

of Lalacheruvu to Ravulapalem NH5

From km

0 / 000

to

0 / 230

From km

36 / 400

to

13 / 700

of Loop Road

of Amalapuram - Bobbarlanka Road

From km

5 / 972

to

0 / 000

of Pulletikurru - Ambajipeta Road

From km

3 / 210

to

0 / 000

of Pulletikurru - Ambajipeta Road to bandarulanka

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

160 / 850

of Vemagiri to Ravulapalem Road

From km

0 / 000

to

0 / 230

of Loop Road

From km

36 / 400

to

13 / 700

of Amalapuram - Bobbarlanka Road

From km

5 / 972

to

0 / 000

of Pulletikurru - Ambajipeta Road

From km

3 / 210

to

0 / 000

of Pulletikurru - Ambajipeta Road to bandarulanka

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 092

From km

6 / 595

to

From km

7 / 270

to

From km

6 / 240

From km

3 / 210

Working K.M.

50.00

of Rajavaram - Podalada Road

0 / 000

of Ambajipeta - Gannavaram Road

6 / 000

of Amalapuram - Bobbarlanka Road

to

5 / 972

of Pulletikurru - Ambajipeta Road

to

0 / 000

of Pulletikurru - Ambajipeta Road to bandarulanka

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

160 / 850

From km

0 / 000

to

0 / 230

From km

36 / 400

to

13 / 700

From km

5 / 972

to

0 / 000

From km

3 / 210

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Loop Road

of Amalapuram - Bobbarlanka Road

of Pulletikurru - Ambajipeta Road

of Pulletikurru - Ambajipeta Road to bandarulanka

Working K.M.

c) Total lead

=
Or say:

254

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.

Ambajipeta - Gannavaram Road to K. Munjavaram ( via) Pothailanka From K.M. 0.000 to 4.300
Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

300

2.150

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

1 / 049

From km

2 / 150

to

0 / 000

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of AG road - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

49 / 092

to

31 / 735

of Rajavaram - Podalada Road

From km

6 / 595

to

1 / 049

of Ambajipeta - Gannavaram Road

From km

2 / 150

to

0 / 000

of AG road - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 092

From km

6 / 595

to

From km

2 / 150

to

Working K.M.

50.00

of Rajavaram - Podalada Road

1 / 049

of Ambajipeta - Gannavaram Road

0 / 000

of AG road - K. Munjavaram Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

1 / 049

From km

2 / 150

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of AG road - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

252

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
Pothavaram - K.Yenugupalli Road from K.M. 0.000 to 6.620

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

620

3.310

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

4 / 672

From km

3 / 310

to

0 / 000

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of pothavaram - k.yenugupalli Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

49 / 092

to

31 / 735

of Rajavaram - Podalada Road

From km

6 / 595

to

4 / 672

of Ambajipeta - Gannavaram Road

From km

3 / 310

to

0 / 000

of pothavaram - k.yenugupalli Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 092

From km

6 / 595

to

From km

3 / 310

to

Working K.M.

50.00

of Rajavaram - Podalada Road

4 / 672

of Ambajipeta - Gannavaram Road

0 / 000

of pothavaram - k.yenugupalli Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

49 / 092

to

31 / 735

From km

6 / 595

to

4 / 672

From km

3 / 310

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

of Ambajipeta - Gannavaram Road

of pothavaram - k.yenugupalli Road

Working K.M.

c) Total lead

=
Or say:

250

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sak
Mandal Under NABARD RIDF XX in E.G. -:oOo:Dist.
P. Gannavaram - K. Munjavaram Road from K.M. 0.000 to 10.075

Reach proposed in the present estimate:

km

Centre KM of the Working Reach

to

10

075

5.038

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =

b) Metalled road length:


From km

195 / 000

to

156 / 595

From km

49 / 210

to

31 / 735

From km

2 / 150

to

0 / 000

of NH 5 Lalacheruvu to Ethakota

of Rajavaram - Podalada Road

of p. gannavaram - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =

b) Metalled road length:


Quarry at Kadium Quarry
From km

55 / 600

to

60 / 200

of Kakinada - Rajahmundry Road

From km

183 / 200

to

156 / 595

of Vemagiri to Ethakota NH Jn

From km

49 / 210

to

31 / 735

of Rajavaram - Podalada Road

From km

2 / 150

to

0 / 000

of p. gannavaram - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to panchayat road

panchayat road

From km

50 / 215

to

49 / 210

From km

2 / 150

to

0 / 000

Working K.M.

50.00

of Rajavaram - Podalada Road

of p. gannavaram - K. Munjavaram Road

KM

Total lead

=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory at

Visakhapatnam Refinery

b) Metalled road length:


From km

to

From km

382 / 400

to

156 / 595

From km

49 / 210

to

31 / 735

From km

2 / 150

to

0 / 000

of Refinery to V-V road (NH.5)

of Vijayawada - Visakhapatnam road (NH.5)

of Rajavaram - Podalada Road

of p. gannavaram - K. Munjavaram Road

Working K.M.

c) Total lead

=
Or say:

250

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

2.200 kms
34.150 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
49.660 kms
49.000 kms

0.000 kms

4.600 kms
22.350 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
40.260 kms
40.000 kms

2.200 kms
###
1.250 kms
###
0.230 kms
11.800 kms
0.680 kms
0.600 kms
kms
###
16.760 kms
17.000 kms
###

2.332 kms
4.350 kms
0.230 kms
11.800 kms
0.680 kms
0.600 kms
19.992 kms
20.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

1
0.941 kms

2.200 kms
38.405 kms
26.515 kms
0.471 kms
67.591 kms
58.000 kms

0.000 kms

4.600 kms
26.605 kms
26.515 kms
0.471 kms
58.191 kms
58.000 kms

0.110 kms
###
0.200 kms
###
8.035 kms
0.471 kms
###
8.816 kms
9.000 kms
###

1.600 kms
225.805 kms
26.515 kms
0.471 kms
254.391 kms
254.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

7
2.992 kms

2.200 kms
38.405 kms
26.515 kms
0.941 kms
1.496 kms
kms
69.557 kms
69.000 kms

0.000 kms

4.600 kms
26.605 kms
26.515 kms
0.941 kms
1.496 kms
kms
60.157 kms
60.000 kms

0.110 kms
###
0.200 kms
###
8.035 kms
0.941 kms
1.496 kms
kms
###
10.782 kms
11.000 kms
###

1.600 kms
225.805 kms
26.515 kms
0.941 kms
1.496 kms
kms
256.357 kms
256.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

20
6.420 kms

2.200 kms
34.150 kms
0.230 kms
22.700 kms
3.210 kms
kms
62.490 kms
62.000 kms

0.000 kms

4.600 kms
22.350 kms
0.230 kms
22.700 kms
3.210 kms
kms
53.090 kms
53.000 kms

0.110 kms
###
0.200 kms
###
1.123 kms
6.595 kms
1.270 kms
3.210 kms
kms
###
12.508 kms
12.000 kms
###

1.600 kms
221.550 kms
0.230 kms
22.700 kms
3.210 kms
kms
249.290 kms
249.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli


3.800
3.800 kms

2.200 kms
38.405 kms
17.357 kms
3.410 kms
1.900 kms
kms
63.272 kms
63.000 kms

0.000 kms

4.600 kms
26.605 kms
17.357 kms
3.410 kms
1.900 kms
kms
53.872 kms
54.000 kms

0.110 kms
###
0.200 kms
###
1.123 kms
3.410 kms
1.900 kms
kms
###
6.743 kms
6.000 kms
###

1.600 kms
225.805 kms
17.357 kms
3.410 kms
1.900 kms
kms
250.072 kms
250.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

om K.M.0.000 to 3.800
3.547 kms

2.200 kms
34.150 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
67.026 kms
67.000 kms

0.000 kms

4.600 kms
22.350 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
57.626 kms
57.000 kms

0.110 kms
###
0.200 kms
###
1.123 kms
6.595 kms
1.270 kms
0.268 kms
1.774 kms
kms
###
11.340 kms
11.000 kms
###

1.600 kms
221.550 kms
0.230 kms
22.700 kms
5.972 kms
1.774 kms
kms
253.826 kms
254.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

m K.M. 0.000 to 4.300


4.300 kms

2.200 kms
38.405 kms
17.357 kms
5.546 kms
2.150 kms
kms
65.658 kms
65.000 kms

0.000 kms

4.600 kms
26.605 kms
17.357 kms
5.546 kms
2.150 kms
kms
56.258 kms
56.000 kms

0.110 kms
###
0.200 kms
###
1.123 kms
5.546 kms
2.150 kms
kms
###
9.129 kms
9.000 kms
###

1.600 kms
225.805 kms
17.357 kms
5.546 kms
2.150 kms
kms
252.458 kms
252.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

620
6.620 kms

2.200 kms
38.405 kms
17.357 kms
1.923 kms
3.310 kms
kms
63.195 kms
63.000 kms

0.000 kms

4.600 kms
26.605 kms
17.357 kms
1.923 kms
3.310 kms
kms
53.795 kms
54.000 kms

0.110 kms
###
0.200 kms
###
1.123 kms
1.923 kms
3.310 kms
kms
###
6.666 kms
6.000 kms
###

1.600 kms
225.805 kms
17.357 kms
1.923 kms
3.310 kms
kms
249.995 kms
250.000 kms

KING STRETCH

- 4 (Code No. 178) of Sakhinetipalli

10.075
10.075 kms

2.200 kms
38.405 kms
17.480 kms
5.038 kms
kms
63.123 kms
63.000 kms

0.000 kms

4.600 kms
26.605 kms
17.480 kms
5.038 kms
kms
53.723 kms
53.000 kms

0.110 kms
###
0.200 kms
###
1.005 kms
5.038 kms
kms
###
6.353 kms
6.000 kms
###

1.600 kms
225.805 kms
17.480 kms
5.038 kms
kms
249.923 kms
250.000 kms

Doors
Sl. No.
1
2
2
Windows
Sl. No.
1
2
Ventillators
Sl. No.
1
Columns
Sl. No.
1

Type
D
D1
D2
Type
W
W1
Type
V
Type
C

Size
3'-6" X 7'-0"
3'-0" X 7'-0"
2'-6" X 7'-0"
Size
4'-0" X 4'-0"
2'-6" X 4'-0"
Size
2'-0" X 1'-6"
Size
0'-9" X 1'-0"

Name of Work :-

Construction of Model Anganwadi Centre Building in Kesavadasu

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

ng in Kesavadasupalem - 4 (Code No. 178) of Sakhinetipalli Mandal Under NABARD R

ve Engineer (R&B),
sion : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

ndal Under NABARD RIDF XX in E.G. Dist.

ROADS AND BUILDINGS DEPARTMENT

Name of work : Construction of Model Anganwadi Centre Building

in Kesavadasupalem - 4 (Code No. 178) of


Sakhinetipalli Mandal Under NABARD RIDF XX in
E.G. Dist.

Estimate Amount Rs:

12.00 /-

(R&B) Section : Malikipuram


(R&B) Sub-division : Razole
(R&B) Division : Amalapuram
(R&B) Circle : Kakinada

EAST GODAVARI DISTRICT

Lakhs

D BUILDINGS DEPARTMENT

on of Model Anganwadi Centre Building


vadasupalem - 4 (Code No. 178) of
alli Mandal Under NABARD RIDF XX in

B) Section : Malikipuram

B) Sub-division : Razole

B) Division : Amalapuram

R&B) Circle : Kakinada

T GODAVARI DISTRICT

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Name Work:-

800000134 of 860

Construction of two suited inspection bungalow at P. Gannavar


Godavari District.
DETAILED - CUM - ABSTRACT ESTIMATE (First Floor & Terrace)

Sl.
No.
1

Description

No.

Measurements
L
B
4
5

D
6

Quantity
7

VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to


Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including HIRE CHARGES FOR CENTERING &
SCAFFOLDING cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site, and sales & other taxes on all materials including
all operational, incidental and labour charges such as machine mixing, laying concrete,
curing but excluding Seigniorage charges, etc.,complete for

FOUNDATIONS, PLINTH,

PEDESTALS, PLINTH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS but excluding
cost of steel and its fabrication charges for finished item of work. for: VRCC
Nominal Mix
1 a) 1st floor for Columns
C-1 - 12
12 x
1
Add excess and rounding of ---- LS -----

0.23

0.38

3.05

: M-20

3.20
0.30
3.50
Cum

2 1st floor for Lintels


for W1
for BW
for Door D
for Door D1
for Door D2
for Door D3
for main door at sitout
Add excess and rounding of

2
6
2
2
3
2
1
----

x
1
x
1
x
1
x
1
x
1
x
1
x
1
LS -----

2.400
3.450
1.800
1.650
1.500
1.350
3.000

0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.23
0.23
0.15
0.15
0.15
0.15
0.15

0.25
1.10
0.12
0.11
0.16
0.09
0.10
0.07
2.00
Cum

3 1st floor for Beams


B-1,2,3
deduct columns
--- do --B-4,5,6,7
deduct columns
--- do --for sitout area
midlanding beam
beam at roof landing
Add excess and rounding of

3
-3
-3
4
-2
-2
2
1
1
----

x
1
x
2
x
2
x
1
x
3
x
3
x
1
x
1
x
1
LS -----

16.080
0.230
0.380
9.980
0.380
0.230
1.220
5.720
5.720

0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.38
0.38
0.38
0.38
0.38
0.38
0.45
0.38
0.38

4.22
-0.12
-0.20
3.49
-0.20
-0.12
0.25
0.50
0.50
0.68
9.00
Cum

a)

1st floor for Roof

4
Slab 125mm thickness

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

overall slab
deduct staircase
Add sitout area
Add excess and rounding of

1
-1
1
----

x
1
x
1
x
1
LS -----

Measurements
L
B
16.080
9.98
3.600
2.40
6.300
1.50

800000135 of 860

D
-------

Quantity
160.48
-8.64
9.45
0.71
162.00
Sqm

c)

1st

floor

for

Roof

5
Slab 150mm thickness
Stair first flight
Mid landing
Stair second flight
Add excess and rounding of

Supply & Placing M20

1
1
1
----

x
1
x
1
x
1
LS -----

2.800
2.400
2.800

1.20
0.90
1.20

-------

3.36
2.16
3.36
0.12

9.00
Sqm
as per 456 nominal mix using 20 mm size graded machine

crushed Hard Granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying
concrete, curing and vibrating etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work for Sun Shade 62.50 mm thick, for Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring
Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Ground
floor.
6 a) 1st floor for 62.50mm average thick 0.75M wide Sun shades
For windows W1
2 x
1
2.400
0.750
--For Bay windows BW
6 x
1
3.450
0.750
--Add excess and rounding of ---- LS -----

3.60
15.53
0.87
20.00
Sqm

7 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site, sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete,
curing etc.,complete for finished item of work, centering with Steel up to 3.66, lift
manuals per APSS. No. 402. for Stairecase steps.
1st floor for Staircase steps
Stair first flight
1 x
9
1.200
Stair second flight
1 x
9
1.200
Add excess and rounding of ---- LS -----

0.30
0.30

0.15
0.15

0.24
0.24
0.02
0.50
Cum

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)

800000136 of 860

Measurements
Sl.
Description
No.
Quantity
No.
L
B
D
8 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 12 mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and excluding Seigniorage charges and including sales &
other taxes on all materials including all operational, incidental and labour charges such
as machine mixing, laying concrete, curing etc.,complete for finished item of work, , lift
manuals per APSS. No. 402. For 'Z' Holdfasts.
1st floor for Bed blocks & 'Z' Hold fasts
for window bed blocks BW

3.450

0.230

0.15

0.71

for window bed blocks W1

2.400

0.230

0.15

0.17

for W1
for BW
for Door D
for Door D1
for Door D2
for Door D3
for main door at sitout
Add excess and rounding of

2
6
2
2
2
2
1
----

x
4
x
4
x
6
x
6
x
6
x
6
x
4
LS -----

0.230
0.230
0.230
0.230
0.230
0.230
0.230

0.230
0.230
0.230
0.230
0.230
0.230
0.230

0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.06
0.19
0.10
0.10
0.10
0.10
0.03
0.04
1.60
Cum

Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC
works complete wastage as per drawings and technical specifications Clause 1000 and
1202 MORD & 1100,1600 MORT & H for Bars below 36 mm dia including over laps and
wastage, where weldeding require to be done campulsorily
including cost and
conveyance of bars from approved sourses to site of work, binding wire, cover blocks
and all incidental,operational, labour charges such as cutting, bending, placing in
position, tying etc., and sales and sales & other taxes, on cost of materials for finished
item of work. for HYSD (F.e 415) F1 upto 3.66 M Lift Manual

1st floor for HYSD (Fe-415)


1
Columns concrete

Lintel concrete

Beams concrete

Roof slab 125mm thick

Roof slab 150mm thick


For Sunshades

3.50
Cum
2.00
Cum
9.00
Cum
20.25
Cum
1.35
Cum
1.25
Cum

160 Kgs/Cum

560.00

120 Kgs/Cum

240.00

170 Kgs/Cum

1,530.00

100 Kgs/Cum

2,025.00

100 Kgs/Cum
40 Kgs/Cum

Or say

135.00
50.00
4,540.00
Kgs
4.600
MT

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000137 of 860

Quantity

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000138 of 860

Quantity

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000139 of 860

Quantity

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000140 of 860

Quantity

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000141 of 860

Quantity

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.

Measurements
B

800000142 of 860

Quantity

NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by c
roll formed process steel sheet 1.25mm thick bright CRCA "D"confirming to IS 4351 - 1976 s
should be 50 x 60 mm with 32 mm rebate. The corner of the frame should be welded. The fra
should be painted with one coat of primer and finished painted with pure polyester paint, with to
coated thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate
38mm to accommodate 35mm thick door shutter. The frame section should have groove to ins
gasket. The section of the door and fan light frame is to be filled with polyurethane foam. The fra
section should be cut to length, and joined by way of welding and each frame should be provid
with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 Nos. for single shutter, 6 Nos.
double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm x 200mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 N
for single shutter frame. e)Tie Rod 1 No

1st floor
27 D of size 4'-0"x7'-0"

---

---

---

3.00
No.

27 D1 of size 3'-6"x7'-0"

---

---

---

2.00
No.

28 D2 of size 3'-0"x7'-0"

---

---

---

3.00
No.

Supply and Fixing Flush door shutters, solid bond wood block board type with commercial ply on bo
faces.: 35 mmthick conforming to IS:2202 (part-II) 2983, 4mm thick paint grade commercial plywo
on both sides with internal lipping and 230 mm wide push plate and 150 mm wide kickplate on bo
sides with 1.5mm thick prelaminated sheet (decolam or equivalent) including cost and conveyan
of all materials to work site and including all taxes, all labour charges for making, fixing of d
furniture in position as directed by dept. including cost of furniture fittings like tower bolts, aldro
handles etc., for diferent of doors as mentioned in approved drg. for finished item of work.

1st floor
29 D of size 4'-0"x7'-0"

---

---

---

3.00
No.

30 D1 of size 3'-6"x7'-0"

---

---

---

2.00
No.

31 D2 of size 3'-0"x7'-0"

---

---

---

2.00
No.

32 Supply and fixing of PVC doors to the toilets Door of size 0.75 x 2.00M providing door frame made
hollow extruded PVC section (Nandi or equivalent) having dimensions of 40 X 57mm with the w
thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. The do
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) provid
door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groo
locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5m
+/- 0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. T
shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall
reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
the hardware is fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete w
all materials conveyance charges including providing all fixtures, as per the given design for finish
item of work as directed by the Departmental Officers for finished item of work.

800000143 of 860
993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)
Supply and fixing of PVC doors to the toilets Door of size 0.75 x 2.00M providing door frame made
having dimensions of 40 X 57mm with the w
Sl. hollow extruded PVC section (Nandi or equivalent) Measurements
Description
No.
Quantity
plank
No. thickness of 2mm +/- 0.2mm duly reinforced withL seasoned wood
B
D at the hinges side. The do
frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME (Nandi or Equivalent) provid
door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groo
locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5m
+/- 0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. T
shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall
reinforced inside the door shutter during the fabrication of the door shutter at those points wherev
the hardware is fixed on to the door shutter. PVC DOOR SHUTTER (Nandi or Equivalent) complete w
all materials conveyance charges including providing all fixtures, as per the given design for finish
item of work as directed by the Departmental Officers for finished item of work.

1st floor
D3 of size 2'-6"x7'-0"

---

---

---

2.00
No.

Providing and fixing of Windows/Ventilators made of Pre Painted Steel (base steel as per IS 513
6mm thick "D" quality galvanised as per IS 277 with a zinc of 120 GSM). Primer coated with epo
primer of 5 - 7 microns thick finish painted with a polyester paint of 12-16 microns thick and ba
coated with 5 - 7 microns thick allyed backer. Section for outer frame should be of 46x52 mm sect
for shutters should be of 46x46 mm section for mullion should be of 46x70 mm and section
beeding should be of 18x25 mm the glazing should be panelled with 5mm thick plain glass a
4mm pin headed glass for Ventilators with Ethyl Propylene Diamine Monomar (EPDM) Gaskets. T
sections are to be cut to length, mitre joined with corner brackets. Centre Mulions are to be fix
using mullion cap. Handle made of alluminium powder coated with nylon receiver. Gaskets made
Ethyl Propylene Diamine Monomar (EPDM). Corner brackets made of CRCA with Zinc phosphati
Mullion caps made of glass filled nylon. Guard bars of 10mm are to be provided. the above fra
should be fixed to the concrete/masonary wall by means of self expanding screws ( as per approv
drawing)

1st floor
33 W1 of size 6'-0" x 4'-6"

1.80

---

1.35

4.86
sqm

34 BW of size 9'-6" x 4'-6"

2.85

---

1.35

23.09
No.

35 WV of size 2'-0" x 2'-0"

0.60

---

0.60

0.72
No.

36 Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 m
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and s
vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at s
height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bo
nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted w
one coat of approved steel primer etc., complete for finished item of work as per special spn 1105
1st floor
Varandha

2.40

---

2.67

6.41
6.41
Sqm

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)

800000144 of 860

Measurements
Sl.
Description
No.
Quantity
No.
L
B
D
39 Painting with White washing for Ceiling and Walls two coats with whiting of approved quality to g
an even shade after thoroughly brushing the surface to remove all dirt and remains of loo
powdered materials including cost of all materials, labour charges and incidental such as scafoldi
lift charges etc., complete for finished item of work, including conveyance charges of materials for
Floors
VVIP bed 1&2
DRG/Dining room 1&2

2
2

T.V. Lounge
Stair case area
toilet 1&2
Dressing room 1&2
sitout area
Stair first & second flight
Mid landing
Add excess and rounding of

1
1
2
2
1
2
1
----

x
x

1
1

4.65
4.65

5.26
4.04

..
..

48.92
37.57

x
1
x
1
x
1
x
1
x
1
x
1
x
1
LS -----

5.87
2.40
1.60
1.60
5.87
1.20
2.40

4.04
1.43
2.51
2.51
1.50
2.80
0.90

..
..
..
..
..
..
..

23.71
3.43
8.03
8.03
8.81
6.72
2.16
2.62
150.00
Sqm

40 Painting for Walls with priming coat of approved quality to give an even shade after thoroug
brushing the surface to remove all dirt and remains of loose powdered materials including cost of
materials, labour charges and incidental such as scafolding, lift charges etc., complete for finish
item of work, including conveyance charges of materials for All Floors - for interior walls
First floor & SF
Total plaster area
Deduct external wall area
2 x
2
Add excess and rounding of ---- LS -----

4.04

---

3.05

#VALUE!
-291.71
4.57
#VALUE!
Sqm

41 Painting for Walls with priming coat of approved quality to give an even shade after thoroug
brushing the surface to remove all dirt and remains of loose powdered materials including cost of
materials, labour charges and incidental such as scafolding, lift charges etc., complete for finish
item of work, including conveyance charges of materials for All Floors - for exterior walls
First floor & SF
Outside along X direction
Outside along Y direction

2
2

x
x

1
1

16.08
9.98

-----

3.35
3.35

107.74
66.87

deduct W1

-1

1.8

---

1.35

-4.86

deduct BW

-1

3.45

---

1.35

-27.95

Deduct D

-1

1.2

---

2.1

-2.52

Deduction V

-1

0.6

---

0.6

-0.72

Deduct FG

-1

0.6

---

1.5

-1.80

Stilt floor
Parapet Ist floor
Parapet IInd floor

45.00
2

1.35

---

0.90

4.86

6.00

---

0.90

10.80

16.08

---

0.90

57.89

9.98

---

0.90

35.93

1.35

---

0.90

4.86

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Sl.
No.

Description

No.
1

L
-2

Measurements
B

6.10

---

800000145 of 860

D
0.90

Add excess corners and rounding of ---- LS -----

Quantity
-10.98
6.59
291.71
Sqm

42 Providing 110mm dia ISI marked P.V.C down water take pipes-2.5mm thick including cost
necessary P.V.C Bends, Shoes, Iron Clamps and all other accessories and fixing in position includ
cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operational a
Incidental charges including all labour charges for fixing at site etc; complete for finished item
work.
4

8.00

---

---

32.00
RM

43 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Gran
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials l
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniora
charges, sales & other taxes on all materials including all operational, incidental and labour charg
such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and
fabrication charges for finished item of work for Slabs 50 mm thick etc., for Racks & Platform e
as per APSS. No. 402.

1st floor
For bay windows sill
6 x
1
Add excess and rounding of ---- LS -----

3.450

0.75

15.53
0.47
16.00
sqm

Total Amou

Assistant Executive Engineer (R&B)


Section: Gannavaram

Deputy Executive Engineer (R&B)


Sub Division: Kothapeta

Executive Engineer (R&B)


Division : Amalapuram

Superintending Engineer (R&B)


Circle : Kakinada

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)

of two suited inspection bungalow at P. Gannavaram in East


trict.

ABSTRACT ESTIMATE (First Floor & Terrace)


Rate / per

Amount

8889.00
1 Cum

31,112

9035.00
1 Cum

18,070

8806.00
1 Cum

79,254

800000146 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

964.10
1 Sqm

1092.20
1 Sqm

681.00
1 Sqm

6029.00
1 Cum

Amount

156,185

9,830

13,620

3,015

800000147 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

5781.00
1 Cum

50286.00
1 MT

Amount

9,250

231,316

800000148 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

800000149 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

800000150 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

800000151 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

800000152 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

800000153 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

and fixing MS. Hallow door frames manufactured by cold


thick bright CRCA "D"confirming to IS 4351 - 1976 size
te. The corner of the frame should be welded. The frame
r and finished painted with pure polyester paint, with total
or frame section should be of 105x60mm with a rebate of
r shutter. The frame section should have groove to insert
ght frame is to be filled with polyurethane foam. The frame
ed by way of welding and each frame should be provided
hinges of 100nn long 3 Nos. for single shutter, 6 Nos. for
eners of 6 Nos. 3 in each vertical. c) 40mm x 200mm x
6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No.

2998.00
Each

8,994

2915.00
Each

5,830

2862.00
Each

8,586

d bond wood block board type with commercial ply on both


(part-II) 2983, 4mm thick paint grade commercial plywood
0 mm wide push plate and 150 mm wide kickplate on both
et (decolam or equivalent) including cost and conveyance
g all taxes, all labour charges for making, fixing of door
ncluding cost of furniture fittings like tower bolts, aldrops,
ioned in approved drg. for finished item of work.

7037.00
Each

21,111

6507.00
Each

13,014

5976.00
Each

11,952

ts Door of size 0.75 x 2.00M providing door frame made of


quivalent) having dimensions of 40 X 57mm with the wall
ed with seasoned wood plank at the hinges side. The door
welded. PVC DOOR FRAME (Nandi or Equivalent) providing
d hollow section(Nandi or equivalent) of 20mm X 200 mm
1mm equally divided into 4 no's with tongue and groove
is made of 58 X 24 mm with the wall thickness of 1.5mm
at 4 corners with 125mm X 225mm plastic brackets. The
ith 2 no's of 8mm PVC rods. Teak wood batons shall be
he fabrication of the door shutter at those points wherever
r. PVC DOOR SHUTTER (Nandi or Equivalent) complete with
g providing all fixtures, as per the given design for finished
ntal Officers for finished item of work.

800000154 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

4454.00
Each

Amount

8,908

rs made of Pre Painted Steel (base steel as per IS 513 of


IS 277 with a zinc of 120 GSM). Primer coated with epoxy
ed with a polyester paint of 12-16 microns thick and back
ker. Section for outer frame should be of 46x52 mm section
ction for mullion should be of 46x70 mm and section of
azing should be panelled with 5mm thick plain glass and
h Ethyl Propylene Diamine Monomar (EPDM) Gaskets. The
ined with corner brackets. Centre Mulions are to be fixed
inium powder coated with nylon receiver. Gaskets made of
M). Corner brackets made of CRCA with Zinc phosphating.
Guard bars of 10mm are to be provided. the above frame
wall by means of self expanding screws ( as per approved

6261.00

30,428

sqm
6261.00

144,566

Each
4983.00

3,588

Each

s with vertical, double channel of 20 x10x2 mm of 100 mm


m with 38 mm dia steel pulleys, the top, bottom and side
h 65x65mmx8mm MS Angle and middle guide rail at site
ulleys to guide and fixed with necessary hold fasts, bolts,
ers, handles, all accessories all fixtures and painted with
mplete for finished item of work as per special spn 1105

2844.00
1 Sqm

18,230

800000155 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

Amount

nd Walls two coats with whiting of approved quality to give


g the surface to remove all dirt and remains of loose
aterials, labour charges and incidental such as scafolding,
m of work, including conveyance charges of materials for All

26.30
1 Sqm

3,945

approved quality to give an even shade after thoroughly


d remains of loose powdered materials including cost of all
such as scafolding, lift charges etc., complete for finished
es of materials for All Floors - for interior walls

54.90
1 Sqm

approved quality to give an even shade after thoroughly


d remains of loose powdered materials including cost of all
such as scafolding, lift charges etc., complete for finished
es of materials for All Floors - for exterior walls

#VALUE!

800000156 of 860

993300DETAILED CUM ABSTRACT ESTIMATE (BUILDING)


Rate / per

48.30
1 Sqm

Amount

14,090

down water take pipes-2.5mm thick including cost of


s and all other accessories and fixing in position including
es tax & Other taxes on materials to site, Operational and
harges for fixing at site etc; complete for finished itemof

372.00
1 RM

11,904

using 12 mm size graded machine crushed Hard Granite


quarry including cost and conveyance of all materials like
ggregate, water etc., to site and including Seigniorage
als including all operational, incidental and labour charges
, curing etc.,complete but excluding cost of steel and its
ork for Slabs 50 mm thick etc., for Racks & Platform etc.,

1111.00
1 sqm

Total Amount

Deputy Executive Engineer (R&B)


Sub Division: Kothapeta

Superintending Engineer (R&B)


Circle : Kakinada

17,776

#VALUE!

800000157 of 860

QUARRY CHART

Name of the work:


Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of Sakhinetipalli Mandal Under NABA

Proposed Anganwadi centre at Palivela

PR Road
KM 24/6

A-G Road
Bricks Kiln
Jonnada 2.332 kms
Lalacheruvu
km 195.000

Amalapuram -

M-J Road (13.932 - 11.600)


Jonnada NH -5

KM 36/4
NH5 Jn. Km 162.100

Loop Road - 0.
Ravulapalem NH5 Jn. Km 160.8

Kms 165.200
Metal Quarry at
Katheru 2.200 kms CT

Asst. Executive Engineer (R&B)


Section: Kothapeta

Deputy Executive Engineer (R&B)


Sub-Division: Kothapeta

Sand ramp for at


Ravulapalem 2.200Kms CT

Executive Engineer (R&B)


Division: Amalapuram

dal Under NABARD RIDF XX in E.G. Dist.


Palivela Pallipalem road
PR Road

Amalapuram - Bobbarlanka Road

Loop Road - 0.23 Km


NH5
H5 Jn. Km 160.850
Vijayawada

Superintending Engineer (R&B)


Circle: Kakinada

Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No.


of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

ESTIMATE Rs. 11.03 LA


Abstract
Description
Sl.
No.
1 Augoring and boring of holes in site for Bored cast-insitu R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils without
under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and
shell equipment, etc, complete for all depths and for
finished item of work for piles of following diameters.

unit

Qunatity

1Rm

84

Earth work excavation for Narrow BUILDING foundations


and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting,
etc. complete for finished item of work, but excluding
dewatering charges in Ordinary Soil-Manual Means-Upto
3M depth etc as per SS 20B (ApSS 308) for:-Ordinary
soil-Manual up to 3.0 M

1cum

7.00415

Plain Cement Concrete (1:5:10) proportion nominal mix


(cement: fine aggregate: Coarse aggregate) for
foundation levelling courses and below flooring beds
using 40mm size (SS5) hard Granite metal upto Plinth
level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site and sales & other taxes on
all materials and including all charges for mixing, laying
concrete in foundations ramming in 15 cm layers
finishing top surface to the required level curing, but
excluding seigniorage charge etc., complete for finished
item of work. (APSS No. 402) for:-Machine Mix-PCC
(1:5:10) NOMINAL MIX

1cum

###

160 of 860

Abstract
Description
Sl.
No.
4 Providing Vibrated Cement concrete (1:3:6) as per 456
nominal mix using 40 mm size graded machine crushed
Hard Granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and sales & other taxes on all
materials including all operational, incidental and labour
charges such as machine mixing, laying concrete, curing
and vibrating but excluding Seigniorage charges,
etc.,complete for finished item of work, per APSS. No.
402. for foundations & Basement walls for:-VCC in CM
(1:3:6)

Supply and placing of the M 20 Grade Design Mix


Concrete corresponding to IS 456 using WEIGH BATCHER
/ MIXER with 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, pouring concrete by tremmy, curing
etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No.
402) with minimum cement content as per IS code from
standard suppliers approved by the department for
finished item of work. BORED CAST-IN-SITU UNDER
REAMED PILES including Bore pile stem and under ream
bulbs

unit

Qunatity

1cum

#REF!

1cum

#REF!

161 of 860

Abstract
Description
Sl.
No.
6 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Foundations- Footings VRCC
: M-20
Nominal Mix Centering with Steel upto 3.66

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Pedestals-VRCC
: M-20 Nominal Mix
Centering with Steel upto 3.66

unit

Qunatity

1cum

###

1cum

7.5

162 of 860

Abstract
Description
Sl.
No.
8 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Plinth-VRCC : M-20 Nominal Mix Centering
with Steel upto 3.66

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Columns-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual

unit

Qunatity

1cum

4.6

1cum

2.8

163 of 860

Abstract
Description
Sl.
No.
10 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-LINTELS-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual

11 VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:Beams-VRCC : M-20 Nominal Mix Floor - 0 Centering
with Casurina Ballies, Bamboos, Wooden Reapers,
Runners, Wood Posts, Wall Plates, Steel Centring Plates
upto 3.66 Lift Manual

unit

Qunatity

1cum

#REF!

1cum

3.6

164 of 860

Abstract
Description
Sl.
No.
12 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
120 mm thick-VRCC : M-20 Nominal Mix Floor - 0
Centering with Casurina Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates, Steel
Centring Plates upto 3.66 Lift Manual

13 VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
150 mm thick -VRCC : M-20 Nominal Mix Floor - 0
Centering with Steel upto 3.66 Lift Manual

unit

Qunatity

1sqm

98.4

1sqm

#REF!

165 of 860

Abstract
Description
Sl.
No.
14 RCC M- 20 Nominal mix (Cement:fine aggregate: coarse
aggregate) corresponding to Table 9 of IS 456 using
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and sales &
other taxes on all materials including all operational,
incidental and labour charges such as machine mixing,
laying concrete, curing but excluding Seigniorage
charges, etc.,complete for RCC SLABS, BEAMS but
excluding cost of steel and its fabrication charges for
finished item of work. for:-Sun Shade -RCC : M-20
Nominal Mix Floor - 0 Centering with Steel upto 3.66
Slab thk 62.50mm Lift Manual

unit

Qunatity

1sqm

#REF!

15 Filling with useful available excavated earth (excluding


rock) in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to
work site and all operational, incidental, labour charges,
hire charges of T & P, etc., complete for finished item of
work. (APSS NO. 309 & 310) for Refilling foundations.

1cum

#REF!

16 Filling with Sand in trenches, sides of foundations &


basement from approved quarry consolidating deposited
layer by watering and ramming, including
all
operational, incidental, labour charges, complete
including cost and conveyance of sand / gravel, but
excluding Seigniorage charges, etc; for finished item of
work. (APSS No 309 & 310). for:-Sand filling

1cum

56

166 of 860

Abstract
Description
Sl.
No.
17 Brick Masonary 230mm thick for pannel walls in Super
structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scafolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Super Structure for Lift Manual

18 Reinforced Brick Masonary walls of 100 mm thick in CM


(1:4) using second class bricks having a crushing
strength of 2.5 N/sq.mm. and placing 2 nos of 6mm M.S
plain rods in ever third layer with free ends of the
reinforcement pegged into mortar joints of main brick
walls were applicable including cost and conveyance of
all materials and water from approved sources to work
site and all operational, incidental, labour charges such
as scafolding mixing mortor constructing masonary lift
charges, curing but excluding Seigniorage charges, etc.
complete, but excluding the cost of steel and its
fabrication charges for finished item of work as per SS
509 & 501 for Lift Manual

unit

Qunatity

1cum

#REF!

1sqm

#REF!

167 of 860

Abstract
Description
Sl.
No.
19 RCC M- 20 Nominal mix (Cement:fine aggregate: coarse
aggregate) corresponding to Table 9 of IS 456 using
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and sales &
other taxes on all materials including all operational,
incidental and labour charges such as machine mixing,
laying concrete, curing, but excluding Seigniorage
charges, etc.,complete for FOUNDATIONS, PLINTH,
PEDESTALS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Foundations-VRCC
: M-20 Nominal Mix Centering with Steel upto 3.66
(STRIP BANDS)

20 Plain Cement Concrete M-20 grade as per IS 456


Nominal mix, using 20mm graded machine crushed
Hard Granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and sales & other taxes on all
materials including all operational, incidental and labour
charges such as machine mixing, laying concrete,
curing, including seigniorage charges etc.,complete
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING but excluding cost of steel and its
fabrication charges
for finished item of work for
Stairecase steps , centering with Stell up to 3.66, as
per APSS. No. 402 Lift Manual

unit

Qunatity

1cum

#REF!

1cum

#REF!

168 of 860

Abstract
Description
Sl.
No.
21 Supplying, fitting and placing HYSD (Fe 415/ tmt grade
as per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above,
where welding required to be done compulsorily
including cost and conveyance of bars from approved
sources to site of work, binding wire, cover blocks and
all incidental, operational, labour charges such as
cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Floor 0 Lift Manual

unit

Qunatity

1MT

4.02

22 Supplying, fitting and placing Mild Steel 6mm (Fe


250/tmt IS 1786-1985) bar reinforcement VRCC works
complete wastage as per drawings and technical
specifications Clause 1000 and 1202 MORD &
1100,1600 MORT & H for Bars 6 mm dia including over
laps and wastage, where weldeding require to be done
campulsorily including cost and conveyance of bars
from approved sourses to site of work, binding wire,
cover blocks and all incidental,operational, labour
charges such as cutting, bending, placing in position,
tying etc., and sales and sales & other taxes, on cost of
materials for finished item of work. for MILD STEEL (F.e
250) F1 for Reinforced Brick Masonry Lift Manual

1MT

#REF!

169 of 860

Abstract
Description
Sl.
No.
23 Providing impervious coat to exposed RCC roof slab
surfaces to required slopes with CM (1:3) prop. 20mm
thick (average) mixed with water proofing compound,
laid over roof slab when it is green, finished smooth with
a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and
conveyance of all materials like sand, water proofing
compound, water etc., to site, and sales & other taxes
on all materials and operational, incidental, and labour
charges for mixing mortar, laying, lift charges, rendering
smooth and thread lining, curing including rounding of
junctions of wall and slab, but excluding Seigniorage
charges, etc., complete for finished item of work. (APSS
No. 901 & 903) for:-Impervious coat CM(1:3), 20mm Lift
Manual

24 Ceiling Plastering 12 mm thick in two coats with base


coat of 8mm thick in CM (1:5) and top coat of 4mm thick
in CM (1:3) with dubara sponge finishing including cost
and conveyance of all materials like cement, sand,
water etc., to site, and sales & other taxes on all
materials, and all operational, incidental charges on
materials and including cost of all labour charges for
mixing mortar, finishing, scafolding, lift charges, curing
as directed by Engineer - in - charge but excluding
Seigniorage charges, etc., complete for Internal & Even
faces and RCC exposed faces for finished item of work.
(SS 901,903 & 904) for:-Plastering 2/c in CM (1:3) &
(1:5): 12 mm Floor - 0 Centering with Steel upto 3.66
Lift Manual(CEILING)

unit

Qunatity

1sqm

#REF!

1sqm

150

170 of 860

Abstract
Description
Sl.
No.
25 Plastering 20 mm thick in two coats with base coat of 16
mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
External & Uneven Surfaces of Brick Wall for finished
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
CM (1:4) & (1:6): 20 mm Floor - 0 Centering with Steel
upto 3.66 Lift Manual

26 Plastering 12 mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
Internal & Even faces of Brick Wall and RCC exposed
faces for finished item of work. (SS 901,903 & 904) for:Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0
Centering with Steel upto 3.66 Lift Manual

unit

Qunatity

1sqm

#REF!

1sqm

#REF!

171 of 860

Abstract
Description
Sl.
No.
27 Flooring with vitrified tiles of 1st quality, set over base
coat of cement mortar (1:8), 12 mm thick over CC bed
already laid or RCC roof slab, including neat cement
slurry of honey like consistency spread @ 3.3.kgs per
sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including
cost of all materials like cement, sand water and tiles
etc., complete, including seigniorage charges, etc.,
complete for finished item of work, , for:-Floring with
vitrified tiles 8 to 10mm thick in CM 1:8 Floor - 1 Lift
Manual

unit

Qunatity

1sqm

210

28 Providing skirting to internal walls to 15 cm height/risers


of steps with vitrified tiles length equal to flooring
stones, set over base coat of CM (1:5) 12 mm thick with
cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointed with white cement
paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement,
sand and water etc., complete but excluding
Seigniorage charges, etc., complete for finished item of
work, for:-Skirting/Riser with Vitrified tiles 8-10mm thick
in CM 1:5 Floor - 0 Lift Manual

1sqm

30

29 Flooring with ceramic tiles, set over base coat of cement


mortar (1:8), 7.30mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed neatly
with white cement paste to full depth mixed with
pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc.,
complete, but excluding Seigniorage charges, etc.,
complete for finished item of work, for:-Floring with
ceramic tiles 7.3mm thick in CM 1:8 Floor - 0 Lift
Manual

1sqm

30

172 of 860

Abstract
Description
Sl.
No.
30 Dadooing to walls with Glazed Tiles of 1st quality and
premium variety and colour as approved by Engineer,
7mm thick of size not less than 200 mm x 300 mm as
per the design and pattern approved by the architect of
approved colour, shade and make set over a base coat
of C.M (1:5) proportion, 12mm thick and neat grey
cement slurry of honey like consistency, spread at the
rate of 3.3kgs per sqm and jointed with white cement or
coloured cement to match the shade of the tiles,
including cost and conveyance of all materials like
cement, sand, water, tiles, coloured cement etc., to site,
cost of materials and all labour charges for mixing of
cement mortar, laying glazed tiles to level, curing, but
excluding Seigniorage charges, etc., complete for
finished item of work as directed by Engineer-in-charge.
for:-Dadooing tiles in CM 1:5 Lift Manual(CLADDING)

unit

Qunatity

1sqm

110

31 Flooring with Chequered Terrazzo tiles of 22 mm thick


(Medium shade) set over base coat of cement mortar
(1:6) 12 mm thick over CC bed already laid or RCC roof
slab, including near cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed with
neat cement to full depth mixed with pigment of
matching shade including cost of all materials like
cement, sand water and tiles etc., complete, but
excluding Seigniorage charges, complete for finished
item of work, including the cost of conveyance of all
materials.

1sqm

90

32 Roofing with 6 mm thick corrugated asbestos cement


sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain
washers complete including seigniorage charges etc.,
complete for finished item of work, but excluding the
cost of purlins, rafters, trusses & cost of conveyance of
all materials upto 600 pitch. for:-Roofing with 6 mm
thick corrugated asbestos cement sheets

1sqm

17

173 of 860

Abstract
Description
Sl.
No.
33 Providing mild steel pipes of diferent diameters
including cost and conveyance of all materials, cutting
and bending to required sizes and shapes placing in
position and welding as per approved designs and
drawings to the supplies at the time of execution of work
including cost and conveyance of materials, welding
rods
and
all
all
wastages
such
as
overlaps,couplings,welded
joints
etc.,
and
all
operational, incidental labour charges such as cutting
bending placing in position, welding etc., complete for
finished item of work for AC Sheet Roof First Floor Lift
manual

unit

Qunatity

1mt

0.11

34 Supplying and fixing Flush Doors by using Salwood


frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 1.2x2.1 m

1No

1.00

35 Supplying and fixing Flush Doors by using Salwood


frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 1.05x2.1 m

1No

2.00

36 Supplying and fixing Flush Doors by using Salwood


frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 1.00x2.1 m

1No

1.00

174 of 860

Abstract
Description
Sl.
No.
37 Supplying and fixing Flush Doors by using Salwood
frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 0.9x2.1 m

unit

Qunatity

1No

2.00

38 Supplying and fixing Flush Doors by using Salwood


frame section 100x 75 mm and fixing Flush shutters 35
mm thick with Bothsides commercial ply of Solid bond
wood core type of approved company make including
cost and conveyance of salwood , flush shutters,
furniture fittings like al aldrops, al towers bolts,al
handles,al door stoppers,ms butthinges, 'Z' hold fasts
labour charges etc., complete size 0.85x2.1 m

1No

1.00

39 Supplying and fixing fully paneled windows by using


Salwood frame of section 100x75 mm and shutter using
Teak wood styles and 20 mm thick teak wood panels
including cost and conveyance of Salwood, Teakwood
and providing MS Grills for safty grill, cost of furniture
fittings and fixing MS safty grills to frame including
labour charges and fixing in position etc., complete for
finished item of work as directed by Engineer - in Charge. for WINDOWS SIZE 1.5x1.35

1No

2.00

40 Supplying and fixing fully paneled windows by using


Salwood frame of section 100x75 mm and shutter using
Teak wood styles and 20 mm thick teak wood panels
including cost and conveyance of Salwood, Teakwood
and providing MS Grills for safty grill, cost of furniture
fittings and fixing MS safty grills to frame including
labour charges and fixing in position etc., complete for
finished item of work as directed by Engineer - in Charge. for WINDOWS SIZE 0.9x1.35

1No

4.00

175 of 860

Abstract
Description
Sl.
No.
41 Supplying and fixing fully paneled windows by using
Salwood frame of section 100x75 mm and shutter using
Teak wood styles and 20 mm thick teak wood panels
including cost and conveyance of Salwood, Teakwood
and providing MS Grills for safty grill, cost of furniture
fittings and fixing MS safty grills to frame including
labour charges and fixing in position etc., complete for
finished item of work as directed by Engineer - in Charge. for WINDOWS SIZE 0.9x1.07

unit

Qunatity

1No

2.00

42 Supplying and fixing sal wood fully glazed ventilators by


using salwood frame of 75x50 mm and fixing 2nos of
12mm MS SQARE BARS HORIZONTALLY AND FIXING 4MM
THICK PIN HEADED GLASS INCLUDING COST AND
CONVEYANCE OF ALL MATERIALS,LABOUR CHARGES FOR
WROUGHT IRONAND FIXING IN POSITION ETC,.
COMPLETE shutters BY USING glass pannels and
providing MS SAFETY GRILLS TO FRAME INCLUDING
conveyance of all materials,labour charges ETC,. AND
FIXING IN POSITIN ETC,. COMPLETE size 0.9x0.60m

1No

3.00

43 Supplying and fixing sal wood fully glazed ventilators by


using salwood frame of 75x50 mm and fixing 2nos of
12mm MS SQARE BARS HORIZONTALLY AND FIXING 4MM
THICK PIN HEADED GLASS INCLUDING COST AND
CONVEYANCE OF ALL MATERIALS,LABOUR CHARGES FOR
WROUGHT IRONAND FIXING IN POSITION ETC,.
COMPLETE shutters BY USING glass pannels and
providing MS SAFETY GRILLS TO FRAME INCLUDING
conveyance of all materials,labour charges ETC,. AND
FIXING IN POSITIN ETC,. COMPLETE .45x.60m

1No

1.00

176 of 860

Abstract
Description
Sl.
No.
44 Painting with White washing for Ceiling and Walls Two
coats with whiting of approved quality to give an even
shade after thoroughly brushing the surface to remove
all dirt and remains of loose powdered materials
including cost of all materials, labour charges and
incidental such as scafolding, lift charges etc., complete
for finished item of work, including conveyance charges
of materials for All Floors

unit

Qunatity

1sqm

230.00

45 Painting to New walls with 2 coats of ready mixed oil


bound wahsable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making 3 coats in all to give an even
shade after thourughly brushing the surface to remove
all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work
site and all operational, incidental, labour charges etc.
complete for finished item of work as per SS 911 for
internal walls for All Floors

1sqm

#REF!

46 Painting to new walls with 2 coats of plastic emulsion


paint of approved brand and shade over a base coat of
appropriate primer of approved brand, making 3 coats
after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials, including cost
and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for
finished item of work as per SS 911 for external walls

1sqm

#REF!

47 Painting with Synthetic Enamel paints - Two Coats - for


New Wood Work of approved brand and shade, Base
coat of Prime coat for Wood primer overall making 3
coats in all to give an even shade after throughly
brushing the surface to remove all dirt and remains of
loose
powdered
materials,
including
cost
and
conveyance of allmaterials to work site and all
operational, incidential, labour charges, etc., complete
for finished item of work as per SS 1207 & 1212. for All
Floors

1sqm

200

177 of 860

Abstract
Description
unit
Qunatity
Sl.
No.
48 Conveyance of surplus excavated earth with an extra 1Cum..
100
lead of 2 KMs over intial lead & lifts and cost and
transportation by tractors, loading & unloading charges
etc., complete, as directed by the Departmental officers
etc., complete for finished item of work.

49 Providing 110mm dia ISI marked P.V.C down water take


pipes-2.5mm thick including cost of necessary P.V.C
Bends, Shoes, Iron Clamps and all other accessories and
fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished
itemof work.

RM

20.00

178 of 860

Abstract
Description
Sl.
No.
50 ARCH TYPE WINDOW(TEAK WOOD) 1NO
51 BAY WINDOWS 2 NOS
52 PROVIDING MS RAILING USING 40MM MS PIPES

unit

Qunatity
LS
LS
LS

53 PROVISION FOR CUB BOARDS AND SHUTTERS

LS

54 PROVISION FOR FLY PROOF SHUTTERS TO WINDOWS

LS

55 PROVISION FOR ARCHITECTURAL FEATURES


56 PROVISON FOR SUPPLYING ANS FIXING FOLDING GLASS
SHUTTER DOORS 'FD" 2NOS

LS
LS

57 ROUNDING OFF

LS
CIVIL WORK TOTAL

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&


(R&B) Sub-division : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R&


(R&B) Circle : Kakinada

179 of 860

esavadasupalem - 4 (Code No. 178)


Dist.

ESTIMATE Rs. 11.03 LAKHS


Rate

Amount

241.7

20,303

244

1,709

3622.3

8,331

180 of 860

Rate

Amount

5072.5

#REF!

6772

#REF!

181 of 860

Rate

Amount

7104.5

68,232

7407.7

55,558

182 of 860

Rate

Amount

9068.7

41,716

8610

24,108

183 of 860

Rate

Amount

8690.5

#REF!

8150.9

29,343

184 of 860

Rate

Amount

963.7

94,828

1127.9

#REF!

185 of 860

Rate

Amount

664.4

#REF!

19.9

#REF!

714.8

40,029

186 of 860

Rate

Amount

4541.1

#REF!

569.4

#REF!

187 of 860

Rate

Amount

6902.4

#REF!

5604

#REF!

188 of 860

Rate

Amount

64159.2

257,920

58174.2

#REF!

189 of 860

Rate

Amount

319.2

#REF!

300.1

45,015

190 of 860

Rate

Amount

301.2

#REF!

286.4

#REF!

191 of 860

Rate

Amount

1532.3

321,783

1534.6

46,038

855.7

25,671

192 of 860

Rate

Amount

801.2

88,132

645.2

58,068

374.2

6,361

193 of 860

Rate

Amount

64903.6

7,139

7209

7,209

6701.2

13,402

6445.1

6,445

194 of 860

Rate

Amount

6193.3

12,387

6077.5

6,078

20332.8

40,666

12344.3

49,377

195 of 860

Rate

Amount

11209.7

22,419

1723.3

985.2

5,170

985

196 of 860

Rate

Amount

27.1

6,233

92.5

#REF!

154.7

#REF!

146.2

29,240

197 of 860

Rate

Amount

64.8

6,480

365.3

7,306

198 of 860

Rate

Amount

25000
60000
50000

25,000
60,000
50,000

50000

50,000

50000

50,000

50000
50000

50,000
50,000

10217

10,217
#REF!

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

199 of 860

Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No.


of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

ESTIMATE Rs. 11.03 LA


Abstract
Description
Sl.
No.
1 Augoring and boring of holes in site for Bored cast-insitu R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils without
under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and
shell equipment, etc, complete for all depths and for
finished item of work for piles of following diameters.

unit

Qunatity

1Rm

84.00

Earth work excavation for Narrow BUILDING foundations


and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting,
etc. complete for finished item of work, but excluding
dewatering charges in Ordinary Soil-Manual Means-Upto
3M depth etc as per SS 20B (ApSS 308) for:-Ordinary
soil-Manual up to 3.0 M

1cum

7.00

Filling with Sand in trenches, sides of foundations &


basement from approved quarry consolidating deposited
layer by watering and ramming, including
all
operational, incidental, labour charges, complete
including cost and conveyance of sand / gravel, but
excluding Seigniorage charges, etc; for finished item of
work. (APSS No 309 & 310). for:-Sand filling

1cum

56.00

200 of 860

Abstract
Description
Sl.
No.
4 Plain Cement Concrete (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) for
foundation levelling courses and below flooring beds
using 40mm size (SS5) hard Granite metal upto Plinth
level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site and sales & other taxes on
all materials and including all charges for mixing, laying
concrete in foundations ramming in 15 cm layers
finishing top surface to the required level curing, but
excluding seigniorage charge etc., complete for finished
item of work. (APSS No. 402) for:-Machine Mix-PCC
(1:5:10) NOMINAL MIX

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Foundations- piles VRCC : M-20 Nominal
Mix Centering with Steel upto 3.66

unit

Qunatity

1cum

2.30

1cum

9.60

201 of 860

Abstract
Description
Sl.
No.
6 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Pile caps -VRCC
: M-20 Nominal Mix
Centering with Steel upto 3.66

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Plinth-VRCC : M-20 Nominal Mix Centering
with Steel upto 3.66

unit

Qunatity

1cum

7.50

1cum

4.60

202 of 860

Abstract
Description
Sl.
No.
8 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Columns-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:Beams-VRCC : M-20 Nominal Mix Floor - 0 Centering
with Casurina Ballies, Bamboos, Wooden Reapers,
Runners, Wood Posts, Wall Plates, Steel Centring Plates
upto 3.66 Lift Manual

unit

Qunatity

1cum

2.80

1cum

3.60

203 of 860

Abstract
Description
Sl.
No.
10 VRCC M- 20 Nominal mix (Cement:fine aggregate:
coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
120 mm thick-VRCC : M-20 Nominal Mix Floor - 0
Centering with Casurina Ballies, Bamboos, Wooden
Reapers, Runners, Wood Posts, Wall Plates, Steel
Centring Plates upto 3.66 Lift Manual

11 VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for RCC
SLABS, BEAMS but excluding cost of steel and its
fabrication charges for finished item of work. for:-Slabs
150 mm thick -VRCC : M-20 Nominal Mix Floor - 0
Centering with Steel upto 3.66 Lift Manual

unit

Qunatity

1sqm

98.40

1sqm

#REF!

204 of 860

Abstract
Description
Sl.
No.
4 Brick Masonary 230mm thick for pannel walls in Super
structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scafolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Super Structure for Lift Manual

12 Plain Cement Concrete M-20 grade as per IS 456


Nominal mix, using 20mm graded machine crushed
Hard Granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and sales & other taxes on all
materials including all operational, incidental and labour
charges such as machine mixing, laying concrete,
curing, including seigniorage charges etc.,complete
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING but excluding cost of steel and its
fabrication charges
for finished item of work for
Stairecase steps , centering with Stell up to 3.66, as
per APSS. No. 402 Lift Manual

unit

Qunatity

1cum

#REF!

1cum

#REF!

205 of 860

Abstract
Description
Sl.
No.
13 Supplying, fitting and placing HYSD (Fe 415/ tmt grade
as per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above,
where welding required to be done compulsorily
including cost and conveyance of bars from approved
sources to site of work, binding wire, cover blocks and
all incidental, operational, labour charges such as
cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Floor 0 Lift Manual

unit

Qunatity

1MT

4.02

14 Ceiling Plastering 12 mm thick in two coats with base


coat of 8mm thick in CM (1:5) and top coat of 4mm thick
in CM (1:3) with dubara sponge finishing including cost
and conveyance of all materials like cement, sand,
water etc., to site, and sales & other taxes on all
materials, and all operational, incidental charges on
materials and including cost of all labour charges for
mixing mortar, finishing, scafolding, lift charges, curing
as directed by Engineer - in - charge but excluding
Seigniorage charges, etc., complete for Internal & Even
faces and RCC exposed faces for finished item of work.
(SS 901,903 & 904) for:-Plastering 2/c in CM (1:3) &
(1:5): 12 mm Floor - 0 Centering with Steel upto 3.66
Lift Manual(CEILING)

1sqm

150.00

206 of 860

Abstract
Description
Sl.
No.
15 Plastering 20 mm thick in two coats with base coat of 16
mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
External & Uneven Surfaces of Brick Wall for finished
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
CM (1:4) & (1:6): 20 mm Floor - 0 Centering with Steel
upto 3.66 Lift Manual

15 Plastering 12 mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scafolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
Internal & Even faces of Brick Wall and RCC exposed
faces for finished item of work. (SS 901,903 & 904) for:Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0
Centering with Steel upto 3.66 Lift Manual

16 ROUNDING OFF

unit

Qunatity

1sqm

#REF!

1sqm

#REF!

LS
CIVIL WORK TOTAL

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&


(R&B) Sub-division : Razole

Executive Engineer (R&B)

Superintending Engineer (R&


207 of 860

Abstract
Sl.
No.

Description
(R&B) Division : Amalapuram

unit

Qunatity
(R&B) Circle : Kakinada

208 of 860

esavadasupalem - 4 (Code No. 178)


Dist.

ESTIMATE Rs. 11.03 LAKHS


Rate

Amount

191

16,044

231.6

1,622

714.8

40,029

209 of 860

Rate

Amount

3484.4

8,014

7563.8

72,643

210 of 860

Rate

Amount

7906.9

59,302

9480.5

43,610

211 of 860

Rate

Amount

8816.7

24,687

8575.8

30,873

212 of 860

Rate

Amount

541.06

53,240

924.9

#REF!

213 of 860

Rate

Amount

4541.1

6029

#REF!

214 of 860

Rate

Amount

49445.3

198,770

289.6

43,440

215 of 860

Rate

Amount

301.2

275.1

#REF!

10217
#REF!

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


216 of 860

Rate

Amount

(R&B) Circle : Kakinada

217 of 860

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.

Water Supply & Sanitation


NAME OF WORK ::-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of S


Mandal Under NABARD RIDF XX in E.G. Dist.

11 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80

Unit

Rate

S& F 15 mm Nominal Bore GI pipe


Medium Grade

Rm

131.00

Add LA charges

Rm

33.00

each

131.00

Add Over Head Charges


Total rate per 1 Rm

1 S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including
the cost of pipe & its fittings & labour charges complete
Code
Unit for finished
Rate itemof work.
Material
BMW-F.85

S& F 32 mm Nominal Bore GI pipe


Medium Grade

Rm

269.00

m - 4 (Code No. 178) of Sakhinetipalli

er IS 1239 ISI mark with GI fittings


ed itemof work.
Coefficient
1.000
0%

Amount
131.00
0.00

14%

131.00
17.84
148.84

or say

149.00

er IS 1239 ISI mark with GI fittings


ed itemof
work.
Coefficient
Amount
1.000

269.00

2 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
(not requiring blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method

Rate
320.00
166.40

Foundation of Buildings
Seigniorage charges

cum
cum

166.40
30.00

Add Over Head Charges

cum

321.20

Total rate per 1 cum

2 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method

Rate
320.00
116.48

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

146.48

Total rate per 1 cum

1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross draina
appurtenant structures and placing the excavated stuf neatly in specified dump area or disposing of
directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Rate
Out turn of two mazdoors assumed at 4 cum per day.
DATA:
Manpower
SOR P. No. 266/I/10
Work Inspector
day
275.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
198.88
Excavation
Method

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

228.88

Total rate per 1 cum

1 Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers clear
carefully stacking materials useful for reuse if any etc., complete as directed by the Engineer-in-charge of th
Dismantling the existing Manglore tiled roof over ceiling tiles - Unit 1 sqm

Code
Manpower
BMT-S.05

Flat and pan tiles or Mangalore tiles over flat


tiles without roof timbers
Add LA charges
Add Over Head Charges

Unit

Rate

sqm

8.30
8.30

cum

8.30

Total rate per 1 sqm

2 Dismantling & Demolishing


and
disposal
of Lime work unserviceable materials within 100 metres
including labour charges etc., complete as directed by the Enginee - in - Charge.
Lime work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
390.40
393.79

cum

397.73

Total rate per 1 cum =

1 Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100 metres lead la
etc., complete as directed by the Engineer - in - Charge.
Unreinforced cement concrete upto 15 cm thicknes
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
780.80
784.19

cum

792.03

Total rate per 1 cum =


1 Dismantling and Demolition RCC work including stacking of serviceable materials and disposal of
materials within 100 metres lead labour charges etc; complete for finished item of work as directed by the
Charge.
RCC Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges
Total rate per 1 cum =

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
1382.40
1385.79

cum

1399.65

3 Dismantling Brick work including stacking of serviceable materials and disposal of unserviceable materia
metres lead labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge
Brick Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
130.88
134.27

cum

135.61

Total rate per 1 cum =

2 Dismantling Kadapa slabs or Shahabad stone slabs flooring on sand bed carefully stacking materials us
including labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge.
Kadapa slabs or Shahabad stones
Code
Manpower

Unit

Rate

BMT-S.11

Dismantling Kadapa slabs or Shahabad stone


slabs flooring
Add LA charges

sqm

4.20

cum

4.20

Add Over Head Charges

cum

4.20

Total rate per 1 sqm =

4 Dismantling clearing away and carefully stacking materials useful for reuse Old cement mortar plaster inclu
of serviceable materials and disposal of unserviceable materials within 100 metres lead labour charges etc
finished item of work as directed by the Engineer - in - Charge.
Old cement mortar plaster for 1 sqm
Code
Miscellaneous
BMT-S.08
Old cement mortar plaster
Add LA charges
Add Over Head Charges

Unit

Rate

sqm
cum

2.90
2.90

cum

2.90

Total rate per 1 sqm

5 Removing and Refixing Windows glazed of any thickness fixing the frame, fixing the fixures to the win
Labour charges for making, fabricating office furniture, racks, work-station furniture, cup-board shutters to
boards with ply-wood/ MDF sheets, decolam/ veneer laminations including fixing cutting, making, asse
hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with necessary screws exc
materials, accessories, fittings etc., complete as directed by the Engineer-in-charge of the work
Labour
charges
for making,
fabricatingfixing
officethe
Removing and Refixing
Windows
glazed
of any thickness
Code
Manpower
BMM-V.07

furniture, racks, work-station furniture, cupboard shutters to existing cup-boards with


ply-wood/ MDF sheets, decolam/ veneer
laminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures,
fixing
pasting sheets/ laminations
Add LAlocks,
charges
fixing in position with necessary screws
excluding cost of materials, accessories,
fittings etc

frame, fixing the fixures to the wind

Unit

Rate

sqm

365.00
365.00

Add Over Head Charges

sqm

365.00

Total rate per 1 sqm

6 Dismantling the existing Wrought and framed timber in roofs or floors clearing away and carefully stack
useful for reuse if any etc., complete as directed by the Engineer-in-charge of the work
Dismantling the existing Wrought and framed timber in roofs or floors
Code
Unit
Manpower
BMT-S.06

Wrought and framed timber in roofs or floors

cum

Add LA charges
Add Over Head Charges

Rate
125.00
125.00

cum

125.00

Total rate per 1 cum

5 Plain Cement concrete (1:6:10) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course

P.C.C. 1:6:10 for Base course

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

hour

328.60

Water

Mechinery
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3113.06

Total rate per 1 cum

22 Plain Cement concrete (1:4:8) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course

P.C.C. 1:4:8 for Base course


Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

hour

328.60

Water

Machinary
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3235.33

Total rate per 1 cum

23 Providing Vibrated Cement concrete (1:3:6) as per 456 nominal mix using 40 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, per APSS. No. 402.

P.C.C. 1:3:6 with centering


Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

4008.82

Water

Mechinery
SOR P. No. 379/16
SOR P. No. 379/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Miscellaneous

Total rate per 1 cum

3 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. First Floor

M-20 using 12 mm down graded metal F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60
2.47
165.70

hour

Add LA charges on Crew charges

1.78

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

SOR P. No. 229/I/11


SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
43.89
BLD-CSTN-6-1

Plastering with CM (1:3), 12 mm thick


A. MATERIALS:
Cement Mortar (1:3)
Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

cum
day
day
cum

3099.09
420.00
320.00
55.92

Add Over Head Charges

cum

234.94

Total rate per 1 cum

2 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. Second Floor

M-20 using 12 mm down graded metal F2


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60

hour

2.47
165.70

Add LA charges on Crew charges

1.78

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
43.89

Lift charges F2
Add LA charges

cum
cum

4.81
4.81

Miscellaneous

SOR P. No. 229/I/11


SOR P. No. 230/III/4

Miscellaneous

Plastering with CM (1:3), 12 mm thick


A. MATERIALS:
Cement Mortar (1:3)
Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

BLD-CSTN-6-1
cum
day
day
cum

3099.09
420.00
320.00
55.92

Lift charges F2
Add LA charges

cum
cum

5.59
5.59

Add Over Head Charges

cum

239.75

Total rate per 1 cum

6 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for FOOTINGS FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1

Code
Material

SOR P. No. 292/M- 189

Unit

BLD CSTN 3-14:31A


Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needle vibrator 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99

Hire charges for Centering and Scafafolding


Unsupported Height Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6922.71

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

7 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PEDASTALS FI

V.R.C.C. Design Mix M-20

Centering with Unsuported hight Pedastal FI-1

Code
Material

SOR P. No. 292/M- 189

Unit

BLD CSTN 3-14:31A


Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99

Hir charges for Centering and Scafafolding


Unsupported Hight Pedastal 1

cum

1025.00

Add LA charges

cum

710.00

Add Over Head Charges

cum

7224.71

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 /
B/Pedastals

Total rate per 1 cum

8 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PLINTH BEAM FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Plinth Beam -F1

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99

Hir charges for Centering and Scafafolding


Unsupported Hight Plinth beam F1

cum

2410.00

Add LA charges

cum

1075.00

Add Over Head Charges

cum

8609.71

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89/C/
Plinth beam

Total rate per 1 cum

9 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

420.00
375.00
320.00
1924.77
BACIC RATE 1 Cum

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns FI

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
Columns First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns FI

cum

1075.00

Add LA charges

cum

948.00

Add Over Head Charges

cum

7571.49

Total rate per 1 cum

10 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F2

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 93 /
Columns Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns F2

cum

1170.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

948.00
249.85
249.85

Add Over Head Charges

cum

7916.34

Total rate per 1 cum

11 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F3

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 93 /
Columns Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns F3

cum

1265.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1138.00
499.70
499.70

Add Over Head Charges

cum

8261.19

Total rate per 1 cum

12 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F1

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 89 /
Lintels First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels FI

cum

1518.00

Add LA charges

cum

675.00

Add Over Head Charges

cum

8014.49

Total rate per 1 cum

13 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F2

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Lintels Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels F2
Add LA charges
Lift charges F2
Add LA charges
Add Over Head Charges
Total rate per 1 cum

cum

1586.00

cum
cum
cum

743.00
249.85
249.85

cum

8332.34

14 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F3

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Lintels Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels F3
Add LA charges
Lift charges F3
Add LA charges
Add Over Head Charges

cum

1653.00

cum
cum
cum

810.00
499.70
499.70

cum

8649.19

Total rate per 1 cum

15 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS centering with Stell up to
APSS. No. 402. for BEAMS FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
Aggregates 20 mm Graded HBG
Water

cum
cum
cum
Kl

5.20
513.42
1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
90.49
165.70
42.07

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams FI

420.00
375.00
320.00
1062.66
BACIC RATE 1 Cum

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
Beams First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams FI

cum

2071.00

Add LA charges

cum

795.00

Add Over Head Charges

cum

6999.98

Total rate per 1 cum

16 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F2

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Beams Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams F2

cum

2151.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

875.00
119.52
119.52

Add Over Head Charges

cum

7199.50

Total rate per 1 cum

17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F3

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Beams Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams F3

cum

2230.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

954.00
239.04
239.04

Add Over Head Charges

cum

7398.02

Total rate per 1 cum

17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB FI

V.R.C.C. Design Mix M-20

Centering with Unsuported hight up to 3.66 M RCC Slab FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
11.46
165.70
5.33

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
132.94
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight RCC SLAB FI

cum

232.00

Add LA charges

cum

89.00

Add Over Head Charges

cum

848.57

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 / Slabs
up to 150 mm thick
First floor

Total rate per 1 Sqm 125mm thick

18 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F2

V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F2

cum

241.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

98.00
14.97
14.97

Add Over Head Charges

cum

872.54

Total rate per 1 Sqm

19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F3

V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F3

cum

250.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

107.00
29.94
29.94

Add Over Head Charges

cum

896.51

Total rate per 1 Sqm

20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase FI

V.R.C.C. Design Mix M-20

Centering hight up to 3.66 M VRCC Steps for Staircase FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
20.27
165.70
9.43

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
238.99
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight For Stairecase FI

cum

242.00

Add LA charges

cum

93.00

Add Over Head Charges

cum

1350.70

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 / Slabs
up to 225 mm thick
First floor

Total rate per 1 Sqm 225mm thick

21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase F2

V.R.C.C. Design Mix M-20

hight up to 3.66 M VRCC Steps for Stairecase 225mm thick F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F2

cum

251.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

102.00
26.87
26.87

Add Over Head Charges

cum

1386.57

Total rate per 1 Sqm

22 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick RCC Steps for Staircase F3

V.R.C.C. Design Mix M-20 Centering up to 3.66 M RCC Steps for Staircase 225mm thick F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Steps F3

cum

261.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

112.00
53.74
53.74

Add Over Head Charges

cum

1423.44

Total rate per 1 Sqm

19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick SUN SHADES FI

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges

hour

522.50
3.52

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
66.12
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade FI

cum

271.00

Add LA charges

cum

104.00

Add Over Head Charges

cum

575.46

Mechinery
SOR P. No. 325/9

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 /
CHAJJAS SUNSHADES First
floor

Total rate per 1 sqm

20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F2

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade F2

cum

281.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

114.00
6.96
6.96

Add Over Head Charges

cum

592.42

Total rate per 1 sqm

21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F3

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous

SOR P. No. 93 /
CHAJJAS SUNSHADES Third
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade F3

cum

292.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

125.00
13.92
13.92

Add Over Head Charges

cum

610.38

Total rate per 1 sqm

7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.

M - 20 Nominal Mix Centering with Unsuported hight Pedastal FI-1


Code
Unit
Material

Rate

CSSN-A-05

Cement 43 Gr. (including loading charges)

cum

5.20

BLD-CSTN-1.9

Aggregates 20 mm Graded HBG

cum

1920.72

M 005

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

SOR P. No. 250/M 189

Water

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous

420.00
375.00
320.00
1307.99

SOR P. No. 89 /
B/Pedastals

Hir charges for Centering and Scafafolding


Unsupported Hight Pedastal 1

cum

1025.00

Add LA charges

cum

710.00

Add Over Head Charges

cum

6959.38

Total rate per 1 cum

19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, W
RCC WALLS IN BUILDINGS, for Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall
Centring Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Lintles F2.

M - 20 Nominal Mix Centering with Unsuported hight Lintels -F3


Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including
cum
Seigniorage charges)
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 90 /
Lintles

Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight upto 3.66M Lintles
Floor 3

cum

1844.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1084.00
392.63
392.63

Add Over Head Charges


Total rate per 1 cum F 2

cum

8239.79

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F3

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Water

Mechinery
SOR P. No. 325/16

Concrete mixer 300 / 200 (diesel)

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II

day
day

420.00
375.00

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35

SOR P. No. 230/III/4

Light mazdoor
Add LA charges

day
cum

320.00
878.02

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Beams F3

cum

2619.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1277.00
193.03
193.03

Add Over Head Charges

cum

7694.12

Miscellaneous
SOR P. No. 90 /
Beams

Total rate per 1 cum

## Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

F3

Unit

Rate

cum
cum

5.20
1920.72

cum

513.42

Kl

77.00

hour

328.60
5.12
165.70
3.69

hour

day
day
day
sqm

420.00
375.00
320.00
87.82

Hir charges for Centering and Scafafolding


Unsupported Hight 3.60M 100 mm thick
Slab F3

sqm

297.00

Add LA charges
Lift charges F2
Add LA charges

sqm
sqm
sqm

145.00
19.33
19.33

Add Over Head Charges

cum

741.37

Total rate per 1 sqm

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sun Shades First floor

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1, Lift Manual

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
50.68
165.70
36.47

hour

day
day
day
cum

420.00
375.00
320.00
878.02
BACIC RATE 1 CUM

BACIC COST OF 1 SQM 62.50 mm THICK F1


Miscellaneous
SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick First floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50 mm thick Chajjas-Sunshades
First floor F1

cum

289.00

Add LA charges

cum

139.00

Add Over Head Charges

cum

570.80

Total rate per 1 sqm F 1

20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Third floor.

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 3

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
3.23
165.70
2.32

hour

day
day
day
cum

420.00
375.00
320.00
54.60

SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50 mm thick Chajjas-Sunshades
Third floor

cum

317.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

167.00
12.03
12.03

Add Over Head Charges

cum

633.51

Total rate per 1 sqm F 2

1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F1

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47
165.70
1.78

hour

Add Over Head Charges

day
day
day
sqm

420.00
375.00
320.00
83.94

cum

248.54

Total rate per 1 sqm

21 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F2

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG

cum
cum

5.20
1715.64

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

SOR P. No. 250/M 189

Water

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
2.47
165.70
1.78

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
83.94

Lift charges F2
Add LA charges

sqm
sqm

8.82
8.82

Add Over Head Charges

cum

257.36

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous

Total rate per 1 sqm

## Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F3

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
Lift charges F3
Add LA charges
Add Over Head Charges
Total rate per 1 sqm

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47
165.70
1.78

hour

day
day
day
sqm

420.00
375.00
320.00
83.94

sqm
sqm

17.64
17.64

cum

266.18

1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.

Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual

F1

Code
Material

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47

day
day
day
sqm

420.00
375.00
320.00
83.94

Hir charges for Centering and Scafafolding


Unsupported Hight
Add LA charges

cum

723.00

cum

446.00

Add Over Head Charges

cum

969.39

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 sqm

1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual

F3

Code
Material

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47

day
day
day
sqm

420.00
375.00
320.00
83.94

Hir charges for Centering and Scafafolding


Unsupported Hight

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
sqm
sqm

446.00
17.28
17.28

Add Over Head Charges

cum

986.67

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 sqm

5 Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and baseme
lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming
and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P e
Refilling foundation
for finished item of work. (APSS NO. 309 & 310) for Refilling foundations.
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
16.64
Add Over Head Charges
Total rate per 1 cum

cum

16.64

17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure FI

Brick Masonry in CM (1:8) for Super Structure FI, Lift Manual


Material
Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 91 / First
floor

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges
Add Over Head Charges

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

cum

304.84

cum

260.71

cum

4238.26

Total Super Structure rate per 1 cum

1 Reinforced Brick Masonary walls of 100 mm thick in CM (1:4) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Reinforced Brick Masonary walls of 100 mm in CM(1:4) for F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 91 / First
floor

Unit

Rate

Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges

Sqm
sqm

68.59
58.66

Add Over Head Charges

sqm

524.79

Total Super Structure rate per 1 sqm F1

5 Providing Vibrated Cement concrete (1:2:4) as per 456 nominal mix using 20 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No.

P.C.C. 1:2:4 Centering with Stell up to 3.66 M Hight


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
189.80
165.70
136.60

hour

day
day
cum

420.00
320.00
486.80

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

5420.19

Total rate per 1 cum

10 Providing Cement concrete (1:2:4) as per 456 nominal mix using 12 mm size graded machine crushed
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No
for top of compound wall

P.C.C. 1:2:4 Centering with Steel up to 3.66 M Hight


Code
Material

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60
189.80

day
day
cum

420.00
320.00
486.80

SOR P. No. 89 /
A/Footings

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

5069.92

Total rate per 1 cum

19 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501

Reinforced Brick Masonary walls of 100 mm in CM(1:6) for F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 91 / First
floor

Unit

Rate

Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges

Sqm
sqm

68.59
58.66

Add Over Head Charges

sqm

512.31

Total Super Structure rate per 1 sqm F1

6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
Stell up to 3.66, as per APSS. No. 402 for Strip Bands.

M - 20 Nominal Mix Centering with Unsuported hight Strip Bands.


Code
Unit
Material

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 250/M 189

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
0.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1307.99

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6491.68

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

19 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof First Floor Lift manual

Mild Steel Tube F1 lift manual


Code
Material
SOR P. No. 233/I/3

SOR P. No. 274/81

Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4

Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor

Rate

kg

70.00

M.T

38000.00

each

9.00

day
day
day

420.00
420.00
320.00

Hr

61.20

cum

7400.00

Mechinery
Welding Charges (Hire charges of Welding
Machine)
Add LA charges

Add Over Head Charges

cum

48852.00

Total rate per 1 MT

28 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual

Mild Steel Tube F2 lift manual


Code
Material
SOR P. No. 233/I/3

SOR P. No. 274/81

Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4

Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)

Rate

kg

70.00

M.T

38000.00

each

9.00

day
day
day
cum

420.00
420.00
320.00
7400.00

Hr

61.20

Lift charges F2
Add LA charges

cum
cum

740.00
740.00

Add Over Head Charges

cum

49592.00

Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges

Mechinery
Welding Charges (Hire charges of Welding
Machine)
Miscellaneous

Total rate per 1 MT

19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for FI
Impervious coat in CM (1:3) 20mm thick FI, Lift Manual.
Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 21/BMTImpervious Water Proof Compound
H.01

Unit

Rate

kg
Cum

5.20
513.42

kg

24.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Add Over Head Charges

Sqm

271.87

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Total rate per 1 sqm

20 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F3
Impervious coat in CM (1:3) 20mm thickF3
Code
Material
CSSN-A-05
M 005
BMT-H.01
Manpower
CSSR-M-011
CSSR-M-077
CSSR-M-087

Unit

Rate

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
Impervious Water Proof Compound

kg

5.20

Cum
kg

513.42
24.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Lift charges F3
Add LA charges

Sqm
Sqm

40.78
40.78

Add Over Head Charges

sqm

312.65

Miscellaneous

Total rate per 1 sqm

22 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
Ceilling Plastering with CM 2 coats, 12 mm thick F3
finished item of work (APSS 901,903 & 904) for Celling plastering F3.
Code
Unit
Rate
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Base Coat in CM(1:5), 8 mm thick


Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

23.91

Add LA charges
Lift charges F3
Add LA charges

Sqm
Sqm
Sqm

21.54
41.28
41.28

Add Over Head Charges

Sqm

305.74

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering

Scafafolding charges for Plastering F3

Total rate per 1 sqm F3

1 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in
dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to
seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on
including cost of all labour charges for mixing mortar, finishing, scafolding, lift charges, curing etc., a
Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for fin
work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual

Plastering with 12mm thick 2 coats F1


Code
Material
Base Coat in CM(1:6), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls

Unit

Rate

kg
cum

5.20
513.42

kg
cum

5.20
513.42

day
day
day
cum

420.00
375.00
320.00
206.39

Sqm

6.86

Add LA charges

cum

5.87

Add Over Head Charges

cum

242.17

Scafafolding charges for Plastering F1

Total rate per 1 sqm F1

24 Flooring plastering 20mm thick average in CM (1:4) with sponze finishing.cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth curing, etc,, complete for finished item of work (APSS 901,903 & 904) fo

Flooring plastering 20mm thick in CM (1:4) F-0


Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

kg
cum

5.20
513.42

day
day
cum

375.00
320.00
86.45

cum

136.54

Total rate per 1 sqm F-0

25 Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards and Labour charges for
of paris false ceiling with for GI channels of perimeter channel 30mm x 27mm x 0.55 thick and ceilin
51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint compound and luppum/ p
per specification without painting including cost of all materials including cost of Plaster of paris shee
finished item of work

Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards

Code
Material

Unit

(BLD CSTN 10-31 & SOR


No. 399.)

Rate

Coefficient

BMT-M.54

10mm thick plaster of paris board

Sqm

327.00

BMT-M.07

G.I. Perimeter Channel - 20 mm x 27 mm x


30 mm(web) of 0.55 mm thick

Rm

65.00

BMT-M.05

G.I. Ceiling Section 51.5 mm x 26 mm x 10.5


mm x 0.55 mm thick

Rm

74.00

BMT-H.90

Synthetic/ Plaster of Paris Putty

kg

14.00

Corpenter CI-1
Painter CI-1
Painter CII-2
Light mazdoor
Add LA charges

day
day
day
day
Sqm

420.00
480.00
375.00
320.00
533.63

Add Over Head Charges

sqm

1006.40

Manpower

Total rate per 1 sqm

31 Replacing boken glass pannel with 4mm pin headed glass including cost, conveyance of all materials to
operational, incidental and labour charge etc., complete for finished item of work as directed by the E
Charge.
Replacing boken glass pannel with 4mm pin headed glass
Code

Unit

Rate

Manpower
BMT-I.13, P.No. 27

BMM-V.24, P. No. 83

Pin headed Glass 4 mm thick

sqm

220.00

Add wastage 10%

sqm

220.00

Labour charges

sqm

173.00

Add LA charges

173.00

For wastage, Screws. And beading, etc

cum
L.S

Add Over Head Charges

cum

515.00

Total rate per 1 sqm

16 Supply of NITO bond AR 8 or equivalent chemical including cost and conveyance of all materials to site
taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of NITO bond AR 8 or equivalent chemical
Code
Material
NITO bond AR 8 or equivalent chemical approved
rate

Unit

Rate

lit

440.00

Total rate per 1 Lit

17 Supply of CONPLAST X 421 IC admixure equivalent chemical including cost and conveyance of all ma
including all taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of CONPLAST X 421 IC admixure equivalent chemical
Code
Unit
Rate
Material
CONPLAST X 421 IC admixure equivalent
chemical approved rate

lit

104.00

Total rate per 1 Lit

18 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary soil
For Ordinary soil up to 3 M
3M
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
116.48
Excavation Method

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

146.48

Total rate per 1 cum

4 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost
of purlins,
trusses
& cost of conveyance
of all materials
item of work upto 600 pitch S
Roofing
with 6rafters,
mm thick
corrugated
asbestos cement
sheets finished
F2
Code
Material
BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4

Unit taken 10 sqm


6 mm thick corrugated AC sheets
8 mm dia G.I J bolts & nuts
G.I washers
Bitumen washers
Carpenter II class
Man mazdoor
Add LA charges

Unit

Rate

t/sqm
nos
nos
nos

1880.00
8.00
0.50
0.20

day
day
cum

375.00
320.00
33.51

Miscellaneous
Sundries including 50 x 6 mm iron wind ties
white lead etc.

L.S

Add for Standard specification 1mm. Thick


ridging and 1.25 mm thick sheet vallyes
when such are required for a particular work.
Average allowance for 10 sqm roofing.

L.S

Lift charges F2
Add LA charges

cum
cum

3.35
3.35

Add Over Head Charges

sqm

3001.00

Total rate per 1 sqm= Rate/10 =

1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F2

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
526.07

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

sqm

554.55

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F3

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
526.07

Lift charges F3
Add LA charges
Add water Charges

sqm
sqm
sqm

45.98
45.98
45.98

Add Over Head Charges

sqm

577.77

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

35 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

843.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1159.57

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

Add Over Head Charges

sqm

1171.17

Total rate per 1 sqm

2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F3

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

843.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1159.57

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

1217.61

Miscellaneous

Total rate per 1 sqm

34 Flooring with ceramic tiles, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.01

Ceramic tiles 7.3mm thick 1st quality

Unit

Rate

Sqm

465.00

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
762.27

Add Over Head Charges

sqm

769.89

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

24 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement
pasteceramic
to full tiles,
depthset
mixed
with coat
pigment
of matching
shade,
cost of all materials like cemen
Flooring with
over base
of cement
mortar (1:8),
12 including
mm thick F3
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
Code
Unit
Rate
conveyance of all materials. for F3
Material
SOR P. No. 12 / BMTC.01

SOR P. No. 88 / BMSW.68

Ceramic tiles 7.3mm thick 1st quality

Sqm

465.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg
cum
Kg

5.20
513.42
29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor

day
day
day

420.00
375.00
320.00

Manpower

SOR P. No. 266/I/11


SOR P. No. 267/II/35
SOR P. No. 269/III/4

Add LA charges
Add water Charges

Sqm
sqm

229.92
758.52

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

812.55

Miscellaneous

Total rate per 1 sqm

35 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement paint spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, in
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
finished item of work. (APSS No 701 & 707) for Bath rooms F1

Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), F1

Code
Material

Unit

Rate

SOR P. No. 12 / BMTC.07

Glazed coloured Tiles of any size Ist Quality

Sqm

413.00

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Add Over Head Charges

sqm

717.77

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

34 Flooring with Chequered Terrazzo tiles of 22 mm thick (Medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F1

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

day
day
day

420.00
375.00
320.00

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor

Add LA charges
Add water Charges

Sqm
sqm

229.92
526.07

Add Over Head Charges

sqm

531.33

Total rate per 1 sqm


20 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost of purlins, rafters, trusses & cost of conveyance of all materials finished item of work upto 600 pitch
Roofing with 6 mm thick corrugated asbestos cement sheets F1
Code
Unit
Material
Unit taken 10 sqm
BMT-E.17
6 mm thick corrugated AC sheets
t/sqm
BMS-W.64
8 mm dia G.I J bolts & nuts
nos
BMS-W.65
G.I washers
nos
BMS-W.67
Bitumen washers
nos
Manpower
SOR P. No. 266/I/4
Carpenter II class
day
SOR P. No. 269/III/4
Man mazdoor
day
Add LA charges
cum
Sundries including 50 x 6 mm iron wind ties
white lead etc.

L.S

Add for Standard specification 1mm. Thick


ridging and 1.25 mm thick sheet vallyes
when such are required for a particular work.
Average allowance for 10 sqm roofing.

L.S

Add Over Head Charges

sqm

Rate
1880.00
8.00
0.50
0.20
375.00
320.00
33.51

2997.65

Total rate per 1 sqm= Rate/10 =

32 Supply and fixing of PVC doors to the toilets size 0.90 x 2.10M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.

Code
Considering siz of PVC door 090 x 2.10M
for PVC door frame (V)
for PVC door frame (H)

for PVC door Shutter

Unit
2x 2.10 =
2x 0.90 =

0.90x 2.10 =

Rate

ABSTRACT
Material
BMT-N.46
BMT-N.44

PVC door frame


PVC door Shutter

rm
sqm

215.00
1570.00

Add Over Head Charges

cum

4257.30

Total rate per each PVC door =

33 Gronolithick Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine c
laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m
the top surface to required smoothness and slopes and thread lining including cost of all materials like c
sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but
cost of conveyance of all materials for F1
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Unit

Rate

Sqm

1715.64

Kg
cum

5.20
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

285.00
260.00
215.00
101.69
217.96

Add Over Head Charges

sqm

220.14

6mm to 12 mm H.G. Metal (Machine


crushed)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)

Total rate per 1 sqm

29 NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by cold roll fo
steel sheet 1.25mm thick bright CRCA confirming to IS 4351 - 1976 size should be 50 x 60 mm with 32 m
corner of the frame should be welded. The frame should be painted with one coat of primer and finished
pure polyester paint, with total coated thickness of 1.25 mm. Size of door frame section should be of 105x
rebate of 38mm to accommodate 35mm thick door shutter. The frame section should have groove to inse
section of the door and fan light frame is to be filled with polyurethane foam. The frame section should be
and joined by way of welding and each frame should be provided with: a) 2mm thick MS powder coated
100nn long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 No
vertical. c) 40mm x 200mm x 1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Al
1 No. for single shutter frame. e)Tie Rod 1 No

Code
Material
BMT-F.01

MS. Hallow door frames manufactured by


cold roll formed process steel sheet 1.25mm
thick bright CRCA confirming to IS 4351 1976 with Hinges tower Bolts etc.
Add Over Head Charges

Unit

Rate

Rm

233.00

sqm

233.00

Total rate per 1 Rm

32 Cost Suply and Fixing Fly proof mesh ( Netlon make) of superior quality to the existing Windows & Ven
alround Willkro tape ( Male and Female Streep) duly fixing the tape to the Windows & Ventilaters frame us
screws Code
and gum of all materials work site and including all taxes and Unit
all labour charges
Rate for striching, ma
position as directed by Dept| Officers for finished item of work
Unit taken 6' - 0" x 4' - 6" =
###
For Window
27.00 Sft=
For frame
( 6'-0" + 6'-0") + (4'-6' + 4'-6' )
21.00 Rft Or
Material
BMT-F.18
Cost of Fly proof mesh (Netlon)
sqm
155.00
BMT-M.23
Cost of male and female tap
Rm
5.00
Stiching charges
L.S
Rm
15.00
Gum and Screws
L.S
Rm
7.00
Labour charges fixing
L.S
sqm
40.00
Wollon fly proof mesh for Window
Add Over Head Charges
1.00 sqm

2.510 sqm
each

Wollon fly proof mesh for Window=

662.25

752.42 x 1.00 sqm


2.51 sqm

25 Supply of Best Country Wood ( Sal Wood ) wrought and putup Sal Wood scantlings: any length in length
and conveyance of all materials to work site and all operational, incidential, labour charges, etc., comple
item
of work
Supply of Best Country Wood Sal Wood scantlings: any length wrought and putup
Code
Material
BMT-E.15
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Sal Wood scantlings: any length

cum

38847.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

26 Supply of Best Country Wood ( Sal Wood ) wrought and putup in Sal Wood Plancks: any thickness in len
cost and conveyance of all materials to work site and all operational, incidential, labour charges, etc.,
finished item of work
Supply of Best Country Wood Sal Wood Plancks: any thickness wrought and putup

Code
Material
BMT-E.16
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Sal Wood Plancks: any thickness

cum

49491.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

1 Supply of Best Teak Wood wrought and putup Teak Wood scantlings: any length including cost and conv
materials to work site and all operational, incidential, labour charges, etc., complete for finished item of wo
Supply of Best Teak Wood scantlings: any length wrought and putup

Code
Material
BMT-E.06
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Best Teak Wood scantlings: 2.0 to 3.0 M

cum

81225.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

2 Supply of Best Teak Wood wrought and putup in Teak Wood Plancks: any thickness in length includ
conveyance of all materials to work site and all operational, incidential, labour charges, etc., complete for
of work
Supply of Best Teak Wood Plancks: any thickness wrought and putup

Code
Material
BMT-E.08
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Best Teak Wood Plancks: any thickness

cum

116540.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum


27 Labour charges wrought and putup New Wood work etc., complete for finished item of work

Labour charges wrought and putup Wood work

Code
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Carpenter Cl- I
Light mazdoor
Add LA charges

Unit

Rate

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.20 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.20 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.52 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.20 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x1.085x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

512.83

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

5252.99

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.20 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.05 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.05 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.21 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.05 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x0.935x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

441.92

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4890.50

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.05 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.00 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.00 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.10 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.00 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x0.855x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

404.11

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4708.28

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.00 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.90 x 2.10 M
Code

Unit

Rate

Unit taken DOOR 'D' of size


Requirement of Sal wood

0.90 M x
For frame
Verticlal
Horizontal

1.89 sqm

2.10 M

2 x 2.1 x 0.10 x 0.075 =


1 x 0.9 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x0.785x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

371.04

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4528.13

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

0.90 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.85 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
0.85 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
1.79 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 0.85 x 0.10 x 0.075 =

Total Frame

35 mm thick

Requirement of flush shutter

1x0.755x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

356.85

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4444.91

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

0.85 x 2.10 M

Flush Shutter Door

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 1.50x1.35
Country wood Framed and Fully Panneled Window Three Shutters

Code
Unit taken 1.50x1.35 ( 3 Shutters) =

Requirement of Sal wood

1.50 M x
For frame
Verticlal
Horizontal

1.35 M

Unit
Rate
2.025 sqm

4 x 1.35 x 0.10 x 0.075 =


2 x 1.50 x 0.10 x 0.075 =

Total Sal wood Frame


Requirement of Teak wood

For shutters frame


4 x 2 x 1.225 x 0.075 x 0.030 =
Verticlal
4 x 3 x 0.425 x 0.075 x 0.030 =
Horizontal

Total Sal wood Frame


Requirement of Teak wood

For Shutter Planks

3 x 2 x 0.425 x 0.525 x 0.020 =

ABSTRACT
Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

555.75

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture for Windows Panelled : Thrible Leaf with half


Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

Aluminium Flat Latches: 200 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

6
6
6
3
3

Add Over Head Charges

sqm

14751.20

Aluminium Butt hinges (IS:205)- 75 mm Long


Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

1.50 x 1.35 M

Fully Panneled Window=

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.35
Country wood Framed and Fully Panneled Window Double Shutters

Code
Unit taken 0.90x1.35 ( 2 Shutters) =

Requirement of Sal wood

0.90 M x
For frame
Verticlal
Horizontal

1.35 M

Unit
Rate
1.215 sqm

3 x 1.35 x 0.10 x 0.075 =


2 x 0.90 x 0.10 x 0.075 =

Total Sal wood Frame


Requirement of Teak wood

For shutters frame


2 x 2 x 1.225 x 0.075 x 0.030 =
Verticlal
2 x 3 x 0.425 x 0.075 x 0.030 =
Horizontal

Total Sal wood Frame


Requirement of Teak wood

For Shutter Planks

2 x 2 x 0.362 x 0.525 x 0.020 =

ABSTRACT
Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

444.41

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture for Windows Panelled : Double Leaf with half


Shutters (Schedule Item No. 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

Aluminium Flat Latches: 200 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

2
4
4
2
2

Add Over Head Charges

sqm

8982.41

Aluminium Butt hinges (IS:205)- 75 mm Long


Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

0.90 x 1.35 M

Fully Panled Window

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.07
Country wood Framed and Fully Panneled Window Double Shutters

Code
Unit taken 0.90x1.07 ( 2 Shutters) =

Requirement of Sal wood

Requirement of Teak wood

0.90 M x
For frame
Verticlal
Horizontal

1.07 M

Unit
Rate
0.963 sqm

3 x 1.07 x 0.10 x 0.075 =


2 x 0.9 x 0.10 x 0.075 =

Total Sal wood Frame


For shutters frame
2 x 2 x 0.995 x 0.075 x 0.030 =
Verticlal

Horizontal

2 x 2 x 0.525 x 0.075 x 0.030 =

Total Sal wood Frame


Requirement of Teak wood

For Shutter Planks

2 x 2 x 0.362 x 0.525 x 0.020 =

ABSTRACT
Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

444.41

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture for Windows Panelled : Double Leaf with half


Shutters (Schedule Item No. 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

Aluminium Flat Latches: 200 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

2
4
4
2
2

Add Over Head Charges

sqm

8158.72

Aluminium Butt hinges (IS:205)- 75 mm Long


Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

0.90 x 1.07 M

Fully Panled Window

1 Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.90 x 0.60m
Code
Unit taken 0.90x0.60 =

Requirement of Sal wood

0.90 M x
For frame
Verticlal
Horizontal

0.60 M

Unit
Rate
0.540 sqm

2 x 0.90 x 0.075 x 0.050 =


3 x 0.60 x 0.050 x 0.075 =

Total Sal wood Frame


ABSTRACT
Cost of Sal wood for frame

Cum

49097.00

Labour charges including LA Charges

Sqm

952.25

Plain Float Glass 4 mm thick


Add LA charges

Sqm
Sqm

334.00
180.36

Cost snd Supply of MS 12 mm bars

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

38.64

BMT-I.01

Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)

Add Over Head Charges


0.90 x 0.60 M

LS

sqm

1533.32

Glazed Ventilator

## Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.60 x 0.45m
Code
0.60 M x
For frame
Verticlal
Horizontal

Unit taken 0.60x0.45 =

Requirement of Sal wood

0.45 M

Unit
Rate
0.270 sqm

2 x 0.60 x 0.075 x 0.050 =


2 x 0.45 x 0.050 x 0.075 =

Total Sal wood Frame


ABSTRACT
Cost of Sal wood for frame
Labour charges including LA Charges

Cum
Sqm

49097.00
952.25

Plain Float Glass 4 mm thick


Add LA charges

Sqm
Sqm

334.00
90.18

Cost snd Supply of MS 12 mm bars

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

19.32

BMT-I.01

Add LA charges

Sundries inclusive of putty, brads, hold fasts


2 Nos and wind appliances and screws for
planks (Vide standard specification)

Add Over Head Charges


0.60 x 0.45 M

sqm

852.14

Glazed Ventilator
Fully Panneled Window=

2.03 sqm
1.00 sqm

LS

Fully Panneled Window=

8676.65 x 1.00 sqm


2.03 sqm

28 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 100 x 2.00 Door single le
of with are made of well seasoned best country wood 3"x4" free from all difects such as werping, bend
and
fixed with 6 nos 'Z' hold fasts of size 300x40mm size and withBLD-CSTN-13-12-243
1 1/2 thick best country wood styles and r
Country wood Framed and Planked Doors (Schedule Item No. 297
thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup and con
Code
materials
work site and including all taxes, all laber charges for making,Unit
fixing of doorRate
furniture in position
1/2
21.67
Unit
3'-3
"x6'-7"
= Tower bolts (Ave
sft
2.00 sqm
Dept|taken
Officers
including
Top
: Size), Bottom
Tower bolts 150mm
long, Brass Butt hinges
mm Long, MS-Powder Coated AldropFor
(IS:2681)
frame 250 mm long, Heavy duty Aluminium Door stopper, Alu
Handles (IS:208) 150 mm Long, MS-Powder
Coated Aldrop
(IS:2681)
Verticlal
2 x 6'-7"
x 3" x300
4" =mm long and all labour charges su
by the Departmental Officers for finished
item
of
work.
for
External
doors
(Schedule Item 292)
1/2
Horizontal
1x 3'-3 " x 3" x 4" =
For Shutter frame
Verticlal

2x 4'' x 11/2" x6'- 3" =


1x 2'-91/2" x 4" x 11/2" =

Top, Bottom& Middile

3x 2'-91/2" x 5" x 11/2" =

Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
2.00 Or
0.106
3.741 Or
Sqm
Cum
Cft
Sundries inclusive of putty, brads, hold fasts
6 Nos and wind appliances and screws for
planks (Vide standard specification)

BMT-G.09
BMT-G.08
BMT-G.22
BMT-G.57
BMT-G.34
BMT-G.45

166
164
182
214
191
202

cft
cft
Cum

1390.26
1691.66
10250.00

LS

Furniture - Iron - for External doors (Schedule Item 292)


Nos
2
Bottom Tower bolts 150mm long
Nos
2
Brass Butt hinges (IS:205)- 150 mm Long
Nos
6
Heavy duty Aluminium Door stopper
Nos
1
Aluminium Door Handles (IS:208) 150 mm L
Nos
1
MS-Powder Coated Aldrop (IS:2681) 300 mm
Nos
1
Top Tower bolts (Ave : Size)

Add Over Head Charges

sqm

8381.98

Fully Panneled External Door=

2.00 sqm
1.00 x 2.00 M

1.00 sqm

Fully Panneled External Door=

Fully Panneled External Door=

9523.19 x 1.00 sqm


2.00 sqm
Total rate per 1sqm

29 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 1.00 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 297
7/8" thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup an
Code
Unit
Rate
of all materials work site and including all taxes, all laber charges for
making, fixing
of door furniture
1/2
21.67bolts (Ave
Unit
taken
sft : Size), Bottom2.00
sqm
directed
by 3'-3
Dept| "x6'-7"
Officers =including Top Tower
Tower
bolts 150mm long, Al
hinges (IS:205)- 150 mm Long, MS-Powder
Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
For frame
Aluminium Door Handles (IS:208) 150 mm
Long and all2labour
as diricted by the Department
Verticlal
x 6'-7" charges
x 3" x 4" such
=
finished item of work. for Internal doors (Schedule Item 293) 1/2
Horizontal
1x 3'-3 " x 3" x 4" =
For Shutter frame
Verticlal

2x 4'' x 11/2" x6'- 3" =


1x 2'-91/2" x 4" x 11/2" =

Top, Bottom& Middile

3x 2'-91/2" x 5" x 11/2" =

Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
2.00 Or
0.106
3.741 Or
Sqm
Cum
Cft
Sundries inclusive of putty, brads, hold fasts
6 Nos and wind appliances and screws for
planks (Vide standard specification)

cft
cft
Cum

1390.26
1691.66
10250.00

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.09
BMT-G.08
BMT-G.26
BMT-G.44
BMT-G.57
BMT-G.34

166
164
183
200
214
191

Top Tower bolts (Ave : Size)


Bottom Tower bolts 150mm long
Aluminium Butt hinges (IS:205)- 150 mm Lo
MS-Powder Coated Aldrop (IS:2681) 250 mm
Heavy duty Aluminium Door stopper
Aluminium Door Handles (IS:208) 150 mm L

Add Over Head Charges

Nos
Nos
Nos
Nos
Nos
Nos

1
1
6
1
1
1

sqm

7810.98

1.00 x 2.00 M
2.00 sqm
1.00 sqm

Fully Panneled Internal Door=


Fully Panneled Internal Door=

Fully Panneled Internal Door=

8874.44 x 1.00 sqm


2.00 sqm
Total rate per 1sqm

30 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 0.75 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 293
7/8" thick Sal wood flanks for pannels as per specifications of APDSS
including cost, wrought and putup an
of all materials work site and including all taxes, all laber charges for making, fixing of door furniture
Fully :Panneled
Internal
Door=
directed by Dept| Officers including
Top Tower bolts (Ave
Size), Bottom
Tower
bolts 150mm long, Al
2.00 sqm
hinges (IS:205)- 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
Fully
Panneled
Internal
Door=
1.50
sqm 150
Aluminium Door Handles
(IS:208)
mm
Long and
all labour
charges such as diricted by the Department
6828.98 x
1.50 sqm
finished item of work. for Internal doors (Schedule Item 293)
2.00 sqm
Furniture - Iron - for Internal doors (Schedule Item 293) as per
above item.
BMT-G.09
BMT-G.08
BMT-G.26
BMT-G.44
BMT-G.57
BMT-G.34

166
164
183
200
214
191

Top Tower bolts (Ave : Size)


Bottom Tower bolts 150mm long
Aluminium Butt hinges (IS:205)- 150 mm Lo
MS-Powder Coated Aldrop (IS:2681) 250 mm
Heavy duty Aluminium Door stopper
Aluminium Door Handles (IS:208) 150 mm L

Nos
Nos
Nos
Nos
Nos
Nos

Add Over Head Charges

0.75 x 2.00 M

1
1
6
1
1
1

6103.74

Fully Panneled Internal Door=

31 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.50 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13 - 22- 270
Country wood Framed 1/2
and Fully Panneled Window Three Shutters
35x5mm size with 1 thick best country wood styles and rise using 7/8" thick Sal wood flanks for pannels
Code
Ratecost, wrought an
M.S. Grills (execluding cost of M.S. Grills) as per specifications of Unit
APDSS including
1/2
1.80 sqm
Unit
taken 4'-11"
3'- 11 " =
conveyance
of allxmaterials
work site and 19.46
including allsft
taxes, all laber charges
for making, fixing of Pann
furniture in position as directed by Dept|
For Officers
frame including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium Butt hinges (IS:205)100 mm3 Long,
1/2
Verticlal
x 3'-11Window
" x 21/2"stoppers
x 3" = Aluminium, and all labour
as diricted by the Departmental Officers for finished item of work. 1/2
Horizontal
2 x 4'-11" x 2 " x 3" =
For shutters frame
Verticlal
3 x 2 x 3'-111/2" x 3 1/2" x 1 1/2"=
Horizontal
3 x 2 x 2 x 1'-3" x 3 1/2" x 1 1/2" =
Total Frame
For Shutter Planks
3x 1'-0" x 3'-111/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
1.80 Or
3.285 Or
Sqm
Cft

cft
cft
Cum
0.093
Cum

1390.26
1691.66
10250.00

Sundries inclusive of putty, brads, hold fasts


4 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture for Windows Panelled : Thrible Leaf with half


Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

6
12
6
3
1

Add Over Head Charges

sqm

7636.89

Aluminium Flat Latches: 200 mm long


Aluminium Butt hinges (IS:205)- 75 mm Long
Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

1.50 x 1.20 M
1.80 sqm
1.00 sqm

Fully Panneled Window=


Fully Panneled Window=

Fully Panneled Window=

8676.65 x 1.00 sqm


1.80 sqm

32 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.80 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13
- 22270
Country wood Framed 1/2
Fully Panneled Window Three Shutters
35x5mm size with 1 and
thick
best country wood styles and rise using
7/8" thick Sal
wood
flanks for pannels
Code(execluding cost of M.S. Grills) as per specifications of Unit
Ratecost, wrought an
M.S. Grills
APDSS including
Panneled
Window=
conveyance of all materials work
taxes,
all laber
charges for making, fixing of Pann
1.80 site
sqmand including allFully
furniture in position as directed by Dept| Officers including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium
Butt
hinges
(IS:205)100Window=
mm Long, Window stoppers Aluminium, and all labour
Fully
Panneled
2.16
sqm
as diricted by the Departmental Officers for finished item of work.
5863.89 x
2.16 sqm
1.80 sqm
Furniture for Windows Panelled : Thrible Leaf with half
Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

205
176
164
213

Aluminium Flat Latches: 200 mm long


Aluminium Butt hinges (IS:205)- 75 mm Lon
Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

Nos
Nos
Nos
Nos

Add Over Head Charges

1.80 x 1.20 M

6
12
6
3

8674.67

Fully Panneled Window=

7 White washing for Ceiling Single coat with whiting of approved quality to give an even shade after thorou
the surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
and incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyan
materials for All Floors
White washing for Ceiling One coats with whiting for All Floors

Code
Material
BMT-J.27
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087

Unit

Rate

kg

14.00

Painter Cl- I
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
11.30

Add Over Head Charges

sqm

12.98

Surya Cem or equivalent quality

Total rate per 1 sqm

29 Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a
approved cement primer grade I making 3 coats in all to give an even shade after thourughly brushing
remove
all dirt and remains of loose powdered materials, including cost and conveyance of all materials to
Painting to new walls with 2 coats of water proof cement paint (overall 3 coats) for All Floors
all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for Extarn
Unit
Rate
Floors Code
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
BMT-J.24

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
68.33

Add Over Head Charges

sqm

119.04

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Total rate per 1 sqm

23 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming C
(All Colours) of apporved brand and shade making 2 coats in all to give an even shade after thourughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
Extarnal walls for All Floors

Painting to old walls with 2 coats of water proof cement paint (overall 2 coats) for All Floors

Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087

Unit

Rate

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
68.33

Sundries including brushes, etc.,

Sqm

80.58

Add Over Head Charges

sqm

81.39

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Co
(All Colours) of apporved brand and shade over a base coat of approved cement primer grade I making m
in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of all materials to work site and all operational, incidental, labou
complete for finished item of work as per SS 912 for Extarnal walls for All Floors

Painting to old walls with 1 coat of water proof cement paint (overall 1 coat) for All Floors

Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087

Unit

Rate

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
420.00
375.00
69.39

Sundries including brushes, etc.,

Sqm

76.39

Add Over Head Charges

sqm

77.15

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and
base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conv
materials to work site and all operational, incidental, labour charges etc. complete for finished item of w
911 for internal walls for All Floors
Painting to old walls with Distempering, 3 Coats with Oil Bound Distemper

Code

Unit

Rate

Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

SOR P. No. 268/II/38

Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

lit

100.00

day
day
Sqm

480.00
375.00
6.14

kg

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

58.98

Add Over Head Charges

sqm

70.71

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem/
PMCC/ ESSAR or equivalent

Miscellaneous

Total rate per 1 sqm

29 Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper of approved brand and sha
coats in all to give an even shade after thourughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls for All Floors
Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper

Code
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

kg

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

58.98

Add Over Head Charges

sqm

59.57

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem/
PMCC/ ESSAR or equivalent

Miscellaneous

Total rate per 1 sqm

22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-1 coats-Internal Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
28.46

Sundries including brushes, etc.,

Sqm

37.46

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Add Over Head Charges

sqm

37.83

Total rate per 1 sqm

1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

63.18

Add Over Head Charges

sqm

63.81

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

28 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls

Plastic Emulsion paint-3 coats-Internal Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
10.97

lit

180.00

SOR P. No. 268/II/38

Painter CI-1
Painter CI-II
Add LA charges

Material
BMT-J.22
Manpower

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

79.15

Add Over Head Charges

sqm

79.94

SOR P. No. 267/I/35

SOR P. No. 268/II/38

Miscellaneous

Total rate per 1 sqm

1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

61.38

Add Over Head Charges

sqm

61.99

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

29 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade over a base coat of appropriate primer of approved bra
coats after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,
and conveyance of all materials to work site and all operational, incidental, labour charges etc. complet
item of work as per SS 911 for internal walls

Acrylic Exterior Emulsion-3 coats-Internal Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
10.97

lit

136.00

SOR P. No. 268/II/38

Painter CI-1
Painter CI-II
Add LA charges

Material
BMT-J.25
Manpower

Acrylic Exterior Emulsion Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

75.63

Add Over Head Charges

sqm

76.39

SOR P. No. 267/I/35

SOR P. No. 268/II/38

Miscellaneous

Total rate per 1 sqm

1 Painting to old walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade after thoroughly brushing the surface to remove all dir
of loose powdered materials, including cost and conveyance of all materials to work site and all operation
labour charges etc. complete for finished item of work as per SS 911 for internal walls

Acrylic Exterior Emulsion paint-2 coats-Internal old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent
Painter CI-1
Painter CI-II
Add LA charges

Unit

Rate

lit

136.00

day
day
Sqm

480.00
375.00
48.78

Miscellaneous
Sundries including brushes, etc.,

Sqm

58.30

Add Over Head Charges

sqm

58.88

Total rate per 1 sqm

22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
External walls
Plastic Emulsion paint-1 coat-External Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
20.33

Add Over Head Charges

sqm

77.33

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Total rate per 1 sqm

1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Add Over Head Charges

sqm

90.86

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Total rate per 1 sqm

30 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Plastic Emulsion paint-3 coats-External Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

SOR P. No. 267/I/35

Painter CI-1

Unit

Rate

lit

100.00

day

480.00

SOR P. No. 268/II/38

Painter CI-II
Add LA charges

Material
BMT-J.22
Manpower

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35


SOR P. No. 268/II/38
SOR P. No. 269/III/4

day
Sqm

375.00
28.46

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Add Over Head Charges

sqm

129.32

Total rate per 1 sqm

30 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade over a base coat of appropriate primer of approved brand, making
thoroughly
brushing
the
surface
to remove
all dirt and remains of loose powdered materials, includ
Acrylic Exterior
Emulsion
paint-3
coats-External
Walls
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for fin
Code
Unit
Rate
work as per SS 911 for external walls
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
Acrylic Exterior Emulsion Asian/ Berger/
BMT-J.25
Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
lit
136.00
equivalent
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
Sqm
76.46
Miscellaneous
Sqm
125.80
Sundries including brushes, etc.,
Add Over Head Charges

sqm

127.06

Total rate per 1 sqm

1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Sundries including brushes, etc.,

Sqm

89.06

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Add Over Head Charges

sqm

89.95

Total rate per 1 sqm

1 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Acrylic Exterior Emulsion paint-2 coats-External old Walls

Code
Material
BMT-J.25
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

136.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Sundries including brushes, etc.,

Sqm

85.98

Add Over Head Charges

sqm

86.84

Acrylic Exterior Emulsion Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

31 Painting with Synthetic Enamel paints - Two Coats - For New Iron Work of approved brand and shade, mak
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two Coats - For New Iron Work for All Floors

Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

170.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
44.72

Add Over Head Charges

sqm

63.42

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.

Total rate per 1 sqm

32 Painting with Synthetic Enamel paints - Three Coats - for New Wood Work of approved brand and shade, m
in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors

Painting with Synthetic Enamel paints - Three Coats - for New Wood Work for All Floors

Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.
Painter CI-1
Painter CI-II

Unit

Rate

lit

170.00

day
day

480.00
375.00

Add LA charges

Sqm

65.04

Add Over Head Charges

sqm

93.94

Total rate per 1 sqm

30 Painting with Synthetic Enamel paints - Two Coats - for Old Wood work of approved brand and shade, maki
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two coats - for Old Wood Work for All Floors

Code
Material
BMT-J.30

Unit

Rate

lit

170.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Add Over Head Charges

sqm

67.48

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Total rate per 1 sqm

31 Polishing two coats with french polish of approved brand for new wood work of teak wood frame and shutt
even glossy surface with uniform texture including cleaning the surface of all dirt, dust, etc. , and apply
wood filler, sand papering including cost and conveyance of all materials to work site andall operationa
Polishing two coats with french polish of approved brand
labour charges, etc., complete for finished item of work as per SS 1212. for All Floors
Code
Unit
Rate
Material
Thinner for Melamine polish/ French polish BMT-J.12/P. No. 27
lit
92.00
Sheenlac
BMT-J.10/P. No. 27

Spirit

lit

70.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
130.08

Add Over Head Charges

sqm

143.59

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Total rate per 1 sqm

6 Painting with Synthetic Enamel paints - One Coat - For Old Iron Work of approved brand and shade, ma
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials,
including
cost
and paints
conveyance
of allmaterials
to Work
work for
siteAlland
all operational, incidential, labour
Painting with
Synthetic
Enamel
- One Coats
- For Old Iron
Floors
complete for finished item of work as per SS 1207 & 1212. for All Floors
Code
Unit
Rate
Material
Synthetic Enamel paint (at 20 sqm / litre as
BMT-J.30
lit
170.00
per British Paints (I) Ltd.
Manpower
CSSR-M-035
Painter CI-1
day
480.00
CSSR-M-037
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46

Add Over Head Charges

sqm

36.96

Total rate per 1 sqm

33 Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon
Cement Primer & Two Coats of Altek Flora/ sai coat/ Neon/indocem super track for internal walls (Emul
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges a
such as scafolding, lift charges etc., complete for finished item of work, including conveyance charges of
All Floors
Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All

Code
Material
BMT-J.36

Unit

Rate

Supply & Application of Two Coats of


Altek/sai coat/ Neon Super Fine, One Coat of
Altek/ sai coat/ Neon Water

Sqm

95.00

Add Over Head Charges

sqm

95.00

Total rate per 1 sqm

28 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cementwith
paint
spread
at Tiles,
the rate
3.30
Cement
paste
fixed
with
of machine shade, in
Dadoing
Glazed
coloured
set over
baseKgs
coat of
of cement
mortar
(1:5),
12 mm
thickpigments
F3
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F3
SOR P. No. 12 / BMTC.07

Glazed coloured Tiles of any size Ist Quality

Sqm

413.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Lift charges F3
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

764.21

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm F3

56 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate
of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF3pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F3
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
64.00
Add LA charges
cum
64.00
Add water Charges
sqm
64.00
Add Over Head Charges
Total rate per 1 sqm F3

cum

691.78

28 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, la
for dressing of flooring stones etc., complete for finished item of work, for F3
Flooring with Rough Kadapa/Shahabad 50mm thick, (1:8), 12 mm thick F3

Code

Unit

Rate
Basic rate 1 sqm

Lift charges F3
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

477.71

Miscellaneous

Total rate per 1 sqm F3

27 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Sh


length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey lik
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matc
full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., comp
seigniorage charges, etc., complete for finished item of work, including the cost of conveyance of all materi

Skirting with 15 to 18mm thick polished shabad stones, (1:3), 12 mm thick F3

Code

Unit

Rate
Basic rate 1 sqm

Lift charges F3
Add LA charges
Add water Charges

cum
cum
sqm

44.70
44.70
44.70

Add Over Head Charges

cum

523.11

Miscellaneous

Total rate per 1 sqm F3

35 Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work
be paid for separately) including cost and conveyance of all materials like cement, fine aggregate
aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
Unit centering,Rate
cost of Code
steel and its fabrication charges for finished item of work, including
shuttering.
Details of cost for 10 posts, i.e., 0.336 Cu. M (1.80M long)
(Details as per Annexure ' X ' at the end of this item)
Material
Cement concrete 1:2:4 (1 cement : 2 coarse
sand :4 graded stone aggregate 12.5 mm
nominal size)

cum

5760.190

M.S. reinforcement 6 mm dia bars


10
x 4 x 1.88 = 75.20 metres
10 x 9
x 0.50 = 45.00 metres./ l20.00 m 120.20 m
@ 0.22 Kg/m=26.44 Kg

Kg

51.83

10 mm cement plaster with cement mortar


1:2 12mm thick (1 cement: 2 sand)

sqm

121.13

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
175.40

Add Over Head Charges


Cost Ten Posts
Cost of 1 Post = Rate/1.80 Rm =
Cost of 1 Rm =

sqm

4677.99

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Plastering with CM (1:2), 12 mm thick


A. MATERIALS:

BLD-CSTN-6

SOR P. No. 229/I/11


SOR P. No. 230/III/4

Cement Mortar (1:3)


Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

cum
day
day
cum

4347.09
420.00
320.00
55.92

29 Randam Rubble Stone masonary in CM (1:8) (Cement : Sand) using hard variety of rough stone other than
approved quarry including cost and conveyance of all materials like cement, sand, masonary stones, wate
and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work in foundation & Basement. (APSS No. 615 &
Masonry In C.M (1:8)
R.R. Masonry in CM (1:8)
Code
Unit
Rate
Material
Cement 43 Gr. (including loading charges)

cum

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Random rubble stone (including seigniorage


charges)

cum

713.65

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1144.00

Add Over Head Charges

cum

2575.03

Manpower
SOR P. No. 266/I/11
SOR P. No. 2268/III/4

Total rate per 1 cum

26 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-15
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
SOR P. No. 89

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings F3

cum

723.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

446.00
135.32
135.32

Add Over Head Charges

cum

5155.81

Total rate per 1 cum

19 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
charges, sales & other taxes on
P.C.C. M-10
3.66
Hight First
Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F1
Material

SOR P. No. 292/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Concrete mixer 300 / 200 (diesel)

hour

328.60

Mechinery
SOR P. No. 379/16

Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Basic rate 1 cum


Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings First
floor

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

4734.49

Total rate per 1 cum

20 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for Footings F2

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

446.00
67.66
67.66

Add Over Head Charges

cum

4802.15

Total rate per 1 cum

21 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for footings F3
Add LA charges
cum
446.00
Lift charges F3
cum
135.32
Add LA charges
cum
135.32
Add Over Head Charges

cum

4869.81

Total rate per 1 cum

22 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-20
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for Footings F2

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

446.00
67.66
67.66

Add Over Head Charges

cum

5374.15

Total rate per 1 cum

23 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
P.C.C. M-20 Centering with Stell up to 3.66 M Hight Third Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F3
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings F3

cum

723.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

446.00
135.32
135.32

Add Over Head Charges

cum

5441.81

Total rate per 1 cum

23 Supply and placing of the M 35 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance
water etc., to site
Code of all materials like cement, fine aggregate (sand) coarse
Unitaggregate,Rate
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
Material
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
Cement 43
Gr. of
(including
loading
charges) chargescum
5.20 of work (APSS
SCAFFOLDING but excluding
cost
steel and
its fabrication
for finished item
Coarse sand
for mortor
(including
cum
513.42
minimum cement content
420 charges)
Kgs per 1 cum as per IS code from standard suppliers approved by th
Seigniorage
20 mm
Graded HBG
cum curing 1920.72
including pumping, Aggregates
Steel centering,
shuttering,
laying concrete, vibrating,
etc. complete but exc
steelP. and
its fabrication
charges for finished item of work for FOUNDATIONS,
PLINTH,77.00
PEDASTALS, centering
SOR
No. 292/M
189
Water
Kl
to
3.66, as per APSS. No. 402. for FOOTINGS FI
Mechinery
SOR P. No. 379/9
SOR P. No. 379/40

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

hour

522.50
253.00
165.70
182.09

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

420.00
375.00
320.00
1627.99
BACIC RATE 1 Cum

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
A/Footings

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1
Add LA charges

cum
cum

723.00
446.00

Add Over Head Charges

cum

7286.71

Total rate per 1 cum

28 Supply and fixing anodised aluminium door fixed with all accessories (stappers, bolts and stoppers etc.,
and sectional in accordance with the approved drawings with alluminium single shutter with allround fra
101.60 x 44.45 x2.50 mm (20102) thick and fixed with alluminium single shutter with vertical styles of
44.45 x 2.02 mm (19569) top rail 47.62x44.45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm
bottom rail of sizes 95.25x44.45x2 mm (19505) with archit clural accessories having section 88x40x3.2 mm
5 mm tinted glass sheet with glazing chips of size 79x 17.30 x0.10mm (19352) for height of 1.20 m
cement bonded paticle board ( Bison Lam or equivalent ) of 10mm thick to a hight of 0.91 m at botto
Rubber beading shutters mounted in heavy duty floor spring including cost and conveyance of all m
accessories including labour charges for fabrication and fixing in position as directed by the Engineer in Cha

Code

Unit

Rate

Lenth in RM

Weight RM

Alround frame with single groove (20102)


Vertical member for shutters (19569)

5.100
4.200

1.977
1.052

Top rail for the shutters (19571)


Middle rail for shutters (20060)

0.900
0.900

0.974
1.072

Bottom rail for shutter (19505)

0.900

1.519

Size of the door = 0.91 x 2.10 meters ( Single shutters)


Material requirement

Architectural accessories (19546)


Glazing clips (19352)

3.900
3.900

3.06
0.097

0.900

1.200

0.900

0.910

Add for stifeners and corner pices

9mm thick MDF Board shutter (BSL)


5mm thick tinted glass
ABSTRACT
BMS-W.01

Cost of aluminium section with anodisation


(P 69)

Kgs

250.00

BMT-K.80

9mm thick particel board MDF Or equivalent


for shutter (P28)
5mm thick tinted glass P23)
Heavy duty floor spring (P19)
Brass fancy handles 200mm (P19)
150mm Aluminium hinges (P19)

sqm

534.00

BMT-I.08
BMT-G.65
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53

150mm Aluminium tower bolts (P18)

Door stopper (P19)

sqm
each
each
each
each
each

570.00
2422.00
312.00
100.00
69.00
34.00

Manpower
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor

Machinery

Add LA charges
Labour charges for

BMC-X.02

Power Saw Cutter - Hand Operated - Hire charges

BMC-X.03

Power Drill - Hand Operated - Hire Charges

day
day
day
day
day
Sqm

420.00
375.00
375.00
375.00
320.00
2268.90

Hr

105.00

Hr

97.00

1.91 Sqm

15262.48

Power charges for motor

Add Over Head Charges

each

Rate as per Sqm

15415.10

17,513.87 / 1.89=

28 Supply and fixing double action anodised Aluminium fully glazed door as per approved drawing using sid
top frames with section 101.50 x 44.45 x 2.50 mm with double shutters using shutters frame of size 47 x
mm for top 47 x 44.45 x 1.50 mm for middle and 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertic
Code
Unit
Rate
of size of size 47 x 44.45 x 1.2 mm with necessery glazing clips of size 19 x 17.30 x 0.80 mm and rubber
Size of the door = 2.74 x 2.59 meters ( Double shutters)
Rm necessary
mm thick plain glass with 2 nos floorsprings, 2 nos locks and 4 nos round door 7.92
handles
accessories
(stappers, bolts and stoppers etc.,) including cost and conveyance
materials
A) Material requirement
Lenth in RM of all
Weight
RM and accesso
labour charges for fabrication and fixing in position as directed by the Engineer in Charge. for 1.52 m x
A.As (As
perwith
approved
drawing)
Alround
frame
Double groove
(101.50*44.45*2.50 mm)
7.920
1.983
Vertical member for shutters (47*44.45*1.2 mm))

10.360

0.720

Top rail for the shutters (47*44.45*1.80 mm))


Middle rail for shutters (47*44.45*1.50 mm)
Bottom rail for shutters (114.30*44.45*2.30 mm)

2.740
2.740
2.740

0.900
0.831
1.800

20.720
21.920

0.115
0.115

Add for 5% wastage


Horizontal (19*17.30*0.80 mm)
Vertical (19*17.30*0.80 mm)

C) Rubber beeding

D) 5mm thick tinted glass


Add for 10% wastage

3.548

2.000

Kgs

250.00

Rm
sqm
each
each
each
each
each
each

2.00
570.00

ABSTRACT
BMS-W.01
BMS-W.06
BMT-I.08
BMT-G.65
BMT-G.66
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53

Manpower

Cost of aluminium section with anodisation


(P 69)
Rubber beeding (P70)
5mm thick tinted glass (P23)
Heavy duty floor spring (P19)
Heavy duty mortise lock 6/7 levers with PC or CP

Brass fancy handles 200mm (P19)


150mm Aluminium hinges (P19)
150mm Aluminium tower bolts (P18)
Door stopper (P19)
Labour charges for
7.10 Sqm
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor
Non-technical work inspector
LA charges

Machinery

Hire charges for

BMC-X.02

Power Saw Cutter - Hand Operated - Hire charges

BMT-X.03

Power Drill - Hand Operated - Hire Charges

2422.00
474.00
312.00
100.00
69.00
34.00

day
day
day
day
day
day
Sqm

420.00
375.00
375.00
375.00
320.00
275.00
2024.47

Hr

105.00

Hr

97.00

7.10 Sqm

25153.96

Power charges for motor

Add Over Head Charges

each

Rate as per Sqm

25405.50
28,864.46 / 7.10=

18 NCL or Equivalent Door Frames: Providing and fixing door frames fabricated from sections made of ga
powder coated (base steel as per IS 513, galvanised as per IS 277 with zinc of 120 grams / square metre
made section should be with a Powder Coating of pure Polyester Powder of 50-60 microns thick with
thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate of 38mm to
35mm thick door shutter. The frame section should have groove to insert gasket. The section of the door
frame is to be filled with polyurethane foam. The frame section should be cut to length, and joined by w
and each frame should be provided with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 N
shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No. for
frame. e)Tie Rod 1 No

Code
Material
BMT-N.59

NCL or Equivalent Door Frames (base steel


as per IS 513, galvanised as per IS 277 with
zinc of 120 grams / square metre) with
Hinges tower Bolts etc.

Unit

Rate

Rm

385.00

Add Over Head Charges

sqm

385.00

Total rate per 1 sqm

22 Providing and fixing 35mm thick RAJSHRI or Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER
sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on o
top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel la
2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel desig
panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam
other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. com
direction of Engineer-in-Charge, manufacture specification and drawing

Code
Material
BMT-N.06

Unit

Rate

Providing and fixing 35mm thick RAJSHRI


or Equivalent BRAND FACTORY MADE
MOULDED DOOR SHUTTER

sqm

2900.00

Add Over Head Charges

sqm

2900.00

Total rate per 1 sqm

1 Windows: Double shutter 4'-0" x 4 '-6" (1219.2x1371.6mm) outer frame section size of 46 x 52 mm
section size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.12)
Code
Material
BMT-P.12

Windows: Double shutter 4'-0" x 4 '-6"


(1219.2x1371.6mm) outer frame section
size of 46 x 52 mm shutter frame section
size of 46 x 46 mm Mullion section size of 46
x 70 mm (Code BMT-P.12)
Add Over Head Charges

Unit

Rate

sqm

5195.00

sqm

5195.00

Total rate per 1 sqm


2 Windows: Double shutter 3'-0" x 4 '-6" (914.4x1371.6mm) outer frame section size of 46 x 52 mm shutter
size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.10)
Code
Material
BMT-P.10

Windows: Double shutter 3'-0" x 4 '-6"


(914.4x1371.6mm) outer frame section size
of 46 x 52 mm shutter frame section size of
46 x 46 mm Mullion section size of 46 x 70
mm (Code BMT-P.10)
Add Over Head Charges

Unit

Rate

sqm

5195.00

sqm

5195.00

Total rate per 1 sqm

3 Ventilators: Fixed louvers (Box section) outer frame section size of 33 x 57 mm Mullion section size of 33 x 5
P.20 to 22)

Code
Material
BMT-P.20 to 22

Unit

Rate

Ventilators: Fixed louvers (Box section) outer


frame section size of 33 x 57 mm Mullion
section size of 33 x 57 (Code BMT-P.20 to 22)

sqm

3685.00

Add Over Head Charges

sqm

3685.00

Total rate per 1 sqm

4 Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking a
The shutter
1.5mm +/-0.15mm
Codeframe is made of 30mm X 79mm with the wall thickness of
Unit
Rate section mitre-c
at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no'
Material
Supply
andbefixing
of doorinside
shutters
rods. Teak wood batons
shall
reinforced
themade
door of
shutter during the fabrication of the door sh
BMT-N.45
rigid
PVC
extruded
hollow
section(Nandi
sqm
1795.00
points wherever the hardware is fixed onto the door shutter. or
equivalent)
Add Over Head Charges

sqm

1795.00

Total rate per 1 sqm

33 Cost Suply and Fixing M.S Grills approved design including cost Mild steel and all Labour charges for fab
works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, po
including cost of fixing in position as diricted by the Departmental Officers for finished item of work.
Code

kg

Rate
38.00
16.00

kg

3.00

Add LA charges

kg

19.00

Add Over Head Charges

kg

57.00

BMM-V.14

865

BMM-V.15

866

Cost of Mild steel


Labour charges for fabricating steel
works like Window Grills,
Compound Wall Grills, Iron Doors,
Windows including cost of welding
rods, power charges, excluding
cost of fixing in position

Labour charges for fixing Iron


Doors, Iron Windows and Window
Grills in position

Unit
kg

34 Providing 110mm dia ISI marked P.V.C Rain down water take pipes-2.5mm thick including cost of necessar
Shoes, Iron Clamps and all other accessories and fixing in position including cost and conveyance of all m
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges for
etc; complete for finished itemof work.
Code
Material
BMW-G.13
BMW-G.60
BMW-G.63
BMW-G.100
BMW-G.106

110 mm dia 3 M Single Socket PVC/SWR pipe


-110
4 Kg/sq.cm
Prince/Sudhakar
or any -ISI
mm dia -- Door
Bend 87.5 Degree
Brand
UPVC/SWR
or
110
mm diaPipe
- 45fittings
Degree(Prince/Sudhakar
Bend - UPVC/SWR
any ISI
Brand)
Pipe
fittings
(Prince/Sudhakar or any ISI
110
mm dia - Vent Cowl - UPVC/SWR Pipe
Brand)
fittings
or any ISI
Brand)
110 mm(Prince/Sudhakar
- Pipe Clip - UPVC/SWR
Pipe
fittings
(Prince/Sudhakar or any ISI Brand)

Unit

Rate

each
each
each
each
each

383.00
84.00
56.00
15.00
14.00

BMW-G.152

Labour charges for laying, fixing and


commissioning the PVC pipes including
couplers/ bends/ tees etc any diameter
including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with
Add
Over
Head Charges
solvent
jointing
as per standard practice

Rm

58.00

Rm

272.74

Total rate per 1 Rm

49 Supply and fixing of CEMENT JALI-50 mm thick fixing in position including cost and conveyance of all ma
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished it
Code
Material
BMS-W.17

Unit

Rate

CEMENT JALI - 50 mm thick

sqm

335.00

Add Over Head Charges

sqm

335.00

Total rate per 1 sqm

50 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft
nominalCode
bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom
locking plates and
Unit
Rate
for inside & outside locking with push-pull operations including cost of hood cover and springs complete
Material
one coat of approved
steelshutter
primer,made
locks,ofball
Rolling
80 xbearings,
1.25 mm all accessories etc complete for finished item o
BMT-F.29
2000.00
special spn: 1108, fixing
in
position
including
cost
and conveyance ofsqm
all materials
to site, Operational a
machine rolled CRCA
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Add Over Head Charges

sqm

2000.00

Total rate per 1 sqm

51 Supply and fixing of Teak wood dias and railing including cost of Teak wood 1 st quality conveyance to site
unloading and all labour charges including making, fixing, finishing etc., complete as directed by the
Officers for Second Floor, Lift Manual
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper (overall 3 coats) for All Floors

Code
Material
BMT-E.06

Best Teak Wood scantlings: 2.0 to 3.0 M

Unit

Rate

cum

81225.00

Add 10% wastage

cum

81225.00

Corpenter Cl- I
Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
10250.00

Labour charges for fixing


Add LA charges

Sqm
Sqm

230.00
8122.45

Add Over Head Charges

sqm

107719.95

Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4

Miscellaneous
BMM-V.23

Total rate per 1 sqm

19 Course Rubble Stone Masonry in CM (1:6) 1st Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) 1st sort
Code
Material

SOR P. No. 73 /
BMS-W.54

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Dressing faces of other than granite stone(double line


dressing) 0.45 M width

sqm

95.00

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1792.40

Add Over Head Charges

cum

3503.59

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4

Total rate per 1 cum

7 Cost and Supply and fabrication of M.S. Cattle trap using 15 Nos of 32mm MS Steel rods welded as equal s
Nos of 75 x 40 x 5 mm MS channel and fixing in position on the already laid concrete walls, including all la
for welding, transporting and fixing in position, cost of welding rods etc., complete as directed by the
Officers for finished item of work.
75 x 40 x 5 mm MS Channels on cross walls
32 mm dia MS rods

6.00 x
15.00 x

1.53 =
4.10 =

9.18 Rm x 6.80 Kgs/ 1Rm


###

ABSTRACT
Material
Miscellaneous
BMM-V.16

M.S. Channels & MS Rods

kg

38.00

Labour charges for fabricating all heavy steel


Add LA charges

kg

12.00
5405.88

BMM-V.15

Labour charges for fixing in position


Add LA charges
Add Over Head Charges

kg

3.00
1351.47

cum

23875.97

Total rate per each MS Catle trap

8 BISON LAM ( Pre Laminated Cement Bonded Particle Board) ALUMINIUM PARTATIONS-Supply and fixing o
aluminum glazed partitions using 10MM BISONLAM and 5.50 mm thick plain glass to full height. Using with
a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodize
microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly
beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and c
all materials etc., complete as directed by the Departmental Officers for finished item of work.

Material
BMT-M.77

ALUMINIUM PARTATIONS

sqm

2625.00

cum

2625.00

Miscellaneous
Add Over Head Charges
Total rate per 1 sqm

10 CUPBOARD FRAMES & SHUTTERS USING BISONLAM (Pre-Laminated Cement Bonded Particle Board) - Supply
BISONPANEL (IS 14276) box type cup board using BISONPANEL for making frame of size 100mm x 35m
sandwiched 20MM boards, one BISONPANEL and one BISONLAM with plain 35mm wood lipping. The Shutter
20MM thick BISONLAM (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hard
powder coated Piano hinges of size x , Aluminum powder coated handles of size 4 (101.6mm), Alu
bolt 4 (101.6mm) Godrej locks, screws, wood lipping and Fevicol etc., complete as directed by the
Officers for finished item of work.
Material

CUPBOARD FRAMES & SHUTTERS USING


BISONLAM
Diference between BISON PANEL CEMENT
BONDED PARICLE BOARD CONFORMING
BMT-K.91 - BMT-K.90 20mm thick - 16 mm thick ( 514*1.25 sqm =
642.50) - 412*1.25 sqm = 515.00) = 127.50
BMT-N.32

sqm

2250.00

sqm

127.50

cum

2377.50

Miscellaneous
Add Over Head Charges
Total rate per 1 sqm

1 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F2
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F2

Code

Unit

Rate

cum

22.99

Miscellaneous
Lift charges F2

Add LA charges
Add water Charges

cum
sqm

22.99
22.99

Add Over Head Charges

cum

1467.54

Total rate per 1 sqm F2

26 ELIXIR or Equivalent Top Hung in Structural Glazing: Providing and Fixing Top Hung shutters in Struc
fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513
galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72mm. The glass h
made of 304 grade stainless steel of 0.6mm thick. Galvanized steel sections are to be used as stifeners ins
coated steel/powder coated sections as per the design requirement. Design calculations are made to suit w
as given in IS 875. Primer coat with epoxy primer of 5-7 microns thick and back coated with Alkyd backer o
or powder coated with pure polyester powder up to 50-60 microns thick. The outer frame should be of 20m
0.6mm, Shutter section should be of 58mm x 33mm x 0.72 mm, stifener section should be 56mm x 31mm
Bihari Hinges 2 Nos for each shutter and Aluminium Stays 2 Nos. for each shutter, Aluminium Handle
shutter. The rate is inclusive of cost and conveyance of all materials to site, all labour charges, incidental ch
all consumables etc. and scafolding charges, form work etc. complete for finished item of work

Code
Material
BMT-Q.02

Unit

Rate

ELIXIR or Equivalent Top Hung in Structural


Glazing

sqm

4246.00

Add Over Head Charges

sqm

4246.00

Total rate per 1 sqm

13 Course Rubble Stone Masonry in CM (1:6) IInd Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) IInd sort
Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)

kg

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1372.40

Add Over Head Charges

cum

2942.93

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4

Total rate per 1 cum

35 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F1
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F1

Code
Material

Unit

Rate

Sqm

2300.00

Kg

5.20

cum

513.42

Kg

25.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
223.52
2807.31

Machine Cutting charges - for Marble/ Granit

Rm

9.00

BMT-B.09

High Polished Granite 16 to 18 mm thick up


to 8'-00 (2.43 M) other than black/ premium
colours

CSSN-A-05

Cement 43 Gr. (including loading charges)

M 005

Coarse sand for mortor (including


Seigniorage charges)

SOR P. No. 74/BMSW.68

White cement

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
BMM-V.12

Basic rate 1 sqm


Add Over Head Charges

sqm

2865.38

Total rate per 1 sqm

36 Supply & Fixing 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328) The rate is inclusi
conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. a
charges, form work etc. complete for finished item of work
Code
Material
BMT-L.20
Miscellaneous
BMM-V.07

Labour charges for making, fabricating office


furniture,
racks,
work-station
furniture with
12 mm thick
Both
sides Teak Veneer
ply-wood
decolam/
veneer
Decoratedsheets,
Plywood
(IS:1328)
laminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures,
fixing
pasting sheets/ laminations
Add LAlocks,
charges
fixing in position with necessary screws
excluding cost of materials, accessories,
Add
Over Head Charges
fittings

Unit

Rate

sqm

1045.00

sqm
Sqm

317.00
317.00

sqm

1362.00

Total rate per 1 sqm

1 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F2
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F2

Code

Unit

Rate
Basic rate 1 sqm

Lift charges F2
Add LA charges
Add water Charges

sqm
sqm
sqm

22.35
22.35
22.35

Add Over Head Charges

sqm

2887.95

lit

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

#REF!
#REF!
#REF!

Sundries including brushes, etc.,

Sqm

#REF!

Add Over Head Charges

sqm

#REF!

Miscellaneous

Total rate per 1 sqm F2


BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem or
Equivalent

Miscellaneous

Total rate per 1 sqm

1 Supply and fixing of curtain Glazing made of pre painted steel (base steel as per IS 513 of 0.6 mm th
galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12- 16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
Rate should be 18 x
should Code
be 46 x 52 mm, section for mullion should be 46 x 70 mm andUnit
section for beading
Material
Glazing should be panelled with 5 mm thick plain float Glass with Ethyl Propylene diameine Monomer (EP
The sections are to be cut to length, mitre joined with corner bracket. Centre mullions are to be fixed suin
Mullion
size of
46 x 70mm
Beading
Handle made of high
gradesection
Aluminium
powder
coated
and nylon receiver. Gaskets made of Ethyl propy
section
size of 18
x 25ofmm
Fixed
Glazing
3'Monomer
(EPDM)
Corner
brackets
made
CRCA
with
zinc
phosphating.
made of Glass fill
BMT-Q.12
sqmMullion caps
3673.00
x fixed
4'-0" (914.4x1219.2mm)
grid outer
above frames should0"be
to the concrete / masonry
wall be means of self expanding screws. & comple
size of 46 x 52 mm
item.- Fixed Glazing frame
2'-0" xsection
2'-0" (609.6x609.6mm)
grid outer frames section size of 46 x 52 mm

Add Over Head Charges

sqm

3673.00

Total rate per 1 sqm

6 Flush Pointing with CM (1:3) to Brick / CRS Masonry finishing cost of all materials, seigniorage charg
conveyance charges of materials and including all operational, incidental and labour charges for mixing m
rendering smooth curing, etc,, complete for finished item of work
Flush Pointing with CM (1:3) to Brick / CRS Masonry
Code
Material

Unit

Rate

kg

5.20

CSSN-A-05

Cement 43 Gr. (including loading charges)

M 005

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-II / Brick layer CI-II


Light mazdoor
Add LA charges

day
day
cum

375.00
320.00
424.30

Manpower
CSSR-M-077
CSSR-M-087

Add Over Head Charges

cum

514.58

Total rate per 10 sqm

20 Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-19
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580mm & 630 mm Long fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.02
Manpower
BMW-D.03

Unit

Rate

W.C 1st quality ISI marked conforming to


IS:2556-Part-3-1981 with "P" or "S" trap
Hindware/ Parryware/ Neycer - ISI Mark: 630
mm Long

each

700.00

Add LA charges

each

200.00

Add Over Head Charges

each

700.00

Total rate per each

21 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindusta
Parryware make white glazed with 'S' trap fixing in position including cost and conveyance of all material
Other taxes
all labour
Code on materials to site, Operational and Incidental charges including
Unit
Rate charges for fixin
complete for finished itemof work.
Material
Supplying and Fixing European Water Closet
of 1st quality conforming to IS:2556-Part-2BMW-D.14
each
1250.00
1973 of Hindustan / Neycer or Parryware
make white glazed with 'S' trap
Manpower
BMW-D.15

Add LA charges

each

175.00

Add Over Head Charges

each

1250.00

Total rate per each

31 Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S'
flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of ap
with rubber bufer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges a
make etc. complete for finished item of work in all respects: White Colour fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.

Code
Material
BMW-D.18

Unit

Rate

Supply, Installation and commissioning


approved make floor mounted EWC (suit)
CASCADE model 'P' or 'S' trap with dual flush
porcelain cistern fixed on EWC

each

6500.00

Add Over Head Charges

each

6500.00

Total rate per each

20 S & F 12.7 mm brass bib cock Indian make 400 grams fixing in position including cost and conveyance of
Sales tax & Other taxes on materials to site, Operational and Incidental charges including all labour charge
site etc; complete for finished itemof work.
Code

Unit

Rate

Material
BMW-E.17
Manpower
BMW-E.18

S & F 12.7 mm brass bib cock Indian make


400 grams

each

170.00

Add LA charges

each

20.00

Add Over Head Charges

each

170.00

Total rate per each

31 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position inclu
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
BMW-D.29
Manpower
BMW-D.30

Supplying and Fixing Pedestal for Wash Hand


Basin (H.S.W / Parry / Earthenware)

each

810.00

Add LA charges

each

90.00

Add Over Head Charges

each

810.00

Total rate per each

5 Making drainage connection in the existing inspection including all repairs including all labour charges for
for finished itemof work.
Code
Material
BMW-B.07
Manpower
BMW-B.08

Unit

Rate

Making drainage connection in the existing


inspection

each

90.00

Add LA charges

each

50.00

Add Over Head Charges

each

90.00

Total rate per each


6 Repairing and over hauling flushing tank including all labour charges for etc; complete for finished itemof
Code
Material

Unit

Rate

BMW-I.17

Repairing and over hauling flushing tank

each

64.00

Add Over Head Charges

each

64.00

Total rate per each

35 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 412
cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except r
blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping including all labour cha
Code
Unit
Rate
complete for finished itemof work.
Material
Supplying, laying, jointing and testing 152.4
BMW-A.03
Rm
346.00
mm SWG SP-1 pipes
Manpower
BMW-A.06
Add LA charges
Rm
120.00
Add Over Head Charges

each

346.00

Total rate per each

35 S&F 12.7 mm dia NP push cock Ist quality fixing in position including cost and conveyance of all material
Other taxes on materials to site, Operational and Incidental charges including all labour charges for fixin
complete
for finished itemof work.
Code
Unit
Rate
Material
S & F CP Short body bib cock fancy type
BMW-E.29
deluxe 400 grams 12.7 mm dia S&F 12.7
each
200.00
mm dia NP push cock Ist quality
Add Over Head Charges

each

200.00

Total rate per each

36 Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet fixing in position including cost and conveyance of
Sales tax
& Other taxes on materials to site, Operational and IncidentalUnit
charges including
Code
Rate all labour charge
site etc; complete for finished itemof work.
Material
Supply & Fixing 38.1 mm dia PVC solid waste
BMW-G.06
each
70.00
pipe outlet
Add Over Head Charges

each

70.00

Total rate per each

36 Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P coated fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
Supplying & Fixing 12.7 mm PVC connection
BMW-I.48
each
74.00
with brass union nut C.P coated
Manpower
BMW-I.49
Add LA charges
each
14.00
Add Over Head Charges

each

74.00

Total rate per each


47 Chiselling the brick masonry wall and repairs as directed by the department.
Code
Material
BMW-I.07

Unit

Rate

Chiselling the brick masonry wall and repairs


as directed by the department.

Rm

21.00

Add Over Head Charges

Rm

21.00

Total rate per 1 Rm


16 Cleaning the W.C with acid and Vim powder including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.82

Unit

Rate

Cleaning the W.C with acid and Vim powder

each

30.00

Add Over Head Charges

each

30.00

Total rate per each


17 Cleaning the Urinal with acid and Vim power including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.83

Unit

Rate

Cleaning the Urinal with acid and Vim power

each

30.00

Add Over Head Charges

each

30.00

Total rate per each

18 Cleaning the wash basin with acid and Vim powder including all labour charges etc; complete as dir
Departmental Officers incharge for finished itemof work.
Code
Material
BMW-I.84

Unit

Rate

Cleaning the wash basin with acid and Vim


powder

each

30.00

Add Over Head Charges

each

30.00

Total rate per each


19 Cleaning the E.W.C with acid and Vim power including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.85

Unit

Rate

Cleaning the E.W.C with acid and Vim power

each

30.00

Add Over Head Charges

each

30.00

Total rate per each

42 Supply and Fixing of Iron Door grilld of size 1.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10
20mm MS squre rods and bottom flower design with 25 x 6mm MS flats providing 150mm Spike at the top
lathe
machine
and weight of MS grade squre and rounds shall conform to IS 4351 - 1976 as per appro
Size (1.50
x 2.40M)
complete
finished
item rods
of work
fixing of gate to compound
wall,
cost
40 x 40mm solid squre
(V) including transportation charges,
6.00 Rm x 12.56
Kgs/
1Rman
2x 2 x 1.50 =
of all materials along with test certificates for raw materials including all tools and all incidental labou
40 x 10mm MS flats (H)
14.40 Rm x 3.14 Kgs/ 1Rm
2x 3for
x 2.40
= item of work.
finished item of work as directed by the Departmental Officers
finished
40 x 10mm MS flats (Curved)
6.00 Rm x 3.14 Kgs/ 1Rm
2x 2 x 1.50 =
20mm MS squre rods (Main Verticals)

2x 5 x (1.50+2.10)/2

18.00 Rm x 3.14 Kgs/ 1Rm

20mm MS squre rods (Intermediate Verticals)

2x 5 x (1.20+1.75)/2

14.75 Rm x 3.14 Kgs/ 1Rm

25 x 10mm MS flats for hold fasts

2x 2 x 1.20 =

4.80 Rm x 3.14 Kgs/ 1Rm

ABSTRACT
Material
Miscellaneous
BMM-V.16

approved rate Repairs and


development works to Sri
Brahmopasana temple at
Kakinada in East Godavari
District

do

M.S. Flats & MS Rods

kg

38.00

Labour charges for fabricating all heavy steel


Add LA charges

kg

14.00
3602.62

CI Ornamental Spikes charges

each /L.S

50.00

Ball and pin arrangement @ bottom

each /L.S

250.00

cum

15881.16

Add Over Head Charges


Total rate per each MS Grill =

36 Cost & Supply of New Ceiling tiles from approved source including cost and conveyance of tiles to work an
site for verification as directed by the Departmental Officers.
Cost & Supply of NewCeiling tiles

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

37 Cost & Supply of New Mangalore tiles from approved source including cost and conveyance of tiles to work
at site for verification as directed by the Departmental Officers.
Cost & Supply of New Mangalore tiles

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

38 Cost & Supply of Ridge tiles from approved source including cost and conveyance of tiles to work and stack
verification as directed by the Departmental Officers.
Cost & Supply of Ridge tiles from approved source

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

39 Reroofing with best Manglore tiles over ceiling tiles and cement mortor borders (1:2) including cost and c
all materials from approved source to site of work and all operational, incidential, labour charges such as m
laying tiles in position, including boarders with cement mortor, etc., complete for finished item of work
Reroofing with best Manglore tiles over ceiling tiles - Unit 1 sqm

Code
Material

Unit

Rate

Cement mortor (1:2)

cum

4347.09

Mason Cl- I / Brick layer Cl- I


Mason Cl- ll / Brick layer Cl-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
179.65

Add Over Head Charges

sqm

218.77

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

40 Labour charges for shifting the racks 12 nos of size 1.80M x 0.75M x 3.05M to out side of the store room
stacking at safety place for taking up repairs to the store room and again shifting back and rearrang
carefully in the store room after repairs including labour charges for all operations etc., as directed by the
charge
Code
Material

Unit

Rate

Rate as per Quatation (1 Job.)


Total rate 1 Job

1 Cost Suply and Fixing of best Salwood SS Fly proof mesh for Door shutter diferent sizes frame with fly
frame size 3" x 1 1/2" thick and beading 3/4" x 1/2" thick including cost, wrought and putup and conv
materials work site and including all taxes, all laber charges for making, fixing of door furniture in position
Dept| Officers including M.S.P.C. hings, tower bolts, M.S. aldop and M.S handle, and all labour charges such
the Departmental Officers for finished item of work.
Code
Unit taken 3'-6" x 7' - 0" =

Unit
24.50
For frame
Verticlal
Horizontal
Beading
Verticlal
Horizontal

sft

Rate
2.28 sqm

2 x 1 x 6'-10 1/2" x 3" x 1 1/2" =


4 x 1 x 3'-3" x 3" x 1 1/2" =
1 x 2 x 6'-10 1/2" x 3/4" x 1/2" =
1 x 4 x 3'-3" x 3/4" x 1/2" =
Total qty of frame

ABSTRACT
BMT-E.15
BMT-G.28
BMT-G.14
BMT-G.35
BMT-F.19
BMM-V.07

Cost of Sal wood for frame


100 long MS PC hinges
100 mm long MS tower bolts
125 mm long MS handle
SS fly froof mesh
Labour charges
Add extra for MAA

cft
Nos
Nos
Nos
Sqm
Sqm
Sqm

1100.01
16.00
18.00
23.00
376.00
365.00
832.20

Add Over Head Charges


Total rate per 2.28sqm

1.00 sqm

sqm

2809.09

2.28 sqm

SS fly proof mesh Door=

SS fly proof mesh Door=

3191.55 x 1.00 sqm


2.28 sqm
Total rate per 1sqm

1 Cost Suply and Fixing of best Salwood Window Double shutters diferent of size shutters frame thick 3 1/2
plank thick 3/4" including cost, wrought and putup and conveyance of all materials work site and includin
laber charges for making, fixing of window furniture in position as directed by Dept| Officers including M
tower bolts, and M.S handle, and all labour charges such as diricted by the Departmental Officers for fin
work.

Code
Unit taken 2' - 6" x 3' - 0" =

Unit
7.50
For shutters frame
Verticlal
Horizontal

sft

Rate
0.70 sqm

2 x 2 x 3'-0" x 3 1/2" x 1 1/2"=


2 x 2 x 1'-1 1/2" x 3 1/2" x 1 1/2" =
Total qty of frame

ABSTRACT
BMT-E.15
BMT-G.27
BMT-G.31
BMT-G.14
7Kg/1sqm
BMM-V.07

Cost of Sal wood for frame


MS- Butt hinges - 75 mm Long
75 mm long Alluminium Handle
100 mm long MS tower bolts
MS Rods including fabrication charges
Labour charges
0.601 Cft or
0.70sqm Or
0.017
Add extra for MAA
Add Over Head Charges
Total rate per
0.70Sqm

1.00 sqm

cft
Nos
Nos
Nos
kgs
Sqm
Cum
Sqm

1390.26
8.00
45.00
18.00
53.50
10250.00

sqm

1384.95

174.25

0.700 sqm

For Salwood Window Shutters=

For Salwood Window Shutters=

1573.51 x 1.00 sqm


0.70 sqm
Total rate per 1sqm

s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
m depth
BLD CSTN 2.4
Coefficient
Amount
0.520
0%

166.40
0.00

75%
1

124.80
30.00

14%

321.20
43.73
364.93

or say

365.00

epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ing charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring
BLD CSTN 2-1
Coefficient
Amount
0.364
0%

116.48
0.00

30.00

13.615%

146.48
19.94
166.42

or say

166.00

ders upto 0.30 m dia. for foundations of canal cross drainage and other
vated stuf neatly in specified dump area or disposing of the same as
0 m and initial lift upto 3 m.
IRR-CCDW-1-1
Coefficient
Amount

0.025
0.600
0%
1

6.88
192.00
0.00
30.00

14%

228.88
31.16
260.04

or say

260.00

or Mangalore tiles over flat tiles without roof timbers clearing away and
any etc., complete as directed by the Engineer-in-charge of the work.

Coefficient

Amount

1.000

8.30

0%

0.00

14%
or say

8.30
1.13
9.43
9.00

of Lime work unserviceable materials within 100 metres lead and lift
ected by the Enginee - in - Charge.
BLD-CSTN-14-8-295
Coefficient
Amount
1.220
0%
1%

390.40
0.00
3.39
3.94

14%

397.73
54.15
451.88

or say

452.00

ent concrete upto 15 cm thicknes within 100 metres lead labour charges
- Charge.
BLD-CSTN-14-8-296
Coefficient
Amount
2.440
0%
1%

780.80
0.00
3.39
7.84

14%

792.03
107.83
899.86

or say

900.00

uding stacking of serviceable materials and disposal of unserviceable


es etc; complete for finished item of work as directed by the Engineer - in BLD-CSTN-14-8-298
Coefficient
Amount
4.320
0%
1%

1382.40
0.00
3.39
13.86

14%

1399.65
190.56
1590.21

or say

1590.00

serviceable materials and disposal of unserviceable materials within 100


finished item of work as directed by the Engineer - in - Charge.
BLD-CSTN-14-8-299
Coefficient
Amount
0.409
0%
1%

130.88
0.00
3.39
1.34

14%

135.61
18.46
154.07

or say

154.00

slabs flooring on sand bed carefully stacking materials useful for reuse
shed item of work as directed by the Engineer - in - Charge.

Coefficient

Amount

1.000

4.20

0%

0.00

14%

4.20
0.57
4.77

or say

5.00

ng materials useful for reuse Old cement mortar plaster including stacking
viceable materials within 100 metres lead labour charges etc; complete for
eer - in - Charge.

Coefficient

Amount

1.000
0%

2.90
0.00

14%

2.90
0.39
3.29

or say

3.30

ny thickness fixing the frame, fixing the fixures to the window shutters
furniture, racks, work-station furniture, cup-board shutters to existing cupveneer laminations including fixing cutting, making, assembling, fixing
eets/ laminations fixing in position with necessary screws excluding cost of
as directed by the Engineer-in-charge of the work

y thickness fixing the

frame, fixing the fixures to the window shutters.

Coefficient
1.000
0%

Amount
365.00
0.00

14%

365.00
49.69
414.69

or say

414.70

d timber in roofs or floors clearing away and carefully stacking materials


ed by the Engineer-in-charge of the work
Coefficient
1.000

Amount
125.00

0%

0.00

14%

125.00
17.02
142.02

or say

142.00

ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix

BLD CSTN 3.9:22

Coefficient
129.600

Amount
673.92

0.900

1254.09

0.540

277.25

1.200

92.40

1.000

328.60

0%
0.100
1.390
0%

0.00
42.00
444.80
0.00

14%

3113.06
423.84
3536.90

or say

3537.00

ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix

BLD CSTN 3.5:22


Coefficient
Amount
162.000

842.40

0.900

1254.09

0.450

231.04

1.200

92.40

1.000

328.60

0%
0.100
1.390
0%

0.00
42.00
444.80
0.00

14%

3235.33
440.49
3675.82

or say

3676.00

as per 456 nominal mix using 40 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
ork, per APSS. No. 402.

Coefficient
216.000

Amount
1123.20

0.450

627.04

0.900

462.08

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000

723.00

0%

0.00

14%

4008.82
545.80
4554.62

or say

4554.60

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. First Floor

BLD CSTN 3-7:24


Coefficient
Amount
17.500
0.045
0.023
0.060
0.013
0%
0.013

91.00
77.20
11.81
4.62
4.27
0.00
2.15

0%
0.003
0.007
0.125
0%

0.00
1.26
2.63
40.00
0.00
234.94

BLD-CSTN-6-1
0.015
0.060
0.096
0%

46.49
25.20
30.72
0.00

14%

31.99
369.34

or say

369.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. Second Floor

BLD CSTN 3-7:24


Coefficient
Amount
17.500
0.045
0.023
0.060

91.00
77.20
11.81
4.62

0.013

4.27

0%
0.013

0.00
2.15

0%

0.00

0.003
0.007
0.125
0%

1.26
2.63
40.00
0.00

1.000
0%

4.81
0.00
239.75

BLD-CSTN-6-1
0.015
0.060
0.096
0%

46.49
25.20
30.72
0.00

1.000
0%

5.59
0.00

14%

32.64
380.39

or say

380.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
FI

BLD CSTN 3-14:31A


Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267
4.600
0%

55.86
100.13
1472.00
0.00
6199.71

1.000

723.00

0%

0.00

14%

6922.71
942.53
7865.24

or say

7865.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
S FI

BLD CSTN 3-14:31A


Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267
4.600
0%

55.86
100.13
1472.00
0.00
6199.71

1.000

1025.00

0%

0.00

14%

7224.71
983.64
8208.35

or say

8208.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
EAM FI

BLD CSTN 3-14:31A


Coefficient
Amount
350.000

1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267
4.600
0%

55.86
100.13
1472.00
0.00
6199.71

1.000

2410.00

0%

0.00

14%

8609.71
1172.21
9781.92

or say

9782.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS FI

Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800
1.200

1536.58
92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.167
70.14
0.167
62.63
5.600
1792.00
0%
0.00
BACIC RATE 1 Cum
6496.49
BLD CSTN 3-15:31B
BACIC RATE 1 Cum

1.000
0%

6496.49

1075.00
0.00

14%

7571.49
1030.86
8602.35

or say

8602.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS F2

BLD CSTN 3-15:31B


BACIC RATE 1 Cum

6496.49

1.000

1170.00

0%
1.000
0%

0.00
249.85
0.00

14%

7916.34
1077.81
8994.15

or say

8994.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS F3

BLD CSTN 3-15:31B


BACIC RATE 1 Cum

6496.49

1.000

1265.00

0%
1.000
0%

0.00
499.70
0.00

14%

8261.19
1124.76
9385.95

or say

9386.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS FI

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49

1.000
0%

1518.00
0.00

14%

8014.49
1091.17
9105.66

or say

9106.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS F2

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49
1.000

1586.00

0%
1.000
0%

0.00
249.85
0.00

14%

8332.34
1134.45
9466.79

or say

9467.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS F3

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49
1.000

1653.00

0%
1.000
0%

0.00
499.70
0.00

14%

8649.19
1177.59
9826.78

or say

9827.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for RCC SLABS, BEAMS centering with Stell up to 3.66, as per

Coefficient
350.000
0.400
0.800
1.200
0.308
0%
0.308
0%

Amount
1820.00
205.37
1536.58
92.40
160.93
0.00
51.04
0.00

0.067
28.14
0.133
49.88
3.077
984.64
0%
0.00
BACIC RATE 1 Cum
4928.98
BLD CSTN 3-15:31B

BACIC RATE 1 Cum

1.000
0%

4928.98

2071.00
0.00

14%

6999.98
953.05
7953.03

or say

7953.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r BEAMS F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 Cum
4928.98

1.000

2151.00

0%
1.000
0%

0.00
119.52
0.00

14%

7199.50
980.21
8179.71

or say

8180.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r BEAMS F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 Cum
4928.98

1.000

2230.00

0%
1.000
0%

0.00
239.04
0.00

14%

7398.02
1007.24
8405.26

or say

8405.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB FI

BLD CSTN 3-15:31C


Coefficient
Amount
43.750

227.50

0.050

25.67

0.100
0.150

192.07
11.55

0.039
0%
0.039
0%

20.38
0.00
6.46
0.00

0.008
0.017
0.385
0%
BACIC RATE 1 SQM

1.000
0%

3.36
6.38
123.20
0.00
616.57

232.00
0.00

14%

848.57
115.53
964.10

or say

964.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
616.57
1.000

241.00

0%
1.000
0%

0.00
14.97
0.00

14%

872.54
118.80
991.34

or say

991.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
616.57

1.000

250.00

0%
1.000
0%

0.00
29.94
0.00

14%

896.51
122.06
1018.57

or say

1019.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick VRCC Steps for Staircase FI

BLD CSTN 3-15:31C


Coefficient
Amount
78.750

409.50

0.090

46.21

0.180
0.270

345.73
20.79

0.069
0%
0.069
0%

36.05
0.00
11.43
0.00

0.015
0.030
0.692
0%
BACIC RATE 1 SQM

1.000
0%

6.30
11.25
221.44
0.00
1108.70

242.00
0.00

14%

1350.70
183.90
1534.60

or say

1535.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick VRCC Steps for Staircase F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
1108.70

1.000

251.00

0%
1.000
0%

0.00
26.87
0.00

14%

1386.57
188.78
1575.35

or say

1575.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick RCC Steps for Staircase F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
1108.70

1.000

261.00

0%
1.000
0%

0.00
53.74
0.00

14%

1423.44
193.80
1617.24

or say

1617.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick SUN SHADES FI

BLD CSTN 3-15:31C


Coefficient
Amount
21.875

113.75

0.025

12.84

0.050
0.075

96.04
5.78

0.019
0%

9.93
0.00

0.004
0.008
0.192
0%
BACIC RATE 1 SQM

1.000

1.68
3.00
61.44
0.00
304.46

271.00

0%

0.00

14%

575.46
78.35
653.81

or say

654.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick RCC SUN SHADES F2

BLD CSTN 3-15:31C

Coefficient
BACIC RATE 1 SQM

Amount
304.46

1.000

281.00

0%
1.000
0%

0.00
6.96
0.00

14%

592.42
80.66
673.08

or say

673.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick RCC SUN SHADES F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
304.46

1.000

292.00

0%
1.000
0%

0.00
13.92
0.00

14%

610.38
83.10
693.48

or say

693.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS,
No. 402.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000
0%

1025.00
0.00

14%

6959.38
947.52
7906.90

or say

7906.90

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for COLUMNS, LINTELS, WATER TANKS,
es, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel
66 M, as per APSS. No. 402. for Lintles F2.

BLD CSTN 3-13:30B


Coefficient
Amount
350.000
0.900
0.450
1.200

1820.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1844.00

0%
1.000
0%

0.00
392.63
0.00

14%

8239.79
1121.85
9361.64

or say

9362.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
on charges for finished item of work for Beams, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,
BLD CSTN 3-13:30B
Coefficient
Amount
350.000

1820.00

0.900

1728.65

0.450

231.04

1.200

92.40

0.267

87.74

0%
0.267
0%

0.00
44.24
0.00

0.067
0.133

28.14
49.88

2.500
0%

800.00
0.00

1.000

2619.00

0%
1.000
0%

0.00
193.03
0.00

14%

7694.12
1047.55
8741.67

or say

8742.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for Slabs 100 mm thick, for Casurina
Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height

BLD CSTN 3-13:30C


Coefficient
Amount
35.000
0.045

182.00
86.43

0.090

46.21

0.120

9.24

0.027
0%
0.027
0%

8.87
0.00
4.47
0.00

0.007
0.013
0.250
0%

2.94
4.88
80.00
0.00

1.000

297.00

0%
1.000
0%

0.00
19.33
0.00

14%

741.37
100.94
842.31

or say

842.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for Sun Shade 62.50 mm thick, for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402. for Sun Shades First floor

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.450
0.900
1.200
0.267
0%
0.267
0%

2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%
BACIC RATE 1 CUM

28.14
49.88
800.00
0.00
4508.80

BACIC COST OF 1 SQM 62.50 mm THICK F1

281.80

1.000
0%

289.00
0.00

14%

570.80
77.71
648.51

or say

648.50

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for Sun Shade 62.50 mm thick, for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402. for Sunshades Third floor.

BLD CSTN 3-13:30C


Coefficient
Amount
21.875
0.056
0.028
0.075

113.75
107.56
14.38
5.78

0.017
0%
0.017
0%

5.59
0.00
2.82
0.00

0.004
0.008
0.156
0%

1.68
3.00
49.92
0.00

1.000

317.00

0%
1.000
0%

0.00
12.03
0.00

14%

633.51
86.25
719.76

or say

720.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

14%

248.54
33.84
282.38

or say

282.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%
1.000
0%

1.43
2.51
80.00
0.00
8.82
0.00

14%

257.36
35.04
292.40

or say

292.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

1.000
0%

17.64
0.00

14%

266.18
36.24
302.42

or say

302.00

sing 12 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
finished item of work for Slabs 50 mm thick etc., for Racks & Platform

BLD CSTN 3-13:30C


Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%

4.27
0.00

0.0034
0.0067
0.250
0%
1.000
0%

1.43
2.51
80.00
0.00
723.00
0.00

14%

969.39
131.98
1101.37

or say

1101.00

sing 12 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
finished item of work for Slabs 50 mm thick etc., for Racks & Platform

BLD CSTN 3-13:30C


Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%

4.27
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

1.000

723.00

0%
1.000
0%

0.00
17.28
0.00

14%

986.67
134.34
1121.01

or say

1121.00

excluding rock) in trenches, sides of foundations and basement with initial


nsolidating each deposited layer by watering and ramming including cost
operational, incidental, labour charges, hire charges of T & P etc., complete
BLD CSTN 2-9
0) for Refilling foundations.
Coefficient
Amount
0.052
0%

16.64
0.00

14%

16.64
2.27
18.91

or say

18.90

ls in Super structure with CM ( 1:8) prop (Cement:Sand) using 2nd class


x11x7 cm having a crushing strength of 2.5N/sq.mm including cost,
nd water from approved source to work site and all operational, incidental
moratar, constructing masonary, lift charges, curing etc., complete for
04) for Super Structure FI

BLD CSTN 5-5:43


36.000
512.000
0.200

187.20
2727.94
102.68

0.240
0.560
1.890
0%

100.80
210.00
604.80
0.00

1.000

304.84

0%

0.00

14%

4238.26
577.04
4815.30

or say

4815.30

ick in CM (1:4) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
BLD CSTN 5-12:50
Coefficient
Amount
7.200
51.200
0.020

37.44
272.79
10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000
0%

68.59
0.00

14%

524.79
71.45
596.24

or say

596.20

as per 456 nominal mix using 20 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402.

Coefficient
320.000
0.900
0.450
1.200

Amount
1664.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000

723.00

0%

0.00

14%

5420.19
737.96
6158.15

or say

6158.00

56 nominal mix using 12 mm size graded machine crushed Hard Granite


uarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402. Coping

Coefficient
320.000
0.900
0.450
1.200

Amount
1664.00
1544.08
231.04
92.40

1.000
0%

328.60
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000
0%

723.00
0.00

14%

5069.92
690.27
5760.19

or say

5760.00

ick in CM (1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501

BLD CSTN 5-12:50


Coefficient
Amount
4.800
51.200
0.020

24.96
272.79
10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000
0%

68.59
0.00

14%

512.31
69.75
582.06

or say

582.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
nished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with
p Bands.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
0.000
0%

328.60
0.00
0.00
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

723.00

0%

0.00

14%

6491.68
883.84
7375.52

or say

7375.50

ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof First Floor Lift manual

BLD CSTN 4-1


Coefficient

Amount

3.000

210.00

1.025

38950.00

70.00

630.00

2.500
10.000
10.000

1050.00
4200.00
3200.00

10.000

612.00

0%

0.00

14%

48852.00
6651.20
55503.20

or say

55503.00

ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof Third Floor Lift manual

BLD CSTN 4-1


Coefficient

Amount

3.000

210.00

1.025

38950.00

70.00

630.00

2.500
10.000
10.000
0%

1050.00
4200.00
3200.00
0.00

10.000

612.00

1.000
0%

740.00
0.00

14%

49592.00
6751.95
56343.95

or say

56344.00

roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for

BLD CSTN 10-25


Coefficient
Amount
10.080
0.021

52.42
10.78

0.200

4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

14%

271.87
37.02
308.89

or say

308.90

roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for

BLD CSTN 10-25


Coefficient
Amount
10.080

52.42

0.021
0.200

10.78
4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

1.000
0%

40.78
0.00

14%

312.65
42.57
355.22

or say

355.00

ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
BLD CSTN 8-10
r Celling plastering F3.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

23.91

0%
1.000
0%

0.00
41.28
0.00

14%

305.74
41.63
347.37

or say

347.00

coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
onveyance of all materials like cement, sand, water etc., to site, including
all materials, and all operational, incidental charges on materials and
ng mortar, finishing, scafolding, lift charges, curing etc., as directed by
nal & Even faces of Brick Wall and RCC exposed faces for finished item of
CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual

BLD CSTN 8-10


Coefficient
Amount

2.640
0.011

13.73
5.65

1.440
0.004

7.49
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

242.17
32.97
275.14

or say

275.10

CM (1:4) with sponze finishing.cost of all materials, seigniorage charges,


and including all operational, incidental and labour charges for mixing
, complete for finished item of work (APSS 901,903 & 904) for walls F-0.

BLD CSTN 8-2


Coefficient
Amount
7.560
0.021

39.31
10.78

0.094
0.160
0%

35.25
51.20
0.00

Basic rate

136.54

14%

136.54
18.59
155.13

or say

155.00

g 10mm thick plaster of paris boards and Labour charges for fixing plaster
perimeter channel 30mm x 27mm x 0.55 thick and ceiling channels of
and fixing and finishing using joint compound and luppum/ putty finish as
cost of all materials including cost of Plaster of paris sheets/ boards for

(BLD CSTN 10-31 & SOR item 18 p.


No. 399.)
Amount
1.030

336.81

0.640

41.60

0.840

62.16

2.300

32.20

0.260
0.289
0.226
0.628
0%

109.20
138.72
84.75
200.96
0.00

14%

1006.40
137.02
1143.42

or say

1143.00

headed glass including cost, conveyance of all materials to work site, all
c., complete for finished item of work as directed by the Enginee - in -

Coefficient

Amount

1.000
10%

220.00
22.00

1.000

173.00

0%

0.00
100.00

14%

515.00
70.12
585.12

or say

585.00

mical including cost and conveyance of all materials to site including all
eer-in-charge of the work
Coefficient
1.000

Amount
440.00
440.00

uivalent chemical including cost and conveyance of all materials to site


by the Engineer-in-charge of the work
Coefficient
1.000

Amount
104.00
104.00

epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ng charges etc as per SS - 20 B (APSS 308). For Ordinary soil-Manual up to
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
1

116.48
0.00
30.00

14%

146.48
19.94
166.42

or say

166.00

cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch Second Floor
Coefficient

Amount

14.73
2.203
2.203
2.203

2769.98
17.62
1.10
0.44

0.043
0.054
0%

16.21
17.30
0.00
25.00
150.00

1.000
0%
14%

3.35
0.00
3001.00
408.59
3409.59
341.00

m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
5.26

1.000
0%
1%

22.99
0.00
0.23

14%
or say

554.55
554.55
75.50
630.05
630.00

m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
5.26

1.000
0%
1%

45.98
0.00
0.46

14%
or say

577.77
577.77
78.66
656.43
656.00

oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-5


Coefficient
Amount
1.050

885.15

6.060

31.51

0.014

7.19

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
11.60
1171.17

1171.17
14%

159.45
1330.62

or say

1330.60

oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-5


Coefficient
Amount
1.050

885.15

6.060

31.51

0.014

7.19

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
11.60

1.000
0%
1%

45.98
0.00
0.46

14%

1217.61
165.78
1383.39

or say

1383.00

of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-6


Coefficient
Amount
1.050

488.25

6.180
0.012

32.14
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.62
769.89
769.89
104.82
874.71
874.70

14%
or say

of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials
like CSTN
cement,
BLD
9-6sand water
e charges, etc., complete for finished item of work, including the cost of
Coefficient
Amount
1.050

488.25

5.460
0.012
0.200

28.39
6.16
5.80

0.096
0.224
0.330

40.32
84.00
105.60

0%
1%
1.000
0%
1%
14%
or say

0.00
7.59
45.98
0.00
0.46
812.55
110.63
923.18
923.00

Tiles of any size Ist Quality of make approved as by Engineer - in - Charge


00 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and neat
of Cement paste fixed with pigments of machine shade, including cost,
aterials and water etc., from approved sources to work site all operational,
ortar fixing in position, lift charges, watering curing etc., complete for
Bath rooms F1

BLD CSTN 9-6


Coefficient
Amount
1.050

433.65

6.756
0.012

35.13
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11
717.77

14%

97.72
815.49

or say

815.50

m thick (Medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330

40.32
84.00
105.60

0%
1%

14%
or say

0.00
5.26
531.33
531.33
72.34
603.67
603.70

cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto 600 pitch
BLD-CSTN-8-4
Coefficient
Amount
14.73
2.203
2.203
2.203

2769.98
17.62
1.10
0.44

0.043
0.054
0%

16.21
17.30
0.00
25.00
150.00

14%

2997.65
408.13
3405.78
340.60

s size 0.90 x 2.10M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.

Coefficient

Amount
4.200
1.800

Total

6.000 Rm
1.890 sqm

6.00
1.89

1290.00
2967.30

14%

4257.30
579.63
4836.93

Or say

4837.00

ith (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal
b, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing
lopes and thread lining including cost of all materials like cement, metal,
niorage charges, etc., complete for finished item of work, but excluding the
BLD CSTN 9-13-111
Coefficient
Amount
0.017

29.17

12.000
0.0085

62.40
4.36

0.125
0.006
0.300
20%
1%

35.63
1.56
64.50
20.34
2.18

14%

220.14
29.97
250.11

or say

250.00

d fixing MS. Hallow door frames manufactured by cold roll formed process
ming to IS 4351 - 1976 size should be 50 x 60 mm with 32 mm rebate. The
ame should be painted with one coat of primer and finished painted with
ess of 1.25 mm. Size of door frame section should be of 105x60mm with a
door shutter. The frame section should have groove to insert gasket. The
e filled with polyurethane foam. The frame section should be cut to length,
should be provided with: a) 2mm thick MS powder coated butt hinges of
for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each
s screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver
No

Coefficient

Amount

1.000

233.00

14%

233.00
31.72
264.72

or say

265.00

on make) of superior quality to the existing Windows & Ventilaters using


p) duly fixing the tape to the Windows & Ventilaters frame using necessary
d including all taxes and all labour charges for striching,
making,
fixing in
Coefficient
Amount
ed item of work
6.40 Rm
2.510
6.400
6.400
6.400
2.510

389.05
32.00
96.00
44.80
100.40

14%

662.25
90.17
752.42

299.77

or say

300.00

ought and putup Sal Wood scantlings: any length in length including cost
and all operational, incidential, labour charges, etc., complete for finished
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%

38847.00
7434.00
2816.00
0.00
49097.00

rought and putup in Sal Wood Plancks: any thickness in length including
k site and all operational, incidential, labour charges, etc., complete for

BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%

49491.00
7434.00
2816.00
0.00
59741.00

p Teak Wood scantlings: any length including cost and conveyance of all
dential, labour charges, etc., complete for finished item of work
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%

81225.00
7434.00
2816.00
0.00
91475.00

tup in Teak Wood Plancks: any thickness in length including cost and
all operational, incidential, labour charges, etc., complete for finished item

BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%

116540.00
7434.00
2816.00
0.00
126790.00

work etc., complete for finished item of work

Coefficient
17.700
8.800
0%

Amount
7434.00
2816.00
0.00
10250.00

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.20 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0090

Cum
Cum

0.0405

Cum

2.2297

Sqm

2.2297

Sqm

0.0405

1988.43

2.2297

1636.60

0.0405

415.13

2.2297

512.83

0%

0.00
150.00

4702.99

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

5252.99
715.19
5968.18

Say

5968.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.05 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0079

Cum
Cum

0.0394

Cum

1.9214

Sqm

1.9214

Sqm

0.0394

1934.42

1.9214

1410.31

0.0394

403.85

1.9214

441.92

0%

0.00
150.00

4340.50

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4890.50
665.84
5556.34
5556.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.00 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0075

Cum
Cum

0.0390

Cum

1.7570

Sqm

1.7570

Sqm

0.0390

1914.78

1.7570

1289.64

0.0390

399.75

1.7570

404.11

0%

0.00
150.00

4158.28

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4708.28
641.03
5349.31
5349.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.90 x 2.10 M
Coefficient

Amount

For Door
0.0315
0.0068

Cum
Cum

0.0383

Cum

1.6132

Sqm

1.6132

Sqm

0.0383

1880.42

1.6132

1184.09

0.0383

392.58

1.6132

371.04

0%

0.00
150.00

3978.13

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4528.13
616.50
5144.63
5145.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.85 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0064

Cum
Cum

0.0379

Cum

1.5515

Sqm

1.5515

Sqm

0.0379

1860.78

1.5515

1138.80

0.0379

388.48

1.5515

356.85

0%

0.00
150.00

3894.91

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4444.91
605.17
5050.08
5050.00
Each

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 1.50x1.35

Coefficient
Amount
For Windows
0.0405
0.0225

Cum
Cum

0.0630

Cum

0.0221

Cum

0.0115

Cum

0.0336

Cum

0.0268

Cum

0.0630
0.0336
0.0268
2.025

3093.11
3073.56
3397.97
1928.31

29.25

1111.50

29.25

468.00

29.25

87.75

0%

0.00
100.00

13260.20

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00
15.00

576.00
192.00
414.00
264.00
45.00

14%

14751.20
2008.38
16759.58

Say

16760.00

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.35

Coefficient
Amount
For Windows
0.0304
0.0135

Cum
Cum

0.0439

Cum

0.0110

Cum
Cum

0.0057

0.0167

Cum

0.0152

Cum

0.0439
0.0167
0.0152
1.215

2155.36
1527.63
1927.21
1156.98

23.39

888.82

23.39

374.24

23.39

70.17

0%

0.00
80.00

8180.41

e for Windows Panelled : Double Leaf with half


(Schedule Item No. 310)
96.00
32.00
69.00
88.00
15.00

192.00
128.00
276.00
176.00
30.00

14%

8982.41
1222.96
10205.37

Say

10205.00

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.07

Coefficient
Amount
For Windows

0.0135

Cum
Cum

0.0376

Cum

0.0090

Cum

0.0241

0.0047

Cum

0.0137

Cum

0.0152

Cum

0.0376
0.0137
0.0152
0.963

1846.05
1253.21
1927.21
917.02

23.39

888.82

23.39

374.24

23.39

70.17

0%

0.00
80.00

7356.72

e for Windows Panelled : Double Leaf with half


(Schedule Item No. 310)
96.00
32.00
69.00
88.00
15.00

192.00
128.00
276.00
176.00
30.00

14%

8158.72
1110.81
9269.53

Say

9270.00

ntilators by using salwood frame of 75 x 50mm & and fixing 2 numbers of


ng 4mm thick pin headed glass including cost and conveyance of all
p & fixing in position etc., complete for finished item of work as directed by

Coefficient

Amount

For Glazed Ventilator

0.00675

Cum
Cum

0.0135

Cum

0.00675

0.0135

662.81

0.540

514.22

0.54
0%

180.36
0.00

2.034

77.29

2.034

32.54

2.034

6.10

0%

0.00
60.00

1533.32
14%

1533.32
208.76
1742.08

Say

1742.00

ntilators by using salwood frame of 75 x 50mm & and fixing 2 numbers of


ng 4mm thick pin headed glass including cost and conveyance of all
p & fixing in position etc., complete for finished item of work as directed by
Coefficient

Amount

For Glazed Ventilator


0.00450
0.00338

Cum
Cum

0.00788

Cum

0.00788
0.270

386.88
257.11

0.27
0%

90.18

1.017

38.65

1.017

16.27

1.017

3.05

0%

0.00

0.00

60.00

852.14
14%

852.14
116.02
968.16

Say

968.00
8676.65

8676.65 x 1.00 sqm


2.03 sqm

4284.77
Say

4285.00

alwood) Fully Panneled Door of size 100 x 2.00 Door single leaf door frame
try wood 3"x4" free from all difects such as werping, bending, knot etc.,
40mm size and with 1 1/2 thick best country wood styles and rise using 7/8"
fications of APDSS including cost, wrought and putup and conveyance of all
Coefficient
Amountby
laber charges for making, fixing of door furniture in
position as directed
For Door
: Size), Bottom Tower bolts 150mm long, Brass Butt
hinges (IS:205)- 150
1) 250 mm long, Heavy duty Aluminium Door stopper, Aluminium Door
ated Aldrop (IS:2681) 300 mm long and all labour charges
diricted
1.096 such as Cft
of work. for External doors (Schedule Item 292)
0.274
Cft
0.520
0.116

Cft
Cft

0.436

Cft

2.442

Cft

1.299

Cft

1.299

Cft

2.442
1.299
0.106

3395.01
2197.47
1086.50

150.00

e - Iron - for External doors (Schedule Item 292)


86.00
69.00
166.00
38.00
85.00
124.00

14%

172.00
138.00
996.00
38.00
85.00
124.00
8381.98
1141.21

9523.19
9523.19
Say

9523.19 x 1.00 sqm


2.00 sqm
Say

9523.00

4761.60
4762.00
1 Sqm

(Salwood) Fully Panneled Door of size 1.00 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
Amountas
axes, all laber charges for making, fixing of doorCoefficient
furniture in position
Forlong,
DoorAluminium Butt
er bolts (Ave : Size), Bottom Tower bolts 150mm
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental
Officers
1.096
Cft for
dule Item 293)
0.274
Cft
0.520
0.116

Cft
Cft

0.436

Cft

2.442

Cft

1.299

Cft

1.299

Cft

2.442
1.299
0.106

3395.01
2197.47
1086.50

150.00

6828.98

e - Iron - for Internal doors (Schedule Item 293)


86.00
69.00
100.00
104.00
38.00
85.00
14%

86.00
69.00
600.00
104.00
38.00
85.00
7810.98
1063.46
8874.44

Say

8874.00
8874.44

8874.44 x 1.00 sqm


2.00 sqm
Say

4437.22
4437.00
1 Sqm

(Salwood) Fully Panneled Door of size 0.75 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
axes, all laber charges for making, fixing of door furniture in position as
er bolts (Ave : Size), Bottom Tower bolts 150mm long, Aluminium
Butt
6828.98
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental Officers for
5121.74
dule Item 293)
2.00 sqm

e - Iron - for Internal doors (Schedule Item 293) as per


em.
86.00
69.00
100.00
104.00
38.00
85.00

86.00
69.00
600.00
104.00
38.00
85.00
6103.74

14%

831.02
6934.76

Say

6935.00

(Salwood) Fully Panneled Window of size 1.50 x 1.20M Three Panneled


seasoned best country wood 2 1/2"x3" free from all difects such as werping,
hold fasts of size 300x40mm size and with 2 Nos Mild steel screws of
d styles and rise using 7/8" thick Sal wood flanks for pannels with welded
Coefficient
Amount
as per specifications of APDSS including cost, wrought
and putup
and
For Windows
cluding all taxes, all laber charges for making, fixing
of Panneled Window
ers including Top Tower bolts Alluminium 150mm long, Bottom Tower bolts
- 100 mm Long, Window stoppers Aluminium, and all
labour charges
0.618
Cft such
ished item of work.
0.512
Cft

0.547

Cft
Cft

2.543

Cft

0.742

Cft

0.742

Cft

2.543
0.742
0.093

3535.43
1255.21
953.25

0.866

120.00

5863.89

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00
15.00

576.00
384.00
414.00
264.00
15.00

14%

7636.89
1039.76
8676.65

Say

8677.00
8676.65

8676.65 x 1.00 sqm


1.80 sqm

4820.36
Say

4820.00

(Salwood) Fully Panneled Window of size 1.80 x 1.20M Three Panneled


seasoned best country wood 2 1/2"x3" free from all difects such as werping,
hold fasts of size 300x40mm size and with 2 Nos Mild steel screws of
d styles and rise using 7/8" thick Sal wood flanks for pannels with welded
Coefficient
Amount
as per specifications of APDSS including cost, wrought
and putup
and
cluding all taxes, all laber charges for making, fixing of Panneled 5863.89
Window
ers including Top Tower bolts Alluminium 150mm long, Bottom Tower bolts
- 100 mm Long, Window stoppers Aluminium, and all labour charges such
ished item of work.
7036.67
1.80 sqm

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00

576.00
384.00
414.00
264.00
8674.67

14%

1181.06
9855.73

Say

9856.00

hiting of approved quality to give an even shade after thoroughly brushing


loose powdered materials including cost of all materials, labour charges
etc., complete for finished item of work, including conveyance charges of
BLD CSTN 9-4
Coefficient
Amount
0.120

1.68

0.003
0.008
0.022
0%

1.26
3.00
7.04
0.00

14%

12.98
1.77
14.75

or say

15.00

proof cement paint of apporved brand and shade over a base coat of
oats in all to give an even shade after thourughly brushing the surface to
d materials, including cost and conveyance of all materials to work site and
BLD CSTN 10-5
complete for finished item of work as per SS 912 for Extarnal walls for All
Coefficient
Amount
0.100

10.00

0.021
0.049
0%

10.08
18.38
0.00

0.350

12.25

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

14%

119.04
16.21
135.25

or say

135.00

nd approved Water Proof Cement Paint over Priming Coat, 2 Coats


making 2 coats in all to give an even shade after thourughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 912 for

BLD CSTN 12-4


Coefficient
Amount
0.350

12.25

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

1%

0.81

14%

81.39
11.08
92.47

or say

92.00

nd approved Water Proof Cement Paint over Priming Coat, One Coat
ver a base coat of approved cement primer grade I making making 2 coats
y brushing the surface to remove all dirt and remains of loose powdered
ll materials to work site and all operational, incidental, labour charges etc.
12 for Extarnal walls for All Floors

BLD CSTN 10-3


Coefficient
Amount
0.200

7.00

0.009
0.021
0.150
0%

4.32
8.82
56.25
0.00

1%

0.76

14%

77.15
10.50
87.65

or say

88.00

mixed oil bound wahsable distemper of approved brand and shade over a
brand, making 3 coats in all to give an even shade after thourughly
emains of loose powdered materials, including cost and conveyance of all
idental, labour charges etc. complete for finished item of work as per SS

BLD CSTN 10-1


Coefficient
Amount

0.050

5.00

0.0024
0.0133
0%

1.15
4.99
0.00

0.170

10.20

0.036
0.084
0%

17.28
31.50
0.00

1%
14%
or say

0.59
70.71
9.63
80.34
80.30

oats with Oil Bound Distemper of approved brand and shade making 2
ourughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls for All Floors
BLD CSTN 9-10
Coefficient
Amount
0.170

10.20

0.036
0.084
0%

17.28
31.50
0.00

1%

0.59
59.57
8.11
67.68
68.00

14%
or say

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11-i
Coefficient
Amount
0.050

9.00

0.021
0.049
0%

10.08
18.38
0.00

1%

0.37
37.83

14%

5.15
42.98

or say

43.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal

BLD CSTN 12-11 ii


Coefficient
Amount
0.080

14.40

0.036
0.084
0%

17.28
31.50
0.00

1%

0.63

14%

63.81
8.69
72.50

or say

73.00

mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls

BLD CSTN 12-11 ii-a


Coefficient
Amount
0.050

5.00

0.008
0.019
0%

3.84
7.13
0.00

0.080

14.40

0.036
0.084
0%

17.28
31.50
0.00

1%

0.79

14%

79.94
10.88
90.82

or say

91.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11 vi

Coefficient

Amount

0.070

12.60

0.036
0.084
0%

17.28
31.50
0.00

1%

0.61

14%

61.99
8.44
70.43

or say

70.00

ylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/


hade over a base coat of appropriate primer of approved brand, making 3
o remove all dirt and remains of loose powdered materials, including cost
and all operational, incidental, labour charges etc. complete for finished

BLD CSTN 12-11 ii-a


Coefficient
Amount
0.050

5.00

0.008
0.019
0%

3.84
7.13
0.00

0.080

10.88

0.036
0.084
0%

17.28
31.50
0.00

1%

0.76

14%

76.39
10.40
86.79

or say

87.00

ylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/


hade after thoroughly brushing the surface to remove all dirt and remains
nd conveyance of all materials to work site and all operational, incidental,
of work as per SS 911 for internal walls

BLD CSTN 12-11 vi


Coefficient
Amount
0.070

9.52

0.036
0.084
0%

17.28
31.50
0.00

1%

0.58

14%

58.88
8.02
66.90

or say

67.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-iv
Coefficient
Amount
0.050

9.00

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

14%

77.33
10.53
87.86

or say

88.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.080

14.40

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

14%

90.86
12.37
103.23

or say

103.00

mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v-a
Coefficient
Amount
0.100

10.00

0.021

10.08

0.049
0%

18.38
0.00

0.080

14.40

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

14%

129.32
17.61
146.93

or say

146.90

xterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or


a base coat of appropriate primer of approved brand, making 3 coats after
all dirt and remains of loose powdered materials,
including
cost and
BLD CSTN
12-11-v-a
ll operational, incidental, labour charges etc. complete for finished item of
Coefficient
Amount
0.100

10.00

0.021
0.049
0%

10.08
18.38
0.00

0.080

10.88

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

1%

1.26

14%

127.06
17.30
144.36

or say

144.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.070

12.60

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

1%

0.89
89.95

14%

12.25
102.20

or say

102.00

xterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or


r thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v
Coefficient
Amount
0.070

9.52

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

1%

0.86

14%

86.84
11.82
98.66

or say

99.00

oats - For New Iron Work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-12-v
Coefficient
Amount
0.110

18.70

0.033
0.077
0%

15.84
28.88
0.00

14%

63.42
8.63
72.05

or say

72.10

Coats - for New Wood Work of approved brand and shade, making 3 coats
brushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors

BLD CSTN 12-12-vii


Coefficient
Amount
0.170

28.90

0.048
0.112

23.04
42.00

0%

0.00

14%

93.94
12.79
106.73

or say

106.70

oats - for Old Wood work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-10-iv
Coefficient
Amount
0.110

18.70

0.036
0.084
0%

17.28
31.50
0.00
67.48
9.19
76.67
77.00

14%
or say

oved brand for new wood work of teak wood frame and shutters to give an
uding cleaning the surface of all dirt, dust, etc. , and applying a coat of
d conveyance of all materials to work site andall operational, incidental,
BLD CSTN 12-15
m of work as per SS 1212. for All Floors
Coefficient
Amount
0.023

2.10

0.163

11.41

0.096
0.224
0%

46.08
84.00
0.00

14%

143.59
19.55
163.14

or say

163.00

oat - For Old Iron Work of approved brand and shade, making 1 coat in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential,
charges, etc.,
BLD labour
CSTN 12-12-ii
207 & 1212. for All Floors
Coefficient
Amount
0.050

8.50

0.021
0.049
0%

10.08
18.38
0.00
36.96

14%

5.03
41.99

or say

42.00

ai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water Based
sai coat/ Neon/indocem super track for internal walls (Emulsion Paint) to
ed materials including cost of all materials, labour charges and incidental
e for finished item of work, including conveyance charges of materials for

t/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All Floors

Coefficient
1.000

Amount
95.00

14%

95.00
12.93
107.93

or say

108.00

Tiles of any size Ist Quality of make approved as by Engineer - in - Charge


00 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and neat
of Cement paste fixed with pigments of machine
shade,
cost,
BLD
CSTNincluding
9-6
aterials and water etc., from approved sources to work site all operational,
Coefficient
Amount
ortar fixing in position, lift charges, watering curing etc., complete for
r Bath rooms F3
1.050

433.65

6.756
0.012

35.13
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11

1.000
0%
1%

45.98
0.00
0.46

14%

764.21
104.05
868.26

or say

868.00

height/risers of steps with ceramic tiles 7.30 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching
shade 9-17
to full depth,
BLD CSTN
ent, sand and water etc., complete including seigniorage
charges,
etc.,
Coefficient
Amount
he cost of conveyance of all materials for F3
Basic rate 1 sqm
627.14
1.000
0%
1%
14%
or say

64.00
0.00
0.64
691.78
94.19
785.97
786.00

thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorage charges, labour charges
or finished item of work, for F3
BLD CSTN 9-23
Coefficient
Amount
Basic rate 1 sqm
431.27
1.000
0%
1%

45.98
0.00
0.46

14%

477.71
65.04
542.75

or say

543.00

eight/risers of steps with 15 to 18 mm mm thick polished Shahabad stone


coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
ointed with white cement paste mixed with pigment of matching shade to
ke Shahabad stone, cement, sand and water etc., complete including
d item of work, including the cost of conveyance of all materials for F3

BLD CSTN 9-23


Coefficient
Amount
Basic rate 1 sqm
477.96
1.000
0%
1%

44.70
0.00
0.45

14%

523.11
71.22
594.33

or say

594.00

mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete to
conveyance of all materials like cement, fine aggregate (sand) coarse
Seigniorage charges, sales & other taxes on all
materials
including all
BLD
CSTN 14-6
ch as machine mixing, laying concrete, curing etc.,complete but excluding
Amount
shed item of work, including centering, shuttering.Coefficient

0.336

1935.42

26.440

1370.41

9.880

1196.76

0.120
0.120
0.250
0%

50.40
45.00
80.00
0.00
4677.99
636.91
5314.90
531.49
295.27
295.00

14%

or say

0.015
0.060
0.096
0%

65.21
25.20
30.72
0.00
121.13

Cement : Sand) using hard variety of rough stone other than granite from
ce of all materials like cement, sand, masonary stones, water, etc., to site
terials including all labour charges like mixing cement mortar, wall
ed item of work in foundation & Basement. (APSS No. 615 & 601) For RR
BLD CSTN 6-13
Coefficient
Amount
59.400

308.88

0.440

361.67

0.500

356.83

0.160

234.22

0.330

169.43

1.200
2.000
0%

504.00
640.00
0.00

14%

2575.03
350.59
2925.62

or say

2926.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-12:29
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4297.49

1.000

723.00

0%
1.000
0%

0.00
135.32
0.00

14%

5155.81
701.96
5857.77

or say

5858.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F1
220.000

1144.00

0.450

231.04

0.900
1.200

1728.65
92.40

1.000

328.60

0%
0.100
1.390
0%
Basic rate 1 cum

1.000
0%

0.00
42.00
444.80
0.00
4011.49

723.00
0.00

14%

4734.49
644.60
5379.09

or say

5379.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F2
Basic rate 1 cum
4011.49
1.000

723.00

0%
1.000
0%

0.00
67.66
0.00

14%

4802.15
653.81
5455.96

or say

5456.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4011.49
1.000
0%
1.000
0%

723.00
0.00
135.32
0.00

14%

4869.81
663.02
5532.83

or say

5533.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-11:28
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F2
Basic rate 1 cum
4583.49

1.000

723.00

0%
1.000
0%

0.00
67.66
0.00

14%

5374.15
731.69
6105.84

or say

6106.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-11:28
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4583.49

1.000

723.00

0%
1.000
0%

0.00
135.32
0.00
5441.81

14%

740.90
6182.71

or say

6183.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc.,
to site and Amount
including
Coefficient
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
2184.00
d its fabrication charges for finished item of work420.000
(APSS No. 402)
with
0.400
205.37
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete 0.800
but excluding1536.58
cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
with Stell
up
1.200
92.40
FI
1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
55.86
0.267
100.13
4.600
1472.00
0%
0.00
BACIC RATE 1 Cum
6563.71
BLD CSTN 3-14:31A
BACIC RATE 1 Cum
1.000
0%

6563.71
723.00
0.00

14%

7286.71
992.09
8278.80

or say

8279.00

fixed with all accessories (stappers, bolts and stoppers etc.,) with all sizes
ed drawings with alluminium single shutter with allround frame section of
fixed with alluminium single shutter with vertical styles of sizes 47.62 x
45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm (20060 and
5) with archit clural accessories having section 88x40x3.2 mm (19456) and
of size 79x 17.30 x0.10mm (19352) for height of 1.20 m pre laminated
equivalent ) of 10mm thick to a hight of 0.91 m at bottom panel PVC/
y duty floor spring including cost and conveyance of all materials and
ation and fixing in position as directed by the Engineer in Charge.

Coefficient
Weght
Kg
10.08
4.42
0.88
0.96
1.37

Amount

11.93
0.38
30.02
3.73
33.75 Kgs
1.08 Sqm
0.82 Sqm
33.75

8437.50

1.08

576.72

0.82

467.40
2422.00
312.00
300.00
138.00
34.00

1.00
1.00
3.00
2.00
1.00

0%

331.01
590.39
295.55
295.55
756.40
0.00

1.515

159.04

1.515

146.92

1%

152.62

0.788
1.574
0.788
0.788
2.364

14%

17,513.87 / 1.89=
Or say

15415.10
2098.77
17513.87
9266.60
9267.00

minium fully glazed door as per approved drawing using side vertical and
0 mm with double shutters using shutters frame of size 47 x 44.45 x 1.80
nd 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertical side frames
Coefficient
Amount
ssery glazing clips of size 19 x 17.30 x 0.80 mm and rubber for beeding 5
s, 2 nos locks and 4 nos round door handles necessary fixed with all
Weght
) including cost and conveyance of all materials and
accessories including
sition as directed by the Engineer in Charge. for 1.52Kg
m x 1.32 m as per
15.71
7.46
2.47
2.28
4.93
32.85
1.64
2.38
2.52

39.39 Kgs
69.85
69.85
69.85 RM
7.10
0.71
7.81 Sqm
39.39

9847.50

69.85
7.81

139.70
4451.70
4844.00
948.00
624.00
600.00
276.00
68.00

2.00
2.00
2.00
6.00
4.00
2.00

0%

295.08
527.25
263.63
263.63
674.88
193.33
0.00

5.630

591.15

5.630

546.11

1%

251.54

0.703
1.406
0.703
0.703
2.109
0.703

14%
28,864.46 / 7.10=
Or say

25405.50
3458.96
28864.46
4065.42
4065.00

nd fixing door frames fabricated from sections made of galvanized steel


vanised as per IS 277 with zinc of 120 grams / square metre). The factory
ting of pure Polyester Powder of 50-60 microns thick with total coated
ection should be of 105x60mm with a rebate of 38mm to accommodate
should have groove to insert gasket. The section of the door and fan light
The frame section should be cut to length, and joined by way of welding
mm thick MS powder coated butt hinges of 100nn long 3 Nos. for single
ectroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm x 200mm x
os. with split end tail. d) Nylon Aldrop Receiver 1 No. for single shutter

Coefficient
1.000

Amount
385.00
385.00

14%

52.42
437.42

or say

437.00

Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER consisting of


kness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and
width on the other stiles and bottom rails. The inner panel laminated with
e resistant moulded Pac sheet with 2,4,6 raised panel design in diferent
r routing the moulded design on flush door and 2mm prelam Pac sheet on
door and solvent cement adhesive on Pac lipping etc. complete as per
specification and drawing

Coefficient

Amount

1.000

2900.00

14%

2900.00
394.84
3294.84

or say

3295.00

9.2x1371.6mm) outer frame section size of 46 x 52 mm shutter frame


e of 46 x 70 mm (Code BMT-P.12)
Coefficient

Amount

1.000

5195.00

14%

5195.00
707.30
5902.30

or say

5902.00

x1371.6mm) outer frame section size of 46 x 52 mm shutter frame section


70 mm (Code BMT-P.10)
Coefficient

Amount

1.000

5195.00

14%

5195.00
707.30
5902.30

or say

5902.00

rame section size of 33 x 57 mm Mullion section size of 33 x 57 (Code BMT-

Coefficient

Amount

1.000

3685.00

14%

3685.00
501.71
4186.71

or say

4187.00

gid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 mm


equally divided into 4 no's with tongue and groove locking arrangements.
with the wall thickness of 1.5mm +/-0.15mm section
mitre-cut and
joined
Coefficient
Amount
ackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC
nside the door shutter during the fabrication of the door shutter at those
1.000
1795.00
door shutter.
14%

1795.00
244.39
2039.39

or say

2039.00

sign including cost Mild steel and all Labour charges for fabricating steel
ills, Iron Doors, Windows including cost of welding rods, power charges,
y the Departmental Officers for finished item of work.
Coefficient
1.000
1.000

Amount
38.00
16.00

1.000

3.00

0%

0.00

14%
Say

57.00
7.76
64.76
65.00
1 Kg

wn water take pipes-2.5mm thick including cost of necessary P.V.C Bends,


and fixing in position including cost and conveyance of all materials, Sales
tional and Incidental charges including all labour charges for fixing at site

Coefficient
0.330
0.330
0.330
0.330
1.000

Amount
126.39
27.72
18.48
4.95
14.00

1.400
14%
or say

81.20
272.74
37.13
309.87
309.90

k fixing in position including cost and conveyance of all materials to site,


ll labour charges for fixing at site etc; complete for finished itemof work.
Coefficient

Amount

1.000

335.00

14%

335.00
45.61
380.61

or say

381.00

x 1.25 mm machine rolled CRCA laths, interlocked together through their


ds by end-locks, mounted on specially designed pipe shaft of 50mm dia
plates, guide channels, stoppers, bottom locking plates
and arrangements
Coefficient
Amount
erations including cost of hood cover and springs complete, painted with
l bearings, all accessories etc complete for finished item of work as per
1.000 and Incidental
2000.00
cost and conveyance of all materials to site, Operational
at site etc; complete for finished itemof work.
2000.00
14%

272.30
2272.30

or say

2272.00

g including cost of Teak wood 1 st quality conveyance to site, loading and


making, fixing, finishing etc., complete as directed by the Departmental

oil bound wahsable distemper (overall 3 coats) for All Floors

Coefficient
1.000

BLD CSTN 10-1

Amount
81225.00

10%

8122.50

17.700
8.800
0%

7434.00
2816.00
0.00

35.315
0%

8122.45
0.00

14%

107719.95
14666.07
122386.02

or say

122386.00

Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-2-V
Coefficient
Amount
67.200

349.44

0.940

772.66

0.160

234.22

0.280

143.76

2.222

211.11

2.500
2.320
0%

1050.00
742.40
0.00

14%

3503.59
477.01
3980.60

or say

3981.00

trap using 15 Nos of 32mm MS Steel rods welded as equal spacing over 6
in position on the already laid concrete walls, including all labour charges
on, cost of welding rods etc., complete as directed by the Departmental

9.18 Rm x 6.80 Kgs/ 1Rm


###
Total

62.42
388.07
450.49 Kgs

450.490

17118.62

450.490
0%

5405.88
0.00

450.490
0%

1351.47
0.00

14%

23875.97
3250.71
27126.68

or say

27127.00

Particle Board) ALUMINIUM PARTATIONS-Supply and fixing of BISON LAM


NLAM and 5.50 mm thick plain glass to full height. Using with BISON LAM to
remaining height with glass and aluminum sections anodized to 12 to 15
m and 1.5mm thickness with one meter centre to centre duly fixed with clip
me to pillars by M.S. flats, bolts and nuts including cost and conveyance of
Departmental Officers for finished item of work.

1.000

2625.00

14%

2625.00
357.39
2982.39

or say

2982.00

NLAM (Pre-Laminated Cement Bonded Particle Board) - Supply and fixing of


using BISONPANEL for making frame of size 100mm x 35mm using two
nd one BISONLAM with plain 35mm wood lipping. The Shutters are made of
t Bonded Particle Board) of approved shade inclusive of hardware like M.S.
Aluminum powder coated handles of size 4 (101.6mm), Aluminum tower
od lipping and Fevicol etc., complete as directed by the Departmental

1.000

2250.00

1.000

127.50

14%

2377.50
323.70
2701.20

or say

2701.00

height/risers of steps with Vitrified tiles 8 to 10 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching shade to full depth,
ent, sand and water etc., complete including seigniorage charges, etc.,
he cost of conveyance of all materials for F2
BLD CSTN 9-15
Coefficient
Amount
0%
1444.32
1.000

22.99

0%
1%

0.00
0.23

14%

1467.54
199.81
1667.35

or say

1667.00

Glazing: Providing and Fixing Top Hung shutters in Structural Glazing


Pre-painted Steel / Powder coated (Base steel as per IS 513 of D quality,
m/Sqm) with total coated thickness of 0.72mm. The glass holding section
hick. Galvanized steel sections are to be used as stifeners inside the colour
e design requirement. Design calculations are made to suit wind pressures
mer of 5-7 microns thick and back coated with Alkyd backer of 5-7 microns
up to 50-60 microns thick. The outer frame should be of 20mm x 58mm x
33mm x 0.72 mm, stifener section should be 56mm x 31mm x 1mm. EARL
minium Stays 2 Nos. for each shutter, Aluminium Handle 1 no. for each
yance of all materials to site, all labour charges, incidental charges, cost of
form work etc. complete for finished item of work

Coefficient

Amount

1.000

4246.00

14%

4246.00
578.09
4824.09

or say

4824.00

Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-3
Coefficient
Amount
76.800

399.36

0.940

772.66

0.160

234.22

0.320

164.29

1.500
2.320
0%

630.00
742.40
0.00

14%

2942.93
400.68
3343.61

or say

3344.00

to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours,


hine cut and flat nosed and set over 12mm thick CM (1:5) prop. base coat
ls and water from approved sources to work site including seignorage
and all operational , incidental and labour charges such as mixing cement
rubbing, lift charges, curing, etc., complete for finished item of work,
als for F1
BLD CSTN 9-23
Coefficient
Amount

1.100

2530.00

6.756

35.13

0.012

6.16

0.500

12.50

0.096
0.224
0.310
0%
1%

40.32
84.00
99.20
0.00
28.07

3.333

30.00

Basic rate 1 sqm

2865.38

14%

2865.38
390.12
3255.50

or say

3256.00

Teak Veneer Decorated Plywood (IS:1328) The rate is inclusive of cost and
charges, incidental charges, cost of all consumables etc. and scafolding
tem of work
Coefficient

Amount

1.000

1045.00

1.000
0%

317.00
0.00

14%

1362.00
185.44
1547.44

or say

1547.00

to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours,


hine cut and flat nosed and set over 12mm thick CM (1:5) prop. base coat
ls and water from approved sources to work site including seignorage
and all operational , incidental and labour charges such as mixing cement
rubbing, lift charges, curing, etc., complete for finished item of work,
als for F2
BLD CSTN 9-23

Coefficient
Basic rate 1 sqm
1.000
0%
1%

Amount
2865.38
22.35
0.00
0.22

14%

2887.95
393.19
3281.14

or say

3281.00

0.170

10.20

0.036
0.084
#REF!

#REF!
#REF!
#REF!

1%

#REF!

#REF!

#REF!
#REF!
#REF!

or say

#REF!

f pre painted steel (base steel as per IS 513 of 0.6 mm thick D quality,
M) Primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
Coefficient
ould be 46 x 70 mm and section for beading should
be 18 x 25Amount
mm. The
plain float Glass with Ethyl Propylene diameine Monomer (EPDM) Gaskets.
ned with corner bracket. Centre mullions are to be fixed suing mullion cap.
er coated and nylon receiver. Gaskets made of Ethyl propylene Diamine
RCA with zinc phosphating. Mullion caps made of Glass
The
1.000filled nylon.
3673.00
/ masonry wall be means of self expanding screws. & complete for finished
mm) grid outer frames section size of 46 x 52 mm

14%

3673.00
500.08
4173.08

or say

4173.00

Masonry finishing cost of all materials, seigniorage charges, including


g all operational, incidental and labour charges for mixing mortar, laying,
nished item of work
BLD CSTN 5-1
Coefficient
Amount
14.400

74.88

0.030

15.40

0.500
0.740
0%

187.50
236.80
0.00
514.58

14%

70.06
584.64

or say

585.00

d W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or


Mark: 580mm & 630 mm Long fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
1.000
0%

Amount
700.00
0.00

14%

700.00
95.31
795.31

or say

795.00

of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or


ing in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges
for fixing atAmount
site etc;
Coefficient
1.000
0%

1250.00
0.00

14%

1250.00
170.19
1420.19

or say

1420.00

ed make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual
nternal parts of dual flush cistern, ultra solid seat cover of approved make
cock 450 mm long PVC inter connection pipe wall flanges all of approved
ork in all respects: White Colour fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.

Coefficient

Amount

1.000

6500.00

14%

6500.00
884.98
7384.98

or say

7385.00

00 grams fixing in position including cost and conveyance of all materials,


Operational and Incidental charges including all labour charges for fixing at
Coefficient

Amount

1.000

170.00

0%

0.00

14%

170.00
23.15
193.15

or say

193.00

Basin (H.S.W / Parry / Earthenware) fixing in position including cost and


taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000

810.00

0%

0.00

14%

810.00
110.28
920.28

or say

920.00

pection including all repairs including all labour charges for etc; complete
Coefficient

Amount

1.000

90.00

0%

0.00

14%

90.00
12.25
102.25

or say

102.00

uding all labour charges for etc; complete for finished itemof work.
Coefficient

Amount

1.000

64.00

14%

64.00
8.71
72.71

or say

73.00

mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight
xcavation of trenches and socket pits in any soil (except rock requiring
efilling with watering and tamping including all labour charges for etc;
Coefficient
Amount
1.000
0%

346.00
0.00

14%

346.00
47.11
393.11

or say

393.00

ng in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges for fixing at site etc;
Coefficient
Amount
1.000

200.00

14%

200.00
27.23
227.23

or say

227.00

pipe outlet fixing in position including cost and conveyance of all materials,
Operational and Incidental charges including all labour
charges for
fixing at
Coefficient
Amount
1.000

70.00

14%

70.00
9.53
79.53

or say

80.00

n with brass union nut C.P coated fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
0%
14%

74.00
0.00
74.00
10.08
84.08

or say

84.00

as directed by the department.


Coefficient

Amount

1.000

21.00

14%

21.00
2.86
23.86

or say

24.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

powder including all labour charges etc; complete as directed by the


mof work.
Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10mm MS flats,


n with 25 x 6mm MS flats providing 150mm Spike at the top by turning on
e and rounds shall conform to IS 4351 - 1976 as per approved drawing,
sportation charges, fixing of gate to compound
wall,
cost
6.00 Rm x 12.56
Kgs/
1Rmand conveyance
75.36
or raw materials including all tools and all incidental labour charges for
14.40 Rm x 3.14 Kgs/ 1Rm
45.22
tmental Officers for finished item of work.
6.00 Rm x 3.14 Kgs/ 1Rm
18.84
18.00 Rm x 3.14 Kgs/ 1Rm
56.52
14.75 Rm x 3.14 Kgs/ 1Rm

46.32

4.80 Rm x 3.14 Kgs/ 1Rm

15.07

Total

257.33 Kgs

257.33

9778.54

257.33
0%

3602.62
0.00

40.00

2000.00

2.00

500.00

14%

15881.16
2162.22
18043.38

Or say

18043.00

ved source including cost and conveyance of tiles to work and stacking at
mental Officers.

Coefficient

Amount
12.00
12.00

proved source including cost and conveyance of tiles to work and stacking
rtmental Officers.
Coefficient

Amount
12.00
12.00

urce including cost and conveyance of tiles to work and stacking at site for
fficers.
Coefficient

Amount

24.00
24.00

tiles and cement mortor borders (1:2) including cost and conveyance of
ork and all operational, incidential, labour charges such as mixing mortor,
cement mortor, etc., complete for finished item of work

Coefficient

Amount

0.009

39.12

0.030
0.070
0.440
0%

12.60
26.25
140.80
0.00

14%

218.77
29.79
248.56

or say

249.00

of size 1.80M x 0.75M x 3.05M to out side of the store room and carefully
rs to the store room and again shifting back and rearranging the racks
ing labour charges for all operations etc., as directed by the Engineer - in Coefficient

Amount
9500.00
9500.00

proof mesh for Door shutter diferent sizes frame with fly froof mesh of
4" x 1/2" thick including cost, wrought and putup and conveyance of all
laber charges for making, fixing of door furniture in position as directed by
bolts, M.S. aldop and M.S handle, and all labour charges such as diricted by
work.
Coefficient
For Door

Amount

0.430
0.406

Cft
Cft

0.036
0.034

Cft
Cft

0.906

Cft

0.906
4.00
2.00
1.00
2.28
2.28
0%

996.61
64.00
36.00
23.00
857.28
832.20
0.00

14%

2809.09
382.46
3191.55
3191.55

3191.55 x 1.00 sqm


2.28 sqm
Say

1399.80
1400.00
1 Sqm

w Double shutters diferent of size shutters frame thick 3 1/2" x 1 1/2" and
putup and conveyance of all materials work site and including all taxes, all
urniture in position as directed by Dept| Officers including M.S.P.C. hings,
harges such as diricted by the Departmental Officers for finished item of

Coefficient
For Window

Amount

0.437
0.164
0.601

Cft
Cft
Cft

0.601
4.00
1.00
2.00
4.90
0.017
0%
14%

835.55
32.00
45.00
36.00
262.15
174.25
0.00
1384.95
188.56
1573.51
1573.51

1573.51 x 1.00 sqm


0.70 sqm
Say

2247.87
2248.00
1 Sqm

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.

Water Supply & Sanitation


NAME OF WORK ::-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of S


Mandal Under NABARD RIDF XX in E.G. Dist.

11 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80

Unit

Rate

S& F 15 mm Nominal Bore GI pipe


Medium Grade

Rm

131.00

Add LA charges

Rm

33.00

each

131.00

Add Over Head Charges


Total rate per 1 Rm

12 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.81
Manpower
BMW-F.82

Unit

Rate

S& F 20 mm Nominal Bore GI pipe


Medium Grade

Rm

146.00

Add LA charges

Rm

33.00

each

146.00

Add Over Head Charges


Total rate per 1 Rm

13 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.83
Manpower
BMW-F.84

Unit

Rate

S& F 25 mm Nominal Bore GI pipe


Medium Grade

Rm

191.00

Add LA charges

Rm

33.00

each

191.00

Add Over Head Charges


Total rate per 1 Rm

1 S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark
including
the cost of pipe & its fittings & labour charges complete
Code
Unit for finished
Rate itemof work.
Material
BMW-F.85

S& F 32 mm Nominal Bore GI pipe


Medium Grade

Rm

269.00

m - 4 (Code No. 178) of Sakhinetipalli

er IS 1239 ISI mark with GI fittings


ed itemof work.
Coefficient
1.000
0%

Amount
131.00
0.00

14%

131.00
17.84
148.84

or say

149.00

er IS 1239 ISI mark with GI fittings


ed itemof work.
Coefficient
1.000
0%

Amount
146.00
0.00

14%

146.00
19.88
165.88

or say

166.00

er IS 1239 ISI mark with GI fittings


ed itemof work.
Coefficient
1.000
0%

Amount
191.00
0.00

14%

191.00
26.00
217.00

or say

217.00

er IS 1239 ISI mark with GI fittings


ed itemof
work.
Coefficient
Amount
1.000

269.00

SOR 2014-15
I

Sl

NAME OF THE STRUCTURAL MEMBER

A
B
C

II

Labour
charges

3
4
HIRE CHARGES FOR CENTERING & SCAFFOLDING
FOOTINGS
277.00
446.00
PEDESTALS
315.00
710.00
PLINTH BEAMS
1335.00
1075.00

Sl

NAME OF THE STRUCTURAL MEMBER

Material
Hire
charges

Labour
charges

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to


Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall P
First Floor
LINTELS
760.00
903.00
CHAJJAS - SUNSHADES
150.00
139.00
COLUMNS
229.00
1268.00
BEAMS
1342.00
1064.00
SLABS - Up to 150 mm thick
152.00
121.00
SLABS - above 150 mm - Up to 300 mm thick
156.00
124.00
SLABS - above 300 mm thick
164.00
130.00

A
B
C
D
E
F
G

III

Material
Hire
charges

Sl

NAME OF THE STRUCTURAL MEMBER

Material
Hire
charges

Labour
charges

HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballie


Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for BRICK MASONRY/ STO
WALL PUTTY/ TEXTURE PAINTS etc - 1 sqm. Paga No. 91
A
1st - Floor
9.93
58.66
B
2nd - Floor
9.93
83.03
C
3rd - Floor
9.93
107.39
D
4th - Floor
9.93
131.76
E
5th - Floor
9.93
156.12
F
6th - Floor
9.93
180.49

IV

Sl

NAME OF THE STRUCTURAL MEMBER

Material
Hire
charges

Labour
charges
4

HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballie


Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for PLASTERING to WALL
Paga No. 91
A
1st - Floor
0.99
5.87
B
2nd - Floor
0.99
8.30
C
3rd - Floor
0.99
10.74
D
4th - Floor
0.99
13.18
E
5th - Floor
0.99
15.61
F
6th - Floor
0.99
18.05

Sl

NAME OF THE STRUCTURAL MEMBER

Material
Hire
charges

Labour
charges

HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casuarinas Ballie


Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for CEILING PLASTERING
Paga No. 92
A
1st - Floor
2.37
11.95
B
2nd - Floor
2.37
16.75
C
3rd - Floor
2.37
21.54
D
4th - Floor
2.37
26.33
E
5th - Floor
2.37
31.13
F
6th - Floor
2.37
35.92

5
Centring
Charges for
2011-12

5
& SCAFFOLDING
723.00
1025.00
2410.00

Unit of
Measurement
6
Page No. 84
per 1 cum
per 1 cum
per 1 cum

Centring
Charges for
2011-12

Unit of
Measurement

pported Height up to 3.66 M


s, Wood Posts, Wall Plates etc.,
Paga No. 85
1663.00
per 1 cum
289.00
per 1 sqm
1497.00
per 1 cum
2406.00
per 1 cum
273.00
per 1 sqm
280.00
per 1 sqm
294.00
per 1 sqm
Centring
Charges for
2011-12

Unit of
Measurement

ing Casuarinas Ballies, Bamboos,


BRICK MASONRY/ STONE MASONRY/
m. Paga No. 91
68.59
per 1 sqm
92.96
per 1 sqm
117.32
per 1 sqm
141.69
per 1 sqm
166.05
per 1 sqm
190.42
per 1 sqm
Centring
Charges for
2011-12

Unit of
Measurement

Second Floor
993.00
153.00
1395.00
1170.00
133.00
136.00
143.00

Paga No. 89
Third Floor
1084.00
167.00
1522.00
1277.00
145.00
88.00
91.00

Fourth Floor
1174.00
181.00
971.00
814.00
91.00
95.00
99.00

ing Casuarinas Ballies, Bamboos,


PLASTERING to WALLS - 1 sqm.
6.86
9.29
11.73
14.17
16.60
19.04

per
per
per
per
per
per

1
1
1
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm

Centring
Charges for
2011-12

Unit of
Measurement

ng Casuarinas Ballies, Bamboos,


CEILING PLASTERING - 1 sqm
14.32
19.12
23.91
28.70
33.50
38.29

per
per
per
per
per
per

1
1
1
1
1
1

sqm
sqm
sqm
sqm
sqm
sqm

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.
NAME OF WORK ::-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (C


178) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Task code. Cement morter (1:2) BLD-CSTN-1-3


Code
Material
Cement 43 Gr. (including loading charges)

Unit

Rate

kg

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

kg

5.20

cum

513.42

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


I

Task code. Cement morter (1:3) BLD-CSTN-1-4


Code
Material
Cement 43 Gr. (including loading charges)

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


II Task code. Cement morter (1:4) BLD-CSTN-1-5
Sl.
Code
No
Material
Cement 43 Gr. (including loading charges)

Manpower
SOR P. No. 230/III/4

Total rate per 1 cum


1 Task code. Cement morter (1:5) BLD-CSTN-1-6
Code
Material
CSSR-A-05
Cement 43 Gr. (including loading charges)
M-005
Manpower
CSSR-M-087

Total rate per 1 cum


2 Task code. Cement morter (1:6) BLD-CSTN-1-7
Code
Material
CSSR-A-05
Cement 43 Gr. (including loading charges)
M-005

Coarse sand for mortor (including


Seigniorage charges)

Manpower
CSSR-M-087

Light mazdoor
Add LA charges

day
cum

320.00
64.00

Unit

Rate

cum
cum
cum
cum

2088.43
1820.43
1658.43
1458.43

Unit

Rate

Aggregate 13.20 - 12.50 mm nominal size

cum

1820.43

Aggregate 10 mm nominal size


Aggregate 6 mm nominal size

cum
cum

1658.43
1458.43

Total rate per 1 cum


I Task code. Aggregate 20 mm Graded HBG
Code
Material
Aggregate 20 mm nominal size
Aggregate 13.20 - 12.50 mm nominal size
Aggregate 10 mm nominal size
Aggregate 6 mm nominal size
Total rate per 1 cum
II Task code. Aggregate 12 mm Graded HBG
Code
Material

Total rate per 1 cum

1 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
soil-Manual up to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Excavation Method

Unit

Rate

day
cum

320.00
116.48

Foundation of Buildings
Seigniorage charges

cum
cum

116.48
30.00

Add Over Head Charges

cum

203.84

Total rate per 1 cum

2 Earth work excavation for Narrow foundations for Buildings and depositing on bank for all lifts and with an
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
(not requiring blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method

Rate
320.00
166.40

Foundation of Buildings
Seigniorage charges

cum
cum

166.40
30.00

Add Over Head Charges

cum

321.20

Total rate per 1 cum

2 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
Add LA charges
cum
Excavation
Method

Rate
320.00
116.48

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

146.48

Total rate per 1 cum

1 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross draina
appurtenant structures and placing the excavated stuf neatly in specified dump area or disposing of
directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Code
Unit
Rate
Out turn of two mazdoors assumed at 4 cum per day.
DATA:
Manpower
SOR P. No. 266/I/10
Work Inspector
day
275.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
198.88
Excavation
Method

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

228.88

Total rate per 1 cum

1 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cl
Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved design
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc
all depths and for finished item of work for piles of following diameters.
Pile foundation-Manual Means- 1 Rm
Code
up to 300 mm dia
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Add Over Head Charges
Total rate per 1 Rm

Unit

Rate

day
cum

320.00
168.32

cum

168.32

2 Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black co
ordinary soils with Augoring and boring equipment in site as per IS 2911 - 1980 as per approved design
operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc
all depths and for finished item of work for piles of following diameters.

up to 300 mm dia - DOUBLE UNDER REAMING


Code
Total cost for 1 Bulb Each
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Add Over Head Charges

Unit

Rate

day
cum

320.00
179.20

cum

179.20

Total rate per Each

1 Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers clear
carefully stacking materials useful for reuse if any etc., complete as directed by the Engineer-in-charge of th
Dismantling the existing Manglore tiled roof over ceiling tiles - Unit 1 sqm
Code
Unit
Rate
Manpower
BMT-S.05

Flat and pan tiles or Mangalore tiles over flat


tiles without roof timbers
Add LA charges
Add Over Head Charges

sqm

8.30
8.30

cum

8.30

Total rate per 1 sqm

and
disposal
of Lime work unserviceable materials within 100 metres
2 Dismantling & Demolishing
including labour charges etc., complete as directed by the Enginee - in - Charge.
Lime work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
390.40
393.79

cum

397.73

Total rate per 1 cum =

1 Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100 metres lead la
etc., complete as directed by the Engineer - in - Charge.
Unreinforced cement concrete upto 15 cm thicknes
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
780.80
784.19

Add Over Head Charges

cum

792.03

Total rate per 1 cum =


1 Dismantling and Demolition RCC work including stacking of serviceable materials and disposal of
materials within 100 metres lead labour charges etc; complete for finished item of work as directed by the
Charge.
RCC Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
1382.40
1385.79

cum

1399.65

Total rate per 1 cum =

3 Dismantling Brick work including stacking of serviceable materials and disposal of unserviceable materia
metres lead labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge
Brick Work Dismantling
Code
Manpower
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Sundriees and rounding of
Add for water charges @ 1 %
Add Over Head Charges

BLD-CSTN-14-8
Unit

Rate

day
cum
LS

320.00
130.88
134.27

cum

135.61

Total rate per 1 cum =

2 Dismantling Kadapa slabs or Shahabad stone slabs flooring on sand bed carefully stacking materials us
including labour charges etc; complete for finished item of work as directed by the Engineer - in - Charge.
Kadapa slabs or Shahabad stones
Code
Manpower
BMT-S.11

Unit

Rate

Dismantling Kadapa slabs or Shahabad stone


slabs flooring
Add LA charges

sqm

4.20

cum

4.20

Add Over Head Charges

cum

4.20

Total rate per 1 sqm =

4 Dismantling clearing away and carefully stacking materials useful for reuse Old cement mortar plaster inclu
of serviceable materials and disposal of unserviceable materials within 100 metres lead labour charges etc
finished item of work as directed by the Engineer - in - Charge.
Old cement mortar plaster for 1 sqm
Code

Unit

Rate

Miscellaneous
BMT-S.08

Old cement mortar plaster


Add LA charges

sqm
cum

2.90
2.90

Add Over Head Charges

cum

2.90

Total rate per 1 sqm

5 Removing and Refixing Windows glazed of any thickness fixing the frame, fixing the fixures to the win
Labour charges for making, fabricating office furniture, racks, work-station furniture, cup-board shutters to
boards with ply-wood/ MDF sheets, decolam/ veneer laminations including fixing cutting, making, asse
hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with necessary screws exc
materials, accessories, fittings etc., complete as directed by the Engineer-in-charge of the work
Labour
charges
for making,
fabricatingfixing
officethe
Removing and Refixing
Windows
glazed
of any thickness
Code
Manpower
BMM-V.07

furniture, racks, work-station furniture, cupboard shutters to existing cup-boards with


ply-wood/ MDF sheets, decolam/ veneer
laminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures,
fixing
pasting sheets/ laminations
Add LAlocks,
charges
fixing in position with necessary screws
excluding cost of materials, accessories,
fittings
etcHead Charges
Add Over

frame, fixing the fixures to the wind

Unit

Rate

sqm

365.00
365.00

sqm

365.00

Total rate per 1 sqm

6 Dismantling the existing Wrought and framed timber in roofs or floors clearing away and carefully stack
useful for reuse if any etc., complete as directed by the Engineer-in-charge of the work
Dismantling the existing Wrought and framed timber in roofs or floors
Code
Unit
Manpower
BMT-S.06

Wrought and framed timber in roofs or floors

cum

Add LA charges
Add Over Head Charges

Rate
125.00
125.00

cum

125.00

Total rate per 1 cum

5 Plain Cement concrete (1:5:10) Proportion nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course

P.C.C. 1:5:10 for Base course


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 40 mm nominal size
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 292/M- 189 Water
Mechinery

Unit

Rate

cum
cum
cum
KL

5.20
1393.43
513.42
77.00

SOR P. No. 3379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

hour

328.60
189.80

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3066.85

Manpower
SOR P. No. 267/I/11
SOR P. No. 269/III/4

Total rate per 1 cum

4 Plain Cement concrete (1:6:10) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course

P.C.C. 1:6:10 for Base course


Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

hour

328.60

Water

Mechinery
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3113.06

Total rate per 1 cum

22 Plain Cement concrete (1:4:8) Proparation nominal mix (coarse aggregate) for foundation levelling cours
flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
machine mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the
curing etc.,complete for finished item of work, inluding centering, shuttering as per APSS. No. 402. for
Base course

P.C.C. 1:4:8 for Base course


Code
Material

Unit

Rate

SOR P. No. 292/M- 189

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

hour

328.60

Water

Machinary
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Add Over Head Charges

cum

3235.33

Total rate per 1 cum

23 Providing Vibrated Cement concrete (1:3:6) as per 456 nominal mix using 40 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, per APSS. No. 402.

P.C.C. 1:3:6 with centering


Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 40 mm nominal size

cum

1393.43

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

4008.82

Water

Mechinery
SOR P. No. 379/16
SOR P. No. 379/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 2269/III/4

Miscellaneous

Total rate per 1 cum

3 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. First Floor

M-20 using 12 mm down graded metal F1


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

SOR P. No. 229/I/11


SOR P. No. 230/III/4

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60
2.47
165.70
1.78

hour

day
day
day
cum

420.00
375.00
320.00
43.89
BLD-CSTN-6-1

Plastering with CM (1:3), 12 mm thick


A. MATERIALS:
Cement Mortar (1:3)
Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

cum
day
day
cum

3099.09
420.00
320.00
55.92

Add Over Head Charges

cum

234.94

Total rate per 1 cum

2 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402. Second Floor

M-20 using 12 mm down graded metal F2


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)

hour

Add LA charges on Crew charges

2.47
165.70
1.78

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
43.89

Lift charges F2
Add LA charges

cum
cum

4.81
4.81

Miscellaneous

SOR P. No. 229/I/11


SOR P. No. 230/III/4

BLD-CSTN-6-1

Plastering with CM (1:3), 12 mm thick


A. MATERIALS:
Cement Mortar (1:3)
Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

cum
day
day
cum

3099.09
420.00
320.00
55.92

Lift charges F2
Add LA charges

cum
cum

5.59
5.59

Add Over Head Charges

cum

239.75

Miscellaneous

Total rate per 1 cum

6 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for FOOTINGS FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1

Code
Material

SOR P. No. 292/M- 189

Unit

BLD CSTN 3-14:31A


Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needle vibrator 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II

day
day

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36

420.00
375.00

SOR P. No. 2269/III/4

Light mazdoor
Add LA charges

day
cum

320.00
1627.99

Hire charges for Centering and Scafafolding


Unsupported Height Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6922.71

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

7 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PEDASTALS FI

V.R.C.C. Design Mix M-20

Centering with Unsuported hight Pedastal FI-1

Code
Material

SOR P. No. 292/M- 189

Unit

BLD CSTN 3-14:31A


Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99

Hir charges for Centering and Scafafolding


Unsupported Hight Pedastal 1

cum

1025.00

Add LA charges

cum

710.00

Add Over Head Charges

cum

7224.71

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 /
B/Pedastals

Total rate per 1 cum

8 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
to 3.66, as per APSS. No. 402. for PLINTH BEAM FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Plinth Beam -F1

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG

cum

1920.72

Kl

77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99

Hir charges for Centering and Scafafolding


Unsupported Hight Plinth beam F1

cum

2410.00

Add LA charges

cum

1075.00

Add Over Head Charges

cum

8609.71

Water

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89/C/
Plinth beam

Total rate per 1 cum

9 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
391.64
165.70
182.09

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

420.00
375.00
320.00
1924.77
BACIC RATE 1 Cum

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns FI

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
Columns First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns FI

cum

1075.00

Add LA charges

cum

948.00

Add Over Head Charges

cum

7571.49

Total rate per 1 cum

10 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F2

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 93 /
Columns Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns F2

cum

1170.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

948.00
249.85
249.85

Add Over Head Charges

cum

7916.34

Total rate per 1 cum

11 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for COLUMNS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Columns F3

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 93 /
Columns Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Columns F3

cum

1265.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1138.00
499.70
499.70

Add Over Head Charges

cum

8261.19

Total rate per 1 cum

12 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS FI

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F1

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 89 /
Lintels First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels FI

cum

1518.00

Add LA charges

cum

675.00

Add Over Head Charges

cum

8014.49

Total rate per 1 cum

13 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F2

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Lintels Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels F2
Add LA charges
Lift charges F2
Add LA charges
Add Over Head Charges
Total rate per 1 cum

cum

1586.00

cum
cum
cum

743.00
249.85
249.85

cum

8332.34

14 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for LINTELS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Lintels F3

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Lintels Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Lintels F3
Add LA charges
Lift charges F3
Add LA charges
Add Over Head Charges

cum

1653.00

cum
cum
cum

810.00
499.70
499.70

cum

8649.19

Total rate per 1 cum

15 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for RCC SLABS, BEAMS centering with Stell up to
APSS. No. 402. for BEAMS FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
Aggregates 20 mm Graded HBG
Water

cum
cum
cum
Kl

5.20
513.42
1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
90.49
165.70
42.07

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams FI

420.00
375.00
320.00
1062.66
BACIC RATE 1 Cum

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
Beams First floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams FI

cum

2071.00

Add LA charges

cum

795.00

Add Over Head Charges

cum

6999.98

Total rate per 1 cum

16 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F2

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F2

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Beams Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams F2

cum

2151.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

875.00
119.52
119.52

Add Over Head Charges

cum

7199.50

Total rate per 1 cum

17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for BEAMS F3

V.R.C.C. Design Mix M-20 Centering with Unsuported hight up to 3.66 M Beams F3

Code

Unit

Rate
BACIC RATE 1 Cum

Miscellaneous
SOR P. No. 93 /
Beams Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight Beams F3

cum

2230.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

954.00
239.04
239.04

Add Over Head Charges

cum

7398.02

Total rate per 1 cum

17 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB FI

V.R.C.C. Design Mix M-20

Centering with Unsuported hight up to 3.66 M RCC Slab FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
11.46
165.70
5.33

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
132.94
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight RCC SLAB FI

cum

232.00

Add LA charges

cum

89.00

Add Over Head Charges

cum

848.57

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 / Slabs
up to 150 mm thick
First floor

Total rate per 1 Sqm 125mm thick

18 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F2

V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Second floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F2

cum

241.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

98.00
14.97
14.97

Add Over Head Charges

cum

872.54

Total rate per 1 Sqm

19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 125mm thick RCC SLAB F3

V.R.C.C. Design Mix M-20 Centering with hight up to 3.66 M RCC Slab 125mm thick F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 150 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F3

cum

250.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

107.00
29.94
29.94

Add Over Head Charges

cum

896.51

Total rate per 1 Sqm

20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase FI

V.R.C.C. Design Mix M-20

Centering hight up to 3.66 M VRCC Steps for Staircase FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

522.50
20.27
165.70
9.43

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
238.99
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight For Stairecase FI

cum

242.00

Add LA charges

cum

93.00

Add Over Head Charges

cum

1350.70

Mechinery
SOR P. No. 379/9
SOR P. No. 380/41

hour

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 / Slabs
up to 225 mm thick
First floor

Total rate per 1 Sqm 225mm thick

21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick VRCC Steps for Staircase F2

V.R.C.C. Design Mix M-20

hight up to 3.66 M VRCC Steps for Stairecase 225mm thick F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Slab F2

cum

251.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

102.00
26.87
26.87

Add Over Head Charges

cum

1386.57

Total rate per 1 Sqm

22 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, vibrating, curing etc. complete but exc
steel and its fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TAN
with Stell up to 3.66, as per APSS. No. 402. for 225mm thick RCC Steps for Staircase F3

V.R.C.C. Design Mix M-20 Centering up to 3.66 M RCC Steps for Staircase 225mm thick F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 / Slabs
up to 225 mm thick
Third floor

Hir charges for Centering and Scafafolding


Unsupported Hight RCC Steps F3

cum

261.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

112.00
53.74
53.74

Add Over Head Charges

cum

1423.44

Total rate per 1 Sqm

19 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick SUN SHADES FI

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade FI

Code
Material

SOR P. No. 292/M- 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Batching plant 0.5 cum ( 6 Cum/hr)


Add LA charges on Crew charges

hour

522.50
3.52

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
66.12
BACIC RATE 1 SQM

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade FI

cum

271.00

Add LA charges

cum

104.00

Add Over Head Charges

cum

575.46

Mechinery
SOR P. No. 325/9

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 89 /
CHAJJAS SUNSHADES First
floor

Total rate per 1 sqm

20 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F2

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F2

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous
SOR P. No. 93 /
CHAJJAS SUNSHADES Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade F2

cum

281.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

114.00
6.96
6.96

Add Over Head Charges

cum

592.42

Total rate per 1 sqm

21 Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS
minimum cement content 350 Kgs per 1 cum as per IS code from standard suppliers approved by th
including pumping, Steel centering, shuttering, laying concrete, curing etc. complete but excluding cost o
fabrication charges for finished item of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
to 3.66, as per APSS. No. 402. for 62.50mm thick RCC SUN SHADES F3

R.C.C. Design Mix M-20 Centering with hight up to 3.66 M for 62.50mm thick Sun shade F3

Code

Unit

Rate
BACIC RATE 1 SQM

Miscellaneous

SOR P. No. 93 /
CHAJJAS SUNSHADES Third
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50mm thick Sun shade F3

cum

292.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

125.00
13.92
13.92

Add Over Head Charges

cum

610.38

Total rate per 1 sqm

6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.

M - 20 Nominal Mix Centering with Unsuported hight Footing F1


Code
Unit
Material
Cement 43 Gr. (including loading charges)

cum

Rate
5.20

SOR P. No. 250/M 189

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1307.99

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6657.38

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

7 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.

M - 20 Nominal Mix Centering with Unsuported hight Pedastal FI-1


Code
Unit
Material

Rate

CSSN-A-05

Cement 43 Gr. (including loading charges)

cum

5.20

BLD-CSTN-1.9

Aggregates 20 mm Graded HBG

cum

1920.72

M 005

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

SOR P. No. 250/M 189

Water

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous

420.00
375.00
320.00
1307.99

SOR P. No. 89 /
B/Pedastals

Hir charges for Centering and Scafafolding


Unsupported Hight Pedastal 1

cum

1025.00

Add LA charges

cum

710.00

Add Over Head Charges

cum

6959.38

Total rate per 1 cum

8 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH
centering with Stell up to 3.66, as per APSS. No. 402.

M - 20 Nominal Mix Centering with Unsuported hight Plinth Beam -F1


Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including
cum
Seigniorage charges)
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 89 /
C/Plinth beam

Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1307.99

Hir charges for Centering and Scafafolding


Unsupported Hight Plinth beam

cum

2410.00

Add LA charges

cum

1075.00

Add Over Head Charges

cum

8344.38

Total rate per 1 cum

9 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F1
Code
Unit
Rate
Material

SOR P. No. 250/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Columns F1

cum

1497.00

Add LA charges

cum

1268.00

Add Over Head Charges

cum

7760.16

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
Columns

Total rate per 1 cum

10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F2
Code
Unit
Rate
Material

SOR P. No. 250/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

hour

328.60
189.80
165.70
136.60

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

Manpower

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

SOR P. No. 229/I/11


SOR P. No. 230/II/35
SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Columns F2

cum

1624.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

1395.00
196.32
196.32

Add Over Head Charges

cum

7823.48

Miscellaneous
SOR P. No. 90 /
Columns

Total rate per 1 cum

11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Columns F3
Code
Unit
Rate
Material

SOR P. No. 250/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
136.60

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Columns F3

cum

1751.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

1522.00
392.63
392.63

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
Columns

Add Over Head Charges

cum

8146.79

Total rate per 1 cum

10 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for LINTELS, for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402. for Lintles F1.

M - 20 Nominal Mix Centering with Unsuported hight Lintels -F1


Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including
cum
Seigniorage charges)
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 90 /
Lintles

Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight Lintles Floor 1

cum

1663.00

Add LA charges

cum

903.00

Add Over Head Charges

cum

7926.16

Total rate per 1 cum F 1

19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for LINTELS , for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402. for Lintles F2.

M - 20 Nominal Mix Centering with Unsuported hight Lintels -F2


Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including
cum
Seigniorage charges)
SOR P. No. 250/M 189 Water
Kl
Mechinery

Rate
5.20
1920.72
513.42
77.00

SOR P. No. 325/16


SOR P. No. 325/40

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight upto 3.66M Lintles
Floor 2

cum

1753.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

993.00
196.32
196.32

Add Over Head Charges

cum

7952.48

hour

328.60
189.80
165.70
136.60

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
Lintles

Total rate per 1 cum F 2

19 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for COLUMNS, LINTELS, W
RCC WALLS IN BUILDINGS, for Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall
Centring Plates etc., for unsupported height 3.66 M, as per APSS. No. 402. for Lintles F2.

M - 20 Nominal Mix Centering with Unsuported hight Lintels -F3


Code
Unit
Material
Cement 43 Gr. (including loading charges)
cum
Aggregates 20 mm Graded HBG
cum
Coarse sand for mortor (including
cum
Seigniorage charges)
SOR P. No. 250/M 189 Water
Kl
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
hour
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
hour
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
day
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
day
SOR P. No. 230/III/4
Light mazdoor
day
Add LA charges
cum
Miscellaneous
SOR P. No. 90 /
Lintles

Rate
5.20
1920.72
513.42
77.00
328.60
189.80
165.70
136.60
420.00
375.00
320.00
1636.77

Hir charges for Centering and Scafafolding


Unsupported Hight upto 3.66M Lintles
Floor 3

cum

1844.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1084.00
392.63
392.63

Add Over Head Charges

cum

8239.79

Total rate per 1 cum F 2

11 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF BEAMS for Ca
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F1.

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Water

Mechinery
SOR P. No. 325/16

Concrete mixer 300 / 200 (diesel)

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
878.02

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Beams F1

cum

2406.00

Add LA charges

cum

1064.00

Add Over Head Charges

cum

7548.09

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
Beams

Total rate per 1 cum

12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F2

Code
Material

Unit

Rate

SOR P. No. 250/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Water

Mechinery
SOR P. No. 325/16

Concrete mixer 300 / 200 (diesel)

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
878.02

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Beams F2

cum

2512.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

1170.00
96.52
96.52

Add Over Head Charges

cum

7490.61

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 /
Beams

Total rate per 1 cum

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Beams, for Cas
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported h
as per APSS. No. 402.
Supply & Placing M20 Centering with Unsuported hight up to 3.66 M Beams, Lift Manual F3

Code
Material

SOR P. No. 250/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kl

77.00

Water

Mechinery
SOR P. No. 325/16

Concrete mixer 300 / 200 (diesel)

hour

328.60

SOR P. No. 325/40

Add LA charges on Crew charges


Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

50.68
165.70
36.47

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II

day
day

420.00
375.00

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35

SOR P. No. 230/III/4

Light mazdoor
Add LA charges

day
cum

320.00
878.02

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M Beams F3

cum

2619.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

1277.00
193.03
193.03

Add Over Head Charges

cum

7694.12

Miscellaneous
SOR P. No. 90 /
Beams

Total rate per 1 cum

1 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF SLAB 120 m
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual

F1

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorag
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
50.68
165.70
36.47

hour

day
day
day
sqm

420.00
375.00
320.00
878.02
BACIC RATE 1 CUM

BACIC COST OF 1 SQM 120 mm THICK F1


Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M upto 150 mm
thick Slab

cum

273.00

Add LA charges

cum

121.00

Add Over Head Charges

cum

814.06

Total rate per 1 cum

12 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for ROOF SLAB 150 m
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, slab, Lift Manual

F1

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including Seigniorag
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
50.68
165.70
36.47

hour

day
day
day
sqm

420.00
375.00
320.00
878.02
BACIC RATE 1 CUM

BACIC COST OF 1 SQM 150 mm THICK F1


Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66M upto 150 mm
thick Slab

cum

273.00

Add LA charges

cum

121.00

Add Over Head Charges

cum

949.32

Total rate per 1 cum

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery

F2

Unit

Rate

cum
cum

5.20
1920.72

cum

513.42

Kl

77.00

SOR P. No. 325/16


SOR P. No. 325/40

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
87.82

Hir charges for Centering and Scafafolding


Unsupported Hight 3.60M 100 mm thick
Slab F2

sqm

285.00

Add LA charges
Lift charges F2
Add LA charges

sqm
sqm
sqm

133.00
9.66
9.66

Add Over Head Charges

cum

719.70

hour

328.60
5.12
165.70
3.69

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

Total rate per 1 sqm

14 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Slabs 100 mm thick
Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for unsup
3.66 M, as per APSS. No. 402.

Supply & Placing M20 Centering with Unsuported hight up to 3.66M, 100 mm thick slab, Lift Manual

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 90 / Slabs
up to 150 mm thick
First floor

F3

Unit

Rate

cum
cum

5.20
1920.72

cum

513.42

Kl

77.00

hour

328.60
5.12
165.70
3.69

hour

day
day
day
sqm

420.00
375.00
320.00
87.82

Hir charges for Centering and Scafafolding


Unsupported Hight 3.60M 100 mm thick
Slab F3

sqm

297.00

Add LA charges
Lift charges F2
Add LA charges

sqm
sqm
sqm

145.00
19.33
19.33

Add Over Head Charges

cum

741.37

Total rate per 1 sqm

13 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sun Shades First floor

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 1, Lift Manual

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
50.68
165.70
36.47

hour

day
day
day
cum

420.00
375.00
320.00
878.02
BACIC RATE 1 CUM

BACIC COST OF 1 SQM 62.50 mm THICK F1


Miscellaneous
SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick First floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50 mm thick Chajjas-Sunshades
First floor F1

cum

289.00

Add LA charges

cum

139.00

Add Over Head Charges

cum

570.80

Total rate per 1 sqm F 1

20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Second floor.

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 2

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
3.23
165.70
2.32

SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor

hour

day
day
day
cum

420.00
375.00
320.00
54.60

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50 mm thick Chajjas-Sunshades
Second floor

cum

303.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

153.00
6.02
6.02

Add Over Head Charges

cum

613.50

Total rate per 1 sqm F 2

20 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing and vibrating
but excluding cost of steel and its fabrication charges for finished item of work for Sun Shade 62.50
Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel Centring Pla
unsupported height 3.66 M, as per APSS. No. 402. for Sunshades Third floor.

S & P M20 Centering with Unsuported hight up to 3.66M, 62.50 mm Sun Shade F 3

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
3.23
165.70
2.32

hour

day
day
day
cum

420.00
375.00
320.00
54.60

SOR P. No. 90 /
CHAJJAS SUNSHADES 62.50
mm thick Second
floor

Hir charges for Centering and Scafafolding


Unsupported Hight 62.50 mm thick Chajjas-Sunshades
Third floor

cum

317.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

167.00
12.03
12.03

Add Over Head Charges

cum

633.51

Total rate per 1 sqm F 2

1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F1

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47
165.70
1.78

hour

Add Over Head Charges

day
day
day
sqm

420.00
375.00
320.00
83.94

cum

248.54

Total rate per 1 sqm

1 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F2

Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG

cum
cum

5.20
1715.64

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

SOR P. No. 250/M 189

Water

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
2.47
165.70
1.78

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
83.94

Lift charges F2
Add LA charges

sqm
sqm

8.82
8.82

Add Over Head Charges

cum

257.36

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous

Total rate per 1 sqm

15 Providing M20 over leaky roof as per 456 nominal mix using 12 mm size graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work for Slabs
etc., for Over Leaky Roof as per APSS. No. 402.
Supply & Placing M20 50 mm thick over leaky roof slab, Lift Manual

F3

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
Lift charges F3
Add LA charges
Add Over Head Charges
Total rate per 1 sqm

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47
165.70
1.78

hour

day
day
day
sqm

420.00
375.00
320.00
83.94

sqm
sqm

17.64
17.64

cum

266.18

1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.

Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual

F1

Code
Material

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47

day
day
day
sqm

420.00
375.00
320.00
83.94

Hir charges for Centering and Scafafolding


Unsupported Hight
Add LA charges

cum

723.00

cum

446.00

Add Over Head Charges

cum

969.39

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 sqm

1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual

F2

Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47

day
day
day
sqm

420.00
375.00
320.00
83.94

SOR P. No. 89 /
A/Footings

Hir charges for Centering and Scafafolding


Unsupported Hight

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
sqm
sqm

446.00
8.64
8.64

Add Over Head Charges

cum

978.03

Total rate per 1 sqm

1 Providing M20 as per 456 nominal mix using 12 mm size graded machine crushed Hard Granite m
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for Slabs 50 mm thick etc., for Rack
etc., as per APSS. No. 402.
Supply & Placing M20 50 mm thick for Racks & Platforms etc.,, Lift Manual

F3

Code
Material

Unit

Rate

cum
cum

5.20
1715.64

cum

513.42

Kl

77.00

hour

328.60
2.47

day
day
day
sqm

420.00
375.00
320.00
83.94

Hir charges for Centering and Scafafolding


Unsupported Hight

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
sqm
sqm

446.00
17.28
17.28

Add Over Head Charges

cum

986.67

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 sqm

3 Filling with sand in trenches, sides of foundations and basement with initial lead in layers not exceeding
consolidating each deposited layer by watering and ramming including cost and conveyance of water to wo
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (AP
310)
Sand filling
Code
Material
Manpower
SOR P. No. 269/III/4

Unit

Rate

Coarse sand for filling (including Seigniorage


charges)

cum

446.42

Light mazdoor
Add LA charges

day
cum

320.00
16.64

Add Over Head Charges

cum

463.06

Total rate per 1 cum

4 Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and baseme
lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming
and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P e
Refilling foundation
for finished item of work. (APSS NO. 309 & 310) for Refilling foundations.
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
16.64
Add Over Head Charges
Total rate per 1 cum

cum

16.64

17 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure FI

Brick Masonry in CM (1:8) for Super Structure FI, Lift Manual


Material
Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 91 / First
floor

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges
Add Over Head Charges

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

cum

304.84

cum

260.71

cum

4238.26

Total Super Structure rate per 1 cum

1 Reinforced Brick Masonary walls of 100 mm thick in CM (1:4) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501
Reinforced Brick Masonary walls of 100 mm in CM(1:4) for F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 91 / First
floor

Unit

Rate

Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges

Sqm
sqm

68.59
58.66

Add Over Head Charges

sqm

524.79

Total Super Structure rate per 1 sqm F1

5 Providing Vibrated Cement concrete (1:2:4) as per 456 nominal mix using 20 mm size graded machine
Granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No.

P.C.C. 1:2:4 Centering with Stell up to 3.66 M Hight


Code
Material
Cement 43 Gr. (including loading charges)
Aggregates 20 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
SOR P. No. 325/40
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 89 /
A/Footings

Unit

Rate

cum
cum
cum
Kl

5.20
1920.72
513.42
77.00

hour

328.60
189.80
165.70
136.60

hour

day
day
cum

420.00
320.00
486.80

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

5420.19

Total rate per 1 cum

10 Providing Cement concrete (1:2:4) as per 456 nominal mix using 12 mm size graded machine crushed
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
materials including all operational, incidental and labour charges such as machine mixing, laying concret
vibrating etc.,complete for finished item of work, centering with Stell up to 3.66, lift manuals per APSS. No
for top of compound wall

P.C.C. 1:2:4 Centering with Steel up to 3.66 M Hight


Code
Material

Cement 43 Gr. (including loading charges)


Aggregates 12 mm Graded HBG
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 250/M 189 Water
Mechinery
SOR P. No. 325/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 229/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 230/III/4
Light mazdoor
Add LA charges
Miscellaneous

Unit

Rate

cum
cum
cum
Kl

5.20
1715.64
513.42
77.00

hour

328.60
189.80

day
day
cum

420.00
320.00
486.80

SOR P. No. 89 /
A/Footings

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

5069.92

Total rate per 1 cum

20 Reinforced Brick Masonary walls of 100 mm thick in CM (1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501

Reinforced Brick Masonary walls of 100 mm in CM(1:6) for F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous
SOR P. No. 91 / First
floor

Unit

Rate

Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges

Sqm
sqm

68.59
58.66

Add Over Head Charges

sqm

512.31

Total Super Structure rate per 1 sqm F1

21 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501 for F2

Reinforced Brick Masonary walls of 100 mm in CM(1:6) for F2

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Miscellaneous

Unit

Rate

Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

kg
Nos
Cum

5.20
5.328
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

SOR P. No. 91 /
Second floor

Scafafolding charges for Brick Masonry /


Stone Masonry F2
Add LA charges
Lift charges F2
Add LA charges
Add Over Head Charges

Sqm

92.96

sqm
sqm
sqm

83.03
13.57
13.57

sqm

550.25

Total rate per 1 sqm

22 Reinforced Brick Masonary walls of 100 mm thick in CM(1:6) using second class bricks having a crushing s
N/sq.mm. and placing 2 nos of 6mm M.S plain rods in ever third layer with free ends of the reinforcemen
mortar joints of main brick walls were applicable including cost and seignorage charges and conveyance o
and water from approved sources to work site and all operational, incidental, labour charges such as scaf
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and
charges for finished item of work as per SS 509 & 501 for F3

Reinforced Brick Masonary walls of 100 mm in CM(1:6) for F3

Code

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/36
SOR P. No. 2269/III/4

Unit
kg
Nos

Rate
5.20
5.328

Cum

513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
sqm

420.00
375.00
320.00
135.70

Scafafolding charges for Brick Masonry /


Stone Masonry F3

Sqm

117.32

Add LA charges
Lift charges F3
Add LA charges

sqm
sqm
sqm

107.39
27.14
27.14

Add Over Head Charges

Sqm

588.18

Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)

Miscellaneous
SOR P. No. 91 / Third
floor

Total rate per 1 sqm

6 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine agg
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all material
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
cost of steel and its fabrication charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS, c
Stell up to 3.66, as per APSS. No. 402 for Strip Bands.

M - 20 Nominal Mix Centering with Unsuported hight Strip Bands.


Code
Unit
Material

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Aggregates 20 mm Graded HBG

cum

1920.72

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 250/M 189

cum

513.42

Kl

77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges
Needil vibrater 40 mm (petrol)
Add LA charges on Crew charges

hour

328.60
189.80
165.70
0.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1307.99

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

6491.68

Water

Mechinery
SOR P. No. 325/16
SOR P. No. 325/40

hour

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
SOR P. No. 89 /
A/Footings

Total rate per 1 cum

23 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. for Staircase step

P.C.C. M-20
Code
Material

Centering with Stell up to 3.66 M Hight

SOR P. No. 292/M 189

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Concrete mixer 300 / 200 (diesel)

hour

328.60

Mechinery
SOR P. No. 379/16

Add LA charges on Crew charges

189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Basic rate 1 cum


Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings First
floor

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

5306.49

Total rate per 1 cum

14 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for HYSD (F.e 415) F1

Suppliying, fitting and placing HYSD (F.e 415) FI lift manual


Code
Material
SOR P. No. 271/I/3
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Manpower
SOR P. No. 266/I/2
Black smith / Tin smith / Rivetor
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Add Over Head Charges

Unit

Rate

kg
M.T

70.00
34000.00

day
day
M.T

420.00
320.00
7400.00

M.T

43520.00

Total rate per 1 MT

15 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
HYSD
(F.eapproved
415) F2 sourses
lift manual
bars from
to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting,
bending,
placing
in position, tying etc., and sales and sales
& other taxes,
on cost of materia
Code
Unit
Rate
item
of
work.
for
HYSD
(F.e
415)
F2
Material
SOR P. No. 271/I/3
Binding wire
kg
70.00
Reinforcement steel (including loading
M.T
34000.00
charges) (HYSD/TMT)
Manpower
SOR P. No. 266/I/2
Black smith / Tin smith / Rivetor
day
420.00
SOR P. No. 2269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
7400.00
Miscellaneous
Lift charges F2
cum
740.00
Add LA charges
cum
740.00
Add Over Head Charges

cum

44260.00

Total rate per 1 MT

16 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete w
drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars belo
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
HYSD
(F.eapproved
415) F3 sourses
lift manual
bars
from
to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting,
bending,
placing
in position, tying etc., and sales and sales
& other taxes,
on cost of materia
Code
Unit
Rate
item of work. for HYSD (F.e 415) F3
Material
SOR P. No. 271/I/3
Binding wire
kg
70.00
Reinforcement steel (including loading
charges) (HYSD/TMT)
Manpower

M.T

34000.00

SOR P. No. 266/I/2


SOR P. No. 2269/III/4

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
7400.00

Lift charges F3
Add LA charges

cum
cum

1480.00
1480.00

Add Over Head Charges

cum

45000.00

Miscellaneous

Total rate per 1 MT

15 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Ba
including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F1

Mils Steel (F.e 250) FI lift manual


Code
Material
SOR P. No. 271/I/3
Binding wire

Unit

Rate

kg

70.00

Reinforcement steel (including loading


charges) (HYSD/TMT)

M.T

36000.00

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
M.T

420.00
320.00
7400.00

Add Over Head Charges

M.T

45620.00

Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4

Total rate per 1 MT

3 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars
dia including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F2

Mild Steel (Fe 250/tmt) F2 lift manual


Code
Material
SOR P. No. 271/I/3

Unit

Rate

Binding wire

kg

70.00

Reinforcement steel (including loading


charges) (HYSD/TMT)

M.T

36000.00

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
7400.00

Lift charges F2

cum

740.00

Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4

Miscellaneous

Add LA charges

cum

740.00

Add Over Head Charges

cum

46360.00

Total rate per 1 MT

4 Supplying, fitting and placing Mild Steel (Fe 250/tmt IS 1786-1985) bar reinforcement VRCC works comple
per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars
dia including over laps and wastage, where weldeding require to be done campulsorily including cost and c
bars from approved sourses to site of work, binding wire, cover blocks and all incidental,operational, labour
as cutting, bending, placing in position, tying etc., and sales and sales & other taxes, on cost of materia
item of work. for MILD STEEL (F.e 250) F3

Mild Steel (Fe 250/tmt) F3 lift manual


Code
Material
SOR P. No. 271/I/3

Unit

Rate

Binding wire

kg

70.00

Reinforcement steel (including loading


charges) (HYSD/TMT)

M.T

36000.00

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
7400.00

Lift charges F2
Add LA charges

cum
cum

1480.00
1480.00

Add Over Head Charges

cum

47100.00

Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4

Miscellaneous

Total rate per 1 MT

20 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof First Floor Lift manual

Mild Steel Tube F1 lift manual


Code
Material
SOR P. No. 233/I/3

SOR P. No. 274/81

Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4

Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor

Rate

kg

70.00

M.T

38000.00

each

9.00

day
day
day

420.00
420.00
320.00

Hr

61.20

cum

7400.00

Mechinery
Welding Charges (Hire charges of Welding
Machine)
Add LA charges

Add Over Head Charges

cum

48852.00

Total rate per 1 MT

5 Providing mild steel pipes of diferent diameters including cost and conveyance of all materials, cutting a
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual

Mild Steel Tube F2 lift manual


Code
Material
SOR P. No. 233/I/3

SOR P. No. 274/81

Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4

Unit
Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)

Rate

kg

70.00

M.T

38000.00

each

9.00

day
day
day
cum

420.00
420.00
320.00
7400.00

Hr

61.20

Lift charges F2
Add LA charges

cum
cum

740.00
740.00

Add Over Head Charges

cum

49592.00

Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges

Mechinery
Welding Charges (Hire charges of Welding
Machine)
Miscellaneous

Total rate per 1 MT

1 Providing mild steel of diferent diameters including cost and conveyance of all materials, cutting an
required sizes and shapes placing in position and welding as per approved designs and drawings to the s
time of execution of work including cost and conveyance of materials, welding rods and all all wasta
overlaps,couplings,welded joints etc., and all operational, incidental labour charges such as cutting bend
position, welding etc., complete for finished item of work for AC Sheet Roof Third Floor Lift manual

Mild Steel Tube F3 lift manual


Code
Material
SOR P. No. 233/I/3

SOR P. No. 274/81

Manpower
SOR P. No. 267/I/47
SOR P. No. 2679/I/2
SOR P. No. 269/III/4

Mechinery

Binding wire
Reinforcement steel (including loading
charges) (HYSD/TMT)
Welding Electrodes @ 5 per joint (14 joints /
ton)
Welder
Brick smith/Tin smith/Rivetor)
Light mazdoor
Add LA charges

Unit

Rate

kg

70.00

M.T

38000.00

each

9.00

day
day
day
cum

420.00
420.00
320.00
7400.00

Welding Charges (Hire charges of Welding


Machine)

Hr

61.20

Lift charges F3
Add LA charges

cum
cum

1480.00
1480.00

Add Over Head Charges

cum

50332.00

Miscellaneous

Total rate per 1 MT

16 Brick Masonary 225 mm thick for pannel walls in Basement and Super structure with CM ( 1:8) prop (Cemen
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm i
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Basement

Brick Masonry in CM (1:8) for Basement


Code
Material
Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

cum

3933.42

Total Basement rate per 1 cum

18 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure F2

Brick Masonry in CM (1:8) for Super Structure F2


Material
Cement
Gr. (including
loading
charges)
2nd class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 91 /
Second floor

kg
cum
cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

Scafafolding charges for Brick Masonry /


Stone Masonry

cum

413.16

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

369.02
91.56
91.56

Add Over Head Charges

cum

4438.14

Total Super Structure rate per 1 cum F2

19 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) us
bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm in
seigniorage and conveyance of all materials and water from approved source to work site and all operatio
labour charges such as scafolding, mixing moratar, constructing masonary, lift charges, curing etc.,
finished item of work as per (APSS No.501 & 504) for Super Structure F3

Brick Masonry in CM (1:8) for Super Structure F3


Material
Cement
Gr. (including
loading
charges)
2nd
class43
bricks
(Non-Modular
or Traditional
size) 23x11x7 cm (including seigniorage
Coarse
sand for mortor (including
charges)
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/36
Mason CI-II / Brick layer CI-II
SOR P. No. 2269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 91 /
Thirdd floor

Scafafolding charges for Brick Masonry /


Stone Masonry
Add LA charges
Lift charges F2
Add LA charges
Add Over Head Charges

kg
Nos
Cum

5.20
5.328
513.42

day
day
day
cum

420.00
375.00
320.00
915.60

Sqm

521.42

cum
cum
cum

477.29
183.12
183.12

cum

4637.96

Total Super Structure rate per 1 cum F3

19 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for FI
Impervious coat in CM (1:3) 20mm thick FI, Lift Manual.
Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 21/BMTImpervious Water Proof Compound
H.01

Unit

Rate

kg
Cum

5.20
513.42

kg

24.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Add Over Head Charges

Sqm

271.87

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Total rate per 1 sqm

26 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F2
Impervious coat in CM (1:3) 20mm thickF2
Code
Material

BMT-H.01
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Unit

Rate

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
Impervious Water Proof Compound

kg

5.20

Cum

513.42

kg

24.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Lift charges F2
Add LA charges

Sqm
Sqm

20.39
20.39

Add Over Head Charges

sqm

292.26

Miscellaneous

Total rate per 1 sqm

27 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg o
compound per bag of cement laid over roof when it is green including cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth and thread lining, curing, rounding of junctions of wall and slab etc,,
finished item of work for F3
Impervious coat in CM (1:3) 20mm thickF3
Code
Material
CSSN-A-05
M 005
BMT-H.01
Manpower
CSSR-M-011
CSSR-M-077
CSSR-M-087

Unit

Rate

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
Impervious Water Proof Compound

kg

5.20

Cum
kg

513.42
24.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
203.87

Lift charges F3
Add LA charges

Sqm
Sqm

40.78
40.78

Add Over Head Charges

sqm

312.65

Miscellaneous

Total rate per 1 sqm

20 Ceiling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Celling plastering F1.

Ceilling Plastering with CM 2 coats, 12 mm thick F1, Lift Manual.


Code
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 92/ First
floor Celing

Scafafolding charges for celing Plastering


F1
Add LA charges

Add Over Head Charges

Unit

Rate

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

14.32

Sqm

11.95

Sqm

254.87

Total rate per 1 sqm F1

21 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all
operational,
incidental
charges
mixing
Ceilling
Plastering
with and
CM 2labour
coats,
12 mmfor
thick
F2 mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Celling plastering F2.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
Sqm
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
Sqm
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
206.39
Sqm
Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering

Scafafolding charges for Plastering F2

Sqm

19.12

Add LA charges
Lift charges F2
Add LA charges

Sqm
Sqm
Sqm

16.75
20.64
20.64

Add Over Head Charges

Sqm

280.31

Total rate per 1 sqm F2

22 Ceilling Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:
with sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth curing, etc,,
Ceilling Plastering with CM 2 coats, 12 mm thick F3
finished item of work (APSS 901,903 & 904) for Celling plastering F3.
Code
Unit
Rate
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Base Coat in CM(1:5), 8 mm thick


Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

23.91

Add LA charges
Lift charges F3
Add LA charges

Sqm
Sqm
Sqm

21.54
41.28
41.28

Add Over Head Charges

Sqm

305.74

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

Miscellaneous
SOR P. No. 92/
Second floor Celing
plastering

Scafafolding charges for Plastering F3

Total rate per 1 sqm F3

21 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth
complete for finished item of work (APSS 901,903 & 904) for Uneven faces F1.

Plastering with 20mm thick 2 coats F1, Lift Manual.


Code
Material
Base Coat in CM(1:6), 16 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 91/ First
floor Plastering to
walls

Unit

Rate

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

6.86

Add LA charges

Sqm

5.87

Add Over Head Charges

Sqm

254.44

Scafafolding charges for Plastering F1

Total rate per 1 sqm F1

22 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth
Plastering with 20mm thick 2 coats F2
complete for finished item of work (APSS 901,903 & 904) for External walls F2.

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Unit

Rate

kg
Cum

5.20
513.42

kg
Cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

9.29

Add LA charges
Lift charges F2
Add LA charges

Sqm
Sqm
Sqm

8.30
20.64
20.64

Add Over Head Charges

sqm

277.51

Base Coat in CM(1:6), 16 mm thick


Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Mason CI-1 / Brick layer CI-1
Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

Miscellaneous
SOR P. No. 91/
Second floor
Plastering to walls

Scafafolding charges for Plastering F2

Total rate per 1 sqm F2

23 Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4m
Dubara sponze finishing cost of all materials, seigniorage charges, including conveyance charges of
including
allwith
operational,
incidental
andF3labour charges for mixing mortar, laying, rendering smooth
Plastering
20mm thick
2 coats
complete
for
finished
item
of
work
(APSS
901,903 & 904) for External Unit
walls F3.
Code
Rate
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Base Coat in CM(1:6), 16 mm thick


Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)

kg
cum

5.20
513.42

kg
cum

5.20
513.42

day
day
day
Sqm

420.00
375.00
320.00
206.39

Sqm

11.73

Add LA charges
Lift charges F3
Add LA charges

Sqm
Sqm
Sqm

10.74
41.28
41.28

Add Over Head Charges

sqm

300.59

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

Miscellaneous
SOR P. No. 91/ Third
floor Plastering to
walls

Scafafolding charges for Plastering F3

Total rate per 1 sqm F3

1 Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in
dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to
seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on
including cost of all labour charges for mixing mortar, finishing, scafolding, lift charges, curing etc., a
Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for fin
work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual

Plastering with 12mm thick 2 coats F1


Code
Material
Base Coat in CM(1:6), 8 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Top Coat in CM(1:4), 4 mm thick
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls

Unit

Rate

kg
cum

5.20
513.42

kg
cum

5.20
513.42

day
day
day
cum

420.00
375.00
320.00
206.39

Sqm

6.86

Add LA charges

cum

5.87

Add Over Head Charges

cum

242.17

Scafafolding charges for Plastering F1

Total rate per 1 sqm F1

22 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F1 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Even faces F1.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous
SOR P. No. 77/ First
floor Plastering to
walls

Scafafolding charges for Plastering F1

Sqm

6.86

Add LA charges

cum

5.87

Add Over Head Charges

cum

247.41

Total rate per 1 sqm F1

23 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F2 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Internal walls F2.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous
SOR P. No. 77/
Second floor
Plastering to walls

Scafafolding charges for Plastering F2

Sqm

9.29

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

8.30
20.64
20.64

Add Over Head Charges

cum

270.48

Total rate per 1 sqm F2

24 Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4m
sponze finishing.cost of all materials, seigniorage charges, including conveyance charges of materials and
operational,
incidental
labour
charges
Plastering with
12mmand
thick
2 coats
F3 for mixing mortar, laying, rendering smooth curing, etc,,
finished item of work (APSS 901,903 & 904) for Internal walls F3.
Code
Unit
Rate
Material
Base Coat in CM(1:5), 8 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Top Coat in CM(1:3), 4 mm thick
Cement 43 Gr. (including loading charges)
kg
5.20
Coarse sand for mortor (including
cum
513.42
Seigniorage charges)
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
day
420.00
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
206.39
Miscellaneous

SOR P. No. 91/ Third


floor Plastering to
walls

Scafafolding charges for Plastering F3

Sqm

11.73

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

10.74
41.28
41.28

Add Over Head Charges

cum

293.56

Total rate per 1 sqm F3

24 Flooring plastering 20mm thick average in CM (1:4) with sponze finishing.cost of all materials, seignio
including conveyance charges of materials and including all operational, incidental and labour charg
mortar, laying, rendering smooth curing, etc,, complete for finished item of work (APSS 901,903 & 904) fo

Flooring plastering 20mm thick in CM (1:4) F-0


Code
Material
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
Manpower
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges

Add Over Head Charges

Unit

Rate

kg
cum

5.20
513.42

day
day
cum

375.00
320.00
86.45

cum

136.54

Total rate per 1 sqm F-0

25 Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards and Labour charges for
of paris false ceiling with for GI channels of perimeter channel 30mm x 27mm x 0.55 thick and ceilin
51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint compound and luppum/ p
per specification without painting including cost of all materials including cost of Plaster of paris shee
finished item of work

Supply & Fixing of plaster of paris ceiling usig 10mm thick plaster of paris boards

Code
Material

Unit

(BLD CSTN 10-31 & SOR


No. 399.)

Rate

Coefficient

BMT-M.54

10mm thick plaster of paris board

Sqm

327.00

BMT-M.07

G.I. Perimeter Channel - 20 mm x 27 mm x


30 mm(web) of 0.55 mm thick

Rm

65.00

BMT-M.05

G.I. Ceiling Section 51.5 mm x 26 mm x 10.5


mm x 0.55 mm thick

Rm

74.00

BMT-H.90

Synthetic/ Plaster of Paris Putty

kg

14.00

Corpenter CI-1
Painter CI-1
Painter CII-2
Light mazdoor
Add LA charges

day
day
day
day
Sqm

420.00
480.00
375.00
320.00
533.63

Add Over Head Charges

sqm

1006.40

Manpower

Total rate per 1 sqm

29 Replacing boken glass pannel with 4mm pin headed glass including cost, conveyance of all materials to
operational, incidental and labour charge etc., complete for finished item of work as directed by the E
Charge.
Replacing boken glass pannel with 4mm pin headed glass
Code

Unit

Rate

Manpower
BMT-I.13, P.No. 27

BMM-V.24, P. No. 83

Pin headed Glass 4 mm thick

sqm

220.00

Add wastage 10%

sqm

220.00

Labour charges

sqm

173.00

Add LA charges

173.00

For wastage, Screws. And beading, etc

cum
L.S

Add Over Head Charges

cum

515.00

Total rate per 1 sqm

16 Supply of NITO bond AR 8 or equivalent chemical including cost and conveyance of all materials to site
taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of NITO bond AR 8 or equivalent chemical
Code
Material
NITO bond AR 8 or equivalent chemical approved
rate

Unit

Rate

lit

440.00

Total rate per 1 Lit

17 Supply of CONPLAST X 421 IC admixure equivalent chemical including cost and conveyance of all ma
including all taxes, etc., complete as directed by the Engineer-in-charge of the work
Supply of CONPLAST X 421 IC admixure equivalent chemical
Code
Unit
Rate
Material
CONPLAST X 421 IC admixure equivalent
chemical approved rate

lit

104.00

Total rate per 1 Lit

18 Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for fin
work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary soil
For Ordinary soil up to 3 M
3M
Code
Unit
Rate
Manpower
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
cum
116.48
Excavation Method

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

146.48

Total rate per 1 cum

19 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, , lift manuals per APSS. No. 402. 0 Floor

P.C.C. M-15
Code
Material

0 Floor

Cement 43 Gr. (including loading charges)

Unit

Rate

cum

5.20

SOR P. No. 292/M 189

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

hour

328.60
189.80

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Mechinery
SOR P. No. 379/16

Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Basic rate 1 cum


Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings First
floor

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

4297.49

Total rate per 1 cum

4 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost
of purlins,
trusses
& cost of conveyance
of all materials
item of work upto 600 pitch S
Roofing
with 6rafters,
mm thick
corrugated
asbestos cement
sheets finished
F2
Code
Material
BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4

Unit taken 10 sqm


6 mm thick corrugated AC sheets
8 mm dia G.I J bolts & nuts
G.I washers
Bitumen washers
Carpenter II class
Man mazdoor
Add LA charges

Unit

Rate

t/sqm
nos
nos
nos

1880.00
8.00
0.50
0.20

day
day
cum

375.00
320.00
33.51

Miscellaneous
Sundries including 50 x 6 mm iron wind ties
white lead etc.

L.S

Add for Standard specification 1mm. Thick


ridging and 1.25 mm thick sheet vallyes
when such are required for a particular work.
Average allowance for 10 sqm roofing.

L.S

Lift charges F2
Add LA charges

cum
cum

3.35
3.35

Add Over Head Charges

sqm

3001.00

Total rate per 1 sqm= Rate/10 =


52 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost
of purlins,
trusses
& cost of conveyance
of all materials
item of work upto 600 pitch
Roofing
with 6rafters,
mm thick
corrugated
asbestos cement
sheets finished
F3
Code
Material

Unit
Unit taken 10 sqm

Rate

BMT-E.17
BMS-W.64
BMS-W.65
BMS-W.67
Manpower

6 mm thick corrugated AC sheets


8 mm dia G.I J bolts & nuts
G.I washers
Bitumen washers

SOR P. No. 266/I/4

Carpenter II class
Man mazdoor
Add LA charges

SOR P. No. 269/III/4

t/sqm
nos
nos
nos

1880.00
8.00
0.50
0.20

day
day
cum

375.00
320.00
33.41

Sundries including 50 x 6 mm iron wind ties


white lead etc.

L.S

2822.56

Add for Standard specification 1mm. Thick


ridging and 1.25 mm thick sheet vallyes
when such are required for a particular work.
Average allowance for 10 sqm roofing.

L.S

Miscellaneous

Lift charges F3
Add LA charges

cum
cum

6.68
6.68

Add Over Head Charges

sqm

3004.24

Total rate per 1 sqm= Rate/10 =

1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F2

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
526.07

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

sqm

554.55

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

1 Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F3

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
526.07

Lift charges F3
Add LA charges
Add water Charges

sqm
sqm
sqm

45.98
45.98
45.98

Add Over Head Charges

sqm

577.77

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

33 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

843.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1159.57

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

Add Over Head Charges

sqm

1171.17

Total rate per 1 sqm

2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2

Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F2

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

843.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1159.57

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

1194.39

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

2 Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed alread
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed nea
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with Vitrified tiles, set over base coat of cement mortar (1:8), 12 mm thick F3

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

843.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1159.57

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

1217.61

Miscellaneous

Total rate per 1 sqm

36 Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F1
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.15

Unit

Rate

Vitrified tiles of 1st quality of size 600x600


of 8 to 10mm thick

Sqm

1048.00

Cement 43 Gr. (including loading charges)

Kg

5.20

cum

513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
1430.02

Add Over Head Charges

sqm

1444.32

Coarse sand for mortor (including


Seigniorage charges)
SOR P. No. 88 / BMSW.68

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

34 Flooring with ceramic tiles, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F1
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F1

Code
Material
SOR P. No. 12 / BMTC.01

Ceramic tiles 7.3mm thick 1st quality

Unit

Rate

Sqm

465.00

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg
cum

5.20
513.42

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
762.27

Add Over Head Charges

sqm

769.89

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

35 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cemen
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
conveyance of all materials. for F2
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick F2

Code
Material
SOR P. No. 12 / BMTC.01

SOR P. No. 88 / BMSW.68

Unit

Rate

Ceramic tiles 7.3mm thick 1st quality

Sqm

465.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg
cum
Kg

5.20
513.42
29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
758.52

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

789.33

Manpower

SOR P. No. 266/I/11


SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm

36 Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already la
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neat
cement
pasteceramic
to full tiles,
depthset
mixed
with coat
pigment
of matching
shade,
cost of all materials like cemen
Flooring with
over base
of cement
mortar (1:8),
12 including
mm thick F3
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, includin
Code
Unit
Rate
conveyance of all materials. for F3
Material
SOR P. No. 12 / BMTC.01

SOR P. No. 88 / BMSW.68

Ceramic tiles 7.3mm thick 1st quality

Sqm

465.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg
cum
Kg

5.20
513.42
29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor

day
day
day

420.00
375.00
320.00

Manpower

SOR P. No. 266/I/11


SOR P. No. 267/II/35
SOR P. No. 269/III/4

Add LA charges
Add water Charges

Sqm
sqm

229.92
758.52

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

812.55

Miscellaneous

Total rate per 1 sqm

35 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement paint spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, in
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
finished item of work. (APSS No 701 & 707) for Bath rooms F1

Dadoing with Glazed coloured Tiles, set over base coat of cement mortar (1:5), F1

Code
Material

Unit

Rate

SOR P. No. 12 / BMTC.07

Glazed coloured Tiles of any size Ist Quality

Sqm

413.00

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Add Over Head Charges

sqm

717.77

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

32 Flooring with Chequered Terrazzo tiles of 22 mm thick (Medium shade) set over base coat of cement morta
thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spre
per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost o
like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished
including the cost of conveyance of all materials.
Flooring with chequrred terrazzo tiles of 20 mm thick (medium shade) of CM (1:6) 12 mm thick F1

Code
Material
SOR P. No. 15 / BMTD.01

SOR P. No. 88 / BMSW.68

chequrred terrazzo tiles of 22 mm thick


(medium shade)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)
White cement

Unit

Rate

Sqm

229.00

Kg
cum

5.20
513.42

Kg

29.00

day
day
day

420.00
375.00
320.00

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor

Add LA charges
Add water Charges

Sqm
sqm

229.92
526.07

Add Over Head Charges

sqm

531.33

Total rate per 1 sqm


21 Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I
complete including all operations such as fixing in position etc., complete for finished item of work, but
cost of purlins, rafters, trusses & cost of conveyance of all materials finished item of work upto 600 pitch
Roofing with 6 mm thick corrugated asbestos cement sheets F1
Code
Unit
Material
Unit taken 10 sqm
BMT-E.17
6 mm thick corrugated AC sheets
t/sqm
BMS-W.64
8 mm dia G.I J bolts & nuts
nos
BMS-W.65
G.I washers
nos
BMS-W.67
Bitumen washers
nos
Manpower
SOR P. No. 266/I/4
Carpenter II class
day
SOR P. No. 269/III/4
Man mazdoor
day
Add LA charges
cum
Sundries including 50 x 6 mm iron wind ties
white lead etc.

L.S

Add for Standard specification 1mm. Thick


ridging and 1.25 mm thick sheet vallyes
when such are required for a particular work.
Average allowance for 10 sqm roofing.

L.S

Add Over Head Charges

sqm

Rate
1880.00
8.00
0.50
0.20
375.00
320.00
33.51

2997.65

Total rate per 1 sqm= Rate/10 =

30 Supply and fixing of PVC doors to the toilets size 0.90 x 2.10M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.

Code
Considering siz of PVC door 090 x 2.10M
for PVC door frame (V)
for PVC door frame (H)

for PVC door Shutter

Unit
2x 2.10 =
2x 0.90 =

0.90x 2.10 =

Rate

ABSTRACT
Material
BMT-N.46
BMT-N.44

PVC door frame


PVC door Shutter

rm
sqm

215.00
1570.00

Add Over Head Charges

cum

4257.30

Total rate per each PVC door =

37 Gronolithick Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine c
laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m
the top surface to required smoothness and slopes and thread lining including cost of all materials like c
sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but
cost of conveyance of all materials for F1
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size F1

Code
Material

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Unit

Rate

Sqm

1715.64

Kg
cum

5.20
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

285.00
260.00
215.00
101.69
217.96

Add Over Head Charges

sqm

220.14

6mm to 12 mm H.G. Metal (Machine


crushed)
Cement 43 Gr. (including loading charges)
Coarse sand for mortor (including
Seigniorage charges)

Total rate per 1 sqm

38 Supply and fixing of PVC doors to the toilets Door of size 075 x 2.00M providing door frame made of hollow
section (Nandi or equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut
DOOR FRAME (Nandi or Equivalent) providing door shutters made of rigid PVC extruded hollow sec
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's wi
groove locking arrangements. The shutter frame is made of 58 X 24 mm with the wall thickness of 1.5mm
section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets. The shutter shall b
reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be reinforced inside the door shutt
fabrication of the door shutter at those points wherever the hardware is fixed on to the door shutter. PVC DO
(Nandi or Equivalent) complete with all materials conveyance charges including providing all fixtures, as
design for finished item of work as directed by the Departmental Officers for finished item of work.

Code
Considering size of PVC door 0.75 x 2.00M
for PVC door frame (V)
for PVC door frame (H)

for PVC door Shutter

Unit
1.50 Sqm
2x 2.00 =
2x 0.75 =

Rate

0.75x 2.00 =
ABSTRACT

Material
BMT-N.46

PVC door frame

rm

215.00

BMT-N.44

PVC door Shutter

sqm

1570.00

Add Over Head Charges

cum

3537.50

Considering size of PVC Door=

1.50 sqm
1.00 sqm

Considering size of PVC Door=

4019.13 x 1.00 sqm


1.50 sqm
Total rate per 1sqm

Total rate per each PVC door =

31 Supply and fixing mild steel hallow door frames of Size 3'0" x 7'0" manufactured by cold rolled formed
1.25mm bright CRCA'D' quality MS Grade confirming to IS 4351-1976 suitable for single double leaf dof
frame of section 105x60x30mm rebate including 6 (six) numbers of standard lugs made from flat steel st
than 1.60mm thick including base tie of section 50mm x 25mm minimum free fixed hinges of size 1000 x
numbers for single shutter and 6 ( six ) number for double shutter with one side fixed to for fixing 3 numb
shutter with one side fixed to for fixing 3 numbers rubber bottom inserts in frame necessary arrangeme
hole (10 inches long 12mm dia aldrop of and tower bolts welded to frame at top and bottom and fixin
hinges to frame for wind cleat one number assembled ny mean of welding at corners including painting a
the departmental officers along with test certificate for raw materials and including all tolls cost and con
materials and all incidental for finished item of work.

Code
Door type

Unit
3'-0"

2X 7'-0" + 3'-0" = 17'-0" =


Wight of Door frame

Rate

7'-0"

Weight of the frame at 3.95 Kg/Rm

5.185
20.481

Rm
Kgs

ABSTRACT
Material
BMT-F.01

Cost of Door frame

BMM-V.14
BMM-V.15

Labour charges for fabrication


Labour charges for fixing the door frame

Add LA charges

rm
rm
rm
Sqm

389.14

cum

1697.25

233.00
16.00
3.00

Trance portation charges

Add Over Head Charges


Total rate per each=

6 NCL or Equivalent Door Frames: Providing and fixing MS. Hallow door frames manufactured by cold roll fo
steel sheet 1.25mm thick bright CRCA confirming to IS 4351 - 1976 size should be 50 x 60 mm with 32 m
corner of the frame should be welded. The frame should be painted with one coat of primer and finished
Code
Unit
Rate
pure polyester paint,MS.
with
total door
coated
thickness
of 1.25 mm.
Size of door frame section should be of 105x
Hallow
frames
manufactured
by
Material
rebate of 38mm to accommodate
35mm
thick
door
shutter.
The frame section should have groove to inse
cold roll formed
process
steel
sheet
1.25mm
BMT-F.01
Rm
233.00
section
of the door and
fan
lightCRCA
frameconfirming
is to be filled
polyurethane
foam. The frame
section should be
thick
bright
to ISwith
4351
and joined by way of
welding
and
each
frame
should
be
provided
with:
a)
2mm
thick
MS
powder coated
1976 with Hinges tower Bolts etc.
100nn long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 No
Add Over
Head Charges
233.00
vertical. c) 40mm x 200mm
x 1.2mm
hold fasts screwed to stifeners sqm
6 Nos. with split
end tail. d) Nylon Al
1 No. for single shutter frame. e)Tie Rod 1 No
Total rate per 1 Rm

32 Supply and fixing Flush door shutters, solid bond wood block board type with commercial ply on both faces
conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges fo
door shutters of any thickness to the existing door frame including fixing the fixtures to the door shutter for
of work.
Code
Material
BMT-N.17
Miscellaneous
BMM-V.23

Unit

Rate

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

230.00

Add Over Head Charges

sqm

964.00

Total rate per 1 sqm

30 Cost Suply and Fixing Fly proof mesh ( Netlon make) of superior quality to the existing Windows & Ven
alround Willkro tape ( Male and Female Streep) duly fixing the tape to the Windows & Ventilaters frame us
screws Code
and gum of all materials work site and including all taxes and Unit
all labour charges
Rate for striching, ma
position as directed by Dept| Officers for finished item of work
Unit taken 6' - 0" x 4' - 6" =
###
For Window
27.00 Sft=
For frame
( 6'-0" + 6'-0") + (4'-6' + 4'-6' )
21.00 Rft Or
Material
BMT-F.18
Cost of Fly proof mesh (Netlon)
sqm
155.00
BMT-M.23
Cost of male and female tap
Rm
5.00
Stiching charges
L.S
Rm
15.00
Gum and Screws
L.S
Rm
7.00
Labour
charges
fixing
L.S
sqm
40.00
Wollon fly proof mesh for Window
Add Over Head Charges
1.00 sqm

2.510 sqm
each

662.25

Wollon fly proof mesh for Window=


752.42 x 1.00 sqm
2.51 sqm

39 Supply of Best Country Wood ( Sal Wood ) wrought and putup Sal Wood scantlings: any length in length
and conveyance of all materials to work site and all operational, incidential, labour charges, etc., comple
item
of work
Supply of Best Country Wood Sal Wood scantlings: any length wrought and putup
Code
Material
BMT-E.15
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Sal Wood scantlings: any length

cum

38847.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

40 Supply of Best Country Wood ( Sal Wood ) wrought and putup in Sal Wood Plancks: any thickness in len
cost and conveyance of all materials to work site and all operational, incidential, labour charges, etc.,
finished item of work
Supply of Best Country Wood Sal Wood Plancks: any thickness wrought and putup

Code
Material

Unit

Rate

BMT-E.16
Manpower

Sal Wood Plancks: any thickness

cum

49491.00

SOR P. No. 266/I/11

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

SOR P. No. 269/III/4

Total rate per 1 cum

1 Supply of Best Teak Wood wrought and putup Teak Wood scantlings: any length including cost and conv
materials to work site and all operational, incidential, labour charges, etc., complete for finished item of wo
Supply of Best Teak Wood scantlings: any length wrought and putup

Code
Material
BMT-E.06
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Best Teak Wood scantlings: 2.0 to 3.0 M

cum

81225.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

2 Supply of Best Teak Wood wrought and putup in Teak Wood Plancks: any thickness in length includ
conveyance of all materials to work site and all operational, incidential, labour charges, etc., complete for
of work
Supply of Best Teak Wood Plancks: any thickness wrought and putup

Code
Material
BMT-E.08
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Unit

Rate

Best Teak Wood Plancks: any thickness

cum

116540.00

Carpenter Cl- I
Light mazdoor
Add LA charges

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum


41 Labour charges wrought and putup New Wood work etc., complete for finished item of work
Labour charges wrought and putup Wood work

Code
Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Carpenter Cl- I
Light mazdoor
Add LA charges

Unit

Rate

day
day
Sqm

420.00
320.00
10250.00

Total rate per 1 cum

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.20 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.20 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.52 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.20 x 0.10 x 0.075 =

Total Frame
Requirement of flush shutter

35 mm thick

1x1.085x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

512.83

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

5252.99

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.20 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.05 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.05 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.21 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.05 x 0.10 x 0.075 =

Total Frame
Requirement of flush shutter

35 mm thick

1x0.935x2.055 =

Flsh Shtter
ABSTRACT
Cost of Sal wood for frame

Cum

49097.00

BMT-N.17

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

441.92

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4890.50

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.05 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 1.00 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
1.00 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
2.10 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 1.00 x 0.10 x 0.075 =

Total Frame
Requirement of flush shutter

35 mm thick

1x0.855x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges including LA Charges for


Salwood frame

BMM-V.23

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

404.11

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4708.28

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

1.00 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.90 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
0.90 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
1.89 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 0.9 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x0.785x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

371.04

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4528.13

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

0.90 x 2.10 M

Flush Shutter Door

1 Supply and fixing Flush Doors by using Salwood frame section 100x 75 mm and fixing Flush door shutte
wood block board type with commercial ply on both faces.: 35 mmthick conforming to IS:2202 of ANA
KUTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush door shutters of any thickness t
door frame including fixing the fixtures to the door shutter for finished item of work. Door size 0.85 x 2.10 M
Code
Unit taken DOOR 'D' of size
Requirement of Sal wood

Unit
0.85 M x
For frame
Verticlal
Horizontal

2.10 M

Rate
1.79 sqm

2 x 2.1 x 0.10 x 0.075 =


1 x 0.85 x 0.10 x 0.075 =

Total Frame
35 mm thick

Requirement of flush shutter

1x0.755x2.055 =

Flsh Shtter
ABSTRACT

BMT-N.17

Cost of Sal wood for frame

Cum

49097.00

Flush door shutters, solid bond wood block


board type with commercial ply on both
faces.: 35 mmthick

sqm

734.00

Cum

10250.00

Labour charges for fixing Flush door shutters


of any thickness to the existing door frame
including fixing the fixtures to the door
shutter excluding cost of shutter

sqm

230.00

Add LA charges

Sqm

356.85

Labour charges including LA Charges for


Salwood frame
BMM-V.23

Sundries inclusive of putty, brads, hold fasts


6 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.11

Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm


LongTop & Bottom

Nos

BMT-G.45
BMT-G.28
BMT-G.34
BMT-G.57

MS-Powder Coated Aldrop (IS:2681) 300 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

1
3
1
1
1

Add Over Head Charges

sqm

4444.91

MS-Powder Coated Butt hinges (IS:205)- 100 mm Long


Aluminium Door Handles (IS:208) 150 mm Long
Heavy duty Aluminium Door stopper

0.85 x 2.10 M

Flush Shutter Door

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 1.50x1.35
Country wood Framed and Fully Panneled Window Three Shutters

Code
Unit taken 1.50x1.35 ( 3 Shutters) =

Requirement of Sal wood

Requirement of Teak wood

1.50 M x
For frame
Verticlal
Horizontal

1.35 M

Unit
Rate
2.025 sqm

4 x 1.35 x 0.10 x 0.075 =


2 x 1.50 x 0.10 x 0.075 =

Total Sal wood Frame


For shutters frame
4 x 2 x 1.225 x 0.075 x 0.030 =
Verticlal
4 x 3 x 0.425 x 0.075 x 0.030 =
Horizontal
Total Sal wood Frame

Requirement of Teak wood

For Shutter Planks

3 x 2 x 0.425 x 0.525 x 0.020 =

ABSTRACT
Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

555.75

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

Add LA charges

Sundries inclusive of putty, brads, hold fasts


4 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Furniture for Windows Panelled : Thrible Leaf with half


Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

6
6
6
3
3

Add Over Head Charges

sqm

14751.20

Aluminium Flat Latches: 200 mm long


Aluminium Butt hinges (IS:205)- 75 mm Long
Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

1.50 x 1.35 M

Fully Panneled Window=

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.35
Country wood Framed and Fully Panneled Window Double Shutters

Code
Unit taken 0.90x1.35 ( 2 Shutters) =

Requirement of Sal wood

Requirement of Teak wood

0.90 M x
For frame
Verticlal
Horizontal

1.35 M

Unit
Rate
1.215 sqm

3 x 1.35 x 0.10 x 0.075 =


2 x 0.90 x 0.10 x 0.075 =

Total Sal wood Frame


For shutters frame
2 x 2 x 1.225 x 0.075 x 0.030 =
Verticlal
2 x 3 x 0.425 x 0.075 x 0.030 =
Horizontal
Total Sal wood Frame

Requirement of Teak wood

For Shutter Planks

2 x 2 x 0.362 x 0.525 x 0.020 =

ABSTRACT
Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

Add LA charges

Sqm

Sundries inclusive of putty, brads, hold fasts


4 Nos and wind appliances and screws for
planks (Vide standard specification)

444.41

LS

Furniture for Windows Panelled : Double Leaf with half


Shutters (Schedule Item No. 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

Aluminium Flat Latches: 200 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

2
4
4
2
2

Add Over Head Charges

sqm

8982.41

Aluminium Butt hinges (IS:205)- 75 mm Long


Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

0.90 x 1.35 M

Fully Panled Window

1 Supplying and fixing Fully Paneled windows by using Salwood frame of section 100x75 mm and shutter usi
styles and 20 mm thick teak wood panels including cost and conveyance of Salwood, Teakwood and provi
for safty grill, cost of furniture fittings and fixing MS safty grills to frame including labour charges and fixi
etc., complete for finished item of work as directed by Engineer - in - Charge. SIZE 0.90 x 1.07
Country wood Framed and Fully Panneled Window Double Shutters

Code
Unit taken 0.90x1.07 ( 2 Shutters) =

Requirement of Sal wood

0.90 M x
For frame
Verticlal
Horizontal

1.07 M

Unit
Rate
0.963 sqm

3 x 1.07 x 0.10 x 0.075 =


2 x 0.9 x 0.10 x 0.075 =

Total Sal wood Frame


Requirement of Teak wood

For shutters frame


2 x 2 x 0.995 x 0.075 x 0.030 =
Verticlal
2 x 2 x 0.525 x 0.075 x 0.030 =
Horizontal
Total Sal wood Frame

Requirement of Teak wood

For Shutter Planks

2 x 2 x 0.362 x 0.525 x 0.020 =

ABSTRACT

BMM-V.14

Cum
Cum
Cum
Sqm

49097.00
91475.00
126790.00
952.25

Cost snd Supply of MS Safty grills

Kg

38.00

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

Cost of Sal wood for frame


Cost of Best Teak wood for frame
Cost of Best Teak wood for planks
Labour charges including LA Charges

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position
Add LA charges
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)

Kg

3.00

Sqm

444.41

LS

Furniture for Windows Panelled : Double Leaf with half


Shutters (Schedule Item No. 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

Aluminium Flat Latches: 200 mm long

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

2
4
4
2
2

Add Over Head Charges

sqm

8158.72

Aluminium Butt hinges (IS:205)- 75 mm Long


Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

0.90 x 1.07 M

Fully Panled Window

1 Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.90 x 0.60m
Code
0.90 M x
For frame
Verticlal
Horizontal

Unit taken 0.90x0.60 =

Requirement of Sal wood

0.60 M

Unit
Rate
0.540 sqm

2 x 0.90 x 0.075 x 0.050 =


3 x 0.60 x 0.050 x 0.075 =

Total Sal wood Frame


ABSTRACT
Cost of Sal wood for frame
Labour charges including LA Charges

Cum
Sqm

49097.00
952.25

Plain Float Glass 4 mm thick


Add LA charges

Sqm
Sqm

334.00
180.36

Cost snd Supply of MS 12 mm bars

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

38.64

BMT-I.01

Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)

LS

Add Over Head Charges


0.90 x 0.60 M

sqm

1533.32

Glazed Ventilator

## Supplying and Fixing Salwood Fully Glazed ventilators by using salwood frame of 75 x 50mm & and fixing
12mm MS square bars horizontally and fixing 4mm thick pin headed glass including cost and conv
materials, labour charges for wrought & put up & fixing in position etc., complete for finished item of work
Engineer - in - Charge. size 0.60 x 0.45m
Code
0.60 M x
For frame
Verticlal
Horizontal

Unit taken 0.60x0.45 =

Requirement of Sal wood

0.45 M

Unit
Rate
0.270 sqm

2 x 0.60 x 0.075 x 0.050 =


2 x 0.45 x 0.050 x 0.075 =

Total Sal wood Frame


ABSTRACT
Cost of Sal wood for frame
Labour charges including LA Charges

Cum
Sqm

49097.00
952.25

Plain Float Glass 4 mm thick


Add LA charges

Sqm
Sqm

334.00
90.18

Cost snd Supply of MS 12 mm bars

Kg

38.00

BMM-V.14

Labour charges for fabricating steel works


like Window Grills, Compound Wall Grills,
Iron Doors, Windows including cost of
welding rods, power charges, excluding cost
of fixing in position

Kg

16.00

BMM-V.15

Labour charges for fixing Iron Doors, Iron


Windows and Window Grills in position

Kg

3.00

Sqm

19.32

BMT-I.01

Add LA charges
Sundries inclusive of putty, brads, hold fasts
2 Nos and wind appliances and screws for
planks (Vide standard specification)

Add Over Head Charges


0.60 x 0.45 M
2.03 sqm
1.00 sqm

Fully Panneled Window=

LS

sqm

852.14

Glazed Ventilator
Fully Panneled Window=
8676.65 x 1.00 sqm
2.03 sqm

42 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 100 x 2.00 Door single le
of with are made of well seasoned best country wood 3"x4" free from all difects such as werping, bend
and
fixed with 6 nos 'Z' hold fasts of size 300x40mm size and withBLD-CSTN-13-12-243
1 1/2 thick best country wood styles and r
Country wood Framed and Planked Doors (Schedule Item No. 297
thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup and con
Code
materials
work site and including all taxes, all laber charges for making,Unit
fixing of doorRate
furniture in position
1/2
21.67
Unit
3'-3
"x6'-7"
= Tower bolts (Ave
sft
2.00 sqm
Dept|taken
Officers
including
Top
: Size), Bottom
Tower bolts 150mm
long, Brass Butt hinges
mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper, Alu
Handles (IS:208) 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 300 mm long and all labour charges su
by the Departmental Officers for finished item of work. for External doors (Schedule Item 292)

For frame
Verticlal
Horizontal
For Shutter frame
Verticlal

2 x 6'-7" x 3" x 4" =


1x 3'-31/2" x 3" x 4" =
2x 4'' x 11/2" x6'- 3" =
1x 2'-91/2" x 4" x 11/2" =

Top, Bottom& Middile

3x 2'-91/2" x 5" x 11/2" =

Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
2.00 Or
0.106
3.741 Or
Sqm
Cum
Cft
Sundries inclusive of putty, brads, hold fasts
6 Nos and wind appliances and screws for
planks (Vide standard specification)

BMT-G.09
BMT-G.08
BMT-G.22
BMT-G.57
BMT-G.34
BMT-G.45

166
164
182
214
191
202

1390.26
1691.66
10250.00

LS

Furniture - Iron - for External doors (Schedule Item 292)


Nos
2
Bottom Tower bolts 150mm long
Nos
2
Brass Butt hinges (IS:205)- 150 mm Long
Nos
6
Heavy duty Aluminium Door stopper
Nos
1
Aluminium Door Handles (IS:208) 150 mm L
Nos
1
MS-Powder Coated Aldrop (IS:2681) 300 mm
Nos
1
Top Tower bolts (Ave : Size)

Add Over Head Charges

2.00 sqm
1.00 x 2.00 M

1.00 sqm

cft
cft
Cum

sqm

8381.98

Fully Panneled External Door=


Fully Panneled External Door=

Fully Panneled External Door=

9523.19 x 1.00 sqm


2.00 sqm
Total rate per 1sqm

43 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 1.00 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 297
7/8" thick Sal wood flanks for pannels as per specifications of APDSS including cost, wrought and putup an
Code
Unit
Rate
of all materials work site and including all taxes, all laber charges for
making, fixing
of door furniture
1/2
21.67
Unit
taken
sft : Size), Bottom2.00
sqm
directed
by 3'-3
Dept| "x6'-7"
Officers =including Top Tower bolts (Ave
Tower
bolts 150mm long, Al
hinges (IS:205)- 150 mm Long, MS-Powder
Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
For frame
Aluminium Door Handles (IS:208) 150 mm
Long
as diricted by the Department
Verticlaland all2labour
x 6'-7" charges
x 3" x 4" such
=
finished item of work. for Internal doors (Schedule Item 293) 1/2
Horizontal
1x 3'-3 " x 3" x 4" =

For Shutter frame


Verticlal

2x 4'' x 11/2" x6'- 3" =


1x 2'-91/2" x 4" x 11/2" =

Top, Bottom& Middile

3x 2'-91/2" x 5" x 11/2" =

Total Frame
For Shutter Planks
1x 3'-0" x 6'- 101/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
2.00 Or
0.106
3.741 Or
Sqm
Cum
Cft
Sundries inclusive of putty, brads, hold fasts
6 Nos and wind appliances and screws for
planks (Vide standard specification)

cft
cft
Cum

1390.26
1691.66
10250.00

LS

Furniture - Iron - for Internal doors (Schedule Item 293)


BMT-G.09
BMT-G.08
BMT-G.26
BMT-G.44
BMT-G.57
BMT-G.34

166
164
183
200
214
191

Top Tower bolts (Ave : Size)


Bottom Tower bolts 150mm long
Aluminium Butt hinges (IS:205)- 150 mm Lo
MS-Powder Coated Aldrop (IS:2681) 250 mm
Heavy duty Aluminium Door stopper
Aluminium Door Handles (IS:208) 150 mm L

Add Over Head Charges

1.00 x 2.00 M
2.00 sqm
1.00 sqm

Nos
Nos
Nos
Nos
Nos
Nos

1
1
6
1
1
1

sqm

7810.98

Fully Panneled Internal Door=


Fully Panneled Internal Door=

Fully Panneled Internal Door=

8874.44 x 1.00 sqm


2.00 sqm
Total rate per 1sqm

44 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Door of size 0.75 x 2.00M Door sin
frame of with are made of well seasoned best country wood 3"x4" free from all difects such as werping,
etc., and fixed with 6 nos 'Z' hold fasts of size 300x40mm size and with 1 1/2 thick best country wood styles
BLD-CSTN-13-12-243
Country wood Framed and Planked Doors (Schedule Item No. 293
7/8" thick Sal wood flanks for pannels as per specifications of APDSS
including cost, wrought and putup an
of all materials work site and including all taxes, all laber charges for making, fixing of door furniture
Fully :Panneled
Internal
Door=
directed by Dept| Officers including
Top Tower bolts (Ave
Size), Bottom
Tower
bolts 150mm long, Al
2.00 sqm
hinges (IS:205)- 150 mm Long, MS-Powder Coated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium
Fully
Panneled
Internal
Door=
1.50
sqm 150
Aluminium Door Handles
(IS:208)
mm
Long and
all labour
charges such as diricted by the Department
6828.98 x
1.50 sqm
finished item of work. for Internal doors (Schedule Item 293)
2.00 sqm
Furniture - Iron - for Internal doors (Schedule Item 293) as per
above item.
BMT-G.09
BMT-G.08
BMT-G.26

166
164
183

Top Tower bolts (Ave : Size)


Bottom Tower bolts 150mm long
Aluminium Butt hinges (IS:205)- 150 mm Lo

Nos
Nos
Nos

1
1
6

BMT-G.44
BMT-G.57
BMT-G.34

200
214
191

MS-Powder Coated Aldrop (IS:2681) 250 mm


Heavy duty Aluminium Door stopper
Aluminium Door Handles (IS:208) 150 mm L

Nos
Nos
Nos

1
1
1

Add Over Head Charges

0.75 x 2.00 M

6103.74

Fully Panneled Internal Door=

45 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.50 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13 - 22- 270
Country wood Framed 1/2
and Fully Panneled Window Three Shutters
35x5mm size with 1 thick best country wood styles and rise using 7/8" thick Sal wood flanks for pannels
Code(execluding cost of M.S. Grills) as per specifications of Unit
Ratecost, wrought an
M.S. Grills
APDSS including
1.80 sqm
Unit
taken 4'-11"
3'- 111/2" =
conveyance
of allxmaterials
work site and 19.46
including allsft
taxes, all laber charges
for making, fixing of Pann
furniture in position as directed by Dept|
For Officers
frame including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium Butt hinges (IS:205)100 mm3 Long,
1/2
Verticlal
x 3'-11Window
" x 21/2"stoppers
x 3" = Aluminium, and all labour
as diricted by the Departmental Officers for finished item of work. 1/2
Horizontal
2 x 4'-11" x 2 " x 3" =
For shutters frame
Verticlal
3 x 2 x 3'-111/2" x 3 1/2" x 1 1/2"=
Horizontal

3 x 2 x 2 x 1'-3" x 3

1/2

"x1

1/2

"=

Total Frame
For Shutter Planks
3x 1'-0" x 3'-111/2" x 3/4" =

Total qty of Planks


ABSTRACT
Cost of Sal wood for frame
Cost of Sal wood for planks
Labour charges including LA Charges
1.80 Or
0.093
3.285 Or
Sqm
Cum
Cft
Sundries inclusive of putty, brads, hold fasts
4 Nos and wind appliances and screws for
planks (Vide standard specification)

cft
cft
Cum

1390.26
1691.66
10250.00

LS

Furniture for Windows Panelled : Thrible Leaf with half


Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

PVC Silencer market rate

Nos
Nos
Nos
Nos
Nos

6
12
6
3
1

Add Over Head Charges

sqm

7636.89

Aluminium Flat Latches: 200 mm long


Aluminium Butt hinges (IS:205)- 75 mm Long
Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

1.50 x 1.20 M
1.80 sqm
1.00 sqm

Fully Panneled Window=

Fully Panneled Window=


Fully Panneled Window=
8676.65 x 1.00 sqm
1.80 sqm

46 Cost Suply and Fixing of Best Country wood (Salwood) Fully Panneled Window of size 1.80 x 1.20M Th
Shutters the frame of witch are made of well seasoned best country wood 2 1/2"x3" free from all difects suc
bending, knot etc., and fixed with 4 nos 'Z' hold fasts of size 300x40mm size and with 2 Nos Mild st
BLD-CSTN-13
- 22270
Country wood Framed 1/2
Fully Panneled Window Three Shutters
35x5mm size with 1 and
thick
best country wood styles and rise using
7/8" thick Sal
wood
flanks for pannels
Code
Unit
Rate
M.S. Grills (execluding cost of M.S. Grills) as per specifications of APDSS including cost, wrought an
Panneled
Window=
conveyance of all materials work
taxes,
all laber
charges for making, fixing of Pann
1.80 site
sqmand including allFully
furniture in position as directed by Dept| Officers including Top Tower bolts Alluminium 150mm long, Botto
150mm long, Aluminium
Butt
hinges
(IS:205)100Window=
mm Long, Window stoppers Aluminium, and all labour
Fully
Panneled
2.16
sqm
as diricted by the Departmental Officers for finished item of work.
5863.89 x
2.16 sqm
1.80 sqm
Furniture for Windows Panelled : Thrible Leaf with half
Shutters (Schedule Item No. 309 & 310)
BMT-G.48
BMT-G.19
BMT-G.08
BMT-G.56

205
176
164
213

Aluminium Flat Latches: 200 mm long


Aluminium Butt hinges (IS:205)- 75 mm Lon
Top & Bottom tower bolts 150 mm long
Deluxe window stay Aluminium

Nos
Nos
Nos
Nos

Add Over Head Charges

1.80 x 1.20 M

6
12
6
3

8674.67

Fully Panneled Window=

26 Painting for Ceiling and Walls two coats with whiting of approved quality to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all ma
charges and incidental such as scafolding, lift charges etc., complete for finished item of work, includin
charges of materials for All Floors
Painting for Ceiling two coats with whiting for All Floors

Code
Material
BMT-J.27
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

kg

14.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
18.75

Add Over Head Charges

sqm

21.55

Surya Cem or equivalent quality

Total rate per 1 sqm

7 White washing for Ceiling Single coat with whiting of approved quality to give an even shade after thorou
the surface to remove all dirt and remains of loose powdered materials including cost of all materials, la
and incidental such as scafolding, lift charges etc., complete for finished item of work, including conveyan
materials for All Floors
White washing for Ceiling One coats with whiting for All Floors

Code
Material
BMT-J.27

Surya Cem or equivalent quality

Manpower
CSSR-M-035
CSSR-M-037

Painter Cl- I
Painter CI-II

Unit

Rate

kg

14.00

day
day

420.00
375.00

CSSR-M-087

Light mazdoor
Add LA charges

day
Sqm

320.00
11.30

Add Over Head Charges

sqm

12.98

Total rate per 1 sqm

27 Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a
approved cement primer grade I making 3 coats in all to give an even shade after thourughly brushing
remove
all dirt and remains of loose powdered materials, including cost and conveyance of all materials to
Painting to new walls with 2 coats of water proof cement paint (overall 3 coats) for All Floors
all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for Extarn
Unit
Rate
Floors Code
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
BMT-J.24

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
68.33

Add Over Head Charges

sqm

119.04

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Total rate per 1 sqm

23 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming C
(All Colours) of apporved brand and shade making 2 coats in all to give an even shade after thourughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
Extarnal walls for All Floors

Painting to old walls with 2 coats of water proof cement paint (overall 2 coats) for All Floors

Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087

Unit

Rate

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
68.33

Sundries including brushes, etc.,

Sqm

80.58

Add Over Head Charges

sqm

81.39

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Co
(All Colours) of apporved brand and shade over a base coat of approved cement primer grade I making m
in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of all materials to work site and all operational, incidental, labou
complete for finished item of work as per SS 912 for Extarnal walls for All Floors

Painting to old walls with 1 coat of water proof cement paint (overall 1 coat) for All Floors

Code
Material
BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037
CSSR-M-087

Unit

Rate

lit

35.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
420.00
375.00
69.39

Sundries including brushes, etc.,

Sqm

76.39

Add Over Head Charges

sqm

77.15

Water proof Cement paint of Snowcem/


Indocem Or Equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and
base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade aft
brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conv
materials to work site and all operational, incidental, labour charges etc. complete for finished item of w
911 for internal walls for All Floors
Painting to old walls with Distempering, 3 Coats with Oil Bound Distemper

Code

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
6.14

kg

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

58.98

Add Over Head Charges

sqm

70.71

Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

SOR P. No. 268/II/38

Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem/
PMCC/ ESSAR or equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper of approved brand and sha
coats in all to give an even shade after thourughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls for All Floors
Painting to old walls with Distempering, 2 Coats with Oil Bound Distemper

Code
Material
BMT-J.21
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

kg

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

58.98

Add Over Head Charges

sqm

59.57

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem/
PMCC/ ESSAR or equivalent

Miscellaneous

Total rate per 1 sqm

22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-1 coats-Internal Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
28.46

Sundries including brushes, etc.,

Sqm

37.46

Add Over Head Charges

sqm

37.83

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

63.18

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Add Over Head Charges

sqm

63.81

Total rate per 1 sqm

28 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for internal walls

Plastic Emulsion paint-3 coats-Internal Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
10.97

lit

180.00

SOR P. No. 268/II/38

Painter CI-1
Painter CI-II
Add LA charges

Material
BMT-J.22
Manpower

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

79.15

Add Over Head Charges

sqm

79.94

SOR P. No. 267/I/35

SOR P. No. 268/II/38

Miscellaneous

Total rate per 1 sqm

1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 9
walls
Plastic Emulsion paint-2 coats-Internal old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

61.38

Add Over Head Charges

sqm

61.99

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

27 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade over a base coat of appropriate primer of approved bra
coats after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,
and conveyance of all materials to work site and all operational, incidental, labour charges etc. complet
item of work as per SS 911 for internal walls

Acrylic Exterior Emulsion-3 coats-Internal Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
10.97

lit

136.00

SOR P. No. 268/II/38

Painter CI-1
Painter CI-II
Add LA charges

Material
BMT-J.25
Manpower

Acrylic Exterior Emulsion Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

75.63

Add Over Head Charges

sqm

76.39

SOR P. No. 267/I/35

SOR P. No. 268/II/38

Miscellaneous

Total rate per 1 sqm

1 Painting to old walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Ind
ESSAR or equivalent of approved brand and shade after thoroughly brushing the surface to remove all dir
of loose powdered materials, including cost and conveyance of all materials to work site and all operation
labour charges etc. complete for finished item of work as per SS 911 for internal walls

Acrylic Exterior Emulsion paint-2 coats-Internal old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

136.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Sundries including brushes, etc.,

Sqm

58.30

Add Over Head Charges

sqm

58.88

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

22 Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
External walls
Plastic Emulsion paint-1 coat-External Walls

Code
Material

Unit

Rate

BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
20.33

Add Over Head Charges

sqm

77.33

Total rate per 1 sqm

1 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Add Over Head Charges

sqm

90.86

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Total rate per 1 sqm

30 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat
primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Plastic Emulsion paint-3 coats-External Walls

Code
Material
BMT-J.01
Manpower

Primer Coat
Cost of Primer

Unit

Rate

lit

100.00

day
day
Sqm

480.00
375.00
28.46

lit

180.00

SOR P. No. 268/II/38

Painter CI-1
Painter CI-II
Add LA charges

Material
BMT-J.22
Manpower

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Add Over Head Charges

sqm

129.32

SOR P. No. 267/I/35

SOR P. No. 268/II/38


SOR P. No. 269/III/4

Total rate per 1 sqm

28 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade over a base coat of appropriate primer of approved brand, making
thoroughly
brushing
the
surface
to remove
all dirt and remains of loose powdered materials, includ
Acrylic Exterior
Emulsion
paint-3
coats-External
Walls
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for fin
Code
Unit
Rate
work as per SS 911 for external walls
Material
Primer Coat
BMT-J.01
Cost of Primer
lit
100.00
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Material
Acrylic Exterior Emulsion Asian/ Berger/
BMT-J.25
Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
lit
136.00
equivalent
Manpower
SOR P. No. 267/I/35
Painter CI-1
day
480.00
SOR P. No. 268/II/38
Painter CI-II
day
375.00
SOR P. No. 269/III/4
Light mazdoor
day
320.00
Add LA charges
Sqm
76.46
Miscellaneous
Sqm
125.80
Sundries including brushes, etc.,
Add Over Head Charges

sqm

127.06

Total rate per 1 sqm

1 Painting to old walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly
surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of a
work site and all operational, incidental, labour charges etc. complete for finished item of work as pe
external walls
Plastic Emulsion paint-2 coats-External old Walls

Code
Material
BMT-J.22
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38
SOR P. No. 269/III/4

Unit

Rate

lit

180.00

Painter CI-1
Painter CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

480.00
375.00
320.00
76.46

Sundries including brushes, etc.,

Sqm

89.06

Add Over Head Charges

sqm

89.95

Plastic Emulsion Paint Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

Miscellaneous

Total rate per 1 sqm

1 Painting to new walls with 2 coats of Acrylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PM
equivalent of approved brand and shade after thoroughly brushing the surface to remove all dirt and rem
powdered materials, including cost and conveyance of all materials to work site and all operational, inci
charges etc. complete for finished item of work as per SS 911 for external walls
Acrylic Exterior Emulsion paint-2 coats-External old Walls

Code
Material
BMT-J.25
Manpower

Acrylic Exterior Emulsion Asian/ Berger/


Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or
equivalent

SOR P. No. 267/I/35

Painter CI-1

Unit

Rate

lit

136.00

day

480.00

SOR P. No. 268/II/38


SOR P. No. 269/III/4

Painter CI-II
Light mazdoor
Add LA charges

day
day
Sqm

375.00
320.00
76.46

Sundries including brushes, etc.,

Sqm

85.98

Add Over Head Charges

sqm

86.84

Miscellaneous

Total rate per 1 sqm

29 Painting with Synthetic Enamel paints - Two Coats - For New Iron Work of approved brand and shade, mak
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two Coats - For New Iron Work for All Floors

Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

170.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
44.72

Add Over Head Charges

sqm

63.42

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.

Total rate per 1 sqm

30 Painting with Synthetic Enamel paints - Three Coats - for New Wood Work of approved brand and shade, m
in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors

Painting with Synthetic Enamel paints - Three Coats - for New Wood Work for All Floors

Code
Material
BMT-J.30
Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Unit

Rate

lit

170.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
65.04

Add Over Head Charges

sqm

93.94

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.

Total rate per 1 sqm

28 Painting with Synthetic Enamel paints - Two Coats - for Old Wood work of approved brand and shade, maki
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials, including cost and conveyance of allmaterials to work site and all operational, incidential, labour
complete for finished item of work as per SS 1207 & 1212. for All Floors
Painting with Synthetic Enamel paints - Two coats - for Old Wood Work for All Floors

Code
Material

Unit

Rate

BMT-J.30

Synthetic Enamel paint (at 20 sqm / litre as


per British Paints (I) Ltd.

lit

170.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
48.78

Add Over Head Charges

sqm

67.48

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Total rate per 1 sqm

29 Polishing two coats with french polish of approved brand for new wood work of teak wood frame and shutt
even glossy surface with uniform texture including cleaning the surface of all dirt, dust, etc. , and apply
wood filler, sand papering including cost and conveyance of all materials to work site andall operationa
Polishing two coats with french polish of approved brand
labour charges, etc., complete for finished item of work as per SS 1212. for All Floors
Code
Unit
Rate
Material
Thinner for Melamine polish/ French polish BMT-J.12/P. No. 27
lit
92.00
Sheenlac
BMT-J.10/P. No. 27

Spirit

lit

70.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

480.00
375.00
130.08

Add Over Head Charges

sqm

143.59

Manpower
SOR P. No. 267/I/35
SOR P. No. 268/II/38

Total rate per 1 sqm

6 Painting with Synthetic Enamel paints - One Coat - For Old Iron Work of approved brand and shade, ma
all to give an even shade after throughly brushing the surface to remove all dirt and remains of loo
materials,
including
cost
and paints
conveyance
of allmaterials
to Work
work for
siteAlland
all operational, incidential, labour
Painting with
Synthetic
Enamel
- One Coats
- For Old Iron
Floors
complete for finished item of work as per SS 1207 & 1212. for All Floors
Code
Unit
Rate
Material
Synthetic Enamel paint (at 20 sqm / litre as
BMT-J.30
lit
170.00
per British Paints (I) Ltd.
Manpower
CSSR-M-035
Painter CI-1
day
480.00
CSSR-M-037
Painter CI-II
day
375.00
Add LA charges
Sqm
28.46
Add Over Head Charges

sqm

36.96

Total rate per 1 sqm

31 Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon
Cement Primer & Two Coats of Altek Flora/ sai coat/ Neon/indocem super track for internal walls (Emul
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges a
such as scafolding, lift charges etc., complete for finished item of work, including conveyance charges of
All Floors
Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All

Code
Material
BMT-J.36

Supply & Application of Two Coats of


Altek/sai coat/ Neon Super Fine, One Coat of
Altek/ sai coat/ Neon Water

Unit

Rate

Sqm

95.00

Add Over Head Charges

sqm

95.00

Total rate per 1 sqm

36 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement with
paintGlazed
spread
at theTiles,
rateset
3.30
Cement
paste
fixed
with12pigments
of machine shade, in
Dadoing
coloured
overKgs
baseofcoat
of cement
mortar
(1:5),
mm thick F2
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F2
SOR P. No. 12 / BMTC.07

Glazed coloured Tiles of any size Ist Quality

Sqm

413.00

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

740.99

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm F2

37 Dadoing with ISO accredited Glazed coloured Tiles of any size Ist Quality of make approved as by Enginee
of size 300x200mm and boarder tiles of size 200 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based
cement
paint
spread
at Tiles,
the rate
3.30
Cement
paste
fixed
with
of machine shade, in
Dadoing with
Glazed
coloured
set over
baseKgs
coat of
of cement
mortar
(1:5),
12 mm
thickpigments
F3
seigniorage charges and conveyance of all materials and water etc., from approved sources to work site a
Code
Unit
Rate
incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc.,
Material
finished item of work. (APSS No 701 & 707) for Bath rooms F3
SOR P. No. 12 / BMTC.07

Glazed coloured Tiles of any size Ist Quality

Sqm

413.00

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
710.66

Lift charges F3
Add LA charges
Add water Charges

cum
cum
sqm

45.98
45.98
45.98

Add Over Head Charges

cum

764.21

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Miscellaneous

Total rate per 1 sqm F3

36 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F1

Skirting with ceramic tiles, set over base coat of cement mortar (1:5), 12 mm thick F1

Code
Material

Unit

Rate

SOR P. No. 12 / BMTC.01

Ceramic tiles 7.3mm thick 1st quality

Sqm

374.00

Kg
cum

5.20
513.42

SOR P. No. 88 / BMSW.68

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)
White cement

Kg

29.00

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges
Add water Charges

day
day
Sqm
sqm

420.00
375.00
320.00
520.83
Basic rate 1 sqm

Add Over Head Charges

sqm

526.04

Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Total rate per 1 sqm

37 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF2pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F2
Basic rate 1 sqm
Miscellaneous
Lift charges F2
cum
32.00
Add LA charges
cum
32.00
Add water Charges
sqm
32.00
Add Over Head Charges

cum

558.36

Total rate per 1 sqm F2

38 Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate
of with
3.30 ceramic
kgs pertiles,
sqmsetand
jointed
with
paste12mixed
withF3pigment of matching shade
Skirting
over
base coat
of white
cementcement
mortar (1:5),
mm thick
including
cost
of
all
materials
like
tiles,
cement,
sand
and
water
etc.,
complete including
seigniorage
Code
Unit
Rate
complete for finished item of work, including the cost of conveyance of all materials for F3
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
64.00
Add LA charges
cum
64.00
Add water Charges
sqm
64.00
Add Over Head Charges

cum

590.68

Total rate per 1 sqm F3

38 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, la
Flooring with Rough Kadapa/Shahabad 50mm thick, (1:8), 12 mm thick F1
for dressing of flooring stones etc., complete for finished item of work, for F1
Code
Unit
Rate
Material
SOR P. No. 11 / BMTB.02

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Kadapa slab 50 mm thick and size not less


than 0.457 M x 0.457 M

Sqm

86.00

Cement 43 Gr. (including loading charges)


Coarse sand for mortor (including
Seigniorage charges)

Kg
cum

5.20
513.42

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
229.92
343.63
Basic rate 1 sqm

Add Over Head Charges

sqm

347.07

Total rate per 1 sqm

39 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials
likeKadapa/Shahabad
flooring stone,50mm
cement,
and
water
etc., complete, including seigniorage charges, la
Flooring
with Rough
thick,sand,
(1:8), 12
mm
thick F2
for dressing
of
flooring
stones
etc.,
complete
for
finished
item
of work, Unit
for F2
Code
Rate

Basic rate 1 sqm


Miscellaneous
Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

370.29

Total rate per 1 sqm F2

40 Flooring with Rough Kadapa/Shahabad ... mm thick stones, set over base coat of cement mortar (1 : 8) 12 m
CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, inc
all
materials
likeKadapa/Shahabad
flooring stone,50mm
cement,
and
water
etc., complete, including seigniorage charges, la
Flooring
with Rough
thick,sand,
(1:8), 12
mm
thick F3
for dressing of flooring stones etc., complete for finished item of work, for F3
Code
Unit
Rate
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
45.98
Add LA charges
cum
45.98
Add water Charges
sqm
45.98
Add Over Head Charges

cum

393.51

Total rate per 1 sqm F3

39 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Sh


length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey lik
spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matc
full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., comp
seigniorage charges, etc., complete for finished item of work, including the cost of conveyance of all materi

Skirting with 15 to 18mm thick polished shabad stones, (1:3), 12 mm thick F1

Code
Material
SOR P. No. 11 / BMTB.05

SOR P. No. 88 / BMSW.68

Unit

Rate

Polished Shahabad/ Tandur stone slabs of 15


to 18 mm thick (0.457x0.304) or any other
size as specified
Cement 43 Gr. (including loading charges)

Sqm

129.10

Kg

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Kg

29.00

White cement

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
223.52
433.30
Basic rate 1 sqm

Add Over Head Charges

sqm

437.63

Total rate per 1 sqm

40 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Sh


length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey lik
spread
at the
of thick
3.30polished
kgs per
sqmstones,
and jointed
white
Skirting with
15 torate
18mm
shabad
(1:3), 12with
mm thick
F2 cement paste mixed with pigment of matc
full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., comp
Code
Unit
Rate
seigniorage charges, etc., complete for finished item of work, including the cost of conveyance of all materi
Basic rate 1 sqm
Miscellaneous
Lift charges F2
cum
22.35
Add LA charges
cum
22.35
Add water Charges
sqm
22.35
Add Over Head Charges

cum

460.20

Total rate per 1 sqm F2

41 Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm mm thick polished Sh


length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey lik
spread
at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matc
Skirting with 15 to 18mm thick polished shabad stones, (1:3), 12 mm thick F3
full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., comp
Codecharges, etc., complete for finished item of work, including Unit
Rate
seigniorage
the cost of conveyance
of all materi
Basic rate 1 sqm
Miscellaneous
Lift charges F3
cum
44.70
Add LA charges
cum
44.70
Add water Charges
sqm
44.70
Add Over Head Charges

cum

482.78

Total rate per 1 sqm F3

33 Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work
be paid for separately) including cost and conveyance of all materials like cement, fine aggregate
aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
Providing and fixing RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
Unit centering,Rate
cost of Code
steel and its fabrication charges for finished item of work, including
shuttering.
Details of cost for 10 posts, i.e., 0.336 Cu. M (1.80M long)
(Details as per Annexure ' X ' at the end of this item)

Material
Cement concrete 1:2:4 (1 cement : 2 coarse
sand :4 graded stone aggregate 12.5 mm
nominal size)

cum

5760.190

M.S. reinforcement 6 mm dia bars


10
x 4 x 1.88 = 75.20 metres
10 x 9
x 0.50 = 45.00 metres./ l20.00 m 120.20 m
@ 0.22 Kg/m=26.44 Kg

Kg

51.83

10 mm cement plaster with cement mortar


1:2 12mm thick (1 cement: 2 sand)

sqm

121.13

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
175.40

Add Over Head Charges


Cost Ten Posts
Cost of 1 Post = Rate/1.80 Rm =
Cost of 1 Rm =

sqm

4677.99

Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

SOR P. No. 229/I/11


SOR P. No. 230/III/4

Plastering with CM (1:2), 12 mm thick


A. MATERIALS:
Cement Mortar (1:3)
Mason CI-1 / Brick layer CI-1
Light mazdoor
Add LA charges

BLD-CSTN-6
cum
day
day
cum

4347.09
420.00
320.00
55.92

6 Randam Rubble Stone masonary in CM (1:8) (Cement : Sand) using hard variety of rough stone other than
approved quarry including cost and conveyance of all materials like cement, sand, masonary stones, wate
and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work in foundation & Basement. (APSS No. 615 &
Masonry In C.M (1:8)
R.R. Masonry in CM (1:8)
Code
Unit
Rate
Material
Cement 43 Gr. (including loading charges)

cum

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Random rubble stone (including seigniorage


charges)

cum

713.65

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1144.00

Manpower
SOR P. No. 266/I/11
SOR P. No. 2268/III/4

Add Over Head Charges

cum

2575.03

Total rate per 1 cum

20 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F2

P.C.C. M-15
Code

Centering with Stell up to 3.66 M Hight Second Floor


Unit

Rate
Basic rate 1 cum

Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for Footings F2

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

446.00
67.66
67.66

Add Over Head Charges

cum

5088.15

Total rate per 1 cum

21 Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-15
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
SOR P. No. 89

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings F3

cum

723.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

446.00
135.32
135.32

Add Over Head Charges

cum

5155.81

Total rate per 1 cum

20 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
charges, sales & other taxes on
P.C.C. M-10
3.66
Hight First
Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F1
Material

SOR P. No. 292/M 189

Cement 43 Gr. (including loading charges)

cum

5.20

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

Mechinery
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)

hour

Add LA charges on Crew charges

328.60
189.80

Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
486.80

Basic rate 1 cum


Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings First
floor

cum

723.00

Add LA charges

cum

446.00

Add Over Head Charges

cum

4734.49

Total rate per 1 cum

21 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for Footings F2
Add LA charges
cum
446.00
Lift charges F2
cum
67.66
Add LA charges
cum
67.66
Add Over Head Charges

cum

4802.15

Total rate per 1 cum

22 Plain Cement Concrete M-10 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-10
3.66
Hight Third
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Code
Unit
Rate
for finished item of work, centering with Steel up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
Miscellaneous
Hir charges for Centering and Scafafolding
SOR P. No. 89.
cum
723.00
Unsupported Hight 3.66 M for footings F3
Add LA charges
cum
446.00
Lift charges F3
cum
135.32
Add LA charges
cum
135.32
Add Over Head Charges

cum

4869.81

Total rate per 1 cum

24 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand)
coarse Centering
aggregate, with
waterStell
etc.,up
to to
site
andMincluding
Seigniorage
P.C.C. M-20
3.66
Hight Second
Floor charges, sales & other taxes on
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F2
for finished
Basic rate 1 cum

Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for Footings F2

cum

723.00

Add LA charges
Lift charges F2
Add LA charges

cum
cum
cum

446.00
67.66
67.66

Add Over Head Charges

cum

5374.15

Total rate per 1 cum

25 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed Hard
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fi
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
P.C.C. M-20 Centering with Stell up to 3.66 M Hight Third Floor
including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
Codeitem of work, centering with Steel up to 3.66, lift manuals per
UnitAPSS. No. 402.
Rate F3
for finished
Basic rate 1 cum
Miscellaneous
SOR P. No. 89.

Hir charges for Centering and Scafafolding


Unsupported Hight 3.66 M for footings F3

cum

723.00

Add LA charges
Lift charges F3
Add LA charges

cum
cum
cum

446.00
135.32
135.32

Add Over Head Charges

cum

5441.81

Total rate per 1 cum

25 Supply and placing of the M 35 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry inclu
conveyance
water etc., to site
Code of all materials like cement, fine aggregate (sand) coarse
Unitaggregate,Rate
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour ch
Material
weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR
Cement 43
Gr. of
(including
loading
charges) chargescum
5.20 of work (APSS
SCAFFOLDING but excluding
cost
steel and
its fabrication
for finished item
Coarse sand
for mortor
(including
cum
513.42
minimum cement content
420 charges)
Kgs per 1 cum as per IS code from standard suppliers approved by th
Seigniorage
20 mm
Graded HBG
cum curing 1920.72
including pumping, Aggregates
Steel centering,
shuttering,
laying concrete, vibrating,
etc. complete but exc
steelP. and
its fabrication
charges for finished item of work for FOUNDATIONS,
PLINTH,77.00
PEDASTALS, centering
SOR
No. 292/M
189
Water
Kl
to
3.66, as per APSS. No. 402. for FOOTINGS FI
Mechinery
SOR P. No. 379/9
Batching plant 0.5 cum ( 6 Cum/hr)
hour
522.50
Add LA charges on Crew charges
253.00
SOR P. No. 379/40
Needil vibrater 40 mm (petrol)
hour
165.70
Add LA charges on Crew charges
182.09
Manpower
SOR P. No. 266/I/11
SOR P. No. 267/II/35
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges

day
day
day
cum

420.00
375.00
320.00
1627.99
BACIC RATE 1 Cum

V.R.C.C. Design Mix M-20 Centering with Unsuported hight Footing FI-1

BACIC RATE 1 Cum


Miscellaneous
SOR P. No. 89 /
A/Footings

Hir charges for Centering and Scafafolding


Unsupported Hight Footing 1
Add LA charges

cum
cum

723.00
446.00

Add Over Head Charges

cum

7286.71

Total rate per 1 cum

5 Supply and fixing anodised aluminium door fixed with all accessories (stappers, bolts and stoppers etc.,
and sectional in accordance with the approved drawings with alluminium single shutter with allround fra
101.60 x 44.45 x2.50 mm (20102) thick and fixed with alluminium single shutter with vertical styles of
44.45 x 2.02 mm (19569) top rail 47.62x44.45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm
bottom rail of sizes 95.25x44.45x2 mm (19505) with archit clural accessories having section 88x40x3.2 mm
5 mm tinted glass sheet with glazing chips of size 79x 17.30 x0.10mm (19352) for height of 1.20 m
cement bonded paticle board ( Bison Lam or equivalent ) of 10mm thick to a hight of 0.91 m at botto
Rubber beading shutters mounted in heavy duty floor spring including cost and conveyance of all m
accessories including labour charges for fabrication and fixing in position as directed by the Engineer in Cha

Code

Unit

Rate

Lenth in RM

Weight RM

Alround frame with single groove (20102)


Vertical member for shutters (19569)
Top rail for the shutters (19571)

5.100

1.977

4.200
0.900

1.052
0.974

Middle rail for shutters (20060)


Bottom rail for shutter (19505)

0.900
0.900

1.072
1.519

Architectural accessories (19546)


Glazing clips (19352)

3.900
3.900

3.06
0.097

0.900

1.200

0.900

0.910

Size of the door = 0.91 x 2.10 meters ( Single shutters)


Material requirement

Add for stifeners and corner pices

9mm thick MDF Board shutter (BSL)


5mm thick tinted glass
ABSTRACT
BMS-W.01

Cost of aluminium section with anodisation


(P 69)

Kgs

250.00

BMT-K.80

9mm thick particel board MDF Or equivalent


for shutter (P28)
5mm thick tinted glass P23)
Heavy duty floor spring (P19)
Brass fancy handles 200mm (P19)
150mm Aluminium hinges (P19)

sqm

534.00

BMT-I.08
BMT-G.65
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53

150mm Aluminium tower bolts (P18)

Door stopper (P19)

sqm
each
each
each
each
each

570.00
2422.00
312.00
100.00
69.00
34.00

Manpower
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor

Machinery

Add LA charges
Labour charges for

BMC-X.02

Power Saw Cutter - Hand Operated - Hire charges

day
day
day
day
day
Sqm

420.00
375.00
375.00
375.00
320.00
2268.90

Hr

105.00

1.91 Sqm

BMC-X.03

Power Drill - Hand Operated - Hire Charges

Hr

97.00
15262.48

Power charges for motor

Add Over Head Charges

each

Rate as per Sqm

15415.10

17,513.87 / 1.89=

5 Supply and fixing double action anodised Aluminium fully glazed door as per approved drawing using sid
top frames with section 101.50 x 44.45 x 2.50 mm with double shutters using shutters frame of size 47 x
mm for top 47 x 44.45 x 1.50 mm for middle and 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertic
Code
Unit
Rate
of size of size 47 x 44.45 x 1.2 mm with necessery glazing clips of size 19 x 17.30 x 0.80 mm and rubber
Size of the door = 2.74 x 2.59 meters ( Double shutters)
Rm necessary
mm thick plain glass with 2 nos floorsprings, 2 nos locks and 4 nos round door 7.92
handles
accessories
(stappers, bolts and stoppers etc.,) including cost and conveyance
materials
A) Material requirement
Lenth in RM of all
Weight
RM and accesso
labour charges for fabrication and fixing in position as directed by the Engineer in Charge. for 1.52 m x
A.As (As
perwith
approved
drawing)
Alround
frame
Double groove
(101.50*44.45*2.50 mm)
7.920
1.983
Vertical member for shutters (47*44.45*1.2 mm))
Top rail for the shutters (47*44.45*1.80 mm))

10.360
2.740
2.740

0.720
0.900
0.831

2.740

1.800

Horizontal (19*17.30*0.80 mm)

20.720

0.115

Vertical (19*17.30*0.80 mm)

21.920

0.115

3.548

2.000

Kgs

250.00

Rm
sqm
each
each
each
each
each
each

2.00
570.00

Middle rail for shutters (47*44.45*1.50 mm)


Bottom rail for shutters (114.30*44.45*2.30 mm)
Add for 5% wastage

C) Rubber beeding

D) 5mm thick tinted glass


Add for 10% wastage
ABSTRACT
BMS-W.01
BMS-W.06
BMT-I.08
BMT-G.65
BMT-G.66
BMT-G.59
BMT-G.26
BMT-G.08
BMT-G.53

Manpower

Cost of aluminium section with anodisation


(P 69)
Rubber beeding (P70)
5mm thick tinted glass (P23)
Heavy duty floor spring (P19)
Heavy duty mortise lock 6/7 levers with PC or CP

Brass fancy handles 200mm (P19)


150mm Aluminium hinges (P19)
150mm Aluminium tower bolts (P18)
Door stopper (P19)
Labour charges for
7.10 Sqm
1st Class Carpenter
2nd Class Carpenter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Light mazdoor
Non-technical work inspector
LA charges

Machinery

Hire charges for

BMC-X.02

Power Saw Cutter - Hand Operated - Hire charges

2422.00
474.00
312.00
100.00
69.00
34.00

day
day
day
day
day
day
Sqm

420.00
375.00
375.00
375.00
320.00
275.00
2024.47

Hr

105.00

7.10 Sqm

BMT-X.03

Power Drill - Hand Operated - Hire Charges

Hr

25153.96

Power charges for motor

Add Over Head Charges

97.00

each

Rate as per Sqm

25405.50
28,864.46 / 7.10=

18 NCL or Equivalent Door Frames: Providing and fixing door frames fabricated from sections made of ga
powder coated (base steel as per IS 513, galvanised as per IS 277 with zinc of 120 grams / square metre
made section should be with a Powder Coating of pure Polyester Powder of 50-60 microns thick with
thickness of 1.25 mm. Size of door frame section should be of 105x60mm with a rebate of 38mm to
35mm thick door shutter. The frame section should have groove to insert gasket. The section of the door
frame is to be filled with polyurethane foam. The frame section should be cut to length, and joined by w
and each frame should be provided with: a) 2mm thick MS powder coated butt hinges of 100nn long 3 N
shutter, 6 Nos. for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm
1.2mm hold fasts screwed to stifeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No. for
frame. e)Tie Rod 1 No

Code
Material
BMT-N.59

Unit

Rate

NCL or Equivalent Door Frames (base steel


as per IS 513, galvanised as per IS 277 with
zinc of 120 grams / square metre) with
Hinges tower Bolts etc.

Rm

385.00

Add Over Head Charges

sqm

385.00

Total rate per 1 sqm

22 Providing and fixing 35mm thick RAJSHRI or Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER
sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on o
top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel la
2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel desig
panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam
other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. com
direction of Engineer-in-Charge, manufacture specification and drawing

Code
Material
BMT-N.06

Unit

Rate

Providing and fixing 35mm thick RAJSHRI


or Equivalent BRAND FACTORY MADE
MOULDED DOOR SHUTTER

sqm

2900.00

Add Over Head Charges

sqm

2900.00

Total rate per 1 sqm

NCL or Equivalent PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES. Supply and fixing of w
Hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.6 mm thic
galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
33 Windows: Double shutter 4'-0" x 6 '-0" (1219.2x1828.8mm) outer frame section size of 46 x 52 mm
should be 46 x 52 mm section for shutter should be 46 x 46 mm section for mullion should be 46 x 70 mm
section size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.13)
for beading should be 18 x 25 mm and section for louvered ventilation should be 33 x57mm Box section.
Unit for ventilators
Rate with Ethyl propy
should Code
be panelled with
5mm Double
thick plain
float4'-0"
glassx &
4 mm pinhead glass
Windows:
shutter
6 '-0"
monomer
The
sections
are
to
be
cut
to
length
mitre
joined
with
corner
brocket centre mull
Material Gasket (EPDM).
(1219.2x1828.8mm) outer frame section
fixed
using mullion cap.
high grade
aluminium
coated and nylon
receiver. Gaskets
BMT-P.13
size Handle
of 46 x made
52 mmofshutter
frame
section powder sqm
4630.00
propylene Diamine monomer
made
size of 46 (EPDM).
x 46 mmCorner
Mullionbrackets
section size
of of
46 CRCA with Zinc Phosphate. Mullion caps m
filled nylon. The above
should
be fixed to the concrete /masonry wall by means of self expa
x 70 frames
mm (Code
BMT-P.13)
including 10 mm square guard bars with 6" pitch complete for finished item of work.

Add Over Head Charges

sqm

4630.00

Total rate per 1 sqm


34 Windows: Double shutter 4'-0" x 4 '-6" (1219.2x1371.6mm) outer frame section size of 46 x 52 mm
section size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.12)
Code
Material
BMT-P.12

Windows: Double shutter 4'-0" x 4 '-6"


(1219.2x1371.6mm) outer frame section
size of 46 x 52 mm shutter frame section
size of 46 x 46 mm Mullion section size of 46
x 70 mm (Code BMT-P.12)
Add Over Head Charges

Unit

Rate

sqm

5195.00

sqm

5195.00

Total rate per 1 sqm


35 Windows: Double shutter 3'-0" x 4 '-6" (914.4x1371.6mm) outer frame section size of 46 x 52 mm shutter
size of 46 x 46 mm Mullion section size of 46 x 70 mm (Code BMT-P.10)
Code
Material
BMT-P.10

Windows: Double shutter 3'-0" x 4 '-6"


(914.4x1371.6mm) outer frame section size
of 46 x 52 mm shutter frame section size of
46 x 46 mm Mullion section size of 46 x 70
mm (Code BMT-P.10)
Add Over Head Charges

Unit

Rate

sqm

5195.00

sqm

5195.00

Total rate per 1 sqm

36 Ventilators: Fixed louvers (Box section) outer frame section size of 33 x 57 mm Mullion section size of 33 x 5
P.20 to 22)
Code
Material
BMT-P.20 to 22

Unit

Rate

Ventilators: Fixed louvers (Box section) outer


frame section size of 33 x 57 mm Mullion
section size of 33 x 57 (Code BMT-P.20 to 22)

sqm

3685.00

Add Over Head Charges

sqm

3685.00

Total rate per 1 sqm

37 Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent) of 20m
with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and groove locking a
The shutter
1.5mm +/-0.15mm
Codeframe is made of 30mm X 79mm with the wall thickness of
Unit
Rate section mitre-c
at 4 corners with 125mm X 225mm plastic brackets. The shutter shall be horizontally reinforced with 2 no'
Material
Supply
andbefixing
of doorinside
shutters
rods. Teak wood batons
shall
reinforced
themade
door of
shutter during the fabrication of the door sh
BMT-N.45
PVC extruded
hollow
sqm
1795.00
points
wherever the rigid
hardware
is fixed onto
thesection(Nandi
door shutter. or
equivalent)
Add Over Head Charges

sqm

1795.00

Total rate per 1 sqm

47 Cost Suply and Fixing M.S Grills approved design including cost Mild steel and all Labour charges for fab
works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, po
including
cost of fixing in position as diricted by the Departmental Officers
item of work.
Code
Unitfor finishedRate
Cost of Mild steel

kg

38.00

BMM-V.14

865

Labour charges for fabricating steel


works like Window Grills,
Compound Wall Grills, Iron Doors,
Windows including cost of welding
rods, power charges, excluding
cost of fixing in position

kg

16.00

BMM-V.15

866

Labour charges for fixing Iron


Doors, Iron Windows and Window
Grills in position

kg

3.00

Add LA charges

kg

19.00

Add Over Head Charges

kg

57.00

48 Providing 110mm dia ISI marked P.V.C Rain down water take pipes-2.5mm thick including cost of necessar
Shoes, Iron Clamps and all other accessories and fixing in position including cost and conveyance of all m
tax & Other
all labour charges for
Code taxes on materials to site, Operational and Incidental charges
Unit including Rate
etc; complete for finished itemof work.
Material
110 mm dia 3 M Single Socket PVC/SWR pipe
BMW-G.13
-110
4 Kg/sq.cm
Prince/Sudhakar
or any -ISI
each
383.00
mm dia -- Door
Bend 87.5 Degree
Brand
BMW-G.60
UPVC/SWR
Pipe
fittings
(Prince/Sudhakar
or
each
84.00
110 mm dia - 45 Degree Bend - UPVC/SWR
any
ISI
Brand)
BMW-G.63
Pipe fittings (Prince/Sudhakar or any ISI
each
56.00
110
mm dia - Vent Cowl - UPVC/SWR Pipe
Brand)
Labour
charges for laying, fixing and
BMW-G.100
each
15.00
fittings
or any ISI
Brand)
110
mm(Prince/Sudhakar
- Pipe Clip
- UPVC/SWR
Pipe
fittings
commissioning
the
PVC
pipes
including
BMW-G.106
each
14.00
(Prince/Sudhakar
or any
Brand)
couplers/ bends/ tees
etcISI
any
diameter
BMW-G.152
Rm
58.00
including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with
Add
Over
Head Charges
Rm
272.74
solvent
jointing
as per standard practice
Total rate per 1 Rm

49 Providing 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand inc
necessary P.V.C Bends, Shoes, Iron Clamps and all other accessories and fixing in position including cost an
of all materials,
Sales tax & Other taxes on materials to site, Operational
Code
Unit and Incidental
Rate charges includ
charges for fixing at site etc; complete for finished itemof work.
Material
75 mm dia 3 M Single Socket PVC/SWR pipe BMW-G.11
4
Prince/Sudhakar
or any -ISI
each
202.00
75Kg/sq.cm
mm dia -- Door
Bend 87.5 Degree
Brand
BMW-G.58
UPVC/SWR
fittings (Prince/Sudhakar
each
53.00
75
mm dia Pipe
- 45 Degree
Bend - UPVC/SWRor
any ISI
Brand)
BMW-G.61
Pipe
fittings
(Prince/Sudhakar or any ISI
each
30.00
75
mm dia - Vent Cowl - UPVC/SWR Pipe
Brand)
Labour
charges
for
laying,
fixing
and
BMW-G.98
each
11.00
fittings
or anyPipe
ISI Brand)
75 mm (Prince/Sudhakar
- Pipe Clip
UPVC/SWR
fittings
commissioning
the- PVC
pipes including
BMW-G.104
each
12.00
(Prince/Sudhakar
or any
Brand)
couplers/ bends/ tees
etcISI
any
diameter
BMW-G.152
Rm
58.00
including fixing necessary fittings like bends,
plugs, couplers, junctions, tees, etc with
solvent
jointing
as per standard practice
Add Over
Head Charges
Rm
190.88
Total rate per 1 Rm

49 Supply and fixing of CEMENT JALI-50 mm thick fixing in position including cost and conveyance of all ma
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished it
Code
Material
BMS-W.17

CEMENT JALI - 50 mm thick

Unit

Rate

sqm

335.00

Add Over Head Charges

sqm

335.00

Total rate per 1 sqm

50 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft
nominalCode
bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom
locking plates and
Unit
Rate
for inside & outside locking with push-pull operations including cost of hood cover and springs complete
Material
one coat of approved
steelshutter
primer,made
locks,ofball
Rolling
80 xbearings,
1.25 mm all accessories etc complete for finished item o
BMT-F.29
2000.00
special spn: 1108, fixing
in position
including cost and conveyance ofsqm
all materials
to site, Operational a
machine
rolled CRCA
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Add Over Head Charges

sqm

2000.00

Total rate per 1 sqm

51 Supply and fixing of Teak wood dias and railing including cost of Teak wood 1 st quality conveyance to site
unloading and all labour charges including making, fixing, finishing etc., complete as directed by the
Officers for Second Floor, Lift Manual
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper (overall 3 coats) for All Floors

Code
Material
BMT-E.06

Unit

Rate

Best Teak Wood scantlings: 2.0 to 3.0 M

cum

81225.00

Add 10% wastage

cum

81225.00

Corpenter Cl- I
Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
10250.00

Labour charges for fixing


Add LA charges

Sqm
Sqm

230.00
8122.45

Add Over Head Charges

sqm

107719.95

Manpower
SOR P. No. 266/I/4
SOR P. No. 269/III/4

Miscellaneous
BMM-V.23

Total rate per 1 sqm

20 Course Rubble Stone Masonry in CM (1:6) 1st Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.
C.R. Masonry in CM (1:6) 1st sort
Code
Material

SOR P. No. 73 /
BMS-W.54

Unit

Rate

Cement 43 Gr. (including loading charges)

cum

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Dressing faces of other than granite stone(double line


dressing) 0.45 M width

sqm

95.00

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1792.40

Add Over Head Charges

cum

3503.59

Total rate per 1 cum

7 Cost and Supply and fabrication of M.S. Cattle trap using 15 Nos of 32mm MS Steel rods welded as equal s
Nos of 75 x 40 x 5 mm MS channel and fixing in position on the already laid concrete walls, including all la
for welding, transporting and fixing in position, cost of welding rods etc., complete as directed by the
Officers for finished item of work.
75 x 40 x 5 mm MS Channels on cross walls
32 mm dia MS rods

6.00 x
15.00 x

1.53 =
4.10 =

9.18 Rm x 6.80 Kgs/ 1Rm


###

ABSTRACT
Material
Miscellaneous
BMM-V.16
BMM-V.15

M.S. Channels & MS Rods

kg

38.00

Labour charges for fabricating all heavy steel


Add LA charges
Labour charges for fixing in position
Add LA charges

kg

12.00
5405.88
3.00
1351.47

Add Over Head Charges

kg

cum

23875.97

Total rate per each MS Catle trap

8 BISON LAM ( Pre Laminated Cement Bonded Particle Board) ALUMINIUM PARTATIONS-Supply and fixing o
aluminum glazed partitions using 10MM BISONLAM and 5.50 mm thick plain glass to full height. Using with
a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodize
microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly
beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and c
all materials etc., complete as directed by the Departmental Officers for finished item of work.

Material
BMT-M.77

ALUMINIUM PARTATIONS

sqm

2625.00

cum

2625.00

Miscellaneous
Add Over Head Charges
Total rate per 1 sqm

10 CUPBOARD FRAMES & SHUTTERS USING BISONLAM (Pre-Laminated Cement Bonded Particle Board) - Supply
BISONPANEL (IS 14276) box type cup board using BISONPANEL for making frame of size 100mm x 35m
sandwiched 20MM boards, one BISONPANEL and one BISONLAM with plain 35mm wood lipping. The Shutter
20MM thick BISONLAM (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hard
powder coated Piano hinges of size x , Aluminum powder coated handles of size 4 (101.6mm), Alu
bolt 4 (101.6mm) Godrej locks, screws, wood lipping and Fevicol etc., complete as directed by the
Officers for finished item of work.
Material
BMT-N.32

CUPBOARD FRAMES & SHUTTERS USING


BISONLAM

sqm

2250.00

Diference between BISON PANEL CEMENT


BONDED PARICLE BOARD CONFORMING
BMT-K.91 - BMT-K.90 20mm thick - 16 mm thick ( 514*1.25 sqm =
642.50) - 412*1.25 sqm = 515.00) = 127.50

sqm

127.50

cum

2377.50

Miscellaneous
Add Over Head Charges
Total rate per 1 sqm

1 Providing skirting to internal walls to 15 cm height/risers of steps with Vitrified tiles 8 to 10 mm thick le
flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency
rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade
including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage
complete for finished item of work, including the cost of conveyance of all materials for F2
Skirting with Vitrified tiles, set over base coat of cement mortar (1:5), 12 mm thick F2

Code

Unit

Rate

Lift charges F2
Add LA charges
Add water Charges

cum
cum
sqm

22.99
22.99
22.99

Add Over Head Charges

cum

1467.54

Miscellaneous

Total rate per 1 sqm F2

26 ELIXIR or Equivalent Top Hung in Structural Glazing: Providing and Fixing Top Hung shutters in Struc
fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513
galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72mm. The glass h
made of 304 grade stainless steel of 0.6mm thick. Galvanized steel sections are to be used as stifeners ins
coated steel/powder coated sections as per the design requirement. Design calculations are made to suit w
as given in IS 875. Primer coat with epoxy primer of 5-7 microns thick and back coated with Alkyd backer o
or powder coated with pure polyester powder up to 50-60 microns thick. The outer frame should be of 20m
0.6mm, Shutter section should be of 58mm x 33mm x 0.72 mm, stifener section should be 56mm x 31mm
Bihari Hinges 2 Nos for each shutter and Aluminium Stays 2 Nos. for each shutter, Aluminium Handle
shutter. The rate is inclusive of cost and conveyance of all materials to site, all labour charges, incidental ch
all consumables etc. and scafolding charges, form work etc. complete for finished item of work

Code
Material
BMT-Q.02

Unit

Rate

ELIXIR or Equivalent Top Hung in Structural


Glazing

sqm

4246.00

Add Over Head Charges

sqm

4246.00

Total rate per 1 sqm

13 Course Rubble Stone Masonry in CM (1:6) IInd Sort (Cement : Sand) using hard variety of rough stone othe
from approved quarry including cost and conveyance of all materials like cement, sand, masonary stones,
site and including seigniorage charges, on materials including all labour charges like mixing cement
construction, curing, etc., complete for finished item of work.

C.R. Masonry in CM (1:6) IInd sort


Code
Material

Unit

Rate

Cement 43 Gr. (including loading charges)

kg

5.20

Course rubble stone 30x30x60 (including


seigniorage charges)

cum

821.98

Through stones 25x25x45 to 60 (including


seigniorage charges)

cum

1463.89

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
1372.40

Add Over Head Charges

cum

2942.93

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/III/4

Total rate per 1 cum

35 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F1
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F1

Code
Material

Unit

Rate

Sqm

2300.00

Kg

5.20

cum

513.42

Kg

25.00

Mason CI-1 / Brick layer CI-1


Mason CI-II / Brick layer CI-II
Light mazdoor
Add LA charges
Add water Charges

day
day
day
Sqm
sqm

420.00
375.00
320.00
223.52
2807.31

Machine Cutting charges - for Marble/ Granit

Rm

9.00

BMT-B.09

High Polished Granite 16 to 18 mm thick up


to 8'-00 (2.43 M) other than black/ premium
colours

CSSN-A-05

Cement 43 Gr. (including loading charges)

M 005

Coarse sand for mortor (including


Seigniorage charges)

SOR P. No. 74/BMSW.68

White cement

Manpower
SOR P. No. 229/I/11
SOR P. No. 230/II/35
SOR P. No. 230/III/4

Miscellaneous
BMM-V.12

Basic rate 1 sqm


Add Over Head Charges
Total rate per 1 sqm

sqm

2865.38

36 Supply & Fixing 9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328) The rate is inclusi
conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. a
charges, form work etc. complete for finished item of work
Code
Material
BMT-L.20
Miscellaneous
BMM-V.07

Labour charges for making, fabricating office


furniture,
racks,
work-station
furniture with
12 mm thick
Both
sides Teak Veneer
ply-wood
sheets,
decolam/
veneer
Decorated Plywood (IS:1328)
laminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures,
fixing
pasting sheets/ laminations
Add LAlocks,
charges
fixing in position with necessary screws
excluding cost of materials, accessories,
Add Over Head Charges
fittings

Unit

Rate

sqm

1045.00

sqm
Sqm

317.00
317.00

sqm

1362.00

Total rate per 1 sqm

1 Supplying and fixing High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and re
1st quality in single piece with the edges machine cut and flat nosed and set over 12mm thick CM (1:5) p
including cost and conveyance of all materials and water from approved sources to work site including
charges, sales & other taxes on all materials and all operational , incidental and labour charges such as m
mortar, dressing, laying, fixing in position , rubbing, lift charges, curing, etc., complete for finished
including the cost of conveyance of all materials for F2
Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours F2

Code

Unit

Rate
Basic rate 1 sqm

Lift charges F2
Add LA charges
Add water Charges

sqm
sqm
sqm

22.35
22.35
22.35

Add Over Head Charges

sqm

2887.95

lit

60.00

Painter CI-1
Painter CI-II
Add LA charges

day
day
Sqm

#REF!
#REF!
#REF!

Sundries including brushes, etc.,

Sqm

#REF!

Add Over Head Charges

sqm

#REF!

Miscellaneous

Total rate per 1 sqm F2


BMT-J.21
Manpower
CSSR-M-035
CSSR-M-037

Oil Bound Washable Distemper Acrylic Based


Asian/ Berger/ Nerolac/ Saicoat/Indocem or
Equivalent

Miscellaneous

Total rate per 1 sqm

1 Supply and fixing of curtain Glazing made of pre painted steel (base steel as per IS 513 of 0.6 mm th
galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer of 5-7 microns thick, finish
a polyester paint of 12- 16 microns thick and back coated with 5-7 microns thick alkyd backer. Section fo
Rate should be 18 x
should Code
be 46 x 52 mm, section for mullion should be 46 x 70 mm andUnit
section for beading
Material
Glazing
should be panelled with 5 mm thick plain float Glass with Ethyl Propylene diameine Monomer (EP
The sections are to be cut to length, mitre joined with corner bracket. Centre mullions are to be fixed suin
Mullion
size of
46 x 70mm
Beading
Handle made of high
gradesection
Aluminium
powder
coated
and nylon receiver. Gaskets made of Ethyl propy
section
size of 18
x 25ofmm
Fixed
Glazing
3'Monomer
(EPDM)
Corner
brackets
made
CRCA
with
zinc
phosphating.
made of Glass fill
BMT-Q.12
sqmMullion caps
3673.00
0"
x
4'-0"
(914.4x1219.2mm)
grid
outer
above frames should be fixed to the concrete / masonry wall be means of self expanding screws. & comple
size of 46 x 52 mm
item.- Fixed Glazing frame
2'-0" xsection
2'-0" (609.6x609.6mm)
grid outer frames section size of 46 x 52 mm

Add Over Head Charges

sqm

3673.00

Total rate per 1 sqm

6 Flush Pointing with CM (1:3) to Brick / CRS Masonry finishing cost of all materials, seigniorage charg
conveyance charges of materials and including all operational, incidental and labour charges for mixing m
rendering smooth curing, etc,, complete for finished item of work
Flush Pointing with CM (1:3) to Brick / CRS Masonry
Code
Material

Unit

Rate

kg

5.20

CSSN-A-05

Cement 43 Gr. (including loading charges)

M 005

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

Mason CI-II / Brick layer CI-II


Light mazdoor
Add LA charges

day
day
cum

375.00
320.00
424.30

Add Over Head Charges

cum

514.58

Manpower
CSSR-M-077
CSSR-M-087

Total rate per 10 sqm

20 Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-19
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580mm & 630 mm Long fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.02
Manpower
BMW-D.03

Unit

Rate

W.C 1st quality ISI marked conforming to


IS:2556-Part-3-1981 with "P" or "S" trap
Hindware/ Parryware/ Neycer - ISI Mark: 630
mm Long

each

700.00

Add LA charges

each

200.00

Add Over Head Charges

each

700.00

Total rate per each

21 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindusta
Parryware make white glazed with 'S' trap fixing in position including cost and conveyance of all material
Other taxes
all labour
Code on materials to site, Operational and Incidental charges including
Unit
Rate charges for fixin
complete for finished itemof work.
Material
Supplying and Fixing European Water Closet
of 1st quality conforming to IS:2556-Part-2BMW-D.14
each
1250.00
1973 of Hindustan / Neycer or Parryware
make white glazed with 'S' trap
Manpower
BMW-D.15
Add LA charges
each
175.00
Add Over Head Charges
Total rate per each

each

1250.00

31 Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S'
flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of ap
with rubber bufer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges a
make etc. complete for finished item of work in all respects: White Colour fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges for fixing at site etc; complete for finished itemof work.

Code
Material
BMW-D.18

Unit

Rate

Supply, Installation and commissioning


approved make floor mounted EWC (suit)
CASCADE model 'P' or 'S' trap with dual flush
porcelain cistern fixed on EWC

each

6500.00

Add Over Head Charges

each

6500.00

Total rate per each

20 S & F 12.7 mm brass bib cock Indian make 400 grams fixing in position including cost and conveyance of
Sales tax & Other taxes on materials to site, Operational and Incidental charges including all labour charge
site etc; complete for finished itemof work.
Code
Material
BMW-E.17
Manpower
BMW-E.18

Unit

Rate

S & F 12.7 mm brass bib cock Indian make


400 grams

each

170.00

Add LA charges

each

20.00

Add Over Head Charges

each

170.00

Total rate per each

31 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position inclu
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
BMW-D.29
Manpower
BMW-D.30

Supplying and Fixing Pedestal for Wash Hand


Basin (H.S.W / Parry / Earthenware)

each

810.00

Add LA charges

each

90.00

Add Over Head Charges

each

810.00

Total rate per each

5 Making drainage connection in the existing inspection including all repairs including all labour charges for
for finished itemof work.
Code
Material
BMW-B.07
Manpower
BMW-B.08

Unit

Rate

Making drainage connection in the existing


inspection

each

90.00

Add LA charges

each

50.00

Add Over Head Charges

each

90.00

Total rate per each


6 Repairing and over hauling flushing tank including all labour charges for etc; complete for finished itemof
Code
Material
BMW-I.17

Unit

Rate

Repairing and over hauling flushing tank

each

64.00

Add Over Head Charges

each

64.00

Total rate per each

35 Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 412
cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except r
blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping including all labour cha
Code
Unit
Rate
complete for finished itemof work.
Material
Supplying, laying, jointing and testing 152.4
BMW-A.03
Rm
346.00
mm SWG SP-1 pipes
Manpower
BMW-A.06
Add LA charges
Rm
120.00
Add Over Head Charges

each

346.00

Total rate per each


35 S&F 12.7 mm dia NP push cock Ist quality fixing in position including
Other taxes on materials to site, Operational and Incidental charges
complete
for finished itemof work.
Code
Material
S & F CP Short body bib cock fancy type
BMW-E.29
deluxe 400 grams 12.7 mm dia S&F 12.7
mm dia NP push cock Ist quality
Add Over Head Charges

cost and conveyance of all material


including all labour charges for fixin
Unit
Rate
each

200.00

each

200.00

Total rate per each

36 Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet fixing in position including cost and conveyance of
Sales tax
& Other taxes on materials to site, Operational and IncidentalUnit
charges including
Code
Rate all labour charge
site etc; complete for finished itemof work.

Material
BMW-G.06

Supply & Fixing 38.1 mm dia PVC solid waste


pipe outlet

each

70.00

Add Over Head Charges

each

70.00

Total rate per each

36 Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P coated fixing in position includ
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charge
labour charges
for fixing at site etc; complete for finished itemof work. Unit
Code
Rate
Material
Supplying & Fixing 12.7 mm PVC connection
BMW-I.48
each
74.00
with brass union nut C.P coated
Manpower
BMW-I.49
Add LA charges
each
14.00
Add Over Head Charges

each

74.00

Total rate per each


47 Chiselling the brick masonry wall and repairs as directed by the department.
Code
Material
BMW-I.07

Unit

Rate

Chiselling the brick masonry wall and repairs


as directed by the department.

Rm

21.00

Add Over Head Charges

Rm

21.00

Total rate per 1 Rm


16 Cleaning the W.C with acid and Vim powder including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.82

Unit

Rate

Cleaning the W.C with acid and Vim powder

each

30.00

Add Over Head Charges

each

30.00

Total rate per each


17 Cleaning the Urinal with acid and Vim power including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.83

Unit

Rate

Cleaning the Urinal with acid and Vim power

each

30.00

Add Over Head Charges

each

30.00

Total rate per each

18 Cleaning the wash basin with acid and Vim powder including all labour charges etc; complete as dir
Departmental Officers incharge for finished itemof work.
Code
Material
BMW-I.84

Unit

Rate

Cleaning the wash basin with acid and Vim


powder

each

30.00

Add Over Head Charges

each

30.00

Total rate per each


19 Cleaning the E.W.C with acid and Vim power including all labour charges etc; complete as directed by the
Officers incharge for finished itemof work.
Code
Material
BMW-I.85

Unit

Rate

Cleaning the E.W.C with acid and Vim power

each

30.00

Add Over Head Charges

each

30.00

Total rate per each

42 Supply and Fixing of Iron Door grilld of size 1.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10
20mm MS squre rods and bottom flower design with 25 x 6mm MS flats providing 150mm Spike at the top
lathe
machine
and weight of MS grade squre and rounds shall conform to IS 4351 - 1976 as per appro
Size (1.50
x 2.40M)
complete
finished
item rods
of work
fixing of gate to compound
wall,
cost
40 x 40mm solid squre
(V) including transportation charges,
6.00 Rm x 12.56
Kgs/
1Rman
2x 2 x 1.50 =
of all materials along with test certificates for raw materials including all tools and all incidental labou
40 x 10mm MS flats (H)
14.40 Rm x 3.14 Kgs/ 1Rm
2x 3for
x 2.40
= item of work.
finished item of work as directed by the Departmental Officers
finished
40 x 10mm MS flats (Curved)
6.00 Rm x 3.14 Kgs/ 1Rm
2x 2 x 1.50 =
18.00
Rm x 3.14 Kgs/ 1Rm
(1.50+2.10)/2
20mm MS squre rods (Main Verticals)
2x 5 x
20mm MS squre rods (Intermediate Verticals)

2x 5 x (1.20+1.75)/2

25 x 10mm MS flats for hold fasts

2x 2 x 1.20 =

14.75 Rm x 3.14 Kgs/ 1Rm


4.80 Rm x 3.14 Kgs/ 1Rm

ABSTRACT
Material
Miscellaneous
BMM-V.16

approved rate Repairs and


development works to Sri
Brahmopasana temple at
Kakinada in East Godavari
District

do

M.S. Flats & MS Rods

kg

38.00

Labour charges for fabricating all heavy steel


Add LA charges

kg

14.00
3602.62

CI Ornamental Spikes charges

each /L.S

50.00

Ball and pin arrangement @ bottom

each /L.S

250.00

cum

15881.16

Add Over Head Charges


Total rate per each MS Grill =

36 Cost & Supply of New Ceiling tiles from approved source including cost and conveyance of tiles to work an
site for verification as directed by the Departmental Officers.
Cost & Supply of NewCeiling tiles

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

37 Cost & Supply of New Mangalore tiles from approved source including cost and conveyance of tiles to work
at site for verification as directed by the Departmental Officers.
Cost & Supply of New Mangalore tiles

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

38 Cost & Supply of Ridge tiles from approved source including cost and conveyance of tiles to work and stack
verification as directed by the Departmental Officers.
Cost & Supply of Ridge tiles from approved source

Code
Material

Unit

Rate

Rate as per local Quatation (1 No.)


Total rate each

39 Reroofing with best Manglore tiles over ceiling tiles and cement mortor borders (1:2) including cost and c
all materials from approved source to site of work and all operational, incidential, labour charges such as m
laying tiles in position, including boarders with cement mortor, etc., complete for finished item of work
Reroofing with best Manglore tiles over ceiling tiles - Unit 1 sqm

Code
Material

Unit

Rate

Cement mortor (1:2)

cum

4347.09

Mason Cl- I / Brick layer Cl- I


Mason Cl- ll / Brick layer Cl-II
Light mazdoor
Add LA charges

day
day
day
Sqm

420.00
375.00
320.00
179.65

Add Over Head Charges

sqm

218.77

Manpower
SOR P. No. 266/I/11
SOR P. No. 268/II/35
SOR P. No. 269/III/4

Total rate per 1 sqm

40 Labour charges for shifting the racks 12 nos of size 1.80M x 0.75M x 3.05M to out side of the store room
stacking at safety place for taking up repairs to the store room and again shifting back and rearrang
carefully in the store room after repairs including labour charges for all operations etc., as directed by the
charge
Code
Material

Unit
Rate as per Quatation (1 Job.)
Total rate 1 Job

Rate

1 Cost Suply and Fixing of best Salwood SS Fly proof mesh for Door shutter diferent sizes frame with fly
frame size 3" x 1 1/2" thick and beading 3/4" x 1/2" thick including cost, wrought and putup and conv
materials work site and including all taxes, all laber charges for making, fixing of door furniture in position
Dept| Officers including M.S.P.C. hings, tower bolts, M.S. aldop and M.S handle, and all labour charges such
the Departmental Officers for finished item of work.
Code
Unit taken 3'-6" x 7' - 0" =

Unit
24.50
For frame
Verticlal
Horizontal
Beading
Verticlal
Horizontal

sft

Rate
2.28 sqm

2 x 1 x 6'-10 1/2" x 3" x 1 1/2" =


4 x 1 x 3'-3" x 3" x 1 1/2" =
1 x 2 x 6'-10 1/2" x 3/4" x 1/2" =
1 x 4 x 3'-3" x 3/4" x 1/2" =
Total qty of frame

ABSTRACT
BMT-E.15
BMT-G.28
BMT-G.14
BMT-G.35
BMT-F.19
BMM-V.07

Cost of Sal wood for frame


100 long MS PC hinges
100 mm long MS tower bolts
125 mm long MS handle
SS fly froof mesh
Labour charges
Add extra for MAA

cft
Nos
Nos
Nos
Sqm
Sqm
Sqm

1100.01
16.00
18.00
23.00
376.00
365.00
832.20

Add Over Head Charges


Total rate per 2.28sqm

sqm

2809.09

1.00 sqm

2.28 sqm

SS fly proof mesh Door=

SS fly proof mesh Door=

3191.55 x 1.00 sqm


2.28 sqm
Total rate per 1sqm

1 Cost Suply and Fixing of best Salwood Window Double shutters diferent of size shutters frame thick 3 1/2
plank thick 3/4" including cost, wrought and putup and conveyance of all materials work site and includin
laber charges for making, fixing of window furniture in position as directed by Dept| Officers including M
tower bolts, and M.S handle, and all labour charges such as diricted by the Departmental Officers for fin
work.

Code
Unit taken 2' - 6" x 3' - 0" =

Unit
7.50
For shutters frame
Verticlal
Horizontal

sft

Rate
0.70 sqm

2 x 2 x 3'-0" x 3 1/2" x 1 1/2"=


2 x 2 x 1'-1 1/2" x 3 1/2" x 1 1/2" =
Total qty of frame

ABSTRACT
BMT-E.15
BMT-G.27
BMT-G.31
BMT-G.14
7Kg/1sqm
BMM-V.07

Cost of Sal wood for frame


MS- Butt hinges - 75 mm Long
75 mm long Alluminium Handle
100 mm long MS tower bolts
MS Rods including fabrication charges
Labour charges

cft
Nos
Nos
Nos
kgs
Sqm

1390.26
8.00
45.00
18.00
53.50
10250.00

0.601

Cft or

0.70sqm

Or

Add extra for MAA


Add Over Head Charges
Total rate per
0.70Sqm

1.00 sqm

0.017

Cum
Sqm

174.25

sqm

1384.95

0.700 sqm

For Salwood Window Shutters=

For Salwood Window Shutters=

1573.51 x 1.00 sqm


0.70 sqm
Total rate per 1sqm

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.

Anganwadi Centre Building in Kesavadasupalem - 4 (Code No.


Mandal Under NABARD RIDF XX in E.G. Dist.

Coefficient
720.000

Amount
3744.00

1.050

539.09

0.200
0%

64.00
0.00
4347.09

Coefficient
480.000

Amount
2496.00

1.050

539.09

0.200
0%

64.00
0.00
3099.09

Coefficient
360.000

Amount
1872.00

1.050

539.09

0.200
0%

64.00
0.00
2475.09

Coefficient
288.000

Amount
1497.60

1.050

539.09

0.200
0%

64.00
0.00
2100.69

Coefficient
240.000
1.050

Amount
1248.00
539.09

0.200
0%

64.00
0.00
1851.09

Coefficient
0.600
0.150
0.150
0.100

Amount
1253.06
273.06
248.76
145.84
1920.72

Coefficient

Amount

0.600

1092.26

0.200
0.200

331.69
291.69
1715.64

s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). For Ordinary

BLD CSTN 2-1


Coefficient
Amount
0.364
0%

116.48
0.00

75%
0

87.36
0.00

14%

203.84
27.75
231.59

or say

231.60

s for Buildings and depositing on bank for all lifts and with an initial lead of
ur charges such as shoring ,sheeting, planking, strutting, etc. complete for
cluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
m depth
BLD CSTN 2.4
Coefficient
Amount
0.520
0%

166.40
0.00

75%
1

124.80
30.00

14%

321.20
43.73
364.93

or say

365.00

epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ing charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring
BLD CSTN 2-1
Coefficient
Amount
0.364
0%

116.48
0.00

30.00

14%

146.48
19.94
166.42

or say

166.00

ders upto 0.30 m dia. for foundations of canal cross drainage and other
vated stuf neatly in specified dump area or disposing of the same as
0 m and initial lift upto 3 m.
IRR-CCDW-1-1
Coefficient
Amount

0.025
0.600
0%
1

6.88
192.00
0.00
30.00

14%

228.88
31.16
260.04

or say

260.00

cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like
under reams as per IS 2911 - 1980 as per approved designs including all
arges of machinery, augur bore drill and shell equipment, etc, complete for
es of following diameters.

Coefficient

0.526
0%
14%
or say

Amount

168.32
0.00
168.32
22.92
191.24
191.00

es for building foundations in loamy, clayey soils like Black cotton soils and
ment in site as per IS 2911 - 1980 as per approved designs including all
arges of machinery, augur bore drill and shell equipment, etc, complete for
es of following diameters.

Coefficient

Amount

0.560
0%

179.20
0.00

14%

179.20
24.40
203.60

or say

204.00

or Mangalore tiles over flat tiles without roof timbers clearing away and
any etc., complete as directed by the Engineer-in-charge of the work.

Coefficient

Amount

1.000

8.30

0%

0.00

14%
or say

8.30
1.13
9.43
9.00

of Lime work unserviceable materials within 100 metres lead and lift
ected by the Enginee - in - Charge.
BLD-CSTN-14-8-295
Coefficient
Amount
1.220
0%
1%

390.40
0.00
3.39
3.94

14%

397.73
54.15
451.88

or say

452.00

ent concrete upto 15 cm thicknes within 100 metres lead labour charges
- Charge.
BLD-CSTN-14-8-296
Coefficient
Amount
2.440
0%
1%

780.80
0.00
3.39
7.84

14%

792.03
107.83
899.86

or say

900.00

uding stacking of serviceable materials and disposal of unserviceable


es etc; complete for finished item of work as directed by the Engineer - in BLD-CSTN-14-8-298
Coefficient
Amount
4.320
0%
1%

1382.40
0.00
3.39
13.86

14%

1399.65
190.56
1590.21

or say

1590.00

serviceable materials and disposal of unserviceable materials within 100


finished item of work as directed by the Engineer - in - Charge.
BLD-CSTN-14-8-299
Coefficient
Amount
0.409
0%
1%

130.88
0.00
3.39
1.34

14%

135.61
18.46
154.07

or say

154.00

slabs flooring on sand bed carefully stacking materials useful for reuse
shed item of work as directed by the Engineer - in - Charge.

Coefficient

Amount

1.000

4.20

0%

0.00

14%

4.20
0.57
4.77

or say

5.00

ng materials useful for reuse Old cement mortar plaster including stacking
viceable materials within 100 metres lead labour charges etc; complete for
eer - in - Charge.

Coefficient

Amount

1.000
0%

2.90
0.00

14%

2.90
0.39
3.29

or say

3.30

ny thickness fixing the frame, fixing the fixures to the window shutters
furniture, racks, work-station furniture, cup-board shutters to existing cupveneer laminations including fixing cutting, making, assembling, fixing
eets/ laminations fixing in position with necessary screws excluding cost of
as directed by the Engineer-in-charge of the work

y thickness fixing the

frame, fixing the fixures to the window shutters.

Coefficient
1.000
0%

Amount
365.00
0.00

14%

365.00
49.69
414.69

or say

414.70

d timber in roofs or floors clearing away and carefully stacking materials


ed by the Engineer-in-charge of the work
Coefficient
1.000
0%

Amount
125.00
0.00

14%

125.00
17.02
142.02

or say

142.00

ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix

BLD CSTN 3-7:24


Coefficient
Amount
129.600
0.900
0.450
1.200

673.92
1254.09
231.04
92.40

1.000
0%

328.60
0.00

0.100
1.390
0%

42.00
444.80
0.00

14%

3066.85
417.55
3484.40

or say

3484.40

ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix

BLD CSTN 3.9:22


Coefficient
Amount
129.600

673.92

0.900

1254.09

0.540

277.25

1.200

92.40

1.000

328.60

0%
0.100
1.390
0%

0.00
42.00
444.80
0.00

14%

3113.06
423.84
3536.90

or say

3537.00

ominal mix (coarse aggregate) for foundation levelling courses and bellow
Granite metal up to plinth level from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
ons ramming in 15 cm layers finishing top surface to the required level
k, inluding centering, shuttering as per APSS. No. 402. for Machine Mix

BLD CSTN 3.5:22


Coefficient
Amount

162.000

842.40

0.900

1254.09

0.450

231.04

1.200

92.40

1.000

328.60

0%
0.100
1.390
0%

0.00
42.00
444.80
0.00

14%

3235.33
440.49
3675.82

or say

3676.00

as per 456 nominal mix using 40 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
ork, per APSS. No. 402.

Coefficient
216.000

Amount
1123.20

0.450

627.04

0.900

462.08

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000

723.00

0%
14%

0.00
4008.82
545.80
4554.62

or say

4554.60

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. First Floor

BLD CSTN 3-7:24


Coefficient
Amount
17.500
0.045
0.023
0.060

91.00
77.20
11.81
4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.003
0.007
0.125
0%

1.26
2.63
40.00
0.00
234.94

BLD-CSTN-6-1
0.015
0.060
0.096
0%

46.49
25.20
30.72
0.00

14%

31.99
369.34

or say

369.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2. Second Floor

BLD CSTN 3-7:24


Coefficient
Amount
17.500
0.045
0.023
0.060
0.013

91.00
77.20
11.81
4.62
4.27

0%
0.013

0.00
2.15

0%

0.00

0.003
0.007
0.125
0%

1.26
2.63
40.00
0.00

1.000
0%

4.81
0.00
239.75

BLD-CSTN-6-1
0.015
0.060
0.096
0%

46.49
25.20
30.72
0.00

1.000
0%

5.59
0.00

14%

32.64
380.39

or say

380.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
FI

BLD CSTN 3-14:31A


Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267

55.86
100.13

4.600
0%

1472.00
0.00
6199.71

1.000

723.00

0%

0.00

14%

6922.71
942.53
7865.24

or say

7865.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
S FI

BLD CSTN 3-14:31A


Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267
4.600
0%

55.86
100.13
1472.00
0.00
6199.71

1.000

1025.00

0%
14%

0.00
7224.71
983.64
8208.35

or say

8208.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with Stell up
EAM FI

BLD CSTN 3-14:31A


Coefficient
Amount
350.000

1820.00

0.400

205.37

0.800

1536.58

1.200

92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
0.267
4.600
0%

55.86
100.13
1472.00
0.00
6199.71

1.000

2410.00

0%

0.00

14%

8609.71
1172.21
9781.92

or say

9782.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS FI

Coefficient
350.000

Amount
1820.00

0.400

205.37

0.800
1.200

1536.58
92.40

1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.167
70.14
0.167
62.63
5.600
1792.00
0%
0.00
BACIC RATE 1 Cum
6496.49
BLD CSTN 3-15:31B
BACIC RATE 1 Cum

1.000
0%

6496.49

1075.00
0.00

14%

7571.49
1030.86
8602.35

or say

8602.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS F2

BLD CSTN 3-15:31B


BACIC RATE 1 Cum

6496.49

1.000

1170.00

0%
1.000
0%

0.00
249.85
0.00

14%

7916.34
1077.81
8994.15

or say

8994.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r COLUMNS F3

BLD CSTN 3-15:31B


BACIC RATE 1 Cum

6496.49

1.000

1265.00

0%
1.000
0%

0.00
499.70
0.00

14%

8261.19
1124.76
9385.95

or say

9386.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS FI

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49

1.000
0%

1518.00
0.00

14%

8014.49
1091.17
9105.66

or say

9106.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS F2

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49
1.000

1586.00

0%
1.000
0%

0.00
249.85
0.00

14%

8332.34
1134.45
9466.79

or say

9467.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r LINTELS F3

BLD CSTN 3-15:31B


Coefficient
Amount
BACIC RATE 1 Cum
6496.49
1.000

1653.00

0%
1.000
0%

0.00
499.70
0.00

14%

8649.19
1177.59
9826.78

or say

9827.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
em of work for RCC SLABS, BEAMS centering with Stell up to 3.66, as per

Coefficient
350.000
0.400
0.800
1.200
0.308
0%
0.308
0%

Amount
1820.00
205.37
1536.58
92.40
160.93
0.00
51.04
0.00

0.067
28.14
0.133
49.88
3.077
984.64
0%
0.00
BACIC RATE 1 Cum
4928.98
BLD CSTN 3-15:31B

BACIC RATE 1 Cum

1.000
0%

4928.98

2071.00
0.00

14%

6999.98
953.05
7953.03

or say

7953.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r BEAMS F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 Cum
4928.98

1.000

2151.00

0%
1.000
0%

0.00
119.52
0.00

14%

7199.50
980.21
8179.71

or say

8180.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r BEAMS F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 Cum
4928.98

1.000

2230.00

0%
1.000
0%

0.00
239.04
0.00

14%

7398.02
1007.24
8405.26

or say

8405.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB FI

BLD CSTN 3-15:31C


Coefficient
Amount
43.750

227.50

0.050

25.67

0.100
0.150

192.07
11.55

0.039
0%
0.039
0%

20.38
0.00
6.46
0.00

0.008
0.017
0.385
0%
BACIC RATE 1 SQM

1.000
0%

3.36
6.38
123.20
0.00
616.57

232.00
0.00

14%

848.57
115.53
964.10

or say

964.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
616.57
1.000

241.00

0%
1.000
0%

0.00
14.97
0.00

14%

872.54
118.80
991.34

or say

991.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 125mm thick RCC SLAB F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
616.57

1.000

250.00

0%
1.000
0%

0.00
29.94
0.00

14%

896.51
122.06
1018.57

or say

1019.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick VRCC Steps for Staircase FI

BLD CSTN 3-15:31C


Coefficient
Amount
78.750

409.50

0.090

46.21

0.180
0.270

345.73
20.79

0.069
0%
0.069
0%

36.05
0.00
11.43
0.00

0.015
0.030
0.692
0%
BACIC RATE 1 SQM

1.000
0%

6.30
11.25
221.44
0.00
1108.70

242.00
0.00

14%

1350.70
183.90
1534.60

or say

1535.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick VRCC Steps for Staircase F2

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
1108.70

1.000

251.00

0%
1.000
0%

0.00
26.87
0.00

14%

1386.57
188.78
1575.35

or say

1575.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete but excluding cost of
tem of work for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering
r 225mm thick RCC Steps for Staircase F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
1108.70

1.000

261.00

0%
1.000
0%

0.00
53.74
0.00

14%

1423.44
193.80
1617.24

or say

1617.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick SUN SHADES FI

BLD CSTN 3-15:31C


Coefficient
Amount
21.875

113.75

0.025

12.84

0.050
0.075

96.04
5.78

0.019
0%

9.93
0.00

0.004
0.008
0.192
0%
BACIC RATE 1 SQM

1.000

1.68
3.00
61.44
0.00
304.46

271.00

0%

0.00

14%

575.46
78.35
653.81

or say

654.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick RCC SUN SHADES F2

BLD CSTN 3-15:31C

Coefficient
BACIC RATE 1 SQM

Amount
304.46

1.000

281.00

0%
1.000
0%

0.00
6.96
0.00

14%

592.42
80.66
673.08

or say

673.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc., to site and including
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
d its fabrication charges for finished item of work (APSS No. 402) with
um as per IS code from standard suppliers approved by the department
g, laying concrete, curing etc. complete but excluding cost of steel and its
for LINTELS, COLUMNS, RCC WALLS, WATER TANKS centering with Stell up
thick RCC SUN SHADES F3

BLD CSTN 3-15:31C


Coefficient
Amount
BACIC RATE 1 SQM
304.46

1.000

292.00

0%
1.000
0%

0.00
13.92
0.00

14%

610.38
83.10
693.48

or say

693.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS,
No. 402.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

723.00

0%

0.00

14%

6657.38
906.40
7563.78

or say

7563.80

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS,
No. 402.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000
0%

1025.00
0.00

14%

6959.38
947.52
7906.90

or say

7906.90

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for FOUNDATIONS, PLINTH, PEDASTALS,
No. 402.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

2410.00

0%

0.00

14%

8344.38
1136.09
9480.47

or say

9480.50

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for COLUMNS, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13:30B


Coefficient
Amount

400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1497.00

0%

0.00

14%

7760.16
1056.55
8816.71

or say

8816.70

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for COLUMNS, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13B


Coefficient
Amount
350.000

1820.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%

328.60
0.00
165.70
0.00

1.000
0%

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1624.00

0%
1.000
0%

0.00
196.32
0.00

14%

7823.48
1065.17
8888.65

or say

8889.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for COLUMNS, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13B


Coefficient
Amount
350.000

1820.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1751.00

0%
1.000
0%

0.00
392.63
0.00
8146.79

14%

1109.19
9255.98

or say

9256.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for LINTELS, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13:30B


Coefficient
Amount
400.000
0.900
0.450
1.200

2080.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1663.00

0%

0.00

14%

7926.16
1079.15
9005.31

or say

9005.30

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for LINTELS , for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13:30B


Coefficient
Amount
350.000
0.900
0.450
1.200

1820.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1753.00

0%
1.000
0%

0.00
196.32
0.00

14%

7952.48
1082.73
9035.21

or say

9035.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for COLUMNS, LINTELS, WATER TANKS,
es, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates, Steel
66 M, as per APSS. No. 402. for Lintles F2.

BLD CSTN 3-13:30B


Coefficient
Amount
350.000
0.900
0.450
1.200

1820.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.167
0.167
4.700
0%

70.14
62.63
1504.00
0.00

1.000

1844.00

0%
1.000
0%

0.00
392.63
0.00

14%

8239.79
1121.85
9361.64

or say

9362.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for ROOF BEAMS for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,

BLD CSTN 3-13:30C


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

0.267

87.74

0%
0.267
0%

0.00
44.24
0.00

0.067
0.133
2.500
0%

28.14
49.88
800.00
0.00

1.000

2406.00

0%

0.00

14%

7548.09
1027.67
8575.76

or say

8575.80

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
on charges for finished item of work for Beams, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,
BLD CSTN 3-13:30B
Coefficient
Amount

350.000

1820.00

0.900

1728.65

0.450

231.04

1.200

92.40

0.267

87.74

0%
0.267
0%

0.00
44.24
0.00

0.067
0.133
2.500
0%

28.14
49.88
800.00
0.00

1.000

2512.00

0%
1.000
0%

0.00
96.52
0.00

14%

7490.61
1019.85
8510.46

or say

8510.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
on charges for finished item of work for Beams, for Casurina Ballies,
osts, Wall Plates, Steel Centring Plates etc., for unsupported height 3.66 M,
BLD CSTN 3-13:30B
Coefficient
Amount
350.000

1820.00

0.900

1728.65

0.450

231.04

1.200

92.40

0.267

87.74

0%
0.267
0%

0.00
44.24
0.00

0.067
0.133

28.14
49.88

2.500
0%

800.00
0.00

1.000

2619.00

0%
1.000
0%

0.00
193.03
0.00

14%

7694.12
1047.55
8741.67

or say

8742.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for ROOF SLAB 120 mm thick , for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402.

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.450
0.900
1.200
0.267
0%
0.267
0%

2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%
BACIC RATE 1 CUM

28.14
49.88
800.00
0.00
4508.80

BACIC COST OF 1 SQM 120 mm THICK F1

541.06

1.000
0%

273.00
0.00

14%

814.06
110.83
924.89

or say

924.90

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for ROOF SLAB 150 mm thick , for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402.

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.450
0.900
1.200
0.267
0%
0.267
0%

2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%
BACIC RATE 1 CUM

28.14
49.88
800.00
0.00
4508.80

BACIC COST OF 1 SQM 150 mm THICK F1

676.32

1.000
0%

273.00
0.00

14%

949.32
129.25
1078.57

or say

1078.60

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for Slabs 100 mm thick, for Casurina
Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height

BLD CSTN 3-13:30C


Coefficient
Amount
35.000
0.045

182.00
86.43

0.090

46.21

0.120

9.24

0.027
0%
0.027
0%

8.87
0.00
4.47
0.00

0.007
0.013
0.250
0%

2.94
4.88
80.00
0.00

1.000

285.00

0%
1.000
0%

0.00
9.66
0.00

14%

719.70
97.99
817.69

or say

818.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
charges for finished item of work for Slabs 100 mm thick, for Casurina
Wood Posts, Wall Plates, Steel Centring Plates etc., for unsupported height

BLD CSTN 3-13:30C


Coefficient
Amount
35.000
0.045

182.00
86.43

0.090

46.21

0.120

9.24

0.027
0%
0.027
0%

8.87
0.00
4.47
0.00

0.007
0.013
0.250
0%

2.94
4.88
80.00
0.00

1.000

297.00

0%
1.000
0%

0.00
19.33
0.00

14%

741.37
100.94
842.31

or say

842.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for Sun Shade 62.50 mm thick, for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402. for Sun Shades First floor

BLD CSTN 3-13:30C


Coefficient
Amount
400.000
0.450
0.900
1.200
0.267
0%
0.267
0%

2080.00
864.32
462.08
92.40
87.74
0.00
44.24
0.00

0.067
0.133
2.500
0%
BACIC RATE 1 CUM

28.14
49.88
800.00
0.00
4508.80

BACIC COST OF 1 SQM 62.50 mm THICK F1

281.80

1.000
0%

289.00
0.00

14%

570.80
77.71
648.51

or say

648.50

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for Sun Shade 62.50 mm thick, for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402. for Sunshades Second floor.

BLD CSTN 3-13:30C


Coefficient
Amount
21.875
0.056
0.028
0.075

113.75
107.56
14.38
5.78

0.017
0%
0.017
0%

5.59
0.00
2.82
0.00

0.004
0.008
0.156
0%

1.68
3.00
49.92
0.00

1.000

303.00

0%
1.000
0%

0.00
6.02
0.00

14%

613.50
83.53
697.03

or say

697.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing and vibrating etc.,complete
n charges for finished item of work for Sun Shade 62.50 mm thick, for
rs, Runners, Wood Posts, Wall Plates, Steel Centring Plates etc., for
402. for Sunshades Third floor.

BLD CSTN 3-13:30C


Coefficient
Amount
21.875
0.056
0.028
0.075

113.75
107.56
14.38
5.78

0.017
0%
0.017
0%

5.59
0.00
2.82
0.00

0.004
0.008
0.156
0%

1.68
3.00
49.92
0.00

1.000

317.00

0%
1.000
0%

0.00
12.03
0.00

14%

633.51
86.25
719.76

or say

720.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

14%

248.54
33.84
282.38

or say

282.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%
1.000
0%

1.43
2.51
80.00
0.00
8.82
0.00

14%

257.36
35.04
292.40

or say

292.00

minal mix using 12 mm size graded machine crushed Hard Granite metal
luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
ur charges such as machine mixing, laying concrete, curing and vibrating
its fabrication charges for finished item of work for Slabs 50 mm thick
2.
BLD CSTN 3-13:30C
Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%
0.013
0%

4.27
0.00
2.15
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

1.000
0%

17.64
0.00

14%

266.18
36.24
302.42

or say

302.00

sing 12 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
finished item of work for Slabs 50 mm thick etc., for Racks & Platform

BLD CSTN 3-13:30C


Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%

4.27
0.00

0.0034
0.0067
0.250
0%
1.000
0%

1.43
2.51
80.00
0.00
723.00
0.00

14%

969.39
131.98
1101.37

or say

1101.00

sing 12 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
finished item of work for Slabs 50 mm thick etc., for Racks & Platform

BLD CSTN 3-13:30C


Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%

4.27
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

1.000

723.00

0%
1.000
0%

0.00
8.64
0.00

14%

978.03
133.16
1111.19

or say

1111.00

sing 12 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
finished item of work for Slabs 50 mm thick etc., for Racks & Platform

BLD CSTN 3-13:30C


Coefficient
Amount
17.500
0.023

91.00
39.46

0.045

23.10

0.060

4.62

0.013
0%

4.27
0.00

0.0034
0.0067
0.250
0%

1.43
2.51
80.00
0.00

1.000

723.00

0%
1.000
0%

0.00
17.28
0.00

14%

986.67
134.34
1121.01

or say

1121.00

tions and basement with initial lead in layers not exceeding 15 cm thick,
g and ramming including cost and conveyance of water to work site and all
harges of T & P etc., complete for finished item of work. (APSS NO. 309 &
BLD CSTN 2-8
Coefficient
Amount
1.000

446.42

0.052
0%

16.64
0.00

14%

463.06
63.05
526.11

or say

526.10

excluding rock) in trenches, sides of foundations and basement with initial


nsolidating each deposited layer by watering and ramming including cost
operational, incidental, labour charges, hire charges of T & P etc., complete
BLD CSTN 2-9
0) for Refilling foundations.
Coefficient
Amount
0.052
0%

16.64
0.00

14%

16.64
2.27
18.91

or say

18.90

ls in Super structure with CM ( 1:8) prop (Cement:Sand) using 2nd class


x11x7 cm having a crushing strength of 2.5N/sq.mm including cost,
nd water from approved source to work site and all operational, incidental
moratar, constructing masonary, lift charges, curing etc., complete for
04) for Super Structure FI

BLD CSTN 5-5:43


36.000
512.000
0.200

187.20
2727.94
102.68

0.240
0.560
1.890
0%

100.80
210.00
604.80
0.00

1.000

304.84

0%

0.00

14%

4238.26
577.04
4815.30

or say

4815.30

ick in CM (1:4) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501
BLD CSTN 5-12:50
Coefficient
Amount
7.200
51.200
0.020

37.44
272.79
10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000
0%

68.59
0.00

14%

524.79
71.45
596.24

or say

596.20

as per 456 nominal mix using 20 mm size graded machine crushed Hard
ed quarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402.

Coefficient
320.000
0.900
0.450
1.200

Amount
1664.00
1728.65
231.04
92.40

1.000
0%
1.000
0%

328.60
0.00
165.70
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000

723.00

0%

0.00

14%

5420.19
737.96
6158.15

or say

6158.00

56 nominal mix using 12 mm size graded machine crushed Hard Granite


uarry including cost and conveyance of all materials like cement, fine
c., to site and including Seigniorage charges, sales & other taxes on all
and labour charges such as machine mixing, laying concrete, curing and
rk, centering with Stell up to 3.66, lift manuals per APSS. No. 402. Coping

Coefficient
320.000
0.900
0.450
1.200

Amount
1664.00
1544.08
231.04
92.40

1.000
0%

328.60
0.00

0.100
1.390
0%

42.00
444.80
0.00

1.000
0%

723.00
0.00

14%

5069.92
690.27
5760.19

or say

5760.00

ick in CM (1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501

BLD CSTN 5-12:50


Coefficient
Amount
4.800
51.200
0.020

24.96
272.79
10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000
0%

68.59
0.00

14%

512.31
69.75
582.06

or say

582.00

hick in CM(1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501 for F2

BLD CSTN 5-12:50


Coefficient
Amount
4.800
51.200
0.020
0.060
0.060
0.275
0%

24.96
272.79
10.27
25.20
22.50
88.00
0.00

1.000

92.96

0%
1.000
0%

0.00
13.57
0.00

14%
or say

550.25
74.92
625.17
625.00

hick in CM(1:6) using second class bricks having a crushing strength of 2.5
n rods in ever third layer with free ends of the reinforcement pegged into
ble including cost and seignorage charges and conveyance of all materials
e and all operational, incidental, labour charges such as scafolding mixing
curing etc. complete but excluding the cost of steel and its fabrication
9 & 501 for F3

BLD CSTN 5-12:50


Coefficient
Amount
4.800
24.96
51.200
272.79
0.020

10.27

0.060
0.060
0.275
0%

25.20
22.50
88.00
0.00

1.000

117.32

0%
1.000
0%

0.00
27.14
0.00

14%

588.18
80.08
668.26

or say

668.00

ix using 20 mm size graded machine crushed Hard Granite metal (coarse


cost and conveyance of all materials like cement, fine aggregate (sand)
ding Seigniorage charges, sales & other taxes on all materials including all
ch as machine mixing, laying concrete, curing etc.,complete but excluding
nished item of work for FOUNDATIONS, PLINTH, PEDASTALS, centering with
p Bands.

BLD CSTN 3-13:30A


Coefficient
Amount
400.000

2080.00

0.900

1728.65

0.450

231.04

1.200

92.40

1.000
0%
0.000
0%

328.60
0.00
0.00
0.00

0.133
0.267
3.600
0%

55.86
100.13
1152.00
0.00

1.000

723.00

0%

0.00

14%

6491.68
883.84
7375.52

or say

7375.50

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
r charges such as machine mixing, laying concrete, curing etc.,complete
up to 3.66, lift manuals per APSS. No. 402. for Staircase steps

BLD CSTN 3-11:28


Coefficient
Amount
330.000

1716.00

0.450

231.04

0.900
1.200

1728.65
92.40

1.000

328.60

0%
0.100
1.390
0%
Basic rate 1 cum

1.000
0%

0.00
42.00
444.80
0.00
4583.49

723.00
0.00
5306.49

14%

722.48
6028.97

or say

6029.00

mt IS 1786-1985) bar reinforcement VRCC works complete wastage as per


1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36 mm dia
eding require to be done campulsorily including cost and conveyance of
nding wire, cover blocks and all incidental,operational, labour charges such
etc., and sales and sales & other taxes, on cost of materials for finished

BLD CSTN 4-1


Coefficient
Amount
6.000
1.050
10.000
10.000
0%

420.00
35700.00
4200.00
3200.00
0.00

14%

43520.00
5925.25
49445.25

or say

49445.30

mt IS 1786-1985) bar reinforcement VRCC works complete wastage as per


1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36 mm dia
eding require to be done campulsorily including cost and conveyance of
BLD CSTN
nding wire, cover blocks and all incidental,operational,
labour4-1
charges such
etc., and sales and sales & other taxes, on cost Coefficient
of materials for
finished
Amount
6.000
1.050
10.000
10.000
0%
1.000
0%

420.00
35700.00
4200.00
3200.00
0.00
740.00
0.00

14%

44260.00
6026.00
50286.00

or say

50286.00

mt IS 1786-1985) bar reinforcement VRCC works complete wastage as per


1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36 mm dia
eding require to be done campulsorily including cost and conveyance of
BLD CSTN
nding wire, cover blocks and all incidental,operational,
labour4-1
charges such
etc., and sales and sales & other taxes, on cost Coefficient
of materials for
finished
Amount
6.000

420.00

1.050

35700.00

10.000
10.000
0%

4200.00
3200.00
0.00

1.000
0%

1480.00
0.00

14%

45000.00
6126.75
51126.75

or say

51127.00

50/tmt IS 1786-1985) bar reinforcement VRCC works complete wastage as


ause 1000 and 1202 MORD & 1100,1600 MORT & H for Bars 6 mm dia
eding require to be done campulsorily including cost and conveyance of
nding wire, cover blocks and all incidental,operational, labour charges such
etc., and sales and sales & other taxes, on cost of materials for finished

BLD CSTN 4-1


Coefficient
Amount
6.000

420.00

1.050

37800.00

10.000
10.000
0%

4200.00
3200.00
0.00

14%

45620.00
6211.16
51831.16

or say

51831.00

50/tmt IS 1786-1985) bar reinforcement VRCC works complete wastage as


use 1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36 mm
eldeding require to be done campulsorily including cost and conveyance of
nding wire, cover blocks and all incidental,operational, labour charges such
etc., and sales and sales & other taxes, on cost of materials for finished

BLD CSTN 4-1


Coefficient

Amount

6.000

420.00

1.050

37800.00

10.000
10.000
0%
1.000

4200.00
3200.00
0.00
740.00

0%

0.00

14%

46360.00
6311.91
52671.91

or say

52672.00

50/tmt IS 1786-1985) bar reinforcement VRCC works complete wastage as


use 1000 and 1202 MORD & 1100,1600 MORT & H for Bars below 36 mm
eldeding require to be done campulsorily including cost and conveyance of
nding wire, cover blocks and all incidental,operational, labour charges such
etc., and sales and sales & other taxes, on cost of materials for finished

BLD CSTN 4-1


Coefficient

Amount

6.000

420.00

1.050

37800.00

10.000
10.000
0%

4200.00
3200.00
0.00

1.000
0%

1480.00
0.00

14%

47100.00
6412.67
53512.67

or say

53513.00

ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof First Floor Lift manual

BLD CSTN 4-1


Coefficient

Amount

3.000

210.00

1.025

38950.00

70.00

630.00

2.500
10.000
10.000

1050.00
4200.00
3200.00

10.000

612.00

0%

0.00

14%

48852.00
6651.20
55503.20

or say

55503.00

ers including cost and conveyance of all materials, cutting and bending to
and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof Third Floor Lift manual

BLD CSTN 4-1


Coefficient

Amount

3.000

210.00

1.025

38950.00

70.00

630.00

2.500
10.000
10.000
0%

1050.00
4200.00
3200.00
0.00

10.000

612.00

1.000
0%

740.00
0.00

14%

49592.00
6751.95
56343.95

or say

56344.00

including cost and conveyance of all materials, cutting and bending to


and welding as per approved designs and drawings to the supplies at the
d conveyance of materials, welding rods and all all wastages such as
operational, incidental labour charges such as cutting bending placing in
em of work for AC Sheet Roof Third Floor Lift manual

BLD CSTN 4-1


Coefficient

Amount

3.000

210.00

1.025

38950.00

70.00

630.00

2.500
10.000
10.000
0%

1050.00
4200.00
3200.00
0.00

10.000
1.000
0%

612.00
1480.00
0.00

14%

50332.00
6852.70
57184.70

or say

57185.00

in Basement and Super structure with CM ( 1:8) prop (Cement:Sand) using


ze) 23x11x7 cm having a crushing strength of 2.5N/sq.mm including cost,
nd water from approved source to work site and all operational, incidental
moratar, constructing masonary, lift charges, curing etc., complete for
04) for Basement

BLD CSTN 5-5:43


Coefficient
Amount
36.000
512.000
0.200
0.240
0.560
1.890
0%

14%
Or say

187.20
2727.94
102.68
100.80
210.00
604.80
0.00
3933.42
535.54
4468.96
4469.00

ls in Super structure with CM ( 1:8) prop (Cement:Sand) using 2nd class


x11x7 cm having a crushing strength of 2.5N/sq.mm including cost,
nd water from approved source to work site and all operational, incidental
moratar, constructing masonary, lift charges, curing etc., complete for
04) for Super Structure F2

BLD CSTN 5-5:43


36.000
512.000
0.200

187.20
2727.94
102.68

0.240
0.560
1.890
0%

100.80
210.00
604.80
0.00

1.000

413.16

0%
1.000
0%

0.00
91.56
0.00

14%

4438.14
604.25
5042.39

or say

5042.00

ls in Super structure with CM ( 1:8) prop (Cement:Sand) using 2nd class


x11x7 cm having a crushing strength of 2.5N/sq.mm including cost,
nd water from approved source to work site and all operational, incidental
moratar, constructing masonary, lift charges, curing etc., complete for
04) for Super Structure F3

BLD CSTN 5-5:43


36.000
512.000
0.200

187.20
2727.94
102.68

0.240
0.560
1.890
0%

100.80
210.00
604.80
0.00

1.000

521.42

0%
1.000
0%

0.00
183.12
0.00

14%

4637.96
631.46
5269.42

or say

5269.00

roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for

BLD CSTN 10-25


Coefficient
Amount
10.080
0.021

52.42
10.78

0.200

4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

14%

271.87
37.02
308.89

or say

308.90

roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for

BLD CSTN 10-25


Coefficient
Amount
10.080

52.42

0.021

10.78

0.200

4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

1.000
0%

20.39
0.00
292.26
39.79
332.05
332.00

14%
or say

roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
of when it is green including cost of all materials, seigniorage charges,
and including all operational, incidental and labour charges for mixing
lining, curing, rounding of junctions of wall and slab etc,, complete for

BLD CSTN 10-25


Coefficient
Amount
10.080

52.42

0.021
0.200

10.78
4.80

0.066
0.154
0.370
0%

27.72
57.75
118.40
0.00

1.000
0%

40.78
0.00

14%

312.65
42.57
355.22

or say

355.00

ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
r Celling plastering F1.

BLD CSTN 8-10


Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

14.32

0%

14%
or say

0.00
254.87
34.70
289.57
289.60

ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Celling plastering F2.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

19.12

0%
1.000
0%

0.00
20.64
0.00

14%
or say

280.31
38.16
318.47
318.00

ck, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick
gniorage charges, including conveyance charges of materials and including
for mixing mortar, laying, rendering smooth curing, etc,, complete for
BLD CSTN 8-10
r Celling plastering F3.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

23.91

0%
1.000
0%

0.00
41.28
0.00

14%

305.74
41.63
347.37

or say

347.00

e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering smooth curing, etc,,
903 & 904) for Uneven faces F1.

BLD CSTN 8-9


Coefficient
Amount

4.300
0.018

22.36
9.24

1.450
0.004

7.54
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

254.44
34.64
289.08

or say

289.10

e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering smooth curing, etc,,
BLD CSTN 8-9
903 & 904) for External walls F2.

Coefficient

Amount

4.300
0.018

22.36
9.24

1.450
0.004

7.54
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

9.29

0%
1.000
0%

0.00
20.64
0.00

14%

277.51
37.78
315.29

or say

315.00

e coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with
s, seigniorage charges, including conveyance charges of materials and
our charges for mixing mortar, laying, rendering
smooth
curing, etc,,
BLD
CSTN 8-9
903 & 904) for External walls F3.
Coefficient
Amount

4.300
0.018

22.36
9.24

1.450
0.004

7.54
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

11.73

0%
1.000
0%

0.00
41.28
0.00

14%

300.59
40.93
341.52

or say

342.00

coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with
onveyance of all materials like cement, sand, water etc., to site, including
all materials, and all operational, incidental charges on materials and
ng mortar, finishing, scafolding, lift charges, curing etc., as directed by
nal & Even faces of Brick Wall and RCC exposed faces for finished item of
CM (1:4) & (1:6): 12 mm Floor - 0 upto 3.66 Lift Manual

BLD CSTN 8-10


Coefficient
Amount

2.640
0.011

13.73
5.65

1.440
0.004

7.49
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

242.17
32.97
275.14

or say

275.10

se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
or Even faces F1.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

6.86

0%

0.00

14%

247.41
33.68
281.09

or say

281.10

se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Internal walls F2.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

9.29

0%
1.000
0%

0.00
20.64
0.00

14%

270.48
36.83
307.31

or say

307.00

se coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with
age charges, including conveyance charges of materials and including all
or mixing mortar, laying, rendering smooth curing,
etc,, 8-10
complete for
BLD CSTN
r Internal walls F3.
Coefficient
Amount

3.170
0.011

16.48
5.65

1.920
0.004

9.98
2.05

0.063
0.147
0.390
0%

26.46
55.13
124.80
0.00

1.000

11.73

0%
1.000
0%

0.00
41.28
0.00

14%

293.56
39.97
333.53

or say

334.00

CM (1:4) with sponze finishing.cost of all materials, seigniorage charges,


and including all operational, incidental and labour charges for mixing
, complete for finished item of work (APSS 901,903 & 904) for walls F-0.

BLD CSTN 8-2


Coefficient
Amount
7.560
0.021

39.31
10.78

0.094
0.160
0%

35.25
51.20
0.00

Basic rate

136.54

14%

136.54
18.59
155.13

or say

155.00

g 10mm thick plaster of paris boards and Labour charges for fixing plaster
perimeter channel 30mm x 27mm x 0.55 thick and ceiling channels of
and fixing and finishing using joint compound and luppum/ putty finish as
cost of all materials including cost of Plaster of paris sheets/ boards for

(BLD CSTN 10-31 & SOR item 18 p.


No. 399.)
Amount
1.030

336.81

0.640

41.60

0.840

62.16

2.300

32.20

0.260
0.289
0.226
0.628
0%

109.20
138.72
84.75
200.96
0.00

14%

1006.40
137.02
1143.42

or say

1143.00

headed glass including cost, conveyance of all materials to work site, all
c., complete for finished item of work as directed by the Enginee - in -

Coefficient

Amount

1.000
10%

220.00
22.00

1.000

173.00

0%

0.00
100.00

14%

515.00
70.12
585.12

or say

585.00

mical including cost and conveyance of all materials to site including all
eer-in-charge of the work
Coefficient
1.000

Amount
440.00
440.00

uivalent chemical including cost and conveyance of all materials to site


by the Engineer-in-charge of the work
Coefficient
1.000

Amount
104.00
104.00

epositing on bank for all lifts and with an initial lead of 10m including all
s shoring ,sheeting, planking, strutting, etc. complete for finished item of
ng charges etc as per SS - 20 B (APSS 308). For Ordinary soil-Manual up to
BLD CSTN 2-1
Coefficient
Amount
0.364
0%
1

116.48
0.00
30.00

14%

146.48
19.94
166.42

or say

166.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
r charges such as machine mixing, laying concrete, curing etc.,complete
SS. No. 402. 0 Floor

BLD CSTN 3-12:29


Coefficient
Amount
275.000

1430.00

0.450

231.04

0.900
1.200

1728.65
92.40

1.000
0%

328.60
0.00

0.100
1.390
0%

42.00
444.80
0.00

Basic rate 1 cum

4297.49

1.000

0.00

0%

0.00

14%

4297.49
585.10
4882.59

or say

4883.00

cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch Second Floor
Coefficient

Amount

14.73
2.203
2.203
2.203

2769.98
17.62
1.10
0.44

0.043
0.054
0%

16.21
17.30
0.00
25.00
150.00

1.000
0%
14%

3.35
0.00
3001.00
408.59
3409.59
341.00

cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto BLD-CSTN-8-4
600 pitch
Coefficient

Amount

14.734
2.203
2.203
2.203
0.043
0.054
0%

2769.99
17.62
1.10
0.44
16.13
17.28
0.00
25.00
150.00

1.000
0%
14%

6.68
0.00
3004.24
409.03
3413.27
341.00

m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
5.26

1.000
0%
1%

22.99
0.00
0.23

14%
or say

554.55
554.55
75.50
630.05
630.00

m thick (medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
5.26

1.000
0%
1%

45.98
0.00
0.46

14%
or say

577.77
577.77
78.66
656.43
656.00

oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-5


Coefficient
Amount
1.050

885.15

6.060

31.51

0.014

7.19

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
11.60
1171.17

1171.17
14%

159.45
1330.62

or say

1330.60

oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-5


Coefficient
Amount
1.050

885.15

6.060

31.51

0.014

7.19

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
11.60

1.000
0%
1%

22.99
0.00
0.23

14%

1194.39
162.62
1357.01

or say

1357.00

oat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC
ey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-5


Coefficient
Amount
1.050

885.15

6.060

31.51

0.014

7.19

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
11.60

1.000
0%
1%

45.98
0.00
0.46

14%

1217.61
165.78
1383.39

or say

1383.00

eight/risers of steps with vitrified tiles 8 to 10 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching shade to full depth,
ent, sand and water etc., complete including seigniorage charges, etc.,
he cost of conveyance of all materials for F1
BLD CSTN 9-15
Coefficient
Amount
1.100

1152.80

6.756

35.13

0.012

6.37

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
14.30
1444.32

14%

1444.32
196.64
1640.96

or say

1641.00

of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of

BLD CSTN 9-6


Coefficient
Amount
1.050

488.25

6.180
0.012

32.14
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.62
769.89
769.89
104.82
874.71
874.70

14%
or say

of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials like cement, sand water
e charges, etc., complete for finished item of work, including the cost of
BLD CSTN 9-6
Coefficient
Amount
1.050

488.25

5.460
0.012
0.200

28.39
6.16
5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.59

1.000
0%
1%

22.99
0.00
0.23
789.33
107.47
896.80
897.00

14%
or say

of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof
like consistency spread @ 3.3.kgs per sqm & jointed neatly with white
t of matching shade, including cost of all materials
like CSTN
cement,
BLD
9-6sand water
e charges, etc., complete for finished item of work, including the cost of
Coefficient
Amount
1.050

488.25

5.460
0.012
0.200

28.39
6.16
5.80

0.096
0.224
0.330

40.32
84.00
105.60

0%
1%
1.000
0%
1%
14%
or say

0.00
7.59
45.98
0.00
0.46
812.55
110.63
923.18
923.00

Tiles of any size Ist Quality of make approved as by Engineer - in - Charge


00 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and neat
of Cement paste fixed with pigments of machine shade, including cost,
aterials and water etc., from approved sources to work site all operational,
ortar fixing in position, lift charges, watering curing etc., complete for
Bath rooms F1

BLD CSTN 9-6


Coefficient
Amount
1.050

433.65

6.756
0.012

35.13
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11
717.77

14%

97.72
815.49

or say

815.50

m thick (Medium shade) set over base coat of cement mortar (1:6) 12 mm
b, including near cement slurry of honey like consistency spread @ 3.3.kgs
epth mixed with pigment of matching shade including cost of all materials
plete, including seigniorage charges, complete for finished item of work,
als.
BLD CSTN 9-4
Coefficient
Amount
1.050

240.45

6.180
0.012

32.14
6.16

0.600

17.40

0.096
0.224
0.330

40.32
84.00
105.60

0%
1%

14%
or say

0.00
5.26
531.33
531.33
72.34
603.67
603.70

cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I plain washers
ng in position etc., complete for finished item of work, but excluding the
yance of all materials finished item of work upto 600 pitch
BLD-CSTN-8-4
Coefficient
Amount
14.73
2.203
2.203
2.203

2769.98
17.62
1.10
0.44

0.043
0.054
0%

16.21
17.30
0.00
25.00
150.00

14%

2997.65
408.13
3405.78
340.60

s size 0.90 x 2.10M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.

Coefficient

Amount
4.200
1.800

Total

6.000 Rm
1.890 sqm

6.00
1.89

1290.00
2967.30

14%

4257.30
579.63
4836.93

Or say

4837.00

ith (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal
b, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing
lopes and thread lining including cost of all materials like cement, metal,
niorage charges, etc., complete for finished item of work, but excluding the
BLD CSTN 9-13-111
Coefficient
Amount
0.017

29.17

12.000
0.0085

62.40
4.36

0.125
0.006
0.300
20%
1%

35.63
1.56
64.50
20.34
2.18

14%

220.14
29.97
250.11

or say

250.00

oor of size 075 x 2.00M providing door frame made of hollow extruded PVC
sions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly
hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC
ng door shutters made of rigid PVC extruded hollow section(Nandi or
thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
me is made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm
th 125mm X 225mm plastic brackets. The shutter shall be horizontally
eak wood batons shall be reinforced inside the door shutter during the
wherever the hardware is fixed on to the door shutter. PVC DOOR SHUTTER
rials conveyance charges including providing all fixtures, as per the given
the Departmental Officers for finished item of work.

Coefficient

Amount
4.000
1.500

Total

5.500 Rm
1.500 sqm

5.500

1182.50

1.500

2355.00

14%

3537.50
481.63
4019.13
4019.13

4019.13 x 1.00 sqm


1.50 sqm
Say

2679.42
2679.00
1 Sqm

Or say

4019.00

mes of Size 3'0" x 7'0" manufactured by cold rolled formed process with
nfirming to IS 4351-1976 suitable for single double leaf dof door sections,
ing 6 (six) numbers of standard lugs made from flat steel strings not less
on 50mm x 25mm minimum free fixed hinges of size 1000 x 65 x 2mm, 3
er for double shutter with one side fixed to for fixing 3 numbers for double
mbers rubber bottom inserts in frame necessary arrangements for aldrop
d tower bolts welded to frame at top and bottom and fixing 50mm long
ssembled ny mean of welding at corners including painting as directed by
ificate for raw materials and including all tolls cost and conveyance of all
work.

Coefficient

5.185
20.481
20.481

0%

Amount

1208.11
327.70
61.44
0.00
100.00

14%

1697.25
231.08
1928.33

Or say

1928.00

d fixing MS. Hallow door frames manufactured by cold roll formed process
ming to IS 4351 - 1976 size should be 50 x 60 mm with 32 mm rebate. The
ame should be painted with one coat of primer and finished painted with
Coefficient
Amount
ess of 1.25 mm. Size of door frame section should be of 105x60mm with a
door shutter. The frame section should have groove to insert gasket. The
1.000be cut to length,
233.00
e filled with polyurethane foam. The frame section should
should be provided with: a) 2mm thick MS powder coated butt hinges
of
233.00
for double shutter. b) CRCA Electroplates stifeners of 6 Nos. 3 in each
14% Aldrop Receiver
31.72
s screwed to stifeners 6 Nos. with split end tail. d) Nylon
264.72
No
or say
265.00

nd wood block board type with commercial ply on both faces.: 35 mmthick
UTTY/ STANDARD/ SHUBHDWAR/ including Labour charges for fixing Flush
door frame including fixing the fixtures to the door shutter for finished item

Coefficient

Amount

1.000

734.00

1.000

230.00

0%

0.00

14%

964.00
131.25
1095.25

or say

1095.00

on make) of superior quality to the existing Windows & Ventilaters using


p) duly fixing the tape to the Windows & Ventilaters frame using necessary
d including all taxes and all labour charges for striching,
making,
fixing in
Coefficient
Amount
ed item of work
6.40 Rm
2.510
6.400
6.400
6.400
2.510

389.05
32.00
96.00
44.80
100.40

14%

662.25
90.17
752.42

299.77

or say

300.00

ought and putup Sal Wood scantlings: any length in length including cost
and all operational, incidential, labour charges, etc., complete for finished
BLD-CSTN-13
Coefficient
Amount
1.000
17.700
8.800
0%

38847.00
7434.00
2816.00
0.00
49097.00

rought and putup in Sal Wood Plancks: any thickness in length including
k site and all operational, incidential, labour charges, etc., complete for

BLD-CSTN-13
Coefficient
Amount

1.000
17.700
8.800
0%

49491.00
7434.00
2816.00
0.00
59741.00

p Teak Wood scantlings: any length including cost and conveyance of all
dential, labour charges, etc., complete for finished item of work
BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%

81225.00
7434.00
2816.00
0.00
91475.00

tup in Teak Wood Plancks: any thickness in length including cost and
all operational, incidential, labour charges, etc., complete for finished item

BLD-CSTN-14
Coefficient
Amount
1.000
17.700
8.800
0%

116540.00
7434.00
2816.00
0.00
126790.00

work etc., complete for finished item of work

Coefficient
17.700
8.800
0%

Amount
7434.00
2816.00
0.00
10250.00

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.20 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0090

Cum
Cum

0.0405

Cum

2.2297

Sqm

2.2297

Sqm

0.0405

1988.43

2.2297

1636.60

0.0405

415.13

2.2297

512.83

0%

0.00
150.00

4702.99

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

5252.99
715.19
5968.18
5968.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.05 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0079

Cum
Cum

0.0394

Cum

1.9214

Sqm

1.9214

Sqm

0.0394

1934.42

1.9214

1410.31

0.0394

403.85

1.9214

441.92

0%

0.00
150.00

4340.50

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4890.50
665.84
5556.34
5556.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 1.00 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0075

Cum
Cum

0.0390

Cum

1.7570

Sqm

1.7570

Sqm

0.0390

1914.78

1.7570

1289.64

0.0390

399.75

1.7570
0%

404.11
0.00
150.00

4158.28

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4708.28
641.03
5349.31
5349.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.90 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0068

Cum
Cum

0.0383

Cum

1.6132

Sqm

1.6132

Sqm

0.0383

1880.42

1.6132

1184.09

0.0383

392.58

1.6132

371.04

0%

0.00

150.00

3978.13

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4528.13
616.50
5144.63
5145.00
Each

ood frame section 100x 75 mm and fixing Flush door shutters, solid bond
on both faces.: 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/
bour charges for fixing Flush door shutters of any thickness to the existing
door shutter for finished item of work. Door size 0.85 x 2.10 M
Coefficient
For Door

Amount

0.0315
0.0064

Cum
Cum

0.0379

Cum

1.5515

Sqm

1.5515

Sqm

0.0379

1860.78

1.5515

1138.80

0.0379

388.48

1.5515

356.85

0%

0.00
150.00

3894.91

e - Iron - for Internal doors (Schedule Item 293)


120.00

240.00

124.00
16.00
85.00
38.00
15.00

124.00
48.00
85.00
38.00
15.00

14%

Say

4444.91
605.17
5050.08
5050.00
Each

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 1.50x1.35

Coefficient
Amount
For Windows

0.0225

Cum
Cum

0.0630

Cum

0.0221
0.0115

Cum
Cum

0.0336

Cum

0.0268

Cum

0.0630
0.0336
0.0268
2.025

3093.11
3073.56
3397.97
1928.31

29.25

1111.50

29.25

468.00

29.25

87.75

0.0405

0%

0.00

100.00

13260.20

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00
15.00

576.00
192.00
414.00
264.00
45.00

14%

14751.20
2008.38
16759.58

Say

16760.00

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.35

Coefficient
Amount
For Windows
0.0304
0.0135

Cum
Cum

0.0439

Cum

0.0110
0.0057

Cum
Cum

0.0167

Cum

0.0152

Cum

0.0439
0.0167
0.0152
1.215

2155.36
1527.63
1927.21
1156.98

23.39

888.82

23.39

374.24

23.39

70.17

0%

0.00
80.00

8180.41

e for Windows Panelled : Double Leaf with half


(Schedule Item No. 310)
96.00
32.00
69.00
88.00
15.00

192.00
128.00
276.00
176.00
30.00

14%

8982.41
1222.96
10205.37

Say

10205.00

y using Salwood frame of section 100x75 mm and shutter using Teak wood
uding cost and conveyance of Salwood, Teakwood and providing MS Grills
ng MS safty grills to frame including labour charges and fixing in position
cted by Engineer - in - Charge. SIZE 0.90 x 1.07

Coefficient
Amount
For Windows
0.0241
0.0135

Cum
Cum

0.0376

Cum

0.0090
0.0047

Cum
Cum

0.0137

Cum

0.0152

Cum

0.0376
0.0137
0.0152
0.963

1846.05
1253.21
1927.21
917.02

23.39

888.82

23.39

374.24

23.39

70.17

0%

0.00
80.00

7356.72

e for Windows Panelled : Double Leaf with half


(Schedule Item No. 310)
96.00
32.00
69.00
88.00
15.00

192.00
128.00
276.00
176.00
30.00

14%

8158.72
1110.81
9269.53

Say

9270.00

ntilators by using salwood frame of 75 x 50mm & and fixing 2 numbers of


ng 4mm thick pin headed glass including cost and conveyance of all
p & fixing in position etc., complete for finished item of work as directed by

Coefficient

Amount

For Glazed Ventilator


0.00675
0.00675

Cum
Cum

0.0135

Cum

0.0135
0.540
0.54
0%

662.81
514.22
180.36
0.00

2.034

77.29

2.034

32.54

2.034

6.10

0%

0.00
60.00

1533.32

14%

1533.32
208.76
1742.08

Say

1742.00

ntilators by using salwood frame of 75 x 50mm & and fixing 2 numbers of


ng 4mm thick pin headed glass including cost and conveyance of all
p & fixing in position etc., complete for finished item of work as directed by
Coefficient

Amount

For Glazed Ventilator

0.00338

Cum
Cum

0.00788

Cum

0.00450

0.00788
0.270

386.88
257.11

0.27
0%

90.18

1.017

38.65

1.017

16.27

1.017

3.05

0%

0.00

0.00
60.00

852.14
14%

852.14
116.02
968.16

Say

968.00
8676.65

8676.65 x 1.00 sqm


2.03 sqm

4284.77
Say

4285.00

alwood) Fully Panneled Door of size 100 x 2.00 Door single leaf door frame
try wood 3"x4" free from all difects such as werping, bending, knot etc.,
40mm size and with 1 1/2 thick best country wood styles and rise using 7/8"
fications of APDSS including cost, wrought and putup and conveyance of all
Coefficient
Amountby
laber charges for making, fixing of door furniture in
position as directed
For Door
: Size), Bottom Tower bolts 150mm long, Brass Butt
hinges (IS:205)- 150
1) 250 mm long, Heavy duty Aluminium Door stopper, Aluminium Door
ated Aldrop (IS:2681) 300 mm long and all labour charges such as diricted
of work. for External doors (Schedule Item 292)

1.096
0.274
0.520

Cft
Cft

0.116

Cft
Cft

0.436

Cft

2.442

Cft

1.299

Cft

1.299

Cft

2.442
1.299
0.106

3395.01
2197.47
1086.50

150.00

e - Iron - for External doors (Schedule Item 292)


86.00
69.00
166.00
38.00
85.00
124.00

14%

172.00
138.00
996.00
38.00
85.00
124.00
8381.98
1141.21
9523.19
9523.19

Say

9523.19 x 1.00 sqm


2.00 sqm
Say

9523.00

4761.60
4762.00
1 Sqm

(Salwood) Fully Panneled Door of size 1.00 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
Amountas
axes, all laber charges for making, fixing of doorCoefficient
furniture in position
Forlong,
DoorAluminium Butt
er bolts (Ave : Size), Bottom Tower bolts 150mm
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental
Officers
1.096
Cft for
dule Item 293)
0.274
Cft

0.520
0.116

Cft
Cft

0.436

Cft

2.442

Cft

1.299

Cft

1.299

Cft

2.442
1.299
0.106

3395.01
2197.47
1086.50

150.00

6828.98

e - Iron - for Internal doors (Schedule Item 293)


86.00
69.00
100.00
104.00
38.00
85.00

86.00
69.00
600.00
104.00
38.00
85.00

14%

7810.98
1063.46
8874.44

Say

8874.00
8874.44

8874.44 x 1.00 sqm


2.00 sqm
Say

4437.22
4437.00
1 Sqm

(Salwood) Fully Panneled Door of size 0.75 x 2.00M Door single leaf door
t country wood 3"x4" free from all difects such as werping, bending, knot
300x40mm size and with 1 1/2 thick best country wood styles and rise using
pecifications of APDSS including cost, wrought and putup and conveyance
axes, all laber charges for making, fixing of door furniture in position as
er bolts (Ave : Size), Bottom Tower bolts 150mm long, Aluminium
Butt
6828.98
ated Aldrop (IS:2681) 250 mm long, Heavy duty Aluminium Door stopper,
ng and all labour charges such as diricted by the Departmental Officers for
5121.74
dule Item 293)
2.00 sqm

e - Iron - for Internal doors (Schedule Item 293) as per


em.
86.00
69.00
100.00

86.00
69.00
600.00

104.00
38.00
85.00

104.00
38.00
85.00
6103.74

14%

831.02
6934.76

Say

6935.00

(Salwood) Fully Panneled Window of size 1.50 x 1.20M Three Panneled


seasoned best country wood 2 1/2"x3" free from all difects such as werping,
hold fasts of size 300x40mm size and with 2 Nos Mild steel screws of
d styles and rise using 7/8" thick Sal wood flanks for pannels with welded
Coefficient
Amount
as per specifications of APDSS including cost, wrought
and putup
and
For Windows
cluding all taxes, all laber charges for making, fixing
of Panneled Window
ers including Top Tower bolts Alluminium 150mm long, Bottom Tower bolts
- 100 mm Long, Window stoppers Aluminium, and all
labour charges
0.618
Cft such
ished item of work.
0.512
Cft
0.866

Cft

0.547

Cft

2.543

Cft

0.742

Cft

0.742

Cft

2.543
0.742
0.093

3535.43
1255.21
953.25

120.00

5863.89

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00
15.00

576.00
384.00
414.00
264.00
15.00

14%

7636.89
1039.76
8676.65

Say

8677.00
8676.65

8676.65 x 1.00 sqm


1.80 sqm

4820.36

Say

4820.00

(Salwood) Fully Panneled Window of size 1.80 x 1.20M Three Panneled


seasoned best country wood 2 1/2"x3" free from all difects such as werping,
hold fasts of size 300x40mm size and with 2 Nos Mild steel screws of
d styles and rise using 7/8" thick Sal wood flanks for pannels with welded
Coefficient
Amount
as per specifications of APDSS including cost, wrought
and putup
and
cluding all taxes, all laber charges for making, fixing of Panneled 5863.89
Window
ers including Top Tower bolts Alluminium 150mm long, Bottom Tower bolts
- 100 mm Long, Window stoppers Aluminium, and all labour charges such
ished item of work.
7036.67
1.80 sqm

e for Windows Panelled : Thrible Leaf with half


(Schedule Item No. 309 & 310)
96.00
32.00
69.00
88.00

576.00
384.00
414.00
264.00
8674.67

14%

1181.06
9855.73

Say

9856.00

ith whiting of approved quality to give an even shade after thoroughly


emains of loose powdered materials including cost of all materials, labour
ft charges etc., complete for finished item of work, including conveyance

BLD CSTN 9-5


Coefficient
Amount
0.200

2.80

0.006
0.015
0.032
0%

2.88
5.63
10.24
0.00

14%

21.55
2.93
24.48

or say

24.50

hiting of approved quality to give an even shade after thoroughly brushing


loose powdered materials including cost of all materials, labour charges
etc., complete for finished item of work, including conveyance charges of
BLD CSTN 9-4
Coefficient
Amount
0.120

1.68

0.003
0.008

1.26
3.00

0.022
0%

7.04
0.00

14%

12.98
1.77
14.75

or say

15.00

proof cement paint of apporved brand and shade over a base coat of
oats in all to give an even shade after thourughly brushing the surface to
d materials, including cost and conveyance of all materials to work site and
BLD CSTN 10-5
complete for finished item of work as per SS 912 for Extarnal walls for All
Coefficient
Amount
0.100

10.00

0.021
0.049
0%

10.08
18.38
0.00

0.350

12.25

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

14%

119.04
16.21
135.25

or say

135.00

nd approved Water Proof Cement Paint over Priming Coat, 2 Coats


making 2 coats in all to give an even shade after thourughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 912 for

BLD CSTN 12-4


Coefficient
Amount
0.350

12.25

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

1%

0.81

14%

81.39
11.08
92.47

or say

92.00

nd approved Water Proof Cement Paint over Priming Coat, One Coat
ver a base coat of approved cement primer grade I making making 2 coats
y brushing the surface to remove all dirt and remains of loose powdered
ll materials to work site and all operational, incidental, labour charges etc.
12 for Extarnal walls for All Floors

BLD CSTN 10-3


Coefficient
Amount
0.200

7.00

0.009
0.021
0.150
0%

4.32
8.82
56.25
0.00

1%

0.76

14%

77.15
10.50
87.65

or say

88.00

mixed oil bound wahsable distemper of approved brand and shade over a
brand, making 3 coats in all to give an even shade after thourughly
emains of loose powdered materials, including cost and conveyance of all
idental, labour charges etc. complete for finished item of work as per SS

BLD CSTN 10-1


Coefficient
Amount

0.050

5.00

0.0024
0.0133
0%

1.15
4.99
0.00

0.170

10.20

0.036
0.084
0%

17.28
31.50
0.00

1%
14%
or say

0.59
70.71
9.63
80.34
80.30

oats with Oil Bound Distemper of approved brand and shade making 2
ourughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls for All Floors
BLD CSTN 9-10
Coefficient
Amount
0.170

10.20

0.036
0.084
0%

17.28
31.50
0.00

1%

0.59
59.57
8.11
67.68
68.00

14%
or say

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11-i
Coefficient
Amount
0.050

9.00

0.021
0.049
0%

10.08
18.38
0.00

1%

0.37

14%

37.83
5.15
42.98

or say

43.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal

BLD CSTN 12-11 ii


Coefficient
Amount
0.080

14.40

0.036
0.084
0%

17.28
31.50
0.00

1%

0.63

14%

63.81
8.69
72.50

or say

73.00

mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for internal walls

BLD CSTN 12-11 ii-a


Coefficient
Amount
0.050

5.00

0.008
0.019
0%

3.84
7.13
0.00

0.080

14.40

0.036
0.084
0%

17.28
31.50
0.00

1%

0.79

14%

79.94
10.88
90.82

or say

91.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
r charges etc. complete for finished item of work as per SS 911 for internal
BLD CSTN 12-11 vi
Coefficient
Amount
0.070

12.60

0.036
0.084
0%

17.28
31.50
0.00

1%

0.61

14%

61.99
8.44
70.43

or say

70.00

ylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/


hade over a base coat of appropriate primer of approved brand, making 3
o remove all dirt and remains of loose powdered materials, including cost
and all operational, incidental, labour charges etc. complete for finished

BLD CSTN 12-11 ii-a


Coefficient
Amount
0.050

5.00

0.008
0.019
0%

3.84
7.13
0.00

0.080

10.88

0.036
0.084
0%

17.28
31.50
0.00

1%

0.76

14%

76.39
10.40
86.79

or say

87.00

ylic Exterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/


hade after thoroughly brushing the surface to remove all dirt and remains
nd conveyance of all materials to work site and all operational, incidental,
of work as per SS 911 for internal walls

BLD CSTN 12-11 vi


Coefficient
Amount
0.070

9.52

0.036
0.084
0%

17.28
31.50
0.00

1%

0.58

14%

58.88
8.02
66.90

or say

67.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-iv
Coefficient
Amount

0.050

9.00

0.015
0.035
0.150
0%

7.20
13.13
48.00
0.00

14%

77.33
10.53
87.86

or say

88.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.080

14.40

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

14%

90.86
12.37
103.23

or say

103.00

mulsion paint of approved brand and shade over a base coat of appropriate
er thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v-a
Coefficient
Amount
0.100

10.00

0.021
0.049
0%

10.08
18.38
0.00

0.080

14.40

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

14%

129.32
17.61
146.93

or say

146.90

xterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or


a base coat of appropriate primer of approved brand, making 3 coats after
all dirt and remains of loose powdered materials,
including
cost and
BLD CSTN
12-11-v-a
ll operational, incidental, labour charges etc. complete for finished item of
Coefficient
Amount
0.100

10.00

0.021
0.049
0%

10.08
18.38
0.00

0.080

10.88

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

1%

1.26

14%

127.06
17.30
144.36

or say

144.00

mulsion paint of approved brand and shade after thoroughly brushing the
se powdered materials, including cost and conveyance of all materials to
our charges etc. complete for finished item of work as per SS 911 for
BLD CSTN 12-11-v
Coefficient
Amount
0.070

12.60

0.021
0.049
0.150
0%

10.08
18.38
48.00
0.00

1%

0.89

14%

89.95
12.25
102.20

or say

102.00

xterior Emulsion Asian/ Berger/ Nerolac/ Saicoat/Indocem/ PMCC/ ESSAR or


r thoroughly brushing the surface to remove all dirt and remains of loose
eyance of all materials to work site and all operational, incidental, labour
k as per SS 911 for external walls
BLD CSTN 12-11-v
Coefficient
Amount
0.070

9.52

0.021

10.08

0.049
0.150
0%
1%

18.38
48.00
0.00
0.86

14%

86.84
11.82
98.66

or say

99.00

oats - For New Iron Work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-12-v
Coefficient
Amount
0.110

18.70

0.033
0.077
0%

15.84
28.88
0.00

14%

63.42
8.63
72.05

or say

72.10

Coats - for New Wood Work of approved brand and shade, making 3 coats
brushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors

BLD CSTN 12-12-vii


Coefficient
Amount
0.170

28.90

0.048
0.112
0%

23.04
42.00
0.00

14%

93.94
12.79
106.73

or say

106.70

oats - for Old Wood work of approved brand and shade, making 2 coats in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential, labour charges, etc.,
207 & 1212. for All Floors
BLD CSTN 12-10-iv
Coefficient
Amount

0.110

18.70

0.036
0.084
0%

17.28
31.50
0.00
67.48
9.19
76.67
77.00

14%
or say

oved brand for new wood work of teak wood frame and shutters to give an
uding cleaning the surface of all dirt, dust, etc. , and applying a coat of
d conveyance of all materials to work site andall operational, incidental,
BLD CSTN 12-15
m of work as per SS 1212. for All Floors
Coefficient
Amount
0.023

2.10

0.163

11.41

0.096
0.224
0%

46.08
84.00
0.00

14%

143.59
19.55
163.14

or say

163.00

oat - For Old Iron Work of approved brand and shade, making 1 coat in
rushing the surface to remove all dirt and remains of loose powdered
lmaterials to work site and all operational, incidential,
charges, etc.,
BLD labour
CSTN 12-12-ii
207 & 1212. for All Floors
Coefficient
Amount
0.050

8.50

0.021
0.049
0%

10.08
18.38
0.00

14%

36.96
5.03
41.99

or say

42.00

ai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water Based
sai coat/ Neon/indocem super track for internal walls (Emulsion Paint) to
ed materials including cost of all materials, labour charges and incidental
e for finished item of work, including conveyance charges of materials for

t/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon Water for All Floors

Coefficient
1.000

Amount
95.00

14%

95.00
12.93
107.93

or say

108.00

Tiles of any size Ist Quality of make approved as by Engineer - in - Charge


00 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and neat
of Cement paste fixed with pigments of machine
shade,
cost,
BLD
CSTNincluding
9-6
aterials and water etc., from approved sources to work site all operational,
Coefficient
Amount
ortar fixing in position, lift charges, watering curing etc., complete for
r Bath rooms F2
1.050

433.65

6.756
0.012

35.13
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11

1.000
0%
1%

22.99
0.00
0.23

14%

740.99
100.89
841.88

or say

842.00

Tiles of any size Ist Quality of make approved as by Engineer - in - Charge


00 x 100 mm set over 12mm thick in C.M. (1:5) Prop.based coat and neat
of Cement paste fixed with pigments of machine
shade,
cost,
BLD
CSTNincluding
9-6
aterials and water etc., from approved sources to work site all operational,
Coefficient
Amount
ortar fixing in position, lift charges, watering curing etc., complete for
r Bath rooms F3
1.050

433.65

6.756
0.012

35.13
6.16

0.200

5.80

0.096
0.224
0.330
0%
1%

40.32
84.00
105.60
0.00
7.11

1.000
0%
1%

45.98
0.00
0.46

14%

764.21
104.05

868.26
or say

868.00

height/risers of steps with ceramic tiles 7.30 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching shade to full depth,
ent, sand and water etc., complete including seigniorage charges, etc.,
he cost of conveyance of all materials for F1

BLD CSTN 9-17


Coefficient
Amount
1.100

411.40

6.756
0.012

35.13
6.16

0.200

5.80

0.077
0.080
0%
1%
Basic rate 1 sqm

32.34
30.00
0.00
5.21
526.04

14%

526.04
71.62
597.66

or say

598.00

height/risers of steps with ceramic tiles 7.30 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching
shade 9-17
to full depth,
BLD CSTN
ent, sand and water etc., complete including seigniorage
charges,
etc.,
Coefficient
Amount
he cost of conveyance of all materials for F2
Basic rate 1 sqm
526.04
1.000
0%
1%
14%
or say

32.00
0.00
0.32
558.36
76.02
634.38
634.00

height/risers of steps with ceramic tiles 7.30 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching
shade 9-17
to full depth,
BLD CSTN
ent, sand and water etc., complete including seigniorage
charges,
etc.,
Coefficient
Amount
he cost of conveyance of all materials for F3
Basic rate 1 sqm
526.04
1.000
0%
1%
14%

64.00
0.00
0.64
590.68
80.42
671.10

or say

671.00

thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-2 charges
or finished item of work, for F1
Coefficient
Amount

1.050

90.30

3.120
0.014

16.22
7.19

0.096
0.224
0.330
0%
1%
Basic rate 1 sqm

40.32
84.00
105.60
0.00
3.44
347.07

14%

347.07
47.25
394.32

or say

394.00

thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-2 charges
or finished item of work, for F2
Coefficient
Amount
Basic rate 1 sqm
1.000
0%
1%

347.07
22.99
0.00
0.23

14%

370.29
50.41
420.70

or say

421.00

thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over
pointing with cement mortar 1:3 duly filling joints nearly, including cost of
, and water etc., complete, including seigniorageBLD
charges,
CSTNlabour
9-23 charges
or finished item of work, for F3
Coefficient
Amount
Basic rate 1 sqm
347.07
1.000
0%
1%

45.98
0.00
0.46

14%

393.51
53.58
447.09

or say

447.00

eight/risers of steps with 15 to 18 mm mm thick polished Shahabad stone


coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
ointed with white cement paste mixed with pigment of matching shade to
ke Shahabad stone, cement, sand and water etc., complete including
d item of work, including the cost of conveyance of all materials for F1

BLD CSTN 9-23


Coefficient
Amount
1.100

142.01

9.060

47.11

0.012

6.16

0.500

14.50

0.096
0.224
0.310
0%
1%
Basic rate 1 sqm

40.32
84.00
99.20
0.00
4.33
437.63

14%

437.63
59.58
497.21

or say

497.00

eight/risers of steps with 15 to 18 mm mm thick polished Shahabad stone


coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
ointed with white cement paste mixed with pigment
matching
BLDofCSTN
9-23shade to
ke Shahabad stone, cement, sand and water etc., complete including
Coefficient
Amount
d item of work, including the cost of conveyance of all materials for F2
Basic rate 1 sqm
437.63
1.000
0%
1%
14%
or say

22.35
0.00
0.22
460.20
62.66
522.86
523.00

eight/risers of steps with 15 to 18 mm mm thick polished Shahabad stone


coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency
ointed with white cement paste mixed with pigment of matching shade to
BLD CSTN 9-23
ke Shahabad stone, cement, sand and water etc., complete including
Amount
d item of work, including the cost of conveyance ofCoefficient
all materials for
F3
Basic rate 1 sqm
437.63
1.000
0%
1%

44.70
0.00
0.45

14%

482.78
65.73
548.51

or say

549.00

mm bar bibs as per design in plate No. 22/2/2. (earth work & concrete to
conveyance of all materials like cement, fine aggregate (sand) coarse
Seigniorage charges, sales & other taxes on all materials including all
BLD CSTN 14-6
ch as machine mixing, laying concrete, curing etc.,complete but excluding
Amount
shed item of work, including centering, shuttering.Coefficient

0.336

1935.42

26.440

1370.41

9.880

1196.76

0.120
0.120
0.250
0%

50.40
45.00
80.00
0.00
4677.99
636.91
5314.90
531.49
295.27
295.00

14%

or say

0.015
0.060
0.096
0%

65.21
25.20
30.72
0.00
121.13

Cement : Sand) using hard variety of rough stone other than granite from
ce of all materials like cement, sand, masonary stones, water, etc., to site
terials including all labour charges like mixing cement mortar, wall
ed item of work in foundation & Basement. (APSS No. 615 & 601) For RR
BLD CSTN 6-13
Coefficient
Amount
59.400

308.88

0.440

361.67

0.500

356.83

0.160

234.22

0.330

169.43

1.200
2.000
0%

504.00
640.00
0.00
2575.03

14%

350.59
2925.62

or say

2926.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other taxes on all materials
r charges such as machine mixing, laying concrete, curing etc.,complete
up to 3.66, lift manuals per APSS. No. 402. F2

BLD CSTN 3-12:29


Coefficient
Amount
Basic rate 1 cum
4297.49

1.000

723.00

0%
1.000
0%

0.00
67.66
0.00

14%

5088.15
692.75
5780.90

or say

5781.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-12:29
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4297.49

1.000

723.00

0%
1.000
0%

0.00
135.32
0.00

14%

5155.81
701.96
5857.77

or say

5858.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F1
220.000

1144.00

0.450

231.04

0.900
1.200

1728.65
92.40

1.000
0%
0.100
1.390
0%
Basic rate 1 cum

1.000
0%

328.60
0.00
42.00
444.80
0.00
4011.49

723.00
0.00

14%

4734.49
644.60
5379.09

or say

5379.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F2
Basic rate 1 cum
4011.49
1.000
0%
1.000
0%

723.00
0.00
67.66
0.00

14%

4802.15
653.81
5455.96

or say

5456.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-10
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4011.49
1.000
0%
1.000
0%

723.00
0.00
135.32
0.00

14%

4869.81
663.02
5532.83

or say

5533.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-11:28
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F2
Basic rate 1 cum
4583.49

1.000

723.00

0%
1.000
0%

0.00
67.66
0.00

14%

5374.15
731.69
6105.84

or say

6106.00

56 Nominal mix, using 20 mm graded machine crushed Hard Granite metal


luding cost and conveyance of all materials like cement, fine aggregate
and including Seigniorage charges, sales & other
taxes
all materials
BLD
CSTNon
3-11:28
r charges such as machine mixing, laying concrete, curing etc.,complete
Coefficient
Amount
up to 3.66, lift manuals per APSS. No. 402. F3
Basic rate 1 cum
4583.49

1.000

723.00

0%
1.000
0%

0.00
135.32
0.00

14%

5441.81
740.90
6182.71

or say

6183.00

Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with


anite metal (coarse aggregate) from approved quarry including cost and
e aggregate (sand) coarse aggregate, water etc.,
to site and Amount
including
Coefficient
l materials including all operational, incidental and labour charges such as
crete, curing etc.,complete including HIRE CHARGES FOR CENTERING &
2184.00
d its fabrication charges for finished item of work420.000
(APSS No. 402)
with
0.400
205.37
um as per IS code from standard suppliers approved by the department
g, laying concrete, vibrating, curing etc. complete 0.800
but excluding1536.58
cost of
em of work for FOUNDATIONS, PLINTH, PEDASTALS, centering
with Stell
up
1.200
92.40
FI
1.333
0%
1.333
0%

696.49
0.00
220.88
0.00

0.133
55.86
0.267
100.13
4.600
1472.00
0%
0.00
BACIC RATE 1 Cum
6563.71
BLD CSTN 3-14:31A
BACIC RATE 1 Cum
1.000
0%

6563.71
723.00
0.00

14%

7286.71
992.09
8278.80

or say

8279.00

fixed with all accessories (stappers, bolts and stoppers etc.,) with all sizes
ed drawings with alluminium single shutter with allround frame section of
fixed with alluminium single shutter with vertical styles of sizes 47.62 x
45x 1.95 mm (19571) lock rail of sized 49.91x44.45x2.01mm (20060 and
5) with archit clural accessories having section 88x40x3.2 mm (19456) and
of size 79x 17.30 x0.10mm (19352) for height of 1.20 m pre laminated
equivalent ) of 10mm thick to a hight of 0.91 m at bottom panel PVC/
y duty floor spring including cost and conveyance of all materials and
ation and fixing in position as directed by the Engineer in Charge.

Coefficient

Amount

Weght
Kg
10.08
4.42
0.88
0.96
1.37
11.93
0.38
30.02
3.73
33.75 Kgs
1.08 Sqm
0.82 Sqm
33.75

8437.50

1.08

576.72

0.82

467.40
2422.00
312.00
300.00
138.00
34.00

1.00
1.00
3.00
2.00
1.00

0%

331.01
590.39
295.55
295.55
756.40
0.00

1.515

159.04

0.788
1.574
0.788
0.788
2.364

1.515

146.92

1%

152.62

14%

15415.10
2098.77
17513.87
9266.60

17,513.87 / 1.89=
Or say

9267.00

minium fully glazed door as per approved drawing using side vertical and
0 mm with double shutters using shutters frame of size 47 x 44.45 x 1.80
nd 114.30 x 44.45 mm 2.30 mm for bottom and sutter vertical side frames
Coefficient
Amount
ssery glazing clips of size 19 x 17.30 x 0.80 mm and rubber for beeding 5
s, 2 nos locks and 4 nos round door handles necessary fixed with all
Weght
) including cost and conveyance of all materials and
accessories including
sition as directed by the Engineer in Charge. for 1.52Kg
m x 1.32 m as per
15.71
7.46
2.47
2.28
4.93
32.85
1.64
2.38
2.52
39.39 Kgs
69.85
69.85
69.85 RM
7.10
0.71
7.81 Sqm
39.39

9847.50

69.85
7.81

139.70
4451.70
4844.00
948.00
624.00
600.00
276.00
68.00

2.00
2.00
2.00
6.00
4.00
2.00

0%

295.08
527.25
263.63
263.63
674.88
193.33
0.00

5.630

591.15

0.703
1.406
0.703
0.703
2.109
0.703

5.630

1%
14%

546.11
251.54
25405.50
3458.96
28864.46
4065.42

28,864.46 / 7.10=
Or say

4065.00

nd fixing door frames fabricated from sections made of galvanized steel


vanised as per IS 277 with zinc of 120 grams / square metre). The factory
ting of pure Polyester Powder of 50-60 microns thick with total coated
ection should be of 105x60mm with a rebate of 38mm to accommodate
should have groove to insert gasket. The section of the door and fan light
The frame section should be cut to length, and joined by way of welding
mm thick MS powder coated butt hinges of 100nn long 3 Nos. for single
ectroplates stifeners of 6 Nos. 3 in each vertical. c) 40mm x 200mm x
os. with split end tail. d) Nylon Aldrop Receiver 1 No. for single shutter

Coefficient

Amount

1.000

385.00

14%

385.00
52.42
437.42

or say

437.00

Equivalent BRAND FACTORY MADE MOULDED DOOR SHUTTER consisting of


kness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and
width on the other stiles and bottom rails. The inner panel laminated with
e resistant moulded Pac sheet with 2,4,6 raised panel design in diferent
r routing the moulded design on flush door and 2mm prelam Pac sheet on
door and solvent cement adhesive on Pac lipping etc. complete as per
specification and drawing

Coefficient

Amount

1.000

2900.00

14%

2900.00
394.84
3294.84

or say

3295.00

OWS, VENTILATORS & DOOR FRAMES. Supply and fixing of windows & top
pre - painted steel (base steel as per IS 513 of -0.6 mm thick 'D" quality,
) primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
9.2x1828.8mm) outer frame section size of 46 x 52 mm shutter frame
uld be 46 x 46 mm section for mullion should be 46 x 70 mm, and section
e of 46 x 70 mm (Code BMT-P.13)
n for louvered ventilation should be 33 x57mm Box section. The windows
Coefficient
Amount
glass & 4 mm pinhead glass for ventilators with Ethyl
propylene
Diamine
be cut to length mitre joined with corner brocket centre mullions are to be
grade aluminium powder coated and nylon receiver. Gaskets
of Ethyl
1.000 made 4630.00
brackets made of CRCA with Zinc Phosphate. Mullion caps made 4630.00
of glass
xed to the concrete /masonry wall by means of self expanding screws.
ch complete for finished item of work.

14%
or say

630.37
5260.37
5260.00

9.2x1371.6mm) outer frame section size of 46 x 52 mm shutter frame


e of 46 x 70 mm (Code BMT-P.12)
Coefficient

Amount

1.000

5195.00

14%

5195.00
707.30
5902.30

or say

5902.00

x1371.6mm) outer frame section size of 46 x 52 mm shutter frame section


70 mm (Code BMT-P.10)
Coefficient

Amount

1.000

5195.00

14%

5195.00
707.30
5902.30

or say

5902.00

rame section size of 33 x 57 mm Mullion section size of 33 x 57 (Code BMTCoefficient

Amount

1.000

3685.00

14%

3685.00
501.71
4186.71

or say

4187.00

gid PVC extruded hollow section(Nandi or equivalent) of 20mm X 200 mm


equally divided into 4 no's with tongue and groove locking arrangements.
with the wall thickness of 1.5mm +/-0.15mm section
mitre-cut and
joined
Coefficient
Amount
ackets. The shutter shall be horizontally reinforced with 2 no's of 8mm PVC
nside the door shutter during the fabrication of the door shutter at those
1.000
1795.00
door shutter.
14%

1795.00
244.39
2039.39

or say

2039.00

sign including cost Mild steel and all Labour charges for fabricating steel
ills, Iron Doors, Windows including cost of welding rods, power charges,
y the Departmental Officers for finished item of work.
Coefficient
Amount
1.000

38.00

1.000

16.00

1.000

3.00

0%

0.00

14%
Say

57.00
7.76
64.76
65.00
1 Kg

wn water take pipes-2.5mm thick including cost of necessary P.V.C Bends,


and fixing in position including cost and conveyance of all materials, Sales
tional and Incidental charges including all labour charges
for fixing
at site
Coefficient
Amount
0.330
0.330
0.330
0.330
1.000
1.400
14%
or say

126.39
27.72
18.48
4.95
14.00
81.20
272.74
37.13
309.87
309.90

WR pipe - 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand including cost of


d all other accessories and fixing in position including cost and conveyance
materials to site, Operational and Incidental charges
including Amount
all labour
Coefficient
hed itemof work.
0.330
0.330
0.330
0.330
1.000
1.400

66.66
17.49
9.90
3.63
12.00
81.20

14%

190.88
25.99
216.87

or say

217.00

k fixing in position including cost and conveyance of all materials to site,


ll labour charges for fixing at site etc; complete for finished itemof work.
Coefficient
1.000

Amount
335.00

14%

335.00
45.61
380.61

or say

381.00

x 1.25 mm machine rolled CRCA laths, interlocked together through their


ds by end-locks, mounted on specially designed pipe shaft of 50mm dia
plates, guide channels, stoppers, bottom locking plates
and arrangements
Coefficient
Amount
erations including cost of hood cover and springs complete, painted with
l bearings, all accessories etc complete for finished item of work as per
1.000 and Incidental
2000.00
cost and conveyance of all materials to site, Operational
at site etc; complete for finished itemof work.
2000.00
14%

272.30
2272.30

or say

2272.00

g including cost of Teak wood 1 st quality conveyance to site, loading and


making, fixing, finishing etc., complete as directed by the Departmental

oil bound wahsable distemper (overall 3 coats) for All Floors

Coefficient
1.000

BLD CSTN 10-1

Amount
81225.00

10%

8122.50

17.700
8.800
0%

7434.00
2816.00
0.00

35.315
0%

8122.45
0.00

14%

107719.95
14666.07
122386.02

or say

122386.00

Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.
BLD CSTN 4-2-V
Coefficient
Amount
67.200

349.44

0.940

772.66

0.160

234.22

0.280

143.76

2.222

211.11

2.500
2.320
0%

1050.00
742.40
0.00

14%

3503.59
477.01
3980.60

or say

3981.00

trap using 15 Nos of 32mm MS Steel rods welded as equal spacing over 6
in position on the already laid concrete walls, including all labour charges
on, cost of welding rods etc., complete as directed by the Departmental

9.18 Rm x 6.80 Kgs/ 1Rm


###
Total

62.42
388.07
450.49 Kgs

450.490

17118.62

450.490
0%
450.490
0%

5405.88
0.00
1351.47
0.00

14%

23875.97
3250.71
27126.68

or say

27127.00

Particle Board) ALUMINIUM PARTATIONS-Supply and fixing of BISON LAM


NLAM and 5.50 mm thick plain glass to full height. Using with BISON LAM to
remaining height with glass and aluminum sections anodized to 12 to 15
m and 1.5mm thickness with one meter centre to centre duly fixed with clip
me to pillars by M.S. flats, bolts and nuts including cost and conveyance of
Departmental Officers for finished item of work.

1.000

2625.00

14%

2625.00
357.39
2982.39

or say

2982.00

NLAM (Pre-Laminated Cement Bonded Particle Board) - Supply and fixing of


using BISONPANEL for making frame of size 100mm x 35mm using two
nd one BISONLAM with plain 35mm wood lipping. The Shutters are made of
t Bonded Particle Board) of approved shade inclusive of hardware like M.S.
Aluminum powder coated handles of size 4 (101.6mm), Aluminum tower
od lipping and Fevicol etc., complete as directed by the Departmental

1.000

2250.00

1.000

127.50

14%

2377.50
323.70
2701.20

or say

2701.00

height/risers of steps with Vitrified tiles 8 to 10 mm thick length equal to


) 12 mm thick with cement slurry of honey like consistency spread at the
hite cement paste mixed with pigment of matching shade to full depth,
ent, sand and water etc., complete including seigniorage charges, etc.,
he cost of conveyance of all materials for F2
BLD CSTN 9-15
Coefficient
Amount
0%
1444.32
1.000
0%
1%

22.99
0.00
0.23

14%

1467.54
199.81
1667.35

or say

1667.00

Glazing: Providing and Fixing Top Hung shutters in Structural Glazing


Pre-painted Steel / Powder coated (Base steel as per IS 513 of D quality,
m/Sqm) with total coated thickness of 0.72mm. The glass holding section
hick. Galvanized steel sections are to be used as stifeners inside the colour
e design requirement. Design calculations are made to suit wind pressures
mer of 5-7 microns thick and back coated with Alkyd backer of 5-7 microns
up to 50-60 microns thick. The outer frame should be of 20mm x 58mm x
33mm x 0.72 mm, stifener section should be 56mm x 31mm x 1mm. EARL
minium Stays 2 Nos. for each shutter, Aluminium Handle 1 no. for each
yance of all materials to site, all labour charges, incidental charges, cost of
form work etc. complete for finished item of work

Coefficient

Amount

1.000

4246.00

14%

4246.00
578.09
4824.09

or say

4824.00

Sort (Cement : Sand) using hard variety of rough stone other than granite
eyance of all materials like cement, sand, masonary stones, water, etc., to
materials including all labour charges like mixing cement mortar, wall
d item of work.

BLD CSTN 4-3


Coefficient
Amount
76.800

399.36

0.940

772.66

0.160

234.22

0.320

164.29

1.500
2.320
0%

630.00
742.40
0.00

14%

2942.93
400.68
3343.61

or say

3344.00

to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours,


hine cut and flat nosed and set over 12mm thick CM (1:5) prop. base coat
ls and water from approved sources to work site including seignorage
and all operational , incidental and labour charges such as mixing cement
rubbing, lift charges, curing, etc., complete for finished item of work,
als for F1
BLD CSTN 9-23
Coefficient
Amount

1.100

2530.00

6.756

35.13

0.012

6.16

0.500

12.50

0.096
0.224
0.310
0%
1%

40.32
84.00
99.20
0.00
28.07

3.333

30.00

Basic rate 1 sqm

2865.38

14%

2865.38
390.12
3255.50

or say

3256.00

Teak Veneer Decorated Plywood (IS:1328) The rate is inclusive of cost and
charges, incidental charges, cost of all consumables etc. and scafolding
tem of work
Coefficient

Amount

1.000

1045.00

1.000
0%

317.00
0.00

14%

1362.00
185.44
1547.44

or say

1547.00

to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours,


hine cut and flat nosed and set over 12mm thick CM (1:5) prop. base coat
ls and water from approved sources to work site including seignorage
and all operational , incidental and labour charges such as mixing cement
rubbing, lift charges, curing, etc., complete for finished item of work,
als for F2
BLD CSTN 9-23
Coefficient
Amount
Basic rate 1 sqm
2865.38
1.000
0%
1%

22.35
0.00
0.22

14%

2887.95
393.19
3281.14

or say

3281.00

0.170

10.20

0.036
0.084
#REF!

#REF!
#REF!
#REF!

1%

#REF!

#REF!

#REF!
#REF!
#REF!

or say

#REF!

f pre painted steel (base steel as per IS 513 of 0.6 mm thick D quality,
M) Primer coated with epoxy primer of 5-7 microns thick, finish painted with
back coated with 5-7 microns thick alkyd backer. Section for outer frame
Coefficient
ould be 46 x 70 mm and section for beading should
be 18 x 25Amount
mm. The
plain float Glass with Ethyl Propylene diameine Monomer (EPDM) Gaskets.
ned with corner bracket. Centre mullions are to be fixed suing mullion cap.
er coated and nylon receiver. Gaskets made of Ethyl propylene Diamine
RCA with zinc phosphating. Mullion caps made of Glass
The
1.000filled nylon.
3673.00
/ masonry wall be means of self expanding screws. & complete for finished
mm) grid outer frames section size of 46 x 52 mm

14%

3673.00
500.08
4173.08

or say

4173.00

Masonry finishing cost of all materials, seigniorage charges, including


g all operational, incidental and labour charges for mixing mortar, laying,
nished item of work
BLD CSTN 5-1
Coefficient
Amount
14.400

74.88

0.030

15.40

0.500
0.740
0%

187.50
236.80
0.00

14%

514.58
70.06
584.64

or say

585.00

d W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or


Mark: 580mm & 630 mm Long fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
1.000
0%

Amount
700.00
0.00

14%

700.00
95.31
795.31

or say

795.00

of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or


ing in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges
for fixing atAmount
site etc;
Coefficient
1.000
0%

1250.00
0.00

14%

1250.00
170.19
1420.19

or say

1420.00

ed make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual
nternal parts of dual flush cistern, ultra solid seat cover of approved make
cock 450 mm long PVC inter connection pipe wall flanges all of approved
ork in all respects: White Colour fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.

Coefficient

Amount

1.000

6500.00

14%

6500.00
884.98
7384.98

or say

7385.00

00 grams fixing in position including cost and conveyance of all materials,


Operational and Incidental charges including all labour charges for fixing at
Coefficient
1.000
0%

Amount
170.00
0.00

14%

170.00
23.15
193.15

or say

193.00

Basin (H.S.W / Parry / Earthenware) fixing in position including cost and


taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
0%

810.00
0.00

14%

810.00
110.28
920.28

or say

920.00

pection including all repairs including all labour charges for etc; complete
Coefficient

Amount

1.000

90.00

0%

0.00

14%

90.00
12.25
102.25

or say

102.00

uding all labour charges for etc; complete for finished itemof work.
Coefficient

Amount

1.000

64.00

14%

64.00
8.71
72.71

or say

73.00

mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight
xcavation of trenches and socket pits in any soil (except rock requiring
efilling with watering and tamping including all labour charges for etc;
Coefficient
Amount
1.000
0%

346.00
0.00

14%

346.00
47.11
393.11

or say

393.00

ng in position including cost and conveyance of all materials, Sales tax &
and Incidental charges including all labour charges for fixing at site etc;
Coefficient
Amount
1.000

200.00

14%

200.00
27.23
227.23

or say

227.00

pipe outlet fixing in position including cost and conveyance of all materials,
Operational and Incidental charges including all labour
charges for
fixing at
Coefficient
Amount

1.000

70.00

14%

70.00
9.53
79.53

or say

80.00

n with brass union nut C.P coated fixing in position including cost and
taxes on materials to site, Operational and Incidental charges including all
for finished itemof work.
Coefficient
Amount
1.000
0%

74.00
0.00

14%

74.00
10.08
84.08

or say

84.00

as directed by the department.


Coefficient

Amount

1.000

21.00

14%

21.00
2.86
23.86

or say

24.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

powder including all labour charges etc; complete as directed by the


mof work.
Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

ncluding all labour charges etc; complete as directed by the Departmental


Coefficient

Amount

1.000

30.00

14%

30.00
4.08
34.08

or say

34.00

.50 x 2.40 M using 40 x 40mm solid squre section, 40 x 10mm MS flats,


n with 25 x 6mm MS flats providing 150mm Spike at the top by turning on
e and rounds shall conform to IS 4351 - 1976 as per approved drawing,
sportation charges, fixing of gate to compound
wall,
cost
6.00 Rm x 12.56
Kgs/
1Rmand conveyance
75.36
or raw materials including all tools and all incidental labour charges for
14.40 Rm x 3.14 Kgs/ 1Rm
45.22
tmental Officers for finished item of work.
6.00 Rm x 3.14 Kgs/ 1Rm
18.84
18.00 Rm x 3.14 Kgs/ 1Rm
56.52
14.75 Rm x 3.14 Kgs/ 1Rm

46.32

4.80 Rm x 3.14 Kgs/ 1Rm

15.07

Total

257.33 Kgs

257.33

9778.54

257.33
0%

3602.62
0.00

40.00

2000.00

2.00

500.00

14%

15881.16
2162.22
18043.38

Or say

18043.00

ved source including cost and conveyance of tiles to work and stacking at
mental Officers.

Coefficient

Amount
12.00
12.00

proved source including cost and conveyance of tiles to work and stacking
rtmental Officers.
Coefficient

Amount
12.00
12.00

urce including cost and conveyance of tiles to work and stacking at site for
fficers.
Coefficient

Amount
24.00
24.00

tiles and cement mortor borders (1:2) including cost and conveyance of
ork and all operational, incidential, labour charges such as mixing mortor,
cement mortor, etc., complete for finished item of work

Coefficient

Amount

0.009

39.12

0.030
0.070
0.440
0%

12.60
26.25
140.80
0.00

14%

218.77
29.79
248.56

or say

249.00

of size 1.80M x 0.75M x 3.05M to out side of the store room and carefully
rs to the store room and again shifting back and rearranging the racks
ing labour charges for all operations etc., as directed by the Engineer - in Coefficient

Amount
9500.00
9500.00

proof mesh for Door shutter diferent sizes frame with fly froof mesh of
4" x 1/2" thick including cost, wrought and putup and conveyance of all
laber charges for making, fixing of door furniture in position as directed by
bolts, M.S. aldop and M.S handle, and all labour charges such as diricted by
work.
Coefficient
For Door

Amount

0.430
0.406

Cft
Cft

0.036
0.034

Cft
Cft

0.906

Cft

0.906
4.00
2.00
1.00
2.28
2.28
0%

996.61
64.00
36.00
23.00
857.28
832.20
0.00
2809.09
382.46
3191.55

14%

3191.55
3191.55 x 1.00 sqm
2.28 sqm
Say

1399.80
1400.00
1 Sqm

w Double shutters diferent of size shutters frame thick 3 1/2" x 1 1/2" and
putup and conveyance of all materials work site and including all taxes, all
urniture in position as directed by Dept| Officers including M.S.P.C. hings,
harges such as diricted by the Departmental Officers for finished item of

Coefficient
For Window

Amount

0.437
0.164
0.601

Cft
Cft
Cft

0.601
4.00
1.00
2.00
4.90
0.017

835.55
32.00
45.00
36.00
262.15
174.25

0%
14%

0.00
1384.95
188.56
1573.51
1573.51

1573.51 x 1.00 sqm


0.70 sqm
Say

2247.87
2248.00
1 Sqm

Name of Work:-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178)


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
DETAILED ESTIMATE
Sl. No
1

Measurements
L
B
3
2
4
5
VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS
456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including HIRE CHARGES FOR CENTERING & SCAFFOLDING cost and conveyance
of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, and sales
& other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing but excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS, PLINTH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS
but excluding cost of steel and its fabrication charges for finished item of work. for: VRCC : M-20
Nominal Mix
Description

For Columns :For building columns upto bottom of GF slab

No

12

0.23

0.38

3
4

x
x

1
1

16.08
9.98

0.23
0.23

3
4
3
3
2
2
1

x
x
x
x
x
x
x

1
1
2
2
3
3
1

16.08
9.98
0.23
0.38
0.38
0.23
5.72

0.23
0.23
0.23
0.23
0.23
0.23
0.23

For Roof slabs of 125mm thick


Over entire building
Portico
deduct staircase portion
Add for variations

1
1
-1

x
x
x

1
1
1

16.08
6.32
3.81

9.98
1.22
2.44

For slab of 150mm thick


Stair case flights
Stair case landing
Add for variations

1
1

x
x

2
1

3.74
0.90

1.22
2.44

Add for variations

For Lintels :For roof beams along the building


For roof beams across the building
Add for variations

For roof beams :For roof beams along the building


For roof beams across the building
Deduct columns

Stair case Mid landing beam


Add for variations

Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and sales & other taxes on all materials including all operational, incidental and labour
charges such as mixing, laying concrete, curing but excluding Seigniorage charges, etc.,complete
but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-

ntre Building in Kesavadasupalem - 4 (Code No. 178) of


D RIDF XX in E.G. Dist.
#REF!
DETAILED ESTIMATE
Measurements

Quantity

D
6
ggregate: coarse aggregate) corresponding to Table 9 of IS
e crushed hard granite metal (coarse aggregate) from
S FOR CENTERING & SCAFFOLDING cost and conveyance
te (sand) coarse aggregate, water etc., to site, and sales
g all operational, incidental and labour charges such as
g but excluding Seigniorage charges, etc.,complete for
TH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS
ation charges for finished item of work. for: VRCC : M-20

3.30

3.46
0.04
3.50
cum

0.38
0.38

4.22
3.49
0.43
8.14
cum

0.38
0.38
0.38
0.38
0.38
0.38
0.38

4.22
3.49
-0.12
-0.20
-0.20
-0.12
0.50
0.43
8.00
cum

-------

160.48
7.71
-9.30
1.11
160.00
sqm

-----

9.13
2.20
0.67
12.00

M-20 grade as per IS 456 nominal mix using 20mm size


metal (coarse aggregate) from approved quarry including
e cement, fine aggregate (sand) coarse aggregate, water
l materials including all operational, incidental and labour
curing but excluding Seigniorage charges, etc.,complete
ation charges for finished item of work, for:-Machine Mix-

0
Sub Work : WATER SUPPLY AND SANITARY FOR JUDGE RESIDENTIAL QUEATER
Abstract
All rates/amounts are in INR
Qunatity
Rate

S.No. Description

unit

Earth work excavation for BUILDING foundations and


depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges
such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage
excluding dewatering charges in Ordinary Soil-Manual
Means-Upto 3M depth etc as per SS 20B (ApSS 308) for:Ordinary soil-Manual up to 3.0 M

1cum

110

152.162

Plain Cement Concrete (1:5:10) proportion nominal mix


(cement: fine aggregate: Coarse aggregate) for
foundation levelling courses and below flooring beds
using 40mm size (SS5) hard Granite metal upto Plinth
level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials and
including all charges for mixing, laying concrete in
foundations ramming in 15 cm layers finishing top
surface to the required level curing etc., complete for
finished item of work. (APSS No. 402) for:-Machine MixPCC (1:5:10) NOMINAL MIX

1cum

11.5

2536.85

Plain Cement Concrete corresponding to M-20 grade as


per IS 456 nominal mix using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as
mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for
finished item of work, for:-Machine Mix-PCC : M-20
NOMINAL MIX

1cum

2.2

3869.937

Cost Summary , dated 11/10/2010

708 of 860

S.No. Description

unit

Qunatity

Rate

Providing impervious coat to exposed RCC roof slab


surfaces to required slopes with CM (1:3) prop. 20mm
thick (average) mixed with water proofing compound,
laid over roof slab when it is green, finished smooth with
a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and
conveyance of all materials like sand, water proofing
compound, water etc., to site, including seigniorage
charges, sales & other taxes on all materials and
operational, incidental, and labour charges for mixing
mortar, laying, lift charges, rendering smooth and thread
lining, curing including rounding off junctions of wall and
slab etc., complete for finished item of work. (APSS No.
901 & 903) for:-Impervious coat CM(1:3), 20mm Floor - 0
Lift Manual

1sqm

130

247.588

RCC M- 20 Nominal mix (Cement:fine aggregate: coarse


aggregate) corresponding to Table 9 of IS 456 using
20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and
including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour
charges such as machine mixing, laying concrete, curing
etc.,complete for RCC SLABS, BEAMS but excluding cost
of steel and its fabrication charges for finished item of
work. for:-Slabs-VRCC : M-20 Nominal Mix Floor - 0
Centering with Steel upto 3.66 Slab thk 100 Lift Manual

1sqm

45

696.572

Supplying, fitting and placing HYSD (Fe 415/ tmt grade as


per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above, where
welding required to be done compulsorily including cost
and conveyance of bars from approved sources to site of
work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending,
placing in position, tying etc., and sales & other taxes, on
cost of all materials complete for finished item of work
for:-HYSD with lap splicing Floor - 0 Lift Manual

1MT

0.5

44237.543

Cost Summary , dated 11/10/2010

709 of 860

S.No. Description

unit

Qunatity

Rate

Random Rubble Stone masonry in CM (1:6) prop:


(cement : sand) using hard Granite stones from approved
quarry including cost and conveyance of all materials like
cement, sand water, granite stones, etc., from approved
quarry to site and including labour for cutting stones to
required size and shape, mixing of cement, mortar,
construction, scaffolding charges, curing etc., complete
for finished item of work in foundation & basement.
(APSS No. 615 & 601) for:-RR Masonry in CM (1:6)

1cum

34

2039.502

Supplying & Fixing Orissa Pan white glazed W.C 1st


quality ISI marked conforming to IS:2556-Part-3-1981
with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI
Mark: 580 mm x 440 mm

1EACH

1439.25

Supply & fixing of PVC low level system parry ware, slim
line with internal components & short bend: 10 litres
capacity Dual Flush

1EACH

1539

10

Supplying and Fixing best Indian make plastic seat and


lid for European water closets with rubber or plastic
Buffers as per IS 2548-1996

1EACH

401.85

11

Supplying and Fixing European Water Closet of 1st


quality conforming to IS:2556-Part-2-1973 of Hindustan /
Neycer or Parryware make white glazed with 'S' trap

1EACH

1474.875

12

Supplying & Fixing Indian make Flat Back Wash Hand


Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 and fitted with 15
mm nominal bore Chromium Plated Pillar Tap of 1st
quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso
or equivalent complete with standard CI brackets
including wooden block: 550 x 400 mm - Single C.P. Pillar
cock

1EACH

1382.25

13

Supplying and Fixing Pedestal for Wash Hand Basin


(H.S.W / Parry / Earthenware)

1EACH

949.05

14

Supplying & Fixing white glazed flat back Bowl urinals of


size 440 mm x 265 mm x 315 mm with internal flushing
rim fixed with screws complete Indian make
(HSW/Parry/Neycer) conforming to IS:2556-1995

1EACH

712.5

15
16

a) Supplying & fixing CI Nahany trap grating


75 mm dia 3 M Double Socket PVC/SWR pipe - 6
Kg/sq.cm - Prince/Sudhakar or any ISI Brand

1EACH
RM

21
114

18.24
142.12

17

110 mm dia 3 M Double Socket PVC/SWR pipe - 6


Kg/sq.cm - Prince/Sudhakar or any ISI Brand

RM

121

274.74

18

160 mm dia 3 M Double Socket PVC/SWR pipe - 6


Kg/sq.cm - Prince/Sudhakar or any ISI Brand

RM

15

566.2

Cost Summary , dated 11/10/2010

710 of 860

S.No. Description

unit

Qunatity

Rate

19

a) Providing & Placing on Terrace (at all floor levels)


polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable
locking arrangement & making necessary holes for inlet
& outlets and over flow pipes but without fittings & base
support for tanks

LIT

4000

4.668

20

75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

15

60.42

21

110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

12

95.76

22

75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

15

44.46

23

110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

12

74.1

24

75 mm dia - Single Tee with Door - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

15

64.98

25

110 mm dia - Single Tee with Door - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)

1EACH

12

117.42

26

a) S & F concealed stop cock 12.7 mm (1/2") Indian


Make 400 grams Seiko/ Senior/ Nice or equivalent

1EACH

20

464.55

27

a) S & F Gunmetal Gate (GM peet) valve as per IS - 778


Class - I, Indian make heavy type - 25 mm NB Size

RM

50

613.035

28

a) S & F Gunmetal Gate (GM peet) valve as per IS - 778


Class - I, Indian make heavy type - 20 mm NB Size

RM

20

419.235

29

a) S & F Gunmetal Gate (GM peet) valve as per IS - 778


Class - I, Indian make heavy type - 40 mm NB Size

RM

60

1246.02

30

a) S & F Gunmetal Gate (GM peet) valve as per IS - 778


Class - I, Indian make heavy type - 15 mm NB Size

RM

30

312.075

31

a) S & F 19.04 mm dia & 609.6 mm long aluminium


anodized towel rod with brackets and aluminium screws

1EACH

133.38

32

a) S & F 25.4 mm dia & 609.6 mm long aluminium


anodized towel rod with brackets and aluminium screws

1EACH

146.775

Cost Summary , dated 11/10/2010

711 of 860

S.No. Description

unit

Qunatity

Rate

33

Supply and fixing wall mirror with provision for over head
shower and 115 mm long bend pipe with wall flange
Jaquar make queen series with 7 years warranty:
Chrome plated

1EACH

4644.36

34

a) S & F 12.7 x 88.9 CP fancy shower

1EACH

249.66

35

Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet

1EACH

12

79.8

36

Supply & Fixing wall mixer with telephonic shower


arrangement with crutch and telephone shower with
flexible tube Jaquar make Continental series Chrome
colour for bath tub with 7 years warranty

1EACH

5232.6

37

a) Supplying & fixing stainless steel sink size 20" x18" x


8 " (508x457.2x203.2mm) 1 mm thick with accessories

1EACH

4218

38

Supply & Fixing bath tub over flow set complete with
over flow cap,450mm ball chain with rubber plug 7 Union
bend with brass nuts Jaquar make, Chrome colour with 7
years warranty

1EACH

1073.88

39

Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in


CM 1:6 prop. Masonry. Inspection chamber up to 914.4
mm (3'0") and fitted with light weight 457.2 mm x 457.2
mm (1'6"x1'6") C.I frame and cover of 20 Kg.

1EACH

12

2993.64

40

Supplying & fixing 150 mm x 100 mm SWG gully traps


conforming to ISI 651 & 4127 with C.I Grating & Cost.
Brick masonry in CM 1:6 prop. Intermediate chamber and
fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and
hinged cover

1EACH

12

477.66

41
42
43
44
45

S& F GI union 12.7 mm Ist Quality


S& F GI union 19.05 mm Ist Quality
S& F GI union 25.4 mm Ist Quality
S& F GI union 38.1 mm Ist Quality
a) S& F 25 mm Nominal Bore GI pipe Medium Grade
properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

1EACH
1EACH
1EACH
1EACH
1EACH

10
10
12
8
8

33.06
39.9
60.42
90.06
226.005

46

a) S& F 40 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

1EACH

351.975

47

a) S& F 15 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

1EACH

12

157.605

48

a) S& F 20 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

1EACH

174.705

Cost Summary , dated 11/10/2010

712 of 860

S.No. Description

unit

Qunatity

Rate

49

Supply & Fixing bath tub over flow set complete with
over flow cap,450mm ball chain with rubber plug 7 Union
bend with brass nuts Jaquar make, Chrome colour with 7
years warranty

1EACH

1073.88

50

Conveyance of Debris an extract lead of 0.5 Kms. Over


initial lead and lift execluding all labour charges from site
to outside of the work etc., as directed by the
Departmental officers etc., complete for finished

1CUM

60

100

51

Provision for bore well

L.S

52

Provision for motor with pump set

L.S

53

rounding and unforeseen items

L.S

Total for water supply and sanitary

Cost Summary , dated 11/10/2010

713 of 860

DGE RESIDENTIAL QUEATER


Abstract
All rates/amounts are in INR
Amount
16738

29174

8514

Cost Summary , dated 11/10/2010

714 of 860

Amount
32186

31346

22119

Cost Summary , dated 11/10/2010

715 of 860

Amount
69343

1439

10773

804

2950

12440

4745
6413

383
16202
33244
8493

Cost Summary , dated 11/10/2010

716 of 860

Amount
18672

906

1149

667

889

975
1409

9291

30652

8385

74761

9362

667

294

Cost Summary , dated 11/10/2010

717 of 860

Amount
4644

749

958
5233

4218

2148

35924

5732

331
399
725
720
1808

1408

1891

699

Cost Summary , dated 11/10/2010

718 of 860

Amount
2148

6000

75000
35000
6686
6,57,806

Cost Summary , dated 11/10/2010

719 of 860

DETAILED ESTIMATE FOR WATER SUPPLY AND SANITARY


0

Estimat
Measurements
Sl.
No
1

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

7.00

4.00

2.50

70.00

Earth work excavation for BUILDING foundations and


depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges
such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage
excluding dewatering charges in Ordinary Soil-Manual
Means-Upto 3M depth etc as per SS 20B (ApSS 308) for:Ordinary soil-Manual up to 3.0 M

For septic tank

for water sump

4.00

2.20

2.50

22.00

for sewage

60.00

0.45

0.45

12.15
5.85

add

110.00
cum
2

Plain Cement Concrete (1:5:10) proportion nominal mix


(cement: fine aggregate: Coarse aggregate) for foundation
levelling courses and below flooring beds using 40mm size
(SS5) hard Granite metal upto Plinth level from approved
quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site,
including seigniorage charges, sales & other taxes on all
materials and including all charges for mixing, laying
concrete in foundations ramming in 15 cm layers finishing
top surface to the required level curing etc., complete for
finished item of work. (APSS No. 402) for:-Machine MixPCC (1:5:10) NOMINAL MIX

For septic tank

7.00

4.00

0.30

8.40

for water sump

4.00

2.20

0.30

2.64
0.46
11.5
cum

Measurements
Sl.
No
3

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

Plain Cement Concrete corresponding to M-20 grade as


per IS 456 nominal mix using 20mm size graded machine
crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as mixing,
laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work,
for:-Machine Mix-PCC : M-20 NOMINAL MIX

For septic tank inside bottom

6.00

3.00

0.10

1.80

for water sumpixnside bottom

3.00

1.20

0.10

0.36
0.04
2.20
cum

Providing impervious coat to exposed RCC roof slab


surfaces to required slopes with CM (1:3) prop. 20mm
thick (average) mixed with water proofing compound, laid
over roof slab when it is green, finished smooth with a
floating coat of neat cement and thread lining at regular
intervals of 45cmx45cm including cost and conveyance of
all materials like sand, water proofing compound, water
etc., to site, including seigniorage charges, sales & other
taxes on all materials and operational, incidental, and
labour charges for mixing mortar, laying, lift charges,
rendering smooth and thread lining, curing including
rounding off junctions of wall and slab etc., complete for
finished item of work. (APSS No. 901 & 903) for:Impervious coat CM(1:3), 20mm Floor - 0 Lift Manual

all round the septic tank inside

18.00

..

3.00

54.00

all round the septic tank top

21.00

..

0.38

7.98

for sides (out sides)

21.00

..

0.45

9.45

for bottom

6.00

..

3.00

18.00

3.00

25.20

for all roung thr sump inside

8.40

..

for all roung thr sump top

11.40

..

0.38

4.33

for sides (out sides)

11.40

..

0.45

5.13

3.00

..

1.20

3.60

bottom

2.31
130.00
sqm

Measurements
Sl.
No
5

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

25.42

VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse


aggregate) corresponding to Table 9 of IS 456 using 20mm
size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including HIRE
CHARGES FOR CENTERING & SCAFFOLDING cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, and including
Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing
etc.,complete for RCC SLABS, BEAMS but excluding cost of
steel and its fabrication charges for finished item of work.
for:-Slab 100mm thick-VRCC : M-20 Nominal Mix Floor 0 Centering with Steel upto 3.66 Lift Manual

roo slab 100mm thick


over septic tank

6.76

3.76

for bullet wall

3.00

1.50

9.00

over water sump

3.76

2.96

11.13

deduct man hole

-1 x

0.6

0.6

-0.72
0.17

say

45.00
sqm

Supplying, fitting and placing HYSD (Fe 415/ tmt grade as


per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above, where
welding required to be done compulsorily including cost
and conveyance of bars from approved sources to site of
work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending,
placing in position, tying etc., and sales & other taxes, on
cost of all materials complete for finished item of work
for:-HYSD with lap splicing Floor - 0 Lift Manual

slab 100mm thick

4.5

cum

100

kg/cum

450.0
0.45

say

0.5
MT

Measurements
Sl.
No
7

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

Random Rubble Stone masonry in CM (1:6) prop:


(cement : sand) using hard Granite stones from approved
quarry including cost and conveyance of all materials like
cement, sand water, granite stones, etc., from approved
quarry to site and including labour for cutting stones to
required size and shape, mixing of cement, mortar,
construction, scaffolding charges, curing etc., complete for
finished item of work in foundation & basement. (APSS No.
615 & 601) for:-RR Masonry in CM (1:6)

For all round septic tank

18.76

0.38

3.00

21.39

for all round water sump

9.92

0.38

3.00

11.31

for went pipe piller

0.45

0.45

0.45

0.09
1.21
34.00
cum

Supplying & Fixing Orissa Pan white glazed W.C 1st quality
ISI marked conforming to IS:2556-Part-3-1981 with "P" or
"S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm
x 440 mm
At Master bed room toilet

1.00

At 2 Bed rooms

2.00

At out side toilet

1.00

At for sequent toilet

1.00
5.00
nos

Supply & fixing of PVC low level system parry ware, slim
line with internal components & short bend: 10 litres
capacity Dual Flush
For all W.C

7.00
nos

10

Supplying and Fixing best Indian make plastic seat and lid
for European water closets with rubber or plastic Buffers
as per IS 2548-1996
for europen W.Cs

x 2

2.00
nos

11

Supplying and Fixing European Water Closet of 1st quality


conforming to IS:2556-Part-2-1973 of Hindustan / Neycer
or Parryware make white glazed with 'S' trap
At Master bed room toilet

1.00

At Bed rooms

1.00
2.00
nos

Measurements
Sl.
No
12

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

Supplying & Fixing Indian make Flat Back Wash Hand


Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 with waste fittings like rubber plug,
chain, 32 mm nominal size C.P. Fitting with parallel pipe
thread conforming to IS:2963-1979 and fitted with 15 mm
nominal bore Chromium Plated Pillar Tap of 1st quality
Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including
wooden block: 550 x 400 mm - Single C.P. Pillar cock

At toilet rooms

x 3

3.00

At dininig hall

x 2

2.00

At out side

x 2

2.00

At Kitchen and Wash

x 2

2.00
9.00
nos

13

Supplying and Fixing Pedestal for Wash Hand Basin


(H.S.W / Parry / Earthenware)
At toilet rooms

x 3

3.00

At dininig hall

x 2

2.00
5.00
nos

14

Supplying & Fixing white glazed flat back Bowl urinals of


size 440 mm x 265 mm x 315 mm with internal flushing
rim
fixed
with
screws
complete
Indian
make
(HSW/Parry/Neycer) conforming to IS:2556-1995
At Master bed room toilet

1.00

At 2 Bed rooms

2.00

At out side toilet

1.00

At for sequent toilet

1.00
5.00
nos

15

Supplying & fixing CI Nahany traps 1st quality ISI marked


conforming to IS:1729-1979 with C.P. Grating
At wash hand basins

x 7

7.00

At urinals

x 4

4.00

At for toilets

x 5

5.00

At kitchen

x 2

2.00

At bath rooms

x 5

5.00
23.00
nos

16

75 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm


- Prince/Sudhakar or any ISI Brand

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

wash hand basins to out side

6.00

42.00

Nahani trap to out side

6.00

42.00

for toilets to out sides

6.00

30.00
114.00
rm

17

110 mm dia 3 M Double Socket PVC/SWR pipe - 6


Kg/sq.cm - Prince/Sudhakar or any ISI Brand
W.C to Manhole

6.00

42.00

MH TO MH

15.00

15.00

MH to MH

12.00

36.00

15.00

15.00

SEPTIC TANK OUT LET

10.00

10.00

VENT PIPE

3.00

To SEPTIC TANK

3.00
121.00
rm

18

160 mm dia 3 M Double Socket PVC/SWR pipe - 6


Kg/sq.cm - Prince/Sudhakar or any ISI Brand
main to septictank

x 1

15.00

15.00
rm

19

Providing & Placing on Terrace


(at all floor levels)
polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable
locking arrangement & making necessary holes for inlet &
outlets and over flow pipes but without fittings & base
support for tanks
PVC water storage tank

1000

2000.00
liters

20

75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)
75 mm dia - Door Bend

x 15

15.00
nos

21

110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)
110 mm dia - Door Bend

x 12

6.00

nos
22

75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)
75 mm dia - Plain Bend

x 15

15.00
nos

23

110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)
110 mm dia - Plain Bend

x 12

6.00

nos

Measurements
Sl.
No
24

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

75 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings


(Prince/Sudhakar or any ISI Brand)
75 mm dia - single Tee with door

x 15

15.00
nos

25

110 mm dia - Single Tee with Door - UPVC/SWR Pipe


fittings (Prince/Sudhakar or any ISI Brand)
110 mm dia - single Tee with door

x 12

12.00
nos

26

S & F concealed stop cock 12.7 mm (1/2") Indian Make


400 grams Seiko/ Senior/ Nice or equivalent
At wash hand basins

7.00

At low level tanks

7.00

At Urinals

4.00

At kitchen sink

2.00
20.00
nos

27

S & F CP Long body bib cock fancy type deluxe 400 grams
12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent
At Toilets, Bath rooms & Outside tap

14

14.00
nos

28

S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class


- I, Indian make heavy type - 25 mm NB Size
1

x 8

8.00
nos

29

S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class


- I, Indian make heavy type - 20 mm NB Size
1

x 4

4.00
nos

30

S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class


- I, Indian make heavy type - 15 mm NB Size
1

x 12

12.00
nos

31

S & F 19.04 mm dia


& 609.6 mm long aluminium
anodized towel rod with brackets and aluminium screws
At toilet

x 5

5.00
nos

32

S & F 25.4 mm dia & 609.6 mm long aluminium anodized


towel rod with brackets and aluminium screws
At Dining hall

x 2

2.00
nos

Measurements
Sl.
No
33

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

S & F 12.7 x 88.9 CP fancy shower


1

x 3

3.00
nos

34

Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet
1

x 12

12.00
nos

35

Supply & Fixing Supplying & Fixing 12.7 mm PVC


connection with brass union nut C.P coated
At wash hand basin

x 12

12.00
nos

36

Supplying and fixing TV shape mirror with plastic frame


size 609.6 mm x 457 .2 mm
At Toilets

x 5

5.00
nos

37

Supply & Fixing wall mixer with telephonic shower


arrangement with crutch and telephone shower with
flexible tube Jaquar make Continental series Chrome
colour for bath tub with 7 years warranty / Jupiter Aqua
Lines-JAL or equivalent series
At Bath room

x 1

1.00
nos

38

Supply & Fixing bath tub over flow set complete with over
flow cap,450mm ball chain with rubber plug 7 Union bend
with brass nuts Jaquar make, Chrome colour with 7 years
warranty / Jupiter Aqua Lines-JAL or equivalent series

At Bath room

x 2

2.00
nos

39

Supply & Fixing of Wall Mixer with provision for overhead


shower and 115mm long bend pipe with wall flange Jaquar
make Florentine(Quarter turn) series, Chrome finish with 7
years warranty / Jupiter Aqua Lines-JAL or equivalent
series
At Bath room

x 1

1.00
nos

40

Supplying & fixing stainless steel sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick with accessories
1

x 1

1.00
nos

Measurements
Sl.
No
41

Description of item

No

Quantity
Cum/Sqm/M
t/Nos

Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in


CM 1:6 prop. Masonry. Inspection chamber up to 914.4
mm (3'0") and fitted with light weight 457.2 mm x 457.2
mm (1'6"x1'6") C.I frame and cover of 20 Kg.
1

x 12

12.00
nos

42

Supplying & fixing 150 mm x 100 mm SWG gully traps


conforming to ISI 651 & 4127 with C.I Grating & Cost.
Brick masonry in CM 1:6 prop. Intermediate chamber and
fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and
hinged cover
1

x 12

12.00
nos

43

S& F GI union 12.7 mm Ist Quality


1

x 10

10.00
nos

44

45

S& F GI union 19.05 mm Ist Quality


1

x 10

10.00

x 12

12.00

S& F GI union 25.4 mm Ist Quality


nos

46

S& F GI union 38.1 mm Ist Quality


1

x 8

8.00
nos

47

S& F 15 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges
complete
1

x 1

30.00

30.00
Rm

48

S& F 20 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete
1

x 1

20.00

20.00
Rm

49

S& F 25 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour
charges complete

Measurements
Sl.
No

Description of item

No
1

x 1

L
50.00

Quantity
Cum/Sqm/M
t/Nos
50.00
Rm

50

S& F 40 mm Nominal Bore GI pipe Medium Grade


properties & weight as per IS 1239 ISI mark with GI fittings
including the cost of pipe & its fittings & labour charges
complete
1

x 1

60.00

60.00
Rm

Provision for bore well

-- LS --

Provision for motor with pump set

-- LS --

rounding and unforeseen items

-- LS --

Total for water supply and sanitary

IMATE FOR WATER SUPPLY AND SANITARY


0

Estimate Rs 12.00 Lakhs


Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Rate/Per

Amount

Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No.


of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Sub Work:Construction of Compound wall to Residential Quarters to II nd Additional District Judg


Mummidivaram in East Godavari District.

ESTIMATE Rs. 9.20 LA


Abstract
Sl.
No.

Description

unit

Qunatity

Augoring and boring of holes in site for Bored cast-insitu R.C.C. Piles for building foundations in loamy, clayey
soils like Black cotton soils and ordinary soils without
under reams as per IS 2911 - 1980 as per approved
designs including all operations, incidental, labour
charges, hire charges of machinery, augur bore drill and
shell equipment, etc, complete for all depths and for
finished item of work for piles of following diameters.

1Rm

161.04

Earth work excavation for BUILDING foundations and


depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges
such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work but exincluding
seigniorage charges and dewatering charges in Ordinary
Soil-Manual Means-Upto 3M depth etc as per SS 20B
(ApSS 308) for:-Ordinary soil-Manual up to 3.0 M

1cum

40

Plain Cement Concrete (1:5:10) proportion nominal mix


(cement: fine aggregate: Coarse aggregate) for
foundation levelling courses and below flooring beds
using 40mm size (SS5) hard Granite metal upto Plinth
level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, and sales & other taxes on
all materials and including all charges for mixing, laying
concrete in foundations ramming in 15 cm layers
finishing top surface to the required level curing, but
excluding seigniorage charges, etc., complete for
finished item of work. (APSS No. 402) for:-Machine MixPCC (1:5:10) NOMINAL MIX

1cum

740 of 860

Abstract
Sl.
No.

Description

unit

Qunatity

Supply and placing of the M 20 Grade Design Mix


Concrete corresponding to IS 456 using WEIGH BATCHER
/ MIXER with 20mm size graded machine crushed hard
granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, pouring concrete by tremmy, curing
etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No.
402) with minimum cement content as per IS code from
standard suppliers approved by the department for
finished item of work. BORED CAST-IN-SITU UNDER
REAMED PILES including Bore pile stem and under ream
bulbs

1cum

12

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS, PLINTH BEAM,
COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS but
excluding cost of steel and its fabrication charges for
finished item of work. for: VRCC : M-20 Nominal Mix for
Piller Caps

1cum

19

741 of 860

Abstract
Sl.
No.

Description

unit

Qunatity

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
FOUNDATIONS, PLINTH, PEDESTALS but excluding cost of
steel and its fabrication charges for finished item of
work. for:-Plinth-VRCC : M-20 Nominal Mix Centering
with Steel upto 3.66

1cum

VRCC M- 20 Nominal mix (Cement:fine aggregate:


coarse aggregate) corresponding to Table 9 of IS 456
using 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry
including
HIRE
CHARGES
FOR
CENTERING
&
SCAFFOLDING cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water
etc., to site, and sales & other taxes on all materials
including all operational, incidental and labour charges
such as machine mixing, laying concrete, curing but
excluding Seigniorage charges, etc.,complete for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS but excluding cost of steel and its fabrication
charges for finished item of work. for:-Columns-VRCC :
M-20 Nominal Mix Floor - 0 Centering with Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates, Steel Centring Plates upto 3.66 Lift
Manual

1cum

742 of 860

Abstract
Sl.
No.

Description

unit

Qunatity

Supplying, fitting and placing HYSD (Fe 415/ tmt grade


as per IS 1786-1985) bar reinforcement VRCC works
complete including wastage, as per drawings and
technical specifications Clauses 1000 and 1202 MORD &
1100, 1600 MORTH for Bars 36 mm dia and above,
where welding required to be done compulsorily
including cost and conveyance of bars from approved
sources to site of work, binding wire, cover blocks and
all incidental, operational, labour charges such as
cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Floor 0 Lift Manual

1MT

Brick Masonry 225mm thick for pannel walls in Super


structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scaffolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Basement for Lift Manual

1cum

10 Brick Masonary 230mm thick for pannel walls in Super


structure with CM ( 1:8) prop (Cement:Sand) using 2nd
class bricks (Non-Modular or Traditional size) 23x11x7
cm having a crushing strength of 2.5N/sq.mm including
cost and conveyance of all materials and water from
approved source to work site and all operational,
incidental labour charges such as scaffolding, mixing
moratar, constructing masonary, lift charges, curing but
excluding Seigniorage charges, etc., complete for
finished item of work as per (APSS No.501 & 504) for
Super Structure for Lift Manual

1cum

26

743 of 860

Abstract
Sl.
No.

Description

unit

Qunatity

11 Plastering 20 mm thick in two coats with base coat of 16


mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
External & Uneven Surfaces of Brick Wall for finished
item of work. (SS 901,903 & 904) for:-Plastering 2/c in
CM (1:4) & (1:6): 20 mm Floor - 0 Centering with Steel
upto 3.66 Lift Manual

1sqm

150

12 Plastering 12 mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water
etc., to site, and sales & other taxes on all materials,
and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, scaffolding, lift charges, curing, including
cutting Grooves as directed by Engineer - in - charge,
but excluding Seigniorage charges, etc., complete for
Internal & Even faces of Brick Wall and RCC exposed
faces for finished item of work. (SS 901,903 & 904) for:Plastering 2/c in CM (1:4) & (1:6): 12 mm Floor - 0
Centering with Steel upto 3.66 Lift Manual

1sqm

114

13 Painting to new walls with 2 coats of plastic emulsion


paint of approved brand and shade over a base coat of
appropriate primer of approved brand, making 3 coats
after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials, including cost
and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for
finished item of work as per SS 911 for external walls

1sqm

265

744 of 860

Abstract
Sl.
No.

Description

14 Painting with Synthetic Enamel paints - Three Coats - for


New Iron Work of approved brand and shade, making 3
coats in all to give an even shade after throughly
brushing the surface to remove all dirt and remains of
loose
powdered materials,
including cost and
conveyance of allmaterials to work site and all
operational, incidential, labour charges, etc., complete
for finished item of work as per SS 1207 & 1212. for All
Floors

15 PROVISION FOR ARCHITECTURAL FEATURES


16 Provision for S&F IRON gate wicket gate 1 No.
17 Provision for Rounding off

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Executive Engineer (R&B)


(R&B) Division : Amalapuram

unit

Qunatity

1sqm

10.00

LS
LS
LS

Deputy Executive Engineer (R&B


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

745 of 860

Kesavadasupalem - 4 (Code No. 178)


Dist.

s to II nd Additional District Judge at

ESTIMATE Rs. 9.20 LAKHS


Rate

Amount

241.7

38,923

244

9,760

3622.3

18,112

746 of 860

Rate

Amount

6772

,81,264

7104.5

1,34,986

747 of 860

Rate

Amount

9068.7

45,344

8610

17,220

748 of 860

Rate
64159.2

Amount
256,637

4165.2

,37,487

4541.1

1,18,069

749 of 860

Rate

Amount

301.2

45,180

286.4

32,650

154.7

40,996

750 of 860

Rate

Amount

124.40

1,244

10000
25000
7128

10,000
25,000
7,128

TOTAL

9,20,000

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

751 of 860

Name of Work:-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178


of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Sub Work:Construction of Compound wall to Residential Quarters to II nd Additional District Judge a


Mummidivaram in East Godavari District.

ESTIMATE Rs. 9.20 LAKH


Sl.
No
1
1

Description

Measurements
L
B
D
2
3
4
5
6
Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building
foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under
reams as per IS 2911 - 1980 as per approved designs including all operations,
incidental, labour charges, hire charges of machinery, augur bore drill and shell
equipment, etc, complete for all depths and for finished item of work for piles of
following diameters.
For C3 Main Columns
For C3 Main Columns

DETAILED ESTIMATE
No

11
11

x
x

2
2

---

---

3.66
3.66

Earth work excavation for BUILDING foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work but
exincluding seigniorage charges and dewatering charges in Ordinary Soil-Manual
Means-Upto 3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0
M
C3piller caps

11

1.525

0.915

1.200

C3piller caps

11

1.525

0.915

1.200

Add for variations

Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size
(SS5) hard Granite metal upto Plinth level from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, and
sales & other taxes on all materials and including all charges for mixing, laying concrete
in foundations ramming in 15 cm layers finishing top surface to the required level
curing, but excluding seigniorage charges, etc., complete for finished item of work.
(APSS No. 402) for:-Machine Mix-PCC (1:5:10) NOMINAL MIX
C3 piller caps

11

1.525

0.915

0.15

C3 piller caps

11

1.525

0.915

0.15

Add for variations

Sl.
No
4

Description

DETAILED ESTIMATE
No

Measurements
L
B
D
Supply and placing of the M 20 Grade Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and
including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing,
pouring concrete by tremmy, curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content as per IS code from standard suppliers approved by the department for finished
item of work. BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and
under ream bulbs
C3

11

/4*305

0.305

3.66

C3

11

/4*305

0.305

3.66

Add excess and rounding off ---- LS -----

VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to


Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including HIRE CHARGES FOR CENTERING &
SCAFFOLDING cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site, and sales & other taxes on all materials including
all operational, incidental and labour charges such as machine mixing, laying concrete,
curing but excluding Seigniorage charges, etc.,complete for FOUNDATIONS, PLINTH,
PEDESTALS, PLINTH BEAM, COLUMNS, LINTLES, ROOF BEAMS, ROOF SALBS but
excluding cost of steel and its fabrication charges for finished item of work. for: VRCC :
M-20 Nominal Mix

For Footings
C3piller caps

11

1.525

0.915

0.6

C3piller caps

11

1.525

0.915

0.6

31.66

0.23

0.30

11
11

x
x

1
1

0.23
0.23

0.23
0.23

1.50
1.50

Add for variations

For Plinth beams :For Compound wall alround


Add for variations

For Columns :For C3 Columns


For C3 Columns
Add for variations

Sl.
No
8

Description

DETAILED ESTIMATE
No

Measurements
L
B
D
Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia
and above, where welding required to be done compulsorily including cost and
conveyance of bars from approved sources to site of work, binding wire, cover blocks
and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying etc., and sales & other taxes, on cost of all materials complete for
finished item of work for:-HYSD with lap splicing Lift Manual

For piles concreate


For footings
For columns
For Plinth beams
Add for variations

12.00
19.00
2.00
5.00

80.00
100.00
120.00
120.00

Kgs
Kgs
Kgs
Kgs

/
/
/
/

Cum
Cum
Cum
Cum

Say
9

Brick Masonry 230mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm
having a crushing strength of 2.5N/sq.mm including cost and conveyance of all
materials and water from approved source to work site and all operational, incidental
labour charges such as scaffolding, mixing moratar, constructing masonary, lift charges,
curing but excluding Seigniorage charges, etc., complete for finished item of work as
per (APSS No.501 & 504) for Basement for Lift Manual

Compond wall
Pedastals
Add for variations

2
22

x
x

1
1

31.66
0.35

0.23
0.35

0.45
0.45

Brick Masonry 230mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm
having a crushing strength of 2.5N/sq.mm including cost and conveyance of all
materials and water from approved source to work site and all operational, incidental
labour charges such as scaffolding, mixing moratar, constructing masonary, lift charges,
curing but excluding Seigniorage charges, etc., complete for finished item of work as
per (APSS No.501 & 504) for Super Structure for Lift Manual

Compond wall
Pedastals
Deduct Iron gate with wicket gate
Add for variations

2
22
-1

x
x
x

1
1
1

31.66
0.35
3.00

0.23
0.35
0.23

1.50
1.50
1.50

Sl.
No
8

Description

Measurements
L
B
D
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site, and sales & other
taxes on all materials, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting Grooves as directed by Engineer - in - charge, but excluding
Seigniorage charges, etc., complete for External & Uneven Surfaces of Brick Wall for
finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Floor - 0 Centering with Steel upto 3.66 Lift Manual

Compond wall for basement


Compond wall for above basement
Add for variations

DETAILED ESTIMATE
No

2
2

x
x

1
1

31.66
31.66

-----

0.75
1.50

Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to site, and sales & other
taxes on all materials, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting Grooves as directed by Engineer - in - charge, but excluding
Seigniorage charges, etc., complete for Internal & Even faces of Brick Wall and RCC
exposed faces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM
(1:4) & (1:6): 12 mm Floor - 0 Centering with Steel upto 3.66 Lift Manual
Compound wall top
Compond wall for above basement
Pedastals
Add for variations

2
2
20

x
x
x

1
1
1

31.66
31.66
0.12

0.23
-----

--1.50
1.50

10 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and
shade over a base coat of appropriate primer of approved brand, making 3 coats after
thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials, including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for finished item of work as per SS
911 for external walls
For above Qty item No. 5
For above Qty item No. 6
Add for variations

Sl.
No

Description

DETAILED ESTIMATE
No

Measurements
L
B
D
11 Painting with Synthetic Enamel paints - Three Coats - for New Iron Work of approved
brand and shade, making 3 coats in all to give an even shade after throughly brushing
the surface to remove all dirt and remains of loose powdered materials, including cost
and conveyance of allmaterials to work site and all operational, incidential, labour
charges, etc., complete for finished item of work as per SS 1207 & 1212. for All Floors
For approved Iron gate
12 Provision for ornamental architectural features
13 Provision for S&F IRON gate wicket gate 1 No.
14 Provision for rounding off

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

i Centre Building in Kesavadasupalem - 4 (Code No. 178)


ABARD RIDF XX in E.G. Dist.

to Residential Quarters to II nd Additional District Judge at


District.
ESTIMATE Rs. 9.20 LAKHS
DETAILED ESTIMATE
Quantity
7

80.52
80.52
161.04
Rm

18.42
18.42
3.16
40.00
cum

2.30
2.30
0.40
5.00
cum

DETAILED ESTIMATE
Quantity

5.89
5.89
0.22
12.00
Cum

9.21
9.21
0.58
19.00
cum
4.37
0.63
5.00
cum
0.87
0.87
0.26
2.00
cum

DETAILED ESTIMATE
Quantity

960.00
1900.00
240.00
600.00
300.00
4000.00
Kgs
4.00

6.55
1.21
1.24
9.00
Cum

21.85
4.04
-1.04
1.15
26.00
Cum

DETAILED ESTIMATE
Quantity

47.49
94.98
7.53
150.00
sqm

14.56
94.98
3.60
0.86
114.00
sqm

150.00
114.00
1.00
265.00
sqm

DETAILED ESTIMATE
Quantity

10.00
sqm
-- L.S --- L.S --- L.S --

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)

DETAILED CUM ABSTRACT ESTIMATE FOR WATER SUPPLY AND SANITARY


Name of Work:-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
Estimate Rs
Measurements
Sl.
No
1

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work, but exincluding
seigniorage charge and excluding dewatering charges in Ordinary Soil-Manual Means-Upto
3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M

For septic tank

7.00

4.00

2.50

70.00

for water sump

for sewage

4.00

2.20

2.50

22.00

60.00

0.45

0.45

12.15

add

5.85
110.00
cum

Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse
aggregate) for foundation levelling courses and below flooring beds using 40mm size (SS5)
hard Granite metal upto Plinth level from approved quarry including cost and conveyance of
all materials like cement, sand, coarse aggregate, water etc. to site, and sales & other
taxes on all materials and including all charges for mixing, laying concrete in foundations
ramming in 15 cm layers finishing top surface to the required level curing, but excluding
seigniorage charges, etc., complete for finished item of work. (APSS No. 402) for:-Machine
Mix-PCC (1:5:10) NOMINAL MIX

For septic tank

7.00

4.00

0.30

8.40

for water sump

4.00

2.20

0.30

2.64
0.46
11.5
cum

Plain Cement Concrete M-15 grade as per IS 456 Nominal mix, using 20 mm graded
machine crushed Hard Granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site, including sales & other taxes on all materials including all operational,
incidental and labour charges such as machine mixing, laying concrete, curing
etc.,complete for finished item of work, , lift manuals per APSS. No. 402. for bottom of
Septic tank.

For septic tank inside bottom

6.00

3.00

0.10

1.80

for water sump inside bottom

3.00

1.20

0.10

0.36
0.04
2.20
cum

Measurements
Sl.
No
4

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM
(1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab
when it is green, finished smooth with a floating coat of neat cement and thread lining at
regular intervals of 45cmx45cm including cost and conveyance of all materials like sand,
water proofing compound, water etc., to site and sales & other taxes on all materials and
operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering
smooth and thread lining, curing including rounding off junctions of wall and slab, but
excluding seigniorage charges, etc., complete for finished item of work. (APSS No. 901 &
903) for:-Impervious coat CM(1:3), 20mm Floor - 0 Lift Manual

all round the septic tank inside

18.00

..

3.00

54.00

all round the septic tank top

21.00

..

0.38

7.98

for sides (out sides)

21.00

..

0.45

9.45

for bottom

6.00

..

3.00

18.00

for all roung thr sump inside

8.40

..

3.00

25.20

for all roung thr sump top

11.40

..

0.38

4.33

for sides (out sides)

11.40

..

0.45

5.13

bottom

3.00

..

1.20

3.60
2.31
130.00
sqm

VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to


Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including HIRE CHARGES FOR CENTERING &
SCAFFOLDING cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site, and sales & other taxes on all materials including all
operational, incidental and labour charges such as machine mixing, laying concrete, curing,
but excluding seigniorage charges, etc.,complete for RCC SLABS, BEAMS but excluding cost
of steel and its fabrication charges for finished item of work. for:-Slabs-VRCC : M-20
Nominal Mix Floor - 0 Centering with Steel upto 3.66 Slab thk 100 Lift Manual

roo slab 100mm thick


over septic tank

6.76

3.76

25.42

for bullet wall

3.00

1.50

9.00

over water sump

3.76

2.96

11.13

deduct man hole

-1 x

0.6

0.6

-0.72

say

45.00

0.17
sqm

Measurements
Sl.
No
6

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

Supplying, fitting and placing HYSD (Fe 415/ tmt grade as per IS 1786-1985) bar
reinforcement VRCC works complete including wastage, as per drawings and technical
specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars 36 mm dia and
above, where welding required to be done compulsorily including cost and conveyance of
bars from approved sources to site of work, binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing in position, tying etc., and
sales & other taxes, on cost of all materials complete for finished item of work for:-HYSD
with lap splicing Floor - 0 Lift Manual

slab 100mm thick

4.5 cum

100

kg/cum

450.00
0.45

say

0.50
MT

Brick Masonary 230 mm thick for pannel walls in Super structure with CM ( 1:8) prop
(Cement:Sand) using 2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having
a crushing strength of 2.5N/sq.mm including cost and conveyance of all materials and water
from approved source to work site and all operational, incidental labour charges such as
scaffolding, mixing moratar, constructing masonary, lift charges, curing, but excluding
seigniorage charges, etc., complete for finished item of work as per (APSS No.501 & 504)
for Basement
For all round septic tank

18.76

0.38

3.00

21.39

for all round water sump

9.92

0.38

3.00

11.31

for went pipe piller

0.45

0.45

0.45

0.09
1.21
34.00
cum

Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x
440 mm fixing in position including constructing Brick masonry seat and CC Squatting plate
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.

At VVIP bed room toilet

1.00

At 2 Bed rooms

2.00

At out side toilet

1.00

At for sequent toilet

1.00
5.00
nos

Supply & fixing of PVC low level system parry ware, slim line with internal components &
short bend: 10 Litres capacity Single Flush fixing in position including cost and conveyance
of all materials, Sales tax & Other taxes on materials to site, Operational and Incidental
charges including all labour charges for fixing at site etc; complete for finished itemof work.
For all W.C

2.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

10 Supplying and Fixing best Indian make plastic seat and lid for European water closets with
rubber or plastic Buffers as per IS 2548-1996 fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
for europen W.Cs

2.00
nos

11 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-21973 of Hindustan / Neycer or Parryware make Colour glazed with 'P' trap fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.
At VVIP bed room toilet

1.00

At VIP Lounge room toilet

1.00
2.00
nos

12 Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm
nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted
with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams
Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including
wooden block: 550 x 400 mm - Single C.P. Pillar cock fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

At toilet rooms

2.00

At meeting hall

1.00

At Kitchen

1.00
4.00
nos

13 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing
at site etc; complete for finished itemof work.

At toilet rooms

2.00

At meeting hall

1.00
3.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

14 Providing and fixing white glazed flat back bowl urinal of size 440mmx265mmx315mm
with internal flushing system with flat back large integrated overflow of approved make
with CP spreader, C.P. waste coupling, C.P. brass bottle trap, push cock of approved make
including 38.10 mm PVC waste pipe out let, of required length and 12.7 mm PVC
connection with brass union nut C.P coated etc. all complete, fixing in position including
cost and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site etc;
complete for finished itemof work.

At toilet rooms

2.00
2.00
nos

15 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with
C.P. Grating fixing with white cement as per site requirements with standard practice for
100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

At wash hand basins

4.00

At urinals

2.00

At for toilets

2.00

At kitchen

1.00
9.00
nos

16 Providing 75 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend
87.5 Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR
Pipe fittings, Iron Clamps and all other accessories and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

wash hand basins to out side

6.00

24.00

Nahani trap to out side

6.00

18.00

for toilets to out sides

6.00

12.00
54.00
rm

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

17 Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost of necessary Door Bend
87.5 Degree , Plain Bend 87.5 DegreeShoes, Single Tee with Door, Pipe Clip - UPVC/SWR
Pipe fittings, Iron Clamps and all other accessories and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

W.C to Manhole

6.00

12.00

MH TO MH

15.00

15.00

MH to MH

12.00

36.00

15.00

15.00

10.00

10.00

To SEPTIC TANK
SEPTIC TANK OUT LET

88.00
rm
18 Providing 160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme or any ISI Brand and 160 mm x 110 mm - Internal Reducer
- UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand) and fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing
at site etc; complete for finished itemof work.

main to septictank

15.00

15.00
rm

19 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex
/Aqua tech or equivalent Polyethylene water storage tank double layer confirming to ISI
12701/96 mark with lid & manufacture with cover and suitable locking arrangement &
making necessary holes for inlet & outlets and over flow pipes but without fittings & base
support for tanks etc., complete as directed by the Departmental Officers for finished item
of work.

PVC water storage tank

1000

1000
liters

20 Providing and fixing 12.7 mm heavy duty NP Sink cock Seiko/ Senior/ Nice or equivalent and
38.10 mm PVC waste pipe out let, of required length and 12.7 mm PVC connection with
brass union nut C.P coated etc. all complete and fixing in position including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and
Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

At kitchen sink

1.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

21 S & F CP Long body bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/
Senior/ Nice or equivalent fixing in position including cost and conveyance of all materials,
Sales tax & Other taxes on materials to site, Operational and Incidental charges including
all labour charges for fixing at site etc; complete for finished itemof work.
At Toilets, Bath rooms & Outside tap

5.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

22 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 25
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.

8.00
nos

23 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 20
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.
1

4.00
nos

24 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 15
mm NB Size fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all labour
charges for fixing at site etc; complete for finished itemof work.
1

x 12

12.00
nos

25 S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and
aluminium screws fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.
At toilets

2.00
nos

26 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and
aluminium screws fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.
At toilet

2.00
nos

27 S & F 12.7 x 88.9 CP fancy shower fixing in position including cost and conveyance of all
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof work.
1

1.00
nos

28 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2
mm fixing in position including cost and conveyance of all materials, Sales tax &
Other taxes on materials to site, Operational and Incidental charges including all
labour charges for fixing at site etc; complete for finished itemof work.

Measurements
Sl.
No

Description of item
At Toilets

No
1

L
3

Quantity
Cum/Sq
m/Mt/No
s
3.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

29 Supply & Fixing wall mixer with telephonic shower arrangement with crutch and
telephone shower with flexible tube Jaquar make Continental series Chrome
colour for bath tub with 7 years warranty / Jupiter Aqua Lines-JAL or equivalent
series including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges
for fixing at site etc; complete for finished itemof work.

At Bath room

1.00
nos

30 Supply & Fixing bath tub over flow set complete with over flow cap,450mm ball
chain with rubber plug 7 Union bend with brass nuts Jaquar make, Chrome colour
with 7 years warranty / Jupiter Aqua Lines-JAL or equivalent series including cost
and conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
At Bath room

2.00
nos

31 Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm long
bend pipe with wall flange Jaquar make Continental series, Chrome finish with 7
years warranty / Jupiter Aqua Lines-JAL or equivalent series including cost and
conveyance of all materials, Sales tax & Other taxes on materials to site,
Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.

At Bath room

1.00
nos

32 Supplying & fixing stainless steel sink size 20" x18" x 8 " (508x457.2x203.2mm) 1
mm thick with accessories including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges
including all labour charges for fixing at site etc; complete for finished itemof
work.

1.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

33 Constructing Constructing 457.2 mm x 457.2 mm (1'6"x1'6") dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop
using 2nd Class Clay Bricks of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including plastering with cement mortar
1:3 prop; thick both inside and outside fitted light weight 457.2 mm x 457.2
mm (1'6"x1'6") C.I frame and cover of 20 Kg. and frames including excavating pits
up to a depth of Inspection chamber up to 914.4 mm (3'0") in all sorts of soils
(excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm
HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and
all incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.

4.00
nos

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

34 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 &
4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate
chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged
cover and including cost and conveyance of all materials like cement, sand,
bricks, water etc., to site, cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.

x 12

12.00
nos

35 S& F GI union 12.7 mm Ist Quality


1

x 10

10.00
nos

36 S& F GI union 19.05 mm Ist Quality


1

x 10

10.00

x 12

12.00

37 S& F GI union 25.4 mm Ist Quality


nos
38 S& F GI union 38.1 mm Ist Quality
1

8.00
nos

39 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1

30.00

30.00
Rm

40 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.

20.00

20.00
Rm

41 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1

50.00

50.00
Rm

Measurements
Sl.
No

Description of item

No

Quantity
Cum/Sq
m/Mt/No
s

42 S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS
1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour
charges complete for finished itemof work.
1

60.00

60.00
Rm

43 Provision for bore well

-- LS --

44 Provision for motor with pump set

-- LS --

45 Rounding and unforeseen items

-- LS --

Total for water supply and sanitary

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

ACT ESTIMATE FOR WATER SUPPLY AND SANITARY

adi Centre Building in Kesavadasupalem - 4 (Code No. 178) of


Mandal Under NABARD RIDF XX in E.G. Dist.
Estimate Rs 6.82 Lakhs
Rate/Per

Amount

139.40

15,334

1 Cum

3622.30

41,656

1 Cum

4629.00
1 Cum

10,184

Rate/Per

Amount

319.20

41,496

1 Sqm

854.20
1 Sqm

38,439

Rate/Per

Amount

64159.20

32,080

1 MT

4165.20

1,41,617

1 Cum

1803.50

9,018

Each

1760.80
Each

3,522

Rate/Per

Amount

505.00

1,010

Each

1854.60

3,709

Each

1731.70

6,927

Each

1195.00
Each

3,585

Rate/Per

Amount

2473.80

4,948

Each

361.40

3,253

Each

355.40
1 Rm

19,192

Rate/Per

Amount

528.20

46,482

1 Rm

793.40

11,901

1 Rm

8.90

8,900

1 Lit

1464.40
Each

1,464

Rate/Per

Amount

688.60

3,443

Each

Rate/Per

Amount

804.80

6,438

Each

549.50

2,198

Each

408.10

4,897

Each

183.50

367

Each

165.50

331

Each

327.20
Each

327

Rate/Per

Amount

570.20

1,711

Each

Rate/Per

Amount

6132.10

6,132

Each

1431.80

2,864

Each

4391.30

4,391

Each

5313.30
Each

5,313

Rate/Per

Amount

3538.60

14,154

Each

Rate/Per

Amount

604.20

7,250

Each
43.30

433

Each

52.40

524

Each
79.80

958

Each
118.60

949

Each

205.70

6,171

1 Rm

227.30

4,546

1 Rm

295.70
1 Rm

14,785

Rate/Per

Amount

460.60

27,636

1 Rm
80,000
35,000
6,216
6,81,751

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 17


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Sub Work:Construction of Compound wall to Residential Quarters to II nd Additional District Jud


Mummidivaram in East Godavari District.

ESTIMATE Rs. 0.32 LA


Abstract
Sl.
No.

Description

unit

Qunatity

Dismantling the existing Flat and pan tiles or Mangalore


tiles over flat tiles without roof timbers clearing away
and carefully stacking materials useful for reuse if any
etc., complete as directed by the Engineer-in-charge of
the work.

1cum

391.1

Dismantling & Demolishing Unreinforced cement


concrete upto 15 cm thicknes within 100 metres lead
labour charges etc., complete as directed by the
Enginee - in - Charge.

1cum

20.52

Dismantling Brick work including stacking of serviceable


materials and disposal of unserviceable materials within
100 metres lead labour charges etc; complete for
finished item of work as directed by the Engineer - in Charge.

1cum

129.68

Dismantling the existing Wrought and framed timber in


roofs or floors clearing away and carefully stacking
materials useful for reuse if any etc., complete as
directed by the Engineer-in-charge of the work

1cum

1.74

Deduct for Salvage of materials (Doors, Windows,


Manglore tiles and roof timbers etc;)
Provision for Rounding off

LS
LS

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

788 of 860

Kesavadasupalem - 4 (Code No. 178) of


st.

rs to II nd Additional District Judge at

ESTIMATE Rs. 0.32 LAKHS


Rate

Amount

13

5,084

838

17,196

144

18,674

197

343

-10000

-10,000

703

703

TOTAL

32,000

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

789 of 860

Name of Work:Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of
Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

Sub Work:Dismantling the Existing old court building (now occupaied by Bar Association) at Amalapuram in
East Godari District.

ESTIMATE Rs. 0.32 LAKHS


Sl.
No
1
1

DETAILED ESTIMATE
Description

Measurements
L
B
D
2
3
4
5
6
Dismantling Brick work including stacking of serviceable materials and disposal of
unserviceable materials within 100 metres lead labour charges etc; complete for finished
item of work as directed by the Engineer - in - Charge.

Long walls
Cross walls
Front room long walls
Cross walls
Back side rooms long walls
Cross walls
Sloped room long walls
Dias partation wall

2
2
2
1
2
2

x
x
x
x
x
x

1
2
1
1
2
1

24.60
4.90
2.90
4.90
1.75
5.25

0.35
0.35
0.35
0.35
0.35
0.35

3.50
3.50
2.10
3.50
2.80
3.50

1
2
1
1

x
x
x
x

1
1
1
1

4.90
3.65
1.85
4.90

0.35
0.35
0.35
0.35

3.50
2.55
2.10
0.90

Dismantling the existing Flat and pan tiles or Mangalore tiles over flat tiles without roof
timbers clearing away and carefully stacking materials useful for reuse if any etc., complete
as directed by the Engineer-in-charge of the work.

Main building roof

No

2
2
2
2

x
x
x
x

1
1
1
1

24.60
3.00
5.25
3.95

6.00
3.50
4.50
3.50

---------

Dismantling & Demolishing Unreinforced cement concrete upto 15 cm thicknes within 100
metres lead labour charges etc., complete as directed by the Enginee - in - Charge.
Front rooms floor
Side rooms floor
Old court hall
Dias portion
Cross walls portions

2
3
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

2.50
4.90
7.30
4.90
4.90
3.35

1.90
4.90
4.90
2.40
0.35
1.80

0.15
0.15
0.15
0.15
0.15
0.15

Sl.
No
4

DETAILED ESTIMATE
Description

No

Measurements
L
B
D
Dismantling the existing Wrought and framed timber in roofs or floors clearing away and
carefully stacking materials useful for reuse if any etc., complete as directed by the
Engineer-in-charge of the work
Wooden pillers
Wooden beam
Wooden rafters

1
1
1
1

x
x
x
x

4
1
42
42

0.10
12.50
3.50
3.50

0.10
0.10
0.10
0.10

1.80
0.15
0.05
0.05

Deduct for Salvage of materials (Doors, Windows, Manglore tiles and roof timbers etc;)

Provision for rounding off

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

adi Centre Building in Kesavadasupalem - 4 (Code No. 178) of


BARD RIDF XX in E.G. Dist.

urt building (now occupaied by Bar Association) at Amalapuram in


ESTIMATE Rs. 0.32 LAKHS

DETAILED ESTIMATE
Quantity
7

60.27
24.01
4.26
6.00
6.86
12.86
6.00
6.52
1.36
1.54
129.68
cum

295.20
21.00
47.25
27.65
391.10
cum

1.43
10.80
5.37
1.76
0.26
0.90
20.52
cum

DETAILED ESTIMATE
Quantity

0.07
0.19
0.74
0.74
1.74
Cum
-- L.S --- L.S --

Name Of Work: Construction of Residential quarters for IInd Additional District Judge at Mummidiv
Sub-Work: Providing E.I. to the above building.

Sl No.

Qty.

Description of Item

Rate

90

Mts Supply and Laying of 20mm dia 2.0mm thick PVC pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in Roof Slabs with
all required PVC / Metallic Deep Boxes including masonary work
and labour charges etc., complete.(Data No. 1.13.1)

37.50

60

Mts Supply and Laying of 25mm dia 2.0mm thick PVC pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in Roof Slabs with
all required PVC / Metallic Deep Boxes including masonary work
and labour charges etc., complete.(Data No. 1.13.2)

44.60

50

Mts Supply and laying of 20mm dia 1.5mm thick P.V.C.pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in wall with PVC /
Metallic junction boxes and all required accessories including
masonary work for light, fan and separate plug point with supply
and fixing of suitable size well seasoned wooden deep box
including all labour charges etc., complete.(Data No. 1.9.1)

46.00

50

Mts Supply and laying of 25mm dia 1.5mm thick P.V.C.pipe ISI mark of
Sudhakar / Maco Plast / Modi make concealed in wall with PVC /
Metallic junction boxes and all required accessories including
masonary work for light, fan and separate plug point with supply
and fixing of suitable size well seasoned wooden deep box
including all labour charges etc., complete.(Data No. 1.9.3)

51.90

Mts Supply and laying of 32mm dia 2.5mm thick P.V.C. pipe ISI Mark of
Sudhakar / Maco Plast / Modi make concealed in wall with all
required PVC / Metallic Junction Boxes including masonary work
and labour charges etc., complete for Run of mains.(Data No.
1.12.5)

69.40

14

33.00

32

Nos Supply and fixing of fan hook in RCC slab of 12/15mm dia MS Rod
while laying the slab. (Data No. 12.1.16)
Pts Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular switch of GM / Anchor / Gold Medal / Million /
Vimal / Maru / Milltec make on 3mm thick hylam sheet suitable to
be fixed on existing wooden / Metallic deep box in existing
surface / consealed pipe wiring including cost and conveyance of
all material and all labour charges etc., complete for light and bell
points in R.B.(Data No. 2.7.2)

300.30

Sl No.

Qty.

15

10

11

12

13

Description of Item

Rate

pts Wiring with run of 3 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular switch of GM / Anchor / Gold Medal / Million /
Vimal / Maru / Milltec make on 3mm thick hylam sheet suitable to
be fixed on existing wooden / Metallic deep box in existing
surface / consealed pipe wiring including cost and conveyance of
all material and all labour charges etc., complete for fan and
Pts Wiring
of 2
14/0.3mm
(1.02.7.5)
Sq.mm) FRLS / HFFR PVC
Exhaustwith
fan run
points
in of
N.R.B.
(Data No.
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of Ceiling rose and 6A
ISI mark Mini Modular 2 way switch of GM / Anchor / Gold Medal /
Million / Vimal / Maru / Milltec make on 3mm thick hylam sheet
suitable to be fixed on existing wooden / Metallic deep box in
existing surface / consealed pipe wiring including cost and
conveyance of all material and all labour charges etc., complete for
Nos Supply
and
of in
6AR.B.(Data
ISI mark No.
Mini
Modular switch
with 6A 3/2
light and
bellfixing
points
2.7.2)(staircase
point)
pin wall plug socket of GM / Anchor / Gold Medal / Million / Vimal /
Maru / Milltec make on a common switch board with earth
connections in surface / consealed wiring including cost and
conveyance of all material and all labour charges etc., complete in
N.R.B. / R.B. (Data No.2.2.7)
Pts Wiring with run of 3 of 14/0.3mm (1.0 Sq.mm) FRLS / HFFR PVC
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
consealed pipe including supply and fixing of 6A ISI mark Mini
Modular switch with 6A 3/2 pin wall plug socket of GM / Anchor /
Gold Medal / Million / Vimal / Maru / Milltec make on 3mm thick
hylam sheet suitable to be fixed on existing wooden / Metallic deep
box in existing surface / consealed pipe wiring including cost and
coveyance of all material and all labour charges etc., complete in
N.R.B. / R.B. (Data No. 2.6.8)

399.50

Nos Supply and fixing of 16A 3pin / 6A 3pin ISI mark Mini Modular plug
socket with 16 Amps switch, Fuse, Indicator (5 in One) of GM /
Anchor / Gold Medal / Million / Vimal / Maru / Milltec make on 3mm
thick hylam sheet suitable to be fixed on existing wooden / Metallic
deep box in existing surface / consealed pipe wiring including cost
and coveyance of all material and all labour charges etc., complete
in N.R.B. / R.B. (Data No. 2.6.13)

293.10

Nos Supply and fixing of Legrand / L & T / GE / Siemens / Schneider / 1398.60


ABB make DB with 1 No 20A single phase plug and Socket, in sheet
steel enclosure with 1 No 10A to 20A 10 KA SP MCB including
internal connection and labour charges for Flush Mounting etc.,
complete(Data No. 7.4.1)

450.45

95.40

243.10

Sl No.

Qty.

Description of Item

Rate

14

Nos Supply and fixing of 4 Nos 6A 3 pin ISI mark wall plug sockets with
4 Nos 6A Mini Modular type switches with cover frame of GM /
Anchor / Gold Medal / Million / Vimal / Maru / Milltec make on 3mm
thick hylam sheet suitable to be fixed on existing wooden / Metallic
deep box in existing surface / consealed pipe wiring for computer
including cost and conveyance of all material and all labour
charges etc., complete in N.R.B. / R.B. (Data No. 2.6.11)

397.50

15

No Supply and fixing of million/GM make 32 A DP switch flush type


duly recessed in wall with wooden deep box of covered with hylam
sheet with connections and all labour charges etc., complete.(SD
2.1.6) (Data enclosed)

241.00

16

Nos Supply and fixing of Mini Modular telephone Jack with connector of
makes GM / Anchor / Gold Medal / Million / Vimal / Maru / Milltecon
on existing wooden / Metallic deep box in existing surface /
consealed pipe wiring including cost and coveyance of all material
and all labour charges etc., complete in N.R.B. / R.B. (Data No.
3.2.3)

67.00

17

60

Mts Supply and run of 2 Pair telephone wire of makes Gold Medal /
Million / Finolex / Delton / Surabi / Polycab in existing pipe including
all labour charges etc., complete.(Elec 7.1.1+labour)(10.10+2)

12.10

18

225

50.80

19

75

Mts Supply and Run of 2 of 36/0.3mm (2.5 Sq.mm) FR / FRLS P.V.C.


insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
pipe for run of mains inlcuding all labour charges etc., complete.
Mts Supply
and
Run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS P.V.C.
(Data No.
4.2.8)
insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
pipe for run of mains inlcuding all labour charges etc., complete.
(Data No. 4.2.2)

25.50

Sl No.

Qty.

Description of Item

Rate

20

100

Mts Supply and Run of 2 of 56/0.3mm (4.0 Sq.mm) FR / FRLS P.V.C.


insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
pipe for run of mains inlcuding all labour charges etc., complete.
(Data No. 4.2.11)

73.70

21

375

Mts Supply and Run of 1 of 14/0.3mm (1.0 Sq.mm) FR / FRLS P.V.C.


insulated flexible ISI mark copper cable of GM / L&T / RPG /
Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard /
Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing
pipe for earth continuity inlcuding all labour charges etc.,
complete.(Data No. 4.1.2)

12.60

22

10

Mts Supply and Run of 4 of 84/0.3mm (6.0 Sq.mm) with Run 1 of


36/0.3mm(2.5 Sqmm) FR / FRLS P.V.C. insulated flexible ISI mark
copper cable of GM / L&T / RPG / Havells / V-Guard / Power Flex /
Polycab / Gold Medal / Standard / Milion / Vimal / Sun cab /
Paragaon / Fortune Art make in existing pipe for run of mains
inlcuding all labour charges etc., complete.(Data No. 4.4.5) [From
Meter board to 4 way TPN DB]

230.80

23

17

Nos Supply, Transportation and fixing of 1x36/40W box type tube light
luminaire with powder coated CRCA sheet steel housing with VPIT
Ballast and 1No 4'-40W tube Including fixing on wall / ceiling on TW
round blocks and all standrad accessories of makes Crompton /
Bajaj / HPL / Surya / Havells.(Data No. 9.1.1)

718.20

24

Nos Supply and fixing of 1x 11 W mirror light with standard accessories


diffuser of makes Crompton/Bajaj/Havells make with 11 W CFL
lamp including connections and labour chargers etc., complete.
( SD 8.2.1 ) (Data enclosed)

713.00

25

Nos Supply, Transportation and Fixing of 12"(300mm) 250V light duty 1656.10
ISI mark of Crompton / Bajaj / Havells / Orint Make exhaust / Fresh
Air fan with metallic body and blades including making hole in wall
and masonary work and all labour charges etc., complete. (Data
No. 12.1.18)

26

27

Nos Supply, Transportation and fixing of 1X36/40W flourscent street 1860.60


light luminaire with sheet alluminium housing and UV stabilised
acrylic cover and all standrad accessories of makes Crompton /
Bajaj / HPL / Surya / Havells including 1.0 Mtr 25mm dia 'B' Class GI
pipe bracket, anti tilting MS flat including 40W tube and
connections etc., complete.(Data No. 13.1.2)
No Supply, Transportation and fixing of of 70W MV Well glass low bay 3427.60
luminaire of IP 65 protection integral type with all standard
accessories of makes Crompton / Bajaj / HPL / Surya / Havells and
fixing of luminaire including 70W MV lamp with 2.5 Sqmm flexible
copper cable and all labour charges etc., complete.(Data No.
17.1.4)

Sl No.

Qty.

Description of Item

Rate

28

Nos Supply and fixing of Anchor / Gold Medal Olive / Million Zoom make
ISI mark batten holder / slanting holder in lieu of ceiling rose of
light point complete with all connections and all labour charges
with 40W bulb (for new installation).(Data No. 3.1.1)

38.90

29

Nos Supply and fixing of Anchor / Gold Medal / Million / Vimal / Maru
make buzzer on 4"x4" decolam block including giving connections,
cost of all accessories and labour charges etc., complete.(Data No.
3.1.3)

86.10

30

Nos Supply and fixing of Anchor / Gold Medal / Million / Vimal / Maru
make Ding Dong Bell on 4"x7" decolam block including giving
connections, cost of all accessories and labour charges etc.,
complete.(Data No. 3.1.5)

153.00

31

14

32

14

Nos Supply, Transportation and Fixing of 1200mm (48") Sweep 1705.70


Crompton Decora / Bajaj Ultima / Havells Velocity / Usha Astra /
Orient PSPO make AC Ceiling fan with all standard accessories but
without regulator including all labour charges etc., complete.(Data
Nos Supply
& Fixing of Mini Modular type Stepped electronic regulator 266.00
No. 12.1.1)
with cover frame of makes GM / Anchor / Gold Medal / Million /
Vimal / Maru / Milltec.(Data No. 12.1.9)

Sl No.

Qty.

Description of Item

Nos Supply and fixing of 19/20mm dia steel tube down rod for ceiling
fan of 1 Mtr Length with bolts and nuts duly painted with matching
colour of fan including all labour charges etc., complete.(Data No.
12.1.17)

Rate

33

10

34

Nos Supply and fixing of 4 way TPN DB with IP-43 Protection with 1 No 6659.30
63A FP Isolator and 12Nos 6-32 A 10kA SP MCBs of Legrand / L &
T / GE / Siemens / Schneider / ABB make including internal
connections and labour charges for Flush Mounting etc., complete.
(Data No. 7.2.13)

35

Nos Supply, Transportation and fixing of 1x18W CFL Integral post top 2456.00
luminaire with conical shape, opel clear acylic diffuser with cast
alluminium capsule with VPIT ballast of makes Crompton / Bajaj /
Surya / K Lite / HPL and fixing of luminaire including 1x18W CFL
Lamp with 1.0 Sqmm flexible copper cable and all labour charges
etc., complete.(Data No. 18.1.1)

36

40

37

No Supply and fixing of 18"X24" peeta board with 3nos 63A Fuse units 1550.00
and 1no neutral link including giving connections with 6Sqmm
flexible copper cable and all labour charges etc., complete.(DATA)

38

No Providing independent earthing by excavating a pit to a depth of 2300.50


2.25Mt in all soils, as per size specified in the Data, using 40mm
dia 'B' class GI pipe of 2.5 Mtrs length with necessary No.8 G.I.
double earth wire and accessories with 18" dia 2" thick hume pipe
ring duly providing staggered holes including filling with 20Kg Salt
and 40Kg Charcoal or 40Kg bentonite powder in layers and all
labour charges etc., complete.(Data No. 23.1.1)

39

15

Mts Supply and Run of 4 of 16.0 Sq.mm WPSC (Whether Proof Single
Core) Aluminium cable of ISI mark of Finolex / Polycab / Gold Medal
/ Million / Payal / Sun Light / Power Flex. make along with No.10
SWG G.I bearer wire through PVC cleats with all accessories
including labour charges etc., complete for service mains.(Data No.
8.1.6)

Mts Supply and Run of No. 8 SWG copper wire including cost of all
accessories and labour charges etc., complete. (0.1155Kgs/1Mtr)
(Data No. 5.2.2)

86.00

131.20

69.00

Sl No.

Qty.

Description of Item

Rate

Add variation SSR 2013-14 rate @ 10%


Sub total
Add VAT @ 5%
Q.C charges@ 1%
Insurance charges@0.68%
L.S for A.P.E.P.D.C.L charges
LS for unforeseen items and rounding off

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R


(R&B) Sub-division : Razo

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Superintending Engineer (R
(R&B) Circle : Kakinada

arters for IInd Additional District Judge at Mummidivaram.

Per

Amount

Mtr

3375.00

Mtr

2676.00

Mtr

2300.00

Mtr

2595.00

Mtr

347.00

Each

462.00

Pt

9609.60

Per

Amount

pt

5992.50

Pt

2252.25

Each

858.60

pt

1458.60

Each

586.20

Each

4195.80

Per

Amount

Each

795.00

Each

241.00

Each

201.00

Mtr

726.00

Mtr

11430.00

Mtr

1912.50

Per

Amount

Mtr

7370.00

Mtr

4725.00

Mtr

2308.00

Each

12209.40

Each

2139.00

Each

4968.30

Each

7442.40

Each

3427.60

Per

Amount

Each

233.40

Each

86.10

Each

153.00

Each

23879.80

Each

3724.00

Per

Amount

Each

860.00

Each

6659.30

Each

4912.00

Mtr

5248.00

Each

1550.00

Each

2300.50

Mtr

1035.00

Per

Amount
147244.85
14724.49
161969.34
8098.47
1619.69
1101.39
25000.00
197788.89
2211.11
2,00,000

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

Superintending Engineer (R&B)


(R&B) Circle : Kakinada

LEAD/LIFT/LOADING & UNLOADING CHARGES SSR 2014-15


DATA FOR LEAD CHARGES BY HEAD LOAD
Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone
LEAD UP TO 100 m

COM-LDLFT-1:1
Mazdoor
1.00 No
Unit
CPO
Rate per

250

7.00 Cum
14%

250

1.00 Cum

250

Deduct
14%

LEAD UP TO 150 m

COM-LDLFT-1:2
Mazdoor

250

Unit

35

CPO

40.71

35.71

Rate per

Cement/ HYSD Steel/ Structural steel


LEAD UP TO 100 m

COM-LDLFT-1:3
Mazdoor
1.00 No
Unit

250

12.00 MT

CPO

14%

Rate per

1.00 MT

250

250

Deduct
14%

LEAD UP TO 150 m

COM-LDLFT-1:4
Mazdoor

250

Unit

35

CPO

23.75

20.83

Rate per

PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood
LEAD UP TO 100 m

COM-LDLFT-1:5
Mazdoor
1.00 No
Unit
CPO
Rate per

250

5.50 Cum
14%
1.00 Cum

250

250

Deduct
14%

LEAD UP TO 150 m

COM-LDLFT-1:6
Mazdoor

250

Unit

35

CPO

51.82

45.45

Rate per

(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
Earth / Sand / Gravel / Murrum / Lime / Surki /Coarse aggregate / Rubble stone / Size stone / Cut stone
Tipper 5 Cum Hire Charges
Sl. No

Description

SSR Page
No.

Fuel Charges

Crew charges

Hours

Rate

Amount

Hours

Rate

Amount

Hours

Rate

Amount

Cost for
5 Cum
(6+9+12)

10

11

12

13

COM-LDLFT-2

COM-LDLFT-2:7

1 LEAD UP TO 1 KM

406
0.15
COM-LDLFT-2:8

454.40

68.16

0.15

239.10

35.87

0.15

124.80

18.72

122.75

2 LEAD UP TO 2 KM

406
0.21
COM-LDLFT-2:9

454.40

95.42

0.21

239.10

50.21

0.21

124.80

26.21

171.84

3 LEAD UP TO 3 KM

406
0.28
COM-LDLFT-2:10

454.40

127.23

0.28

239.10

66.95

0.28

124.80

34.94

229.12

4 LEAD UP TO 4 KM

406
0.34
COM-LDLFT-2:11

454.40

154.50

0.34

239.10

81.29

0.34

124.80

42.43

278.22

5 LEAD UP TO 5 KM

406
0.40
COM-LDLFT-2:12

454.40

181.76

0.40

239.10

95.64

0.40

124.80

49.92

327.32

454.40

27.26

0.06

239.10

14.35

0.06

124.80

7.49

49.10

454.40

22.72

0.05

239.10

11.96

0.05

124.80

6.24

40.92

6 LEAD UPTO 5 to 30
KM/ EVERY KM

406

0.06

COM-LDLFT-2:13
7 LEAD BEYOND 30 KM/
EVERY KM

406

0.05

(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials
Tipper 5 cum Hire Charges
Sl. No

Description

SSR Page
No.

Fuel Charges

Crew charges

Hours

Rate

Amount

Hours

Rate

Amount

Hours

Rate

Amount

Cost for
8 Mt
(6+9+12)

10

11

12

13

COM-LDLFT-2

COM-LDLFT-2:14

1 LEAD UP TO 1 KM

406
0.15
COM-LDLFT-2:15

454.40

68.16

0.15

239.10

35.87

0.15

124.80

18.72

122.75

2 LEAD UP TO 2 KM

406
0.21
COM-LDLFT-2:16

454.40

95.42

0.21

239.10

50.21

0.21

124.80

26.21

171.84

3 LEAD UP TO 3 KM

406
0.28
COM-LDLFT-2:17

454.40

127.23

0.28

239.10

66.95

0.28

124.80

34.94

229.12

4 LEAD UP TO 4 KM

406
0.34
COM-LDLFT-2:18

454.40

154.50

0.34

239.10

81.29

0.34

124.80

42.43

278.22

5 LEAD UP TO 5 KM

406
0.40
COM-LDLFT-2:19

454.40

181.76

0.40

239.10

95.64

0.40

124.80

49.92

327.32

454.40

27.26

0.06

239.10

14.35

0.06

124.80

7.49

49.10

454.40

22.72

0.05

239.10

11.96

0.05

124.80

6.24

40.92

6 LEAD UPTO 5 to 30
KM/ EVERY KM

406

0.06

COM-LDLFT-2:20
7 LEAD BEYOND 30 KM/
EVERY KM

406

0.05

(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood
Tipper 5 cum Hire Charges
Sl. No

Description

SSR Page
No.

Fuel Charges

Crew charges

Hours

Rate

Amount

Hours

Rate

Amount

Hours

Rate

Amount

Cost for
3.40 Cum
(6+9+12)

10

11

12

13

COM-LDLFT-2

COM-LDLFT-2:21

1 LEAD UP TO 1 KM

406
0.15
COM-LDLFT-2:22

454.40

68.16

0.15

239.10

35.87

0.15

124.80

18.72

122.75

2 LEAD UP TO 2 KM

406
0.21
COM-LDLFT-2:23

454.40

95.42

0.21

239.10

50.21

0.21

124.80

26.21

171.84

3 LEAD UP TO 3 KM

406
0.28
COM-LDLFT-2:24

454.40

127.23

0.28

239.10

66.95

0.28

124.80

34.94

229.12

4 LEAD UP TO 4 KM

406
0.34
COM-LDLFT-2:25

454.40

154.50

0.34

239.10

81.29

0.34

124.80

42.43

278.22

5 LEAD UP TO 5 KM

406
0.40
COM-LDLFT-2:26

454.40

181.76

0.40

239.10

95.64

0.40

124.80

49.92

327.32

454.40

27.26

0.06

239.10

14.35

0.06

124.80

7.49

49.10

454.40

22.72

0.05

239.10

11.96

0.05

124.80

6.24

40.92

6 LEAD UPTO 5 to 30
KM/ EVERY KM

406

0.06

COM-LDLFT-2:27
7 LEAD BEYOND 30 KM/
EVERY KM

406

0.05

(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
WATER
Water tanker 8000 ltr
Sl. No
1

Description

SSR Page
No.

Hours

Fuel Charges

Crew charges

Rate

Amount

Hours

Rate

Amount

Hours

Rate

Amount

Cost for
8000 Lit
(6+9+12)

2
COM-LDLFT-2

3
4
COM-LDLFT-2:28

10

11

12

13

1 LEAD UP TO 1 KM

407
0.15
COM-LDLFT-2:29

408.80

61.32

0.15

239.10

35.87

0.15

117.00

17.55

114.74

2 LEAD UP TO 2 KM

407
0.21
COM-LDLFT-2:30

408.80

85.85

0.21

239.10

50.21

0.21

117.00

24.57

160.63

3 LEAD UP TO 3 KM

407
0.28
COM-LDLFT-2:31

408.80

114.46

0.28

239.10

66.95

0.28

117.00

32.76

214.17

4 LEAD UP TO 4 KM

407
0.34
COM-LDLFT-2:31

408.80

138.99

0.34

239.10

81.29

0.34

117.00

39.78

260.06

5 LEAD UP TO 5 KM

407
0.40
COM-LDLFT-2:32

408.80

163.52

0.40

239.10

95.64

0.40

117.00

46.80

305.96

408.80

24.53

0.06

239.10

14.35

0.06

117.00

7.02

45.90

408.80

20.44

0.05

239.10

11.96

0.05

117.00

5.85

38.25

6 LEAD UPTO 5 to 30
KM/ EVERY KM

407

0.06

COM-LDLFT-2:33
7 LEAD BEYOND 30 KM/
EVERY KM

407

0.05

(Lead) Conveyance charges for machinery per kilometer for transporting materials by tippers and trucks excluding loading, unloading a
charges of machinery
BRICKS
Truck 10 T Hire Charges

Fuel Charges

Crew charges

Hours

Rate

Amount

Hours

Rate

Amount

Hours

Rate

Amount

Cost for
3000 Nos
(6+9+12)

Sl. No

Description

SSR Page
No.

10

11

12

13

1 LEAD UP TO 1 KM

406

0.15

424.50

63.68

0.15

239.10

35.87

0.15

117.00

17.55

117.10

2 LEAD UP TO 2 KM

406

0.21

424.50

89.15

0.21

239.10

50.21

0.21

117.00

24.57

163.93

3 LEAD UP TO 3 KM

406

0.28

424.50

118.86

0.28

239.10

66.95

0.28

117.00

32.76

218.57

4 LEAD UP TO 4 KM

406

0.34

424.50

144.33

0.34

239.10

81.29

0.34

117.00

39.78

265.40

5 LEAD UP TO 5 KM

406

0.40

424.50

169.80

0.40

239.10

95.64

0.40

117.00

46.80

312.24

6 LEAD UPTO 5 to 30
KM/ EVERY KM

406

0.06

424.50

25.47

0.06

239.10

14.35

0.06

117.00

7.02

46.84

7 LEAD BEYOND 30 KM/


EVERY KM

406

0.05

424.50

21.23

0.05

239.10

11.96

0.05

117.00

5.85

39.04

CNVEYANCE CALICULATION OF MATERIAL BUILDINGS DATA FOR THE YEAR 2011 - 2012 ( Less 14% Contract Profit & Overhead
Sl.
No.

Nature of Material

Lead
from
Quarry
to site
Km's

Up to 1
Km lead
Charges

Up to 5
Km lead
Charges

Amount
4

Amount
5

Km's
6

Rate
7

Amount
8

Km's
9

Rate
10

Amount
11

12

13

1 Sand for Mortor

35.0 Kms

24.55

65.46

25.0 Kms

9.82

245.5

5.0 Kms

8.18

40.9

351.86

327.31

2 Sand for Filling

10.0 Kms

24.55

65.46

5.0 Kms

9.82

49.1

0.0 Kms

8.18

114.56

90.01

3 HBG Metal

74.0 Kms

24.55

65.46

25.0 Kms

9.82

245.5

44.0 Kms

8.18

359.92

670.88

646.33

4 Bricks

56.0 Kms

39.03

104.08

25.0 Kms

15.61

390.25

26.0 Kms

13.01

338.26

832.59

793.56

Up to 5 Km to 30 Km's

Beyond 30 Km / Every Km

Grand Total
Total
Conveyance (Deduct
(5+8+11)
1 Km lead (12-4))

UNLOADING CHARGES SSR 2014-15

LEAD CHARGES BY HEAD LOAD


urki / Coarse aggregate / Rubble stone / Size stone / Cut stone
COM-LDLFT-1:2
2.00 No

250

7.00 Cum
14%

500

Deduct 14%

500
500

1.00 Cum

70
81.43

71.43

/ HYSD Steel/ Structural steel


COM-LDLFT-1:4
2.00 No

250

12.00 MT
14%

500

1.00 Cum

70
47.5

250

5.50 Cum
14%

Deduct 14%

500

1.00 MT

COM-LDLFT-1:6
2.00 No

500

500

41.67

Deduct 14%

500
500

70
103.64

90.91

sporting materials by tippers and trucks excluding loading, unloading and hire

urki /Coarse aggregate / Rubble stone / Size stone / Cut stone


RATE PER Deduct 14%
1 Cum
RATE PER 1
(15/5 )
Cum (13/5 )

C P and OC
14% (13)

Total
(13+14)

14

15

16

17

17.19

139.94

27.99

24.55

24.06

195.90

39.18

34.37

32.08

261.20

52.24

45.82

38.95

317.17

63.43

55.64

45.82

373.14

74.63

65.46

6.87

55.97

11.19

9.82

5.73

46.65

9.33

8.18

sporting materials by tippers and trucks excluding loading, unloading and hire

poles/ AC & GI sheets/ Packed materials


RATE PER Deduct 14%
1 Mt
RATE PER 1
(15/8 )
Mt (13/8 )

C P and OC
14% (13)

Total
(13+14)

14

15

16

17

17.19

139.94

17.49

15.34

24.06

195.90

24.49

21.48

32.08

261.20

32.65

28.64

38.95

317.17

39.65

34.78

45.82

373.14

46.64

40.92

6.87

55.97

7.00

6.14

5.73

46.65

5.83

5.12

sporting materials by tippers and trucks excluding loading, unloading and hire

slabs/ BS slabs/ CC & Laterite blocks/ Wood


RATE PER
1 Cum
RATE PER 1
(15/3.40 Cum (13/3.4 )
)

C P and OC
14% (13)

Total
(13+14)

14

15

16

17

17.19

139.94

41.16

36.10

24.06

195.90

57.62

50.54

32.08

261.20

76.82

67.39

38.95

317.17

93.29

81.83

45.82

373.14

109.75

96.27

6.87

55.97

16.46

14.44

5.73

46.65

13.72

12.04

sporting materials by tippers and trucks excluding loading, unloading and hire
WATER
RATE PER
RATE PER
1000 lit
1000 lit
(15/3.40
(13/8 )
)

C P and OC
14% (13)

Total
(13+14)

14

15

16

17

16.06

130.80

16.35

14.34

22.49

183.12

22.89

20.08

29.98

244.15

30.52

26.77

36.41

296.47

37.06

32.51

42.83

348.79

43.60

38.25

6.43

52.33

6.54

5.74

5.36

43.61

5.45

4.78

sporting materials by tippers and trucks excluding loading, unloading and hire
BRICKS
C P and OC
14% (13)

Total
(13+14)

RATE PER
1000 Nos
(15/3)

RATE PER
1000 Nos
(13/8 )

14

15

16

17

16.39

133.49

44.50

39.03

22.95

186.88

62.29

54.64

30.60

249.17

83.06

72.86

37.16

302.56

100.85

88.47

43.71

355.95

118.65

104.08

6.56

53.40

17.80

15.61

5.47

44.51

14.84

13.01

R THE YEAR 2011 - 2012 ( Less 14% Contract Profit & Overhead Charges )
Grand Total
Conveyance (Deduct
1 Km lead (12-4))
13
327.31
90.01
646.33
793.56

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO THE WORKING STRETCH


Name of the work:

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code


178) of Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.
-:oOo:-

A) For HBG metal:


HBG metal from
Katheru
a) Cart track length =
b) Metalled road length:
From km
195 / 000
to
From km
13 / 932
to
From km
0 / 000
to

quarry

165 / 200
11 / 800
0 / 200

of NH. 5 Road
of Mandapeta - Jonnada road
of Alamuru - Alamuru I.B road

2.200

=
=
=

29.800
2.132
0.200

Total metalled road length

34.332

B) For gravel:
Kesavaram
Gravel quarry from
Quarry to Road point of 49/6 of Kakinada - Rajahmundry Road
From km
49 / 600
to
46 / 000
of Kakinada - Rajahmundry road
From km
0 / 000
to
6 / 100
of Dwarapudi - Yanam road
From km
0 / 000
to
11 / 800
of Mandapeta Jonnada road
From km
0 / 000
to
0 / 200
of Alamuru - Alamuru I.B road

Or say:

34.000

=
=
=
=
=

2.000
3.600
6.100
11.800
0.200

Total metalled road length


C) For Sand :
C) For Sand :
Sand from
Jonnada
a) Cart track length =
b) Metalled road length jonnada junction:
From km
13 / 932
to
From km
0 / 000
to

23.700

11 / 800
0 / 200

of Mandapeta - Jonnada road


of Alamuru - Alamuru I.B road

Or say:

24.000

0.000
2.000
2.132
0.200

=
=

Total metalled road length

4.332
Or say:

4.000

D) For Bricks :
Bricks from
Local
Total metalled road length

4.000
Or say:

Assistant Executive Engineer (R&B)


(R&B) Section : Malikipuram

Deputy Executive Engineer (R&B),


(R&B) Sub-division : Razole

4.000

Executive Engineer (R&B


(R&B) Division : Amalapur

OUS MATERIALS UPTO THE WORKING STRETCH

nganwadi Centre Building in Kesavadasupalem - 4 (Code No.


ndal Under NABARD RIDF XX in E.G. Dist.
-:oOo:-

2.200 kms
29.800 kms
2.132 kms
0.200 kms
34.332 kms
34.000 kms

2.000
3.600
6.100
11.800
0.200

kms
kms
kms
kms
kms

23.700 kms
24.000 kms

0.000
2.000
2.132
0.200

kms
kms
kms
kms

4.332 kms
4.000 kms

4.000 kms
4.000 kms

Executive Engineer (R&B)


(R&B) Division : Amalapuram

Andhra Pradesh Standard Data


Buildings For Year 2014-2015.

Water Supply & Sanitation


NAME OF WORK ::-

Construction of Model Anganwadi Centre Building in Kesavadasupalem - 4 (Code No. 178) of


Sakhinetipalli Mandal Under NABARD RIDF XX in E.G. Dist.

1 Earth work excavation for building foundations and depositing on bank for all lifts and with an initial lead
of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting
etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS
20 B (APSS 308). For Ordinary soil-Manual up to 3 M
For Ordinary soil up to 3 M
Code
Manpower
SOR P. No. 269/III/4 Light mazdoor
Add LA charges

Unit

Rate

day
cum

320.00
116.48

0.364
0%

Excavation
Method

Seigniorage charges

cum

30.00

Add Over Head Charges

cum

146.48

14%

Total rate per 1 cum

BLD CSTN 2-1


Coefficient

or say

2 Plain Cement concrete (1:5:10) Proparation nominal mix (coarse aggregate) for foundation levelling
courses and bellow flooring beds using 40 mm size (SS5) Hard Granite metal up to plinth level from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as machine mixing, laying concrete in
foundations ramming in 15 cm layers finishing top surface to the required level curing etc.,complete fo
finished item of work, inluding centering, shuttering as per APSS. No. 402. for Machine Mix Base course

P.C.C. 1:5:10 for Base course


Code
Material
Cement 43 Gr. (including loading
charges)
Aggregates 40 mm nominal size
Coarse sand for mortor (including
Seigniorage charges)
SOR P. No. 292/M 189 Water
Mechinery
SOR P. No. 379/16
Concrete mixer 300 / 200 (diesel)
Add LA charges on Crew charges
Manpower
SOR P. No. 266/I/11 Mason CI-1 / Brick layer CI-1
SOR P. No. 269/III/4 Light mazdoor
Add LA charges
Add Over Head Charges
Total rate per 1 cum

BLD CSTN 3-7:24


Coefficient

Unit

Rate

cum
cum
cum
KL

5.20
1393.43
513.42
77.00

129.600
0.900
0.450
1.200

hour

328.60
189.80

1.000
0%

day
day
cum

420.00
320.00
486.80

0.100
1.390
0%

cum

3066.85

14%
or say

3 Plain Cement Concrete M-20 grade as per IS 456 Nominal mix, using 20 mm graded machine crushed
Hard Granite metal (coarse aggregate) from approved quarry including cost and conveyance of al
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including
Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labou
charges such as machine mixing, laying concrete, curing etc.,complete for finished item of work
centering with Steel up to 3.66, lift manuals per APSS. No. 402. for Staircase steps
P.C.C. M-20
Code
Material

Centering with Stell up to 3.66 M Hight

SOR P. No. 292/M 189

BLD CSTN 3-11:28


Coefficient

Unit

Rate

Cement 43 Gr. (including loading


charges)

cum

5.20

330.000

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

0.450

Aggregates 20 mm Graded HBG


Water

cum
Kl

1920.72
77.00

0.900
1.200

Concrete mixer 300 / 200 (diesel)

hour

328.60

1.000

189.80

5%

420.00
320.00
486.80

0.100
1.390
5%

Mechinery
SOR P. No. 379/16

Add LA charges on Crew charges


Manpower
SOR P. No. 266/I/11
SOR P. No. 269/III/4

Mason CI-1 / Brick layer CI-1


Light mazdoor
Add LA charges

day
day
cum

Basic rate 1 cum


Miscellaneous
SOR P. No. 89.

Hir charges for Centering and


Scafaffolding Unsupported Hight
3.66 M for footings First floor

cum

723.00

1.000

Add LA charges

cum

446.00

5%

Add Over Head Charges

cum

5364.86

5%

Total rate per 1 cum

or say

4 Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of wate
proof compound per bag of cement laid over roof when it is green including cost of all materials
seigniorage charges, including conveyance charges of materials and including all operational, incidenta
and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off
junctions of wall and slab etc,, complete for finished item of work

Impervious coat in CM (1:3) 20mm thick


Code
Material
Cement 43 Gr. (including loading
charges)
Coarse sand for mortor (including
Seigniorage charges)
BMT-H.01
Impervious Water Proof Compound
Manpower
SOR P. No. 266/I/11
Mason CI-1 / Brick layer CI-1
SOR P. No. 267/II/35
Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4
Light mazdoor
Add LA charges
Add Over Head Charges

BLD CSTN 10-25


Coefficient

Unit

Rate

kg
cum
kg

5.20
513.42
24.00

10.080
0.021
0.200

day
day
day
cum

420.00
375.00
320.00
203.87

0.066
0.154
0.370
0%

cum

271.87

14%

Total rate per 1 sqm

or say

5 Supply & Placing M20 as per 456 nominal mix using 20 mm size graded machine crushed Hard Granite
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges
sales & other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing and vibrating etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work for Slab thick 100 mm, centering with Stell up to 3.66, as
per APSS. No. 402.
M - 20 Nominal Mix Centering with Unsuported hight 3.66 M
Code
Unit
Material

SOR P. No. 292/M 189

Rate

BLD CSTN 3-13A


Coefficient

Cement 43 Gr. (including loading


charges)

cum

5.20

400.000

Aggregates 20 mm Graded HBG

cum

1920.72

0.900

Coarse sand for mortor (including


Seigniorage charges)

cum

513.42

0.450

Kl

77.00

1.200

hour

320.00

1.000

486.80

0%

165.70

1.000

136.60

0%

420.00
375.00
320.00
1307.99

0.133
0.267
3.600
0%

Water

Mechinery
SOR P. No. 379/16

Concrete mixer 300 / 200 (diesel)


Add LA charges on Crew charges

SOR P. No. 379/41

Needil vibrater 40 mm (petrol)

hour

Add LA charges on Crew charges


Manpower
Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4 Light mazdoor
Add LA charges
SOR P. No. 266/I/11

day
day
day
cum

BACIC COST 1 CUM


BACIC COST OF 1 SQM 100 mm THICK F1
Miscellaneous
SOR P. No. 90 /
Slabs up to 150 mm
thick First floor

Hir charges for Centering and


Scafaffolding Unsupported Hight
3.66M upto 150 mm thick Slab

cum

273.00

1.000

Add LA charges

cum

446.00

0%

Add Over Head Charges

cum

865.58

14%

Total rate per 1 cum

or say

6 Supplying, fitting and placing HYSD (Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete
wastage as per drawings and technical specifications Clause 1000 and 1202 MORD & 1100,1600 MORT &
H for Bars below 36 mm dia including over laps and wastage, where weldeding require to be done
campulsorily including cost and conveyance of bars from approved sourses to site of work, binding wire
cover blocks and all incidental,operational, labour charges such as cutting, bending, placing in position
tying etc., and sales and sales & other taxes, on cost of materials for finished item of work. for HYSD (F.e
415) F1
HYSD (F.e 415) FI lift manual
Code
Material

Unit

Rate

BLD CSTN 4-1


Coefficient

SOR P. No. 271/I/3

Binding wire
Reinforcement steel (including
loading charges) (HYSD/TMT)

kg
M.T

70.00
34000.00

6.000
1.050

Manpower
SOR P. No. 266/I/2
SOR P. No. 2269/III/4

Black smith / Tin smith / Rivetor


Light mazdoor
Add LA charges

day
day
cum

420.00
320.00
7400.00

10.000
10.000
0%

Add Over Head Charges

cum

43520.00

14%

Total rate per 1 MT

or say

7 Brick Masonary 225 mm thick for pannel walls in Super structure with CM ( 1:8) prop (Cement:Sand) using
2nd class bricks (Non-Modular or Traditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm
including cost, seigniorage and conveyance of all materials and water from approved source to work site
and all operational, incidental labour charges such as scaffolding, mixing moratar, constructing masonary
lift charges, curing etc., complete for finished item of work as per (APSS No.501 & 504) for Basement

Brick Masonry in CM (1:8) for Basement


Code
Material
Cement 43 Gr. (including loading
2nd
class bricks (Non-Modular or
charges)
Traditional size) 23x11x7 cm
Coarse
sand
for mortorcharges)
(including
(including
seigniorage
Seigniorage charges)
Manpower
SOR P. No. 266/I/11 Mason CI-1 / Brick layer CI-1
SOR P. No. 268/II/35 Mason CI-II / Brick layer CI-II
SOR P. No. 269/III/4 Light mazdoor
Add LA charges
Add Over Head Charges

BLD CSTN 4-3


Coefficient

Unit

Rate

kg
cum
cum

5.20
5.328
513.42

36.000
512.000
0.200

day
day
day
cum

420.00
375.00
320.00
915.60

0.240
0.560
1.890
0%

cum

3933.42

14%

Total Basement rate per 1 cum

Or say

8 Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3
1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm fixing in position
including constructing Brick masonry seat and CC Squatting plate including cost and conveyance of al
materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges including al
labour charges for fixing at site etc; complete for finished itemof work.
Code
Material
BMW-D.04
BMW-D.09
BMW-D.10
Manpower
BMW-D.06

Unit

Rate

Coefficient

each

915.00

1.000

each

220.00

1.000

each

65.00

1.000

Add LA charges

each

288.00

0%

Add Over Head Charges

each

1200.00

14%

Supplying & Fixing Orissa Pan white


glazed W.C 1st quality ISI marked
conforming to IS:2556-Part-3-1981
with "P" or "S" trap Hindware/
Providing
masonry
seat 580
for
Parryware/Brick
Neycer
- ISI Mark:
Providing
Cement
Concrete
Orissa
pan/
Indian
W.C.
mm x 440 mm
Squatting plate for Orissa pan/
Indian W.C. in P.C.C. 1:2:4

Total rate per each

or say

9 Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend
10 litres capacity Dual Flush fixing in position including cost and conveyance of all materials, Sales tax
& Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
BMW-G.09
Manpower
BMW-D.12

Supply & fixing of PVC low level


system parry ware, slim line with
internal components & short bend:
10 Litres capacity Dual Flush
Add LA charges
Add Over Head Charges

Unit

Rate

Coefficient

each

1350.00

1.000

each

403.00

0%

each

1350.00

14%

Total rate per each

or say

10 Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber o

plastic Buffers as per IS 2548-1996 fixing in position including cost and conveyance of all materials, Sales

tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
Supplying and Fixing best Indian
BMW-D.16
make plastic seat and lid for
Manpower
European water closets with rubber
BMW-D.17
Add LA charges
or plastic Buffers as per IS 25481996
Add Over Head Charges
Total rate per each

Unit

Rate

Coefficient

each

340.00

1.000

each

58.00

0%

each

340.00

14%
or say

11 Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 o

Hindustan / Neycer or Parryware make Colour glazed with 'P' trap fixing in position including cost and

conveyance of all materials, Sales tax & Other taxes on materials to site, Operational and Incidenta
charges including all labour charges for fixing at site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
Supplying and Fixing European
each
1250.00
1.000
BMW-D.14
Water
Closet
of
1st
quality
Manpower
conforming
to IS:2556-Part-2-1973
BMW-D.15
Add LA charges
each
201.00
0%
of Hindustan / Neycer or Parryware
make Colour glazed with 'P' trap
Add Over Head Charges
each
1250.00
14%
Total rate per each

or say

12 Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalen
complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.

Code
Material
BMW-D.24
Manpower
BMW-D.28

Supplying & Fixing Indian make Flat


Back Wash Hand Basin
(HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part4:1972
Add LA charges
Add Over Head Charges

Unit

Rate

Coefficient

each

1150.00

1.000

each

288.00

0%

each

1150.00

14%

Total rate per each

or say

13 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operationa
and Incidental charges including all labour charges for fixing at site etc; complete for finished itemof work

Code
Material
BMW-D.29
Manpower
BMW-D.30

Unit

Rate

Coefficient

Supplying and Fixing Pedestal for


Wash Hand Basin (H.S.W / Parry /
Earthenware)

each

810.00

1.000

Add LA charges

each

104.00

0%

Add Over Head Charges

each

810.00

14%

Total rate per each

or say

14 Providing and fixing white glazed flat back bowl urinal of size 440mmx265mmx315mm with interna
flushing system with flat back large integrated overflow of approved make with CP spreader, C.P. waste
coupling, C.P. brass bottle trap, push cock of approved make including 38.10 mm PVC waste pipe out let,
of required length and 12.7 mm PVC connection with brass union nut C.P coated etc. all complete, fixing
in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
Code
Material
BMW-D.33
BMW-E.03
BMW-E.29
BMW-E.31

S & F white glazed flat back Bowl


urinals of size 440 mm x 265 mm x
315 mm with internal flushing rim
fixed with screws complete Indian
make (HSW/Parry/Neycer)
S & F concealed stop cock 12.7 mm
conforming to IS:2556-1995
(1/2") Indian Make heavy duty
Seiko/ Senior/ Nice or equivalent
S&F 12.7 mm dia NP push cock Ist
quality
S & F 38.1 mm C.P waste coupling
Half or Full Thread 1st Quality
Indian make Parryware or
equivalent

Unit

Rate

Coefficient

each

600.00

1.000

each

400.00

1.000

each

200.00

1.000

each

200.00

1.000

BMW-E.33

S & F 31.75 mm PVC bottle trap

each

105.00

1.000

BMW-E.35

S& F 38.1 mm brass plumber union

each

50.00

1.000

each

70.00

1.000

each

74.00

1.000

each
each
each
each
each
each

115.00
35.00
23.00
23.00
12.00
16.00

0%
0%
0%
0%
0%
0%

each

1699.00

14%

BMW-G.06
BMW-I.48
Manpower
BMW-D.36
BMW-E.04
BMW-E.32
BMW-E.34
BMW-E.36
BMW-I.49

Supply & Fixing 38.1 mm dia PVC


solid waste pipe outlet
Supplying & Fixing 12.7 mm PVC
connection with brass union nut C.P
coated
Add
Add
Add
Add
Add
Add

LA
LA
LA
LA
LA
LA

charges
charges
charges
charges
charges
charges

=
=
=
=
=
=

(
(
(
(
(
(

BMW-D.33 )
BMW-E.03 )
BMW-E.31 )
BMW-E.33 )
BMW-E.35 )
BMW-I.49 )

Add Over Head Charges


Total rate per each

or say

15 Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating
fixing with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75 mm (3"
outlet pipe - 4 Kgs fixing in position including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Code
Material
BMW-C.41
Manpower
BMW-C.42

Supplying & fixing CI Nahany traps


1st quality ISI marked conforming
to IS:1729-1979 with C.P. Grating
fixing with white cement as per site
requirements with standard
practice
for 100 mm dia Inlet- 75
Add LA charges
mm (3") outlet pipe - 4 Kgs

Unit

Rate

Coefficient

each

243.00

1.000

each

45.00

0%

Add Over Head Charges

each

243.00

14%

Total rate per each

or say

16 Providing 75 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme o


any ISI Brand including cost of necessary Door Bend 87.5 Degree , Plain Bend 87.5 DegreeShoes, Single
Tee with Door, Pipe Clip - UPVC/SWR Pipe fittings, Iron Clamps and all other accessories and fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
Code
Unit
Rate
Coefficient
75 mm dia 3 M Double Socket
Material
PVC/SWR pipe - 6 Kg/sq.cm each
374.00
0.330
BMW-G.36
75
mm dia - Door Bend 87.5
Prince/Sudhakar/Kisan/Supreme
or
75
mm dia
- Plain Bend
87.5
Degree
UPVC/SWR
Pipe
fittings
each
53.00
0.330
BMW-G.58
any ISI Brand
Degree
- UPVC/SWR
Pipe
fittings
75
mm
dia
Single
Tee
with
Door
(Prince/Sudhakar
or
any
ISI
Brand)
each
39.00
0.330
BMW-G.55
Labour
charges for laying, fixing or
(Prince/Sudhakar/Kisan/Supreme
UPVC/SWR Pipe fittings
and
commissioning
the
PVC
pipes
each
57.00
0.330
BMW-G.70
75
- Pipe Clip - UPVC/SWR Pipe
anymm
ISI Brand)
(Prince/Sudhakar/Kisan/Supreme
or
including
couplers/ bends/ortees
etc
fittings
(Prince/Sudhakar
any
ISI
each
12.00
1.000
BMW-G.104
any ISI Brand)
any
diameter including fixing
Brand)
Rm
58.00
1.400
BMW-G.152
necessary fittings like bends, plugs,
couplers, junctions, tees, etc with
solvent
jointing
as per standard
Add Over
Head Charges
Rm
265.79
14%
practice
Total rate per 1 Rm

or say

17 Providing 110 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme o


any ISI Brand including cost of necessary Door Bend 87.5 Degree , Plain Bend 87.5 DegreeShoes, Single
Tee with Door, Pipe Clip - UPVC/SWR Pipe fittings, Iron Clamps and all other accessories and fixing in
position including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.

Code
Material
BMW-G.35
BMW-G.60
BMW-G.63
BMW-G.69
BMW-G.106
BMW-G.152

110 mm dia 3 M Double Socket


PVC/SWR pipe - 6 Kg/sq.cm 110
mm dia - Door Bend 87.5
Prince/Sudhakar/Kisan/Supreme
or
110
mm- dia
- Plain Bend
Degree
UPVC/SWR
Pipe 87.5
fittings
any ISI Brand
Degree
UPVC/SWR
Pipe
fittings
110
mm- dia
- Single
Tee ISI
with
Door (Prince/Sudhakar
orlaying,
any
Brand)
Labour
charges for
fixing
(Prince/Sudhakar/Kisan/Supreme
or
UPVC/SWR
Pipe fittings
and
commissioning
PVC pipes
100
mmBrand)
- Pipe Clip -the
UPVC/SWR
any
ISI
(Prince/Sudhakar/Kisan/Supreme
or
including
couplers/
bends/ teesoretc
Pipe
fittings
(Prince/Sudhakar
any ISI
Brand)
any
any diameter
ISI Brand)including fixing
necessary fittings like bends, plugs,
couplers, junctions, tees, etc with
Add
Over
Head Charges
solvent
jointing
as per standard
practice

Unit

Rate

Coefficient

each
each
each
each
each
Rm

655.00
84.00
56.00
85.00
14.00
58.00

0.330
0.330
0.330
0.330
1.000
1.400

Rm

385.60

14%

Total rate per 1 Rm

or say

18 Providing 160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme o


any ISI Brand and 160 mm x 110 mm - Internal Reducer - UPVC/SWR Pipe fittings
(Prince/Sudhakar/Kisan/Supreme or any ISI Brand) and fixing in position including cost and conveyance o
all materials, Sales tax & Other taxes on materials to site, Operational and Incidental charges including al
labour charges for fixing at site etc; complete for finished itemof work.

Code
Material
BMW-G.54
BMW-G.151

160 mm dia 3 M Double Socket


PVC/SWR pipe - 6 Kg/sq.cm Prince/Sudhakar/Kisan/Supreme
or
160 mm x 110 mm - Internal
any ISI - UPVC/SWR Pipe fittings
Reducer
BrandPrince/Sudhakar/Kisan/Supre
(Prince/Sudhakar/Kisan/Supreme
or
me
ISI Brand
any or
ISIany
Brand)
Add Over Head Charges

Unit

Rate

Coefficient

each
each

1490.00
177.00

0.330
0.330

Rm

550.11

14%

Total rate per 1 Rm

or say

19 Supplying, Placing & Providing on Terrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua tech o
equivalent Polyethylene water storage tank double layer confirming to ISI 12701/96 mark with lid &
manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets
and over flow pipesProviding
but without
fittings
base (at
support for tanks etc., complete as directed by the
& Placing
on &
Terrace
Departmental Officers
for
finished
item
of
work.
all floor levels) polyethylene water
Material
BMW-G.01

Miscellaneous
BMW-G.02

storage tank with Double layer


approved brand & manufacture
with cover and suitable locking
arrangement & making necessary
holes
forcharges
inlet & outlets and over
Add LA
flow pipes but without fittings &
base support for tanks
Add Over Head Charges
Total rate per 1 lit.

lit

4.40

1.000

lit

0.44

0%

cum

4.40

14%
or say

20 Providing and fixing 12.7 mm heavy duty NP Sink cock Seiko/ Senior/ Nice or equivalent and 38.10 mm
PVC waste pipe out let, of required length and 12.7 mm PVC connection with brass union nut C.P coated
etc. all complete and fixing in position including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Material
S & F 12.7 mm heavy duty NP Sink
cock Seiko/ Senior/ Nice or
each
860.00
1.000
BMW-E.26
equivalent
Supply & Fixing 38.1 mm dia PVC
each
70.00
1.000
BMW-G.06
solid waste pipe outlet
Supplying & Fixing 12.7 mm PVC
connection with brass union nut C.P
each
74.00
1.000
BMW-I.48
coated
Miscellaneous
0%
Add LA charges = ( BMW-E.26 )
each
29.00
BMW-E.27
BMW-E.36
Add LA charges = ( BMW-E.35 )
each
12.00
0%
BMW-I.49
Add LA charges = ( BMW-I.49 )
each
16.00
0%
Add Over Head Charges

cum

1004.00

Total rate per 1 lit.

14%
or say

21 S & F CP Long body bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice o
equivalent fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on
materials to site, Operational and Incidental charges including all labour charges for fixing at site etc
complete for finished itemof work.
Code
Material
BMW-E.21
Manpower
BMW-E.25

S & F CP Long body bib cock fancy


type deluxe 400 grams 12.7 mm
dia Indian make Seiko/ Senior/ Nice
or equivalent
Add LA charges
Add Over Head Charges

Unit

Rate

Coefficient

each

470.00

1.000

each

40.00

0%

each

470.00

14%

Total rate per each

or say

22 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-F.17
Manpower
BMW-F.18

S & F Gunmetal Gate (GM peet)


valve as per IS - 778 Class - I,
Indian make heavy type - 25 mm
NB Size
Add LA charges

Unit

Rate

Coefficient

each

530.00

1.000

each

36.00

0%

Add Over Head Charges

each

530.00

14%

Total rate per each

or say

23 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material

Unit

Rate

Coefficient

BMW-F.19

S & F Gunmetal Gate (GM peet)


valve as per IS - 778 Class - I,
Indian make heavy type - 20 mm
NB Sizemake heavy type - 32 mm
NB Size

each

360.00

1.000

Manpower
BMW-F.20

Add LA charges

each

36.00

0%

Add Over Head Charges

each

360.00

14%

Total rate per each

or say

24 S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - 15 mm NB Size
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-F.21
Manpower
BMW-F.22

S & F Gunmetal Gate (GM peet)


valve as per IS - 778 Class - I,
Indian make heavy type - 15 mm
NB Sizemake heavy type - 32 mm
NB
AddSize
LA charges

Unit

Rate

Coefficient

each

266.00

1.000

each

36.00

0%

Add Over Head Charges

each

266.00

14%

Total rate per each

or say

25 S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.20
Manpower
BMW-I.21

S & F 25.4 mm dia & 609.6 mm


long aluminium anodized towel rod
with brackets and aluminium
screws
Add LA charges

Unit

Rate

Coefficient

each

121.00

1.000

each

36.00

0%

Add Over Head Charges

each

121.00

14%

Total rate per each

or say

26 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws
fixing in position including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.22
Manpower
BMW-I.23

S & F 19.04 mm dia & 609.6 mm


long aluminium anodized towel rod
with brackets and aluminium
screws
Add LA charges

Unit

Rate

Coefficient

each

105.00

1.000

each

55.00

0%

Add Over Head Charges

each

105.00

14%

Total rate per each

or say

27 S & F 12.7 x 88.9 CP fancy shower fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at site etc; complete for finished itemof work.
Code
Material
BMW-F.106
Manpower
BMW-F.107

Unit

Rate

Coefficient

S & F 12.7 x 88.9 CP fancy shower

each

215.00

1.000

Add LA charges

each

18.00

0%

Add Over Head Charges

each

215.00

14%

Total rate per each

or say

28 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm fixing in position
including cost and conveyance of all materials, Sales tax & Other taxes on materials to site, Operationa
and Incidental charges including all labour charges for fixing at site etc; complete for finished itemof work
Code
Material
BMW-I.105
Manpower
BMW-I.106

Unit

Rate

Coefficient

Supplying and fixing TV shape


mirror with plastic frame size 609.6
mm x 457 .2 mm

each

378.00

1.000

Add LA charges

each

95.00

0%

Add Over Head Charges

each

378.00

14%

Total rate per each

or say

29 Supply & Fixing wall mixer with telephonic shower arrangement with crutch and telephone shower with
flexible tube Jaquar make Continental series Chrome colour for bath tub with 7 years warranty / Jupite
Aqua Lines-JAL or equivalent series including cost and conveyance of all materials, Sales tax & Othe
taxes on materials to site, Operational and Incidental charges including all labour charges for fixing at site
etc; complete for finished itemof work.
Code
Material
BMW-I.179

Supply & Fixing wall mixer with


telephonic shower arrangement
with crutch and telephone shower
with flexible tube Jaquar make
Continental series Chrome colour
for
withCharges
7 years warranty /
Addbath
Overtub
Head
Jupiter Aqua Lines-JAL or equivalent
series
Total rate per each

Unit

Rate

Coefficient

each

4590.00

1.000

each

4590.00

14%
or say

30 Supply & Fixing bath tub over flow set complete with over flow cap,450mm ball chain with rubber plug 7
Union bend with brass nuts Jaquar make, Chrome colour with 7 years warranty / Jupiter Aqua Lines-JAL o
equivalent series including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.180

Supply & Fixing wall mixer with


telephonic shower arrangement
with crutch and telephone shower
with flexible tube Jaquar make
Continental series Chrome colour
for
withCharges
7 years warranty /
Addbath
Overtub
Head
Jupiter Aqua Lines-JAL or equivalent
series
Total rate per each

Unit

Rate

Coefficient

each

942.00

1.000

each

942.00

14%
or say

31 Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm long bend pipe with wal
flange Jaquar make Continental series, Chrome finish with 7 years warranty / Jupiter Aqua Lines-JAL o
equivalent series including cost and conveyance of all materials, Sales tax & Other taxes on materials to
site, Operational and Incidental charges including all labour charges for fixing at site etc; complete fo
finished itemof work.
Code
Material
BMW-I.177

Supply & Fixing of Wall Mixer with


provision for overhead shower and
115mm long bend pipe with wall
flange Jaquar make Continental
series, Chrome finish with 7 years
Add Over /Head
Charges
warranty
Jupiter
Aqua Lines-JAL or
equivalent series

Unit

Rate

Coefficient

each

3252.00

1.000

each

3252.00

14%

Total rate per each

or say

32 Supplying & fixing stainless steel sink size 20" x18" x 8 " (508x457.2x203.2mm) 1 mm thick with
accessories including cost and conveyance of all materials, Sales tax & Other taxes on materials to site
Operational and Incidental charges including all labour charges for fixing at site etc; complete for finished
itemof work.
Code
Material
BMW-I.123
Manpower
BMW-I.124

Unit

Rate

Coefficient

Supplying & fixing stainless steel


sink size 20" x18" x 8 "
(508x457.2x203.2mm) 1 mm thick
with accessories

each

3620.00

1.000

Add LA charges

each

368.00

0%

Add Over Head Charges

each

3620.00

14%

Total rate per each

or say

33 Constructing Constructing 457.2 mm x 457.2 mm (1'6"x1'6") dia brick masonry inspection chamber as pe
IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cemen
mortar 1:3 prop; thick both inside and outside fitted light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.
frame and cover of 20 Kg. and frames including excavating pits up to a depth of Inspection chamber up to
914.4 mm (3'0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like
mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work
as per Standard specification.

Code
Material
BMW-B.06

Unit

Rate

Coefficient

Constructing Constructing 457.2


mm x 457.2 mm (1'6"x1'6") dia
brick masonry inspection chamber
as per IS - 4111: Part-1:1986

each

2626.00

1.000

Add Over Head Charges

each

2626.00

14%

Total rate per each

or say

34 Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating &
Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9"
C.I Frame and hinged cover and including cost and conveyance of all materials like cement, sand, bricks
water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labou
charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished
item of work as per Standard specification.

Code
Material
BMW-A.72

Supplying & fixing 150 mm x 100


mm SWG gully traps conforming to
ISI 651 & 4127 with C.I Grating &
Cost. Brick masonry in CM 1:6 prop.
Intermediate chamber and fitted
with 304.8 mm x 288.6mm (12"x9")
C.I Frame and hinged cover
Add Over Head Charges

Unit

Rate

Coefficient

each

482.00

1.000

each

482.00

14%

Total rate per each

or say

35 S & F GI union 12.70 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.01

S& F GI union 12.7 mm Ist Quality


Add Over Head Charges

each
each

29.00
29.00

Total rate per each

1.000
14%
or say

36 S& F GI union 19.05 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.02

S& F GI union 19.05 mm Ist Quality


Add Over Head Charges

each
each

29.00
35.00

Total rate per each

1.000
14%
or say

37 S& F GI union 25.4 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.03

S& F GI union 25.4 mm Ist Quality


Add Over Head Charges

each
each

53.00
53.00

Total rate per each

1.000
14%
or say

38 S& F GI union 38.1 mm Ist Quality fixing in position including cost and conveyance of all materials, Sales
tax & Other taxes on materials to site, Operational and Incidental charges including all labour charges fo
fixing at
site etc; complete for finished itemof work.
Code
Unit
Rate
Coefficient
Material
BMW-F.05

S& F GI union 38.1 mm Ist Quality


Add Over Head Charges
Total rate per each

each
each

79.00
79.00

1.000
14%
or say

39 S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.79
Manpower
BMW-F.80

Unit

Rate

Coefficient

S& F 15 mm Nominal Bore GI pipe


Medium Grade

Rm

131.00

1.000

Add LA charges

Rm

33.00

0%

each

131.00

14%

Add Over Head Charges


Total rate per 1 Rm

or say

40 S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.81
Manpower
BMW-F.82

Unit

Rate

Coefficient

S& F 20 mm Nominal Bore GI pipe


Medium Grade

Rm

146.00

1.000

Add LA charges

Rm

33.00

0%

each

146.00

14%

Add Over Head Charges


Total rate per 1 Rm

or say

41 S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.83
Manpower
BMW-F.84

Unit

Rate

Coefficient

S& F 25 mm Nominal Bore GI pipe


Medium Grade

Rm

191.00

1.000

Add LA charges

Rm

33.00

0%

each

191.00

14%

Add Over Head Charges


Total rate per 1 Rm

or say

42 S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with G
fittings including the cost of pipe & its fittings & labour charges complete for finished itemof work.
Code
Material
BMW-F.87
Manpower
BMW-F.88

Unit

Rate

Coefficient

S& F 40 mm Nominal Bore GI pipe


Medium Grade

Rm

301.00

1.000

Add LA charges

Rm

31.00

0%

each

301.00

14%

Add Over Head Charges


Total rate per 1 Rm

or say

undations and depositing on bank for all lifts and with an initial lead
dental, labour charges such as shoring ,sheeting, planking, strutting,
k including seigniorage excluding dewatering charges etc as per SS nual up to 3 M
BLD CSTN 2-1
Amount
116.48
0.00
30.00
146.48
19.94
166.42
166.40

oparation nominal mix (coarse aggregate) for foundation levelling


ing 40 mm size (SS5) Hard Granite metal up to plinth level from
onveyance of all materials like cement, fine aggregate (sand) coarse
ncluding Seigniorage charges, sales & other taxes on all materials
and labour charges such as machine mixing, laying concrete in
finishing top surface to the required level curing etc.,complete for
ing, shuttering as per APSS. No. 402. for Machine Mix Base course

BLD CSTN 3-7:24


Amount
673.92
1254.09
231.04
92.40
328.60
0.00
42.00
444.80
0.00
3066.85
417.55
3484.40
3484.40

as per IS 456 Nominal mix, using 20 mm graded machine crushed


ate) from approved quarry including cost and conveyance of all
ate (sand) coarse aggregate, water etc., to site and including
axes on all materials including all operational, incidental and labour
aying concrete, curing etc.,complete for finished item of work,
anuals per APSS. No. 402. for Staircase steps
BLD CSTN 3-11:28
Amount
1716.00
231.04
1728.65
92.40
328.60
9.87
42.00
444.80
25.31
4618.67

723.00
23.19
5364.86
278.97
5643.83
5643.80

RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water
laid over roof when it is green including cost of all materials,
yance charges of materials and including all operational, incidental
ar, laying, rendering smooth and thread lining, curing, rounding off
te for finished item of work

BLD CSTN 10-25


Amount
52.42
10.78
4.80
27.72
57.75
118.40
0.00
271.87
37.02
308.89

308.90

minal mix using 20 mm size graded machine crushed Hard Granite


roved quarry including cost and conveyance of all materials like
e aggregate, water etc., to site and including Seigniorage charges,
s including all operational, incidental and labour charges such as
ring and vibrating etc.,complete but excluding cost of steel and its
of work for Slab thick 100 mm, centering with Stell up to 3.66, as

BLD CSTN 3-13A


Amount
2080.00
1728.65
231.04
92.40

320.00
0.00
165.70
0.00
55.86
100.13
1152.00
0.00
5925.78
592.58

273.00
0.00
865.58
117.85
983.43
983.40

Fe 415/tmt IS 1786-1985) bar reinforcement VRCC works complete


al specifications Clause 1000 and 1202 MORD & 1100,1600 MORT &
ing over laps and wastage, where weldeding require to be done
eyance of bars from approved sourses to site of work, binding wire,
tional, labour charges such as cutting, bending, placing in position,
r taxes, on cost of materials for finished item of work. for HYSD (F.e

BLD CSTN 4-1


Amount

420.00
35700.00

4200.00
3200.00
0.00
43520.00
5925.25
49445.25
49445.30

nel walls in Super structure with CM ( 1:8) prop (Cement:Sand) using


ditional size) 23x11x7 cm having a crushing strength of 2.5N/sq.mm
eyance of all materials and water from approved source to work site
charges such as scaffolding, mixing moratar, constructing masonary,
finished item of work as per (APSS No.501 & 504) for Basement

BLD CSTN 4-3


Amount
187.20
2727.94
102.68
100.80
210.00
604.80
0.00
3933.42
535.54
4468.96
4469.00

e glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm fixing in position
seat and CC Squatting plate including cost and conveyance of all
n materials to site, Operational and Incidental charges including all
omplete for finished itemof work.
Amount
915.00
220.00
65.00
0.00
1200.00
163.38
1363.38
1363.40

stem parry ware, slim line with internal components & short bend:
g in position including cost and conveyance of all materials, Sales tax
Operational and Incidental charges including all labour charges for
d itemof work.
Amount
1350.00
0.00
1350.00
183.80
1533.80
1533.80

e plastic seat and lid for European water closets with rubber or

xing in position including cost and conveyance of all materials, Sales

e, Operational and Incidental charges including all labour charges for

d itemof work.
Amount
340.00
0.00
340.00
46.29
386.29
386.30

ater Closet of 1st quality conforming to IS:2556-Part-2-1973 of

ke Colour glazed with 'P' trap fixing in position including cost and

ax & Other taxes on materials to site, Operational and Incidental

or fixing at site etc; complete for finished itemof work.


Amount
1250.00
0.00
1250.00
170.19
1420.19
1420.20

at Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality


ith waste fittings like rubber plug, chain, 32 mm nominal size C.P.
nforming to IS:2963-1979 and fitted with 15 mm nominal bore
ality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent
ncluding wooden block: 550 x 400 mm - Single C.P. Pillar cock
onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for

Amount
1150.00
0.00
1150.00
156.57
1306.57
1306.60

Wash Hand Basin (H.S.W / Parry / Earthenware) fixing in position


materials, Sales tax & Other taxes on materials to site, Operational
bour charges for fixing at site etc; complete for finished itemof work.

Amount
810.00
0.00
810.00
110.28
920.28
920.30

flat back bowl urinal of size 440mmx265mmx315mm with internal


ntegrated overflow of approved make with CP spreader, C.P. waste
cock of approved make including 38.10 mm PVC waste pipe out let,
connection with brass union nut C.P coated etc. all complete, fixing
ance of all materials, Sales tax & Other taxes on materials to site,
cluding all labour charges for fixing at site etc; complete for finished

Amount

600.00
400.00
200.00
200.00

105.00
50.00
70.00
74.00
0.00
0.00
0.00
0.00
0.00
0.00
1699.00
231.32
1930.32
1930.30

1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating


equirements with standard practice for 100 mm dia Inlet- 75 mm (3")
including cost and conveyance of all materials, Sales tax & Other
l and Incidental charges including all labour charges for fixing at site
.
Amount
243.00
0.00
243.00
33.08
276.08
276.10

ket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or


sary Door Bend 87.5 Degree , Plain Bend 87.5 DegreeShoes, Single
R Pipe fittings, Iron Clamps and all other accessories and fixing in
nce of all materials, Sales tax & Other taxes on materials to site,
cluding all labour charges for fixing at site etc; complete for finished
Amount
123.42
17.49
12.87
18.81
12.00
81.20
265.79
36.19
301.98
302.00

cket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or


sary Door Bend 87.5 Degree , Plain Bend 87.5 DegreeShoes, Single
R Pipe fittings, Iron Clamps and all other accessories and fixing in
nce of all materials, Sales tax & Other taxes on materials to site,
cluding all labour charges for fixing at site etc; complete for finished

Amount
216.15
27.72
18.48
28.05
14.00
81.20
385.60
52.50
438.10
438.10

cket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or


x 110 mm - Internal Reducer - UPVC/SWR Pipe fittings
ny ISI Brand) and fixing in position including cost and conveyance of
on materials to site, Operational and Incidental charges including all
omplete for finished itemof work.

Amount
491.70
58.41
550.11
74.90
625.01
625.00

rrace (at all floor levels) 1000 Lit. capacity of Sintex /Aqua tech or
ge tank double layer confirming to ISI 12701/96 mark with lid &
locking arrangement & making necessary holes for inlet & outlets
ings & base support for tanks etc., complete as directed by the
m of work.

4.40
0.00
4.40
0.60
5.00
5.00

duty NP Sink cock Seiko/ Senior/ Nice or equivalent and 38.10 mm


ength and 12.7 mm PVC connection with brass union nut C.P coated
n including cost and conveyance of all materials, Sales tax & Other
l and Incidental charges including all labour charges for fixing at site
.
860.00
70.00
74.00
0.00
0.00
0.00
1004.00
136.69
1140.69
1140.70

pe deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or
g cost and conveyance of all materials, Sales tax & Other taxes on
cidental charges including all labour charges for fixing at site etc;
Amount
470.00
0.00
470.00
63.99
533.99
534.00

e as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size


onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
530.00
0.00
530.00
72.16
602.16
602.20

e as per IS - 778 Class - I, Indian make heavy type - 20 mm NB Size


onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for

Amount

360.00

0.00
360.00
49.01
409.01
409.00

e as per IS - 778 Class - I, Indian make heavy type - 15 mm NB Size


onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
266.00
0.00
266.00
36.22
302.22
302.20

aluminium anodized towel rod with brackets and aluminium screws


onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
121.00
0.00
121.00
16.47
137.47
137.50

g aluminium anodized towel rod with brackets and aluminium screws


onveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for
Amount
105.00
0.00
105.00
14.30
119.30
119.30

xing in position including cost and conveyance of all materials, Sales


e, Operational and Incidental charges including all labour charges for
d itemof work.
Amount
215.00
0.00
215.00
29.27
244.27
244.30

r with plastic frame size 609.6 mm x 457 .2 mm fixing in position


materials, Sales tax & Other taxes on materials to site, Operational
bour charges for fixing at site etc; complete for finished itemof work.
Amount
378.00
0.00
378.00
51.46
429.46
429.50

phonic shower arrangement with crutch and telephone shower with


al series Chrome colour for bath tub with 7 years warranty / Jupiter
including cost and conveyance of all materials, Sales tax & Other
l and Incidental charges including all labour charges for fixing at site
.
Amount
4590.00
624.93
5214.93
5214.90

et complete with over flow cap,450mm ball chain with rubber plug 7
ake, Chrome colour with 7 years warranty / Jupiter Aqua Lines-JAL or
conveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for

Amount
942.00
128.25
1070.25
1070.30

rovision for overhead shower and 115mm long bend pipe with wall
es, Chrome finish with 7 years warranty / Jupiter Aqua Lines-JAL or
conveyance of all materials, Sales tax & Other taxes on materials to
ges including all labour charges for fixing at site etc; complete for

Amount
3252.00
442.76
3694.76
3694.80

ink size 20" x18" x 8 " (508x457.2x203.2mm) 1 mm thick with


yance of all materials, Sales tax & Other taxes on materials to site,
cluding all labour charges for fixing at site etc; complete for finished
Amount
3620.00
0.00
3620.00
492.86
4112.86
4112.90

x 457.2 mm (1'6"x1'6") dia brick masonry inspection chamber as per


mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
crushing strength of 5 N/sq.mm including plastering with cement
and outside fitted light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I
including excavating pits up to a depth of Inspection chamber up to
(excluding rock) and laying cement concrete (1:4:8) 150 mm thick
C. 1:2:4 benching and channel 100 mm thick as per Standard
conveyance of all materials like cement, sand, bricks, water etc., to
all materials and all incidental and operational, labour charges like
masonry, lift charges, curing etc., complete for finished item of work

Amount
2626.00
2626.00
357.53
2983.53
2983.50

m SWG gully traps conforming to ISI 651 & 4127 with C.I Grating &
ntermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9")
ding cost and conveyance of all materials like cement, sand, bricks,
e charges on all materials and all incidental and operational, labour
onstructing masonry, lift charges, curing etc., complete for finished
ation.

Amount
482.00
482.00
65.62
547.62
547.60

xing in position including cost and conveyance of all materials, Sales


e, Operational and Incidental charges including all labour charges for
d itemof work.
Amount
29.00
3.95
32.95
33.00

xing in position including cost and conveyance of all materials, Sales


e, Operational and Incidental charges including all labour charges for
d itemof work.
Amount
35.00
4.77
39.77
39.80

ing in position including cost and conveyance of all materials, Sales


e, Operational and Incidental charges including all labour charges for
d itemof work.
Amount
53.00
7.22
60.22
60.20

ing in position including cost and conveyance of all materials, Sales


e, Operational and Incidental charges including all labour charges for
d itemof work.
Amount
79.00
10.76
89.76
89.80

Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
131.00
0.00
131.00
17.84
148.84
148.80

Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
146.00
0.00
146.00
19.88
165.88
165.90

Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
191.00
0.00
191.00
26.00
217.00
217.00

Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings & labour charges complete for finished itemof work.
Amount
301.00
0.00
301.00
40.98
341.98
342.00

Toilet
1.50x1.1
5M

V
3.70M
V

V
V

D
D
D

V
V

5.28x1.11M

Bath
1.50x1.1
5M
Bath
1.50x1.1
5M

D
D
D
D

3.70M
V

V
V
V

V
Bath
1.50x1.1
5M

3.70M
V
Bath
1.50x1.1
5M

3.47x0.92M

Toilet
1.50x1.1
5M

Toilet
1.50x1.1
5M

V
Toilet
1.50x1.1
5M

3.70M

3.93M

3.05M

3.05M

3.05M

0.60

11.40M
V

5.28x1.11M