STANDARD OPERATING
PROCEDURE OF MULTI
PURPOSE TENDER
BASIS:
ITEM:
A. From Fire
HWP (M)
BASIS:
ITEM:
STANDARD OPERATING
PROCEDURE
CONTD...
Results
Remarks
18
object
Ensure all valves are in closed condition
Apply 2nd. gear & engage P.T.O. lever
Accelerate throttle as required. Watch the
compound gauge & pressure gauge. If pressure
gauge shown positive pressure, pump ready to
prime
Connect delivery hose(s) to delivery out let(s)
as required
Slightly open delivery valve but fully
Open cooling valve
As per the requirement of branch man
accelerate pressure by operating the throttle as
required
Use visual/whistle/line signals from starting to
completion of the work
After completion of job, close all valves
Normalize the accelerator
Close the cooling valve
Enter in cabin, disengage the PTO lever & 2nd.
gear
Check the air in air pressure gauge if required
19
to up
Stop the engine
6
7
8
9
10
11
12
13
14
15
16
17
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
Remarks
BASIS:
ITEM:
C. Hose Reel
There are three provisions in hose reel namely 1.Low pressure hose reel
2.Hydrant to hose reel and 3. High pressure hose Reel
1. Low pressure Hose Reel:-
Results
Remarks
Results
Remarks
drum
Operate the flush valve.
2. Hydrant to hose reel:(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Remove the blank cap on Auxiliary connection
2
Connect delivery hose between hydrant & hose
reel connection
3
Follow the point 01 to 07 as mentioned above.
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
D. Hose Reel
There are three provisions in hose reel namely 1.Low pressure hose reel
2.Hydrant to hose reel and 3. High pressure hose Reel
3. High pressure Hose Reel:(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Engage the PTO lever
2
Take hose reel hose up to target point & put
nozzle valve in open condition
3.
Hold high pressure gun firmly
4.
Give visual signal or whistle signal for water
ON as well as further requirement of pressure
5.
Open out let valve
6.
Build up the pressure gradually but fully
according to branch man.
7.
Adjust high pressure gun lever to get spray/jet
8
After completion of the job, give signal to
reduce pressure
9
Ensure proper rolling the hose reel on hose
10
Results
Remarks
drum
Operate the flush valve.
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
E. Water Monitor
There are two provisions in monitor namely 1.Water monitor 2.Foam monitor and
3. Foam Provision on hand line (s).
1. Water Monitor:
1
It can be use, while using at open source water or with MPT water tank/hydrant
to tank but the procedure is same as explained in DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Depute fireman on top of the MPT to operate
monitor
Results
Remarks
2
3
4
5
6
7
8
9
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
F. Foam Monitor
There are two provisions in monitor namely 1.Water monitor 2.Foam monitor and
3. Foam Provision on hand line (s).
2. Foam Monitor:
1
It can be use, while using at open source water or with MPT water tank/hydrant
to tank but the procedure is same as explained in DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Depute fireman on top of the MPT to operate
monitor
2
Aim it to suitable direction
3.
Give visual signal or whistle signal for water
ON as well as further requirement of pressure
4.
Open pump to monitor valve
5.
Build up the pressure gradually but fully
Results
Remarks
6.
7.
8.
9.
10
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
There are two provisions in monitor namely 1.Water monitor 2.Foam monitor and
3. Foam Provision on hand line (s).
3. Foam provision on hand line (s) :
1
It can be use, while using at open source water or with MPT water tank/hydrant
to tank but the procedure is same as explained in DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
1
2
3
4
5
6
7
8
9
Items of Test
Laid deliver hose line from pump to target point
Connect hose line (s) to pump delivery
Connect MFG- 5 at other hand with pickup tube
Submerge the pickup tube strainer pipe in to
foam solution container
Always keep handy two spare foam drums
Spray the water beside to target.
Gradually enhance the pressure up to 7 kg/cm 2
Ensure proper foam is producing
Than apply foam on target point
Results
Remarks
10
11
12
13
14
15
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
H. After Use.
passage
Check all lights
Necessary entries shall be made in concern log
book
Park the MPT in proper turnout place & report it
is ready for turnout.
Results
Remarks
HWP (M)
STANDARD OPERATING
PROCEDURE
LIGHT MAST
BASIS:
ITEM:
Light Mast
Light Mast :
1
It can be used while fire fighting & rescue operations during night time where the
illumination is poor as explained in DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Took the vehicle to out from garage. Start the
Engine & build up the air up to 6 kg/cm2 in
tank & ensure that drain valve of light Robot
shall be in open condition
2
Open the air tank valve. When air is passing
close the drain valve
3
Put on the switch near Emergency Stop button
& find the light must glow on cable remote
control
4
Pull the generator to out
5
Take out the Cable Remote Control
6
Press the button mast extension/lower of
remote control
7
The lights can operable up to 3600 angle by
starting the generator & pressing the concern
buttons.
8
Focus the lighting on desirable spot
9
After completion of the job, press down mark on
remote & ensure that the light robot sited
properly
10
Close the valve at air tank & put open the drain
Results
Remarks
11
12
13
valve
Cover the mast with hood
Circuit breaker & Ignition switch to be put off
Generator to be push inside & close the locker
HWP (M)
STANDARD OPERATING
PROCEDURE
LIGHT MAST- GENRATOR
BASIS:
ITEM:
Light Mast-Generator:
1
It can be used while fire fighting & rescue operations during night time where the
illumination is poor as explained in DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
Items of Test
Pull out it from locker
Ensure fuel to be full in the tank
Put on the fuel cock
Start the engine manually or auto
Connect the plug to AC out supply & ensure
that circuit breaker switch to be put on
After completion of the job put off the circuit
barker switch
Wait 10 minutes to cool the engine
Push it inside of locker
Close the fuel clock
Close the locker door
Record the purpose of use, time in concern
document
Report immediately to duty officer any
deficiencies are noticed.
Results
Remarks
HWP (M)
STANDARD OPERATING
PROCEDURE
FOR CO2 BANK
BASIS:
ITEM:
Items of Test
Took the discharge device up to the spot
Open the header valve
Remove safety pin of cylinder
Open the cylinder valve in anti clock direction
one by one according to the situation demand
After completion of the job close the header
valve
Wind up the hose on CO2 reel
Re insert the safety pin to used cylinder (S)
After returning to Fire Station replace the used
cylinders with full cylinders
The cylinder capacity is less than 10% no need
for replacement
Record the same in concern records
Cylinders shall be hydro tested for every 5
years according to Gas cylinder Rules-2004
HWP (M)
STANDARD OPERATING
PROCEDURE
FOR DCP Extinguisher (s)
Results
Remarks
BASIS:
ITEM:
Items of Test
Uncoil the discharge hose up to the spot
Operate the squeeze grip nozzle
Remove safety pin from CO2 pillet cylinder
Open the CO2 pillet cylinder valve slowly but
fully
Stay upwind direction
Direct the DCP on the seat of fire
If the fire is in confined space, close the
windows
Wear B.A. Set & follow buddy system with life
line.
After extinguishing the fire close pillet CO2
cylinder valve
Re-fix the safety pin to pillet CO2 cylinder
Coil the discharge hose
Return to Fire Station
Refill the DCP in cylinder & replace the CO2
cylinder with full.
If the CO2 is less than 10% no need to replace.
Results
Remarks
HWP (M)
BASIS:
ITEM:
It is mounted on the top of the MPT and secured in gallows with locking
provision to prevent fall down while the MPT is in motion. It is widely using for fire
fighting, Rescue operations, first floor ladder, improvised structure, used as
bridge between two buildings, to ascending & dis- ascending to top floor, ship
holds, confined spaces, basements, step ladder, to use in 4 men extension
ladder drill and to make water dam.
DOC. No.FR/EQP/32/13 & 14.
(Tick () for O.K & (X) for not O.K)
Sl.No.
Items of Test
1
Dismount & pitch the ladder at desired place
2
Hold it firmly
3
Extend the ladder by pulling extension rope,
confirm proper securing the safety locks
4
Pitch it on desired place, but 5 rounds shall be
above the parapet wall but maintain the safety
distance i.c., th. of the length of the ladder
5
Strings shall be caught by 02 members & 01
member firmly hold the round at behind
6
Climb/down the ladder by unison method
7
While coming down the ladder shall be left side
to fireman
8
After completion of the job, remove from
mounting place
9
Hold firmly & bring the extension portion in
original place by operating the extension rope
10
Mount the ladder on MPT & lock in gallows
11
Any deficiencies observed report to the duty
officer
12
After use it shall be tested according to the
standard
HWP (M)
Results
Remarks
BASIS:
ITEM:
Combi tool is provided in each MPT for lifting, cutting and spreading
purpose in case of an emergency.
HWP (M)
BASIS:
ITEM:
STANDARD OPERATING
PROCEDURE
Results
Remarks
Sl.No.
Items of Test
1
Hold the bars and caught firmly at bars rear
side
2
Disconnect hand brake
3
Safely remove the TFP from hook
4
Safely pull the TFP up to Fire hydrant
5
Park the TFP on hard surface & maintain the
6
7
8
9
10
11
12
13
14
15
16
17
15
Results
Remarks
level
Apply hand brake & put the legs in proper
position
Start the engine
Ensure all valve are closed position
Accelerate throttle as required
Use visual/whistle/line signals from starting to
completion of the work Strictly
Close all valves except cooling valve
Normalize the accelerator
Close the cooling valve
Stop the engine
Disconnect the hand brake
Hold the pulling bars, rear legs, loose & tight
them as required
Connect the towing hook to jeep/Fire Engine
Took & park the TFP at earmarked place on
legs
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
Results
Remarks
6
7
8
9
10
11
12
13
14
15
16
17
18
19
HWP (M)
STANDARD OPERATING
PROCEDURE
CONTD...
BASIS:
ITEM:
C. After Use.
Results
Remarks
11
12
13
passage
Check all spot light & meter lights
Necessary entries shall be made in concern log
14
book
Park the TFP in proper turnout place & report it
is ready for turnout.
HWP (M)
STANDARD OPERATING
PROCEDURE
BASIS:
ITEM:
air
Open cooling valve
Close the delivery valve & accelerate throttle
as required
Use visual/whistle/line signals from starting to
completion of the work Strictly
Close all valves except cooling valve
Normalize the accelerator
Results
Remarks
13
14
15
gear
Check the air in air pressure gauge if required
16
17
to up
Check water level in water tank
Stop the engine
HWP (M)
STANDARD OPERATING
PROCEDURE
BASIS:
ITEM:
object
Ensure all valves are in closed condition
Start the Engine
Accelerate throttle as required. Watch the
compound gauge & pressure gauge. If pressure
8
9
10
11
12
13
14
Results
Remarks
15
HWP (M)
STANDARD OPERATING
PROCEDURE FOR EXHAUST
BLOWER
BASIS:
SCOPE:
EXHAUST BLOWER
Sl.
No.
OPERATING PROCEDURE
1
2
3
4
5
6
7
8
9
10
Date of
use
Standard
training
Result Remarks
HWP (M)
STANDARD OPERATING
PROCEDURE OF FIRE
EXTINGUISHERS
BASIS:
SCOPE:
CO2 Type, DCP Type, Foam (Mech.) & Water CO2 Type.
Sl.
No.
OPERATING PROCEDURE
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
Date of
use
CO2 TYPE FIRE EXTINGUISHER (S)
Standard
training
Result Remarks
11
12
13
windows
Don B.A. set/cover the nose with hand cut
chief
After extinguishing the fire made proper
cross ventilation
Handed over the extinguisher for
maintenance & further action
FOAM FIRE EXTINGUISHER (S)
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
12
13
Remember - PASS
PASS-
Pull pin
Aim Nozzle at base of fire
Squeeze Handle
Sweep from side to side
HWP (M)
STANDARD OPERATING
PROCEDURE FOR HIGH
EXPANSION FOAM
GENERATOR
BASIS:
SCOPE:
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
OPERATING PROCEDURE
Connect delivery hose between hydrant and
hydrant to tank
Open the tank to pump foam valve
Select the Foam selector valve according to
foam concentration percentage
Connect the discharge outlet of the pump to
foam inlet of Hi-expansion foam generator inlet
using delivery hose
Increase the pump pressure up to 7kg/cm2
Open the delivery valve slowly but fully
Direct the Hi-expansion foam at desired place
After completion of the job close the foam
selector valve, delivery valve
Normalize the throttle.
Disconnect the foam generator connection
Wash thoroughly foam generator and concerned
equipments with fresh water
Standard
training
FROM PUMP
Date of
use
Result Remarks
HWP (M)
STANDARD OPERATING
PROCEDURE FOR HIGH
EXPANSION FOAM
GENERATOR
BASIS:
Standard
SCOPE:
FROM AUXILLERY
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
OPERATING PROCEDURE
Connect delivery hose pipe to auxiliary
connection.
Dip the pickup tube in foam drum
Select the Foam selector valve according to
foam concentration percentage
Buildup the pressure up to 7kg/cm2
Increase the pump pressure up to 7kg/cm2 in the
pump
Connect the delivery hose between pump and
HX foam generator
Direct the Hi-expansion foam at desired place
After completion of the job close the foam
selector valve, delivery valve
Normalize the throttle.
Disconnect the foam generator connection and
other connections
Wash thoroughly foam generator and concerned
equipments with fresh water
Date of
use
training
Result Remarks
HWP (M)
BASIS:
STANDARD OPERATING
PROCEDURE FOR
OSCILLATING MONITOR
Standard
training
OPERATING PROCEDURE
Took the monitor and place on equal hard
surface
Lay delivery hose across front legs within 10 feet
diameter hose loop minimum and give input
pressure.
Tighten the belts on hose
Maximum flow is 375 GPM
The minimum pressure required 10kg/cm2
Select discharge rate then adjust the nozzle as
per demand i.e., spray or jet
Put the button on ON condition for oscillating
Depend up on the requirement set the
adjustment levers for oscillation
Normalize the throttle.
After completion of the job, normalize the
pressure and normalize the above procedure
Wash thoroughly and clean. Stowed at
designated place.
Date of
use
Result Remarks