DETAILED AND ABSTRACT ESTIMATE FOR


Providing B.T on R/F Kondannaguda to Velijerla Code No. 114120
Const.of 1 Vent of 600 mm Dia RCC NP3 Class Hume Pipe culve
0/8 to 1/0 Km
Measurements
Description of work
No.s
L
B
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH ,including overhead charges & Contractors profit ,But excluding VAT &
Seignarage charges.
Body wall
Under Pipes

2
1

7.17
9.43

1.45
0.97

1
1

2
x1
x

7.17
9.43

1.45
0.97

1
1

x
x

2
2

6.97
6.97

1.25
0.98

Plain cement concrete M15grade (Nominal mix) using 40,20 & 10mm HBG metal mechanically
mixed in substructure complete as per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit ,But excluding VAT & Seignarage charges. for Abutments, Piers,
cut-off walls above Bed Level
Body wall above GL (Above Bed Level)
P.P walls
Deduct Pipe Portion

Providing concrete for plain concrete M15 ( Nominal mix) in open foundations using 40,20 &
10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including
overhead charges & Contractors profit ,But excluding VAT & Seignarage charges.
for
Foundations
Body wall Foundation
Body wall below GL (Bed Level)

Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9
MORD & 304 MORTH ,including overhead '- charges & Contractors profit, But excluding VAT &
Seignarage charges.
Body wall Foundation
Under Pipes

1
1

1
1
0.78

2
x2
x -1
x

6.97
6.97
0.83

0.69
0.45
0.69

Providing and laying boulder apron for bed protection with stone boulders of minimum size and
weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per
drawing and technical specifications Clause 1301 MORD / 2503 MORTH ,including overhead
charges and contractors profit ,But excluding VAT & Seignarage charges.
Up stream Side
Down stream Side

1
1

x
x

1
1

6.97
6.97

1.50
3.00

( width equal to body wall length )

Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of
granular material including fixing collar with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including overhead charges & Contractors profit ,But
excluding VAT & Seignarage charges.
900 mm dia Pipes NP3 Class

12.50

--

TOTAL

Asst.Exe.Engineer
PRI - Sub Division -1, Shaadnagar

Dy. Executive Engineer


PRI Shadnagar

Executive Engineer
PRI Mahabubngar

T ESTIMATE FOR
o Velijerla Code No. 11412052
NP3 Class Hume Pipe culvert
Km
Measurements
Quantity Rate. Per
D
fications Clause 305.1
f stumps and other
des and bottom and
cal Specification 305
But excluding VAT &

3.84
3.39

79.74
30.96
110.700
cum

92.84
1 cum

Amount

10,277.00

cation Clause 305.3.9


But excluding VAT &

0.10
0.30

2.08
2.74
4.820
cum

554.36
1cum

2,672.00

ations using 40,20 &


d in foundation and
awings and technical
100 MORTH ,including
arage charges.
for
0.15
0.65

2.61
8.85
11.460
cum

4715.40
1cum

54,038.00

13.18
2.82
-0.31
15.690
cum

4987.44
1cum

78,253.00

G metal mechanically
on Clauses 802, 804,
,including overhead
for Abutments, Piers,
1.37
0.45
0.69

of minimum size and


d dry complete as per
,including overhead

0.30
0.30

3.14
6.27

9.410
cum

804.44
1cum

7,570.00

first class bedding of


excluding excavation,
l and parapets. Tech
ntractors profit ,But
--

12.500
12.500
Rm

7102.04
Rm

88,776.00
241,586.00

Executive Engineer
PRI Mahabubngar

Superintending Engineer
P.R.Mahabubngar

RoadWidth
RoadLvl
BedLvl
NoOfPipes
DiaOfPipe
ThkOfPipe
HwWidthBottom
HwWIdthTop
PipeBedOffset
HwBedOffset
HwBedThk
PipeBedThk
OuterDiaOfPipe
Gap
PipeOverBurden
LengthOfPipe
PipeBedWIdth

7.5
100
97
1
0.6
0.085
1.25
0.4
0.1
0.1
0.1
0.3
0.77
0.385
2.315
12.13
0.97

HwLength
HwBedLength
HwExeWidth
PipeExeLength
HwExeDepth
PipeBedDepth
HwHtBelowBL
HwHtAbovePipe
HwHtTotal
HwHtParapet

6.97
7.17
1.45
9.43
3.835
3.385
0.65
0.6
2.02
0.45