LUSAIL KATARA HOTEL

PACKAGE 2 (SUBSTRUCTURE AND BASEMENT WORKS)


2 WEEKS LOOKAHEAD PROGRAM NO. 6 (Up to 15-Jan-16) Rev 01
Data Date as
15-Jan-16
of:

LEGEND:
- Engineering 1st Submittal
- Engineering Re Submittal
- Site Construction Works
WEEK 28
No.
1

Activity ID

Unit

Target quantity

WEEK 29

2-Jan-16

3-Jan-16

4-Jan-16

5-Jan-16

6-Jan-16

7-Jan-16

8-Jan-16

9-Jan-16

10-Jan-16

0
0
0

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

1
1
1

11-Jan-16

12-Jan-16

13-Jan-16

14-Jan-16

1
1
1

15-Jan-16

Remarks

ENGINEERING WORKS
- MATERIAL SUBMITTAL
- Waterproofing for Wall Expansion joints (Additional)
- PREQUALIFICATION
- METHOD STATEMENT
- Pile Head Treatment (Resubmission)
DESIGN/SHOP DRAWINGS SUBMITTALS
- Reinforcement for Raft Zone T5 for P4 & P3
- Reinforcement for Columns Bsmt 2 to Bsmt 1 Zone T5
- Post Tensioning for Bsmt 1 & Promenade Level Zone T5
- Setting out for Pile Caps/Cut-off Level Zone T4
- Structural Arrangement for Zone T4
- Post Tensioning for Bsmt 1 & Promenade Level Zone T4
- RFI
- Revised Drawings 2nd Bsmt Drainage Works (MEP)

CONSTRUCTION WORKS
ENGINEER'S/CLIENT SITE OFFICE

CLIENT SITE OFFICE


- Levelling and installation of Interlock Stone
- Curbstone Pavement
- Office Cabin Erection + Fitout
- Cable Termination to Electrical Panel & Generator

- Electrical Panel Installation

- External Plumbing

0.55

0.55

0.55

0.55

0.55

0.55

- Fire Alarm & Data Telephone


ZONE P4 PILE CAP/RAFT FOUNDATION WORKS
- Pile Head Cutting

nos

6.00

- Preparation and application of pile head treatment

ZONE P3 PILE CAP/RAFT FOUNDATION WORKS


- Preparation works for Tower Crane foundation
- Pile Head Cutting

nos

5.00

sqm

739.80

nos

7.00

- Preparation and application of pile head treatment


- Waterproofing Membrane Horizontal (Area 1)

- Preparation for Shotcrete


sqm

454.00

- Pile Head Cutting

nos

7.00

- Preparation for Shotcrete


- Shotcrete

sqm

433.00

- Shotcrete
ZONE P1 PILE CAP/RAFT FOUNDATION WORKS

ZONE T4 PILE CAP/RAFT FOUNDATION WORKS


- Pile Head Cutting

nos

- Excavation

cum

- Blinding

sqm

8.00
340.20
162.00

ZONE T5 PILE CAP/RAFT FOUNDATION WORKS


- Waterproofing Membrane Horizontal (Area 3)

sqm

- Waterproofing Membrane Vertical

sqm

508.80
91.40

- Preparation and application of pile head treatment


- Pile Boring (Swiss Boring)

nos

- Pile reinforcement couplers

nos

- Protection Screed (Area 3)

sqm

10.00
7.00
508.80

ZONE T2 PILE CAP/RAFT FOUNDATION WORKS

KATARA SECTION T5 PILE CAP/RAFT FOUNDATION WORKS

1.00
-

sqm

151.20

0.55
1.00
1.00

0.55
1.00
1.00

0.55
1.00
1.00

0.55
-

1.00
1.00

0.8

0.8

0.8

0.8

0.64

0.64

1.00

1.00

151.33
-

0.64
151.33
-

0.64
151.33
-

0.64

0.64

0.64

123.30

0.64

123.30

123.30

0.8

123.30

0.64

0.8

123.30

0.64

123.30

0.64

0.64

0.64

0.64

1.00

1.00

1.00

1.00

1.00

0.64
1

0.64

0.64

0.64
144.33

0.64
144.33

144.33

0.73

0.73

0.73

0.73

0.73

0.73

0.73

0.73

0.73

0.73

0.73

30.93

30.93

30.93

30.93

30.93

30.93

30.93

30.93

30.93

30.93

30.93

27.00

27.00

27.00

27.00

27.00

27.00

42.40
-

42.40
-

42.40
-

42.40
-

42.40

42.40

42.40

42.40

42.40

15.23

15.23

15.23

15.23

15.23

15.23

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

0.91

0.91

0.91

0.91

0.91

0.91

0.91

0.91

0.91

0.91

0.91

1.17

1.17

1.17

1.17

1.17

1.17

84.80

84.80

84.80

84.80

84.80

84.80

1.00

151.20
-

Issuance of design drawings (lightning protection, electrical


power)

42.40

1.00

Awaiting for official confirmation from the Client regarding design


issues (additional piles) and issuance of design drawings
(lightning protection, electrical power)

Awaiting for official confirmation from the Client regarding design


issues (additional piles) and issuance of design drawings
(lightning protection, electrical power)

0.64

Awaiting for official confirmation from the Client regarding design


issues (additional piles) and issuance of design drawings
(lightning protection, electrical power)

0.64

0.64

Anti termite, blinding, waterproofing

Awaiting for official confirmation from the Client regarding design


issues (additional piles) and issuance of design drawings
(lightning protection, electrical power)

ZONE T3 PILE CAP/RAFT FOUNDATION WORKS

- Preparation for Shotcrete


- Shotcrete

1.00

ZONE P2 PILE CAP/RAFT FOUNDATION WORKS


- Pile Head Cutting

0.55

Issuance of design drawings (lightning protection, electrical


power)

Awaiting for official confirmation from the Client regarding design


issues (additional piles) and issuance of design drawings
(lightning protection, electrical power)

Enginnering works under progress as per latest instruction received on 13th and advance copy on 28th September

KATARA SECTION T4 PILE CAP/RAFT FOUNDATION WORKS


Refer Letter No 8900/HBK/L20150825/HOF/043
KATARA SECTION T3 PILE CAP/RAFT FOUNDATION WORKS

ON HOLD

KATARA SECTION T2 PILE CAP/RAFT FOUNDATION WORKS

Page 1 of 1