LEGEND:
- Engineering 1st Submittal
- Engineering Re Submittal
- Site Construction Works
WEEK 28
No.
1
Activity ID
Unit
Target quantity
WEEK 29
2-Jan-16
3-Jan-16
4-Jan-16
5-Jan-16
6-Jan-16
7-Jan-16
8-Jan-16
9-Jan-16
10-Jan-16
0
0
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
11-Jan-16
12-Jan-16
13-Jan-16
14-Jan-16
1
1
1
15-Jan-16
Remarks
ENGINEERING WORKS
- MATERIAL SUBMITTAL
- Waterproofing for Wall Expansion joints (Additional)
- PREQUALIFICATION
- METHOD STATEMENT
- Pile Head Treatment (Resubmission)
DESIGN/SHOP DRAWINGS SUBMITTALS
- Reinforcement for Raft Zone T5 for P4 & P3
- Reinforcement for Columns Bsmt 2 to Bsmt 1 Zone T5
- Post Tensioning for Bsmt 1 & Promenade Level Zone T5
- Setting out for Pile Caps/Cut-off Level Zone T4
- Structural Arrangement for Zone T4
- Post Tensioning for Bsmt 1 & Promenade Level Zone T4
- RFI
- Revised Drawings 2nd Bsmt Drainage Works (MEP)
CONSTRUCTION WORKS
ENGINEER'S/CLIENT SITE OFFICE
- External Plumbing
0.55
0.55
0.55
0.55
0.55
0.55
nos
6.00
nos
5.00
sqm
739.80
nos
7.00
454.00
nos
7.00
sqm
433.00
- Shotcrete
ZONE P1 PILE CAP/RAFT FOUNDATION WORKS
nos
- Excavation
cum
- Blinding
sqm
8.00
340.20
162.00
sqm
sqm
508.80
91.40
nos
nos
sqm
10.00
7.00
508.80
1.00
-
sqm
151.20
0.55
1.00
1.00
0.55
1.00
1.00
0.55
1.00
1.00
0.55
-
1.00
1.00
0.8
0.8
0.8
0.8
0.64
0.64
1.00
1.00
151.33
-
0.64
151.33
-
0.64
151.33
-
0.64
0.64
0.64
123.30
0.64
123.30
123.30
0.8
123.30
0.64
0.8
123.30
0.64
123.30
0.64
0.64
0.64
0.64
1.00
1.00
1.00
1.00
1.00
0.64
1
0.64
0.64
0.64
144.33
0.64
144.33
144.33
0.73
0.73
0.73
0.73
0.73
0.73
0.73
0.73
0.73
0.73
0.73
30.93
30.93
30.93
30.93
30.93
30.93
30.93
30.93
30.93
30.93
30.93
27.00
27.00
27.00
27.00
27.00
27.00
42.40
-
42.40
-
42.40
-
42.40
-
42.40
42.40
42.40
42.40
42.40
15.23
15.23
15.23
15.23
15.23
15.23
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
0.91
1.17
1.17
1.17
1.17
1.17
1.17
84.80
84.80
84.80
84.80
84.80
84.80
1.00
151.20
-
42.40
1.00
0.64
0.64
0.64
1.00
0.55
Enginnering works under progress as per latest instruction received on 13th and advance copy on 28th September
ON HOLD