Sewage System Maintenance Comparison

The effort is presented as Hours/Year. This is achieved by estimating the effort for the maintenance task and equating it to effort/year. For example: Monthly tasks will be multiplied by 12. A 5 annual task will be divided by 5. The effort has been
presented as ships staff (SS) effort and base staff (BS) effort. Effort is based purely on an estimate and not based on empirical data. Although estimates may be incorrect they are consitent for both schedules, therefore, the estimated saving is
correct. No potential capital savings have been shown but this could be extensive due to the nature of the PMS schedule.
LEGACY PMS SCHEDULE
Task Title

Interval

Skill

VACUUM SEWAGE PLANT T22 (III) - Take vibration readings and record in Equipment Log.
VACUUM SEWAGE PLANT T22 (III) - Electrode probes, remove and clean.
SEWAGE PUMP - Turn pump when not in regular use.

1 Month
1 Month
1 Week

SS
SS
SS

VACUUM SEWAGE PLANT T22 (III) - Remove and clean the float switch of the liquid service tank.
SANITARY SERVICE - OVERHAUL at refit 150mm NR (RA storm valves).
SANITARY SERVICE - Check pipework secure and undamaged, inspect joints for leaks.
SEWAGE SYSTEM - Visually inspect flexible connecting pipes.(non hydraulic).

6 Month
5 Years
1 Month
6 Month

SS
BS
SS
SS

VACUUM SEWAGE PLANT T22 (III) - Holding tanks, discharge contents and flush internally.
VACUUM SEWAGE PLANT T22 (III) - Inspect earth bonding.
SANITARY SERVICE - Operate all valves, stopcocks and bibcocks throughfull limits of travel.
VACUUM SEWAGE PLANT T22 (III) - CLEAN and SURVEY holding tank.
SANITARY SERVICE - Chemically CLEAN vacuum soil and urinal system pipes as identified in Enclosure No.

6 Month
6 Month
6 Month
4 Year
2 Year

SS
SS
SS
BS
BS

SANITARY SERVICE - OVERHAUL at refit 50mm SDNR valves.


SEWAGE SYSTEM - Inspect shock/vibration mountings.
SANITARY SERVICE - Recharge charcoal filters SANITARY SERVICE - RENEW valves and fittings as identified in the Location List / Enclosure No.
SANITARY SERVICE - Inspect scupper pot gratings, check clear.
SANITARY SERVICE - Inspect traps and sealing elements, rectify defects as necessary
SANITARY SERVICE - Inspect and operate butterfly valves
SANITARY SERVICE - Inspect and operate gate valves
SANITARY SERVICE - Inspect and operate screw down valves.
SANITARY SERVICE - Inspect wafer check valves
SANITARY SERVICE - Inspect non-return valves
Inspect and operate SDNR valves
Inspect non-return (RA Storm) valves
SANITARY SERVICE - Inspect and operate T-ported plug valves
SANITARY SERVICE - INSPECT 50% of hull valves, ships staff to nominate.
SANITARY SERVICE - OVERHAUL at refit wafer check valves.
SANITARY SERVICE - OVERHAUL at refit gate valves.
SANITARY SERVICE - OVERHAUL at refit 3-way T-Ported valves.
SANITARY SERVICE - Survey system and record defects for rectification.
SANITARY SERVICE - Check WC flushing valve (Solway) for positive closure.
SANITARY SERVICE - Operate WC air escape valves.
SANITARY SERVICE - Check urinal stopcock for positive closure.
SANITARY SERVICE - Grease threads of water seal and trap plugs.
SEWAGE PUMP - Inspect pump.
SEWAGE PUMP - Carry out performance check
SEWAGE PUMP - Remove overhaul and replace complete unit.
SANITARY SERVICE - Clean and grease all reducing valves.
VACUUM SEWAGE PLANT T22 (III) - Control panel lamps, test.
VACUUM SEWAGE PLANT T22 (III) - Work vacuum system valves.
VACUUM SEWAGE PLANT T22 (III) - Liquid service tank, drain flush and refill.
VACUUM SEWAGE PLANT T22 (III) - Check tank vents and anti-flash fittings.
SANITARY SERVICE - Remove urinal pipes to soil pipe connection, clean and replace VACUUM SEWAGE PLANT T22 (III) - Inspect reducing valve in salt water cooling coil of the liquid service TK.
VACUUM SEWAGE PLANT T22 (III) - Vacuum tank, drain and clean, clean level probes.
VACUUM SEWAGE PLANT T22 (III) - Recirculation/aeration ejector inspect.
VACUUM SEWAGE PLANT T22 (III) - Inspect and clean control panel
VACUUM SEWAGE PLANT T22 (III) - Inspect holding down tank and flush vent pipework with fresh water.
VACUUM SEWAGE PLANT T22 (III) - Replace control panel battery.
VACUUM SEWAGE PLANT T22 (III) - PRESSURE TEST Liquid service tank cooling coil.
VACUUM SEWAGE PLANT T22 (III) - INSPECT WC pan pedestals.
SANITARY SERVICE - Carry out OPERATIONAL TEST.
SANITARY SERVICE - SET TO WORK.
SANITARY SERVICE - Present for Installation Inspection (II)
SANITARY SERVICE - Present for Final Installation Inspection (FII).
SANITARY SERVICE - Present for Harbour Acceptance Trials (HATs.
SANITARY SERVICE - Present for Sea Acceptance Trials (SATs).
SANITARY SERVICE - Request use of drain cleaning equipment.

5 Years
12 Month
12 Month
4 Year
1 Week
1 Month
2 Month
2 Month
2 Month
2 Month
2 Month
2 Month
2 Month
2 Month
5 Years
5 Years
5 Years
5 Years
5 Years
6 Month
1 Month
6 Month
6 Month
18 Month
6 Month
3 Year
6 Month
1 Day
1 Month
1 Month
6 Month
12 Month
6 Month
12 Month
12 Month
12 Month
12 Month
2 Year
4 Year
4 Year
Occasional
Occasional
Occasional
Occasional
Occasional
Occasional
Occasional

BS
SS
SS
BS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
BS
BS
BS
BS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
BS
BS
BS
BS
BS
BS
BS
BS
SS

FBR SCHEDULE
Effort/hr Effort/yr( Effort/yr( Task Title
s
SS)
BS)
2
24
Sewage Plant - Carry out audible check of sewage and Vacuum pump
8
96
Sewage Plant - Remove and clean warning sensor probes
0.5
26
Sewage System - Turn all pumps if not operated in the last month
Sewage Plant - Cycle valves VSS 2013, VSS 2083 and VSS 2087
4
8
Sewage Plant - Remove and clean holding tank low level cut out N1
600
120
Sewage System - Renew shipside vavles
2
24
Sewage System - Inspect system for signs of leakage
0.5
1
Sewage System - Inspect flexible bellows for signs of degradation
Sewage System - Check flexible hose register for next change due date for braided hoses
6
12
Vacuum Sewage System - Open up, flush and clean
2
4
Sewage Plant - Carry out earth bonding checks
4
8
Sewage Plant - Test operation of holding tank low level cut out N1
300
75
Sewage Plant - Clean and survey holding tank
150
75
Sewage System - Flush and chemically clean system pipework and tanks
Sewage Plant - Functional test holding tank relief valve
150
30
Sewage System - Renew discharge line non return valves
0.5
0.5
Sewage System - Inspect all machinery mounts for signs of degradation
6
6
Sewage System - Recharge charcoal filters
600
150
8
416
8
96
2
12
2
12
2
12
2
12
2
12
1
6
2
12
2
12
600
120
600
120
600
120
600
120
16
3.2
2
4
2
24
1
2
6
12
0.5
0.5
1
2
150
50
4
8
0.5
2
1
12
4
48
0.5
1
32
6
12
4
4
8
8
4
4
8
8
2
1
150
37.5
1
0.25
150
150
SANITARY SERVICE - Carry out OPERATIONAL TEST.
150
150
SANITARY SERVICE - SET TO WORK.
150
150
SANITARY SERVICE - Present for Installation Inspection (II)
150
150
SANITARY SERVICE - Present for Final Installation Inspection (FII).
150
150
SANITARY SERVICE - Present for Harbour Acceptance Trials (HATs.
150
150
SANITARY SERVICE - Present for Sea Acceptance Trials (SATs).
150
150
SANITARY SERVICE - Request use of drain cleaning equipment.
SS Effort 1017.2
Base Staff Effort 2017.75

Potential Ships Staff Manpower Savings in Man Hours/year =


Potential Base Staff Manpower Saving in Man Hours/year =

Interval

Skill

1 Month
1 Month
1 Month
6 Month
6 Month
5 Year
1 Year
1 Year
1 Year
1 Year
13 Month
3 Year
5 Year
2 Year
6 Year
5 Year
1 Year
1 Year

Mechanic
Mechanic
Mechanic
Mechanic
Mechanic
Base Staff
Mechanic
Mechanic
Mechanic
Mechanic
Mechanic
Mechanic
Base Staff
Base Staff
Base Staff
Base Staff
Mechanic
Technician

Occasional Dockyard
Occasional Dockyard
Occasional Dockyard
Occasional Dockyard
Occasional Dockyard
Occasional Dockyard
Occasional Ships Staff
880.9
(86.6%)
681.4
(33.7%)

Effort/hr Effort/yr( Effort/yr(


s
SS)
BS)
0.5
6
8
96
0.5
6
0.5
1
4
8
600
120
2
2
0.5
0.5
1
1
6
6
2
2
4
1.3
300
60
150
75
8
1.3
150
30
0.5
0.5
6
6

150
150
150
150
150
150
150
SS Effort 136.3
Base Staff Effort

150
150
150
150
150
150
150
1336.3