Sie sind auf Seite 1von 8

TRAINING PROGRAM

(CETP)
PROCESS ENGINEERING POLYMER (PE)

Coverage
Training Plan and Progress
Accomplished and On-going Tasks and Projects
Identified Improvements

TRAINING PROGRESS
Trainings

Specific Courses/ Subjects/ Projects

Status

Department
Overview

PED Functions and Organization


Process Monitoring and Improvements
Technical Development
Engineering Project Development and
Administration
PED Process Monitoring and Process Coverage
PED Project Development and Administration
PED Files Navigation

Completed

Tasks, Projects and Activities


Tasks/Activities

Car Seal Survey


(PE1 and PE2)

PP Capacity
Expansion

Details

Status

Quarterly Task.
Accomplished
Ensure safety and integrity of equipment by ensuring 2nd QTY Survey
vital manual valves are properly car sealed
(PED IOC 1742
& 1741)

Provided support in acquiring


data and documents needed for the
Expansion Project

Completed.

Preparation of WIPs for Spare ICA Dryer (MF-1Completed.


625)
HAZOP Minutes
Project Involvement
HAZOP Study (Performed as Scribe for MF-1-698)
to be submitted.
JHA, PSSR Participation

Tasks, Projects and Activities


Project

REW

Details
EW1845: Logic to Close PV254-3 to Prevent PE Trip in High Pressure
Raised by: FA Biongcog (PED NCP)
Target Completion: 15 July 2016
Objectives: The intent of the proposed logic is to prevent high pressure
trip of PE in case of 2 PE trains running initially
and 1 train suddenly trips
Recommendations (as of Rev 2):
The logic in closing PV254-3 can be beneficial in preventing B/L overpressure during
PE2 Reactor kill (PE1 Reactor is stable) and during PE1 Reactor kill provided PE2 is at a
high rate. But with low PE2 rate and PE1 Reactor kill, the possibility of overpressure
can still exist ( See Scenario 5 to 8 at Table 4)if there are no improvements with the
control of PC6201.
Therefore, it is recommended to modify the logic to close PV254-3 during Reactor Kill
at specific condition (with consideration on total C2 flow, process status of NCP &
Polymer). It is also recommended to improve the C2 pressure control, PC6201, at the
NCP side to prevent over-pressure at the polymer battery limit.
It can be noted that in the future, if all of the HP C2 demands of PE1 and PE2 will be
directly supplied by NCP, the logic proposed in this study may no longer be utilized.
Improvements in pressure control at the NCP side should be studied.

Status

PEAN Rev 0
submitted last
28 Jun
PEAN Rev 1
Submitted last
15 July
Target
Submission of
PEAN Rev 2:
19 Jul

Tasks, Projects and Activities


Project

REW

Details

Status

EW2007: Investigation of N2 to expansion bellows supply


pressure
Raised by: JT Pates
On-going study
Target Completion: 29 July 2016
And Investigation.
Objective: Determine cause of pressure alarm high when
Orifice already
N2 to expansion bellows supply valve is fully opened and
inspected

provide corrective solution

PED Immersion
Immersion Type

Subject

Remarks

AutoCAD

Utilized for EW1845

ChemCAD

Utilized for EW1845

InstruCALC

Utilized for EW2007

PHA WORKS

As HAZOP Scribe

Raw Materials

C2 System

Studied for EW1845

Data Collection and Analysis

PHD Data Gathering

Utilized for EW1845

Project
Management/Completion of
REW Study

REW Study/Process

EW1845; EW2007

HAZOP Study

Scribe

As Scribe for MF-1-698

Logic Diagram

Logic Interpretation
Drafting Logic Description
and Diagram

Utilized for EW1845

Computer/Simulation
Software

Thank you!