Area/ Location:
Plumbing
6th floor, Water Meter (near Unit 7)
Date:
Time Started:
May 2,2016
13:29
Time Ended:
Working Condition:
15:15
Okay
Element #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
ACTIVITY
P
P
P
S
S
S
S
P
P
P
S
P
P
S
S
S
P
P
P
P
P
S
P
I
P
I
P
S
S
P
I
S
P
P
P
P
Heating PPR
Removing excess
Heating PPR
Changing bala o fusion heater
Warming of fusion heater
Measuring PPR
Planning
Heating PPR
Heating 90 elbow PPR
Attaching PPR
Planning
Heating PPR (installed)
Removing excess
Getting materials (3rd floor)
Changing bala o fusion heater
Warming of fusion heater
Heating PPR (installed)
Removing excess
Heating PPR
Removing excess
Heating PPR
Planning
Changing bala o fusion heater
Putting gloves
Sawing excess heated PPR
Co-worker get ladder
Sawing excess heated PPR
Planning
Changing bala o fusion heater
Cutting PPR
Rest
Planning and Measuring
Heating PPR
Heating 90 elbow PPR
Removing excess
Heating PPR
Observed Time
60.26
30.53
34.25
226.28
163.72
9.85
22.28
43
97.47
42.66
19.85
224.69
33.4
222.43
112.06
137.88
105.28
46.88
197.75
57.53
17.1
127.18
146.87
25.22
17.81
36.66
25.66
57.91
108.37
43.9
28.25
39.59
288.44
67.84
15.49
76.49
37
38
39
40
41
42
43
44
45
46
P
S
I
I
P
S
S
P
P
S
Attaching PPR
Measuring and Planning
Waiting for PPR to cool down (w/detaching
Rest
Heating 90 elbow PPR
Measuring and Planning
Travel to 5th floor
Rotating PPR
Adjusting PPR (Riser)
Measuring
47
37.69
48
49
50
51
52
53
S
P
S
I
P
P
Measuring
Adjusting PPR (Riser)
Measuring
Rest
Measuring wall
Checking placement
60.03
13.84
36.41
79.46
17.9
15.55
85.4
170.77
564.12
20.93
115.03
84.72
1222.81
19.68
43.37
6.47
5605.01
93.417
1.56
2021.76
2828.61
754.64
5605.01
Materials:
63 mm PPR, fusion
heater
Name/s of Worker:
Melvin Adanza
Mike Ozon
Studied by:
Checked by:
Rating Factor
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
Normal Time
45.20
22.90
25.69
169.71
122.79
7.39
16.71
32.25
73.10
32.00
14.89
168.52
25.05
166.82
84.05
103.41
78.96
35.16
148.31
43.15
12.83
95.39
110.15
18.92
13.36
27.50
19.25
43.43
81.28
32.93
21.19
29.69
216.33
50.88
11.62
57.37
Allowance Factor
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Vreenhart V. Fider
Standard Time
54.23
27.48
30.83
203.65
147.35
8.87
20.05
38.70
87.72
38.39
17.87
202.22
30.06
200.19
100.85
124.09
94.75
42.19
177.98
51.78
15.39
114.46
132.18
22.70
16.03
32.99
19.25
52.12
97.53
39.51
25.43
35.63
259.60
61.06
13.94
68.84
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
64.05
128.08
423.09
15.70
86.27
63.54
917.11
14.76
32.53
4.85
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
76.86
153.69
507.71
18.84
103.53
76.25
1100.53
17.71
39.03
5.82
75%
28.27
0.2
33.92
75%
75%
75%
75%
75%
75%
45.02
10.38
27.31
59.60
13.43
11.66
0.2
0.2
0.2
0.2
0.2
0.2
54.03
12.46
32.77
71.51
16.11
14.00
Total Standard
Time (sec)
Total Standard
Time (min)
5040.66
1.40
84.01
Function:
Plumber
Helper
Remarks
63 mm
90 elbow PPR
Bracket 7th
Department:
Area/ Location:
Date:
Time Started:
Installation of Bracket
7th floor, Watermeter 1
May 2,2016
8:31
Time Ended:
Working Condition:
9:35
Okay
Element #
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
S
P
S
P
P
S
P
S
P
P
P
P
I
S
I
S
P
P
P
P
P
S
P
P
S
P
S
I
P
S
P
P
P
P
P
S
ACTIVITY
Preparing materials
Holing
Planning
Holing
Chipping
Planning
Chipping
Getting materials
Unscrewing bracket
Placing bracket
Screwing bracket
Holing
Peer convo
Getting Tools
Rest and Peer convo
Planning
Putting screw on bracket
Placing Ubolt
Adjusting Ubolt
Putting Ubolt on bracket
Screwing Ubolt and bracket
Getting materials
Screwing bracket
Screwing Ubolt and bracket
Measuring and Planning (Bracket 2)
Fabricate (3rd floor)
Planning
Phone convo
Holing
Getting materials
Chipping
Placing grip anchor
Screwing bracket with phone convo
Chipping
Screwing bracket
Getting materials
Page 7
Bracket 7th
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
68
68
68
P
S
P
P
P
P
P
P
P
P
P
P
P
S
P
P
P
P
P
S
P
P
P
P
P
P
P
P
P
P
S
S
P
P
P
Screwing bracket
Planning
Hammering Bracket
Screwing bracket
Detaching screw on bracket
Screwing bracket
Hammering Bracket
Holing
Placing grip anchor
Chipping wall
Plaching grip anchor
Hammering grip anchor
Placing bracket
Planning
Chipping wall
Plaching grip anchor
Hammering Bracket
Chipping
Unscrewing bracket
Planning
Holing
Placing bracket
Plaching grip anchor
Placing bracket
Screwing bracket
Placing Ubolt
Hammering Ubolt
Placing Ubolt
Hammering Ubolt
Adjusting Ubolt
Planning
Screwing bracket
Adjusting screw of Ubolt
Painting Bracket 1
Painting Bracket 2
Total Time (sec)
Total Time (min)
Total Time (hour)
Total Value Added Tme (Primary)
Total Secondary Time
Total Idle Time
Page 8
Bracket 7th
Materials:
Barena
Bracket
Pliers
Name/s of Worker:
Nikka Esteban
Milberto Catcho
Grip anchor
Ubolt
Observed Time
319.59
66.31
7.03
13.13
58.78
25.35
20.28
28.78
67.84
75.28
18.28
52.72
20.53
41.84
30.44
17.97
94.98
31.19
3.19
72.56
25.13
8.06
125.84
126.48
72
32.47
159.89
46.06
37.75
52.5
26
106.54
168.55
23.31
51.75
14.9
Rating Factor
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
Studied by:
Checked by:
Normal Time
239.6925
49.7325
5.2725
9.8475
44.085
19.0125
15.21
21.585
50.88
56.46
13.71
39.54
15.3975
31.38
22.83
13.4775
71.235
23.3925
2.3925
54.42
18.8475
6.045
94.38
94.86
54
24.3525
119.9175
34.545
28.3125
39.375
19.5
79.905
126.4125
17.4825
38.8125
11.175
Page 9
Allowance Factor
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Bracket 7th
84.31
32.97
8.12
76.34
12.28
123.03
15.97
32.4
32.86
8.63
24.5
14.53
28.78
10.56
14.4
44.53
3.28
17.46
72.62
104.25
52.78
12.09
39.86
36.4
274.75
45.85
8.4
16.66
8.47
17.75
28.56
137.07
74.79
117.1
85.41
3861.06
64.351
1.0725166667
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
75%
63.2325
24.7275
6.09
57.255
9.21
92.2725
11.9775
24.3
24.645
6.4725
18.375
10.8975
21.585
7.92
10.8
33.3975
2.46
13.095
54.465
78.1875
39.585
9.0675
29.895
27.3
206.0625
34.3875
6.3
12.495
6.3525
13.3125
21.42
102.8025
56.0925
87.825
64.0575
2702.71
1061.32
97.03
3861.06
Page 10
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
Bracket 7th
Function:
Plumber
Plumber
Vreenhart V. Fider
Standard Time
287.631
59.679
6.327
11.817
52.902
22.815
18.252
25.902
61.056
67.752
16.452
47.448
18.477
37.656
27.396
16.173
85.482
28.071
2.871
65.304
22.617
7.254
113.256
113.832
64.8
29.223
143.901
41.454
33.975
47.25
23.4
95.886
151.695
20.979
46.575
13.41
Remarks
Idle
w/phone convo
Page 11
Bracket 7th
75.879
29.673
7.308
68.706
11.052
110.727
14.373
29.16
29.574
7.767
22.05
13.077
25.902
9.504
12.96
40.077
2.952
15.714
65.358
93.825
47.502
10.881
35.874
32.76
247.275
41.265
7.56
14.994
7.623
15.975
25.704
123.363
67.311
105.39