Basement wall Design

Unit wt of soil =
Heignt of wall =
Heignt of soil =
Length of wall =
Design moment =
Design shear force =
Concrete grade =
Rebar grade =
Angle of friction =
Depth of Wall =

19.000
2.845
2.845
3.734
12.587
30.470
M20
Fe500
30.0
203.2

KN/m3
m
m
m
KNm
KN

Degree
mm

Check for depth:


Mu = 0.138xfckxbxd2
d=
67.530 mm
Assume thickness of wall
D=
203.200 mm
d=
173.200 mm
Calculation of area of reinforcement:
Vertical reinforcement
Mu = 0.87. . . 1

8.00 inch

.
. .

2
964.855 mm

Ast =

Horizontal reinforcement
Ast =
0.25% of h*t
0.25% of 2845*203.20
1445.260
mm2
Provide 12mm rebar @ spacing 100mm for Vertical reinforcement
2
Ast prov =
1130.973 mm
Provide 12mm rebar @ spacing 150mm for Horizontal reinforcement
2
Ast prov =
1608.810 mm
Check for shear
Tv =
V/bd
30.47*1000/(1000*203.20)
0.150
N/mm2
Percentage of steel =
Tc =
0.500 N/mm2
Tc>Tv

ok

0.557 %