Project Name: North Yaran Oil Field Development Cluster

Subject: Fittings & Flanges

Page 1 of 5

Vendor's Name: Jiangying tianning metsl pipe fitting CO, ITD


Proposal Reference No.: ***
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-003/004

Date: 2015/08/19

Proposal Date: 2015/07/13

Clarification : 00

VENDORS REPLY

JSC REPLY

Whether a compliance or a deviation,


Vendor shall reply to the purchasers
requirements with item by item, specially
,Engineering specification and Specific job
requirement s attached in requisition
1.

through the deviation list. if there are any


deviations, exceptions and /or alternatives,
Vendor shall specify them with the detailed
technical reason in the deviation list form
attached on the requisition .Vendor shall
reply to general comments, even if they are
duplicate
The Supplier shall have, at its usual
practice, a Quality Assurance Program
proving with the support of documentary
evidence that the materials, design,
manufacture, examinations and testing of

2.

fittings are conformed by specifications


and requirements of corresponding
requisition and purchase order. When
required by purchase order, Supplier shall
submit, for approval, its Quality Assurance
Program.
PAGE 1 OF 5

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: Fittings & Flanges

Page 2 of 5

Vendor's Name: Jiangying tianning metsl pipe fitting CO, ITD


Proposal Reference No.: ***
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-003/004

Date: 2015/08/19

Proposal Date: 2015/07/13

Clarification : 00

VENDORS REPLY

JSC REPLY

All material shall be furnished in


3.

accordance with the codes, standards and


specifications attached/specified in theMR.
Number of items shall be consider acc. to

4.

requirements of NACE MR 175/ ISO


15156, region 2, HIC requirements.

5.

Warranty & guarantee shall be considered


by vendor.

6.

Packing, Shipping & Marking shall

be

consider acc. to project specification.


7.

All fittings shall be protected from external


Corrosion for a period of 2 years as a min
so vendor shall confirm mill varnish will
protect pipes against corrosion for 2 years
as a min.
Please confirm that all requested mentioned

8.

points in this document will be carried out


by vendor.
The flanges & fittings shall be new and
their internal and external walls shall be

9.

clean, without foreign matters. The traces of


oxidation shall be accepted, if they do not
exceed a certain surface area.
PAGE 2 OF 5

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: Fittings & Flanges

Page 3 of 5

Vendor's Name: Jiangying tianning metsl pipe fitting CO, ITD


Proposal Reference No.: ***
NO.
10.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-003/004

Date: 2015/08/19

Proposal Date: 2015/07/13

Clarification : 00

VENDORS REPLY

JSC REPLY

Chemical Composition shall be completely


in accordance with related ASTM.

11.

For all ASTM Fittings material NDT testing


(RT or UT) shall be applied in accordance
with ASTM E 213.

12.

For all Fittings , the certification documents


shall be provided according to E10204-3.2.

13.

Dimensions and tolerances shall conform to


ASME B16.9 ,Fittings shall be designed for
pressure

rating

fully equal

to

those

calculated for seamless pipe of the same or


equivalent material and thickness.
14.

Forged carbon and alloy steel threaded and


socket-welding fitting shall conform to
ASME B16.11.

15.

All welds including welds in tubular


products for which fittings are made shall be
radio graphically examined throughout the
length of each weld , Butt-welding fitting
shall be furnished with beveled ends
prepared for butt-welding in accordance
with ANSI B16.25.

16.

Impact test shall be carried out with


PAGE 3 OF 5

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: Fittings & Flanges

Page 4 of 5

Vendor's Name: Jiangying tianning metsl pipe fitting CO, ITD


Proposal Reference No.: ***
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-003/004

Date: 2015/08/19

Proposal Date: 2015/07/13

Clarification : 00

VENDORS REPLY

JSC REPLY

considering acc. To NY-000-PI-ESS-011.


17.

Schedule of flanges & fitting shall be


revised acc. to wall thickness & final PMS.

18.

Elbows shall be considered with Long


Radiuses type ( 1.5 OD ).

19.

Please announce price of HIC & SSC test in


total offer.

20.

Items should be marked in accordance with


item codes.

21.

Drilling of flanges should be in accordance


ASME B16.5.

22.

Technical offer should be revised according


to attached file. ( items code ,quantity and
descriptions of components shall be revised,
also quantity of components shall be
checked again by MTO attach. )

23.

Purchased piping component shall be passed


impact test ,SSC test & HIC test ,other wise
future responsibilities are by vendor.

24.

Changing base material is not acceptable


from engineering idea but there is any
change in material selection , project
PAGE 4 OF 5

VENDORS SECOND REPLY

conclusion

Project Name: North Yaran Oil Field Development Cluster


Subject: Fittings & Flanges

Page 5 of 5

Vendor's Name: Jiangying tianning metsl pipe fitting CO, ITD


Proposal Reference No.: ***
NO.

JSC COMMENTS

Reference: NY-JS-000-PI-MRQ-003/004

Date: 2015/08/19

Proposal Date: 2015/07/13

Clarification : 00

VENDORS REPLY

JSC REPLY

manager shall be confirmed that.


25.

Please remove thredolet from piping


component.

PAGE 5 OF 5

VENDORS SECOND REPLY

conclusion