Study on Rural Energy Supply with Utilization of Renewable Energy

in Rural Areas in the Republic of Indonesia

CHAPTER 8

Manual for Micro-hydro power Development


Chapter 8

COST ESTIMATION

8.1 Cost Estimation for Rough Planning Stage


When you are going to make a trial calculation of construction cost in Rough
Planning Stage, it can be calculated by the method shown in Table8.1.2. However,
before calculating, it is necessary to carry out an easy field survey, and decide the item
mentioned to Table8.1.1.
Table8.1.1 Items to make a trial calculation of construction cost
Description
Item
Plan
Maximum Out Put (kW)
Turbine Discharge (m3/s)
Effective Head (m)
Intake Facilities
Height of Dam (m)
Length of Dam (m)
Headrace
Length of Headrace (m)
Penstock
Diameter of Penstock (m)
Distribution
Number of Households (kk)
Distance to the furthest house from P.S

In addition, since indirect costs, such as tax, contractor fee, design cost, and supervisor
fee, are contained in the cost of construction calculated by Fig 8.1.2, when a part of
these indirect costs can be omitted, examination is required separately.

- 8-1 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

Table8.1.2 Method to make a trial calculation of construction cost in Rough Planning Stage

(Rp)
No.
Description
(1) PREPARATORY WORKS

Formulation
{(2)+(3)+(4)+(5)}0.1

(2) CIVIL WORKS


Intake Facilities

Gabion Dam
210,000(HL)
Stone Masonry Dam
785,000(HL)+850,000
Concrete Dam
1,650,000(HL)
Long or Mid-Penstock type
0.504
60,300,000Q

Settling Basin

Remarks
Transportation, Clearing,
Temporally Works
H : Height of Dam(m)
L : Length of Dam(m)
H : Height of Dam(m)
L : Length of Dam(m)
H : Height of Dam(m)
L : Length of Dam(m)
3

Q : Turbine Discharge(m /s)


(Back to System Layout : Page42)

Short Penstock type


0.794
54,200,000Q

Q : Turbine Discharge(m3/s)
(Back to System Layout : Page41)

Headrace

435,000Q0.18L

Q : Turbine Discharge(m3/s)
L : Length of Headrace(m)

Head Tank
Penstock

47,600,000Q
Civil Works
0.571
L
775,000
Pestock
15,000(Unit waight)L
0.456
4,890,000P

Power House Base

0.5

Power House Building


(3) ELECTROMECHANICAL
WORKS

2,460,000P+20,350,000

(4) DISTRIBUTION WORKS

14,300X0.5541

(5) CONSUMER CONNECTION

428,000X+31,900,000

(6) OTHERS

{(2)+(3)+(4)+(5)}0.05
TOTAL

0.56

75,710,000(P/He)

(1)+(2)+(3)+(4)+(5)+(6)

- 8-2 -

Q : Turbine Discharge(m /s)


: Daiameter of Penstock (m)
L : Length of Penstock (m)
L : Length of Penstock (m)
P : Maximum Output(kW)
(Include Tail race)
P : Maximum Output(kW)
Closs flow Turbine T-13
P : Maximum Output(kW)
He : Effective Head(m)
X : Number of Household
2
Distance
X : Number of Household

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

100,000,000

90,000,000

Concrete Dam

(H
L
)

80,000,000

85
)+
(H

st(R

Stone Masonry

t(R

p)
=

78
5,
00

50,000,000

Co

os

40,000,000

Cost (Rp)

p)

60,000,000

0,

=1

00

,65
0

, 00

70,000,000

30,000,000

20,000,000

y=

10,000,000

(H
00
0
,
0
1
2

L)

Gabion Dam

0
0

10

20

30

40

50

60

70

HL

Fig8.1.1 Cost of Intake facilities


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-3 -

80

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

80,000,000

70,000,000

60,000,000

Long or Mid-length Penstock type


0.504

Cost(Rp) =60,300,000Q

Cost (Rp)

50,000,000

40,000,000

30,000,000

Short Penstock type


0.794

Cost(Rp) = 54,200,000Q

20,000,000

10,000,000

0
0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

Q (m /s)

Fig8.1.2 Cost of Settling Basin


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-4 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

500,000

Unit Cost(Rp/m) = 435,000Q

0.18

450,000

Unit Cost (Rp/m)

400,000

350,000

300,000

250,000

200,000
0

0.2

0.4

0.6

0.8

Q (m /s)

Fig8.1.3 Unit Cost of Headrace


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-5 -

1.2

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

70,000,000

0.5

Cost(Rp) = 47,600,000Q
60,000,000

50,000,000

Cost (Rp)

40,000,000

30,000,000

20,000,000

10,000,000

0
0

0.2

0.4

0.6

0.8

Q (m /s)

Fig8.1.4 Cost of Head tank


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-6 -

1.2

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

1,200,000

Cost(Rp) = 775,000

0.571

1,000,000

Cost (Rp)

800,000

600,000

400,000

200,000

0
0.2

0.4

0.6

0.8

1.2

Daiameter of Penstock (m)

Fig8.1.5 Cost of Penstock (Civil Works)


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-7 -

1.4

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

100

90

t=3mm
y = 0.07417 + 0.00133
t=4mm
y = 0.0989 - 0.0021

80

t=5mm
y = 0.1236 + 0.0012

t=5mm

Unit vilume waigth (kg/m)

70

60

t=4mm

50

t=3mm

40

30

20

10

0
100

200

300

400

500

600

700

Daiameter of Penstock (mm)

Fig8.1.6 Unit volume waight of Penstock


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-8 -

800

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

40,000,000
0.456

Cost(Rp) = 4,890,000P
35,000,000

30,000,000

Cost (Rp)

25,000,000

20,000,000

15,000,000

10,000,000

5,000,000

0
0

10

20

30

40

50

60

70

80

P (kW)

Fig8.1.7 Cost of Power house Base


(Inc. Tail race)
Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-9 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

250,000,000

Cost(Rp) = 2,460,000P + 20,350,000

200,000,000

Cost (Rp)

150,000,000

100,000,000

50,000,000

0
0

10

20

30

40

50

60

P (kW)

Fig8.1.8 Cost of Power house builiding


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-10 -

70

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

400,000,000

Cost(Rp) = 75,710,000 (P/He)

0.56

350,000,000

300,000,000

Cost (Rp)

250,000,000

200,000,000

150,000,000

100,000,000

50,000,000

0
0

10

12

P/He

Fig8.1.9 Cost of Electromechanical Works


Notes: For a trial calculation of construction cost in Rough Planning Stage

- 8-11 -

14

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

800,000,000

Cost(Rp) = 14300x

0.5541

700,000,000

600,000,000

Cost (Rp)

500,000,000

400,000,000

300,000,000

200,000,000

100,000,000

0
0

50,000,000

100,000,000

150,000,000

200,000,000

250,000,000

x = (Number of Household) * (Distance) ^ 2

Fig8.1.10 Cost of Distribution Works


Notes: For a trial calculation of construction cost in Rough Planning Stage
- 8-12 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

350,000,000

Cost (Rp) = 428000 x + 31900000


300,000,000

250,000,000

Cost (Rp)

200,000,000

150,000,000

100,000,000

50,000,000

0
0

100

200

300

400

500

600

700

Number of Household

Fig8.1.11 Cost of Consumer Connection


Notes: For a trial calculation of construction cost in Rough Planning Stage
- 8-13 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

8.2 Cost Estimation for Detail Design Stage


Construction cost consists of items as shown in Table8.2.1.
Table8.2.1 Construction Cost
No.
Item
Direct cost of construction
1
PREPARATORY WORKS
2 CIVIL WORKS
3
ELECTRO-MECHANICAL WORKS
4 DISTRIBUTION WORKS
5 CONSUMER CONNECTION
SUB TOTAL(A)
Indirect cost
1 DESIGN FEE
2 SUPERVISOR FEE
3 MANAGEMENT FEE
4 TAX
SUB TOTAL(B)

Cost
Addition item
Addition item
Addition item
Addition item
Addition item

510% of SUB TOTAL(A)


510% of SUB TOTAL(A)
510% of SUB TOTAL(A)
12.5% of SUB TOTAL(A)

TOTAL

8.2.1 Items
Typical items of a direct cost are shown below.
(1) Preparatory works
Preparatory works consist of item as follows.
- Location setting out
- Felling and measurement
- Equipment & materials mobilization
(2) Civil works
Civil works consist of item as follows.
- Intake facilities
- Settling basin
- Headrace
- Head tank

- 8-14 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

Spillway
Penstock and foundation
Powerhouse base
Tailrace
Power house building
Finishing

(3) Electro-mechanical works


Electro-mechanical works consist of item as follows.
-

Turbine
Controller
Dummy load
Generator
Accessories, spare parts and tools
Set up and installation
Transportation and packing
Testing
Pre commissioning trial run

(4) Distribution works


Distribution works consist of item as follows.
- Transmission pole
- Cable
- Transformer
- Accessories
(5) Consumer connection
- Cable
- Switch
- Accessories

- 8-15 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

8.2.2 Quantity
In order to calculate direct cost of construction, it is necessary to calculate the quantity
for every work or material based on design. For example, in case of headrace of
masonry, quantity will be calculated for excavation, foundation rubble stone, stone
masonry, backfill, and plaster like Fig 8.2.1.

Foundation rubble stone


Excavation

Plaster

Fig 8.2.1

Stone masonry

Backfill

The example of works which should be calculatedHeadrace

With a natural thing, these items change according to a kind and the quality of structure.
For example, in Intake, the item that should calculate will be changed according to type
of dam like Table 8.2.2. And in Headrace, the item which should calculate will be
changed according to the quality of the material of Headrace like Table 8.2.3.

Gabion dam
Excavation (m3)
Backfill (m3)
Gabion (m3)

Table 8.2.2 Quantity of dam


Masonry dam
- Excavation (m3)
- Backfill (m3)
- Foundation
Rubble
Stone (m3)
- Stone masonry (m3)
- Plaster (m2)
- Stoplog (m2)
- Gabion (m3)

- 8-16 -

Concrete dam
Excavation (m3)
Backfill (m3)
Sand filling (m3)
Concrete (m3)
Plaster (m2)
Stoplog (m2)
Gabion (m3)

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Simple earth channel


Excavation (m3)

Manual for Micro-hydro power Development


Chapter 8

Table8.2.3 Quantity of headrace


Masonry channel
- Excavation (m3)
- Backfill (m3)
- Foundation
Rubble
Stone (m3)
- Stone masonry (m3)
- Plaster (m2)

Concrete channel
Excavation (m3)
Backfill (m3)
Sand filling (m3)
Concrete (m3)
Plaster (m2)

This is the same for other structures too, and care is taken not to omit ay items that
should be added up based on drawings.Ref 8.1 Breakdown of Construction Cost of
Pilot Project

8.2.3 Unit Cost


Table 8.2.4 shows standard unit cost of civil work of PU. Unit Price of Table 8.2.4 is
price of Tana-Toraja. Since unit cost changes according to various situations of each
area, it is desirable to perform unit cost setup enough in consideration of the local
characteristics.

- 8-17 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

Table8.2.4 Unit cost of PU (Toraja)


Koef.

Unit

Unit Price
(Rp)

Unit Cost
(Rp)

Excavation(m3)
unskill labour
foreman
tools
Total

0.625
0.062
1.000

man
man
ls

15,000
17,500
12,000

22,500
9,375
1,085
12,000
22,460

Backfill (m 3)
unskill labour
foreman
tools
Total

0.192
0.019
1.000

man
man
ls

15,000
17,500
12,000

15,200
2,880
333
12,000
15,213

Sand Filling (m 3)
sand
unskill labour
foreman
Total

1.200
0.150
0.010

m
man
man

40,000
15,000
17,500

50,400
48,000
2,250
175
50,425

Fondation Rubble Stone (m3)


stone
sand
unskill labour
skill labour
foreman
Total

1.200
0.400
1.125
0.563
0.056

m3
m3
man
man
man

50,000
40,000
15,000
25,000
17,500

108,000
60,000
16,000
16,875
14,075
980
107,930

1.200
3.520
0.380
2.250
1.125
0.113
0.017

m3
zak
m3
man
man
man
man

50,000
26,500
40,000
15,000
25,000
30,000
17,500

234,000
60,000
93,280
15,200
33,750
28,125
3,390
298
234,043

Stone Masonry 1:2 (m3)


stone
PC
sand
unskill labour
skill labour
chief labor
foreman
Total

Stone Masonry 1:3 (m3)


stone
PC
sand
unskill labour
skill labour
chief labor
foreman
Total

1.200
2.840
0.400
2.250
1.125
0.113
0.017

m
zak
m3
man
man
man
man

50,000
26,500
40,000
15,000
25,000
30,000
17,500

217,000
60,000
75,260
16,000
33,750
28,125
3,390
298
216,823

Stone Masonry 1:4 (m3)


stone
PC
sand
unskill labour
skill labour
chief labor
foreman
Total

1.200
2.500
0.420
2.250
1.125
0.113
0.017

m3
zak
m3
man
man
man
man

50,000
26,500
40,000
15,000
25,000
30,000
17,500

209,000
60,000
66,250
16,800
33,750
28,125
3,390
298
208,613

- 8-18 -

Remark

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Surface Finish (m2)


PC
sand
meduam skill labour
skill labour
chief labor
foreman
Total
Gabion (m 3)
stone
wire cage
unskill labour
skill labour
foreman
Total
Stoplogs (unit)
wood
carpenter
labour
foreman
tools
Total

Manual for Micro-hydro power Development


Chapter 8

Koef.

Unit

Unit Price
(Rp)

0.237
0.019
0.286
0.214
0.021
0.020

zak
m3
man
man
man
man

26,500
40,000
20,000
25,000
30,000
17,500

1.200
3.500
0.450
0.200
0.020

m
kg
man
man
man

50,000
7,000
15,000
25,000
17,500

0.048
1.000
2.000
0.100
1.000

m3
man
man
man
ls

4,150,000
25,000
15,000
17,500
25,000

Working floor (m 2)
PC
sand for concrete
split/gravel
tools
labour
skill labour
chief labor
foreman
Total

3.956
0.550
0.930
1.000
2.000
0.500
0.050
0.010

zak
m3
m3
ls
man
man
man
man

26,500
50,000
75,000
15,000
15,000
25,000
30,000
17,500

Rainforce Concrete K225(m3)


PC
split/gravel
sand for concrete
labour
skill labour
chief labor
foreman
tools
steel bar concrete
wire
labour for steel concrete
chief for steel concrete
unskill labour
nail
carpenter
chief of carpenter
Total

7.896
0.810
0.490
3.000
0.500
0.050
0.110
1.000
175.0
2.000
6.750
2.250
8.750
4.000
5.000
0.500

zak
m3
m3
man
man
man
man
ls
kg
kg
man
man
man
kg
man
man

26,500
75,000
50,000
15,000
25,000
30,000
17,500
75,000
7,000
9,000
25,000
30,000
15,000
7,500
25,000
30,000

- 8-19 -

Unit Cost
(Rp)

Remark

19,100
6,281
760
5,720
5,350
630
350
19,091
96,600
60,000
24,500
6,750
5,000
350
96,600
281,000
199,200
25,000
30,000
1,750
25,000
280,950
261,000
104,834
27,500
69,750
15,000
30,000
12,500
1,500
175
261,259
2,211,000
209,244
60,750
24,500
45,000
12,500
1,500
1,925 con.+form
75,000
1,225,000
18,000
168,750
67,500
131,250 con.+form
30,000
125,000
15,000
2,210,919

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

[Ref. 8-1 Cross-sectional method to calculate quantity]


It is convenient to use the cross-sectional method when calculating complicated quantities such a
headrace. When you want to calculate the quantity of excavation of headrace as shown in the
following figure, first, you draw a sectional view for every changing point of cross-sectional
form, and the excavation area for every section is calculated using planimeter, etc.

- 8-20 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

Next, you can make the next table from the relation between the area of each section, and
distance.

Section name Excavation Area Average Area

Distance

Volume

2.00m

2.690m

3.00m

4.125m

3.00m

3.735m

2.00m

2.180m

A-A
B-B
C-C
D-D
E-E

1.31 m

1.345m

1.38m

1.375m

1.37m

1.245m

1.12m

1.090m

3
3
3
3

1.06m

Total

12.73m

This cross-sectional method is applicable not only to excavation area but also to calculation
quantities of backfill or masonry.

- 8-21 -

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

Manual for Micro-hydro power Development


Chapter 8

[Ref. 8-2 The example of bill of quantity]


No

Description

PREPARATORY WORKS

II

CIVIL WORKS
1 Intake Facilities include setling basin
a. Excavation
b. Backfill
c. Foundation rubble stone
d. Stone Masonry 1 : 2
e. Plaster
f. Gabions
w
h
2
g. Stoplogs (80 x 100 ) cm
w
h
2
h. Flushing Gate (60 x 210 ) cm
i. Screen

Unit

Quantity

Unit Price
Rp

m
3
m
3
m
3
m
2
m
3
m
unit
unit
2
m
sub total

2
a.
b.
c.
d.
e.
f.

Headrace
Excavation
Backfill
Foundation rubble stone
Stone Masonry 1 : 4
Plaster
Stoplogs (80w x 100h) cm2

m
3
m
3
m
3
m
2
m
unit
sub total

3
a.
b.
c.
d.
e.
f.
g.

Head Tank
Excavation
Backfill
Foundation rubble stone
Stone Masonry 1 : 3
Plaster
w
h
2
Gate (60 x 200 ) cm
Screen

4
a.
b.
c.
d.
e.

Spillway Channel
Excavation
Backfill
Foundation rubble stone
Stone Masonry 1 : 4
Plaster

5
a.
b.
c.
d.
e.
f.
g.
h.
I.
j.
k.
l.

Penstock and Foundation


Excavation
Reinforced Concrete
Working floor
Sand filling
Plaster
Penstock set work
Welded steel
Butterfly valve
Reducer pipe
Clamp penstock
Bend degree angle
Anchor bolt

m
3
m
3
m
3
m
2
m
unit
2
m
sub total
3

m
3
m
3
m
3
m
2
m
sub total
3

m
3
m
3
m
3
m
2
m
1
m
1
m
unit
unit
pcs
pcs
pcs
sub total

- 8-22 -

Amount
Rp

Total Price
Rp

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

No

Description
6
a.
b.
c.
d.
e.
f.
g.
h.

Power House Base + Tail Race


Excavation
Backfill
Sand filling
Working floor
Reinforce Concrete
Foundation rubble stone
Stone Masonry 1 : 4
Surface finish

Unit

Quantity

Manual for Micro-hydro power Development


Chapter 8

Unit Price
Rp

m
3
m
3
m
3
m
3
m
3
m
3
m
2
m
sub total

7 Power House
a. Building

sub total
8
a.
b.
c.

Finishing
Penstock painting
Building Painting
Service Walkway

m
ls
1
m
sub total

III

MECHANICAL & ELECTRICAL


1 Crossflow Turbine
a. Turbine T13 bo. 600 mm
b. Turbine base frame
c. Pulley of turbine
e. Flexible Coupling

unit
unit
unit
unit

f.
g.
h.
I.
j.
k.
l.

unit
unit
unit
unit
ls
ls
unit

Plummer Block Bearing Set


Flat belt
Fence Guard
adapter pipe
Dynamic Balancing
Heat treatment
Pressure gauge

sub total
2 Electronic Load Controller

unit
sub total

3 Ballast Load
a. Air Heater (54 kVA)
b. Housing Ballast

unit
unit
sub total

4
a.
b.
c.

Generator
Syncronous Generator Stamford
Generator base frame
Pulley of generator

unit
unit
unit
sub total

5 Accessories, Spare parts & Tools

unit
sub total

6 Set up & Installation

ls
sub total

7 Transportation & Packaging

ls
sub total

8 Testing (welding)

ls
sub total

9 Pre commissioning Trial Run

ls
sub total

- 8-23 -

Amount
Rp

Total Price
Rp

Study on Rural Energy Supply with Utilization of Renewable Energy


in Rural Areas in the Republic of Indonesia

No
IV

Description

Unit

DISTRIBUTION WORKS
a. Transmission pole
2
b. Twisted Cable 4 * 70 mm
2
c. Twisted Cable 4 * 35 mm
2
d. Twisted Cable 2 * 16 mm
e. Accessories
f. Installation expense

pcs
1
m
1
m
1
m
ls
ls

CONSUMER CONNECTION
2
a. NYM Cable 2 * 1.5 mm
2
b. NYM Cable 3 * 1.5 mm
c. Electric Socket
d. Series Switch
e. Single Switch
f. Connector
g. Service Wedge Clamp
h. Cable Clam
i. Plafond Fitting
j. Hanger Fitting
k. Rosset Wood
l. Cellophane Tape
m. Screw
n. T - dus
o. MCB and housing
2
p. Twisted Cable 2 * 10 mm
q. Grounding
r. Installation Expense
s MCCB Group

m
1
m
pcs
pcs
pcs
pcs
pcs
pack
pcs
pcs
pcs
pcs
pack
pcs
unit
1
m
unit
unit
unit

Quantity

Manual for Micro-hydro power Development


Chapter 8

Unit Price
Rp

Amount
Rp

TOTAL Rp