Beruflich Dokumente
Kultur Dokumente
(Part 1 of 2)
Muharram 1436 H
November 2014 G
Contractors name
Contractors signature
Contractors Seal
Note: The bidders must return all of the tender documents of competition after
being signed and sealed.
CONDITIONS OF BIDDERS
Each applicant for this tender competition must attach the following:
1. Each bidder shall submit with his Tender an initial bank Guarantee of value equal
to one percent of the final value of the bid sum Issued by an approved local Bank,
and should be valid for at least (90) days from the date of opening the tenders.
The reduction of value or period is not allowed ,The bidder shall also provide a
Final Guarantee equal to five percent of the final value of bid during the next 10
days from the date of receiving letter of acceptance, the project name should be
identical to the one mentioned in the advertising.
2. A copy of the Commercial Registration Certificate which is still valid.
3. Copy of classification certificate for Saudi contractors if the value of the tender
subjected to classification requirements this certificate should be still valid and
this classification should cover the tender value, including the constant sums that
are not subject to competition, if any, to be sure that the classification degree
covering the total value of the contract.
4. Copy from certificate of the Commerce Chamber membership which is still valid.
5. Copy from certificate of Zakat & Income organization which is still valid.
6. Copy from certificate of social insurance organization which is still valid.
7. Copy from certificate of commitment & obligation from
organization which is still valid
social insurance
11. The original copy of tender submitting letter signed from the company or
institution owner or the officially authorized person to sign who has the approval
of Chamber of Commerce and in case of partnership the tender should be signed
and sealed form all partners.
12. The purchase receipt of the tender .
13. All prices must be in numbers as well as letters, pricing must be for each item
within every section in the BOQ & for the sum of each section. In case of conflict
between number pricing & lettered, the lettered will be the one to be considered.
14. In case of a company or institution has no intention to participate in this tender, it
has to hand back all tender documents attached with apologizing letter to the
general director before the date of opening the bids.
15. The name & number of the tender (competition) should be written on the tender
envelope edge.
16. According to the instructions the contractor pursuer should be a Saudi national
and holds an official authorization from the company or enterprise and must be
approved by Chamber of Commerce to attend the bid opening and the
transactions.
17. The bidders for this tender should be aware of tenders & procurement
governmental system & its executive regulations before submitting their tender,
and no objection will be accepted for unawareness by the system rules &
regulations.
This can be reviewed by visiting the website of the ministry of finance
(www.mof.gov.sa) system & regulations & which items & instruction will be
applied in awarding of this tender.
18. The bidders should review prices in their bid displayed in letters and in a words to
make sure prices are well recorded as well as the items are accurately typed and
arrangement of tender papers in one file including a letter of total bid value and
make sure that no scratching or modifications and if any it should be signed and
stamped beside. percentage of scratching and modifications should be not more
than 10 % from price list.
19. According to the provisions of article thirty eight in the governmental competition
& procurement system and article sixty two of the executive regulations stated in
the of cabinet (Council of Ministers) number (23) of date 17/01/1428 H &
instructions resulted, the General Directorate of Water in Aseer have the right to
pay the contractor equal (20%) of the total value of the contract provided, but the
value shouldn't exceed amount of fifty million riyals or its equivalent in return for
a bank guarantee equal to this value.
20. The directorate of water have the right to divide the competition after awarding ,
cancellation of some items or reduction to reach to the approved project value in
accordance with the provisions of Article 8 in the executive Regulations of
governmental competition & procurement system.
21. The contractor shall submit with his offer additional copy from bill of quantities
and price lists total value & the value of each item is identical to the original one
and must be sealed with the bidder seal.
Bill of Quantities
Content
Item
Description
From Page
To Page
Tender Attachments
Contents
Preliminaries
25
Page 1/1
Page 1/29
Page 2/1
Page 2/8
Page 3/1
Page 3/7
Page 4/1
Page 4/24
Page 5/1
Page 5/27
Page 6/1
Page 6/7
Page 7/1
Page 7/14
Page 8/1
Page 8/13
Page 9/1
Page 9/14
10
Page 10/1
Page 10/6
11
Page 11/1
Page 11/7
12
Page 12/1
Page 12/16
13
Page 13/1
Page 13/15
14
Page 14/1
Page 14/19
15
Page 15/1
Page 15/13
16
Page 16/1
Page 16/20
17
Page 17/1
Page 17/10
18
Page 18/1
Page 18/10
19
Page 19/1
Page 19/13
20
Page 20/1
Page 20/24
21
Page 21/1
Page 21/5
Summary of Part 1
Page-1
Page-1
Summary of Part 2
Page-1
Page-1
General Summary
Page-1
Page-1
-1-
Description
Bill No.01
Site Work
Unit
Item No
1-1
Quantity
Unit Rate
Previous
Current
Different
Road Works
1-1-1 Excavation (in any type of soil) to shaped the cross section
layers and longitudinal grades as per drawings
m3
5,055
27,000
21,945
m3
480
10,500
10,020
m2
13,920
9,000
-4,920
m2
300
-300
1-1-5 Provide and spread prime coat using liquid asphalt type
MC-30 as per specifications.
m2
13,920
-13,920
1-1-6 Provide and spread tack coat using liquid asphalt type
RC-3000 as per specifications.
1-1-7 Bituminous Concrete Base Course Grading I, Class A, 100mm
Thick
1-1-8 Bituminous Concrete Base Course Grading I, Class A, 150mm
Thick
1-1-9 Provide, prepare and compact 50 mm of hot mix asphalt
concrete wearing surface for road complete as per drawings
and specifications.
1-1-10 Provide and spread prime coat using liquid asphalt type
MC-70 as per specifications.
m2
13,590
-13,590
m2
300
-300
m2
13,590
-13,590
m2
13,590
-13,590
m2
9,000
9,000
Page 1/1
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
1-1-11 Provide and spread tack coat using liquid asphalt type
RC-70 as per specifications.
1-1-12 Bituminous Concrete Base Course Grading 2, Class A, 150mm
Thick
1-1-13 Provide, prepare and compact 50 mm of hot mix asphalt
concrete wearing surface Grading 2, Class A for road complete
as per drawings and specifications.
m2
9,000
9,000
m2
9,000
9,000
m2
9,000
9,000
L.m
2,485
2000
-485
Page 1/2
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
m3
800
800
1-2-2 Grouted riprap lining for the open ditch with thickness 20cm
m2
1,305
1,305
Page 1/3
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-3
Quantity
Unit Rate
Previous
Current
Different
L.m
1,260
-1,260
L.m
230
230
1-3-3 Galvanized steel chain link fence with PVC coated , 2,950 net
height including foundation works as well as excavation
,
backfilling, soil compaction , supply & cast in -situ of sulfate
resistant plain & reinforcement concrete for foundation
,
columns & semelles, isolation of foundation , metal post ,
support, bolts, welding & all necessary items for fixation ,
provided with 3 layer of galvanized steel barbed wire for
climbing preventation & achieve security of all as per
specifications
and drawings
Carried To Summary
of Bill No.1
L.m
150
510
360
Page 1/4
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-3-4 Provide and install steel gates, including the main gate for the
equipment with 7500 mm wide and the small gate for
individuals with 1000 mm wide and the price includes the
work of the installation, bolts, welds and hinges, and all the
accessories needed to finish the work as per specifications and
1-3-5 Provide and install galvanized steel chain link gates with PVC
coated, 2400 net height , with 7500 mm wide and the price
includes the work of the installation , bolts, welds and hinges ,
and all the accessories needed to finish the work as per
specifications and drawings.
1-4
Quantity
Unit Rate
Previous
Current
Different
No.
-1
No.
m2
19,100
10780
-8,320
L.m
1,530
245
-1,285
No.
No.
m2
159
101
9400
0
0
1,130
-159
-101
-8270
-2
Landscape Works
1-4-1 Supply & installation of cement tiles size 400 x 400 x40 mm
complete with mortar and underlayers
1-4-2 Supply & installation of precast concrete curbstones around
green areas complete with all required and necessary works
Supply and plant the following items for planted areas.
Rate includes excavation & backfilling, agricultural soil,
gravel layers, supports, and all materials or activities
required to finish the work as per specifications and
1-4-3 Medium Trees, Ficus benjamina
1-4-4 Tree belt around the site as shown on drawings
1-4-5 Grass
Page 1/5
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
Networks
First:
1-5
1-5-1 110 mm
L.m
475
370
-105
1-5-2 32 mm
L.m
30
25
-5
1-5-3 25 mm
L.m
80
85
1-5-4 25 mm.
No.
-1
1-5-5 32 mm.
No.
No.
-1
Page 1/6
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-6
Quantity
Unit Rate
Previous
Current
Different
1-6-1 25 mm
L.m
175
180
1-6-2 110 mm
L.m
1,000
500
-500
No.
10
13
No.
13
-9
No.
Wash Hydrants
Page 1/7
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
No.
-1
L.m
L.m
No.
20
1,100
9
0
470
8
-20
-630
-1
Fire Network:
1-7
1-7-1 Supply, install and test of fire hose box made of steel
including all accessories mounted on the wall with dimensions
according to drawings and details on drawings. The item shall
include connection to fire network of diameter 63 mm made of
Bronze supplied with a cover and a chain and a hose 63 mm
diameter and 30 m length of working pressure IP/in2 and a
nozzel 65 mm and a fire extingusher 6 kg.
Supply and install ductile iron (DI) pipes with NP 10 .
Works shall include supply, installation and protection of
pipes and accessories, bends and thrust blocks, pressure
tests, cleaning disinfection, surveying, trenches excavation
in all types of soil except rock and providing side safety
guards and signs, backfilling and bidding and all works
needed to complete works as per specifications and
drawings for the following pipe diameters.
1-7-2 200 mm
1-7-3 150 mm
1-7-4 Supply and install fire hydrants NP 10 bars of diameter 150
mm and work shall include supply
, installation, all parts ,
couplings, valves accessories , marker posts and all what is
needed according to specifications and drawings with the
Page 1/8
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
No.
-6
L.m
460
520
60
L.m
320
90
-230
1-8-3 Supply and construct Inspection Chamber of precast / cast in situ concrete with dimensions (600600 mm ) according to
details drawings including excavating in all kind of soil
including rock, backfilling, internal and external coating , stairs
and heavy dutycovers of according to specifications and
drawings and surface reinstatement and all requirements to
complete the works
No.
10
16
Page 1/9
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
No.
11
15
L.m
180
210
30
1-8-6 Interceptor with heavy duty cover for roads drainage with
width 0.4 m and depth 1.2 m and the item shall include all
excavation works in all soil including rock soil and
backfilling, internal and external coating and all requirments to
complete the work.
L.m
15
-15
L.m
150
45
-105
L.m
80
35
-45
1-9
Page 1/10
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
-1
Manhole Works
1-9-3 Supply and construct manholes of precast / cast in-situ
concrete according to details drawings including excavating in
all kind of soil including rock, backfilling, internal and
external coating, stairs and heavy duty covers according to
specifications and drawings and surface reinstatement and all
requirements to complete the works
No.
Page 1/11
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
L.m
105
105
L.m
105
-105
L.m
105
-105
L.m
105
210
105
1-10-5 DN 400 mm
L.m
30
25
-5
L.m
75
-75
1-10-7 DN 600 mm
L.m
60
60
L.m
30
10
-20
Page 1/12
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-10-9 DN 400 mm
1-10-10
1-10-11
1-10-12
1-10-13
1-10-14 DN 600 mm
Pipes from Treated Effluent Pump Station to 3.0 m outside
the WWTP fence
1-10-15 DN 500 mm
1-10-16 DN 100 mm
Pipes from Sludge Holding Tank to Mechanical
Dewatering Building
1-10-17 DN 100 mm
Supply and install interconnecting Carbon Steel pipes NP 6
bar between different treatment units. Works shall include
excavation in all types of soil, supply, installation and
protection of pipes and accessories, bends and thrust
blocks, pressure tests, cleaning, surveying and all works
needed to complete works as per specifications for the
following pipe diameters.
Pipes from outside the wastewater treatment plant to
Potable and Fire water tank:
1-10-18 DN 200 mm.
Quantity
Unit Rate
Previous
Current
Different
L.m
255
190
-65
L.m
L.m
L.m
L.m
0
20
70
55
220
16
0
25
220
-4
-70
-30
L.m
15
15
L.m
L.m
50
60
0
0
-50
-60
L.m
180
150
-30
L.m
15
15
Page 1/13
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Pipes from outside the wastewater treatment plant to
Potable and Fire water tank:
1-10-18 DN 200 mm.
Pipes from Potable and Fire water tank to potable and fire
Pump station:
1-10-19 DN 250 mm.
Supply and install interconnecting Painted Carbon Steel
pipes NP 6 bar between different treatment units. Works
shall include excavation in all types of soil, supply,
installation and protection of pipes and accessories, bends,
pressure tests, cleaning, surveying and all works needed to
complete works as per specifications.
Pipes from Air blower building to Biological Tank
DN 500 mm
DN 400 mm
DN350 mm
DN200 mm
Pipes from Air blower building to Grit & Grease removal
tank
1-10-24 DN 100 mm
Supply and install interconnecting GRP pipes NP
4 bar
between different treatment units . Works shall include
excavation in all types of soil
, supply, installation and
protection of pipes and accessories , bends, pressure tests ,
cleaning, surveying and all works needed to complete
works as per specifications for the following pipe diameters.
1-10-20
1-10-21
1-10-22
1-10-23
Quantity
Unit Rate
Previous
Current
Different
L.m
15
15
L.m
25
25
L.m
L.m
L.m
L.m
65
55
45
35
220
60
40
65
155
5
-5
30
L.m
55
55
L.m
30
60
30
Page 1/14
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Pipes from Equalization Tank to Odor Control System
1-10-25 DN 300 mm
Pipes from Sludge Holding Tank to Odor Control System
1-10-26 DN 300 mm
Supply and install interconnecting uPVC pipes NP
6 bar
between different treatment units . Works shall include
excavation in all types of soil
, supply, installation and
protection of pipes and accessories
, bends and thrust
blocks, pressure tests , cleaning, surveying and all works
needed to complete works as per specifications for the
following pipe diameters.
Pipes from Chlorination Building to Biological tank
1-10-27 DN25 mm
1-11 Flow Meters Chambers :
Supply and install electromagnetic flow meters on lines at
locations shown on drawings and the item shall include
supply, installation of meter and the concrete support
below the meter as per drawings and Specifications. The
item shall also include construction and preparation of the
chamber to allow for installation of RTU to be connected
to automatic control center and all accessories to finish
work as needed for the following meter diameters:
1-11-1 Flowmeter (0-1500 m3/hr) for raw sewage pipe from
equalization tank to fine screens building on DN 400 mm
Quantity
Unit Rate
Previous
Current
Different
L.m
30
60
30
L.m
25
-20
L.m
460
120
-340
No.
Page 1/15
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-12
Quantity
Unit Rate
Previous
Current
Different
No.
No.
No.
Valve Champers
Supply and construct a valve chamber of reinforced concrete
for the electrically operated butterfly valve . pluggable with
scada system including valves, all the accessories, the
excavation and backfill works, internal and external insulation
of the chamber and the supply and installation of valves and
accessories, including flanged Tees connections, as well as
pipes and fittings accessories , electrical panels.. etc. and
concrete base below the valve, covers, stairs and all what is
necessary according to specifications and drawings for the
following diameters :
Page 1/16
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
No.
Page 1/17
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-13
Quantity
Unit Rate
Previous
Current
Different
Electrical Works
Low Tension Cables
NOTE:
cables for second stage for branches feeders shall not be
supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected
in the current stage to facilitate the installation for the
second stage as described in the drawings.
Supply install and connect the following multi-core cables
(CU/XLPE/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire: (but excluding cable
ducting, trenches and excavations)
L.m
200
200
L.m
230
230
L.m
125
280
155
L.m
160
160
L.m
110
95
-15
L.m
110
90
-20
L.m
100
200
100
L.m
140
70
-70
L.m
120
120
Page 1/18
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
L.m
150
150
L.m
145
145
L.m
115
115
L.m
210
230
20
L.m
135
135
L.m
30
30
L.m
60
60
L.m
130
200
70
L.m
220
220
L.m
250
250
No.
Page 1/19
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
1-14
Quantity
Unit Rate
Previous
Current
Different
No.
14
-10
No.
13
-10
L.m
1,100
950
-150
No
L.m
275
100
-175
Electrical Devices
The electrical devices for second stage shall not be supplied
in the current stage but it should be supplied in the second
stage as described in the drawings
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable:
Page 1/20
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
L.m
700
-700
L.m
750
2,200
1,450
L.m
275
350
75
L.m
50
50
L.m
L.m
L.m
L.m
L.m
25
25
1-17-7 Cable duct for 3 x dia 150mm pipes + 4 x dia 50mm pipes.
L.m
25
25
1-17-8 Cable duct for 3 x dia 150mm pipes + 6 x dia 50mm pipes.
L.m
10
10
Page 1/21
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
1-17-9 Cable duct for 6 x dia 100mm pipes + 5 x dia 50mm pipes.
L.m
15
-15
1-17-10 Cable duct for 8 x dia 100mm pipes + 3 x dia 50mm pipes.
L.m
40
-40
1-17-11 Cable duct for 7 x dia 100mm pipes + 5 x dia 50mm pipes.
L.m
36
-36
1-17-12 Cable duct for 5 x dia 100mm pipes + 6 x dia 50mm pipes.
L.m
10
-10
1-17-13 Cable duct for 2 x dia 100mm pipes + 3 x dia 50mm pipes.
L.m
30
-30
L.m
20
-15
L.m
55
-55
1-17-16 Cable duct for 6 x dia 150mm pipes + 6 x dia 100mm pipes +
5 x dia 50mm pipes.
L.m
30
-30
1-17-17 Cable duct for 3 x dia 150mm pipes + 5 x dia 100mm pipes +
6 x dia 50mm pipes.
L.m
25
-25
L.m
20
-20
1-17-19 Cable duct for 7 x dia 100mm pipes + 3 x dia 50mm pipes.
L.m
30
-30
1-17-20 Cable duct for 6 x dia 100mm pipes + 6 x dia 50mm pipes.
L.m
25
-25
1-17-21 Cable duct for 6 x dia 100mm pipes + 4 x dia 50mm pipes.
L.m
30
-30
Page 1/22
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
1-17-22 Cable duct for 5 x dia 100mm pipes + 10 x dia 50mm pipes.
L.m
25
-25
1-17-23 Cable duct for 5 x dia 100mm pipes + 6 x dia 50mm pipes.
L.m
130
-130
1-17-24 Cable duct for 4 x dia 100mm pipes + 5 x dia 50mm pipes.
L.m
15
-15
1-17-25 Cable duct for 4 x dia 100mm pipes + 3 x dia 50mm pipes.
L.m
30
-30
1-17-26 Cable duct for 3 x dia 100mm pipes + 4 x dia 50mm pipes.
L.m
32
-32
1-17-27 Cable duct for 2 x dia 100mm pipes + 6 x dia 50mm pipes.
L.m
-5
1-17-28 Cable duct for 2 x dia 100mm pipes + 5 x dia 50mm pipes.
L.m
10
-10
1-17-29 Cable duct for 2 x dia 100mm pipes + 4 x dia 50mm pipes.
L.m
95
-95
1-17-30 Cable duct for 2 x dia 100mm pipes + 3 x dia 50mm pipes.
L.m
110
-110
L.m
20
-20
L.m
35
20
-15
L.m
200
15
-185
L.m
100
-100
L.m
275
-270
1-17-36 Cable duct for 7 x dia 150mm pipes + 5 x dia 100mm pipes +
8 x dia 50mm
1-17-37 Cable duct for 7 x dia 150mm pipes + 4 x dia 100mm pipes +
7 x dia 50mm
L.m
20
20
L.m
40
40
Page 1/23
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
1-17-38 Cable duct for 7 x dia 150mm pipes + 3 x dia 100mm pipes +
5 x dia 50mm
1-17-39 Cable duct for 7 x dia 150mm pipes + 3 x dia 100mm pipes +
6 x dia 50mm
1-17-40 Cable duct for 12 x dia 150mm pipes + 3 x dia 100mm pipes +
7 x dia 50mm
1-17-41 Cable duct for 10 x dia 150mm pipes + 4 x dia 100mm pipes +
4 x dia 50mm
1-17-42 Cable duct for 9 x dia 150mm pipes + 3 x dia 100mm pipes +
4 x dia 50mm
1-17-43 Cable duct for 5 x dia 150mm pipes + 4 x dia 100mm pipes +3
x dia 50mm
1-17-44 Cable duct for 5 x dia 150mm pipes + 4 x dia 100mm pipes +3
x dia 50mm
1-17-45 Cable duct for 2 x dia 50mm pipes.
L.m
35
35
L.m
30
30
L.m
L.m
L.m
L.m
54
54
L.m
40
40
L.m
55
55
L.m
45
45
L.m
30
30
L.m
15
15
L.m
L.m
60
60
L.m
20
20
L.m
20
20
Page 1/24
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
L.m
10
10
1-17-54 Cable duct for 3 x dia 150mm pipes + 3 x dia 100mm pipes +
4 x dia 50mm
1-17-55 Cable duct for 3 x dia 150mm pipes + 6 x dia 50mm
L.m
30
30
L.m
10
10
L.m
15
15
No.
12
No.
12
23
11
No.
11
10
-1
No.
-2
L.m
15
15
1-17-62 supply & install cable duct bank for 12 x dia 50mm pipes
L.m
-5
1-17-63 supply & install cable duct bank for 9 x dia 50mm pipes
L.m
10
-10
Page 1/25
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
1-17-64 supply & install cable duct bank for 6 x dia 50mm pipes
L.m
28
-28
1-17-65 supply & install cable duct bank for 4 x dia 50mm pipes
L.m
145
-145
1-17-66 supply & install cable duct bank for 3 x dia 50mm pipes
L.m
25
15
-10
1-17-67 supply & install cable duct bank for 2 x dia 50mm pipes
L.m
480
70
-410
1-17-68 supply & install cable duct bank for 1 x dia 50mm pipes
L.m
1,450
-1,450
No.
L.m
1,550
1,100
-450
L.m
4,300
2,800
-1,500
1-18
Lighting Board
Supply, Install and connect the following lighting and pwer
distrubition board complete with main and secondary
circuit.
1-18-1 Type (LP-OL) for site lighting
1-19
Page 1/26
In Number
In Words
Description
Bill No.01
Site Work
Unit
Item No
Quantity
Unit Rate
Previous
Current
Different
No.
160
95
-65
No.
52
25
-27
No.
160
95
-65
No.
52
52
No.
-5
No.
1-20
Page 1/27
In Number
In Words
Bill No.01
Site Work
Total
Description
SR
COLLECTION OF BILL NO.1
Page 1/1
Page 1/2
Page 1/3
Page 1/4
Page 1/5
Page 1/6
Page 1/7
Page 1/8
Page 1/9
Page 1/10
Page 1/11
Page 1/13
Page 1/14
Page 1/15
Page 1/16
Page 1/17
Page 1/18
Page 1/19
Page 1/20
Carried Forward
Page 1/28
Bill No.01
Site Work
Total
Description
SR
Brought Forward
Page 1/21
Page 1/22
Page 1/23
Page 1/24
Page 1/25
Page 1/26
Page 1/27
Page 1/29
Item
No
2-1
Bill No.02
Coarse Screen and Equalization Tank
Description
Unit
Quantity
Unit Rate
m3
m3
3,320
75
3,320
75
0
0
m2
745
745
m3
m3
450
320
450
320
0
0
Page 2/1
In Words
Item
No
Bill No.02
Coarse Screen and Equalization Tank
Description
Unit
Quantity
Unit Rate
m2
130
130
m2
745
745
m2
585
585
Page 2/2
In Words
Item
No
2-4
Bill No.02
Coarse Screen and Equalization Tank
Description
Unit
Quantity
Unit Rate
m2
m2
m2
835
550
62
835
550
62
0
0
0
m2
120
120
m2
90
90
0
0
0
No.
Page 2/3
In Words
Item
No
2-6
2-6-1
2-6-2
2-6-3
2-6-4
2-6-5
2-6-6
2-6-7
2-6-8
2-6-9
2-6-10
2-6-11
2-6-12
2-6-13
2-6-14
Bill No.02
Coarse Screen and Equalization Tank
Description
Mechanical Works:
Wastewater Treatment Equipment & Works
Supply, install and test following items complete with fittings
and all accessories according to drawings and specifications
Notes
All pipes and fittings shall be ductile iron (DI), unless
otherwise mentioned
All pipes and fittings shall be PN-10 rated
Coarse Screen and Equalization Tank works
Manually operated stainless steel (316L) penstock 500 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 400 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 300 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 200 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 150 mm
diam. (non rising)
Double socket collar 500 mm diam.
Double socket collar 400 mm diam.
Double socket collar 300 mm diam.
Double socket collar 200 mm diam.
Double socket collar 150 mm diam.
Double spigot puddle pipe 500 mm diam.
Double spigot puddle pipe 400 mm diam.
Double spigot puddle pipe 300 mm diam.
Double spigot puddle pipe 200 mm diam.
Unit
Quantity
Unit Rate
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
1
1
1
1
1
1
1
1
1
0
0
0
0
0
2
0
0
0
-1
-1
-1
-1
-1
1
-1
-1
-1
Page 2/4
In Words
Item
No
Bill No.02
Coarse Screen and Equalization Tank
Description
Unit
No.
No.
2-6-20
2-6-21
2-6-22
2-6-23
2-6-24
2-7
2-7-1
2-7-2
2-7-3
2-7-4
2-7-5
Quantity
Unit Rate
No.
No.
No.
No.
No.
No.
No.
1
1
3
2
1
1
3
2
0
0
0
0
No.
No.
No.
No.
L.m
L.m
6
1
9
2
6
1
9
2
0
0
0
0
Page 2/5
In Words
Item
No
2-7-6
2-7-7
2-7-8
2-7-9
2-7-10
2-7-11
Bill No.02
Coarse Screen and Equalization Tank
Description
Unit
No.
No.
No.
No.
No.
No.
2-7-12
2-7-13
2-7-14
2-7-15
2-7-16
2-7-17
2-7-18
2-7-19
2-8
2-8-1
Quantity
Unit Rate
No.
No.
No.
No.
No.
No.
No.
No.
4
1
1
7
1
1
1
2
4
1
1
7
1
1
0
2
0
0
0
0
0
0
-1
0
No.
No.
No.
No.
No.
Page 2/6
In Words
Item
No
Bill No.02
Coarse Screen and Equalization Tank
Description
2-9-4 Temp. meter C/W Digital Indicator and Transmital Unit and
all accessories.
2-10 Spare Parts
2-10-1 Impeller
2-10-2 Wearing Ring Set
2-10-3 Mechanical Seal
2-10-4 Pump Bearing Set
2-10-5 Motor Bearing Set
Unit
No.
No.
No.
No.
No.
No.
Quantity
Unit Rate
1
2
2
2
2
Page 2/7
1
2
2
2
2
0
0
0
0
0
In Words
Bill No.02
Coarse Screen and Equalization Tank
Total
Description
SR
COLLECTION OF BILL NO.2
Page 2 / 1
Page 2 / 2
Page 2 / 3
Page 2 / 4
Page 2 / 5
Page 2 / 6
Page 2 / 7
Item
No
Description
3-1
Bill No.03
Fine Screen and Grit Removal
Unit
Quantity
Unit Rate
m3
m3
225
100
225
100
0
0
m2
130
130
m3
80
80
m
m
In Words
Description
Item
No
Bill No.03
Fine Screen and Grit Removal
Unit
Quantity
Unit Rate
m2
55
55
45
45
50
50
13
10
-3
242
242
-2
m2
130
130
m2
390
320
-70
m
m
m
m
m
m
In Words
Item
No
Description
3-4
Unit
Quantity
Unit Rate
Bill No.03
Fine Screen and Grit Removal
m2
m2
345
85
345
85
0
0
m2
50
50
m2
425
425
m2
23
23
L.m
90
90
Steel Work
In Words
Item
No
Description
Bill No.03
Fine Screen and Grit Removal
Unit
Quantity
Unit Rate
3-6
3-6-1
3-6-2
3-6-3
3-6-4
3-6-5
3-6-6
3-6-7
3-6-8
3-6-9
3-6-10
3-6-11
3-6-12
No.
L.m
L.m
L.m
No.
No.
No.
No.
L.m
No.
1
1
6
1
2
1
1
1
2
2
1
1
6
1
2
1
1
1
2
2
0
0
0
0
0
0
0
0
0
0
No.
No.
In Words
Item
No
Description
Bill No.03
Fine Screen and Grit Removal
Unit
Quantity
Unit Rate
No.
No.
No.
3
1
3
1
0
0
No.
No.
No.
No.
No.
12
2
12
2
0
0
No.
No.
No.
L.m
3
3
7
3
3
2
0
0
-5
No.
No.
No.
No.
No.
1
1
1
0
0
0
0
0
1
1
-1
-1
-1
1
1
In Words
Item
No
Description
Bill No.03
Fine Screen and Grit Removal
Unit
Quantity
Unit Rate
L.m
L.m
No.
4
0
1
0
4
1
-4
4
0
In Words
Bill No.03
Fine Screen and Grit Removal
Description
Total
SR
Item
No
Description
4-1
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
m3
7,112
7,112
m3
630
630
m3
56
56
4-2-2 50 mm thick.
m2
114
114
m2
3,000
3,000
Page 4/1
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
4-2-4
4-2-5
4-2-6
4-2-7
4-2-8
4-2-9
4-2-10
4-2-11
4-2-12
4-2-13
4-2-14
4-2-15
4-2-16
4-2-17
4-3
4-3-1
4-3-2
m3
m3
m3
m3
m3
m3
m3
7
1,337
6
17
10
1
13
7
1,337
6
17
10
1
13
0
0
0
0
0
0
0
m2
m2
m2
m2
m3
m3
m3
114
315
290
250
55
1,415
9
114
315
290
250
55
1,415
9
0
0
0
0
0
0
0
m2
m2
114
3,000
114
3,000
0
0
Page 4/2
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
3,675
3,675
m2
114
114
m2
80
80
No.
Page 4/3
In Words
Item
No
4-5
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
m2
150
150
m2
210
210
210
210
L.m
m2
105
210
105
210
0
0
210
210
m2
L.m
m2
105
70
105
70
0
0
m2
140
140
Page 4/4
In Words
Item
No
4-7
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
2
2
2
2
0
0
No.
No.
No.
No.
1
1
2
1
1
2
0
0
0
No.
No.
Page 4/5
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
4-9-3 Supply and install galvanized steel ladder, 2500 mm height, for
Back Pulse Tank.
4-9-4 Supply and Install galvanized steel grating cover including
angels , 800mm wide for trenches .
4-9-5 Supply and Install galvanized steel checkered plate, with anti
corrosion paint
4-9-6 Supply and Install galvanized steel grating, 200mm wide to
cover half round trench.
4-9-7 Supply and install galvanized steel inner handrai with 50 mm
dia., 1100 mm height includes post, Supports & all accessories
required to finish the work.
4-9-8 Supply and install galvanized steel external handrai with
40
mm dia ., 800 mm height includes post
, Supports & all
accessories required to finish the work.
4-10 PLASTER WORK
Internal Plaster
Cement and Sand Plaster as Specified applied in Two Coats:
4-10-1 Walls and Columns.
4-10-2 For ceiling
No.
L.m
15
15
m2
235
235
L.m
26
26
L.m
20
20
L.m
670
670
m2
930
930
450
450
100
100
4,410
4,410
External Plaster
4-10-3 Tylorene plaster rough texture beige color for external walls m2
type (b) including grooves with ornamented aluminum Ushaped.
4-11 Painting Work
Internal
Supply and paint for inner surface of tanks by 3 faces of
epoxy Poly Sulfide according to specifications.
4-11-1 For walls and Columns.
m2
Page 4/6
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
2,200
2,200
180
180
4-11-4 For pump room, electric room and entrance as per drawing.
m2
455
455
L.m
140
140
m2
930
930
m2
450
450
External
supply and paint for external surface and exposed to
atmospheric agents with acrylic paint polyurathen of 4
faces as per specifications .
4-11-8 For external surface
m2
1,120
1,120
Anti-slip epoxy paint for flooring insulator acid & oil &
grease resistant including screed underlayer.
Page 4/7
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
4-12
4-12-1
4-12-2
4-12-3
4-12-4
4-12-5
4-12-6
4-12-7
4-12-8
4-12-9
4-12-10
4-12-11
4-12-12
4-13
4-13-1
Notes
All pipes and fittings shall be stainless steel (SS+ 316L), unless
other wise mentioned ductile iron (DI), unless otherwise
mentioned
All pipes and fittings shall be PN-10 rated
Inlet Piping and Inlet Chamber for aeration tank
Double socket collar 500 mm diam. (DCI).
Flanged and Spigot puddle pipe 500 mm diam.
Pipes connections 500 mm diam. (Various lengthes)
Manually operated stainless steel (316L) penstock (1500*500)
mm.
Manually operated Gate Valve 500 mm diam, flanged type
Dismantling Joint C/W Flanges 500 mm diam, flanged type
Elbow 90 diam. 500 mm. flanged type.
Flanged and Spigot puddle pipe 600 mm diam.
Pipes connections 600 mm diam. (Various lengthes)
Manually operated Gate Valve 600 mm diam, flanged type
Dismantling Joint C/W Flanges 600 mm diam, flanged type
Elbow 90 diam. 600 mm. flanged type.
Anoxic Tank
Submersible Mixer (St.St.316L) complete with 3 KW electrical
motor, guide rails, chain and all accessories.
No.
No.
L.M
No.
1
2
12
2
0
0
0
2
-1
-2
-12
0
No.
No.
No.
No.
L.M
No.
No.
No.
1
1
1
0
0
0
0
0
0
0
0
2
12
1
1
1
-1
-1
-1
2
12
1
1
1
No.
Page 4/8
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
2
1
750
2
1
750
0
0
0
No.
22
22
No.
No.
No.
No.
No.
No.
No.
L.m
No.
No.
No.
3
6
3
6
0
0
4-14-2
4-14-3
4-14-4
4-15
4-15-1
Page 4/9
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
3
3
3
3
3
3
0
0
0
4-15-18
4-15-19
4-15-20
4-15-21
4-15-22
4-16
4-16-1
No.
No.
No.
No.
No.
3
3
3
3
3
3
3
3
3
3
0
0
0
0
0
No.
15
15
L.m
20
20
L.m
15
15
No.
No.
No.
No.
No.
2
4
4
4
2
4
4
4
0
0
0
0
No.
No.
4
4
4
4
0
0
4-16-2
4-16-3
4-17
4-17-1
4-17-2
4-17-3
4-17-4
4-17-5
4-17-6
4-17-7
Page 4/10
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
14
12
14
12
0
0
3
25
3
25
0
0
-1
1
1
1
6
1
2
2
2
1
1
1
6
1
2
2
2
0
0
0
0
0
0
0
0
No.
No.
No.
L.m
2
2
20
2
2
20
0
0
0
Page 4/11
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
4-18-15 Feeding Chlorine Pipes 25 mm diam . C/W all fittings , valves No.
and tees.
4-18-16 Feeding water pipes diameter 200 mm to back pulse tank
L.m
4-19 Cleaning Equipment
4-19-1 Horizontal centrifugal End Suction Pump 25 L/s @ 10 m head No.
C/W electric motor, pressure gauges and all accessories.
No.
No.
L.m
No.
No.
No.
No.
No.
L.m
1
7
2
2
2
8
5
26
1
7
2
2
2
8
5
26
0
0
0
0
0
0
0
0
No.
No.
No.
Page 4/12
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
L.m
L.m
10
10
No.
No.
No.
No.
No.
No.
No.
12
12
No.
Page 4/13
In Words
Item
No
Description
4-22-5
4-22-6
4-22-7
4-22-8
4-22-9
4-22-10
4-22-11
4-23
4-23-1
4-23-2
4-23-3
4-23-4
4-23-5
4-23-6
4-24
4-24-1
4-24-2
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
1
1
3
1
1
1
3
1
0
0
0
0
No.
No.
No.
No.
No.
No.
No.
No.
No.
1
2
2
1
2
2
No.
No.
1
1
1
1
0
0
0
0
0
0
Page 4/14
In Words
Item
No
4-24-3
4-24-4
4-24-5
4-24-6
4-24-7
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
No.
No.
2
2
2
2
2
Page 4/15
2
2
2
2
2
0
0
0
0
0
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
No.
Kg.
700
700
Page 4/16
In Words
Item
No
4-27
4-27-1
4-27-2
4-27-3
4-27-4
4-27-5
4-27-6
4-27-7
4-27-8
4-27-9
4-28
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
No.
No.
No.
No.
No.
No.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
No.
Page 4/17
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
L.m
25
25
L.m
15
15
L.m
45
45
L.m
60
60
L.m
70
70
Page 4/18
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Unit Rate
Quantity
175
175
210
210
Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and Wiring
Between Devices and to panelboard, Contactor or to
lighting Switch panelboards as Applicable:
No.
53
53
No.
No.
No.
Page 4/19
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
No.
No.
No.
No.
1
2
1
2
1
2
1
2
0
0
0
0
No.
No.
No.
No.
4-31-8
4-31-9
4-31-10
4-31-11
4-32
Page 4/20
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Unit Rate
4-32-5 Disconnect switch 3x 20A, IP55, for Valves & flow control &
No.
mixers including conduits and wiring (power and control
wires) up to panel board
4-32-6 Disconnect switch 2x 20A, IP55, for flow meter including
No.
conduits and wiring (power and control wires) up to panel board
4-33
Quantity
25
25
No.
No.
35
35
No.
No.
No.
No.
No.
No.
No.
2
4
2
10
2
4
2
10
0
0
0
0
4-34
4-34-1
4-34-2
4-34-3
4-34-4
Page 4/21
In Words
Item
No
Description
Bill No.04
Biological Tank.
Unit
Quantity
Unit Rate
No.
No.
No.
2
2
1
2
2
1
0
0
0
No.
4-35-2 Supply, install and connect wall mounted telephone outlet RJ 11 No.
including junction box, conduit cover,Cat 3 wires to (TB-BT).
4-35-3 Supply, install and connect wall mounted telephone outlet RJ 11 No.
weather proof including junction box , conduit cover ,Cat 3
wires to (TB-AB2).
4-36 Lightning Protection System
4-36-1 Supply, install and connect complete lightning protection No.
system for the building complete as specified and as per
drawings
4-37 Grounding System
4-37-1 Supply, install and connect a complete service equipment No.
grounding identical to IEC & IEE systems type TNS including
pits, grounding peripheral grid conduit and grounding electrode
conductor, complete as shown on drawings and as specified in
specs.
4-38 SCADA
4-38-1 Supply, install and connect all wiring from RTU unit Including
Device Boxes, Cover Plates and Conduits, complete as shown
on drawings and as specified in Specifications.
No.
Page 4/22
In Words
Bill No.04
Biological Tank.
Total
Description
SR
COLLECTION OF BILL NO.1
Page 4 / 1
Page 4 / 2
Page 4 / 3
Page 4 / 4
Page 4 / 5
Page 4 / 6
Page 4 / 7
Page 4 / 8
Page 4 / 9
Page 4 / 10
Page 4 / 11
Page 4 / 12
Page 4 / 13
Page 4 / 14
Carried Forward
Page 4/23
Bill No.04
Biological Tank.
Total
Description
SR
Brought Forward
Page 4 / 15
Page 4 / 16
Page 4 / 17
Page 4 / 18
Page 4 / 19
Page 4 / 20
Page 4 / 21
Page 4 / 22
Page 4/24
Description
Item No
5-1
5-1-1
5-1-2
5-1-3
5-2
5-2-1
5-2-2
Bill No.05
Treated Effluent Water Pump Station
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
m3
4,610
980
-3,630
600
450
-150
m3
11
11
m2
405
180
-225
560
485
-75
m3
330
75
-255
5-2-4
m3
300
-300
Page 5/1
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
100
0
-100
5-2-5
m3
5-2-6
m3
15
-15
5-2-7
m3
90
-90
5-2-8
m3
5-2-9
25
50
25
350
-350
65
258
193
40
-40
25
-17
m3
68
68
m3
m3
m2
m2
90
80
480
90
92
44
380
0
2
-36
-100
-90
Sundries
upstands and parapets (smooth Concrete)
Gutter ( as Per Structural Drawings ) :
Staircases steps (smooth Concrete)
concrete cantilevers (smooth Concrete)
Concrete pad for mechanical equipments on roof (smooth
Concrete)
m3
No.
m3
m3
m3
15
10
4
2
4
1
9
2
3
2
-14
-1
-2
1
-2
m
m
m
Page 5/2
Item No
5-4
5-4-1
5-4-2
5-4-3
Bill No.05
Treated Effluent Water Pump Station
Description
Waterproofing:
Polythene sheet gauge 1000 laid horizontally under ground
slab.
Prepare surfaces and apply two layers of bituminous
membrane 4 mm thick each and 50 mm thick screed under
trenches and ground slabs.
Prepare surfaces and apply prime coat and 2 coats of cold
bitumen to concrete surfaces Above and around footing ,
around columns necks and tie beams.
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
m2
840
665
-175
m2
440
440
m2
1,800
700
-1,100
Page 5/3
Description
Item No
5-5
5-5-1
5-5-2
Bill No.05
Treated Effluent Water Pump Station
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:
Block 200 mm thick.
m2
325
310
-15
5-6
Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
5-6-1
5-6-2
m2
m2
500
500
420
420
-80
-80
5-6-3
5-6-4
5-6-5
L.m
L.m
m2
160
160
500
145
145
420
-15
-15
-80
5-6-6
m2
500
420
-80
330
280
-50
170
140
-30
5-6-7
5-6-8
m
m
Page 5/4
Item No
5-7
5-7-1
5-7-2
5-7-3
5-7-4
5-7-5
5-7-6
5-7-7
5-8
5-8-1
5-8-2
5-8-3
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Steel Work
Aluminum Doors and Windows
Supply and install complete colored powder coated
aluminum doors & windows units glazed and/or non
glazed, fixed in accordance with the manufacturers
instructions including frames, sub-frames, angles,
channels, glazing, beads, sealant, aluminum infill panels,
fixing accessories including glazing and making good
complete all as shown on drawing:
Type 1 with size 1200 mm width x 1200 mm height.
Type 2 with size 1200 mm width x 1200mm height with sand
trap and fly mesh backing.
Type 3 with size 1200 mm width x 1200 mm height.
Type 4 with size 1000 mm width x 2200 mm height.
Type 5 with size 600 mm width x 600 mm height.
Type 6 with size1200mm width x 1200 mm height.
Type 7 with size 1200mm width x 1200mm height with sand
trap and fly mesh backing.
Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 3200mm width x 2600 mm height
including door size 1100mm width x 2100 mm height .
Door Type 2 with size 2000mm width x 2600 mm height .
Door Type 3 with size 1000mm width x 2200 mm height .
No.
No.
24
4
21
6
-3
2
No.
No.
No.
No.
No.
32
1
2
1
4
29
1
2
1
7
-3
0
0
0
3
No.
No.
No.
1
3
1
2
0
-1
Page 5/5
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
5-8-4
Unit
No.
Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0
No.
L.m
31
31
L.m
47
-47
L.m
45
45
L.m
31
-31
L.m
35
35
No.
No.
L.m
1
1
70
1
1
70
0
0
0
L.m
25
-17
m2
880
680
-200
Page 5/6
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
m2
Unit Rate
Quantity
Previous Current Different In Number
In Words
450
540
90
m2
315
310
-5
m2
m2
22
22
5-12-1
5-12-2
5-13
5-13-1
5-13-2
5-14
m2
L.m
24
22
3
6
-21
-16
L.m
L.m
1
8
1
8
0
0
m2
240
600
360
L.m
170
165
-5
Page 5/7
Bill No.05
Treated Effluent Water Pump Station
Description
Item No
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
m2
860
680
-180
460
540
80
m2
17
-17
Page 5/8
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Mechanical Works:
First: Wastewater Treatment Equipment & Works
Supply, install and test following items complete with
fittings and all accessories according to drawings and
specifications
5-15
5-15-1
5-15-2
5-15-3
5-15-4
5-15-5
5-15-6
5-15-7
5-15-8
5-15-9
5-15-10
5-15-11
5-15-12
Notes
All pipes and fittings shall be ductile iron (DI), unless
otherwise mentioned
All pipes and fittings for suction lines inside building shall be
PN-10 rated
All pipes and fittings for delivery lines inside building shall be
PN-10 rated
Main Suction Header
Pipe connection 600 mm diam. With flanges (variable length)
Tee Connection 600/300 mm diam., flanged type
Tee Connection 600/100 mm diam., flanged type
Tee Connection 600/150 mm diam., flanged type
Drain ball valve 50 mm diam.
Puddle piece 600 mm diam., flanged and spigot type
Dismantling piece 600 mm diam., flanged type
Blind flanged 600 mm diam.
Blind flanged 300 mm diam.
Blind flanged 100 mm diam.
Collar 600 mm diam.
Gate valve 600 mm dia
L.m
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
17
6
3
2
1
1
5
1
3
1
1
0
Page 5/9
17
6
0
2
1
1
5
1
3
0
0
1
0
0
-3
0
0
0
0
0
0
-1
-1
1
Item No
5-16
5-16-1
5-17
5-17-1
5-17-2
5-17-3
5-17-4
5-17-5
5-18
5-18-1
5-18-2
Bill No.05
Treated Effluent Water Pump Station
Description
Group (1): pump to transmission line 500 mm diam . to
(Dalagan tank)
Horizontal Split case Centrifugal pumps discharge 100 l/s with
head 45 m complete with electrically motor , pressure gauges in
suction and delivery pipes , fittings and accessories for erect
and operation
Group (1) Suction pipe line
Double Flanged 90 Elbow 300 mm diam.
Connectin pipes 300 mm diam., flanged type (various lengthes)
Manually operated Gate Valve 300 mm diam.
Dismantling piece 300 mm diam., flanged type
Double Flanged Eccentric reducer 300/ pump suction
Group (1) Delivery pipe line
Double Flanged concentric reducer 250/ pump outlet
Double Flanged Pipe 250 mm diam. (1500 mm Length approx.)
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
L.m
No.
No.
No.
3
8
3
3
3
3
8
3
3
3
0
0
0
0
0
No.
No.
3
3
3
3
0
0
No.
No.
No.
3
3
3
3
3
3
0
0
0
No.
L.m
No.
No.
No.
No.
6
14
3
1
1
3
6
14
3
1
0
3
0
0
0
0
-1
0
Page 5/10
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
5-19
5-21-5
5-21-6
5-21-7
5-21-8
5-21-9
5-21-10
No.
-2
No.
-1
No.
L.m
No.
No.
No.
2
6
2
2
2
0
0
0
0
0
-2
-6
-2
-2
-2
No.
No.
No.
No.
2
2
3
2
0
0
0
0
-2
-2
-3
-2
No.
L.m
No.
No.
No.
No.
3
13
1
1
2
1
0
0
0
0
0
0
-3
-13
-1
-1
-2
-1
Page 5/11
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
L.m
No.
No.
No.
3
6
2
2
2
2
6
2
2
2
-1
0
0
0
0
No.
No.
No.
No.
No.
No.
L.m
No.
No.
No.
No.
2
2
3
2
2
1
7
1
1
2
1
2
2
2
2
2
1
7
1
0
1
1
0
0
-1
0
0
0
0
0
-1
-1
0
Page 5/12
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
-1
No.
-2
No.
No.
No.
7
1
2
5
1
1
-2
0
-1
No.
No.
No.
0
0
0
No.
-1
Page 5/13
Description
Item No
5-28
5-28-1
5-28-2
5-28-3
5-28-4
5-28-5
5-28-6
5-28-7
Bill No.05
Treated Effluent Water Pump Station
Unit
No.
No.
No.
No.
No.
No.
No.
Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
2
2
2
2
2
Page 5/14
1
1
2
2
2
2
2
0
0
0
0
0
0
0
Item No
5-29
5-29-1
5-29-2
5-30
5-30-1
5-30-2
5-30-3
5-30-4
5-30-5
5-31
5-31-1
5-31-2
Bill No.05
Treated Effluent Water Pump Station
Description
Second: Plumbing, Fire Fighting & HVAC Works
Plumbing Fixtures
Supply, Install, Connect and Test the Following Sanitary
Fixtures Complete with Mixers, Angle Valves, Flexible
Connections, Soap Holder, Paper Holder and all Fittings
and Accessories as Specified and as Shown on the
Drawings:
Vitreous china European water closet.
Vitreous china wash basin lavatory.
Drainage Work
Drainage and Vent Pipes
110 mm pipe diameter (PVC)
75 mm pipe diameter (PVC)
50 mm pipe diameter (PVC)
Supply, Install and Test the Following Fittings Complete as
Specified and as Shown on Drawings:
75 mm diameter floor drain
50 mm roof vent cap side wall mounted.
Water Supply
Supply, Install and Test the Following Complete as
Specified and as Shown on Drawings:
Electric water heater 30 liter capacity, 1.5 Kw.
Polyethylene tank with capacity 1000 liter.
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
1
1
1
1
0
0
L.m
L.m
L.m
4
2
5
4
2
5
0
0
0
No.
No.
1
1
1
1
0
0
No.
No.
1
1
1
1
0
0
Page 5/15
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
L.m
L.m
6
5
6
5
0
0
L.m
No.
No.
1
1
1
1
0
0
No.
-2
No.
-2
No.
No.
5-31-6
5-31-7
5-32
5-32-1
Page 5/16
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Fans
Supply, Install and Test the Following Fans, Including
Flanges, Support Framing, Mounting Bolts, Controls and
all Necessary Fixing Accessories and Connection as
Specified and as Shown on Drawings:
5-33-3 Exhaust fans type EXF-01, 7650 CFM, 0.3" WG static
pressure.
5-33-4 Exhaust fans type EXF-01, 3750 CFM, 0.3" WG static
pressure.
5-33-5 Exhaust fans type EXF-02, 70 CFM, 0.1" WG static pressure.
5-33-6 Exhaust fans type EXF-03, 100 CFM, 0.1" WG static pressure.
No.
-4
No.
No.
No.
1
1
1
1
0
0
Page 5/17
Item No
5-34
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Electrical Works
Lighting & Power Panel Boards
Supply, install and connect the following lighting and
power panleboards complete with main, secondary circuit
breakers,earthing network and and all necessary devices as
shown on drawings and as specified:
5-34-1
5-34-2
5-34-3
5-34-4
5-34-5
5-34-6
5-35
No.
No.
No.
No.
No.
No.
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
No.
Page 5/18
Item No
5-36
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Low Tension Cables:Supply install and connect the following multi-core cable
(CU/XLPE/PVC),with necessary ties, glands, cable cleats,
cable trays, including earthing wire:
Note: cables for second stage for branches feeders shall not
be supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected
in the current stage to facilitate the installation for the
second stage as described in the drawings.
L.m
110
110
L.m
200
200
L.m
10
10
L.m
L.m
140
120
140
120
0
0
Page 5/19
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
L.m
5-37-1
5-37-2
5-37-3
5-37-4
5-37-5
Unit Rate
Quantity
Previous Current Different In Number
In Words
60
60
0
L.m
75
75
L.m
10
10
No.
No.
No.
No.
No.
57
12
2
11
1
57
12
2
11
1
0
0
0
0
0
No.
Page 5/20
Item No
5-37-7
5-37-8
5-37-9
5-37-10
5-37-11
5-37-12
5-37-13
5-37-14
5-37-15
5-37-16
5-37-17
5-38
Bill No.05
Treated Effluent Water Pump Station
Description
Supply, Install and Connect the Following devices,
Including Device Boxes, Cover Plates, Conduits and
Wiring to Lighting Points or Receptacles or panelboards
as Applicable:
One way one gang switch.
One way one gang switch (weatherproof).
One way two gang switch.
Two way one gang switch
Lighting switches panel type (LSP-TW)
Douple pole switch 20A for water heater .
Douple pole switch 30A for AC split unit.
Cable outlet for AC split unit .
Cable outlet for water heater.
Flexible Cable outlet for exhaust fan.
Electrical Box for R.T.U
Sundries Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point and all disconnect switches regarding 2nd stage shall
not be supplied in the current stage :
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
2
1
2
4
1
1
4
4
1
2
1
2
1
2
4
1
1
4
4
1
2
1
0
0
0
0
0
0
0
0
0
0
0
No.
No.
Page 5/21
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
2
2
0
No.
No.
No.
No.
No.
No.
No.
Page 5/22
Item No
5-40
5-40-1
5-40-2
5-40-3
5-40-4
5-40-5
5-40-6
5-40-7
5-40-8
5-40-9
5-40-10
5-40-11
5-40-12
5-41
5-41-1
5-41-2
5-41-3
5-41-4
5-41-5
5-41-6
Bill No.05
Treated Effluent Water Pump Station
Description
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :
Type 65 ECA236.
Type 65 SMH150.
Type 65 FMH150.
Type 20 EMA42.
Type 20 ENA24.
Type 65 ECA24.
Type 44 WF118.
Type 65 WF218
Type 44 CF218
Type 20 CF218
Emergency light, type EM2.
Exit light, type EX. (weatherproof)
Fire Alarm System
Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between devices and Fire Alarm Control Unit box (FB).
Manual fire alarm station (weatherproof).
Fire alarm bell (weatherproof).
Manual fire alarm station .
Fire alarm bell .
Optical smoke detector.
Fire alarm Flasher (weatherproof).
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
48
21
5
6
6
3
1
1
1
1
11
1
48
21
5
6
6
3
1
1
1
1
11
1
0
0
0
0
0
0
0
0
0
0
0
0
No.
No.
No.
No.
No.
No.
1
1
3
3
12
1
1
1
3
3
12
1
0
0
0
0
0
0
Page 5/23
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0
1
1
0
No.
No.
No.
No.
No.
No.
No.
No.
Page 5/24
Item No
Bill No.05
Treated Effluent Water Pump Station
Description
5-44 Earthing System for power equipments:5-44-1 Supply, install and connect a complete equipment earthing
network including conductors, earth pits and all accessories as
specified,drawings and per IEC IEE - type " TNS"
5-45 Earthing System for SCADA equipments:5-45-1 Supply, install and connect a complete equipment earthing
network including conductors, earth pits and all accessories as
specified,drawings and per IEC IEE - type " TNS"
5-46 Lightning Protection System
5-46-1 Supply, installand connect lightning protection system for the
whole building complete as specified and as per drawings.
5-47 Control and insturmentaion system.
5-47-1 Supply, install and connect all routes (boxes,conduits,cable
trays) from (RTU) to all Field Instruments) ,control panels and
MCC'S with all accessories as specified and drawings
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
Page 5/25
Bill No.05
Treated Effluent Water Pump Station
Description
Total
SR
Page 5/26
Bill No.05
Treated Effluent Water Pump Station
Description
Total
SR
Brought Forward
Page 5/13
Page 5/14
Page 5/15
Page 5/16
Page 5/17
Page 5/18
Page 5/19
Page 5/20
Page 5/21
Page 5/22
Page 5/23
Page 5/24
Page 5/25
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
6-1
Quantity
Previous
Unit Rate
m3
m3
10,000
200
5,200
428
-4800
228
m2
4,500
3,000
-1500
m3
m3
m3
3,780
2,720
431
1,800
815
75
-1980
-1905
-356
6-2
Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork &Polythene sheet gauge 1000
6-2-1 100 mm thick.
Reinforced In-Situ Concrete
Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn
Formwork, Reinforcement, Mechanical and Electrical
Sleeves and all materials required for all types of concrete
joints (exp., contraction & construction... etc) and
waterstop (if any) . All as Per Structural Drawings:
6-2-2 Foundations (rough concrete)
6-2-3 concrete walls (smooth concrete)
6-2-4 Columns (smooth concrete)
Page 6/1
In Words
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
6-2-5
6-2-6
6-2-7
6-2-8
Quantity
Previous
Unit Rate
m
m3
m3
m3
29
3,780
35
5
14
0
0
0
-15
-3780
-35
-5
m2
13
13
2,500
2500
m2
4,510
3,450
-1060
m2
650
390
-260
Page 6/2
In Words
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
6-4
Quantity
Previous
Unit Rate
m2
m2
m2
7,860
3,700
3,690
2,820
2,340
2,295
-5040
-1360
-1395
m2
2,100
1,165
-935
m2
3,930
2,400
-1530
3,930
2,400
-1530
L.m
m2
m2
L.m
m2
m2
255
3,930
3,930
255
2,630
1,300
200
2,400
2,400
200
1,600
800
-55
-1530
-1530
-55
-1030
-500
6-5
Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
Page 6/3
In Words
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
Quantity
Previous
Unit Rate
No.
-2
No.
-2
No.
-2
No.
No.
-4
No.
No.
-2
No.
L.m
2
0
0
15
-2
15
No.
-2
No.
No.
6
2
0
2
-6
0
Page 6/4
In Words
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
Quantity
Previous
Unit Rate
Mechanical Works
Wastewater Treatment Equipment & Works
Supply, install and test following items complete with all
fitting and accessories
Note
-All pipes, fittings for treated water tanks shall be of ductile
cost iron (DI)
- All pipe fittings for treated water tanks shall be PN-10 rated
6-7 Tank inlet chamber
6-7-1 Collar 300 mm diameter
6-7-2 Elbow 90 diameter 300 mm, flanged Spigot type
No.
No.
2
0
0
2
-2
2
No.
No.
2
2
2
2
0
0
6-7-5
6-7-6
6-7-7
6-7-8
6-7-9
6-8
6-8-1
6-8-2
6-8-3
6-8-4
6-8-5
6-8-6
6-8-7
No.
L.m
No.
No.
No.
2
4
2
2
2
2
10
2
2
2
0
6
0
0
0
No.
No.
No.
No.
No.
No.
No.
2
2
2
2
2
2
2
2
2
2
2
2
2
0
0
0
0
0
0
0
-2
Page 6/5
In Words
Description
Bill No.06
Treated Effluent Water Tank
Unit
Item No
Quantity
Previous
Unit Rate
6-9
6-9-1
6-9-2
6-9-3
Tank overflow
Elbow 90 diameter 400 mm, flanged type
Puddle piece diameter 400 mm, flanged type
Connecting pipes diameter 400 mm, flanged and spigot type
No.
No.
L.m
4
2
10
0
0
0
-4
-2
-10
6-9-4
6-9-6
6-9-5
6-9-9
6-9-7
6-9-8
No.
No.
No.
No.
No.
L.m
2
0
0
0
0
0
0
2
2
2
2
10
-2
2
2
2
2
10
No.
-2
No.
No.
No.
No.
4
2
2
2
4
2
2
0
0
0
0
-2
No.
18
40
22
No.
10
10
6-9-10
6-10
6-10-1
6-10-2
6-10-3
6-10-4
6-11
6-11-1
Page 6/6
In Words
Bill No.06
Treated Effluent Water Tank
Total
Description
SR
COLLECTION OF BILL NO.1
Page 6 / 1
Page 6 / 2
Page 6 / 3
Page 6 / 4
Page 6 / 5
Page 6 / 6
Page 6/7
Bill No.07
Mechanical Dewatering Building
Description
Item No
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
7-1
m3
142
142
77
77
m2
Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork .
44
44
184
165
-19
m3
m3
m2
m2
14
27
100
0
14
25
85
11
0
-2
-15
11
Page 7/1
Item No
7-2-7
7-2-8
7-2-9
7-2-10
Bill No.07
Mechanical Dewatering Building
Description
Unit
m2
m2
m3
m3
7-2-11
7-2-12
7-2-13
7-3
7-3-1
7-3-2
7-3-3
Unit Rate
Quantity
Previous Current Different In Number
In Words
12
12
0
9
11
2
2
2
0
0
2
2
m3
m3
m2
10
21
132
10
19
105
0
-2
-27
m3
No.
m3
4
4
1
4
4
2
0
0
1
m2
120
209
89
m2
85
85
m2
220
220
Page 7/2
Item No
Bill No.07
Mechanical Dewatering Building
Description
Unit
m2
Unit Rate
Quantity
Previous Current Different In Number
In Words
0
12
12
m2
m2
40
40
Page 7/3
Description
Item No
7-6
Bill No.07
Mechanical Dewatering Building
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:
m2
180
180
m2
117
117
Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
117
117
L.m
45
45
L.m
45
45
m2
117
117
m2
117
117
77
77
40
40
m
m
Page 7/4
Description
Item No
7-8
Bill No.07
Mechanical Dewatering Building
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
7-8-3 Type 3 with size 2500mm width x 1200mm height with fly
mesh backing.
No.
7-8-4 Type 4 with size 2500mm width x 1200mm height with fly
mesh backing.
No.
No.
No.
No.
No.
3
0
2
0
0
3
0
2
-3
3
-2
2
m2
12
10
-2
7-9
7-9-1
7-9-2
7-9-3
7-9-4
7-10
7-10-1
Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 1800mm width x 2200 mm height .
Door Type 1 with size 1800mm width x 2500 mm height .
Door Type 2 with size 1000mm width x 2200 mm height .
Door Type 2 with size 1000mm width x 2500 mm height .
Sundries
Supply and Install galvanized steel checkered plate for trenchs.
Page 7/5
Bill No.07
Mechanical Dewatering Building
Description
Item No
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
10
10
0
L.m
L.m
21
21
7-10-4 Supply and install galvanized steel ladder 7350 mm high with
safety cage.
No.
m2
m2
305
105
305
105
0
0
m2
180
180
m2
135
135
L.m
50
50
m2
305
305
105
105
7-11
Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
7-11-1 Walls and Columns.
7-11-2 For ceiling
External Plaster
7-11-3 Tylorene plaster rough texture beige color for external walls
type (b) including cavity is marked by aluminum U-shaped.
7-12
Painting Work
Internal
7-12-1 Epoxy paint for flooring insulator and resistant to acids,
chemicals, oils, grease and anti-slip.
Page 7/6
Item No
Bill No.07
Mechanical Dewatering Building
Description
Mechanical Works
First: Wastewater Treatment Equipment & Works
Supply, install and test following items complete with all
accessories as per specification and drawings
7-13 Equipment
7-13-1 Centrifugal decounter capacity of 35 m3/hr including pipes,
fittings, joints, meters and all accessories and metal works
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
1
1
2
1
1
2
0
0
0
No.
7-13-7 All sludge pipes, polymer dosing pipes and drain pipes
including all fittings inside the building
7-14 Measuring Equipment
7-14-1 Pressure sensor with pressure transmitter with all accessories
ready to be connected to (RTU) and SCADA system
No.
No.
No.
No.
No.
No.
No.
2
2
2
2
2
2
0
0
0
Page 7/7
Item No
Bill No.07
Mechanical Dewatering Building
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
-1
No.
Page 7/8
Item No
7-17
Bill No.07
Mechanical Dewatering Building
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Electrical Works
Lighting & Power Panel Boards
Supply, install and connect the following lighting and
power panleboards complete with main, secondary circuit
breakers,earthing network and and all necessary devices as
shown on drawings and as specified:
No.
No.
1
1
1
1
0
0
No.
L.m
40
40
L.m
10
10
7-19
Low Tension Cables:Supply install and connect the following multi-core cable
(CU/XLPE/PVC),with necessary ties, glands, cable cleats,
cable trays, including earthing wire:
Page 7/9
Item No
Bill No.07
Mechanical Dewatering Building
Description
Unit
L.m
7-20-1
7-20-2
7-20-3
7-20-4
Unit Rate
Quantity
Previous Current Different In Number
In Words
20
20
0
L.m
60
60
L.m
10
10
L.m
40
40
No.
No.
No.
No.
36
1
8
2
36
1
8
2
0
0
0
0
No.
No.
No.
1
1
1
1
0
0
Page 7/10
Item No
7-20-8
7-20-9
7-20-10
7-20-11
7-20-12
7-20-13
7-21
Bill No.07
Mechanical Dewatering Building
Description
Supply, Install and Connect the Following devices,
Including Device Boxes, Cover Plates, Conduits and Wiring
to Lighting Points or Receptacles or panelboards as
Applicable:
One way one gang switch (weatherproof).
One way two gang switch.
One way two gang switch (weatherproof).
two way one gang switch (weatherproof)
two way two gang switch (weatherproof)
Douple pole switch 30A for AC split unit.
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires (except pump cable) Between devices
and main connection point :
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
No.
1
1
1
2
4
1
1
1
1
2
4
1
0
0
0
0
0
0
No.
No.
2
2
2
2
0
0
No.
No.
No.
Page 7/11
Description
Item No
7-22
7-22-1
7-22-2
7-22-3
7-22-4
7-23
7-23-1
7-23-2
7-23-3
7-23-4
7-23-5
7-23-6
7-23-7
7-23-8
7-24
Bill No.07
Mechanical Dewatering Building
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
4
25
4
3
4
25
4
3
0
0
0
0
No.
No.
No.
No.
No.
No.
No.
No.
2
2
1
1
6
1
1
1
2
2
1
1
6
1
1
1
0
0
0
0
0
0
0
0
No.
Page 7/12
Item No
Bill No.07
Mechanical Dewatering Building
Description
Unit
No.
Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0
No.
No.
No.
Page 7/13
Bill No.07
Mechanical Dewatering Building
Total
Description
SR
COLLECTION OF BILL NO.7
Page 7 / 1
Page 7 / 2
Page 7 / 3
Page 7 / 4
Page 7 / 5
Page 7 / 6
Page 7 / 7
Page 7 / 8
Page 7 / 9
Page 7 / 10
Page 7 / 11
Page 7 / 12
Page 7 / 13
Page 7/14
Item No
8-1
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
m3
m3
50
27
50
27
0
0
m2
m2
21
80
21
80
0
0
m3
m3
m3
8
2
4
8
2
4
0
0
0
Page 8/1
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
m3
m2
m3
Quantity
Unit Rate
Previous Current Different In Number
In Words
15
15
0
80
50
-30
1
1
0
8-2-9
8-2-10
8-2-11
8-2-12
8-3
8-3-1
m3
m3
m2
m2
5
17
30
56
5
17
30
56
0
0
0
0
m3
No.
m2
100
100
m2
60
60
m2
78
78
Page 8/2
Description
Item No
8-5
Bill No.08
Air Blower Building for Grit Removal
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
Block Works
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:
m2
135
135
m2
68
68
8-6
Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
8-6-1 Foam concrete 50 mm average thick (30mm min.) for slopes
8-6-2 Waterproofing membrane layer 4 mm thick , including required
overlapping
8-6-3 Ditto but laid vertically
m2
68
68
L.m
47
47
L.m
47
47
m2
68
68
m2
68
68
m2
43
43
m2
25
25
Page 8/3
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
8-7
8-7-1
8-7-2
8-7-3
8-8
8-8-1
8-8-2
8-8-3
8-9
8-9-1
8-9-2 Supply and install galvanized steel ladder 5100 mm high with
safety cage.
8-9-3 Supply and install galvanized steel ladder 3250 mm high.
8-9-4 Galvanized steel bridge with single way, model I (lift), with
the carrying capacity of 1 tons.
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
No.
No.
No.
2
7
12
2
7
12
0
0
0
No.
No.
No.
1
1
1
1
0
0
m2
No.
No.
L.m
1
14
1
14
0
0
Page 8/4
Description
Item No
8-10
Bill No.08
Air Blower Building for Grit Removal
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
m2
2
148
148
61
61
External Plaster
8-10-3 Tylorene plaster rough texture beige color for external walls
type (b) including cavity is marked by aluminum U-shaped.
m2
110
110
m2
85
85
L.m
40
40
m2
148
148
61
61
8-11
Painting Work
Internal
8-11-1 Epoxy paint for flooring insulator and resistant to acids,
chemicals, oils, grease and anti-slip.
8-11-2 Epoxy paint applied on 100 mm high screed base.
Prepare Surfaces and Apply Prime Coat, required Putty
layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.
8-11-3 For plastered walls
8-11-4 For plastered ceiling
Page 8/5
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
Mechanical Works
First: Wastewater Treatment Equipment & Works
Install, supply and test following items complete with all its
accessories as in drawing, and specifications:8-12
Equipment Works
Notes:
- All pipes and fittings inside the air blower building shall be
from epoxy coated carbon steel, unless otherwise mentioned
8-12-1 Air blower with a flow rate of 500 m3/hr and pressure
difference of 0.5 bar including all accessories, fittings, filters,
siliencer and meters on the discharge mainfold as per
specifications and drawings.
No.
No.
No.
No.
No.
No.
No.
No.
2
2
2
2
2
2
2
2
2
2
0
0
0
0
0
8-14
8-14-1
8-14-2
8-14-3
8-14-4
8-14-5
Spare Parts
complete set of o-rings and mechanical seals
complete set of bearing for both motor and blower
Belt convyer set
Complete set of filtration units
Complete set of flexible joints
Page 8/6
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
No.
No.
2
2
2
2
0
0
No.
Page 8/7
Description
Item No
8-17
Bill No.08
Air Blower Building for Grit Removal
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
Electrical Works
Lighting & Power Distribution Boards
Supply, install and connect the following lighting and
power Distribution boards complete with main and
secondary circuit breakers,..etc.
No.
No.
No.
1
1
1
1
0
0
L.m
L.m
10
30
10
30
0
0
8-18
Page 8/8
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
L.m
L.m
10
15
10
15
0
0
8-20-1
8-20-2
8-20-3
8-20-4
8-20-5
No.
No.
No.
No.
No.
17
2
3
2
1
17
2
3
2
1
0
0
0
0
0
No.
No.
1
2
1
2
0
0
No.
No.
No.
No.
2
1
2
2
2
1
2
2
0
0
0
0
Page 8/9
Item No
8-21
8-21-1
8-21-2
8-21-3
8-22
8-22-1
8-22-2
8-22-3
8-22-4
8-22-5
Bill No.08
Air Blower Building for Grit Removal
Description
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point:
Disconnect switch 3x 60A, IP55, for Air Blower including
conduits up to cable outlets.
Disconnect switch 3x 30A, IP55, for over head crane including
conduits and wiring (power and control wires ) up to cable
outlets.
Disconnect switch 2x 30A, IP55, for split unit Ac including
conduits and wiring (power and control wires ) up to cable
outlets.
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :
Type 65SMH150
Type 20ENA24
Type 65WF218
Emergency light, type EM2.
Exit light Unit Type EX, weather proof.
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
No.
No.
No.
4
4
3
5
1
4
4
3
5
1
0
0
0
0
0
Page 8/10
Item No
8-23
8-23-1
8-23-2
8-23-3
8-23-4
8-23-5
8-23-6
8-23-7
8-23-8
8-23-9
8-24
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
No.
No.
No.
No.
No.
No.
No.
No.
No.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
No.
No.
1
1
1
1
0
0
No.
Quantity
Unit Rate
Previous Current Different In Number
In Words
Page 8/11
Item No
Bill No.08
Air Blower Building for Grit Removal
Description
Unit
Quantity
Unit Rate
Previous Current Different In Number
In Words
No.
No.
No.
Page 8/12
Bill No.08
Air Blower Building for Grit Removal
Total
Description
SR
COLLECTION OF BILL NO.8
Page 8 / 1
Page 8 / 2
Page 8 / 3
Page 8 / 4
Page 8 / 5
Page 8 / 6
Page 8 / 7
Page 8 / 8
Page 8 / 9
Page 8 / 10
Page 8 / 11
Page 8 / 12
Page 8/13
Item No
9-1
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-1-1
m3
300
300
9-1-2
m3
100
100
9-2-1
9-2-2
m2
m2
90
300
90
300
0
0
9-2-3
9-2-4
9-2-5
9-2-6
9-2-7
9-2-8
m3
m3
m3
m2
m3
m3
30
25
55
225
5
14
30
25
55
225
5
17
0
0
0
0
0
3
9-2
Item No
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-4-3
m3
m2
m2
m3
20
45
265
30
20
45
265
30
0
0
0
0
m3
No.
8
7
8
7
0
0
m2
390
390
m2
250
250
m2
100
410
310
Item No
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-5
Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified, including bond
beams, bond columns, lintels, sills and jambs:
9-5-1
9-6
m2
300
300
m2
280
280
9-6-2
m2
280
280
9-6-3
9-6-4
9-6-5
9-6-6
9-6-7
9-6-8
L.m
L.m
m2
m2
m2
m2
100
100
280
280
180
100
100
100
280
280
180
100
0
0
0
0
0
0
9-6-1
4 mm thick
, including
Item No
9-7
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-7-1
9-7-2
No.
No.
21
8
21
8
0
0
9-7-3
9-8
No.
24
24
No.
No.
No.
1
1
1
1
1
1
0
0
0
m2
No.
27
1
27
1
0
0
No.
L.m
1
54
1
54
0
0
9-8-1
9-8-2
9-8-3
9-9
9-9-1
9-9-2
9-9-3
9-9-4
Page 9/4
Bill No.09
Air Blower Building for Biological Tank
Description
Item No
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-10
Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
9-10-1 Walls and Columns.
9-10-2 For ceiling
External Plaster
9-10-3 Tylorene plaster rough texture beige color for external walls
type (b) including ornamented aluminum U-shaped.
m2
m2
450
260
450
260
0
0
m2
310
310
m2
315
315
L.m
90
90
m2
m2
450
260
450
260
0
0
9-11
Painting Work
Internal
9-11-1 Antislip epoxy paint for flooring insulator and resistant to
acids, chemicals, oils, grease including screed underlayer.
Item No
9-12
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
Mechanical Works
First: Wastewater Treatment Equipment & Works
Install, supply and test following items complete with all its
accessories as in drawing, and specifications:Equipment Works
Notes:
- All pipes and fittings inside the air blower building shall
be from epoxy coated carbon steel, otherwise mentioned.
No.
No.
No.
No.
No.
No.
No.
No.
No.
2
2
2
2
2
2
2
2
2
2
0
0
0
0
0
9-14
9-14-1
9-14-2
9-14-3
9-14-4
9-14-5
Spare Parts
Complete set of orings and mechanical seals
Complete set of bearing for both motor and blower
Belt convyer set
Complete set of filtration units
Complete set of flexible joints
Bill No.09
Air Blower Building for Biological Tank
Description
Item No
Unit
24
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
Page 9/7
Item No
Bill No.09
Air Blower Building for Biological Tank
Description
Electrical Works
9-17 Lighting&Power Distribution Boards
Supply, install and connect the following lighting and
power Distribution boards complete with main and
secondary circuit breakers..etc.
9-17-1 Type (LP-ABB)
9-18 Motor control center (MCC)
Note:
CBs of branch circuits for second stage equipments shall
not be supplied in this stage, but put spaces in distribution
boards for these CBs as a future extension as per
drawings.
Supply, install and connect the following motor control
centers complete with main and secondary circuit
breakers,contactors,starters,digital instruments, relays,
surge arrestors ,PLC unit, Capacitor Bank and all
necessary conduits, devices and control wires as per
drawings and specifications.
9-18-1 Motor control cenetr MCC-ABB
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
Page 9/8
Item No
9-19
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
L.m
35
35
L.m
30
30
L.m
10
10
L.m
10
10
No.
Item No
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
9-21
Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable:
9-21-1
9-21-2
9-21-3
9-21-4
9-21-5
9-21-6
9-21-7
No.
No.
No.
No.
No.
No.
No.
31
10
2
1
1
1
3
31
10
2
1
1
1
3
0
0
0
0
0
0
0
9-21-8
9-21-9
9-21-10
9-21-11
No.
No.
No.
No.
1
1
2
3
1
1
2
3
0
0
0
0
Page 9/10
Description
Item No
9-22
9-22-1
9-22-2
9-22-3
9-22-4
9-23
9-23-1
9-23-2
9-23-3
9-23-4
9-23-5
Bill No.09
Air Blower Building for Biological Tank
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point:
Note:
All disconnected switches for the second stage shall not be
supplied in the current stage but should be supplied in the
second stage as described in drawings.
Disconnect switch 3x 250A, IP55, for Air Blower.
Disconnect switch 3x 400A, IP55, for Air Blower.
Disconnect switch 3x 30A, IP55, for over head crane.
Disconnect switch 2x 30A, IP65, for split unit Ac including
conduits and wiring (power and control wires ) up to cable
outlets.
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :
Type 65SMH150
Type 20ENA24
Type 65WF218
Emergency light, type EM2.
Exit light Unit Type EXIT, weather proof.
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
3
2
1
3
3
2
1
3
0
0
0
0
No.
No.
No.
No.
No.
15
6
2
7
1
15
6
2
7
1
0
0
0
0
0
Page 9/11
Bill No.09
Air Blower Building for Biological Tank
Description
Item No
9-24
9-24-1
9-24-2
9-24-3
9-24-4
9-24-5
9-24-6
9-24-7
9-24-8
9-24-9
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
No.
No.
No.
No.
No.
No.
No.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
No.
No.
No.
No.
9-25
Page 9/12
Item No
Bill No.09
Air Blower Building for Biological Tank
Description
Unit
Unit Rate
Quantity
Previous Current Different In Number
In Words
No.
No.
Page 9/13
Bill No.09
Air Blower Building for Biological Tank
Total
Description
SR
COLLECTION OF BILL NO.9
Page 9/1
Page 9/2
Page 9/3
Page 9/4
Page 9/5
Page 9/6
Page 9/7
Page 9/8
Page 9/9
Page 9/10
Page 9/11
Page 9/12
Page 9/13
Bill of Quantities
Summary of Part 1 in Volume 3)
Item
Description
From
Page
1/29
2/8
3/7
4/24
5/27
6/7
7/14
8/13
9/14
S.R
Biological Tank.
In Words...............................................
..................................................................
Page -1
Amount
S.R