Sie sind auf Seite 1von 150

Kingdom of Saudi Arabia

Ministry of Water & Electricity

General Directorate for Water


Aseer Region
Project of Studying and Design of Tertiary Wastewater
Treatment Plant in Al-Shaaf District at
Aseer Region - 2
Wastewater Treatment Plant
in Al-Shaaf District
(VOLUME 3 )
BILLS OF QUANTITIES

(Part 1 of 2)

Muharram 1436 H
November 2014 G

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

CONSTRUCTION of Tertiary Treated Sewage Water Plant


in Al Shaaf District at Aseer Region
Contract summary:
The contractor reviewed the attached contract documents competition that contains
1. Condition of contract
2. Bills of quantities
3. Drawings
4. Technical specifications
5. Safety and security methods .
Also the work location & all necessary data for determination of the contract
value.
Total contract value in number
Total contract value in word
Period Of Execution

Twenty Four Arabic month

Contractors name
Contractors signature
Contractors Seal

Note: The bidders must return all of the tender documents of competition after
being signed and sealed.

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Kingdom of Saudi Arabia


Ministry of Electricity & Water
General directorate of Water at Aseer Region
Procurement Department / Competitions

CONDITIONS OF BIDDERS
Each applicant for this tender competition must attach the following:
1. Each bidder shall submit with his Tender an initial bank Guarantee of value equal
to one percent of the final value of the bid sum Issued by an approved local Bank,
and should be valid for at least (90) days from the date of opening the tenders.
The reduction of value or period is not allowed ,The bidder shall also provide a
Final Guarantee equal to five percent of the final value of bid during the next 10
days from the date of receiving letter of acceptance, the project name should be
identical to the one mentioned in the advertising.
2. A copy of the Commercial Registration Certificate which is still valid.
3. Copy of classification certificate for Saudi contractors if the value of the tender
subjected to classification requirements this certificate should be still valid and
this classification should cover the tender value, including the constant sums that
are not subject to competition, if any, to be sure that the classification degree
covering the total value of the contract.
4. Copy from certificate of the Commerce Chamber membership which is still valid.
5. Copy from certificate of Zakat & Income organization which is still valid.
6. Copy from certificate of social insurance organization which is still valid.
7. Copy from certificate of commitment & obligation from
organization which is still valid

social insurance

8. Copy from certificate of (Commitment to bring Saudi labor instead of foreign


one).
9. Copy from the investment license if the bidder was licensed according to the
(foreign investment)
10. In the case of the contractor partnership of a number of contractors It is
imperative that the Partnership of Contractors shall present with their Tender a
copy of the registered partnership agreement and approved from chamber of
commerce on all partners signature with full consideration to full text of article
No. (18) of the Regulations of the system of competition and purchases
government and the application of all provisions of this Article to partnership.

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

11. The original copy of tender submitting letter signed from the company or
institution owner or the officially authorized person to sign who has the approval
of Chamber of Commerce and in case of partnership the tender should be signed
and sealed form all partners.
12. The purchase receipt of the tender .
13. All prices must be in numbers as well as letters, pricing must be for each item
within every section in the BOQ & for the sum of each section. In case of conflict
between number pricing & lettered, the lettered will be the one to be considered.
14. In case of a company or institution has no intention to participate in this tender, it
has to hand back all tender documents attached with apologizing letter to the
general director before the date of opening the bids.
15. The name & number of the tender (competition) should be written on the tender
envelope edge.
16. According to the instructions the contractor pursuer should be a Saudi national
and holds an official authorization from the company or enterprise and must be
approved by Chamber of Commerce to attend the bid opening and the
transactions.
17. The bidders for this tender should be aware of tenders & procurement
governmental system & its executive regulations before submitting their tender,
and no objection will be accepted for unawareness by the system rules &
regulations.
This can be reviewed by visiting the website of the ministry of finance
(www.mof.gov.sa) system & regulations & which items & instruction will be
applied in awarding of this tender.
18. The bidders should review prices in their bid displayed in letters and in a words to
make sure prices are well recorded as well as the items are accurately typed and
arrangement of tender papers in one file including a letter of total bid value and
make sure that no scratching or modifications and if any it should be signed and
stamped beside. percentage of scratching and modifications should be not more
than 10 % from price list.
19. According to the provisions of article thirty eight in the governmental competition
& procurement system and article sixty two of the executive regulations stated in
the of cabinet (Council of Ministers) number (23) of date 17/01/1428 H &
instructions resulted, the General Directorate of Water in Aseer have the right to
pay the contractor equal (20%) of the total value of the contract provided, but the
value shouldn't exceed amount of fifty million riyals or its equivalent in return for
a bank guarantee equal to this value.
20. The directorate of water have the right to divide the competition after awarding ,
cancellation of some items or reduction to reach to the approved project value in
accordance with the provisions of Article 8 in the executive Regulations of
governmental competition & procurement system.

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

21. The contractor shall submit with his offer additional copy from bill of quantities
and price lists total value & the value of each item is identical to the original one
and must be sealed with the bidder seal.

Important note: Any tender envelope that submitted after specified


mentioned time in tender announcement will be rejected

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
InAl-Shaaf District At Aseer Region-2

Bill of Quantities
Content
Item

Description

From Page

To Page

Tender Attachments

Contents

Preliminaries

25

Bill No. (1) Site Work

Page 1/1

Page 1/29

Bill No. (2) Coarse Screen and Equalization Tank

Page 2/1

Page 2/8

Bill No. (3) Fine Screen and Grit Removal Tank

Page 3/1

Page 3/7

Bill No. (4) Biological Tank

Page 4/1

Page 4/24

Bill No. (5) Treated Effluent Water Pump Station

Page 5/1

Page 5/27

Bill No. (6) Treated Effluent Water Tank

Page 6/1

Page 6/7

Bill No. (7) Mechanical Dewatering Building

Page 7/1

Page 7/14

Bill No. (8) Air Blower Building for Grit Removal

Page 8/1

Page 8/13

Bill No. (9) Air Blower Building for Biological Tank

Page 9/1

Page 9/14

10

Bill No. (10) Site Drainage Pumping Station

Page 10/1

Page 10/6

11

Bill No. (11) Fire & Potable Water Tank

Page 11/1

Page 11/7

12

Bill No. (12) Fire & Potable water pump station

Page 12/1

Page 12/16

13

Bill No. (13) Chlorination Building

Page 13/1

Page 13/15

14

Bill No. (14) Power House

Page 14/1

Page 14/19

15

Bill No. (15) SCADA Building

Page 15/1

Page 15/13

16

Bill No. (16) Administration Building

Page 16/1

Page 16/20

17

Bill No. (17) Store and Workshop

Page 17/1

Page 17/10

18

Bill No. (18) Security Room

Page 18/1

Page 18/10

19

Bill No. (19) Guard House

Page 19/1

Page 19/13

20

Bill No. (20) R.O. Unit

Page 20/1

Page 20/24

21

Bill No. (21) SCADA System

Page 21/1

Page 21/5

Summary of Part 1

Page-1

Page-1

Summary of Part 2

Page-1

Page-1

General Summary

Page-1

Page-1

-1-

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-1

Quantity

Unit Rate

Previous

Current

Different

Road Works

1-1-1 Excavation (in any type of soil) to shaped the cross section
layers and longitudinal grades as per drawings

m3

5,055

27,000

21,945

1-1-2 Filling with suitable excavated material including leveling and


compaction with approved materials as per drawings and
specifications
1-1-3 provide and compact a granular base course layer 300 mm
thick after compacted including a compacted subgrade 300mm
thick as per drawings and specifications.
1-1-4 Cement Concrete paving layer thickness of 27 cm according to
the elevations and thicknesses and cross sections shown on
drawings and in accordance with the specifications.

m3

480

10,500

10,020

m2

13,920

9,000

-4,920

m2

300

-300

1-1-5 Provide and spread prime coat using liquid asphalt type
MC-30 as per specifications.

m2

13,920

-13,920

1-1-6 Provide and spread tack coat using liquid asphalt type
RC-3000 as per specifications.
1-1-7 Bituminous Concrete Base Course Grading I, Class A, 100mm
Thick
1-1-8 Bituminous Concrete Base Course Grading I, Class A, 150mm
Thick
1-1-9 Provide, prepare and compact 50 mm of hot mix asphalt
concrete wearing surface for road complete as per drawings
and specifications.
1-1-10 Provide and spread prime coat using liquid asphalt type
MC-70 as per specifications.

m2

13,590

-13,590

m2

300

-300

m2

13,590

-13,590

m2

13,590

-13,590

m2

9,000

9,000

Carried To Summary of Bill No.1

Page 1/1

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-1-11 Provide and spread tack coat using liquid asphalt type
RC-70 as per specifications.
1-1-12 Bituminous Concrete Base Course Grading 2, Class A, 150mm
Thick
1-1-13 Provide, prepare and compact 50 mm of hot mix asphalt
concrete wearing surface Grading 2, Class A for road complete
as per drawings and specifications.

m2

9,000

9,000

m2

9,000

9,000

m2

9,000

9,000

1-1-14 cast in-situ Concrete Curb as typical drawings and


specifications

L.m

2,485

2000

-485

Carried To Summary of Bill No.1

Page 1/2

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-2 Open Ditch


1-2-1 Excavation works for the open ditch with internal dimensions
as shown in the drawing including all soil and rocks types

m3

800

800

1-2-2 Grouted riprap lining for the open ditch with thickness 20cm

m2

1,305

1,305

Carried To Summary of Bill No.1

Page 1/3

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-3

Quantity

Unit Rate

Previous

Current

Different

Fences and Gates Works

1-3-1 External masonry fence with 4,000 mm bay width, 3,000 mm


net height including foundation work as well as excavation,
backfilling & soil compaction, supply & cast in-situ plain &
reinforcement concrete for foundation, columns, semelles,
posts & the price include smooth finished concrete for
reinforcement concrete elements above ground level & sulfate
resistant concrete for underground elements, foundation
isolation, cavity block work with 200 mm thick, taralwin
screed with cement category (B) for both face of blocks
including making necessary grooves & fixation of aluminum
ornamented with (U) shape as per drawings & specifications.

L.m

1,260

-1,260

1-3-2 Construction of external precast concrete fence units of 180


mm thick, consist of bays with 4000 mm width & 3000 mm net
height, which have the logo of general directorate of water
grooved on it, including excavation, backfilling, plain & sulfat
resistant reinforcement concrete for concrete element
underground & smooth reinforcement concrete for element
above ground, isolation for foundation, plastering, painting,
masonry work around gates as per drawings

L.m

230

230

1-3-3 Galvanized steel chain link fence with PVC coated , 2,950 net
height including foundation works as well as excavation
,
backfilling, soil compaction , supply & cast in -situ of sulfate
resistant plain & reinforcement concrete for foundation
,
columns & semelles, isolation of foundation , metal post ,
support, bolts, welding & all necessary items for fixation ,
provided with 3 layer of galvanized steel barbed wire for
climbing preventation & achieve security of all as per
specifications
and drawings
Carried To Summary
of Bill No.1

L.m

150

510

360

Page 1/4

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-3-4 Provide and install steel gates, including the main gate for the
equipment with 7500 mm wide and the small gate for
individuals with 1000 mm wide and the price includes the
work of the installation, bolts, welds and hinges, and all the
accessories needed to finish the work as per specifications and
1-3-5 Provide and install galvanized steel chain link gates with PVC
coated, 2400 net height , with 7500 mm wide and the price
includes the work of the installation , bolts, welds and hinges ,
and all the accessories needed to finish the work as per
specifications and drawings.
1-4

Quantity

Unit Rate

Previous

Current

Different

No.

-1

No.

m2

19,100

10780

-8,320

L.m

1,530

245

-1,285

No.
No.
m2

159
101
9400

0
0
1,130

-159
-101
-8270

-2

Landscape Works

1-4-1 Supply & installation of cement tiles size 400 x 400 x40 mm
complete with mortar and underlayers
1-4-2 Supply & installation of precast concrete curbstones around
green areas complete with all required and necessary works
Supply and plant the following items for planted areas.
Rate includes excavation & backfilling, agricultural soil,
gravel layers, supports, and all materials or activities
required to finish the work as per specifications and
1-4-3 Medium Trees, Ficus benjamina
1-4-4 Tree belt around the site as shown on drawings
1-4-5 Grass

Carried To Summary of Bill No.1

Page 1/5

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

Networks
First:
1-5

Potable Water Network:


Supply and install uPVC with NP 10 . Works shall include
supply, installation and protection of pipes and accessories,
bends and thrust blocks, pressure tests, cleaning
disinfection, surveying, trenches excavation in all types of
soil including rock and providing side safety guards and
signs, backfilling and bidding and all works needed to
complete works as per specifications and drawings for the
following pipe diameters.

1-5-1 110 mm

L.m

475

370

-105

1-5-2 32 mm

L.m

30

25

-5

1-5-3 25 mm

L.m

80

85

1-5-4 25 mm.

No.

-1

1-5-5 32 mm.

No.

1-5-6 110 mm.

No.

-1

Supply and install Ball valve with NP


10 bars on water
mains and work shall include supply and installation of all
valve accessories , couplings, marker posts and concrete
base below the valve and all what is necessary according to
specifications and drawings for the following diameters:

Carried To Summary of Bill No.1

Page 1/6

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-6

Quantity

Unit Rate

Previous

Current

Different

Irrigation & Tanks Wash Water Network:


Supply and install uPVC with NP 10 . Works shall include
supply, installation and protection of pipes and accessories,
bends and thrust blocks, pressure tests, cleaning
disinfection, surveying, trenches excavation in all types of
soil including rock and providing side safety guards and
signs, backfilling and bidding and all works needed to
complete works as per specifications and drawings for the
following pipe diameters.

1-6-1 25 mm

L.m

175

180

1-6-2 110 mm

L.m

1,000

500

-500

1-6-3 Supply and install wash hydrants of diameter 25mm on water


mains and work shall include supply and installation of all
accessories according to specifications:
Irrigation Hydrants

No.

10

13

1-6-4 Supply and install irrigation hydrants of diameter 25 mm on


water mains and work shall include supply and installation of
all accessories according to specifications:

No.

13

-9

No.

Wash Hydrants

Supply and install Ball valve with NP 10 bars on water


mains and work shall include supply and installation of all
valve accessories, couplings, marker posts and concrete
base below the valve and all what is necessary according to
specifications and drawings for the following diameters:
1-6-5 110 mm.
Carried To Summary of Bill No.1

Page 1/7

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

No.

-1

L.m
L.m
No.

20
1,100
9

0
470
8

-20
-630
-1

Fire Network:
1-7

Fire Hose Boxes

1-7-1 Supply, install and test of fire hose box made of steel
including all accessories mounted on the wall with dimensions
according to drawings and details on drawings. The item shall
include connection to fire network of diameter 63 mm made of
Bronze supplied with a cover and a chain and a hose 63 mm
diameter and 30 m length of working pressure IP/in2 and a
nozzel 65 mm and a fire extingusher 6 kg.
Supply and install ductile iron (DI) pipes with NP 10 .
Works shall include supply, installation and protection of
pipes and accessories, bends and thrust blocks, pressure
tests, cleaning disinfection, surveying, trenches excavation
in all types of soil except rock and providing side safety
guards and signs, backfilling and bidding and all works
needed to complete works as per specifications and
drawings for the following pipe diameters.
1-7-2 200 mm
1-7-3 150 mm
1-7-4 Supply and install fire hydrants NP 10 bars of diameter 150
mm and work shall include supply
, installation, all parts ,
couplings, valves accessories , marker posts and all what is
needed according to specifications and drawings with the

Carried To Summary of Bill No.1

Page 1/8

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

No.

-6

1-8-1 Diameter 200 mm

L.m

460

520

60

1-8-2 Diameter 150 mm

L.m

320

90

-230

1-8-3 Supply and construct Inspection Chamber of precast / cast in situ concrete with dimensions (600600 mm ) according to
details drawings including excavating in all kind of soil
including rock, backfilling, internal and external coating , stairs
and heavy dutycovers of according to specifications and
drawings and surface reinstatement and all requirements to
complete the works

No.

10

16

1-7-5 Supply and Construct reinforced concrete chamber for gate


valves of diameter 150 mm as shown on drawings and in
specifications.
Work shall include valves
, excavation,
backfilling, reinforced and plain concrete works , insulation,
supply and , installation of covers and stairs and all acessories
and pipes needed to connect valves in addition to surface
reinstatement. The item also shall include proper installation
and construction of the chamber for RTU connection to
SCADA System and all requirements needed to finish work.
1-8

Site Drainage & Sewage Network:


Supply and construct uPVC sewer connections to the
manholes according to drawings. Work shall include all
connections, with socket and spigot flexible joints excavating
in all kind of soil including rock, backfilling, bedding, surfaces
reinstatement, removal of excavated material, secure the site
with safety guards, for the following diameters:

Carried To Summary of Bill No.1

Page 1/9

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-8-4 Supply and construct manholes of precast / cast in-situ


concrete according to details drawings including excavating in
all kind of soil including rock, backfilling, internal and
external coating, stairs and heavy duty covers according to
specifications and drawings and surface reinstatement and all
requirements to complete the works

No.

11

15

1-8-5 Supply and construct High Density Poly Ethelene (HPDE)


sewage force main connecting the site drainage pump station
to the inlet head works. Work shall include excavation in all
kind of soil including rock, backfilling, bedding, surfaces
reinstatement, removal of excavated material, secure the site
with safety guards, including all connection works for
diameter 150 mm:

L.m

180

210

30

1-8-6 Interceptor with heavy duty cover for roads drainage with
width 0.4 m and depth 1.2 m and the item shall include all
excavation works in all soil including rock soil and
backfilling, internal and external coating and all requirments to
complete the work.

L.m

15

-15

1-9-1 Diameter 400 mm

L.m

150

45

-105

1-9-2 Diameter 600 mm

L.m

80

35

-45

1-9

Tanks Overflow Network:


Supply and construct PVC sewer connections to the
manholes according to drawings. Work shall include all
connections, with socket and spigot flexible joints
excavating in all kind of soil including rock, backfilling,
bedding, surfaces reinstatement, removal of excavated
material, secure the site with safety guards, for the
following diameters:

Carried To Summary of Bill No.1

Page 1/10

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

-1

Manhole Works
1-9-3 Supply and construct manholes of precast / cast in-situ
concrete according to details drawings including excavating in
all kind of soil including rock, backfilling, internal and
external coating, stairs and heavy duty covers according to
specifications and drawings and surface reinstatement and all
requirements to complete the works

No.

Carried To Summary of Bill No.1

Page 1/11

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

Second:Interconnecting Pipes between process Units


1-10

Site Interconnecting pipes


Supply and install interconnecting Ductile Iron (DI) - K9
pipes NP 10 bar between different treatment units. Works
shall include excavation in all types of soil, supply,
installation and protection of pipes and accessories, bends
and thrust blocks, pressure tests, cleaning, surveying and
all works needed to complete works as per specifications
for the following pipe diameters.

Pipes from outside the wastewater treatment plant to


Coarse screen inlet chamber:
1-10-1 DN 150 mm.

L.m

105

105

1-10-2 DN 300 mm.

L.m

105

-105

1-10-3 DN 400 mm.

L.m

105

-105

1-10-4 DN 500 mm.

L.m

105

210

105

1-10-5 DN 400 mm

L.m

30

25

-5

Pipes from Grit and grease removal chamber to Biological


tank
1-10-6 DN 500 mm

L.m

75

-75

1-10-7 DN 600 mm

L.m

60

60

L.m

30

10

-20

Pipes between equalization tank and Fine screens

Pipes from Biological Tank to Treated Effluent Tanks


1-10-8 DN 300 mm
Carried To Summary of Bill No.1

Page 1/12

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-10-9 DN 400 mm

1-10-10
1-10-11
1-10-12
1-10-13

Pipes from Treated Effluent Tanks to Treated Effluent


Pump Station
DN 300 mm
DN 400 mm
DN 500 mm
DN 600 mm
Pipes from Treated Effluent Tanks to Proposed Treated
Effluent Pump Station

1-10-14 DN 600 mm
Pipes from Treated Effluent Pump Station to 3.0 m outside
the WWTP fence
1-10-15 DN 500 mm
1-10-16 DN 100 mm
Pipes from Sludge Holding Tank to Mechanical
Dewatering Building
1-10-17 DN 100 mm
Supply and install interconnecting Carbon Steel pipes NP 6
bar between different treatment units. Works shall include
excavation in all types of soil, supply, installation and
protection of pipes and accessories, bends and thrust
blocks, pressure tests, cleaning, surveying and all works
needed to complete works as per specifications for the
following pipe diameters.
Pipes from outside the wastewater treatment plant to
Potable and Fire water tank:
1-10-18 DN 200 mm.

Quantity

Unit Rate

Previous

Current

Different

L.m

255

190

-65

L.m
L.m
L.m
L.m

0
20
70
55

220
16
0
25

220
-4
-70
-30

L.m

15

15

L.m
L.m

50
60

0
0

-50
-60

L.m

180

150

-30

L.m

15

15

Carried To Summary of Bill No.1

Page 1/13

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
Pipes from outside the wastewater treatment plant to
Potable and Fire water tank:
1-10-18 DN 200 mm.
Pipes from Potable and Fire water tank to potable and fire
Pump station:
1-10-19 DN 250 mm.
Supply and install interconnecting Painted Carbon Steel
pipes NP 6 bar between different treatment units. Works
shall include excavation in all types of soil, supply,
installation and protection of pipes and accessories, bends,
pressure tests, cleaning, surveying and all works needed to
complete works as per specifications.
Pipes from Air blower building to Biological Tank
DN 500 mm
DN 400 mm
DN350 mm
DN200 mm
Pipes from Air blower building to Grit & Grease removal
tank
1-10-24 DN 100 mm
Supply and install interconnecting GRP pipes NP
4 bar
between different treatment units . Works shall include
excavation in all types of soil
, supply, installation and
protection of pipes and accessories , bends, pressure tests ,
cleaning, surveying and all works needed to complete
works as per specifications for the following pipe diameters.
1-10-20
1-10-21
1-10-22
1-10-23

Pipes from Equalization Tank to Odor Control System


1-10-25 DN 300 mm
Carried To Summary of Bill No.1

Quantity

Unit Rate

Previous

Current

Different

L.m

15

15

L.m

25

25

L.m
L.m
L.m
L.m

65
55
45
35

220
60
40
65

155
5
-5
30

L.m

55

55

L.m

30

60

30

Page 1/14

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
Pipes from Equalization Tank to Odor Control System
1-10-25 DN 300 mm
Pipes from Sludge Holding Tank to Odor Control System
1-10-26 DN 300 mm
Supply and install interconnecting uPVC pipes NP
6 bar
between different treatment units . Works shall include
excavation in all types of soil
, supply, installation and
protection of pipes and accessories
, bends and thrust
blocks, pressure tests , cleaning, surveying and all works
needed to complete works as per specifications for the
following pipe diameters.
Pipes from Chlorination Building to Biological tank
1-10-27 DN25 mm
1-11 Flow Meters Chambers :
Supply and install electromagnetic flow meters on lines at
locations shown on drawings and the item shall include
supply, installation of meter and the concrete support
below the meter as per drawings and Specifications. The
item shall also include construction and preparation of the
chamber to allow for installation of RTU to be connected
to automatic control center and all accessories to finish
work as needed for the following meter diameters:
1-11-1 Flowmeter (0-1500 m3/hr) for raw sewage pipe from
equalization tank to fine screens building on DN 400 mm

Quantity

Unit Rate

Previous

Current

Different

L.m

30

60

30

L.m

25

-20

L.m

460

120

-340

No.

Carried To Summary of Bill No.1

Page 1/15

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-12

Quantity

Unit Rate

Previous

Current

Different

No.

No.

No.

Valve Champers
Supply and construct a valve chamber of reinforced concrete
for the electrically operated butterfly valve . pluggable with
scada system including valves, all the accessories, the
excavation and backfill works, internal and external insulation
of the chamber and the supply and installation of valves and
accessories, including flanged Tees connections, as well as
pipes and fittings accessories , electrical panels.. etc. and
concrete base below the valve, covers, stairs and all what is
necessary according to specifications and drawings for the
following diameters :

1-12-1 Valve Champers with average dimensions 2.0x1.8 m and


average depth 2.0m for shut off valve with diameter 500 mm
and NP 10 Bar
1-12-2 Valve Champers with average dimensions 2.0x1.8 m and
average depth 2.0m for shut off valve with diameter 400 mm
and NP 10 Bar
1-12-3 Valve Champers with average dimensions 2.0x1.8 m and
average depth 2.0m for shut off valve with diameter 250 mm
and NP 10 Bar

Carried To Summary of Bill No.1

Page 1/16

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

Supply and construct a valve chamber of reinforced concrete


for the electrically operated gate valve. pluggable with scada
system including valves, all the accessories, the excavation
and backfill works, internal and external insulation of the
chamber and the supply and installation of valves and
accessories, including flanged Tees connections, as well as
pipes and fittings accessories , electrical panels.. etc. and
concrete base below the valve, covers, stairs and all what is
necessary according to specifications and drawings for the
following diameters :
1-12-4 Valve Champers with average dimensions 2.0x1.8 m and
average depth 2.0m for shut off valve with diameter 300 mm
and NP 10 Bar

No.

Carried To Summary of Bill No.1

Page 1/17

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

1-13

Quantity

Unit Rate

Previous

Current

Different

Electrical Works
Low Tension Cables
NOTE:
cables for second stage for branches feeders shall not be
supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected
in the current stage to facilitate the installation for the
second stage as described in the drawings.
Supply install and connect the following multi-core cables
(CU/XLPE/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire: (but excluding cable
ducting, trenches and excavations)

1-13-1 Cable (3 x 70 mm2+E=35 mm2) (from TR1 to Fire Pump).


1-13-2 Cable 2x(4 x 120 mm2+E=70 mm2) (from MDB-1 to MCC-1).

L.m

200

200

L.m

230

230

1-13-3 Cable 2(4 x 240 mm 2+E=120 mm 2) (from MDB -2 to MCC MDB).


1-13-4 Cable 4 x 120 mm2+E=70 mm2 (from MDB-2 to MCC-FPP).

L.m

125

280

155

L.m

160

160

1-13-5 Cable 2x(4 x 240 mm 2+E=120mm2) (from MDB -2 to MCC AR).


1-13-6 Cable (4 x 240 mm 2+E=120mm2) (from MDB -2 to MCC MBR).
1-13-7 Cable 4x(4 x 240 mm 2+E=120 mm 2) (from MDB -1 to MCC ABB).
1-13-8 Cable (4 x 70 mm2+E=35 mm2) (from MDB-2 to LP-AD).

L.m

110

95

-15

L.m

110

90

-20

L.m

100

200

100

L.m

140

70

-70

1-13-9 Cable (4 x 16 mm2+E=16mm2) (from MDB-2 to LP-SC).

L.m

120

120

Carried To Summary of Bill No.1

Page 1/18

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-13-10 Cable 2x(4 x 240 mm 2+E=120mm2) (from MDB -2 to MCC RO).


1-13-11 Cable 2x(4 x 240 mm 2+E=120mm2) (from MDB -2 to
EXISTING PUMP STATION.
1-13-12 Cable 4x(4 x 240 mm 2+E=120 mm 2) (from MDB -1 to MCC TW).
Supply install and connect the following multi-core cables
(CU/PVC/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC): (but
excluding cable ducting, trenches and excavations)

L.m

150

150

L.m

145

145

L.m

115

115

1-13-13 Cable 4 x10 mm2 + E=10 mm2 (from MDB-2 to DP-CL)


1-13-14 Cable 4 x10 mm2 + E=10 mm2 (from MDB-1 to, LP-OL, PCPDS LP-PH).
1-13-15 Cable 4 x6 mm2 + E=6 mm2 (from MDB-1 to LP-WS).

L.m

210

230

20

L.m

135

135

L.m

30

30

1-13-16 Cable 4 x10 mm2 + E=10 mm2 (from MDB-2 to LP-GH).


1-13-17 Cable 4 x10 mm 2 + E=10 mm 2 (from MCC-1 to Grit removal
and Fine screen) & (from MCC-MD to PCP-DS)
1-13-18 Cable 3 x10 mm 2 + E=10 mm 2 (from MCC-1 to Equalization
pump).
1-13-19 Cable 3 x6 mm 2 + E=6 mm 2 (from MCC-1 to Jib crane and
Submersible mixers).
1-13-20 Cable outlet box, Galvanized metal inside flow meter
chambers for feeding flow meter.

L.m

60

60

L.m

130

200

70

L.m

220

220

L.m

250

250

No.

Carried To Summary of Bill No.1

Page 1/19

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No
1-14

Quantity

Unit Rate

Previous

Current

Different

No.

14

-10

No.

13

-10

L.m

1,100

950

-150

No

L.m

275

100

-175

Electrical Devices
The electrical devices for second stage shall not be supplied
in the current stage but it should be supplied in the second
stage as described in the drawings
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable:

1-14-1 16-Amp. 220 volt duplex receptacle , weather proof , at Valve


chamber room and flow meter chamber in site.
1-14-2 Cable outlet box, Galvanized metal inside valve chambers for
feeding valves.
1-15 Fire Alarm System
1-15-1 Supply, install and connect main fire alarm cable pulled inside
ducting and tubes underground and between the buildings
and the main fire control panel include the installation in the
ducts (but excluding ducting, trenches works )
1-16 Telephone System
1-16-1 Supply, install and connect telephone system network from the
main telephone box to the nearest telephone manhole of the
local telephone company (STC). work includes all cable
concrete encased ducting and all civil works needed.
1-16-2 Supply, install and connect 10-pairs telephone cable work
include the installation in the ducts
(but excluding ducting
works )
Carried To Summary of Bill No.1

Page 1/20

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-16-3 Supply, install and connect 8-pairs telephone cable work


include the installation in the ducts
(but excluding ducting
works )
1-16-4 Supply, install and connect 5-pairs telephone cable work
include the installation in the ducts
(but excluding ducting
works )
1-16-5 Supply, install and connect Fiber Optic cable (from Main
Switch to buildings) for DATA system inside under ground
duct bank work include the installation in the ducts (but
excluding ducting works )
1-17 Underground Distribution Network
Supply and install concrete encased PVC ducts, including
trenching, excavation and backfilling but excluding cabling.

L.m

700

-700

L.m

750

2,200

1,450

L.m

275

350

75

1-17-1 Cable duct for 3 x dia 150mm pipes.

L.m

50

50

+ 3 x dia 100mm pipes +

L.m

+ 5 x dia 100mm pipes +

L.m

+ 4 x dia 100mm pipes +

L.m

+ 5 x dia 100mm pipes +

L.m

L.m

25

25

1-17-7 Cable duct for 3 x dia 150mm pipes + 4 x dia 50mm pipes.

L.m

25

25

1-17-8 Cable duct for 3 x dia 150mm pipes + 6 x dia 50mm pipes.

L.m

10

10

1-17-2 Cable duct for 9 x dia 150mm pipes


7 x dia 50mm pipes.
1-17-3 Cable duct for 7 x dia 150mm pipes
6 x dia 50mm pipes.
1-17-4 Cable duct for 5 x dia 150mm pipes
3 x dia 50mm pipes.
1-17-5 Cable duct for 7 x dia 150mm pipes
8 x dia 50mm pipes.
1-17-6 Cable duct for 2 x dia 50mm pipes.

Carried To Summary of Bill No.1

Page 1/21

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-17-9 Cable duct for 6 x dia 100mm pipes + 5 x dia 50mm pipes.

L.m

15

-15

1-17-10 Cable duct for 8 x dia 100mm pipes + 3 x dia 50mm pipes.

L.m

40

-40

1-17-11 Cable duct for 7 x dia 100mm pipes + 5 x dia 50mm pipes.

L.m

36

-36

1-17-12 Cable duct for 5 x dia 100mm pipes + 6 x dia 50mm pipes.

L.m

10

-10

1-17-13 Cable duct for 2 x dia 100mm pipes + 3 x dia 50mm pipes.

L.m

30

-30

1-17-14 Cable duct for 5 x dia 50mm pipes.

L.m

20

-15

1-17-15 Cable duct for 3 x dia 50mm pipes.

L.m

55

-55

1-17-16 Cable duct for 6 x dia 150mm pipes + 6 x dia 100mm pipes +
5 x dia 50mm pipes.

L.m

30

-30

1-17-17 Cable duct for 3 x dia 150mm pipes + 5 x dia 100mm pipes +
6 x dia 50mm pipes.

L.m

25

-25

1-17-18 Cable duct for 3 x dia 150mm pipes.

L.m

20

-20

1-17-19 Cable duct for 7 x dia 100mm pipes + 3 x dia 50mm pipes.

L.m

30

-30

1-17-20 Cable duct for 6 x dia 100mm pipes + 6 x dia 50mm pipes.

L.m

25

-25

1-17-21 Cable duct for 6 x dia 100mm pipes + 4 x dia 50mm pipes.

L.m

30

-30

Supply and install PVC duct Bank, including trenching,


excavation and backfilling but excluding cabling.

Carried To Summary of Bill No.1

Page 1/22

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-17-22 Cable duct for 5 x dia 100mm pipes + 10 x dia 50mm pipes.

L.m

25

-25

1-17-23 Cable duct for 5 x dia 100mm pipes + 6 x dia 50mm pipes.

L.m

130

-130

1-17-24 Cable duct for 4 x dia 100mm pipes + 5 x dia 50mm pipes.

L.m

15

-15

1-17-25 Cable duct for 4 x dia 100mm pipes + 3 x dia 50mm pipes.

L.m

30

-30

1-17-26 Cable duct for 3 x dia 100mm pipes + 4 x dia 50mm pipes.

L.m

32

-32

1-17-27 Cable duct for 2 x dia 100mm pipes + 6 x dia 50mm pipes.

L.m

-5

1-17-28 Cable duct for 2 x dia 100mm pipes + 5 x dia 50mm pipes.

L.m

10

-10

1-17-29 Cable duct for 2 x dia 100mm pipes + 4 x dia 50mm pipes.

L.m

95

-95

1-17-30 Cable duct for 2 x dia 100mm pipes + 3 x dia 50mm pipes.

L.m

110

-110

1-17-31 Cable duct for 7 x dia 50mm pipes.

L.m

20

-20

1-17-32 Cable duct for 6 x dia 50mm pipes.

L.m

35

20

-15

1-17-33 Cable duct for 5 x dia 50mm pipes.

L.m

200

15

-185

1-17-34 Cable duct for 4 x dia 50mm pipes.

L.m

100

-100

1-17-35 Cable duct for 3 x dia 50mm pipes.

L.m

275

-270

1-17-36 Cable duct for 7 x dia 150mm pipes + 5 x dia 100mm pipes +
8 x dia 50mm
1-17-37 Cable duct for 7 x dia 150mm pipes + 4 x dia 100mm pipes +
7 x dia 50mm

L.m

20

20

L.m

40

40

Carried To Summary of Bill No.1

Page 1/23

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-17-38 Cable duct for 7 x dia 150mm pipes + 3 x dia 100mm pipes +
5 x dia 50mm
1-17-39 Cable duct for 7 x dia 150mm pipes + 3 x dia 100mm pipes +
6 x dia 50mm
1-17-40 Cable duct for 12 x dia 150mm pipes + 3 x dia 100mm pipes +
7 x dia 50mm
1-17-41 Cable duct for 10 x dia 150mm pipes + 4 x dia 100mm pipes +
4 x dia 50mm
1-17-42 Cable duct for 9 x dia 150mm pipes + 3 x dia 100mm pipes +
4 x dia 50mm
1-17-43 Cable duct for 5 x dia 150mm pipes + 4 x dia 100mm pipes +3
x dia 50mm
1-17-44 Cable duct for 5 x dia 150mm pipes + 4 x dia 100mm pipes +3
x dia 50mm
1-17-45 Cable duct for 2 x dia 50mm pipes.

L.m

35

35

L.m

30

30

L.m

L.m

L.m

L.m

54

54

L.m

40

40

L.m

55

55

1-17-46 Cable duct for 3 x dia 150mm pipes + 5 x dia 50mm

L.m

45

45

1-17-47 Cable duct for 3 x dia 150mm pipes + 6 x dia 50mm

L.m

30

30

1-17-48 Cable duct for 5 x dia 150mm pipes + 6 x dia 50mm

L.m

15

15

1-17-49 Cable duct for 3 x dia 100mm pipes + 7 x dia 50mm

L.m

1-17-50 Cable duct for 4 x dia 150mm pipes + 6 x dia 50mm

L.m

60

60

1-17-51 Cable duct for 2 x dia 100mm pipes.

L.m

20

20

1-17-52 Cable duct for 3 x dia 150mm pipes + 5 x dia 50mm

L.m

20

20

Carried To Summary of Bill No.1

Page 1/24

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-17-53 Cable duct for 5 x dia 150mm pipes + 5 x dia 50mm

L.m

10

10

1-17-54 Cable duct for 3 x dia 150mm pipes + 3 x dia 100mm pipes +
4 x dia 50mm
1-17-55 Cable duct for 3 x dia 150mm pipes + 6 x dia 50mm

L.m

30

30

L.m

10

10

1-17-56 Cable duct for 5 x dia 150mm pipes + 7 x dia 50mm

L.m

15

15

1-17-57 600 x 600 x 1000mm.

No.

12

1-17-58 800 x 800 x 1000mm.

No.

12

23

11

1-17-59 300 x 300 x 600mm.

No.

11

10

-1

1-17-60 600 x 600 x 600mm.

No.

-2

Supply, install and connect PVC cable ducts for street


lighting cable. works including trenching, excavation and
backfilling compaction and protection but excluding
cabling.
1-17-61 supply & install cable duct bank for 5 x dia 50mm pipes

L.m

15

15

1-17-62 supply & install cable duct bank for 12 x dia 50mm pipes

L.m

-5

1-17-63 supply & install cable duct bank for 9 x dia 50mm pipes

L.m

10

-10

Supply Install and Connect the following Handholes

Carried To Summary of Bill No.1

Page 1/25

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

1-17-64 supply & install cable duct bank for 6 x dia 50mm pipes

L.m

28

-28

1-17-65 supply & install cable duct bank for 4 x dia 50mm pipes

L.m

145

-145

1-17-66 supply & install cable duct bank for 3 x dia 50mm pipes

L.m

25

15

-10

1-17-67 supply & install cable duct bank for 2 x dia 50mm pipes

L.m

480

70

-410

1-17-68 supply & install cable duct bank for 1 x dia 50mm pipes

L.m

1,450

-1,450

No.

Low Tension Cables for street Lighting


Supply, Install and Connect the Following Multicore,
CU/PVC/PVC Cables, for Street Lighting Pulled in
Underground Ducts and grounding wires. but (excluding
ductings and excavations)
1-19-1 Cable 4 x 10 mm2 + E = 10 mm2.

L.m

1,550

1,100

-450

1-19-2 Cable 4 x 6 mm2 + E = 6 mm2.

L.m

4,300

2,800

-1,500

1-18

Lighting Board
Supply, Install and connect the following lighting and pwer
distrubition board complete with main and secondary
circuit.
1-18-1 Type (LP-OL) for site lighting
1-19

Carried To Summary of Bill No.1

Page 1/26

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.01
Site Work

Unit

Item No

Quantity

Unit Rate

Previous

Current

Different

No.

160

95

-65

Lighting Fixtures and Equipment


Supply, install and connect the following lighting fixtures
including lamps, control gear,etc and wiring to columns
fuse junction boxes
1-12-1 Street lighting luminaire, housing 1X250W HPS lamp.

No.

52

25

-27

1-12-2 Fence lighting luminaire, housing 1X26 W flourescent lamp.

No.

160

95

-65

No.

52

52

No.

-5

No.

1-20

External lighting outlets

supply& install and connect the following fence lighting


including pvc pipes up to outlets.
1-20-1 fence lighting outlet
1-21

Supply, Install and Connect the Following lighting poles


Including concrete Foundations, Fuse Junction Boxes, and
all Necessary Accessories.
1-12-3 Lighting pole 12m high including protection devices as
specified.
1-12-4 Supply, Construct and connect earth pits at the end of the
street lighting circuit.
1-22 Extension work for scada system
1-22-1 Supply, install and connect all extensions of (pipes, conduits)
from RTUs for all field instruments in the site layout at tanks
value chambers, flow meter chambers and fire valve chambers
or any other valve chambers including all necessary
accessories according to drawing and specifications.

Carried To Summary of Bill No.1

Page 1/27

In Number

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.01
Site Work

Total

Description

SR
COLLECTION OF BILL NO.1
Page 1/1
Page 1/2
Page 1/3
Page 1/4
Page 1/5
Page 1/6
Page 1/7
Page 1/8
Page 1/9
Page 1/10
Page 1/11
Page 1/13
Page 1/14
Page 1/15
Page 1/16
Page 1/17
Page 1/18
Page 1/19
Page 1/20
Carried Forward

Page 1/28

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.01
Site Work

Total

Description

SR
Brought Forward
Page 1/21
Page 1/22
Page 1/23
Page 1/24
Page 1/25
Page 1/26
Page 1/27

Total Sum of Bill No. (1) Carried to Summary


of Part 1 in Volume 3

Page 1/29

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
2-1

Bill No.02
Coarse Screen and Equalization Tank

Description

Unit

Quantity

Unit Rate

Previous Current Different In Number

Excavations & Earth Works


Excavation in any firm soil with manual or/and
mechanical equipment & tools, including dewatering (If
any), side supports, stockpile excavated materials suitable
for backfilling in approved locations, loading and
transporting the disposal materials to approved dumps:

2-1-1 Excavation for foundations from natural ground level


2-1-2 Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.
2-2 Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork &Polythene sheet gauge 1000
2-2-1 100 mm thick.
Reinforced Cast In-Situ Concrete
Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn
Formwork, Reinforcement, Mechanical and Electrical
Sleeves and all materials required for all types of concrete
joints (exp., contraction & construction... etc) and
waterstop (if any). All as Per Structural Drawings:

m3
m3

3,320
75

3,320
75

0
0

m2

745

745

2-2-2 Raft concrete with thickness as indicated in structural drawings


2-2-3 concrete walls (Smooth Concrete)

m3
m3

450
320

450
320

0
0

Carried To Summary of Bill No.2

Page 2/1

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Bill No.02
Coarse Screen and Equalization Tank

Description

Vibrated Reinforced Concrete Class "A" with ordinary


portland cement Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves as Per
Structural Drawings:
2-2-4 Suspended Solid Slab 200 mm thick (smooth Concrete)
2-3 Waterproofing:
2-3-1 Prepare surfaces and apply two layers of bitumenous
membrane each 4 mm thick with geotextile layer and
protection layer of plain concrete 50 mm thick to horizontal
surfaces
2-3-2 Prepare surfaces and apply two layers of bitumenous
membrane each 4 mm including overlapping thick with its
protection boards including all necessary elements for
installation as per engineer approval.

Unit

Quantity

Unit Rate

Previous Current Different In Number

m2

130

130

m2

745

745

m2

585

585

Carried To Summary of Bill No.2

Page 2/2

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
2-4

Bill No.02
Coarse Screen and Equalization Tank

Description

Unit

Quantity

Unit Rate

Previous Current Different In Number

Internal Painting For Tanks


Supply and paint for inner surface of tanks by 3 faces of
epoxy Poly Sylfuide according to specifications.

2-4-1 For walls and Columns.


2-4-2 For floors
2-4-3 For ceiling
Epoxy paint anti-slip for flooring insulator with hardener
including screed and anti-slip as per specifications.

m2
m2
m2

835
550
62

835
550
62

0
0
0

2-4-4 For upper side walk.


2-5 Steel Work
2-5-1 Supply and Install galvanized steel checkered plate painted
with anti corrosion paint
2-5-2 Supply and install stainless steel ladder from top to bottom of
tank , 4800 mm high with safety cage.

m2

120

120

m2

90

90

0
0
0

No.

Carried To Summary of Bill No.2

Page 2/3

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

2-6
2-6-1
2-6-2
2-6-3
2-6-4
2-6-5
2-6-6
2-6-7
2-6-8
2-6-9
2-6-10
2-6-11
2-6-12
2-6-13
2-6-14

Bill No.02
Coarse Screen and Equalization Tank

Description
Mechanical Works:
Wastewater Treatment Equipment & Works
Supply, install and test following items complete with fittings
and all accessories according to drawings and specifications
Notes
All pipes and fittings shall be ductile iron (DI), unless
otherwise mentioned
All pipes and fittings shall be PN-10 rated
Coarse Screen and Equalization Tank works
Manually operated stainless steel (316L) penstock 500 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 400 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 300 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 200 mm
diam. (non rising)
Manually operated stainless steel (316L) penstock 150 mm
diam. (non rising)
Double socket collar 500 mm diam.
Double socket collar 400 mm diam.
Double socket collar 300 mm diam.
Double socket collar 200 mm diam.
Double socket collar 150 mm diam.
Double spigot puddle pipe 500 mm diam.
Double spigot puddle pipe 400 mm diam.
Double spigot puddle pipe 300 mm diam.
Double spigot puddle pipe 200 mm diam.

Unit

Quantity

Unit Rate

Previous Current Different In Number

No.

No.

No.

No.

No.

No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1

0
0
0
0
0
2
0
0
0

-1
-1
-1
-1
-1
1
-1
-1
-1

Carried To Summary of Bill No.2

Page 2/4

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Bill No.02
Coarse Screen and Equalization Tank

Description

Unit

2-6-15 Double spigot puddle pipe 150 mm diam.


2-6-16 Manually operated stainless steel (316L) penstock 1000500
mm (non rising)
2-6-17 Manually operated stainless steel (316L) penstock 1250700
mm (non rising)
2-6-18 Truck Dumping Station for 4 trucks complete with Pipe 200
mm diam ., dump openings , opening covers concrete base ,
drain gutters and all accessories according to specs.
2-6-19 Screening system of mechanical coarse screens (St.St.316L), 5
mm thickness, 10 mm spacing for channel size of 12501000
mm and to be cleaned automatically by level differential and
timer and C /W all electric motors , gear box , screening chute ,
control panel and all accessories.

No.
No.

2-6-20
2-6-21
2-6-22
2-6-23
2-6-24
2-7
2-7-1

2-7-2
2-7-3
2-7-4
2-7-5

Automatic Belt Conveyor with all accessories.


Screening Compactor (to 75%) with capacity of 1 m3/hr.
Screening Container (St.St.316L) 1000800600 mm
Submersible Mixer
(St.St.316L) complete with
5 KW
electrical motor, guide rails, chain and all accessories.
Electrically and Manually Jib Crane 1 ton capacity complete
with all accessories.
Pumping Units to Fine Screen
Submersible Pumping unit 72 l/sec @ 10 m head C /W electric
motor, delivery elbow, guide rails, chain, pressure gauges and
all accessories.
Double Flanged Puddle pipe 200 mm diam.
Double Flanged Puddle pipe 400 mm diam.
Double Flanged Pipes 200 mm diam.
Double Flanged Pipes 400 mm diam.

Quantity

Unit Rate

Previous Current Different In Number


1
2
1
2
2
0

No.

No.

No.

No.
No.
No.
No.

1
1
3
2

1
1
3
2

0
0
0
0

No.

No.

No.
No.
L.m
L.m

6
1
9
2

6
1
9
2

0
0
0
0

Carried To Summary of Bill No.2

Page 2/5

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
2-7-6
2-7-7
2-7-8
2-7-9
2-7-10
2-7-11

Bill No.02
Coarse Screen and Equalization Tank

Description

Unit

Dismantling piece 200 mm diam.


Dismantling piece 400 mm diam.
Elbow 90, 200 mm diam., flanged
Non-Return Valve (check valve) 200 mm diam.
Manually operated Gate Valve Valve 200 mm diam.
Double flanged concentric reducer
200 mm diam ./ pump
discharge.
Tee Connection 400/200 mm diam., flanged type
Tee Connection 400/100 mm diam., flanged type
Blind Flange 400 mm diam.
Blind Flange 200 mm diam.
Air Valve 100 mm diam.
Manually operated gate valve 100 mm diam.
Double Socket Collar 400 mm diam.
Electrically and Manually Jib Crane 1 ton capacity complete
with all accessories.
Odor Control System For Equalization Tank
GRP Covers with 10 mm thickness for area of 926m C/W all
connections, openings and all accessories.

No.
No.
No.
No.
No.
No.

2-8-2 Odor Control System 5000 m 3/hr C /W fans , connections,


piping, concrete base, control panel and all accessories.
2-9 Measuring Equipment
2-9-1 Pressure Transmitter C/W all accessories and suitable to be
connected to RTU and Scada system.
2-9-2 Pressure Switch C/W all accessories and suitable to be
connected to RTU and Scada system.
2-9-3 PH meter C/W Digital Indicator and Transmital Unit and all
accessories.
Carried To Summary of Bill No.2

2-7-12
2-7-13
2-7-14
2-7-15
2-7-16
2-7-17
2-7-18
2-7-19
2-8
2-8-1

Quantity

Unit Rate

Previous Current Different In Number


3
3
0
2
2
0
3
3
0
3
3
0
3
3
0
3
3
0

No.
No.
No.
No.
No.
No.
No.
No.

4
1
1
7
1
1
1
2

4
1
1
7
1
1
0
2

0
0
0
0
0
0
-1
0

No.

No.

No.

No.

No.

Page 2/6

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Bill No.02
Coarse Screen and Equalization Tank

Description

2-9-4 Temp. meter C/W Digital Indicator and Transmital Unit and
all accessories.
2-10 Spare Parts
2-10-1 Impeller
2-10-2 Wearing Ring Set
2-10-3 Mechanical Seal
2-10-4 Pump Bearing Set
2-10-5 Motor Bearing Set

Unit
No.

No.
No.
No.
No.
No.

Quantity

Unit Rate

Previous Current Different In Number


1
1
0

1
2
2
2
2

Carried To Summary of Bill No.2

Page 2/7

1
2
2
2
2

0
0
0
0
0

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.02
Coarse Screen and Equalization Tank

Total

Description

SR
COLLECTION OF BILL NO.2
Page 2 / 1
Page 2 / 2
Page 2 / 3
Page 2 / 4
Page 2 / 5
Page 2 / 6
Page 2 / 7

Total Sum of Bill No. (2) Carried to Summary


of Part 1 in Volume 3
Page 2/8

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

3-1

Excavations & Earth Works


Excavation in any firm soil with manual or/and
mechanical equipment & tools, including dewatering (If
any), side supports, stockpile excavated materials suitable
for backfilling in approved locations, loading and
transporting the disposal materials to approved dumps.

Bill No.03
Fine Screen and Grit Removal

Unit

Quantity

Unit Rate

Previous Current Different In Number

3-1-1 Excavation for foundations from natural ground level


3-1-2 Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.
3-2 Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork

m3
m3

225
100

225
100

0
0

3-2-1 100 mm thick.

m2

130

130

Reinforced In-Situ Concrete


Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn
Formwork, Reinforcement, Mechanical and Electrical
Sleeves and all materials required for all types of concrete
joints (exp., contraction & construction... etc). All as Per
Structural Drawings:
3-2-2 Foundations rough concrete)

m3

3-2-3 Tie Beams ( rough concrete)


3-2-4 Columns Necks ( rough Concrete)

80

80

m
m

Carried To Summary of Bill No.3


Page 3/1

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item
No

Bill No.03
Fine Screen and Grit Removal

Unit

Quantity

Unit Rate

Previous Current Different In Number


Vibrated Reinforced Concrete Class "A" with ordinary
portland cement Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and
waterstop (if any) as Per Structural Drawings:

3-2-5 Suspended Solid Slab 200 mm thick (smooth concrete)

m2

55

55

3-2-6 Suspended Solid Slab 300 mm thick (smooth concrete)

45

45

50

50

13

10

-3

242

242

-2

m2

130

130

m2

390

320

-70

3-2-7 Suspended Solid Slab 400 mm thick (smooth concrete)


3-2-8 Suspended Solid Slab 700 mm thick (smooth concrete)
3-2-9 Beams (smooth concrete)
3-2-10 Columns (smooth concrete)
3-2-11 Walls (smooth concrete)
3-2-12 Staircases steps and landings (smooth concrete)
3-3 Waterproofing:
3-3-1 Polythene sheet gauge 1000 under footing , ground beams and
ground slab.
3-3-2 Prepare surfaces and apply prime coat and
2 coats of cold
bitumen to concrete surfaces Above and around footing
,
around columns necks and tie beams.

m
m
m
m
m
m

Carried To Summary of Bill No.3


Page 3/2

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

3-4

Internal and External Painting for Tanks


Supply and paint for inner surface of tanks by 3 faces of
epoxy Poly Sylpheed according to specifications.

Unit

Quantity

Unit Rate

Previous Current Different In Number

3-4-1 For internal walls and Columns.


3-4-2 For internal floors
Epoxy paint anti-slip for flooring insulator with hardener
including, screed as per specifications.
3-4-3 For upper side walk.
Supply and paint for external surface exposed to external
weather agents with acrylic polyurathen of 4 faces as per
specifications.
3-4-4 For external surface
3-5

Bill No.03
Fine Screen and Grit Removal

m2
m2

345
85

345
85

0
0

m2

50

50

m2

425

425

m2

23

23

L.m

90

90

Steel Work

3-5-1 Supply and Install galvanized steel checkered painted plate


with anti corrosion paint
3-5-2 Manufacturing and install galvanized steel external hanrail
with 40 mm dia., 800mm height includes posts, supports & all
accessories.

Carried To Summary of Bill No.3


Page 3/3

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.03
Fine Screen and Grit Removal

Unit

Quantity

Unit Rate

Previous Current Different In Number


Mechanical Works:
Wastewater Treatment Equipment & Works
Supply, install and test following items complete with
fittings and all accessories according to drawings and
specifications
Notes

3-6
3-6-1
3-6-2
3-6-3
3-6-4
3-6-5
3-6-6
3-6-7
3-6-8
3-6-9
3-6-10
3-6-11
3-6-12

All pipes and fittings shall be ductile iron (DI), unless


otherwise mentioned
All pipes and fittings shall be PN-10 rated
Fine Screen Tanks
Double Socket 90 Elbow 400 mm diam.
Socket and Spigot Pipe 400 mm diam.
Flanged and Spigot Pipe 400 mm diam.
Double Flanged Pipe 400 mm diam.
Double Flanged 90 Elbow 400 mm diam.
Tee Connection 400/100 mm diam., flanged Type.
Manually operated Gate Valve 100 mm diam.
Air Valve 100 mm diam.
Flanged and Spigot Pipe 400 mm diam.
Manually operated non- risen stem stainless steel (316L)
penstock 1000x700 mm (Non Rising)
Manually operated non- risen stem stainless steel (316L)
penstock 1000x500 mm (Non Rising
Screening system of filter with screening screw type the
screenining, compacting and washing system consist of
Mechanical Filter screen (St.St.316L) with 2 mm spacing and
comlete with screening screw (St.St.316L), compacting &
washing system, screeing chut, electric motors, gear boxes,
control panel and all accessories.

No.
L.m
L.m
L.m
No.
No.
No.
No.
L.m
No.

1
1
6
1
2
1
1
1
2
2

1
1
6
1
2
1
1
1
2
2

0
0
0
0
0
0
0
0
0
0

No.

No.

Carried To Summary of Bill No.3


Page 3/4

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.03
Fine Screen and Grit Removal

Unit

Quantity

Unit Rate

Previous Current Different In Number

3-6-13 Automatic Belt Convyour include pipe with all accessories.

No.

3-6-14 Screening Container (St.St.316L) 1000800600 mm


3-6-15 Electrically and Manually Jib Crane 1 ton capacity complete
with all accessories.
3-7 Grit Removal Tanks
3-7-1 Manually operated stainless steel (316L) penstock
1000x500mm
3-7-2 Electrically operated Travelling Bridge C/W sand scraper, oil
scraper, electric motors, gear boxes, control panel and all
accessories.
3-7-3 Complete air diffusing system C/W diffusers, stainless steel
air piping, fittings, valves and all accessories.

No.
No.

3
1

3
1

0
0

No.

No.

No.

3-7-4 Air Diffuser (medium tube) with capacity 10 m3/hr


3-7-5 Complete sand liftting system C /W air lift pump (25m3/hr @
6 m head ), air piping , sand discharge piping , valves and all
accessories.
3-7-6 Complete sand classifier system C /W No . (1) sand classifier
vessel (with total capacity 50 m3/hr), sand chute , supernatant
piping and all accessories.
3-7-7 Sand Container (St.St.316L) 1000x800x600 mm
3-7-8 Oil Container (St.St.316L) 1000x800x600 mm
3-7-9 Stainless Steel (316L) weir plates 2500x3x300 mm C/W all
gaskets, fasterners and all accessories.
3-7-10 Double Socket 90 Elbow 500 mm diam.
3-7-11 Flanged and Spigot puddle piece 500 mm diam.
3-7-12 Double Socket 90 Elbow 600 mm diam.
3-7-13 Flanged and Spigot puddle piece 600 mm diam.
3-7-14 Flanged and Spigot puddle piece 80 mm diam.

No.
No.

12
2

12
2

0
0

No.

No.
No.
L.m

3
3
7

3
3
2

0
0
-5

No.
No.
No.
No.
No.

1
1
1
0
0

0
0
0
1
1

-1
-1
-1
1
1

Carried To Summary of Bill No.3


Page 3/5

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.03
Fine Screen and Grit Removal

Unit

Quantity

Unit Rate

Previous Current Different In Number

3-7-15 Flanged and Spigot pipe 500 mm diam. Appr.


3-7-16 Flanged and Spigot pipe 600. mm diam. Appr.
3-7-17 Drainage oil piping connection from oil collection gutter
80mm dia . To down to oil container including valve , joints
fillings & all accessories.

L.m
L.m
No.

4
0
1

Carried To Summary of Bill No.3


Page 3/6

0
4
1

-4
4
0

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.03
Fine Screen and Grit Removal

Description

Total
SR

COLLECTION OF BILL NO.3


Page 3/1
Page 3/2
Page 3/3
Page 3/4
Page 3/5
Page 3/6

Total Sum of Bill No. (3) Carried to Summary


of Part 1 in Volume 3
Page 3/7

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

4-1

Excavations & Earth Works


Excavation in any firm soil with manual or/and mechanical
equipment & tools, including dewatering (If any), side
supports, stockpile excavated materials suitable for
backfilling in approved locations, loading and transporting
the disposal materials to approved dumps.

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-1-1 Excavation for foundations from natural ground level

m3

7,112

7,112

4-1-2 Selected fill and backfill to be placed next to walls and


footings and compacted well to the required compaction
density according to drawings & specifications.
4-2 Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork
4-2-1 Ordinary concrete with different thickness

m3

630

630

m3

56

56

4-2-2 50 mm thick.

m2

114

114

4-2-3 100 mm thick.

m2

3,000

3,000

Plain Concrete Class "B" with Sulphate Resistant Cement


type V and Formwork &Polythene sheet gauge 1000

Carried To Summary of Bill No.4

Page 4/1

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Reinforced In-Situ Concrete
Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and all
materials required for all types of concrete joints (exp.,
contraction & construction... etc) and waterstop (if any) .
All as Per Structural Drawings:

4-2-4
4-2-5
4-2-6
4-2-7
4-2-8
4-2-9
4-2-10
4-2-11
4-2-12
4-2-13
4-2-14
4-2-15
4-2-16
4-2-17
4-3
4-3-1
4-3-2

Trenches with 600 mm depth (smooth concrete)


Foundations raft (rough concrete)
isolated footings (rough concrete)
Beams (smooth concrete)
Tie Beams ( rough concrete)
Columns Necks ( rough concrete)
Concrete pad for mechanical equipments rested on floors, as
specified and as shown on drawings.
Ground floor Slab 150 mm thick (smooth concrete)
Suspended Solid Slab 200 mm thick (smooth concrete)
Suspended Solid Slab 300 mm thick (smooth concrete)
Suspended Solid Slab 500 mm thick (smooth concrete)
Columns ( smooth concrete)
Walls (smooth Concrete)
Staircases steps 300 mm (smooth Concrete)
Waterproofing:
Polythene sheet gauge 1000 laid horizontally under ground slab.
Prepare surfaces and apply two layers of bitumenous membrane
each 4 mm thick with geotextile layer and protection layer of
plain concrete 50 mm thick to horizontal surfaces

m3
m3
m3
m3
m3
m3
m3

7
1,337
6
17
10
1
13

7
1,337
6
17
10
1
13

0
0
0
0
0
0
0

m2
m2
m2
m2
m3
m3
m3

114
315
290
250
55
1,415
9

114
315
290
250
55
1,415
9

0
0
0
0
0
0
0

m2
m2

114
3,000

114
3,000

0
0

Carried To Summary of Bill No.4

Page 4/2

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


2

4-3-3 As previously for the vertical element with protective layer of


the Polypropylene sheets 4 mm thick.
4-3-4 Prepare surfaces and apply two layers of bituminous membrane
4 mm thick each and 50 mm thick screed under trenches and
ground slabs.
4-3-5 Prepare surfaces and apply prime coat and 2 coats of cold
bitumen to concrete surfaces Above and around footing ,
around columns necks and tie beams& trenshes sides
4-4 Structural Steel Works
Structural Steel work to be Detailed by the Contractor in
Accordance with the Engineer's Drawings and
Requirements, all Structural Steel to be as Per ASTM A36,
all as Specified and as Shown on Drawings Including all
Bolting, Welding, Painting with Fire Protection Coating,
Hauling, Hoisting Steel Plates, angle cleats, Bolts Black
Bolts and Fixing in Position all Shop and Design Drawings
to be Approved by the Engineer Before Commencement of
Fabrication:

3,675

3,675

m2

114

114

m2

80

80

4-4-1 Supply and erect structural Steel Stairs as indicated in the


structural drawing, complete with angles ,bolts, plates, paint,
handrails,checkered plates, all neccesary accessories, etc, all as
directed and approved by the Engineer .

No.

Carried To Summary of Bill No.4

Page 4/3

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
4-5

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Block Work

Hollow precast concrete block work for walls bedded in


cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:
4-5-1 Block 200 mm thick.
4-6
Roofing System

m2

150

150

m2

210

210

Supply , spread and place on the roof the following all


complete as specified and as per shop drawings and as
approved by the Engineer
4-6-1 Foam concrete 50 mm average thick (30mm min.) for slopes
4-6-2 Waterproofing membrane layer 4 mm thick , including required
overlapping

210

210

4-6-3 Ditto but laid vertically


4-6-4 Protective Sheeting Membrane

L.m
m2

105
210

105
210

0
0

4-6-5 50 mm thick polystrene rigid heat insulation boards.

210

210

4-6-6 Mastic sealant with aluminum flashing to parapets


4-6-7 Cement tiles 400x400x40mm thick laid on roof

m2
L.m
m2

105
70

105
70

0
0

4-6-8 50 mm thick graduated gravel layer with 16-32 mm dia.

m2

140

140

Carried To Summary of Bill No.4

Page 4/4

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
4-7

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Steel Wook
Aluminum Doors and Windows
Supply and install complete colored powder coated
aluminum doors & windows units glazed and/or non glazed,
fixed in accordance with the manufacturers instructions
including frames, sub-frames, angles, channels, glazing,
beads, sealant, aluminum infill panels, fixing accessories
including glazing and making good complete all as shown
on drawing:

4-7-1 Window Type 1 with size 1200mm width x 1500 mm height

No.

4-7-2 Window Type 2 with size 1500mm width x 850 mm height


4-7-3 Window Type 3 with size 1500mm width x 1100 mm height

No.
No.

2
2

2
2

0
0

4-7-4 Window Type 4 with size 1200mm width x 850 mm height


4-8 Steel Doors
Fabricate, Supply and Install Steel Doors Including Frame,
Paint, ironware and related accessories as shown on the
drawings and in accordance with the directives of Engineer:

No.

4-8-1 Door Type 1 with size 2500mm width x 2200 mm height .


4-8-2 Door Type 2 with size 1000mm width x 2200 mm height .
4-8-3 Door Type 1 with size 2500mm width x 2200 mm height with
sand trap and fly mesh backing .
4-9 Sundries
4-9-1 Supply and install stainless steel ladder with safety cage from
top to bottom of tank , 5450 mm high.
4-9-2 Supply and install galvanized steel ladder, 6500 mm height ,
(from 2172 to 2165 ).

No.
No.
No.

1
1
2

1
1
2

0
0
0

No.

No.

Carried To Summary of Bill No.4

Page 4/5

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-9-3 Supply and install galvanized steel ladder, 2500 mm height, for
Back Pulse Tank.
4-9-4 Supply and Install galvanized steel grating cover including
angels , 800mm wide for trenches .
4-9-5 Supply and Install galvanized steel checkered plate, with anti
corrosion paint
4-9-6 Supply and Install galvanized steel grating, 200mm wide to
cover half round trench.
4-9-7 Supply and install galvanized steel inner handrai with 50 mm
dia., 1100 mm height includes post, Supports & all accessories
required to finish the work.
4-9-8 Supply and install galvanized steel external handrai with
40
mm dia ., 800 mm height includes post
, Supports & all
accessories required to finish the work.
4-10 PLASTER WORK
Internal Plaster
Cement and Sand Plaster as Specified applied in Two Coats:
4-10-1 Walls and Columns.
4-10-2 For ceiling

No.

L.m

15

15

m2

235

235

L.m

26

26

L.m

20

20

L.m

670

670

m2

930

930

450

450

100

100

4,410

4,410

External Plaster
4-10-3 Tylorene plaster rough texture beige color for external walls m2
type (b) including grooves with ornamented aluminum Ushaped.
4-11 Painting Work
Internal
Supply and paint for inner surface of tanks by 3 faces of
epoxy Poly Sulfide according to specifications.
4-11-1 For walls and Columns.

m2

Carried To Summary of Bill No.4

Page 4/6

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


2

2,200

2,200

180

180

4-11-4 For pump room, electric room and entrance as per drawing.

m2

455

455

4-11-5 On 100 mm high screed base.


Prepare Surfaces and Apply Prime Coat, required Putty
layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.

L.m

140

140

4-11-6 For plastered walls

m2

930

930

4-11-7 For plastered ceiling

m2

450

450

External
supply and paint for external surface and exposed to
atmospheric agents with acrylic paint polyurathen of 4
faces as per specifications .
4-11-8 For external surface

m2

1,120

1,120

4-11-2 For floors


4-11-3 For ceiling

Anti-slip epoxy paint for flooring insulator acid & oil &
grease resistant including screed underlayer.

Carried To Summary of Bill No.4

Page 4/7

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Mechanical Works:
First: Wastewater Treatment Equipment & Works
Supply, install and test following items complete with fittings
and all accessories according to drawings and specifications

4-12
4-12-1
4-12-2
4-12-3
4-12-4
4-12-5
4-12-6
4-12-7
4-12-8
4-12-9
4-12-10
4-12-11
4-12-12
4-13
4-13-1

Notes
All pipes and fittings shall be stainless steel (SS+ 316L), unless
other wise mentioned ductile iron (DI), unless otherwise
mentioned
All pipes and fittings shall be PN-10 rated
Inlet Piping and Inlet Chamber for aeration tank
Double socket collar 500 mm diam. (DCI).
Flanged and Spigot puddle pipe 500 mm diam.
Pipes connections 500 mm diam. (Various lengthes)
Manually operated stainless steel (316L) penstock (1500*500)
mm.
Manually operated Gate Valve 500 mm diam, flanged type
Dismantling Joint C/W Flanges 500 mm diam, flanged type
Elbow 90 diam. 500 mm. flanged type.
Flanged and Spigot puddle pipe 600 mm diam.
Pipes connections 600 mm diam. (Various lengthes)
Manually operated Gate Valve 600 mm diam, flanged type
Dismantling Joint C/W Flanges 600 mm diam, flanged type
Elbow 90 diam. 600 mm. flanged type.
Anoxic Tank
Submersible Mixer (St.St.316L) complete with 3 KW electrical
motor, guide rails, chain and all accessories.

No.
No.
L.M
No.

1
2
12
2

0
0
0
2

-1
-2
-12
0

No.
No.
No.
No.
L.M
No.
No.
No.

1
1
1
0
0
0
0
0

0
0
0
2
12
1
1
1

-1
-1
-1
2
12
1
1
1

No.

Carried To Summary of Bill No.4

Page 4/8

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-14 Aeration System


4-14-1 Air piping (St.St.316L) inside aeration tanks complete with all No.
fittings, special joints , valves stands for all branches , puddle
pipes & blind flanges for stage II and all accessories.

No.
No.
No.

2
1
750

2
1
750

0
0
0

No.

4-15-2 Double flanged concentric reducer


350 mm diam ./ pump No.
discharge.
4-15-3 connection Pipes 350 mm diam. (various lengths)
L.m

22

22

4-15-4 Elbow 90, 350 mm diam., flanged type.

No.

4-15-5 Non-Return (Check Valve) 350 mm diam.

No.

4-15-6 Manually operated Gate Valve 350 mm diam.

No.

4-15-7 Dismantling piece 350 mm diam.

No.

4-15-8 Tee connection 600/350 mm diam., flanged type.

No.

4-15-9 Dismantling piece 600 mm diam., (DI).

No.

4-15-10 Blind Flange 600 mm diam.

No.

4-15-11 Pipes 600 mm diam. (various lengthes)

L.m

4-15-12 Elbow 90 600 mm diam., flanged type.

No.

4-15-13 Tee connection 600/400 mm diam., flanged type.


4-15-14 Puddle 400 mm diam., spigot and flanged type.

No.
No.

3
6

3
6

0
0

4-14-2
4-14-3
4-14-4
4-15
4-15-1

Manually operated Butterfly Valve 200 mm diam.


Manually operated Butterfly Valve 150 mm diam.
Air Diffusers (EPDM) dischrge 8.5 m3/hr.
Recirculation Pumps
Submersible Pumping unit 240 L/sec & 8 m head C /W electric
motor, delivery elbow , guide rails , chain, pressure gauges and
all accessories.

Carried To Summary of Bill No.4

Page 4/9

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-15-15 Blind Flange 400 mm diam.


No.
4-15-16 Dismantling piece 400 mm diam.. (DI).
No.
4-15-17 Electrically and Manually operated Gate Valve 400 mm diam ., No.
ready to be connected to (RTU) & SCADA system.

3
3
3

3
3
3

0
0
0

4-15-18
4-15-19
4-15-20
4-15-21
4-15-22
4-16
4-16-1

No.
No.
No.
No.
No.

3
3
3
3
3

3
3
3
3
3

0
0
0
0
0

No.

15

15

L.m

20

20

L.m

15

15

No.

No.
No.
No.
No.

2
4
4
4

2
4
4
4

0
0
0
0

No.
No.

4
4

4
4

0
0

4-16-2
4-16-3
4-17
4-17-1
4-17-2
4-17-3
4-17-4
4-17-5
4-17-6
4-17-7

Tee connection 400/400 mm diam., flanged type.


Tee connection 400/150 mm diam., flanged type.
Tee connection 400/300 mm diam., flanged type.
Gate vlave 300 mm dim.
Dimantling piece 300 mm diam.
MBR Equipment
MBR Unit , with ultimate flow of 52 m 3/hr complete with all
connections and accessories.
Main Air Piping 350 mm diam. Complete with all fittings , tees,
puddles, special joints and all accessories.
Sub-Air piping system for MBR units 200 mm diam C /W all
fittings, tees, puddles, special joints and all accessories.
Permeat Pumping Units
Horizontal centrifugal End Suction Pump 50 L/s @ 10 m head
C/W electric motor, pressure gauges and all accessories.
Manually operated Gate Valve 250 mm diam.
Dismantling piece 250 mm diam, (DI) flanged type
Double flanged eccentric reducer 250 mm diam./ pump suction.
Double flanged concentric reducer 200 mm diam./ pump
discharge.
Non-Return Check Valve 200 mm diam.
Electrically and Manually operated Butterfly Valve 200 mm
diam., suitable to be connected to (RTU) AND SCADA system.
Carried To Summary of Bill No.4

Page 4/10

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-17-8 Common suction piping 400 mm diam including all fittings


L.m
4-17-9 Outlet permeat piping from MBR tanks 250 mm diam . C/W all L.m
fittings, tees, elbows.
4-17-10 Electrically and Manually operated Butterfly Valve
250 mm No.
diam., ready to be connected to (RTU) & SCADA system.

14
12

14
12

0
0

4-17-11 Dismantling piece 250 mm diam, (DI) flanged type


No.
4-17-12 Delivery premeat piping 400 mm diam. C/W tees, puddles,
L.m
blind flanges and all fittings to out borders for the building.
4-17-13 Double Socket Collar 400 mm diam.
No.
4-18 Back Pulse System
4-18-1 Horizontal centrifugal End Suction Pump 72 L/s @ 10 m head No.
C/W electric motor, pressure gauges and all accessories.
4-18-2 Float Valve 200 mm diam.
No.
4-18-3 Puddle piece 200 mm diam., flanged type.
No.
4-18-4 Manually operated butterfly valve 200 mm diam.,
No.
4-18-5 Dismantling jont 200 mm diam(DI).
No.
4-18-6 Puddle piece 300 mm diam., flanged type.
No.
4-18-7 Dismantling piece 300 mm diam.. (DI)
No.
4-18-8 Manually operated gate Valve 300 mm diam.
No.
4-18-9 Double flanged eccentric reducer 300 mm diam./pump suction. No.

3
25

3
25

0
0

-1

1
1
1
6
1
2
2
2

1
1
1
6
1
2
2
2

0
0
0
0
0
0
0
0

4-18-10 Double flanged eccentric reducer 200 mm diam./pump


discharge
4-18-11 Non return valve (check valve) 200 mm diam.
4-18-12 Manually operated gate valve 200 mm diam.
4-18-13 Delivery permeate piping 200 mm diam . C/W tees , puddles,
blind flanges and all fittings.

No.

No.
No.
L.m

2
2
20

2
2
20

0
0
0

Carried To Summary of Bill No.4

Page 4/11

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-18-14 Electrically and Manually operated Butterfly Valve


200 mm
diam., ready to be connected to (RTU) & SCADA system.

No.

4-18-15 Feeding Chlorine Pipes 25 mm diam . C/W all fittings , valves No.
and tees.
4-18-16 Feeding water pipes diameter 200 mm to back pulse tank
L.m
4-19 Cleaning Equipment
4-19-1 Horizontal centrifugal End Suction Pump 25 L/s @ 10 m head No.
C/W electric motor, pressure gauges and all accessories.

4-19-2 GRP Tank 10 m 3 C /W all connections , openings, level


indicator and all accessories.
4-19-3 Float Valve 150 mm diam.
4-19-4 Filling Permeate Water Pipes 150 mm diam. C/W all fittings.
4-19-5 Double flanged eccentric reducer 150 mm diam./ pump suction.
4-19-6 Double flanged concentric reducer
150 mm diam ./ pump
discharge. Valve 150 mm diam.
4-19-7 Non-Return
4-19-8 Dismantling piece 150 mm diam. (DCI).
4-19-9 Manually operated Gate Valve 150 mm diam.
4-19-10 Delivery permeate piping 150 mm diam . C/W tees , puddles,
blind flanges and all fittings.
4-19-11 electrically and manually butterfly valve
150 mm diameter
ready to be connected to RTU SCADA system
4-19-12 Feeding Chlorine Pipes 25 mm diam . C/W all fittings , valves
and tees.
4-19-13 Feeding Citric Acid Pipes 25 mm diam. C/W all fittings, valves
and tees.

No.

No.
L.m
No.
No.
No.
No.
No.
L.m

1
7
2
2
2
8
5
26

1
7
2
2
2
8
5
26

0
0
0
0
0
0
0
0

No.

No.

No.

Carried To Summary of Bill No.4

Page 4/12

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-20 Sludge Equipment


4-20-1 Horizontal Sludge Progressive cavity Pumping Units 35 m3/hr.
& 2 bar head C /W electric motor , pressure gauges and all
accessories.
4-20-2 Suction pipes 100 mm diam . C/W all valves , fittings and
special pieces.
4-20-3 Delivery pipes 100 mm diam . Up to 1 m outside the building
C/W all valves, fittings and special pieces.
4-20-4 Supernatant Piping 150 mm diam C /W 3 gate valves diameter
150 mm, fittings and special pieces.
Sludge mixer from stainless steel
(SS316L) the ability of
engine and a comprehensive installation guide and the chain
and all the accessories.
4-21 Odor Control System For Holding Tank
4-21-1 Corregated GRP Covers with 10 mm thickness for area of
1016m C/W all connections, openings and all accessories.
4-21-2 Odor Control System 5000 m 3/hr. C/W fans , connections,
piping, concrete base and all accessories.
4-22 Measuring Equipment
4-22-1 Pressure Transmitter C/W all accessories and suitable to be
connected to RTU and SCADA system.
4-22-2 pressure differential transmittal with all accessories ready to be
connected to RTU and SCADA system.
4-22-3 Pressure Switch C/W all accessories and suitable to be
connected to RTU and SCADA system.
4-22-4 Flow Switch C/W all accessories ready to be connected to RTU
and SCADA system.

No.

L.m

L.m

10

10

No.

No.

No.

No.

No.

No.

No.

12

12

No.

Carried To Summary of Bill No.4

Page 4/13

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

4-22-5
4-22-6
4-22-7
4-22-8

Electromagnetic Flow meter 600 mm diam.


Electromagnetic Flow meter 400 mm diam.
Electromagnetic Flow meter 250 mm diam.
PH meter C/W Digital Indicator and Transmittal Unit and all
accessories.
Temp. meter C/W Digital Indicator and Transmittal Unit and all
accessories.
Dissolved Oxygen meter C/W Digital Indicator and Transmittal
Unit and all accessories.
MLSS meter C/W Digital Indicator and Transmittal Unit and all
accessories.
Subsidiary Equipment
Drainage System with No . (2) submersible pumping units 3 L/s
@ 8 m head C /W gate valves , non-return valves , fittings,
special joints , puddles, collar, delivery elbows , control system ,
panel and all accessories.
Portable Jib Crane
0.5 ton capacity complete with all
accessories.
Electrically and Manually Jib Crane 1 ton capacity complete
with all accessories.
Electrically and Manually Gantry Crane 3 ton.
Sampling system
Hydrogen sulfide monotoring system
Spare Parts for Each Pump Station
Impeller
Pump Shaft

4-22-9
4-22-10
4-22-11
4-23
4-23-1

4-23-2
4-23-3
4-23-4
4-23-5
4-23-6
4-24
4-24-1
4-24-2

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


No.
No.
No.
No.

1
1
3
1

1
1
3
1

0
0
0
0

No.

No.

No.

No.

No.

No.

No.
No.
No.

1
2
2

1
2
2

No.
No.

1
1

1
1

0
0
0
0
0
0

Carried To Summary of Bill No.4

Page 4/14

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
4-24-3
4-24-4
4-24-5
4-24-6
4-24-7

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Wearing ring set
Mechanical Seal
Sleeve of pump shaft
Pump Bearing Set
Motor Bearing Set

No.
No.
No.
No.
No.

2
2
2
2
2

Carried To Summary of Bill No.4

Page 4/15

2
2
2
2
2

0
0
0
0
0

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

Second: Plumbing, Firefighting & HVAC Works


4-25 Fire Fighting System
4-25-1 Portable dry powder fire extinguisher 6 Kg capacity fixed to
wall.
4-25-2 CO2 fire extinguisher 5 Kg capacity fixed to walls.
4-26 HVAC & Ventilation System

No.

No.

No.

No.

Kg.

700

700

Supply, Install and TestMini-Split Units Including


Evaporator Blower Unit and Condensing Unit with Steel
base, vibration isolators, controls and accessories:
4-26-1 Unit 30 MBH. cooling capacity
Fans
Supply, Install and Test the Following Fans, Including
Flanges, Support Framing, Mounting Bolts, Controls and
all Necessary Fixing Accessories and Connection as
Specified and as Shown on Drawings:
4-26-2 Exhaust Fans type EXF -01, 7500 CFM , 0.35" WG static
pressure.
Ductwork
Glavanized steel ducting for ventilation system including all
beads, junctions, reducers and flexible, volume damper, joints
as specified and as shown on drawings.

Carried To Summary of Bill No.4

Page 4/16

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No
4-27

4-27-1
4-27-2
4-27-3
4-27-4
4-27-5
4-27-6
4-27-7
4-27-8
4-27-9
4-28

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number


Electrical Works
Power Distribution Boards
Supply, install and connect the following lighting and power
Distribution boards complete with main and secondary
circuit breakers,..etc.
Panel board Type (LP-BT)
Panel board Type (MSP-EXF-BT) for exhaust fans
Type (PCP-PP-BT)
Type (PCP-BPP-BT)
Type (PCP-CP-BT)
Type (PCP-SP-BT)
Type (PCP-MX1)
Type (PCP-WP-BT)
Type (MCC-MOV-BT1)
Motor control center (MCC)
Note

No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1

0
0
0
0
0
0
0
0
0

No.

CBs of branch circuits for second stage equipments shall


not be supplied in this stage, but leaving enough empty
space in distribution boards for these CBs for a future
extension as per drawings, All panel boards for second
stage should be supplied in the second stage as described in
the drawings.
Supply, install and connect the following motor control
centers complete with main and secondary circuit breakers,
contactors, starters, digital instruments, relays, surge
arrestors , PLC unit and all necessary conduits, devices and
control wires as per drawings and specifications.
4-28-1 Motor control cenetr MCC-MBR
Carried To Summary of Bill No.4

Page 4/17

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-28-2 Motor control cenetr MCC-AR


4-29 Low Tension Cables
NOTE
Cables for second stage for branches feeders shall not be
supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected in
the current stage to facilitate the installation for the second
stage as described in the drawings.

No.

4-29-1 Cable 4x70mm+E=35mm


(from MCC-MBR to PCP-PP-BT)
4-29-2 Cable 4x35mm+E=16mm
(from MCC-MBR to MCC-MOV-BT1)
Supply install and connect the following multi-core cable
(CU/PVC/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):

L.m

25

25

L.m

15

15

4-29-3 Cable 3x10mm+E=10mm


(from PCP-BPP-BT to BACK PULSE PUMPS)
4-29-4 Cable 4x10mm+E=10mm
(from MCC-MBR to LP-BT & PCP-BPP-BT & PCP-MX1)

L.m

45

45

L.m

60

60

4-29-5 Cable 4x6mm+E=6mm (from MCC-MBR to PCP-CP-BT &


PCP-SP-BT & PCP-WP-BT)

L.m

70

70

Supply install and connect the following multi-core cable


(CU/XLPE/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):

Carried To Summary of Bill No.4

Page 4/18

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Unit Rate

Previous Current Different In Number

4-29-6 Cable 3x6mm+E=6mm (from MCC-MBR to Disconnected


L.m
switch of O.H.C & Jib Crane)
& (from PCP-PP-BT to PERMEATE PUMPS)
& (from PCP-CP-BT to CLEANING PUMPS)
4-29-7 Cable 3x4mm+E=4mm
L.m
(from MCC-MBR to Disconnected switch of O.H.C)
& (from PCP-WP-BT to WASTE WATER PUMPS)
& (from MSP-EXF-BT to EXHAUST FANS)
4-30 Routes for second stage
4-30-1 Supply and install necessary cable Extensions ,supports and all No.
necessary accessories as shown on drawings and as specified
and all necessary ducts , routs, conduits, cable trays , etc for
2nd stage should be supplied and erected in the current stage
with all necessary accessories to facilitate the installation of
cables in the second stage according to the specification and
recommendations from the engineer.
4-31

Quantity
175

175

210

210

Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and Wiring
Between Devices and to panelboard, Contactor or to
lighting Switch panelboards as Applicable:

4-31-1 Lighting Point 3 x 2.5 mm2.

No.

53

53

4-31-2 16-Amp. 220 volt single receptacle, weather proof.

No.

4-31-3 16-Amp. 220 volt single receptacle.

No.

4-31-4 20-Amp. 220 volt Industrial usage receptacle, weather proof.

No.

Carried To Summary of Bill No.4

Page 4/19

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-31-5 30-Amp. 380 volt Industrial usage receptacle, weather proof.

No.

4-31-6 20-Amp. 220 volt single receptacle.

No.

4-31-7 Cable outlets for Minisplit AC units.

No.

No.
No.
No.
No.

1
2
1
2

1
2
1
2

0
0
0
0

All disconnected switches for the second stage shall not be


supplied in the current stage but should be supplied in the
second stage as described in drawings.
4-32-1 Disconnect switch 3x 40A, IP55, for PERMEATE PUMPS.

No.

4-32-2 Disconnect switch 3x 30A, IP65, for over head crane.

No.

4-32-3 Disconnect switch 2x 40A, IP65, for split unit Ac including


conduits and wiring (power and control wires ) up to cable
outlets.
4-32-4 Disconnect switch 3x 20A, IP65, for EXHAUST FANS

No.

No.

4-31-8
4-31-9
4-31-10
4-31-11
4-32

Supply, Install and Connect the Following devices ,


Including Device Boxes, Cover Plates, Conduits and Wiring
to Lighting Points or Receptacles or panelboards as
Applicable:
One way one gang switch.
One way two gang switch.
Lighting control panel LSP-BT
Douple pole switch 30A for AC split unit.
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point:
Note:

Carried To Summary of Bill No.4

Page 4/20

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Unit Rate

Previous Current Different In Number

4-32-5 Disconnect switch 3x 20A, IP55, for Valves & flow control &
No.
mixers including conduits and wiring (power and control
wires) up to panel board
4-32-6 Disconnect switch 2x 20A, IP55, for flow meter including
No.
conduits and wiring (power and control wires) up to panel board
4-33

Quantity
25

25

Lighting Fixtures and Equipment


Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and Starters
for Fluorescent Fixtures, Through Wiring for Continuous
Rows,and Heat Resistant Wiring to Lighting Point and all
Necessary Accessories :

4-33-1 Type 65FMH150

No.

4-33-2 Type 65ECA236

No.

35

35

4-33-3 Type 20ENA24

No.

4-33-4 Type 65WF218

No.

4-33-5 Emergency light, type EM2.

No.

No.
No.
No.
No.

2
4
2
10

2
4
2
10

0
0
0
0

4-34

4-34-1
4-34-2
4-34-3
4-34-4

Fire Alarm System


Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between and Fire Alarm Control Unit Panel:
Manual fire alarm station (weather proof).
Fire alarm bell (weather proof).
Manual fire alarm station.
Optical smoke detector.

Carried To Summary of Bill No.4

Page 4/21

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item
No

Description

Bill No.04
Biological Tank.

Unit

Quantity

Unit Rate

Previous Current Different In Number

4-34-5 Fire alarm siren (weatherproof).


4-34-6 Fire alarm flasher (weatherproof).
4-34-7 Supply, install and connect fire alarm box including all
necessary accessories as specified Type FB-BT.
4-35 Telephone System
Supply, install and connect telephone box including all
accessories complete as per Specifications and drawing:
4-35-1 10 pairs TB-BT

No.
No.
No.

2
2
1

2
2
1

0
0
0

No.

4-35-2 Supply, install and connect wall mounted telephone outlet RJ 11 No.
including junction box, conduit cover,Cat 3 wires to (TB-BT).

4-35-3 Supply, install and connect wall mounted telephone outlet RJ 11 No.
weather proof including junction box , conduit cover ,Cat 3
wires to (TB-AB2).
4-36 Lightning Protection System
4-36-1 Supply, install and connect complete lightning protection No.
system for the building complete as specified and as per
drawings
4-37 Grounding System
4-37-1 Supply, install and connect a complete service equipment No.
grounding identical to IEC & IEE systems type TNS including
pits, grounding peripheral grid conduit and grounding electrode
conductor, complete as shown on drawings and as specified in
specs.

4-38 SCADA
4-38-1 Supply, install and connect all wiring from RTU unit Including
Device Boxes, Cover Plates and Conduits, complete as shown
on drawings and as specified in Specifications.

No.

Carried To Summary of Bill No.4

Page 4/22

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.04
Biological Tank.

Total

Description

SR
COLLECTION OF BILL NO.1
Page 4 / 1
Page 4 / 2
Page 4 / 3
Page 4 / 4
Page 4 / 5
Page 4 / 6
Page 4 / 7
Page 4 / 8
Page 4 / 9
Page 4 / 10
Page 4 / 11
Page 4 / 12
Page 4 / 13
Page 4 / 14

Carried Forward

Page 4/23

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.04
Biological Tank.

Total

Description

SR
Brought Forward
Page 4 / 15
Page 4 / 16
Page 4 / 17
Page 4 / 18
Page 4 / 19
Page 4 / 20
Page 4 / 21
Page 4 / 22

Total Sum of Bill No. (4) Carried to Summary


of Part 1 in Volume 3

Page 4/24

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
5-1

5-1-1
5-1-2

5-1-3
5-2

5-2-1
5-2-2

Bill No.05
Treated Effluent Water Pump Station

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Excavations & Earth Works


Excavation in any firm soil with manual or/and mechanical
equipment & tools, including dewatering (If any), side
supports, stockpile excavated materials suitable for
backfilling in approved locations, loading and transporting
the disposal materials to approved dumps.
Excavation for foundations from natural ground level
Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.
imported soil to be placed unber stairs consiste of clean sand.
Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork .
100 mm thick.
50 mm thick.

m3

4,610

980

-3,630

600

450

-150

m3

11

11

m2

405

180

-225

560

485

-75

Reinforced In-Situ Concrete


Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and all
materials required for all types of concrete joints (exp.,
contraction & construction... etc) and waterstop (if any) .
All as Per Structural Drawings:
5-2-3

Foundations (Unsmooth concrete)

m3

330

75

-255

5-2-4

Walls ( smooth concrete)

m3

300

-300

Carried To Summary of Bill No.5

Page 5/1

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words
100
0
-100

5-2-5

Trenches with 600 mm depth (smooth Concrete)

m3

5-2-6

Trenches with 1000 mm depth (smooth Concrete)

m3

15

-15

5-2-7

Trenches with 1500 mm depth (smooth Concrete)

m3

90

-90

5-2-8

Tie Beams ( rough concrete)

m3

5-2-9

25

50

25

350

-350

65

258

193

40

-40

25

-17

m3

68

68

Beams (Smooth Concrete)


Columns (Smooth Concrete)
Suspended Solid Slab 200 mm thick (smooth Concrete)
Suspended Solid Slab 220 mm thick (smooth Concrete)

m3
m3
m2
m2

90
80
480
90

92
44
380
0

2
-36
-100
-90

Sundries
upstands and parapets (smooth Concrete)
Gutter ( as Per Structural Drawings ) :
Staircases steps (smooth Concrete)
concrete cantilevers (smooth Concrete)
Concrete pad for mechanical equipments on roof (smooth
Concrete)

m3
No.
m3
m3
m3

15
10
4
2
4

1
9
2
3
2

-14
-1
-2
1
-2

Ground floor Slab 200 mm thick (Smooth Concrete)

5-2-10 Ground floor Slab 150 mm thick (Smooth Concrete)


5-2-11 Columns ( Smooth Concrete)
5-2-12 Concrete pad for mechanical equipments, as specified and as
shown on drawings.
5-2-13 Trenches (smooth concrete).
5-2-14 Ramps (smooth concrete).

m
m
m

Vibrated Reinforced Concrete Class "A" with ordinary


portland cement Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and
waterstop (if any) as Per Structural Drawings:
5-2-15
5-2-16
5-2-17
5-2-18
5-3
5-3-1
5-3-2
5-3-3
5-3-4
5-3-5

Carried To Summary of Bill No.5

Page 5/2

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-4
5-4-1
5-4-2

5-4-3

Bill No.05
Treated Effluent Water Pump Station

Description
Waterproofing:
Polythene sheet gauge 1000 laid horizontally under ground
slab.
Prepare surfaces and apply two layers of bituminous
membrane 4 mm thick each and 50 mm thick screed under
trenches and ground slabs.
Prepare surfaces and apply prime coat and 2 coats of cold
bitumen to concrete surfaces Above and around footing ,
around columns necks and tie beams.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

m2

840

665

-175

m2

440

440

m2

1,800

700

-1,100

Carried To Summary of Bill No.5

Page 5/3

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
5-5

5-5-1
5-5-2

Bill No.05
Treated Effluent Water Pump Station

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:
Block 200 mm thick.

m2

Block 100 mm thick.

325

310

-15

5-6

Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer

5-6-1
5-6-2

m2
m2

500
500

420
420

-80
-80

5-6-3
5-6-4
5-6-5

Foam concrete 50 mm average thick (30mm min.) for slopes


Waterproofing membrane layer 4 mm thick , including required
overlapping
Ditto but laid vertically
Mastic sealant with aluminum flashing to parapets
Protective Sheeting Membrane

L.m
L.m
m2

160
160
500

145
145
420

-15
-15
-80

5-6-6

50 mm thick polystrene rigid heat insulation boards.

m2

500

420

-80

330

280

-50

170

140

-30

5-6-7
5-6-8

50 mm thick graduated gravel layer with 16-32 mm dia.


Cement tiles 400x400x40mm thick laid on roof

m
m

Carried To Summary of Bill No.5

Page 5/4

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-7

5-7-1
5-7-2
5-7-3
5-7-4
5-7-5
5-7-6
5-7-7
5-8

5-8-1
5-8-2
5-8-3

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Steel Work
Aluminum Doors and Windows
Supply and install complete colored powder coated
aluminum doors & windows units glazed and/or non
glazed, fixed in accordance with the manufacturers
instructions including frames, sub-frames, angles,
channels, glazing, beads, sealant, aluminum infill panels,
fixing accessories including glazing and making good
complete all as shown on drawing:
Type 1 with size 1200 mm width x 1200 mm height.
Type 2 with size 1200 mm width x 1200mm height with sand
trap and fly mesh backing.
Type 3 with size 1200 mm width x 1200 mm height.
Type 4 with size 1000 mm width x 2200 mm height.
Type 5 with size 600 mm width x 600 mm height.
Type 6 with size1200mm width x 1200 mm height.
Type 7 with size 1200mm width x 1200mm height with sand
trap and fly mesh backing.
Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 3200mm width x 2600 mm height
including door size 1100mm width x 2100 mm height .
Door Type 2 with size 2000mm width x 2600 mm height .
Door Type 3 with size 1000mm width x 2200 mm height .

No.
No.

24
4

21
6

-3
2

No.
No.
No.
No.
No.

32
1
2
1
4

29
1
2
1
7

-3
0
0
0
3

No.

No.
No.

1
3

1
2

0
-1

Carried To Summary of Bill No.5

Page 5/5

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

5-8-4

Door Type 4 with size 1000mm width x 2200 mm height with


under cut .
5-8-5 Door Type 5 with size 800mm width x 2200 mm height with
under cut .
5-9 Sundries
5-9-1 Supply and Install galvanized steel grating , 1850mm wide for
trench.
5-9-2 Supply and Install galvanized steel grating , 600mm wide for
trench.
5-9-3 Supply and Install galvanized steel grating , 800mm wide for
trench.
5-9-4 Supply and Install galvanized steel grating , 100mm wide to
cover half round trench.
5-9-5 Supply and Install galvanized steel grating , 200mm wide to
cover half round trench.
5-9-6 Supply and install galvanized steel ladder 4100 mm high.
5-9-7 Supply and install galvanized steel ladder 4400 mm high.
5-9-8 Galvanized steel beam, model I (for crane), with B category &
carrying capacity of 3 tons.
5-9-9 Supply and install galvanized steel handrail with 1000 mm
height including post & supports & all accessories required to
finish the work.
5-10 Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
5-10-1 For walls and columns.

Unit
No.

Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0

No.

L.m

31

31

L.m

47

-47

L.m

45

45

L.m

31

-31

L.m

35

35

No.
No.
L.m

1
1
70

1
1
70

0
0
0

L.m

25

-17

m2

880

680

-200

Carried To Summary of Bill No.5

Page 5/6

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

5-10-2 For ceiling


External Plaster
5-10-3 Tylorene plaster rough texture beige color for external walls
type (b) including grooves with ornamented aluminum Ushaped.
5-11 Ceramic Tiles
5-11-1 Unglazed heavy duty ceramic floor tiles size 200 x 200 mm of
approved quality and color including mortar bed from cement
sand ratio(3:1), sand layer and pointed in special colored grout:

m2

Unit Rate
Quantity
Previous Current Different In Number
In Words
450
540
90

m2

315

310

-5

m2

5-11-2 Glazed ceramic wall tiles size


200 x 200 mm of approved
quality and color including adhesive
5-12 Terrazzo tiles
Precast terrazzo floor tiles of approved quality and color
including mortar bed from cement sand ratio
(3:1) ,sand
layer and pointed in special colored grout :

m2

22

22

5-12-1
5-12-2
5-13
5-13-1
5-13-2
5-14

m2
L.m

24
22

3
6

-21
-16

L.m
L.m

1
8

1
8

0
0

m2

240

600

360

L.m

170

165

-5

250 x 250 x 25 mm terrazzo tiles to floors .


100 mm heigh terrazzo skirting.
Marble Threshold
Marble threshold , 100 mm wide ,30 mm thick.
Marble threshold , 200 mm wide ,30 mm thick.
Painting Work
Internal
5-14-1 Anti-slip epoxy paint for flooring insulator and resistant to
acids, chemicals, oils & grease
5-14-2 Epoxy paint applied on 100 mm high screed base.

Carried To Summary of Bill No.5

Page 5/7

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.05
Treated Effluent Water Pump Station

Description

Item No

Prepare Surfaces and Apply Prime Coat, required Putty


layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.
5-14-3 For plastered walls

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

m2

860

680

-180

5-14-4 For plastered ceiling

460

540

80

Prepare Surfaces and Apply Prime Coat, required Putty


layers,Two Undercoats and Necessary Finishing Coats
from Emulsion Paint.
5-14-5 For plastered walls

m2

17

-17

Carried To Summary of Bill No.5

Page 5/8

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Mechanical Works:
First: Wastewater Treatment Equipment & Works
Supply, install and test following items complete with
fittings and all accessories according to drawings and
specifications

5-15
5-15-1
5-15-2
5-15-3
5-15-4
5-15-5
5-15-6
5-15-7
5-15-8
5-15-9
5-15-10
5-15-11
5-15-12

Notes
All pipes and fittings shall be ductile iron (DI), unless
otherwise mentioned
All pipes and fittings for suction lines inside building shall be
PN-10 rated
All pipes and fittings for delivery lines inside building shall be
PN-10 rated
Main Suction Header
Pipe connection 600 mm diam. With flanges (variable length)
Tee Connection 600/300 mm diam., flanged type
Tee Connection 600/100 mm diam., flanged type
Tee Connection 600/150 mm diam., flanged type
Drain ball valve 50 mm diam.
Puddle piece 600 mm diam., flanged and spigot type
Dismantling piece 600 mm diam., flanged type
Blind flanged 600 mm diam.
Blind flanged 300 mm diam.
Blind flanged 100 mm diam.
Collar 600 mm diam.
Gate valve 600 mm dia

L.m
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

17
6
3
2
1
1
5
1
3
1
1
0

Carried To Summary of Bill No.5

Page 5/9

17
6
0
2
1
1
5
1
3
0
0
1

0
0
-3
0
0
0
0
0
0
-1
-1
1

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-16
5-16-1

5-17
5-17-1
5-17-2
5-17-3
5-17-4
5-17-5
5-18
5-18-1
5-18-2

Bill No.05
Treated Effluent Water Pump Station

Description
Group (1): pump to transmission line 500 mm diam . to
(Dalagan tank)
Horizontal Split case Centrifugal pumps discharge 100 l/s with
head 45 m complete with electrically motor , pressure gauges in
suction and delivery pipes , fittings and accessories for erect
and operation
Group (1) Suction pipe line
Double Flanged 90 Elbow 300 mm diam.
Connectin pipes 300 mm diam., flanged type (various lengthes)
Manually operated Gate Valve 300 mm diam.
Dismantling piece 300 mm diam., flanged type
Double Flanged Eccentric reducer 300/ pump suction
Group (1) Delivery pipe line
Double Flanged concentric reducer 250/ pump outlet
Double Flanged Pipe 250 mm diam. (1500 mm Length approx.)

5-18-3 Non- Return valve (check valves) 250 mm diam.


5-18-4 Dismantling piece 250 mm diam., flanged type
5-18-5 Manually and electrically operated butterfly Valve
250 mm
diam. Ready to be connected to (RTU) and SCADA system
5-18-6 All Flanged Tee Connection 500/250 mm diam.
5-18-7 Connecting Pipes 500 mm diam., flanged type
5-18-8 Flanged dismantling piece 500 mm diam., flanged type
5-18-9 Flanged and spigot puddle pipe 500 mm diam.
5-18-10 Collar 500 mm diam.
5-18-11 Blind flanged 300 mm diam.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.
L.m
No.
No.
No.

3
8
3
3
3

3
8
3
3
3

0
0
0
0
0

No.
No.

3
3

3
3

0
0

No.
No.
No.

3
3
3

3
3
3

0
0
0

No.
L.m
No.
No.
No.
No.

6
14
3
1
1
3

6
14
3
1
0
3

0
0
0
0
-1
0

Carried To Summary of Bill No.5

Page 5/10

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

5-19

Group (2): pump to transmission line 100 mm diam . to


(university compus)
5-19-1 Vertical Centrifugal pumps ( In- Line) discharge 10 l/s with
head 60 m complete with electrically motor, pressure gauges in
suction and delivery pipes , fittings and accessories for erect
and operation
5-19-2 pressrized stainless steel tank (hydroform) with capacity 1 m3
complete with connection pipes on delivery line , gauges. Gate
valve and all fittings neccassery for erec and operation.
5-20
5-20-1
5-20-2
5-20-3
5-20-4
5-20-5
5-21
5-21-1
5-21-2
5-21-3
5-21-4

Group (2) Suction pipe line


Double Flanged 90 Elbow 100 mm diam.
Connecting pipes 100 mm diam., flanged type
Manually operated Gate Valve 100 mm diam.
Dismantling piece 100 mm diam., flanged type
Double Flanged Eccentric reducer 100/ pump suction
Group (2) Delivery Pipe Line
Double Flanged concentric reducer 100/ pump outlet
Non- Return (check valve) valve 100 mm diam.
Dismantling piece 100 mm diam., flanged type
Manually and electrically operated butterfly Valve
100 mm
diam. Ready to be connected to (RTU) and SCADA system

5-21-5
5-21-6
5-21-7
5-21-8
5-21-9
5-21-10

Tee Connection 100/100 mm diam., flanged type


Connecting pipes 100 mm diam., flanged type
Puddle piece 100 mm diam., flanged and spigot type
Collar 100 mm diam.
Blind flanged 100 mm diam.
Drain ball valve 25 mm diam.

No.

-2

No.

-1

No.
L.m
No.
No.
No.

2
6
2
2
2

0
0
0
0
0

-2
-6
-2
-2
-2

No.
No.
No.
No.

2
2
3
2

0
0
0
0

-2
-2
-3
-2

No.
L.m
No.
No.
No.
No.

3
13
1
1
2
1

0
0
0
0
0
0

-3
-13
-1
-1
-2
-1

Carried To Summary of Bill No.5

Page 5/11

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

5-22 Group (3): Potable water pumps for sit layout


5-22-1 Horizontal Centrifugal pumpsl Centrifugal pumps ( In- Line)
discharge 20 l/s with head 40 m complete with electrically
motor, pressure gauges in suction and delivery pipes , fittings
and accessories for erect and operation.
5-22-2 pressrized stainless steel tank (hydroform) with capacity 1 m3
complete with connection pipes on delivery line , gauges. Gate
valve and all fittings neccassery for erec and operation.
5-23
5-23-1
5-23-2
5-23-3
5-23-4
5-23-5
5-24
5-24-1
5-24-2
5-24-3
5-24-4
5-24-5
5-24-6
5-24-7
5-24-8
5-24-9
5-24-10
5-24-11

Group (3) Suction pipe line


Double Flanged 90 Elbow 150 mm diam.
Connecting pipes 150 mm diam. (various Length)
Manually operated Gate Valve 150 mm diam.
Dismantling piece 150 mm diam., flanged type
Double Flanged Eccentric reducer 150/ pump suction
Group (3) Delivery pipe line
Double Flanged concentric reducer 100/ pump outlet
Non- Return valve (check valve) 100 mm diam.
Dismantling piece 100 mm diam., flanged type
Manually operated gate Valve 100 mm diam.
Tee Connection 100/100 mm diam., flanged type
Tee Connection 50/100 mm diam., flanged type
Connecting pipes 100 mm diam., flanged type
Puddle piece 100 mm diam., flanged and spigot type
Collar 100 mm diam.
Blind flanged 100 mm diam.
Drain ball valve 25 mm diam.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

No.
L.m
No.
No.
No.

3
6
2
2
2

2
6
2
2
2

-1
0
0
0
0

No.
No.
No.
No.
No.
No.
L.m
No.
No.
No.
No.

2
2
3
2
2
1
7
1
1
2
1

2
2
2
2
2
1
7
1
0
1
1

0
0
-1
0
0
0
0
0
-1
-1
0

Carried To Summary of Bill No.5

Page 5/12

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

5-25 Measuring Equipment


5-25-1 pressure sensor with pressure transmitter including all
accessories ready to be connected to (RTU) and SCADA
system
5-25-2 pressure switch including all accessories ready to connect with
RTU/ SCADA system
5-25-3 flow switches including all accessories
5-25-4 magnetic flow meter 500 mm diam.
5-25-5 magnetic flow meter 100 mm diam.
5-26 Subsidiary Equipment
5-26-1 submersible pumps with capacity 3 l/s and head 10 m complete
with gate valves , non- return valves , fittings, puddle pieces ,
collars, base plates , duck foot , floating valves and control
panel for automatic operation with all necessary accessories.
5-26-2 Manually and electrically overhead crane 3 ton
5-27 Water hammer protection system
5-27-1 water hammer analysis for pump ng system include Group (1)
pumps to transmission line 500 mm diam. To (Dalagan Tank

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

-1

No.

-2

No.
No.
No.

7
1
2

5
1
1

-2
0
-1

No.

No.

No.

0
0
0

No.

-1

contractor shall coordinate with directorate general water


& waste water to get approved shop drawing to complete
water hammer analysis study before staring work in anti
hammer system
5-27-2 Supply, install and test surge tanks , air valves, etc and all
necessary equipments for water hammer protection with pipes,
valves, fittings and all structure works needed to complete anti
hammer protection works
Carried To Summary of Bill No.5

Page 5/13

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
5-28
5-28-1
5-28-2
5-28-3
5-28-4
5-28-5
5-28-6
5-28-7

pumps spare parts


pump impeller
pump shaft
bearing rings
mechanical seal
pump shaft gland
pump bearing set
motor bearing set

Bill No.05
Treated Effluent Water Pump Station

Unit

No.
No.
No.
No.
No.
No.
No.

Unit Rate
Quantity
Previous Current Different In Number
In Words

1
1
2
2
2
2
2

Carried To Summary of Bill No.5

Page 5/14

1
1
2
2
2
2
2

0
0
0
0
0
0
0

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-29

5-29-1
5-29-2
5-30
5-30-1
5-30-2
5-30-3

5-30-4
5-30-5
5-31

5-31-1
5-31-2

Bill No.05
Treated Effluent Water Pump Station

Description
Second: Plumbing, Fire Fighting & HVAC Works
Plumbing Fixtures
Supply, Install, Connect and Test the Following Sanitary
Fixtures Complete with Mixers, Angle Valves, Flexible
Connections, Soap Holder, Paper Holder and all Fittings
and Accessories as Specified and as Shown on the
Drawings:
Vitreous china European water closet.
Vitreous china wash basin lavatory.
Drainage Work
Drainage and Vent Pipes
110 mm pipe diameter (PVC)
75 mm pipe diameter (PVC)
50 mm pipe diameter (PVC)
Supply, Install and Test the Following Fittings Complete as
Specified and as Shown on Drawings:
75 mm diameter floor drain
50 mm roof vent cap side wall mounted.
Water Supply
Supply, Install and Test the Following Complete as
Specified and as Shown on Drawings:
Electric water heater 30 liter capacity, 1.5 Kw.
Polyethylene tank with capacity 1000 liter.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.

1
1

1
1

0
0

L.m
L.m
L.m

4
2
5

4
2
5

0
0
0

No.
No.

1
1

1
1

0
0

No.
No.

1
1

1
1

0
0

Carried To Summary of Bill No.5

Page 5/15

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Supply, Lay, Connect and Test the Following Pipes


Including all Necessary Fixing Accessories and Fittings
Complete as Specified and as Shown on Drawings:
Cold Water Pipes (polypropelene)
5-31-3 25 mm diameter.
5-31-4 32 mm diameter.
Hot Water Pipes (polypropelene) with insulation
5-31-5 25 mm diameter.
Supply, Lay, Connect and Test the Following Pipes
Including all Necessary Fixing Accessories and Fittings
Complete as Specified and as Shown on Drawings:

L.m
L.m

6
5

6
5

0
0

L.m

32 mm diameter isolating valve.


15 mm diameter flushing hose.
Fire Fighting System
Portable dry powder fire extinguisher 6 Kg capacity fixed to
wall.
5-32-2 CO2 fire extinguisher 5 Kg capacity fixed to walls.
5-33 Air Conditioning And Ventilation System
Supply, Install and TestMini-Split Units Including
Evaporator Blower Unit and Condensing Unit with Steel
base, vibration isolators, controls and accessories:

No.
No.

1
1

1
1

0
0

No.

-2

No.

-2

5-33-1 Type MSIU -1 & MSOU-1, cooling load capacity 18 MBH .


Cooling only

No.

5-33-2 Type MSIU -2 & MSOU-2, cooling load capacity 24 MBH .


Cooling only

No.

5-31-6
5-31-7
5-32
5-32-1

Carried To Summary of Bill No.5

Page 5/16

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Fans
Supply, Install and Test the Following Fans, Including
Flanges, Support Framing, Mounting Bolts, Controls and
all Necessary Fixing Accessories and Connection as
Specified and as Shown on Drawings:
5-33-3 Exhaust fans type EXF-01, 7650 CFM, 0.3" WG static
pressure.
5-33-4 Exhaust fans type EXF-01, 3750 CFM, 0.3" WG static
pressure.
5-33-5 Exhaust fans type EXF-02, 70 CFM, 0.1" WG static pressure.
5-33-6 Exhaust fans type EXF-03, 100 CFM, 0.1" WG static pressure.

No.

-4

No.

No.
No.

1
1

1
1

0
0

Carried To Summary of Bill No.5

Page 5/17

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-34

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Electrical Works
Lighting & Power Panel Boards
Supply, install and connect the following lighting and
power panleboards complete with main, secondary circuit
breakers,earthing network and and all necessary devices as
shown on drawings and as specified:

5-34-1
5-34-2
5-34-3
5-34-4
5-34-5
5-34-6
5-35

Lighting and power panelboard type " LP-TW "


Lighting and power panelboard type " LP-UPS "
Control panel for exhaust fans type (MSP-TW)
Lighting switch panel (LSP)
Control panel for Motorized valves type (MCC-MOV)
Control panel for dewatering pumps type (PCP-DW)
Motor control center (MCC)
Supply, install and connect the following motor control
centers complete with main and secondary circuit
breakers,contactors,starters,digital instruments, relays,
surge arrestors ,PLC unit and all necessary
conduits,devices and control wires as per drawings and
specifications.
5-35-1 Motor control cenetr "MCC-TW" for treated water pumTW

No.
No.
No.
No.
No.
No.

1
1
1
1
1
1

1
1
1
1
1
1

0
0
0
0
0
0

No.

Carried To Summary of Bill No.5

Page 5/18

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-36

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Low Tension Cables:Supply install and connect the following multi-core cable
(CU/XLPE/PVC),with necessary ties, glands, cable cleats,
cable trays, including earthing wire:
Note: cables for second stage for branches feeders shall not
be supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected
in the current stage to facilitate the installation for the
second stage as described in the drawings.

5-36-1 Cable 3x120 mm + E=70mm


from MCC-TW to disconnect switches of (treated pumTW 1st
group)
5-36-2 Cable 3x16 mm + E=16 mm
from MCC-TW to disconnect switches of (treated pumTW 2nd
group)
from MCC-TW to disconnect switches of (Service water
pumTW)

L.m

110

110

L.m

200

200

5-36-3 Cable (4x25) mm + E=16 mm


from MCC-TW to (LP-TW)
Supply install and connect the following multi-core cable
(CU/PVC/PVC) , with necessary ties, glands, cable cleats,
cable trays, including earthing wire (Location of pumps
valves and flow meters inside pump station as dscribed in
the SCADA system):
5-36-4 Cable 3x4 mm from MCC-MOV to (Flowmeters)
5-36-5 Cable 3x4mm + E=4 mm
from MSP-TW to exhaust fans
Carried To Summary of Bill No.5

L.m

10

10

L.m
L.m

140
120

140
120

0
0

Page 5/19

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

5-36-6 Cable 4x4mm + E=4 mm


from MCC-TW to disconnect switches of overhead crane
(O.H.C)
5-36-7 Cable 4x6mm+E=6 mm
from MCC-TW to MSP-TW & PCP-DW
5-36-8 Cable 4x10mm + E=10mm
from "MCC-TW" to " MCC-MOV"
5-37 Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable.

L.m

5-37-1
5-37-2
5-37-3
5-37-4
5-37-5

Lighting Point 3 x 2.5 mm2.


16-Amp.220 volt double receptacle
16-Amp.220 volt double receptacle inside ground box
16-Amp.220 volt single receptacle(Weatherproof).
20-Amp. 220 volt single receptacle industrial type
(Weatherproof).
5-37-6 30-Amp. 380 volt three phase receptacle industrial type
(Weatherproof).

Unit Rate
Quantity
Previous Current Different In Number
In Words
60
60
0

L.m

75

75

L.m

10

10

No.
No.
No.
No.
No.

57
12
2
11
1

57
12
2
11
1

0
0
0
0
0

No.

Carried To Summary of Bill No.5

Page 5/20

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

5-37-7
5-37-8
5-37-9
5-37-10
5-37-11
5-37-12
5-37-13
5-37-14
5-37-15
5-37-16
5-37-17
5-38

Bill No.05
Treated Effluent Water Pump Station

Description
Supply, Install and Connect the Following devices,
Including Device Boxes, Cover Plates, Conduits and
Wiring to Lighting Points or Receptacles or panelboards
as Applicable:
One way one gang switch.
One way one gang switch (weatherproof).
One way two gang switch.
Two way one gang switch
Lighting switches panel type (LSP-TW)
Douple pole switch 20A for water heater .
Douple pole switch 30A for AC split unit.
Cable outlet for AC split unit .
Cable outlet for water heater.
Flexible Cable outlet for exhaust fan.
Electrical Box for R.T.U
Sundries Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point and all disconnect switches regarding 2nd stage shall
not be supplied in the current stage :

5-38-1 Disconnect switch 3x 200A, IP55 for (treated pumps 1st


group) including wiring conduits (power and control ) to
cable outlet
5-38-2 Disconnect switch 3x40A, IP55 for (treated pumps 2nd group )
including wiring conduits (power and control ) to cable outlet

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

2
1
2
4
1
1
4
4
1
2
1

2
1
2
4
1
1
4
4
1
2
1

0
0
0
0
0
0
0
0
0
0
0

No.

No.

Carried To Summary of Bill No.5

Page 5/21

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words
2
2
0

5-38-3 Disconnect switch 3x50A, IP55 for (Service water pumps )


including wiring conduits (power and control ) to cable outlet

No.

5-38-4 Disconnect switch 3x30A, IP55 for O .H crane including


wiring conduits (power and control ) to cable outlet
5-38-5 Disconnect switch 3x20A, IP55 for Exhaust fans and pumps
valves including wiring conduits
(power and control ) to
cable outlet
5-38-6 Disconnect switch 2x30A, IP65 for A .C unit including wiring
conduits (power and control ) to cable outlet
5-38-7 Uninterruptable Power Supply (UPS) unit (4 KVA ) operating
for 3 hours.
5-38-8 Supply, Install, Fixing and Connect cable trays complete, with
all necessary accessories required for complete installation as
specified and as indicated on the drawings.

No.

No.

No.

No.

No.

No.

5-39 Routes in second stage


5-39-1 Supply and install cable trays,supports and and all necessary
accessories as shown on drawings and as specified and all
necessary ducts,routs ,conduits ,etc for 2 nd stage should be
supplied and erected in the current stage with all necessary
accessories to facilitate the installation of cables in the second
stage according to the specification and recommendations
from the engineer

Carried To Summary of Bill No.5

Page 5/22

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
5-40

5-40-1
5-40-2
5-40-3
5-40-4
5-40-5
5-40-6
5-40-7
5-40-8
5-40-9
5-40-10
5-40-11
5-40-12
5-41

5-41-1
5-41-2
5-41-3
5-41-4
5-41-5
5-41-6

Bill No.05
Treated Effluent Water Pump Station

Description
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :
Type 65 ECA236.
Type 65 SMH150.
Type 65 FMH150.
Type 20 EMA42.
Type 20 ENA24.
Type 65 ECA24.
Type 44 WF118.
Type 65 WF218
Type 44 CF218
Type 20 CF218
Emergency light, type EM2.
Exit light, type EX. (weatherproof)
Fire Alarm System
Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between devices and Fire Alarm Control Unit box (FB).
Manual fire alarm station (weatherproof).
Fire alarm bell (weatherproof).
Manual fire alarm station .
Fire alarm bell .
Optical smoke detector.
Fire alarm Flasher (weatherproof).

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

48
21
5
6
6
3
1
1
1
1
11
1

48
21
5
6
6
3
1
1
1
1
11
1

0
0
0
0
0
0
0
0
0
0
0
0

No.
No.
No.
No.
No.
No.

1
1
3
3
12
1

1
1
3
3
12
1

0
0
0
0
0
0

Carried To Summary of Bill No.5

Page 5/23

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0
1
1
0

5-41-7 Fire alarm Sounder (weatherproof).


5-41-8 Supply, install and connect fire alarm box including all
necessary accessories as specified Type FB-PS.
5-42 Telephone System
Supply, install and connect telephone box including all
accessories complete as per Specifications and drawing:

No.
No.

5-42-1 Supply , install , and connect grounded telephone outlet RJ 11


including junction box , conduit cover , Cat 3 wires to the
nearest telephone box all as specified.
5-42-2 Supply , install , and connect wall mounted telephone outlet
RJ11 including junction box , conduit cover, Cat 3 wires to the
nearest telephone box all as specified.
5-42-3 Supply , install , and connect wall mounted telephone outlet
RJ11 (weather proof ) including junction box , conduit cover ,
Cat 3 wires to the nearest telephone box all as specified.

No.

No.

No.

5-42-4 10 pairs TB-TW.


5-43 Data System
Supply, install and connect the following data outlet
including all accessories complete.
5-43-1 Supply , install , and connect data outlet RJ 45 (ground box )
including junction box , conduit cover , Cat 6 wires to the
intermediate distribution frame all as specified and described
in the drawings
5-43-2 Supply , install , and connect data outlet RJ 45 including
junction box , conduit cover , Cat 6 wires to the intermediate
distribution frame all as specified and described in the
drawings.

No.

No.

No.

Carried To Summary of Bill No.5

Page 5/24

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.05
Treated Effluent Water Pump Station

Description

5-44 Earthing System for power equipments:5-44-1 Supply, install and connect a complete equipment earthing
network including conductors, earth pits and all accessories as
specified,drawings and per IEC IEE - type " TNS"
5-45 Earthing System for SCADA equipments:5-45-1 Supply, install and connect a complete equipment earthing
network including conductors, earth pits and all accessories as
specified,drawings and per IEC IEE - type " TNS"
5-46 Lightning Protection System
5-46-1 Supply, installand connect lightning protection system for the
whole building complete as specified and as per drawings.
5-47 Control and insturmentaion system.
5-47-1 Supply, install and connect all routes (boxes,conduits,cable
trays) from (RTU) to all Field Instruments) ,control panels and
MCC'S with all accessories as specified and drawings

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

No.

No.

Carried To Summary of Bill No.5

Page 5/25

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.05
Treated Effluent Water Pump Station

Description

Total
SR

COLLECTION OF BILL NO. 5


Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
Page 5/7
Page 5/8
Page 5/9
Page 5/10
Page 5/11
Page 5/12
Page 5/13
Page 5/14
Page 5/12
Carried Forward

Page 5/26

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.05
Treated Effluent Water Pump Station

Description

Total
SR

Brought Forward
Page 5/13
Page 5/14
Page 5/15
Page 5/16
Page 5/17
Page 5/18
Page 5/19
Page 5/20
Page 5/21
Page 5/22
Page 5/23
Page 5/24
Page 5/25

Total Sum of Bill No. (5) Carried to Summary


of Part 1 in Volume 3
Page 5/27

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No
6-1

Quantity
Previous

Unit Rate

Current Different In Number

Excavations & Earth Works


Excavation in any firm soil with manual or/and
mechanical equipment & tools, including dewatering (If
any), side supports, stockpile excavated materials suitable
for backfilling in approved locations, loading and
transporting the disposal materials to approved dumps.

6-1-1 Excavation for foundations from natural ground level


6-1-2 Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.

m3
m3

10,000
200

5,200
428

-4800
228

m2

4,500

3,000

-1500

m3
m3
m3

3,780
2,720
431

1,800
815
75

-1980
-1905
-356

6-2

Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork &Polythene sheet gauge 1000
6-2-1 100 mm thick.
Reinforced In-Situ Concrete
Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn
Formwork, Reinforcement, Mechanical and Electrical
Sleeves and all materials required for all types of concrete
joints (exp., contraction & construction... etc) and
waterstop (if any) . All as Per Structural Drawings:
6-2-2 Foundations (rough concrete)
6-2-3 concrete walls (smooth concrete)
6-2-4 Columns (smooth concrete)

Carried To Summary of Bill No.6

Page 6/1

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No
6-2-5
6-2-6
6-2-7
6-2-8

Quantity
Previous

upstands and parapets for power house (smooth concrete)


Suspended Solid Slab 250 mm thick (smooth concrete)
Suspended Solid Slab 300 mm thick (smooth concrete)
Staircases steps (smooth concrete).
Vibrated reinforced concrete Class "A" with ordinary
portland cement including clean sawn formwork,
reinforcement, mechanical and electrical sleeves, pour
strips and water stops (If any) as per structural drawings:

Unit Rate

Current Different In Number

m
m3
m3
m3

29
3,780
35
5

14
0
0
0

-15
-3780
-35
-5

6-2-9 Suspended Solid Slab 250 mm thick (smooth concrete)

m2

13

13

6-2-10 Suspended Solid Slab 250 mm thick (smooth concrete)

2,500

2500

m2

4,510

3,450

-1060

m2

650

390

-260

6-2-11 Stairs (smooth concrete).


6-3 Waterproofing:
6-3-1 Prepare surfaces and apply two layers of bitumenous
membrane each 4 mm thick with geotextile layer and
protection layer of plain concrete 100 mm thick to horizontal
surfaces
6-3-2 Prepare surfaces and apply two layers of bitumenous
membrane each 4 mm including overlapping thick with its
protection boards including all necessary elements for
installation as per engineer approval.

Carried To Summary of Bill No.6

Page 6/2

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No
6-4

Quantity
Previous

Unit Rate

Current Different In Number

Internal and External Painting for Tanks


supply and paint for inner surface of tanks by 3 faces of
pure polyurea "fast hardening "

6-4-1 For walls and Columns.


6-4-2 For floors
6-4-3 For ceiling
supply and paint for external surface and exposed to
atmospheric agents with acrylic paint Boliorathin of 4
faces as per specifications .

m2
m2
m2

7,860
3,700
3,690

2,820
2,340
2,295

-5040
-1360
-1395

6-4-4 For external surface

m2

2,100

1,165

-935

m2

3,930

2,400

-1530

3,930

2,400

-1530

L.m
m2
m2
L.m
m2
m2

255
3,930
3,930
255
2,630
1,300

200
2,400
2,400
200
1,600
800

-55
-1530
-1530
-55
-1030
-500

6-5

Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer

6-5-1 Foam concrete 50 mm average thick (30mm min.) for slopes


6-5-2 Waterproofing membrane layer 4 mm thick, including
required overlapping
6-5-3 Ditto but laid vertically
6-5-4 Protective Sheeting Membrane
6-5-5 50 mm thick polystrene rigid heat insulation boards.
6-5-6 Mastic sealant with aluminum flashing to parapets
6-5-7 50 mm thick graduated gravel layer with 16-32 mm dia.
6-5-8 Cement tiles 400x400x40mm thick laid on roof

Carried To Summary of Bill No.6

Page 6/3

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No

Quantity
Previous

6-6 Metal works


6-6-1 Supply and install stainless steel ladder from top to bottom of
tank , 7100 mm high with safety cage.
6-6-2 Supply and install stainless steel ladder from top to bottom of
tank , 3340 mm high.
6-6-3 Supply and install stainless steel ladder from top to bottom of
tank , 3300 mm high.
6-6-4 Supply and install stainless steel ladder from top to bottom of
tank , 5000 mm high with safety cage.
6-6-5 Supply and install galvanized steel ladder , 7000 mm high with
safety cage, to rise to the roof of the tank
6-6-6 Supply and install galvanized steel ladder , 5500 mm high with
safety cage, to rise to the roof of the tank
6-6-7 Supply and install stainless steel steps wall mounted
, 1800
mm high.
6-6-8 Detto but , 1200 mm high.
6-6-9 Supply and install galvanized steel handrail with
1100 mm
height including post & supports & all accessories for external
stairs.
6-6-10 Supply and Install steel cover , size 900 x 900 mm ,with anti
corrosion paint
6-6-11 Detto but , size 600 x 600 mm
6-6-12 Detto but , size 1000 x 1500 mm

Unit Rate

Current Different In Number

No.

-2

No.

-2

No.

-2

No.

No.

-4

No.

No.

-2

No.
L.m

2
0

0
15

-2
15

No.

-2

No.
No.

6
2

0
2

-6
0

Carried To Summary of Bill No.6

Page 6/4

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No

Quantity
Previous

Unit Rate

Current Different In Number

Mechanical Works
Wastewater Treatment Equipment & Works
Supply, install and test following items complete with all
fitting and accessories
Note
-All pipes, fittings for treated water tanks shall be of ductile
cost iron (DI)
- All pipe fittings for treated water tanks shall be PN-10 rated
6-7 Tank inlet chamber
6-7-1 Collar 300 mm diameter
6-7-2 Elbow 90 diameter 300 mm, flanged Spigot type

No.
No.

2
0

0
2

-2
2

6-7-3 Puddle piece flanged and socket diameter 300 mm


6-7-4 Electrically and manually operated butterfly valves 300 mm
diam. Ready to be connected to (RTU) and SCADA system

No.
No.

2
2

2
2

0
0

6-7-5
6-7-6
6-7-7
6-7-8
6-7-9
6-8
6-8-1
6-8-2
6-8-3
6-8-4
6-8-5
6-8-6
6-8-7

No.
L.m
No.
No.
No.

2
4
2
2
2

2
10
2
2
2

0
6
0
0
0

No.
No.
No.
No.
No.
No.
No.

2
2
2
2
2
2
2

2
2
2
2
2
2
0

0
0
0
0
0
0
-2

Dismantling piece diameter 300 mm


Connecting pipes diameter 300 mm, flanged type
Puddle piece with flanges 300 mm
Elbow 90 diameter 300 mm, flanged type
Bell mooth diameter 300 mm, flanged type
Outlet Chamber
Bell mouth diameter 400 mm, flanged type
Elbow 90 diameter 400 mm, flanged type
Pudlle piece diameter 400 mm, flanged type
Manually operated butterfly valve 400 mm diam.
Dismantling piece diameter 400 mm
Puddle piece diameter 400 mm with flange and spigot type
Collar diameter 400 mm
Carried To Summary of Bill No.6

Page 6/5

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Bill No.06
Treated Effluent Water Tank

Unit

Item No

Quantity
Previous

Unit Rate

Current Different In Number

6-9
6-9-1
6-9-2
6-9-3

Tank overflow
Elbow 90 diameter 400 mm, flanged type
Puddle piece diameter 400 mm, flanged type
Connecting pipes diameter 400 mm, flanged and spigot type

No.
No.
L.m

4
2
10

0
0
0

-4
-2
-10

6-9-4
6-9-6
6-9-5
6-9-9
6-9-7
6-9-8

Elbow 90 diameter 400 mm, socket type


Elbow 90 diameter 300 mm, socket type
Elbow 90 diameter 300 mm, flanged type
Elbow 90 diameter 300 mm, flange socket type
Puddle piece diameter 300 mm, flanged type
Connecting pipes diameter 300 mm, flanged and spigot type

No.
No.
No.
No.
No.
L.m

2
0
0
0
0
0

0
2
2
2
2
10

-2
2
2
2
2
10

No.

-2

No.
No.
No.
No.

4
2
2
2

4
2
2
0

0
0
0
-2

No.

18

40

22

No.

10

10

6-9-10
6-10
6-10-1
6-10-2
6-10-3
6-10-4
6-11
6-11-1

Collar diameter 400 mm, socket type


Tank Drain chamber
Puddle piece diameter 200 mm, flange and socket
Manually operated gate valve 200 mm diam.
Dismantling piece diameter 200 mm, flanged
Collar 200 mm diam.
Vent and Rain drainage
Vent pipe for ventilation 200 mm dia . Including puddle piece
and all other accessories
6-11-2 Rain gutter fro reservoir roof including all fittings to reach
ground level

Carried To Summary of Bill No.6

Page 6/6

In Words

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.06
Treated Effluent Water Tank

Total

Description

SR
COLLECTION OF BILL NO.1
Page 6 / 1
Page 6 / 2
Page 6 / 3
Page 6 / 4
Page 6 / 5
Page 6 / 6

Total Sum of Bill No. (6) Carried to Summary


of Part 1 in Volume 3

Page 6/7

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Bill No.07
Mechanical Dewatering Building

Description

Item No

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

7-1

Excavations & Earth Works


Excavation in any firm soil with manual or/and mechanical
equipment & tools, including dewatering (If any), side
supports, stockpile excavated materials suitable for
backfilling in approved locations, loading and transporting
the disposal materials to approved dumps.
7-1-1 Excavation for foundations from natural ground level
7-1-2 Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.
7-2

m3

142

142

77

77

m2

Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork .

7-2-1 100 mm thick.


7-2-2 50 mm thick.

44

44

184

165

-19

m3
m3
m2
m2

14
27
100
0

14
25
85
11

0
-2
-15
11

Reinforced In-Situ Cconcrete


Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and all
materials required for all types of concrete joints (exp.,
contraction & construction... etc) and waterstop (if any) .
All as Per Structural Drawings:
7-2-3
7-2-4
7-2-5
7-2-6

Foundations (rough concrete)


Tie Beams (rough concrete)
Ground floor Slab 150 mm thick (smooth concrete)
Ground floor Slab 200 mm thick (smooth concrete)

Carried To Summary of Bill No.7

Page 7/1

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No
7-2-7
7-2-8
7-2-9
7-2-10

Bill No.07
Mechanical Dewatering Building

Description

Unit

Trenches 600mm (smooth concrete)


Ramps 150 mm thick (smooth concrete)
Columns necks (smooth concrete)
Walls (smooth concrete).
Vibrated Reinforced Concrete Class "A" with ordinary
portland cement Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and
waterstop (if any) as Per Structural Drawings:

m2
m2
m3
m3

7-2-11
7-2-12
7-2-13
7-3
7-3-1
7-3-2
7-3-3

Columns (smooth concrete)


Beams (smooth concrete)
Suspended Solid Slab 180 mm thick (smooth concrete)
Sundries
Upstands and parapets (smooth concrete)
Gutter ( as Per Structural Drawings ) :
Concrete pad for mechanical equipments, as specified and as
shown on drawings.
7-4 Waterproofing:
7-4-1 Polythene sheet gauge 1000 laid horizontally under footing
,ground slab ,tie beam ,ramps and trenches.
7-4-2 Prepare surfaces and apply two layers of bituminous membrane
4 mm thick each and 50 mm thick screed under trenches and
ground slabs.
7-4-3 Prepare surfaces and apply prime coat and
2 coats of cold
bitumen to concrete surfaces Above and around footing
,
around columns necks ,trenches and tie beams.

Unit Rate
Quantity
Previous Current Different In Number
In Words
12
12
0
9
11
2
2
2
0
0
2
2

m3
m3
m2

10
21
132

10
19
105

0
-2
-27

m3
No.
m3

4
4
1

4
4
2

0
0
1

m2

120

209

89

m2

85

85

m2

220

220

Carried To Summary of Bill No.7

Page 7/2

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

Bill No.07
Mechanical Dewatering Building

Description

7-4-4 Prepare surfaces and apply two layers of bituminous membrane


4 mm thick each with geotextile layer and 50 mm thick screed
to horizontal surfaces.
7-4-5 Prepare surfaces and apply two layers of bituminous membrane
4 mm thick each with polypropylene protection boards for
vertical surfaces as per engineer approval.
7-5 Structural Steel Works
7-5-1 Structural Steel work , the price including Design ,Supply and
erect and Fixing in Position all the Structural Steel element
complete with connection,Welding , Painting with Protection
Coating , stairs , all neccesary accessories, etc, all Shop and
Design Drawings to be Approved by the Engineer Before
Commencement of Fabrication.

Unit
m2

Unit Rate
Quantity
Previous Current Different In Number
In Words
0
12
12

m2

m2

40

40

Carried To Summary of Bill No.7

Page 7/3

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Description

Item No
7-6

Bill No.07
Mechanical Dewatering Building

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:

7-6-1 Block 200 mm thick.


7-7

m2

180

180

m2

117

117

Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer

7-7-1 Foam concrete 50 mm average thick (30mm min.) for slopes


7-7-2 Waterproofing membrane layer 4 mm thick , including required
overlapping

117

117

7-7-3 Ditto but laid vertically

L.m

45

45

7-7-4 Mastic sealant with aluminum flashing to parapets

L.m

45

45

7-7-5 Protective Sheeting Membrane

m2

117

117

7-7-6 50 mm thick polystrene rigid heat insulation boards.

m2

7-7-7 50 mm thick graduated gravel layer with 16-32 mm dia.


7-7-8 Cement tiles 400x400x40mm thick laid on roof

117

117

77

77

40

40

m
m

Carried To Summary of Bill No.7

Page 7/4

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Description

Item No
7-8

Bill No.07
Mechanical Dewatering Building

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Aluminum Doors and Windows

Supply and install complete colored powder coated


aluminum doors & windows units glazed and/or non
glazed, fixed in accordance with the manufacturers
instructions including frames, sub-frames, angles,
channels, glazing, beads, sealant, aluminum infill panels,
fixing accessories including glazing and making good
complete all as shown on drawing:
7-8-1 Type 1 with size2500mm width x 1200 mm height.

No.

7-8-2 Type 2 with size2500mm width x 1200 mm height.

No.

7-8-3 Type 3 with size 2500mm width x 1200mm height with fly
mesh backing.

No.

7-8-4 Type 4 with size 2500mm width x 1200mm height with fly
mesh backing.

No.

No.
No.
No.
No.

3
0
2
0

0
3
0
2

-3
3
-2
2

m2

12

10

-2

7-9

7-9-1
7-9-2
7-9-3
7-9-4
7-10
7-10-1

Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 1800mm width x 2200 mm height .
Door Type 1 with size 1800mm width x 2500 mm height .
Door Type 2 with size 1000mm width x 2200 mm height .
Door Type 2 with size 1000mm width x 2500 mm height .
Sundries
Supply and Install galvanized steel checkered plate for trenchs.

Carried To Summary of Bill No.7

Page 7/5

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Bill No.07
Mechanical Dewatering Building

Description

Item No

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words
10
10
0

7-10-2 Supply and Install galvanized steel grating, 150mm wide to


cover half round trench.
7-10-3 Supply and install galvanized steel handrail with
1100mm
height includes any materials and activities required to finish
the work.

L.m
L.m

21

21

7-10-4 Supply and install galvanized steel ladder 7350 mm high with
safety cage.

No.

m2
m2

305
105

305
105

0
0

m2

180

180

m2

135

135

7-12-2 Epoxy paint applied on 100 mm high screed base.


Prepare Surfaces and Apply Prime Coat, required Putty
layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.

L.m

50

50

7-12-3 For plastered walls

m2

305

305

105

105

7-11

Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
7-11-1 Walls and Columns.
7-11-2 For ceiling
External Plaster
7-11-3 Tylorene plaster rough texture beige color for external walls
type (b) including cavity is marked by aluminum U-shaped.
7-12

Painting Work
Internal
7-12-1 Epoxy paint for flooring insulator and resistant to acids,
chemicals, oils, grease and anti-slip.

7-12-4 For plastered ceiling

Carried To Summary of Bill No.7

Page 7/6

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

Bill No.07
Mechanical Dewatering Building

Description

Mechanical Works
First: Wastewater Treatment Equipment & Works
Supply, install and test following items complete with all
accessories as per specification and drawings
7-13 Equipment
7-13-1 Centrifugal decounter capacity of 35 m3/hr including pipes,
fittings, joints, meters and all accessories and metal works

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

7-13-2 Dosing metering pump positive displacement type


for polymer ccapacity 3 m3/hr at a pressure of 2 bar including
all pipes, fittings, connections and meters on inlet and outlet

No.

7-13-3 Horizontal screw conveyer with all accessories


7-13-4 Inclined screw conveyer with all accessories
7-13-5 Container from stainless steel
(316 L ) capacity 5 m 3 for
dewatered sludge
7-13-6 Polymer preparation system including tanks , mixers (high and
low speed) and all other accessories with capacity 3 m3/hr

No.
No.
No.

1
1
2

1
1
2

0
0
0

No.

7-13-7 All sludge pipes, polymer dosing pipes and drain pipes
including all fittings inside the building
7-14 Measuring Equipment
7-14-1 Pressure sensor with pressure transmitter with all accessories
ready to be connected to (RTU) and SCADA system

No.

No.
No.

7-14-2 Pressure switch with pressure transmitter with all accessories


ready to be connected to (RTU) and SCADA system

No.

7-14-3 Flow switch with all accessories


7-14-4 Electromagnetic flowmeter diameter 75 mm with all accessories
7-14-5 Electromagnetic flowmeter diameter 25 mm with all accessories

No.
No.
No.

2
2
2

2
2
2

0
0
0

Carried To Summary of Bill No.7

Page 7/7

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

Bill No.07
Mechanical Dewatering Building

Description

Second: Plumbing, Fire Fighting & HVAC Works


7-15 Fire Fighting System
7-15-1 Portable dry powder fire extinguisher 6 Kg capacity fixed to
wall.
7-15-2 CO2 fire extinguisher 5 Kg capacity fixed to walls.
7-16 HVAC & Ventilation System
Supply, Install and TestMini-Split Units Including
Evaporator Blower Unit and Condensing Unit with Steel
base, vibration isolators, controls and accessories:

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

7-16-1 Unit 24 MBH. Cooling capacity


FANS
Supply, Install and Test the Following Fans, Including
Flanges, Support Framing, Mounting Bolts, Controls and
all Necessary Fixing Accessories and Connection as
Specified and as Shown on Drawings:

No.

-1

7-16-2 Exhaust Fans EXF-01, 2120 CFM, 0.4" WG static pressure.

No.

Carried To Summary of Bill No.7

Page 7/8

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No
7-17

Bill No.07
Mechanical Dewatering Building

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Electrical Works
Lighting & Power Panel Boards
Supply, install and connect the following lighting and
power panleboards complete with main, secondary circuit
breakers,earthing network and and all necessary devices as
shown on drawings and as specified:

7-17-1 Lighting and power panelboard type " LP-MDB "


7-17-2 Control panel for exhaust fans type (MSP-EXF)
7-18 Motor control center (MCC)
Supply, install and connect the following motor control
centers complete with main and secondary circuit
breakers,contactors,starters,digital instruments, relays,
surge arrestors ,PLC unit and all necessary
conduits,devices and control wires as per drawings and
specifications.

No.
No.

1
1

1
1

0
0

7-18-1 Motor control cenetr "MCC-MDB" for treated water pumps

No.

L.m

40

40

L.m

10

10

7-19

Low Tension Cables:Supply install and connect the following multi-core cable
(CU/XLPE/PVC),with necessary ties, glands, cable cleats,
cable trays, including earthing wire:

7-19-1 Cable 3x95 mm + E=50mm


from MCC-MDB to disconnect switches of (DECANTER)
7-19-2 Cable (4x10) mm + E=10 mm
from MCC-PS to (LP-MDB)

Carried To Summary of Bill No.7

Page 7/9

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

Bill No.07
Mechanical Dewatering Building

Description

Unit

7-19-3 Cable 3x10 mm + E=10 mm


from MCC-MDB to disconnect switches of sludge progressive
cavity pump
Supply install and connect the following multi-core cable
(CU/PVC/PVC) , with necessary ties, glands, cable cleats,
cable trays, including earthing wir :
7-19-4 Cable 3x4mm + E=4 mm
from MCC-MDB to polymer progressive cavity pumps
from MCC-MDB to screw conveyor.
from MCC-MDB to mixer
7-19-5 Cable 2x4mm+E=4 mm
from MCC-MDB to MSP-EXF
7-19-6 Cable 2x2.5mm + E=2.5mm
from " MSP-PS" to exhaust fans
7-20 Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and Wiring
Between Devices and to panelboard, Contactor or to
lighting Switch panelboards as Applicable.

L.m

7-20-1
7-20-2
7-20-3
7-20-4

Lighting Point 3 x 2.5 mm2.


16-Amp.220 volt single receptacle
16-Amp.220 volt single receptacle(Weatherproof).
20-Amp. 220 volt single receptacle industrial type
(Weatherproof).
7-20-5 30-Amp. 380 volt three phase receptacle industrial type
(Weatherproof).
7-20-6 Cable outlet for AC split unit .
7-20-7 Electrical Box for R.T.U.

Unit Rate
Quantity
Previous Current Different In Number
In Words
20
20
0

L.m

60

60

L.m

10

10

L.m

40

40

No.
No.
No.
No.

36
1
8
2

36
1
8
2

0
0
0
0

No.

No.
No.

1
1

1
1

0
0

Carried To Summary of Bill No.7

Page 7/10

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

7-20-8
7-20-9
7-20-10
7-20-11
7-20-12
7-20-13
7-21

Bill No.07
Mechanical Dewatering Building

Description
Supply, Install and Connect the Following devices,
Including Device Boxes, Cover Plates, Conduits and Wiring
to Lighting Points or Receptacles or panelboards as
Applicable:
One way one gang switch (weatherproof).
One way two gang switch.
One way two gang switch (weatherproof).
two way one gang switch (weatherproof)
two way two gang switch (weatherproof)
Douple pole switch 30A for AC split unit.
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires (except pump cable) Between devices
and main connection point :

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.
No.
No.

1
1
1
2
4
1

1
1
1
2
4
1

0
0
0
0
0
0

7-21-1 Disconnect switch 3x250A, IP55 for decanter.


7-21-2 Disconnect switch 3x40A, IP55 for sludge progressive cavity
pumps.
7-21-3 Disconnect switch 3x20A, IP55 for polymer progressive cavity
pumps, screw conveyor and Mixer.
7-21-4 Disconnect switch 2x15A, IP65 for Exhaust fans including
wiring conduits (power and control) to cable outlet

No.
No.

2
2

2
2

0
0

No.

No.

7-21-5 Disconnect switch 2x30A, IP65 for A .C unit including wiring


conduits (power and control) to cable outlet

No.

Carried To Summary of Bill No.7

Page 7/11

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Description

Item No
7-22

7-22-1
7-22-2
7-22-3
7-22-4
7-23

7-23-1
7-23-2
7-23-3
7-23-4
7-23-5
7-23-6
7-23-7
7-23-8
7-24

Bill No.07
Mechanical Dewatering Building

Lighting Fixtures and Equipment


Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and Starters
for Fluorescent Fixtures, Through Wiring for Continuous
Rows,and Heat Resistant Wiring to Lighting Point and all
Necessary Accessories :
Type 20 ENA24.
Type 65 ECA24.
Type 65 WF218.
Emergency light, type EM2.
Fire Alarm System
Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between devices and Fire Alarm Control Unit box (FB).
Manual fire alarm station (weatherproof).
Fire alarm bell (weatherproof).
Manual fire alarm station .
Fire alarm bell .
Optical smoke detector.
Fire alarm Flasher (weatherproof)..
Fire alarm Sounder (weatherproof)..
Supply, install and connect fire alarm box including all
necessary accessories as specified Type FB-MDB.
Telephone System
Supply, install and connect telephone box including all
accessories complete as per Specifications and drawing:

7-24-1 5 pairs TB-MDB.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.

4
25
4
3

4
25
4
3

0
0
0
0

No.
No.
No.
No.
No.
No.
No.
No.

2
2
1
1
6
1
1
1

2
2
1
1
6
1
1
1

0
0
0
0
0
0
0
0

No.

Carried To Summary of Bill No.7

Page 7/12

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Item No

Bill No.07
Mechanical Dewatering Building

Description

7-24-2 Supply , install , and connect wall mounted telephone outlet


RJ11 including junction box , conduit cover, Cat 3 wires to the
nearest telephone box all as specified.
7-25 Lightning Protection System
7-25-1 Supply, install and connect lightning protection system for the
whole building complete as specified and as per drawings.
7-26 Earthing System :7-26-1 Supply, install and connect a complete equipment earthing
network including conductors, earth pits and all accessories as
specified,drawings and per IEC IEE - type " TNS".
7-27 Control and Insturmentaion System.
7-27-1 Supply, install and connect all routes (boxes,conduits,cable
trays) from (RTU) to all Field Instruments) ,control panels and
MCC'S with all accessories as specified and drawings

Unit
No.

Unit Rate
Quantity
Previous Current Different In Number
In Words
1
1
0

No.

No.

No.

Carried To Summary of Bill No.7

Page 7/13

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region -2

Bill No.07
Mechanical Dewatering Building

Total

Description

SR
COLLECTION OF BILL NO.7
Page 7 / 1
Page 7 / 2
Page 7 / 3
Page 7 / 4
Page 7 / 5
Page 7 / 6
Page 7 / 7
Page 7 / 8
Page 7 / 9
Page 7 / 10
Page 7 / 11
Page 7 / 12
Page 7 / 13

Total Sum of Bill No. (7) Carried to Summary


of Part 1 in Volume 3

Page 7/14

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
8-1

Bill No.08
Air Blower Building for Grit Removal

Description

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Excavations & Earth Works


Excavation in any firm soil with manual or/and mechanical
equipment & tools, including dewatering (If any), side
supports, stockpile excavated materials suitable for
backfilling in approved locations, loading and transporting
the disposal materials to approved dumps.

8-1-1 Excavation for foundations from natural ground level


8-1-2 Selected fill and backfill to be placed next to walls and
footings and compacted well to the required compaction
density according to drawings & specifications.
8-2 Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork .

m3
m3

50
27

50
27

0
0

8-2-1 100 mm thick.


8-2-2 50 mm thick.
Reinforced In-Situ Concrete

m2
m2

21
80

21
80

0
0

m3
m3
m3

8
2
4

8
2
4

0
0
0

Vibrated Reinforced Concrete Class "A" with Sulphate Resistant


Cement type V Including Clean Sawn Formwork, Reinforcement,
Mechanical and Electrical Sleeves and all materials required for all
types of concrete joints (exp., contraction & construction... etc) and
waterstop (if any) . All as Per Structural Drawings:

8-2-3 Foundations (rough concrete)


8-2-4 Concrete base for equipment (ough concrete)
8-2-5 Trenches (smooth concrete)

Carried To Summary of Bill No.8

Page 8/1

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

8-2-6 Tie Beams ( rough concrete)


8-2-7 Ground floor Slab 150 mm thick (smooth concrete)
8-2-8 Columns Necks ( rough concrete)

Unit
m3
m2
m3

Quantity
Unit Rate
Previous Current Different In Number
In Words
15
15
0
80
50
-30
1
1
0

Vibrated Reinforced Concrete Class "A" with ordinary portland


cement Including Clean Sawn Formwork, Reinforcement,
Mechanical and Electrical Sleeves and waterstop (if any) as Per
Structural Drawings:

8-2-9
8-2-10
8-2-11
8-2-12
8-3
8-3-1

Columns (Smooth Concrete)


Beams (Smooth Concrete)
Suspended Solid Slab 200 mm thick (smooth Concrete)
Suspended Solid Slab 250 mm thick (smooth Concrete)
Sundries
upstands and parapets (smooth Concrete)

8-3-2 Gutter ( as Per Structural Drawings ) :


8-4 Waterproofing:
8-4-1 Polyethylene sheet gauge
1000 laid horizontally under
footings, trenches, tie beams, ground slabs and ramps.
8-4-2 Prepare surfaces and apply two layers of bituminous
membrane 4 mm thick each and 50 mm thick screed under
trenches and ground slabs.
8-4-3 Prepare surfaces and apply prime coat and
2 coats of cold
bitumen to concrete surfaces Above and around footing
,
around columns necks and tie beams.

m3
m3
m2
m2

5
17
30
56

5
17
30
56

0
0
0
0

m3
No.

m2

100

100

m2

60

60

m2

78

78

Carried To Summary of Bill No.8

Page 8/2

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
8-5

Bill No.08
Air Blower Building for Grit Removal

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Block Works
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified , including bond
beams, bond columns, lintels, sills and jambs:

8-5-1 Block 200 mm thick.

m2

135

135

m2

68

68

8-6

Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
8-6-1 Foam concrete 50 mm average thick (30mm min.) for slopes
8-6-2 Waterproofing membrane layer 4 mm thick , including required
overlapping
8-6-3 Ditto but laid vertically

m2

68

68

L.m

47

47

8-6-4 Mastic sealant with aluminum flashing to parapets

L.m

47

47

8-6-5 Protective Sheeting Membrane

m2

68

68

8-6-6 50 mm thick polystrene rigid heat insulation boards.

m2

68

68

8-6-7 50 mm thick graduated gravel layer with 16-32 mm dia.

m2

43

43

8-6-8 Cement tiles 400x400x40mm thick laid on roof

m2

25

25

Carried To Summary of Bill No.8

Page 8/3

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

8-7

Aluminum Doors and Windows


Supply and install complete colored powder coated
aluminum doors & windows units glazed and/or non
glazed, fixed in accordance with the manufacturers
instructions including frames, sub-frames, angles,
channels, glazing, beads, sealant, aluminum infill panels,
fixing accessories including glazing and making good
complete all as shown on drawing:

8-7-1
8-7-2
8-7-3
8-8

Door Type 1 with size2400mm width x 1000 mm height .


Door Type 2 with size 1200mm width x1000 mm height .
Louver Type 3 with size 1200mm width x 1000 mm height .
Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 2500mm width x 2500 mm height with
louver as per drawings.
Door Type 2 with size 1600mm width x 2500 mm height .
Door Type 3 with size 900mm width x 2500 mm height .
Sundries
Supply and Install galvanized steel checkered plate for trench.

8-8-1
8-8-2
8-8-3
8-9
8-9-1

8-9-2 Supply and install galvanized steel ladder 5100 mm high with
safety cage.
8-9-3 Supply and install galvanized steel ladder 3250 mm high.
8-9-4 Galvanized steel bridge with single way, model I (lift), with
the carrying capacity of 1 tons.

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

No.
No.
No.

2
7
12

2
7
12

0
0
0

No.

No.
No.

1
1

1
1

0
0

m2
No.

No.
L.m

1
14

1
14

0
0

Carried To Summary of Bill No.8

Page 8/4

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
8-10

Bill No.08
Air Blower Building for Grit Removal

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:

8-10-1 Walls and Columns.

m2
2

148

148

8-10-2 For ceiling

61

61

External Plaster
8-10-3 Tylorene plaster rough texture beige color for external walls
type (b) including cavity is marked by aluminum U-shaped.

m2

110

110

m2

85

85

L.m

40

40

m2

148

148

61

61

8-11

Painting Work
Internal
8-11-1 Epoxy paint for flooring insulator and resistant to acids,
chemicals, oils, grease and anti-slip.
8-11-2 Epoxy paint applied on 100 mm high screed base.
Prepare Surfaces and Apply Prime Coat, required Putty
layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.
8-11-3 For plastered walls
8-11-4 For plastered ceiling

Carried To Summary of Bill No.8

Page 8/5

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Mechanical Works
First: Wastewater Treatment Equipment & Works
Install, supply and test following items complete with all its
accessories as in drawing, and specifications:8-12

Equipment Works
Notes:
- All pipes and fittings inside the air blower building shall be
from epoxy coated carbon steel, unless otherwise mentioned

8-12-1 Air blower with a flow rate of 500 m3/hr and pressure
difference of 0.5 bar including all accessories, fittings, filters,
siliencer and meters on the discharge mainfold as per
specifications and drawings.

No.

8-12-2 Electrical overhead crane with 1 ton Capacity.


8-13 Measuring equipment
8-13-1 Pressure sensor with a pressure transmitter with all accessories
ready to be connected to (RTU) and SCADA system.

No.

No.

No.
No.
No.
No.
No.

2
2
2
2
2

2
2
2
2
2

0
0
0
0
0

8-14
8-14-1
8-14-2
8-14-3
8-14-4
8-14-5

Spare Parts
complete set of o-rings and mechanical seals
complete set of bearing for both motor and blower
Belt convyer set
Complete set of filtration units
Complete set of flexible joints

Carried To Summary of Bill No.8

Page 8/6

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

Second: Plumbing, Firefighting & HVAC Works


8-15 Fire Fighting System
8-15-1 Portable dry powder fire extinguisher 6 Kg capacity
8-15-2 CO2 fire extinguisher 5 Kg capacity
8-16 HVAC & Ventilation System
Supply, Install and TestMini-Split Units Including
Evaporator Blower Unit and Condensing Unit with Steel
base, vibration isolators, controls and accessories:
8-16-1 Type MSIU-1 & MSOU-1, cooling load capacity 24
MBH.Cooling only

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

No.
No.

2
2

2
2

0
0

No.

Carried To Summary of Bill No.8

Page 8/7

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No

8-17

Bill No.08
Air Blower Building for Grit Removal

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Electrical Works
Lighting & Power Distribution Boards
Supply, install and connect the following lighting and
power Distribution boards complete with main and
secondary circuit breakers,..etc.

8-17-1 Type (LP-ABG)

No.

8-18-1 Motor control cenetr MCC-1


8-18-2 Motor control cenetr MCC-ABG
8-19 Low Tension Cables
Supply install and connect the following multi-core cable
(CU/XLPE/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):

No.
No.

1
1

1
1

0
0

8-19-1 Cable 4x35mm+E=16mm (from MCC-1 to MCC-ABG)


8-19-2 Cable 3x25mm+E=25mm (from MCC-ABG to Disconnected
switch of Air Blowers)

L.m
L.m

10
30

10
30

0
0

8-18

Motor control center (MCC)


Note:
CBs of branch circuits for second stage equipments dont
supplied in this stage, but put spaces in distribution boards
for these CBs as a future extension as per drawings.
Supply, install and connect the following motor control
centers complete with main and secondary circuit
breakers, contactors, starters, digital instruments, relays,
surge arrestors, PLC unit and all necessary devices and
control wires as per drawings and specifications.

Carried To Summary of Bill No.8

Page 8/8

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

Supply install and connect the following multi-core cable


(CU/PVC/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):
8-19-3 Cable 4x10mm+E=10mm (from MCC-ABG to LP-ABG)
8-19-4 Cable 3x6mm+E=6mm (from MCC -ABG to Disconnected
switch of O.H.C)
8-20 Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable:

L.m
L.m

10
15

10
15

0
0

8-20-1
8-20-2
8-20-3
8-20-4
8-20-5

No.
No.
No.
No.
No.

17
2
3
2
1

17
2
3
2
1

0
0
0
0
0

No.
No.

1
2

1
2

0
0

No.
No.
No.
No.

2
1
2
2

2
1
2
2

0
0
0
0

Lighting Point 3 x 2.5 mm2.


16-Amp. 220 volt single receptacle, weather proof
16-Amp. 220 volt duplex receptacle.
16-Amp. 220 volt duplex receptacle, weather proof
20-Amp. 220 volt Industrial usage receptacle, weather proof

8-20-6 30-Amp. 380 volt Industrial usage receptacle, weather proof


8-20-7 Cable outlets for Minisplit AC units
Supply, Install and Connect the Following devices ,
Including Device Boxes, Cover Plates, Conduits and
Wiring to Lighting Points or Receptacles or panelboards
as Applicable:
8-20-8 One way one gang switch, weather proof.
8-20-9 One way two gang switch.
8-20-10 Lighting control panel LSP-ABG
8-20-11 Douple pole switch 30A for AC split unit.

Carried To Summary of Bill No.8

Page 8/9

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
8-21

8-21-1
8-21-2

8-21-3

8-22

8-22-1
8-22-2
8-22-3
8-22-4
8-22-5

Bill No.08
Air Blower Building for Grit Removal

Description
Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point:
Disconnect switch 3x 60A, IP55, for Air Blower including
conduits up to cable outlets.
Disconnect switch 3x 30A, IP55, for over head crane including
conduits and wiring (power and control wires ) up to cable
outlets.
Disconnect switch 2x 30A, IP55, for split unit Ac including
conduits and wiring (power and control wires ) up to cable
outlets.
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :
Type 65SMH150
Type 20ENA24
Type 65WF218
Emergency light, type EM2.
Exit light Unit Type EX, weather proof.

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

No.

No.

No.

No.
No.
No.
No.
No.

4
4
3
5
1

4
4
3
5
1

0
0
0
0
0

Carried To Summary of Bill No.8

Page 8/10

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
8-23

8-23-1
8-23-2
8-23-3
8-23-4
8-23-5
8-23-6
8-23-7
8-23-8
8-23-9
8-24

Bill No.08
Air Blower Building for Grit Removal

Description

Unit

Fire Alarm System


Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between and Fire Alarm Control Unit Panel:
Manual fire alarm station (weather proof).
Fire alarm bell (weather proof).
Manual fire alarm station.
Fire alarm bell.
Optical smoke detector.
Optical heat and smoke detector (Multi sensor).
Fire alarm siren (weatherproof).
.Fire alarm flasher (weatherproof).
Supply, install and connect fire alarm box including all
necessary accessories as specified Type FB-ABG.
Telephone System
Supply, install and connect main telephone fbox including
all accessories complete as per Specifications and drawing:

No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1

0
0
0
0
0
0
0
0
0

No.
No.

1
1

1
1

0
0

No.

8-24-1 5 pairs TB-ABG


8-24-2 Supply, install and connect wall mounted telephone outlet
RJ11 including junction box, conduit cover,Cat 3 wires to (TBABG).
8-24-3 Supply, install and connect wall mounted telephone outlet
RJ11 weather proof including junction box, conduit cover,Cat
3 wires to (TB-ABG).

Quantity
Unit Rate
Previous Current Different In Number
In Words

Carried To Summary of Bill No.8

Page 8/11

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.08
Air Blower Building for Grit Removal

Description

8-25 Lightning Protection System


8-25-1 Supply, install and connect complete lightning protection
system for the building complete as specified and as per
drawings
8-26 Earthing System
8-26-1 Supply, install and connect a complete service equipment
earthing identical to IEC & IEE systems type TNS including
pits, grounding peripheral grid conduit and earthing electrode
conductor, complete as shown on drawings and as specified in
specs.
8-27 SCADA System
8-27-1 Supply, install and connect all wiring from RTU unit Including
Device Boxes, Cover Plates and Conduits, complete as shown
on drawings and as specified in Specifications.

Unit

Quantity
Unit Rate
Previous Current Different In Number
In Words

No.

No.

No.

Carried To Summary of Bill No.8

Page 8/12

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.08
Air Blower Building for Grit Removal

Total

Description

SR
COLLECTION OF BILL NO.8
Page 8 / 1
Page 8 / 2
Page 8 / 3
Page 8 / 4
Page 8 / 5
Page 8 / 6
Page 8 / 7
Page 8 / 8
Page 8 / 9
Page 8 / 10
Page 8 / 11
Page 8 / 12

Total Sum of Bill No. (8) Carried to Summary


of Part 1 in Volume 3

Page 8/13

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
9-1

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Excavations & Earth Works


Excavation in any firm soil with manual or/and
mechanical equipment & tools, including dewatering (If
any), side supports, stockpile excavated materials suitable
for backfilling in approved locations, loading and
transporting the disposal materials to approved dumps.

9-1-1

Excavation for foundations from natural ground level

m3

300

300

9-1-2

m3

100

100

9-2-1
9-2-2

Selected fill and backfill to be placed next to walls and


footings and compacted well to the required compaction
density as specified and as shown on drawings.
Concrete Works
Plain Cast-in Situ Concrete
Plain Concrete Class "B" with Sulphate Resistant Cement
type V and Formwork .
100 mm thick.
50 mm thick.
Reinforced Cast In-Situ Concrete
Vibrated Reinforced Concrete Class "A" with Sulphate
Resistant Cement type V Including Clean Sawn
Formwork, Reinforcement, Mechanical and Electrical
Sleeves and all materials required for all types of concrete
joints (exp., contraction & construction... etc) and
waterstop (if any) . All as Per Structural Drawings:

m2
m2

90
300

90
300

0
0

9-2-3
9-2-4
9-2-5
9-2-6
9-2-7
9-2-8

Footing (Unsmooth concrete)


Trenches 600 mm (smooth Concrete)
Tie Beams ( unsmooth concrete)
Ground floor Slab 150 mm thick (Smooth Concrete)
Columns Necks ( Unsmooth Concrete)
Concrete pad for mechanical equipments (unsmooth concrete).

m3
m3
m3
m2
m3
m3

30
25
55
225
5
14

30
25
55
225
5
17

0
0
0
0
0
3

9-2

Carried To Summary of Bill No.9


Page 9/1

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Vibrated Reinforced Concrete Class "A" with ordinary


portland cement Including Clean Sawn Formwork,
Reinforcement, Mechanical and Electrical Sleeves and
waterstop (if any) as Per Structural Drawings:
9-2-9
9-2-10
9-2-11
9-2-12
9-3
9-3-1
9-3-2
9-4
9-4-1
9-4-2

9-4-3

Beams (Smooth Concrete)


Suspended Solid Slab 250 mm thick (smooth Concrete)
Suspended Solid Slab 220 mm thick (smooth Concrete)
Columns (Smooth Concrete)
Sundries
upstands and parapets (smooth Concrete)
Gutter ( as Per Structural Drawings ) :
Waterproofing:
Polythene sheet gauge 1000 laid horizontally under ground
slab, ground beam & footings.
Prepare surfaces and apply two layers of bituminous
membrane 4 mm thick each and 50 mm thick screed under
trenches and ground slabs.
Prepare surfaces and apply prime coat and
2 coats of cold
bitumen to concrete surfaces Above and around footing
,
around columns necks and tie beams.

m3
m2
m2
m3

20
45
265
30

20
45
265
30

0
0
0
0

m3
No.

8
7

8
7

0
0

m2

390

390

m2

250

250

m2

100

410

310

Carried To Summary of Bill No.9


Page 9/2

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

9-5

Block Work
Hollow precast concrete block work for walls bedded in
cement and sand mortar (1:3) as specified, including bond
beams, bond columns, lintels, sills and jambs:

9-5-1
9-6

Block 200 mm thick.


Roofing System
Supply , spread and place on the roof the following all
complete as specified and as per shop drawings and as
approved by the Engineer
Foam concrete 50 mm average thick (30mm min.) for slopes

m2

300

300

m2

280

280

9-6-2

Waterproofing membrane layer


required overlapping

m2

280

280

9-6-3
9-6-4
9-6-5
9-6-6
9-6-7
9-6-8

Ditto but laid vertically


Mastic sealant with aluminum flashing to parapets
Protective Sheeting Membrane
50 mm thick polystrene rigid heat insulation boards.
50 mm thick graduated gravel layer with 16-32 mm dia.
Cement tiles 400x400x40mm thick laid on roof

L.m
L.m
m2
m2
m2
m2

100
100
280
280
180
100

100
100
280
280
180
100

0
0
0
0
0
0

9-6-1

4 mm thick

, including

Carried To Summary of Bill No.9


Page 9/3

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
9-7

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Aluminum Doors and Windows


Supply and install complete colored powder coated
aluminum doors & windows units glazed and/or non
glazed, fixed in accordance with the manufacturers
instructions including frames, sub-frames, angles,
channels, glazing, beads, sealant, aluminum infill panels,
fixing accessories including glazing and making good
complete all as shown on drawing:

9-7-1
9-7-2

Door Type 1 with size1200mm width x 1200 mm height .


Door Type 2 with size 1200mm width x 1200mm height with
louvers & fly mesh backing. .

No.
No.

21
8

21
8

0
0

9-7-3
9-8

Louver Type 3 with size 1200mm width x 1200mm height .


Steel Doors
Fabricate, Supply and Install Steel Doors Including
Frame, Paint, ironware and related accessories as shown
on the drawings and in accordance with the directives of
Engineer:
Door Type 1 with size 2500mm width x 2500 mm height .
Door Type 2 with size 1600mm width x 2200 mm height .
Door Type 3 with size 900mm width x 2200 mm height .
Sundries
Supply and Install galvanized steel checkered plate for trench.
Supply and install galvanized steel ladder 5450 mm high with
safety cage.
Supply and install galvanized steel ladder 3700 mm high.
Galvanized steel beam, model I (for crane), with the carrying
capacity of 1 tons.

No.

24

24

No.
No.
No.

1
1
1

1
1
1

0
0
0

m2
No.

27
1

27
1

0
0

No.
L.m

1
54

1
54

0
0

9-8-1
9-8-2
9-8-3
9-9
9-9-1
9-9-2
9-9-3
9-9-4

Carried To Summary of Bill No.9

Page 9/4

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.09
Air Blower Building for Biological Tank

Description

Item No

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

9-10

Plaster Work
Internal Plaster
Cement and Sand Plaster as Specified applied in Two
Coats:
9-10-1 Walls and Columns.
9-10-2 For ceiling
External Plaster
9-10-3 Tylorene plaster rough texture beige color for external walls
type (b) including ornamented aluminum U-shaped.

m2
m2

450
260

450
260

0
0

m2

310

310

m2

315

315

9-11-2 Epoxy paint applied on 100 mm high screed base.


Prepare Surfaces and Apply Prime Coat, required Putty
layers,Two Undercoats and Necessary Finishing Coats
from Enamel Paint.

L.m

90

90

9-11-3 For plastered walls


9-11-4 For plastered ceiling

m2
m2

450
260

450
260

0
0

9-11

Painting Work
Internal
9-11-1 Antislip epoxy paint for flooring insulator and resistant to
acids, chemicals, oils, grease including screed underlayer.

Carried To Summary of Bill No.9


Page 9/5

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

9-12

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Mechanical Works
First: Wastewater Treatment Equipment & Works
Install, supply and test following items complete with all its
accessories as in drawing, and specifications:Equipment Works
Notes:
- All pipes and fittings inside the air blower building shall
be from epoxy coated carbon steel, otherwise mentioned.

9-12-1 Air blower with a flow rate of


6600 m 3/hr and pressure
difference of 0.5 bar including all accessories , fittings, filters,
siliencer and meters on the discharge mainfold as per
specifications and drawings.

No.

9-12-2 Air blower with a flow rate of


3250 m 3/hr and pressure
difference of 0.7 bar including all accessories , fittings, filters,
siliencer and meters on the discharge mainfold as per
specifications and drawings.

No.

9-12-3 Electrical overhead crane with 1 ton Capacity.


9-13 Measuring Equipment
9-13-1 Pressure sensor with a pressure transmitter with all accessories
ready to be connected to (RTU) and SCADA system.

No.

No.

No.
No.
No.
No.
No.

2
2
2
2
2

2
2
2
2
2

0
0
0
0
0

9-14
9-14-1
9-14-2
9-14-3
9-14-4
9-14-5

Spare Parts
Complete set of orings and mechanical seals
Complete set of bearing for both motor and blower
Belt convyer set
Complete set of filtration units
Complete set of flexible joints

Carried To Summary of Bill No.9


Page 9/6

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.09
Air Blower Building for Biological Tank

Description

Item No

Unit

Second: Plumbing, Fire Fighting & HVAC Works


9-15 Fire Fighting System
9-15-1 Portable dry powder fire extinguisher 6 Kg capacity fixed to
wall.
9-15-2 CO2 fire extinguisher 5 Kg capacity fixed to walls.
9-16 Air Conditioning And Ventilation System
Supply, Install and TestMini-Split Units Including
Evaporator Blower Unit and Condensing Unit with Steel
base, vibration isolators, controls and accessories:
9-16-1 Type MSIU -1 &
MBH.Cooling only

MSOU-1, cooling load capacity

24

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

No.

Carried To Summary of Bill No.9

Page 9/7

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.09
Air Blower Building for Biological Tank

Description

Electrical Works
9-17 Lighting&Power Distribution Boards
Supply, install and connect the following lighting and
power Distribution boards complete with main and
secondary circuit breakers..etc.
9-17-1 Type (LP-ABB)
9-18 Motor control center (MCC)
Note:
CBs of branch circuits for second stage equipments shall
not be supplied in this stage, but put spaces in distribution
boards for these CBs as a future extension as per
drawings.
Supply, install and connect the following motor control
centers complete with main and secondary circuit
breakers,contactors,starters,digital instruments, relays,
surge arrestors ,PLC unit, Capacitor Bank and all
necessary conduits, devices and control wires as per
drawings and specifications.
9-18-1 Motor control cenetr MCC-ABB

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

Carried To Summary of Bill No.9

Page 9/8

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No
9-19

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

Low Tension Cables


Note:
Cables for second stage for branches feeders shall not be
supplied in the current stage but all necessary
ducts,conduits,trays etc should be supplied and erected
in the current stage to facilitate the installation for the
second stage as described in the drawings.
Supply install and connect the following multi-core cable
(CU/XLPE/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):

9-19-1 Cable 3x185mm+E=95mm (from MCC-ABB to


Disconnected switch of Air Blowers)
9-19-2 Cable 3x95mm+E=50mm (from MCC-ABB to Disconnected
switch of Air Blowers)
Supply install and connect the following multi-core cable
(CU/PVC/PVC), with necessary ties, glands, cable cleats,
cable trays, including earthing wire (CU/PVC):

L.m

35

35

L.m

30

30

9-19-3 Cable 4x10mm+E=10mm (from MCC-ABB to LP-ABB)

L.m

10

10

9-19-4 Cable 3x6mm+E=6mm (from MCC-ABB to Disconnected


switch of O.H.C)
9-20 Routes for second stage
9-20-1 Supply and install cable trays ,supports and and all necessary
accessories as shown on drawings and as specified and all
necessary ducts ,routs ,conduits, etc for 2nd stage should be
supplied and erected in the current stage with all necessary
accessories to facilitate the installation of cables in the second
stage according to the specification and recommendations
from the engineer.

L.m

10

10

No.

Carried To Summary of Bill No.9


Page 9/9

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.09
Air Blower Building for Biological Tank

Description

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

9-21

Electrical Devices
Supply, Install and Connect the Following Devices
Including Device Boxes, Cover Plates, Conduits and
Wiring Between Devices and to panelboard, Contactor or
to lighting Switch panelboards as Applicable:

9-21-1
9-21-2
9-21-3
9-21-4
9-21-5
9-21-6
9-21-7

Lighting Point 3 x 2.5 mm2.


16-Amp. 220 volt single receptacle, weather proof
16-Amp. 220 volt single receptacle.
16-Amp. 220 volt duplex receptacle.
20-Amp. 220 volt Industrial usage receptacle, weather proof
30-Amp. 380 volt Industrial usage receptacle, weather proof
Cable outlets for Minisplit AC units
Supply, Install and Connect the Following devices ,
Including Device Boxes, Cover Plates, Conduits and
Wiring to Lighting Points or Receptacles or panelboards
as Applicable:

No.
No.
No.
No.
No.
No.
No.

31
10
2
1
1
1
3

31
10
2
1
1
1
3

0
0
0
0
0
0
0

9-21-8
9-21-9
9-21-10
9-21-11

One way one gang switch, weather proof.


One way three gang switch.
Lighting control panel LSP-ABB
Douple pole switch 30A for AC split unit.

No.
No.
No.
No.

1
1
2
3

1
1
2
3

0
0
0
0

Carried To Summary of Bill No.9

Page 9/10

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Description

Item No
9-22

9-22-1
9-22-2
9-22-3
9-22-4

9-23

9-23-1
9-23-2
9-23-3
9-23-4
9-23-5

Bill No.09
Air Blower Building for Biological Tank

Miscellaneous Devices
Supply Install and Connect the Following Disconnecting
Switches Complete Including Enclosure, Flexible Metallic
Conduits and wires Between devices and main connection
point:
Note:
All disconnected switches for the second stage shall not be
supplied in the current stage but should be supplied in the
second stage as described in drawings.
Disconnect switch 3x 250A, IP55, for Air Blower.
Disconnect switch 3x 400A, IP55, for Air Blower.
Disconnect switch 3x 30A, IP55, for over head crane.
Disconnect switch 2x 30A, IP65, for split unit Ac including
conduits and wiring (power and control wires ) up to cable
outlets.
Lighting Fixtures and Equipment
Supply, Install and Connect the Following Lighting
Fixtures Including Lamps, Electronic Ballasts and
Starters for Fluorescent Fixtures, Through Wiring for
Continuous Rows,and Heat Resistant Wiring to Lighting
Point and all Necessary Accessories :

Type 65SMH150

Type 20ENA24
Type 65WF218
Emergency light, type EM2.
Exit light Unit Type EXIT, weather proof.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.

3
2
1
3

3
2
1
3

0
0
0
0

No.
No.
No.
No.
No.

15
6
2
7
1

15
6
2
7
1

0
0
0
0
0

Carried To Summary of Bill No.9

Page 9/11

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.09
Air Blower Building for Biological Tank

Description

Item No
9-24

Fire Alarm System


Supply, Install and Connect the Following Fire Alarm
Devices Including Device Boxes, Conduit and Wiring
Between and Fire Alarm Control Unit Panel:

9-24-1
9-24-2
9-24-3
9-24-4
9-24-5
9-24-6
9-24-7
9-24-8
9-24-9

Manual fire alarm station (weather proof).


Fire alarm bell (weather proof).
Manual fire alarm station.
Fire alarm bell.
Optical smoke detector.
Beam detector (Transmitter & Receiver).
Fire alarm siren (weatherproof).
Fire alarm flasher (weatherproof).
Supply, install and connect fire alarm box including all
necessary accessories as specified Type FB-AB2.
Telephone System
Supply, install and connect main telephone fbox including
all accessories complete as per Specifications and drawing:

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.
No.
No.
No.
No.
No.
No.
No.
No.

1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1

0
0
0
0
0
0
0
0
0

9-25-1 5 pairs TB-ABH

No.

9-25-2 Supply, install and connect telephone outlet RJ11 including


junction box, conduit cover,Cat 3 wires to (TB-ABH).

No.

9-25-3 Supply, install and connect telephone outlet RJ11 weather


proof including junction box, conduit cover,Cat 3 wires to
(TB-ABH).
9-26 Lightning Protection System
9-26-1 Supply, install and connect complete lightning protection
system for the building complete as specified and as per
drawings

No.

No.

9-25

Carried To Summary of Bill No.9

Page 9/12

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Item No

Bill No.09
Air Blower Building for Biological Tank

Description

9-27 Grounding System


9-27-1 Supply, install and connect a complete service equipment
grounding identical to IEC & IEE systems type TNS
including pits, grounding peripheral grid conduit and
grounding electrode conductor, complete as shown on
drawings and as specified in specs.
9-28 SCADA System
9-28-1 Supply, install and connect all wiring from RTU unit
Including Device Boxes, Cover Plates and Conduits, complete
as shown on drawings and as specified in Specifications.

Unit

Unit Rate
Quantity
Previous Current Different In Number
In Words

No.

No.

Carried To Summary of Bill No.9

Page 9/13

Total for difference


SR

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill No.09
Air Blower Building for Biological Tank

Total

Description

SR
COLLECTION OF BILL NO.9
Page 9/1
Page 9/2
Page 9/3
Page 9/4
Page 9/5
Page 9/6
Page 9/7
Page 9/8
Page 9/9
Page 9/10
Page 9/11
Page 9/12
Page 9/13

Total Sum of Bill No. (9) Carried to Summary


of Part 2 in Volume 3
Page 9/14

General Directorate of Water Aseer Region


Project Of Tertiary Wastewater Treatment Plant
In Al-Shaaf District At Aseer Region-2

Bill of Quantities
Summary of Part 1 in Volume 3)
Item

Description

From
Page

Bill No. (1) Site Work

1/29

Bill No. (2) Coarse Screen and Equalization Tank

2/8

Bill No. (3) Fine Screen and Grit Removal

3/7

Bill No. (4)

4/24

Bill No. (5) Treated Effluent Water Tank

5/27

Bill No. (6) Treated Water Reservoir 25,000m3

6/7

Bill No. (7) Mechanical Dewatering Building

7/14

Bill No. (8) Air Blower Building for Grit Removal

8/13

Bill No. (9) Air Blower Building for Biological Tank

9/14

The Total Amount of Summary of Part 1 in Volume 3

S.R

Biological Tank.

In Words...............................................
..................................................................

Page -1

Amount
S.R

Das könnte Ihnen auch gefallen