1.1 Definitions:
Phase displacement of a three-phase winding: this is the angular deviation between the vectors representing HV
and LV voltages of the equivalent terminals of the same winding pair.
Vectors are assumed to rotate in an anticlockwise direction.
The HV winding vector, whose 1st phase is oriented at 12 oclock on a time dial, acts as a reference, and the
phase displacement of all the other windings is normally expressed by a time index.
Connection symbol: this is the conventional symbol indicating the connection modes for HV and LV windings and
their relative phase displacements expressed by a combination of letters and time indexes.
The transformation ratio is measured on each transformer tap.
The connection symbol of three-phase transformers and the polarity of single-phase transformers must be checked.
3. Theoretical reminders
Calculation of the rated transformation ratio for each tap:
This ratio is only valid for the same given voltage reference.
Example:
Ratio of phase-to-earth or phase-to-phase HV/LV voltages.
To obtain the rated transformation ratio, you must (for Yd and Dy connections) multiply or divide, respectively,
by 3, according to whether the measured voltages are phase-to-earth or phase-to-phase.
For Yy and Dd connections, the rated transformation ratio is not modified.
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 1 of 3
MOD/ESS/021-Rev03
4. Test methodology
The connection symbol is checked and the transformation ratio is measured on each tap, at a voltage less than or
equal to 110V applied on the HV side.
Measurement consists of comparing for each phase the HV voltage in phase with the LV voltage.
This operation is carried out using a transformation measurement bridge that places in opposition the voltages in
phases in order to compare their modules.
The transformation ratio value is displayed on the measurement device.
Connection is correct when the ratio value is the same on each phase.
Example: connection Dyn11
- the HV side of the transformer is delta-connected.
- the LV side is star-connected with extended neutral.
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 2 of 3
MOD/ESS/021-Rev03
I IA BI I I IB CI I I IC AI I
= = =
I Ia nI I
I Ib nI I
I Ic nI I
5. Test precautions
Do not use voltages greater than 50 V in the workshop.
Confine the test zone.
Supply the transformer by the winding with the highest voltage.
Breaking means by pedal or pushbutton compulsory in the workshop.
6. Personnel safety
7. Test results
The tolerances:
No-load transformation ratio:
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 3 of 3
MOD/ESS/022-Rev03
In concrete terms, no-load losses are generated by the part encircled by a dotted line below:
france transfo
Ejemplar imprimido en calidad de consulta. Verificar el nivel de puesta al da en la base informtica antes de toda utilizacin
Pgina 1 de 2
MOD/ESS/022-Rev03
Supply voltages must be monitored and controlled to give or take 0.125 % (corresponding to a maximum difference of
0.5 V for a voltage of 400 V).
3. Test precautions
The voltage measurement is taken directly to the terminals of the transformer. The measurement cables and power
supply must be connected so as to avoid priming with high voltage.
4. Personnel safety
In event of resonance, discharge the tested transformer prior to operation.
5. Test results
Application of reduced tolerances on no-load losses is negotiable at the time of the invitation to tender.
For this reason, to guarantee transformer performance, the International Electrotechnical Committee has stipulated
in standard IEC 60076-1 9, tolerances to be complied with as a function of the measurement taken:
Articles
1. No-load losses
2. No-load current
3. Total losses
(Po + Psc)
Tolerances
+ 15% of the declared values
provided that tolerances on total
losses are complied with.
+ 30% of the value declared by the
manufacturer.
+ 10% of the declared values
france transfo
Ejemplar imprimido en calidad de consulta. Verificar el nivel de puesta al da en la base informtica antes de toda utilizacin
Pgina 2 de 2
MOD/ESS/023-Rev02
Equivalent diagram:
= (3/2) x RHVx I 2
Pjoules = 3 r (I/3) 2
= (3/2) RT I 2 where RT = (2/3) x r
For a star connection:
Pjoules = 3 x r x I 2
= (3/2) x RT x I 2
where RT = 2 x r
Special losses are mainly made up of eddy current losses.
- At reference temperature:
Joule losses vary according to temperature whereas special losses are inversely proportional to temperature.
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 1 of 3
MOD/ESS/023-Rev02
Example:
With an ambient temperature of 20C and at a refere nce temperature of 120C, we still have as a percen tage:
As a rule, the MV winding is supplied at a nominal frequency of 50Hz, at a voltage giving a current as close as
possible to nominal current, with the LV winding short-circuited.
A three-phase precision wattmeter is used for measurement and gives directly:
- the applied voltage,
- the 3 currents,
- the average current,
- the load losses
The short-circuit voltage is expressed as a percentage of the nominal voltage:
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 2 of 3
MOD/ESS/023-Rev02
The measurement principle and the equipment used are the same as those for the no-load loss measurement test.
3. Test precautions
Measurements must be taken quickly to prevent winding temperature rises from introducing significant errors (winding
temperature must be controlled).
Measurement quality (in accuracy and precision) lies in the quality of practical production of the three-phase ShortCircuit.
To avoid introducing additional special losses (due to a bad Short-Circuit), the Short-Circuit bar cross-section must be
sufficient:
the Short-Circuit bar cross-section must be greater than or equal to the coil connection cross-section.
(In event of coil double connections, 2 Short-Circuit bars must be taken to comply with the cross-section stipulation).
Care must be taken with contact surface finish.
4. Personnel safety
5. Test results
For very special transformers, consult the Technical Department.
The tolerances
Tolerances are taken from the standard, unless otherwise specified by the client.
Articles
1.b Partial losses :
(No-load or load losses)
3. Short-circuit voltage
a) on the main tap
Tolerances
+ 15% of each partial loss,
provided that the tolerance is complied with
on total losses (+10% of values declared)
+ 7.5 % of the value declared by the manufacturer if the value of short-circuit voltage
(Usc) is > 10%.
+ 10 % of the value declared by the manufacturer if Usc is < than 10%.
+ 10 % of the value declared by the manufacturer if Usc is > 10%
+ 15 % of the value declared by the manufacturer if Usc is < than 10%
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 3 of 3
MOD/ESS/025-Rev03
if R1 = R4 and R2 = R5
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 1 of 2
MOD/ESS/025-Rev03
where
RT = (2/3) x r
In the case of Delta connection of windings.
RT = 2 x r
In the case of Star connection of windings.
Where RT is the equivalent resistance between phases, and r the resistance of a transformer winding.
3. Test precautions
For dry type transformers, the test begins after a rest period of at least 48 hours of the transformer at stabilised
ambient temperature. Resistance and temperature must be measured simultaneously, using for winding temperature,
sensors placed at significant positions, preferably in the windings.
For oil-immersed transformers equipped with oil-filled pockets, temperature is measured at the pocket.
For Distribution oil-immersed transformers (not equipped with oil-filled pockets), the temperature measured is the
ambient temperature.
4. Personnel safety
Do not disconnect the installation when the measurement device is energised.
Opening of an inductive circuit could result in an electric arc.
There is a potential risk for personnel and measurement equipment during these transient states.
5. Test results
This measurement is an intermediate phase to determine load losses and temperature rises.
france transfo
Copy printed for information purposes. Check for the latest version in the electronic database before use.
Page 2 of 2
MOD/ESS/027-Rev05
1. General
The following test methods are taken from standards NF EN 60726 (2003), IEC 60726 (1982) and IEC 60076-3
(2000), modified, if necessary, by an internal FT rule.
Useful information on HV measurements and on measurement device calibrations are available in standards IEC
60060-1 and IEC 60060-2 on high voltage measurement techniques.
To verify withstand between phases, between turns and at the transformer earth, 2 routine tests are conducted: an
induced voltage test and an applied voltage test.
Check quality of internal insulation of transformer windings and insulation between phases under stresses
representative of voltage rise at power frequency on networks.
For Um 72.5 kV the test is normally conducted with partial discharge level measurements to check absence of
partial discharges in conditions with the transformer in operation. Refer to standard IEC 60076-3
france transfo
Copy printed for consultation. Check the update level in the computer database prior to use.
Page 1 of 4
MOD/ESS/027-Rev05
200 Hz
Current transformer
LV
MV
2*Un
2*Un
U1-2
U2-3
U1-3
Generator
Motor+alternator
I1
I2
I3
Measurement
device
Tested transformer
Test duration
For Um 72.5 kV the test is normally conducted with measurement of partial discharge level. Refer to standard
IEC 60076-3
For transformers with HV windings with non-even insulation, refer to standard IEC 60076-3.
Between these windings and the parts of the transformer intended to be earthed, on the other under stresses
representative of voltage rise at power frequency.
In the case of graduated insulation, the test is replaced by an induced voltage test.
france transfo
Copy printed for consultation. Check the update level in the computer database prior to use.
Page 2 of 4
MOD/ESS/027-Rev05
Single-phase
step-up
transformer
Capacitor voltage
divider or VT
Tested
transformer
The test is performed by connecting the HV to earthing system and powering the BT and inversely.
For windings with non-uniform insulation, the test is conducted with allowance for insulation of the neutral terminal
france transfo
Copy printed for consultation. Check the update level in the computer database prior to use.
Page 3 of 4
MOD/ESS/027-Rev05
4. Personnel safety
Recommendations concerning applied and induced voltage tests are as follows:
After all dielectric tests, use an insulating pole to earth the terminals and discharge the transformer, prior to work
on the device.
Should test duration exceed 5 minutes, the test must not be carried out in a confined area.
5. Test results
The test is conform if the if it there is no collapse in voltage.
france transfo
Copy printed for consultation. Check the update level in the computer database prior to use.
Page 4 of 4