Beruflich Dokumente
Kultur Dokumente
PT. TEKALUMNI
KONSULTAN
MCA INDONESIA
Document No.
MCA-TKK-BED-PP001
PROJECT
Rev.
Contract No:
Pages:
2015/Grant-TAPP/007
1 of 6
: MCA KONSORSIUM
(PT. Bioenergi Pratama Jaya dan PT. asiaBIOGAS)
LOCATION
A
REV.
11/08/15
DATE
THE
MYD
PREPARED CHECKED
AK
APPROVE
D
Table of Content
1
GENERAL INFORMATION............................................................3
PROJECT OF TERMS...................................................................5
DESIGN....................................................................................5
5.1
5.2
5.3
5.4
GENERAL................................................................................................ 5
MATTERIALS............................................................................................... 6
CONNECTIONS............................................................................................ 6
PRESSURE INSTRUMENTS..............................................................................7
5.4.1 General........................................................................................................... 7
5.4.2 Pressure & Differential Pressure Gauges........................................................8
5.4.3 Pressure & Differential Pressure Controller.....................................................8
5.4.4 Pressure & Differential Pressure Transmitter..................................................8
5.7 NAMEPLATES............................................................................................ 17
6
GENERAL INFORMATION
This document should be used in conjunction with the drawings, specifications,
codes and standards and must comply with the rules and regulations of the
Government of Indonesia or the other recognized regulations.
This specification covers the minimum requirements governing the design,
materials, fabrication, inspection, testing, painting, complete with internal
equipment, spare parts and VENDOR Data.
The requirements set forth do not relieve VENDOR of his responsibility to
perform all services in a safe manner, to meet applicable codes and standards,
to comply with government regulations or to supply a product capable of
performing its intended service.
This specification does not dictate detailed design of the equipment or
assembly of components. It is intended that those responsibilities be retained
fully by the VENDOR so that all equipment and process warranties remain
unmitigated
ISO
MAOP
NACE
SLE
SMTS
SMYS
SDV
EXP
Fn
example)
H
HP
HYD
OCC
SA
Sc
SE
Sh
SL
SO
SUS
Sy
T1
T2
W
WNC
WW
API RP 554
ASTM D 1086
A106 Gr. B
A411
IEC 60079
Explosive Atmospheres
IEC 60529
S12.1
PROJECT OF TERMS
PROJECT
4.1
NAMEPLATES
a. An identification nameplate shall be provided on each instrument. For
Temperature instrument both temperature instrument and the thermowell
shall be furnished with identification nameplates.
b. Nameplate shall be permanently attached using stainless screws or rivets.
Adhesives shall not be used.
c. Nameplates for field mounted instruments shall be of 16 gauge SS 316
plate.
d. Instrument Tag No. as identified on the Instrument Data Sheet shall be
marked clearly on the name plate.
e. Nameplates shall be in English. Letter size shall be 3 / 16 inches minimum
height. Letter shall be engraved. Printing or painting the letter to the
stainless steel plate is not accepted.
f. Panel mounted instruments shall be provided with phenolic or stainless
steel nameplates on the rear in addition to white background black letter
phenolic nameplate in the front, which has with tag number and service
description.
g. Nameplate on control valves shall show the valve size, valve trim style
and serial number and year of manufacture as a minimum.
h. Nameplates shall be of SS 316 and are to be fixed with SS 316 bolts and
nuts.
5.1
Visual Check
Functional Test
Calibration
c. All instrument supply line shall be disconnected from the instrument and
isolated from main headers prior to introducing instrument air to the system.
d. All leak testing and a preliminary function test shall be performed by the
contractor prior to the final witness test.
e. All analog transmitters such as Pressure transmitters, Temperature
transmitters and Current to Pressure transducers shall be calibrated for proper
zero span range as indicated datasheets manufcturers recommended
calibration procedure.
f.
g. Contractor shall notify Company seven days prior to the date such test is to be
performed. The test is to verify complete functionality of the equipment including
logic, operability, and mechanical performance.
5.2
QA/QC CERTIFICATION
Vendor shall provide the QA/QC Test and Inspection Certificates / Reports for the complete supply:
a. QA/QC Certification for Visual controls:
Material, Rating
Scale,
Operating range,
Labelling,
Painting,
Measure 5 points : 0%, 25%, 50%, 75%, 100% (increase and decrease),
20% of the supply for the Transmitters and Switches, and other Instruments.
quantities :