Beruflich Dokumente
Kultur Dokumente
ORIGINAL PROPOSAL
Floor Plan
Office Area
Barkhamsted Facility
Barkhamsted Facility
Overhead View
Salt Shed
Storage Area
Mobile Lift
Cost
Public Works Building $2,297,630
Salt Storage Shed $ 340,620
Site Work $ 557,617
Demolition $ 80,000
Portable Vehicle Lift $ 140,000
Architecture & Engineering (8%) $ 255,669
Escalation (4%) $ 127,834
Misc. $ 176,338
Reductions:
Permits / Taxes / Contingencies, etc. ($ 228,326)
Other Changes