COMMISSIONING REPORT

Customer:

Country:

Link:

Work Order:

Equipment:

The commissioning of the referred link has been concluded on _____________


The attached test sheets show the results of the tests carried out

We here undersign to certificate that the link under test fully complies with the technical
specifications as per contract.

For Siemens

For Customer

DATE

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 1/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

Ed. 1

Em./Var.

Firma

Escudero

Index
COMMISSIONING REPORT ................................................................................................... 1
1
COMMISSIONING TEST SHEET .................................................................................... 3
1.1.
SRA L XD link equipment............................................................................................. 3
1.2.
System Configuration................................................................................................... 3
2
CHECK LIST INSTRUMENTS ......................................................................................... 4
2.1.
Mandatory Instrument Check ....................................................................................... 4
3
FACTORY DATA AND SOFTWARE VERSION RELEASE............................................. 5
3.1.
Factory data and software version release Table ........................................................ 5
3.1.1.
Plug In Version [ ] N.A. ...................................................................................... 5
3.1.2.
Single Board Version [ ] N.A.............................................................................. 6
3.2.
PC Management Software Table ................................................................................. 6
4
LOCAL TEST ................................................................................................................... 7
4.1.
Terminal Set Up ........................................................................................................... 7
4.2.
Local Tributary Check .................................................................................................. 8
5
HOP TESTS..................................................................................................................... 9
5.1.
Background B.E.R. Test (*).......................................................................................... 9
5.2.
Tx / Rx Switching Tests (*) ........................................................................................... 9
5.3.
Received Power Level ............................................................................................... 10
6
NETWORK CONFIGURATION...................................................................................... 11
6.1.
NE Address ................................................................................................................ 11
6.2.
Routing Table (*) ........................................................................................................ 11

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 2/11-

1740

Rep.

Esec. Elifani

Data

13/11/03

Contr

Escudero

Ed. 1

COMMISSIONING TEST SHEET

1.1.

SRA L XD link equipment

Em./Var.

Firma

Escudero

Customer:
Country:
Link:
Order:
Identification Station A:
Identification Station B:

1.2.

System Configuration

Frequency

Capacity

System type

[ ]

7 GHz

[ ] Up to 8x2 Mb/s

[ ] (1+0)

[ ]

8 GHz

[ ]

13 GHz

[ ] Up to 16x2 Mb/s

[ ] 2x(1+0) Double
Terminal

[ ]

15 GHz

[ ]

18 GHz

[ ] Single Board

[ ] 2x(1+0) Add/Drop
Repeater

[ ]

23 GHz

[ ]

26 GHz

[ ] Plug In

[ ] (1+1) Hot Standby

[ ]

28 GHz

[ ]

38 GHz

[ ]

___ GHz (other)

[ ] (1+1) Frequency
Diversity
[ ] (1+1) Polarisation
Diversity

Note:

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 3/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

CHECK LIST INSTRUMENTS

2.1.

Mandatory Instrument Check

Ed. 1

Em./Var.

Type

Firma

Escudero

Description
Minimal Requirement:
CPU Intel Pentium II, DRAM 128 Mb,
HD 6 Gb, with Serial RS232 Port connection.
O.S: Windows /2000/XP

[ ] Personal Computer

Suggested Siemens Series Exxxx PC Notebook


[ ] SRA L XD SW Package

LCT 5.0 or higher, SRA L XD plug-in


(see OMN for LCT installation)

[ ] PC-SRA L serial cable

RS-232 serial cable pin-to-pin


D 9pin M D 9pin F

[ ] Digital Multimeter

Digital Multimeter, suggested model: Agilent971-A

[ ] PDH signal analyser

2 Mb/s Data generator and Receiver suggested model


Acterna EDT 135 with In / Out Connector 75 and 120 ohm.

[ ] Series of coax adaptor


[ ] Test Cabling
[ ] Dynamometric wrench

SIEMENS
Mod. 151-204/66
Ed. 02

BNC (m) / 1.6-5.6 (f), 1.0-2.3 (m) / 1.6-5.6 (f), 1.6-5.6 male/male,
1.6-5.6 female / female. (If applicable)
1.6-5.6 male / male, 1.0 / 2.3 male /male (with the properly
length).
Depend to the Tributary Interface
Siemens code 323-500/99

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 4/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

Ed. 1

Em./Var.

FACTORY DATA AND SOFTWARE VERSION RELEASE

3.1.

Factory data and software version release Table

3.1.1.

Plug In Version

Station B
UNIT
Hw Code &Ed.
System SVR
Back Plane
Controller
BB 1
BB 2(*)
ODU 1
ODU 2(*)
TRIB Access Card
Memory Key
(*)
Fit only applicable Cell and if equipped.

Mod. 151-204/66
Ed. 02

Escudero

[ ] N.A.

Station A
UNIT
Hw Code &Ed.
System SVR
Back Plane
Controller
BB 1
BB 2(*)
ODU 1
ODU 2(*)
TRIB Access Card
Memory Key
(*)
Fit only applicable Cell and if equipped.

SIEMENS

Firma

SW Code

SVR

SW Code

SVR

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 5/11-

Rep.

1740

Esec. Elifani

3.1.2.

Data

13/11/03

Contr

Escudero

Single Board Version

Ed. 1

Firma

Escudero

[ ] N.A.

Station A
UNIT
Hw Code &Ed.
System SVR
IDU
ODU 1
ODU 2(*)
Memory Key
(*)
Fit only applicable Cell and if equipped.
Station B
UNIT
Hw Code &Ed.
System SVR
IDU
ODU 1
ODU 2(*)
Memory Key
(*)
Fit only applicable Cell and if equipped.

3.2.

Em./Var.

SW Code

SVR

SW Code

SVR

PC Management Software Table


SW package

Software Code

Software Release

[ ] Network Manager
Net Viewer ()
Net Builder ()
ECL revision (only if showed)
[ ] Hop Manager
Link Viewer ()
Net Builder ()
ECL revision (only if showed)
[ ] Other

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 6/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

LOCAL TEST

4.1.

Terminal Set Up

Station A Set-Up
Channel mode

Ed. 1

Em./Var.

Firma

Escudero

Channel 1

Channel 2 [ ] N.A.

[ ] CONTINUOUS
[ ] FREQUENCY PLAN

[ ] CONTINUOUS
[ ] FREQUENCY PLAN

Transmitted frequency

(KHz)

(KHz)

Received frequency

(KHz)

(KHz)

(DBm)

(DBm)

Frequency Plan (*)


Transmitted power
requested: ______
Coupling value (**)
(*) Only in case of Frequency plan setting
Station B Set-Up
Channel mode

(**) Only for Hot Standby configuration


Channel 1

Channel 2 [ ] N.A.

[ ] CONTINUOUS
[ ] FREQUENCY PLAN

[ ] CONTINUOUS
[ ] FREQUENCY PLAN

Transmitted frequency

(KHz)

(KHz)

Received frequency

(KHz)

(KHz)

(DBm)

(DBm)

Frequency Plan (*)


Transmitted power
requested: ______
Coupling value (**)
(*) Only in case of Frequency plan setting

SIEMENS
Mod. 151-204/66
Ed. 02

(**) Only for Hot Standby configuration

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 7/11-

1740

Rep.

Esec. Elifani

4.2.

Data

13/11/03

Contr

Escudero

Ed. 1

Em./Var.

Firma

Escudero

Local Tributary Check

Station A (**)

Local Loop Check


Result (*)

Station B (**)

Local Loop Check


Result (*)

[ ]

Trib 1

[ ]

OK

[ ]

Trib 1

[ ]

OK

[ ]

Trib 2

[ ]

OK

[ ]

Trib 2

[ ]

OK

[ ]

Trib 3

[ ]

OK

[ ]

Trib 3

[ ]

OK

[ ]

Trib 4

[ ]

OK

[ ]

Trib 4

[ ]

OK

[ ]

Trib 5

[ ]

OK

[ ]

Trib 5

[ ]

OK

[ ]

Trib 6

[ ]

OK

[ ]

Trib 6

[ ]

OK

[ ]

Trib 7

[ ]

OK

[ ]

Trib 7

[ ]

OK

[ ]

Trib 8

[ ]

OK

[ ]

Trib 8

[ ]

OK

[ ]

Trib 9

[ ]

OK

[ ]

Trib 9

[ ]

OK

[ ]

Trib 10

[ ]

OK

[ ]

Trib 10

[ ]

OK

[ ]

Trib 11

[ ]

OK

[ ]

Trib 11

[ ]

OK

[ ]

Trib 12

[ ]

OK

[ ]

Trib 12

[ ]

OK

[ ]

Trib 13

[ ]

OK

[ ]

Trib 13

[ ]

OK

[ ]

Trib 14

[ ]

OK

[ ]

Trib 14

[ ]

OK

[ ]

Trib 15

[ ]

OK

[ ]

Trib 15

[ ]

OK

[ ]

Trib 16

[ ]

OK

[ ]

Trib 16

[ ]

OK

(*) To/From DDF (if applicable)


(**) Only the avaible tributary (depend to the system configuration and system Licence)

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 8/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

Ed. 1

HOP TESTS

5.1.

Background B.E.R. Test (*)

Em./Var.

Main Channel
Better than 10-10 (Long term)
(**)

Firma

Reserve

Escudero

[ ]

N.A.

OK [ ]

No Errors (**)
Short Term [ ]

OK [ ]

(*) Make the test on 2 Mb/s channel chosen by the Customer


(**) Value applicable in normal propagation condition.

5.2.

Tx / Rx Switching Tests (*)

From Station A

Channel 1

Channel 2

TX Switch

OK [ ]

OK [ ]

RX Switch

OK [ ]

OK [ ]

Channel 1

Channel 2

TX Switch

OK [ ]

OK [ ]

RX Switch

OK [ ]

OK [ ]

From Station B

(*) Only for 1+1 system

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 9/11-

Rep.

1740

Esec. Elifani

5.3.

Data

13/11/03

Contr

Escudero

Ed. 1

Em./Var.

Firma

Escudero

Received Power Level


Station A
ODU 1

ODU 2

Station B
ODU 1

ODU 2

TX Transmitted Power [dBm]


AG Antenna Gain [dB]
TX
side FL Feeder Loss [dB] (*)
TS=TX+AG-FL
AG Antenna Gain [dB]
RX
FL Feeder Loss [dB] (*)
side
RS=AG-FL
DS: Distance: 20 Log (D) [Km]
FQ: Frequency: 20 Log (f) [GHz]
Hop
Data CL: Coupling Loss
FSL Free Space Loss
FSL=DS+FQ+CL+92,4
NRS Nominal Received Signal (**)
NRS=TS+RS-FSL
Reading Received Power PC (**)
PC Tolerance (+ 2,5 - 2,5 dB)
(*) If Applicable
(**) Value applicable in absence of fading and in normal propagation condition.

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 10/11-

Rep.

1740

Esec. Elifani

Data

13/11/03

Contr

Escudero

NETWORK CONFIGURATION

6.1.

NE Address

Station Name

Ed. 1

Em./Var.

Firma

Escudero

Station A

Station B

Station D/I (*)

Name
___________

Name
___________

Name (*)
___________

IP Address (**)
NET Mask (**)
(*) Applicable in Double terminal or D/I configuration
(**) If TNMS planning is not enable set the following NE Address

6.2.

IP Address

Net mask

Station A

150.166.8.4

255.255.255.0

Station B

150.166.16.2

255.255.255.0

Routing Table (*)


Station A

[ ]

N.A.

Routing Entry 1

[ ]

N.A.

Routing Entry 2

[ ]

N.A.

Routing Entry 3

Station B
[ ]

N.A.

Routing Entry 1

[ ]

N.A.

Routing Entry 2

[ ]

N.A.

Routing Entry 3

Interface

Destination Network

Gateway

Interface

Destination Network

Gateway

(*) If Applicable

SIEMENS
Mod. 151-204/66
Ed. 02

SRA L XD Field Commissioning Tests Sheets

902-101/22
- 11/11-

Das könnte Ihnen auch gefallen