Sie sind auf Seite 1von 3

From: (b) (6)

To: (b) (6)

Cc: (b) (6)


Subject: TCA: PF225 (& VF300) Change Request #15 - E-2A Fence Type Mod
Date: Monday, March 03, 2008 6:15:19 PM

(b)
(6)
TCA concurs based on the site visit, discussion and this decision we all agreed upon!

Thanks, (b)
(6)
(b) (6)
Field Operations Supervisor
Tucson Sector
(b) (6)

From: (b) (6)


Sent: Monday, March 03, 2008 4:00 PM
To: (b) (6)

Cc: (b) (6)


Subject: RE: PF225 (& VF300) Change Request #15 - E-2A Fence Type Mod

Justification for Change


Request the initial project designated for 6.44 miles of Personnel – Vehicle Type I
(PV-1) fence be changed to a combination of 5.8 miles of PV-1 and 0.4 miles of
Vehicle Fence Type I (VF-1) Post and Rail. The change to VF-1 would be on the
westerly, 0.4 mile, portion of NPS property. During a site visit it was determined and
agreed this change would meet the intent and requirement of the coordinated local
agencies. It is believed the vehicle fence may be more cost affective for the upper
(westerly) portion of the project while meeting the intent and objective of the project. ..

Description of Requested Change


Personnel – Vehicle Type I (PV-1) fence beginning on the west side of the San Pedro
river, at the 100 year flood plain, extends west along the US/Mexican border for a
distance of 5.8 miles where it transitions into Vehicle Fence Type I (VF-1) Post and
Rail continuing west for 0.4 miles. The change from PV-1 to VF-1 would be at 31° 20’
01.06” N, 110° 14’ 54.9” for 0.4 miles ending at 31° 20’ 01.6” N, 110° 15’ 18.2” W.

From: (b) (6)


Sent: Monday, March 03, 2008 2:46 PM
To: (b) (6)
Cc: (b) (6)
Subject: RE: PF225 (& VF300) Change Request #15 - E-2A Fence Type Mod

Sir,

Looks Good

(b)
(6)
From: (b) (6)
Sent: Monday, March 03, 2008 12:48 PM
To: (b) (6)
Cc: (b) (6)
Subject: FW: PF225 (& VF300) Change Request #15 - E-2A Fence Type Mod
Importance: High

(b) (6)

Please review and respond.

Thanks

(b) (6)
Tucson Sector
Assistant Chief Patrol Agent
(b) (6)

From: (b) (6)

Sent: Sunday, March 02, 2008 11:35 AM


To: (b) (6)

Cc: (b) (6)

Subject: PF225 (& VF300) Change Request #15 - E-2A Fence Type Mod
Importance: High

All

Please review the attached change request and advise on any issues that you see relative your area of
expertise. This request involves the change of the fence type from pedestrian (PV-1) to vehicle (VF-1)
for approx. 0.4 of mile and minor adjustments to the overall start/stop points of the overall
segment. Please provide your feedback/comments by this Friday, March 7th.

Thanks

(b)
(6)

From: (b) (6)


Sent: Thursday, February 28, 2008 12:12 PM
To: (b) (6)
Subject: Fw: PF225_E2A_Change Request_PF&VF
Thanks

(b)
(6)
Message sent from my Blackberry

----- Original Message -----


From: (b) (6)
To: (b) (6)

Cc: (b) (6)

Sent: Thu Feb 28 10:16:34 2008


Subject: PF225_E2A_Change Request_PF&VF

(b) (6)

Please see attached change request for E2A.

We are scheduling a site visit for E2A where we can physically show the team the change requested.

A question pertaining to the VF aspect of this change is will the dollars be a different color covering this contract;
separate line items for PF vs. VF?

Thanks,
(b)
(6)
(b) (6)
U.S. Army Corps of Engineers / Los Angeles District
Interagency and International Services
3636 N. Central Avenue, Suite 900
Phoenix, AZ 85012
(b) (6)

Das könnte Ihnen auch gefallen