1

It was observed that battery


yard shed found in unstable
condition at battery-1.

Stability of the shed need to be ensured


and proper support should be provide for
the shed. Predical inspection should be
done. Ensure competent suprevision.

It was observed that lots of


workers were doing luch
roadside in open area. There is
hazard of dust contamination
in meals. It was observed that
no toilets provided and
workers were excreting in
open areas

Proper rest shelters shall be provided.


Proper counciling shall be provided to all
workers about personal hygien.

It was observed that unsafe


excavation practices observed
in the sub-station area.
Repairing of damage cable
was in progress without any
prior information to competent
authorities.

All works must be carried with Pre Use


Inspection, PRA and PTW.
PTW procedure must be strictly fallowed.
PTW Procedure must be strictly ensured
without any deviations.
All the records of PTW, PRA and Pre Use
must be maintained at least 1 Year.
supervisor should conduct a pre-use
inspection prior to start of work.

It was observed that workers


are consuming water from
water source at unsafe place
in unhygienic manner.

Water source shall be shifted to safer


place. All workers shall be trained for
personal hygiene. They shall be aware of
health hazards. Proper supervision shall
be done.

It was observed that the cable


was damaged during
unauthorised excavation work
without PTW & PRA at substation area.

Proper PTW shall be obtained from


competent authorities. PRA shall be
prepared and followed. LOTO shall be
done before starting excavtion over
underground utilities.

It was observed that U" jacks


were installed in the base of
scaffolding rested over
wooden runners in coal
blending silo.

Scaffolding should be made as per the


industrial standard with fully covered plat
form,hand rails,mid-rails toe-guards
,access and proper base.Inspection and
tag system should be followed as per the
standard.Height and width ratio should
be followed as per the standard.Safety
harness should be used working more
than 1.8 mtr height. Job specific training
should be conducted for all workers
about he requirement of work at height.

Stretcher should be provided


near the high rise buildings
construction site.

Appropriated Emergency preparedness


arrangements shall be done near all
height works. Propper training for
emergency situations shall be provided
to all wrokers.

Approach to be provided near


KC-1 Conveyor and Coke Warf
meeting area.

Working platforms should be made as per


the standardwith fully covered plat
form,hand rails,mid-rails toe-guards
,access and proper base.Inspection and
tag system should be followed as per the
standard.Safety harness should be used
working more than 1.8 mtr height.Job
specific training should be conducted for
all workers about he requirement of work
at height.

It was observed that the


skidded man lift was pushed
by pay loader in very unsafe
way when the operator was in
bucket at Quenching Tower
area.

Proper and safe work method shall be


followed to take out skidded vehicles. It
shall be ensured that the operators and
all other passenger are step out of
vehicle. Ensure experienced supervision

10

It was observed that substandard fittings were used in


hydra no. AP31 AP 4338 at
Fabrication Yard #2.

11

It was observed that the


proper means of access and
egress was not provided at
coke wharf platforms.

12

It was observed that workers


engaged in shuttering work
were working without fall
protection equipments at Coke
Wharf Area.

Damaged parts shall be replaced with


new one. Management tools should be
followed as per the standard. Pre- use
inspection should be done on regular
basis and maintained well. Training shall
be conducted on regular basis..Cross
checking should be done by contractor
supervisor on regular basis.
Working platform should be provided as
per the standard. Life line should be
provided. Access should be provided to
the working area. All temporary working
platforms should be made as per the
industrial standards. Pre-use inspection
should be done before usage of platform.
Protection should be provide for ladder.
Access should be provided as per the
standard. Job specific training should be
conducted for all related workers about
the requirements of working surface and
height work. Safety harness should be
used while working more than 1.8 meter
height
Proper working plat form should be
provided for all height work operations.
Access should be provided to reach the
work place as per the standard. Safety
harness should be used working more
than 1.8 meter height. Job specific
training should be conducted for all
workers about he requirement of work at
height. Inspection and tagging should be
done before starting the job

13

It was observed that hiltimachine pre-use inspection


was not done at Coke Warf
area.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

14

It was observed that operator


using sub standard method for
stoping hydera ( AP 31 AP
4338) at fabricaiton yard#1

Damaged part of hydra shall be repaired


or replaced. Inspection should be done
on regular basis and maintained the
records.

15

It was observed that the


power cable routing was not
done properly at Cable trench
.

Cable routing and dressing should be


done as per the standard. Cables should
be away from people and vehicle
movement area. Inspection should be
done on regular basis and maintained
the records. Training should be
conducted for all electricians about the
requirement of cable routing and
dressing.

16

It was observed that TPI was


not done for meterial
conveing bucket at substation
area.

Third party inspection shall be conduct


for meterial conveing bucket.

17

It was observed that LT cable


was damaged due to
excavation near DG shed area.

Proper PTW shall be obtained from


competent authorities. PRA shall be
prepared and followed. LOTO shall be
done before starting excavtion over
underground utilities.

18

It was observed that


insufficient supprt for scaffold
at coke warf

Scaffolding shall be constructed


according to the industrial standards.
Daily inspections shall be done.
Scaffoldings shall be inspected and
tagged authorised and competent person

19

It was observed that the


access platform was not
secured with railing system at
coke wharf area.

Proper railing system shall be installed


towards opening side. Proper inspection
shall be done.

20

It was observed that the hot


work was in progress without
any precautionary measures.
The storage bag of hason
cloth caught fire at Battery
#2.

Proper precautionary measures shall be


taken before starting hot works.
Flammable materials shall be removed
from job site. Fire extinguisher shall be
radial available at site.

21

It was observed that the


outrigger's support was given
in very unsafe way at
Chimney.

Proper base support shall be given to


outriggers of crane a/c to industrial
standards. Proper inspection shall be
conducted before starting the activity.

22

It was observed that on/off


switching system found
damaged and some substandard arrangements were
done in hydra no. AP 31 AR
9846 at Fabrication Yard #1.

Sub-standard arrangements shall be


reomved immediatelya and all damaged
fittings shall be replaced with new one
a/c to industrial standarads. Proper preuse inspections shall be conducted.

23

It was observed that the door


of man-lift was not secured
with enough barricading at
Battery#1.

All man-lift buckets shall be secured


properly. Workers shall be trained to used
fal protection equipments properly.

24

It was observed that damaged


and multy jointed welding
cable was using for welding
work atFabrication yard 2 .

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

25

It was observed that the safe


access was not provided to
silo reinforcement at Coal
Blending Silo.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

26

It was observed that the


proper gratings were not
installed at staircases and
landing of JH#3.

Safe means of access shall be provided


to the workplaces. Gratings shall be
installed in staircase and landings. Safe
working area shall be ensured before
starting the activity.

27

It was observed that the no


means of access and egress
provided to the worker
engaged in the Fit up activity
at Secondary Crusher
Building.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

28

It was observed that the


cutting activity was in
progress in very unsafe way.
Spatters were falling on
tarpaulin at Secondary
Crusher Building.

Area below hot work shall be free from


flammable or combustible material. Fire
extinguisher shall be radial available on
site.

29

It was observed that the substandard parts were used in


the bucket of JCB at Coke
Wharf.

Proper pre-use inspection shall be done


everyday. Damaged parts shall be
repaired or replaced with new on ASAP.

30

It was observed that worker


engaed in fit up activity were
not provided with proper
means of access and egress
was provided at Conveyor
K4.

Area beneath the height work shall be


secured by abdication. Warning boards
shall be displayed at site.

31

It was observed that the


damaged pressure guage was
used in the cutting set at
Secondary Crusher.

Damaged pressure gauge should be


replaced with new one. Management
tools should be followed as per the
standard. Pre- use inspection should be
done on regular basis and maintained
well. Training should be conducted for
gas cutters about the requirement of gas
cutting operation. Cross checking should
be done by contractor supervisor on
regular basis.

32

It was observed that the water


logging was not cleared in
Chimmeny area.

Water logging shall be cleared as soon as


possible to avoid health hazards.
Temporary drainage system shall be
develop to clear the water logging.

33

It was observed that improper


arrangement for shifting of
heavy material (gas duct pipe)
by trailer to chimmeny area.

SOP shall be prepared and followed


properly. Proper supervision shall be
ensured.

34

It was observed that the


workers engaged in civil
activities were working in very
unsafe way without platforms
at Coke Wharf area.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

35

It was observed that no


backsman provided for the
man-litf travelling at Substation Area.

The backsman shall be provided for


manlift movements. Proper supervision
shall be provided

36

It was observed that hot work


was in progress without
taking sufficient precautionary
measures at Battery #2

Proper precautionary measures shall be


taken before starting hot works.
Flammable materials shall be removed
from job site. Fire extinguisher shall be
radial available at site.

It was observed that worker


found working in unsafe
position and no means of
access was provided for
scaffolding platform at Battery
#2.

Proper working plat form should be


provided for all height work operations.
Access should be provided to reach the
work place as per the standard. Safety
harness should be used working more
than 1.8 meter height. Job specific
training should be conducted for all
workers about he requirement of work at
height. Inspection and tagging should be
done before starting the job

38

It was observed that improper


working platform found at
Fabrication yard 2. No means
of access and egress provided.
No anchorage points for fall
protection equipments.

Working platform should be provided


with means of access as per the
standard. Pre-use inspection should be
done before usage of platform. Protection
should be provide for ladder. Access
should be provided as per the standard.
Job specific training should be conducted
for all related workers about the
requirements of working surface and
height work.

39

One vehicle was parking slope


area at road side, stoppers
also not placed.
(LEADER'S SAFETY HOURS
POINTS)

Wheel stoppers shall be provided.


Parking shallbe done on designated
places.

37

40

Quenching Tower On
scaffolding lose materials are
kept, to be move for all area.
(LEADER'S SAFETY HOURS
POINTS)

Loose materials shall be removed from


the scaffolding structures. Good standard
of house keeping shall be ensure. Preuse inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

41

Remove of storm water or


chemical to be spread in water
to avoid Breeding of
Mosquitoes.
(LEADER'S SAFETY HOURS
POINTS)

All water loggings shall cleared as early


as possible. Temporary drainage system
shall be prepared to avoid the wter
loggings.

42

Observed some workers are


not using goggle. (LEADER'S
SAFETY HOURS POINTS)

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

43

It was observed that the


overheated power line was hit
by hydra at Fabrication yard
#2.

Overheated power lines shall be


considered and safe distance shall be
maintained from them during marching
of hydra, cranes or any other
construction vehicle.

44

In 40T Crane seat belt, fire


extinguisher & first aid box are
not found. Same to be
provided.(Leader's Safety
Hours Inspection point)

All earthmovers shall be provided with


necessary safety devices according to
industrial standards. Pre-used inspections
shall be done before using and all
checkpoints shall be checked properly.

45

Some workers found not


wearing the Industrial Safety
shoes. Same to be reviewed &
rectified. (Leader's Safety
Hours Inspection point)

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

46

Hydra No.5498 Start/Stop


button was found not in good
condition. Same to be
replaced. (Leader's Safety
Hours Inspection point)

Proper pre-use inspection shall be done


everyday. Damaged parts shall be
repaired or replaced with new on ASAP.

47

All gauges damages- Yet the


Permit show all are intact.
Need correct remarks & shall
be fixed. (Leader's Safety
Hours Inspection point)

Proper pre-use inspection shall be done


everyday. Damaged parts shall be
repaired or replaced with new on ASAP.

48

General Information related to


Safety & Emergency need to
be shared among the team.
(Leader's Safety Hours
Inspection point).

Proper training for emergency situations


shall be provided to all employees.

49

It was observed that the


workers engaged in civil
works were working in
unsecured and incomplete
platform, gratings were not
secured properly.
Mid rails and toe boards were
not provided, no anchoring
point for safety harness.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Safety harness should
be used working more than 1.8 meter
height. Proper anchoring point for safety
harness shall be provide. Job specific
training should be conducted for all
workers about he requirement of work at
height.

50

It was observed that no means


of access and egress was
provided for Gas collecting
pipe at Battery#2.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

Food is taking inside the


construction site (at battery
area).

Proper rest shed shall be provide.

52

No PPE's (Goggle) were used


by most of the workers
working at battery area.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

53

Temporary shed provided for


DB#4 near battery #4 to be
secured properly and
damaged sheets shall be
replaced.

Temporary shed shall be secured


properly and damaged sheets shall be
replaced. Regular site inspection shall be
done.

54

It was observed that improper


working platform found at
battery yard. No means of
access and egress provided.
No anchorage points for fall
protection equipments.

Working platform should be provided


with means of access as per the
standard. Pre-use inspection should be
done before usage of platform. Protection
should be provide for ladder. Access
should be provided as per the standard.
Job specific training should be conducted
for all related workers about the
requirements of working surface and
height work.

55

It was observed that no fall


arrester system was installed
in vertical ladder provided at
Quenching Tower.

Ladder should be in good condition.


Preuse inspection should be done. Ladder
should be extended 1mtr above the rest
platform. Ladder should be secured
firmly. Training should be provided to
workers on ladder safety requirements.

51

It was observed that platforms


were not constructed properly,
gap observed on platforms
were not covered properly at
Quenching tower.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 meter height. Job
specific training should be conducted for
all workers about he requirement of work
at height.

57

It was observed that


unsecured material stored on
scaffolding in very unsafe way
on height at Coke Wharf

Stacking of material shall be done


properly. Loose materials shall be
removed from the working area. Good
standard of house keeping shall be
ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement

58

It was observed that damaged


web sling was deployed in
errection and shiffting activity
at various places ( Fib
1&2,SCB,PCB, battery yard)

Damaged slings shall be replaced with


new one. Pre-use inspection of tools and
tackles shall be done before use.

56

It was observed that the


stacking of material was done
on the open edges of coal
tower.

Stacking shall be not at or near the


edges at height. Proper training shall be
provided to workmen. Proper supervision
of workplaces shall be done.

60

It was observed that platforms


were not constructed properly,
gap observed on platforms
were not covered properly at
Quenching tower.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 meter height. Job
specific training should be conducted for
all workers about he requirement of work
at height.

61

It was observed that proper


means of access and egress
were not provided to reach the
work locations at coal tower.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

59

Hydra No.5498 Start/Stop


button was found not in good
condition. Same to be
replaced. (Leader's Safety
Hours Inspection point)

Edge protection should be provided


around the open floor area. Inspection
should be done before start of the work.
Proper working surface should be
provided for all jobs.PRA should be
followed as per the standard. Worker
shall be trained properly to use proper
PPE's at critical work sites and proper
handrail or edge protection shall be
provided for all the open edges. Proper
supervision shall be done.

63

It was observed that the LT


cable routed along the
working place at cable
trench.

Cable routing and dressing should be


done as per the standard. Cables should
be away from people movement area.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

64

It was observed that improper


arrangement for shifting of
heavy structural material by
trailer to fabrication yard2.

SOP shall be prepared and followed


properly. Proper supervision shall be
ensured.

62

65

It was observed that the


excavtion was done in very
unsafe way near the
scaffolding base at Coal
Blending Silo.

While doing excavations, stability of


adjecent structures shall be taken in to
conderation. Safe distance shall be
mentained from the exsiting structures to
ensure the stability.

66

It was observed that the


proper means of access and
egress was not provided uring
the reinforcement and
shuttering activity at cable
trench near sub-station.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

67

It was observed that terminal


connection to the welding
rectifier was not given
properly at Battery #2.

Prior inspection shall be done for all


electrical installations before starting up.
If any gear found damaged shall be
replaced immediately.

It was observed that workers


engaged in the chiping activity
with hilti machine were
working on sub-standard and
unsecured platform at
Chimney.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

69

It was observed that some


members of engineering team
were observe without
sufficient PPE's on site.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

70

It was observed that the edge


protection was not provided to
open edges at JH#3.

Open edges at height shall be secured


properly with hard barricading to avoid
fall hazards.

68

It was observed that oxygen


cylinder was laid on ground on
varoius places at site.

Cylinder storage should be done as per


the standard. All cylinder should be
positioned vertically upright, properly
secured, with hazard communication, fire
extinguisher and identification. Training
should be conducted for all workers
about the requirement of gas cylinder
storage & handling.

72

It was observed that worker


were working without
mandatory PPE's and fall
protection equipments at substation building.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

73

It was observed that worker


engaged in the roof structure
fabrication was working
without fall protection and
proper access and egress at
secondary crusher building.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity. Proper fall
protection arrangements shall be
provided for height works.

71

74

It was observed that the


scffolding base was landed on
unstable supports at Substation.

Scaffolding should be made as per the


industrial standard with fully covered plat
form,hand rails,mid-rails toe-guards
,access and proper base.Inspection and
tag system should be followed as per the
standard.Height and width ratio should
be followed as per the standard.Safety
harness should be used working more
than 1.8 mtr height. Job specific training
should be conducted for all workers
about he requirement of work at height.

75

It was onbserved that the


damaged sling was used in
the erection of parts of GCP at
Battery #4.

Damaged sling shall be replaced with


new one. Proper pre-use inspection shall
be done.

It was observed that the


substandard platform was
used for the structure welding
and alignment at Battery #3
Pusher Side.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails ,mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 meter height. Job
specific training should be conducted for
all workers about he requirement of work
at height.

76

77

It was observed that unsafe


electrical connection was done
at Battery #3.

Electrical connections shall be done in


safe way a/c to the industrial standards.
Proper pre-use inspection shall be done
before use.

78

It was observed that


unsecured ladder used for the
access over the gas collecting
pipe at Intermediate platform
between Battery #1 & Battery
#2.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

79

It was observed that substandard joints observed in


welding rectifier at Coke
Cutter Building.

Cable joints shall be done properly. Lugs


shall be used for welding cable joints.

It was observed that workers


working on the oGCP structure
were not equipped with fall
protection equipment viz.
Safety Belt.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

81

It was observed that workmen


working at height without
anchoring double body
harness at coal tower

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

82

It was observed that


housekeeping was not done
and nailed shuttering material
was scattered below the
power cable at SCB area

Cable joints shall be done properly. Lugs


shall be used for welding cable joints.

80

83

84

85

It was observed that


housekeeping was not done
properly shuttering material
was scattered unsafely and
substandard scaffolding was
use for height work at
substation area

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basis. Scaffolding should be made as per
the industrial standard with fully covered
plat form, hand rails, mid-rails toe-guards
,access and proper base

It was observed that poor


housekeeping found in access
and egress at sub station area

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basic

It was observed that damaged


and malty jointed welding
cable was using for welding
work at Coal Tower Area.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

86

87

88

It was observed that workmen


engaged in civil activity were
working without mandatory
PPEs at substation area

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that damaged


and malty jointed welding
cable was using for welding
work in Coal Tower Area

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

It was observed that improper


return job earting was
provided to welding machine
Coal Tower Area.

Welding machine job earthing shall be


done properly. Proper welding cable shall
be used for all the return earth to
welding job. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

It was observed that no fire


extinguisher provided near
main DG and no weather
protection viz. shed , canopy
at cock cutter area.

Proper weather protection shall be


provided all electrical installations. Preuse inspection shall be done properly.Fire
fighting equipments shall be installed .
Other necessary preventive measures
shall be taken according to PRA.

90

It was observed that


housekeeping was not done
and material was scattered
below the electrical panel at
refractory shed

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

91

It was observed that the


splicing was not done in the
sling used for supporting the
OGCP with chain block pulley
in Chimaney Area.

splicing of hand made slings shall be


done according to industrial standard.
Sufficient number of U" clamps shall be
given to secuire the splicing

89

92

93

94

It was observed that parralel


works were in progress at
Battery #2.

Only one work activity shall be done at


same axis.parralel activities shall be
avoided. PTW system shall be
implemented properly and shall be
authorized only after conforming physical
conditions on site.

It was observed that terminal


connection were given in very
unsafe and un-standardized
way at Battery #2.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

It was observed that big


halogen light was used in the
semi-confined space viz. Gas
Collecting Pipe at Battery #2.

PTW system shall be followed Strictly.


Risk shall be analyzed properly for
respective job. Checkpoints given on
PTW shall checked and verified physically
and then got selected on forms.
Surveillance training shall be provided to
all employees, if needed.

95

It was observed that improper


welding cable joint was
observed in the Intermidiate
platform between Battery #1
& Battery #2.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

96

It was observed that packing


was not given and sufficient
no "U" clamps were not used
in the sling used in tieing
Chain block pulley at Battery
#2.

Packing shall b provided to slings when


introduce to sharp edge

It was observed that concrete


debris were found lied in the
pathway provided for the GCP
Pipe at Battery #1.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

97

98

It was observed that the


excavated drain was not
barricaded properly at Battery
area.

Proper hard barricading should be


provided immediately after the
completion of excavation as per the
industrial standard. Access should be
provided as per the standard.
A competent person should inspect the
excavation daily before the start of the
work an deep the records of the same.

99

It was observed that proper


means of access and working
platform was not provided for
shuttering support and
concreting work at drain near
Battery Area.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

It was observed that improper


return earthing as given to the
welding job at Coke Cutter
Building.

Welding machine job earthing shall be


done properly. Proper welding cable shall
be used for all the return earth to
welding job. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

10
0

10
1

10
2

10
3

It was observed that manual


lifting area was not barricaded
at Quenching Tower.

Area should be barricaded before starting


the manual lifting work activity.

It was observed that workers


engaged at Quenching car
were not using Fall protection
equipments.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that worker


engaged in concret mixing
was not using proper PPE's at
Coal Tower Building.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

10
4

It was observed that cabale


was layed over ground at
Battery #3.

Cable routing and dressing should be


done as per the standard. Cables should
be away from people and vehicle
movement area. Inspection should be
done on regular basis and maintained
the records. Training should be
conducted for all electricians about the
requirement of cable routing and
dressing.

10
5

It was observed that proper


means of access and egress
was not provided for worker
engaged in the grinding work
in the coal tower building.

Proper means of access and egress shall


be provided to all job site.

10
6

It was observed that the


rigging arrangement done for
the manual lifting of the
shuttering plate was very
unsafe at Quenching Tower.

All rigging arrangements shall be done


a/c to guidelines and industrial
standards. Proper supervision shall be
done and training shall be given for safe
rigging practices.

10
7

It was observed that workmen


working at height in critical
place without working
platform at Batery#4 pear
side.

Working platform should be provided


with means of access as per the
standard. Pre-use inspection should be
done before usage of platform. Protection
should be provide for ladder. Access
should be provided as per the standard.
Job specific training should be conducted
for all related workers about the
requirements of working surface and
height work.

10
8

It was observed that unsafe


rigging practices are doing
and packing was not provide
while shifting at Fabrication
yard

All rigging arrangements shall be done


a/c to guidelines and industrial
standards. Proper packing shall be
provide for all edges of lifting load.
Proper supervision shall be done and
training shall be given for safe rigging
practices.

10
9

It was observed that the


inspection of fire extinguisher
was not done at Fabrication
Yard #1

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

It was observed that


housekeeping was not done
properly empty diesel drum
scattered near pushing car

Proper housekeeping shall be maintained


on daily basis. Material stacking shall be
done properly. Proper work site
inspection shall be done.

11
1

It was observed that cable was


laid on ground at coal tower.

Cable routing and dressing should be


done as per the standard. Cables
abounds be away from people and
vehicle movement and wet areas.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

11
2

It was observed that the edge


protection was not provided to
open edges at Secondary
Crusher Building.

Open edges at height shall be secured


properly with hard barricading to avoid
fall hazards.

11
0

11
3

It was observed that no proper


means of access and egress
was provided at the trench
and no barrication at JH#2.

Access should be provided to reach the


work place as per the standard. Job
specific training should be conducted for
all workers about he requirement of
work. Inspection should be done before
starting the job

11
4

It was observed that the


improper housekeeping was
done near coal tower building.
combustible material was
accumulated.

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basis.

It was observed that the


worker engaged in unsafe way
without platform at SCB

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

11
5

11
6

It was observed that damaged


web sling was found at SCB

All the lifting tools and tackles should be


in good condition. Visual inspection
should be done for all lifting tools and
tackles prior to use. Ensure all lifting
appliances and gears are third party
inspected ,certified,tagged and colour
coded as per the standard before use.

11
7

It was observed that the


improper panel body earthing
was given at Fabrication Yard
#1.

All electrical equipment body earthing


shall be done properly. Cable lug shall be
used for all cable connections. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted for electricians.

11
8

It was observed that no fire


fighting equipments were
installed at Refractory Shed.

Fire fighting equipments shall be installed


at site during hot works. Other necessary
preventive measures shall be taken
according to PRA.

11
9

It was observed that multijoint cable was observed at


Fabrication Yard #1.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

12
0

It was observed that preassembly of gallery was in


progress on unsafe preassembly bed at fabrication
yard #1 Unsafe wooden
pickings were given on other
side

Proper pre-assembly arrangements shall


be done. Proper per-use inspection
shallbe done.

12
1

It was observed that the


glandings were not provided
to the DB's at DB #2 at
Fabrication Yard #1.

Proper glandings shall be provided to all


electrical connections. All installations
shall be done accoring to industrial
standards.

12
2

12
3

12
4

It was observed that the


power cable routing was not
done properly at fabrication
yard 1

Cable routing and dressing should be


done as per the standard. Cables should
be away from people and vehicle
movement area. Inspection should be
done on regular basis and maintained
the records. Training should be
conducted for all electricians about the
requirement of cable routing and
dressing.

It was observed that the


workers working near
quenching tower without fall
protection equipments viz.
safety belt at Coke Wharf.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that the


worker engaged in civil
activities was working in very
unsafe way without platforms
at coke wharf area

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

It was observed that the


worker engaged in height
work activity without
anchoring safety belt and
without proper working
platform.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

12
6

It was observed thatt pit found


without barrication at JH#2

Proper hard barricading should be


provided immediately after the
completion of excavation as per the
industrial standard. Access should be
provided as per the standard.
A competent person should inspect the
excavation daily before the start of the
work an deep the records of the same.

12
7

It was observed that man-lift


affected area was not
barricaded at JH#2.

Man-lift affected area shall be properly


barricaded. Un-authorised entry shall be
prohibited.

12
5

It was observed that


unsecured materials were
found in access of K#4.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

12
9

It was observed that the


power cable joits was not done
properly at Sub-station
Buidling.

Power cable joints should be done


properly as per the standard. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted for electricians.
Cable routing and dressing should be
done properly.

13
0

It was observed that PP rope


used for hardening of chain
block at Secondary Crusher
Building.

Proper tools and tackles shall be used at


erection activity. All tools shall be
accoring to the industrial standards. All
tools and tackles shall be inspected
properly before use.

12
8

13
1

It was observed that the


compressed gas cylinder were
not secured properly at
Fabrication Yard #1.

Cylinder storage should be done as per


the standard. All cylinder should be
positioned vertically upright, properly
secured, with hazard communication, fire
extinguisher and identification. Training
should be conducted for all workers
about the requirement of gas cylinder
storage & handling.

13
2

It was observed that multy out


going power cable connect
through RCCB instead of using
the Distridution Board at DB
#2 at Fabrication Yard#1.

All inputs shall be given through the


electrical distribution boards. All
electrical installations shall be done
according to thr industrial standards.

13
3

It was observed that the


cutting activity was in
progress in very unsafe way at
Gas Collection at Chimaney
Area.

All the critical areas shall be secured with


abrricadings and entry of un-authorised
persons shall be prohibited. Proper
supervisions shall be ensured.

It was observed that electrical


fitting support by brick in very
unsafe way at Sub-station
Building.

Sub-standard supports shall be removed.


All the electrical installations shall be
supported by standard supporting
system.

13
5

Workers engaged in the


electrical installations were
not using fall protecting
equipments at Sub-station
Building.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

13
6

It was observed that the floor


opening was not secured
porperly at Sub-station
Building.

All floor openings shall be secured


properly with checker plates. Porper
inspections shalll be done.

13
4

It was observed that workmen


engaged in curing work
activity without using any fall
protecting equipment in Coke
Wharf.

Proper anchorage points shall be


provided. Life lines shall be installed in
heights to anchor the fall protection
equipments. Employees should be
provide with all Mandatory PPEs and
Required Specific PPE as listed in the PPE
Matrix.

13
8

It was observed that the


excavted pit was secured with
the barricading at Sub-station
Area.

Proper hard barricading should be


provided immediately after the
completion of excavation as per the
industrial standard. Access should be
provided as per the standard.
A competent person should inspect the
excavation daily before the start of the
work an deep the records of the same.

13
9

It was observed that drinking


water arrangement was given
near excavated pit near Substation.

All water sources at site shall be moved o


some safe and hygenic places.

13
7

14
0

It was observed that the


welderengaged in coal tower
was working in very unsafe
way with using substandard
platforms.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

14
1

It was observed that knoted


pp rope used for lifting activity
and activity was going on
without barrication at Coal
Tower Building.

Proper tools and tackles shall be used at


erection activity. All tools shall be
accoring to the industrial standards. All
tools and tackles shall be inspected
properly before use.

14
2

It was observed that the LT


cable and welding cable
overlap with each that near
coal tower.

All electrical installations shall be done


according to the industrial standards.

14
3

It was observed that the LT


cable routed along the
excavated trench from rebars
and other material stackings
near JH#2.

Cable routing and dressing should be


done as per the standard. Cables
abounds be away from people and
vehicle movement and wet areas.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

14
4

It was observed thatunsafe


parallel work were in progress
and spatters from hot work
were falling on packing
material at Battery #2.

Parallel works shall be strictly prohibited.


Area below hot works shall be barricaded
and fire extinguishers shall be radialy
available at site.

14
5

It was observed that unsafe


erection & height work was in
progress.
Positioning of man-lift was
done in wrong direction.
Worker came out from man-lift
to do fit up.
No fall protection was
provided.
Activity was in progress
without PTW & PRA.
At K#7.

PTW system shall be followed Strictly.


Risk shall be analyzed properly for
respective job. Checkpoints given on
PTW shall checked and verified physically
and then got selected on forms.
Surveillance training shall be provided to
all employees, if needed.

14
6

It was obsrved that unsafe


forklift operation on road.

Forklift operations shall be done


according to the SOP.

14
7

It was observed that


substandard welding machine
found and body earthing was
not provided to the welding
rectifier at K7 area.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

14
8

It was observed that no


weather protection provide to
electrical panel near Battery
#2.

Proper weather protection shall be


provided all electrical installations. Preuse inspection shall be done properly.

It was observedd that the


workers engaged in the fit up
of roof structure were workinh
without proper fall protection
arrangements at Secondary
Crusher Building.

Proper fall protection arrangements shall


be done at height viz. safety net, life line
etc. Strict supervision shall be ensured
during height works.

15
0

It was observed that the


welders and cutters engaged
without mandatory PPE's at
Fabrication Yard #2.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

15
1

It was observed that pre-use


inspection of electrical DB was
not done at Fabrication yard 2.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

14
9

15
2

It was observed that electrical


and welding cables were
routed togetherly at
Fabrication Yard #2.

Welding and power cables shall be routed


properly. Cable routing and dressing
should be done as per the standard.
Cables should be away from people and
vehicle movement area. Inspection
should be done on regular basis and
maintained the records. Training should
be conducted for all electricians about
the requirement of cable routing and
dressing.

15
3

It was observed that


substandard return earthing
was given to welding job at
Fabrication Yard #2.

Welding machine job earthing shall be


done properly. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

15
4

It was observed that multicable and damaged cabled


were observed at Fabrication
Yard #2.

Malty-joints power cables shall be


replaced with new one. Proper inspection
shall be done.

15
5

It was observed that unsafe


and damaged terminal joints
observed at welding rectifiers
installed at Fabrication Yard
#2.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

15
6

It was observed that damaged


power cables observed at
Fabrication Yard #2.

Multi-joints power cables shall be


replaced with new one. Proper inspection
shall be done.

It was observed that loose and


unsecured material stored on
the K#2.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

15
7

It was observed that welder


enaged in the JH#2 was
working without attached
helmet.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

15
9

It was observed that the substandard platform was used


during fit up of platform
support structure at Battery
#3.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

16
0

It was observed that no


illumination was not povided
to the GC pipe at Battery #2.

Sufficient level of illumination shall be


maintened in semi-confined spaces. All
precautionary measures in the PRA shall
be properly implemented on ground.

15
8

16
1

16
2

16
3

It was observed that


substandard return earthing
was given to welding job at
coal tower.

Welding machine job earthing shall be


done properly. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

It was observed that worker


were working at the
unsecured edges without any
fall protection at coke wharf

Edge protection should be provided


around the open floor area. Inspection
should be done before start of the work.
Proper working surface should be
provided for all jobs.PRA should be
followed as per the standard. Worker
shall be trained properly to use proper
PPE's at critical work sites and proper
handrail or edge protection shall be
provided for all the open edges. Proper
supervision shall be done.

it was observed that workmen


working at height without
Mandatory PPEs at coke
cutter

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

Chain to be provided for the


cylinders on Cutting set
trolley. (Leader's Safety Hours
Inspection point)

Compressed cylinders shall be secured to


prevent from fall. Daily inspection shall
be done and training shall be provided
for safe stacking practices.

16
5

It was observed that welder


engaged in the welding work
activity were without
mandatory PPE's viz. shoulder
pads, hand gloves, etc. at
Fabrication #2

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

16
6

It was observed that body


earthing was not given to the
welding rectifier at .fabrication
yard

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

16
4

16
7

It was observed that the


excavation activity was in
progress without area
evacuation and no warning
board display

The area around critical activities viz


excavation shall be barricaded. Warning
board shall be displayed and unauthorized entry shall be strictly
prohibited. Proper supervision shall be
ensured during activity.

16
8

It was observed that the


stamping beam loading
activity on pathway was not
secured with barricading at
fabrication # 1

Hard abreaction should be provided


around stamping beam. Inspection
should be done on regular basis.
Barrication maintenance should be done
on regular intervels.Hazard
communication should be provided near
the Stamping station

It was observed that slign


padding was given for heavy
lifts at fabrication yard

Hard abreaction should be provided


around stamping beam. Inspection
should be done on regular
basis.Barrication maintenance should be
done on regular intervels.Hazard
communication should be provided near
the Stamping station

16
9

17
0

It was observed that the


power cable routed along the
pathway at silo area.

Cable routing and dressing should be


done as per the standard. Cables should
be away from people movement area.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

17
1

It was observed that the


excavation activity was in
progress without area
barrication, PTW and PRA at
silo area

The area around critical activities viz


excavation shall be barricaded. Warning
board shall be displayed and unauthorized entry shall be strictly
prohibited. Proper supervision shall be
ensured during activity.

It was observed that the


workers engaged in height
works were working in
unsecured and incomplete
platform, no anchoring point
for safety harness.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Safety harness should
be used working more than 1.8 meter
height. Proper anchoring point for safety
harness shall be provide. Job specific
training should be conducted for all
workers about he requirement of work at
height.

17
2

17
3

17
4

17
5

It was observed that hook


latch was not installed in rope
pulley and taking with
reinforcement bar

Damaged parts shall be replaced with


new one. Pre-use inspection of tools and
tackles shall be done before use.

It was observed that lots of


unsecured loose materials
were stacked at the top of coal
blending silo.

Stacking of material shall be done


properly. Loose materials shall be
removed from the working area.
Precautionary measures prescribed in the
PRA shall be followed properly. Proper
supervion shall be ensured critical
activities like de-shuttering.

It was observed that the


scaffolding was not
constructed properly at the
top of coal blending silo

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 mtr height. Job
specific training should be conducted for
all workers about he requirement of work
at height.

17
6

It was observed that lots of


unsecured loose materials
were stacked at the top of coal
blending silo.

Stacking of material shall be done


properly. Loose materials shall be
removed from the working area.
Precautionary measures prescribed in the
PRA shall be followed properly. Proper
supervion shall be ensured critical
activities like de-shuttering.

17
7

It was observed that no body


earth provide for distribution
board and without weather
protection at coal blending silo

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

17
8

It was observed that


dismantling of scaffolding was
in progress without proper PRA
and without barricating the
area at coal blending silo.

PTW system shall be followed properly.


Risk shall be analyzed properly for
respective job. Checkpoints given on
PTW shall checked and verified physically
and then got selected on forms.
Surveillance training shall be provided to
all employees, if needed.

It was observed that the


proper body earthing was not
provided to the welding
rectifier at Coal blending silo

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

18
0

It was observed that the


proper means of access and
egress was not provided at
coke wharf.

Access should be provided to the


working area. Protection should be
provide for ladder. Access should be
provided as per the standard. Job specific
training should be conducted for all
related workers about the requirements
of working surface and height work.
Safety harness should be used while
working more than 1.8 meter height

18
1

It was observed that


conveying the material by
hydra was in progressing in
very unsafe way at Fabrication
yard 2.

The shifting of material shall be done


appropriately. SOP shall be followed
properly.

17
9

It was observed that electrical


board was not secured
properly at Fabrication yard 2.

Electrical pannel need to be secured


properly. Prior inspection should be done
regularly for all electrical pannels.

18
3

It was observed that workers


was using substandard
platform at fabrication yard #
2.

Proper working plat form should be


provided for all height work
operations.Acess should be provided to
reach the work place as per the
standard.Safety harness should be used
working more than 1.8 mtr height.Job
specific training should be conducted for
all workers about he requirement of work
at height.Inspection and tagging should
be done before starting the job.

18
4

It was observed that


substandard and unsecured
ladder was used at fabrication
yard#2

Ladder should be in good condition.


Preuse inspection should be done. Ladder
should be extended 1mtr above the rest
platform. Ladder should be secured
firmly. Training should be provided to
workers on ladder safety requirements.

18
2

It was observed that welding


rectifier was found very un
safe position at fabricaiton
yard#2

All welding rectifier should be on position


and good working condition. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted for electricians.

18
6

It was observed that the


power cable was not routed
properly at fabricaiton yard#2

Cable routing and dressing should be


done as per the standard. Cables
abounds be away from people and
vehicle movement and wet areas.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

18
7

It was obsrved that worker


engaged in chippinh activity
were not provided with fall
protection arrangement viz.
anchoring point, life line. At
Chimmney area.

Proper anchorage system or life line shall


be provided for effetive anchorage of fall
protection system. Proper training for
height works shall be provided.

18
5

18
8

It was observed that the


worker engaged in the
chipping activity with hilti
machine was working without
mandatory PPE's viz. Safety
goggles, gloves, nose mask,
ear plugs at At Chimmney
area.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

18
9

It was observed that the lid of


hydra (AP31 AP4338) fuel
tank was found damaged at
Fabrication yard2.

Damaged fuel tank lid shall be replaced.


Tank lid shall not be covered with any
flammable material.

It was observed that the


worker engaged in the
fabrication of railing at
primary crusher staircase was
not working with fall
protection equipment.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

19
0

It was observed that the


outrigger's support was given
in very unsafe way at Primary
crusher building.

Proper base support shall be given to


outriggers of crane a/c to industrial
standards. Proper inspection shall be
conducted before starting the activity.

19
2

It was observed that improper


power cable routing done at
Substation Area.

Cable routing and dressing should be


done as per the standard. Cables abould
be away from people and vehicle
movement area. Inspection should be
done on regular basis and maintained
the records. Training should be
conducted for all electricians about the
requirement of cable routing and
dressing.

19
3

It was observed that the


workers engaged in painting
works were working in
unsecured and incomplete
platform, gratings were not
secured properly and no
anchoring point for safety
harness. At Sub - station Area.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Safety harness should
be used working more than 1.8 meter
height. Proper anchoring point for safety
harness shall be provide. Job specific
training should be conducted for all
workers about he requirement of work at
height.

19
1

19
4

It was observed that damaged


cutting hose was found at
Battery yard-3

All damaged parts shall be replaced with


new one. Proper pre-use inspection shall
be done every day before starting the
job.

19
5

It was observed that the


found damaged cutting sets
torch was using at Battery
yard-3

All damaged fittings of gas cutting sets


torch shall be replaced with new one.
Proper pre-use inspections shall be
conducted.

It was observed that the flash


back arrestor was not installed
in cutting set at Battery yard-3

Flash back arrestor should be provided


for all gas cutting set. Management tools
should be followed as per the standard.
Pre- use inspection should be done on
regular basis and maintained well.
Training should be conducted for gas
cutters about the requirement of gas
cutting operation. Cross checking should
be done by contractor supervisor on
regular basis.

19
6

19
7

It was observed that food


waste scattered at Fabrication
yard 2

All waste material should be collected


and disposed properly .
Designated and separate waste/scrap
collection bins should be placed at
strategic locations for depositing food
waste/scrap. The bins shall be
maintained on a regular basis.
Conduct the housekeeping activates
towards the end of each shift.
Ensure effective supervision and provide
training to workers on housekeeping.

19
8

It was observed that the floor


openings were not secured at
Sub-station building.

All floor opening at work area shall be


properly secured with barricading. Work
field inspection shall be conducted prior
to start the work and proper
precautionary measures shall be taken.

19
9

It was observed that the


concrete debris was lied alone
pathway at Coal Tower Area.

Concrete debris shall be cleaned after


completion of work. All workers shall be
trained proper housekeeping and proper
supervisor shall be done.

20
0

It was observed that the


return earthing to welding job
was given in improper way at
fabrication yard-2

Welding machine job earthing shall be


done properly. Proper welding cable shall
be used for all the return earth to
welding job. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

20
1

It was observed that the


hydra no. (AP31.AR.9846 )
break oil tank cap was not
found and covered with
flammable material at
fabrication yard2

Damaged break oil tank cap shall be


replaced. Tank lid shall not be covered
with any flammable material.

It was observed that the


improper housekeeping was
done near fabrication yard 2.
Lots of combustible material
material was accumulated.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

20
2

20
3

20
4

20
5

It was observed that the


workers working without fall
protection equipments viz.
safety belt at JH -1.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that pre-use


inspection of gas cutting set
was not done and was not
secured properly at
Fabrication yard 2.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.
Cylinder storage should be done as per
the standard. All cylinder should be
positioned vertically upright, properly
secured, with hazard communication, fire
extinguisher and identification. Training
should be conducted for all workers
about the requirement of gas cylinder
storage & handling.

It was observed that welder


engaged in welding work
without mandatory PPE's . At
Fabrication yard 2

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that electrical


distribution board is in
damage condition at
fabrication yard # 2

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

20
7

It was observed that the


welders engaged in the
Fabrication, were working
without mandatory PPE's.at
substation area

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

20
8

It was observed that damaged


light (glass was broken) found
at K2

Damaged parts shall be replaced


immediately. Pre-use inspection should
be done on regular basis and maintained
well.

20
6

20
9

It was observed that worker


engaged in civil activity were
no proper means of access
and egress at JH3.

Proper access should be provided to all


the work locations. Proper supervision
should be ensured at all the times.
Training should be provided to all the
workmen.

21
0

It was observed that damaged


light (glass was broken) found
at Substation Area.

Damaged parts shall be replaced


immediately. Pre-use inspection should
be done on regular basis and maintained
well.

21
1

It was observed that welding


rectifier pre-use inspection
was not done at Fabrication
yard2.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

21
2

It was observed that the


workers engaged in civil
activities was working in very
unsafe way without platforms
and without proper access and
egress at Chimmney area.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

21
3

It was observed that the


found damaged cutting sets
torch was using at quenching
tower.

All damaged fittings of gas cutting sets


torch shall be replaced with new one.
Proper pre-use inspections shall be
conducted.

21
4

It was observed that the


excavated soil was dumped on
the edges of excavated pit,
may result in collapsation in
Coke cutter.

Excavated soil shall be dumped away 1.5


m away from excavated edges to prevent
collapsation. Proper preventives shall be
taken a/c to physical conditions on site.

21
5

21
6

21
7

It was observed that the


excavated area was not
secured with barricade at
Coke cutter.

Proper hard barricading should be


provided immediately after the
completion of excavation as per the
industrial standard. Access should be
provided as per the standard.
A competent person should inspect the
excavation daily before the start of the
work an deep the records of the same.

It was observed that


fabricated lifting hook was
using without TPI at
Fabrication yard2.

Third party inspection should be done for


all lifting tools and tackles. Colour coding
and tagging also should be done for all
lifting tools and tackles. Proper rigging
tools, tackles & equipments as per r the
industrial standard only used for the
lifting operations .

It was observed that welder


engaged in fabrication work
without mandatory PPE's viz.
Safety helmet ,Safety Gloves.
Fabrication yard 2.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

21
8

It was observed that the


worker engaged in the
grinding activity was working
without mandatory PPE's viz.
face shield at Fabrication yard
2

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site,
Regular Tool Box talk must be conducted
regarding use of PPE,s and must be
recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

21
9

It was observed that the


improper housekeeping was
done. Lots of unwanted and
combustible material
material was accumulated.
Near electrical panel.
Fabrication yard 2.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

22
0

It was observed that welding


rectifier was found damaged
condition, needs to be
changed. At fabrication yard2.

All damage welding meachine shall be


replaces with new one. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted.

22
1

It was observed that no fire


fighting equipment provided
and insufficient weather
protection viz. shed , canopy
at Fabrication yard-2

Proper weather protection shall be


provided all electrical installations. Preuse inspection shall be done properly.
Fire fighting equipments shall be installed
. Other necessary preventive measures
shall be taken according to PRA.

22
2

It was observed that found


cutting set hose pipe was
damaged condition at
Fabrication yard 2

Compressed gas hose pipe shall be


routed through safe places and should
not routed near to the ignition source

It was observed that


housekeeping was not done
and combustible material was
scattered along pathway at
JH1

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

22
3

22
4

It was observed that the


electrical panel was not
provided with sufficient
guarding at JH1

All guards and covers of electrical fittings


shall be fixed properly so as to avoid
direct contact. Pre-used inspection shall
be conducted daily.

22
5

It was observed that body


earthing was not given to the
welding rectifier at Fabrication
yard 2 .

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

It was observed that the no


chain to be provided for the
cylinders on cutting set trolley
and pre-use inspection of gas
cutting set was not done at
fabrication yard-2

Compressed cylinders shall be secured to


prevent from fall. Daily inspection shall
be done and training shall be provided
for safe stacking practices. Pre-use
inspection system shall be followed
properly. Checkpoints given on checklist
shall checked and verified physically and
then got selected on forms. Surveillance
training shall be provided to all
employees, if needed.

22
6

It was observed that found


unstable shead at fabrication
yard-2.

shead should be made as per the


industrial standard . Inspection should
be followed as per the standard.

22
8

It was observed that oxygen


cylinder was laid on ground .
improper storage of
compressed cylinders at
Fabrication yard 2.

Cylinder storage should be done as per


the standard. All cylinder should be
positioned vertically upright, properly
secured, with hazard communication, fire
extinguisher and identification. Training
should be conducted for all workers
about the requirement of gas cylinder
storage & handling.

22
9

It was observed that sub


standard unsecured DB was
in used without providing
sufficient guarding at
Fabrication yard 2

All electrical DB should be as par


standard .guards and covers of electrical
fittings shall be fixed properly so as to
avoid direct contact. Pre-used inspection
shall be conducted daily.

22
7

23
0

It was observed that the cable


routing was not done properly
and welding cable and power
cable overlap with each other
at Fabrication yard 2.

Cable routing and dressing should be


done as per the standard. Cables
abounds be away from people and
vehicle movement and wet areas.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

23
1

It was observed that sub


standard sling was deployed
in erection activity at
Fabrication yard 2.

Damaged slings shall be replaced with


new one. Pre-use inspection of tools and
tackles shall be done before use.

23
2

It was observed that the


excavated soil was dumped on
the edges of excavated pit,
may result in collapsation in
Coke cutter.

Excavated soil shall be dumped away 1.5


m away from excavated edges to prevent
collapsation. Proper preventives shall be
taken a/c to physical conditions on site.

It was observed that worker


engaged in reinforcement
activity were working without
working platform at Coke
cutter

Proper working plat form should be


provided for all height work operations.
Access should be provided to reach the
work place as per the standard. Safety
harness should be used working more
than 1.8 mtr height. Job specific training
should be conducted for all workers
about he requirement of work at height.

23
4

It was observed that the


worker was engaged in
reinforcement activity was
without mandatory PPE's at
Coke cutter.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

23
5

It was observed that proper


means of access and egress
not provided for the excavated
pit at Coke cutter.

Proper means of access and regress shall


be provided for the tank. Ensure
competent supervision. Site inspection
shall be done regularly.

23
3

23
6

It was observed that the preuse inspection of Electrical DB


was not done properly near
Jain store at Fabrication yard2.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

23
7

It was observed that the substandard return earthing was


given to the welding job at
fabrication tyard-2

Welding machine job earthing shall be


done properly. Cable lug shall be used for
all cable connections. Pre-use inspection
should be done on regularly as per the
standard. Job specific training should be
conducted for electricians.

It was observed that the


improper housekeeping was
done near chimmney area.
Lots of combustible material
material was accumulated.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

23
8

It was observed that power


connection of grinding
machine was given directly to
the panel without plug top
installation at Substation Area.

Proper plug top shall installed and power


shall be provided through separate
electrical board. It shall be routed
through ELCB. Proper pre-use inspections
shall be done.

24
0

It was observed that nacked


wire inserted directly in power
panel without industrial Plug
Top at Substation Area.

Standard metallic plug top should be


provided for all electrical power
connections. Pre use inspection need to
be done prior to work. Job specific
training should be conducted . All
electrical related work should be carried
out by authorized person.

24
1

It was observed that the


access platform was not
secured with railing system at
coke wharf area.

Proper railing system shall be installed


towards opening side. Proper inspection
shall be done.

23
9

It was observed that no proper


means of access and egress to
conveyor at coke wharf area.

Proper access should be provided to all


the work locations. Proper supervision
should be ensured at all the times.
Training should be provided to all the
workmen.

24
3

It was observed that improper


installation of distribution box
at Substation Area.

All distribution board shall be provided


with stand and proper weather
protection. Pre-use inspection shall be
done properly. Fitting and installation
shall be done qualified and trained
electrician.

24
4

It was observed that unsafe


means of access was given to
the cable trench near.JH3.

Proper means of access and egress shall


be provided to all job site.

24
2

It was observed that


compressed cylinder not
secured properly near
battery2

All cylinders shall be stored in upright


position and tied to rigid support with
chain. Daily inspection shall be done and
training shall be provided for safe
stacking practices.

24
6

It was observed that the


excavated pit was not
secured at quenching tower.

Proper hard barricading should be


provided immediately after the
completion of excavation as per the
industrial standard. Access should be
provided as per the standard.
A competent person should inspect the
excavation daily before the start of the
work an deep the records of the same.

24
7

It was observed that pre use


inspection not done for drilling
meachine at fabrication yard-1

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

24
5

It was observed that the


concrete debris lied at
Quenching tower.

Concrete debris shall be cleaned after


completion of work. All workers shall be
trained proper housekeeping and proper
supervisor shall be done.

It was observed that the


improper housekeeping was
done near quenching tower .

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basis.

25
0

It was observed that the


improper housekeeping was
done near coal tower area..
Lots of combustible material
material was accumulated.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

25
1

Chain to be provided for the


cylinders on Cutting set
trolley. at Primary crusher -1structural

Compressed cylinders shall be secured to


prevent from fall. Daily inspection shall
be done and training shall be provided
for safe stacking practices.

24
8

24
9

25
2

It was observed that the


housekeeping was not done
properly at Primary Crusher
Building.

Proper housekeeping shall be maintained


on daily basis. Material stacking shall be
done properly. Proper work site
inspection shall be done.

25
3

It was observed that proper


means of access and egress
were not provided to reach the
work locations ( stamping
station to coal tower) at coal
tower.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

It was observed that damaged


and malty jointed electrical
cable was found at stamping
station coal tower.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

25
4

It was observed that sub


standard sling was deployed
in erection activity at
stamping station, coal tower.

Damaged slings shall be replaced with


new one. Pre-use inspection of tools and
tackles shall be done before use.

25
6

It was observed that worker


were working at the
unsecured edges of opening
without any fall protection at
pusher car

Edge protection should be provided


around the open floor area. Install the fall
protection (railing system) Inspection
should be done before start of the
work.PRA should be followed as per the
standard. Worker shall be trained
properly to use proper PPE's at critical
work sites and proper handrail or edge
protection shall be provided for all the
open edges. Proper supervision shall be
done.

25
7

It was observed that area


beneath errection activity was
not secured at battery #3

Area beneath the height work shall be


secured by abdication. Warning boards
shall be displayed at site.

25
5

25
8

It was observed that the OGCP


unsafe rigging practices was
progressing were using
substandard sling and used
chain block pulley hook latch
was found damaged. At
battery#3

All rigging arrangements shall be done


a/c to guidelines and industrial
standards. Proper packing shall be
provide for all edges of lifting load.
Proper supervision shall be done and
training shall be given for safe rigging
practices.

25
9

It was observed that


illumination was not provided
near critical errection of OGCP
at Battery #3.

Sufficient level of illumination shall be


maintained at critical jobs . All
precautionary measures in the PRA shall
be properly implemented on ground.

It was observed that the


proper means of access and
egress was not provided at
battery-3

Access should be provided to the


working area. Protection should be
provide for ladder. Access should be
provided as per the standard. Job specific
training should be conducted for all
related workers about the requirements
of working surface and height work.
Safety harness should be used while
working more than 1.8 meter height

26
0

26
1

It was observed that the


unsafe stacking of refractory
material was done on the
edges along platform at
Battery #1.

Stacking of material shall be done


properly. Loose materials shall be
removed from the working area.
Precautionary measures prescribed in the
PRA shall be followed properly. Proper
supervion shall be ensured critical
activities.

26
2

It was observed that


unsecured ladder used for the
access over the gas collecting
pipe at battery#3.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

26
3

It was observed that welding


rectifier pre-use inspection
was not done at battery#3.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

It was observed that the


damaged sling was used in
the pre-assembly and shifting
of gallery at Battery #3 and
4.

Damaged sling shall be replaced with


new one. Proper pre-use inspection shall
be done.

26
5

It was observed that the


welder engaged in the welding
activity at GCP pipe near
Boiler was working without
platform and with out
mandatory PPE's.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails, mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 mar height. Job
specific training should be conducted for
all workers about he requirement of work
at height.

26
6

It was observed that the


insufficient fall protection
arrangement was done on K7
to pass through the pathway
without grating.

Access to workplaces shall be properly


secured. Fall protection arrangement in
critical areas shall be ensured.

26
4

26
7

It was observed that the


cutting set was kept idle in the
scaffolding erection and
dismantling area at Coal
Blending Silo.

Area below height work shall be free from


hazardous material. The area shall be
cordon off and unauthorized entry shall
be restricted.

26
8

It was observed that improper


material stacking was found in
side the leap frog store room
at coal blending silo.

Proper material stacking shall be


ensured. House keeping activity should
be done regular basis. Tool box talk
should be given to workers about
material stacking .

26
9

It was observed that the


welding rectifiers were
installed without weather
protection at Secondary
crusher Building.

All electrical installations shall be


protected with shed. Proper pre-use
inspection shall be done before use.

27
0

27
1

27
2

It was observed that the


power cable joints was not
done properly at Secondary
crusher Building.

Power cable joints should be done


properly as per the standard. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted for electricians.
Cable routing and dressing should be
done properly.

It was observed that welders


engaged in critical welding
activity were not using the
welding helmet attached with
face-shield at Secondary
Crusher Building.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that workers


engaged in the refractory
material conveying were
working on unsecured edges
at intermediate platform
between Battery #1 & Battery
#2.

Edge protection should be provided


around the open floor area. Inspection
should be done before start of the work.
Proper working surface should be
provided for all jobs.PRA should be
followed as per the standard. Worker
shall be trained properly to use proper
PPE's at critical work sites and proper
handrail or edge protection shall be
provided for all the open edges. Proper
supervision shall be done.

27
3

It was observed that loose and


unsecured material stored on
the battery area.

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

27
4

It was observed that the


concreting activity was in
progress , boom placer
vehicle stopped at main
pathway without area
barrication at Coke Wharf .

The area around critical activities viz


concreting shall be barricaded. Warning
board shall be displayed and unauthorized entry shall be strictly
prohibited. Proper supervision shall be
ensured during activity.

27
5

It was observed that PP rope


was deployed in structural
material shifting activity at
Coke cutter.

Proper tools and tackles shall be used in


the structural shifting, erection activities.
All tools and tackles shall be according to
industrial standards, shall be undergone
TPI.

27
6

It was observed that loose and


unsecured material stored at
Fabrication yard 2 .

Loose materials shall be removed from


the working area. Good standard of
house keeping shall be ensure. Pre- use
inspection should be done on regular
basis. Training should be conducted
about the requirement of house keeping.
Cross checking should be done by
contractor supervisor on regular basis.

27
7

It was observed that the


there was no handle found in
cutting torch at Fabrication
yard 2

All damaged fittings of gas cutting sets


torch shall be replaced with new one.
Proper pre-use inspections shall be
conducted.

27
8

It was observed that cylinder


conveying by JCB was in
progressing in very unsafe
way at Quenching tower.

The shifting of material shall be done


appropriately. SOP shall be followed
properly.

27
9

It was observed that pre use


inspection and tagging for
scaffolding was not done at
Quenching tower.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

28
0

It was observed that


insufficient and unsafe
support was given to the lid of
mixing chamber of batching
plant. The maintenance work
was in progress without PRA>

All maintenance works shall be executed


according to PRA. Risk involved in the
activity shall be properly analyzed and
appropriate preventive measures shall be
suggested and their implementation shall
be ensured on ground physically.

It was observed that the


worker engaged in the
chipping activity with hilti
machine was working without
mandatory PPE's viz. Gloves,
Ear plugs at Coke Wharf area.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

28
1

It was observed that heavy


oil leakage found in air
compressor at Coke Wharf.

All leakages should be clear before


starting the job.Pre-use inspection should
be done on regular basis and maintained
well.T raining should be conducted for all
mobile equipment operators about the
requirement of mobile equipments.

28
3

It was observed that the


worker engaged in civil
activities was working in very
unsafe way without platforms
and without fall protection
arrangements at Coke Wharf
area.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
meter height. Job specific training should
be conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

28
4

It was observed that the preuse inspection of Electrical DB


(near quenching tower) was
not done properly at
Quenching tower .

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

28
2

28
5

28
6

28
7

It was observed that the


workers were engaged upper
door fit up activity very unsafe
way and without platforms
and with out fall protection
arrangements at battery -2

Working platforms should be made as per


the standard with fully covered plat form,
hand rails,mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 meter height. Job
specific training should be conducted for
all workers about he requirement of work
at height

It was observed that the


welder engaged in fabrication
activity was working without
fall protection equipments viz.
safety belt at battery -3 and 4.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that the


worker engaged in the cutting
activity was working without
mandatory PPE's at
Intermediate platform of
Battery -3and4.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

It was observed that the


electrical box was not secured
properly at Primary crusher

All guards and covers of electrical fittings


shall be fixed properly so as to avoid
direct contact. Pre-used inspection shall
be conducted daily.

28
9

It was observed that the


power cable was not routed
properly at Primary crusher
area.

Cable routing and dressing should be


done as per the standard. Cables
abounds be away from people and
vehicle movement and wet areas.
Inspection should be done on regular
basis and maintained the records.
Training should be conducted for all
electricians about the requirement of
cable routing and dressing.

29
0

It was observed that operator


using sub standard method for
stopping hydra (KA-35 A7845)
and hydraulic oil very low, Oil
leakage was found in hydra. At
Battery 2

Damaged part of hydra shall be repaired


or replaced. Inspection should be done
on regular basis and maintained the
records.

28
8

29
1

It was observed that the preuse inspection of tractor was


not done at Batching plant.

Pre-use inspection system shall be


followed properly. Checkpoints given on
checklist shall checked and verified
physically and then got selected on
forms. Surveillance training shall be
provided to all employees, if needed.

29
2

It was observed that damaged


and sub standard slings are
deployed for lifting activity at
battery.4.
1) Deteriorations were
observed in strands of sling.
2) No tagging was done.

Damaged slings shall be replaced with


new one. Splicing shall be properly
secured with D-shackles and tagging
shall be done. Pre-use inspection of tools
and tackles shall be done before use.

29
3

It was observed that the lid of


hydra (AP04AD 7340) oil tank
was found damaged at
battery4.

Damaged fuel tank lid shall be replaced.


Tank lid shall not be covered with any
flammable material.

29
4

It was observed that


unsecured ladder was used at
battery 2&3.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

29
5

It was observed that the


unsafe stacking of loose
materials and chemical tins
was stocked at at
Intermediated platform
between Battery #2 & Battery
#3.

Proper housekeeping shall be maintained


on daily basis. Material stacking shall be
done properly. Proper work site
inspection shall be done.

It was observed that worker


engaged in the welding
activity were working very
unsafe manner and without
platforms and with out fall
protection arrangements at
battery3.

Working platforms should be made as per


the standard with fully covered plat form,
hand rails,mid-rails toe-guards ,access
and proper base. Inspection and tag
system should be followed as per the
standard. Safety harness should be used
working more than 1.8 meter height. Job
specific training should be conducted for
all workers about he requirement of work
at height

29
6

It was observed that the


welder engaged in the
fabrication activity were
working very unsafe way on
sub-standard platform with
insufficient PPE's at Battery
#3.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
meter height. Job specific training should
be conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

29
8

It was observed that workers


engaged in the railing of fit up
were working without fall
protection equipments viz.
safety belt at K5.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

29
9

It was observed that the lid of


hydra (wb-37b 4954)fuel tank
was found damaged and no
side mirror was found at
Fabrication yard2.

Damaged fuel tank lid shall be replaced.


Tank lid shall not be covered with any
flammable material.

29
7

30
0

It was observed that the lid of


hydra (AP 31 AP9846)fuel tank
was found damaged pre use
inspection was not done
regularly at Fabrication yard2.

Damaged fuel tank lid shall be replaced.


Tank lid shall not be covered with any
flammable material.Pre-use inspection
system shall be followed properly.
Checkpoints given on checklist shall
checked and verified physically and then
got selected on forms. Surveillance
training shall be provided to all
employees, if needed.

30
1

It was observed that damaged


web sling was deployed in
erection activity at
Fabrication yard2.

Damaged slings shall be replaced with


new one. Pre-use inspection of tools and
tackles shall be done before use.

30
2

It was observed that


unsecured ladder was used at
Fabrication yard2.

Proper means of access and egress shall


be provided to the workplaces. Proper
supervision of sites shall be done. Safe
working conditions shall be ensured
before starting the activity.

It was observed that the


plywood cutter machine
electrical cable was found
damaged at Coke Wharf .

Damaged electrical cable shall be


replaced with new one. Pre-use
inspection should be done on regularly as
per the standard. Job specific training
should be conducted for electricians.

30
4

It was observed that unsafe


stacking of shuttering material
was observed at quenching
tower area.

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basis. Scaffolding should be made as per
the industrial standard with fully covered
plat form, hand rails, mid-rails toe-guards
,access and proper base

30
5

It was observed that


unsecured openings were not
secured at Coke Wharf.

All floor opening at work area shall be


properly secured with barricading. Work
field inspection shall be conducted prior
to start the work and proper
precautionary measures shall be taken.

30
3

30
6

30
7

30
8

It was observed that substandard and unsafe grating


laying was done on platforms
at Coke Wharf.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

It was observed that unsafe


platforms were used in the
pipe fabrication works at
Fabrication Yard #2.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

It was observed that


scaffolding construction was
done in very unsafe way. Base
plate was not given and
stability was ensured at Coke
Wharf.

Scaffolding should be made as per the


industrial standard with fully covered plat
form, hand rails,mid-rails toe-guards
,access and proper base. Inspection and
tag system should be followed as per the
standard. Height and width ratio should
be followed as per the standard. Safety
harness should be used working more
than 1.8 mtr height. Job specific training
should be conducted for all workers
about he requirement of work at height.

30
9

It was observed that barbending and cutting activity


was in progress without PTW &
PRA at Steel Yard near Coal
Blending Silo.

PTW system shall be followed Strictly.


Risk shall be analyzed properly for
respective job. Checkpoints given on
PTW shall checked and verified physically
and then got selected on forms.
Surveillance training shall be provided to
all employees, if needed.

31
0

It was observed that soil


contamination was done
because of oil at Chimney
Area.

Oil spillages shall be avoided. Soil


contamination shall not be done.

31
1

It was observed that


substandard slings were in use
in different working areas.1)
Deterioration was observed in
the web slings. 2) Substandard splicing was
observed in the wire rope
slings. 3) Untested wire rope
slings were in use. 4) SWl was
not mentioned on the slings
and identification tagging was
not done on all wire rope
slings.

Use of deteriorated slings shall be


avoided. All damaged slings shall be
discarded. All hand made slings shall be
manufactured according to IS standards.
All lifting tools and tackles shall be tested
and approved by Competent Third Party
for use. All slings shall be marked with
identification no. and swl to ensure the
safe use.

31
2

It was observed that workers


engaged in the cable pulling
activity were working without
mandatory PPE's at Primary
Crusher Building.

Employees should be provide with all


Mandatory PPEs and Required Specific
PPE as listed in the PPE Matrix.
Mandatory use of the PPE shall also be
ensured by way of effective
administrative controls such as access
control at the site, Regular Tool Box talk
must be conducted regarding use of
PPE,s and must be recorded the same.
100 % Compliance regarding use of PPE
must be ensured.

31
3

It was observed that inappropriate (CO2) fire


extinguisher was installed at
Paint Storage Shed at
Fabrication Yard#1.

Fire risk shall be properly analyzed and


appropriate type of fire extinguisher shall
be installed at designated place.

It was observed that


unsecured, substandard
platform was overloaded
during the alignment activity
of lower door of Battery.

Proper working plat form should be


provided with proper hand rain and mid
rail for all height work operations. Access
should be provided to reach the work
place as per the standard. Safety harness
should be used working more than 1.8
mtr height. Job specific training should be
conducted for all workers about he
requirement of work at height. Inspection
and tagging should be done before
starting the job.

It was observed that


accumulation of loose
materials was cleared in JH#2.

Good standard of house keeping shall be


ensure. Pre- use inspection should be
done on regular basis. Training should be
conducted about the requirement of
house keeping. Cross checking should be
done by contractor supervisor on regular
basis. Scaffolding should be made as per
the industrial standard with fully covered
plat form, hand rails, mid-rails toe-guards
,access and proper base

31
4

31
5

31
6

It was observed that muli-joint


cables were used in the JH#2.

Multi jointed welding cable shall be


replaced with new one. Welding cable
joints should be done properly as per the
standard. Pre-use inspection should be
done on regularly as per the standard.
Job specific training should be conducted
for electricians. Cable routing and
dressing should be done properly.

31
7

It was observed that area


leveling and grading activity
for crane marching was in
progress without PTW & PRA
at Sub-station area.

PTW system shall be followed Strictly.


Risk shall be analyzed properly for
respective job. Checkpoints given on
PTW shall checked and verified physically
and then got selected on forms.
Surveillance training shall be provided to
all employees, if needed.