ORDER
RECEIVING
0 MIN
WASH &
MIX
6 MIN
SPOONING
2 MIN
THROUGHPUT TIME :
Is the time the product undergoes through the manufacturing process. It is th
Kristen"s Throughput time includes all value added activities for producing 1 dozen cookies , there
Activity
Mixing
Spooning
Setting & Baking
Cooling
Packing
Total throughput time
Time
6 min
2 min
10 min
3 min
2 min
25 min
CYCLE TIME:
Cycle time is the time from the beginning of the process to the end of the proc
cycle time is the time from when the order is received to the time the custome
the payment.
Kristen"s Cycle time for conversion and production of 1 dozen cookies includes all the activites fro
Activity
Time
Mixing
6 min
Spooning
2 min
Setting & Baking
10 min
Cooling
3 min
Packing
2 min
Payment
1 min
Total Cycle time
26 min
MAXIMUM PRODUCTION:
The maximum capacity is the maximum number of goods that can be produced with the
Kristen"s We will have maximum production if we simultaneously spoon the other dozen while one
SPOONING
2 MIN
OVEN
HEAT
1
MIN
BAKING
9 MIN
COOLING
5 MIN
acturing process. It is the time required to convert the raw material to the finished good.
cing 1 dozen cookies , therefore payment time is not included in throughput because it is a non-value added act
t can be produced with the available resources used to the maximum capacity.
PACK
2 MIN
hed good.
PAY
1 MIN
Answer 1
Activity
Order Receipt
Wash & Mix (1-3 dozen)
Spooning
Set the Oven
Baking
Unload
Cooling
Packing
Payment
Total Time Taken for 1 do
Answer 2
Total Operating Time (Mins)
Step
Step
Step
Step
1
2
3
3
While the cookies being baked the second dozen can be spooned
By the end of 18th minute the second dozen is loaded into the oven
During the second dozen being in the oven, the first dozen is left for cooling and packed by
By the end of 28th minute the second dozen has been baked and the first dozen is ready fo
By the end of 33rd minute the second dozen has cooled down
By the end of 35th minute the second dozen has been packed
Payment and pickup takes place at the end of 36 minutes for 2nd order
Time taken to process an order of 2 dozen cookies end to end is 36 mins
Bottlenecks- setting the oven thermostat for baking
Time for second dozen = Time for first dozen + bottleneck
Time taken for the 2 dozen for production is 36 mins
Time for the third dozen=Time taken for first dozen+2*bottlenecks
General equation for nth dozen= 26+(n-1)*bottleneck
This general equation should be less then equal to the time constraing of 240 mins (4hrs)
Equation = 16 + 10n <=240
Therefore n = 22
Answer 3
Kristen's job = Washing, Mixing and Spooning
Roommate's job = Set, Pack & Payment collection
Answer 4
1st order
Answer 5
0 additional mixers required since 1 sits ideal for a long time during baking and cooling
2 more baking trays require
12 mins
17 mins
22 mins
0/ hours assumption
0.1667
Time Taken
12
17
22
5/ hours assumption
0.25
Time Taken
12
17
22
s required since 1 sits ideal for a long time during baking and cooling
since 3 dozen is the capacity of the mixer
ORDER SIZE
1 dozen
2 dozen
3 dozen
4 dozen
5 dozen
6 dozen
7 dozen
8 dozen
9 dozen
10 dozen
11 dozen
12 dozen
13
14
15
16
17
18
19
20
21
22
dozen
dozen
dozen
dozen
dozen
dozen
dozen
dozen
dozen
dozen
COMPLETION TIME
26 min
36 min
46 min
56 min
66 min
76 min
86 min
96 min
106 min
116 min
126 min
136
146
156
166
176
186
196
206
216
226
236
min
min
min
min
min
min
min
min
min
min
min
Material Cost/Dozen
0.70
0.70
0.70
Material Cost/Dozen
0.70
0.70
0.70
Total Cost
2.70
4.23
5.77
Total Cost/Dozen
2.70
2.12
1.92
Total Cost
3.70
5.65
7.60
Total Cost/Dozen
3.70
2.83
2.53
Cost Saving/Dozen
NA
22%
29%
AVAILABLE FACTS
COST OF IN GRADIENTS
PACKING COST
MIXING TIME
ACTIVITY
ORDER
WASH
SPOONING
OVEN HEAT
BAKING
REMOVE
COOL
PACK
PAY
TOTAL
RESOURCECUMMULATIVE
0
6
2
1
9
0
5
2
1
26
0
6
8
9
18
18
23
25
26
2 3 4 5
Batch 1
ORDER
WASH
SPOONING
OVEN HEAT
BAKING
REMOVE
COOL
PACK
PAY
Batch 2
BAKING
COOL
PACK
PAY
Batch 3
BAKING
COOL
PACK
PAY
ES
DOZEN)
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
BAKING
27
28
COOLING
PACKING
PAYMENT
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46