BBU3900 V200

Installation Guide

Issue: 05
Part Number: 31504449
Date: 2009-03-05
HUAWEI TECHNOLOGIES CO., LTD.

Content

Safety Information

1. Information About the Installation

2. Installing the BBU in the APM30

3. Installing the BBU in the APM30H

15

4. Installing the BBU in the APM30 (+24 V)

17

5. Installing the BBU in the 19-Inch Cabinet

19

6. Installing the BBU on the Wall

23

7. Installing the BBU in the PS4890 Cabinet

28

8. Installing the BBU in the OMB Cabinet

33

9. Installing the BBU in the TMC

39

10. Installing the BBU in the TMC11H

41

11. Checking the Power-On Status of the BBU

42

12. Reference

43

Safety Information
Following All Safety Precautions
Before any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.

Complying with the Local Safety Regulations


When operating the device, comply with the local safety regulations. The safety precautions provided in the
documents are supplementary. You must comply with the local safety regulations.

Qualified Personnel Only


The personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning work.

Symbols
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.

Safety of Personnel
The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
Non-standard and improper high voltage operations may result in fire and electric shock.
In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
Power off the device before performing operations on the power supply equipment.
High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
When working at a height, be cautious about falling objects.

Device Safety
Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
The NodeB must be powered on within one week after installation.

1 Information About the Installation


a

Installation Tools

Insulated screwdriver

Adjustable wrench

Cross screwdriver

Socket wrench

Straight screwdriver

Torque wrench

Power cable crimping


pliers

RJ-45 crimping pliers

Wire cutter

Rubber hammer

Claw hammer

Cable peeler

Percussion drill

Multimeter

Heat gun

Long measuring tape

Level bar

Vacuum cleaner

1 Information About the Installation


b

Installation Scenarios

1.APM30

2.APM30H

BBU

BBU

3.TMC

4.TMC11H

BBU

BBU

1 Information About the Installation


b

Installation Scenarios
6.PS4890

5.APM30 (+24V

BBU
BBU

7. In OMB cabinet

8. In other 19-inch cabinet

9. On the Wall

BBU
BBU
BBU

1 Information About the Installation


c

BBU Hardware and Cables

1. Appearance of the BBU (Unit: mm)

2. Configuration Principles of the BBU Boards

Board

Mandatory/Op
tional

Full
Configuration

Installation Slot

Remarks

WMPT

Mandatory

S6 and S7

Preferentially configured in Slot 7.

WBBP

Mandatory

S0 to S3

Preferentially configured in Slot 3,


then Slot 2, at last Slot 0,1.

UPEU

Mandatory

PWR1 and WR2

Preferentially configured in PWR2.

UBFA

Mandatory

FAN

Only in the FAN slot.

UTRP

Optional

S0 to S5

Preferentially configured in Slot 4,


5.

UELP

Optional

S0 and S4

Preferentially configured in Slot 4.

UFLP

Optional

S0 and S4

Preferentially configured in Slot 4.

UEIU

Optional

PWR1

Preferentially configured in PWR1.

1 Information About the Installation


d

Cable connections of the BBU


Alarm
Equipment

Monitoring
Equipment

Power System

BBU Power Cable

Alarm Cable

E1 surge protection transfer cable

CPRI Optical

E1 Cable

FE cable

Monitoring Cable

FE surge protection transfer cable

Procedure

2 Installing the BBU in the APM30


a

Cable connections

NO.

Cable

Installation Position
From...

To ...

BBU power cable

LOAD3 on PDU

PWR on BBU

E1 transfer cable

E1/T1 on WMPT

INSIDE on UELP

E1cable

OUTSIDE on UELP

Transmission equipment

Monitoring cable

TX/RX on APMI

MON1on BBU

CPRI

CPRI on BBU

CPRI on RRU

2 Installing the BBU in the APM30


b

Installing BBU
1 Install the mounting ears at both sides of
the BBU reversely.

PDU

BBU
M6 bolt

2 Slide the BBU case into the cabinet.


3 Check the DIP switches (see appendix).

Installing cables
1. Install power cable.
Connect the OT terminal of the power cable to the LOAD3
terminal of the PDU, and then fix the 3V3 connector of the
power cable to the PWR port on the BBU.

LOAD3
NEG(-)
RNT(+)

PWR
The power cable is to be made
depending on field requirements.

2 Installing the BBU in the APM30


b

Installing the BBU cables

2. Install optical cables.


Connect one end of the optical cable to CPRI0, CPRI1, or CPRI2 on the WBBP. Then,
connect the other end to the RRU.
Insert the optical module into CPRI0, CPRI1,
or CPRI2.
Turn outwards the puller on the optical
module.

Optical module
Puller

Remove the dustproof caps from the


optical connectors.
Insert the optical connector at one end of the
CPRI optical cable into the optical module. lead
the CPRI optical cable out of the cabinet along
the left side of the cabinet.

Wrap the fiber tail with the winding pipe till the
first cable tie.

Connect the fiber tails labeled 1A and


1B to the CPRI_W port on the RRU.
Connect the fiber tails labeled 2A and
2B to one of the CPRI0 to CPRI5 ports
on the WMPT.

Optical cable
connector

Winding pipe

10

2 Installing the BBU in the APM30


b

Installing the BBU cables

3. Install the E1 transfer cable.


Fix the DB25 connector of the E1 transfer cable to the INSIDE port on the UELP and the DB26 connector to the
E1/T1 port on the WMPT.

4. Install the E1 cable.


Cabling the E1 cable.
Fix the DB26 connector of the E1 cable to the
OUTSIDE port on the UELP.
Strip the jacket off the E1 cable near the
grounding point at the lower right corner of the
cabinet to expose the shielding layer

E1 cable

25mm

E1 transfer cable

Thread the E1 cable through the grounding clip.


Then, tighten the screw on the grounding clip to
make the shielding layer of the E1 cable in full
contact with the grounding clip. Finally, connect
the PGND cable on the grounding clip to the
grounding bolt of the APM30.

INSIDE

OUTSIDE

Shielding layer
of the E1 cable

E1/T1

11

2 Installing the BBU in the APM30


b

Installing the BBU Cables


5. Install the FE transfer cable (FE transmission
mode).
Connect one end of the FE transfer cable to the
FE0 port near the INSIDE label on the UFLP and
the other end to the FE0 port on the WMPT.
6. Install the FE cable (FE transmission).
Connect one end of the FE cable to the FE0 port
near the OUTSIDE label on the UFLP. Then, lead
the other end out of the cabinet along the right side
of the cabinet.

FE transfer cable
FE cable

Strip the jacket off the FE cable near the


grounding point at the lower right corner of the
cabinet to expose the shielding layer
25mm

INSIDE FE0

OUTSIDE FE0

FE0

Thread the FE cable through the grounding


clip. Then, tighten the screw on the grounding
clip to make the shielding layer of the FE
cable in full contact with the grounding clip.
Finally, connect the PGND cable on the
grounding clip to the grounding bolt of the
APM30.
Shielding layer
of the FE cable

12

2 Installing the BBU in the APM30


b

Installing the BBU Cables


7. Install the monitoring signal cable
between the APMI and the BBU.
Fix the RJ45 connector at one end of the cable to the
MON1 port on the UPEU.

MON1

Monitoring signal cable between the


APMI and the BBU

EXT-ALM1
External alarm
cable

8. Install the external alarm cable.


Connect one end of the alarm cable to the EXT-ALM port
on the UPEU, and the other end to the associated alarm
device.
The port on the external alarm device is added depending
on field requirements.

9. Install the EMUA monitoring signal cable.


When the MON0 port on the BBU is available, fix the RJ45 connector of the EMUA
monitoring signal cable to the MON0 port on the UPEU, and the DB9 connector to the
corresponding port on the EMUA.

MON0

RS485

13

2 Installing the BBU in the APM30


b

Installing the BBU Cables


b. When the MON0 port on the BBU is unavailable, cut off the RJ45 connector of the
EMUA monitoring signal cable, and then connect the four exposed bare wires to the
RX+, RX-, TX+, and TX- ports on the APMI. For the relationship between the ports and
wires. Fix the DB9 connector to the corresponding port on the EMUA.

EMUA monitoring signal cable


Pin on the RJ45
Connector

Pin on the DB9 Male


Connector

Color

Type

Port on the APMI

X1.1

X2.3

White

Twisted pair

TX+

X1.2

X2.7

Orange

X1.4

X2.2

Blue

X1.5

X2.6

White

14

TXTwisted pair

RX+
RX-

3 Installing the BBU in the APM30H


a

BBU Cable Connections


The procedure for installing the BBU case in the APM30H is the same as that in the APM30.
For details, see pages 914. The following figure shows the cable connections of the BBU.
Page 15 shows how to install the monitoring signal cable between the HEUA and the BBU
in the APM30H.

No.

Cable

Installation Position
One end is connected to...

The other end is connected


to...

BBU power cable

LOAD3 terminal of the PDU

PWR port on the BBU

E1 transfer cable

E1/T1 port on the WMPT

INSIDE port on the UELP

E1 cable

OUTSIDE port on the UELP

External transmission device

Monitoring signal
cable

COM IN port on the HEUA

MON1 port on the BBU

CPRI optical
cable

CPRI port on the BBU

CPRI port on the RRU

15

3 Installing the BBU in the APM30H


b

Installing the Monitoring Signal Cable between the HEUA and the BBU

HEUA
COM IN
MON1

UPEU on the
BBU

16

4 Installing the BBU in the APM30 (+24 V)


a

BBU Cable Connections


The procedure for installing the BBU in the APM30 (+24 V) is the same as that in the APM30. For
details, see pages 914. The following figure shows the cable connections of the BBU. Page 17
shows how to install the monitoring signal cable of the cabinet.

No.

Cable

Installation Position
One end is connected to...

The other end is connected


to...

BBU power cable

LOAD3 terminal of the PDU

PWR port on the BBU

E1 surge protection
transfer cable

E1/T1 port on the WMPT

INSIDE port on the UELP

E1 cable

OUTSIDE port on the UELP

External transmission device

Monitoring signal
cable

COM IN port on the HEUA

MON1 port on the BBU

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

17

4 Installing the BBU in the APM30 (+24 V)


b

Installing the Monitoring Signal Cable of the Cabinet

Pin assignment of the monitoring signal cable of the cabinet


Pin on the RJ45
Connector

Pin on the RJ45


Connector

Wire Color

Wire Type

X1.1

X2.1

White/orange

Twisted pair

X1.2

X2.2

Orange

X1.3

X2.3

White/green

X1.6

X2.6

Green

X1.5

X2.5

White/blue

X1.4

X2.4

Blue

X1.7

X2.7

White/brown

X1.8

X2.8

Brown

18

Twisted pair

Twisted pair

Twisted pair

5 Installing the BBU in the 19-Inch Cabinet


a

BBU Cable Connections

No.

Cable

Installation Position
From...

To...

BBU power
cable

External power supply

PWR port on the BBU

E1 cable

External transmission device

E1/T1 port on the WMPT

FE cable
(optional)

External transmission device

FE0 port on the WMPT

Monitoring
signal cable

External monitoring device

MON/ALM on the BBU

CPRI optical
cable

CPRI port on the RUU

CPRI port on the BBU

19

5 Installing the BBU in the 19-Inch Cabinet


b

Space Requirements

1. 25 mm on the left of the BBU for ventilation


2. 25 mm on the right of the BBU for ventilation
3. 70 mm in front of the BBU for cabling

Installing the BBU Case

Slide the BBU case into the cabinet. Then, tighten the four M6 screws.

20

5 Installing the BBU in the 19-Inch Cabinet


d

Installing BBU Cables

1 Install the PGND cable.

Grounding bolt
on the right side
of the BBU

PGND cable

2 Install the power cable.

PWR

3 Install the signal cable.

EXT-ALM0

21

MON1

5 Installing the BBU in the 19-Inch Cabinet


d

Installing the BBU Cables


4 Install the CPRI optical cable and the E1 cable.

E1/T1
E1/T1

Insert the optical module into the CPRI0, CPRI1, or CPRI2 port.
Turn outwards the puller on the optical module.

Optical module
Puller

Remove the dustproof caps from the optical connectors.


Insert the optical connector at one end of the CPRI optical cable into the
optical module. Lead the CPRI optical cable out of the cabinet along the
left side of the cabinet.

CPRI optical cable

Winding pipe

22

6 Installing the BBU on the Wall


a

BBU Cable Connections

External
grounding bar
External power
equipment

External
External transmission
equipment

grounding bar

External monitoring
equipment

SN

Cable

Installation Position
One End Connected to...

The Other End


Connected to...

RRU power cable

LOAD0 to LOAD5 on the DCDU-03

Power supply socket on the


RRU

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

E1 cable

E1/T1 port on the WMPT

External transmission
equipment

Monitoring signal
cable

MON/ALM port on the BBU

External monitoring equipment

BBU power cable

PWR port on the BBU

LOAD6 on the DCDU-03

DCDU power cable

DC input port on the DCDU-03

External power equipment

PGND cable

Grounding bolt on the equipment

External grounding bar

23

6 Installing the BBU on the Wall


b

Space Requirements

A single BBU

BBUDCDU-03C
DCDU-03C
BBU

The DCDU is installed near the BBU.

Installing the BBU Case

1. Install the mounting ears for wall installation.


Mounting ear on
the BBU case

Mounting ear
for wall installation

24

6 Installing the BBU on the Wall


c

Installing the BBU Case

2. Place the BBU against the wall, and then use the marking pen to mark
the holes of the mounting ears for wall installation.

wall

BBU

3. Install the expansion bolts.

Bolt M1080
Nut
Spring washer 10
Flat washer 10
Expansion tube

55mm60mm

20mm

25

6 Installing the BBU on the Wall


c

Installing the BBU Case

4. Mount the BBU on the wall.

Flat washer

Spring washer

Installing the DCDU-03C Case


2. Place the DCDU-03C against the wall,
and then use the marking pen to mark the
anchor points of the mounting ears for
wall installation.

1. Turn the mounting ears on the


DCDU-03C by 90 degrees.

wall

26

6 Installing the BBU on the Wall


d

Installing the DCDU-03C Case

3. Install the expansion bolts.

Bolt M1080
Nut
Spring washer 10
Flat washer 10
Expansion tube

55mm60mm

20mm

4. Mount the DCDU-03C on the wall.

27

7 Installing the BBU in the PS4890 Cabinet


a

BBU Cable Connections

No.

Cable

Installation Position
From...

To...

BBU power cable

LOAD6 terminal on the


DCDU

PWR port on the BBU

E1 cable

External transmission
device

E1/T1 port on the WMPT

BBU alarm cable (optional)

External transmission
device

ALM port on the UPEU

Monitoring signal cable


between the PMU and the
BBU

RS232/RS422 port on the


PMU

MON0 port on the BBU

CPRI optical cable

CPRI port on the RRU

CPRI port on the BBU

28

7 Installing the BBU in the PS4890 Cabinet


b

Installing the BBU

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

29

7 Installing the BBU in the PS4890 Cabinet


c

Installing the BBU Cables


1 Install the power cable.

LOAD 6

PWR

30

7 Installing the BBU in the PS4890 Cabinet


c

Installing the BBU Cables

2 Install the signal cable.

Install the BBU alarm cable (optional).


Install the monitoring signal cable between the PMU and the BBU.

MON0

RS232/RS422

EXT ALM1

31

7 Installing the BBU in the PS4890 Cabinet


c

Installing the BBU Cables


Insert the optical module into the CPRI0, CPRI1,
or CPRI2 port.

3 Installing the CPRI optical


cable and the E1 cable.

Turn outwards the puller on the optical module.

Optical
module

Puller

Remove the dustproof caps from the optical


connectors.
Insert the optical connector at one end of the
CPRI optical cable into the optical module. lead
the CPRI optical cable out of the cabinet along
the left side of the cabinet.

E1/T1

CPRI optical cable

Winding pipe

32

8 Installing the BBU in the OMB Cabinet


a

BBU Cable Connections

No.

Cable

Installation Position
From...

To...

PGND cable

External grounding bar

Grounding bar of the OMB


cabinet

Input power cable

External DC power supply

DC input terminal of the DCDU

of the OMB
3

BBU power cable

LOAD6 output terminal on the


DCDU

PWR port on the BBU

E1 transfer cable

E1/T1 port on the WMPT

INSIDE port on the UELP

E1 cable

OUTSIDE port on the UELP

External transmission device

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

33

8 Installing the BBU in the OMB Cabinet


b

Installing the brackets on the metal pole and mounting plate

a.1 Install the brackets on the metal pole.


Use a level bar to adjust the levelness of the brackets to ensure that the front and back brackets are
on the same plane.

Flat washer Spring washer


Bolt M10110

Inner hexagon
spanner
255~306kgfcm

a.2 Install the mounting plate.

Inner hexagon
spanner
255~306kgfcm

Flat Spring
washer washer

Bolt M10110

appearance of the mounting plate

34

8 Installing the BBU in the OMB Cabinet


c

Installing the OMB Cabinet


Slide the BBU case into the OMB
cabinet gently. Then, tighten the four
M6 screws.

Installing the BBU Cables

1. Install the PGND cable of OMB Cabinet.

35

8 Installing the BBU in the OMB Cabinet


d

Installing the BBU Cables

2 Install the input power cable.

NEG(-)
RNT(+)

LOAD6

3. Install the BBU power cable.

36

8 Installing the BBU in the OMB Cabinet


d

Installing the BBU Cables

4 Install the E1 cable (E1 transmission).

OUTSIDE
E1/T1
INSIDE

Shielding layer

37

8 Installing the BBU in the OMB Cabinet


d

Installing the BBU Cables

5. Install the FE cable (FE transmission).

6. Install the CPRI optical cable.


1. Insert the optical module into the CPRI0, CPRI1, or
CPRI2 port.
2. Turn outwards the puller on the optical
module.

Optical module

Puller

3. Remove the dustproof caps from the


optical connectors.
4. Insert the optical connector at one end
of the CPRI optical cable into the optical
module. lead the CPRI optical cable out of
the cabinet along the left side of the
cabinet.

38

9 Installing the BBU in the TMC


a

BBU Cable Connections


The procedure for installing the BBU in the TMC is the same as that in the APM30. For details,
see pages 914. Page 39 shows how to install the TMC alarm cable in the TMC.

No.

Cable

Installation Position
From...

To...

BBU power cable

LOAD6 terminal of the PDU

PWR port on the BBU

E1 transfer cable

E1/T1 port on the WMPT

INSIDE port on the UELP

E1 cable

OUTSIDE port on the UELP

External transmission device

Monitoring signal cable

Wiring terminal of cabinet


monitoring

ALM1 port on the BBU

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

39

9 Installing the BBU in the TMC


b

Installing the BBU

Slide the BBU case into the


TMC cabinet. Then, tighten
the four M6 screws.

Installing the BBU Cables

Installing the TMC alarm cable

APMI
Door status sensor

a. Fix the RJ45 connector


at one end of the alarm
cable to the EXT_ALM1
port on the BBU.

Wiring
terminal
of
DCDU surge protection

b. Connect the two bare


terminals X1.4 (blue) and
X1.5 (white) to the alarm
wiring terminals on the
door status sensor.
c. Connect the two bare
terminals X1.1 (white)
and X1.2 (orange) to the
OUT+ and OUT- alarm
wiring terminals on the
APMI.
d. Connect the two bare
terminals X1.3 (white)
and X1.6 (green) to the
alarm wiring terminals on
the DCDU.

40

10 Installing the BBU in the TMC11H


a

BBU Cable Connections


The procedure for installing the BBU in the TMC11H is the same as that in the APM30. For
details, see pages 914.

No.

Cable

Installation Position
From...

To...

CPRI optical cable

CPRI port on the BBU

CPRI port on the RRU

E1 transfer cable

E1/T1 port on the WMPT

INSIDE port on the UELP

E1 cable

OUTSIDE port on the UELP

External transmission device

BBU power cable

LOAD6 terminal on the PDU

PWR port on the BBU

Monitoring signal
cable

Wiring terminal of cabinet monitoring

MON1 port on the BBU

41

11 Checking the Power-On Status of the BBU


Procedure for checking the power-on status of the BBU:
Start

Powering on the BBU3900

Clearing the fault


Powering off the
BBU3900

a
No

Checking whether all LEDs on the


BBU are normal?
Yes

End

a
The normal status of LED on the
WMPT is as follows:
RUN LED: 1s ON, 1s OFF
(blinking at 0.5 Hz)
ALM LED: OFF
ACT LED: ON
The normal status of LED on the
UBFA is as follows:
STATE LED: Green
1s ON, 1s OFF (blinking at 0.5 Hz)
The normal status of LED on the
UPEU is as follows:
RUN LED: ON
The normal status of LED on the
WBBP is as follows:
RUN LED: 1s ON, 1s OFF
(blinking at 0.5 Hz)
ALM LED: OFF

42

12 Reference
c
a

Cable List
Cable

Connector

Connects to

PGND cable

OT terminal

Grounding bolt of the BBU3900

OT terminal

Protection grounding bar

3V3 connector

PWR port on the UPEU

Bare wire. The connector needs


to be made on site according to
the field requirements. (The
following figure shows the BBU
power cable by taking OT
terminals as an example.)

External power supply

DLC connector

Connect the fiber tails labeled 1A


and 1B to the CPRI_W port on the
RRU

DLC connector

Connect the fiber tails labeled 2A


and 2B to one of the CPRI0 to
CPRI3 ports on the WBBP

DB26 male connector

E1/T1 port on the WMPT, or


OUTSIDE port on the UELP

The connector needs to be made


on site according to the field
requirements.

Peer device

BBU power cable

CPRI optical cable

E1 cable

43

12 Reference
c
a

Cable List

Cable

Connector

Connects to

E1 transfer

DB26 male connector

PWR port on the UPEU

DB25 male connector

E1/T1 port on the WMPT

RJ45 connector

FE0 port on the WMPT

RJ45 connector

Routing equipment

RJ45 connector

FE0 port on the WMPT

RJ45 connector

FE0 port near the INSIDE label on


the UFLP

Monitoring

RJ45 connector

RS232/RS422 port on the PMU

signal cable
between the

RJ45 connector

MON port on the BBU

cable

FE cable

FE transfer
cable

PMU and the


BBU

44

12 Reference
a

Cable List

Cable

Connector

Connects to

APMI-BBU
Monitoring

Be connected

APMI

RJ45 connector

MON1 port on the UPEU

RJ45 connector

MON0 or MON1 port on the


UPEU

DB9 male connector

RS485 port on the EMUA

RJ45 connector

EXT-ALM0 or EXT-ALM1 port on


the MON0 or MON1 port on the

signal cable

EMUA Monitoring
signal cable

Alarm cable

UPEU
RJ45 connector

External alarm device

45

12 Reference
b

Engineering Specifications of the BBU

Item

Specification

Dimensions

86 mm (height) x 442 mm (width) x 310 mm (length)

Weight

Typical configuration: 7 kg; full configuration: 11 kg

Input voltage

48 V DC or +24 V DC

Checking the DIP Switches of the BBU

Wear an ESD wrist strap or a pair of ESD gloves when performing


operations related to the boards, as shown in the figure below.

ESD strap

ESD gloves

1. Remove the BBU boards.

46

12 Reference
c

Checking the DIP Switches of the BBU


2. Set the DIP switches of the BBU.
Settings of the DIP switches on the UELP

75-ohm E1 Mode

Other Modes

Settings of the DIP switches on the WMPT


T1 Mode

75-ohm E1 Mode

3. Reinstall the boards.

47

120-ohm E1 Mode

12 Reference
ed

Pin Assignment of the BBU Signal Cables


75-ohm E1 cable

Pin on the DB26 Male

Wire Type

Coaxial SN. Label

X1.1

Tip

X1.2

Ring

X1.3

Tip

X1.4

Ring

X1.5

Tip

X1.6

Ring

X1.7

Tip

X1.8

Ring

X1.19

Tip

X1.20

Ring

X1.21

Tip

X1.22

Ring

X1.23

Tip

X1.24

Ring

X1.25

Tip

X1.26

Ring

Connector

48

RX1+
RX1-

RX2+
RX2-

RX3+
RX3-

RX4+
RX4-

TX1+
TX1-

TX2+
TX2-

TX3+
TX3-

TX4+
TX4-

12 Reference
d

Pin Assignment of the BBU Signal Cables

120-ohm E1 cable
Pin on the DB26 Male

Wire Color

Wire Type

Label

Connector
X1.1

Blue

RX1+
Twisted pair

X1.2

White

RX1-

X1.3

Orange

RX2+

X1.4

White

X1.5

Green

X1.6

White

X1.7

Brown

Twisted pair

RX2RX3+

Twisted pair
RX3RX4+
Twisted pair
X1.8

White

X1.19

Grey

RX4TX1+
Twisted pair

X1.20

White

X1.21

Blue

TX1TX2+
Twisted pair

X1.22

Red

X1.23

Orange

TX2TX3+
Twisted pair

X1.24

Red

TX3-

X1.25

Green

TX4+

X1.26

Red

Twisted pair

49

TX4-

12 Reference
d

Pin Assignment of the BBU Signal Cables

FE cable
Pin on the RJ45
Connector

Wire Color

Wire Type

Pin on the RJ45


Connector

X1.2

Orange

Twisted pair

X2.2

X1.1

White/orange

X1.6

Green

X1.3

White/green

X1.4

Blue

X1.5

White/blue

X1.8

Brown

X1.7

White/brown

X2.1
Twisted pair

X2.6
X2.3

Twisted pair

X2.4
X2.5

Twisted pair

X2.8
X2.7

Monitoring signal cable between the APMI and the BBU


Pin on the RJ45

Wire

Pins on the

Connector

Color

X2, X3, X4,

Wire Type

Port on the
APMI

and X5
X1.1

White

X2

Twisted

TX+

pair
X1.2

Orange

X3

Twisted
pair

TX-

X1.4

Blue

X4

Twisted

RX+

pair
X1.5

White

X5

Twisted
pair
50

RX-

12 Reference
d

Pin Assignment of the BBU Signal Cables

EMUA monitoring signal cable


Pin on the RJ45

Pin on the

Wire

Wire

Port on the

Connector

DB9 Male
Connector

Color

Type

APMI

X1.1

X2.3

White

Twisted

TX+

pair
X1.2

X2.7

Orange

Twisted

TX-

pair
X1.4

X2.2

Blue

Twisted

RX+

pair
X1.5

X2.6

White

Twisted
pair

RX-

Alarm cable
Pin on the RJ45

Pin on the RJ45

Wire Color

Wire Type

Connector

Connector

X1.1

X2.1

White/orange

Twisted pair

X1.2

X2.2

Orange

X1.3

X2.3

White/green

X1.6

X2.6

Green

X1.5

X2.5

White/blue

X1.4

X2.4

Blue

X1.7

X2.7

White/brown

X1.8

X2.8

Brown

51

Twisted pair

Twisted pair

Twisted pair