CT Sizing/ Dimensions Calculations


Table of Contents
500kV
500kV
500kV
220kV
220kV
220kV

Line
Line
Line
Line
Line
Line

Sheet

CTs-1
CTs-3
CTs-2
CTs-2
CTs-3
CTs-1

3
5
8
10
12
14

Enclosure 1
Current transformers calculated magnetizing curves are enclosed for reference.
Reference Documents
Single Line Protection
Technical Data sheet 500kV CTs class 0.2/5P20
Technical Data sheet 220kV CTs class 0.2/5P20
General
The calculations below are done to check the following.
Protections cores with low impedance protection:
Checking that actual load is less than rated load.
Checking that actual ALF ratio is larger than 40kA.
Protection cores with high impedance protection:
Calculation of operating voltage stable for 40kA through fault
current.
Checking that actual knee point voltage of CT is higher than two
times the operating voltage
Measuring cores:
Checking that actual load is less than rated load.
Checking actual Fs value and propose dummy loads where
necessary not to overload the instruments and meters during
primary faults.
All resistance values on current transformers secondary winding and cables are the values at

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 1

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

75 C.
CT ratios:
Ratios of CTs used for calculations are as under:
500kV Line CTs 750/1A: ratio shall be used for all metering cores.
500kV Line CTs 2500/1A: ratio shall be used for all Protective cores
except bus bar protection cores, which will use 3000/1A.
220kV Line CTs 600/1A: ratio shall be used for all metering cores.
220kV Line CTs 2400/1A: ratio shall be used for all Protective cores.
220kV Line CTs 2400/1A: ratio shall be used for all cores except
metering core which will use 600/1A.
The burden of each Protection relay & Meter is given Appendix 1.
The Burden from cables on CTs are based on using cable core size of 6mm2
Distance is calculated from foundation plan & maximum distance is taken for all
calculations.

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 2

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

DIA 1 & 2
1. 500kV Line CTs-1
Current Transformer Type: LVB-500W2
Cor
e
1

Ratio

Burden(VA)
30/30/30/30/15

Cla
ss
0.2

ALF/
Fs
---

Ekn(V) Knee Point


Voltage
---

3000-2500-2000-1250-750/1A

2
3
4
5

Rct()
20/17/14/9/5

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

60/60/30/30/15
60/60/30/30/15
60/60/30/30/15

5P
5P
5P

20
20
20

915/762/610/381/228
915/762/610/381/228
915/762/610/381/228

24/20/16/10/6
24/20/16/10/6
24/20/16/10/6

3000-2500-2000-1250-750/1A

60/60/30/30/15

5P

20

915/762/610/381/228

24/20/16/10/6

Core 1: Burden: Metering equipment of Line as Below:


A-meter
W-meter
Var-meter
Wh-meter
Digital Power Meter

0.2VA
0.2VA
0.2VA
0.2VA
0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
2.85VA

Total connected burden

5.15VA

The rated burden is 15VA> 5.15VA, i.e. ok.


Maximum secondary current at actual load (Fs) can be calculated as:
Fs= Esat ( Rct Actualload ) * In
Fs = Instrumental security factor according to IEC 60044
Esat = Current transformer saturation voltage
Rct= Current transformer secondary resistance
In= Current transformer secondary rated current
Fs should be lower than maximum current withstand of the connected meters in order to
protect meters at primary faults in the system.
Insertion of actual burden gives Fs:
Fs = 30 (5 5.15) *1
= 2.95

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 3

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 2.95, i.e ok
Core 2. Burden: Protection equipment as below.
P443 Distance Protection Relay
P841 Auto Reclose& Schnchro-check relay
Cable Switchgear to relay room

0.15VA
0.15VA
2.85VA

Total connected burden

3.15VA

The rated burden is 60VA> 3.15VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= Eknee ( Rct Actualload ) * ln
ALF= Accuracy limiting factor according to IEC 60044
Eknee= Current transformer knee-point voltage
Rct = Current transformer secondary resistance.
ln = Current transformer secondary rated current.
ALF= 762 ( 20 3.15) *1
= 32.92
This corresponds to a primary current of 32.92*2500A =82.3kA>40kA, i.e. ok
Core 3: Burden; Protection equipment as below.
7SA612 Distance Protection Relay
P841 Auto Reclosure with synchro-check relay
P127 Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
2.85VA

Total connected burden

3.3VA

The rated burden is 60VA> 3.3VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 ( 20 3.3) *1
=32.7
This corresponds to a primary current of 32.49*2500A =81.75kA>40kA, i.e. ok
Core 4: Burden; Protection equipment as below.
P821 Beaker failure Relay
Cable Switchgear to relay room
Total connected burden

0.15VA
2.85VA
3VA

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 4

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

The rated burden is 60VA> 3VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 742 (20 3) * 1
=32.26
This corresponds to a primary current of 32.26*2500A =80.65kA>40kA, i.e. ok
Core 5:Burden; Protection equipment as below.
P723 Hogh Impedence Bus bar Differential Protection Relay
Cable Switchgear to relay room

0.15VA
2.85VA

Total connected burden

3VA

The rated burden is 60VA> 3VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 915 (24 3) *1
=33.89
This corresponds to a primary current of 33.89*3000A =101.67kA>40kA, i.e. ok
Calculation of required operating voltage UR for through falut stability.
UR= Ifmax (Rct + R1) where
Ifmax is the maximum available through fault current (Secondary A)
R1 is the loop cable resitance up to connection point
As maximum through fault current the switchgear design short circuit level is used
Ifmax =40kA
The required operating voltage will be:
UR = 13.33 (24 + 2.85) = 357.91 V
Check of CT core output.
To secure opertion at internal faults the CT cores must give a voltage output
Eknee = 915> 715.82= 2 * UR, i.e knee-point voltage is sufficient.

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 5

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

2. 500kV Line CTs-3


Current Transformer Type: LVB-500W2
Cor
e
1
2
3

Ratio

Burden(VA)
30/30/30/30/15
30/30/30/30/15
60/60/30/30/15

Cla
ss
0.2
0.2
5P

ALF/
Fs
----20

Ekn(V) Knee Point


Voltage
----915/762/610/381/228

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

4
5
6

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

Rct()
20/17/14/9/5
20/17/14/9/5
24/20/16/10/6

60/60/30/30/15
60/60/30/30/15
60/60/30/30/15

5P
5P
5P

20
20
20

915/762/610/381/228
915/762/610/381/228
915/762/610/381/228

24/20/16/10/6
24/20/16/10/6
24/20/16/10/6

Core 1: Burden: Protection equipment as below.


A-meter
W-meter
Var-meter
Wh-meter
Digital Power Meter

0.2VA
0.2VA
0.2VA
0.2VA
0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
2.70VA

Total connected burden

5VA

The rated burden is 15VA> 5VA, i.e. ok.


Fs = 30 (5 5) *1
= 3
Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 3, i.e ok.
Core 2: Same as Core 1, CT-3 of DIA 1 & 2.
Core 3: Burden; Protection equipment as below.
P443 Distance Protection Relay
P841 Auto Reclosure with synchro-check relay
Cable Switchgear to relay room
Total connected burden

0.15VA
0.15VA
2.70VA
3VA

The rated burden is 60VA > 3VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 3) *1
=33.13

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 6

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

This corresponds to a primary current of 33.13*2500A =82.83kA > 40kA, i.e. ok


Core 4: Burden; Protection equipment as below.
7SA612 Distance Protection Relay
P841 Auto Reclosure with synchro-check relay
P127Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
2.70VA

Total connected burden

3.15VA

The rated burden is 60VA > 3.15VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 3.15) *1
= 32.92
This corresponds to a primary current of 32.92*2500A =82.3kA>40kA, i.e. ok
Core 5: Burden: Protection equipment as below.
P821 Breaker Failure
P723 Transformer HV Connection Differential relay
Cable Switchgear to relay room

0.15VA
0.15VA
2.70VA

Total connected burden

3VA

The rated burden is 60VA> 3VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 3) *1
=33.13
This corresponds to a primary current of 33.13*2500A =82.825kA>40kA, i.e. ok
Core 6: Burden: Protection equipment as below.
P127 Over Load Relay
P633 Rough Balance relay
P127Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
2.70VA

Total connected burden

3.15VA

The rated burden is 60VA> 3.15VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 7

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

ALF= 762 ( 20 3.15) *1


=32.92
This corresponds to a primary current of 32.92*2500A =82.3kA>40kA, i.e. ok

3. 500kV Line CTs-2

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 8

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Current Transformer Type: LVB-500W2


Cor
e
1
2
3
4
5

Ratio

Burden(VA)

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

30/30/30/30/15
60/60/30/30/15
60/60/30/30/15
60/60/30/30/15
60/60/30/30/15

Clas
s
0.2
5P
5P
5P
5P

ALF
/Fs
--20
20
20
20

Ekn(V) Knee Point


Voltage
--915/762/610/381/228
915/762/610/381/228
915/762/610/381/228
915/762/610/381/228

Rct()
20/17/14/9/5
24/20/16/10/6
24/20/16/10/6
24/20/16/10/6
24/20/16/10/6

Core 1: Burden: Protection equipment as below.


A-meter
W-meter
Var-meter
Wh-meter
Digital Power Meter

0.2VA
0.2VA
0.2VA
0.2VA
0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
2.48VA

Total connected burden

4.78VA

The rated burden is 15VA> 4.78VA, i.e. ok.


Fs = 30 (5 4.78) *1
= 3.067
Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 3.607, i.e ok.
Core 2: Burden: Protection equipment as below
P127 Over Load Relay
P633 Rough Balance relay
P127 Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
2.48VA

Total connected burden

2.93VA

The rated burden is 60VA> 2.93VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 2.93) * 1
= 33.23
This corresponds to a primary current of 33.23*2500A =83.08kA>40kA, i.e. ok
Core 3: Burden: Protection equipment as below

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 9

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

P821 Breaker Failure


P723 Transformer HV Connection Differential relay
Cable Switchgear to relay room

0.15VA
0.15VA
2.48VA

Total connected burden

2.78VA

The rated burden is 60VA> 2.78VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 2.78) * 1
=33.45
This corresponds to a primary current of 33.45*2500A =83.63kA>40kA, i.e. ok
Core 4.Burden; Protection equipment as below.
P821 Beaker failure Relay
Cable Switchgear to relay room

0.15VA
2.48VA

Total connected burden

2.63VA

The rated burden is 60VA> 2.63VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 2.63) * 1
=33.67
This corresponds to a primary current of 33.67*2500A =84.175kA>40kA, i.e. ok
Core 5:Burden; Protection equipment as below.

P723 High Impedence Bus Bar Differential Protection Relay


Cable Switchgear to relay room

0.15VA
2.48VA

Total connected burden

2.63VA

The rated burden is 60VA> 2.63VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 915 (24 2.63) *1
= 34.36
This corresponds to a primary current of 34.36*3000A =103.08kA>40kA, i.e. ok
Calculation of required operating voltage UR for through falut stability.

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 10

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

UR= Ifmax (Rct + R1) where


Ifmax is the maximum available through fault current (Secondary A)
R1 is the loop cable resitance up to connection point
As maximum through fault current the switchgear design short circuit level is used
Ifmax =40kA
The required operating voltage will be:
UR = 13.33 (24 + 2.63) = 354.98 V
Check of CT core output.
To secure opertion at internal faults the CT cores must give a voltage output E knee = 915>
709.96= 2 * UR, i.e knee-point voltage is sufficient.

1. 220kV Line CTs-2

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 11

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Current Transformer Type: LVB-220W3


Core

Ratio

Burden(VA)

Class

ALF/Fs

1
2
3
4
5
6

2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A

30/30/15
60/30/15
60/30/15
60/30/15
60/30/15
60/30/15

0.2

--20
20
20
20
20

5P
5P
5P
5P
5P

Ekn(V) Knee Point


Voltage
--450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5

Rct()
16/8/4

11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75

Core 1: Burden: Protection equipment as below.


A-meter
W-meter
Var-meter
Wh-meter
Digital Power Meter

0.2VA
0.2VA
0.2VA
0.2VA
0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
1.57VA

Total connected burden

3.87VA

The rated burden is 15VA> 3.87VA, i.e. ok.


Fs = 55 (4 3.87) *1
= 6.98
Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 6.98, i.e ok.
Core 2: Burden; Protection equipment as below.
P127 Over Load Relay
P633 Rough Balance relay
P127 Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
1.57VA

Total connected burden

2.02 VA

The rated burden is 60VA> 2.02VA, i.e. ok.

Actual ALF (ALF) can approx. be calculated as:


ALF= 450 (11 2.02) *1

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 12

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

=34.56
This corresponds to a primary current of 34.56*2400A =83.94kA>40kA, i.e. ok
Core 3: Burden; Protection equipment as below.
P723 Transformer HV Connection Differential relay
Cable Switchgear to relay room

0.15VA
1.57VA

Total connected burden

1.72VA

The rated burden is 60VA> 1.72VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 450 (11 1.72) *1
= 35.38
This corresponds to a primary current of 35.38*2400A =84.91kA>40kA, i.e. ok
Core 4.Burden; Protection equipment as below.
P723 High Impedance Bus Bar Differential Protection Relay
Cable Switchgear to relay room

0.15VA
1.57VA

Total connected burden

1.72VA

The rated burden is 60VA> 1.72VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 450 (11 1.72) * 1
=35.38
This corresponds to a primary current of 35.38*2400A =84.91kA>40kA, i.e. ok
Calculation of required operating voltage UR for through falut stability.
UR= Ifmax (Rct + R1) where
Ifmax is the maximum available through fault current (Secondary A)
R1 is the loop cable resitance up to connection point
As maximum through fault current the switchgear design short circuit level is used
Ifmax =40kA
The required operating voltage will be:
UR = 16.67 (11+ 1.72) = 212.04 V

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 13

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Check of CT core output.


To secure opertion at internal faults the CT cores must give a voltage output E knee = 450>
424.08= 2 * UR, i.e knee-point voltage is sufficient.
Core 5: Burden; Protection equipment as below.
Not Used
Core 6: Burden; Protection equipment as below.
Not Used

2. 220kV Line CTs-3


Current Transformer Type: LVB-220W3

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 14

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Core

Ratio

Burden(VA)

Class

ALF/Fs

1
2
3
4
5
6

2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A

30/30/15
60/30/15
60/30/15
60/30/15
60/30/15
60/30/15

0.2

--20
20
20
20
20

5P
5P
5P
5P
5P

Ekn(V) Knee Point


Voltage
--450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5

Rct()
16/8/4

11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75

Core 1: Burden: Protection equipment as below.


A-meter
W-meter
Var-meter
Wh-meter

0.2VA
0.2VA
0.2VA
0.2VA

Digital Power Meter

0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
1.83VA

Total connected burden

4.13VA

The rated burden is 15VA> 4.13VA, i.e. ok.


Fs = 55 ( 4 4.13) *1
= 6.76
Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 6.76, i.e ok.
Core 2: Burden; Protection equipment as below.
P127 Over Load Relay
P633 Rough Balance relay
P127Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
1.83VA

Total connected burden

2.28VA

The rated burden is 60VA> 2.28VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 450 (11 2.28) *1
=33.88
This corresponds to a primary current of 33.88*2400A =81.31kA>40kA, i.e. ok

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 15

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Core 3: Burden; Protection equipment as below.


P723 LV Connection Protection Relay
Cable Switchgear to relay room

0.15VA
1.83VA

Total connected burden

1.98VA

Actual ALF (ALF) can approx. be calculated as:


ALF= 450 (11 1.98) *1
= 34.67
This corresponds to a primary current of 33.67*2400A =80.8kA>40kA, i.e. ok
Core 4.Burden; Protection equipment as below.
P821 Breaker Failure Relay
Cable Switchgear to relay room
Total connected burden

0.15VA
1.83VA
1.98VA

Actual ALF (ALF) can approx. be calculated as:


ALF= 450 (11 1.98) * 1
=34.67
This corresponds to a primary current of 34.67*2400A =83.208kA>40kA, i.e. ok
Core 5: Burden; Protection equipment as below.
Not Used
Core 6: Burden; Protection equipment as below.
Not Used

3. 220kV Line CTs-1


Current Transformer Type: LVB-220W3

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 16

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Core

Ratio

Burden(VA)

Class

1
2
3
4
5
6

2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A
2400-1200-600/1A

30/30/15
60/30/15
60/30/15
60/30/15
60/30/15
60/30/15

0.2

ALF/Fs

5P
5P
5P
5P
5P

20
20
20
20
20

Ekn(V) Knee Point


Voltage
--450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5
450/225/112.5

Rct()
16/8/4

11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75
11/5.5/2.75

Core 1: Burden: Protection equipment as below.


A-meter
W-meter
Var-meter
Wh-meter
Digital Power Meter

0.2VA
0.2VA
0.2VA
0.2VA
0.5VA

Transducer W for Recorder


Transducer var for Recorder
Cable Switchgear to relay room

0.5VA
0.5VA
2.01VA

Total connected burden

4.31VA

The rated burden is 15VA> 4.31VA, i.e. ok.


Fs = 55 ( 4 4.31) *1
= 6.62
Meter with lowest withstand is Wh-meter, which can stand 20*ln = 20> 6.62, i.e ok.
Core 2: Burden; Protection equipment as below.
7SA612 Distance Protection Relay
P841 Auto Reclosure with synchro-check relay
P127Over Current Relay
Cable Switchgear to relay room

0.15VA
0.15VA
0.15VA
2.01VA

Total connected burden

2.46VA

The rated burden is 60VA> 2.46VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 450 (11 2.46) *1
=33.43
This corresponds to a primary current of 33.43*2400A =80.23kA>40kA, i.e. ok
Core 3: Burden; Protection equipment as below.

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 17

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

P443 Distance Protection Relay


P841 Auto Reclose& Schnchro-check relay
Cable Switchgear to relay room
Total connected burden

0.15VA
0.15VA
2.01VA
2.31VA

Actual ALF (ALF) can approx. be calculated as:


ALF= 450 (11 2.31) *1
=33.81
This corresponds to a primary current of 33.81*2400A =81.144kA>40kA, i.e. ok
Core 4.Burden; Protection equipment as below.
P723 High Impedance Bus Bar Differential Protection Relay
Cable Switchgear to relay room

0.15VA
2.01VA

Total connected burden

2.16VA

Actual ALF (ALF) can approx. be calculated as:


ALF= 450 (11 2.16) * 1
=34.19
This corresponds to a primary current of 34.19*2400A =82.056kA>40kA, i.e. ok
Calculation of required operating voltage UR for through falut stability.
UR= Ifmax (Rct + R1) where
Ifmax is the maximum available through fault current (Secondary A)
R1 is the loop cable resitance up to connection point
As maximum through fault current the switchgear design short circuit level is used
Ifmax =40kA
The required operating voltage will be:
UR = 16.67 (11+ 2.16) = 219.38 V
Check of CT core output.
To secure opertion at internal faults the CT cores must give a voltage output
Eknee = 450> 438.76= 2 * UR, i.e knee-point voltage is sufficient.
Core 5: Burden; Protection equipment as below.
Not Used
Core 6: Burden; Protection equipment as below.
Not Use

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 18

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

DIA 3
1. 500kV Line CTs-1
Current Transformer Type: LVB-500W2
Cor
e
1
2
3
4
5

Ratio

Burden(VA)

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

30/30/30/30/15
60/60/30/30/15
60/60/30/30/15
60/60/30/30/15
60/60/30/30/15

Cla
ss
0.2
5P
5P
5P
5P

ALF/
Fs
--20
20
20
20

Ekn(V) Knee Point


Voltage
--915/762/610/381/228
915/762/610/381/228
915/762/610/381/228
915/762/610/381/228

Rct()
20/17/14/9/5
24/20/16/10/6
24/20/16/10/6
24/20/16/10/6
24/20/16/10/6

Core 1: Same as core 1 of 500Kv line CT-1 of DIA 1 & 2.


Core 2: Same as core 2 of 500Kv line CT-1 of DIA 1 & 2.
Core 3: Same as core 3 of 500Kv line CT-1 of DIA 1 & 2.
Core 4: Same as core 4 of 500Kv line CT-1 of DIA 1 & 2.
Core 5: Same as core 5 of 500Kv line CT-1 of DIA 1 & 2.

2. 500kV Line CTs-3


Current Transformer Type: LVB-500W2

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 19

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

Core

Ratio

Burden(VA)

3000-2500-2000-1250-750/1A

30/30/30/30/15

3000-2500-2000-1250-750/1A

30/30/30/30/15

3
4
5
6

3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A
3000-2500-2000-1250-750/1A

60/60/30/30/15
60/60/30/30/15
60/60/30/30/15
60/60/30/30/15

Cl
as
s
0.
2
0.
2
5P
5P
5P
5P

ALF/
Fs

Ekn(V) Knee Point


Voltage

Rct()

---

---

20/17/14/9/5

---

---

20/17/14/9/5

20
20
20
20

915/762/610/381/228
915/762/610/381/228
915/762/610/381/228
915/762/610/381/228

24/20/16/10/6
24/20/16/10/6
24/20/16/10/6
24/20/16/10/6

Core 1: Same as core 1 of 500Kv line CT-3 of DIA 1 & 2.


Core 2: Same as core 2 of 500Kv line CT-3 of DIA 1 & 2.
Core 3: Same as core 3 of 500Kv line CT-3 of DIA 1 & 2.
Core 4: Same as core 4 of 500Kv line CT-3 of DIA 1 & 2.
Core 5: Burden: Protection equipment as below.
P443 Distance Protection Relay
Cable Switchgear to relay room
Total connected burden

0.15VA
2.70VA
2.85VA

The rated burden is 60VA> 2.85VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 2.85) *1
=33.35
This corresponds to a primary current of 33.35*2500A =83.385kA>40kA, i.e. ok
Core 6: Burden: Protection equipment as below.
7SA612 Distance Protection Relay

0.15VA

P127Over Current Relay


Cable Switchgear to relay room

0.15VA
2.70VA

Total connected burden

3VA

The rated burden is 60VA> 3.15VA, i.e. ok.


Actual ALF (ALF) can approx. be calculated as:
ALF= 762 (20 3) *1

CT Sizing/Dimension Calculations for 500KV Shikarpur Project

Page 20

TEL: 86-21-61610909
FAX: 86-21-61610900
Web:www.syec.com.cn
3399

No.3399, Huaning Rd, Minhang Dist., Shanghai, 201108 P.R.C

=33.13
This corresponds to a primary current of 33.13*2500A =82.83kA>40kA, i.e. ok

1. 500kV Line CTs-2


Current Transformer Type: LVB-500W2
Cor
e
1

Ratio

Burden(VA)

3000-2500-2000-1250-750/1A

3000-2500-2000-1250-750/1A

3000-2500-2000-1250-750/1A

3000-2500-2000-1250-750/1A

3000-2500-2000-1250-750/1A

30/30/30/30/1
5
60/60/30/30/1
5
60/60/30/30/1
5
60/60/30/30/1
5
60/60/30/30/1
5

Cla
ss
0.2

ALF/
Fs
---

Ekn(V) Knee Point


Voltage
---

Rct()
20/17/14/9/5

5P

20

915/762/610/381/228

24/20/16/10/6

5P

20

915/762/610/381/228

24/20/16/10/6

5P

20

915/762/610/381/228

24/20/16/10/6

5P

20

915/762/610/381/228

24/20/16/10/6

Core 1: Same as core 1 of 500Kv line CT-3 of DIA 3.


Core 2: Same as core 5 of 500Kv line CT-3 of DIA 3.
Core 3: Same as core 6 of 500Kv line CT-3 of DIA 3.
Core 4: Same as core 4 of 500Kv line CT-2 of DIA 1 & 2.
Core 5: Same as core 5 of 500Kv line CT-2 of DIA 1 & 2.

CT Sizing/Dimension Calculations for 500KV Shikarpur Project