Beruflich Dokumente
Kultur Dokumente
Foot-mounted hoist
FDR 3 FDR 5 FDR 10
42352044.eps
181104 EN
203 644 44
714 IS 813
Design overview
42352144.eps
Frequency [Hz]
Electrical equipment code 1)
Operating voltage [ V ]
Hoist speed in m/min
Motor type: Z = Cylindrical rotor
Hook path in m
Reeving
SWL in t
Range 3; 5; 10
Demag rope hoist
1) Code 01
Code 02
Code 03
Code 04
Code 05
FDR with internal electrics for application on a crane. Crane bridge enclosure, DSE-8R control pendant with control cable and cables for the mobile
floor control must be ordered separately.
FDR with internal electrics and solo electrics with crane switch and transformer fitted in an enclosure on the trolley, for application as a solo trolley.
DSE-8R control pendant with control cable must be ordered separately.
Like code 01 but control via DRC-10 radio control system
Like code 02 but control via DRC-10 radio control system
EZDR with fitted in parallel interface
20364444.p65/181104
Selection criteria
1.
2.
3.
4.
The group is determined from the operating time and load spectrum
Load spectrum
1 Light
Hoist units which are usually subject to very small
loads and in exceptional cases only to maximum
loads.
SWL
Light
Medium
Heavy
Very heavy
4-8
8-16
over 16
2-4
4-8
8-16
1-2
2-4
4-8
0,5-1
1-2
2-4
FEM
2m
3m
4m
ISO
M5
M6
M7
Group of mechanisms to
Operating time
2 Medium
Hoist units which are usually subject to small loads
but rather often to maximum loads.
2 m/M 5
3 m/M 6
2/1, 4/2
4 m/M 7
SWL
3 m/M 6
2)
4 m/M 7
4/1
Range
2 m/M 5
SWL in t
DR 3
1,6
DR 5
2,5
DR 10
Example
SWL
Load spectrum
Hoist speed
Creep hoist speed
Reeving
Average hook path
No. of cycles/hour
Working time/day
5t
medium from table
6 m/min
1 m/min
4/1
3m
20
8 hours
1,25
3,2
2,5
1,6
3,2
3,2
10
6,3
Operating time
3 Heavy
Hoist units which are usually subject to medium
loads but frequently to maximum loads.
SWL
Operating time
4 Very heavy
Hoist units which are usually subject to maximum or
almost maximum loads.
SWL
The average operating time per working day is estimated or calculated as follows:
Operating time/day =
Operating time/day =
2 x 3 x 20 x 8
= 2,66 hours
60 x 6
For the medium load spectrum and an average daily operating time of 2,66 hours,
the table shows group 2 m. For a load capacity of 5 t and 4/1 rope reeving, the table
indicates hoist size DR 5 - 5.
Operating time
Selection table
Range
DR 3
Group of
mechanisms
to
FEM/ISO
SWL
Hook
path
Lifting speed
m/min
2 m/M 5
1,6
3 m/M 6
1,25
4 m/M 7
2 m/M 5
2,5
3 m/M 6
4 m/M 7
1,6
2 m/M 5
V1
V2
V3
SWL
Hook
path
2/1
Lifting speed
m/min
V1
V2
V3
SWL
Hook
path
4/1
20364444.p65/181104
DR 10
3 m/M 6
4 m/M 7
3,2
V1
V2
V3
4/2
3,2
12; 20
12/2
18/3
2 - 25
2,5
6; 10
6/1
9/1,5
1 - 12,5
-
DR 5
Lifting speed
m/min
12; 20
12/2
18/3
2 - 25
6; 10
6/1
9/1,5
1 - 12,5
6; 10;
20
5/0,8
1-9
1 - 12,5
5,8;
11,35;
15,2
10/1,7
2 - 18
2 - 25
3,2
10
12; 20;
40
10/1,7
2 - 18
2 - 25
6,3
4
3,2
877
A
35
630
79
120
465
210
170
F
Hoist inverter
42352344.eps
Hook travel
42352744.eps
20364444.p65/181104
FDR 3 dimensions in mm
R
H12
475
802
567
H20
700
1027
792
Drum length
Rope reeving
Drum length
Wheel base
H12
R
475
4/1
H20
H12
700
475
490
H20
700
380
23
111
170
Dimensions in mm
20364444.p65/181104
170
283
85
142
970
A
13
715
93
178
558
177
240
Hoist inverter
42352444.eps
Hook travel
20364444.p65/181104
FDR 5 dimensions in mm
R
H12
495
837
598
H20
730
1072
833
Drum length
Rope reeving
Drum length
Wheel base
4/1
H12
H20
H12
H20
495
730
495
730
500
420
21,3
36,1
Dimensions in mm
M
20364444.p65/181104
115
175
195
293
88
147
1127
A
846
5
108
180
610
194
310
Hoist inverter
Hook travel
42352544.eps
20364444.p65/181104
FDR 10 dimensions in mm
R
H12
590
941
714
H20
850
1201
974
H40
1500
1851
1624
Drum length
Rope reeving
Drum length
Wheel base
4/1
4/2
H12
H20
H40
H12
H20
H40
H12
H20
H40
590
850
1500
590
850
1500
590
850
1500
2m/3m
590
490
4m
680
610
C
Dimensions in
mm
38
56
149
243
20364444.p65/181104
500
197
328
653
99
165
38
327
320
450
775
A1
A1
2 x B3
C3
H3
T1
D2
D3
T3
H2
T2
C2
T4
T2
C1
T2
T3
H1
D1
D1
D2
B3
B3
R
A2
A1
F
42352744.eps
Bracket dimensions in mm
Right
B4
B1
Left
DR 3
H12
D3
H12
210
H20
DR 10
H12
240
H20
310
A1
45
50
50
A2
120
140
210
101
B1
73
86,5
B2
61
71,5
86
B3
25
30
30
B4
46
51,5
62
345
380
430
C1
45
50
50
C2
185
210
235
C3
70
60
85
30
40
55
13,5
D1
13,5
13,5
D2
13,5
18
22
D3
29
34
45
152
176
230
F 2/1 + 4/1
21,3
38
F 4/2
23
36,1
56
H1
55
65
75
H2
180
200
230
H3
20
20
25
12
20
25
min. 25
T1
min. 15
min. 20
T2
10
12
15
T3
min. 10
min. 12
min. 15
T4
95
R
Weight
10
H20
DR 5
475
1)
[kg]
120
700
32
495
120
730
49
590
850
89
20364444.p65/181104
B3 B3
Drum length
B2
B4
H3
T2
C1
H1
T2
H2
C2
C3
H4
A2
A1
B3
B4
G2
B3
A2
E1
B3
A1
G1
D2
B1
G3
42352844.eps
H2
C2
C3
H3
T2
H1
T2
T2
C1
B3
B3
A1
R
G2
F
B3
B3
D2
A2
E1
A1
G1
A2
B4
B
42352944.eps
Bracket dimensions in mm
Drum length
Reeving
H40
4/1 + 2/1
H40
4/2
A1
A2
B1
B2
B3
B4
C1
C2
C3
D1
D2
D3
310
50
210
148
101
86
30
62
430
50
235
85
55
13,5
22
45
E1
H40
4/1 + 2/1
60
230
H40
4/2
230
Drum length
Reeving
20364444.p65/181104
38
G1
G2
G3
159
531
403
591
403
35
H
250
H1
75
H2
H3
H4
25
60
230
T2
Weight [kg]
25
15
1500
154
11
Foot-mounted variant
Wall-mounted variant
Z3
Z1
42353044.eps
42353244.eps
Ceiling-mounted variant
V=
42353144.eps
Foot-mounted
Z1
Z2
H12
H20
H12
H20
H40
2/1
4,4
4,7
5,9
6,3
3,5
3,8
4,5
4/1
4,8
5,1
6,2
6,6
3,7
4,7
3,7
4,7
Z3
2/1
16,14
17,63
23,36
25,51
33,53
34,48
40,64
23,56
27,42
32,44
38,53
47,9
57,66
67,73
25,4
25,1
25,29
2/1
9,95
10,87
15,1
16,49
28,58
29,39
34,65
4/1
14,53
16,91
20,97
24,9
40,84
49,16
57,74
18,37
26,2
31,95
40,18
4/2
2/1
16,75
4/1
27,2
4/2
12
4/1
4/2
Wall-mounted
DR 10
H20
4/2
Ceiling-mounted
DR 5
H12
Drum length
21,65
21,4
21,56
28,71
49
53,98
59.9
48,24
75,93
91,83
107,81
36,31
35,66
35,36
20364444.p65/181104
DR 3
Ma =
120 Nm for DR 3
3
8
7
300 Nm for DR 5
590 Nm for DR 10
Ma = 60 Nm
42353344.eps
Items 1 5 are included in the scope of supply when ordering the foot-mounted hoist with mounting brackets.
Part
Designation
Standard
Strength
Support washer
DIN 988
Spring steel
DIN 471
Spring steel
Quantity
Hex. screw
DIN 5017
8.8-A2F
M12 x 130
M12 x 170
M12 x 170
Quantity
8.8-A2F
VM 12, Ma = 60 Nm
VM 12, Ma = 60 Nm
VM 12, Ma = 60 Nm
Quantity
St-A2F
13 x 30 x 6
13 x 30 x 6
13 x 30 x 6
Quantity
Material
Quantity
20364444.p65/181104
Locknut
Washer
DIN 980
DIN 7349
Hex. screw
DIN 6914
10.9-HV or
10.9-TZN HV
Mounted on:
Ceiling
Quantity
DR 3
DR 5
2/1
4/1
30 x 42 x 2,5
DR 10
2/1
4/1
40 x 50 x 2,5
2/1+4/2
4/1
55 x 68 x 3
12
30 x 2,5
40 x 2,5
55 x 3
1)
1)
M12 x L
Ma = 120 Nm
M16 x L
Ma = 300 Nm
M20 x L 1 )
Ma = 590 Nm
Wall
Quantity
Floor
Quantity
M12
M16
M20
Hex. nut
DIN 6915
10-HV or
10-TZN HV
Quantity
Like part 6
Like part 6
Like part 6
Washer
DIN 6919
C45 HV or
C45 TZN HV
13 x 30 x 6
17 x 30 x 4
21 x 37 x 4
Like 2 x part 6
Like 2 x part 6
Like 2 x part 6
Quantity
13
approx.
ca. 5
5
approx.
ca.30
30
See page 15
approx.ca.
5 5
Fixed
return sheave
approx.
ca. 30
30
14
20364444.p65/181104
42353444.eps
DT
W
M
N
R
42353944.eps
M M
W
DT
N
W
V
=
=
R
42354044.eps
DR 3
1-groove
Hoist unit
Drum length
Useful length
Useful rope length
20364444.p65/181104
Distance
DR 5
1-groove
DR 10
1-groove
DR 10
2-groove
H12
H20
H12
H20
H12
H20
H40
H12
H20
H40
340
565
350
585
395
655
1305
136
266
591
24238
40278
24080
40248
24286
40273
80238
11612
22713
50464
min B.
3892
6467
4006
6696
4521
7497
14936
1557
3045
6766
Dimension
81
135
82
136
84
140
278
36
71
157
Dimension
475
700
495
730
590
850
1500
590
850
1500
Rope diameter
13
Pitch
7,8
10
14
10
Drum diameter
DT
177
219
274
271,8
Dimension
223
243
291
291
Dimension
76
79
107
55
Dimension
59
66
88
Dimension
25
15
Main/creep lifting F6
No. of
poles
Motor size
% CDF
kW
ZBR 100
C 12/2 - B050
12
ZBR 100
D 12/2 - B050
12
Starts/h
rpm
cos
cos
400 V
IN (A)
IA (A)
0,55
20
430
240
4,6
0,53
0,72
3,4
40
2800
120
8,5
40
0,78
0,88
V1
2
0,8
20
410
240
5,7
0,55
0,75
5,3
40
2780
120
11
55
0,88
0,85
V2
2
400 V (U 20 V)
400 V
Motor size
mm
20
1,5
25
25
1,5
19
Range DR 5
No. of
poles
Code
Motor size
% CDF
kW
ZBR 100
D 12/2 - B050
12
ZBR 132
D 12/2 - B140
12
Starts/h
rpm
cos
cos
400 V
IN (A)
IA (A)
0,8
20
410
240
5,7
0,55
0,75
5,3
40
2780
120
11
55
0,88
0,85
V1
2
1,4
20
400
240
9,6
15
0,54
0,68
8,9
40
2870
120
18
120
0,89
0,85
V2
2
400 V (U 20 V)
400 V
Motor size
25
1,5
19
50
2,5
15
Range DR 10
No. of
poles
Code
Motor size
ZBR 132
D 12/2 - B140
% CDF
kW
12
Starts/h
rpm
cos
cos
400 V
IN (A)
IA (A)
1,4
20
400
240
9,6
15
0,54
0,68
8,9
40
2870
120
18
120
0,89
0,85
V1
2
400 V
400 V (U 20 V)
Range DR 10
16
mm
Motor size
mm
50
2,5
15
20364444.p65/181104
Range DR 3
Range DR 3
No. of poles
Code
FEM
classification
% CDF
Motor size
ZBR 100 B 4 - B050
ZBR 100 B 4 - B050
Hoist output
Phub
rpm
kW
7,3
DIC-4-017
16,5
2520
5,7
DIC-4-014
14
4,5
DIC-4-014
14
2m
4
V3
3m
Range DR 3
n
for 87 Hz
60
4m
Inverter
type
Rated current
inverter
for 2kHz
I (A)
400 V (U 20 V)
400 V
Inverter type
mm
DIC-4-017
16
1,5
58
DIC-4-014
16
1,5
70
Range DR 5
No. of poles
Code
FEM
classification
% CDF
Motor size
ZBR 132 B 4 - B140
ZBR 112 A 4 - B140
Hoist output
Phub
rpm
kW
2m
4
V3
3m
Range DR 5
n
for 87 Hz
60
2550
4m
Inverter
type
Rated current
inverter
for 2kHz
I (A)
11,4
DIC-4-025
25
9,1
DIC-4-025
25
7,3
DIC-4-017
16,5
400 V
400 V (U 20 V)
Inverter type
mm
DIC-4-025
35
2,5
65
DIC-4-017
16
1,5
58
Range DR 10
No. of poles
Code
FEM
classification
% CDF
Motor size
n
for 87 Hz
rpm
3m
Hoist output
Phub
16,3
60
Inverter
type
Rated current
inverter
for 2kHz
kW
2m
2560
4m
I (A)
DIC-4-040
40
13,1
DIC-4-032
32
10,4
DIC-4-025
25
22,7
DIC-4-040
40
18,1
DIC-4-040
40
14,5
DIC-4-032
32
4
ZBR 132 C 4 - B140
ZBR 132 C 4 - B140
2m
V3
50
3m
2680
60
20364444.p65/181104
Range DR 10
4m
400 V
400 V (U 20 V)
Inverter type
mm
DIC-4-040
50
6,0
97
DIC-4-032
35
4,0
80
DIC-4-025
35
2,5
65
17
18
20364444.p65/181104
Notes
20364444.p65/181104
Notes
19