Beruflich Dokumente
Kultur Dokumente
2 IMPRIMACION - EJECUCION
4 SUMINISTROS DE ASFALTO DILUIDO PARA TRATAMIENTO SUPERFICIAL
5 TRANSPORTE DE MATERIAL GRANULAR 3/4" Y 3/8"
6 TRATAMIENTO SUPERFICIAL DOBLE - EJECUCION
7 CARPETA DE CONCRETO ASFALTICO
8 SUMINISTROS DE CEMENTO ASFALTICO
9 SUMINISTROS DE SOLVENTE Y KEROSENE
11524
92192 m2
DATOS ENCONTR
UNIDAD
COSOTO
UNITARIO
CANTIDAD
COSTO TOTAL
LT
M2
LT
M3K
M2
M3
TON
LT
13.24
3.11
30.16
1.93
9.47
216.45
15,979.49
4.47
107,000.00
103,500.00
22,000.00
152,000.00
11,400.00
4,150.00
476.00
50,129.00
1,416,680.00
321,885.00
663,520.00
293,360.00
107,958.00
898,267.50
7,606,237.24
224,076.63
1.16
0.24
0.0450 --e
0.54
122329.5648
1.1606
DATOS ENCONTRADOS
Superficie Total
del Proyecto
92,192.00
92,192.00
92,192.00
92,192.00
92,192.00
92,192.00
92,192.00
92,192.00
r carpeta asfaltica
TAZA DE
RIEGO
Incluido perdidas
1.1227 %
1,416,680.00
103,500.00
663,520.00
1,220,622.08
0.12
898,267.50
224,076.63
997747.92
99,480.42
4,609.60
459.60
15.3666262
- 1.00 lt/m2
- 1.00 lt/m2
1416680