Sie sind auf Seite 1von 1

Project: Feasibility cum PDR for 4/6-laning of Ambala to Kaithal section of NH-65

Final Feasibility cum Preliminary Design Report: Annexure

Results of Subgrade Soil


Annexure 5.4
Sl.
Sample No.
No.

Km

FDD by Sand
Replacement
gm/cm3

O.M.C.
(%)

MDD
gm/cm3

CBR
Soaked
(%)

Free
Field CBR
sweeling
using
Index
DCP
(%)
(%)

L.L
(%)

P.L
(%)

P.I
(%)

IS :Classification as
per IS:1498-1987

P1

5.0

1.626

13.4

1.755

4.9

NIL

4.1

19.2

ML

P2

10.0

1.664

13.9

1.750

4.8

NIL

5.6

19.5

ML

P3

15.0

1.643

13.2

1.769

5.1

NIL

3.0

20.5

ML

P4

20.0

1.666

14.0

1.738

4.5

NIL

4.4

21.5

ML

P5

25.0

1.685

14.2

1.734

4.4

NIL

3.3

21.9

ML

P6

30.0

1.615

13.8

1.740

4.5

NIL

4.3

21.3

ML

P7

35.0

1.579

13.5

1.765

4.8

NIL

4.2

21.8

ML

P8

40.0

1.484

14.3

1.720

4.9

1.1

4.5

22.8

19.1

3.7

ML

P9

45.0

1.404

14.5

1.725

4.4

0.5

2.1

22.5

19.3

3.2

ML

10

P10

50.0

1.701

11.9

1.808

5.5

NIL

3.3

18.8

ML

11

P11

55.0

1.692

12.2

1.801

5.3

NIL

3.5

18.5

ML

12

P12

60.0

1.681

12.2

1.796

5.4

NIL

4.6

18.6

ML

13

P13

65.0

1.684

12.7

1.782

5.0

NIL

5.2

19.8

ML

14

P14

70.0

1.642

13.1

1.765

4.8

NIL

5.9

20.1

ML

15

P15

74.0

1.679

13.5

1.760

4.8

NIL

5.3

20.4

ML

Document : 1058/RH/REP/FFR/403_1_RO

Das könnte Ihnen auch gefallen