CRONOGRAMA VALORIZADO EJECUCION DE OBRA

PROYECTO: INSTALACION DE LOS SERVICIOS TURISTICOS PUBLICOS EN EL COMPLEJO ARQUEOLOGICO HUACA BANDERA DEL DISTRITO DE PACORA - PROVINCIA Y DEPARTAMENTO DE LAMBAYEQUE
oct-16
ITEM

PARTIDAS

01

MEJORAMIENTO DE ACCESOS

01.01

OBRAS PRELIMINARES

Und.

Metrado

Costo Unitario

Costo Parcial

Metrado

Valorizacin Mensual

GLB

1.00

9,750.26

9,750.26

1.00

01.01.02

TRAZO , REPLANTEO Y CONTROL TOPOGRAFICO

KM

7.56

2,427.25

18,350.01

7.56

HA

3.78

3,032.95

11,464.55

2.59

mes

4.00

9,299.56

37,198.24

1.03

GLB

1.00

10,000.00

10,000.00

01.01.05
01.02

MOVIMIENTO DE TIERRAS

01.01.04

Metrado

Valorizacin Mensual

S/. 9,750.26
S/. 18,350.01
S/. 7,865.96

1.00

0.00%

1.00

68.61%

1.19

S/. 3,598.59

31.39%

0.00%

0.00%

1.00

S/. 9,299.56

25.00%

1.03

25.83%

0.94

23.44%

1.00

0.00%

0.00%

0.00%

1.00

50.00%

753.17

0.00%

1.00

785.60

40.31%

0.00%

1.00

59.69%

11,021.42

S/. 4,752.50
S/. 8,515.88
S/. 18,956.84

26.88%

59.69%

40.31%

0.00%

1.00

49.69%

4,126.63

S/. 129,287.20

50.31%

0.00%

1.00

50.00%

1,839.72

31.88%

0.00%

1.00

50.00%

2,697.01

31.88%

0.00%

1.00

50.31%

0.00%

1.00

50.31%

0.00%

1.00

20.42%

0.00%

1.00

25.73%

1.00

1.00

S/. 9,570.80
S/. 10,000.00

100.00%

S/. 4,089.36

1,163.17

47,024.71

0.00%

16,318.53

S/. 8,841.86
S/. 12,608.79
S/. 28,067.87

0.00%

4,075.36

S/. 127,681.15

18.13%

2,885.83

18.12%

4,230.60

m3

PERFILADO Y COMPACTADO DE SUBRASANTE EN ZONAS DE CORTE.


m2

27,339.95

1.72

m3

8,201.99

31.33

PAVIMENTOS
TRANSPORTE

256,968.35
496,720.89

TRANSPORTE DE MATERIAL DE ELIMINACION HASTA 1 KM

M3K

5,771.66

6.93

39,997.60

1,046.11

01.04.02

TRANSPORTE DE MATERIAL DE ELIMINACION > 1 KM

M3K

8,461.20

2.13

18,022.36

1,533.59

01.04.03

TRANSPORTE DE AFIRMADO HASTA 1 KM

M3K

8,201.99

7.65

62,745.22

0.00%

4,075.36

01.04.04

TRANSPORTE DE AFIRMADO > 1 KM

M3K

156,412.94

2.30

359,749.76

0.00%

77,717.68

TRANSPORTE DE MATERIAL PROPIO PARA RELLENO HASTA 1 KM

M3K

2,338.52

6.93

16,205.94

0.00%

1,861.07

S/. 19,998.80
S/. 9,011.18
S/. 31,176.53
S/. 178,750.66
S/. 12,897.23

0.00%

13.00

S/. 3,238.69

440.49

0.00%

66.64

OBRAS DE ARTE Y DRENAJE

S/. 7,249.57
S/. 3,266.55

49.69%

4,126.63

49.69%

78,695.26

79.58%

477.45

100.00%

0.00%

0.00%

1.00

100.00%

0.00%

0.00%

1.00

100.00%

0.00%

0.00%

1.00

100.00%

0.00%

0.00%

1.00

3,238.69
ALC

13.00

249.13

3,238.69
262,919.56

EMBOQUILLADO DE PIEDRA

01.05.02.01

TRAZO Y REPLANTEO.

m2

66.64

6.61

01.05.02.02

EXCAVACION NO CLASIFICADA

m3

1,529.16

6.14

9,389.04

0.00%

1,529.16

01.05.02.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

1,834.99

6.93

12,716.48

0.00%

1,834.99

S/. 440.49
S/. 9,389.04
S/. 12,716.48
S/. 3,784.80

01.05.02.04

CAMA DE APOYO CON MATERIAL DE AFIRMADO, e=0.20 m

m3

66.64

104.45

6,960.55

0.00%

36.24

54.38%

30.40

01.05.02.05

EMBOQUILLADO DE PIEDRA C:A, 1:4

m3

2,380.00

55.13

131,209.40

0.00%

0.00%

2,132.08

01.05.02.06

ENCOFRADO Y DESENCOFRADO

m2

16.00

37.79

604.64

0.00%

0.00%

16.00

01.05.02.07

JUNTA TRANSVERSAL

456.00

6.86

3,128.16

0.00%

0.00%

85.50

01.05.02.08

ENROCADO D=20"

m2

1,530.00

64.36

98,470.80

0.00%

0.00%

95.63

SEALIZACIN
SEALES PREVENTIVAS

und

8.00

394.46

3,155.68

0.00%

0.00%

1.00

01.06.02

SEALES REGLAMENTARIAS

und

16.00

432.20

6,915.20

0.00%

0.00%

1.00

01.06.03

SEALES INFORMATIVAS

und

2.00

640.18

1,280.36

0.00%

0.00%

0.75

01.06.04

POSTES DE KILOMETRAJE.

und

9.00

142.27

1,280.43

0.00%

0.00%

COSTOS AMBIENTALES
ACONDICIONAMIENTO DE BOTADEROS

m2

3,000.00

2.44

7,320.00

01.07.02

ACONDICIONAMIENTO DE CANTERAS.

m2

3,000.00

1.09

3,270.00

1,387.50

S/. 3,385.50

01.07.03

ACONDICIONAMIENTO DE AREAS OCUPADAS POR PATIO DE MAQUINAS


m2

500.00

2.81

1,405.00

01.07.04

EDUCACION AMBIENTAL, BOLETINES CHARLAS

mes

4.00

1,000.00

4,000.00

1.03

01.07.05

SEALIZACION AMBIENTAL

GLB

1.00

2,000.00

2,000.00

Glb

1.00

2,741.05

2,741.05

1.00

Caminos de Acceso

600.00

16.90

10,140.00

600.00

02.01.03

Desvo Provisional de ro

m2

600.00

9.88

5,928.00

600.00

02.02

TRABAJOS PRELIMINARES

02.02.01

limpieza y desbrose

m2

3,600.00

0.81

02.02.02

Trazo Y Replanteo Topografico

02.02.03

Movilizacion y Desmovilizacion De Equipos Y Maquinarias

Glb

02.03

MOVIMIENTOS DE TIERRA

18.75%

370.50

6.25%

1,434.38

S/. 2,541.63
S/. 92,316.38

0.00%

1.00

10.42%

1.00

0.00%

1.00

81.25%

1.00

93.75%

1.00

S/. 394.46
S/. 432.20
S/. 480.14

12.50%

7.00

6.25%

15.00

37.50%

1.25

0.00%

9.00

0.00%
33.75%

S/. 2,761.22
S/. 6,483.00
S/. 800.23
S/. 1,280.43

87.50%

1.00

93.75%

1.00

62.50%

1.00

100.00%

1.00

S/. 1,029.17

46.25%

1,612.50

0.00%

1,987.50

0.00%

25.73%

1.00

0.00%

S/. 3,934.50
S/. 2,166.38
S/. 1,000.00

53.75%
66.25%

1,012.50

0.00%

271.88

25.00%

1.03

0.00%

0.69

S/. 1,103.63
S/. 763.97
S/. 1,033.33
S/. 1,375.00

0.00%

1.00

0.00%

1.00

45.62%

1.00

23.44%

1.00

31.25%

1.00

54.38%

228.12

25.83%

0.94

68.75%

0.31

S/. 641.03
S/. 937.50
S/. 625.00

S/. 2,741.05
S/. 10,140.00
S/. 5,928.00

100.00%

0.00%

0.00%

1.00

100.00%

0.00%

0.00%

1.00

100.00%

0.00%

0.00%

0.00

34.29%

513.58

47.08%

35.03

26.07%

1.00

5,330.61
600.00

1.77

1.00

1,352.61

2,916.00

1,851.85

1,062.00

282.49

1,352.61

0.74

S/. 1,500.00
S/. 500.00
S/. 1,000.00

168.58

S/. 5,000.00

51.44%

1,234.57

47.08%

282.49

73.93%

0.26

S/. 1,000.00
S/. 500.00
S/. 352.61

S/. 416.00
S/. 62.00

14.27%

1.00

5.84%

1.00

0.00%

0.00
1.00

37,144.08

02.03.01

Descolmatacin de Cauce de ro

m3

1,008.00

29.66

29,897.28

02.03.02

Refine y perfilado de talud para enrocado

m3

60.00

12.78

766.80

02.03.03

Excavacin para cimentacin de ua enrocado

m3

1,350.00

4.80

6,480.00

02.04

ENROCADO

02.04.01

Extraccin,seleccin y acopio de roca en cantera - (D=28")

m3

1,260.00

34.73

104.17

S/. 500.00

16.72%

674.31

0.00%

60.00

7.72%

1,145.83

34.28%

719.84

45.77%

653.59

S/. 20,000.00
S/. 766.80
S/. 5,500.00

66.90%

165.11

100.00%

84.88%

100.00

57.13%

51.87%

S/. 4,897.28
S/. 0.00
S/. 480.00

16.38%

1.00

0.00%

1.00

7.41%

0.00
0.91

114,810.24
43,759.80

431.90

26.01

32,772.60

576.70

S/. 15,000.00
S/. 15,000.00

02.04.02

Carguo y transporte de roca

m3

1,260.00

02.04.03

Colocacin y acomodo de roca en ua de dique

m3

1,356.00

9.44

12,800.64

0.00%

1,271.19

02.04.04

Colocacin y acomodo de roca en talud de dique

m3

1,260.00

20.22

25,477.20

0.00%

1,236.40

02.05

CONFORMACION DE DIQUE

02.05.01

Corte de material de afirmado en cantera

m3

15,300.00

10.67

18.38%

11,246.49

02.05.02

preparacion y mezclado de material

m3

15,300.00

26.35%

10,483.87

02.05.03

carguio y transporte de material

m3

02.05.04

Conformacin de dique con material de prestamo

m3

02.05.05

Eliminacion de Material Exedente

m3

02.06

FLETE TERRESTRE

02.06.01

flete terrestre

02.07

MITIGACION AL IMPACTO AMBIENTAL

02.07.01

restauracion de Areas utilizables/disturbadas

02.08

CAPACITACION

02.08.01

capacitacion en defensa civil

03

CONSTRUCCION DE ESTACIONAMIENTO VEHICULAR

S/. 25,000.00
S/. 17,000.00
S/. 12,000.00
S/. 25,000.00

93.75%

98.13%

23.60

73.51%

1,241.89

68.52%

783.87

72.14%

951.21

98.58%

217.04

S/. 3,759.80
S/. 772.60
S/. 800.64
S/. 477.20

0.00%

0.98

0.00%

0.94

0.00%

1.00

1.87%

0.00
1.00

756,118.11
163,251.00

2,811.62

12.40

189,720.00

4,032.26

15,300.00

18.12

277,236.00

3,311.26

21.64%

11,037.53

15,300.00

6.63

101,439.00

0.00%

15,082.96

5,109.00

4.79

24,472.11

0.00%

1,043.84

S/. 120,000.00
S/. 130,000.00
S/. 200,000.00
S/. 100,000.00
S/. 5,000.00

S/. 30,000.00
S/. 50,000.00
S/. 60,000.00

27.03%

0.54

S/. 1,000.00

54.05%

0.00%

0.20

S/. 200.00

20.00%

S/. 13,251.00
S/. 9,720.00
S/. 17,236.00
S/. 1,439.00
S/. 19,472.11

0.19

S/. 350.00

18.92%

0.80

S/. 800.00

80.00%

20.43%

8.12%

1.00

5.12%

1.00

6.22%

1.00

1.42%

1.00

79.57%

0.00
1.00

1,850.00
Glb

1.00

1,850.00

Glb

1.00

1,000.00

1,850.00

0.27

S/. 500.00

1.00

1,000.00
1,000.00

1.00

850.00
GLB

1.00

850.00

850.00

1.00

S/. 850.00

100.00%

0.00%

0.00%

0.00
0.00

98,577.70

MOVIMIENTO DE TIERRAS

03.01.02

100.00%

S/. 13,667.65

1.00

Campamento y Guardiania

EXCAVACIONES

247.92

935,912.09

02.01.02

NIVELACION DE TERRENO

89.58%

18,809.05

02.01.01

03.01.01

45.62%

17,995.00

01.07.01

03.01

S/. 3,175.75
S/. 117,541.75
S/. 604.64
S/. 586.53
S/. 6,154.43

12,631.67

01.06.01

OBRAS PROVISIONALES

S/. 12,749.24
S/. 5,744.63
S/. 31,568.69
S/. 180,999.10
S/. 3,308.71

266,158.25

LIMPIEZA DE ALCANTARILLAS

CONSTRUCCION DE DEFENSA RIBEREA

S/. 8,718.34

256,968.35

01.04.01

02.01

S/. 9,609.55

85,833.09
1,401.25

02

TOTAL
ACUMULADO

0.00%

0.00%

01.07

23.13%

01.06

Valorizacin Mensual

LIMPIEZA DE ALCANTARILLAS

Metrado

0.00%

648.08

01.05.02

0.00%

21,124.67

01.05.01.01

Valorizacin Mensual

17,683.71

01.05.01

Metrado

6.31

01.05

0.00%

10.84

01.04.05

Valorizacin Mensual

0.00%

2,802.49

01.04

Metrado

CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO SELECCIONADO.


m3
1,948.77

AFIRMADO e=0.20m

CORTE EN MATERIAL SUELTO

01.03.01

Valorizacin Mensual

mar-17

100.00%

01.02.02
01.03

Metrado

feb-17

100.00%

01.02.01
01.02.03

ene-17

86,763.06

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS


LIMPIEZA GENERAL - ROCE Y DESBROCE
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL DURANTE LA
EJECUCION DE OBRA
CAMPAMENTO PROVISIONAL DE LA OBRA

dic-16

1,223,070.30

01.01.01
01.01.03

nov-16

1.00

98,577.70
m2

2,632.18

7.32

19,267.56

2,632.18

19,267.56

100.00%

0.00
1.00

6,279.32
m3

886.91

7.08

6,279.32

886.91

6,279.32

100.00%

1.00

03.01.03

RELLENOS

m3

886.91

36.15

32,061.80

886.91

32,061.80

100.00%

1.00

03.01.04

NIVELACION INTERIOR Y APISONADO

m2

2,632.18

10.78

28,374.90

2,632.18

28,374.90

100.00%

0.00

03.01.05

OTROS

1,207.49

12,594.12

100.00%

03.01.02.01

03.01.05.01
04
04.01
04.01.01
04.02

EXCAVACIONES MASIVAS

LIMITE DE PIEDRA-ESTACIONAMIENTO

m2

1,207.49

10.43

CONSTRUCCION DE SENDEROS Y PASARELAS

12,594.12

0.00
0.00

312,058.32

EXCAVACIONES
EXCAVACIONES MASIVAS

1.00

12,594.12

#REF!

6,279.32
m3

886.91

7.08

ESTRUCTURAS DE MADERA

6,279.32

886.91

6,279.32

100.00%

#REF!
#REF!

137,534.30

04.02.01

COLUMNAS

und

190.00

18.06

3,431.40

190.00

3,431.40

100.00%

#REF!

04.02.02

VIGUETAS

und

4,990.00

26.87

134,081.30

4,990.00

134,081.30

100.00%

#REF!

04.02.03

VIGAS

und

1.00

21.60

21.60

1.00

21.60

100.00%

#REF!

04.03

PISOS Y PAVIMENTOS

#REF!

145,563.74

04.03.01

PISOS DE CONCRETO

m2

1,092.43

70.26

76,754.13

1,092.43

76,754.13

100.00%

#REF!

04.03.02

ACABADO DE CONCRETO EN PISOS

m2

1,865.17

7.77

14,492.37

1,865.17

14,492.37

100.00%

#REF!

04.03.03

SARDINELES

872.80

46.78

40,829.58

872.80

40,829.58

100.00%

#REF!

04.03.04

OTROS

1,207.49

13,487.66

100.00%

1.00

960.96

100.00%

#REF!

21,720.00

100.00%

#REF!

04.03.04.01
04.04
04.04.01
04.04.02
05
05.01

LIMITE DE PIEDRA

SEMBRIO DE GRASS

1,207.49

11.17

glb

1.00

960.96

m2

434.40

50.00

MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO

05.01.02

EXCAVACIONES
EXCAVACIONES DE ZANJA

13,487.66

#REF!
#REF!

22,680.96

CONSTRUCCION DE MIRADOR TURISTICO

05.01.01
05.01.02.01

m2

VARIOS, LIMPIEZA Y JARDINERIA


LIMPIEZA FINAL

#REF!

13,487.66

m2

310.31

7.32

960.96
21,720.00

434.40

328,431.25

#REF!

13,959.33

#REF!

2,271.47

2,271.47

100.00%

93.09

4,977.52

100.00%

#REF!

310.31

#REF!
#REF!

4,977.52
m3

93.09

53.47

4,977.52

05.01.03

RELLENOS

m3

93.09

36.15

3,365.20

93.09

3,365.20

100.00%

#REF!

05.01.04

NIVELACION INTERIOR Y APISONADO

m2

310.31

10.78

3,345.14

310.31

3,345.14

100.00%

#REF!

m2

35.12

25.92

35.12

910.31

100.00%

05.02

OBRAS DE CONCRETO SIMPLE

05.02.01

SOLADO F'C=100 KG/CM2

05.02.02

SOBRECIMIENTO

#REF!

117,940.42
910.31

#REF!
#REF!

105,753.44

05.02.02.01

ENCOFRADO Y DESENCOFRADO

m2

22.20

47.65

1,057.83

22.20

1,057.83

100.00%

#REF!

05.02.02.02

CONCRETO F'C= 175 KG/CM2

m3

316.54

330.75

104,695.61

316.54

104,695.61

100.00%

#REF!

11,276.67

100.00%

05.02.03
05.03
05.03.01

FALSO PISO

m2

310.31

36.34

OBRAS DE CONCRETO ARMADO


ZAPATAS

0.00

178,672.61

0.00

5,862.64

1.00

7.80

413.53

3,225.53

7.80

3,225.53

100.00%

1.00

5.36

1,022.69

190.80

1,022.69

100.00%

1.00
1.00
0.00

CONCRETO F'C = 210 KG/CM2

m3

05.03.01.02

ACERO FY= 4200 kg/cm2

kg

05.03.01.03

ENCOFRADO Y DESENCOFRADO

m2

32.80

47.65

CURADO DE CONCRETO

m2

32.80

1.57

05.03.02

310.31

190.80

05.03.01.01

05.03.01.04

11,276.67

VIGAS DE CONEXION

1,562.92

32.80

1,562.92

100.00%

51.50

32.80

51.50

100.00%

1.00

8,970.80

05.03.02.01

CONCRETO F'C = 210 KG/CM2

m3

7.23

413.53

2,989.82

7.23

2,989.82

100.00%

1.00

05.03.02.02

ACERO FY= 4200 kg/cm2

kg

651.02

5.36

3,489.47

651.02

3,489.47

100.00%

1.00

05.03.02.03

ENCOFRADO Y DESENCOFRADO

m2

50.62

47.65

2,412.04

50.62

2,412.04

100.00%

1.00

CURADO DE CONCRETO

m2

50.62

1.57

79.47

50.62

79.47

100.00%

0.00

161,524.82

100.00%

1.00

05.03.02.04
05.03.03

COLUMNAS

05.03.03.01

CONCRETO F'C = 210 KG/CM2

m3

390.60

05.03.03.02

ACERO FY= 4200 kg/cm2

kg

84.67

05.03.03.03

ENCOFRADO Y DESENCOFRADO

m2

37.80

CURADO DE CONCRETO

m2

37.80

1.57

05.03.03.04
05.04
05.04.01
05.04.02
05.05

1.00

163,839.17
413.53

161,524.82

390.60

5.36

453.83

84.67

453.83

100.00%

1.00

47.65

1,801.17

37.80

1,801.17

100.00%

1.00

59.35

37.80

59.35

100.00%

0.00
1.00
0.00

ESTRUCTURAS DE MADERA

1.00

431.68

COLUMNAS

und

12.00

18.06

VIGUETAS

und

8.00

26.87

REVOQUES Y REVESTIMIENTOS

216.72

12.00

216.72

100.00%

214.96

8.00

214.96

100.00%

1.00

6,805.58

05.05.01

TARRAJEO RAYADO PRIMARIO

m2

37.80

36.26

1,370.63

37.80

1,370.63

100.00%

1.00

05.05.02

TARRAJEO EN COLUMNAS

m2

37.80

46.01

1,739.18

37.80

1,739.18

100.00%

1.00

05.05.03

TARRAJEO EN VIGAS

m2

50.62

73.01

3,695.77

50.62

3,695.77

100.00%

0.00

m2

77.85

67.69

77.85

5,269.67

100.00%

05.06
05.06.01
05.07
05.07.01
06
06.01

COBERTURAS
COBERTURA SOBRE ESTRUCTURA DE MADERA 8'' X 2''
CARPINTERIA DE MADERA
DIMENSION ORNAMENTAL DE AMBIENTES

06.01.02

EXCAVACIONES

06.01.02.01
06.01.03
06.01.04
06.02

m2

98.69

54.23

0.00
1.00

5,351.96

98.69

5,351.96

100.00%

0.00
0.00

21,445.78

MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO

5,269.67
5,351.96

CONSTRUCCION DE ROTONDAS(MERENDERO)

06.01.01

1.00

5,269.67

1.00

6,911.98
m2

237.97

7.32

1,741.94

237.97

1,741.94

100.00%

0.00
1.00

1,272.59
m3

23.80

53.47

1,272.59

23.80

1,272.59

100.00%

1.00

RELLENOS

m3

36.85

36.15

1,332.13

36.85

1,332.13

100.00%

1.00

NIVELACION INTERIOR Y APISONADO

m2

237.97

10.78

2,565.32

237.97

2,565.32

100.00%

0.00

EXCAVACIONES DE ZANJA

ESTRUCTURAS DE MADERA

1.00

6,426.42

06.02.01

COLUMNAS

und

24.00

18.06

433.44

24.00

433.44

100.00%

1.00

06.02.02

VIGUETAS

und

174.00

26.87

4,675.38

174.00

4,675.38

100.00%

1.00

06.02.03

VIGAS

und

61.00

21.60

1,317.60

61.00

1,317.60

100.00%

0.00

06.03
06.03.01
06.04

OTROS
PODIOS DE CONCRETO

1.00

6,009.14
m3

15.36

391.22

REVOQUES Y REVESTIMIENTOS

6,009.14

15.36

6,009.14

100.00%

0.00
1.00

2,098.24

06.04.01

PREPARACION DE GRADAS DE CONCRETO

36.85

30.41

1,120.61

36.85

1,120.61

100.00%

1.00

06.04.02

GRADAS

36.85

26.53

977.63

36.85

977.63

100.00%

0.00

07
07.01

CONSTRUCCION DE SERVICIOS HIGIENICOS


MOVIMIENTO DE TIERRAS

07.01.01

NIVELACION DE TERRENO

07.01.02

EXCAVACIONES

07.01.02.01
07.01.03
07.02

EXCAVACIONES DE ZANJA
NIVELACION INTERIOR Y APISONADO
SOLADO F'C=100 KG/CM2

07.02.02

SOBRECIMIENTO

1.00

1,892.42
m2

19.44

7.32

m3

24.84

53.47

m2

39.14

10.78

m2

22.94

25.92

19.44

142.30

100.00%

1,328.19

24.84

1,328.19

100.00%

1.00

421.93

39.14

421.93

100.00%

0.00

22.94

594.60

100.00%

142.30

1.00

4,050.49
594.60

0.00
1.00

1,328.19

OBRAS DE CONCRETO SIMPLE

07.02.01

0.00

153,173.86

0.00
1.00

2,033.54

07.02.02.01

ENCOFRADO Y DESENCOFRADO

m2

22.20

47.65

1,057.83

22.20

1,057.83

100.00%

1.00

07.02.02.02

CONCRETO F'C= 175 KG/CM2

m3

2.95

330.75

975.71

2.95

975.71

100.00%

1.00

m2

39.14

36.34

1,422.35

39.14

1,422.35

100.00%

0.00

07.02.03
07.03
07.03.01

FALSO PISO
OBRAS DE CONCRETO ARMADO
ZAPATAS

43,650.04

0.00

5,524.38

1.00

07.03.01.01

CONCRETO F'C = 210 KG/CM2

m3

7.60

413.53

3,142.83

7.60

3,142.83

100.00%

1.00

07.03.01.02

ACERO FY= 4200 kg/cm2

kg

187.20

5.36

1,003.39

187.20

1,003.39

100.00%

1.00

07.03.01.03

ENCOFRADO Y DESENCOFRADO

m2

28.00

47.65

1,334.20

28.00

1,334.20

100.00%

1.00

07.03.01.04

CURADO DE CONCRETO

m2

28.00

1.57

43.96

28.00

43.96

100.00%

0.00

07.03.02

VIGAS DE CONEXION

4,316.66

1.00

07.03.02.01

CONCRETO F'C = 210 KG/CM2

m3

07.03.02.02

ACERO FY= 4200 kg/cm2

kg

07.03.02.03

ENCOFRADO Y DESENCOFRADO

m2

CURADO DE CONCRETO

m2

07.03.02.04
07.03.03

413.53

1,281.94

3.10

1,281.94

100.00%

1.00

362.32

5.36

1,942.04

362.32

1,942.04

100.00%

1.00

22.20

47.65

1,057.83

22.20

1,057.83

100.00%

1.00

22.20

1.57

34.85

22.20

34.85

100.00%

0.00

3.10

COLUMNAS
413.53

16,284.81

39.38

16,284.81

100.00%

1.00

641.34

5.36

3,437.58

641.34

3,437.58

100.00%

1.00

47.25

47.65

2,251.46

47.25

2,251.46

100.00%

1.00

47.25

74.18

100.00%

0.00

07.03.03.01

CONCRETO F'C = 210 KG/CM2

m3

39.38

07.03.03.02

ACERO FY= 4200 kg/cm2

kg

07.03.03.03

ENCOFRADO Y DESENCOFRADO

m2

07.03.03.04
07.03.04

CURADO DE CONCRETO

1.00

22,048.03

m2

47.25

1.57
413.53

5,595.06

13.53

5,595.06

100.00%

1.00

VIGAS

74.18

1.00

7,628.23

07.03.04.01

CONCRETO F'C = 210 KG/CM2

m3

13.53

07.03.04.02

ACERO FY= 4200 kg/cm2

kg

204.39

5.36

1,095.53

204.39

1,095.53

100.00%

1.00

07.03.04.03

ENCOFRADO Y DESENCOFRADO

m2

19.05

47.65

907.73

19.05

907.73

100.00%

1.00

07.03.04.04

CURADO DE CONCRETO

m2

19.05

1.57

29.91

19.05

29.91

100.00%

0.00

07.03.05

LOSA ALIGERADA H=0.20m

1.00

4,132.74

07.03.05.01

CONCRETO F'C = 210 KG/CM2

m3

2.96

413.53

1,224.05

2.96

1,224.05

100.00%

1.00

07.03.05.02

ENCOFRADO Y DESENCOFRADO

m2

45.21

47.65

2,154.26

45.21

2,154.26

100.00%

1.00

07.03.05.03

ACERO FY= 4200 kg/cm2

kg

12.96

5.36

69.47

12.96

69.47

100.00%

1.00

07.03.05.04

LADRILLO DE ARCILLA DE 30 X 30 X 15

und

281.64

2.18

613.98

281.64

613.98

100.00%

1.00

CURADO DE CONCRETO

m2

45.21

1.57

70.98

45.21

70.98

100.00%

0.00
1.00
0.00

07.03.05.05
07.04
07.04.01
07.04.02
07.05

MUROS Y TABIQUES DE ALBAILERIA

1.00

8,610.64

MURO DE SOGA DE LADRILLO KING KONG

m2

99.50

66.78

MURO DE MELAMINE

m2

22.22

88.48

REVOQUES Y REVESTIMIENTOS

6,644.61

99.50

6,644.61

100.00%

1,966.03

22.22

1,966.03

100.00%

1.00

16,291.55

07.05.01

TARRAJEO RAYADO PRIMARIO

m2

99.50

36.26

3,607.87

99.50

3,607.87

100.00%

1.00

07.05.02

TARRAJEO INTERIOR

m2

12.13

30.41

368.87

12.13

368.87

100.00%

1.00

07.05.03

TARRAJEO EN COLUMNAS

m2

47.25

46.01

2,173.97

47.25

2,173.97

100.00%

1.00

07.05.04

TARRAJEO EN VIGAS

m2

22.20

73.01

1,620.82

22.20

1,620.82

100.00%

1.00

07.05.05

VESTIDURA DE DERRAMES

57.60

20.23

1,165.25

57.60

1,165.25

100.00%

1.00

ENCHAPES

m2

87.38

84.17

7,354.77

87.38

7,354.77

100.00%

0.00

33.81

2,286.23

100.00%

18.00

444.24

100.00%

1.00

18.00

1,594.62

100.00%

0.00

6.48

2,874.85

100.00%

07.05.06
07.06
07.06.01
07.07
07.07.01
07.07.02
07.08
07.08.01
07.09

CIELORRASOS
CIELORRASO CON MEZCLA

m2

33.81

67.62

und

18.00

24.68

CERRAJERIA
BISAGRAS
CERRADURAS

2,286.23

0.00
1.00

2,038.86
und

18.00

88.59

m2

6.48

443.65

VIDRIOS
BLOQUES DE VIDRIOS

1.00

2,286.23

444.24
1,594.62

1.00

2,874.85

PINTURA

2,874.85

0.00
1.00

3,444.21

07.09.01

PINTURA DE CIELORRASOS, VIGAS, COLUMNAS Y PAREDES

m2

297.92

10.90

3,247.33

297.92

3,247.33

100.00%

1.00

07.09.02

PINTURA DE PUERTAS

m2

14.01

8.94

125.25

14.01

125.25

100.00%

1.00

PINTURA DE VENTANAS

m2

8.64

8.29

71.63

8.64

71.63

100.00%

0.00

07.09.03
07.10
07.10.01

INSTALACIONES SANITARIAS-DESAGUE

0.00

15,617.99

TRABAJOS PRELIMINARES

1.00

3,974.66

07.10.01.01

TRAZO Y REPLANTEO

73.64

3.50

257.74

73.64

257.74

100.00%

1.00

07.10.01.02

EXCAVACIONES DE ZANJA

m3

12.99

53.47

694.58

12.99

694.58

100.00%

1.00

07.10.01.03

RELLENO Y COMPACTACION DE ZANJA

73.64

19.53

1,438.19

73.64

1,438.19

100.00%

1.00

07.10.01.04

CAMA DE APOYO PARA TUBERIAS

73.64

15.85

1,167.19

73.64

1,167.19

100.00%

1.00

07.10.01.05

ELIMINACION DE DESMONTE

416.96

100.00%

0.00

07.10.02
07.10.02.01
07.10.02.02
07.10.03
07.10.03.01
07.10.03.02
07.10.04

m3

15.46

26.97

3,257.86

19.57

713.33

100.00%

0.00

TUBERIA DE PVC SAL PARA DESAGUE DE 2'' ENTERRADA

19.57

36.45

713.33

54.07

2,544.53

100.00%

0.00

TUBERIA DE PVC SAL PARA DESAGUE DE 4'' ENTERRADA

54.07

47.06

2,544.53
524.78

7.86

254.19

100.00%

0.00

254.19

6.30

270.59

100.00%

0.00

2,454.08

8.00

1,324.16

100.00%

0.00

REDES DE DISTRIBUCION ENTERRADAS

MONTANTE DE DESAGUE
TUBERIA DE PVC SAL PARA DRENAJE DE 2'' EMPOTRADA

7.86

32.34

TUBERIA DE PVC SAL PARA DRENAJE DE 4'' EMPOTRADA

6.30

42.95

SALIDA DE DESAGUE Y VENTILACION

416.96

15.46

0.00

0.00

270.59

07.10.04.01

SALIDA DE DESAGUE PVC SAL DE 2''

pto

8.00

165.52

1,324.16

6.00

1,099.92

100.00%

0.00

07.10.04.02

SALIDA DE DESAGUE PVC SAL DE 4''

pto

6.00

183.32

1,099.92

1.00

30.00

100.00%

0.00

07.10.04.03

ACCESORIOS VARIOS (TEE, CODOS, CRUZ)

glb

1.00

30.00

30.00

glb

1.00

900.00

07.10.05
07.10.05.01
07.10.06

PRUEBA HIDRAULICA DEL SISTEMA


PRUEBA HIDRAULICA DEL SISTEMA DE DESAGUE

0.00

900.00

INSTALACIONES DE APARATOS SANITARIOS

1.00

900.00

100.00%

0.00
0.00

0.00

900.00
1,988.66

7.00

818.86

100.00%

07.10.06.01

INSTALACION DE LAVATORIO

und

7.00

116.98

818.86

7.00

818.86

100.00%

0.00

07.10.06.02

INSTALACION DE INODORO

und

7.00

116.98

818.86

3.00

350.94

100.00%

0.00

INSTALACION DE URINARIO

und

3.00

116.98

350.94
1.00

183.78

100.00%

07.10.06.03
07.10.07
07.10.07.01
07.10.08

CAJAS DE REGISTRO
CAJA DE REGISTRO

und

1.00

183.78

4.00

94.52

SUMIDERO DE BRONCE ROSCADO 2"

und

07.10.08.02

REGISTRO ROSCADO DE BRONCE 4"

und

2.00

07.10.08.03

SALIDA DE LLUVIA DE 3''

und

18.00

0.00
0.00

183.78
891.10

4.00

378.08

42.43%

0.00

378.08

2.00

67.88

17.95%

0.00

33.94

67.88

18.00

445.14

100.00%

0.00

24.73

445.14
892.36

12.00

641.64

100.00%

0.00

6.60

171.07

100.00%

0.00

46.31

100.00%

0.00

ACCESORIOS VARIOS

07.10.08.01

07.10.09

0.00

183.78

BIODIGESTOR

07.10.09.01

EXCAVACIONES DE ZANJA

m3

12.00

53.47

641.64

07.10.09.02

SOLADO F'C=100 KG/CM2

m2

6.60

25.92

171.07

07.10.09.03

LOSA DE CONCRETO e=0.05m

0.00

0.00

79.65

0.14

07.10.09.03.01

CONCRETO F'C= 175 KG/CM2

m3

0.14

330.75

46.31

0.07

3.34

100.00%

0.00

07.10.09.03.02

ENCOFRADO Y DESENCOFRADO

m2

0.07

47.65

3.34

1.00

30.00

100.00%

0.00

ACCESORIOS DE PVC ENTRADA YSALIDA

glb

1.00

30.00

550.71

1.54

82.34

100.00%

0.00

82.34

0.26

86.00

100.00%

0.00

7.06

382.37

100.00%

0.00

07.10.09.03.03
07.10.10

COMPLEMENTO DE BIODIGESTOR

0.00

30.00

07.10.10.01

EXCAVACIONES DE ZANJA

m3

1.54

53.47

07.10.10.02

CONCRETO F'C= 175 KG/CM2

m3

0.26

330.75

86.00

07.10.10.03

TARRAJEO CON IMPERMEABILIZANTE MEZCLA 1:2 e=1.5 cm

m2

7.06

54.16

382.37

0.00

9,477.40

0.00

07.11
07.11.01

INSTALACIONES SANITARIAS-AGUA

4,914.77

94.74

331.59

100.00%

0.00

331.59

12.99

694.58

100.00%

0.00

53.47

694.58

94.74

1,850.27

100.00%

0.00

19.53

1,850.27

94.74

1,501.63

100.00%

0.00

19.90

536.70

100.00%

0.00

94.74

1,298.89

100.00%

15.30

209.76

100.00%

TRABAJOS PRELIMINARES

07.11.01.01

TRAZO Y REPLANTEO

94.74

3.50

07.11.01.02

EXCAVACIONES DE ZANJA

m3

12.99

07.11.01.03

RELLENO Y COMPACTACION DE ZANJA

94.74

07.11.01.04

CAMA DE APOYO PARA TUBERIAS

94.74

15.85

ELIMINACION DE DESMONTE

m3

19.90

26.97

07.11.01.05
07.11.02
07.11.02.01
07.11.03
07.11.03.01
07.11.04
07.11.04.01
07.11.04.02
07.11.04.03
07.11.05
07.11.05.01
07.11.06
07.11.06.01
07.12
07.12.01

REDES DE DISTRIBUCION ENTERRADAS


TUBERIA DE PVC C-10 DE 1/2'' CR ENTERRADA

94.74

13.71

15.30

13.71

pto

7.00

124.94

7.00

874.58

100.00%

0.00

3.00

374.82

100.00%

0.00

7.00

874.58

100.00%

0.00

1.00

900.00

100.00%

1.00

30.00

100.00%

124.94

374.82

SALIDA DE AGUA FRIA DE PVC DE 1/2'' (INODORO)

pto

7.00

124.94

874.58

CODOS, TEE, REDUCCIONES RED DE AGUA FRIA

0.00

874.58

3.00

0.00

900.00
glb

1.00

900.00

ACCESORIOS
1.00

30.00

SALIDAS PARA ALUMBRADO, TOMACORRIENTES Y FUERZA

0.00
0.00

900.00
30.00

glb

0.00

2,123.98
pto

PRUEBA HIDRAULICA Y DESINFECCION DEL SISTEMA DE AGUA

0.00

209.76

SALIDA DE AGUA FRIA DE PVC DE 1/2'' (URINARIO)


PRUEBA HIDRAULICA

0.00

1,298.89
209.76

SALIDA DE AGUA FRIA


SALIDA DE AGUA FRIA DE PVC DE 1/2'' (LAVATORIO)

0.00

536.70
1,298.89

REDES DE DISTRIBUCION EMPOTRADAS


TUBERIA DE PVC C-10 DE 1/2'' CR EMPOTRADA

1,501.63

0.00
0.00

30.00

0.00

41,828.21

SALIDAS

6,203.74

20.00

1,647.60

100.00%

0.00

07.12.01.01

SALIDAS PARA ALUMBRADO

pto

20.00

82.38

1,647.60

7.00

526.75

100.00%

0.00

07.12.01.02

SALIDAS DE INTERRUPTORES

pto

7.00

75.25

526.75

5.00

579.15

100.00%

0.00

07.12.01.03

SALIDAS DE TOMACORRIENTE BIPOLAR SIMPLE

pto

5.00

115.83

579.15

287.52

3,450.24

100.00%

0.00

CANALIZACIONES Y/O TUBERIAS

287.52

12.00

287.52

13,694.58

100.00%

0.00
0.00

07.12.01.04
07.12.02

CONDUCTOS

0.00

3,450.24
28,519.11

07.12.02.01

3-1x6 mm2 N2XH-90 + 1X6 mm2 (T)

287.52

47.63

13,694.58

287.52

5,828.03

100.00%

07.12.02.02

2-1x4 mm2 NXH-90 + 1X4 mm2 (T)

287.52

20.27

5,828.03

287.52

4,830.34

100.00%

0.00

07.12.02.03

2-1x2.5 mm2 NHX-90 + 1X2.5 mm2 (T)

287.52

16.80

4,830.34

287.52

4,166.16

100.00%

0.00

2-1x1.5 mm2 NHX-90 + 1X1.5 mm2 (T)

287.52

14.49

4,166.16

2.00

37.48

100.00%

0.00

2.00

18.74

37.48

1.00

3,196.02

100.00%

0.00

2.00

3,871.86

100.00%

0.00

1.00

1,110.97

100.00%

07.12.02.04
07.12.03

CAJAS DE PASO

07.12.04

TABLERO PRINCIPAL

und

1.00

3,196.02

3,196.02

TABLERO DE DISTRIBUCION

und

2.00

1,935.93

3,871.86

07.12.05
07.13
07.13.01
08

und

POZO DE TIERRA
POZO DE PUESTA A TIERRA

und

1.00

1,110.97

INSTALACION DE PANELES INFORMATIVOS


und

20.00

18.06

361.20

08.02

BASE DE CEDRO

und

20.00

346.85

6,937.00

08.03

TABLERO DE MADERA MDF

und

10.00

346.85

3,468.50

09
09.01
10
10.01
10.01.01
10.01.02
10.02

und

40.00

15.00

glb

1.00

123,345.00

MITIGACION IMPACTO AMBIENTAL


MITIGACION DEL IMPACTO AMBIENTAL

0.00

1,110.97

COLUMNAS

PERFIL DE ACERO

0.00
0.00

11,366.70

08.01

08.04

0.00

1,110.97

600.00

20.00

361.20

100.00%

0.00

20.00

6,937.00

100.00%

0.00

10.00

3,468.50

100.00%

0.00

40.00

600.00

100.00%

0.00

1.00

123,345.00

100.00%

0.00

123,345.00

OTROS

123,345.00

0.00

265,984.90

DEMOLICION DE CONSTRUCCION EXISTENTE

0.00

15,984.90
5,719.20

100.00%

0.00

30.00

10,265.70

100.00%

0.00

1.00

250,000.00

100.00%

2.28

DEMOLICION

m2

240.00

23.83

5,719.20

240.00

ELIMINACION DE DEMOLICIONES

m3

30.00

342.19

10,265.70

250,000.00

250,000.00

INSTALACION DE RED PRIMARIA-SISTEMA DE UTILIZACION EN M.T.(10-22.9) KV-3 glb


1.00
PARA EL COMPLEJO ARQUEOLOGICO HUACA BANDERA
Costo Directo Total
Gastos Generales
Costo Indirecto Total
Utilidad
subtotal
I.G.V. 18%
Costo Total
% Avance Fisico Programado

1,223,070.30

245.99%

0.00

30.00
1.00

371,793.93

30.40%

30.40%

1,585,880.08

129.66%

129.66%

831,049.08

67.95%

67.95%

219,886.30

17.98%

17.98%

64,059.85

5.24%

5.24%

400,696.54

32.76%

32.76%