Sie sind auf Seite 1von 2

Client Name:

Project Name:
Location:

Dear Sir,

Attn:
Email:
Tel:

ARC DE TRIOMPHE

Date: Mar. 29 2016

Page No.: 1 of 2

CAR PARKING SHADE STRUCTURE FOR WOQOD PETROL STATION

AL MIRQAB / OLD SALATA

Our ref. No.


Your ref. No.
Our Drawing Ref. No.

HILAL AHAMED
hilal.ahmed@arcdetriomphe.qa
6694 6344

QS 10732

Reference to your request, we are pleased to submit our quotation for your kind consideration.

1.

Details:

1.1
1.2

Product:
Model:

Technical Specification:

1.3
Design Calculation
Load Calculation Basis:
1.4
Fabric Prestressing Load(kN/m)
1.5
Self weight of Fabric(g/m2)
1.6
Design Live Load (kN/m2)
1.7
Design Dead Load (kN/m2)
1.8
Wind Load Calculation
1.8.1 Basic Wind Speed V (m/s)
1.9
Structural Steel Design
1.9.1
American Standard
Item
1.10
1.11
1.12
Item
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25

Description
Textile Roof Membrane
Average Weight
Textile Life Span warranty
Description

Shop Drawing
Steel Structural Members
Protective Coating (Painting)
Steel Structural Bolting
Textile Metal Accessories and Wire Rope
Anchor Bolts
Installation / Erection Supervisor
Installation Team

Cont. Next Page

Tensile Structure Membrane


Subject to the Approved Drawing
Include
Varies
330 g/m2
Varies
0.2 kN/m2

45 m/s(162KPH) According to ASCE/SEI 7-05

According to the US standard ANSI/AISC 360-10.


Allowable Stress Design (ASD)

Definition
HDPE Fabric (High Density Polyethylene)
330 gsm
10 Years
Definition
Details
Mild Steel
Epoxy Polyurethane Paint
Galvanized
Galvanized
Galvanized Supply only
At Project Site
At Project Site

Note

Include

Note

Include
Include
Include
Include
Include
Include
Include
Include

Page 2 of 2
QS-10732
2. Area as per Given B.O.Q.

Item
Description
2.1
2.2
2.3 Car Parking Shade
2.4
2.5

3. Grand Total Price


Item

Qty.

Approx. Dimension / Area

1 no.
1 no.
1 no.
1 no.
3 nos.

5.55m x 5.5m
8.25m x 5.5m
11.0m x 5.5m
16.5m x 5.5m
22.0m x 5.5m
Grand Total Area

30.52 sq.m
45.38
60.5
90.75
363
590.15 Sq.m

Grand Total Price

3.1

82,621 QAR (Eight Two Thousand Six Hundred Twenty One Qatari Riyals Only)

4.1
4.2
4.3
4.4
4.5

Any Civil and Anchorage Works


Drilling & Chemical (Hilti)
Safety Scaffolding & Crane Lifting Equipments
Any Electrical Lighting Works
Third Party Certificate / Insurance / Work Permit

4. Excluded Items

5. Payment Terms
5.1

Payment Method

5.2

Quotation Validity

Best Regards

________________________
Engr. Muhammad Yaseen
General Manager

www.qatar-sat.com
info@qatar-sat.com
P.O Box: 6998 Doha Qatar
S&M New Industrial Area
Mebaireek Junction (Exit 17)
Salwa Road
Tel: +974 460 6877 / 6619 1733

Total Area

Project
Project
Project
Project
Project

Exclude
Exclude
Exclude
Exclude
Exclude

20% - Advance Payment / After Receiving LOI.


30% - After Shop Drawing & Design Calculation Approval.
20% - After Delivery of Anchor Bolts.
30% - Steel Erection & Textile Installation Progress Payment.
30 Days

Das könnte Ihnen auch gefallen