SECTION-8
Bill of Quantities
1.
General
The contractors attention is drawn to the conditions of contract, the
specifications and the drawings all of which are to be read in conjunction with
the Bill of Quantities hereinafter. Directions and descriptions of work and
material given in the other parts of the Contract Documents are not
necessarily repeated in the Bill of Quantities.
The total cost of complying with all the provisions, conditions, obligations and
liabilities etc. described in the contract and of carrying out the works as
specified including, but not by way of limitation, all charges and the rates and
prices inserted in the Bill of Quantities hereinafter unless expressly otherwise
provided for in the contract. Consequently, the contractor shall have no claim
for further or extra payment in respect of any work or rates and prices set
against each item are to be for full and / or described in the specification
which can reasonably be inferred there from and are to cover the cost of
provision of all labour, materials, tools, tackles, plants, equipment, fuel, over
head & profit etc., all as per conditions stipulated elsewhere. The rates shall
also include all contingent costs and charges including all taxes such as VAT,
Income Tax, Building & other Construction workers welfare cess and general
tax and all the contractors obligations under the contract and all matters and
things necessary for the proper completion and maintenance of the works.
The quantities given in the Bill of Quantities are estimated. The basis of
payment shall be the actual quantities of work ordered and carried out as
measured jointly by the contractor and by the Engineer or his representative
and valued at the rates and prices specified in the Bill of Quantities, where
acceptable and otherwise at such rates and prices as the Engineer may fix
within the terms of the contract. The quantities of work and materials stated
in the Bill of Quantities shall not be considered as limiting of extending the
amount of work to be done or material to be supplied by the contractor.
Volume III
Bill of Quantities
Page 1 of 46
KPL/OP/RoRoGCB-II/ 2016
The contractor is deemed to be familiar with all site conditions at the Port
Site, weather, all site investigation records, available means of access and the
locality of any existing services and working restrictions due to testing site
features or other contractors works in order to execute the works. General
directions and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. The contractor is deemed to have
referred to the relevant sections of the contract documentation and prices
incorporated against each item in the Bill of Quantities. The method of
measurement is described in
the following
preambles
and /
or is
2.
MEASUREMENT
2.1 General
Unless stated or billed otherwise, quantities shall be measured in accordance
with IS: 1200 and are net as they are finished and fixed in the works. The
Volume III
Bill of Quantities
Page 2 of 46
KPL/OP/RoRoGCB-II/ 2016
Concrete
The concrete works shall be measured net to the dimensions shown on the
drawings or ordered by the Engineer or his representative except where
otherwise specially described at prescribed in the specifications.
The rates for concrete shall include for all labour, material, tools, tackles,
plant, equipment, fuel, shuttering, centering, transporting, depositing,
concrete compacting, forming construction joints, curing etc.
2.4
Reinforcement Steel
Steel bars will be measured as fabricated by their weight in tones as
calculated from the approved bending schedules and bar lists on the basis of
the nominal weights in IS: 1786. Authorized laps, Chairs/ Separators, lifting
hooks shall also be measured and paid based on the nominal weights as
specified in IS: 1786.
Bill of Quantities
Page 3 of 46
KPL/OP/RoRoGCB-II/ 2016
ii)
Steel Liners
The quantity shall be measured from the bottom of the driven length of
the liner up to the cut off level. Steel liners need not be painted.
iii)
Boring:
(a) For boring in soil other than rock:
Measurements will be made downwards commencing from the level
where boring tool encounters the soil.
(b) Rock boring:
Measurements shall be made downwards commencing from the level
certified by the Engineer or his representative.
iv)
Concrete
Concrete shall be measured in cubic metres and be taken as theoretical
volume between the toe of the pile and cut off level. No measurement
shall be made for the extra concrete provided above the cut off level. A
minimum of 600 mm is required to be provided to permit removal of all
laitance and week concrete before pile cap concreting. Excess concrete,
any excess diameter shall be deemed to be included in the rates.
Volume III
Bill of Quantities
Page 4 of 46
KPL/OP/RoRoGCB-II/ 2016
v)
Reinforcement
Steel reinforcement cages fabricated for piles will be measured as
fabricated by their weight in tonnes as calculated from the approved
bending schedules and bar lists on the basis of the nominal weights in
IS: 1786. The quantity shall also include authorized laps, lifting hook
etc.
PAYMENT
General
Payment to the contractor shall be made on the recorded measurements and
the contractor will have to submit bills in the prescribed form once in a month
and payment will be made ordinarily once in a month. The Port shall pay 75%
of the net amount of the bill submitted within 10 days from the date of receipt
of the bill and the balance within 30 days from the date of receipt of the bill.
On completion of the work or on the prior termination of the contract final
measurement will be taken and account adjusted accordingly. No separate
mobilization/ demobilization fee shall be payable for bringing all the plants,
machinery and equipment required for piling and for any other work. The
contractor shall include the same suitably in the respective items of the rate
schedule.
3.2
Concrete
The rate for concrete items shall include all costs that are necessary to obtain
concrete quality as described in the specifications but not limited to the
following items:
-Supply, delivery and storage of all materials
-Provision of all mixing, transport equipment etc.
Volume III
Bill of Quantities
Page 5 of 46
KPL/OP/RoRoGCB-II/ 2016
-Curing concrete and making and curing of test cubes and testing
-Provision of all shuttering, centering
-Provision of ducts and void formers
-Finishing as specified
-All labour, fuel, tools, tackles, and contingent items
3.3 Pre-Cast Concrete
i)
Casting:
The rates for all pre-cast units (reinforced/ plain) shall cover all costs
that are necessary for casting, curing necessary to complete all the items
according to specification and will be paid under respective items of rate
schedule.
ii)
Fixing:
The rates for all pre-cast units (reinforced/ plain) shall cover all costs
that are necessary for lifting, transportation, placing and fixing in
position to complete all the items according to specification and will be
paid under respective items of rate schedule.
Volume III
Bill of Quantities
Page 6 of 46
KPL/OP/RoRoGCB-II/ 2016
and
making
results
available
to
the
Engineer
or
his
representative;
-Positioning and setting up of all equipments, platform and all temporary
works necessary for the construction of diaphragm walls;
-Excavation and construction of guide walls including supplying of concrete
and reinforcement in accordance with the specification and drawings;
-Boring / excavation of diaphragm wall shaft including provision and use of
bentonite slurry
-Fabrication and Stiffening of diaphragm wall reinforcement cages and
inclusion of spacers to ensure straightness and correct positioning of the
cages;
-Cleanout of diaphragm wall shafts including sampling and testing of
bentonite suspension from the pile shaft as described in the specification;
-Monitoring and recording of concreting operations;
-Carrying out, recording, interpreting and reporting Dynamic Pile Integrity
Test payment will be made only as per the relevant items of the rate schedule.
3.6 Bored Piles
The rates for piling works shall include but not be limited to the following:
-Carrying out seabed survey in the areas to be piled and making results
available to the Engineer or his representative;
-Positioning and setting up of all equipment, platform and all temporary
works necessary for the construction of piles;
-Supplying, fabricating, storing, transporting, welding and cutting of steel
liners including driving to comply with the specification and drawings;
-Boring pile shaft including provision and use of bentonite slurry
Volume III
Bill of Quantities
Page 7 of 46
KPL/OP/RoRoGCB-II/ 2016
Volume III
Bill of Quantities
Page 8 of 46
KPL/OP/RoRoGCB-II/ 2016
A. PREAMBLE
1)
2)
The quantities given in the Bill of Quantities are estimated and provisional
and are given to provide a common basis for bidding. The basis of payment
will be the actual quantities of work ordered and carried out, as measured by
the Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at
such rates and prices as the Engineer may fix within the terms of the
Contract.
3)
The rates and prices bid in the priced Bill of Quantities except insofar as it is
otherwise, provided under the Contract, include all constructional plant,
labour, supervision, materials, all temporary works and false works, erection,
maintenance, establishment and overhead charges, profit, foreign taxation
and levies, local levies and other charges, together with all general risks,
liabilities and obligations set out or implied in the Contract and including
remedy of any defects during the Defects Liability Period.
4)
5)
6)
The rate or price rounded off to the nearest Indian Rupee shall be entered
against each item in the Bill of Quantities both in figures and words, whether
quantities are stated or not. The cost of items against which the Contractor
Volume III
Bill of Quantities
Page 9 of 46
KPL/OP/RoRoGCB-II/ 2016
has failed to enter a rate or price shall be deemed to be covered by other rates
and prices entered in the Bill of Quantities.
7)
The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
items are provided, the cost shall be deemed to be distributed among the rates
and prices entered for the related items of work.
8)
General directions and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
9)
Volume III
Bill of Quantities
Page 10 of 46
KPL/OP/RoRoGCB-II/ 2016
SI.
NO.
BILL NO.
DESCRIPTION OF WORK
BILL NO: 1
BILL NO: 2
DECK STRUCTURE
BILL NO: 3
WHARF ACCESSORIES
BILL NO: 4
BILL NO: 5
AMOUNT
(Rupees)
Volume III
Bill of Quantities
Page 11 of 46
KPL/OP/RoRoGCB-II/ 2016
Probable
Qty
(1)
(2)
1.1
270 Nos
Description of work
Rate in
Figures
and in
words
Rs. p
(4)
(3)
Positioning
and
setting
piling
equipment
Unit in
Figures
and in
words
Total Amount
Rs.
P
(5)
(6)
1No
(one
Positioning
and
equipment
setting
piling
number)
1200 T
1T
Liners
Liners
Supplying,
fabricating,
(One
Tonne)
in
approved
below
including
construction
existing
providing
ground
additional
the
fabricated
liners
in
Bill of Quantities
Page 12 of 46
KPL/OP/RoRoGCB-II/ 2016
Boring
Boring for the 1200mm diameter piles
to the required depth through all types
of soil strata including cemented sand,
boulder layers and hard rock if any up
to the founding level and stacking the
bored soil at convenient place and
transported to the low lying area any
where inside the harbour area within a
lead of 4 Km as directed by the
Engineers representative and pile
Volume III
Bill of Quantities
Page 13 of 46
KPL/OP/RoRoGCB-II/ 2016
etc.,
including
bentonite
elevation
higher
than
the
to
carryout
additional
Bill of Quantities
Page 14 of 46
KPL/OP/RoRoGCB-II/ 2016
shall
be
borne
by
the
contractor.
a)
b)
7830 Rm
270 Rm
cemented
sand
strata
including
cemented
sand
except
1 Rm
( one
Running
Metre)
1 Rm
( one
Running
Metre)
c)
270 Rm
1 Rm
( one
Running
Metre)
1.4.
1900 T
1T
(one
Tonne)
as
per
drawing,
technical
Volume III
materials,
tools
transport,
lowering,
equipment,
cage
fuel
Bill of Quantities
etc.,
Page 15 of 46
KPL/OP/RoRoGCB-II/ 2016
complete.
Note:
Provision
of
authorised
lapping,
9500
cu.m
1 m3
( one
cubic
metre)
level
and
clearing
slab
as
per
drawing
and
Volume III
Bill of Quantities
Page 16 of 46
KPL/OP/RoRoGCB-II/ 2016
1.6
270 Nos
1No
(one
number)
directed
representative
by
the
and
Engineers
all
associated
1 m3
( one
cubic
metre)
necessary
shuttering/formwork,
mixing,
transporting,
handling,
and
maintaining
records
fuel
etc.,
complete.
125 cu.m
1 m3
( one
cubic
metre)
necessary
Volume III
shuttering/formwork,
Bill of Quantities
Page 17 of 46
KPL/OP/RoRoGCB-II/ 2016
mixing,
transporting,
placing,
etc.,
complete.
160 T
Muffs
1T
(one
Reinforcement
for
Pile
Tonne)
1 No
Pile Test
1No
(one
number)
Bill of Quantities
Page 18 of 46
KPL/OP/RoRoGCB-II/ 2016
adopt.
2. The test load shall be furnished
before conducting the test for 1200mm
diameter
pile.
8 Nos
1No
necessary
equipment
and
(one
number)
Bill of Quantities
Page 19 of 46
KPL/OP/RoRoGCB-II/ 2016
300 cu.m
a)
Diaphragm Wall
1 m3
( one
cubic
metre)
construction
including
of
diaphragm
excavation
shuttering/formwork,
wall
necessary
mixing,
records
including
all
10400
1 m2
sq.m
( one
square
metre)
as
shown
in
approved
Engineers
construction
of
representative
for
diaphragm
wall
slurry,
circulation,
Bill of Quantities
all
Page 20 of 46
KPL/OP/RoRoGCB-II/ 2016
dewatering,
bentonite
and
lowering
of
the
as
per
IS
9559-1980.
Note:
1. The payment will be made for one
vertical
2.
The
associated
face
rate
area
only.
under
water
12500
1 m3
Cu.m
( one
Bill of Quantities
Page 21 of 46
KPL/OP/RoRoGCB-II/ 2016
cubic
metre)
materials
except
1865 T
1T
(One
Tonne)
including
including
all
labour,
Volume III
Bill of Quantities
Page 22 of 46
KPL/OP/RoRoGCB-II/ 2016
1.13
8 Nos
1No
necessary
equipment
and
(one
number)
330 m
1 Rm
(one
Running
Metre)
representative
associated
cleaning
of
and
all
projecting
Volume III
Bill of Quantities
Page 23 of 46
KPL/OP/RoRoGCB-II/ 2016
Sl.No
Probable
Qty
(1)
(2)
2.1
Description of work
Rate in
Figures
and in
words
Rs. p
(4)
(3)
Unit in
Figures
and in
words
Total Amount
Rs.
P
(5)
(6)
vibrating,
curing
the
equipment,
fuel,
all
Volume III
Bill of Quantities
Page 24 of 46
KPL/OP/RoRoGCB-II/ 2016
a.
755
1 m3
Main beams
(one
Cu.m
cubic
metre)
b.
170
1 m3
Crane beams
(one
Cu.m
cubic
metre)
c.
2500
1 m3
Deck slab
Cu.m
(one
cubic
metre)
2.2
precast
components
cement
concrete
such
as
216
Main beams
1No
(one
Nos
Number)
b.
48
Crane beams
1No
(one
Nos
Number)
c.
780
Deck slab
1No
(one
Nos
Number)
Volume III
Bill of Quantities
Page 25 of 46
KPL/OP/RoRoGCB-II/ 2016
2.3.
In-situ Concrete
Providing
and
placing
in-situ
transporting
curing
the
,placing,
concrete
Fabrication
of
steel
2800
1 m3
Main beams
(one
cu.m
cubic
metre)
b.
1715
1 m3
Crane beams
cu.m
(one
cubic
metre)
c.
2000
1 m3
Deck slab
cu.m
(one
cubic
metre)
Volume III
Bill of Quantities
Page 26 of 46
KPL/OP/RoRoGCB-II/ 2016
d.
2300
1 m3
Pile muff
(one
Cu.m
cubic
metre)
2.4
1000
Wearing Coat
1 m3
Cu.m
(one
cubic
metre)
shuttering,
transporting,
placing,
mixing,
vibrating,
2450 T
Reinforcement
1T
(one
Tonne)
and
cutting,
bending,
Volume III
Bill of Quantities
Page 27 of 46
KPL/OP/RoRoGCB-II/ 2016
2.6
90
Cu.m
Lean -Concrete
1 m3
(one
concrete
of
volumetric
mix
(1:4:8)
proportions
in
using
cubic
metre)
including
mixing,
and
materails,
tools,
Volume III
Bill of Quantities
Page 28 of 46
KPL/OP/RoRoGCB-II/ 2016
Probable
Qty
(1)
(2)
3.1
18 Nos
Description of work
Rate in
Figures
and in
words
Rs. p
(4)
(3)
Unit in
Figures
and in
words
Total
Amount
Rs.
P
(5)
(6)
1 No.
Fenders
Design, manufacture, test, transport,
(one
number)
including
all
labour,
be
provided.
No
Bill of Quantities
Page 29 of 46
KPL/OP/RoRoGCB-II/ 2016
3.
calculations
for
the
1 No.
Bollards
Design, manufacture, Supplying and
(one
number)
the
bollards
as
per
fuel,
transport,
etc
complete.
Note:
1. Third party test certificate shall be
provided.
2. Sampling and testing requirements
shall be as per specifications.
Volume III
Bill of Quantities
No
Page 30 of 46
KPL/OP/RoRoGCB-II/ 2016
3.
calculations
for
the
Engineer
Engineer's
2 Nos
(one
number)
18 Nos
1 No.
(one
number)
bolts etc.
3.3
1 No.
Ladder
Supply, fabricate and fixing in
position
ladders
of
hot
dip
made
plate/flat/bars
up
with
galvanized
of
painting
MS
the
Bill of Quantities
Page 31 of 46
KPL/OP/RoRoGCB-II/ 2016
etc., complete.
a
8 Nos
Ladder
1 No
( One
Number)
b.
50 m
1 RM
( one
running
metre)
3.4
8 Nos
Mooring rings
1 No
( One
Number)
16 m
Safety chains
1 Rm
( one
position
M.S
galvanised
safety
running
metre)
Volume III
Bill of Quantities
Page 32 of 46
KPL/OP/RoRoGCB-II/ 2016
3.6.
Expansion Joint
Supplying and fixing in position pre
joint filler in the expansion joints
including fabricating and fixing in
position of M.S. plates etc., all as
per
drawing
and
specification
6T
1T
( One
Tonne)
b.
60 sq.m
1 m2
( one square
metre)
3.7.
200 m
1 Rm
Sealing compound
Supplying
and
laying
bitumen
( one
running
metre)
shown
in
the
drawing,
tools
equipment
etc.,
complete
3.8.
5T
1T
Inserts
Supply, fabricate and fix in position
( one
Tonne)
Bill of Quantities
Page 33 of 46
KPL/OP/RoRoGCB-II/ 2016
Volume III
Bill of Quantities
Page 34 of 46
KPL/OP/RoRoGCB-II/ 2016
Probable
Qty
(1)
(2)
4.1
11000
Soil Excavation
Cu.m
(One cubic
meter)
Description of work
Rate in
Figures
and in
words
Rs. p
(4)
(3)
Unit in
Figures
and in
words
Total
Amount
Rs.
P
(5)
(6)
1m3
been
assigned
in
another
tools,
equipments,
fuel
plants
etc.,
&
complete.
Note:
1. No separate payment will be made
to the contractor for Mobilization,
demonization charges of equipment.
The contractor shall include this
charge in the bill of quantities.
Volume III
Bill of Quantities
Page 35 of 46
KPL/OP/RoRoGCB-II/ 2016
3000
Cu.m
1m3
for
(One cubic
meter)
as shown in the
including
materials,
tools,
all
labour,
plants
&
1650
Geotextile Layer
1sq.m
sq.m
(One
square
meter)
handling,
transport,
fuel,
labour,
tools,
Bill of Quantities
Page 36 of 46
KPL/OP/RoRoGCB-II/ 2016
12000 T
1T
Stone Pitching
Supply and Transport the stones
(One
Tonne)
including
all
operations,
tools,
tackles,
plants
and
66 Nos
1NO (One
Gabions
Laying of 9mm 4 strand PP Rope
Number)
mm
aperture
and
size
Bill of Quantities
Page 37 of 46
KPL/OP/RoRoGCB-II/ 2016
Volume III
Bill of Quantities
Page 38 of 46
KPL/OP/RoRoGCB-II/ 2016
(1)
(2)
5.1
25000
Sq.m
Description of work
Rate in
Figures
and in
words
Rs. p
(4)
(3)
Unit in
Figures
and in
words
Total
Amount
Rs.
P
(5)
(6)
1Sq.m
(One
trees
and
saplings
of
girth
upto
square
meter)
39000
1Cu.m
Cu.m
(One
Cubic
form
the
base
for
meter)
pavement/
including
dressing
of
sides,
13000
1Cu.m
Cu.m
(One
Volume III
Bill of Quantities
Page 39 of 46
KPL/OP/RoRoGCB-II/ 2016
deleterious
pavement
material
area
etc.,)
in
the
Cubic
transporting
the
meter)
including
all
labour,
tools,
65000
Preparation
of
sub-grade
to
the
1Sq.m
Sq.m
(One
Square
meter)
440
Cu.m
1 m3
(One
Cubic
Metre)
representative,
including
mixing,
transporting,
placing,
consolidating
Volume III
by
ramming,
curing,
Bill of Quantities
Page 40 of 46
KPL/OP/RoRoGCB-II/ 2016
1990
Cu.m
1 m3
(One
Cubic
Metre)
of
shuttering,
mixing,
concrete
including
all
labour,
all
labour,
material,
590
1 m3
Cu.m
(One
Cubic
Metre)
condition
including
formwork
mixing,
shuttering,/
transporting&
590
1 m3
Cu.m
(One
Cubic
Bill of Quantities
Page 41 of 46
KPL/OP/RoRoGCB-II/ 2016
Metre)
310 T
1T
(one
Tonne)
9250
Cu.m
(GSB)
layer
of
150
mm
1 m3
(One
Cubic
Metre)
content,
compacting
with
Bill of Quantities
Page 42 of 46
KPL/OP/RoRoGCB-II/ 2016
transportation,
tools,
equipment,
including
safety
labour,
measures,
18600
1 m3
Cu.m
(One
Cubic
Metre)
mixing,
transporting
1860
Cu.m
as
per
relevant
specifications,
1 m3
(One
Cubic
Metre)
62000
1 m2
Sq.m
(One
Square
Bill of Quantities
Page 43 of 46
KPL/OP/RoRoGCB-II/ 2016
Metre)
750
Cu.m
1 m3
(One
Cubic
Metre)
3325
1 sq.m
sq.m
(One
Square
Meter)
1040
cu.m
1 m3
(One
Cubic
etc., as require
Metre)
Bill of Quantities
Page 44 of 46
KPL/OP/RoRoGCB-II/ 2016
5.17
66 cu.m
1 m3
(One
Cubic
Metre)
200 m
Supplying
1m
(One
Running
Meter)
5.19
25 Nos
1 No
(One
Number)
Bill of Quantities
Page 45 of 46
KPL/OP/RoRoGCB-II/ 2016
as
directed
by
the
departmental officers.
TOTAL-Bill No.5
Volume III
Bill of Quantities
Page 46 of 46