Date:
County
Project Title:
CT District
PPNO
ALA
4
I-880 Reconstruction, 29th-23rd, Oakland
09/09/08
EA
0044C
Prior
2,000
08/09
09/10
10/11
11/12
12/13
13/14+
2,200
PS&E
7,500
Total
Implementing Agency
4,200 ACCMA
7,500 ACCMA
600
TOTAL
2,000
2,200
8,100
7,000
73,100
5,200 ACCMA
80,100 ACCMA
7,000
73,100
97,000
4,600
CON
4,600
2,000
4,200 ACCMA
7,387 ACCMA
2,200
PS&E
7,387
600
4,600
7,987
4,600
7,000
2,400
70,600
9,400 Caltrans
5,200 ACCMA
70,600 Caltrans
7,000
73,000
96,787
CON
TOTAL
Fund No. 1:
2,000
2,200
Program Code
20.XX.723.000
Existing Funding
Component
Prior
08/09
09/10
10/11
11/12
12/13
13/14+
Total
Funding Agency
Caltrans
E&P (PA&ED)
PS&E
R/W SUP (CT)
CON SUP (CT)
R/W
CON
73,000
73,000
TOTAL
73,000
73,000
Proposed Funding
Notes
The revision to the TCIF/SHOPP is
to provide consistency with the
TCIF Project Baseline Agreement
E&P (PA&ED)
PS&E
R/W SUP (CT)
CON SUP (CT)
2,400
2,400
CON
70,600
70,600
TOTAL
73,000
73,000
R/W
Fund No. 2:
Program Code
20.XX.075.600
Existing Funding
Component
Prior
08/09
09/10
10/11
11/12
12/13
13/14+
Total
PS&E
Funding Agency
MTC
E&P (PA&ED)
5,000
5,000
5,000
Proposed Funding
7,000
7,000
7,000
12,000
E&P (PA&ED)
PS&E
5,000
7,000
Notes
2008 STIP reflects $7M in Con,
5,000 amendment is consistent with the
Baseline Agreement ($7M in ConSup)
7,000
R/W
CON
TOTAL
5,000
7,000
Attachment, Page 2 of 3
12,000
Date:
County
Project Title:
Fund No. 3:
CT District
PPNO
ALA
4
I-880 Reconstruction, 29th-23rd, Oakland
0044C
Program Code
20.30.010.680
Existing Funding
Component
Prior
08/09
09/10
09/09/08
EA
10/11
11/12
12/13
13/14+
Total
Funding Agency
E&P (PA&ED)
PS&E
R/W SUP (CT)
CON SUP (CT)
R/W
2,000
2,000
CON
TOTAL
2,000
Proposed Funding
E&P (PA&ED)
2,000
Notes
1,400 The revision reflects the funding
387 proposed in the TCIF Project
Baseline Agreement
1,400
PS&E
387
1,400
387
1,787
Program Code
LOCAL FUNDS
Existing Funding
Component
E&P (PA&ED)
Prior
2,000
08/09
09/10
10/11
11/12
12/13
13/14+
PS&E
Total
Funding Agency
4,200 MTC
2,200
2,500
2,500
600
2,600
3,200
CON
TOTAL
2,000
2,200
E&P (PA&ED)
2,000
800
PS&E
3,100
2,600
Proposed Funding
100
100
100
10,000
Notes
2,800 The revision reflects the funding
2,000 proposed in the TCIF Project
Baseline Agreement
2,000
600
4,600
5,200
2,600
4,600
10,000
CON
TOTAL
2,000
800
Program Code
Fund No. 5:
Existing Funding
Component
Prior
08/09
09/10
10/11
11/12
12/13
13/14+
Total
Funding Agency
E&P (PA&ED)
PS&E
R/W SUP (CT)
CON SUP (CT)
R/W
CON
TOTAL
Proposed Funding
Notes
E&P (PA&ED)
PS&E
R/W SUP (CT)
CON SUP (CT)
R/W
CON
TOTAL
Attachment, Page 3 of 3
__________________________________________________________
TRAFFIC ADVISORY
Date: June 24, 2013
District: 4 Alameda County
Contact: Gregory Townsend
Phone: 510/286-6115
FOR IMMEDIATE RELEASE
ALAMEDA The 29th Avenue off ramp on northbound Interstate 880 (I-880) will be
closed in order for Caltrans to safely conduct emergency guardrail repairs.
The off ramp will be closed from 9 a.m. to 2 p.m. Motorists traveling northbound will be
detoured to the 23rd Avenue off ramp.
Motorists urged to drive cautiously through the construction zone and leave a safe
traveling distance between your vehicle and the vehicle ahead of you. Caltrans
appreciates your patience as we work to improve the highways and remember to Slow
for the Cone Zone.
.
####
Anotheragreementfortheagreementslayer.ThisisoneIhaveneverheardof!
David:
Hereistheinfoonthepathway,someisintheCityROW.Apparently,wesignedamaintenance
agreementin2001statingthatwewouldmaintaincertainpartsoftheproject.Doyouwantthe
contractplansinadditiontothis?
IrisStarr,AICP
DivisionManagerofTransportationPlanningandFunding
DepartmentofEngineering&Construction
CityofOakland|PublicWorksAgency|APWAAccreditedAgency
250FrankOgawaPlaza,Suite4344|Oakland,CA94612
(510)2386229|(510)2387112Fax
istarr@oaklandnet.com
ReportAProblem|PublicWorksAgencyCallCenter|(510)6155566
www.oaklandpw.com|pwacallcenter@oaklandnet.com|Mobileapp:SeeClickFix
Iris,
Attachedisthemaintenanceagreementandanexhibitwecreatedshowingtheentirebikewayfrom
Emeryvilletothebridge.
YouwillnotethatEmeryvillehasagreedtomaintainthetwolegsintheircity(seetheexhibitattached)
whichisachangetotheOaklandagreement.
Pleaseletmeknowifyouneedanythingelseandwhowouldbeabletoparticipateinawalkthrough
beforeengagingthemaintenanceofthepath.
Thanks
Iris,
I'llsendyouthemaintenanceagreementtomorrow.Ithasschematicplans.Thebikewayisbeing
constructedin3separatecontracts.MostofthepathisinstateRoWI'llsendyouaplanmergingall
contractstogetherandshowingthestateRoW.
Pleaseletmeknowifyouwantthecontractplansafterreceivingtheitemsabove.
Thanks
From: Starr, Iris [mailto:IStarr@oaklandnet.com]
Sent: Tuesday, August 13, 2013 09:41 PM
To: steven.hulsebus@dot.ca.gov <'steven.hulsebus@dot.ca.gov'>
Subject: FW: Caltrans bikeway contracts under construction
Steven,doyouhavetheplans?Whichprojectisthis?
WhatisthescopeofworkandisthepathatallincityROW?
WhofromengineeringhaveyoubeenworkingwithintheCityupuntilnow?
IrisStarr,AICP
DivisionManagerofTransportationPlanningandFunding
DepartmentofEngineering&Construction
CityofOakland|PublicWorksAgency|APWAAccreditedAgency
250FrankOgawaPlaza,Suite4344|Oakland,CA94612
(510)2386229|(510)2387112Fax
istarr@oaklandnet.com
ReportAProblem|PublicWorksAgencyCallCenter|(510)6155566
www.oaklandpw.com|pwacallcenter@oaklandnet.com|Mobileapp:SeeClickFix
Iris:
ThatreallydependsonyourscopeofworkandifthepathwayisintheCity'sROW.
Ifyouhavetheplans,Iamhappytodiscusswithyou.
David
From: Starr, Iris
Sent: Tuesday, August 13, 2013 2:01 PM
To: Lau, David W
Cc: Amirzehni, Gus; Kashi, Kevin; Soo Hoo, Lily; Lau, Danny; steven.hulsebus@dot.ca.gov
Subject: FW: Caltrans bikeway contracts under construction
David:
WhohandlesfinalwalkthroughsonCaltransprojectsbeforeweacceptthemperourmaintenance
agreement?
PleaserespondtoSteveandcc:me.Thanks.
IrisStarr,AICP
DivisionManagerofTransportationPlanningandFunding
DepartmentofEngineering&Construction
CityofOakland|PublicWorksAgency|APWAAccreditedAgency
250FrankOgawaPlaza,Suite4344|Oakland,CA94612
(510)2386229|(510)2387112Fax
istarr@oaklandnet.com
ReportAProblem|PublicWorksAgencyCallCenter|(510)6155566
www.oaklandpw.com|pwacallcenter@oaklandnet.com|Mobileapp:SeeClickFix
Steven,
I'mhandingyourrequestuptomysupervisor,IrisStarr,DivisionManagerforTransportationPlanning&
Funding(andincludedhere).Sheisbetterpositionedforputtingyouincontactwiththemaintenance
sideofouragency.
Best,Jason
JasonPatton,PhD
Bicycle&PedestrianProgramManager
TransportationPlanning&FundingDivision
DepartmentofEngineering&Construction
CityofOakland|PublicWorksAgency|APWAAccreditedAgency
250FrankH.OgawaPlaza,Suite4344|Oakland,CA94612
(510)2387049|(510)2387415Fax
jpatton@oaklandnet.com
ReportAProblem|PublicWorksAgencyCallCenter|(510)6155566
www.oaklandpw.com|pwacallcenter@oaklandnet.com|Mobileapp:SeeClickFix
Jason,
Wearerapidlyapproachingthecompletionofourcontractsandwanttohaveawalkthroughwiththe
appropriatepersonnelatOaklandbeforeturningthepathoverformaintenanceaspertheagreement
betweenOaklandandCaltrans.
WoulditbepossibleifyoucanhelptoidentifywhothisshouldbefromOakland?
Thanks