Project: Rehabilitation of the Cantonal Court

Adress: Mostar, BiH


Type of Works: Architecture and Structure

Note: In cases where certain equipment is specifically named, it is only an indication of the tech
No.

Work description

I. PRELIMINARY WORKS
1.6.

Preparing existing walls for plastering. Preparation


involves partially (at damaged parts) scrape the
existing deteriorated paint on existing walls. The
price includes and necessary scaffolding for the
specified work, as well as the full protection of the
existing woodwork, etc..

Office: 4,19x2,4=10,05 m
Corridor: 1,49x2,40=3,57 m
Office 2: 4,19x2,4=10,06
Office: (8,48+6,04)x2,4=34,85
Storage rm.: (2,33+2,5)x2,4=11,59
Secretary's office: 8,76x2,4=21,02 m
Storage rm.: (2,33+2,5)x2,4=11,59
Office: (6,44+4,99)x2,4=27,43
Expert consultant: 16,29x2,40=39,09 m
Office: (5,07+6,44)x2,40=27,62
Atrium walls: (9,48+9,01)x2x2,40=88,75 m
Total:

VII. FACADE WORKS


7.1.
Procurement of materials handling and facade
walls beneath the flashing in layers.
- Stirodur d=3 cm .

Part buildings facade: 153,77x0,50=76,88 m


7.2.

Procurement of materials and partial repair of the


existing facades and facade walls in layers.
- Waterproofing
- Final facade paint, colour tone determines
architect.
Building facade:
=673,63 m

11.1.

231,88+294,38+147,37=

XI. PAINTING WOORKS


Supply, transport materials, internal transport and
preparing walls. Smoothing and plastering twice
with coating and impregnation, interior samigloss
paint 2 times, the tone chosen by the architect. If
necessary, set the net on the cracks (where they
appear).

Basement Walls:
Storage rm.: 14,05x3,30=46,36 m
Storage rm.: 26,52x3,3=87,52 m
Archive: 21,54x3,30=71,08 m
Corridor: 27,04x3,30=89,23 m
Corridor: 40,02x3,30=132,06 m
Room 1: (2,15+5,25+2,15)x3,3=31,51 m
(1,90+3,10)x1,81=9,05 m, (1,90+2,15)x2,21=8,95
m, 31,51+9,05+8,95=49,51 m

Room 2: 11,00x3,3=36,3 m
Room 3:10,14x3,3=33,46m
Storage rm.: 13,34x3,3=44,02 m
Prepared walls -attic:
Wall stucco:
Basement ceiling:
Storage rm.:
Storage rm.:
Archive:
Corridor:
Corridor:
Room 1:

11.2.

11.3.

Room 2:
Room 3:
Storage rm.:
Total:
Supply, transport materials, internal transport and
pointing of plaster boards walls. Apply a layer of
impregnation and interior semigloss paint 2 times.
Mandatory protection.

Walls d=10 cm:


Furring d=10 cm:
Total:
Supply, transport materials, internal transport and
paint processing of dropped ceiling of plaster
boards. Apply a layer of impregnation and internal
semigloss paint 2 times. Mandatory protection.

Drop ceiling regular gyp.board


Grop ceiling water resistant gyp. Board.
Total:

Project: Rehabilitation of the Cantonal Prosecutors office


Adress: Mostar, BiH
Tyoe of Works: Architecture
Note: In cases where certain equipment is specifically named, it is only an indication of the tech

No.

Description of work

I. PRELIMINARY WORKS
1.4.

Preparing for wall painting walls. Preparation


involves removal of damaged, old wall paint and
other damaged surfaces. The price includes all
necessary scaffolding for the specified work, as
well as the full protection of the existing
woodwork, etc..

Basement:
Archive: 33,88x4,50=152,46 m, doorways:
(2,6x2,2)x2=11,44 m,
152,46-11,44=141,02
m
Detention room: 12,86x4,50=57,87 m
Pantry: 14,98x4,50=67,41 m,
opening:2,80x2,20=6,16 m,
67,416,16=61,25 m
typewrit office:
20,14x4,50=90,63 m,
doorways:2,70x2,20x2=11,88 m, 90,6311,88=78,75 m
Basement corridor: 78,37x4,50=352,66 m,
doorways:(8,45+2,5+3,0+2,2+1,3)x x2,20=38,39
m,
352,66-38,39=314,27 m

Secretaries office:
20,66x4,50=92,97 m,
doorways:2,6x2,2x2=11,44 m,
92,97-11,44=81,53 m
Evidence room:
14,36x4,50=64,62 m,
doorways:2,3x2,2=5,06 m,
64,62-5,06=59,56 m
Evidence room:
14,98x4,50=67,41 m,
doorways:1,78x2,2=3,91 m,
67,41-3,91=63,50 m
Garage: 20,98x4,50=94,41 m,
doorways:2,72x4,00x2=21,76 m,
94,41-21,76=72,65 m

Detention room: 10,30x4,50=46,35 m, opening:


1,65x2,20=3,63 m,
46,35-3,63=42,72
m
Detention room: 9,62x4,50=43,29 m, opening:
1,20x2,20=2,64 m,
43,29-2,64=40,65
m
Court police force: 13,52x4,50=60,84 m, opening:
3,30x2,20=7,26 m,
60,84-7,26=53,58
m
Archive: 42,15x4,50=189,67 m, opening:
2,0x2,20x2=8,80 m,
189,678,80=180,87 m
Telephone switch room: 16,72x4,50=75,24 m
Storage/pantry rm.:

9,89x4,50=44,50 m

Corridor: 24,62x4,50=110,79 m, opening:


2,70x2,20x2=11,88 m, 2,20x2,20=4,84 m,
110,79-11,88-4,84=94,07 m
Ground floor:
Prosecutors office:
14,65x3,50=51,27
m, opening: 2,60x2,20=5,72 m,
51,27-5,72=45,55 m
Prosecutors office:
14,65x3,50=51,27
m, opening: 2,60x2,20=5,72 m,
51,27-5,72=45,55 m
Prosecutors office:
20,66x3,50=72,31
m, opening: 2,60x2,20x2=11,44 m,
72,31-11,44=60,87 m
Prosecutors office:
14,36x3,50=51,20
m, opening: 2,30x2,20=5,06 m,
51,20-5,06=546,14 m
Prosecutors office:
14,98x3,50=52,43
m, opening: 1,78x2,20=3,92 m,
52,43-3,92=48,51 m
Prosecutors office:
20,58x3,50=72,03
m, opening: 1,78x2,20x2=7,83 m,
72,03-7,83=64,20 m

Expert consultant:
14,54x3,50=50,89
m, opening: 2,00x2,20=4,40 m,
50,89-4,40=46,49 m
Corridor: 61,03x3,50=213,60m,
opening:
1,74x2,20=3,82 m,
(1,60+1,80)x3,5=11,90 m,
17,38x3,50=60,83 m,
213,60-3,8211,90-60,83= =137,05 m

Prosecutors office:
14,65x3,50=51,27
m, opening: 2,60x2,20=5,72 m,
51,27-5,72=45,55 m
Prosecutors office:
14,65x3,50=51,27
m, opening: 2,60x2,20=5,72 m,
51,27-5,72=45,55 m
Prosecutors office:
17,77x3,50=62,19
m, opening: 2,60x2,20=5,72 m,
2,30x2,20=5,06 m, 4,50x3,50=15,75 m,
62,19-5,72-5,06-15,75=
=35,66 m

IT Room: 8,82x3,50=30,87 m, opening:


2,68x2,20=5,89 m, 30,87-5,89=24,98 m
Entry:

7,35x3,50=25,72 m

Script room: 35,88x3,50=125,58 m,


opening:1,60x3,50=5,60 m, 2,60x2,20=5,72 m,
2,17x2,20=4,77 m, 0,69x2,20=1,51 m,
2,0x2,20=4,40 m,
125,58-5,6-5,724,77-1,51-4,4= =103,58 m

Mail room: 2,9x3,5=10,15 m


Expert consultant: 3,36x3,50=11,76 m
First fl.:
Prosecutors office:
20,60x3,50=72,10
m, opening: 2,60x2,20x2=11,44 m,
72,10-11,44=60,66 m

Prosecutors office:
13,00x3,50=45,50
m, opening: 2,60x2,20=5,72 m,
45,50-5,72=39,78 m
Prosecutors office:
16,36x3,50=57,26
m, opening: 2,60x2,20=5,72 m,
57,26-5,72=51,54 m
Prosecutors office:
14,36x3,50=50,26
m, opening: 2,30x2,20=5,06 m,
50,26-5,06=45,20 m
Prosecutors office:
14,98x3,50=52,43
m, opening: 1,78x2,20=3,91 m,
52,43-3,91=48,52 m
Prosecutors office:
13,88x3,50=48,58
m, opening: 1,78x2,20=3,91 m,
48,58-3,91=44,67m
Storage-Evidence room:
11,70x3,50=40,95 m, opening: 1,78x2,20=3,91
m,
40,95-3,91=37,04 m
IKT technician:
18,34x3,50=64,19 m,
opening: 2,00x2,20=4,40 m,
64,19-4,40=59,79 m
Corridor: 69,87x3,50=244,54 m, opening:
1,78x2,20=3,91 m, 10,48x3,50=36,68 m,
244,54-3,91-36,68=203,95 m
Prosecutors office:
20,60x3,50=72,10
m, opening: 2,60x2,20x2=11,44 m,
72,10-11,44=60,66 m
Prosecutors office:
13,00x3,50=45,50
m, opening: 2,60x2,20=5,72 m,
45,50-5,72=39,78 m
Prosecutors office:
22,12x3,50=77,42
m, opening: 2,70x2,20=11,88 m,
77,42-11,88=65,54 m
Accounting
18,10x3,50=63,35 m,
opening: 3,30x2,20x2=14,52 m,
63,35-14,52=48,83 m

Secretary:
14,80x3,50=51,80 m,
opening: 3,80x2,20=8,36 m,
51,80-8,36=43,44 m
Cantonal prosecutor:
28,00x3,50=98,00
m, opening: 2,00x2,20x2=8,80 m,
2,17x2,20=4,77 m,
98,00-8,804,77=84,43 m
Secretary of prosecutors off.:
15,18x3,50=53,13 m, opening: 2,00x2,20=4,40
m,
53,13-4,40=48,73 m
Office:
21,54x3,50=75,39 m, opening:
3,30x2,20x2=14,52 m, 7,57x3,50=26,49 m,
75,39-14,52-26,49=34,38 m
Stairs:

1.5.

15,23x3,50x3=159,91 m

Total:
Ceiling preparation for painting. Preparation
involves removal of all damaged and old paint,
scrape existing deteriorated paint on existing
ceiling. The price includes all necessary
scaffolding for the specified work, as well as the
full protection of the existing woodwork, etc..

Archive:
Detention room:
Pantry:
typewrite office
Toilets:
Basement corridor:
typewrite office
Evidence room:
Evidence room:
Garage:
Detention room:
Detention room:
Court police force:
Archive:
Telephone switch room:
Storage/pantry rm.:
Corridor
Ground floor:

1.6.

Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Expert consultant:
Corridor:
Prosecutors office:
Prosecutors office:
Prosecutors office:
IT Room:
Men's room:
Women's room:
Entry:
Script room:
Mail room:
Expert consultant:
First fl.:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Storage-Evidence room:
IKTtechnician:
Corridor:
Prosecutors office:
Prosecutors office:
Prosecutors office:
Toilets: 7,81+9,13=16,94 m
Accounting
Secretary:
Cantonal prosecutor:
Secretary of prosecutors off.:
Office:
Stairs: 13,36x1,2x3=48,09
Total:
Preparation of columns for painting. Preparation
involves partial removal and scrape the existing
deteriorated paint on existing columns. The price
includes all necessary scaffolding for the specified
work.

Archive:

(0,2+0,2)x2x4,50x2=7,20 m

Archive: (0,2+0,2)x2x4,5=3,6 m
Total:

6.1.

6.2.

VI. FASADE WORKS


Procurement of materials handling partial repair of
the existing facades and facade walls in layers:
- Waterproofing
- Final facade colour, tone choice of the architect.
The price included a scaffolding.

Building facade
Procurement of materials handling and facade
parapet on a flat roof ( waterproofing protection) in
layers:
- Facade Styrofoam d = 3 cm,
- Self-adhesive layer and Malta,
- Facade mesh,
- Masking malta II layer,
- Waterproofing
- Final facade paint
Thermal facade 3 cm:

11.1.

XI. WALL PAINTING


Supply, transport materials, internal transport and
preparing walls. Smoothing and plastering twice
with coating and impregnation, interior samigloss
paint 2 times, the tone chosen by the architect. If
necessary, set the net on the cracks (where they
appear).

Wall painting of walls Basement (prepared):


Wall painting of walls Basement (on plaster):
Total:

11.2.

Supply, transport materials, internal transport and


preparation of ceiling. Smoothing and plastering
twice with coating and impregnation, interior
semigloss paint 2 times, the tone chosen by the
architect. If necessary, set the net on the cracks
(where they appear)....

Ceiling painting Basement (prepared):


11.3.

Supply, transport materials, internal transport and


wall painting of columns. Smoothing plaster twice
with coating and impregnation interior semigloss
paint 2 times, the tone chosen by the designer. If
necessary, set the net on the cracks (where they
appear).

Painting of columns Basement (prepared):

I. PRELIMINARY WORKS
VI. FASADE WORKS
XI. WALL PAINTING

ically named, it is only an indication of the technical features the offered equipment would need to comply
Opis radova

units

quantity

I. PRIPREMNI RADOVI
Priprema postojeih zidova za moleraj. Priprema
podrazumijeva djelimino (na mjestima oteenja ili sl.)
struganje postojee dotrajale boje na postojeim
zidovima. U cijenu je uraunata i potrebna skela za
navedeni rad, kao i potpuna zatita postojee stolarije i
sl..

Ured: 4,19x2,4=10,05 m
Hodnik: 1,49x2,40=3,57 m
Dnevna soba: 4,19x2,4=10,06
Ured: (8,48+6,04)x2,4=34,85
Ostava: (2,33+2,5)x2,4=11,59
Daktilobiro: 8,76x2,4=21,02 m
Ostava: (2,33+2,5)x2,4=11,59
Ured: (6,44+4,99)x2,4=27,43
Struni saradnik: 16,29x2,40=39,09 m
Ured: (5,07+6,44)x2,40=27,62
Zidovi atrija: (9,48+9,01)x2x2,40=88,75 m
Ukupno:
UKUPNO:

VII. FASADERSKI RADOVI


Nabavka transport materijala, te izrada fasade zidova
ispod opava u slojevima.
- Stiridur d=3 cm (koji se lijepi za serkla ispod opava).

m
m
m
m
m

10.05
3.57
10.06
34.85
11.59

m
m
m

21.02
11.59
27.43

m
m

39.09
27.62

m
m

88.75
285.62

Fasada objekta-stiridur d=3cm: 153,77x0,50=76,88 m


m

76.88

673.63

Nabavka transport materijala djelimina popravka


postojee fasade, te izrada fasade zidova u slojevima.
- Impregnacija
- Zavrna fasadna boja, ton boje odreuje projektant.

Fasada objekta:
=673,63 m

231,88+294,38+147,37=

Total: VII. FACADE WORKS:

XI. MOLERSKI RADOVI


Nabavka, transport materijala, unutranji transport, te
molerska obrada zidova. Gletovanje i bruenje glet mase
dva puta, sa nanosom impregnacije i unutaranje
poludisperzivne boje 2 puta, ton po izboru projektanta.

Podrum zidovi:
Ostava: 14,05x3,30=46,36 m
Skladite: 26,52x3,3=87,52 m
Arhiv: 21,54x3,30=71,08 m
Hodnik: 27,04x3,30=89,23 m
Hodnik: 40,02x3,30=132,06 m
Prostorija 1: (2,15+5,25+2,15)x3,3=31,51 m
(1,90+3,10)x1,81=9,05 m, (1,90+2,15)x2,21=8,95 m,
31,51+9,05+8,95=49,51 m

Prostorija 2: 11,00x3,3=36,3 m
Prostorija 3:10,14x3,3=33,46m
Skladite: 13,34x3,3=44,02 m
Pripremljeni zidovi potkrovlja:
Malteri zidova:
Podrum plafoni:
Ostava:
Skladite:
Arhiv:
Hodnik:
Hodnik:
Prostorija 1:

m
m
m
m
m

46.36
87.52
71.08
89.23
132.06

m
m
m
m
m
m

49.51
36.30
33.46
44.02
285.62
26.14

m
m
m
m
m
m

10.97
42.54
28.61
24.31
30.61
21.03

Prostorija 2:
Prostorija 3:
Skladite:
Ukupno:
Nabavka, transport materijala, unutranji transport, te
molerska obrada zidova od gips-kartonskih ploa. Nanosi
se sloj impregnacije i unutaranje poludisperzivne boje 2
puta. Obavezna zatita.

m
m
m
m

7.20
5.24
10.23
1,082.04

Zidovi d=10 cm:


Obloga d=10 cm:
Ukupno:
Nabavka, transport materijala, unutranji transport, te
molerska obrada sputanog stropa od gips-kartonskih
ploa. Nanosi se sloj impregnacije i unutaranje
poludisperzivne boje 2 puta. Obavezna zatita.

m
m
m

1,050.00
207.12
1,257.12

Sputani strop klasine ploe:


Sputani strop vlagoodbojne ploe:

499.77

m
m

8.80
508.57

Ukupno:

Total: XI. PAINTING WORKS:

REKAPITULACIJA
PRIPREMNI RADOVI:
FASADERSKI RADOVI
MOLERSKI RADOVI
UKUPNO:

ors office

fically named, it is only an indication of the technical features the offered equipment would need to compl

unit

quantity

PRIPREMNI RADOVI
Priprema zidova za moleraj. Priprema podrazumijeva
dijelimino (na mjestima oteenja ili sl.) struganje
postojee dotrajale boje na postojeim zidovima. U cijenu
je uraunata i potrebna skela za navedeni rad, kao i
potpuna zatita postojee stolarije i sl..

Podrum:
Arhiva: 33,88x4,50=152,46 m, otvori:(2,6x2,2)x2=11,44
m,
152,46-11,44=141,02 m
m

141.02

57.87

61.25

78.75

314.27

81.53

59.56

63.50

72.65

Prostorija za zadravanje: 12,86x4,50=57,87 m


ajna kuhinja: 14,98x4,50=67,41 m,
otvor:2,80x2,20=6,16 m,
67,41-6,16=61,25 m
Daktilo biro:
20,14x4,50=90,63 m,
otvori:2,70x2,20x2=11,88 m, 90,63-11,88=78,75 m

Podrumski hol: 78,37x4,50=352,66 m, otvori:


(8,45+2,5+3,0+2,2+1,3)x x2,20=38,39 m,
352,66-38,39=314,27 m

Daktilo biro:
20,66x4,50=92,97 m,
otvori:2,6x2,2x2=11,44 m,
11,44=81,53 m
Prostorija za dokaze:
otvori:2,3x2,2=5,06 m,
5,06=59,56 m

92,97-

14,36x4,50=64,62 m,
64,62-

Prostorija za dokaze:
14,98x4,50=67,41 m,
otvori:1,78x2,2=3,91 m,
67,413,91=63,50 m
Garaa: 20,98x4,50=94,41 m, otvori:2,72x4,00x2=21,76
m,
94,41-21,76=72,65 m

Prostorija za zadravanje: 10,30x4,50=46,35 m, otvor:


1,65x2,20=3,63 m,
46,35-3,63=42,72 m
m

42.72

40.65

53.58

180.87

75.24

44.50

94.07

45.55

45.55

60.87

46.14

48.51

64.20

Prostorija za zadravanje: 9,62x4,50=43,29 m, otvor:


1,20x2,20=2,64 m,
43,29-2,64=40,65 m

Sudska policija: 13,52x4,50=60,84 m, otvor:


3,30x2,20=7,26 m,
60,84-7,26=53,58 m

Arhiva: 42,15x4,50=189,67 m, otvor: 2,0x2,20x2=8,80


m,
189,67-8,80=180,87 m
Telefonska centrala: 16,72x4,50=75,24 m
Ostava/kuhinja:

9,89x4,50=44,50 m

Hol: 24,62x4,50=110,79 m, otvor: 2,70x2,20x2=11,88 m,


2,20x2,20=4,84 m,
110,79-11,88-4,84=94,07
m
Prizemlje:
Ured tuioca:
2,60x2,20=5,72 m,

Ured tuioca:
2,60x2,20=5,72 m,

14,65x3,50=51,27 m, otvor:
51,27-5,72=45,55 m

14,65x3,50=51,27 m, otvor:
51,27-5,72=45,55 m

Ured tuioca:
20,66x3,50=72,31 m, otvor:
2,60x2,20x2=11,44 m,
72,31-11,44=60,87
m
Ured tuioca:
2,30x2,20=5,06 m,

Ured tuioca:
1,78x2,20=3,92 m,

14,36x3,50=51,20 m, otvor:
51,20-5,06=546,14 m

14,98x3,50=52,43 m, otvor:
52,43-3,92=48,51 m

Ured tuioca:
20,58x3,50=72,03 m, otvor:
1,78x2,20x2=7,83 m,
72,03-7,83=64,20
m

Struni saradnik:
2,00x2,20=4,40 m,

14,54x3,50=50,89 m, otvor:
50,89-4,40=46,49 m
m

46.49

137.05

45.55

45.55

35.66

24.89

25.72

m
m

103.58
10.15

11.76

60.66

Hol: 61,03x3,50=213,60m,
otvor: 1,74x2,20=3,82 m,
(1,60+1,80)x3,5=11,90 m, 17,38x3,50=60,83 m,
213,60-3,82-11,90-60,83= =137,05 m

Ured tuioca:
2,60x2,20=5,72 m,

14,65x3,50=51,27 m, otvor:
51,27-5,72=45,55 m

Ured tuioca:
2,60x2,20=5,72 m,

14,65x3,50=51,27 m, otvor:
51,27-5,72=45,55 m

Ured tuioca:
17,77x3,50=62,19 m, otvor:
2,60x2,20=5,72 m, 2,30x2,20=5,06 m,
4,50x3,50=15,75 m,
62,19-5,72-5,0615,75=
=35,66 m

Server: 8,82x3,50=30,87 m, otvor: 2,68x2,20=5,89 m,


30,87-5,89=24,98 m
Kontrola ulaza:

7,35x3,50=25,72 m

Pisarna: 35,88x3,50=125,58 m, otvor:1,60x3,50=5,60 m,


2,60x2,20=5,72 m, 2,17x2,20=4,77 m, 0,69x2,20=1,51
m, 2,0x2,20=4,40 m,
125,58-5,6-5,72-4,771,51-4,4= =103,58 m

Prijem pote: 2,9x3,5=10,15 m


Struni saradnik: 3,36x3,50=11,76 m
I sprat:
Ured tuioca:
20,60x3,50=72,10 m, otvor:
2,60x2,20x2=11,44 m,
72,10-11,44=60,66
m

Ured tuioca:
2,60x2,20=5,72 m,

Ured tuioca:
2,60x2,20=5,72 m,

Ured tuioca:
2,30x2,20=5,06 m,

Ured tuioca:
1,78x2,20=3,91 m,

Ured tuioca:
1,78x2,20=3,91 m,

13,00x3,50=45,50 m, otvor:
45,50-5,72=39,78 m
39.78

51.54

45.20

48.52

44.67

37.04

59.79

203.95

60.66

39.78

65.54

48.83

16,36x3,50=57,26 m, otvor:
57,26-5,72=51,54 m

14,36x3,50=50,26 m, otvor:
50,26-5,06=45,20 m

14,98x3,50=52,43 m, otvor:
52,43-3,91=48,52 m

13,88x3,50=48,58 m, otvor:
48,58-3,91=44,67m

Ostava-prostorija za dokaze:
m, otvor: 1,78x2,20=3,91 m,
3,91=37,04 m
IKT tehniar:
2,00x2,20=4,40 m,

11,70x3,50=40,95
40,95-

18,34x3,50=64,19 m, otvor:
64,19-4,40=59,79 m

Hol: 69,87x3,50=244,54 m, otvor: 1,78x2,20=3,91 m,


10,48x3,50=36,68 m,
244,54-3,9136,68=203,95 m
Ured tuioca:
20,60x3,50=72,10 m, otvor:
2,60x2,20x2=11,44 m,
72,10-11,44=60,66
m
Ured tuioca:
2,60x2,20=5,72 m,

Ured tuioca:
2,70x2,20=11,88 m,
m
Raunovodstvo:
3,30x2,20x2=14,52 m,
14,52=48,83 m

13,00x3,50=45,50 m, otvor:
45,50-5,72=39,78 m

22,12x3,50=77,42 m, otvor:
77,42-11,88=65,54

18,10x3,50=63,35 m, otvor:
63,35-

Sekretarica:
3,80x2,20=8,36 m,

14,80x3,50=51,80 m, otvor:
51,80-8,36=43,44 m
m

43.44

84.43

48.73

34.38

m
m

159.91
3,436.10

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

64.61
10.18
13.45
25.06
9.94
78.37
26.23
12.06
13.45
27.21
6.30
5.22
11.37
77.61
11.58
39.65
31.35

Kantonalni tuilac:
28,00x3,50=98,00 m, otvor:
2,00x2,20x2=8,80 m, 2,17x2,20=4,77 m,
98,00-8,80-4,77=84,43 m

Sekretar tuilatva:
2,00x2,20=4,40 m,
4,40=48,73 m

15,18x3,50=53,13 m, otvor:
53,13-

Kancelarija:
21,54x3,50=75,39 m, otvor:
3,30x2,20x2=14,52 m, 7,57x3,50=26,49 m,
75,39-14,52-26,49=34,38 m
Stepenice:

15,23x3,50x3=159,91 m

Ukupno:
Priprema plafona za moleraj. Priprema podrazumijeva
djelimino (na mjestima oteenja ili sl.) struganje
postojee dotrajale boje na postojeim zidovima. U cijenu
je uraunata i potrebna skela za navedeni rad, kao i
potpuna zatita postojee stolarije i sl..

Arhiva:
Prostorija za zadravanje:
ajna kuhinja:
Daktilo biro:
Kupatilo:
Podrumski hol:
Daktilo biro:
Prostorija za dokaze:
Prostorija za dokaze:
Garaa:
Prostorija za zadravanje:
Prostorija za zadravanje:
Sudska policija:
Arhiva:
Telefonska centrala:
Ostava/kuhinja:
Hol:
Prizemlje:

Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Struni saradnik:
Hol:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Server:
Wc-e muki:
Wc-e enski:
Kontrola ulaza:
Pisarna:
Prijem pote:
Struni saradnik:
I sprat:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Ostava-prostorija za dokaze:
IKT tehniar:
Hol:
Ured tuioca:
Ured tuioca:
Ured tuioca:
Kupatilo: 7,81+9,13=16,94 m
Raunovodstvo:
Sekretarica:
Kantonalni tuilac:
Sekretar tuilatva:
Kancelarije:
Stepenice: 13,36x1,2x3=48,09
Ukupno:
Priprema stubova za moleraj. Priprema podrazumijeva
djelimino (na mjestima oteenja ili sl.) struganje
postojee dotrajale boje na postojeim zidovima. U cijenu
je uraunata i potrebna skela za navedeni rad.

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

12.71
12.71
26.23
12.06
13.45
26.05
13.14
66.00
12.71
12.71
19.73
18.54
7.81
9.15
18.11
78.41
11.58
11.10

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

23.10
9.00
16.86
12.06
13.45
10.98
8.48
19.22
64.54
26.10
9.00
29.52
16.94
18.12
13.68
48.70
14.40
24.00
48.09
1,272.08

Arhiva:

(0,2+0,2)x2x4,50x2=7,20 m
m
m
m

7.20
3.60
10.80

Fasada objekta:
Nabavka transport materijala, te izrada fasade parapeta
na ravnom krovu (zatita hidroizolacije) u slojevima:
- Fasadni stiropor d=3 cm,
- Samoljepljiva malta I sloj,
- Fasadna mreica,
- Samoljepljiva malta II sloj,
- Impregnacija
- Zavrna fasadna boja

1,423.84

Termo fasada d=3 cm:

32.60

Arhiva: (0,2+0,2)x2x4,5=3,6 m
Ukupno:
UKUPNO:

FASADERSKI RADOVI
Nabavka transport materijala djelimina popravka
postojee fasade, te izrada fasade zidova u slojevima:
- Impregnacija
- Zavrna fasadna boja, ton po izboru projektanta.
U cijenu uraunata i fasadnu skelu.

Total: VI. FASADE WORKS:

MOLERSKI RADOVI
Nabavka, transport materijala, unutranji transport, te
molerska obrada zidova. Gletovanje i bruenje glet mase
dva puta, sa nanosom impregnacije i unutaranje
poludisperzivne boje 2 puta, ton po izboru projektanta. Po
potrebi postaviti mreicu na pukotine (gdje se pojave).

Moleraj zidova podruma (pripremljnih):


m

3,436.10

m
m

590.47
4,026.57

Moleraj zidova podruma (na malter):


Ukupno:

Nabavka, transport materijala, unutranji transport, te


molerska obrada plafona. Gletovanje i bruenje glet mase
dva puta, sa nanosom impregnacije i unutaranje
poludisperzivne boje 2 puta, ton po izboru projektanta. Po
potrebi postaviti mreicu na pukotine (gdje se pojave).

Moleraj plafona podruma (pripremljnih):


m

1,262.14

10.80

Nabavka, transport materijala, unutranji transport, te


molerska obrada stubova. Gletovanje i bruenje glet
mase dva puta, sa nanosom impregnacije i unutaranje
poludisperzivne boje 2 puta, ton po izboru projektanta. Po
potrebi postaviti mreicu na pukotine (gdje se pojave).

Moleraj stubova podruma (pripremljnih):

Total: XI. WALL PAINTING:

REKAPITULACIJA
PRIPREMNI RADOVI
FASADERSKI RADOVI
MOLERSKI RADOVI
UKUPNO:

ZBIRNA REKAPITULACIJA
KANTONALNI SUD
KANTONALNO TUITELJSTVO

UKUPNO:

KM

ent would need to comply with.


unit price
KM

total price
(KM)

0.00
0.00

II. FACADE WORKS:

0.00

0.00
0.00

. PAINTING WORKS:

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

ent would need to comply with.

unit price
KM

total price
(KM)

0.00

0.00

VI. FASADE WORKS:

0.00
0.00

0.00

0.00
0.00

0.00

XI. WALL PAINTING:

0.00

0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00

0.00

Das könnte Ihnen auch gefallen