2 660 MW CHHABRA SUPERCRITICAL TPS

STAGE II, UNIT 5 & 6

Owner:

RAJASTHAN RAJYA VIDYUT UTPADAN NIGAM LTD

Owners Consultant:

TATA CONSULTING ENGINEERS LIMITED

EPC Contractor:

LARSEN & TOUBRO LIMITED


EPC Contractors Consultant:

L&T SARGENT & LUNDY LIMITED


CHP Contractor:

L&T CONSTRUCTION
METALLURGICAL & MATERIAL HANDLING - IC
L&TJobNo:O13057

Project No: 954012

Title:

DATA SHEET & GA FOR COOLING TOWER

Doc/ Drg No: O13057-M-BM-DS-GA-2421

Rev No:

Total No. of Pages :

DS Sub Contractor:

A.P.C. SYSTEM & PRODUCTS PVT.LTD.KOLKATA

Doc/ Drg No: APCSPCHHABRADS022

Rev No:

Page1of9

REVISIONSTATUS:
Prepared
Rev
No.

Name

Date

SR

30.07.15

SR

Reviewed

Approved

Name
Mech

Date

Name

Date

Elec Civil C&I

SES

SP

XXX

XXX XXX

XXX

30.07.15

D.PAL

30.07.15

20.11.15

SP

XXX

XXX XXX

XXX

20.11.15

D.PAL

20.11.15

LARSEN&TOUBROLTD.

RAJASTHAN RAJYA VIDYUT UTPADAN


NIGAM LTD.
2 x 660 MW CHHABRA SUPERCRITICAL
TPS, STAGE II, UNIT 5 & 6
DocumentTitle

RRVUNL
L&TJobNo:O13057

DocumentNo:O13057-M-BM-DS-GA-2420

L&TS&LLIMITED

Rev:B
Date:03.02.16
Page2of9

Revisionsummarysheet

RevNo

Details/Description

Date

FIRSTISSUE

30.07.15

SECONDISSUE

20.11.15

A.P.C. SYSTEM & PRODUCTS PVT. LTD.


KOLKATA
DOCUMENT NO:
PROJECT

L&T

O13057-M-BM-DS-GA-2421, REV-B.

APC

APCSP-CHHABRA-DS-022, REV-1.

TITLE: DATASHEET & GA DRAWING


FOR COOLING TOWER
Capacity (CMH)
Hot Water Temp.
Cold Water Temp.
Design wet bulb Temp.
Evaporation loss
Type
Model
No. of Cells
Static Pumping Head above cold water basin
level ( mm
Shipping Weight (kgs.)
Operating Weight (kgs.)
Mechanical Equipment
Fan : Diameter / No. of blades
No. of fans
Fan Speed (RPM)
Drive
Motor
BHP
Horse power
Current Characteristics Material of Construction
Casing
Inlet
Eliminators
Metering Orifices
Fill
Bolts, Nuts & Washers
Fan Guard
Fan Blade
Fan Cylinder
Basin
GA drawing with foundation load details
Make
Painting
Testing & Inspection
Type of cooling
Pressure at Hot water inlet
Inlet & Outlet Pipe Sizes.
Drift Loss
Blow Down Loss
Exit Wet Bulb Temperature
Ratio (L/G)

PREPARED BY:
SKR

CHECKED BY: DP

48 CuM/Hr.
45 Deg.C.
37 Deg.C.
29 Deg.C.
1.26 %
Induced Draft Counter Flow
CF-405
Single Cell
3350 mm
325 Kg.
810 Kg.
810 mm dia. fan/Blade - 3 Nos.
1 No. per Cell
1425 RPM
Direct Drive
2.376 BHP
3 HP
415V/3PH/50Hz, IE-3 energy efficient
FRP
PVC Pipes
PVC
Polypropylene Spray type Nozzles
PVC
MS-HDG
MS-HDG
FRP
FRP
FRP
Provided
Southern
As per L&T approved painting schedule.
As per QAP
Induced Draft (Using Fan)
1.0 Kg/Cm2
Inlet Pipe Dia. : 65 NB
Outlet Pipe Dia. : 65 NB
0.02%
0.20 CuM/hr (COC=4)
40.44 Deg.C.
2.211

DATE
03.02.16
SHEET
3 OF 9

Sheet - 4 of 9.

PROJECT :

CLIENT :

DS & SW SYSTEM OF CHHABRA CHP PROJECT (AC. L&T)

M/S. A. P. C. SYSTEM & PRODUCTS (P) LIMITED

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.

3HP

GENERAL ARRANGEMENT DRAWING FOR FRP COOLING


TOWER MODEL NO. CF-405 ( WITH BASIN TYPE)

FILE NAME : FRP

COOLING TOWER

TITLE :

CSL. NO. : 15-06-45

SOUTHERN COOLING TOWERS (P) LTD.,KOLKATA.

DRG. NO.: GA07-505

APC DRG. NO.- APCSP-CHHABRA-DS-022

L&T DRG. NO.- O13057-M-BM-DS-GA-2421

TPS STAGE II, UNIT 5 & 6

PROJECT : 2 660 MW CHHABRA SUPERCRITICAL

DRG. NO. : 07-505

CSL. NO.: 15-06-45 FILE NAME : FRP

SOUTHERN COOLING TOWERS (P) LTD., KOLKATA.

MODEL NO. CF-405 (FOR M.S. CHANNEL SUPPT. ONLY)

COOLING TOWER

DRG. FOR SUPPORTING WALL OF FRP COOLING TOWER


TITLE :

M/S. A. P. C. SYSTEM & PRODUCTS (P) LIMITED


DS & SW SYSTEM OF CHHABRA CHP PROJECT (AC. L&T)

PROJECT :

CLIENT :

Sheet - 5 of 9.

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.
Sheet - 6 of 9.

/P

/4

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.
Sheet - 7 of 9.

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.
Sheet - 8 of 9.

PROJECT NO : 2 x 660 MW CHHABRA SUPERCRITICAL TPS, STAGE II, UNIT 5 & 6


L&T DWG NO : O13057-M-BM-DS-GA-2421, REV-B.
APC DWG NO : APCSP-CHHABRA-DS-022, REV-1.
Sheet - 9 of 9.