S/. 186,700.7
Pres. Contratado
S/. 186,700.7
Plazo de ejcucin
Factor de Relacin :
75 Das calendarios
1.00000
CONCEPTO
MONTOS
RECALCULADOS S/.
MONTOS PAGADOS
S/.
DIFERENCIA A
PAGAR S/.
92,825.87
92,825.87
0.00
65,395.12
65,395.12
0.00
158,220.99
158,220.99
0.00
Reajuste de Val. 01
1,670.87
0.00
1,670.87
Reajuste de Val. 02
980.93
0.00
980.93
2,651.79
0.00
2,651.79
Adelanto Directo
0.00
0.00
0.00
0.00
TOTAL ADELANTOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
160,872.78
158,220.99
2,651.79
28,957.10
28,479.78
477.32
189,829.88
186,700.77
3,129.12
TOTAL VALORIZACIONES
TOTAL REAJUSTES
0.00
15,822.10
3,129.12
MONTO CON IGV
18,670.08
21,799.20
Proceso de Licitacin
ADS N 022-2015/CEPO-MPH-BCA
Contrato de Obra
:
:
N 055-2015-MPH-BCA
:
:
:
:
:
:
75
12/17/2015
:
:
3/20/2016
Modalidad
Contratista
Monto Referencial (con IGV)
Monto Contratado (con IGV)
Factor de Relacin
Plazo de Ejecucin
Fecha entrega de terreno
Fecha entrega de Expediente Tcnico
12/4/2015
S/. 186,700.70
S/. 186,700.70
1.000000
(Das calendarios)
12/18/2015
1/5/2016
REAJUSTE
PROGRAMADO
NMERO DE VALORIZACIN
FECHA
AVANCE
PROGRAMADO (1)
AVANCE
EJECUTADO
REAJUSTE
EJECUTADO
K-1
(2)
(3)
REAJUSTE
RECONOCIDO
[1*3]
[2*3]
(4)
V1
V2
V3
ENERO 2016
FEBRERO 2016
MARZO 2016
39,397.02
92,825.87
39,397.02
92,825.87
107,127.35
65,395.12
146,524.37
158,220.99
709.15
(5)
1,670.87
1,670.87
709.15
1,670.87
1,670.87
1,606.91
980.93
980.93
2,316.06
2,651.79
2,651.79
0.018
0.015
11,696.61
0.00
0.00
0.00
0.00
158,220.98
158,220.99
2,316.06
2,651.79
2,651.79
REAJUSTE RECONOCIDO
NMERO DE
VALORIZACIN
01(ENERO)
02(FEBRERO)
CLCULO
PROGRAMADO
EJECUTADO
1,670.87
980.93
Proceso de Licitacin
ADS N 022-2015/CEPO-MPH-BCA
Contrato de Obra
:
:
:
N 055-2015-MPH-BCA
:
:
S/. 186,700.70
:
:
1.000000
:
:
12/18/2015
:
:
1/5/2016
Modalidad
Contratista
Monto Referencial (con IGV)
Monto Contratado (con IGV)
Factor de Relacin
Plazo de Ejecucin
Fecha entrega de terreno
Fecha entrega de Expediente Tcnico
Fecha contractual inicio de obra
Fecha contractual termino
12/4/2015
S/. 186,700.70
75
(Das calendarios)
12/17/2015
Por Entrega de Adelanto Directo
3/20/2016
SIMBOLO
M
C
M
AMM
MM
A
I
DESCRIPCION
IU
COEFIC.
47
21
30
37
65
48
49
03
43
44
05
39
0.218
0.239
0.055
0.132
0.082
0.111
0.163
1.000
INCIDENCIA
100.000%
100.000%
47.273%
21.818%
30.909%
21.212%
14.394%
64.394%
45.122%
54.878%
100.000%
100.000%
V1
ENERO 2016
V2
FEBERO 2016
INDICE BASE
(MAYO-15)
Ir
Kr
Ir
Kr
523.15
461.43
434.47
297.38
242.21
355.41
282.51
497.61
679.52
354.38
443.68
413.82
544.12
462.57
484.19
292.83
244.38
370.35
313.96
477.98
697.33
361.54
441.47
424.99
0.227
0.240
0.029
0.012
0.017
0.029
0.021
0.082
0.038
0.046
0.110
0.167
544.12
462.57
471.04
291.26
239.44
367.26
305.19
459.71
697.45
362.95
443.98
427.53
0.227
0.240
0.028
0.012
0.017
0.028
0.021
0.079
0.038
0.046
0.111
0.168
K ENERO '16
1.018 K FEBRERO 16
1.015
ADELANTO OTORGADO
FECHA
11/28/2000
MONTO
OTORG.
150,847.46
MATERIAL
MONTO
DEFLATADO
DE P.B.
VAL. N
150,847.46
MES
UTILIZADO
(1)
02
Dic.
3,096.16
F.P. N02
PRECIO
UNIT.
(*)
(2)
14.83
PROVEEDOR
MONTO
CONTRATADO
AMORTIZABLE
(3)=(1)*(2)
45,916.02
Ima
Imo
AMORTIZACION
ADELANTO
Ene.
6,320.94
14.83
93,739.53
(4)
350.55
(5)
350.55
(6)=(3)*(4)/(5)
45,916.02
(7)
(8)
150,847.46
350.55
350.55
93,739.53
104,931.44
45,916.02
104,931.44
104,931.44
104,931.44
0.00
A solicitud del Contratista se est amortizando el 100% del adelanto de materiales para el cemento.
PARTIDA
(9)=(7)-(8)
45,916.02
Acumul.
NOTA:
SALDO POR
AMORTIZAR
Acumul.
03
AMORTIZ.
DESCRIPCION
UNID
MET.
VALORIZACION N03
CEMENTO
METRADO
bls.
CEMENTO
total
4.1.01
4.1.02
4.1.08
4.1.09
m3
m3
m2
m2
76.60
51.08
92.72
0.00
4.20
5.50
0.60
0.00
321.72
280.94
55.63
0.00
28.26
0.00
6541.40
128.00
4.20
5.50
0.60
0.80
118.69
0.00
3924.84
102.40
4.1.12
4.1.13
4.4.03
m3
m3
m3
126.60
194.07
0.00
T O TAL
5.46
9.00
0.00
691.24
1746.63
0.00
3096.16
385.04
2.53
21.61
5.46
9.00
2.31
2102.32
22.77
49.92
6320.94
ADELANTO OTORGADO
FECHA
11/8/2000
MONTO
OTORG.
30,008.63
F.P. N01
MATERIAL
MONTO
DEFLATADO
DE P.B.
VAL. N
30,008.63
MES
UTILIZADO
(*)
(2)
(1)
02
03
04
Dic.
Acumul.
Ene.
Acumul.
Feb .
Acumul.
PRECIO
UNIT.
PROVEEDOR
MONTO
CONTRATADO
AMORTIZABLE
(3)=(1)*(2)
AMORTIZACION
Ima
ADELANTO
AMORTIZACION
Imo
(4)
(5)
SALDO POR
AMORTIZAR
(6)=(3)*(4)/(5)
(7)
30,008.63
(8)
(9)=(7)-(8)
9,670.50
1.30
12,571.65
229.97
229.97
12,571.65
12,571.65
598.50
1.30
778.05
229.97
229.97
778.05
778.05
17,335.50
1.30
22,536.15
229.97
229.97
16,658.93
16,658.93
17,436.98
17,436.98
16,658.93
16,658.93
0.00
0.00
4.3.01
DESCRIPCION
UND
Tn.
MET.
9.21
T O TAL
1050.00
MET.
9670.50
9670.50
0.57
VALORIZACION N03
FIERRO
FIERRO
Kg.
total
1050.00
598.50
598.50
MET.
VALORIZACION N04
FIERRO
Kg.
16.51
1050.00
FIERRO
total
17,335.50
17,335.50
: N 01-2000-INADE-8200
PROYECTO
ENTIDAD
UBICACIN
: CHICLAYO - LAMBAYEQUE
CONTRATISTA
SUPERVISION
FECHA
: 20-02-2001.
ADELANTO N 01
MES
VAL.
PERIODO
DE
MES
REGULARIZ.
19-OCT AL 20-NOV
21-NOV AL 20-DIC
21-DIC AL 20-ENE
21-ENE AL 20-FEB
COEF.
MONTO
MONTO
OTORG. (1)
DEFRACTADO
(2)
OCT'00
NOV'00
NOV'00
DIC'00
OCT./00
150,847.46
(3)
(4)
F.P. N02
ADELANTO
SALD.ADEL.
DEDUCCION
DEDUCC. ACUM.
UTILIZ.( A)
Imr
Ima
Imo
POR UTILIZ.
MENSUAL
MENSUAL
(5)=(2)*(3)*(4)
(6)
(7)
(8)
(10)=(1)-(5)
(11)=(5)*(8)/(7)*(((6)-(7))/(8))
339,089.97
0.299
0.5685
57,639.02
#REF!
0.299
0.5685
#REF!
150,847.46
DIC'00
ENE'01
ENE'01
FEB'01
#REF!
0.299
0.5685
#REF!
#REF!
0.299
0.5685
#REF!
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
350.55
MES
PERIODO
1
2
DE
MES
REGULARIZ.
19-OCT AL 20-NOV
21-NOV AL 20-DIC
21-DIC AL 20-ENE
21-ENE AL 20-FEB
DIC'00
DIC'00
MONTO
MONTO
OTORG. (1)
DEFRACTADO
(2)
ENE'01
ENE'01
FEB'01
30,008.63
28,848.85
INCIDENC
(3)
339,089.97
OCT./00
ACERO CORRUGADO
COEF.
NOV'00
NOV'00
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ADELANTO N 01
VAL.
93,208.44
#REF!
(4)
0.299
0.299
0.0870
0.0870
F.P. N02
ADELANTO
SALD.ADEL.
DEDUCCION
DEDUCC. ACUM.
UTILIZ.( A)
Imr
Ima
Imo
POR UTILIZ.
MENSUAL
MENSUAL
(5)=(2)*(3)*(4)
(6)
(7)
(8)
(10)=(1)-(5)
(11)=(5)*(8)/(7)*(((6)-(7))/(8))
8,820.75
#REF!
#REF!
0.299
0.0870
#REF!
#REF!
0.299
0.0870
#REF!
232.87
232.87
223.87
232.87
232.87
223.87
232.28
232.87
223.87
232.28
232.87
223.87
#REF!
232.87
223.87
#REF!
232.87
223.87
232.87
223.87
20,028.10
#REF!
#REF!
#REF!
0.00
0.00
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#REF!
0.00
0.00
#REF!
Proceso de Licitacin
:
:
:
:
:
:
:
:
:
:
:
:
Contrato de Obra
Modalidad
Contratista
Monto Referencial (con IGV)
Monto Contratado (con IGV)
Factor de Relacin
Plazo de Ejecucin
Fecha entrega de terreno
Fecha entrega de Expediente Tcnico
Fecha contractual inicio de obra
Fecha contractual termino
CONCEPTO
(A) DE LAS VALORIZACIONES
ADS N 022-2015/CEPO-MPH-BCA
N 055-2015-MPH-BCA
12/4/2015
(Das calendarios)
12/18/2015
12/17/2015
1/5/2016
3/20/2016
MONTOS
RECALCULADOS S/.
MONTOS
PAGADOS S/.
DIFERENCIA
A PAGAR S/.