Sie sind auf Seite 1von 12

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works

Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

SCHEDULE D
Section-III
Technical Specification of Works

Signature of Contractor

Signature of CSIDC

Page 1 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

Signature of Contractor

CSIDC

Signature of CSIDC

Page 2 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

I. Brief Specifications:
All the works ,pertaining to the execution of each item in the BOQ for Road works, Drainage,
water supply including over head tank and Sumpwell, electrification (Street light) works, and
other utility works shall be strictly followed as per the specifications laid down by the latest
MORTH,IRC,CG PWD, CPWD, CPHEEO and relevant IS codes.
Workmanship- The work shall be carried out according to the specification referred to
hereinafter and according to sound engineering practice. The decision of the Executive
Engineer, in respect of workmanship will be final.

II. SPECIFICATION OF ROAD WORKS


All the works and materials used for construction shall be strictly governed by the latest
MORTH/ IRC specifications and their manual/ latest CPWD specifications/CG PWD
specifications/ IS codes, and the relevant Indian standard specification with amendments and
revisions Issued to the date of tender notice Where ever any material has ISI mark such
material alone has to be used.

II. Construction of RCC OVERHEAD TANK including pipes and valves


RCC over head tank on Turn Key Job Basis including testing & satisfactory trial run for 3 months,
with guarantee for entire work for 24 months or 2 consecutive rainy season which ever is more
with a provision of over loading of RCC Over head tank with 25% during emergency except inlet,
outlet & over flow control arrangement which should design to a permit of 25% over load for
emergent occasions.
This work shall comprise of the following items :(i)

One No. RCC over head tank of 3.00 lac liters capacity with 15 Mtr. Staging
(including providing and fixing of all pipes valves & fittings etc.) at sector-I of Mega
food park, Baguad & Banjari, Thesil-Kurud, Distt.-Dhamtari (C.G.)

(ii)

One No. RCC over head tank of 5.00 lac liters capacity with 15 Mtr. Staging
(including providing and fixing of all pipes valves & fittings etc.) at sector-II of
Mega food park, Baguad & Banjari, Thesil-Kurud, Distt.-Dhamtari (C.G.)

The construction of RCC OVERHEAD TANK including pipes and valves as per item
mentioned in the BOQ with all necessary fittings and fixtures i,e inclusive of all the items of
works viz. Civil works and providing and istalling all mechanical & elelctrical equipements etc.
All complete, completion, testing, commissioning and maintenance of the works except in so far
as the contract otherwise provides, the provision of all labour, materials, constructional plants,
equipments and accessories, temporary and enabling works and works (whether of a temporary
or permanent nature) required in and for such construction, complement and maintenance so
far as the necessity for providing the same is specified in or can be reasonably inferred from the
contract.

Signature of Contractor

Signature of CSIDC

Page 3 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

Workman Ship
a. All works pertaining to the contract shall be carried out per specifications given here under.
b. After satisfactory completion of construction work and water tightness testing, the water
tanks shall be the roughly cleaning with brushes and cleaning agents as permitted by the
engineer in charge to remove dust, dist, loose concrete, chips and scales or any other
undesirable material. The tank shall be filled with water upto the full storage level and
mixed thoroughly with a solution of high strength hypochlorite (HTH) of any other
disinfection solution as approved by the engineer in charge. The solution shall have
strength of at least 0.5m p.m. residual chlorine. The water shall stand for period of 48
hours. It shall then be flushed out by opening the scour valves and shall then be ready for
commissioning. The test shall be certified by the engineer in charge before it is ready for
commissioning.

Excavation
The depth of excavation will generally be guided by the underground strata and the safe bearing
capacity of the foundation soil as directed by the Engineer-in-charge. Strata charge of trail pit.
Section is made available for the purpose of design. This shall be verified by the contractor by
Actual site investigation and test of underground strata at his own cost. Test result shall be
submitted along with design calculation. The contractor shallkeep the side clear of water at all
times. This end he shall provide Arrangement as required.
Design Requirements :
a. The structure should be designed as per actual safe bearing capacity (SBC) of trial pit at site.
The contractor should carryout Safe Bearing Capacity test at his own cost.
b. The tank should be designed for required storage capacity with suitable arrangement for inlet,
and scour.
c. for the purpose design the stress in steel and concrete shall be adopted as specified in the
relevant in the Indian standard code.
d. For the guidance of the contractor the section of trial pit taken at the site of construction is
encloxsed bu the contractor should himself verify the bearing capacity of soil at site for design
of foundation.
e. The RCC overhead tank should be designed in circular shape, Staging means the height from
plinth beam to the beam of bottom dome.
f. Suitable size of RCC stair form plinth beam to bottom dome and MS stair bottom dome to roof
and stair protected by MS railing. A suitable size of aluminum ladder with railing shall be
provided inside the tank.
The minimum diameters of DI pipes are as follows.
Signature of Contractor

Signature of CSIDC

Page 4 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

g. The submitted designs and drawings shall be got checked and approved from IIT/Regional
Engineering college/Govt. Engineering College by the Contractor. The charges for the same
should be paid by Contrator. The contractor shall have to execute the work as per approved
designs and drawings.
h. Provision for lightening arrestor with copper strip as conductor earth electrode.
Filling Foundation with Bed Concrete:
a. Any excavation be done below the specified levels, contractors shall fill in such excavation at
his own cost with M-10 grade of concrete below foundation well reammed in position up to
the level.
b. The contractor shall notify when the excavation is completed and on concrete shall be laid
until.
c. The soil for each individual footing, rats etc., is approved. The contractor is to carry out
necessary soil testing at his own cost. And the test results dully approved by the engineer-incharge.
Shoring:
All sides of excavation shall be adequately supported to prevent subsidence ormovement of
Material in which the excavation is being carried out and to ensure the safety of persons and
hereby quality shall be used for shoring. Thickness of the timber plank shall not be loss than 40mm
width no less than 200mm length of planks shall not be more than 4m. The contracor shall take all
necessary precautions to prevent slips on excavations with adequate shoring and strutting shall be
at his expenses make good any damage or defect and removed to spoil dumps any surplus
materials caused by slips. No extra payment for shoring will be made.
Concrete :
a. Applicable provisions of general Rules and direction shall government work under this section.
All concrete work, plain or reinforced shall be carried out in strict according with this
specification and any working drawing or instructions given from time to time to the
contractor. Works shall be strictly as per I.S. 456 an I.S. 3370 as applicable.
b. Reinforced cement concrete M.30-12mm gauge graded B.T. metal with reinforcement as per
the details shown in the members which retain water. A mimimum clear cover of 40mm and
25mm shall be provided on water retaining face to other faces respectively. This shall not be
made/up plastering. The code of practice should be referred in this respect.
c. The contractor shall submit mix design for each strength, stating the proposed slumps and
proportional weight of cement saturated surface dry aggregated and water. These mixes shall
be proved by preliminary tests of 30 days before concreting for 28 days average strength 15%
higher than the ultimate required.

Signature of Contractor

Signature of CSIDC

Page 5 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

d. The proporation of the concrete shall be such as to work readily into the form angles and
grout the reinforcement without excessive manipulations, segregation or water gain. The
water content shall not be increased from the amount required by the design mix unless
cement at required water cement ratio is added. The engineer-in-charge may require
additional cement without extra compensation to the contractor if the mix adopted does not
produce the required strength.
Steel:a.

Steel reinforing bars for concretes shall be of TMT steel.

b.

Soft iron binding wire shall comply with requirements of I.S. 280.

c.

the reinforcement shall be bent to the shapes shown on the drawings prior to placing and all
bars mist as bent cold. The steel shall be placed in such a way that it is rigidly held in position
while concrete is being poured. The correct clearance shall be maintained by either mortar
blocks or by metal supporting chairs to be supplied by the contractor free of charge.

d.

The contractor shall require getting tested random samples of the steel brought at site to see
whether they confirm so as per I.S. specifications. The cost of such tests shall be borne by the
contractor.

e.

Air vents, wherever provided for, shall be 10mm dia swan neck type.

f.

All railing, ladders, manhole covers air vents, pipes and specials etc, shall besupplied with 2
coats of approved quality and make enamel paint over a primer coat and as directed by the
Engineer-in-charge.

Testing of Water Tightness


a.

The tank will have be tested for the water tightness as per IS-3370 and it will be responsibility
of the contractor to make it water tight. The arrangements for water shall be done by the
contractor at his own cost of testing purposes. The contractor will have to give a test of water
tightness of reservoir to the entire satisfaction of the Nigam. The responsibility of structural
suitability shall also rest solely with the contractor. Maintenance period shall be 24 months
after successful testing and commissioning of tank.

b.

Snowcem or durocem painting of the tank shall be done only after tank is tested for water
tightness only on the outside portion above ground level.

c.

The Nigam shall not be responsible for providing water require for construction and other
purposes. The contractor shall make his own arrangements for the same at his own cost.
No extra charge for the plastering if required for furnishing the surface of structures shall be
paid under any circumstances.

d.

Signature of Contractor

Signature of CSIDC

Page 6 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

Steel for Reinforcement :


All the iron and steel required for the work will be procured by the contractor at his own cost. The
Department shall not supply any quantity of steel under any circumstances. Steel for reinforcement
shall confirm to IS 432-1966 (with upto date revision) and IS 1139-1966 (with upto date revision) the
contractor shall be required to produce the test certificate of the manufacturers to the department
be-fore use of steel for the work. No untested steel shall be used. The department however reserves
right to get the received steel tested at the cost of contractor.
Payment Schedule
Sr.
No.

Stages of Work

Corresponding total
payment upto stage

After excavation & footings with column upto plinth level

10% of total cost

After completion of Staging upto half height.

10% of total cost

After completion of full Staging upto bottom of beam of base 10% of total cost
slab.

After completion of base slab of tank.

10% of total cost

After completion of half height of tank wall.

10% of total cost

After completion of full height tank wall.

10% of total cost

After casting of roof slab.

10% of total cost

After providing & installation of pipes and pipes fittings etc.

10% of total cost

After successful testing & commissioning of tank etc.

20% of total cost

Note : Water required for tresting should be arranged by


contractor himself.
Construction of RCC SUMP WELL including Pump House, pipes, valves and pumps
RCC sump well cum pump house on Turn Key Job Basis including testing & satisfactory trial run for
3 months, with guarantee for entire work for 24 months or 2 consecutive rainy season which ever
is more with a provision of over loading of RCC Over head tank with 25% during emergency except
inlet, outlet & over flow control arrangement which should design to a permit of 25% over load for
emergent occasions.

Signature of Contractor

Signature of CSIDC

Page 7 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

This work shall comprise of the following items :(i)

One No. RCC sump well cum pump house of 1.00 lac liters capacity with total
03 numbers pump sets. Each pump having 40000 litres per hour capacity.
(Kirloskar/Crompton/Siemencs/Jyoti) monoblock Pumps i/c snowcem painting,
ladder, design & drawing complete in all respect at sector-I of Mega food park,
Baguad & Banjari, Thesil-Kurud, Distt.-Dhamtari (C.G.)

(ii)

One No. RCC over head tank of 2.00 lac liters capacity with total 03 numbers
pump sets. Each pump having 50000 litres per hour capacity.
(Kirloskar/Crompton/Siemencs/Jyoti) monoblock Pumps i/c snowcem painting,
ladder, design & drawing complete in all respect at sector-II of Mega food park,
Baguad & Banjari, Thesil-Kurud, Distt.-Dhamtari (C.G.)

The construction RCC sump well with Pump House cum panel room as per item mentioned in the BOQ
with all necessary fittings and fixtures i,e inclusive of all the items of works viz. Civil works and
providing and istalling all mechanical & elelctrical equipements etc. all complete, completion, testing,
commissioning and maintenance of the works except in so far as the contract otherwise provides, the
provision of all labour, materials, constructional plants equipments and accessories, temporary and
enabling works and works (whether of a temporary or permanent nature) required in and for such
construciton, complement and maintenance so far as the necessity for providing the same is specified in
or can be reasonably inferred from the contract.
Workman Ship :
a. All works pertaining to the contract shall be carried out per specifications given here under.
b. After satisfactory completion of construction work and water tightness testing, the water tanks shall
be the roughly cleaning with brushes and cleaning agents as permitted by the engineer in charge to
remove dust, dist, loose concrete, chips and scales or any other undesirable material. The tank shall
be filled with water upto the full storage level and mixed thoroughly with a solution of high
strength hypochlorite (HTH) of any other disinfection solution as approved by the engineer in
charge. The solution shall have strength of at least 0.5m p.m. residual chlorine. The water shall
stand for period of 48 hours. It shall then be flushed out by opening the scour valves and shall then
be ready for commissioning. The test shall be certified by the engineer in charge before it is ready
for commissioning.
Excavation
The depth of excavation will generally be guided by the underground strata and the safe bearing
capacity of the foundation soil as directed by the Engineer-in-charge. Strata charge of trail pit. Section
is made available for the purpose of design. This shall be verified by the contractor by Actual site
investigation and test of underground strata at his own cost. Test result shall be submitted along with
design calculation. The contractor shallkeep the side clear of water at all times. This end he shall
provide Arrangement as required.

Signature of Contractor

Signature of CSIDC

Page 8 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

Design Requirements :
a. The structure should be designed as per actual safe bearing capacity (SBC) of trial pit at site. The
contractor should carryout Safe Bearing Capacity test at his own cost.
b.

The tank should be designed for required storage capacity with suitable arrangement for inlet, and
scour.

c. for the purpose design the stress in steel and concrete shall be adopted as specified in the relevant in
the Indian standard code.
d.

For the guidance of the contractor the section of trial pit taken at the site of construction is
encloxsed bu the contractor should himself verify the bearing capacity of soil at site for design of
foundation.
e. Suitable size of aluminum ladder shall be provided inside the tank. The provision of ladder should
be as per instruction of Engineer-in-charge.
f.

The submitted designs and drawings shall be got shecked and approved from IIT/Regional
Engineering college/Govt. Engineering College by the Contractor. The charges for the same should
be paid by Contractor. The contractor shall have to execute the work as per approved designs and
drawings.

Filling Foundation with Bed Concrete:


a. Any excavation be done below the specified levels, contractors shall fill in such excavation at his
own cost with M-10 grade of concrete below foundation well reammed in position up to the level.
b. The contractor shall notify when the excavation is completed and on concrete shall be laid until.
c. The soil for each individual footing, rats etc., is approved. The contractor is to carry out necessary
soil testing at his own cost. And the test results dully approved by the engineer-in-charge.
Shoring:
All sides of excavation shall be adequately supported to prevent subsidence ormovement of Material in
which the excavation is being carried out and to ensure the safety of persons and hereby quality shall be
used for shoring. Thickness of the timber plank shall not be loss than 40mm width no less than 200mm
length of planks shall not be more than 4m. The contracor shall take all necessary precautions to
prevent slips on excavations with adequate shoring and strutting shall be at his expenses make good any
damage or defect and removed to spoil dumps any surplus materials caused by slips. No extra payment
for shoring will be made.
Concrete :
a. Applicable provisions of general Rules and direction shall government work under this section. All
concrete work, plain or reinforced shall be carried out in strict according with this specification and

Signature of Contractor

Signature of CSIDC

Page 9 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

any working drawing or instructions given from time to time to the contractor. Works shall be
strictly as per I.S. 456 an I.S. 3370 as applicable.
b. Reinforced cement concrete M.30-12mm gauge graded B.T. metal with reinforcement as per the
details shown in the members which retain water. A mimimum clear cover of 40mm and 25mm
shall be provided on water retaining face to other faces respectively. This shall not be made/up
plastering. The code of practice should be referred in this respect.
c. The contractor shall submit mix design for each strength, stating the proposed slumps and
proportional weight of cement saturated surface dry aggregated and water. These mixes shall be
proved by preliminary tests of 30 days before concreting for 28 days average strength 15% higher
than the ultimate required.
d. The proporation of the concrete shall be such as to work readily into the form angles and grout the
reinforcement without excessive manipulations, segregation or water gain. The water content shall
not be increased from the amount required by the design mix unless cement at required water
cement ratio is added. The engineer-in-charge may require additional cement without extra
compensation to the contractor if the mix adopted does not produce the required strength.
Steel:a. Steel reinforing bars for concretes shall be of TMT steel.
b. Soft iron binding wire shall comply with requirements of I.S. 280.
c. the reinforcement shall be bent to the shapes shown on the drawings prior to placing and all bars
mist as bent cold. The steel shall be placed in such a way that it is rigidly held in position while
concrete is being poured. The correct clearance shall be maintained by either mortar blocks or by
metal supporting chairs to be supplied by the contractor free of charge.
d. The contractor shall require getting tested random samples of the steel brought at site to see
whether they confirm so as per I.S. specifications. The cost of such tests shall be borne by the
contractor.
e. Air vents, wherever provided for, shall be 10mm dia swan neck type.
f.

All railing, ladders, manhole covers air vents, pipes and specials etc, shall besupplied with 2 coats
of approved quality and make enamel paint over a primer coat and as directed by the Engineer-incharge.

Testing of Water Tightness


a. The tank will have be tested for the water tightness as per IS-3370 and it will be responsibility of
the contractor to make it water tight. The arrangements for water shall be done by the contractor at
his own cost of testing purposes. The contractor will have to give a test of water tightness of
reservoir to the entire satisfaction of the Nigam. The responsibility of structural suitability shall also
rest solely with the contractor. Maintenance period shall be 36 months after successful testing and
commissioning of tank.

Signature of Contractor

Signature of CSIDC

Page 10 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

b. Snowcem or durocem painting of the tank shall be done only after tank is tested for water tightness
only on the outside portion above ground level.
c. The Nigam shall not be responsible for providing water require for construction and other purposes.
The contractor shall make his own arrangements for the same at his own cost.
d. No extra charge for the plastering if required for furnishing the surface of structures shall be paid
under any circumstances.
Steel for Reinforcement :
All the iron and steel required for the work will be procured by the contractor at his own cost. The
Department shall not supply any quantity of steel under any circumstances. Steel for reinforcement
shall confirm to IS 432-1966 (with upto date revision) and IS 1139-1966 (with upto date revision) the
contractor shall be required to produce the test certificate of the manufacturers to the department before use of steel for the work. No untested steel shall be used. The department however reserves right to
get the received steel tested at the cost of contractor.
Payment Schedule
Sr.
No
.

Stages of Work

Corresponding total
payment upto stage

After excavation & base concrete

15% of tatal cost

After completion of tank wall casting (half height)

20% of tatal cost

After completion full height of tank

20% of tatal cost

After casting of roof

10% of tatal cost

After providing & installation of pipes, valves, pumps


panel board and etc complete.

15% of tatal cost

After successful testing of tank etc.

20% of tatal cost

Note : Water required for tresting should be arranged by


contractor himself.

SPECIFICATION FOR ELECTRIC WORKS IN THE CONSTRUCTION OF RCC OVER HEAD TANK/
SUMPWELL :
The internal Electrical work shall be carried out strictly in accordance with latest Indian
Electricity rules, specially as per latest specification of C.G. Electricity Board and relevant I.S.
specifications.
The size and type of wiring shall be suitable for A.C. supply at 440 (15% volts, 3 phases, 50
cycles for power and 220 volts for lightening.)

Signature of Contractor

Signature of CSIDC

Page 11 of 11

CSIDC F-1- Schedule-D- Section III- Technical Specification of Works


Infrastructure Development for Sector 5, 7, 15, 16 & 22 (Phase-I), in Naya Raipur

CSIDC

All phase wire shall be inside concealed single metal conduit and pipe shall be properly
earthed.
Suitable protection by means of cut-out shall be provided in such live conductors for every
circuit.
The earthing arrangement shall be provided as per I.S. specifications & Indian Electricity
rules.
Lighting arrestor along with suitable earthing arrangement as per relevant I.S. specifications
shall be provided.
All switches and fittings shall be superior type as directed by the Engineer in charge.
The general requirement for lighting fixtures, wiring should be I.S. specifications & Indian
Electricity rules. Light fixtures shall be of Phillips/ G.E.C. or any other standard makes to the entire
satisfaction of the Engineer-in-charge.

Specifications for main distribution Board :


The panel board at pump house shall be designed for the complete electrical load of
pumping of clear water.
The fluorescent tubes in the pump house shall be twin 80 watts. Industrial type nitrous
enamel reflectors complete with original choke, starters etc. manufactured by G.E.C./Phillips or any
other standard make. The fluorescent tubes shall be hung from the ceiling above the pump house to
give a uniforms lighting.
A common switch board shall be provided for the starter for the pumps. These shall be
provided in pump house along necessary cables to the various motors. The panel shall be completed
with incoming triple pole switch volt meter, Ammeter and isolating switches for the various pilot
lamps etc.
The cost of providing and laying the incoming power box cables from the main sub-station
to be constructed by the department in the same premises to panel in pump house should also be
included in the turn-key cost.

Signature of Contractor

Signature of CSIDC

Page 12 of 11

Das könnte Ihnen auch gefallen