BASIC PRICES

Materials

Trade
Description

Unit

EXCAVATION Dry hard earth with transport cost

cube.

EXCAVATION Quarry dust with transport cost

cube.

EXCAVATION 1 1/2" thick plank (class 11)

S. ft

EXCAVATION 2" x 4" joist (class 11)

L. ft

EXCAVATION 2" x 6" joist (class 11)

L. ft

EXCAVATION Wire nails

kg.

CONCRETE

Cement

bag

CONCRETE

Sand

cube.

CONCRETE

Metal 3/4 "

cube.

CONCRETE

Metal 1 "

cube.

CONCRETE

Metal 2 "

cube.

CONCRETE

Water

gal.

FORM WORK 1" thick plank class 11

S. ft

FORM WORK 2 " x 4 " class 11

L. ft

FORM WORK 2 " x 2 " class 11

L. ft

FORM WORK 2 " x 1 " class 11

L. ft

FORM WORK Wire nails

kg.

FORM WORK Mould oil

ltr

FORM WORK 16mm bolt

Nr

REINFORCEM
Tor Steel
ENT
REINFORCEM
25mm
ENT

kg.

Basic Price

REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
BRICK WORK

20mm

kg.

16mm

kg.

12mm

kg.

10mm

kg.

binding wire

kg.

Mild steel
10mm

kg.

6mm

kg.

Rubble

cube.

cement

bag

sand

cube.

water

gal.

8" thick cemrnt hollow block

Nr

6" thick cemrnt hollow block

Nr

4" hick cemrnt hollow block

Nr

Cement

bag

BRICK WORK Sand

cube.

BRICK WORK Water

gal.

BRICK WORK
WATER
PROOFING
WATER
PROOFING
WATER
PROOFING
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS

Nr

Bricks
Cement

bag

Sand

cube.

DPC tar

ltr

4" X 3" Class 1 timber

L. ft.

4" X 2" Class 1 timber

L. ft.

11/4 thick plank

s. ft.

Ply wood door sash

size 3' 0" x 6' 9"

Nr

1" thick plank 6" wide

L. ft.

5mm.glaze sheet.

s. ft.

DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS

4" Brush

Nr

Sand paper

Nr

Wood primer

ltr.

Enamel paint

ltr.

4" x 3" Butt hinges

pair.

4" x 2" Butt hinges

pair.

3/4" brass screws

Nr

1/2" brass screws

Nr

6" long barrel bolt

Nr

12" long barrel bolt

Nr

Mortice lock

Nr

Hold fast

Nr

casement fastner

Nr

casement stay

Nr

ROOF

1" thick Ginisapu plank

s. ft.

ROOF

3/4" thick Ginisapu plank

s. ft.

ROOF

Class 1 timber

c. ft.

ROOF

Calicut tile

Nr

ROOF

Calicut pattern ridge tile

Nr

ROOF

Half round tile

Nr

ROOF

Asbestos roofing sheet

s. ft.

ROOF

Reepers 2" x 1"

l. ft.

ROOF

Wire nails

kg.

ROOF

Colouring powder

kg.

ROOF

Cement

bag

ROOF

Sand

cube

ROOF

Lime

kg.

ROOF

" J " bolt

Nr

ROOF

Wood primer

ltr

ROOF

Enamel paint

ltr

ROOF

Wood preservative

ltr

ROOF

3/4" x 9" timber for valance board

S. ft.

ROOF

Asbestos close fitting

pair

ROOF

Roofing screws

Nr

ROOF

Brass screws 11/2

Nr

FLOOR

Lime

kg.

FLOOR

Cement

cube.

FLOOR

Sand

cube.

FLOOR

water

gall.

FLOOR

Bricks

Nr

FLOOR

Floor tile 6" x 6"

Nr

FLOOR

Flor tile 8" x 8"

Nr

FLOOR

Floor tile 12" x 12"

Nr

FLOOR

Tile grout

kg.

WALL

Cement

bag

WALL

Sand

cube

WALL

Lime

kg.

WALL

water

gal

WALL

Wall tile 6" x 6"

Nr

WALL

Wall tile 8" x 12"

Nr

WALL

Wall tile 8" x 8"

Nr

WALL

Tile grout

kg.

CEILING

Cement

bag

CEILING

Sand

cube

CEILING

Lime

kg.

CEILING

water

gal

CEILING

4" x 2" class 1 timber

l. ft.

CEILING

2" x 2" class 1 timber

l. ft.

CEILING

2" x 1" class 1 timber

l. ft.

CEILING

11/2" x 11/2" cove moulding

l. ft.

CEILING

1/2" x 1/2" beading

l. ft.

CEILING

3/4 " thick timber ceiling plank (lunumidella )

s. ft.

CEILING

Asbestos ceiling sheet

s. ft.

CEILING

Wire nails

kg.

CEILING

Emulsion paint

ltr

PAINTING

Emulsion paint

ltr

PAINTING

Weathersheild paint

ltr

PAINTING

Brush 4"

Nr

PAINTING

Acrylic filler

ltr

PAINTING

Sand paper

Nr

PAINTING

Water

gal

PLUMBING

PVC Pipe Type 400 (12 ft Standard Length


pipes)

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe Type 600 (12 ft Standard Length


pipes)

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe Type 1000 (12 ft Standard Length


pipes)

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Tee

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Bend

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Elbow

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Value socket

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Faucet Socket

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

PVC Pipe fitting - Socket

PLUMBING

20mm dia pipe (1/2 ")

Nr

PLUMBING

25mm dia pipe (3/4")

Nr

PLUMBING

32mm dia pipe (1")

Nr

PLUMBING

40mm dia pipe (11/4")

Nr

PLUMBING

50mm dia pipe (11/2")

Nr

PLUMBING

63mm dia pipe (2")

Nr

PLUMBING

75mm dia pipe (21/2")

Nr

PLUMBING

90mm dia pipe (3")

Nr

PLUMBING

Solvent cement

kg.

Labour
Description

Unit

Plant
Basic Price

Skilled

day

Un skilled

day

Skilled Labour

day

Un Skilled Labour

day

Vibrator Operator

day

1,000.00

Concrete Mixer
operator

day

1,000.00

Skilled Labour

day

1,000.00

Un Skilled Labour

day

600.00

Skilled labour

day

700.00

Un skilled labour

day

450.00

Description

1,000.00 Tractor

600.00

1,000.00 Concrete Mixer


600.00 Vibrator

Unit

Basic Price

Skilled labour

day

1,000.00

Un skilled labour

day

600.00

Skilled Labour

day

1,000.00

Un Skilled Labour

day

600.00

Skilled Labour

day

1,000.00

Un Skilled Labour

day

600.00

Painter

day

1,000.00

Carpenter

day

1,000.00

Skilled labour

day

1,000.00

Un skilled labour

day

600.00

Skilled Labour

day

1,000.00

Un Skilled Labour

day

600.00

Skilled Labour

per day

1,000.00

Un Skilled Labour

per day

600.00

Skilled Labour

per day

1,000.00

Un Skilled Labour

per day

600.00

Skilled Labour

per day

1,000.00

Un Skilled Labour

per day

600.00

Skilled Labour

per day

1,000.00

Un Skilled Labour

per day

600.00

Skilled Labour

per day

1,000.00

Un Skilled Labour

per day

600.00

Basic Prices
MATERIALS
Item
No.

Description

LABOUR
Price
( Rs.)

Item
No.

PLANT

Code
No.

Unit
Gal

254.00

Painter

L-001

Day

1,200.00

Hire of Mixer

P-001

Day

1,500.00

Description

Code No.

Price
Unit
( Rs.)

Item
No.

Description

Code No. Unit

Price
( Rs.)

Acid

M-001

Anti Corrosive Primer

M-002

litre

245.00

Plumber

L-002

Day

1,200.00

Hire of Vibrator

P-002

Day

1,000.00

Asbestos Corrugated Sheet

M-003

Sq.ft

26.00

SK Labour

L-003

Day

1,500.00

Vibrating Rammer

P-003

Day

1,000.00

Barrel Bolt

M-004

No

75.00

SK Labour (Vibrator)

L-004

Day

1,200.00

Binding Wire - 16 BW

M-005

Lbs

100.00

Tinker

L-005

Day

1,200.00

Bitumen

M-006

Gal

80.00

Tiler

L-006

Day

1,200.00

Blasting Powder

M-007

Lbs

200.00

U / SK Labourer

L-007

Day

1,000.00

Blue

M-008

Ozs

10.00

Carpenter

L-008

Day

1,200.00

Boild Lime

M-009

Cwt

300.00

Mason

L-009

Day

1,200.00

10

Bolts 16mm 18"

M-010

No

75.00

10

Glazier

L-010

Day

1,200.00

11

Brass Fanlight Chtches

M-011

No

45.00

12

Brass Nails - 1 1/2"

M-012

Lbs

50.00

13

Brass Pannel Pins

M-013

Doz

1.00

14

Brass scews - 1"

M-014

No

2.50

15

Brass Screws 1 1/2"

M-015

No

3.75

16

Brass Screws - 1/2 "

M-016

No

1.30

17

Brass Screws - 3/4"

M-017

No

1.25

18

Brass Screws - 4" Long

M-018

No

7.50

19

Bricks

M-019

No

6.00

20

Brush - 3"

M-020

No

210.00

21

Brush - 6"

M-021

No

495.00

22

Brush 2"

M-022

No

165.00

23

Butt Hinges

M-023

No

70.00

24

Casement Fasteners

M-024

No

55.00

25

Casement Stays

M-025

No

55.00

26

Cement

M-026

Bag

920.00

27

Clear Glass panes

M-027

Sq.ft

25.00

28

Clips and Nails - 1 "

M-028

No

7.00

29

Clips and Nails - 1 1/2 "

M-029

No

10.50

30

Clips and Nails - 1 1/4 "

M-030

No

8.75

31

Clips and Nails - 2 "

M-031

No

10.75

32

Clips and Screws - 3 "

M-032

No

34.00

33

Clout Nails - 1/4"

M-033

Lbs

25.00

34

Coir Brush - 6"

M-034

No

45.00

35

Coloured Pigment

M-035

Lbs

175.00

36

Colouring Powder

M-036

Lbs

175.00

37

Cotton Waste

M-037

Lbs

12.50

38

D. D. T. Powder

M-038

Lbs

25.00

39

Diesel Fuel

M-039

Ltr

70.00

40

Door Closer

M-040

No

1,850.00

41

Draw Rings

M-041

No

42

Earth Delivered at Site

M-042

Cube

1,500.00

43

Emulsion Paint

M-043

litre

280.00

44

Enamel Paint

M-044

litre

354.00

45

Fibre / Plastic Plugs

M-045

No

1.50

46

Fire Wood

M-046

Lbs

250.00

47

Flannel Cloth

M-047

Yards

70.00

48

Flat Asbestos Ceiling Sheets

M-048

Sq.ft

15.00

49

Floor Brush

M-049

No

210.00

50

Fuel Forge

M-050

Ltr

100.00

51

Fuse wire

M-051

L.ft

10.00

52

Galvanised iron sheet(8'X4') - 18 B.W.G


(1.2 mm)

M-052

No

2,200.00

53

Gravel delivered to site

M-053

Cube

2,000.00

54

Gutter Brackets

M-054

No

55

Gutter joiner

M-055

No

56

Half Round Clay Tiles

M-056

No

5.00

57

Hollow Cement Block - 8" thk.

M-057

No

30.00

22.50

58

Hollow Cement Blocks - 4" thk.

M-058

No

27.00

59

Hollow Cement Blocks - 6" thk.

M-059

No

22.00

60

Iron Nails - 1 1/2

M-060

Kg.

25.00

61

Iron Screws - 3/4"

M-061

No

0.55

62

Jumper Steel

M-062

Lbs

65.00

63

Jute Hessian

M-063

Sq.ft

3.50

64

Metal - 1 "

M-064

Cube

8,000.00

65

Metal - 1 1/2 "

M-065

Cube

3,500.00

66

Metal - 3/4 "

M-066

Cube

6,300.00

67

Mild Steel Dowels - 5/8" , 4" Long.

M-067

No

6.00

68

Mild Steel Rods including transport to site

M-068

Kg.

68.00

69

Mineral Turpentine or Thinner

M-069

litre

80.00

70

Mortice lock with screws

M-070

No

960.00

71

Mould Oil

M-071

litre

35.00

72

Nails - 2"

M-072

Lbs

50.00

73

Nails - 3/4"

M-073

Lbs

20.00

74

Plywood Sash - 6' 9" X 2' 9"

M-074

No

2,000.00

75

Primer

M-075

litre

180.00

76

PVC Elbows / Bent / Socket - 3/4"

M-076

No

15.00

77

PVC Sockets - 1"

M-077

No

14.00

78

PVC down pipes - 12' length

M-078

No

79

PVC elbow - for rainwater down pipes.

M-079

No

80

PVC Elbows / Bent / Socket - 1 1/2"

M-080

No

69.00

81

PVC Elbows / Bent / Socket - 1 1/4"

M-081

No

42.00

82

PVC Elbows / Bent / Socket - 1"

M-082

No

21.00

83

PVC Elbows / Bent / Socket - 1/2"

M-083

No

10.50

84

PVC Elbows / Bent / Socket - 2 1/2"

M-084

No

350.00

85

PVC Elbows / Bent / Socket - 2"

M-085

No

110.00

86

PVC Elbows / Bent / Socket - 3"

M-086

No

580.00

87

PVC End cap

M-087

No

88

PVC gutter - 12' length

M-088

No

89

PVC gutter head - 6"

M-089

No

90

PVC joiner - 3 1/2"

M-090

No

91

PVC mitre bend 6" dia

M-091

No

92

PVC Pipes - 1 1/2"

M-092

L.ft

46.00

93

PVC Pipes - 1 1/4"

M-093

L.ft

32.00

94

PVC Pipes - 1"

M-094

L.ft

21.00

95

PVC Pipes - 1/2"

M-095

L.ft

7.50

96

PVC Pipes - 2"

M-096

L.ft

79.00

97

PVC Pipes - 3"

M-097

L.ft

185.00

98

PVC Pipes - 3/4"

M-098

L.ft

14.00

99

PVC Shoe

M-099

No

100

PVC Sockets - 1 1/2"

M-100

No

29.50

101

PVC Sockets - 1 1/4"

M-101

No

19.50

102

PVC Sockets - 2"

M-102

No

48.00

103

PVC Sockets - 3"

M-103

No

192.00

104

PVC Straps

M-104

No

105

Ridge Tiles (calicut)

M-105

No

35.00

106

Ridges 3' 8" Long (Asbestos)

M-106

Pair

245.00

107

Rim Lock with Screws

M-107

No

500.00

108

Roof tiles - calicut

M-108

No

16.00

109

Roofing Screws and Washers

M-109

No

3.50

110

Roofing Screws or Bolts

M-110

No

3.50

111

Rubble - 6" - 9"

M-111

Cube

112

Salt

M-112

Lbs

2,500.00

113

Sand

M-113

Cube

114

Sand Papers

M-114

No

3.50

115

Slaked Lime

M-115

Lbs

275.00

116

Soldering Lead

M-116

Lbs

13.75

117

Solvent Cement

M-117

Grms

1.40

118

Spur Stone

M-118

No

15.00

10.00
12,500.00

119

Tarnap

M-119

Gal

120

Tee - 1 " Dia

M-120

No

450.00
31.25

121

Tee - 1 1/2 " Dia

M-121

No

102.00

122

Tee - 1/2 " Dia

M-122

No

15.50

123

Tee - 2 " Dia

M-123

No

165.50

124

Tee - 2 1/2" Dia

M-124

No

526.00

125

Tee - 3 " Dia

M-125

No

875.00

126

Tee - 3/4 " Dia

M-126

No

21.50

127

Tee - Dia 1 1/4 "

M-127

No

63.50

128

Tee Hinges

M-128

Pair

165.00

129

Tiles Pressed - 12" X 12"

M-129

No

180.00

130

Tiles Pressed - 8" X 8"

M-130

No

125.00

131

Tiles Terrazzo - 6" X 6"

M-131

No

100.00

132

Tiles Terrazzo - 12" X 12"

M-132

No

150.00

133

Timber Beading - 1/2" X 1/2"

M-133

L.ft

1.50

134

Timber Beadings - 1 1/2"X1/2" (Halmilla)

M-134

L.ft

12.00

135

Timber Ceiling Plank - 6"x3/4"


(Lunumidella)

M-135

Sq.ft

28.00

136

Timber Class I

M-136

Cu.ft

1,200.00

137

Timber Class I - 3" x 1'1/2"

M-137

L.ft

45.00

138

Timber Class I - 4"X3"

M-138

Cu.ft

1,300.00

139

Timber Class I Planks - 1 1/2"

M-139

Sq.ft

140.00

139a Timber Class I Planks - 1"

M-139a

Sq.ft

110.00

140

Timber Class II

M-140

Cu.ft

750.00

141

Timber Class II - 1" Thick

M-141

Sq.ft

65.00

142

Timber Class II - 2" x 1"

M-142

L.ft

12.00

143

Timber Class II - 2" x 2"

M-143

L.ft

22.00

144

Timber class II - 4"X 2"

M-144

L.ft

65.00

145

Timber Cove Molding - 2"X2" (Halmilla)

M-145

Sq.ft

35.00

146

Timber ceiling Joists - 4" x 2"

M-146

L.ft

65.00

147

Timber Planks - 1" (Valance board)

M-147

Sq.ft

65.00

148

Timber Purlins

M-148

L.ft

100.00

149

Timber Reepers - 2"X1"

M-149

L.ft

12.00

150

Timber Strips - 2" X 1/4"

M-150

L.ft

5.00

151

Timber Wedges

M-151

No

5.00

152

Tor Steel Rods including transport to site

M-152

Kg.

220.00

153

Tower / Skeleton Brass Bolts

M-153

No

145.00

154

Varnish

M-154

Ltr

355.00

155

Wall Tiles Glazed 6" x 6"

M-155

No

75.00

156

Wall Tiles Glazed 8" x 12"

M-156

No

100.00

157

Water

M-157

Gal

0.30

158

Wax Polish

M-158

Lbs

150.00

159

White Cement/ tile grout

M-159

Lbs

17.50

160

Wire Brush

M-160

No

65.00

161

Wire Nails

M-161

Lbs

50.00

162

Wire Nails 2" Long

M-162

Lbs

25.00

163

Wire Nails 6" Long

M-163

Lbs

25.00

164

Wirecut Bricks

M-164

No

8.75

165

Wood Preservative

M-165

Gal

450.00

166

Yellow Ochre

M-166

Lbs

15.00

Activity
1

Site Preparation & Excavation

Earth work support and Filling

Anti Termite Treatment & DPC

Random Rubble Masonry Work

Concrete Work

Formwork

Note

Reinforcement

Rate Break Downs of all trades are accordin


Rate Break Downs of Concrete Works

Block Work

Brick Work

10

Roof

11

Doors and Windows

12

Plumbing & Drainage

13

Plastering

14

Tiling

15

Ceiling

16

Painting

Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the
Downs of Concrete Works

Page 23 Of 142

SDS

08/26/2016

Page 24 Of 142

01.B.03

Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
excavated material not exceeding 30' 0"
Analysis for

No
1

Item Description
U / SK Labourer

Item Ref

Unit

Quantity

L-007

Day

2.25

Cube
Rate
1,000.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools

01.B.04

Total for

Rate for 1

Cube

Cube

2,306.25
2,306.25

Rate(Say)

1Cube

2,306.25

Rate(Say)

1ft3

23.06

Rate(Say)

1m3

815.00

Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
excavated material to distance not exceeding 30' 0"
Item Description
U / SK Labourer

Item Ref

Unit

Quantity

L-007

Day

3.5

Cube
Rate
1,000.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools

01.B.05

Total for

Rate for 1

Cube

Cube

3,587.50

Rate(Say)

1Cube

3,587.50

Rate(Say)

1ft3

35.88

Rate(Say)

1m3

1,268.00

Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
excavated material not exceeding 30' 0"
Item Description
U / SK Labourer

Item Ref

Unit

Quantity

L-007

Day

Cube
Rate
1,000.00

SDS

Amount
3,000.00
75.00

Total for

Rate for 1

Cube

Cube

3,000.00
3,000.00

Rate(Say)

1Cube

3,000.00

Rate(Say)

1ft3

30.00

Rate(Say)

1m3

1,060.00

Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Analysis for

No

3,500.00

3,587.50

1.02 Allow 2.5% of Items ( 1.01 ) for Tools

01.B.06

Amount

87.50

Analysis for
No

2,250.00
56.25

Analysis for
No

Amount

Item Description

Item Ref

Unit

1
Quantity

Cube
Rate

Amount

08/26/2016

Page 25 Of 142

U / SK Labourer

L-007

Day

2.5

1,000.00

1.02 Allow 2.5% of Items ( 1.01 ) for Tools

01.B.07

62.50
Total for

Rate for 1

Cube

Cube

2,562.50
2,562.50

Rate(Say)

1Cube

2,562.50

Rate(Say)

1ft3

25.63

Rate(Say)

1m3

905.48

Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
depositing excavated material to a distance not exceeding 30' 0"
Analysis for

No

Cube

Unit

Quantity

M-007

Lbs

0.75

200.00

150.00

1.01 Fuse wire

M-051

L.ft

10

10.00

100.00

1.02 Jumper Steel

M-062

Lbs

65.00

65.00

1.03

Item Description

Item Ref

Blasting Powder

Rate

Allow 20% of Items ( 1, 1.01, 1.02 ) for Steel


Fuel and Forge

Amount

63.00

1.04 SK Labour

L-003

Day

1,500.00

1,500.00

1.05 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

01.B.08

1.01

Item Description
SK Labour

1Cube

3,878.00

Rate(Say)

1ft3

38.78

Rate(Say)

1m3

1,370.00

10

Sq.ft

Item Ref

Unit

Quantity

L-003

Day

1.5

Rate
1,500.00

Allow 25% of Items ( 1 ) for Steel, fuel &


forge

1.02 U / SK Labourer

01.B.09

3,878.00

Benching rock in foundation in 3"-6" Steps (Blasting Prohibited)

No
1

3,878.00

Rate(Say)

Analysis for

Amount
2,250.00
562.50

L-007

Day

0.5

Total for

10

Sq.ft

Rate for 1

Sq.ft

1,000.00

500.00
3,312.50
331.25

Rate(Say)

1 Sq.ft

331.25

Rate(Say)

1m2

3,564.25

Rock Requiring Blasting


Analysis for

SDS

2,500.00

Cube
08/26/2016

Page 26 Of 142

No

Item Description

1.01 Labour Skilled

Item Ref

Unit

Quantity

L-003

Day

Rate
1,500.00

1.03 Allow 2.5% of Items ( 1.01, 1.02 ) for Tools

SDS

Amount
4,500.00
112.50

1.04 Fuel Forge etc.

M-050

Ltr

0.25

100.00

25.00

1.05 Blasting powder

M-007

lbs

0.68

200.00

136.00

1.06 Fuse wire

M-051

L.ft

3.05

10.00

30.50

1.07 Steel Jumper

M-062

lbs

0.45

46.00

20.70

Total for

Cube

Rate for 1

Cube

4,824.70
4,824.70

Rate(Say)

1Cube

4,824.70

Rate(Say)

1ft3

48.25

Rate(Say)

1m3

1,705.00

08/26/2016

Page 27 Of 142

02. Filling and Earth Work Support


A. Filling
B. Earthwork Support
Backfilling
02.A.01 Backfilling to trenches with selected earth available at site.
Analysis for
No
1

Item Description

Item Ref

Unit

Quantity

L-007

Day

U / SK Labourer

Cube
Rate
1,000.00

Amount
1,000.00

1.02 Allow 2.5% of Items ( 1 ) for Tools

25.00
Total for

Rate for 1

Cube

Cube

1,025.00
1,025.00

Rate(Say)

1Cube

1,025.00

Rate(Say)

1 ft3

10.25

Rate(Say)

1m3

362.00

02.A.02 Backfilling to trenches with Imported Material


Analysis for
No
1

Item Description
Earth Delivered at Site

Item Ref

Unit

Quantity

M-042

Cube

Cube
Rate
1,500.00

Amount
1,500.00

1.01 Allow 15% of Items ( 1 ) for Compacting


1.02 U / SK Labourer

02.A.03

225.00
L-007

Day

1.25

Total for

Cube

Rate for 1

Cube

2,975.00
2,975.00
1Cube

2,975.00

Rate(Say)

1 ft3

29.75

Rate(Say)

1m3

1,051.00

Filling under floors including levelling, watering & compacting in 3" layers with available and
selected earth at site
Item Description

1.02 U / SK Labourer

Item Ref

Unit

Quantity

L-007

Day

Cube
Rate
1,000.00

1.02 Allow 2.5% of Items ( 1 ) for Tools

SDS

1,250.00

Rate(Say)

Analysis for
No

1,000.00

Amount
2,000.00
50.00

Total for

Rate for 1

Cube

Cube

2,050.00
2,050.00

Rate(Say)

1Cube

2,050.00

Rate(Say)

1 ft3

20.50
08/26/2016

Page 28 Of 142

Rate(Say)

SDS

1m3

724.00

08/26/2016

Page 29 Of 142

03. Anti termite Treatment & DPC


A.

Anti Termite Treatment

B.

DPC

Anti Termite Treatment


03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for
No

Sqr

Item Ref

Unit

Quantity

M-038

Lbs

16

25.00

1.01 Water

M-157

Gal

20

0.30

1.02 U / SK Labourer

L-007

Day

0.5

1,000.00

Sqr

Item Description

D. D. T. Powder

Total for
Rate for 1

Rate

Sqr

Rate(Say)

1Sqr

Rate(Say)

1ft2

Rate(Say)

1m2

DPC
03.B.01

3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with
sand.
Analysis for
1
Sqr

No

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

2.25

1.02 Sand

M-113

Cube

0.11

1.03 Bitumen

M-006

Gal

1.5

80.00

1.04 Fire Wood

M-046

Lbs

10

250.00

1.05 Water

M-157

Gal

10

0.30

1.06 Mason

L-009

Day

1.25

1.07 U / SK Labourer

L-007

Day

2.5

Sqr

Total for
Rate for 1

Road Development Department - North - East Province

Rate

920.00
###

1,200.00

1,000.00

Sqr

Rate(Say)

1Sqr

Rate(Say)

1ft2

Rate(Say)

1m2

Page 30 Of 142

under floors.

Amount
400.00
6.00
500.00
906.00
906.00
906.00
9.06
97.49

ot tar and blinded with

Amount

2,070.00
1,375.00
120.00
2,500.00
3.00
1,500.00
2,500.00
10,068.00
10,068.00
10,068.00
100.68
1,083.32

Road Development Department - North - East Province

Page 31 Of 142

04. Random Rubble Masonry Work


04.01

Random Rubble Masonry in cement mortar 1:5 in foundation


Analysis for

No

Item Ref

Unit

Quantity

1.01 6" - 9" Rubble

M-111

Cube

1.3

1.02 Cement

M-026

Bag

1.03 Sand

M-113

Cube

1.04 Water

M-157

1.05 Mason
1.06 U / SK Labourer

04.02

Item Description

Rate

Amount

2,500.00

3,250.00

920.00

4,600.00

0.3

12,500.00

3,750.00

Gal

100

0.30

30.00

L-009

Day

1,200.00

4,800.00

L-007

Day

1,000.00

6,000.00

Total for

Cube

Rate for 1

Cube

22,430.00
22,430.00

Rate(Say)

1Cube

22,430.00

Rate(Say)

1ft3

224.30

Rate(Say)

1m3

7,925.80

Random Rubble Masonry in cement mortar 1:5 in Superstructure

No

Item Description

Analysis for
1
Item Ref
Unit Quantity

1.01 6" - 9" Rubble

M-111

Cu

1.3

1.02 Cement

M-026

Bag

1.03 Sand

M-113

Cu

1.04 Water

M-157

1.05 Mason
1.06 U / SK Labourer
1.07

Cube

Allow 3% of Items ( 1.05, 1.06 ) for


Scaffolding

Cube
Rate

Amount

2,500.00

3,250.00

920.00

4,600.00

0.3

12,500.00

3,750.00

Gal

100

0.30

30.00

L-009

Day

4.5

1,200.00

5,400.00

L-007

Day

1,000.00

7,000.00

Total for

Cube

Rate for 1

Cube

372.00
24,402.00
24,402.00

Rate(Say)

1Cube

24,402.00

Rate(Say)

1ft3

244.02

Rate(Say)

1m3

8,622.61

Page 32 Of 142

Page 33 Of 142

05. Concrete Work


A.

Mixing Concrete

B.

Screed

C.

Mass Concrete

D.

Column

E.

Beam

F.

Slab

G.

Lintol

Mixing Concrete
05.A.01 Mixing Concrete 1:1-1/2:3(3/4")
Analysis for
No.

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

23

1.02 Sand

M-113

Cube

1.03 3/4 " Metal

M-066

1.04 Hire of Mixer

Cube
Rate

Amount

860.00

19,780.00

0.42

11,500.00

4,830.00

Cube

0.82

6,300.00

5,166.00

P-001

Day

0.333

1,500.00

499.50

1.05 Water

M-157

Gal

150

0.30

45.00

1.06 SK Labour

L-003

Day

0.333

1,500.00

499.50

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

32,820.00
32,820.00

Rate(Say)

1Cube

32,820.00

Rate(Say)

1m3

11,597.17

05.A.02 Mixing Concrete 1:3:6(1 1/2")


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

13

1.02 Sand

M-113

Cube

1.03 1 1/2 " Metal

M-065

1.04 Hire of Mixer

Cube
Rate

Amount

920.00

11,960.00

0.53

12,500.00

6,625.00

Cube

0.92

6,300.00

5,796.00

P-001

Day

0.333

1,500.00

499.50

1.05 Water

M-157

Gal

110

0.30

33.00

1.06 SK Labour

L-003

Day

0.333

1,500.00

499.50

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

27,413.00
27,413.00

Rate(Say)

1Cube

Rate(Say)

1m3

Page 34 Of 142

27,410.00
9,685.51

05.A.03 Mixing Concrete 1:2 1/2 :5 (1")


Analysis for
No

Item Description

Cube

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

14

920.00

12,880.00

1.02 Sand

M-113

Cube

0.6

12,500.00

7,500.00

1.03 1 " Metal

M-064

Cube

0.9

8,000.00

7,200.00

1.04 Hire of Mixer

P-001

Day

0.333

1,500.00

499.50

1.05 Water

M-157

Gal

100

0.30

30.00

1.06 SK Labour

L-003

Day

0.333

1,500.00

499.50

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

30,609.00
30,609.00

Rate(Say)

1Cube

30,610.00

Rate(Say)

1m3

10,816.25

05.A.04 Mixing Concrete 1:2:4(3/4")


Analysis for
No

Item Description

Cube

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

18

920.00

16,560.00

1.02 Sand

M-113

Cube

0.5

11,500.00

5,750.00

1.03 3/4 " Metal

M-066

Cube

0.88

6,300.00

5,544.00

1.04 Hire of Mixer

P-001

Day

0.333

1,500.00

499.50

1.05 Water

M-157

Gal

120

0.30

36.00

1.06 SK Labour

L-003

Day

0.333

1,500.00

499.50

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

30,889.00
30,889.00

Rate(Say)

1Cube

30,890.00

Rate(Say)

1m3

10,915.19

05.A.05 Mixing Concrete 1:1:2(3/4")


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

31

1.02 Sand

M-113

Cube

0.44

Cube
Rate

Amount

920.00

28,520.00

12,500.00

5,500.00

Page 35 Of 142

1.03 3/4 " Metal

M-066

Cube

0.96

6,300.00

6,048.00

1.04 Hire of Mixer

P-001

Day

0.333

1,500.00

499.50

1.05 Water

M-157

Gal

200

0.30

60.00

1.06 SK Labour

L-003

Day

0.333

1,500.00

499.50

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Cube

Rate for 1

Cube

43,127.00
43,127.00

Rate(Say)

1Cube

43,130.00

Rate(Say)

1m3

15,240.28

Screed Concrete
05.B.01 2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"
Analysis for
No

Item Description

Sqr

Item Ref

Unit

Quantity

05.A.02

Cube

0.1667

27,410.00

4,569.25

1.02 SK Labour

L-003

Day

0.125

1,500.00

187.50

1.03 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

1.01 Mixing Concrete 1:3:6(1 1/2")

Rate

Amount

5,256.75
5,256.75

Rate(Say)

1 Sqr

5,260.00

Rate(Say)

1ft2

52.60

Rate(Say)

1m2

565.98

05.B.02 3" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"
Analysis for
No

Item Description

Sqr

Item Ref

Unit

Quantity

05.A.02

Cube

0.25

27,410.00

6,852.50

1.02 SK Labour

L-003

Day

0.125

1,500.00

187.50

1.03 U / SK Labourer

L-007

Day

0.75

1,000.00

750.00

Total for

Sqr

Rate for 1

Sqr

1.01 Mixing Concrete 1:3:6(1 1/2")

Rate

Amount

7,790.00
7,790.00

Rate(Say)

1 Sqr

7,790.00

Rate(Say)

1ft2

77.90

Rate(Say)

1m2

838.20

Mass Concrete
05.C.01 6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass concrete)

Analysis for
No

Sqr Page 36 Of 142

Item Description

Item Ref

Unit

Quantity

Rate

Amount

1.01 Mixing Concrete 1:2 1/2 : 5(1")

05.A.03

Cube

0.5

30,610.00

15,305.00

1.025 Water

M-157

Gal

200

0.30

60.00

1.03 SK Labour

L-003

Day

0.5

1,500.00

750.00

1.04 U / SK Labourer

L-007

Day

1.25

1,000.00

1,250.00

Total for

Sqr

Rate for 1

Sqr

17,365.00
17,365.00

Rate(Say)

1 Sqr

17,370.00

Rate(Say)

1ft2

173.70

Rate(Say)

1m2

1,869.01

Column Concrete
05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.
Analysis for
No

Item Description

1.01 Mixed Concrete 1:1 1/2 : 3 (3/4")

0.51

Item Ref

Unit

Quantity

05.A.01

Cube

0.51

Cube
Rate
32,820.00

Allow 5% of Items ( 1.01 ) for Wastage

Amount
16,738.20
836.91

1.025 Hire of Vibrator

P-002

Day

0.5

1,000.00

500.00

1.03 Mason

L-009

Day

0.5

1,500.00

750.00

1.04 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

1.05 SK Labourer (Vibrator)

L-004

Day

0.5

1,500.00

750.00

1.06 Jute Hessian

M-063

Sq.ft

45

12.00

540.00

1.07 Water

M-157

Gal

100

0.30

30.00

1.08 U / SK Labourer (curing)

L-007

Day

0.5

1,000.00

500.00

Total for

0.51

Cube

Rate for 1

Cube

22,145.11
43,421.78

Rate(Say)

1Cube

43,422.00

Rate(Say)

1m3

15,343.46

Ground floor - First Floor

1m3

15,343.46

First Floor - Second Floor

1m3

16,877.81

Second Floor - Third Floor

1m3

18,565.59

Third Floor - Fourth Floor

1m3

20,422.15

Page 37 Of 142

06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
No
1.01

Item Description
Sawn timber formwork to 9" x 9" cement concrete
column in ground floor - Making Mould

Analysis for
0.15
Item Ref
Unit Quantity

Sq
Rate

Amount

06.A.02

1 Use

731.00

731.00

1.02 Bolts 16mm 18" (12 nos 20 uses)

M-010

No

0.6

75.00

45.00

1.03 Mould Oil

M-071

litre

0.5

35.00

17.50

1.04 Timber props 4" x 2"

M-144

L.ft

3.5

65.00

227.50

1.05 Carpenter - assembling

L-008

Day

0.25

1,200.00

300.00

1.06 U / SK Labourer - assembling

L-007

Day

0.25

1,000.00

250.00

1.07 Carpenter - dismantling, cleaning & repairing

L-008

Day

0.25

1,200.00

300.00

L-007

Day

0.25

1,000.00

250.00

Total for

0.15

Sq

Rate for 1

Sq

1.08

U / SK Labourer - dismantling, cleaning &


repairing

2,121.00
14,140.00

Rate(Say)

1Sq

14,140.00

Rate(Say)

1ft2

141.40

Rate(Say)

1m2

1,521.46

Ground floor - First Floor

1m2

1,521.46

First Floor - Second Floor

1m2

1,673.61

Second Floor - Third Floor

1m2

1,840.97

Third Floor - Fourth Floor

1m2

2,025.07

06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for
No

Item Description

Uses

Item Ref

Unit

Quantity

1.01 1" Thick Class II Timber

M-141

Sq.ft

18.15

65.00

1,179.75

1.02 2" x 2" Class II Timber In Yokes

M-143

L.ft

17.1

22.00

376.20

1.03 2" x 1" Class II Timber Battens.

M-142

L.ft

16.12

12.00

193.44

1.04 Wire Nails

M-161

Lbs

1.5

50.00

75.00

1.05 Carpenter

L-008

Day

0.5

1,200.00

600.00

1.06 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Uses

Rate for 1

Uses

Rate(Say)

Rate

Amount

2,924.39
731.10
1 Use

731.00

Beam

SDS

08/26/2016

Page 38 Of 142

06.B.01 Sawn timber formwork for concrete beams in ground floor


No

Item Description

Analysis for
0.55
Item Ref
Unit Quantity

Sq
Rate

Amount

1.01

Sawn timber formwork for 9" x 12" concrete beams


06.B.02
in ground floor - Making the mould

1 Use

2,757.00

2,757.00

1.02

Sawn timber formwork for concrete beams in


ground floor-Assembling

06.B.03

1 Use

1,568.00

1,568.00

1.04 Carpenter - Assembling

L-008

Day

1,200.00

1,200.00

1.05 U / SK Labourer - Assembling

L-007

Day

1,000.00

2,000.00

1.06 Mould Oil

M-071

litre

0.5

35.00

17.50

1.07 Wire Nails

M-161

Lbs

0.5

65.00

32.50

1.08 Carpenter - dismantling, cleaning & repairing

L-008

Day

0.5

1,200.00

600.00

L-007

Day

1,000.00

2,000.00

Total for

0.55

Sq

Rate for 1

Sq

1.03 Allow 10% of Items ( 1.02 ) for Repairs

1.09

U / SK Labourer - dismantling, cleaning &


repairing

156.80

10,331.80
18,785.09

Rate(Say)

1Sq

18,785.00

Rate(Say)

1ft2

187.85

Rate(Say)

1m2

2,021.27

Ground floor

1m2

2,021.27

First Floor

1m2

2,223.39

Second Floor

1m2

2,445.73

Third Floor

1m2

2,690.31

06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
No

Item Description

Analysis for
4
Item Ref
Unit Quantity

Uses
Rate

Amount

1.01 1" Thick Class II Timber

M-141

Sq.ft

60

65.00

3,900.00

1.02 2" x 1" Class II Timber Battens.

M-142

L.ft

24

12.00

288.00

1.03 2" x 2" Class II Timber In Yokes

M-143

L.ft

45

22.00

990.00

1.04 4"X2" Timber bearers

M-144

L.ft

30

65.00

1,950.00

1.05 Wire Nails

M-161

Lbs

50.00

100.00

1.06 Carpenter

L-008

Day

1.5

1,200.00

1,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Uses

Rate for 1

Uses

Rate(Say)

SDS

11,028.00
2,757.00
1 Use

2,757.00

08/26/2016

Page 39 Of 142

06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
No

Item Description

Analysis for
6
Item Ref
Unit Quantity

Uses
Rate

Amount

1.01 Timber props 4" x 2"

M-144

L.ft

110

65.00

7,150.00

1.02 2" x 2" Class II Timber for bracings

M-143

L.ft

80

22.00

1,760.00

1.03 1" Thick Class II Timber base plate

M-141

Sq.ft

65.00

390.00

1.04 Timber Wedges

M-151

No

22

5.00

110.00

Total for

Uses

Rate for 1

Uses

9,410.00
1,568.33

Rate(Say)

1 Use

1,568.00

Slab
06.C.01 Sawn timber formwork for underside of first floor slab
Analysis for
2
Item Ref
Unit Quantity

Rate

06.C.02

1 Use

7,241.00

06.C.03

Sq

1.04 Carpenter - Assembling

L-008

Day

1,200.00

1,200.00

1.05 U / SK Labourer - Assembling

L-007

Day

1,000.00

4,000.00

1.06 Mould Oil

M-071

litre

4.54

35.00

158.90

1.07 Wire Nails

M-161

Lbs

50.00

100.00

1.08 Carpenter - dismantling, cleaning & repairing

L-008

Day

0.5

1,200.00

600.00

L-007

Day

1,000.00

2,000.00

Total for

Sq

Rate for 1

Sq

No
1.01

Item Description
Sawn timber formwork for 20" x 10" concrete slab
in ground floor - Making panels

1.02 Allow 20% of Items ( 1.01 ) for Repairs


1.03

Sawn timber formwork for underside of first floor


slab - assembling

1.04 Allow 20% of Items ( 1.03 ) for Wastage

1.09

U / SK Labourer - dismantling, cleaning &


repairing

Sq

Amount
7,241.00
1,448.20

8,176.00
-

8,176.00
1,635.20

26,559.30
13,279.65

Rate(Say)

1Sq

13,280.00

Rate(Say)

1ft2

132.80

Rate(Say)

1m2

1,428.93

Ground floor

1m2

1,428.93

First Floor

1m2

1,571.82

Second Floor

1m2

1,729.00

Third Floor

1m2

1,901.90

06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for
No
SDS

Item Description

Item Ref

Unit

4
Quantity

Uses
Rate

Amount
08/26/2016

Page 40 Of 142

1.01 1" Thick Class II Timber

M-141

Sq.ft

220

65.00

14,300.00

1.02 Timber props 4" x 2"

M-144

L.ft

121

65.00

7,865.00

1.03 Wire Nails

M-161

Lbs

50.00

200.00

1.04 Carpenter

L-008

Day

1,200.00

3,600.00

1.05 U / SK Labourer

L-007

Day

1,000.00

3,000.00

Total for

Uses

Rate for 1

Uses

28,965.00
7,241.25

Rate(Say)

7,241.00

06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for
No

Item Description

Uses

Item Ref

Unit

Quantity

1.01 Timber props 4" x 2"

M-144

L.ft

690

65.00

44,850.00

1.02 2" x 2" Class II Timber In Yokes

M-143

L.ft

66

22.00

1,452.00

1.03 Timber Wedges

M-151

No

122

5.00

610.00

1.04 1" Thick Class II Timber

M-141

Sq.ft

33

65.00

2,145.00

Total for

Uses

Rate for 1

Uses

Rate(Say)

SDS

Rate

Amount

49,057.00
8,176.17
8,176.00

08/26/2016

Page 41 Of 142

07. Reinforcement
7.01

Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for

No

Item Description

Cwt.

Item Ref

Unit

Quantity

M-152

kg

50

M-005

Lbs

1.5

1.05 SK Labour

L-003

Day

1,500.00

1,500.00

1.06 U / SK Labourer

L-007

Day

1,000.00

1,000.00

Total for

Cwt.

Rate for 1

Cwt.

1.01 M.S./Tor Steel Rods including transport to site


1.02 Allow 15% of Items ( 1.01 ) for Wastage
1.03 16 BWG Binding Wire
1.04

7.02

Allow 1.5% of Items ( 1.01 ) for spaces or


chairs

Rate
220.00
-

Amount
11,000.00
1,650.00

100.00

150.00

165.00

15,465.00
15,465.00

Rate(Say)

1Cwt

15,465.00

Rate(Say)

1Kg

309.30

Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for

No

Item Description

Item Ref

Unit

Quantity

M-068

kg

50

1.03 16 BWG Binding Wire

M-005

Lbs

1.5

1.04 SK Labour

L-003

Day

1.05 U / SK Labourer

L-007

1.01 M.S./Tor Steel Rods including transport to site


1.02 Allow 15% of Items ( 1.01 ) for Wastage

Cwt.
Rate
68.00

Amount
3,400.00

510.00

100.00

150.00

1,500.00

1,500.00

Day

1,000.00

1,000.00

Total for

Cwt.

Rate for 1

Cwt.

6,560.00
6,560.00

Rate(Say)

1Cwt

6,560.00

Rate(Say)

1Kg

131.20

Page 42 Of 142

1.11111111
622.222222
192,453.33

Page 43 Of 142

08. Block Work


08.01

8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for

No

Item Description

Item Ref

Unit

Quantity

M-057

No

112

1.03 Cement

M-026

Bag

1.04 Sand

M-113

1.05 Mason
1.06 U / SK Labourer

1.01 Hollow Cement Block (16"x 8"x 8")


1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.07 Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding

08.02

Sqr
Rate

Amount

78.00

8,736.00

436.80

0.75

920.00

690.00

Cube

0.06

12,500.00

750.00

L-009

Day

1.5

1,500.00

2,250.00

L-007

Day

2.5

1,000.00

2,500.00

Total for

Sqr

Rate for 1

Sqr

142.50
15,505.30
15,505.30

Rate(Say)

1 Sq

15,505.00

Rate(Say)

1ft2

155.05

Rate(Say)

1m2

1,668.34

Ground floor

1m2

1,668.34

First Floor

1m2

1,835.17

Second Floor

1m2

2,018.69

3rd floor

1m2

2,220.56

6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for

No

Item Description

Item Ref

Unit

Quantity

M-059

No

112

1.03 Cement

M-026

Bag

1.04 Sand

M-113

1.05 Mason
1.06 U / SK Labourer

1.01 Hollow Cement Blocks (16"x 8"x 6")


1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.07 Allow 3% of Items ( 1.05, 1.06 ) for Scaffolding

Sqr
Rate
22.00

Amount
2,464.00

123.20

0.65

920.00

598.00

Cube

0.07

12,500.00

51.00

L-009

Day

1.5

1,200.00

1,800.00

L-007

Day

1,000.00

2,000.00

Total for

Sqr

Rate for 1

Sqr

114.00
7,150.20
7,150.20

Rate(Say)

1 Sq

7,150.20

Rate(Say)

1ft2

71.50

08.03

Page 44 Of 142

Rate(Say)

1m2

769.36

Ground floor

1m2

769.36

First Floor

1m2

846.30

Second Floor

1m2

930.93

Third Floor

1m2

1,024.02

4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for

No

Item Description

Item Ref

Unit

Quantity

M-058

No

112

1.03 Cement

M-026

Bag

1.04 Sand

M-113

1.05 Mason
1.06 U / SK Labourer

1.01 Hollow Cement Blocks (16"x 8"x 4")


1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.07 Allow 5% of Items ( 1.05, 1.06 ) for Scaffolding

Sqr
Rate
32.00

Amount
3,584.00

179.20

0.4

920.00

368.00

Cube

0.03

12,500.00

51.00

L-009

Day

1,500.00

1,500.00

L-007

Day

1,000.00

2,000.00

Total for

Sqr

Rate for 1

Sqr

175.00
7,857.20
7,857.20

Rate(Say)

1 Sq

7,857.20

Rate(Say)

1ft2

78.57

Rate(Say)

1m2

845.43

Ground floor

1m2

845.43

First Floor

1m2

929.98

Second Floor

1m2

1,022.98

Third Floor

1m2

1,125.27

Page 45 Of 142

Page 46 Of 142

Page 47 Of 142

09. Brick Work


09.01

Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-019

No

550

1.03 Cement

M-026

Bag

1.3

920.00

1,196.00

1.04 Sand

M-113

Cu

0.1

12,500.00

1,250.00

1.05 Water

M-157

Gal

50

0.30

15.00

1.06 Mason

L-009

Day

1.5

1,200.00

1,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Sqr

Rate for 1

Sqr

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.08

09.02

Allow 5% of Items (1.06, 1.07 ) for


Scaffolding

Rate

Amount

6.00
-

3,300.00
165.00

190.00
9,916.00
9,916.00

Rate(Say)

1 Sq

9,916.00

Rate(Say)

1ft2

99.16

Rate(Say)

1m2

1,066.96

Ground floor

1m2

1,066.96

First Floor

1m2

1,120.31

Second Floor

1m2

1,176.33

Third Floor

1m2

1,235.14

9" thick brick wall cement sand 1:5 in ground floor


Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-019

No

1090

1.03 Cement

M-026

Bag

920.00

2,760.00

1.04 Sand

M-113

Cu

0.2

12,500.00

2,500.00

1.05 Water

M-157

Gal

115

0.30

34.50

1.06 Mason

L-009

Day

2.25

1,200.00

2,700.00

1.07 U / SK Labour

L-007

Day

3.75

1,000.00

3,750.00

Total for

Sqr

Rate for 1

Sqr

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.08

Allow 3% of Items (1.06, 1.07 ) for


Scaffolding

Rate(Say)

Rate
6.00

Amount
6,540.00
327.00

193.50
18,805.00
18,805.00
1 Sq

18,805.00

09.03

Page 48 Of 142

Rate(Say)

1ft2

188.05

Rate(Say)

1m2

2,023.42

Ground floor

1m2

2,023.42

First Floor

1m2

2,124.59

Second Floor

1m2

2,230.82

Third Floor

1m2

2,342.36

Brick work in cement sand 1:5 in foundation upto D. P. C


Analysis for

No

Item Description

Cube

Item Ref

Unit

Quantity

M-019

No

1450

1.03 Cement

M-026

Bag

920.00

3,680.00

1.04 Sand

M-113

Cu

0.25

12,500.00

3,125.00

1.05 Water

M-157

Gal

150

0.30

45.00

1.06 Mason

L-009

Day

1,200.00

3,600.00

1.07 U / SK Labourer

L-007

Day

1,000.00

4,000.00

Total for

Cube

Rate for 1

Cube

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage

09.04

Rate
6.00

Amount
8,700.00
435.00

23,585.00
23,585.00

Rate(Say)

1 Cu

23,585.00

Rate(Say)

1ft3

235.85

Rate(Say)

1m3

8,333.92

Brick Work in cement sand 1:8 in foundation upto D. P. C


Analysis for

No

Item Description

Cube

Item Ref

Unit

Quantity

M-019

No

1450

1.03 Cement

M-026

Bag

2.333

920.00

2,146.36

1.04 Sand

M-113

Cu

0.375

12,500.00

4,687.50

1.05 Water

M-157

Gal

150

0.30

45.00

1.06 Mason

L-009

Day

1,200.00

3,600.00

1.07 U / SK Labourer

L-007

Day

1,000.00

4,000.00

Total for

Cube

Rate for 1

Cube

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage

Rate(Say)

Rate
6.00
-

Amount
8,700.00
435.00

23,613.86
23,613.86
1 Cu

23,614.00

09.05

Page 49 Of 142

Rate(Say)

1ft3

236.14

Rate(Say)

1m3

8,344.17

Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-019

No

1630

1.03 Cement

M-026

Bag

4.5

920.00

4,140.00

1.04 Sand

M-113

Cu

0.3

12,500.00

3,750.00

1.05 Water

M-157

Gal

170

0.30

51.00

1.06 Mason

L-009

Day

3.5

1,200.00

4,200.00

1.07 U / SK Labourer

L-007

Day

5.5

1,000.00

5,500.00

Total for

Sqr

Rate for 1

Sqr

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for wastage

1.08

09.06

Allow 2% of Items (1.06, 1.07 ) for


Scaffolding

Rate

Amount

6.00
-

9,780.00
489.00

194.00
28,104.00
28,104.00

Rate(Say)

1 Sq

28,104.00

Rate(Say)

1ft2

281.04

Rate(Say)

1m2

3,023.99

Ground floor

1m2

3,023.99

First Floor

1m2

3,326.39

Second Floor

1m2

3,659.03

Third Floor

1m2

4,024.93

9" Brick Walls in cement sand 1:8 in superstructure in ground floor


Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-019

No

1090

1.03 Cement

M-026

Bag

1.75

920.00

1,610.00

1.04 Sand

M-113

Cu

0.3

12,500.00

3,750.00

1.05 Water

M-157

Gal

115

0.30

34.50

1.06 Mason

L-009

Day

2.25

1,200.00

2,700.00

1.07 U / SK Labourer

L-007

Day

1,000.00

3,000.00

Total for

Sqr

1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.08

Allow 3% of Items ( 1.06, 1.07 ) for


Scaffolding

Rate
6.00
-

Amount
6,540.00
327.00

171.00
18,132.50

Rate for 1

09.07

Page 50 Of 142

Sqr

18,132.50

Rate(Say)

1 Sq

18,133.00

Rate(Say)

1ft2

181.33

Rate(Say)

1m2

1,951.11

Ground floor

1m2

1,951.11

First Floor

1m2

2,146.22

Second Floor

1m2

2,360.84

Third Floor

1m2

2,596.93

4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
brickwork measured separately)
Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-164

No

550

1.03 Cement

M-026

Bag

1.2

920.00

1,104.00

1.04 Sand

M-113

Cu

0.08

12,500.00

1,000.00

1.05 Water

M-157

Gal

30

0.30

9.00

1.06 Mason

L-009

Day

1.5

1,200.00

1,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Sqr

Rate for 1

Sqr

1.01 Wire cut Bricks


1.02 Allow 2% of Items ( 1.01 ) for Wastage

1.08

09.08

Allow 3% of Items (1.06, 1.07 ) for


Scaffolding

Rate

Amount

8.75
-

4,812.50
96.25

114.00
10,935.75
10,935.75

Rate(Say)

1 Sq

10,936.00

Rate(Say)

1ft2

109.36

Rate(Say)

1m2

1,176.71

Ground floor

1m2

1,176.71

First Floor

1m2

1,294.38

Second Floor

1m2

1,423.82

Third Floor

1m2

1,566.21

9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)
Analysis for

No

Item Description

1.01 Wire cut Bricks


1.02 Allow 4% of Items ( 1.01 ) for Wastage
1.03 Cement

Item Ref

Unit

Quantity

M-164

No

1060

M-026

Bag

2.5

Sq
Rate
8.75
920.00

Amount
9,275.00
371.00
2,300.00

Page 51 Of 142

1.04 Sand

M-113

Cu

0.18

12,500.00

2,250.00

1.05 Water

M-157

Gal

100

0.30

30.00

1.06 Mason

L-009

Day

2.25

1,200.00

2,700.00

1.07 U / SK Labourer

L-007

Day

3.75

1,000.00

3,750.00

Total for

Sq

Rate for 1

Sq

1.08

09.10

Allow 3% of Items ( 1.06, 1.07 ) for


Scaffolding

193.50
20,869.50
20,869.50

Rate(Say)

1 Sq

20,870.00

Rate(Say)

1ft2

208.70

Rate(Say)

1m2

2,245.61

Ground floor

1m2

2,245.61

First Floor

1m2

2,470.17

Second Floor

1m2

2,717.19

Third Floor

1m2

2,988.91

13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
measured separately)
Analysis for

No

Item Description

Sqr

Item Ref

Unit

Quantity

M-164

No

1630

1.03 Cement

M-026

Bag

4.5

920.00

4,140.00

1.04 Sand

M-113

Cu

0.3

12,500.00

3,750.00

1.05 Water

M-157

Gal

50

0.30

15.00

1.06 Mason

L-009

Day

3.75

1,200.00

4,500.00

1.07 U / SK Labourer

L-007

Day

5.5

1,000.00

5,500.00

Total for

Sqr

Rate for 1

Sqr

1.01 Wire cut Bricks


1.02 Allow 2% of Items ( 1.01 ) for Wastage

1.08

Allow 2% of Items (1.06, 1.07 ) for


Scaffolding

Rate
8.75
-

Amount
14,262.50
285.25

200.00
32,652.75
32,652.75

Rate(Say)

1 Sq

32,653.00

Rate(Say)

1ft2

326.53

Rate(Say)

1m2

3,513.46

Ground floor

1m2

3,513.46

First Floor

1m2

3,864.81

Second Floor

1m2

4,251.29

Third Floor

1m2

4,676.42

09.11

Page in
52 ground
Of 142
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture
floor

Analysis for
No

Sqr

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.5

920.00

460.00

1.02 Sand

M-113

Cu

0.01

12,500.00

125.00

1.03 Acid

M-001

Gal

0.1

254.00

25.40

1.04 Water

M-157

Gal

10

0.30

3.00

1.05 Mason

L-009

Day

1,200.00

6,000.00

1.06 U / SK Labourer

L-007

Day

3.5

1,000.00

3,500.00

Total for

Sqr

Rate for 1

Sqr

09.12

Item Description

1
Rate

Amount

10,113.40
10,113.40

Rate(Say)

1 Sq

10,113.00

Rate(Say)

1ft2

101.13

Rate(Say)

1m2

1,088.16

3" Thick floor paved in lime mortar 2:5 in ground floor


Analysis for

No

Sqr

Item Ref

Unit

Quantity

1.01 Bricks

M-019

No

350

6.00

2,100.00

1.02 Slaked Lime

M-115

Lbs

1.2

275.00

330.00

1.03 Sand

M-113

Cu

0.11

12,500.00

1,375.00

1.04 Water

M-157

Gal

45

0.30

13.50

1.05 Mason

L-009

Day

1.25

1,200.00

1,500.00

1.06 U / SK Labourer

L-007

Day

2.5

1,000.00

2,500.00

Total for

Sqr

Rate for 1

Sqr

09.13

Item Description

1
Rate

Amount

7,818.50
7,818.50

Rate(Say)

1 Sq

7,819.00

Rate(Say)

1ft2

78.19

Rate(Say)

1m2

841.32

Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
rendering including necessary excavation.
Analysis for

No

Item Description

10

L.ft

Item Ref

Unit

Quantity

Rate

Amount

1.01 Bricks

M-019

No

120

6.00

720.00

1.02 Cement

M-026

Bag

0.5

920.00

460.00

1.03 Sand

M-113

Cu

0.05

12,500.00

625.00

Page 53 Of 142

1.04 Water

M-157

Gal

15

0.30

4.50

1.05 Mason

L-009

Day

0.5

1,200.00

600.00

1.06 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

10

L.ft

Rate for 1

L.ft

09.14

2,909.50
290.95

Rate(Say)

1 ft

290.95

Rate(Say)

1m

954.32

Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for

No

L.ft

Item Ref

Unit

Quantity

1.01 Bricks

M-019

No

140

6.00

840.00

1.02 Cement

M-026

Bag

0.8

920.00

736.00

1.03 Sand

M-113

Cu

0.05

12,500.00

625.00

1.04 Water

M-157

Gal

20

0.30

6.00

1.05 Mason

L-009

Day

1.25

1,200.00

1,500.00

1.06 U / SK Labourer

L-007

Day

1.25

1,000.00

1,250.00

Total for

10

L.ft

Rate for 1

L.ft

09.15

Item Description

10

Rate

Amount

4,957.00
495.70

Rate(Say)

1 ft

495.70

Rate(Say)

1m

1,625.90

Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for

No

Item Description

10

L.ft

Item Ref

Unit

Quantity

Rate

Amount

1.01 Bricks

M-019

No

110

6.00

660.00

1.02 Cement

M-026

Bag

0.7

920.00

644.00

1.03 Sand

M-113

Cu

0.04

12,500.00

500.00

1.04 Water

M-157

Gal

15

0.30

4.50

1.05 Mason

L-009

Day

1,200.00

1,200.00

1.06 U / SK Labourer

L-007

Day

1.25

1,000.00

1,250.00

Total for

10

L.ft

Rate for 1

L.ft

4,258.50
425.85

Rate(Say)

1 ft

425.85

Rate(Say)

1m

1,396.79

Page 54 Of 142

Page 55 Of 142

Page 56 Of 142

Page 57 Of 142

Page 58 Of 142

Page 59 Of 142

Page 60 Of 142

Page 61 Of 142

10. Roof Covering and Ceiling


A.

Roof Frame & Roof Covering

B.

Roof Plumbing

Roof frame & Roof Covering


10.A.01

Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for

No

Item Description

Sqrs

Item Ref

Unit

Quantity

M-136

Cu.ft

34

M-149

L.ft

660

396.00

1.05 Wire Nails 6" Long

M-163

Lbs

25.00

200.00

1.06 Wire Nails 2" Long

M-162

Lbs

25.00

50.00

1.07 Carpenter

L-008

Day

1,500.00

10,500.00

1.08 U / SK Labourer

L-007

Day

900.00

7,200.00

Total for

Sqrs

Rate for 1

Sqrs

1.01 Timber Class I


1.02 Allow 10% of Items ( 1.01 ) for Wastage
1.03 2"X1" Reepers
1.04 Allow 5% of Items ( 1.03 ) for Wastage

Rate
1,200.00

Amount
40,800.00

4,080.00

12.00

7,920.00

71,146.00
11,857.67

Rate(Say)

11,858.00

10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Tiles

M-108

No

750

1.02 Carpenter

L-008

Day

1.03 U / SK Labourer

L-007

Sqrs
Rate

Amount

30.00

22,500.00

1,500.00

4,500.00

Day

900.00

2,700.00

Total for

Sqrs

Rate for 1

Sqrs

29,700.00
4,950.00

Rate(Say)

4,950.00

10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Analysis for
No

Item Description

1.01 Timber Class I


1.02 Allow 10% of Items ( 1.01 ) for Wastage

3.6

Item Ref

Unit

Quantity

M-136

Cu.ft

13.25

Sqrs
Rate
1,200.00
-

Amount
15,900.00
1,590.00

1.03 Carpenter

L-008

Day

2.5

1,200.00

1.04 U / SK Labourer

L-007

Day

1,000.00

Total for

3.6

Sqrs

Rate for 1

Sqrs

3,000.00
3,000.00

23,490.00
6,525.00

Rate(Say)

10.A.04

Page 62 Of 142

6,525.00

Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
separately)
Analysis for

No

Item Description

3.6

Sqrs

Item Ref

Unit

Quantity

Rate

Amount

1.01 Asbestos Corrugated

M-003

Sq.ft

420

26.00

10,920.00

1.02 Roofing Screws and Washers

M109

No

72

3.50

252.00

1.03 Carpenter

L-008

Day

1,200.00

1,200.00

1.04 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

3.6

Sqrs

Rate for 1

Sqrs

14,372.00
3,992.22

Rate(Say)

3,992.00

10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Half Round Clay Tiles

M-056

No

650

1.02 U / SK Labourer

L-007

Day

Total for

Sqr

Rate for 1

Sqr

Sqr
Rate

Amount

5.00

3,250.00

1,000.00

2,000.00
5,250.00
5,250.00

Rate(Say)

1 Sqr

5,250.00

10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Analysis for
No

Item Description

13.33

L.ft.

Item Ref

Unit

Quantity

1.01 Ridges 3' 8" Long - Asbestos

M-106

Pair

245.00

980.00

1.02 Roofing Screws or Bolts

M-110

No

16

3.50

56.00

1.03 Carpenter

L-008

Day

0.25

1,200.00

300.00

1.04 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

Total for

13.33

L.ft.

Rate for 1

L.ft.

Rate(Say)

Rate

Amount

1,586.00
118.98
1 L.ft

119.00

Page 63 Of 142

10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Analysis for
No

Item Description

12

L.ft.

Item Ref

Unit

Quantity

Rate

Amount

1.01 Ridge Tiles

M-105

No

35.00

315.00

1.02 Cement

M-o26

Bag

0.333

920.00

306.36

1.03 Sand

M-113

Cu

0.02

12,500.00

250.00

1.04 Slaked Lime

M-115

Lbs

15

275.00

4,125.00

1.05 Colouring Powder

M-036

Lbs

0.5

175.00

87.50

1.06 Mason

L-009

Day

0.25

1,200.00

300.00

1.07 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

Total for

12

L.ft.

Rate for 1

L.ft.

5,633.86
469.49

Rate(Say)

469.00

10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
Analysis for
No

Item Description

100

Item Ref

Unit

Quantity

M-147

Sq.ft

75

1.03 Brass Screws 1 1/2"

M-015

No

100

1.04 Carpenter

L-008

Day

1.05 U / SK Labourer

L-007

1.01 1" Planks


1.02 Allow 5% of Items ( 1.01 ) for Wastage

1.06 Allow 5% of Items ( 1.04, 1.05 ) for Wastage

L.ft.
Rate
65.00
-

Amount
4,875.00
243.75

3.75

375.00

1,200.00

3,600.00

Day

1,000.00

3,000.00

Total for

100

L.ft.

Rate for 1

L.ft.

330.00
12,423.75
124.24

Rate(Say)

124.00

10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Analysis for
No

Item Description

100

L.ft.

Item Ref

Unit

Quantity

M-147

Sq.ft

75

1.03 Brass Screws 1 1/2"

M-015

No

50

3.75

187.50

1.04 Carpenter

L-008

Day

1,200.00

3,600.00

1.05 U / SK Labourer

L-007

Day

1,000.00

3,000.00

1.01 1" Planks


1.02 Allow 5% of Items ( 1.01 ) for Wastage

Rate
65.00
-

Amount
4,875.00
243.75

1.06

Allow 5% of Items ( 1.04, 1.05 ) for


Scaffolding

Total for

100

L.ft.

Rate for 1

L.ft.

Page 64 Of 142

330.00

12,236.25
122.36

Rate(Say)

122.00

Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber
members.
Analysis for
No

Item Description

15

Item Ref

Unit

Quantity

1.01 Sheet (8'X4')

M-052

Sheet

1.02 Wood Preservative

M-165

Gal

1.03 Cement

M-026

1.04 Slaked Lime

L.ft.
Rate

Amount

2,200.00

4,400.00

0.25

450.00

112.50

Bag

0.1

920.00

92.00

M-115

Lbs

0.05

275.00

13.75

1.05 Sand

M-113

Cu

0.01

12,500.00

125.00

1.06 1" Thick Class II Timber

M-141

Sq.ft

50

65.00

3,250.00

1.07 2" Nails

M-072

Lbs

50.00

100.00

1.08 Carpenter

L-008

Day

1,200.00

1,200.00

1.09 U / SK Labourer

L-007

Day

1,000.00

1,000.00

1.10 Tinker

L-005

Day

0.5

1,200.00

600.00

1.11 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

1.12 Mason

L-009

Day

0.25

1,200.00

300.00

1.13 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

Total for

15

L.ft.

Rate for 1

L.ft.

11,943.25
796.22

Rate(Say)

796.00

18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for
No

Item Description

15

Item Ref

Unit

Quantity

1.01 Sheet (8'X4')

M-052

Sheet

1.02 Cement

M-026

Bag

1.03 Sand

M-113

1.04 Soldering Lead


1.05 Tinker

L.ft.
Rate

Amount

2,200.00

2,200.00

0.05

920.00

46.00

Cu

0.01

12,500.00

125.00

M-116

Lbs

13.75

13.75

L-005

Day

0.5

1,200.00

600.00

1.06 Mason

L-009

Day

0.125

1,200.00

1.07 U / SK Labourer

L-007

Day

0.75

1,000.00

Total for

15

L.ft.

Rate for 1

L.ft.

150.00
750.00

3,884.75
258.98

Rate(Say)

10.B.03

Page 65 Of 142

259.00

6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
fixed at 18" centres (other specials paid seperately)
Analysis for

No

L.ft.

Item Ref

Unit

Quantity

1.01 6" eave gutter lengths (12' each)

M-088

No

0.00

1.02 Joiner

M-055

No

0.00

1.03 gutter brackets

M-054

No

17

0.00

1.04 3/4" brass screws

M-017

No

34

1.25

42.50

1.05 Solvent cement

M-117

grms

20

1.40

28.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

1.07 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

1.08

Item Description

24

Rate

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

Amount

55.00
Total for

24

Rate for 1

L.ft.

L.ft.

1,225.50
51.06

Rate(Say)

1 L.ft.

51.00

10.B.04 6" dia PVC gutter head


Analysis for
No

No.

Item Ref

Unit

Quantity

1.01 6" dia PVC gutter head

M-089

No

0.00

1.02 Gutter Joiner

M-055

No

0.00

1.03 gutter brackets

M-054

No

0.00

1.04 3/4" brass screws

M-017

No

1.25

5.00

1.05 Solvent cement

M-117

grms

12

1.40

16.80

1.06 Plumber

L-002

Day

0.125

1,200.00

150.00

1.07 U / SK Labourer

L-007

Day

0.125

1,000.00

125.00

1.08

Item Description

Rate

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

Amount

13.75
Total for

Rate for 1

No.

Rate(Say)

No.

310.55
310.55
1 No.

311.00

Page 66 Of 142

10.B.05 6" dia PVC mitres


Analysis for
No

No.

Item Ref

Unit

Quantity

1.01 6" dia PVC mitre bend

M-091

No

0.00

1.02 Gutter Joiner

M-055

No

0.00

1.03 gutter brackets

M-054

No

0.00

1.04 3/4" brass screws

M-017

No

1.25

5.00

1.05 Solvent cement

M-117

grms

12

1.40

16.80

1.06 Plumber

L-002

Day

0.125

1,200.00

150.00

1.07 U / SK Labourer

L-007

Day

0.125

1,000.00

125.00

1.08

Item Description

Rate

Amount

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

13.75
Total for

Rate for 1

No.

No.

310.55
310.55

Rate(Say)

1 No.

311.00

10.B.06 6" dia PVC end caps


Analysis for
No

No.

Item Ref

Unit

Quantity

1.01 end cap

M-087

No

0.00

1.05 Solvent cement

M-117

grms

12

1.40

16.80

1.06 Plumber

L-002

Day

0.0625

1,200.00

75.00

1.07 U / SK Labourer

L-007

Day

0.0625

1,000.00

62.50

1.08

Item Description

Amount
-

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

6.88
Total for

Rate for 1

No.

No.

161.18
161.18

Rate(Say)

10.B.07

Rate

1 No.

161.00

3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
specials paid seperately)
Analysis for

No

Item Description

24

L.ft.

Item Ref

Unit

Quantity

Rate

Amount

1.01 3 1/2" down pipe lengths (12' each)

M-078

No

0.00

1.02 3 1/2" Joiner

M-090

No

0.00

1.03 PVC straps

M-104

No

0.00

1.04 1" brass screws

M-014

No

2.50

20.00

1.05 Solvent cement

M-117

grms

30

1.40

42.00

1.06 Plumber

L-002

Day

0.33

1,200.00

1.07 U / SK Labourer

L-007

Day

0.33

1,000.00

1.08

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

Page 67 Of 142

400.00
333.33
36.67

Total for

24

Rate for 1

L.ft.

L.ft.

832.00
34.67

Rate(Say)

1 L.ft.

35.00

10.B.08 3 1/2" dia PVC elbow


Analysis for
No

No.

Item Ref

Unit

Quantity

1.01 elbow

M-079

No

0.00

1.05 Solvent cement

M-117

grms

32

1.40

44.80

1.06 Plumber

L-002

Day

0.0625

1,200.00

75.00

1.07 U / SK Labourer

L-007

Day

0.0625

1,000.00

62.50

1.08

Item Description

Rate

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

Amount
-

6.88
Total for

Rate for 1

No.

No.

189.18
189.18

Rate(Say)

1 No.

189.00

10.B.09 3 1/2" dia PVC Shoe


Analysis for
No

No.

Item Ref

Unit

Quantity

1.01 Shoe

M-099

No

0.00

1.05 Solvent cement

M-117

grms

15

1.40

21.00

1.06 Plumber

L-002

Day

0.0625

1,200.00

75.00

1.07 U / SK Labourer

L-007

Day

0.0625

1,000.00

62.50

1.08

Item Description

Rate

Allow 5% of Items ( 1.06, 1.07) for


Scaffolding

Amount
-

6.88
Total for

Rate for 1

No.

Rate(Say)

No.

165.38
165.38
1 No.

165.00

Page 68 Of 142

Page 69 Of 142

Page 70 Of 142

valance board

barge board

Page 71 Of 142

Page 72 Of 142

Page 73 Of 142

Page 74 Of 142

Page 75 Of 142

11. Doors & Windows


A.

Doors & Windows

B.

Ironmongery

Doors & Windows

11.A.01

Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)
Analysis for

No

Item Description

22.75

Item Ref

Unit

Quantity

1.01 4"X3" Timber

M-138

Cu.ft

1.5

1.02 Spur Stone

M-118

No

1.03 Fibre / Plastic Plugs

M-045

1.04 4" Long Brass Screws

Sq.ft
Rate

Amount

1,300.00

1,950.00

15.00

30.00

No

1.50

9.00

M-018

No

7.50

45.00

1.05 5/8" Mild Steel Dowels 4" Long.

M-067

No

6.00

12.00

1.06 1 1/2" Planks

M-139

Sq.ft

14

140.00

1,960.00

1.07 1" Planks

M-139a

Sq.ft

110.00

550.00

1.08 Carpenter

L-008

Day

1,200.00

6,000.00

1.09 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

Total for

22.75

Sq.ft

Rate for

Sq.ft

12,056.00
529.93

Rate(Say)

530.00

Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including
11.A.02 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)
Analysis for
No

Item Description

28

Item Ref

Unit

Quantity

1.01 4"X3" Timber

M-138

Cu.ft

1.66

1.02 Spur Stone

M-118

No

1.03 Fibre / Plastic Plugs

M-045

1.04 4" Long Brass Screws

Sq.ft
Rate

Amount

1,300.00

2,158.00

15.00

30.00

No

1.50

9.00

M-018

No

7.50

45.00

1.05 5/8" Mild Steel Dowels 4" Long.

M-067

No

6.00

12.00

1.06 1 1/2" Planks

M-139

Sq.ft

16

140.00

2,240.00

1.07 1" Planks

M-139a

Sq.ft

110.00

770.00

1.08 Carpenter

L-008

Day

1,200.00

1.09 U / SK Labourer

L-007

Day

1,000.00

Total for

28

Sq.ft

Rate for

Sq.ft

Page 76 Of 142

7,200.00
2,000.00

14,464.00
516.57

Rate(Say)

517.00

Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4"
11.A.03 thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)
Analysis for
No

Item Description

21.75

Item Ref

Unit

Quantity

1.01 4"X3" Timber

M-138

Cu.ft

1.8

1.02 Spur Stone

M-118

No

1.03 Fibre / Plastic Plugs

M-045

1.04 4" Long Brass Screws

Sq.ft
Rate

Amount

1,300.00

2,340.00

15.00

30.00

No

1.50

9.00

M-018

No

7.50

45.00

1.05 6' 9" X 2' 9" Plywood Sash

M-074

No

2,000.00

2,000.00

1.06 Carpenter

L-008

Day

0.75

1,200.00

900.00

1.07 U / SK Labourer

L-007

Day

0.375

1,000.00

375.00

1.08 Mason - fixing frame

L-009

Day

0.25

1,200.00

300.00

1.09 U / SK Labourer - fixing frame

L-007

Day

0.25

1,000.00

250.00

Total for

21.75

Sq.ft

Rate for

Sq.ft

6,249.00
287.31

Rate(Say)

287.00

Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame
11.A.04 having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)
Analysis for
No

Item Description

16.25

Item Ref

Unit

Quantity

1.01 4"X3" Timber

M-138

Cu.ft

1.7

1.02 Spur Stone

M-118

No

1.03 Fibre / Plastic Plugs

M-045

1.04 4" Long Brass Screws

Sq.ft
Rate

Amount

1,300.00

2,210.00

15.00

30.00

No

1.50

9.00

M-018

No

7.50

45.00

1.05 5/8" Mild Steel Dowels 4" Long.

M-067

No

6.00

12.00

1.06 1" Planks

M-139a

Sq.ft

21

110.00

2,310.00

1.07 Brass Screws 1 1/2"

M-015

No

36

3.75

135.00

1.08 Carpenter

L-008

Day

2.25

1,200.00

2,700.00

1.09 U / SK Labourer

L-007

Day

1,000.00

1,000.00

1.10 Mason - fixing frame

L-009

Day

0.25

1,200.00

1.11 U / SK Labourer - fixing frame

L-007

Day

0.25

1,000.00

Total for

16.25

Sq.ft

Rate for

Sq.ft

Page 77 Of 142

300.00
250.00

9,001.00
553.91

Rate(Say)

554.00

window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable
11.A.05 sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)
Analysis for
No

Item Description

28

Item Ref

Unit

Quantity

1.01 4"X3" Timber

M-138

Cu.ft

3.2

1.02 4" Long Brass Screws

M-018

No

1.03 Fibre / Plastic Plugs

M-045

1.04 1 1/2" Planks

Sq.ft
Rate

Amount

1,300.00

4,160.00

7.50

30.00

No

1.50

6.00

M-139

Sq.ft

9.25

140.00

1,295.00

1.05 Carpenter

L-008

Day

1,200.00

7,200.00

1.06 U / SK Labourer

L-007

Day

2.5

1,000.00

2,500.00

1.07 Mason - fixing frame

L-009

Day

0.5

1,200.00

600.00

1.08 U / SK Labourer - fixing frame

L-007

Day

0.5

1,000.00

500.00

Total for

28

Sq.ft

Rate for

Sq.ft

16,291.00
581.82

Rate(Say)

11.A.06

582.00

1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut
and fixed with timber beadings to doors and windows.
Analysis for

No

Item Description

Item Ref

Unit

Quantity

1.01 Glass panes

M-027

Sq.ft

1.02 1/2" X 1/2" Beading

M-133

L.ft

1.03 Brass Pannel Pins

M-013

1.04 Glazier
1.05 U / SK Labourer

Sq.ft
Rate

Amount

25.00

225.00

30

1.50

45.00

Doz

1.00

4.00

L-010

Day

0.5

1,200.00

600.00

L-007

Day

0.5

1,000.00

500.00

Total for

Sq.ft

Rate for

Sq.ft

Rate(Say)

Ironmongery

1,374.00
152.67
153.00

Page 78 Of 142

11.B.01 Butt Hinges 5" X 2 1/2" Brass


Analysis for
No

Item Description

1.5

Item Ref

Unit

Quantity

1.01 Butt Hinges (pairs 1 1/2)

M-023

No

1.02 3/4" Brass Screws

M-017

No

24

1.03 Carpenter

L-008

Day

1.04 U / SK Labourer

L-007

Pair
Rate

Amount

70.00

210.00

1.25

30.00

0.25

1,200.00

300.00

Day

0.25

1,000.00

250.00

Total for

1.5

Pair

Rate for

Pair

790.00
526.67

Rate(Say)

527.00

11.B.02 Tee Hinges 6" X 1/2" Brass


Analysis for
No

Item Description

1.5

Item Ref

Unit

Quantity

1.01 Tee Hinges

M-128

Pair

1.02 3/4" Iron Screws

M-061

No

18

1.03 Carpenter

L-008

Day

1.04 U / SK Labourer

L-007

Pair
Rate

Amount

165.00

165.00

0.55

9.90

0.25

1,200.00

300.00

Day

0.25

1,000.00

250.00

Total for

1.5

Pair

Rate for

Pair

724.90
483.27

Rate(Say)

483.00

11.B.03 Mortice Lock


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Mortice lock with screws

M-070

No

1.02 Carpenter

L-008

Day

1.03 U / SK Labourer

L-007

No
Rate

Amount

960.00

960.00

0.5

1,200.00

600.00

Day

0.5

1,000.00

500.00

Total for

No

Rate for

No

2,060.00
2,060.00

Rate(Say)

2,060.00

11.B.04 Casement Stays


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Casement Stays

M-025

No

1.02 1/2 " Brass Screws

M-016

No

16

No
Rate

Amount

55.00

220.00

1.30

20.80

1.03 Carpenter

L-008

Day

0.25

1,200.00

1.04 U / SK Labourer

L-007

Day

0.25

1,000.00

Total for

No

Rate for

No

Page 79 Of 142

300.00
250.00
790.80
197.70

Rate(Say)

198.00

11.B.05 Door Closer (Hydraulic)


Analysis for
No

Item Description

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 Door Closer

M-040

No

1,850.00

1,850.00

1.02 3/4" Brass Screws

M-017

No

1.25

10.00

1.03 Carpenter

L-008

Day

0.25

1,200.00

300.00

1.04 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

Total for

No

Rate for

No

2,410.00
2,410.00

Rate(Say)

2,410.00

11.B.06 Tower / Skeleton Brass Bolts 12"


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Tower / Skeleton Brass Bolts

M-153

No

1.02 1/2 " Brass Screws

M-016

No

10

1.03 Carpenter

L-008

Day

1.04 U / SK Labourer

L-007

No
Rate

Amount

145.00

145.00

1.30

13.00

0.063

1,200.00

75.60

Day

0.063

1,000.00

63.00

Total for

No

Rate for

No

296.60
296.60

Rate(Say)

297.00

11.B.07 Barrel Bolt 4"


Analysis for
No

Item Description

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 Barrel Bolt

M-004

No

75.00

75.00

1.02 1/2 " Brass Screws

M-016

No

1.30

10.40

1.03 Carpenter

L-008

Day

0.063

1,200.00

75.60

1.04 U / SK Labourer

L-007

Day

0.063

1,000.00

63.00

Total for

No

Rate for

No

224.00
224.00

Page 80224.00
Of 142

Rate(Say)

11.B.08 Casement Fasteners


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Casement Fasteners

M-024

No

1.02 1/2 " Brass Screws

M-016

No

1.03 Carpenter

L-008

1.04 U / SK Labourer

No
Rate

Amount

55.00

330.00

24

1.30

31.20

Day

0.5

1,200.00

600.00

L-007

Day

0.5

1,000.00

500.00

Total for

No

Rate for

No

1,461.20
243.53

Rate(Say)

244.00

11.B.09 Check this item


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Brass Fanlight Chtches

M-011

No

1.02 1/2 " Brass Screws

M-016

No

1.03 Carpenter

L-008

1.04 U / SK Labourer

No
Rate

Amount

45.00

270.00

24

1.30

31.20

Day

0.5

1,200.00

600.00

L-007

Day

0.5

1,000.00

500.00

Total for

No

Rate for

No

1,401.20
233.53

Rate(Say)

234.00

11.B.10 Draw Rings


Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Draw Rings

M-041

No

1.02 1/2 " Brass Screws

M-016

No

12

1.03 Carpenter

L-008

Day

1.04 U / SK Labourer

L-007

No
Rate

Amount

22.50

135.00

1.30

15.60

0.125

1,200.00

150.00

Day

0.125

1,000.00

125.00

Total for

No

Rate for

No

Rate(Say)

425.60
70.93
71.00

Page 81 Of 142

Page 82 Of 142

Page 83 Of 142

Page 84 Of 142

Page 85 Of 142

Page 86 Of 142

Page 87 Of 142

12. Plumbing & Drainage


12.01 1/2 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No

Item Description

10

L.ft

Item Ref

Unit

Quantity

Rate

Amount

1.01 1/2" PVC Pipes

M-095

L.ft

13

7.50

97.50

1.02 1 " Clips and Nails

M-028

No

7.00

21.00

1.03 Solvent Cement

M-117

Grms

1.40

2.80

1.04 Plumber

L-002

Day

0.125

1,200.00

150.00

1.05 U / SK Labourer

L-007

Day

0.125

1,000.00

125.00

Total for

10

L.ft

Rate for

L.ft

396.30
39.63

Rate(Say)

1 L.ft

40.00

12.02 3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 3/4" PVC Pipes

M-098

L.ft

13

1.02 1 " Clips and Nails

M-028

No

1.03 Solvent Cement

M-117

1.04 Plumber
1.05 U / SK Labourer

L.ft
Rate

Amount

14.00

182.00

7.00

21.00

Grms

1.40

4.20

L-002

Day

0.125

1,200.00

150.00

L-007

Day

0.125

1,000.00

125.00

Total for

10

L.ft

Rate for

L.ft

482.20
48.22

Rate(Say)

1 L.ft

48.00

12.03 1 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No

Item Description

100

L.ft

Item Ref

Unit

Quantity

M-094

L.ft

100

105.00

1.03 1" PVC Sockets

M-077

No

14.00

112.00

1.04 Solvent Cement

M-117

Grms

32

1.40

44.80

1.05 1 " Clips and Nails

M-028

No

35

7.00

245.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

1.07 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

1.01 1" PVC Pipes


1.02 Allow 5% of Items ( 1.01 ) for Wastage

Rate

21.00

Amount

2,100.00

Total for

100

Rate for

L.ft

Page 88 Of 142

L.ft

3,706.80
37.07

Rate(Say)

1 L.ft

37.00

12.04 1 1/4"Diameter PVC pipes fixed to walls (Specials paid separately)


Analysis for
No

Item Description

100

L.ft

Item Ref

Unit

Quantity

M-093

L.ft

100

160.00

1.03 1 1/4" PVC Sockets

M-101

No

19.50

156.00

1.04 Solvent Cement

M-117

Grms

48

1.40

67.20

1.05 1 1/4 " Clips and Nails

M-030

No

35

8.75

306.25

1.06 Plumber

L-002

Day

0.75

1,200.00

900.00

1.07 U / SK Labourer

L-007

Day

0.75

1,000.00

750.00

Total for

100

L.ft

Rate for

L.ft

1.01 1 1/4" PVC Pipes


1.02 Allow 5% of Items ( 1.01 ) for Wastage

Rate

32.00

Amount

3,200.00

5,539.45
55.39

Rate(Say)

1 L.ft

55.00

12.05 1 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No

Item Description

100

L.ft

Item Ref

Unit

Quantity

M-092

L.ft

100

230.00

1.03 1 1/2" PVC Sockets

M-100

No

29.50

236.00

1.04 Solvent Cement

M-117

Grms

64

1.40

89.60

1.05 1 1/2 " Clips and Nails

M-029

No

35

10.50

367.50

1.06 Plumber

L-002

Day

0.75

1,200.00

900.00

1.07 U / SK Labourer

L-007

Day

0.75

1,000.00

750.00

Total for

100

L.ft

Rate for

L.ft

1.01 1 1/2" PVC Pipes


1.02 Allow 5% of Items ( 1.01 ) for Wastage

Rate

46.00

4,600.00

7,173.10
71.73

Rate(Say)

12.06

Amount

1 L.ft

72.00

2" Diameter PVC pipes fixed to walls (Specials paid separately)


Analysis for

No

Item Description

1.01 2" PVC Pipes


1.02 Allow 5% of Items ( 1.01 ) for Wastage

100

Item Ref

Unit

Quantity

M-096

L.ft

100

L.ft
Rate

79.00
-

Amount

7,900.00
395.00

1.03 2" PVC Sockets

M-102

No

1.04 Solvent Cement

M-117

Grms

112

1.05 2 " Clips and Nails

M-031

No

35

1.06 Plumber

L-002

Day

1.07 U / SK Labourer

L-007

48.00

Page 89 Of 142

384.00

1.40

156.80

10.75

376.25

0.75

1,200.00

900.00

Day

0.75

1,000.00

750.00

Total for

100

L.ft

Rate for

L.ft

10,862.05
108.62

Rate(Say)

1 L.ft

109.00

12.07 3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000
Analysis for
No

Item Description

100

Item Ref

Unit

Quantity

M-097

L.ft

100

1.03 3" PVC Sockets

M-103

No

1.04 Solvent Cement

M-117

Grms

200

1.05 3 " Clips and Screws

M-032

No

35

1.06 Plumber

L-002

Day

1.07 U / SK Labourer

L-007

1.01 3" PVC Pipes


1.02

Allow 5% of Items ( 1.01 ) for


Compaction

Amount

185.00

18,500.00

925.00
1,536.00

1.40

280.00

34.00

1,190.00

1,200.00

1,200.00

Day

1,000.00

1,000.00

Total for

100

L.ft.

Rate for

L.ft.

24,631.00
246.31
1 L.ft

246.00

Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6"
Deep, Backfilling & Compacting
Analysis for

No

Item Description

1.01 U / SK Labourer

100

Item Ref

Unit

Quantity

L-007

Day

2.25

Total for

100

L.ft

Rate for

L.ft

L.ft
Rate

1,000.00

Amount

2,250.00
2,250.00
22.50

Rate(Say)

12.09

Rate

192.00

Rate(Say)

12.08

L.ft.

1 L.ft

23.00

Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good average
depth 2" (Pipes and specials paid separately)
Analysis for

No

Item Description

100

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.1

1.02 Sand

M-113

Cu

0.01

1.06 Mason

L-009

Day

L.ft
Rate

Amount

920.00

92.00

12,500.00

125.00

1,200.00

3,600.00

1.07 U / SK Labourer

L-007

Day

Total for

100

L.ft

Rate for

L.ft

Page 90 Of 142

3,000.00
6,817.00
68.17

Rate(Say)

12.10

1,000.00

1 L.ft

68.00

Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and
making good. average depth 3" (Pipes and specials measured paid separately)
Analysis for

No

Item Description

100

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.2

1.02 Sand

M-113

Cu

0.03

1.06 Mason

L-009

Day

1.07 U / SK Labourer

L-007

L.ft
Rate

Amount

920.00

184.00

12,500.00

375.00

3.5

1,200.00

4,200.00

Day

3.5

1,000.00

3,500.00

Total for

100

L.ft

Rate for

L.ft

8,259.00
82.59

Rate(Say)

1 L.ft

83.00

12.11 1/2" dia PVC specials viz-elbow / Bends / Sockets.


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1/2" PVC Elbows / Bent / Socket

M-083

No

10

10.50

105.00

1.02 Solvent Cement

M-117

Grms

20

1.40

28.00

1.06 Plumber

L-002

Day

0.25

1,200.00

300.00

Total for

10

No

Rate for

No

433.00
43.30

Rate(Say)

No

43.00

12.12 3/4" dia PVC specials viz-elbow / Bends / Sockets.


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

1.01 3/4" PVC Elbows / Bent / Socket

M-076

No

10

15.00

150.00

1.02 Solvent Cement

M-117

Grms

30

1.40

42.00

1.06 Plumber

L-002

Day

0.25

1,200.00

300.00

Total for

10

No

Rate for

No

Rate(Say)

12.13 1" dia PVC specials viz-elbo / Bends / Sockets.

Rate

Amount

492.00
49.20
No

49.00

Analysis for
No

Item Description

No Page 91 Of 142

10

Item Ref

Unit

Quantity

Rate

Amount

1.01 1" PVC Elbows / Bent / Socket

M-082

No

10

21.00

210.00

1.02 Solvent Cement

M-117

Grms

40

1.40

56.00

1.06 Plumber

L-002

Day

0.25

1,200.00

300.00

Total for

10

No

Rate for

No

566.00
56.60

Rate(Say)

No

57.00

12.14 1 1/4" dia PVC specials viz-elbo / Bends / Sockets.


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1 1/4" PVC Elbows / Bent / Socket

M-081

No

10

42.00

420.00

1.02 Solvent Cement

M-117

Grms

60

1.40

84.00

1.06 Plumber

L-002

Day

0.25

1,200.00

300.00

Total for

10

No

Rate for

No

804.00
80.40

Rate(Say)

No

80.00

12.15 1 1/2" dia PVC specials viz-elbo / Bends / Sockets.


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1 1/2" PVC Elbows / Bent / Socket

M-080

No

10

69.00

690.00

1.02 Solvent Cement

M-117

Grms

80

1.40

112.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

1,402.00
140.20

Rate(Say)

No

140.00

12.16 2" dia PVC specials viz-elbo / Bends / Sockets.


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 2" PVC Elbows / Bent / Socket

M-085

No

10

1.02 Solvent Cement

M-117

Grms

1.06 Plumber

L-002

No
Rate

Amount

110.00

1,100.00

140

1.40

196.00

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

Rate(Say)

1,896.00
189.60
No

190.00

Page 92 Of 142

12.17 2 1/2" dia PVC specials viz-elbo / Bends / Sockets.


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 2 1/2" PVC Elbows / Bent / Socket

M-084

No

10

1.02 Solvent Cement

M-117

Grms

1.06 Plumber

L-002

No
Rate

Amount

350.00

3,500.00

200

1.40

280.00

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

4,380.00
438.00

Rate(Say)

No

438.00

12.18 3" dia PVC specials viz-elbo / Bends / Sockets.


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 3" PVC Elbows / Bent / Socket

M-086

No

10

1.02 Solvent Cement

M-117

Grms

1.06 Plumber

L-002

No
Rate

Amount

580.00

5,800.00

240

1.40

336.00

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

6,736.00
673.60

Rate(Say)

No

674.00

12.19 1/2" dia PVC Tee


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1/2 " Dia Tee

M-122

No

10

15.50

155.00

1.02 Solvent Cement

M-117

Grms

30

1.40

42.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

797.00
79.70

Rate(Say)

No

80.00

12.20 3/4 " dia PVC Tee


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 3/4 " Dia Tee

M-126

No

10

21.50

215.00

1.02 Solvent Cement

M-117

Grms

45

1.40

63.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

Total for

10

Rate for

No

Page 93 Of 142

No

878.00
87.80

Rate(Say)

No

88.00

12.21 1" dia PVC Tee


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1 " Dia Tee

M-120

No

10

31.25

312.50

1.02 Solvent Cement

M-117

Grms

60

1.40

84.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

996.50
99.65

Rate(Say)

No

100.00

12.22 1 1/4 " dia PVC Tee


Analysis for
No

Item Description

10

No

Item Ref

Unit

Quantity

Rate

Amount

1.01 1 1/4 " Dia Tee

M-127

No

10

63.50

635.00

1.02 Solvent Cement

M-117

Grms

90

1.40

126.00

1.06 Plumber

L-002

Day

0.5

1,200.00

600.00

Total for

10

No

Rate for

No

1,361.00
136.10

Rate(Say)

No

136.00

12.23 1 1/2 " dia PVC Tee


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 1 1/2 " Dia Tee

M-121

No

10

1.02 Solvent Cement

M-117

Grms

120

1.06 Plumber

L-002

Day

Total for

10

No

Rate for

No

No
Rate

Amount

102.00

1,020.00

1.40

168.00

1,200.00

1,200.00
2,388.00
238.80

Rate(Say)

No

239.00

12.24 2 " dia PVC Tee


Analysis for
No

Item Description

Item Ref

Unit

10
Quantity

No
Rate

Amount

1.01 2 " Dia Tee

M-123

No

10

1.02 Solvent Cement

M-117

Grms

210

1.06 Plumber

L-002

Day

Total for

10

No

Rate for

No

165.50

Page 94 Of 142

1,655.00

1.40

294.00

1,200.00

1,200.00
3,149.00
314.90

Rate(Say)

No

315.00

12.25 2 1/2 " dia PVC Tee


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 2 1/2" Dia Tee

M-124

No

10

1.02 Solvent Cement

M-117

Grms

1.06 Plumber

L-002

No
Rate

Amount

526.00

5,260.00

300

1.40

420.00

Day

1.5

1,200.00

1,800.00

Total for

10

No

Rate for

No

7,480.00
748.00

Rate(Say)

No

748.00

12.26 3 " dia PVC Tee


Analysis for
No

Item Description

10

Item Ref

Unit

Quantity

1.01 3 " Dia Tee

M-125

No

10

1.02 Solvent Cement

M-117

Grms

1.06 Plumber

L-002

No
Rate

Amount

875.00

8,750.00

360

1.40

504.00

Day

1.5

1,200.00

1,800.00

Total for

10

No

Rate for

No

Rate(Say)

11,054.00
1,105.40
No

1,105.00

Page 95 Of 142

1/2 "

20mm dia pipe

3/4"

25mm dia pipe

1"

32mm dia pipe

11/4"

40mm dia pipe

11/2"

50mm dia pipe

2"

63mm dia pipe

21/2"

75mm dia pipe

3"

90mm dia pipe

Page 96 Of 142

Page 97 Of 142

Page 98 Of 142

Page 99 Of 142

Page 100 Of 142

Page 101 Of 142

Page 102 Of 142

Page 103 Of 142

13. Plastering
A.

Wall Plastering

B.

Rendering

C.

Sofit Plastering

D.

Skirting

Wall Plastering
13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for
No

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

1.4

1.02 Sand

M-113

Cu

0.06

1.03 Water

M-157

Gal

10

1.04 Mason

L-009

Day

1.05 U / SK Labourer

L-007

1.06

Item Description

Allow 3% of Items ( 1.04, 1.05 ) for


Scaffolding

Sqr
Rate

Amount

920.00

1,288.00

12,500.00

750.00

0.30

3.00

1,500.00

1,500.00

Day

1.5

1,000.00

1,500.00

Total for

Sqr

Rate for

Sqr

90.00
5,131.00
5,131.00

Rate(Say)

1Sq

5,131.00

Rate(Say)

1ft2

51.31

Rate(Say)

1m2

552.10

13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for
No

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.8

1.03 Sand

M-113

Cu

0.07

1.04 Water

M-157

Gal

10

1.05 Mason

L-009

Day

1.06 U / SK Labourer

L-007

Sqr
Rate

Amount

920.00

736.00

12,500.00

875.00

0.30

3.00

1,200.00

1,200.00

Day

1.25

1,000.00

1,250.00

Total for

Sqr

Rate for

Sqr

4,064.00
4,064.00

Rate(Say)

1Sq

4,064.00

Rate(Say)

1ft2

40.64

Rate(Say)

1m2

437.29

Ground floor - First Floor

1m2

437.29

13.A.03

Page 104 Of 142

First Floor - Second Floor

1m2

481.02

Second Floor - Third Floor

1m2

529.12

Third Floor - Fourth Floor

1m2

582.03

5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden
float.
Analysis for
1
Sq

No

Item Description

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.8

920.00

736.00

1.02 Slaked Lime

M-115

Lbs

44

275.00

12,100.00

1.03 Sand

M-113

Cu

0.07

12,500.00

875.00

1.04 Water

M-157

Gal

10

0.30

3.00

1.05 Mason

L-009

Day

1,200.00

1,200.00

1.06 U / SK Labourer

L-007

Day

1.25

1,000.00

1,250.00

Total for

Sqr

Rate for

Sqr

Allow 3% of Items ( 1.04, 1.05 ) for


1.07
Scaffolding

13.A.04

Rate

Amount

73.50
16,237.50
16,237.50

Rate(Say)

1Sq

16,238.00

Rate(Say)

1ft2

162.38

Rate(Say)

1m2

1,747.21

Ground floor - First Floor

1m2

1,747.21

First Floor - Second Floor

1m2

1,921.93

Second Floor - Third Floor

1m2

2,114.12

Third Floor - Fourth Floor

1m2

2,325.53

5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with
lime putty floating.
Analysis for

No

Sqr

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.8

920.00

736.00

1.02 Slaked Lime

M-115

kg

30

275.00

8,250.00

1.03 Sand

M-113

Cu

0.07

12,500.00

875.00

1.04 Water

M-157

Gal

10

0.30

3.00

1.05 Mason

L-009

Day

1.5

1,200.00

1,800.00

1.06 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

Total for

Sqr

Rate for

Sqr

1.07

Item Description

Allow 3% of Items ( 1.05, 1.06 ) for


Scaffolding

Rate(Say)

Rate

Amount

99.00
13,263.00
13,263.00
1Sq

13,263.00

Page 105 Of 142

Rate(Say)

1ft2

132.63

Rate(Say)

1m2

1,427.10

Ground floor - First Floor

1m2

1,427.10

First Floor - Second Floor

1m2

1,569.81

Second Floor - Third Floor

1m2

1,726.79

Third Floor - Fourth Floor

1m2

1,899.47

13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for
No

Item Ref

Unit

Quantity

1.01 Slaked Lime

M-115

kg

65

1.02 Sand

M-113

Cu

0.07

1.03 Water

M-157

Gal

10

1.04 Mason

L-009

Day

1.05 U / SK Labourer

L-007

1.06

Item Description

Allow 3% of Items ( 1.04, 1.05 ) for


Scaffolding

Sqr
Rate

Amount

275.00

17,875.00

12,500.00

875.00

0.30

3.00

1,200.00

1,200.00

Day

1.75

1,000.00

1,750.00

Total for

Sqr

Rate for

Sqr

88.50
21,791.50
21,791.50

Rate(Say)

1Sq

21,792.00

Rate(Say)

1ft2

217.92

Rate(Say)

1m2

2,344.82

Rendering
13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for
No

Item Description

Sqr

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

1.75

920.00

1,610.00

1.02 Sand

M-113

Cu

0.08

12,500.00

1,000.00

1.03 Water

M-157

Gal

10

0.30

3.00

1.04 Mason

L-009

Day

1.25

1,200.00

1,500.00

1.05 U / SK Labourer

L-007

Day

1,000.00

2,000.00

1.06 U / SK Labourer - curing

L-007

Day

0.25

1,000.00

250.00

Total for

Sqr

Rate for

Sqr

6,363.00
6,363.00

Rate(Say)

1Sq

6,363.00

Rate(Say)

1ft2

63.63

Rate(Say)

1m2

684.66

Page 106 Of 142

Ground floor

1m2

684.66

First Floor

1m2

753.12

Second Floor

1m2

828.44

Third Floor

1m2

911.28

13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for
No

Item Description

Sqr

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

1.07

920.00

984.40

1.02 Sand

M-113

Cu

0.05

12,500.00

625.00

1.03 Water

M-157

Gal

10

0.30

3.00

1.04 Mason

L-009

Day

1,200.00

1,200.00

1.05 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

Total for

Sqr

Rate for

Sqr

4,312.40
4,312.40

Rate(Say)

1Sq

4,312.00

Rate(Say)

1ft2

43.12

Rate(Say)

1m2

463.97

13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for
No

Item Description

Item Ref

Unit

Quantity

` 1.01 Cement

M-026

Bag

1.5

1.02 Sand

M-113

Cu

0.05

1.03 Water

M-157

Gal

10

1.04 Mason

L-009

Day

1.05 U / SK Labourer

L-007

1.06 U / SK Labourer - curing

Sq
Rate

Amount

920.00

1,380.00

12,500.00

625.00

0.30

3.00

1,200.00

1,200.00

Day

1.5

1,000.00

1,500.00

L-007

Day

0.25

1,000.00

250.00

Total for

Sq

Rate for

Sq

4,958.00
4,958.00

Rate(Say)

1Sq

4,958.00

Rate(Say)

1ft2

49.58

Rate(Say)

1m2

533.48

13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for
No

Item Description

Sqr

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

2.25

920.00

2,070.00

1.02 Sand

M-113

Cu

0.08

12,500.00

1,000.00

1.03 Water

M-157

Gal

10

1.04 Mason

L-009

Day

1.05 U / SK Labourer

L-007

1.06 U / SK Labourer - curing

13.B.05

Page 107 Of 142

0.30

3.00

1.25

1,200.00

1,500.00

Day

1,000.00

2,000.00

L-007

Day

0.25

1,000.00

250.00

Total for

Sqr

Rate for

Sqr

6,823.00
6,823.00

Rate(Say)

1Sq

6,823.00

Rate(Say)

1ft2

68.23

Rate(Say)

1m2

734.15

3/4" thick rendering in cement and sand 1:2 in colored cement floors finished
smooth
Analysis for
1
Sqr

No

Item Description

Item Ref

Unit

Quantity

Rate

Amount

1.01 Cement

M-026

Bag

2.25

920.00

2,070.00

1.02 Sand

M-113

Cu

0.08

12,500.00

1,000.00

1.03 Coloured Pigment

M-035

Lbs

175.00

875.00

1.04 Water

M-157

Gal

10

0.30

3.00

1.05 Mason

L-009

Day

1.25

1,200.00

1,500.00

1.06 U / SK Labourer

L-007

Day

1,000.00

2,000.00

1.07 U / SK Labourer - curing

L-007

Day

0.25

1,000.00

250.00

Total for

Sqr

Rate for

Sqr

7,698.00
7,698.00

Rate(Say)

1Sq

7,698.00

Rate(Say)

1ft2

76.98

Rate(Say)

1m2

828.30

Sofit Plastering
13.C.01

3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with
Lime putty
Analysis for

No

Sqr

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.8

920.00

736.00

1.02 Slaked Lime

M-115

kg

275.00

2,200.00

1.03 Sand

M-113

Cu

0.05

12,500.00

625.00

1.04 Water

M-157

Gal

0.30

1.50

1.05 Mason

L-009

Day

2.5

1,200.00

3,000.00

1.06 U / SK Labourer

L-007

Day

2.5

1,000.00

2,500.00

Total for

Sqr

1.07

Item Description

Allow 3% of Items ( 1.05, 1.06 ) for


Scaffolding

Rate

Amount

165.00
8,491.50

Rate for

13.C.02

Page 108 Of 142

Sqr

8,491.50

Rate(Say)

1Sq

8,492.00

Rate(Say)

1ft2

84.92

Rate(Say)

1m2

913.74

Ground floor

1m2

913.74

First Floor

1m2

1,005.11

Second Floor

1m2

1,105.62

Third Floor

1m2

1,216.19

3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including
floating with Lime putty
Analysis for

No

Sq

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.8

920.00

736.00

1.02 Slaked Lime

M-115

kg

275.00

2,200.00

1.03 Sand

M-113

Cu

0.05

12,500.00

625.00

1.04 Water

M-157

Gal

0.30

1.50

1.05 Mason

L-009

Day

1,200.00

2,400.00

1.06 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

Sqr

Rate for

Sqr

1.07

Item Description

Allow 3% of Items ( 1.05, 1.06 ) for


Scaffolding

Rate

Amount

132.00
7,358.50
7,358.50

Rate(Say)

1Sq

7,359.00

Rate(Say)

1ft2

73.59

Rate(Say)

1m2

791.83

Ground floor

1m2

791.83

First Floor

1m2

871.01

Second Floor

1m2

958.11

Third Floor

1m2

1,053.92

Skirting
13.D.01

1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove
Analysis for

No

Item Description

10

Item Ref

Unit

Quantity

1.01 Cement

M-026

Bag

0.1

1.02 Sand

M-113

Cu

0.003

1.03 Coloured Pigment

M-035

Lbs

0.25

1.04 Mason

L-009

Day

0.375

L.ft
Rate

Amount

920.00

92.00

12,500.00

37.50

175.00

43.75

1,200.00

450.00

1.05 U / SK Labourer

L-007

Day

0.312

Total for

10

L.ft

Rate for

L.ft

Page 109 Of 142

1,000.00

312.00
935.25
93.53

Rate(Say)

1ft

94.00

Rate(Say)

1m

308.32

Ground floor

1m

308.32

First Floor

1m

339.15

Second Floor

1m

373.07

3rd floor

1m

410.37

Page 110 Of 142

2.333

0.251

0.063

0.100

0.011

0.003

Page 111 Of 142

Page 112 Of 142

Page 113 Of 142

Page 114 Of 142

Page 115 Of 142

Page 116 Of 142

Page 117 Of 142

14. Tilling
A.

Wall Tilling

B.

Floor Tilling

Wall Tilling
14.A.01

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
(Specials measured separately)

No

Item Description

1.01 Glazed Tiles (6''x6")

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

M-155

No

400

1.03 Cement

M-026

Bag

2.5

920.00

2,300.00

1.04 Sand

M-113

Cu

0.11

12,500.00

1,375.00

1.05 White Cement

M-159

Lbs

17.50

17.50

1.06 Mason

L-009

Day

1,200.00

4,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

4,000.00

1.08 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

Total for

Sqr

Rate for 1

Sqr

1.02 Allow 10% of Items ( 1.01 ) for Wastage

14.A.02

75.00
-

30,000.00
3,000.00

45,742.50
45,742.50

Rate(Say)

1Sq

45,743.00

Rate(Say)

1ft2

457.43

Rate(Say)

1m2

4,921.95

Ground floor

1m2

4,921.95

First Floor

1m2

5,414.14

Second Floor

1m2

5,955.56

Third Floor

1m2

6,551.11

Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
(Specials measured separately)

No

Item Description

1.01 Glazed Tiles (8''x12")

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

M-156

No

150

1.03 Cement

M-026

Bag

2.5

920.00

2,300.00

1.04 Sand

M-113

Cu

0.11

12,500.00

1,375.00

1.05 White Cement

M-159

Lbs

17.50

17.50

1.06 Mason

L-009

Day

1,200.00

4,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

4,000.00

1.08 U / SK Labourer

L-007

Day

0.25

1,000.00

250.00

1.02 Allow 10% of Items ( 1.01 ) for Wastage

100.00

Amount

15,000.00
1,500.00

Total for

Rate for 1

Sqr

Page 118 Of 142

Sqr

29,242.50
29,242.50

Rate(Say)

1Sq

29,243.00

Rate(Say)

1ft2

292.43

Rate(Say)

1m2

3,146.55

Ground floor

1m2

3,146.55

First Floor

1m2

3,461.20

Second Floor

1m2

3,807.32

Third Floor

1m2

4,188.05

Floor Tilling
14.B.01

Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor

No

Item Description

1.01 Terrazzo Tiles 12" X 12"

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

M-132

No

100

1.03 Cement

M-026

Bag

1.25

920.00

1,150.00

1.04 Sand

M-113

Cu

0.07

12,500.00

875.00

1.05 Coloured Pigment

M-035

Lbs

175.00

350.00

1.06 Wax Polish

M-158

Lbs

0.5

150.00

75.00

1.07 Cotton Waste

M-037

Lbs

12.50

25.00

1.08 Mason

L-009

Day

1,200.00

4,800.00

1.09 U / SK Labourer

L-007

Day

1,000.00

3,000.00

1.10 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

1.02 Allow 5% of Items ( 1.01 ) for Wastage

150.00
-

15,000.00
750.00

26,525.00
26,525.00

Rate(Say)

1Sq

26,525.00

Rate(Say)

1ft2

265.25

Rate(Say)

1m2

2,854.09

Ground floor

1m2

2,854.09

First Floor

1m2

3,139.50

Second Floor

1m2

3,453.45

Third Floor

1m2

3,798.79

14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
No

Item Description

1.01 Pressed Tiles 8" X 8"


1.02 Allow 5% of Items ( 1.01 ) for Wastage

Analysis for
1
Item Ref
Unit Quantity
M-130

No

225

Sqr
Rate
125.00
-

Amount
28,125.00
1,406.25

Page 119 Of 142

1.03 Cement

M-026

Bag

1.25

920.00

1,150.00

1.04 Sand

M-113

Cu

0.07

12,500.00

875.00

1.05 Colouring Powder

M-036

Lbs

0.25

175.00

43.75

1.06 Cotton Waste

M-037

Lbs

12.50

25.00

1.07 Mason

L-009

Day

1,200.00

4,800.00

1.08 U / SK Labourer

L-007

Day

1,000.00

4,000.00

1.09 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

40,925.00
40,925.00

Rate(Say)

1Sq

40,925.00

Rate(Say)

1ft2

409.25

Rate(Say)

1m2

4,403.53

Ground floor

1m2

4,403.53

First Floor

1m2

4,843.88

Second Floor

1m2

5,328.27

Third Floor

1m2

5,861.10

Page 120 Of 142

Page 121 Of 142

Page 122 Of 142

15. Ceiling

15.01

Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Analysis for

No

Sqrs

Item Ref

Unit

Quantity

1.01 Timber Class I

M-136

Cu.ft

1,200.00

9,600.00

1.02 2" Nails

M-072

Lbs

50.00

50.00

1.03 Fibre / Plastic Plugs

M-045

No

26

1.50

39.00

1.04 Cement

M-026

Bag

0.23

920.00

211.60

1.05 Sand

M-113

Cu

0.02

12,500.00

250.00

1.06 Brush 2"

M-022

No

0.25

165.00

41.25

1.07 Tarnap

M-119

Gal

0.333

450.00

149.85

1.08 Carpenter

L-008

Day

2.5

1,200.00

3,000.00

1.09 Mason

L-009

Day

0.5

1,200.00

600.00

1.10 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

Total for

1.95

Sqrs

Rate for 1

Sqrs

1.11

Item Description

1.95

Allow 3% of Items ( 1.08, 1.09,


1.10 ) for Scaffolding

Rate

153.00
15,594.70
7,997.28

Rate(Say)

15.02

7,997.00

Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
Analysis for

No

Amount

Item Description

1.95

Sqrs

Item Ref

Unit

Quantity

Rate

Amount

1.01 Flat Asbestos Sheets

M-048

Sq.ft

210

15.00

3,150.00

1.02 2"X2" halmilla Cove Moulding

M-145

Sq.ft

60

35.00

2,100.00

1.03 1 1/2"X1/2" Halmilla Beadings

M-134

L.ft

125

12.00

1,500.00

1.04 1/4" clout Nails

M-033

lbs

0.25

25.00

6.25

1.05 Brass Screws 1 1/2"

M-015

No

96

3.75

360.00

1.06 Carpenter

L-008

Day

1.5

1,200.00

1,800.00

1.07 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

1.95

Sqrs

Rate for 1

Sqrs

1.08

Allow 3% of Items ( 1.06, 1.07 ) for


Scaffolding

114.00
11,030.25
5,656.54

Rate(Say)

15.03

5,657.00

3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
Analysis for

No

Item Description

1.95

Sqrs

Item Ref

Unit

Quantity

M-146

L.ft

115

65.00

7,475.00

M-135

Sq.ft

215

28.00

6,020.00

1.03 Cement

M-026

Bag

0.027

920.00

24.84

1.04 Sand

M-113

Cu

0.04

12,500.00

500.00

1.05 1 1/2 brass Nails

M-012

lbs

50.00

440.53

1.01 4" x 2" Timber Joists


1.02

6" x 3/4" Lunumidella Ceiling


Planks.

Rate

Amount

1.06

Mason - making holes, fixing joists &


making goods

L-009

Day

1,200.00

1,200.00

1.07

Carpenter - making holes, fixing


joists & making goods

L-008

Day

1,200.00

1,200.00

1.08

U / SK Labourer - making holes,


fixing joists & making goods

L-007

Day

1,000.00

3,000.00

1.09 Carpenter - Fixing ceiling boards

L-008

Day

1,200.00

3,600.00

1.10

U / SK Labourer - Fixing ceiling


boards

L-007

Day

1,000.00

4,000.00

1.11

Allow 3% of Items (1.06, 1.07, 1.08,


1.09, 1.10) for Scaffolding

Total for

1.95

Sqrs

Rate for 1

Sqrs

390.00
27,850.37
14,282.24

Rate(Say)

15.04

14,282.00

3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
Analysis for

1.8

Sq

No

Item Description
6" x 3/4" Lunumidella Ceiling
1.01
Planks.

Item Ref

Unit

Quantity

M-135

Sq.ft

220

28.00

6,160.00

1.02 2" X 1/4" Timber Strips

M-150

L.ft

40

5.00

200.00

1.03 3/4" Nails

M-073

Lbs

4.5

20.00

90.00

1.04 1 1/2" Brass Nails

M-012

Lbs

50.00

440.53

1.05 Carpenter

L-008

Day

1,200.00

3,600.00

1.06 U / SK Labourer

L-007

Day

1,000.00

6,000.00

Total for

1.8

Sq

Rate for 1

Sq

1.07

Allow 3% of Items ( 1.05, 1.06 ) for


Scaffolding

Rate(Say)

Rate

Amount

288.00
16,778.53
9,321.40
9,321.00

Page 129 Of 142

16. Painting
A.

Wall

B.

Sofit

C.

Wood

D.

Steel

Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Primer

M-075

litre

0.9

180.00

162.00

1.02 Emulsion Paint

M-043

litre

1.4

280.00

392.00

1.03 Water

M-157

Gal

0.1

0.30

0.03

1.04 6" Brush

M-021

No

0.1

495.00

49.50

1.05 Sand Papers

M-114

Sheet

3.50

7.00

1.06 Painter

L-001

Day

1.25

1,200.00

1,500.00

Total for

Sqr

Rate for 1

Sqr

1.07 Allow 3% of Items (1.06) for Scaffolding

45.00
2,155.53
2,155.53

Rate(Say)

1 Sq

2,156.00

Rate(Say)

1ft2

21.56

Rate(Say)

1m2

231.99

Ground floor

1m2

231.99

First Floor

1m2

255.18

Second Floor

1m2

280.70

Third Floor

1m2

308.77

Analysis for
1
Item Ref
Unit Quantity

Sqr

16.A.02 Painting walls with emulsion paint (2 Coats)


No

Item Description

Rate

Amount

1.01 Emulsion Paint - first coat

M-043

litre

0.757

898.75

680.35

1.02 Emulsion Paint - Second coat

M-043

litre

0.649

898.75

583.29

1.03 6" Brush

M-021

No

0.1

750.00

75.00

1.04 Water

M-157

Gal

0.1

1.05 Painter

L-001

Day

Total for

Sqr

Rate for 1

Sqr

1.06 Allow 3% of Items (1.05 ) for Scaffolding

1,400.00
-

2,800.00
84.00
4,222.64
4,222.64

Page 130 Of 142

Rate(Say)

1 Sq

4,223.00

Rate(Say)

1ft2

42.23

Rate(Say)

1m2

454.39

Ground floor

1m2

454.39

First Floor

1m2

499.83

Second Floor

1m2

549.82

Third Floor

1m2

604.80

16.A.03 White or colourwashing two coats in single storey


No

Item Description

Analysis for
10
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Boild Lime

M-009

Cwt

0.5

300.00

150.00

1.02 Salt

M-112

Lbs

10.00

20.00

1.03 Yellow Ochre

M-166

Lbs

0.5

15.00

7.50

1.04 Blue

M-008

Ozs

10.00

20.00

1.05 6" Brush

M-021

No

0.333

495.00

165.83

1.06 Water

M-157

Gal

10

0.30

3.00

1.07 Painter

L-001

Day

2.5

1,200.00

687.50

1.08 U / SK Labourer

L-007

Day

2.5

1,000.00

500.00

Total for

10

Sqr

Rate for 1

Sqr

1.09 Allow 3% of Items (1.07, 1.08 ) for Scaffolding

35.63
1,589.46
158.95

Rate(Say)

1 Sq

159.00

Rate(Say)

1ft2

1.59

Rate(Say)

1m2

17.11

16.A.04 White or colourwashing two coats in two storeyed building


No

Item Description

Analysis for
10
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Boild Lime

M-009

Cwt

0.5

300.00

150.00

1.02 Salt

M-112

Lbs

10.00

20.00

1.03 Yellow Ochre

M-166

Lbs

0.5

15.00

7.50

1.04 Blue

M-008

Ozs

10.00

20.00

1.05 6" Brush

M-021

No

0.333

495.00

164.84

1.06 Water

M-157

Gal

10

0.30

3.00

1.07 Painter

L-001

Day

1,200.00

3,600.00

1.08 U / SK Labourer

L-007

Day

1,000.00

3,000.00

Total for

10

Sqr

1.09 Allow 3% of Items (1.07, 1.08 ) for Scaffolding

198.00
7,163.34

Rate for 1

Page 131 Of 142

Sqr

716.33

Rate(Say)

1 Sqr

716.00

Rate(Say)

1ft2

7.16

Rate(Say)

1m2

77.04

16.A.05 Cement washing to walls of single storyed building 2 coats


No

Analysis for
10
Item Ref
Unit Quantity

Item Description

Sqr
Rate

Amount

1.01 Cement

M-026

Bag

0.625

920.00

575.00

1.02 6" Coir Brush

M-034

No

45.00

45.00

1.03 Water

M-157

Gal

0.30

1.50

1.04 Painter

L-001

Day

1,200.00

2,400.00

1.05 U / SK Labourer

L-007

Day

1,000.00

2,000.00

Total for

10

Sqr

Rate for 1

Sqr

1.06 Allow 3% of Items ( 1.04, 1.05 ) for Scaffolding

132.00
5,153.50
515.35

Rate(Say)

1 Sq

515.00

Rate(Say)

1ft2

5.15

Rate(Say)

1m2

55.41

Ground floor

1m2

55.41

First Floor

1m2

60.96

Second Floor

1m2

67.05

Third Floor

1m2

73.76

Soffit
16.B.01
No

Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
slabs
Analysis for
1
Sq
Item Description
Item Ref
Unit Quantity
Rate
Amount

1.01 Primer

M-075

litre

0.9

180.00

162.00

1.02 Emulsion Paint

M-043

litre

1.5

280.00

420.00

1.03 Water

M-157

Gal

0.1

0.30

0.03

1.04 6" Brush

M-021

No

0.1

495.00

49.50

1.05 Painter

L-001

Day

1.75

1,200.00

2,100.00

Total for

Sq

Rate for 1

Sq

1.06 Allow 3% of Items (1.05 ) for Scaffolding

63.00
2,794.53
2,794.53

Rate(Say)

1 Sq

2,795.00

Rate(Say)

1ft2

27.95

Page 132 Of 142

Rate(Say)

1m2

300.74

Ground floor

1m2

300.74

First Floor

1m2

330.82

Second Floor

1m2

363.90

Third Floor

1m2

400.29

Wood
16.C.01
No

Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
ends etc. after fixing.
Analysis for
1
Sqr
Item Description
Item Ref
Unit Quantity
Rate
Amount

1.01 Wood Preservative

M-165

Gal

0.605

450.00

272.25

1.02 3" Brush

M-020

No

0.1

210.00

21.00

1.03 Painter

L-001

Day

0.75

1,200.00

900.00

1.04 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

1,693.25
1,693.25

Rate(Say)

1 Sq

1,693.00

Rate(Say)

1ft2

16.93

Rate(Say)

1m2

182.17

16.C.02 Painting new timber work with two coats wood preservative
No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Wood Preservative

M-165

Gal

0.5

450.00

225.00

1.02 Brush 2"

M-022

No

0.2

165.00

33.00

1.03 Painter

L-001

Day

0.5

1,200.00

600.00

Total for

Sqr

Rate for 1

Sqr

858.00
858.00

Rate(Say)

1 Sq

858.00

Rate(Say)

1ft2

8.58

Rate(Say)

1m2

92.32

16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Primer

M-075

litre

0.75

180.00

135.00

1.02 Enamel Paint

M-044

litre

2.5

400.00

354.00

1.03 Brush 2"

M-022

No

0.1

60.00

165.00

1.04 Sand Papers

M-114

No

3.50

7.00

Page 133 Of 142

1.05 Painter

L-001

Day

1.5

1,200.00

1,800.00

1.06 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

2,961.00
2,961.00

Rate(Say)

1 Sq

2,960.00

Rate(Say)

1ft2

29.60

Rate(Say)

1m2

318.50

16.C.04 Varnishing two coats with copal varnish after sandpapering


No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Varnish

M-154

litre

1.8

355.00

639.00

1.02 3" Brush

M-020

No

0.33

210.00

70.00

1.03 Painter

L-001

Day

0.5

1,200.00

600.00

1.04 U / SK Labourer

L-007

Day

0.5

1,000.00

500.00

Total for

Sqr

Rate for 1

Sqr

1,809.00
1,809.00

Rate(Say)

1 Sq

1,810.00

Rate(Say)

1ft2

18.10

Rate(Say)

1m2

194.76

16.C.05 Wax polishing to timber in panals & floors


No

Item Description

Analysis for
1
Item Ref
Unit Quantity

1.01 Wax Polish

M-158

Lbs

0.75

1.02 Sand Papers

M-114

Sheet

1.03 Floor Brush

M-049

No

1.04 Flannel Cloth

M-047

1.05 U / SK Labourer

Sqr
Rate

Amount

150.00

112.50

3.50

21.00

0.1

210.00

21.00

Yards

0.5

70.00

35.00

L-007

Day

0.375

1,000.00

375.00

Total for

Sqr

Rate for 1

Sqr

564.50
564.50

Rate(Say)

1 Sq

560.00

Rate(Say)

1ft2

5.60

Rate(Say)

1m2

60.26

Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

Page 134 Of 142

1.01 Anti Corrosive Primer

M-002

litre

2.25

245.00

551.25

1.02 Mineral Turpentine or Thinner

M-069

litre

0.15

80.00

12.00

1.03 Wire Brush

M-160

No

65.00

65.00

1.04 Brush 2"

M-022

No

0.125

165.00

20.63

1.05 Painter

L-001

Day

1.5

1,200.00

1,800.00

1.06 U / SK Labourer

L-007

Day

1.5

1,000.00

1,500.00

Total for

Sqr

Rate for 1

Sqr

16.D.02
No

3,948.88
3,948.88

Rate(Say)

1 Sq

3,950.00

Rate(Say)

1ft2

39.50

Rate(Say)

1m2

425.02

Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
erected steel roof truss.
Analysis for
1
Sqr
Item Description
Item Ref
Unit Quantity
Rate
Amount

1.01 Anti Corrosive Primer

M-002

litre

0.2

245.00

49.00

1.02 Enamel Paint

M-044

litre

1.33

354.00

470.82

1.03 Mineral Turpentine or Thinner

M-069

litre

0.2

80.00

16.00

1.04 Brush 2"

M-022

No

0.2

165.00

165.00

1.05 Painter

L-001

Day

2.5

1,200.00

687.50

1.06 U / SK Labourer

L-007

Day

1,000.00

200.00

Total for

Sqr

Rate for 1

Sqr

1.07 Allow 3% of Items (1.05, 1.06 ) for Scaffolding

26.63
1,614.95
1,614.95

Rate(Say)

1 Sq

1,610.00

Rate(Say)

1ft2

16.10

Rate(Say)

1m2

173.24

16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.
No

Item Description

Analysis for
50
Item Ref
Unit Quantity

Sq.ft
Rate

Amount

1.01 Anti Corrosive Primer

M-002

litre

1.5

245.00

367.50

1.02 Enamel Paint

M-044

litre

0.67

354.00

237.18

1.03 Mineral Turpentine or Thinner

M-069

litre

0.2

80.00

16.00

1.04 Wire Brush

M-160

No

0.5

65.00

32.50

1.05 Brush 2"

M-022

No

0.2

165.00

33.00

1.06 Painter

L-001

Day

0.5

1,200.00

600.00

1.07 U / SK Labourer

L-007

Day

0.75

1,000.00

750.00

Total for

50

Rate for 1

Sq.ft

Page 135 Of 142

Sq.ft

2,036.18
40.72

Rate(Say)

1 Sq. ft

40.00

Rate(Say)

1ft2

40.00

Rate(Say)

1m2

430.40

16.D.04 Painting steel in new work with 2 coats of anti-corrosive paint


No

Item Description

Analysis for
1
Item Ref
Unit Quantity

Sqr
Rate

Amount

1.01 Anti Corrosive Primer

M-002

litre

0.667

245.00

163.42

1.02 Brush 2"

M-022

No

0.2

165.00

33.00

1.03 Painter

L-001

Day

1.5

1,200.00

1,800.00

Total for

Sqr

Rate for 1

Sqr

1,996.42
1,996.42

Rate(Say)

1 Sqr

2,000.00

Rate(Say)

1ft2

20.00

Rate(Say)

1m2

215.20

Page 136 Of 142

Page 137 Of 142

Page 138 Of 142

Page 139 Of 142

Page 140 Of 142

Page 141 Of 142

Page 142 Of 142