Index
Pages
Preambles
P/1 to P/20
General Requirements
B1/1 to B1/12
Site Work
B2/1 to B2/4
Concrete Work
B3/1 to B3/6
Masonry
B4/1 to B4/3
Metal Work
B5/1 to B5/3
B6/1 to B6/5
B7/1 to B7/7
Finishes
B8/1 to B8/11
Specialists
B9/1 to B9/4
B10/1 to B10/14
B11/1 to B11/1
Provisional Sums
B12/1 to B12/6
Grand Summary
GS/1 to GS/1
Dayworks
DW/1 to DW/6
1/119
Index
2/119
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
GENERAL REQUIREMENTS
TENDER and CONTRACT
This is a fixed priced Lump sum contract as described in
the conditons of Tender & Contract, Rates filled in by the
tenderer againts items in this document deemed to include
for Escalation and all items of works required and so
necessary to complete the project, to the satisfaction of
Engineer and Employer based on the drawings,
specifications and all other guidance / documents provided.
Tenderer shall check and satisfy himself with the
correctness and completeness of the documents provided
and the accuracy of the quantities provided in the BOQ. No
claims for such an error or mistake in quantities will be
accepted except if such an item indicates an alterations and
modifications.
Note
Generally
Item
Item
Item
B1-General Requirements
Item
Item
B1/3
B1-General Requirements
B1/4
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Site Administration
The Contractor shall provide sufficient staff and equipment
to perform the administrative duties in executing the
Contract
Day
Site Supervision
The whole of the Works shall be under full time supervision
of the Contractor
Day
Security
The Contractor shall protect the Site and works from
unauthorized entry and fire and shall control his labour
force to prevent nuisance or trespass onto adjacent
property
Day
Day
Transport of Workpeople
The Contractor shall make all necessary arrangements for
the transport of his own, and his sub-contractor's
employees for the duration of the Works
Day
CONSTRUCTIONAL PLANT
Generally
The Contractor shall allow for all necessary
Small plant and tools
Item
Scaffolding
Establishment
Item
Maintenance
Day
Item
B1-General Requirements
B1/5
B1-General Requirements
B1/6
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Maintenance
Day
Item
Site Transport
Establishment
Item
Maintenance
Day
Item
Item
Maintenance
Day
Item
Establishment
Item
Maintenance
Day
Item
B1-General Requirements
B1/7
B1-General Requirements
B1/8
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Item
Item
Establishment
Item
Maintenance
Day
Item
Day
Secretary
Provide full time office secretary for the use of the Engineer
& his Representative.
B1-General Requirements
Day
B1/9
B1-General Requirements
B1/10
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Vehicle
Provide 2 Nos. four wheel drive vehicle including
maintenance and the like.
Day
Attendance of Staff
Provide a full time office attendant including cleaning for
the sole use of the Engineer and his representatives.
Day
Equipment
Provide survey Instruments and protective clothings as
required by the Engineer and his representative.
Item
Progress Photographs
Supply and hand over set of progress photographs as per
Division 1 - General Requirements.
Item
Progress Reports
Provide weekly & monthly progress reports as per Division
1 - General Requirements
Item
Sign Boards
fabricate, erect and maintain sign boars as per specification
and drawings including removal from site.
F
Establishment
Item
Maintenance
Day
Item
B1-General Requirements
B1/11
B1-General Requirements
B1/12
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Establishment
Item
Maintenance
Day
Item
Labor Camp
Labor Camp is not permitted within the Site area or within
the Contractor's site compound. Watchmen and security
staff only may be accommodated subject to the approval of
the Engineer.
Note
Establishment
Item
Maintenance
Day
Item
Item
H
I
B1-General Requirements
Item
Item
B1/13
B1-General Requirements
B1/14
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Traffic Diversion
Provide all temporary diversions of vehicular and
pedestrian traffic if required
Item
Item
Item
Establishment
Item
Maintenance
Day
Item
To Collection
B1-General Requirements
B1/15
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Item
Item
Item
Item
Item
Item
Item
To Collection
B1-General Requirements
B1/16
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Item
Item
Item
Item
Item
Item
Item
Item
To Collection
B1-General Requirements
B1/17
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
CONDITIONS OF CONTRACT
PERFORMANCE SECURITY / INSURANCE
Security
Performance Security in accordance with Conditions of
Contract, Clause 10.1
Item
Insurances
For the works in accordance with Conditions of Contract,
Clause 21
Item
Item
Item
Conditions of Contract
The Contractor to list and price for all costs associated with
compliance with the Conditions of Contract and not
covered elsewhere (details to be provided).
Item
1
2
3
Specification
The Contractor to list and price for all costs associated with
compliance with the Conditions of Contract and not
covered elsewhere (details to be provided).
Item
1
2
3
B1-General Requirements
B1/18
B1-General Requirements
B1/19
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
B1-General Requirements
B1/20
GENERAL REQUIRMENTS
Amount : SAR
Collection
Page B1/1
Page B1/2
Page B1/3
Page B1/4
Page B1/5
Page B1/6
Page B1/7
Page B1/8
Page B1/9
Page B1/10
Page B1/11
B1-General Requirements
B1/21
B1-General Requirements
SAR
B1/22
Item Description
Quantity
Unit
Rate
Amount : SAR
SITE WORK
Site clearance
A
Item
Shoring
B
Item
Dewatering
C
m3
8,099
m3
Disposal
E
To Collection
B2 - Site Work
B2/23
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
1,421
m2
Anti-Termite Treatment
C
Item
Back Filling
D
m3
To Collection
B2 - Site Work
B2/24
Item Description
Quantity
Unit
Rate
Amount : SAR
B2 - Site Work
Item
B2/25
To Collection
SITE WORK
Amount : SAR
Collection
Page B2/1
Page B2/2
Page B2/3
B2/26
SAR
B2 - Site Work
B2/27
Item Description
Quantity
Unit
142
m3
2,486
m3
Rate
Amount : SAR
CONCRETE WORK
Sub-structure concrete
Plain Concrete
Plain concrete , in accordance with concrete
specification and mix design complete as shown on
drawings and as specified.
A
Raft
Columns
17
m3
Core walls.
49
m3
Shear walls
85
m3
Tie beams
m3
213
m3
Slab on grade
78
m3
510
m3
215,000
kg
To raft
To columns
7,212
kg
To core walls.
20,309
kg
To shear walls
39,035
kg
To tie beams
688
kg
42,300
Kg
To slab on grade.
5,500
Kg
120,000
kg
B3 - Concrete Work
B3/28
To Collection
B3 - Concrete Work
B3/29
Item Description
Quantity
Unit
Rate
Amount : SAR
To Raft
270
m2
To columns
108
m2
To core walls.
376
m2
To shear walls
462
m2
To tie beams
m2
950
m2
To slab on grade
39
m2
2,533
m2
Sundries
I
Item
Item
B3 - Concrete Work
B3/30
To Collection
B3 - Concrete Work
B3/31
Item Description
Quantity
Unit
69
m3
Rate
Amount : SAR
Columns.
Core walls.
1,014
m3
Shear walls
441
m3
10,723
m2
12,368
m2
976
m2
Ramp Slab
133
m3
11
m3
80
m3
267
m3
180
m3
Columns
22,340
kg
Core walls
176,109
kg
Shear walls
142,660
kg
17,252
kg
282,980
kg
13,128
kg
85,440
kg
19,200
kg
B3 - Concrete Work
B3/32
To Collection
B3 - Concrete Work
B3/33
Item Description
Quantity
Unit
Rate
Amount : SAR
24,067
m2
24,067
m2
Sides of columns
471
m2
7,847
m2
2,706
m2
Sides and soffits of solid and post tension slabs and Ram
26,692
m2
651
m2
1,182
m2
1,000
m2
Sundries
Allow for control construction and contraction joints or
the like as required all in accordance with the drawings
and specification.
Item
Item
Item
B3 - Concrete Work
Item
Item
B3/34
To Collection
B3 - Concrete Work
B3/35
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Item
Additional Items
D
B3 - Concrete Work
Item
B3/36
To Collection
B3 - Concrete Work
B3/37
Amount : SAR
Page B3/1
Page B3/2
Page B3/3
Page B3/4
Page B3/5
B3/38
SAR
B3 - Concrete Work
B3/39
Item Description
Quantity
Unit
Rate
Amount : SAR
MASONRY
Light weight AAC Block
Supply & fix light weight AAC block bedded and
jointed as manufacture, tied to concrete columns and
beams with galvanized steel anchor as per specification.
A
7,708
m2
35
m2
13,606
m2
m2
637
m2
7,504
m2
824
m2
Solid Block
Supply & fix Solid Block bedded and jointed in cement
sand mortar ( 1:3 ).
G
100 x 200mm.
1,678
200 x 200mm.
753
300 x 200mm.
135
B4 - Masonry
B4/40
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
MASONRY (Cont'd)
Additional Items
A
B4 - Masonry
Item
B4/41
MASONRY WORKS
Collection
Amount : SAR
Page B2/1
Page B2/2
B4 - Masonry
B4/42
B4 - Masonry
SAR
B4/43
Item Description
Quantity
Unit
Rate
Amount : SAR
METAL WORK
Aluminum Handrail & Balustrade
Supply & fix poder coated aluminum handrail &
balustrade as per drawings and specifications and to
the engineer's approval.
A
80
Staircase 2
101
Staircase 3
101
17
Item
Access platform
F
Item
For roof.
Item
Item
B5 - Metal Work
B5/44
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Item
Item
Supply & fix access cover and ladder for the water
tanks, all complete as per drawings for Engineer
approval.
Canopy
Supply & fix stainless steel mirror finished grade 316
canopy including accessories, bolts, fixing elements all
complete as drawings, for Engineer's approval.
Item
Item
Additional Items
E
B5 - Metal Work
Item
B5/45
B5 - Metal Work
B5/46
Amount : SAR
Page B5/1
Page B5/2
B5 - Metal Work
B5/47
B5 - Metal Work
SAR
B5/48
Item Description
Quantity
Unit
m2
5,663
m2
Rate
Amount : SAR
To Horizontal surface.
3,354
m2
To Vertical surface.
2,310
m2
2,310
m2
3,354
m2
Water Stopper
G
item
Water tank
H
2,900
m2
43
m2
Planters
I
B6/49
To Collection
Item
Item Description
Quantity
Unit
763
m2
763
m2
763
m2
763
m2
763
m2
763
m2
312
312
312
763
m2
Rate
Amount : SAR
C
D
Item
B6/50
Item
Item Description
Quantity
Unit
253
m2
253
m2
253
m2
253
m2
109
109
109
4,207
m2
Rate
Amount : SAR
B6/51
Item
Item Description
Quantity
Unit
15,552
m2
Rate
Amount : SAR
Item
Item
B6/52
To Collection
Amount : SAR
Page B6/1
Page B6/2
Page B6/3
Page B6/4
B6/53
SAR
B6/54
Item Description
Quantity
Unit
Rate
Amount : SAR
Type -CW1.
No
Type -CW2.
No
Type -CW3.
No
Type -CW4.
No
Type -CW5.
No
Type -CW6.
No
Type -CW7.
No
Type -CW8.
No
Type -CW9.
11
No
Type -CW10.
23
No
Type -CW11.
13
No
B7 - Doors Windows
B7/55
To CollectionJabal
B7 - Doors Windows
Al-Ka'aba Hotel
B7/56
Item Description
Quantity
Unit
No
No
205
No
218
No
19
No
1
1
No
No
No
Rate
Amount : SAR
G
H
16
No
No
No
No
No
No
No
B7 - Doors Windows
B7/57
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
No
No
No
No
No
No
No
No
No
No
No
No
B7 - Doors Windows
B7/58
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
No
10
No
No
No
No
No
No
No
No
21
No
No
No
Steel Door
Supply & fix steel door including hardware, accessories
...etc all complete as per drawings and specifications and to
the Engineer's approval (PC rate for supply SAR
150,000.00)
L
DS1
Third Party Assurance Test for all Aluminum Works
B7 - Doors Windows
Item
B7/59
Item
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
285
No
84
No
D
E
4
84
No
No
No
408
No
Type DT7, 1500 x 2100mm hig, service lift lobby & corr.
H
I
34
60
No
No
No
K
L
3
4
No
No
29
No
N
O
11
10
No
No
No
Sundries
P
B7 - Doors Windows
Item
B7/60
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Additional Items
A
B7 - Doors Windows
Item
B7/61
To Collection
B7 - Doors Windows
B7/62
Amount : SAR
Page B7/1
Page B7/2
Page B7/3
Page B7/4
Page B7/5
Page B7/6
B7 - Doors Windows
B7/63
B7 - Doors Windows
SAR
B7/64
Item Description
Quantity
Unit
11,606
m2
379
m2
778
m2
271
m2
1,670
m2
292
m2
Rate
Amount : SAR
FINISHES
Internal Flooring
Terrazzo tiles (to receive Carpet)
A
B8 - Finishes
B8/65
To Collection
Item
Item Description
Quantity
Unit
830
m2
2,252
m2
253
m2
11,044
m2
562
m2
Rate
Amount : SAR
FINISHES (Cont'd)
Internal Flooring (Cont'd)
Non-slip Ceranic tiles
A
B8 - Finishes
B8/66
Jabal
To Collection
Item
Al-Ka'aba Hotel
Item Description
Quantity
Unit
62
62
m2
3,335
for riser
3,335
for Landings.
404
m2
2,493
m2
Rate
Amount : SAR
FINISHES (Cont'd)
Internal Flooring (Cont'd)
Granite Tile for Staircase 1
Supply & fix Granite tiles for Staircase 1 at Ground &
Mezzanine Floor, including cement sand mortar (1:3)
jointing and pointing with approved grout as per
drawings and to the Engineer's approval. (PC supply
rate SAR 500/m2)
A
B8 - Finishes
B8/67
B8 - Finishes
B8/68
Item Description
Quantity
Unit
123
m2
13
m2
123
7,104
4,112
1,316
Rate
Amount : SAR
FINISHES (Cont'd)
Cement screed & epoxy paint
A
B
C
D
E
F
100mm width
366
200mm width
528
300mm width
98
B8 - Finishes
B8/69
To Collection
B8 - Finishes
B8/70
Item Description
Quantity
Unit
55
no.
44,311
m2
47
m2
1,988
m2
221
m2
m2
Rate
Amount : SAR
FINISHES (Cont'd)
Ablution Sitting
A
Plaster Works
Supply & apply cement sand plaster to concrete and
block surfaces including all beads, angles, grooves as
required and specified /Note: plaster work not required
to soffit of slabs above false ceiling.
Internal wall
B
B8 - Finishes
B8/71
To Collection
Item
Item Description
Quantity
Unit
383
m2
6,382
m2
8,788
m2
353
m2
1,165
m2
Rate
Amount : SAR
FINISHES (Cont'd)
Internal Walls (Cont'n)
Internal Walls:
Granite tiles
A
B8 - Finishes
B8/72
Jabal
To Collection
Item
Al-Ka'aba Hotel
Item Description
Quantity
Unit
19,737
m2
2,581
m2
10,062
m2
11,931
m2
7,277
6,679
m2
m2
1,112
m2
303
m2
22
m2
159
m2
Rate
Amount : SAR
FINISHES (Cont'd)
Painted walls
A
B
C
D
F
G
B8 - Finishes
B8/73
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
FINISHES (Cont'd)
Internal Ceiling (Cont'd)
Bulk heads
A
Item
Item
Painted Ceiling
C
D
B8 - Finishes
2,816
m2
2,533
m2
B8/74
To Collection
Item
Item Description
Quantity
Unit
45
m2
102
m2
130
30
221
m2
Rate
Amount : SAR
FINISHES (Cont'd)
External Finishes
Floors
A
Supply & fix 30mm thick cut to size granite tiles with
patterns at the main entrance to the Engineer approval.
(PC supply rate SAR 500/ m2)
Ditto, but for entrance steps.
Interlocking
B8 - Finishes
B8/75
Supply & fix (dry fix) 20mm thick cut to size granite
tiles at the main entrance to the Engineer
approval. (PC
Jabal Al-Ka'aba
Hotel
supply rate SAR 500/ m2)
Ditto, but for flower box at main entrance.
43
m2
44
m2
Quantity
Unit
To Collection
Item
Item Description
Rate
Amount : SAR
FINISHES (Cont'd)
External Finishes (Cont'd)
Precast Panels (including concrete pyramid shape)
A
Design ,manufacture, supply, fixing and erection of prefinished, sand blasted, thermally insulated architectural
precast panels on elevations, including supply and
erection of all the required accessories, fittings, grooves,
sealant, plants, equipment, etc... required for the precast
panels stability, tidiness and acoustic insulation
including preparation of shop drawings.
Item
Ceiling
47
m2
Additional Items
C
B8 - Finishes
Item
B8/76
FINISHES
Collection
Amount : SAR
Page B8/1
Page B8/2
Page B8/3
Page B8/4
Page B8/5
Page B8/6
Page B8/7
Page B8/8
Page B8/9
Page B8/10
B8 - Finishes
B8/77
B8 - Finishes
SAR
B8/78
Item Description
Quantity
Unit
No
Rate
Amount : SAR
SPECIALISTS
Traffic Barriers
A
Item
Item
Column guards
D
Item
B9 - Specialists
Item
B9/79
To Collection
B9 - Specialists
B9/80
Item Description
Quantity
Unit
Rate
Amount : SAR
SPECIALISTS (Cont'd)
Pipe guards
A
Item
Speed hump
B
Garbage Chute
Allow for supply, install , testing and commission of
Garbage Chute System as per drawings and
specifications and to the Engineer's approval.
B9 - Specialists
Item
No
B9/81
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
SPECIALISTS (Cont'd)
Additional Items
A
B9 - Specialists
Item
B9/82
SPECIALISTS
Collection
Amount : SAR
Page B9/1
Page B9/2
Page B9/3
B9 - Specialists
B9/83
B9 - Specialists
B9/84
Item Description
Quantity
Unit
Rate
Amount : SAR
PROVISIONAL SUMS
Provisional sums for works to be executed by
nominated Sub-contractors/ Suppliers, to be expended
in whole or in part, or not at all at the direction of the
Engineer.
Window cleaning system
A
Sum
Sum
Sum
350,000
Sum
250,000
Sum
Sum
3,700,000
Sum
Sum
To Collection
B12 - Provisional Sums
B12/85
B12/86
Sum
6,000,000
Sum
Sum
Faade Lighting
E Allow for Faade Lighting works to be carried out by
Specialist Nominated Contractor.
Sum
350,000
Sum
Sum
Ironmongery Works
I Allow for supply only Ironmongery Works for wooden
doors to be carried out by nominated supplier.
Sum
700,000
Sum
1,000,000
Sum
Sum
B12/87
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Sum
3,800,000
Sum
Sum
1,700,000
Sum
Sum
Mirrors
H
Sum
Sum
500,000
B12/88
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
1,000,000
Sum
Sum
Sum
By Owner
Sum
Sum
Electrical Appliances
By Owner
All furniture.
By Owner
B12/89
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Supply, installation, testing, commissioning of substation equipment including transformers, ring main
units, power cables in between transformers & main
distribution boards/ air circuit breakers, from ring
main unit to EWA supply network, KWH meters,
electricity connection charges, power supply connection
charges.
Item
Item
3,000,000
B12/90
To Collection
PROVISIONAL SUMS
Collection
Amount : SAR
Page B12/1
Page B12/2
Page B12/3
Page B12/4
Page B12/5
B12/91
SAR
B12/92
Item Description
Amount : SAR
Grand Summary
B1 General Requirements
B2 Site Work
B3 Concrete Work
B4 Masonry
B5 Metal Work
B6 Thermal & Moisture Protection
B7 Doors & Windows
B8 Finishes
B9
Specialists
Tenderers are advised to fill the next with the overhead and profit
Overhead
Profit
%
%
GS/1
To the
Grand Summary
Form of Tender
SAR
GS/1
Grand Summary
GS/1
Grand Summary
GS/1
Item Description
General Notes
Day works will be administered strictly in accordance with Clause 52.4 of the Conditions of Contract.
The Contractor will be paid for Day Works carried out during the course of the works, while other operations are in
progress, at the rates set out in this schedule. Profits and Overheads are not to be included in the actual rates but stated
as a percentag
The basic unit rates to be inserted in the Day Works Schedule shall be the rates, which the Contractor has used in
determining his unit rates inserted elsewhere in these Tender Documents.
Actual time engaged in the works only will be allowed. In the event of Labor or Plant having to be brought to the site
specifically for an item of Day work, then a reasonable allowance for traveling time shall be considered. Any such
allowance shall be ag
B
No special rates for working overtime will be admissible unless specifically authorized by the Engineer in writing.
The cost of all supervisory and administrative staff, including Engineers, Foremen, Clerks, Store men, Secretaries,
Assistants etc. is to be included in the percentage addition for overheads and profits.
C
Plant hire rates hall include for the cost of maintaining in proper working order, insurance, fuel and all consumables,
cleaning material, replacement and/or sharpening of tools and the like.
Idle time, maintenance or traveling time to the site will not be considered.
The actual cost of hiring plant not listed in the Schedule will be paid based on the Contractor's invoices. Competitive
quotations must be obtained for all plant hired. In the event of Contractor's own plant and equipment being used, a
reasonable rate bas
E
Dayworks
97/119
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Labor
A
Laborers / helpers.
500
Hr
Scaffolders.
150
Hr
Steel fixers.
250
Hr
Drainage layers.
100
Hr
250
Hr
Plasterers.
250
Hr
250
Hr
Plumbers.
150
Hr
Painters.
150
Hr
Electricians./Ac mechanics
150
Hr
100
Hr
100
Hr
Welders.
100
Hr
Pipe Fitter.
100
Hr
Metal Worker.
100
Hr
Attendant.
100
Hr
Charge hand.
100
Hr
100
Hr
Dayworks
98/119
To Collection
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Material
A
Building Sand
50
m3
10
Ton
10
Ton
Coarse aggregate.
25
Fine aggregate.
25
Ton
Ton
10
10
10
10
GGBS (30%)
GGBS (60%)
Microsilica (5%)
Form work.
20
m2
500
No.
500
No.
500
No.
500
No.
500
No.
500
No.
100
m2
100
m2
100
m2
100
m2
100
m2
AA 12mm Plywood
30
m2
AB 18mm plywood
30
m2
AC Epoxy Paint
200
liter
AD Emulsion Paint
200
liter
AE Enamel Paint
200
liter
Percentage Addition
AF Allow for all other costs and charges.
Dayworks
99/119
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Plant
A
Concrete mixer.
20
Hr
50
Hr
50
Hr
50
Hr
Dumper 1 m3 capacity.
50
Hr
Drill machines.
20
Hr
Tower Crane.
50
Hr
50
Hr
50
Hr
50
Hr
20
Hr
Material hoist.
50
Hr
Vibrator.
20
Hr
Power float.
30
Hr
Electric saw.
20
Hr
30
Hr
50
Hr
50
Hr
20
Hr
Pneumatic compressor.
30
Hr
20
Hr
Bob cat.
20
Hr
Welding plant.
20
Hr
30
Hr
30
Hr
Concrete pump.
20
Hr
20
Hr
AA Truck mixer.
Dayworks
100/119
AB Water Pump 25 KW
Item
Item Description
Quantity
Unit
Rate
Amount : SAR
Plant(Cont'd)
A
25
hr
20
hr
Oxygen cutter.
20
hr
Electric cutter.
20
hr
Compactor.
30
hr
Roller.
20
hr
Percentage Addition
G
Dayworks
101/119
To Collection
Dayworks Collection
Amount : SAR
Total of page 1
Total of page 2
Total of page 3
Total of page 4
Total of page 5
Dayworks
102/119
Dayworks
103/119
Preambles
B8- Finishes
B9- Specialists
Grand Summary
Dayworks