Beruflich Dokumente
Kultur Dokumente
Page 1
20.1
GENERAL ............................................................................................................... 2
20.2
AUDITORS .............................................................................................................. 2
20.3
20.3.1
20.3.2
20.4
20.4.1
20.5
20.5.1
CONTRACTORS ..................................................................................................... 6
Concrete Construction Department
6
20.6
20.6.1
20.6.2
CONSULTANTS ...................................................................................................... 7
Site Supervision Department
7
Site Supervision / Design Office Department
7
at
ar
C
on
st
ru
ct
io
Sp
ec
ifi
ca
tio
ns
20
14
20
QCS 2014
Page 2
20.1
GENERAL
The qualification requirements given in this part are optional unless otherwise mentioned
below. The purpose of the qualifications is to prepare the industry to cope with the required
quality of construction. The requirements will become compulsory as and when stated by
Qatar Standards.
20.2
AUDITORS
Qatar Standards auditors and their approved representatives shall be qualified for inspecting
concrete ready mix plants and testing laboratories.
20.3
20.3.1
Technical Department
Position:
ec
ifi
ca
tio
ns
20
14
20
Sp
Qualifications:
(b)
(c)
(d)
Durability of concrete
(h)
on
st
ru
ct
io
(a)
(i)
(j)
(e)
(f)
at
ar
C
(g)
(k)
Position:
Site Supervisor
Qualifications:
(a)
QCS 2014
Page 3
Lab Supervisor
14
Qualifications:
20
ns
(a)
ca
tio
ifi
ec
Sp
ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete
BS EN 12390-3 ..........Testing hardened concrete - Compressive strength of test specimens
BS EN 932-1 .............Aggregates - Methods of sampling
ct
io
on
st
ru
Position:
ar
C
Qualifications:
at
(a)
The technician shall be capable of satisfactorily performing the below fresh concrete
tests:
QCS 2014
Position:
Page 4
Qualifications:
(a)
The technician shall be capable of satisfactorily performing the below fresh and
hardened concrete tests:
14
20
ns
tio
ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete
BS EN 12390-3 .........Testing hardened concrete - Compressive strength of test specimens
ca
ifi
ec
Sp
io
Position:
ct
20.3.2
on
st
ru
Qualifications:
(a)
(b)
Materials management
Plant design, function and maintenance
ar
C
(c)
(e)
at
(d)
(f)
Position:
Plant Operator
Qualifications:
(a)
(b)
(c)
(d)
(f)
Safety procedures
20.4
TESTING LABORATORIES
20.4.1
Position:
14
(e)
Page 5
Qualifications:
20
QCS 2014
(b)
(c)
(d)
Durability of concrete
(e)
(f)
(g)
(h)
(i)
(j)
(k)
Position:
Supervisor
on
st
ru
ct
io
Sp
ec
ifi
ca
tio
ns
(a)
Qualifications:
ar
C
(a)
at
QCS 2014
Page 6
Position:
Qualifications:
14
The technician shall be capable of satisfactorily performing the below fresh and
hardened concrete tests:
20
(a)
ns
tio
ca
ifi
ec
ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete
BS EN 12390-3 .........Testing hardened concrete - Compressive strength of test specimens
Sp
io
ct
on
st
ru
CONTRACTORS
20.5.1
ar
C
20.5
Position:
Site Engineer
at
Qualifications:
(a)
QCS 2014
Position:
Page 7
Qualifications:
Concrete specification review and concrete mixture proportioning
(b)
(c)
(d)
Durability of concrete
(e)
(f)
(g)
(h)
(i)
(j)
(k)
20
ns
tio
ca
ifi
20.6.1
Position:
ec
CONSULTANTS
Sp
20.6
io
Qualifications:
on
st
ru
ct
(a)
14
(a)
ar
C
at
ASTM C1611/C1611M Standard test method for slump flow of self consolidating concrete
20.6.2
Position:
Material Engineer
Qualifications:
(a)
(b)
(c)
(d)
Durability of concrete
QCS 2014
(f)
(g)
(h)
(i)
(j)
(k)
20
14
(e)
Page 8
at
ar
C
on
st
ru
ct
io
Sp
ec
ifi
ca
tio
ns
END OF PART