RFS OPTIMIZER RT ANTENNA INSTALLATION PROCEDURE.

AISG SYSTEMS
This installation procedure is applicable to RFS base station antennas used in multiple
markets. This document covers two main setup scenarios.
This process is for Version 2.x of the NEM-ALD control software
A. Antennas with ACUs supplied separately.
Follow all steps in this procedure
B. Antennas with ACU pre-attached, configured and calibrated. (Antennas with A20 suffix).
Follow steps 1,2, 5-7, and 16-17
1.
As soon as all the material is on-site, record every ACUs serial number; this serial
number will be associated with a specific sector location. It is also recommended that each
ACU be labeled. Example: The first ACU in Alpha sector could be labeled Alpha 1.
2.

Going sector by sector, install the antennas, and tighten bracket at the proper azimuth.

3.
If weatherproofing is mandated, It is recommended that the RF jumper cables be
installed and weatherproofed prior to the installation of the ACUs (motors). This will alleviate
interference issues when installing the ACUs
4.
Install ACUs on each antenna. For proper operation, alternate the tightening of both
screws to the same torque. The ACU should be slightly snug, NOT TIGHT. It is believed that
the proper tension can be achieved by turning the screws until you start to feel resistance.
Then back the screw down a quarter turn. The correct torque is 10-12 in-lbs.
NOTE: If the ACU is on too tight it will prevent the cylinder from turning.
5.
Daisy chain the ACUs on quad antennas with a meter cables. To daisy chain from
one antenna to the next will require site-specific cable lengths.
6.
After all the ACUs are connected; attach the long cable to the open port of the first ACU.
The Common term for this cable is the Home Run cable. Coil and secure enough extra cable
near the antennas so that the cable can reach any ACU in the sector. This is useful if
troubleshooting the ACUs is required at a later time. Run the rest of this cable back to the
cabinet and attach to the controller. Ensure all cable runs are properly secured.
NOTE: Separate sector Home Run cable may be used when sectors are not located close to
each other.

Rev. 0802

7.
Launch the NEM-ALD software. The software will scan all the devices available and
launch its Overview window.
8.
Non-configured ACU(s) will be highlighted in the software by the use of RED text. (Red
text = Device Not Available). Double click on the device to open the RET main window as
shown here.
Then click Status.

Rev 0802

9.
The status bar will indicate the current device status. Not Configured and Not Calibrated
will be active. Select the Antenna Configuration button.

Rev 0802

10.
The Configuration button will launch a list of folders. Select the folder with the
correct antenna, and then press open.

11.

Pick the data file shown then press open.

Rev 0802

12.
The software will return to the Status window, Press Set this will start the upload to
the ACU.

Rev 0802

13.
When the upload is completed the NEM-ALD software will rescan the device and very
briefly indicate the change in status.
(Not configured will be cleared, Not calibrated will
remain active.) The status window will close.

Rev 0802

14.

From the main RET window press Calibrate.

15.

When the calibration cycle is complete the RET status will change (Black = Status OK)

Rev 0802

This completes the configuration and calibration of the RET.


NOTE: At this time the ACU should be ready to set the downtilt on. If the ACU failed the
calibration step (step 15) there could be two issues.
i.
If the ACU was field installed, verify that it is not on too tight. Take the ACU off and
reconnect it to the antenna, observing screw torque requirements.
ii.
The cylinder inside the antenna may be stuck. If you take the proper sized Allen-key
you can work the dipstick though the paces to try and loosen the cylinder.
16.
Set down tilt required by moving the slider tab, clicking on the slider bar (or directly
enter the down tilt value numerically, NEM-ALD-S ONLY). Press Set.

17.
Once you have completed the above steps for one ACU, repeat the process for all the
remaining ACUs, antennas and sectors.
END