Project: SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer:TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

Bus Loading Summary Report


Directly Connected Load
Bus
ID

Constant kVA
kV

Rated Amp

MW

Mvar

Constant Z
MW

Total Bus Load

Constant I

Mvar

MW

Mvar

Generic
MW

Mvar

Percent
MVA

% PF

Amp

Loading

Bus1

132.000

23.439

84.9

102.6

Bus2

132.000

23.439

84.9

102.6

Bus3

132.000

0.000

Bus4

132.000

0.000

Bus5

11.000

22.047

90.0

1161.1

Bus6

11.000

22.048

90.0

1161.0

Bus7

11.000

0.000

Bus9

11.000

22.047

90.0

1161.1

MAIN INFEED 1

132.000

23.340

85.3

102.1

MAIN INFEED 2

132.000

0.206

0.9

9.610

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Project: SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer:TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

Branch Loading Summary Report

Transformer
CKT / Branch

ID

Cable & Reactor

Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)

MVA

Cable1

Cable

474.23

102.56

21.63

Cable2

Cable

474.23

0.00

0.00

Cable4

Cable

474.31

0.01

0.00

T1B

Transformer

30.000

23.439

78.1

22.048

73.5

T2A

Transformer

30.000

0.000

0.0

0.000

0.0

* Indicates a branch with operating load exceeding the branch capability.

Project: SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer:TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

Branch Losses Summary Report

Branch ID
Cable1

From-To Bus Flow

To-From Bus Flow

MW

Mvar

MW

Mvar

Losses
kW

% Bus Voltage
kvar

From

To

Vd
% Drop
in Vmag

-19.905

-12.377

19.905

12.377

0.0

0.1

100.0

100.0

0.00

T1B

19.905

12.377

-19.843

-9.610

61.5

2766.7

100.0

99.7

0.29

Line1

0.04

-19.905

-12.377

19.908

12.184

3.2

-193.0

100.0

100.0

Cable2

0.000

0.000

0.000

0.000

0.0

0.0

100.0

100.0

0.00

Line2

0.000

0.000

0.000

-0.206

0.0

-205.3

100.0

100.0

0.00

T2A

0.000

0.000

0.000

0.000

0.0

0.0

100.0

104.0

4.00

Cable3

19.843

9.610

-19.842

-9.610

1.1

0.2

99.7

99.7

0.01

Cable4

0.000

0.000

0.000

0.000

0.0

-0.2

104.0

104.0

0.00

65.8

2368.5

Project: SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer:TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

Equipment Cable and Overload Heater Losses Summary Report


% Voltage
Connected Load
ID

Cable /Overload Heater


Type

ID

Losses
Library

kW

Terminal on
kvar

Bus

Bus kV

Load kV

% Vd

% Vst

Operating

Starting

Project:SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer: TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus

100.0

95.0

Cable

100.0

95.0

Reactor

100.0

95.0

Line

100.0

95.0

Transformer

100.0

95.0

Panel

100.0

95.0

Protective Device

100.0

95.0

Generator

100.0

95.0

Inverter/Charger

100.0

95.0

OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

OverExcited (Q Max.)

100.0

95.0

UnderExcited (Q Min.)

100.0

Bus Voltage

Generator Excitation

Marginal Report
Device ID
Bus7

Type
Bus

Condition
Over Voltage

Rating/Limit
11.000

Unit
kV

Operating
11.440

% Operating
104.0

Phase Type
3-Phase

Project:SUBSTATION DESIGN

ETAP

Page:

Location:

14.1.0C

Date:

31-08-2016

Contract:

SN:

MUTANDA-01

Engineer:TEMBENS

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF

INDUSTRIAL PROJECT IV

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF
85.69 Lagging

19.908

11.978

23.234

0.000

0.000

0.000

19.908

11.978

23.234

85.69 Lagging

Total Motor Load:

0.000

0.000

0.000

24.44 Lagging

Total Static Load:

19.842

9.610

22.047

90.00 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.066

2.368

System Mismatch:

0.000

0.000

Source (Swing Buses):


Source (Non-Swing Buses):
Total Demand:

Number of Iterations: 3