Beruflich Dokumente
Kultur Dokumente
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer:TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
Constant kVA
kV
Rated Amp
MW
Mvar
Constant Z
MW
Constant I
Mvar
MW
Mvar
Generic
MW
Mvar
Percent
MVA
% PF
Amp
Loading
Bus1
132.000
23.439
84.9
102.6
Bus2
132.000
23.439
84.9
102.6
Bus3
132.000
0.000
Bus4
132.000
0.000
Bus5
11.000
22.047
90.0
1161.1
Bus6
11.000
22.048
90.0
1161.0
Bus7
11.000
0.000
Bus9
11.000
22.047
90.0
1161.1
MAIN INFEED 1
132.000
23.340
85.3
102.1
MAIN INFEED 2
132.000
0.206
0.9
9.610
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer:TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
Transformer
CKT / Branch
ID
Type
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
Cable1
Cable
474.23
102.56
21.63
Cable2
Cable
474.23
0.00
0.00
Cable4
Cable
474.31
0.01
0.00
T1B
Transformer
30.000
23.439
78.1
22.048
73.5
T2A
Transformer
30.000
0.000
0.0
0.000
0.0
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer:TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
Branch ID
Cable1
MW
Mvar
MW
Mvar
Losses
kW
% Bus Voltage
kvar
From
To
Vd
% Drop
in Vmag
-19.905
-12.377
19.905
12.377
0.0
0.1
100.0
100.0
0.00
T1B
19.905
12.377
-19.843
-9.610
61.5
2766.7
100.0
99.7
0.29
Line1
0.04
-19.905
-12.377
19.908
12.184
3.2
-193.0
100.0
100.0
Cable2
0.000
0.000
0.000
0.000
0.0
0.0
100.0
100.0
0.00
Line2
0.000
0.000
0.000
-0.206
0.0
-205.3
100.0
100.0
0.00
T2A
0.000
0.000
0.000
0.000
0.0
0.0
100.0
104.0
4.00
Cable3
19.843
9.610
-19.842
-9.610
1.1
0.2
99.7
99.7
0.01
Cable4
0.000
0.000
0.000
0.000
0.0
-0.2
104.0
104.0
0.00
65.8
2368.5
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer:TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
ID
Losses
Library
kW
Terminal on
kvar
Bus
Bus kV
Load kV
% Vd
% Vst
Operating
Starting
Project:SUBSTATION DESIGN
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer: TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
Marginal
Loading
Bus
100.0
95.0
Cable
100.0
95.0
Reactor
100.0
95.0
Line
100.0
95.0
Transformer
100.0
95.0
Panel
100.0
95.0
Protective Device
100.0
95.0
Generator
100.0
95.0
Inverter/Charger
100.0
95.0
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
OverExcited (Q Max.)
100.0
95.0
UnderExcited (Q Min.)
100.0
Bus Voltage
Generator Excitation
Marginal Report
Device ID
Bus7
Type
Bus
Condition
Over Voltage
Rating/Limit
11.000
Unit
kV
Operating
11.440
% Operating
104.0
Phase Type
3-Phase
Project:SUBSTATION DESIGN
ETAP
Page:
Location:
14.1.0C
Date:
31-08-2016
Contract:
SN:
MUTANDA-01
Engineer:TEMBENS
Revision:
Base
Config.:
Normal
Filename:
Study Case: LF
INDUSTRIAL PROJECT IV
MW
Mvar
MVA
% PF
85.69 Lagging
19.908
11.978
23.234
0.000
0.000
0.000
19.908
11.978
23.234
85.69 Lagging
0.000
0.000
0.000
24.44 Lagging
19.842
9.610
22.047
90.00 Lagging
0.000
0.000
0.000
0.000
0.000
0.000
Apparent Losses:
0.066
2.368
System Mismatch:
0.000
0.000
Number of Iterations: 3