Embankment area:
b
FN = v i
i=a
Fi = v i z
Fi = v i 1
Fi = v i
Excavation (cut) area:
d
FZ = v i
i=c
FN, j = v i
i=a
FZ , j = v i
i=c
fig. 0610 (longitudinal profile the lower part with crosssection marking)
Column 8 earthwork volumes (embankment KN,j):
lp, j (FN, j + FN, j+1 )
K N, j =
2
Column 9 earthwork volumes (excavation KZ,j):
lp, j (FZ , j + FZ , j+1 )
K Z,j =
2
Column 10 cross-spread ................. PPj = min (KZ,j; KN,j)
Column 11 extra excavation .................... Zj = KZ,j PPj
Column 12 missing embankment ............. Nj = KN,j PPj
Column 13 or 14 mass haul ordinate quantify for
each cross-section j:
H1 = 0
.......... point H1
.......... point H4
L1-2 [m] ... measure
Q1-2 = H4 H1 [m3]
2. part consumption branch:
.......... point H1
.......... point H9
L1-3 [m] ... measure (L1-3) + add about 500m for the
arrival from the borrow pit
Q1-3 = H1 H9 [m3]
3. part supply branch:
.......... point H9
.......... point H6
L3-4 [m] ... measure
Q3-4 = H6 H9 [m3]
Determining of mean distribution distance:
(Qi li )
lst = i
[m]
Qi
i
CONCLUSION
TECHNICAL REPORT
all calculations
design categories + width arrangement (a, v, c, e)
pavement construction
location and length of pipe culverts, guard-rails and paved
trenches