1. A professional organization for project management specialists is the
A. PMI B. AMA C. MIS D. IPM 2. The following are PMBOK knowledge area EXCEPT: A. Project Scope Management B. Project Cost Management C. Project Research Management D. Project Risk Management 3. Which of the following is not considered to be a characteristic of a project? A. An established objective B. A clear beginning and end date C. Complex tasks D. Only for certain duration of time 4. Which of the following activities is not considered a project? A. Developing a new software program B. Designing a space station C. Preparing the site for the Olympic Games D. Production of automobile tires 5. Which of the following constraints is not typically found in managing projects? A. Time B. Output C. Cost D. Quality 6. Which of the following choices is not one of the stages of a project life cycle? A. Initiating B. Planning C. Executing D. Delivering 7. In which of the following stages are you more likely to identify project stakeholder, objectives and pre-requirement? A. Initiating B. Planning C. Executing D. Delivering 8. Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller, more manageable components? A. Plan Scope Management B. Validate Scope C. Control Scope D. Create WBS 9. Project scope is: A. All the work that must be done in order to deliver a product according to the specified features and functions, only. B. The features and functions that are to be included in a product or service C. A narrative description of work to be performed under contract D. A and B 10.Leading, communicating, negotiating and problem solving are examples of the __________ management skills. A. Project B. Senior C. General Prepared by: Ms Salina Mokhtar, FOIT
D. HR
11. A project is defined as:
A. B.
A process of considerable scope that implements a plan.
An endeavour, which is planned, executed, and controlled; performed by people; and constrained by limited resources. C. A temporary endeavour undertaken to create a unique product or service. D. An objective based effort of temporary nature.
12. A project kick off meeting is usually conducted to:
A. B. C. D.
Setup project team and announce the PM assignment
To draft project charter Build up team spirit Define project scope and develop WBS
13. All of the following are characteristics of a project EXCEPT:
A. Temporary B. Definite beginning and end C. Interrelated activities D. Repeats itself every month 14. A more A. B. C. D.
document called ___________ is created by decomposing the project scope into smaller, manageable elements. Scope Statement Network Logic Diagram Work Breakdown Structure Requested Change
15. Which of the following is NOT a characteristic of a project?
A. Constrained by limited resources B. Planned, executed, and controlled C. Creates a unique product or service D. On-Going and repetitive
PMP Exam Prep: Master the Latest Techniques and Trends with this In-depth Project Management Professional Guide: Study Guide | Real-life PMP Questions and Detailed Explanation | 200+ Questions and Answers
The PMP Project Management Professional Certification Exam Study Guide - PMBOK Seventh 7th Edition: Proven Methods to Pass the PMP Exam With Confidence - Complete Practice Tests With Answers