Sie sind auf Seite 1von 77

Design of T-Beam Roof Slab

Name of work:-

PKN

1 Room size

6.00

2 R.C.C. supported Beam

0.30

300

mm

3 End bearing on wall

0.40

400

mm

4 Suer imposed load

2000

N/m2

5 Concrete

10.00

Floor finishing

600

N/m2

25000
13.33

N/m3

mcbc

20
7

Grade
N/mm2

Unit weight concrete


m

fy

415

N/mm2

Tensile stress

230

N/mm2

7 Nominal cover Slab

15

mm

Effective cover

20

mm

8 Nominal cover Beam

25

mm

Effective cover

35

mm

9 Reinfocement
Slab main

mm

170

mm c/c

Slab Distribution

mm

410

mm c/c

Beam main

25

mm

2 lgde strirrups

mm

300

6 Steel

3250
8 mm @
8 mm @

400
650

170
340
810

3500
10000 mm
mm c/c
mm c/c

8 mm @
8 mm @
875

700

410
170

mm c/c
mm c/c

810

400

650

100
mm

25 mm
4 Nos.

600

mm c/c

3250

875

440

Nos.

440
300

700
300

(a) Section of the slab


2

400

Nos
25
4

25
mm
Nos

mm

2 x12 mmtop holding bars


8 mm 2 ldge srirrups @
300 mm c/c
300

330

330
6000
(b) L- Section of Beam

400

pk_nandwana@yahoo.co.in

Based on R.C.C. design by B.C. Punmia example 7.12

Design of T-Beam Roof Slab


Name of work:-

PKN

Room size

6.00

10.00

R.C.C. supported Beam

0.30

300

mm

End bearing on wall

0.40

400

mm

Suer imposed load

2000

N/m2

Concrete

Steel

Floor finishing

600

mcbc

20
7

Grade
N/mm2

Unit weight concrete


m

fy

415

N/mm2

Tensile stress

230

Nominal cover Slab

15

mm

Effective cover

20

Nominal cover Beam

25

mm

Effective cover

35

Reinfocement
Slab main

mm

170

mm c/c

Slab Distribution

mm

410

mm c/c

Beam main

25

mm

2 lgde strirrups

mm

300

3250
8 mm @
8 mm @

400
650

170
340
810

3500
10000 mm
mm c/c
mm c/c

8 mm @
8 mm @
875

700

mm c/c

410
170

mm c/c
mm c/c

810

25 mm
4 Nos.

600

Nos.

3250

875

440

25000
13.33

650

440
300

700
300

(a) Section of the slab


2

400

Nos
25
4

25
mm
Nos

mm

2 x12 mmtop holding bars


8 mm 2 ldge srirrups @
300 mm c/c
300

330

330

6000
(b) L- Section of Beam
pk_nandwana@yahoo.co.in

N/m2
N/m3

N/mm2
mm
mm

400

100
mm

400

15

115

20

45

33

44

18

40

20

41

20

40

18

40

16

300
400
600
###

mm
mm
N/mm2
N/m3

34

Design of T-Beam Roof Slab


1
2
3
4
5
6
7

Room size
R.C.C. supported Beam
End bearing on wall
External load
Concrete
M
cbc
Steel
Nominal Cover

6.00
x
0.30 m
0.40 mtr
2000 N/m2
20
7

10.00 mtr
=
=
Floor finishing =
Unit weight concrete =

N/mm2

13.33

st =

fy 415 N/mm2
15 mm

230 N/mm2
20
mm

Effective cover

Solution :Let us keepend sapn of slab slightly less than the middle span so that approximately
(I) End span =
3.10 m (clear)
(II) middle span =
3.20 m (clear)
The clear span of each T B 6.00 m while the R.C. slab monolithic with the
beam will be continous over the three span
Design ConstFor HYSD Bars
Cocrete M =
20

st =
cbc =

m
k=

230 N/mm2
7
13.33
m*c

N/mm

m*c+st
j=1-k/3
1
R=1/2xc x j x k
0.5 x

wt. of concrete

### N/mm2

13.33
13.33
x

0.289

0.90 x

230
0.289

0.289

0.904

0.913

(A) Design of continous slab:let us assume total thickness of slab =


100 mm and effective thickness
Effective span;the width of the supports is more than 1/12the clear span
.Effective end span =
clear span +1/2 effective slab=
3.10 +
Effective middle =
=
clear distance between supports
2 Caculcation of B.M. :Overall depth of slab
self weight of Slab
Super imposed live load
For end span
w .L2
Md (near the center)=d
x
1000
12
Ms (Due to
ws.L2
x
1000
super imposed
10
load)=
For intermidiate span :w L2
Md (at the middle)= d.
x
24
w L2
Ms (at interior supports )d.
x

=
x

=
=

1000

1000

100 mm, consider 1 mtre width of slab


1.00
x
0.10
x
### =
Total =
1
x
2000
=

2500 x

3.14

3.14

12
2000 x
10

2500 x
2500

0.04

24
x

2500
2500
2000

1000

2054083

1000

1971920

Total

4026003

1000

1066667

1000

2560000

3.20

3.20

Ms (at interior supports )


x
1000
=
12
At the supports next to end supports
w L2
Md (at the middle)= d.
x
1000
=
10
ws.L2
Ms =
x
1000
=
9

10
2500 x

3.14

10
2500 x

3.14
10

1000

2560000

Total

3626667

1000

2464900

1000

2464900

Total

4929800

pk_nandwana@yahoo.co.in

3 Design of section :The effective depth will be calculated on the basis of maximum bending moment
out of four value calculated above.

Effective depth
=
required
Rxb

4929800
0.913
x
1000

=
=

Let us check this depth from stiffness (deflection)point of view. Span /effective depth ratio

k.c 100
0.289 x
=
2
2. st
=
we get from fig 7.1 modification factore

For a balance section, % of reinforcement- For M-20


=

Takin
gpt

0.25

7
x

73

26
100
230

1.70

=
1.70
x
26
=
44.2
d=
/
44.2
span /
3100
=
70 mm for end span
depth
3200
/
44.2
=
72 mm
And d for inetrmidia =
keep
=
73
+
20
=
100
effective d =
100
15
over
4
all d
Since the diffences between various bending moments is not large, reinforcement found for large will
provided for other moments also.
4 :-

The maximum bending moment in end span (1) in intermidiate span (2) and at the support next to end
(3) are nearly equal. Hence same reinforcement will be provided in all span .
4929800
BM
Ast =
=
=
293
mm2
230
x
0.904
x
81
st x j x D
3.14xdia2
3.14
x
8
x
8
using
8
A
=
=
mm bars
4 x100
4
x
100
Pitch s =
= 1000 x As
/A
=
1000
x
50 /
293 =
171.5
say
mm
bar,
8
170 mm c/c middle of each span.
Hence Provided
Bent up alternate bars from the bottom at a distance of L/5=
=
3140 /
5 =
620
center of intermidiate supports and at L/ 7 3140 /
7 =
450 mm from the end support.
mmbars @
Thus reinforcement available at each intermidiate support will be=
8
170
296
1000 x
50.2
Actual provided
=
=
296 mm2 pt
=
x
100
170
1000
x
100
Distribution reinforcement:.12 xb xd
1000 x
100
0.12 x
Ast =
=
=
120
mm2
100
100
3.14xdia2
3.14
x
8
x
8
using
8
A
=
=
mm bars
4 x100
4
x
100
Pitch s =
= 1000 x As
/A
=
1000
x
50.2 /
120 =
418.7
say
and also less than
the above pitch is less than 5 time depth of slab = 5xd = 500 mm
8
Hence =
mm bars @
mm
c/c.
410
Check for shear :-

V = 0.4wd .L+0.45 ws .L at the outer supports


0.4 x
2500 +
0.45 x
2000 )x
3.14 =
5966
V
5966
=
=
0.074
N/mm2
bxd
1000
x
81
100
x
148
tc
=
0.18
%
=
0.19
%
For M
1000
x
81
than permissible value of tc
=
0.19 N/mm2
Hence safe

=(

tv

100.As
bxd
0.074 <

20

5 Check for devlopment length at supports:The code stipulates that at the diameter of bars should be such that
1.3xM1
L0
the following Eq.is satisfied at the end of supports
=
+
>
V
0.5
2491986
where M =
x
296 x
230
x
0.904
x
81
=
Side cover x'
=
25 mm is provided at side (end)
and the slab has a support of
=
400 mm width without providing any hook or bend

Ld
v=

pk_nandwana@yahoo.co.in

1.3 xM1
V

=(

400
2

25

)=

L0

1.3

Devlopment length Ld

Alternatively, Ld
Thus

st
4 bd
= 45

1.3x

718

=
=
M1
V
>

175 mm

(with out providing any hook or bend)

2491986
5966
8
x
4

x(

1.6

45

L0

>

175

718 mm

230
x
=

0.8

359

360 mm
Ld

360 Hence Code requirement are satisfied

(B) Design of T beam


Let width of web bw

=
300 mm
lo
bf =
+
bw
+
6Df
=
6
1 load calculation per metre unit weight of slab =
3.10
Load from slab
= (wd+ws) x
+
0.30
+
2
Weight of web (assuming depth of rib) =
300 mm

Effective span =
6400
+
300
+
6
0 N/m3
3.20
=(
2500
+
2
=
0.3
x

6.40
6

100

2000

)x

3.45

0.3
Total w

25000

2 Design of section
M

wL2
8

for balance section, we have


or

###

x
8

6.40

0.45bf.c.Df

0.45

1967

346.49

0.289

d-

100

200 d =
=

### +
###
/

34649
200 =

100

2x

1000

91008000

2kcd-Df
kc
d100
=
0.289
91008000
1967 x
7.00
or
49340
say
250
0.289

0.45 x
247 mm

3 Area of steel:Area of steel =

d-

Df

250

100

200

mm

91008000

mm

Area of steel =

d-

=
=
250
2
2
Alternatively a=
0.9.d =
0.9
x
250
=
225 mm
Adopt d =
210 mm, for primilnary calculation.
91008000
BM
=
Area of steel, Ast =
230
x
210
st xa
2
3.14xdia
using 25
mm bars
A
=
=
4 x 100
Nomber of Bars = Ast/A
=
1884
/
491 =
4
25 mm bar,
Hence Provided
bars of

having,
Ast
=
300 mm keeping '=
300
25
-

Provide D =
Available d =

4
25
8

200

mm

=
3.14

1884

x
4

3.84

1963 mm2
x
491 =
mm nominal cover and using
25
/
2
=

25
x
say

mm2

x
100
=

255

25
4

mmRing
mm

4 Determination of actual N.A. and stress.:Thus the section is complete known However, we have determine the actual stress included
in section. To find the position of N.A., we have from Eq.
N.A. =
bf
x
Df
x(
n
Df/2
)=
m
x
Ast
x(
d
=
1967
x
100
x(
n
50
)= 13.33
x
1963
x(
255
196667
9833333
x
n
=
6670832
26160.125
196667
n
+
6670832
+
9833333
26160.125 n
=
74 mm thus, the N.A. falls in the flange.
=
n
=
16504165
/
222827
N.A. falls in the flange, we have N.

=
=

n2

=
6784
2
b +b -4.a.c
2 a

or

Avrage stress in steel


corresponding
stress In concrete is
given by
5 Check for Sheart:###
wl
V=
2

d=
=

x
2

n
3
m
Ast xa
t
m

6.00

n2

n2

or
26.60

n2+
+

or

26.60

+(

or

26.60

+(

or

26.60

255

140
70
3

+
2
/

or
a.=

bf / 2 x
1967
x
2
26.6
n
n
=

=
=
x

91008000
1963
x
232
200
n
=
13.33
d-n

Ast

x(

13.33

1963

x(

255

26.60 n
6783.896822
708
-4x 1.00
x
-6784
x
2
1
708
-27135.5872881356
2
27843.33
)1/2
2
x
1
167
2

232

mm

200

N/mm2

70
255 -

V
=
bxd
100As
Assuming that at the ends, 2
bars will be bent up available
=
bxd
Hence from Table permissible shear (tc)for M 20 concrete, for
1.28 %
Since tv >
tc
Shear reinforcement necessary
shear resistance of concrete Vc=tc. Bd= 0.42
300 x
255
=
x
=

53325

N tv

70

70

mm

>

73

5.7

53325
255
300 x
100
x
981
300
x
255
steel =
0.42
32130

bars at distance of
2 a
2
= 2
mm bars, let us bend
=
1.414
x
232
=
from the edge of the supports.
330 mm
2
3.14xdia
3.14
x
25
x
25
Area of cross -section of 2
bend up bars
=
4 x100
4
x
100
=
2
x
491
=
982 mm2
Area of bent up bars
Nos.bent up bars
Shear resistance of 2
vs =
sv . Asv . sin
Sin 45
vs =
sv
A
230
x
982
x
0.707
=
159683.02
sin =
x
x
sv
Out of

-25

###
subject to a max. of V / 2 =
/
2
=
26662.5
N
This is
> than the S.F. it self. Through shear resistance of concrete (v 2 = tc. bd )
is additionally available, we will have to provide nominal shear stirrups.
3.14xdia2
3.14
x
using
8
=
=
mm bars area
4 x100
4
using

mm

lgd stirrups area

the maximum spacing of stirrups is given by


nce Provided

mm 2 lgd stirrups, @

=
2.175 x Asv.x fy

x
=

50.2
2.18
300

=
x

8
x

100.4
100.4 x

8
100
mm2
415

300 mm c/c throughout the length of beam.

6 check for development length at the end.


L0
Ld
+
>
Ast available at end.=
V
M1
= moment of resistance of section, assuming all reinforcement stress at st
M1
"= Ast x st x a
230
=
981
x
x
232
=
52359500
N-mm
Alternatively, Ld
53325 N
V =
= 45
=
45
x
25
Let us assume the width of supports equal to
= 400 mm and a side cover x'
25
Assuming no hook provided
Ls
400
we have, Lo=(
x'
=
25
=
175
2
2
1.3 xM1
52359500
L0
+
=
1.3
x
+
175
=
1451
mm
V
53325
=
1451
>
1125
Hence Code requirement are satisfied
The code requires that

1.3xM1

16

34

26

80

=
=

3.14 m
3.20 m

2500
2500
2000

mm

N/m
N/m
N/m

2054083

N-mm

1971920

N-mm

4026003

N-mm (+1)

1066667

N-M

(iii)

2560000

N-M

(iv)

2
0.6
9.40
3.10
3.20

3.40

3.50
0.30

3.40

3.10

3.20

3.10

10.00

fig 1

No beam
space by bea
Net space for
space for end
space for mid

10.00

6.00

no of span =

m
m
m
m

2560000

N-M

(iv)

3626667

N-mm (+2)

2464900

N-mm

2464900

N-mm

4929800

N-mm (+3)

73

mm

for contin slab

0.44

81

mm

m for end span


=

ment found for large will be

the support next to end support

=
=

50.2

mm2

171 mm

mm from
mm c/c

=
=

0.300

50.2

mm2

419 mm
450 mm.

concrete

5966

y hook or bend)

mm

m
=

1967

mm

15525

N/m

=
=

2250
17775

N/m
N/m

91008000

kN-m

91008000

491

mm2

No.

mmRing

n
n
26160.125 n
9833333
-

n)

6783.896822
-6784

)
)

)1/2

Fail
<

0.7

1.28

N/mm2

N
mm2

N
mm2

232

mm

491

mm2

0.707

x
of the supports.

159683.02

50.2

mm2

302

mm

981

=
mm,

1125 mm

mm

satisfied

mm2

10.00

3.40

3.50

3.40

3.20

3.10

space available
no of span proposed
No beam required
space required for beam
Net total space for span
space for end span
space for middle span

0.30
6.00

3.10

fig 1
Design of T-Beam Roof Slab
Name of work:-

PKN
3250
8

400

3500

mm @
mm @

650

170
340
810

3250

mm

10000

mm c/c
mm c/c

8
8

875

mm @
mm @
875

440

25
600

410
170
810

mm
Nos.

300
200

700
300

(a) Section of the slab


400

Nos

25
25
4

mm
mm
Nos

2 x12 mmtop holding bars


8
300

mm 2 ldge srirrups @
mm c/c
300

330
6000 mm

(b) L- Section of Beam

pk_nandwana@yahoo.co.in

Nos.
space available
no of span proposed
No beam required
space required for beam
Net total space for span
space for end span
space for middle span

3
2

2
1

mm c/c
mm c/c

width
6.00
0.30
0.60
9.40
3.10
3.20

400

650
100
440

400

ge srirrups @

330

m
m
m
m

total
total
total

length
10.00

6.20
3.20
9.40

m
m
m

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Shear stress tc
100As
bd
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58
0.59
0.6
0.61
0.62
0.63

M-20
0.17
0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31
0.31
0.32
0.32
0.32
0.32

Reiforcement %
100As
M-20
bd
0.17
0.14
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

Degree
10
15
16
17
18
19
20
21

Value of
sin
0.174
0.259
0.276
0.292
0.309
0.326
0.342
0.358

modification factore Table


200
250
328
415

% fy
0.0
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.0
3.1
3.2

1.90
1.80
1.70
1.60
1.55
1.50
1.50
1.45
1.40
1.35
1.35
1.30
1.30
1.25
1.25
1.20
1.18
1.17
1.16
1.15
1.14
1.13
1.12
1.11
1.11
1.11

angle
cos
0.985
0.966
0.961
0.956
0.951
0.946
0.940
0.934

tan
0.176
0.268
0.287
0.306
0.325
0.344
0.364
0.384

2.0
1.75
1.65
1.55
1.5
1.45
1.4
1.35
1.3
1.3
1.25
1.2
1.2
1.18
1.16
1.14
1.13
1.12
1.1
1.1
1.08
1.06
1.05
1.04
1.03
1.02
1.01
1.00

2
1.85
1.75
1.65
1.5
1.4
1.35
1.30
1.25
1.2
1.16
1.13
1.1
1.1
1.07
1.05
1.03
1.01
1.0
0.99
0.97
0.96
0.95
0.94
0.93
0.92
0.92
0.91
0.91
0.90
0.87
0.86

1.90
1.80
1.70
1.60
1.50
1.40
1.30
1.20
1.15
1.05
1.02
1.20
0.98
0.96
0.94
0.92
0.91
0.90
0.89
0.86
0.86
0.85
0.84
0.83
0.83
0.82
0.82
0.81
0.81
0.81
0.81
0.81
0.81
0.81

0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16

0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41

22
23
24
25
35
40
45
50
55
60
65

0.375
0.391
0.407
0.422
0.573
0.643
0.707
0.766
0.819
0.866
0.906

0.927
0.921
0.924
0.906
0.819
0.766
0.707
0.643
0.574
0.500
0.423

0.404
0.424
0.445
0.466
0.700
0.839
1.000
1.192
1.428
1.732
2.145

1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69

0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46

1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22

0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50

2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75

0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

M-50
1.4

2.0

Development Length in tension


bd

Plain M.S. Bars


(N / mm2)
kd = Ld

bd

1.6

H.Y.S.D. Bars
(N / mm2)
kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

1.2
0.8
0.4

for steeel
fy 500
fy 415

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm2) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
(N/mm2)
in kg/m2
Kg/m2 (N/mm2)
Kg/m2
--3.0
300
2.5
250
5.0
500
4.0
400
0.6
60
7.0
700
5.0
500
0.8
80
8.5
850
6.0
600
0.9
90
10.0
1000
8.0
800
1.0
100
11.5
1150
9.0
900
1.1
110
13.0
1300
10.0
1000
1.2
120
14.5
1450
11.0
1100
1.3
130
16.0
12.0
1.4
1600
1200
140

fy 328
fy 250
fy 207

ble
500
2.00
1.80
1.65
1.50
1.40
1.35
1.30
1.20
1.16
1.08
1.00
0.95
0.90
0.86
0.84
0.82
0.81
0.80
0.79
0.78
0.77
0.76
0.75
0.74
0.73
0.72
0.72
0.72
0.71
0.71
0.71
0.70
0.70
0.69
0.69
0.68
0.68

fs = 120 =fy200

2.0

fs =145 =fy250
fs =190 =fy328

1.6

fs =240 =fy415

1.2
0.8
0.4

0.4

0.8

1.2

Modification factore
Fig 7.1
Fs= steel stress of service load =0.58fy
=

Fs

290

N/mm2

Fs

240

N/mm2

=
=

Fs
Fs

190
145

N/mm2
N/mm2

Fs

120

N/mm2

1.6

fs = 290

2.0

=fy500

2.4

2.8

3.2

Design of T-Beam Roof Slab


1
2
3
4
5

Room size
R.C.C. supported Beam
End bearing on wall
External load
Concrete

6 Steel
7 Nominal Cover

6.00
0.30
0.40
2000
M 20
cbc
7
fy 415
15

x 10.00 mtr
m
mtr
N/m2
Floor finishing
Unit weight concrete
2
N/mm
m
st
N/mm2
mm
Effective cover

= 300 mm
= 400 mm
= 600 N/mm2
= ### N/m3
= 13.33
= 230 N/mm2
20
mm

1 Solution :Let us keepend sapn of slab slightly less than the middle span so that approximately
(I) End span =
3.10 m (clear)
(II) middle span = 3.20 m (clear)
The clear span of each T Beam =
6.00 m while the R.C. slab monolithic with the
beam will be continous over the three span
Design Constants:- For HYSD Bars
Cocrete M =
20

st =
cbc =
m
k=
j=1-k/3
R=1/2xc x j x k

230 N/mm2

7
N/mm3
13.33
m*c

m*c+st =

1
0.5 x

wt. of concrete = 25000 N/mm2

13.33
13.33 x

0.289 /

7 x

7
+

230

= 0.289
= 0.904

0.90 x

0.289 =

0.913

(A) Design of continous slab:let us assume total thickness of slab =


100 mm and effective thickness =
Effective span;the width of the supports is more than 1/12the clear span
.Effective end span =
clear span +1/2 effective slab=
3.10 + 0.04 =
Effective middle = = clear distance between supports
=
2 Caculcation of B.M. :Overall depth of slab
self weight of Slab =

=
x

Super imposed live load =

80

mm

3.14 m
3.20 m

100 mm, consider 1 mtre width of slab


1.00 x 0.10 x ### = 2500 N/m
Total = 2500 N/m
1
x 2000
= 2000 N/m

For end span


Md (near the center)=
Ms (Due to super
imposed load)=

wd.L2
12
ws.L2
10

1000

1000

2500 x
12
2000 x
10

3.14

3.14

x 1000 =

2054083

N-mm

x 1000 =

1971920

N-mm

Total =

4026003

N-mm(+1)

1000 =

1066667

N-M (iii)

1000 =

2560000

N-M (iv)

Total =

3626667

N-mm(+2)

1000 =

2464900

N-mm

x 1000 =

2464900

N-mm

Total =

4929800

N-mm(+3)

For intermidiate span :Md (at the middle)=

wd.L2

1000

24
wd.L2
Ms (at interior supports )
x
1000
12
At the supports next to end supports
wd.L2
Md (at the middle)=
x
1000
10
ws.L2
Ms =
x
1000
9

=
=

=
=

2500 x
24
2500 x
10

3.20

3.20

2500 x
10
2500 x
10

3.14

3.14

pk_nandwana@yahoo.co.in

3 Design of section :The effective depth will be calculated on the basis of maximum bending moment
out of four value calculated above.
4929800

Effective depth required


=
=
=
73
mm
0.913 x 1000
Rxb
= 26 for contin slab
x 100
k.c 100
0.289 x
7
For a balance section, % of reinforcement- For M-20 =
=
= 0.44 %
x
2
230
2. st
Taking pt
= 0.25
% we get from fig 7.1 modification factore = 1.70
70 mm for end span
x
26
= 44.2 d = 3100 / 44.2 =
span / depth = 1.70
3200 /
44.2 =
72 mm
And d for inetrmidiate span =
4 = 81 mm
keep over all d =
73
+
20
= 100 effective d = 100 15 Since the diffences between various bending moments is not large, reinforcement found
for large will be provided for other moments also.
Let us check this depth from stiffness (deflection)point of view. Span /effective depth ratio

4 Main Reiforcement :The maximum bending moment in end span (1) in intermidiate span (2) and at the support
next to end support (3) are nearly equal. Hence same reinforcement will be provided in all span .
4929800
BM
Ast =
=
=
293
mm2
230 x 0.904 x
81
st x j x D
3.14xdia2
3.14 x
8
x 8
using
8 mm bars
A
=
=
= 50.2 mm2
4 x100
4
x
100
Pitch s = = 1000 x As
/A
=
1000 x
50 /
293 = 171.5
say = 171 mm
8 mm bar,
170 mm c/c middle of each span.
Hence Provided
Bent up alternate bars from the bottom at a distance of L/5=
=
3140 /
5 = 620 mm from
3140 /
center of intermidiate supports and at L/ 7 '=
7 =
450 mm from the end support.
mmbars @ 170 mm c/c
Thus reinforcement available at each intermidiate support will be =
8
296
1000 x
50.2
Actual provided =
= 296 mm2 pt
=
x 100 = 0.300 %
170
1000 x 100
Distribution reinforcement:.12 xb xd
100
0.12 x 1000 x
Ast =
=
=
120
mm2
100
100
3.14xdia2
3.14 x
8
x 8
using
8 mm bars
A
=
=
= 50.2 mm2
4 x100
4
x
100
Pitch s = = 1000 x As
/A
=
1000 x 50.2 /
120 = 418.7
say = 419 mm
and also less than = 450 mm.
the above pitch is less than 5 time depth of slab = 5xd =
500 mm
8
Hence provided =
mm bars @
410 mm c/c.
Check for shear :V = 0.4wd .L+0.45 ws .L at the outer supports
0.4 x
2500 +
0.45 x
2000 )x 3.14 =
5966
V
5966
tv
=
=
= 0.074 N/mm2
bxd
1000 x
81
100.As
100
x
148
=
= 0.18 % tc = 0.19 % For M
bxd
1000
x
81
than permissible value of tc =
0.074 <
0.19 N/mm2
Hence safe
v

=(

5 Check for devlopment length at supports:The code stipulates that at the diameter of bars should be such that
1.3xM1
L0 >
the following Eq.is satisfied at the end of supports
=
+
V
0.5 x
where M
=
296 x
230 x 0.904 x
81 = 2491986

20

concrete

Ld
v=

5966

Side cover x'


and the slab has a support of

=
=

25
400

mm is provided at side (end)


mm width without providing any hook or bend

175

mm

pk_nandwana@yahoo.co.in

1.3 xM1
V

=(

400
2

25

)=

L0

1.3

st
4 bd

Devlopment length Ld
Alternatively, Ld
Thus

= 45
=

1.3x

718

=
M1
V
>

(with out providing any hook or bend)

2491986
5966
8
x
4
x( 1.6

175

230
0.8

45

L0

>

Ld

360

718 mm
= 359

mm

360 mm

Hence Code requirement are satisfied

(B) Design of T beam


Let width of web bw =
300 mm
Effective span =
6.40 m
lo
6400
bf =
+
bw
+
6Df
=
+ 300 +
6
x 100 = 1967 mm
6
6
1 load calculation per metre run
unit weight of slab =
0 N/m3
3.10
3.20
Load from slab = (wd+ws) x
+ 0.30 +
=( 2500 + 2000 )x 3.45 = 15525 N/m
2
2
Weight of web (assuming depth of rib)
= 300 mm
= 0.3 x 0.3 x 25000 = 2250 N/m
Total w
= 17775 N/m
2 Design of section
17775 x
6.40 2
wL2
M
=
=
x 1000 =
91008000
kN-m
8
8
2kcd-Df
for balance section, we have
M
= 0.45bf.c.Df
kc
2x 0.289 d- 100
or
= 0.45
x
1967 x
7
x 100
=
91008000
0.289
91008000
346.49
2
x 0.289 d- 100 =
0.45 x
1967 x
7.00
200 d = 14691 +
34649
or
49340
say
= 49340 /
200 =
247 mm
250
mm
3 Area of steel:Df
100 =
= 250
200
mm
2
2
Alternatively a
=
0.9.d =
0.9
x
250 = 225 mm
Adopt d
= 210 mm, for primilnary calculation.
91008000
BM
=
Area of steel,
Ast =
=
1884 mm2
230
x 210
st xa
3.14xdia2
3.14 x 25 x 25
using ### mm bars
A
=
=
= 491
4 x 100
4
x
100
Nomber of Bars = Ast/A =
1884 / 491 = 3.84
say
=
4 No.
4
25 mm bar,
Hence Provided
bars of
Area of steel =

Provide D =
Available d =

d-

having,
Ast =
300 mm keeping '=
300
25
-

4
25
8

x 491 = 1963 mm2


mm nominal cover and using
25
/
2
= 255

mm2

8 mmRing
mm

4 Determination of actual N.A. and stress.:Thus the section is complete known However, we have determine the actual stress included
in section. To find the position of N.A., we have from Eq.
N.A.
=
bf
x
Df
x(
n
- Df/2 )=
m
x Ast x( d
n
= 1967
x
100 x (
n
50 )= 13.33 x 1963 x( 255 n

)
)

x
n

16504165

196667
196667

9833333

bf / 2 x
1967
x
2

26160.13 n
74
222827 =

N.A. falls in the flange, we have N.A .

n2

6784

a.=

d-

Avrage stress in steel

corresponding stress In
concrete is given by

5 Check for Sheart:wl 17775


V=
2

x
2

n)

26.60 n
n
or n2+
- 6783.9
= 26.60 + 708 -4x 1.00 x -6784
x
2
1

n2

= 26.60 +(

or

= 26.60 +(

or

or

255

m
=
Ast xa
t
x
m

6.00

Ast

x(

= 13.33 x 1963 x( 255

or

n
3

- 26160 n
+
9833333

mm thus, the N.A. falls in the flange.

26.6
n

b +b -4.a.c
2 a

6670832
6670832

or

n =

=
=

26.60 +
2
140 /
70
=
3

91008000
=
1963 x
232
200
n
=
x
13.33
d-n

708

- -27135.587288 )1/2
2
27843.33
)1/2
2
x
1
167
2

232

70

mm

mm

200
70
255 -

N/mm2 >

73

5.7

70

Fail
<

N
mm2

N
V
53325
=
= 0.7
mm2
bxd
300 x 255
100As
100 x 981
Assuming that at the ends,
2 bars will be bent up available =
= 1.28 %
bxd
300 x 255
Hence from Table permissible shear (tc)for M 20 concrete, for
1.28 % steel = 0.42 N/mm2
Since tv >
tc
Shear reinforcement necessary
shear resistance of concrete Vc=tc. Bd
= 0.42
255 = 32130 N
x 300 x

53325

N tv =

mm bars, let us bend 2 bars at distance of 2 a = 2 x 232 mm


= 1.414 x
232 = 330 mm from the edge of the supports.
3.14xdia2 =
3.14 x 25 x 25
Area of cross -section of
2
bend up bars
= 491 mm2
4 x100
4
x
100
=
2
x 491 = 982 mm2
Area of bent up bars
Nos.bent up bars
2
vs =
Sin 45 = 0.707
Shear resistance of
sv . Asv . sin

vs =
x Asv
x sin =
230 x 982 x 0.707 = 159683 N
sv
= 53325 /
subject to a max. of V / 2
2
=
26662.5
N
than
the
S.F.
it
self.
Through
shear
resistance
of
concrete
(v 2 = tc. bd )
This is >
Out of 4

using

-25

is additionally available, we will have to provide nominal shear stirrups.


3.14xdia2
3.14 x
8
x 8
8
=
=
mm bars area
4 x100
4
x
100
using 8

mm

lgd stirrups area

the maximum spacing of stirrups is given by


Hence Provided 8

mm 2 lgd stirrups, @

6 check for development length at the end.

2.175 x Asv.x fy

x
=

50.2
2.18
300

= 100.4 mm2
x 100.4 x 415

300 mm c/c throughout the length of beam.

= 50.2

mm2

= 302 mm

1.3xM1 +
L0
Ld
>
Ast available at end.=
981 mm2
V
M1
= moment of resistance of section, assuming all reinforcement stress at st
M1
"= Ast x st x a
230 x
= 981
x
232
=
52359500
N-mm
Alternatively, Ld = 45 = 45 x 25 = 1125 mm
53325 N
V
=
Let us assume the width of supports equal to
= 400 mm and a side cover x' 25 mm,
Assuming no hook provided
Ls
400
we have, Lo
=(
x'
=
25
= 175
mm
2
2
1.3 xM1
52359500
L0
+
=
1.3
x
+ 175 =
1451
mm
V
53325
=
1451 > 1125
Hence Code requirement are satisfied
The code requires that

pk_nandwana@yahoo.co.in

Design of T-Beam Roof Slab


Name of work:-

PKN
3250
8

400

3500

mm @
mm @

650

170
340
810

3250

mm

10000

mm c/c
mm c/c

8
8

875

mm @
mm @
875

410
170
810

mm c/c
mm c/c

400

650
100

440

25
600

mm
Nos.

300

440

200

700
300

(a) Section of the slab


400

Nos

25
25
4

mm
mm
Nos

2 x12 mmtop holding bars


8
300

400

mm 2 ldge srirrups @
mm c/c
300

330

330
6000 mm

(b) L- Section of Beam

pk_nandwana@yahoo.co.in

VALUES OF DESIGN CONSTANTS


Grade of concrete
Modular Ratio

M-15
18.67

M-20
13.33

M-25
10.98

M-30
9.33

M-35
8.11

M-40
7.18

cbc N/mm2
m cbc

8.5

10

11.5

13

(a) st =
140
N/mm2
(Fe 250)
(b) st =
190
N/mm2
(c ) st =
230
N/mm2
(Fe 415)
(d) st =
275
N/mm2
(Fe 500)

Grade of concrete
bd (N / mm2

93.33

93.33

93.33

93.33

93.33

93.33

kc

0.4

0.4

0.4

0.4

0.4

0.4

jc

0.867

0.867

0.867

0.867

0.867

0.867

Rc

0.867

1.214

1.474

1.734

1.994

2.254

Pc (%)

0.714

1.214

1.429

1.643

1.857

Grade of
concrete

kc

0.329

0.329

0.329

0.329

0.329

0.329

M 15

jc

0.89

0.89

0.89

0.89

0.89

0.89

M 20

Rc

0.732

1.025

1.244

1.464

1.684

1.903

M 25

Pc (%)

0.433

0.606

0.736

0.866

0.997

1.127

M 30

kc

0.289

0.289

0.289

0.289

0.289

0.289

M 35

jc

0.904

0.904

0.904

0.904

0.904

0.904

M 40

Rc

0.653

0.914

1.11

1.306

1.502

1.698

M 45

Pc (%)

0.314

0.44

0.534

0.628

0.722

0.816

M 50

kc

0.253

0.253

0.253

0.253

0.253

0.253

jc

0.916

0.916

0.916

0.914

0.916

0.916

Rc

0.579

0.811

0.985

1.159

1.332

1.506

Pc (%)

0.23

0.322

0.391

0.46

0.53

0.599

Permissible shear stress Table v in concrete (IS : 456-2000)


100As
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above

M-15
0.18
0.22
0.29
0.34
0.37
0.40
0.42
0.44
0.44
0.44
0.44
0.44
0.44

Permissible shear stress in concrete


M-20
M-25
M-30
0.18
0.19
0.2
0.22
0.23
0.23
0.30
0.31
0.31
0.35
0.36
0.37
0.39
0.40
0.41
0.42
0.44
0.45
0.45
0.46
0.48
0.47
0.49
0.50
0.49
0.51
0.53
0.51
0.53
0.55
0.51
0.55
0.57
0.51
0.56
0.58
0.51
0.57
0.6

tv N/mm2
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62

M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63

Maximum shear stress c.max in concrete (IS : 456-2000)


Grade of concrete

c.max

M-15
1.6

M-20
1.8

M-25
1.9

M-30
2.2

M-35
2.3

M-40
2.5

Grade of
concrete
M
M
M
M
M
M
M
M
M

10
15
20
25
30
35
40
45
50

Shear stress tc
100As
bd
0.14
0.15
0.16
0.17
0.18
0.19
0.2
0.21
0.22
0.23
0.24
0.25
0.26
0.27
0.28
0.29
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.55
0.56
0.57
0.58

M-20
0.17
0.18
0.18
0.18
0.19
0.19
0.19
0.2
0.2
0.2
0.21
0.21
0.21
0.22
0.22
0.22
0.23
0.23
0.24
0.24
0.24
0.25
0.25
0.25
0.26
0.26
0.26
0.27
0.27
0.27
0.28
0.28
0.28
0.29
0.29
0.29
0.30
0.30
0.30
0.30
0.30
0.31
0.31
0.31
0.31

Reiforcement %
100As
M-20
bd
0.17
0.14
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25

Degree
10
15
16

Value of
sin
0.174
0.259
0.276

% fy
0.0
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.0
3.1
3.2

200

modification factore Table


250
328
415

1.90
1.80
1.70
1.60
1.55
1.50
1.50
1.45
1.40
1.35
1.35
1.30
1.30
1.25
1.25
1.20
1.18
1.17
1.16
1.15
1.14
1.13
1.12
1.11
1.11
1.11

1.90
1.80
1.70
1.60
1.50
1.40
1.30
1.20
1.15
1.05
1.02
1.20
0.98
0.96
0.94
0.92
0.91
0.90
0.89
0.86
0.86
0.85
0.84
0.83
0.83
0.82
0.82
0.81
0.81
0.81
0.81
0.81
0.81
0.81

angle
cos
0.985
0.966
0.961

tan
0.176
0.268
0.287

2.0
1.75
1.65
1.55
1.5
1.45
1.4
1.35
1.3
1.3
1.25
1.2
1.2
1.18
1.16
1.14
1.13
1.12
1.1
1.1
1.08
1.06
1.05
1.04
1.03
1.02
1.01
1.00

2
1.85
1.75
1.65
1.5
1.4
1.35
1.30
1.25
1.2
1.16
1.13
1.1
1.1
1.07
1.05
1.03
1.01
1.0
0.99
0.97
0.96
0.95
0.94
0.93
0.92
0.92
0.91
0.91
0.90
0.87
0.86

0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08

0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4

17
18
19
20
21
22
23
24
25
35
40
45
50
55
60
65

0.292
0.309
0.326
0.342
0.358
0.375
0.391
0.407
0.422
0.573
0.643
0.707
0.766
0.819
0.866
0.906

0.956
0.951
0.946
0.940
0.934
0.927
0.921
0.924
0.906
0.819
0.766
0.707
0.643
0.574
0.500
0.423

0.306
0.325
0.344
0.364
0.384
0.404
0.424
0.445
0.466
0.700
0.839
1.000
1.192
1.428
1.732
2.145

1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08

0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49

2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58

0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08

0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

3.09
3.10
3.11
3.12
3.13
3.14
3.15

0.51
0.51
0.51
0.51
0.51
0.51
0.51

Permissible Bond stress Table bd in concrete (IS : 456-2000)


M-10
--

M-15
0.6

M-20
0.8

M-25
0.9

M-30
1

M-35
1.1

M-40
1.2

M-45
1.3

M-50
1.4

2.0

Development Length in tension


bd

Plain M.S. Bars


(N / mm2)
kd = Ld

bd

1.6

H.Y.S.D. Bars
(N / mm2)
kd = Ld

0.6

58

0.96

60

0.8

44

1.28

45

0.9

39

1.44

40

35

1.6

36

1.1

32

1.76

33

1.2

29

1.92

30

1.3

27

2.08

28

1.4

25

2.24

26

1.2
0.8
0.4

for steeel
fy 500
fy 415

Permissible stress in concrete (IS : 456-2000)


Permission stress in compression (N/mm ) Permissible stress in bond (Average) for
plain bars in tention (N/mm2)
Bending cbc
Direct (cc)
(N/mm2)
(N/mm2)
in kg/m2
Kg/m2 (N/mm2)
Kg/m2
--3.0
300
2.5
250
5.0
500
4.0
400
0.6
60
7.0
700
5.0
500
0.8
80
8.5
850
6.0
600
0.9
90
10.0
1000
8.0
800
1.0
100
11.5
1150
9.0
900
1.1
110
13.0
1300
10.0
1000
1.2
120
14.5
1450
11.0
1100
1.3
130
16.0
12.0
1.4
1600
1200
140
2

fy 328
fy 250
fy 207

able
500
2.00
1.80
1.65
1.50
1.40
1.35
1.30
1.20
1.16
1.08
1.00
0.95
0.90
0.86
0.84
0.82
0.81
0.80
0.79
0.78
0.77
0.76
0.75
0.74
0.73
0.72
0.72
0.72
0.71
0.71
0.71
0.70
0.70
0.69
0.69
0.68
0.68

fs = 120 =fy200

2.0

fs =145 =fy250
fs =190 =fy328

1.6

fs =240 =fy415
fs = 290 =fy500

1.2
0.8
0.4

0.4

0.8

1.2

1.6

2.0

Modification factore
Fig 7.1
Fs= steel stress of service load =0.58fy
= Fs 290 N/mm2
= Fs 240 N/mm2
= Fs 190 N/mm2
= Fs 145 N/mm2
= Fs 120 N/mm2

2.4