Beruflich Dokumente
Kultur Dokumente
= [
3
2( )TAN
4 2
2 2 (45 + )
2
3
2( )TAN
4 2
22 (45+ )
2
] = COT (NQ 1)
= 2 (2 1) TAN
SQUARE FOOTING
= 1.3 + + 0.4 =
CIRCULAR FOOTING
= 1.3 + + 0.3 =
MODIFIED BEARING CAPACITY (WHEN TABLE IS NOT AVAILABLE)
= 3.0
C
, ,
FOR = 0
= 1 +
DEPTH FACTOR
FOR 10
0.2
= 1 + 0.2 2 (45 + 2)
= = 1.0
= = 1 + 0.1
FOR = 0
FOR 10
= 1 +
0.2
= = 1.0
= 1 + 0.2
2 (45 + 2)
2 (45 + )
= = 1 + 0.1
2 (45 + 2)
INCLINATION FACTORS
= (1 + 90)
BETWEEN THE
INCLINED
= (1 + 90)
LOAD
AND
VERTICAL
2
DIRECTION.
= (1 + )
BEARING CAPACITY
WHERE: = +
CASE II
CASE III
= = [ + ( )] >
= COHESION
= WIDTH OF FOOTING
FOUNDATION TYPES
TYPE
SHALLOW FOUNDATION
1. SPREAD FOOTING
OR WALL FOOTING
USES
1. ISOLATED/INDIVIDUAL
COLUMN AND
CONTINUOUS WALLS
2. COMBINED FOOTING
3. RAFT/MAT FOOTING
2. TWO TO FOUR
COLUMNS ON FOOTING
AND/OR SPACE IS
LIMITED
3. SEVERAL ROWS OF
PARALLEL COLUMNS;
HEAVY COLUMN
LOADS; USED TO
REDUCE DIFFERENTIAL
SETTLEMENTS
4. GRILLAGE
FOUNDATION
4. VERY LARGE COLUMN
LOADS FROM SUPER
STRUCTURE
DEEP FOUNDATION
1. FLOATING PILE
1. IN GROUPS OF TWO
SUPPORTING A CAP
WHICH IS CONNECTED
TO A COLUMN
2. BEARING PILE
2. SAME AS ABOVE
3. DRILLED PLIERS OR
CAISSONS
EARTH RETAINING
STRUCTURES
1. RETAINING WALL,
BRIDGE ABUTMENT
1. PERMANENT SOIL
RETENTION
2. SHEETING
STRUCTURES
(SHEET PILES,
WOOD SHEETING,
ETC.)
2. TEMPORARY OR
PERMANENT FOR
EXCAVATION; MARINE
STRUCTURE,
COFFERDAM FOR
UNDERWATER
CONSTRUCTION
(+)
,
. =
(+)
(+)
,
. =
(+)
FOUNDATION DESIGN
STRENGTH REDUCTION FACTORS
STRENGTH CONDITION
0.90
0.70
0.65
0.75
0.65
0.35
0.75
STEPS IN SQUARE OR RECTANGULAR SPREAD FOOTING DESIGN WITH A CENTRICALLY LOADED COLUMN
AND NO MOMENT
1. COMPUTE THE FOOTING DIMENSION B X L OR B USING THE ALLOWABLE SOIL PRESSURE
SQUARE:
RECTANGULAR: BL =
2. CONVERT THE ALLOWABLE SOIL PRESSURE q TO AN ULTIMATE VALUE q ult = q FOR FOOTING DEPTH
==
3. OBTAIN THE ALLOWABLE TWO-WAY ACTION SHEAR STRESS VC AND COMPUTE THE FOOTING DEPTH d.
4. IF THE FOOTING IS RECTANGULAR, IMMEDIATELY CHECK WIDE-BEAM SHEAR. USE THE LARGER d IN
TWO-WAY ACTION (STEP 3) OR WIDE BEAM.
5. COMPUTE THE REQUIRED STEEL FOR BENDING AND USE THE SAME AMOUNT EACH WAY FOR SQUARE
FOOTINGS. USE THE EFFECTIVE d TO THE INTERSECTION OF THE TWO BAR LAYERS FOR SQUARE
FOOTINGS AND IF d > 305 mm (12 in.) FOR d LESS THAN THIS AND FOR RECTANGULAR FOOTINGS, USE THE
ACTUAL d FOR THE TWO DIRECTIONS. THE BENDING MOMENT IS COMPUTED AT THE CRITICAL SECTION.
6. COMPUTE THE BEARINGS AND USE DOWELS FOR BEARING IF THE ALLOWABLE BEARING STRESS IS
EXCEEDED, IN THAT CASE, COMPUTE THE REQUIRED DOWELS BASED ON THE DIFFERENCE BETWEEN
ACTUAL AND ALLOWABLE STRESSES TIMES COLUMN AREA. THIS FORCE DIVIDED BY f y IS THE REQUIRED
AREA OF DOWELS FOR BEARING.
USE MINIMUM OF 0.005 ACOL. OF DOWEL STEEL REGARDLESS OF THE BEARING STRESS.
IF DOWELS ARE REQUIRED TO TRANSFER ANY COLUMN LOAD, THE LENGTH MUST BE ADEQUATE FOR
COMPRESSION BOND.
IF THE FOOTING DOES NOT HAVE SUFFICIENT d, YOU CAN PUT THEM IN SPIRAL ENCASEMENT AND
REDUCE THE REQUIRED LENGTH BY 25%. IF THAT IS NOT ADEQUATE, YOU WILL HAVE TO INCREASE THE
EFFECTIVE DEPTH d OF FOOTING. THE USE OF 90 DEGREE BEND IS COMMONLY USED AD IT ALLOWS EASY
ATTACHMENT OF THE COLUMN DOWELS TO THE FOOTING REINFORCEMENT BY WIRING.
7. DETAIL THE DESIGN.
10
2
1
FOOTING WHERE A, IS THE COLUMN AREA AND 2 IS THE AREA OF THE PORTION OF THE SUPPORTING
FOOTING IS GEOMTETRICALLY SIMILAR AND CONCENTRIC WITH THE COLUMNS.
11
DOWELS
IF THE COMPUTED BEARING FORCE IS HIGHER THAN THE VVALUE ALLOWABLE, IT IS NECESSARY TO
PROVIDE DOWELS TO CARRY THE EXCESS FORCE. THIS CAN BE ALSO BE DONE BY EXTENDING THE
COLUMN BARS INTO THE FOOTING. IF THE COMPUTED BEARING FORCE IS LESS THAN THE ALLOWABLE,
NO DOWELS ARE NEEDED. USE MINIMUM REQUIRED BY CODE.
= 0.005
12
VC = [ 1 + 2/C ] /6 bod
= /3 bod
WHERE: C =
13
WHERE:
2
+1
14
A. AT THE FACE OF THE COLUMN, PEDESTAL OR WALL FOR FOOTING SUPPORTING A CONCRETE
COLUMN PEDESTAL OR WALL.
B. HALFWWAY BETWEEN NIDDLE AND EDGE OF THE WALL FOR FOOTING SUPPORTING A
MASONRY.
15
C. HALFWAT BETWEEN FACE OF COLUMN AND EDGE OF STEEL BASE PLATE FOR FOOTING
SUPPORTING A COLUMN WITH STEEL BASE PLATE.
SHEAR FOOTING
1. BEAM ACTION (ONE WAY)
1
6
16
NC = 17.69
Nq = 7.44
N = 3.64
ave.= [ + ( )]
17
2. SQUARE FOOTING
qu = 1.3cNc + qNq + 0.4 ave B N
= 1.3(12)(17.69) + 34(7.44) + 0.4(34)(4)(3.64)
qu = 726.94 kPa
qallow = 242.13 or 240 kPa
3. CIRCULAR FOOTING
qu = 1.3cNc + qNq + 0.3 ave B N
= 1.3(12)(17.69) + 34(7.44) + 0.3(34)(4)(3.64)
qu = 677.44 kPa
qallow = 225.81 or 220 kPa
18
EXAMPLE 2:
A CIRCULAR FOOTING WITH A 2 m DIAMETER IS TO BE CONSTRUCTED 1.3 m BELOW THE
GROUND SURFACE. THE SUBSOIL CONSISTS OF A UNIFORM DEPOSIT OF DENSE SOIL HAVING
THE FOLLOWING PARAMETERS. ANGLE OF INTERNAL FRICTION = 25 UNCONFINED
COMPRESSIVE STRENGTH = 90 Kn/m2, UNIT WEIGHT OF SOIL = 20 Kn/m3 THE GROUNDWATER
TABLE IS AT GREAT DEPTH AND ITS EFFECT CAN BE IGNORED.
1. COMPUTE THE ULTIMATE BEARING CAPACITY OF SOIL
2. COMPUTE THE GROSS ALLOWABLE BEARING CAPACITY OF THE SOIL USING A FACTOR OF
SAFETY OF 3.
3. COMPUTE THE TOTAL ALLOWABLE LOAD INCLUDING COLUMN LOAD, WEIGHT OF FOOTING
AND WEIGHT OF SOIL SURCHARGE THAT THE FOOTING CAN CARRY.
FOR = 25
Nc = 24.1, Nq = 13.1, N = 9.1
1. q = 20(1.3)
q = 26 Kn/m2
1
c = 2 =
1
2
= 45 Kn/m2
qult
FS = 3
19
1861
3
= 620 X 4 (22 )
Q = 1947.79 KN
20
WALL FOOTING
EXAMPLE 1
A WALL FOOTING IS TO SUPPORT A 250 mm REINFORCED CONCRETE WALL WITH A DEAD
LOAD OF 300 Kn/m AND A LIVE LOAD OF 200 KN/m. THE BOTTOM OF THE FOOTING IS 1.50 m
BELOW THE FINAL GRADE. ASSUME THE SOIL WEIGHS 15.74 KN/m 3 AND THE ALLOWABLE SOIL
PRESSURE IS 190 kPa. fc = 20.7 MPa, fy = 414 MPa. USE 75 mm as STEEL COVERING. CONCRETE
WEIGHS 25.5 KN/m3
1.
COMPUTE
AND DEPTH OF FOOTING
THE WIDTH
21
WIDTH OF FOOTING =
300+200
162.66
= 3.07 OR 3.1m
qu =
1.2DL+1.6LL
1.2(300)+1.6(200)
3.1(1)
qu = 219.35 kPa
3.10.25
2
0.412
x = 1.013 m
Vu = qu (x)(1.0)
= 219.35(1.013)(1)
Vu = 222.20 kn
SHEAR CAPACITY:
Vu = 0.75(1/6)20.7
(1000)(412.5)
1000
(3.10.25)
2
= 1.425
Mu = qu x2 (1.0)(0.5)
= 219.35 (1.425)2 (1.0)(0.5)
= 222.71 kn-m
Mu = Rbd2
222.71(106 )
=
(1000)(4122 )
R = 1.312 MPa
22
0.85
2
[1 1
]
0.85
0.85(20.7)
2(1.312)
[1 1
]
414
0.85(20.7)
= 0.0033
min =
1.4
1.4
= 0.0034 USE
414
SPACING OF 25 mm BARS
Ab = 491 mm2
As = ;
S =
Ab =
491
0.0034 (412.5)
S = 350.09 mm
USE 25 mm BARS @ 350 mm o.c.
TEMP. BARS
As = 0.00186t
FOR 12 BARS; Ab = 113 mm2
113
S = 0.0018(500)
S = 125.56 mm SAY 125 mm
USE 12 mm TEMP. BARS @ 125 mm o.c.
3. DEVELOPMENT LENGTH
AVAILABLE Ld =
3.1
2
- 0.075
0.25
2
= 1.35 m
REQD DEVT LENGTH
C = 75 (SIDE COVER)
ktr = 0 (NO STIRRUPS)
+
75 + 0
=
= 3 > 2.5
25
23
USE 2.5
9
=
+
10
9(414)(1.0)(1.0(1.0)(1.0)
=
25
1020.7 (2.5)
Ld = 818.95 mm
Ld = 819 < 1350 mm
EXAMPLE 2
1. FOR THE WALL FOOTING SHOWN IN THE FIGURE, WHICH OF THE FOLLOWING MUST NEARLY
GIVES THE EFFECTIVE SOIL PRESSURE IF ALLOWABLE SOIL PRESSURE IS 230 kPa.
= Kn/m3
=
fc = 28 mPa
fy = 280 mPa
24
2. WHICH OF THE FOLLOWING MOSTLY GIVES THE MINIMUM WIDTH OF FOOTING ROUNDED TO
NEAREST 0.10 m SUCH THAT THE EFFECTIVE SOIL WILL PRESSURE NOT BE EXCEEDED.
3. WHICH OF THE FOLLOWING MOST NEARLY GIVES THE ULTIMATE SHEAR DUE TO FACTORED
LOADS ACTING ON THE CRITICAL SECTION.
SOLN:
1. qe = 230 24(0.5) 16(0.8)
qe = 205.2 kPa
2. CONSIDER 1 m. STRIP OF WALL
M = (25+25) (1.3+0.25)
M = 77.5 KN-m
max =
max =
6
+
2
205.2 =
6
+
(1) (1)2
472 6(108.5)
+
2.6
2.62
max = 277.84
25
min =
min =
6
+ 2
472 6(108.5)
+
2.6
2.62
min = 85.24
CHECK RIGHT SIDE OF FOOTING
L = 2.6
X=
2.60.25
2
2.60.25
2
412.5
X = 0.7625
q1
192.86
=
1.8375
2.6
q1 = 136.3 kPa
1
V = 2(221.54+277.84)(0.7625)(1)
V = 190.39 KN
26
27
28
SOLUTION:
= 800 + 600 = 1400
220 =
1400
2
= 2.52 ~ 2.6
= 0.2 +
= 75 0.60
= 100 > 0.60
0.2 (2.6) = 0.52
= 0.52 + 0.075 = 0.595 600
= 220 23.5 (0.6) 15.6 (2 0.6)
= 184.06
184.06 =
1400
2
= 2.75 ~ 2.8
0.6 2.8 2.8
CHECK BEAM SHEAR
= 1.2 (800) + 1.6 (600) = 1920
= 600 75 25 = 500
=
1920
2.82
= 244.90
=
2.8 0.3
0.5
2
= 0.75
29
= (2 ( + )2 )
= 244.90 (2.82 (0.3 + 0.5)2 )
= 1763.2
CHECK CAPACITY
1
1
= (0.75) ( ) (27.5)(4)(300 + 500)(500)(
)
3
1000
= 2097.62 > 1763.28
SAFE!
USE 600 x 2800 x 2800 mm SQUARE FOOTING
REINFORCEMENT
=
=
2.8 0.3
2
FOUNDATION DESIGN - eNOTES
30
= 1.25
= ()( )
2
= 249.90(1.25)(2.8)(
1.25
)
2
= 535.65 .
=
=
535.65 (10)6
0.90(2800)(500)2
= 0.85
0.85
2
[1 1
]
. 85( )
0.85 (27.5)
2(0.85)
[1 1
]
275
. 85(27.5)
= 0.0031
=
1.4
275
= 0.0051
USE
=
= 0.0051(2800)(500)
= 7140 2
=
7140
=
491
= 14.54 ~ 15 .
USE
31
EXAMPLE 2.
DESIGN OF AXIALLY LOADED SQUARE FOOTING
32
SOLUTION:
=
180 =
900 + 700
2
= 2.98 ~ 3.0
= 0.2 (3) = 600
= 600 + 75 = 675 700
= 180 24 (0.7) 16 (1.5 0.7)
= 150.4
2 =
900 + 700
150.4
= 3.26 ~ 3.3
0.7 3.3 3.3
CHECK BEAM SHEAR
= 1.2 (900) + 1.6 (700) = 2200
= 25 = 600
=
2200
3.32
= 202.02
=
3.3 0.45
0.5
2
= 0.925
33
= (2 ( + )2 )
= 202.02 (3.32 (0.45 + 0.6)2 )
= 1977.27
CHECK CAPACITY
1
1
= (0.75) ( ) (34.5)(4)(450 + 600)(600)(
)
3
1000
= 3700.41 > 1977.27
SAFE!
USE 700 x 3300 x 3300 mm SQUARE FOOTING
REINFORCEMENT
=
34
3.3 0.45
2
= 1.425
= ()( )
2
1
= 202.02(3.3)(1.425)2 ( )
2
= 676.87 .
=
=
676.87 (10)6
0.90(3300)(600)2
= 0.63
0.85
2
[1 1
]
. 85( )
0.85 (34.5)
2(0.63)
[1 1
]
414
. 85(34.5)
= 0.0015
=
34.5
4(414)
= 0.0035
USE
=
= 0.0035(3300)(600)
= 6930 2
=
6930
=
491
= 14.11 ~ 15 .
USE
35
414
= 0.02(491) (
)
34.5
= 692.15 693
= 0.06( )()
= 0.06(25)(414)
= 621
=
3300 45
75
2
= 1350
>
OKAY!
USE =
36
MDX = 60 KN-m
MlX = 70 KN-m
ASSUME:
fy = 276 Mpa,
fc = 27.6 Mpa
37
SOLUTION:
=
=
60 + 70
400 + 600
= 0.13 ~ 130
280 =
1000
6 (0.13)
[1 +
]
2
= 2.10 ~ 2.2
0.2 (2.2) = 0.44
= 0.44 + 0.075 = 0.515 ~ 600
= 280 23.5 (0.6) 15.7 (1.4 0.6)
= 253.34
253.34 =
1000
6 (0.13)
[1 +
]
2
= 2.299 ~ 2.3
600 2300 2300
= 1.2 (400) + 1.6 (600) = 1440
= 1.2 (60) + 1.6 (70) = 184
=
=
184
= 0.128
1440
1440
6 (0.128)
[1
]
2
2.3
2.3
= 363.11
= 181.32
38
2.3 0.4
0.5
2
= 0.45
= 1.85
1
=
1.85
2.3
1 = 327.54
1
1 = ( ) (363.11 + 327.54) (2.3) (0.45)
2
1 = 357.41
CHECK CAPACITY
1
1
= (0.75) ( ) (27.6)(2300)(500)(
)
6
1000
39
= 79.039
2.3
2
=
0.70
= 307.78 .
1
2 = 1440 ( ) (307.78 + 236.05)(0.92 )
2
2 = 1219.75
CHECK CAPACITY
1
1
= (0.75) ( ) (27.6)(4)(900)(500)(
)
3
1000
= 2364.11 > 1219.75
SAFE!
USE 600 x 2300 x 2300 mm
40
REINFORCEMENT
2.3 0.40
= 0.95
2
4
=
1.35
4 = 288.02 .
1
2
(363.11 288.02)(2.3)(0.952 ) ( )
2
3
= 350.88 .
=
41
350.88 (10)6
(2300)(500)2
= 0.61
=
0.85
2
[1 1
]
. 85( )
0.85 (27.6)
2(0.61)
[1 1
]
276
. 85(27.6)
= 0.0022
=
1.4
276
= 0.0051
USE
=
= 0.0051(2300)(500)
= 5865 2
=
5865
=
491
= 11.95 ~ 12 .
USE
276
= 0.02(491) (
)
27.6
= 516
= 0.06( )()
= 0.06(25)(276)
= 414
42
2.3 0.4
0.075
2
= 0.875
>
OKAY!
USE =
MDX = 70 KN-m
MlX = 80 KN-m
ASSUME:
fy = 276 Mpa,
fc = 27.6 Mpa
43
= 15.7 /3
= 24 /3
= 320
DETERMINE THE FOLOOWING:
A. DIMENSION OF FOOTING
B. AREA OF STEEL REQUIRED
C. NO. OF REINFORCEMENT
SOLUTION:
=
=
70 + 80
450 + 700
= 0.13 ~ 130
320 =
1150
6 (0.13)
[1 +
]
2
= 2.21 ~ 2.3
0.2 (2.3) = 0.46
= 0.46 + 0.075 = 0.535 ~ 600
= 320 24 (0.6) 15.7 (1.5 0.6)
= 291.47
291.47 =
1150
6 (0.13)
[1 +
]
2
= 2.299 ~ 2.3
600 2300 2300
= 1.2 (450) + 1.6 (700) = 1660
= 1.2 (70) + 1.6 (80) = 212
=
=
212
= 0.128
1660
1660
6 (0.128)
[1
]
2
2.3
2.3
= 418.58
= 209.018
44
= 600 75 25 = 500
=
2.3 0.45
0.5
2
= 0.425
= 1.875
1
=
1.875
2.3
1 = 380.01
1
1 = ( ) (418.58 + 380.01) (2.3) (0.425)
2
1 = 390.31
CHECK CAPACITY
1
1
= (0.75) ( ) (27.6)(2300)(500)(
)
6
1000
= 755.20 > 390.31
SAFE!
45
= 91.114
2.3
2
=
0.675
2 = 270.52 .
3
=
0.675 + 0.95
3 = 357.08 .
1
2 = 1660 ( ) (357.08 + 270.52)(0.9252 )
2
2 = 1391.50
CHECK CAPACITY
1
1
= (0.75) ( ) (27.6)(4)(925)(500)(
)
3
1000
= 2429.78 > 1391.50
SAFE!
USE 600 x 2300 x 2300 mm
46
REINFORCEMENT
2.3 0.45
= 0.925
2
4
=
1.375
4 = 334.3 .
1
2
(418.58 334.3)(2.3)(0.9252 ) ( )
2
3
= 384.23 .
=
=
384.23 (10)6
(2300)(500)2
= 0.668
=
0.85
2
[1 1
]
. 85( )
47
0.85 (27.6)
2(0.668)
[1 1
]
276
. 85(27.6)
= 0.0025
=
1.4
276
= 0.0051
USE
=
= 0.0051(2300)(500)
=
=
5865
=
491
= 11.95 ~ 12 .
USE
48
KPA. ASSUME UNIT WEIGHT OF SOIL ABOVE THE FOOTING IS 17 , = Kn/m3, fc = 21 MPa
AND fy = 345 MPa
SOLUTION:
TRIAL H
H = 0.2 LEAST DIMENSION + 0.075
= 0.575 SAY 600 mm
= ( )
= 200 24(0.6) 17(1.8-0.6)
= 165.2 kpa
FOUNDATION DESIGN - eNOTES
49
TRIAL L
=
6
[1
]
165.2 =
600+450
2
ALONG X-AXIS
q4 =
1.2(600)+1.6(450)
2(3.2)
z=
20.4
= 225
= 0.8
= 0
Vu = 225(3.2)(0.8-d)
= 720 (0.8 d)
1
= 0.75 ( ) (1.0)21(3200)
6
= 1833.03d
=
FOUNDATION DESIGN - eNOTES
50
1833.03d = 720(0.8-d)
d = 0.226 m
ALONG Z-AXIS
X=
3.20.4
2
= 1.4
= 0
V4 = 225(2)(1.4-d)
= 450(1.4-d)
1
= 0.75 ( ) (1.0)21(2200)
6
=1145.6d
=
1145.64d = 450(1.4-d)
d = 0.395 m
CHECK PUNCHING SHEAR
51
Vu = quattrib
Vu = 225 [2(3.2)=(0.4+d)2]
1
= 0.75 ( ) (1.0)21(4)(0.4 + )(1000)
3
= 4582.58d(0.4+d)
=
225[2(3.2)-(0.4+d)2] = 4582.58d (0.4+d)
d = 0.370 m
REQD d FOR SHEAR STRESS IS 395 mm
395 mm < 487 mm OK!
USE 0.6 X 2 X 3.2 m RECTANGULAR FOOTING
REINFORCEMENT:
X=
3.20.4
2
Z=
= 1.4
20.4
= 0.8 m
Mux = quattrib
= 225 (3.2) (0.8/2)2
= 230.4 kn-m
Muz = quattrib
= 225 (2) (1.4/2)2
= 441 kN-m
52
Muz; d1
Mux; d2
DIRECTIONS
ALONG X
ALONG Z
b
2000
3200
d
512
487
Mu
441
230.4
min =
R
0.93
0.34
USE
0.0041
0.0041
0.0028
0.001
As
419.84
6389.4
n
9
14
1.4
1.4
=
= 0.0051
345
As = bd
n = As/Ab
(106 )
=
2
=
0.85
2
[1 1
]
0.85
FOR CENTER BAND:
=
3.2
=
= 1.6
2
=
; = 11
14
1.6 + 1
=
14 11
= 1.5; 2
2
53
EXAMPLE 2:
A LIVE LOAD OF 1100 KN AND A TOTAL DEAD LOAD OF 1600 KN IS TO BE CARRIED BY A 500
X 500 mm COLUMN. IF THE COLUMN IS TO BE SUPPORTED BY A RECTANGULAR FOOTING WHOSE
WIDTH IS LIMITED TO 3.2 m AND WHOSE BOTTOM IS 1.8 m BELOW THE GROUND SURFACE.
Kn
ALLOWABLE SOIL BEARING CAPACITY AT THE BASE OF THE FOOTING IS 240 KPa, =17 , =
23.5
Kn/m3,
m3
TRIAL H:
H = 0.2 LEAST DIMENSION + 0.100
= 0.2 (3.5) + 0.1
= 0.8 m
=
= 240 23.5 (0.8) 16 (1.8 0.8)
= 205.2 KPA
TRIAL L:
205.2 kpa =
1100+1600
3.2
54
3.2 (4.2)
= 273.8
= 0
Vu = quattrib
= 273.8 (4.2) (x)
X=
3.20.5
2
= 1.35
1
6
1
= ( ) (1.0)27.6(4200)
6
Vc = 3677.5 d
= ; = 0.25
FOUNDATION DESIGN - eNOTES
55
=
1149.96 (1.35 d) = 0.75 (3677.5d)
d = 0.3977 m
ALONG TRANSVERSE DIRECTION:
Vu = 273.8 (3.2) [
4.20.5
2
56
1
= ( ) (10)27.6 [4(0.5 + )]
3
= 7004.76(0.5 + )
=
273.8 [3.2(4.2) (0.5 + )2 ] = 0.75 [7004.76 (0.5 + )]
d = 0.587 m
REQUIRED d = 0.587 m
687 > 587 mm OK!
USE 0.8 X 3.2 X 4.2 RECTANGULAR FOOTING
CHECK:
PTOTAL = 1100+1600+0.8(3.2)(4.2)(23.5-16)
= 2780.64 KN
57
4.2 0.5
= 1.85
2
3.2 0.5
= 1.35
2
Mux = quattrib
= 273.8 (1.35/2)2 (4.2)
= 1047.9 kn-m
DIRECTIONS
ALONG X
ALONG Z
b
3200
4200
d
712
687
Mu
1499.33
1047.9
min =
R
1.03
0.59
0.0038
0.0022
USE
0.0051
0.0051
As
11619.84
14715.54
n
24
30
1.4
1.4
=
= 0.0051
345
As = bd
n = As/Ab
(106 )
2
58
0.85
2
[1 1
]
0.85
FOR CENTER BAND:
=
4.2
=
= 1.31
3.2
2
=
; = 20.8
24
1.31 + 1
=
30 21
= 4.5; 5
2
59
60
SOLN:
= ( )
= 0.2(4.2) + 0.1 = 0.94 1
= 240 24(1) 16(1.8 1) = 203.2
=
425
= 0.142
3000
3000
6(0.142)
[1 +
]
4.2
61
= 1.2(1700) + 1.6(1300)
= 4120 KN
= 1.2(290) + 1.6(135)
= 564 KN-m
=
564
= 0.137
4120
=
=
6
[1 ]
4120
6(0.137)
[1
]
4.2(4.3)
4.3
= 271.74
= 184.52
62
USING d2
2 = 1.5
= 1000 75 1.5 (25)
= 887.5 mm SAY 887
ALONG LONG DIRECTION:
=
4.2 0.5
0.887 = 0.963
2
1
= (184.52 + 271.74)(4.3)(0.963)
2
= 944.66
CHECK CAPACITY:
(4300)887.5
1
= 0.75 ( ) (1.0)28
6
1000
= 2524.21 KN > 944.66 KN
ALONG SHORT DIRECTION
=
4.3 0.5
0.887 = 1.013 1.01
2
1 184.52 271.74 184.52
=
4.3 1.01
4.3
1 = 251.25
1
= (251.25 + 271.74)(1.01)(4200)
2
= 1109.26
CHECK CAPACITY:
(4200)887.5
1
= 0.75 ( ) (1.0)28
6
1000
= 2465.51 > 1109.26 !
A) SAFE! AGAINST BEAM SHEAR
63
1
(271.74 + 184.52) = 228.03
2
=
= 4120 228.03 (1.3875)2
= 3681.006
CHECK CAPACITY:
(4 1387.5)(887.5)
1
= 0.75 ( ) (1.0)28 (
)
3
1000
64
4.3 0.5
= 1.9
2
4.2 0.5
= 1.85
2
1
2
= 233.2(1.92 )(0.5) + (271.74 233.2)(1.92 )(1.0) ( )
2
3
= 467.30
= 329.65
65
EXAMPLE 2
A 400 X 400 COLUMN, 1.8 m FROM PROPERTY LINE, CARRIES A TOTAL LIVE LOAD OF 1500
KN AND A TOTAL DEAD LOAD OF 2000 KN. THE COLUMN IS TO BE SUPPORTED BY RECTANGULAR
SPREAD FOOTING WHOSE BOTTOM IS 2.0 m BELOW THE GROUND SURFACE. ALLOWABLE SOIL
BEARING CAPACITY AT THE BASE OF FOOTING IS 280 KPA. UNIT WEIGHT OF SOIL ABOVE
FOOTING IS 15.7 Kn/m3 AND UNIT WEIGHT OF CONCRETE IS 23.5 Kn/m3 . ASSUME fc = 28 MPa AND
fy = 275 MPa AND Mdlx = 350 KN-m
Mllx = 150 KN-m
DESIGN THE FOOTING:
A) CHECK BEAM SHEAR
B) CHECK PUNCHING SHEAR
C) MOMENTS ALONG TRANSVERSE AND LONGITUDINAL
SOLN:
= 0.2(3.6) + 0.1 = 0.82 = 0.9
= ( )
= 280 23.5(0.9) 15.7(2 0.9)
= 241.58
=
350 + 150
=
= 0.143
2000 + 1500
66
241.58 =
3500
6(0.143)
[1 +
]
3.6
= 1.2(2000) + 1.6(1500)
= 4800 KN
= 1.2(350) + 1.6(150)
= 660 KN-m
=
660
= 0.138
4800
6
[1 ]
67
4800
6(0.138)
[1
]
3.6(4.8)
4.8
= 325.69
= 229.86
USING d2
2 = 1.5
= 900 75 1.5 (25)
= 787.5 mm SAY 887
3.6 0.4
0.787 = 0.813
2
1
= (325.697 + 229.86)(4.8)(0.813)
2
= 1083.99
68
CHECK CAPACITY:
(4800)787
1
= 0.75 ( ) (1.0)28
6
1000
= 2498.65 KN > 1083.99 KN
ALONG SHORT DIRECTION
4.8 0.4
0.787 = 1.413 1.4
2
1 229.86 325.69 229.86
=
4.8 1.413
4.8
1 = 297.48
1
= (325.69 + 297.48)(1.413)(3.6)
2
= 1584.97
CHECK CAPACITY:
(3600)787
1
= 0.75 ( ) (1.0)28
6
1000
= 1873.99 > 1584.97 !
A) SAFE! AGAINST BEAM SHEAR
69
1
(325.69 + 229.86) = 277.78
2
=
= 4800 277.78(1.1875)2
= 4408.29
CHECK CAPACITY:
(4 1187.5)(787)
1
= 0.75 ( ) (1.0)28 (
)
3
1000
= 4945.24 > 4408.29 !
B. SAFE AGAINST PUNCHING SHEAR
70
REINFORCEMENT
=
4.8 0.5
= 2.15
2
3.6 0.5
= 1.55
2
1
2
= 282.77(2.152 )(0.5) + (325.69 282.77)(2.152 )(1.0) ( )
2
3
= 719.68
= 333.68
71
72
C1
C2
DL
800
1600
LL
500
700
TOTAL
1300
2300
3600
= ( )
= 190 0.8 ( 24 ) ( 2.1 0.8 )( 15.1 )
= 151.17 kPa
=
3600
= 23.814 2
151.17
DL
960
1920
LL
800
1120
TOTAL
1760
3040
73
4800
4800
=
= 195.91
3(8.167)
1
= 0.75 ( ) (1.0)21(4(0.5 + 0.8))800
3
= 4765.9 KN
Vu2 = 3040 195.91 ( 0.5 + 0.8 )2
= 2708.9 KN OK!
74
1
(195.91)(3)(32 ) 1760(3 0.25)
2
= 2195.215 KN.m
(106 )
=
2
2195.215 (106 )
=
0.9(3000)(800)2
= 1.2703
0.85(21)
2(1.2703)
[1 1
]
414
0.85(21)
= 0.00319
min =
1.4
= 0.00338
NO. OF 25 mm
N=
800 (3000)(0.00338)
(252 )
4
n = 16.52 SAY 14 25 mm
75
EXAMPLE 2
Pdl1 = 360 KN
Pdl2 = 355 KN
Pll1 = 325 KN
Pll2 = 400 KN
SOLN:
C1
C2
DL
360
350
LL
325
400
TOTAL
685
750
1435 KN
76
= 95 (1.55)(15.1) 24(0.5)
= 58.395 Kn/m2
=
1435
= 24.574 2
53.395
= 24.574 2
=
24.574 2
4
= 6.1435
CENTER OF PRESSURE
1435 (X) = 685 (0) + 750 (3)
X = 1.5679 m
d = 550 40 - 1.5 (25)
d = 472.5 mm
TRY 4 X 6.1435 X 0.55
BEAM SHEAR
1
= 0.75 ( ) (1.0)21(4000)472.5
6
= 1082.63 KN
PUNCHING SHEAR
1
= 0.75 ( ) (1.0)21(300 + 472.5)(4)472.5
3
= 1672.67 KN
CHECK FOR BEAM SHEAR
C1
C2
DL
432
420
LL
520
640
TOTAL
952
1060
2012 KN
2012
= 81.87
4 (6.1435)
77
78
79
0.85(21)
2(0.2336)
[1 1
]
414
0.85(21)
= 0.0005679
1.4
= 0.00338
NO. OF 25 mm
min =
N=
472.5 (4000)(0.00338)
(252 )
4
n = 13.016 SAY 14 25 mm
80
GIVEN:
Pdl1 = 270 KN
Pdl2 = 225 KN
Pll1 = 250 KN
Pll2 = 300 KN
Mdl1 = 30 KN.m
Mdl2 = 25 KN.m
Mll1 = 20 KN.m
Mll2 = 27 KN.m
81
SOLN:
=
= 110 15.7 (1.34) 24 (0.46)
= 77.92 kPa
C1
C2
Pdl
270
225
PLL
250
300
TOTAL
520
525
1045
Mdl
30
25
MLL
20
27
TOTAL
50
52
102
82
=
=
1045
=
77.92
BL = 13.411 m2
B = 2.62 m
SAY B = 2.7 m
TRY 2.7 X 5.117 X 0.46
LOAD COMINATION 1.2DL + 1.6LL
C1
C2
Pdl
324
270
PLL
400
480
TOTAL
724
750
1474
Mdl
36
30
MLL
32
43.2
TOTAL
68
73.2
141.2
1474
5.117 (2.7)
FOR C1:
VU1 = 106.7 (0.3+0.376)(0.3 + 0.376/2) 729
= 688.8 KN
1
= 0.75 ( ) (1.0)20.7(3(0.3 + 2 )(376)
3
FOUNDATION DESIGN - eNOTES
83
= 706.517 KN OK!
FOR C2:
VU2 = 106.7 (0.1795+0.375+0.376/2)(0.375+0.376) 750
= 690.5 KN
1
= 0.75 ( ) (1.0)20.7(0.375(3) + 2 + 0.1795(2))376
3
= 956.3 KN OK!
84
85
0.85(20.7)
2(2.2186)
[1 1
]
414.7
0.85(20.7)
= 0.00564
min =
1.4
= 0.00337
414.7
As = (2700)(376)
= 5732.92 mm2
NO. OF 25 mm
N=
5732.92
(252 )
4
n = 11.679 SAY 12 25 mm
ANSWER: A) 2.7 X 5.117 X 0.46
B) 12 25 mm
86
EXAMPLE 2:
GIVEN:
Pdl1 = 360 KN
Pdl2 = 355 KN
Pll1 = 325 KN
Pll2 = 400 KN
Mdl1 = 30 KN.m
Mdl2 = 60 KN.m
Mll1 = 25 KN.m
Mll2 = 50 KN.m
87
C1
C2
Pdl
360
350
PLL
325
400
TOTAL
685
750
1435 KN
Mdl
30
60
MLL
25
50
TOTAL
55
110
165 KN.m
= 95 (1.55)(15.1) 24(0.55)
= 58.395 Kn/m2
1435
A = 58.395 = 24.574 2
L = 24.574/4
L = 6.1435 m
CENTER OF PRESSURE
R = 1435 KN
P1 = 685 KN, M1 = 55 KN.m
P2 = 750 KN, M2 = 110 KN.m
1435 (x) = 685 (0) +750 (3) + 55 + 110
X = 1.6829 m
d = 550 40 1.5 (25)
= 472.5 mm
1
= 0.75 ( ) (0.75)20.7(300 + 472.5)(4)(472.5)
3
= 1660.7 KN
88
Pdl
432
420
PLL
520
640
TOTAL
952
1060
2012 KN
Mdl
36
72
MLL
40
80
TOTAL
76
152
228 KN.m
2012
89
90
@C2
327.5 (X) = 3533.33 (X-1.605)
X = 1.769 m
M = (327.5)(1.769)2 (3533.33)(1.769-1.605)2
= 464.92 KN.m
M = RBD2
464.92X106 = 0.9R(4000)(472.5)2
R = 0.5789
=
0.85(20.7)
2(0.5789)
[1 1
]
414
0.85(20.7)
= 0.00142
min =
1.4
= 0.00338
414
NO. OF 25 mm
N=
4000 (472.5)(0.00338)
(252 )
4
n = 13.016 SAY 14 25 mm
91
TRAPEZOIDAL FOOTING
EXAMPLE 1
DESIGN THE TRAPEZOIDAL FOOTING:
C1
C2
PL
1200
1600
LL
950
1400
92
SOLN:
P
2150
3000
C1
C2
1 =
Pu
2960
4160
2150
= 2.77 2.8
280.8
2 =
3000
= 3.27 3.3
280.8
5150
= 18.34 2
280.8
1
(2.8 + 3.3)() = 18.34
2
= 6.01 6.1
1
= (2.8 + 3.3) ( ) (6.1) = 18.61 2 > 18.34 2
2
A
1
2
AREA
2.8 (6.1) = 17.08
(0.5) (6.1) = 1.525
A
52.094
6.207
3.05
4.07
AT = 18.605
=
58.301
18.605
= 3.13 m
TRY 2.8/3.3 X 6.1 X 0.9 m TRAP. FOOTING
93
1 = 2.82
2 = 2.99
3 = 3.08
4 = 3.26
SECTION 1 :
=
7120
=
18.605
= 382.69
94
1
= 382.69 (2.8 + 2.82)(0.187)
2
= 201.09
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(2800)(783)
6
1000
= 1450.02 > !
SECTION 2 :
1
= 2960 (2.8 + 2.99)(382.69)(2.353)
2
= 333.14
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(2990)(783)
6
1000
95
= 1537.44 > !
SECTION 3 :
1
= 2960 (2.8)(382.69)(3.387)(3.08)
2
= 686.26
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3080)(783)
6
1000
= 1583.72 > !
SECTION 4 :
=
1
(382.69)(3.26 + 3.3)(0.547)
2
= 686.61
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3260)(783)
6
1000
= 1676.27 > !
96
LONG DIRECTION:
1
(382.69)(0.567 + 0.317)(6.1)
2
= 1031.81
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(6100)(783)
6
1000
= 3136.58 > !
97
CONSIDER BIGGER Pu
= 4160 (382.69)(1.3832 )
= 3428.03
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(41.383)(783)
3
1000
= 5689.03 > !
USE 2.8/3.3 X 6.1 X 0.9
98
EXAMPLE 2
DESIGN THE TRAPEZOIDAL FOOTING:
C1
C2
PL
1300
1500
LL
1000
1300
99
SOLN:
P
2300
3880
C1
2800
1 =
Pu
3160
4160
3160
= 3.48 3.5
260.5
2 =
3880
= 3.86 3.9
260.5
100
5100
= 19.578 2
260.5
1
(3.5 + 3.9)() = 19.578
2
= 5.29 5.3
1
= (3.5 + 3.9) ( ) (5.3) = 19.61 2 > 19.578 2
2
A
1
2
AREA
3.5 (5.3) = 18.55
(0.4) (5.3) = 1.06
A
49.16
3.74
2.65
3.53
AT = 19.61
=
52.9
19.61
= 2.70 m
TRY 3.5/3.9 X 5.3 X 0.9 m TRAP. FOOTING
1 = 3.51
2 = 3.67
3 = 3.72
4 = 3.88
SECTION 1 :
=
3160 + 3880
=
19.61
= 359
1
= 359 (3.5 + 3.51)(0.077)
2
101
= 96.89
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3510)(783)
6
1000
= 1804.82 > !
SECTION 2 :
1
= 3160 359 (3.5 + 3.67)(2.243)
2
= 273.23
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3670)(783)
6
1000
= 1887.09 > !
SECTION 3 :
1
= 3160 (3.5 + 3.72)(2.873)(359)
2
= 563.38
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3720)(783)
6
1000
= 1912.8 > !
SECTION 4 :
1
= 359 (3.88 + 3.9)(0.257)
2
= 388.89
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(3880)(783)
6
1000
= 1995.07 > !
102
LONG DIRECTION:
1
(359)(0.667 + 0.867)(5.3)
2
= 1459.37
CHECK CAPACITY:
1
1
= 0.75 ( ) (1.0)27.6(5300)(783)
6
1000
= 2725.22 > !
103
104
SOLN:
=
=
=
=
3
12
3
=
12
P = Pi = A1 + A2 + A3
=
FOUNDATION DESIGN - eNOTES
105
=
=
1200
= 0.109 0.11
11000
3 (18.5)(24.5)3
=
= 22671.94 4
12
12
3 (24.5)(18.5)3
=
=
= 12927.08 4
12
12
=
11000
1200() 5400( )
Mx
COLUMN
A1
A2
A3
B1
B2
B3
C1
C2
C3
D1
D2
D3
TOTAL
Pi
400
500
450
1500
1500
1200
1500
1500
1200
400
500
350
11000
y
12.25
12.25
12.25
4
4
4
-4
-4
-4
-12.25
-12.25
-12.25
x
-9.25
0
9.25
-9.25
0
9.25
-9.25
0
9.25
-9.25
0
9.25
yi
12
12
12
4
4
4
-4
-4
-4
-12
-12
-12
My
pyi
4800
6000
5400
6000
6000
4800
-6000
-6000
-4800
-4800
-6000
-4200
1200
Xi
-9
0
9
-9
0
9
-9
0
9
-9
0
9
Pxi
-3600
0
4050
-13500
0
10800
-13500
0
10800
-3600
0
3150
-5400
Q
28.78
24.92
21.05
28.34
24.48
20.61
27.92
24.06
20.19
27.48
23.62
19.76
106
EXAMPLE 2
THE PLAN OF A MAT FOUNDATION IS SHOWN IN THE FIGURE. CALCULATE THE SOIL
PRESSURE @ POINTS (TAKE NOTE: ALL COLUMNS ARE PLANNED TO BE 0.5 X 0.5 m)
SOLN:
PAXIAL
C1 = 350 KN
C4 = 350 KN
C7 = 400 KN
C2 = 400 KN
C5 = 500 KN
C8 = 250 KN
C3 = 400 KN
C6 = 450 KN
C9 = 300 KN
107
=
=
3
=
12
=
3
12
P = Pi = A1 + A2 + A3
=
=
1200
= 0.109 0.11
11000
3 (20.5)(10.5)3
=
=
= 1977.609 4
12
12
=
3 (10.5)(20.5)3
=
= 7538.234 4
12
12
3400
1000()
500( )
Mx
COLUMN
A1
A2
A3
B1
B2
B3
C1
C2
C3
TOTAL
Pi
350
400
400
350
500
450
400
250
300
3400
y
5.25
5.25
5.25
0
0
0
-5.25
-5.25
-5.25
x
-10.25
0
10.25
-10.25
0
10.25
-10.25
0
10.25
yi
5
5
5
0
0
0
-5
-5
-5
My
pyi
1750
2000
2000
0
0
0
-2000
-1250
-1500
1000
Xi
-10
0
10
-10
0
10
-10
0
10
Pxi
-3500
0
4000
-3500
0
4500
-4000
0
3000
500
Q
17.77
18.45
19.13
15.11
15.79
16.47
12.46
13.14
13.82
108
LOADS ON PILE
EXAMPLE 1
A PILE TRESTLE SHOWN CONSIST OF FOUR VERTICAL PILES SURROUNDED BY A 1.4 m.
THICK PILE CAP. IT CARRIES A HORIZONTAL APPLIED LOAD TO THE SURFACE OF THE CAP OF
500 KN. THE ONLY VERTICAL LOAD EXERTED ON THE PILE GROUP IS THE WEIGHT OF THE PILE
CAP. DETERMINE THE LOADS ON THE PILE.
]
[
+
2 2
=
=
FOUNDATION DESIGN - eNOTES
109
1.4
=
500
= 0.8333
=
= 840 (0.8333)
= 700
= 210
= 700
PILE
1
2
3
4
210
210
210
210
1.7
-1.7
-1.7
1.7
2.89
2.89
2.89
2.89
= 11.56
102.94
-102.94
-102.94
102.94
312.94
107.06
107.06
312.94
110
EXAMPLE 2
= 0.18
= 0.14
Q = 3000 KN
n = 12
SOLN:
= = 3000(0.14) = 420
= = 3000(0.18) = 540
3000
=
= 250
12
= 540 , = 420
111
PILE
1
2
3
4
5
6
7
8
9
10
11
12
250
250
250
250
250
250
250
250
250
250
250
250
-1.2
0
1.2
-1.2
0
1.2
-1.2
0
1.2
-1.2
0
1.2
1.44
0
1.44
1.44
0
1.44
1.44
0
1.44
1.44
0
1.44
-43.75
0
43.75
-43.75
0
43.75
-43.75
0
43.75
-43.75
0
43.75
1.8
1.8
1.8
0.6
0.6
0.6
-0.6
-0.6
-0.6
-1.8
-1.8
-1.8
3.24
3.24
3.24
0.36
0.36
0.36
0.36
0.36
0.36
3.24
3.24
3.24
45
45
45
15
15
15
-15
-15
-15
-45
-45
-45
251.25
295
338.75
221.25
265
308.75
191.25
235
278.75
161.25
205
248.75
112
3840
= 1536
2.5
90
= 1 1 (
n = 0.749 (74.9%)
3. DESIGN CAPACITY AS SUGGESTED BY COYLE & SULAIMAN
S > 3D
1.4 > 3 (0.40)
1.4 > 1.2
113
USE =
= 0.749 (12) (320)
= 2876.16 KN
FOR FS = 2.5
=
2876.16
= 1150.46
2.5
EXAMPLE 2
A PILE GROUP CONSISTS OF 16 FRICTION PILES IN COHESIVE SOIL. EACH PILE DIAMETER
IS 0.3 m AND CENTER-TO-CENTER SPACING IS 1.3 m. THE ULTIMATE CAPACITY OF EACH PILE IS
400 KN.
1. COMPUTE THE DESIGN CAPACITY OF THE PILE GROUP USING A FACTOR OF SAFETY OF 2 IF
SOIL IS COHESIONLESS.
2. COMPUTE THE PILE GROUP EFFICIENCY USING CONVERSE-LABARRE EQUATION.
3. COMPUTE THE DESIGN CAPACITY AS SUGGESTED BY COYLE & SULAIMAN.
m=4
n=4
SOLN:
1. DESIGN CAPACITY OF THE PILE GROUP OF THE SOIL IS COHESIONLESS.
=
= 16(400) = 6400
For FS = 2
=
6400
= 3200
2
90
= 1 1 (
n = 0.783 (78.3 %)
114
5011.2
= 2505.6
2
115